ML15280A120: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/16/2015
| issue date = 10/16/2015
| title = Notice of Availability of the Shine Final EIS Cover Letter
| title = Notice of Availability of the Shine Final EIS Cover Letter
| author name = Wrona D J
| author name = Wrona D
| author affiliation = NRC/NRR/DLR/RERGUB
| author affiliation = NRC/NRR/DLR/RERGUB
| addressee name = Piefer G
| addressee name = Piefer G
Line 9: Line 9:
| docket = 05000608
| docket = 05000608
| license number =  
| license number =  
| contact person = Moser M R
| contact person = Moser M
| case reference number = DLR-15-0461
| case reference number = DLR-15-0461
| package number = ML15280A111
| package number = ML15280A111
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015  
{{#Wiki_filter:G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.
 
2555 Industrial Drive Monona, WI 53713
Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.
2555 Industrial Drive Monona, WI 53713  


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY


==Dear Dr. Piefer:==
==Dear Dr. Piefer:==


The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRC's public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.  
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.
 
As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:
As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safe ty issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:
* SHINEs Environmental Report;
* SHINE's Environmental Report;
* the NRC staffs consultation with Federal, State, and local agencies;
* the NRC staff's consultation with Federal, State, and local agencies;
* the NRC staffs independent environmental review; and
* the NRC staff's independent environmental review; and
* the NRC staffs consideration of public comments.
* the NRC staff's consideration of public comments.
 
A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov. Sincerely,        /RA/  David J. Wrona, Chief Environmental Review and Guidance Branch      Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-608  
G. Piefer                                        A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608


==Enclosures:==
==Enclosures:==
: 1. Final EIS
: 1. Final EIS
: 2. Federal Register Notice
: 2. Federal Register Notice cc w/ encls: Distribution List
 
cc w/ encls: Distribution List
: 1. Package: ML15280A111
: 1. Package: ML15280A111
: 2. Letter: ML15280A120
: 2. Letter: ML15280A120
: 3. Federal Register Notice: ML15280A139 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
: 3. Federal Register Notice: ML15280A139
                  *concurrence via e-mail Letter to G. Piefer from D. Wrona dated October 16, 2015  
: 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
                                                              *concurrence via e-mail OFFICE        LA:DLR        PM:RERB:DLR            PM: DPR              OGC        BC:RERB:DLR NAME            IBetts          MMoser              SLynch            MYoung            DWrona DATE          10/ 9 /15        10/ 13 /15          10/ 13 /15        10/ 14 /15        10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
 
E-MAIL:
DISTRIBUTION
PUBLIC Public                   DHowe           SLynch     JLynch           SHarwell RTR r/f                 MAdams           CWeber     CFrazier         MConley RidsNrrDpr               MMoser           DBarss     LLondon         JWeil RidsNrrDprPrta           AAdams           ASapountzis MYoung           VHuckabay RidsNrrDprPrtb           LTran           DSeymour   TZaki           DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:
E-MAIL: PUBLIC Public   DHowe   SLynch JLynch   SHarwell RTR r/f   MAdams CWeber CFrazier MConley RidsNrrDpr   MMoser DBarss   LLondon JWeil RidsNrrDprPrta   AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb   LTran   DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY: Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
Eric P. Heggelund Jim Costedio                                         Environmental Analysis and Review Licensing Manager                                     Specialist SHINE Medical Technologies, Inc.                     State of Wisconsin 2555 Industrial Drive                                 Department of Natural Resources Monona, WI 53713                                     3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.
2555 Industrial Drive Monona, WI 53713  
National Security and International Affairs           TRTR Newsletter Office of Science and Technology Policy               University of Florida Executive Office Building                             Department of Nuclear 1650 Pennsylvania Avenue                             Engineering Sciences Washington, DC 20503                                 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration,             Mark Freitag NA-212                                               City Manager U.S. Department of Energy                             P.O. Box 5005 1000 Independence Ave SW                             Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt                                         1326 Putnam Avenue Manager                                               Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services               Alfred Lembrich P.O. Box 2659                                         541 Miller Avenue Madison, WI 53701-2659                               Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546
 
Kirsten Cutler, Ph.D. National Security and International Affairs Office of Science and Technology Policy Executive Office Building 1650 Pennsylvania Avenue Washington, DC 20503 Randy Howell National Nuclear Security Administration,   NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585  
 
Paul Schmidt Manager Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659  
 
Eric P. Heggelund Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 TRTR Newsletter University of Florida Department of Nuclear Engineering Sciences 202 Nuclear Sciences Center Gainesville, FL 32611
 
Mark Freitag City Manager
 
P.O. Box 5005 Janesville, WI 53547-5005
 
Bill McCoy 1326 Putnam Avenue Janesville, WI 53546 
 
Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546  
 
G. Piefer  UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015


Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.
G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.
2555 Industrial Drive Monona, WI 53713  
2555 Industrial Drive Monona, WI 53713


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY


==Dear Dr. Piefer:==
==Dear Dr. Piefer:==


The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRC's public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.  
The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.
 
As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:
As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safe ty issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:
* SHINEs Environmental Report;
* SHINE's Environmental Report;
* the NRC staffs consultation with Federal, State, and local agencies;
* the NRC staff's consultation with Federal, State, and local agencies;
* the NRC staffs independent environmental review; and
* the NRC staff's independent environmental review; and
* the NRC staffs consideration of public comments.
* the NRC staff's consideration of public comments.
 
A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov. Sincerely,        /RA/  David J. Wrona, Chief Environmental Review and Guidance Branch      Division of License Renewal Office of Nuclear Reactor Regulation


Docket No. 50-608  
G. Piefer                                        A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.
Sincerely,
                                                /RA/
David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608


==Enclosures:==
==Enclosures:==
: 1. Final EIS
: 1. Final EIS
: 2. Federal Register Notice
: 2. Federal Register Notice cc w/ encls: Distribution List
 
cc w/ encls: Distribution List
: 1. Package: ML15280A111
: 1. Package: ML15280A111
: 2. Letter: ML15280A120
: 2. Letter: ML15280A120
: 3. Federal Register Notice: ML15280A139 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
: 3. Federal Register Notice: ML15280A139
                  *concurrence via e-mail Letter to G. Piefer from D. Wrona dated October 16, 2015  
: 4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
                                                              *concurrence via e-mail OFFICE        LA:DLR        PM:RERB:DLR            PM: DPR              OGC        BC:RERB:DLR NAME            IBetts          MMoser              SLynch            MYoung            DWrona DATE          10/ 9 /15        10/ 13 /15          10/ 13 /15        10/ 14 /15        10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015


==SUBJECT:==
==SUBJECT:==
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY  
NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:
 
E-MAIL:
DISTRIBUTION
PUBLIC Public                   DHowe           SLynch     JLynch           SHarwell RTR r/f                 MAdams           CWeber     CFrazier         MConley RidsNrrDpr               MMoser           DBarss     LLondon         JWeil RidsNrrDprPrta           AAdams           ASapountzis MYoung           VHuckabay RidsNrrDprPrtb           LTran           DSeymour   TZaki           DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:
E-MAIL: PUBLIC Public   DHowe   SLynch JLynch   SHarwell RTR r/f   MAdams CWeber CFrazier MConley RidsNrrDpr   MMoser DBarss   LLondon JWeil RidsNrrDprPrta   AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb   LTran   DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY: Jim Costedio Licensing Manager SHINE Medical Technologies, Inc.
Eric P. Heggelund Jim Costedio                                         Environmental Analysis and Review Licensing Manager                                     Specialist SHINE Medical Technologies, Inc.                     State of Wisconsin 2555 Industrial Drive                                 Department of Natural Resources Monona, WI 53713                                     3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.
2555 Industrial Drive Monona, WI 53713  
National Security and International Affairs           TRTR Newsletter Office of Science and Technology Policy               University of Florida Executive Office Building                             Department of Nuclear 1650 Pennsylvania Avenue                             Engineering Sciences Washington, DC 20503                                 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration,             Mark Freitag NA-212                                               City Manager U.S. Department of Energy                             P.O. Box 5005 1000 Independence Ave SW                             Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt                                         1326 Putnam Avenue Manager                                               Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services               Alfred Lembrich P.O. Box 2659                                         541 Miller Avenue Madison, WI 53701-2659                               Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546}}
 
Kirsten Cutler, Ph.D. National Security and International Affairs Office of Science and Technology Policy Executive Office Building 1650 Pennsylvania Avenue Washington, DC 20503 Randy Howell National Nuclear Security Administration,   NA-212 U.S. Department of Energy 1000 Independence Ave SW Washington, DC 20585  
 
Paul Schmidt Manager Radiation Protection Section Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659  
 
Eric P. Heggelund Environmental Analysis and Review  Specialist State of Wisconsin Department of Natural Resources 3911 Fish Hatchery Road Fitchburg, WI 53711 TRTR Newsletter University of Florida Department of Nuclear Engineering Sciences 202 Nuclear Sciences Center Gainesville, FL 32611
 
Mark Freitag City Manager
 
P.O. Box 5005 Janesville, WI 53547-5005
 
Bill McCoy 1326 Putnam Avenue Janesville, WI 53546 
 
Alfred Lembrich 541 Miller Avenue Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546}}

Latest revision as of 09:38, 5 February 2020

Notice of Availability of the Shine Final EIS Cover Letter
ML15280A120
Person / Time
Site: SHINE Medical Technologies
Issue date: 10/16/2015
From: David Wrona
NRC/NRR/DLR/RERGUB
To: Piefer G
SHINE Medical Technologies
Moser M
Shared Package
ML15280A111 List:
References
DLR-15-0461
Download: ML15280A120 (4)


Text

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINEs Environmental Report;
  • the NRC staffs consultation with Federal, State, and local agencies;
  • the NRC staffs independent environmental review; and
  • the NRC staffs consideration of public comments.

G. Piefer A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice cc w/ encls: Distribution List
1. Package: ML15280A111
2. Letter: ML15280A120
3. Federal Register Notice: ML15280A139
4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail OFFICE LA:DLR PM:RERB:DLR PM: DPR OGC BC:RERB:DLR NAME IBetts MMoser SLynch MYoung DWrona DATE 10/ 9 /15 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:

Eric P. Heggelund Jim Costedio Environmental Analysis and Review Licensing Manager Specialist SHINE Medical Technologies, Inc. State of Wisconsin 2555 Industrial Drive Department of Natural Resources Monona, WI 53713 3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.

National Security and International Affairs TRTR Newsletter Office of Science and Technology Policy University of Florida Executive Office Building Department of Nuclear 1650 Pennsylvania Avenue Engineering Sciences Washington, DC 20503 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration, Mark Freitag NA-212 City Manager U.S. Department of Energy P.O. Box 5005 1000 Independence Ave SW Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt 1326 Putnam Avenue Manager Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services Alfred Lembrich P.O. Box 2659 541 Miller Avenue Madison, WI 53701-2659 Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546

G. Piefer UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 16, 2015 Greg Piefer, PhD Chief Operating Officer SHINE Medical Technologies, Inc.

2555 Industrial Drive Monona, WI 53713

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY

Dear Dr. Piefer:

The U.S. Nuclear Regulatory Commission (NRC) staff has completed the final Environmental Impact Statement (ElS) regarding the construction permit submitted by SHINE Medical Technologies, Inc. (SHINE) for the proposed SHINE Medical Radioisotope Production Facility (SHINE facility). Enclosed is a copy of the final EIS and the associated Federal Register Notice of Availability. This notice advises the public that the final EIS is publicly available at the NRCs public document room or from the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html. The ADAMS Accession Number for the final EIS is ML15288A046. In addition, the Hedberg Public Library, 316 South Main Street, Janesville, Wisconsin, has agreed to make the final EIS available.

As discussed in Chapter 6 of the final EIS, after weighing the environmental, economic, technical, and other benefits against environmental and other costs, and considering reasonable alternatives, the NRC staff recommends, unless safety issues mandate otherwise, the issuance of the construction permit to SHINE. This recommendation is based on the following:

  • SHINEs Environmental Report;
  • the NRC staffs consultation with Federal, State, and local agencies;
  • the NRC staffs independent environmental review; and
  • the NRC staffs consideration of public comments.

G. Piefer A separate Notice of Availability of the final EIS will be placed in the Federal Register through the U.S. Environmental Protection Agency. If you have any questions regarding this matter, please contact Ms. Michelle Moser, Environmental Project Manager, for the environmental review of the SHINE construction permit application, by telephone at 301-415-6509 or by e-mail at michelle.moser@nrc.gov.

Sincerely,

/RA/

David J. Wrona, Chief Environmental Review and Guidance Branch Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-608

Enclosures:

1. Final EIS
2. Federal Register Notice cc w/ encls: Distribution List
1. Package: ML15280A111
2. Letter: ML15280A120
3. Federal Register Notice: ML15280A139
4. Final Environmental Impact Statement for the Construction Permit for the SHINE Medical Radioisotope Production Facility: ML15288A046
  • concurrence via e-mail OFFICE LA:DLR PM:RERB:DLR PM: DPR OGC BC:RERB:DLR NAME IBetts MMoser SLynch MYoung DWrona DATE 10/ 9 /15 10/ 13 /15 10/ 13 /15 10/ 14 /15 10/ 16 /15 Letter to G. Piefer from D. Wrona dated October 16, 2015

SUBJECT:

NOTICE OF AVAILABILITY OF THE FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE CONSTRUCTION PERMIT OF THE PROPOSED SHINE MEDICAL RADIOISOTOPE PRODUCTION FACILITY DISTRIBUTION:

E-MAIL:

PUBLIC Public DHowe SLynch JLynch SHarwell RTR r/f MAdams CWeber CFrazier MConley RidsNrrDpr MMoser DBarss LLondon JWeil RidsNrrDprPrta AAdams ASapountzis MYoung VHuckabay RidsNrrDprPrtb LTran DSeymour TZaki DWrona RidsOgcRp Resource RidsAcrsAcnw_MailCTR Resource HARD COPY:

Eric P. Heggelund Jim Costedio Environmental Analysis and Review Licensing Manager Specialist SHINE Medical Technologies, Inc. State of Wisconsin 2555 Industrial Drive Department of Natural Resources Monona, WI 53713 3911 Fish Hatchery Road Fitchburg, WI 53711 Kirsten Cutler, Ph.D.

National Security and International Affairs TRTR Newsletter Office of Science and Technology Policy University of Florida Executive Office Building Department of Nuclear 1650 Pennsylvania Avenue Engineering Sciences Washington, DC 20503 202 Nuclear Sciences Center Gainesville, FL 32611 Randy Howell National Nuclear Security Administration, Mark Freitag NA-212 City Manager U.S. Department of Energy P.O. Box 5005 1000 Independence Ave SW Janesville, WI 53547-5005 Washington, DC 20585 Bill McCoy Paul Schmidt 1326 Putnam Avenue Manager Janesville, WI 53546 Radiation Protection Section Wisconsin Department of Health Services Alfred Lembrich P.O. Box 2659 541 Miller Avenue Madison, WI 53701-2659 Janesville, WI 53548 Gerald and Muriel Bumgarner 1735 S Osborne Ave Janesville, WI 53546