| issue date = 01/14/2016
| issue date = 01/14/2016
| title = Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry Technician
| title = Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry Technician
| author name = Dent J A
| author name = Dent J
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 94
| page count = 94
| project =  
| project =  
| stage = Other
| stage = Request
}}
}}


=Text=
=Text=
{{#Wiki_filter:Entegyi Nuclear OPoer SationsIc* 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001
{{#Wiki_filter:EntegyiNuclear OPoerSationsIc
* 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.
Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001  
Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001


==Reference:==
==Reference:==
Line 30: Line 33:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1).using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration.
 
The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference  
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).
: 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).
The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).
Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment days.If you have any questions regarding the subject matter, please contact Everett P.Perkins at (508) 830-8323.This letter contains no new or revised regulatory commitments.
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1)
I declare under penalty of perjury that the foregoing is true and correct.Executed on the /'4" day of (_/2,j z ~,2016.A. Dent, Jr.;ite Vice President Attachment 1: Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission one White Flint North O-8C2-A 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station John Priest, Director, Massachusetts Department of Public Health Radiation Control Program Commonwealth of Massachusetts 529 Main Street, Suite 1 M2A Charlestown, MA 02129-1121 John Giarrusso, Jr.Planning and Preparedness Section Chief Mass Emergency Management Agency 400 Worcester Road Framingham, MA 01702 ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)
.using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration. The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS  
 
Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment within*30 days.
If you have any questions regarding the subject matter, please contact Everett P.
Perkins at (508) 830-8323.
This letter contains no new or revised regulatory commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the         /'4"   day of     (_/2,j     z
                                                  ~,2016.
  !*hn A. Dent, Jr.
  ;ite Vice President Attachment 1: Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization."
Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman,                          John Priest, Director, Project Manager                                 Massachusetts Department of Public Health Division of Operating Reactor Licensing         Radiation Control Program Office of Nuclear Reactor Regulation           Commonwealth of Massachusetts U. S. Nuclear Regulatory Commission             529 Main Street, Suite 1M2A one White Flint North O-8C2-A                   Charlestown, MA 02129-1121 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1               John Giarrusso, Jr.
U.S. Nuclear Regulatory Commission             Planning and Preparedness Section Chief 2100 Renaissance Blvd, Suite 100               Mass Emergency Management Agency King of Prussia, PA 19406-2713                 400 Worcester Road Framingham, MA 01702 NRC Resident Inspector Pilgrim Nuclear Power Station
 
ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)
 
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==
Line 43: Line 61:
==3.0 BACKGROUND==
==3.0 BACKGROUND==


===4.0 TECHNICAL===
==4.0 TECHNICAL ANALYSIS==


ANALYSIS 5.0 REGULATORY ANALYSIS AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination
==5.0 REGULATORY ANALYSIS==
AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination 5.3 Environmental Consideration


===5.3 Environmental===
==6.0 REFERENCES==
 
Consideration


==6.0 REFERENCES==
1


1 Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT  
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==


Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.
Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.
Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b)and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."  
Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b) and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."


==2.0 PROPOSED CHANGE==
==2.0 PROPOSED CHANGE==
Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician.
 
Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event._Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks: o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area)o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.
Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician. Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).
Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event.
_Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks:
o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.


==3.0 BACKGROUND==
==3.0 BACKGROUND==


The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2 Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..." 10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.
The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2
NUREG-0654 (Reference 6.2), Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements.
 
The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I,"Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks). -The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments.
Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..."
The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations.
10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.
NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.
NUREG-0654 (Reference 6.2), Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements. The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks).             -
On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions.
The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments. The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations. NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.
Specifically, Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan." Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance -Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis.
On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions. Specifically, Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan."
The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).
Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance         - Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis. The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.
3 Attachment I to PNPS Letter 2.16.001 4.0 TECHNICAL ANALYSIS 4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant)functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s);
The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).
and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians.
3
This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations.
 
The basis for our conclusion is contained in the enclosed safety evaluation.
Attachment I to PNPS Letter 2.16.001
In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation.
 
Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4 Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.
==4.0 TECHNICAL ANALYSIS==
Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal.
 
The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.
4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.
Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.*The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.*The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area)o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training.
The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant) functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).
Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment." 5 Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position.
In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s); and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians. This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).
The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.
In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations. The basis for our conclusion is contained in the enclosed safety evaluation. In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.
The OSA is included in this submittal as Attachment
At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation. Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4
: 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.
 
Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.
Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.
Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal. The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.
Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.
      *The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.
      *The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.
o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.
4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training. Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment."
5


===5.0 REGULATORY===
Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.
The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position. The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.
The OSA is included in this submittal as Attachment 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.


ANALYSIS AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,*10 CFR 50.47(b)(2)  
==5.0 REGULATORY ANALYSIS==
-On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
AND ENVIRONMENTAL REVIEW 5.1     Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,
*10 CFR 50, Appendix E, Section IV.A (in part) -The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
      *10 CFR 50.47(b)(2)     - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
*NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part"The criteria and recommendations in this regulatory guide are methods that the 6 Attachment 1Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness." In NUREG-0654, Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard.
      *10 CFR 50, Appendix E, Section IV.A (in part) - The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement.
      *NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part "The criteria and recommendations in this regulatory guide are methods that the 6
Evaluation Criteria l1.B.5 states, in part, that: Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity.
Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*
For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies." Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q).
met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness."
In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.
In NUREG-0654, Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard. Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement. Evaluation Criteria l1.B.5 states, in part, that:
Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2).
Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity. For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies."
The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement.
Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q). In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.
As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.
Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2). The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement. As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.
Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.7 Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.5.2 No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.
Response:
7
No.The proposed training requirements change has no effect on normal plant operation or on any accident initiator.
 
The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.
Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.
Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the"on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.
5.2     No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed training requirements change has no effect on normal plant operation or on any accident initiator. The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.
Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the "on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.
Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
Response: No.
No.The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency.
The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency. It has been evaluated and determined not to significantly affect the ability to perform required or related functions. It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions. The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.
It has been evaluated and determined not to significantly affect the ability to perform required or related functions.
8
It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions.
The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.
8 Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.The proposed change does not affect plant design or method of operation.
10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability.
Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel.
A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
9 Attachment I to PNPS Letter 2.16.001 6. REFERENCES


===6.1. Entergy===
Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.
Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062)6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).
: 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change does not affect plant design or method of operation.
10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability. Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel. A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.
The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.
Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
*5.3      Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
9


===6.4. James===
Attachment I to PNPS Letter 2.16.001
Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station -Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule." 6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance -Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).
: 6. REFERENCES 6.1. Entergy Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062) 6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.
6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).
6.4. James Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station - Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule."
6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance   - Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).
6.7. Entergy Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007) 10


===6.7. Entergy===
ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page) to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i:         Minimum Staffino Renuirements for the PNPS ERO-( 1 )
Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007)10 ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page)
Functional Area                                   Major Task                       TOnshift
Attachment 2 to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i: Minimum Staffino Renuirements for the PNPS ERO-(1)Functional Area Major Task TOnshift Position Title Rs+/-Pos.No. ________________
                                                                                              +/-Pos.No.                     Position Title                    Rs
ponse Plant. Operations Plant Stabilization  
________________                               ponse Plant.Operations                       Plant Stabilization                               +/-       1         Shift Manager                                   On Shift#
+/- 1 Shift Manager On Shift#Assessment of Operational Accident Mitigation 2 Control Room Supervisor On Shift#Aspects 3,4 Lic. Nuc. Plant Operator (2) On Shift#______________________
Assessment of Operational               Accident Mitigation                                       2         Control Room Supervisor                         On Shift#
5.6 Unlic. Nuc. Prant Operator (2)**FB On Shift#"Emerg'ency Direction Emergency Classification j1) Shift Manager On Shift#Emergency Control PARs t (1) Shift Manager On Shift#IEmergency Director 60 mai.
Aspects                                                                                           3,4       Lic. Nuc. Plant Operator (2)                   On Shift#
Plant Ops Supv 60 min.Notification and Notification of PNPS, Local, (1) Shift Manager On Shift#Communications Commonwealth, and Federal personnel 7 Unlic. Nuc. Plant Operator On Shift#and Maintain Communications Offsite Communicator 30 min.EOF Communicator 60 min.ENS Communicator 60 mai.Rad Accident Assessment!....
______________________                     5.6         Unlic. Nuc. Prant Operator (2)**FB             On Shift#
EOF Direction EOF Managter, 60 mai.Ops Accident Assessment Offsite Dose Assessment (8) RP Technician***
  "Emerg'ency Direction                   Emergency Classification                                 j1)         Shift Manager                                   On Shift#
On Shift#Support (9) Radio Chem. Technician**" On Shift#Radiolog:ical Assessment Coord 30 mai.Offsite Surveys OMT Member (2) 30 mai.OMT Member (2) 60 min.Onsite and'ln-plan't Surveys 8 RP Technician On Shift#RP Technician (2) 30 min.RP Technician (2) 60 mmn.Chemistry  
Emergency Control                     PARs                                               t IEmergency (1)       Shift Manager Director On Shift#
/ Radiochemistry 9 Radio Chem. Technician On Shlft#_____Radio Chem. Technician 60 mai.Plant System Engineering TSC / OSC Direction Emergency Plant Manager 60 mai.Repair and Corrective Actions Technical Support 10 Engineer (Shift Control Rm)* On Shift#Engineer (Reactor) 30 mai.Engineer (Mechanical) 60 mai._________________________Englineer (Electrical) 60 min.Eguipment Repairs _____Nuclear Maint. Technician 30 min.Corrective Actions Nuclear Maint, Technician 60 main 11 Unlic. Nuc. Plant Operator On Shift#12 Nuc. Plant Reactor Operator m*FB On Shift#Nuc. Plant Reactor Operator 60 min.Nuclear Maint. (ElectnicalX2) 30 mai.Nuclear Maint. (Electrical) 60 min.___________________
60 mai.
________________________________Nuclear Control Technician(2) 30 mai.Protective Actions (In Plant) Radiation Protection, Access Control, (8), (9) RP Technician (2)*0 On Shift#RP Coverage, Personnel Monitoring, RP Technician (2) 30 mai.and Dosimetry
Emerg*ency Plant Ops Supv                       60 min.
_____RP Technician (2) 60 mai.Fire Fighting 13, 14 Fire Brigade*, (3 **, 2 [NLO or Sec]) On Shift#____________________
Notification and                       Notification of PNPS, Local,                             (1)       Shift Manager                                   On Shift#
_____Plymouth Fire Dept. On Call Rescue Ops and First Aid On Shitt#___________________
Communications                         Commonwealth, and Federal personnel                       7         Unlic. Nuc. Plant Operator                     On Shift#
________________________Ambulance Service ... On Call Site Access Control and Security Security Force* On Shift#Personnel Accountability
and Maintain Communications                                         Offsite Communicator                           30 min.
_____________________un onirt -person as saiu ro oe on snurt wnen, ounng normar or au~nonrzeo oventime nours, that person is witnin tie PNPS owner controlled areas or on the connecting roads between them with Station Management approval.* Position staffed In accordance with technical specifications.
EOF Communicator                               60 min.
** Position staffed in accordance with technical specifications and station procedures.
ENS Communicator                               60 mai.
** May be provided by shift personnel assigned other functions.
Rad Accident Assessment!....           EOF Direction                                                       EOF Managter,                                   60 mai.
.. .(EMP) Emergency Medical Personnel:
Ops Accident Assessment                 Offsite Dose Assessment                                   (8)       RP Technician***                               On Shift#
individuals qualified as EMPs, RNs, First Responders, and Paramedics.
Support                                                                                           (9)       Radio Chem. Technician**"                       On Shift#
Radiolog:ical Assessment Coord                 30 mai.
Offsite Surveys                                                       OMT Member (2)                                 30 mai.
OMT Member (2)                                 60 min.
Onsite and'ln-plan't Surveys                               8         RP Technician                                   On Shift#
RP Technician (2)                               30 min.
RP Technician (2)                               60 mmn.
Chemistry / Radiochemistry                                 9         Radio Chem. Technician                         On Shlft#
_____Radio     Chem. Technician                       60 mai.
Plant System Engineering               TSC / OSC Direction                                                   Emergency Plant Manager                         60 mai.
Repair and Corrective Actions         Technical Support                                         10         Engineer (Shift Control Rm)*                   On Shift#
Engineer (Reactor)                             30 mai.
Engineer (Mechanical)                           60 mai.
_________________________Englineer                               (Electrical)                       60 min.
Eguipment Repairs                                     _____Nuclear               Maint. Technician                   30 min.
Corrective Actions                                                   Nuclear Maint, Technician                       60 main 11         Unlic. Nuc. Plant Operator                     On Shift#
m 12         Nuc. Plant Reactor Operator *FB                 On Shift#
Nuc. Plant Reactor Operator                     60 min.
Nuclear Maint. (ElectnicalX2)                   30 mai.
Nuclear Maint. (Electrical)                     60 min.
________________________________Nuclear                                         Control Technician(2)               30 mai.
Protective Actions (In Plant)         Radiation Protection, Access Control,                   (8), (9)     RP Technician (2)*0                             On Shift#
RP Coverage, Personnel Monitoring,                                   RP Technician (2)                               30 mai.
and Dosimetry                                         _____RP             Technician (2)                             60 mai.
Fire Fighting                                           13, 14       Fire Brigade*, (3 **, 2 [NLO or Sec])           On Shift#
____________________                 _____Plymouth               Fire Dept.                         On Call Rescue Ops and First Aid                                             EMP**                                          On Shitt#
________________________Ambulance                                                   Service         ...               On Call Site Access Control and               Security                                                             Security Force*                                 On Shift#
Personnel Accountability                                                                     _____________________
n*        un  onirtowner PNPS      - person     assaiu controlled      ro oe areas  or on on snurt wnen, ounng the connecting      normar roads        or au~nonrzeo between                    Station nours, them withoventime            that person Management            is witnin tie approval.
* Position staffed In accordance with technical specifications.
      **         Position staffed in accordance with technical specifications and station procedures.
            ** May be provided by shift personnel assigned other functions.
            .. .(EMP) Emergency Medical Personnel: individuals qualified as EMPs, RNs, First Responders, and Paramedics.
NOTES: Response times are based on optimum travel conditions.
NOTES: Response times are based on optimum travel conditions.
On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions  
On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.
#13 and #14 are available to support Shift Manager, where qualified, in non-fire events.(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E, Section IV. A. 9 and maintained as a separate document.B-7 Revision 44 ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)
On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions #13 and #14 are available to support Shift Manager, where qualified, in non-fire events.
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training I Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task On-site
(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E, Section IV. A. 9 and maintained as a separate document.
B-7                                                       Revision 44
 
ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)
 
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)
NUREG 0654         Chemistry Technician Training             Chemistry Technician Training     Justification for Reduced Training I Table B-I       Identified in 2006 Submittal                   Identified in 2016                       Comments "On-Shift"                                                                                     (See OSA Analysis notes below)
Task On-site
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool *The 2012 OSA ensured that PNPS and In- Member Qualification Member Qualification ERO team members can accomplish Plant
* Operations Support Center Pool *The     2012 OSA ensured that PNPS and In-     Member Qualification                       Member Qualification               ERO team members can accomplish Plant
* Respirator User Qualification
* Respirator User Qualification
* Perform Radiation Surveys the required mission in the first 90 Surveys
* Perform Radiation Surveys           the required mission in the first 90 Surveys
* Self-Contained Breathing Apparatus
* Self-Contained Breathing Apparatus
* Perform Contamination Surveys minutes of ERO activation with the User Qualification
* Perform Contamination Surveys       minutes of ERO activation with the User Qualification
* Operate Basic Dose Rate Meters current on-shift ERO staff defined in* Walkdown EOP-4 survey point * -Operate Basic Count Rate Meters Table B-I.locations* Perform Radiation Surveys* Perform Contamination Surveys* Collect an Airborne Radioactivity Sample* Analyze Smears for contamination levels* Analyze Air Samples* Operate Basic Dose Rate Meters* Operate Basic Count Rate Meters* Operate the Scintillation Alpha Counter* Operate the Beta Counter* Operate the Gamma Spec System* Operate the Regulated Air Sample Pump* Operate the Radeco Air Sampler 1 Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task Access *Operations Support Center Pool
* Operate Basic Dose Rate Meters     current on-shift ERO staff defined in
* Operations Support Center Pool *The 2012 OSA ensured that PNPS Control Member Qualification Member Qualification ERO team members can accomplish
* Walkdown EOP-4 survey point             * -Operate Basic Count Rate Meters     Table B-I.
* Control High Radiation Areas the required mission in the first 90* RWP Briefing minutes of ERO activation with the* Perform Stay Time Calculations current on-shift ERO staff defined in* Issue and Return Respirators Table B-i.RP .Operations Support Center Pool
locations
* Operations Support Center Pool *The 2012 OSA ensured that PNPS Coverage Member Qualification Member Qualification ERO team members can accomplish for repair,
* Perform Radiation Surveys
* Perform Contamination Surveys
* Collect an Airborne Radioactivity Sample
* Analyze Smears for contamination levels
* Analyze Air Samples
* Operate Basic Dose Rate Meters
* Operate Basic Count Rate Meters
* Operate the Scintillation Alpha Counter
* Operate the Beta Counter
* Operate the Gamma Spec System
* Operate the Regulated Air Sample Pump
* Operate the Radeco Air Sampler 1
 
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)
NUREG 0654         Chemistry Technician Training           Chemistry Technician Training       Justification for Reduced Training /
Table B-I         Identified in 2006 Submittal                   Identified in 2016                       Comments "On-Shift"                                                                                     (See OSA Analysis notes below)
Task Access     *Operations     Support Center Pool
* Operations Support Center Pool *The     2012 OSA ensured that PNPS Control       Member Qualification                       Member Qualification               ERO team members can accomplish
* Control High Radiation Areas                                                   the required mission in the first 90
* RWP Briefing                                                                   minutes of ERO activation with the
* Perform Stay Time Calculations                                                 current on-shift ERO staff defined in
* Issue and Return Respirators                                                   Table B-i.
RP     . Operations Support Center Pool
* Operations Support Center Pool *The     2012 OSA ensured that PNPS Coverage       Member Qualification                       Member Qualification               ERO team members can accomplish for repair,
* Respirator User Qualification
* Respirator User Qualification
* Perform Radiation Surveys the required mission in the first 90 corrective
* Perform Radiation Surveys           the required mission in the first 90 corrective
* SCBA User Qualification
* SCBA User Qualification
* Perform Contamination Surveys minutes of ERO activation with the actions,
* Perform Contamination Surveys       minutes of ERO activation with the actions,
* RP Job Coverage
* RP Job Coverage
* Operate Basic Dose Rate Meters current on-shift ERO staff defined in search and
* Operate Basic Dose Rate Meters     current on-shift ERO staff defined in search and
* Control High Radiation Areas
* Control High Radiation Areas
* Operate Basic Count Rate Meters Table B-I.rescue first
* Operate Basic Count Rate Meters     Table B-I.
* RWP Briefing aid & Perform Stay Time Calculations firefighting
rescue first
* Perform Radiation Surveys* Perform Contamination Surveys* Collect an Airborne Sample* Analyze Smears* Analyze Air Samples* Operate Basic Dose Rate Meters* Operate Basic Count Rate Meters* Operate the SAC-4* Operate the BC-4* Operate the Gamma Spec System* Operate the RAS Pump* Operate the Radeco* Perform RP Duties in Response to a Plant Fire___________________
* RWP Briefing aid
2 Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task Personnel
        &       Perform Stay Time Calculations firefighting
* Perform Radiation Surveys
* Perform Contamination Surveys
* Collect an Airborne Sample
* Analyze Smears
* Analyze Air Samples
* Operate Basic Dose Rate Meters
* Operate Basic Count Rate Meters
* Operate the SAC-4
* Operate the BC-4
* Operate the Gamma Spec System
* Operate the RAS Pump
* Operate the Radeco
* Perform RP Duties in Response to a Plant Fire___________________
2
 
Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)
NUREG 0654                 Chemistry Technician Training                               Chemistry Technician Training                             Justification for Reduced Training /
Table B-I                 Identified in 2006 Submittal                                         Identified in 2016                                                 Comments "On-Shift"                                                                                                                                         (See OSA Analysis notes below)
Task Personnel
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* The 2012 OSA ensured that PNPS Monitoring Member Qualification Member Qualification ERO team members can accomplish
* The 2012 OSA ensured that PNPS Monitoring             Member Qualification                                         Member Qualification                                         ERO team members can accomplish
* RP Job Coverage the required mission in the first 90* RWP Briefing minutes of ERO activation with the* Perform Personnel Decontamination current on-shift ERO staff defined in Table B-I.Dosimetry
* RP Job Coverage                                                                                                           the required mission in the first 90
* RWP Briefing                                                                                                               minutes of ERO activation with the
* Perform Personnel Decontamination                                                                                         current on-shift ERO staff defined in Table B-I.
Dosimetry
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* No effective change is identified Member Qualification Member Qualification
* No effective change is identified Member Qualification                                         Member Qualification
* Issue and Control Personnel
* Issue and Control Personnel
* Issue Dosimetry Dosimetry OSA Notes: 1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities.
* Issue Dosimetry Dosimetry OSA Notes:
This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.
: 1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear PowerPlants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician.
: 2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.
The PNPS SEP is consistent with the NEI guidance.4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders.
: 3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position. NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician. The PNPS SEP is consistent with the NEI guidance.
Tasks for event response were reviewed for 90 minutes following the declaration.
: 4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.
No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
: 6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
: 7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
3*
ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)
ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)
PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by: Myra Jones Fred Guynn PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION.....................................................................................
 
4 II. ANALYSIS  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by:
Myra Jones Fred Guynn
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION.....................................................................................                           4 II. ANALYSIS  


==SUMMARY==
==SUMMARY==
  .............................................................................
  ............................................................................. 4 A. Emergency Plan Minimum Staffing.................................................................... 5 B. Other Commitments to Shift Staffing........................................................... ....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) .............................................. 6 D. Emergency Plan Tasks Not Analyzed ................................................................ 7 III. ANALYSIS PROCESS .............................................................................. 8 IV. ACCIDENT SCENARIOS ......             .....................................................................                     9 A. Accident Selection........................................................................................ 9 B. Accident Scenarios included in the Analysis ,...................................................... .. 9 C. Accident Scenarios Not Included in the Analysis .................................................. 10 V.     GENERAL ASSUMPTIONS AND LIMITATIONS................................................ 11 A. Notes and Assumptions Applicable to Pilgrim OSA: .............................................. 11 B. NEI 10-05 Assumptions ..................           .........     ................................................... 11 VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS ..................................... 14 Vii APPENDIX B         - ON-SHIFT STAFFING ANALYSIS............................................. 16 A. Accident Analysis #1 - Design Basis Threat (DBT)............................................... 16 B. Design Basis Accident Analysis #2       - Control Rod Drop Accident.............................. 21 C. Design Basis Accident Analysis #4       - Loss of Coolant Accident................................ 27 D. Design Basis Accident Analysis #5       - Main Steam Line Break .................................. 33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident .................................. 39 F. Accident Analysis #8 -   Aircraft Probable Threat .................................................. 45 G. Accident Analysis #9 -   Control Room Evacuation and Alternate Shutdown.................. 51 H. Accident Analysis #10   - Station Blackout........................................................... 57 I. Accident Analysis #11   - LOCA/General Emergency with Release and PAR ................ 63 VIIIAPPENDIX C TIME MOTIONS STUDIES....................................................... 69 A. TMS Shift Manager Safe Shutdown Task........................................................... 69 PNPS                                                                                                               Page 2
4 A. Emergency Plan Minimum Staffing....................................................................
 
5 B. Other Commitments to Shift Staffing...........................................................  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED ............... 73 A. Overlap Requiring Compensatory Measures ..................................................... 73 X. REFERENCES ...................................................................................     74 XI. STAFFING ANALYIS TEAM .................................................................... 74 Page 3 PNPS                                                                                       Page 3
....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) ..............................................
 
6 D. Emergency Plan Tasks Not Analyzed ................................................................
PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19         - 22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstratingthat on-shift personnel assigned emergency plan implementation functions are not assigned responsibilitiesthat would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
7 III. ANALYSIS PROCESS ..............................................................................
I. ANALYSIS  
8 IV. ACCIDENT SCENARIOS  
...... .....................................................................
9 A. Accident Selection........................................................................................
9 B. Accident Scenarios included in the Analysis ,......................................................  
..9 C. Accident Scenarios Not Included in the Analysis ..................................................
10 V. GENERAL ASSUMPTIONS AND LIMITATIONS................................................
11 A. Notes and Assumptions Applicable to Pilgrim OSA: ..............................................
11 B. NEI 10-05 Assumptions  
..................  
.........  
...................................................
11 VI. APPENDIX A -ANALYZED EVENTS AND ACCIDENTS  
.....................................
14 Vii APPENDIX B -ON-SHIFT STAFFING ANALYSIS.............................................
16 A. Accident Analysis #1 -Design Basis Threat (DBT)...............................................
16 B. Design Basis Accident Analysis #2 -Control Rod Drop Accident..............................
21 C. Design Basis Accident Analysis #4 -Loss of Coolant Accident................................
27 D. Design Basis Accident Analysis #5 -Main Steam Line Break ..................................
33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident ..................................
39 F. Accident Analysis #8 -Aircraft Probable Threat ..................................................
45 G. Accident Analysis #9 -Control Room Evacuation and Alternate Shutdown..................
51 H. Accident Analysis #10 -Station Blackout...........................................................
57 I. Accident Analysis #11 -LOCA/General Emergency with Release and PAR ................
63 VIIIAPPENDIX C TIME MOTIONS STUDIES.......................................................
69 A. TMS Shift Manager Safe Shutdown Task...........................................................
69 PNPS Page 2 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED  
...............
73 A. Overlap Requiring Compensatory Measures .....................................................
73 X. REFERENCES  
...................................................................................
74 XI. STAFFING ANALYIS TEAM ....................................................................
74 PNPS Page 3 PNPS Page 3 PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19 -22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities.
This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.I. ANALYSIS  


==SUMMARY==
==SUMMARY==
The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:* Emergency Direction and Control* Plant Operations and Safe Shutdown (SSD)* Fire Fighting (FB)* Accident Assessment
 
* Radiation Protection and Chemistry* Notification/Comnmunication
The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:
* Technical Support* Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks.
* Emergency Direction and Control
These include Repair and Corrective Action, Rescue Operations and First Aid.PNPS Page 4 PNPS Page 4 PNPS ON-SHIFT STAFFING ANALYSIS REPORT A. Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of § 50.47(b).The following table indicates the result of the NEI 10-05 staffing analysis of on-shift-personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.Licensing Basis On-Shift Position 4 Requirement E-Plan Functional Area Staffing Analysis Results 50.54m Emergency Direction and Shift Manager (SM) E-plan Table B-I Control SSD (TMS for SSD1 actions)Control Room Supervisor 50.54m (CRS) E-plan Table B-I1S Shift Control Room E-plan Table B-I1ehia upr Engineer (STA)Licensed Nuclear Plant 50.54m SSD -Operator (RO #1 ) E-plan Table B-i Licensed Nuclear Plant 50.54m SSD1 Operator (RO #2) E-plan Table B-i Non-Licensed Nuclear E-plan Table B-i SSD 2 Plant Operator (NLO #1")1 Non-Licensed Nuclear E-plan Table B-i E-Plan Communicator Plant Operator (NLO #2)______
* Plant Operations and Safe Shutdown (SSD)
Notifications 3 1 Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #3)Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #4)Non-Licensed Nuclear E-plan Table B-i1B PlantOperator_(NLO_#5)
* Fire Fighting (FB)
_________Chemist E-plan Table B-1 Accident1 Assessment/Chemistry1 RP #1 E-plan Table B-i Radiation Protection 1 Fire Brigade #11 E-plan Table B-i FB 1 Fire Brigade #21 E-plan Table B-i FB 1 E-plan Table B-i Per Security Security Security Accountability Contingency
* Accident Assessment
_____________
* Radiation Protection and Chemistry
Contingency Plan _____________
* Notification/Comnmunication
Plan TOTAL 14 1 Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.2 SSD NLO can be filled by RO or SRO.3 E-Plan Communicator can be replaced by SRO that is qualified for the task.4 One of the 5 NLOs is a Radwaste Operator PNPS Page 5 PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)1. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment.
* Technical Support
In addition, the RP Technician shares the responsibility for dose assessment.
* Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks. These include Repair and Corrective Action, Rescue Operations and First Aid.
It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment.
Page 4 PNPS                                                                                                   Page 4
No further analysis or TMS is required.2. The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.3. The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
 
No further analysis TMS is required.4. A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT A.         Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of § 50.47(b).
Details of the TMS are found in section VIII Appendix C.PNPS Page 6 PNPS Page 6 PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed:' 1. Repair and Corrective Action -Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks.
The following table indicates the result of the NEI 10-05 staffing analysis of on-shift
Repair and corrective action is defined as:*An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:
              -personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.
* Unplanned/unexpected actions that address equipment failures.
Licensing Basis                                       On-Shift Position 4                 Requirement           E-Plan Functional Area       Staffing Analysis Results 50.54m           Emergency Direction and Shift Manager (SM)               E-plan Table B-I                   Control SSD (TMS for SSD1 actions)
These actions are contingent in nature and cannot be specified in advance.* Planned/expected actions performed in support of operating procedure implementation, including severe accident management guidelines.
Control Room Supervisor                   50.54m (CRS)                   E-plan Table B-I1S Shift Control Room               E-plan Table B-I1ehia                     upr Engineer (STA)
At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.Initial corrective actions are contained in and controlled by plant operating procedures.
Licensed Nuclear Plant                   50.54m                         SSD                 -
The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required.
Operator (RO #1 )               E-plan Table B-i Licensed Nuclear Plant                   50.54m                         SSD1 Operator (RO #2)               E-plan Table B-i Non-Licensed Nuclear               E-plan Table B-i                     SSD2 Plant Operator (NLO #1")1 Non-Licensed Nuclear               E-plan Table B-i         E-Plan Communicator Plant Operator (NLO #2)______                                       Notifications 3           1 Non-Licensed         Nuclear     E-plan Table B-i1B Plant Operator       (NLO #3)
Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed 2. Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response.
Non-Licensed         Nuclear     E-plan Table B-i1B Plant Operator       (NLO #4)
Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks.
Non-Licensed         Nuclear     E-plan Table B-i1B PlantOperator_(NLO_#5)         _________
The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed.
Chemist                  E-plan Table B-1                   Accident1 Assessment/Chemistry1 RP #1                 E-plan Table B-i           Radiation Protection           1 Fire Brigade #11               E-plan Table B-i                       FB                 1 Fire Brigade #21               E-plan Table B-i                       FB                 1 E-plan Table B-i                                     Per Security Security                       Security                 Accountability     Contingency
Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.PNPS Page 7 PNPS Page 7 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP)personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments.
_____________             Contingency Plan       _____________                     Plan TOTAL                                                                             14 1
Additionally, personnel from Security provided input to the analysis when necessary.
Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.
The team members are identified in Section Xl of this report.The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.
2 SSD NLO can be filled by RO or SRO.
Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation.
3 E-Plan Communicator can be replaced by SRO that is qualified for the task.
These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate.
4 One of the 5 NLOs is a Radwaste Operator PNPS                                                                                                       Page 5
In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.
 
The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -ON-SHIFT STAFFING ANALYSIS.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)
Note that NSIR DPR-ISG-01 states that only DBA accidents"which would result in an emergency declaration" should be evaluated in the staffing assessment.
: 1.       The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment. In addition, the RP Technician shares the responsibility for dose assessment. It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment. No further analysis or TMS is required.
Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description.
: 2.       The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.
If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds.
: 3.       The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function. No further analysis TMS is required.
In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.PNPS Page 8 PNPS Page 8 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection 1. The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance -Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents.
: 4.       A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.
The scenarios considered were:* Design Basis Threat (DBT) ground assault* DBA Control Rod Drop Accident* DBA Loading Error Accident* DBA Loss of Coolant Accident* DBA Main Steam Line Break Accident* DBA Fuel Handling Accident* DBA Radwaste System Accident* Aircraft Probable Threat* Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,* Station Blackout, (SBO)* LOCA/General Emergency with release and PAR a LOCA with entry into Severe Accident Management
Details of the TMS are found in section VIII Appendix C.
* Fire Resulting in Reactor Trip (Appendix R fire)B. Accident Scenarios included in the Analysis 1. Design Basis Threat as described in NE! 10-05* Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed 2. Control Rod Drop Accident as described in FSAR 14.5.1* One control rod drops and reactor trips on APRM 120% flux scram.Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment.
Page 6 PNPS                                                                                             Page 6
EAL is based on condenser release information in FSAR.3. Loss of Coolant Accident as described in FSAR 14.5.3* Double ended guillotine break of a recirculation line. All ECCS operate-as designed.
 
EAL is based on fission product barrier EALs.4. Main Steam Line Break Accident as described in FSAR 14.5.4* Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).PNPS Page 9 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.5. Fuel Handling Accident as described in FSAR 14.5.5* The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.6. Aircraft Probable Threat (50.54hh)* Notification is received from the NRC that a probable aircraft threat exists (>5 minutes, <30 minutes)7. Control Room Fire and Alternate Shutdown* A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.8. Station Blackout* A loss of all offsite AC power occurs and the failure of the emergency diesel generators.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed
: 9. General Emergency with release and "PAR* Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).C. Accident Scenarios Not Included in the Analysis 1. Loading Error Accident as described in ESAR 14.1.5.2* Misloaded bundle in the core. No EAL condition is met.2. Radwaste System Accident as described in FSAR 14.5.6* No EAL condition is met.3. Implement SAMG* A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators.
:' 1. Repair and Corrective Action - Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks. Repair and corrective action is defined as:
No analysis required.4. Appendix R Fire* Fire leading to reactor trip with complications.
                    *An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.
The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis.
In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:
No additional analysis required.PNPS Page 10 PNPS Page 10 PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA: 1. The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.2. The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders.
* Unplanned/unexpected actions that address equipment failures. These actions are contingent in nature and cannot be specified in advance.
Tasks for event response were reviewed for 90 minutes following the declaration.
* Planned/expected actions performed in support of operating procedure implementation, including severe accident management guidelines.
No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.
: 3. The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated.
Initial corrective actions are contained in and controlled by plant operating procedures. The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required. Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed
No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration.
: 2.     Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response. Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks. The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed. Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.
Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.4. All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.
Page 7 PNPS                                                                                               Page 7
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP) personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments. Additionally, personnel from Security provided input to the analysis when necessary. The team members are identified in Section Xl of this report.
The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.
Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation. These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate. In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.
The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -
ON-SHIFT STAFFING ANALYSIS. Note that NSIR DPR-ISG-01 states that only DBA accidents "which would result in an emergency declaration" should be evaluated in the staffing assessment.
Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description. If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds. In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.
Page 8 PNPS                                                                                                 Page 8
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection
: 1.     The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance       - Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents. The scenarios considered were:
* Design Basis Threat (DBT) ground assault
* DBA Control Rod Drop Accident
* DBA Loading Error Accident
* DBA Loss of Coolant Accident
* DBA Main Steam Line Break Accident
* DBA Fuel Handling Accident
* DBA Radwaste System Accident
* Aircraft Probable Threat
* Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,
* Station Blackout, (SBO)
* LOCA/General Emergency with release and PAR a       LOCA with entry into Severe Accident Management
* Fire Resulting in Reactor Trip (Appendix R fire)
B. Accident Scenarios included in the Analysis
: 1.     Design Basis Threat as described in NE! 10-05
* Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed
: 2.     Control Rod Drop Accident as described in FSAR 14.5.1
* One control rod drops and reactor trips on APRM 120% flux scram.
Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment. EAL is based on condenser release information in FSAR.
: 3.     Loss of Coolant Accident as described in FSAR 14.5.3
* Double ended guillotine break of a recirculation line. All ECCS operate
                      -     as designed. EAL is based on fission product barrier EALs.
: 4.     Main Steam Line Break Accident as described in FSAR 14.5.4
* Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).
PNPS                                                                                                 Page 9
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.
: 5.     Fuel Handling Accident as described in FSAR 14.5.5
* The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.
: 6.     Aircraft Probable Threat (50.54hh)
* Notification is received from the NRC that a probable aircraft threat exists
(>5 minutes, <30 minutes)
: 7.     Control Room Fire and Alternate Shutdown
* A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.
: 8.     Station Blackout
* A loss of all offsite AC power occurs and the failure of the emergency diesel generators.
: 9.     General Emergency with release and "PAR
* Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).
C. Accident Scenarios Not Included in the Analysis
: 1.     Loading Error Accident as described in ESAR 14.1.5.2
* Misloaded bundle in the core. No EAL condition is met.
: 2.     Radwaste System Accident as described in FSAR 14.5.6
* No EAL condition is met.
: 3.       Implement SAMG
* A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators. No analysis required.
: 4.     Appendix R Fire
* Fire leading to reactor trip with complications. The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis. No additional analysis required.
Page 10 PNPS                                                                                         Page 10
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA:
: 1.     The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).
Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.
: 2.     The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 3.     The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated. No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration. Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.
: 4.     All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.
B. NEI 10-05 Assumptions
B. NEI 10-05 Assumptions
: 1. Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)2. On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
: 1.     Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)
: 3. Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.4. Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.5. On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.PNPS Page 11 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas)without the aid of a RP technician.
: 2.     On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
: 7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.12. Communications, briefings, and peer checks are acceptable collateral duties.13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
: 3.     Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.
: 15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as"Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation.
: 4.     Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.
As a result, a greater number and variety of actions would need to be implemented by plant personnel." 17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.PNPS Page 12 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.21. Severe Accident Management Guideline (SAMG) -It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.22. SAMG -The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure), and there is not actual or imminent challenge to containment integrity.
: 5.     On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.
PNPS Page 13 PNPS Page 13 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI. APPENDIX A -ANALYZED EVENTS AND ACCIDENTS E e t E e t S~ummary Descriptioniof~i Plant... .... ...... '"== ..:I ....:* : Refe~rence = ......' "= '
PNPS                                                                                             Page 11
iEn t ype- ::::::: :;:, Event.Mode..Document:s)
 
Event ECL.1 DBT Land and/or waterborne 1 NEI 10-05 Site Area Yes HOSTILE ACTION Emergency directed against the ISG IV.C Protected Area by a HOSTILE FORCE.2 DBA Control Rod Drop Accident 1 FSAR 14.5.1 Site Area Yes Emergency 3 DBA Loading Error Accident 1 FSAR 14.5.2 None Noz (misloaded bundle in the______core) 4 DBA Loss of Coolant Accident 1 FSAR 14.5.3 General Yes______Emergency 5 DBA Main Steam Line Break 1 FSAR 14.5.4 Site Area Yes Emergency 6 DBA Fuel Handling Accident 5 FSAR 14.5.5 Site Area Yes Emergency 7 DBA Radwaste System 1 FSAR 14.5.6 None Accident 8 Assumed Aircraft Probable Threat 1 10CFR50.54hh Alert Yes for (1)analysis purpose RG 1.214 9 Assumed Control Room Evacuation 1 FSAR 14.6.1 Alert Yes for and Alternate Shutdown Analysis (fire in main control room) I0CFR50 Purpose Appendix R Fire Hazard Analysis 10 Assumed Station Blackout 1 ISG IV.C Site Area Yes for Emergency analysis purpose 11 Assumed LOCA -General 1 ISG IV.C General Yes for Emergency with Emergency Analysis radiological release and____Purpose PAR 12 Assumed LOCA with entry into 1 ISG IV.C General for severe accident Emergency Analysis procedures.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
Purpose ________________________
: 6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas) without the aid of a RP technician.
_____PNPS Page 14 PNPS Page 1.4 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13 Assumed Appendix R Fire I ISG IV.C AlertNo for Analysis____ Purpose _____________
: 7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.
____ _______1 Plant mode per FSAR or assumed for anaiysis purpose 2 No EAL met on plant condition or dose.3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators.
: 8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.
The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity.
: 9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.
PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.
: 10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown.
: 11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.
Analysis is not required.PNPS Page 15 PNPS Page 15 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] -ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 -Design Basis Threat (DBT)1. Accident Summary* Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition 2. Accident Specific Assumptions Made* This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.* Assume at power in Mode 1* Security notifies the Shift Manager of condition Security Code RED.* Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.* Assume all systems function and the core remains covered. No fuel damage and no release.3. Procedures Reviewed for Accident Response* Procedure 5.3.14, Security Incident* EP-IP-1 00, Classification and Notifications
: 12. Communications, briefings, and peer checks are acceptable collateral duties.
* EP-IP-1 00.1, EAL* EP-IP-410, Evacuation and Assembly* Procedure 2.1.6, Reactor Scram PNPS Page 16 PNPS Page 16 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables PNPS TABLE V-ON-SHIFT POSITION T2/L1 T5/L1 T5/L3 1 Shift Manager Emergency Plan 60 T5/L5. No Yes Table B-i T5/L6 T5/L8 T5/L10________________
: 13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]
_______________T5/L 14 _ _ _ _ _ _ _ _2Control Room Emergency PlanN/T2LNoo Supervisor Table B-I Shift Technical EegnyPa 2L 3 Advisor/Shift Engineer ablrenc B-i n 60 T2/L3 No No (3 rd SRO) Table_____B-1
: 14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
___T5___L__
: 15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.
Licensed Nuclear EegnyPa / 2L oN 4 Plant Operator (RO ablrenc B-iN/ 24NoN Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B lai N/A T2/L5 No No*Non-Licensed 6 Nuclear Plant Emergency Plan N/A T2/L6 No No O)perator (NLO #1) abe-Nlon-Licensed T5/L9 7 .cea lat Emergency Plan 60 T5/L1 1 No No Nuclea Plant able B-i Operator (NLO #2) _______ T5/L1 3 ____Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #f4) al -Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -ii Fire Brigade #1 Emergency Plan N/A N/A No No______________
: 16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as "Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation. As a result, a greater number and variety of actions would need to be implemented by plant personnel."
Table B-I1________
: 17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -
_____12 Fire Brigade #2 Emergency Plan N/A N/A No No______________
Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.
Table B-I1________
PNPS                                                                                   Page 12
_____13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-I1________
 
_____14 RP Technician Emergency Plan 60 N/A No No_____ _____ ____ Table B-I1________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
_____Security Contingenc) 15 Security Plan / E-Plan Table 60 T5/Li15 No No_____ _____ ____ B-i1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PNPS Page 17 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS  
: 18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.
& SAFE SHUTDOWN.~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable
: 19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.
:Licensed Operator Training 1 Shift Manager Shift Manager Program Superisoricensed Operator Training 2 Unit Supervisor Control Room Sprio Program Licensed Operator Training 3 Shift Technical Advisor Shift Engineer/STA Program 4Licensed Nuclear Plant ~Licensed Operator Training RatrOeao#1Operator  
: 20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.
#1 Program 5Licensed Nuclear Plant Licensed Operator Training RatrOeao#2Operator  
: 21. Severe Accident Management Guideline (SAMG)             - It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.
#2 Program 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6___ Auxi___iary
: 22. SAMG - The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure),
___Operator_______Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 IOther needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
and there is not actual or imminent challenge to containment integrity.
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A Nl/A 13 I&C Technician N/A Nl/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 18 PNPS Page 18 PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie PeromdbrakAayi ontetoProligramehd 1 N/A Fire Protection Program 2 N/A Fire Protection Program 3 N/A Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.1n-#ntSrvy DBTiThreati 2 n-it Srvy 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):
Page 13 PNPS                                                                                           Page 13
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI.         APPENDIX A - ANALYZED EVENTS AND ACCIDENTS tEe      E e t                     ...... '"== . . :I Plant...
S~ummary....Descriptioniof~i      .... :* : Refe~rence=......i'*:'     "=   **: ' Analysis*:i*
iEn       t:;:, ype- :::::::           Event.Mode..Document:s)                                 Event ECL.
1             DBT     Land and/or waterborne               1     NEI 10-05                 Site Area       Yes HOSTILE ACTION                                                       Emergency directed against the                       ISG IV.C Protected Area by a HOSTILE FORCE.
2             DBA     Control Rod Drop Accident             1     FSAR 14.5.1             Site Area       Yes Emergency 3             DBA     Loading Error Accident               1     FSAR 14.5.2             None             Noz (misloaded bundle in the
______core) 4             DBA     Loss of Coolant Accident             1     FSAR 14.5.3             General         Yes
______Emergency 5             DBA       Main Steam Line Break               1     FSAR 14.5.4             Site Area       Yes Emergency 6             DBA       Fuel Handling Accident               5     FSAR 14.5.5             Site Area       Yes Emergency 7             DBA       Radwaste System                     1     FSAR 14.5.6             None             No*
Accident 8         Assumed       Aircraft Probable Threat             1     10CFR50.54hh           Alert           Yes for                                                 (1) analysis purpose                                                 RG 1.214 9         Assumed       Control Room Evacuation             1     FSAR 14.6.1             Alert           Yes for     and Alternate Shutdown Analysis     (fire in main control room)                 I0CFR50 Purpose                                                 Appendix R Fire Hazard Analysis 10         Assumed       Station Blackout                     1     ISG IV.C               Site Area       Yes for                                                                         Emergency analysis purpose 11         Assumed       LOCA - General                       1     ISG IV.C               General         Yes for     Emergency with                                                     Emergency Analysis     radiological release and
____Purpose          PAR 12         Assumed       LOCA with entry into                 1     ISG IV.C               General           No*
for     severe accident                                                     Emergency Analysis     procedures.
Purpose     ________________________                                             _____
Page 14 PNPS                                                                                                             Page 1.4
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13     Assumed     Appendix R Fire                     I ISG IV.C           AlertNo for Analysis
____ Purpose     _____________                 ____    _______
1 Plant mode per FSAR or assumed for anaiysis purpose 2
No EAL met on plant condition or dose.
3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators. The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity. PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.
4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown. Analysis is not required.
Page 15 PNPS                                                                                               Page 15
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] - ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 - Design Basis Threat (DBT)
: 1. Accident Summary
* Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition
: 2.     Accident Specific Assumptions Made
* This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.
* Assume at power in Mode 1
* Security notifies the Shift Manager of condition Security Code RED.
* Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.
* Assume all systems function and the core remains covered. No fuel damage and no release.
: 3.     Procedures Reviewed for Accident Response
* Procedure 5.3.14, Security Incident
* EP-IP-1 00, Classification and Notifications
* EP-IP-1 00.1, EAL
* EP-IP-410, Evacuation and Assembly
* Procedure 2.1.6, Reactor Scram Page 16 PNPS                                                                                           Page 16
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.       Tables PNPS V-ON-SHIFT TABLE POSITION T2/L1 T5/L1 T5/L3 1     Shift Manager             Emergency Plan                     60           T5/L5.           No       Yes Table B-i                                     T5/L6 T5/L8 T5/L10
_______________T5/L                               14     _    _ _ _ _ _ _ _
2Control Room                 Emergency PlanN/T2LNoo Supervisor                 Table B-I Shift Technical           EegnyPa                                         2L 3 Advisor/Shift Engineer ablrenc         B-i       n             60           T2/L3           No       No (3 rd SRO)               Table_____B-1             ___T5___L__
Licensed Nuclear           EegnyPa                             /           2L               oN 4     Plant Operator (RO           ablrencB-iN/                                   24NoN Licensed Nuclear           EegnyPa 5   Plant Operator (RO           ablrencB      lai             N/A           T2/L5           No       No*
Non-Licensed 6     Nuclear Plant             Emergency Plan                   N/A           T2/L6           No       No O)perator (NLO #1)           abe-Nlon-Licensed                                                             T5/L9 7 .       cea lat             Emergency Plan                     60         T5/L1 1           No       No Nuclea Plant           able B-i Operator (NLO #2)                                 _______               T5/L1 3   ____
Non-Licensed 8     Nuclear Plant             Emergency Plan                   N/A           N/A             No       No Operator (NLO #3)           al       -
Non-Licensed 9 Nuclear Plant                 Emergency Plan                   N/A           N/A             No       No Operator (NLO #f4)         al       -
Non-Licensed 10 Nuclear Plant                 Emergency Plan                   N/A           N/A             No       No Operator (NLO #5)           al -
ii     Fire Brigade #1           Emergency Plan                   N/A           N/A             No        No
______________    Table   B-I1________                                     _____
12 Fire Brigade #2               Emergency Plan                   N/A           N/A             No        No
______________    Table   B-I1________                                     _____
13 RP / Chemistry                 Emergency Plan                   60           N/A             No       No Technician               Table   B-I1________                                     _____
14 RP Technician                 Emergency Plan                   60           N/A             No       No
_____ ____   Table   B-I1________                                     _____
Security Contingenc) 15 Security                     Plan / E-Plan Table               60         T5/Li15           No        No
_____ ____   B-i1_                         _ _   _ _ _ _ _   _ _ _ _   _   _ _ _
PNPS                                                                                                        Page 17
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS &SAFE SHUTDOWN.
                                          ~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable
:Licensed Operator Training 1   Shift Manager                                       Shift Manager                       Program Superisoricensed Operator Training 2   Unit Supervisor                                     Control Room Sprio                 Program Licensed Operator Training 3   Shift Technical Advisor                             Shift Engineer/STA                 Program 4Licensed                                             Nuclear Plant           ~Licensed Operator Training RatrOeao#1Operator                                 #1                       Program 5Licensed                                             Nuclear Plant           Licensed Operator Training RatrOeao#2Operator                                 #2                       Program 6 uiliry pertor#1Non-licensed                                                       Non-Licensed Operator 6___ Auxi___iary       ___Operator_______Plant                 Operator Nuclear
                                                                                #1             Training Program 7   Auxiliary Operator #2                               N/A                               N/A 8   Other needed for Safe Shutdown                       N/A                               N/A 9   IOther needed for Safe Shutdown                     N/A                               N/A 10     Other needed for Safe Shutdown                     N/A                               N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                   On-Shift Position                 Task Analysis
_______________Controlling              Method 11   Mechanic                                             N/A                               N/A 12   Electrician                                         N/A                               Nl/A 13   I&C Technician                                       N/A                               Nl/A 14   Other                                               N/A                               N/A 15   Other                                               N/A                               Nl/A Page 18 PNPS PNPS                                                                                                                Page 18
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie                                     PeromdbrakAayi ontetoProligramehd 1                         N/A                                       Fire Protection Program 2                         N/A                                       Fire Protection Program 3                         N/A                                       Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.
1n-#ntSrvy                         DBTiThreati 2 Srvy n-it 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):
N/A N/A 6 Othermistey spectific task #1 (describe)
N/A N/A 6 Othermistey spectific task #1 (describe)
N/__ A__Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions.
N/__
RP and Chemistry take cover as directed.I:.. PNSTAL~5-EMERGENCY  
A__
:PLAN I:MPLEMENTATION  
Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions. RP and Chemistry take cover as directed.
:::, :: .PNPS Page 19 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level Shift Manager Emergency Planning Training 1 ECL)Program  
I:..               PNSTAL~5-EMERGENCY :PLAN I:MPLEMENTATION :::, ::                         .
/ EP Drills Approve Offsite Protective Action NAEmergency Planning Training N/AcmenaiosProgram 3 Approve content of State/local notifications Shift Manager Pmrogram Plnin rann Emergency Planning Training 4 Approve extension to allowable dose N/A Program Licensed Operator Training Notification and direction to on-shift staff SitMngr Porm/EegnyPann ( e.g., to assemble, evacuate, etc.) SitMngr .raiigra P mrogram ,Pnnn Emergency Planning Training 6 ERO notification Shift Manager Program Abbreviated NRC notification for DBT SALicensed Operator Training 7event TAProgram 8 Complete State/local notification form Shift Manager Pmrogram Plnin rann EmrogenyPlninarann 9 Perform State/local notifications NLO#2 Pmrogram Plnin rann Program 11 Ativae EDS NO#2Emergency Planning Training 11 civae ERS NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment asmtos rga Ememtns rogenyPlninarann 13 Perform NRC notifications NLO#2 Pmrogram Plnin rann Perform other site-specific event Licensed Operator Training 14 notifications (e.g., Duty Plant Manager, Shift Manager Prga INPO, ANI, etc.) Program_________________
PNPS                                                                                             Page 19
15 Iersnne Accuntbilty SecuityOffcer Security Training Program / EP 15 Prsonel ccontablit Secrit Offcer Drills PNPS Page 20 PNPS Page 20 (PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2 -Control Rod Drop Accident 1. Accident Summary* The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position.
 
It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level   Shift Manager     Emergency Planning Training 1       ECL)Program                                       / EP Drills Approve Offsite Protective Action           NAEmergency                   Planning Training N/AcmenaiosProgram 3   Approve content of State/local notifications Shift Manager     Pmrogram     Plnin     rann Emergency Planning Training 4   Approve extension to allowable dose           N/A               Program Licensed Operator Training Notification and direction to on-shift staff SitMngr           Porm/EegnyPann
The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
( e.g., to assemble, evacuate, etc.)         SitMngr           .raiigra P mrogram     ,Pnnn Emergency Planning Training 6   ERO notification                             Shift Manager     Program Abbreviated NRC notification for DBT         SALicensed                   Operator Training 7event                                         TAProgram 8   Complete State/local notification form       Shift Manager     Pmrogram     Plnin     rann EmrogenyPlninarann 9   Perform State/local notifications           NLO#2             Pmrogram     Plnin     rann Program 11 Ativae EDS                 NO#2Emergency                 Planning Training 11 civae ERS                   NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment               asmtos               rga Ememtns rogenyPlninarann 13   Perform NRC notifications                   NLO#2             Pmrogram   Plnin     rann Perform other site-specific event                               Licensed Operator Training 14   notifications (e.g., Duty Plant Manager,     Shift Manager     Prga INPO, ANI, etc.)                                               Program_________________
* The worst case CRDA occurs during mechanical vacuum pump operation.
15 Iersnne Accuntbilty         SecuityOffcer     Security Training Program / EP 15 Prsonel ccontablit         Secrit Offcer     Drills Page 20 PNPS                                                                                             Page 20
The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment.
 
The condenser leakage scenario is bounding for PNPS.2. Accident Specific Assumptions Made* The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.* The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.* The EAL is based on 1-hr (1/2) of the FSAR EAB dose.3. Procedures Reviewed for Accident Response* 2.4.40, Rapid Increase in main Steam Line or Offgas Activity* EIP-IP-1 00, Classification and Notification
(
* EIP-100.1, EALs* EIP-EP-410, Evacuation and Assembly* 2.1.6, Reactor Scram* EOP-5, Radiological Release Control* 6.1-220, Radiological Controls for Risk Evolutions
PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2     - Control Rod Drop Accident
* ARP-C904LC Alarm Response Procedure* 7.4.64, PRM Alarm Response* 7.3.11, Reactor and Hotwell Water Analysis Preparation PNPS Page 21 PNPS Page 21 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables T5/L3 T5/L5 Emergency Plan 60 No5Yes I Shift Manager Table B-I T5/L6 NoYe T5/L8 T5/L 10______ ______ ___ __ ______ ______T5/L14
: 1. Accident Summary
______2Control Room Emergency PlanN/T/LNoo Supervisor Table B-I Shift Technical EegnyPa 2L oN 3 Advisor/Shift EmrecPan6T2L Noo Eng]ineer (3 rd SRO) Table B-I16 Licensed Nuclear EegnyPa /4 Plant Operator (RO Emrec lnNAT2/L4 No No I) ~~~~able B-I1______
* The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position. It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity. The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
Licensed Nuclear EegnyPa /5 Plant Operator (RO Emrec lnNAT2/L5 No No 2)Table B-i Non-Licensed EegnyPa /6 Nuclear Plant Emrec lnNAT2/L6 No No'O p e ra to r (N L O # 1 ) T a b le B -I1_ _ _ _ _ _ _ _ _ _ _ _ _Nlon-Licensed Emrec lnT5/L9 7 Nluclear Plant Emrec ln60 T5/L11I No No Fable B-I Operator (NLO #2) _________T5/L13 Nlon-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -Non-Licensed Emergency PlanN/NANoo 9 Nuclear Plant aeB-N/NA Noo Operator (NLO #4) al -Non-Licensed IEmergency PlanN/Noo 10 Nuclear PlantN/NA Noo Operator (NLO #5) beB- /11 Fire Brigade #1 Emergency PlanN/NANoo
* The worst case CRDA occurs during mechanical vacuum pump operation. The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment. The condenser leakage scenario is bounding for PNPS.
_______ _______ able B-i1/ / oN 12 Fire Brigade #2 Emergency Plan N/A N/A No No______________
: 2. Accident Specific Assumptions Made
Fable B-I1________
* The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.
13 RP / Chemistry IEmergency Plan 60 T5/L12 No No Technician B-i1________
* The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.
_____14 RP Technician Emergency Plan 60 T4/L1 No No_____ _____ _____ able B-I1_ _ _ __ _ _ _Security Contingencyl 15 Security / E-Plan Table 60 T5/L1 5 No No L PNP TABLE E2 -PLANT p OE RkTIQNS SH
* The EAL is based on 1-hr (1/2) of the FSAR EAB dose.
&deg; I PNPS Page 22 PNPS ON-SHIFT STAFFING ANALYSIS REPORT%
: 3. Procedures Reviewed for Accident Response
e nit ne Control R oom :,"..... ..........  
* 2.4.40, Rapid Increase in main Steam Line or Offgas Activity
:  
* EIP-IP-1 00, Classification and Notification
:= = =::; 2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method Licensed Operator Training 1 Shift Manager Shift Manager Program SuperisorLicensed Operator Training 2 U~nit Supervisor Control Room SuevsrProgram 3 Shft echicalAdvsorLicensed Operator Training 3 Sif Tchica AviorShift Engineer/STA Program Licensed Nuclear Plant Licensed Operator Training 4 Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant Licensed Operator Training 5 Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6 uxliryOpraor#1Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
* EIP-100.1, EALs
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A ,14 O3ther N/A N/A 15 Other N/A N/A PNPS Page 23 PNPS Page 23 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade:;: : ::::} :.: i , Analysis~#
* EIP-EP-410, Evacuation and Assembly
2 Control Rod Drop  
* 2.1.6, Reactor Scram
=, ;= i&#xa2; J: 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The CRDA does not include the need for firefighting.
* EOP-5, Radiological Release Control
PNS ag 2 PNPS Page 24 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio Prfomig Aalyis#2 onrolRo DrpAccid I In-Plant Survey:_RP#1X X X X X X X X X X X X X X X X X X 2 On-site Survey:_-NI/A 3 Personnel Mlonitoring:
* 6.1-220, Radiological Controls for Risk Evolutions
N/A _T Job Coverage: N/A 5 Offsite Rad ,ssessment: (Included in Table , 5 6 Other site specific RP (describe):
* ARP-C904LC Alarm Response Procedure
N/A 7 Chemistry Function task #1 (describe)
* 7.4.64, PRM Alarm Response
* 7.3.11, Reactor and Hotwell Water Analysis Preparation Page 21 PNPS                                                                                         Page 21
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.           Tables T5/L3 T5/L5 Emergency Plan                       60                           No5Yes I   Shift Manager                         Table B-I                                         T5/L6           NoYe T5/L8 T5/L 10
______     ______T5/L14                           ______
2Control Room                         Emergency PlanN/T/LNoo Supervisor                           Table B-I Shift Technical                       EegnyPa                                             2L             oN 3   Advisor/Shift                         EmrecPan6T2L                                                     Noo Eng]ineer (3 rdSRO)                 Table B-I16 Licensed Nuclear                     EegnyPa                               /
4   Plant Operator (RO                   Emrec lnNAT2/L4                                                   No       No I)                         ~~~~able B-I1______
Licensed Nuclear                     EegnyPa                               /
5   Plant Operator (RO                   Emrec lnNAT2/L5                                                   No       No 2)Table                             B-i Non-Licensed                         EegnyPa                               /
6   Nuclear Plant                       Emrec lnNAT2/L6                                                   No       No
    'Op e ra to r   (NLO #1)             T a b le B-I1_                                     _ _ _   _ _ _ _ _ _ _ _ _
Nlon-Licensed                       Emrec             lnT5/L9 7   Nluclear Plant                       Emrec               ln60                         T5/L11I         No       No Operator (NLO #2)                     Fable B-I
_________T5/L13 Nlon-Licensed                       EegnyPa                               /             /           oN 8   Nuclear Plant                         EegnyPa                               /             /           oN Operator (NLO #3)                     al -
Non-Licensed                 Emergency PlanN/NANoo 9   Nuclear Plant                         aeB-N/NA                                                       Noo Operator (NLO #4)                     al -
Non-Licensed                         IEmergency PlanN/Noo 10 Nuclear PlantN/NA                                                                                       Noo Operator (NLO #5)                       beB-                               /
11 Fire Brigade #1                       Emergency PlanN/NANoo
_______     _______         able B-i1/                                         /           oN 12 Fire Brigade #2                         Emergency Plan                     N/A           N/A           No      No
______________              Fable     B-I1________
13 RP / Chemistry                         IEmergency Plan                       60         T5/L12         No       No Technician                         *able    B-i1________                                     _____
14 RP Technician                         Emergency Plan                       60           T4/L1         No      No
__________        _____       able B-I1_                     _ _ __ _ _ _
Security Contingencyl 15 Security                               P*lan / E-Plan Table                 60         T5/L1 5         No       No L /,:*:**!
        !iS*'I::::!**!:*i    *!* PNPS* TABLEE2            - PLANT OE    p RkTIQNS :&* SAoFE* SHUTDO*WN!*I          &deg;    I PNPS                                                                                                                Page 22
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
        %i~~~~ii*~O                    e  nit -*O..........
ne :Control
                                                                *=*      R*.......:
oom :,".....
:=,,*=::;=*
2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole                                 On-Shift Position                       Task Analysis Controlling Method Licensed Operator Training 1   Shift Manager                                     Shift Manager                           Program SuperisorLicensed Operator Training 2   U~nit Supervisor                                 Control Room SuevsrProgram 3   Shft     echicalAdvsorLicensed                                                   Operator Training 3   Sif Tchica AviorShift                             Engineer/STA                     Program Licensed Nuclear Plant                   Licensed Operator Training 4   Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant                   Licensed Operator Training 5   Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed                                       Nuclear             Non-Licensed Operator 6 uxliryOpraor#1Plant                             Operator #1                       Training Program 7   &uxiliary Operator #2                               N/A                                   N/A 8   Other needed for Safe Shutdown                     N/A                                   N/A 9   Other needed for Safe Shutdown                     N/A                                   N/A 10   Other needed for Safe Shutdown                     N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole                                   On-Shift Position                     Task Analysis
________________Controlling                Method 11   Mechanic                                             N/A                                   N/A 12   Electrician                                         N/A                                   N/A 13   l&C Technician                                       N/A                                   N/A
  ,14   O3ther                                               N/A                                   N/A 15   Other                                               N/A                                   N/A Page 23 PNPS                                                                                                                   Page 23
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade h*":::::}:;: *:    :.: i   , Analysis~#2 Control Rod Drop =Accident=',,*:' =,;= :.:!*- i&#xa2; J:
1                             N/A                                         N/A 2                             N/A                                         N/A 3                             N/A                                         N/A 4                             N/A                                         N/A 5                             N/A                                         N/A Note: The CRDA does not include the need for firefighting.
PNS                                                                                           ag 2 PNPS                                                                                         Page 24
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio PrfomigAalyis#2 onrolRo DrpAccident**ii!
In-Plant Survey:_
RP#1X                         X   X   X   X   X     X   X   X   X   X   X   X   X   X   X   X   X 2 On-site Survey:_-
NI/A 3 Personnel Mlonitoring:
N/A      _
T  Job Coverage:
N/A 5 Offsite Rad
    ,ssessment:
(Includedin Table              ,
5 6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A*Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.* Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete*Onsite surveys after enter EOP-5* As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.* Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)* Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.Takes =30 minutes to complete.* Procedure2.1.6 directs Offgas sample (not time critical) but it isolates.
N/A
Sample not required during the 60 minutes.PNPS Page 25 PNPS Page 25 PNPS ON-SHIFT STAFFING ANALYSIS REPORT~.NSTBE5EMRECPLNIMPLEMENTATIOQN  
              *Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.
-:: -i: 'Declre he mergncyclasifiatin lvelEmergency Planning Delr1h megnycasfiainivlShift Manager ' raining Program / EP (ECL) Drills 2 pprove Offsite Protective Action N/ .Emergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Eraining Progamnn Licensed Operator INotification and direction to on-shift staff Training Program /5 Shift Manager EegnyPann (e.g., to assemble, evacuate, etc.) TingmrenYoralang Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator 7 ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8 Complete State/local notification form Shift Manager Tann rga Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Lricnsed OPeraogra 10 Complete NRC event notification form Shift Manager raiicnge POgeramo 11 EnS Planning 11 ctvateERDS LO#Training Program 12 Offsite radiological assessment Chemistry Tcnia Eeraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NILO#2 Eraining Progamnn Perform other site-specific event Licensed Operator 14 notifications (e.g., Duty Plant Manager, Shift Manager Training Program INPO, ANI, etc.) __________
* Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete
15 Personnel Accountability Security Security Training Program PNPS Page 26 PNPS Page 26 PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 -Loss of Coolant Accident 1. Accident Summary* This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location.
    *Onsite       surveys after enter EOP-5
Break of a large .recirculation pipe represents the limiting pipe break inside the containment.
* As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.
Reactor scram, MSIVs isolate, ECCS initiates and injects.* Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.2. Accident Specific Assumptions Made* No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.* EAL is based on FSAR EAB dose.3. Procedures for Accident Response* EP-IP-1 00, Emergency Classification and Notification
* Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)
* EP-IP-100.1.
* Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.
Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
Takes =30 minutes to complete.
* EOP-01, RPV Control* EOP-3, Primary Containment Control* EOP-4, Secondary Containment Control* EOP-5, Radiological Release* 2.1.6, Reactor Scram* EP-IP-240, Emergency Security Organization Activation and Response* 6.3-064, EOP-4 Surveys* EP-I P-400, Protective Action Recommendation PNPS Page 27 PNPS Page 27 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables T2/LI T5/L1 T5/L3 T5/L4 1 Shift Manager Emergency Plan Table 60 T5/L5 No Yes B-i T51L6 T5/L8 T5/L10____ ____ ____ ___ ___ ____ ____ ___ ____ ___ T5/L14_ _ _ _ _ _2 ontrol Room Emergency Plan Table N/T2LNoo Supervisor B-i Shift Technical EmrecPlnTbe 6T2LNoo 3 EmrecPlnTbe 6T2LNoo__ _Engineer (3 rd SRO) B-i Licensed Nuclear EegnyPa al / 2L oN Liceanse Nueratr(R Emergency Plan Table N/A T2/L4 No No NnLicensedNula 65 ula Plant Oeao R Emergency Plan Table N/A T2/L6 No No Operatr (NL #1) -i Non-LicensedT5L 6 Nucler Plant Emergency Plan Table NAT2LNoo Operator (NLO #2) ______ TL1 ______Non-Licensed Emrgnc/PanTal 8 Nuclear Plant B-ignc N/ATale 6 N5/A1 No No Operator (NLO #3) T5/L13____
* Procedure2.1.6 directs Offgas sample (not time critical) but it isolates. Sample not required during the 60 minutes.
_____________
Page 25 PNPS                                                                                                   Page 25
Non-Licensed 9 ula ln Emergency Plan Table N/A N/A No No Nuclar Pant B-i Operator (NLO #4) ______Non-Licensed EegnyPa al 10 Nuclear Plant B-igny la abe N/A N/A No No Operator (NLO #4)______10 FireBiade  
 
#1an Emergency Plan Table N/A N/A No No_____ _____ ____ B-i1_ _ _ _ _ _12 Fire Brigade #2 Emergency Plan Table N/A N/A No No 13 RP / Chemistry Emergency Plan Table 60 T5/L12 No No Technician B-i1______
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
______14 RP Technician Emergency Plan Table 60 T4/L1 No No B-i1______
                  ~.NSTBE5EMRECPLNIMPLEMENTATIOQN - *                                        :: -   i:   '
T4/L2 __ ____ ______15 Security Security Contingency 60 T5/L1 5 No No______________Plan
Declre he mergncyclasifiatin lvelEmergency                                 Planning Delr1h         megnycasfiainivlShift Manager '                           raining Program / EP (ECL)                                                                   Drills 2 pprove Offsite Protective Action               N/           .Emergency                 Planning 2 Recommendations                                 N/Araining                         Program 3   Approve content of State/local notifications   Shift Manager           Eraining     Progamnn Emrgencyg     Planning 4   Approve extension to allowable dose             N/A                     Eraining     Progamnn Licensed Operator INotification and direction to on-shift staff                           Training Program /
/ E-Plan Table B-i1 ______ _______ ____________
5   (e.g., to assemble, evacuate, etc.)             Shift Manager          EegnyPann TingmrenYoralang Emergency Planning 6   ERO notification                               Shift ManagerrangPorm Licensed Operator 7     ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8   Complete State/local notification form         Shift Manager           Tann         rga Emrgencyg Planning 9   Perform State/local notifications               NLO#2                   Emraining Progamnn Lricnsed OPeraogra 10   Complete NRC event notification form           Shift Manager             raiicnge POgeramo 11     *tivae    EnS           *IO#2Emergency                        Planning 11     ctvateERDS                 LO#Training                     Program 12   Offsite radiological assessment               Chemistry Tcnia         Eeraining     Progamnn Emrgencyg     Planning 13   Perform NRC notifications                     NILO#2                 Eraining     Progamnn Perform other site-specific event                                       Licensed Operator 14   notifications (e.g., Duty Plant Manager,       Shift Manager         Training Program INPO, ANI, etc.)                                                       __________
PNPS Page 28 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role On-Shift Position Task Analysis 1 Shift Manager Shift Manager raiicnge POperamo______ ___ ____ ___ ___ ____ ___ ___ ___ ___ ___ ____ ___ __ TrainingProg~ram 3 Licensed Operator Shift TuehialAvisor Shiftro Engine uer/STA r Trainingl Program Licesed uclar Pant Licensed Operator 4 SReato Operhiat dior #Shperto #1inerSTraining Prog~ram 5 eco prtr# Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
15   Personnel Accountability                       Security               Security Training Program Page 26 PNPS                                                                                                 Page 26
#12 Training Program 6 uxiciary Operator #1 NnLicensed Nuclear Pl n on-Licensed Operator Pln Operator #1 Training Program 7 Auxiliary Operator #21/8 Other needed for Safe Shutdown N/A X/9 Other needed for Safe Shutdown N/A X/10 Other needed for Safe Shutdown N/A /Other (non-Operations)
 
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 29 PNPS Page 29 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5 N/A N/A Note: The LOCA does not include a fire.PNPS Page 30 PNPS Page 30 PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements)  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 - Loss of Coolant Accident
& as directed by SM _2 On-site Survey:X X X X X X X X 3 Personnel Monitoring:
: 1. Accident Summary
N/A T Job Coverage: N/A__50Offsite Rad Assessment: (Included in Table 5 6 Other site specific RP (describe):
* This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location. Break of a large     .
N/A 7 Chemistry Function task #1 (describe)
recirculation pipe represents the limiting pipe break inside the containment. Reactor scram, MSIVs isolate, ECCS initiates and injects.
* Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.
MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.
: 2. Accident Specific Assumptions Made
* No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.
* EAL is based on FSAR EAB dose.
: 3. Procedures for Accident Response
* EP-IP-1 00, Emergency Classification and Notification
* EP-IP-100.1. Emergency Action Levels
* EP-IP-300, Offsite Radiological Dose Assessment
* EOP-01, RPV Control
* EOP-3, Primary Containment Control
* EOP-4, Secondary Containment Control
* EOP-5, Radiological Release
* 2.1.6, Reactor Scram
* EP-IP-240, Emergency Security Organization Activation and Response
* 6.3-064, EOP-4 Surveys
* EP-I P-400, Protective Action Recommendation Page 27 PNPS PNPS                                                                                      Page 27
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.     Tables T2/LI T5/L1 T5/L3 T5/L4 1       Shift Manager               Emergency Plan Table             60                 T5/L5             No       Yes B-i                                                 T51L6 T5/L8 T5/L10
____ ____ ____   ___     ____     ___       T5/L14_                   _  _ _ _ _
2      ontrol Room             Emergency Plan Table             N/T2LNoo Supervisor                 B-i Shift Technical             EmrecPlnTbe                       6T2LNoo 3       *dvisor/Shift              EmrecPlnTbe                       6T2LNoo
__ _Engineer       ( 3 rd SRO)   B-i Licensed Nuclear           EegnyPa           al               /                 2L                 oN Liceanse     Nueratr(R     Emergency Plan Table             N/A               T2/L4             No         No NnLicensedNula 65         ula Plant Oeao R             Emergency Plan Table             N/A               T2/L6             No         No Operatr (NL #1) -i Non-LicensedT5L 6 NuclerPlant          Emergency Plan Table             NAT2LNoo Operator (NLO #2)                                     ______                   TL1       ______
Non-Licensed               Emrgnc/PanTal 8     Nuclear Plant               B-ignc                           N/ATale 6                   N5/A1           No         No Operator (NLO #3)                                     _____________            T5/L13____
Non-Licensed 9         ula         ln         Emergency Plan Table             N/A                 N/A             No         No Nuclar Pant           B-i Operator (NLO #4)                                   ______
Non-Licensed               EegnyPa           al 10     Nuclear Plant               B-igny la         abe           N/A                 N/A             No         No Operator (NLO #4)______
10      FireBiade #1an             Emergency Plan Table             N/A                 N/A             No          No
_____     ____ B-i1_                         _ _   _ _ _
12      Fire Brigade #2             Emergency Plan Table             N/A                 N/A             No         No 13     RP / Chemistry             Emergency Plan Table             60               T5/L12             No         No Technician                 B-i1______                                   ______
14      RP Technician               Emergency Plan Table               60               T4/L1             No         No B-i1______                                           T4/L2     __     ____ ______
15      Security                   Security Contingency               60               T5/L1 5           No          No
______________Plan      / E-Plan Table B-i1   ______               _______       ____________
PNPS                                                                                                               Page 28
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role                       On-Shift Position             Task Analysis 1   Shift Manager                           Shift Manager                   raiicnge POperamo
____ ___ ___ ___   ___   ___   ____   ___ __   TrainingProg~ram 3                                                     Licensed Operator Shift TuehialAvisor                     Shiftro Engine       uer/STA r Trainingl Program Licesed uclar Pant       Licensed Operator 4 SReato Operhiat dior#Shperto                       #1inerSTrainingProg~ram 5     eco       prtr#                       Licensed Nuclear Plant       Licensed Operator RatrOeao#2Operator                     #12                 Training Program 6     uxiciary Operator #1                     NnLicensed Nuclear Pl     n   on-Licensed Operator PlnOperator #1               Training Program 7   Auxiliary Operator #21/
8   Other needed for Safe Shutdown           N/A                         X/
9   Other needed for Safe Shutdown           N/A                         X/
10   Other needed for Safe Shutdown           N/A                           /
Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole                         On-Shift Position           Task Analysis Controlling Method 11   Mechanic                                 N/A                         N/A 12   Electrician                               N/A                         N/A 13   I&C Technician                           N/A                         N/A 14   Other                                     N/A                         N/A 15   Other                                     N/A                         N/A Page 29 PNPS                                                                                                 Page 29
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5                     N/A                   N/A Note: The LOCA does not include a fire.
Page 30 PNPS                                                 Page 30
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements) & as directed by SM       _
2 On-site Survey:X                           X X X X X X X 3 Personnel Monitoring:
N/A T Job Coverage:
N/A__
50Offsite Rad Assessment:
(Included in Table 5
6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
.__N/A*Prorac Times are estimated PNPS Page 31 PNPS Page 31 PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ! Func ion. Task O rrS it i P A nalysis:................
      . __N/A
Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift ManagerrangPorm Emrgencyg Planning 4 Approve extension to allowable dose Shift Manager Emraining Progamnn Notiicaionand iretio to n-siftstaf (eg.,Licensed Operator Training to assembleio evacuaireten etc.) siftff(. Shift Manager Program I Emergency_____assemb
              *Prorac     Times are estimated Page 31 PNPS                                                         Page 31
_____e,__evacuate,______et___.___Planning Training Program Emergency Planning 6 ERO notification Shift Manager Training Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann____ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ __ rogram Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civat ERD raiingProgram 11 AciTechnicianO#2Emergency Planning 12' Offsite radiological assessment Chemistry ehnca Emraining Progamnn 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#2Training Program 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) Program__________________
 
15 Personnel Accountability Security Security Training Program PNPS Page 32 PNPS Page 32 PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 -Main Steam Line Break 1. Accident Summary* This event involves the postulation of a large steam line pipe break outside containment.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ne* !                   Func ion.       Task                               O rrS it i P osition*iji          Task*: Analysis:................
It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features.
Emergency Planning 1 Declare the emergency classification level                         Shift Manager               Training Program / EP (ECL)                                                                                         Drills 2 pprove Offsite Protective Action                                   SitMngrEmergency                           Planning 2 Recommendations                                                     ShfTangrraining                       Program Emergency Planning 3     Approve content of State/local notifications                       Shift ManagerrangPorm Emrgencyg   Planning 4     Approve extension to allowable dose                               Shift Manager               Emraining   Progamnn Notiicaionand to n-siftstaf     iretio(eg.,Licensed                                   Operator Training to assembleio   evacuairetenetc.) siftff(.                       Shift Manager               Program I Emergency
This postulated event represents the envelope evaluation of steam line failures outside containment.
_____assemb        _____e,__evacuate,______et___.___Planning                                           Training Program Emergency Planning 6     ERO notification                                                   Shift Manager               Training Program 7     Abbreviated NRC notification for DBT event                         N/A                         Lcne           prtrTann
: 2. Accident Specific Assumptions Made* Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.3. Procedures for Accident Response* EP-IP-IO00, Emergency Classification and Notification
_____________ ___ ______    ____       ___ ___ ___ ___ ___ ___ __   rogram Emergency Planning 8     Complete State/local notification form                             Shift ManagerrangPorm Emrgencyg     Planning 9     Perform State/local notifications                                 NLO#2                       Emraining   Progamnn Licensed Operator Training 10   Complete NRC event notification form                               Shift ManagerPrga 11 civat ERD                                                                 raiingProgram 11     AciTechnicianO#2Emergency                                                               Planning 12' Offsite radiological assessment                                     Chemistry   ehnca         Emraining     Progamnn 13     Prfom NR                   noifiatios NO#2Emergency                               Planning 13     Prfom NR                   noifiatios NO#2Training                             Program 14Perform other site-specific event notifications SitMngrLicensed                                             Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                                                   Program__________________
* EP-IP-1 00.1. Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
15     Personnel Accountability                                         Security                   Security Training Program Page 32 PNPS                                                                                                                           Page 32
* EOP-01, RPV Control* EOP-3, Primary Containment Control* EOP-5, Radiological Release* 2.1.6, Reactor Scram* EP-IP-300, Offsite Radiological Dose Assessment
 
* 6.3-064, EOP-4 Surveys PNPS Page 33 PNPS Page 33 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tablesi : ,,
PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 - Main Steam Line Break
= A P PE.N D IX B =:=:, i ::'On-shift Pos =itin E-Pan:= Reference..
: 1. Accident Summary
=Augnmertation Role In Tlable Unana...................yzed............
* This event involves the postulation of a large steam line pipe break outside containment. It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features. This postulated event represents the envelope evaluation of steam line failures outside containment.
T2/LI T5/L1 T5/L3 1 SitMngr Emergency Plan 60 TISNo Yes Shf aae able B-I T5/L6 T5/L8 T5/L10 T5/L 14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-i Shift Technical 3 Advisor/Shift Emergency Plan 6 2L oN____Engineer,_(3 rd SRO) Table B-I 0T/L oN Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Tablgenc B-I/AT2L No No______ 1)Licensed Nuclear EegnyPa / 2L 5 lant Operator (RO Emrec ln NAT/5No No____2) Table B-I Non-Licensed 6 Nuclear Plant Emergenc Plan N/A T2/L6 No No____Operator (NLO #1)TalB-Non-Licensed T5/L9 7 Nuclear Plant Emergency Plan 6 5L oN Operator (NLO #2)al -T5/L1 3 _____Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3)TalB-Non-Licensed 9 Nuclear Plant Emergency Plan N/A NIA No No____Operator (NLO #4) al -Non-Licensed 10 NcerPat Emergency Plan N/A N/A No No____Operator (NLO #5 al -11 Fire Brigade #1 Emergency Plan NIA N/A No No_____ _____________
: 2. Accident Specific Assumptions Made
Table B-i1______
* Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.
______12 Fire Brigade #2 Emergency Plan N/A N/A No No_____ _____________
: 3. Procedures for Accident Response
Table B-I1______
* EP-IP-IO00, Emergency Classification and Notification
______13 RP / Chemistry Emergency Plan 60 T5/L12 No No____echnician Table B-I 14 RP Technician Emergency Plan 60 T4/L1 No No T____________able B-I T4/L2 Security 15 Security Contingency Plan 60 T5/L15 No No___________________
* EP-IP-1 00.1. Emergency Action Levels
/ E-Plan Table B-i1 _____________
* EP-IP-300, Offsite Radiological Dose Assessment
_____________
* EOP-01, RPV Control
PNPS Page 34 PNPS Page 34 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2- =PLANT OPERATIONS  
* EOP-3, Primary Containment Control
& SAFE SHUTDOWN=i : ;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole  
* EOP-5, Radiological Release
'!:: : = On-Shift i :i Tsk Anialysisl , 1 Shft anaer SiftMangerLicensed Operator ShiftManagerShiftManager raining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator_______Training Program 3 Licensed Operator Shift Technical Advisor Shift Engineer/STA Training Program 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator  
* 2.1.6, Reactor Scram
#1 Training Program 5 RatrOeao#2Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
* EP-IP-300, Offsite Radiological Dose Assessment
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 jOther needed for Safe Shutdown N/A N/A Other (non-Operations)
* 6.3-064, EOP-4 Surveys Page 33 PNPS                                                                                     Page 33
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role On-Shift Position Task Analysis_________________________
 
_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 35 PNPS Page 35 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The MSLB analysis does not include a fire.PNPS Page 36 PNPS Page 36 PNPS ON-SHIFT STAFFING ANALYSIS REPORT: ......... ,.,:,;Analysis  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
#5 M ain Steam : Line ,Break: M  
: 4.         Tables
.... ..........  
:,'*i      i      ;*.;:*:* : ,, ==:*
...I Function / Task __ __ ___;____! N 5 15 25 35 45 55 65 75 85-E 010 15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:_RP#1 X X X X X X 2 On-site Survey:X X X X X X X X X RP#1 3 Personnel Monitoring:
:i!**!==:
N/A_4 Job Coverage: N/A.50Offsite Rad Assessment:
                                                          =   A P PE.N D IX B ,;*; =:=:,              =*                i :*! ::'
On-shift Pos                  E-Pan:=
                                    =itin        Reference.. =Augnmertation Role In Tlable  Unana...................yzed............
TMS.....**
T2/LI T5/L1 T5/L3 1 SitMngr                   Emergency Plan               60             TISNo                             Yes Shfaae                able B-I                                   T5/L6 T5/L8 T5/L10 T5/L 14 2       Control Room                 Emergency Plan               N/A             T2/L2       No                   No Supervisor                   Table B-i Shift Technical 3       Advisor/Shift                 Emergency Plan                 6               2L           oN
____Engineer,_(
3 rd SRO) Table B-I                         0T/L                         oN Licensed Nuclear             EegnyPa                       /               2L 4       Plant Operator (RO Tablgenc           B-I/AT2L                                           No                    No
______  1)
Licensed Nuclear             EegnyPa                       /               2L 5 lant Operator (RO Emrec ln                                   NAT/5No                                             No
____2)                               Table B-I Non-Licensed 6       Nuclear Plant                 Emergenc Plan               N/A             T2/L6       No                   No
____Operator          (NLO #1)TalB-Non-Licensed                                                               T5/L9 7       Nuclear Plant                 Emergency Plan               6               5L           oN Operator (NLO #2)al                     -                                 T5/L1 3                     _____
Non-Licensed 8       Nuclear Plant                 Emergency Plan               N/A             N/A         No                   No Operator (NLO #3)TalB-Non-Licensed 9       Nuclear Plant                 Emergency Plan               N/A             NIA         No                   No
____Operator          (NLO #4) al             -
Non-Licensed 10 NcerPat                   Emergency Plan               N/A             N/A         No                   No
____Operator          (NLO #5 al -
11       Fire Brigade #1               Emergency Plan               NIA             N/A         No                    No
_____________               Table   B-i1______                                                       ______
12        Fire Brigade #2               Emergency Plan               N/A             N/A         No                   No
_____________               Table   B-I1______                                                       ______
13        RP / Chemistry               Emergency Plan               60             T5/L12       No                    No
____echnician                      Table   B-I 14       RP Technician                 Emergency Plan               60             T4/L1       No                   No B-I T____________able                              T4/L2 Security 15       Security                     Contingency Plan               60             T5/L15       No                    No
___________________            / E-Plan Table B-i1   _____________                 _____________
Page 34 PNPS                                                                                                                     Page 34
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-=PLANT OPERATIONS & SAFE SHUTDOWN=
i ;*i:iil:;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole             '!:: *!:: : *i; = On-Shift *Posit~ion,:;' i :i Tsk Anialysisl :i*-:=      ,
1       Shft         anaer         SiftMangerLicensed                       Operator ShiftManagerShiftManager                                             raining Program 2   Unit Supervisor                                   Control Room Supervisor     Licensed Operator
_______Training                                                                Program 3                                                               Licensed Operator Shift Technical Advisor                           Shift Engineer/STA           Training Program 4   RatrOeao#1Licensed                                               Nuclear Plant Licensed Operator RatrOeao#1Operator                                   #1             Training Program 5   RatrOeao#2Licensed                                               Nuclear Plant Licensed Operator RatrOeao#2Operator                                   #2             Training Program 6   Auxiliary Operator #1                               Non-licensed Nuclear       Non-Licensed Operator Plant Operator #1           Training Program 7   Auxiliary Operator #2                               N/A                         N/A 8   Other needed for Safe Shutdown                     N/A                         N/A 9   Other needed for Safe Shutdown                     N/A                         N/A 10   jOther needed for Safe Shutdown                     N/A                         N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role                                 On-Shift Position           Task Analysis
_________________________  _______________Controlling               Method 11   Mechanic                                           N/A                         N/A 12   Electrician                                         N/A                         N/A 13   l&C Technician                                     N/A                         N/A 14   Other                                               N/A                         N/A 15   Other                                               N/A                         Nl/A Page 35 PNPS                                                                                                         Page 35
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1                     N/A                     N/A 2                     N/A                     N/A 3                     N/A                     N/A 4                     N/A                     N/A 5                     N/A                     N/A Note: The MSLB analysis does not include a fire.
Page 36 PNPS PNPS                                                Page 36
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
              <*+,:,<,  ,:,*: ,.,:,;Analysis #5 M ain Steam :Line ,Break: M SLB)...:*,:          ....   :*:, ..........       ...
I Function / Task               __   __         ___;____!           '**                ::;*<;1                    ;::*,.*!':,
N                                     5 15 25 35 45 55 65 75 85-E                               010       15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:
_RP#1                                 X   X   X   X   X   X 2 On-site Survey:X                                                        X  X  X      X      X      X      X      X RP#1 3 Personnel Monitoring:
N/A_
4 Job Coverage:
N/A.
50Offsite Rad Assessment:
Tabie 5 6 Other site specific RP (describe):
Tabie 5 6 Other site specific RP (describe):
N/A 7 Chemistry Function task #1 (describe)
N/A 7 Chemistry Function task #1 (describe)
_N/A_8 Chemistry Function task #2 (describe)
_N/A_
N/A___*Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM PNPS Page 37 PNPS Page 37 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLEIF 5-TEMERGNCY PANAMLYSISREPORT I a;I~ plI Q Line#iucto  
8 Chemistry Function task #2 (describe)
.......OnShif PostionTask Analys Emergency Planning Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn I Emergency Planning 4 Approve extension to allowable dose IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff Shift Manager Program /Emergency
N/A___
,(e.g., to assemble, evacuate, etc.) Planning Training Program 6 IEO ntifcaton SiftMangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event NI/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Eeraining Progamnn 9 P)erform State/local notifications NLO#2 Emergency Planning_____________________________
    *Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM Page 37 PNPS                                                                                                               Page 37
________________
 
Training Program" Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 EDS NO#2Emergency Planning 11 ctvateERDS LO#Training Program Techncian Emergency Planning 12 Offsite radiological assessment Chemistryi Tcnia Training Program 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#Training Program 14 Perform other site-specific event notifications Shift Manager Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) ___________Program 15 Personnel Accountability Security Security Training Program PNPS Page 38 PNPS Page 38 PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 -Fuel Handling Accident 1. Accident Summary* The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.* The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT a;I~
* The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.2. Accident Specific Assumptions Made* Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
PNPS TABLEIF     I 5-TEMERGNCY             PANAMLYSISREPORT plI       Q Line#iucto                                                       OnShif PostionTask .......             Analys Emergency Planning Declare the emergency classification level         Shift Manager                     Training Program / EP (ECL)                                                                                 Drills 2 pprove Offsite Protective Action                   NAEmergency                                   Planning 2 Recommendations                                     N/Araining                                 Program 3   Approve content of State/local notifications       Shift Manager                     Eraining   Progamnn I                     Emergency Planning 4 Approve extension to allowable dose                 IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff       Shift Manager                     Program /Emergency
: 3. Procedures for Accident Response* EOP-5, Radioactive Release Control* 5.4.3, Refueling Floor High Radiation PNPS Page 39 PNPS Page 39 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables APPENDX B! TABL I N-SHIFT POSITIONS; inel Au m naio... ... ....Ro....l in.. Unana..yzed TMSII T2/L1 T5/L1 T5/L3 Emergency Plan 60T5/L5 No Yes I Shift Manager Table B-i16 T5/L6 T51L8 T5/L1 0____ ___ ___ ___ __ ___ ___ ___ __ ___ ___ ___ ___ T5/L 14 2 Control Room Supervisor Emergency Plan N/A T2/L2 No No Table B-i Shift Technical EegnyPa 3 Advisor/Shift Engineer Table B-i2/ / / /___(3 rd SRO)__ ______4Licensed Nuclear Plant Emergency Plan N/A T21L4 No No Operator (RO #1) Table B-i1_________
      ,(e.g., to assemble, evacuate, etc.)                                                 Planning Training Program 6   IEO ntifcaton                 SiftMangerEmergency                           Planning 6     ER notficaionShif Mangerraining                                         Program Licensed Operator Training 7   Abbreviated NRC notification for DBT event NI/APrga Emrogenya     lnnn 8   Complete State/local notification form             Shift Manager                     Eeraining Progamnn 9   P)erform State/local notifications                 NLO#2                             Emergency Planning
_____Licensed Nuclear Plant Emergency PlanN/T2LNoo Operator (RO #2) Table B-i1____ ______ _____6Non-Licensed Nuclear Emergency Plan N/A T21L6 No No Plant Operator (NLO #1) Table B-i______
_____________________________    ________________               Training Program
__________
                                                          "                                 Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11     *ctivte        EDS         NO#2Emergency                                 Planning 11     ctvateERDS                     LO#Training                             Program Techncian Emergency Planning 12   Offsite radiological assessment                     Chemistryi Tcnia                 Training Program 13     Prfom NR noifiatiosNO#2Emergency                                           Planning 13     Prfom NR           noifiatios NO#Training                                 Program 14   Perform other site-specific event notifications Shift Manager                       Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)         ___________Program 15   Personnel Accountability                           Security                         Security Training Program Page 38 PNPS                                                                                                           Page 38
_____T5/L9 7Non-Licensed Nuclear Emergency Plan 60 T5/L11I No No Plant Operator (NLO #2) 'able B-i T5/L1 3_____ ____8 Nlon-Licensed Nuclear iEmergency Plan N/A N/A No No Plant Operator (NLO #3) Fable B-i1________
 
____ ___________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 - Fuel Handling Accident
Non-Licensed Nuclear Emergency Plan N/A N/A No No Pl:)ant Operator (NLO #4) B-i1________
: 1. Accident Summary
___________
* The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.
10 Non-Licensed Nuclear IEmergency Plan N/A N/A No No Plant Operator (NLO #5) rable B-i1________
* The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
____ ___________
* The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.
11 Fire Brigade #1 Emergenc Plan N/A N/A No No 12Fr rgd 2Emergency Plan N/A N/A No No__2 __ire _Brigade_#2_Table B-i1________
: 2. Accident Specific Assumptions Made
_ _ _ _ ______ _____13 RP / Chemistry Emergency Plan 60 T5/L12 No No Technician Iable B-i_________
* Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
_____ ___ ____ _____14 RPTechnician Emergenfcy Plan 60 T4/L3 No No able B-i1_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _Security 15 Security Contingency Plan / 60 T5/L1 5 No No_________________E-Plan Table B-I_______
: 3. Procedures for Accident Response
_____PNPS Page 40 PNPS Page 40 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN OPERATION  
* EOP-5, Radioactive Release Control
& SAF SHU.TDOWN " .........  
* 5.4.3, Refueling Floor High Radiation Page 39 PNPS                                                                                       Page 39
:::.. ...I J.. ........ .. ...................  
 
........I LO neI ...UItI -l O n e.. n tro R o o m. ..... ....I ...... .... ...I [. .:::: ::,,:... ...
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
#: 8 -F elH nd ig.c id n Line # Generic Title/Role On-Shift Position task Analysis_________________________________________
: 4.           Tables APPENDX B!                                                               PNPS*TABL I             N-SHIFT POSITIONS;                 -;***
ontrolling Method Licensed Operator I Shift Manager Shift Manager Training Program 2 Unt Speriso CotrolRoo SuervsorLicensed Operator___ nit Supervisor______ontrol__Roo__
inel              ...                   .   .   .       .Ro....l        Au m naio...                     in.. Unana..yzed                   TMSII T2/L1 T5/L1 T5/L3 Emergency Plan                 60T5/L5                                   No                     Yes I     Shift Manager                         Table B-i16                                           T5/L6 T51L8 T5/L1 0
Supervisor_____
____ __ ___ ___ _________    ___   __ ___ ___   ___   ___       T5/L 14 2     Control Room Supervisor Emergency Plan                                 N/A                   T2/L2               No                     No Table B-i Shift Technical                       EegnyPa 3     Advisor/Shift Engineer                 Table B-i2/                                               /                 /                       /
Training Program 3 Licensed Operator Shift Technical Advisor ]Shift Engineer/STA Training Program 4 Ractr Oeraor 1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator  
___( 3 rd SRO)__                                   ______
#1 Training Program.5 Leco prtr# icensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
4Licensed Nuclear Plant                   Emergency Plan                 N/A                   T21L4               No                     No Operator (RO #1)                       Table   B-i1_________                                                                       _____
#2 Training Program 6 ,uxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_____ _______________________Plant Operator #1 Training Program 7 ,uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other' needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
Licensed Nuclear Plant                 Emergency PlanN/T2LNoo Operator (RO #2)                       Table B-i1____                                                     ______                 _____
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis________________________
6Non-Licensed Nuclear                     Emergency Plan                 N/A                   T21L6               No                     No Plant Operator (NLO #1)               Table   B-i______                     __________                                           _____
_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 41 PNPS Page 41 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade:i:~~~~PNPS ,TABLE :3'-:FIREFIGHTING::I, .:, I N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A-5 N/A N/A Note: FHA does not include a fire.PNPS Page 42 PNPS Page 42 PNPS ON-SHIFT STAFFING ANALYSIS REPORT N ; 5 30-: 35 45- 50-" 55-' 60 :70 80- I In-Plant Survey: N/A___2 On-site Survey: N/A 3 Personnel Monitoring:
T5/L9 7Non-Licensed Nuclear                     Emergency Plan                 60                   T5/L11I               No                     No Plant Operator (NLO #2) 'able B-i                                                           T5/L1 3_____                         ____
RP#1X X X X X T Job Coverage: N/A 50Offsite Rad Assessment: (Included in Table 6 IOther site specific RP (,describe):N/A  
8    Nlon-Licensed Nuclear                 iEmergency Plan                 N/A                     N/A               No                     No Plant Operator (NLO #3)                 Fable   B-i1________                               ____           ___________
.7 Chemistry Function task #1 (describe)
Non-Licensed Nuclear                   Emergency Plan                 N/A                     N/A               No                     No Pl:)ant Operator (NLO #4)             *able    B-i1________                               ___________
10 Non-Licensed Nuclear                     IEmergency Plan                 N/A                     N/A               No                     No Plant Operator (NLO #5)                 rable   B-i1________                               ____           ___________
11   Fire Brigade #1                       Emergenc         Plan         N/A                     N/A               No                     No 12Fr rgd         2Emergency                         Plan         N/A                     N/A               No                      No
__2 __ire     _Brigade_#2_Table               B-i1________                               _   _   _   _   ______                 _____
13 RP     / Chemistry                       Emergency Plan                   60                 T5/L12               No                     No Technician                             Iable   B-i_________                             _____           ___         ____           _____
14 RPTechnician                               Emergenfcy Plan                 60                   T4/L3               No                     No able B-i1_               _ _ _ _ _   _   _ _   _   _   __   _   _   _   _ _         _   _   _ _
Security 15 Security                                 Contingency Plan /               60                 T5/L1 5               No                     No
_________________E-Plan                 Table B-I_______                                                                 _____
Page 40 PNPS PNPS                                                                                                                                Page 40
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN                     OPERATION               & SAF         SHU.TDOWN           :''*': "         .........
            .. ... *1"I ..ILO J.....................
                                    ........           ........     .   . .neI UItI   -l O n e.. n tro R o o m...... .     ... I. . ....         . ... .   ..I [.   .
:::**i*]*:':  ':'*
                                    . ::*:*::Analysis*
                                            . .             * *:;;!::**;          #:-8     F elH nd ig.c                 id n Line # Generic Title/Role                                                                   On-Shift Position                       task Analysis
_________________________________________                                          ontrolling Method Licensed Operator I Shift Manager                                                                     Shift Manager                           Training Program 2 Unt Speriso                                 CotrolRoo SuervsorLicensed Operator
___      nit Supervisor______ontrol__Roo__                                                                   Supervisor_____ Training       Program 3                                                                                     Licensed Operator Shift Technical Advisor                                                         ]Shift Engineer/STA                     Training Program 4 Oeraor Ractr               1Licensed                                         Nuclear Plant           Licensed Operator 4 RatrOeao#1Operator                                                           #1                       Training Program.
5                                 prtr#                                                 Leco icensed Nuclear Plant                 Licensed Operator RatrOeao#2Operator                                                 #2                       Training Program 6         ,uxiliary Operator #1                                                           Non-licensed Nuclear                   Non-Licensed Operator
_____                  _______________________Plant                              Operator #1                   Training       Program 7         ,uxiliary Operator #2                                                           N/A                                   N/A 8       Other needed for Safe Shutdown                                                   N/A                                   N/A 9       Other' needed for Safe Shutdown                                                   N/A                                   N/A 10       Other needed for Safe Shutdown                                                   N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                                                   On-Shift Position                     Task Analysis
________________________                  _______________Controlling                                   Method 11       Mechanic                                                                         N/A                                   N/A 12       Electrician                                                                       N/A                                   N/A 13       l&C Technician                                                                     N/A                                   N/A 14       Other                                                                             N/A                                   N/A 15       Other                                                                             N/A                                   N/A Page 41 PNPS                                                                                                                                                             Page 41
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
          *                      :i:~~~~PNPS ,TABLE:3'-:FIREFIGHTING::I, .:,
I                     N/A                                                   N/A 2                     N/A                                                   N/A 3                     N/A                                                   N/A 4                     N/A                                                   N/A-5                     N/A                                                   N/A Note: FHA does not include a fire.
Page 42 PNPS                                                                               Page 42
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT N                         * ; 5- 1*0.-.15- '20-* 25- 30-: 35 45- 50-" 55-' 60 :70 80- *85-;
I In-Plant Survey:
N/A___
2 On-site Survey:
N/A 3 Personnel Monitoring:
RP#1X                                   X   X   X   X T Job Coverage:
N/A 50Offsite Rad Assessment:
(Included in Table 6 IOther site specific RP
(,describe):N/A                                                                     .
7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A _*Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.Additional RP on shift for refueling/outage to assist with tasks PNPS Page 43  
N/A       _
.PNPS ON-SHIFT STAFFING ANALYSIS REPORT i =iio: PN=: PS TABLE EMERGENCY IM PLEM ENTATION~i:; i LieFuncto I Tsk*I On-Shift Positio 1 Declare the emergency classification level ShftMaagrraining ProgamnniEP (ECL) Drills 2 ,pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 &pprove content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 &pprove extension to allowable dose N/A Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra OpEergerrancy g t o assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 /bbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 raningProgram 11 Planning 12 Offsite radiological assessment Chemistry Tcnia Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) rga 15 Personnel Accountability Security Security Training Program PNPS Page 44 PNPS Page 44 PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 -Aircraft Probable Threat 1. Accident Summary* The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
              *Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.
* The analysis does not include a scenario or response actions taken during or after a crash.2. Accident Specific Assumptions Made* The Shift Manager receives the call from the NRC of probable aircraft threat.* All non-security on-shift personnel are inside the protected area fence at their normal workstation.
Additional RP on shift for refueling/outage to assist with tasks PNPS                                                                                             Page 43
: 3. Procedures for Accident Response* 5.3.1 4.1, Airborne Threat PNP Pae 4 PNPS Page 45 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables i ,:-________Aayi
 
_________
                  .PNPS ON-SHIFT STAFFING ANALYSIS REPORT i i*      =iio:
,.
il:*  PN=:
: ; : :: ::: A ugme:ntation Role :in Table # !
PS TABLE 5.*- EMERGENCY PL*AN IM PLEM ENTATION~i:;                             'i** i LieFuncto                   I Tsk*I                     On-Shift Positio     .*Task Analysis*.!
i TMS Required?Line # On-shift Position E-Plan Reference ;Time I ::Line #:I T :;:ask? ' :,, T2/L1 T5/LI T5/L3 1Shift Manager Emergency Plan 60 T15No Yes Table B-I T5/L6 T5/L8._ T5/L1 0________________
* 1 Declare the emergency classification level           ShftMaagrraining                     ProgamnniEP (ECL)                                                                     Drills 2 ,pprove Offsite Protective Action                   NAEmergency                             Planning 2 Recommendations                                     N/Araining                         Program 3     &pprove content of State/local notifications       Shift Manager         Emraining Progamnn Emrgencyg Planning 4     &pprove extension to allowable dose                 N/A                   Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra                     OpEergerrancy     g t o assemble, evacuate, etc.)                       SitMngrPlanigTra                         inin Pmrogramy EegnyPlanning Tann       rga 6     ERO notification                                   Shift Manager         Emraining Progamnn Licensed Operator Training 7     /bbreviated NRC notification for DBT event         N/APrga Emrogenya           lnnn 8     Complete State/local notification form             Shift Manager         Emraining       Progamnn Emrgencyg       Planning 9     Perform State/local notifications                   NLO#2                 Emraining       Progamnn Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11                                                       raningProgram 11       /*tiTechnicianO#2Emergency                                            Planning 12   Offsite radiological assessment                     Chemistry Tcnia       Emraining     Progamnn Emrgencyg     Planning 13   Perform NRC notifications                           NLO#2                 Emraining     Progamnn 14Perform other site-specific event notifications SitMngrLicensed                           Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                                 rga 15 Personnel Accountability                               Security               Security Training Program Page 44 PNPS                                                                                                     Page 44
T5/L14 _ _ _ _ _ _2 Control Room Emergency Plan N/A T2/L2 No No__ _Supervisor Table B-i _______ _______ ______Shift Technical EegnyPa 3 Advisor/Shift Emrec ln60 T2/L3 No No___Engineer (3 rd SRO) TaleB-Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO ablrenc B-I/AT2L No No Licensed Nuclear EegnyPa / 2L 5 Plant Operator (RO ablrenc B-i /AT2 No No#___ 2) _________Non-Licensed EegnyPa oN 6 Nuclear Plant EegnyPa / 2L oN___Operator (NLO #1) al -/ 2L Non-Licensed T5/L9 7 lant Emergency Plan60T/1Noo 7 Nucler Plant Table B-i10T/I oN___)perator (NLO #2) ________T5/L1 3 _____ _____Non-Licensed EegnyPa / 3L oN 8 Nuclear Plant EegnyPa / 3L oN___Operator (NLO #3) al -Non-Licensed EegnyPa / 3L oN 9 Nuclear Plant EegnyPa / 3L oN___Operator (NLO #4) al -Non-Licensed EegnyPa 10 Nuclear Plant EegnyPa / 3L oN Operator (NLO #5 al -/ 3L oN 11Fr rgd 1 Emergency Plan N/A T3/L4 No No 11 _FireBrigade#1 Table B-i1______
 
______12 Fire Brigade #2 Emergency Plan N/A T3/L5 "No No T________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 - Aircraft Probable Threat
able B-i _______ _ __ _ _ _13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-i1______
: 1. Accident Summary
14 RPehiin Emergency Plan 60 T4/L6 No No RP Technician able B-I1______
* The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
______Security Contingency 15 Security Plan / E-Plan Table 60 N/A No No____ _______________
* The analysis does not include a scenario or response actions taken during or after a crash.
EB-I__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PNPS Page 46 PNPS Page 46 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole  
: 2. Accident Specific Assumptions Made
'On-Shift Position Task Analysis_____ _________________________
* The Shift Manager receives the call from the NRC of probable aircraft threat.
________________Controlling Method 1 Ishift Manager Ishift Manager Licensed Operator______ __________________________
* All non-security on-shift personnel are inside the protected area fence at their normal workstation.
________________Training Program 2 Jnit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 hitTechnical Advisor Shift Engineer/STA Licensed Operator ShiftTraining Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecorOeatr#
: 3. Procedures for Accident Response
perator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator____uiiayOeao Operator #2 Nuler raining Program 6 uxliryOpraor#1Non-licensed Ncer Non-Licensed Operator P~lant Operator #1 Training Program 7  
* 5.3.1 4.1, Airborne Threat Pae   4 PNP PNPS                                                                                       Page 45
#2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
 
Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis____ _ _ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ Controlling Method 11 Mechanic N/A NI/A 12 Electrician N/A N/A 13 I&C Technician N/A N,/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 47 PNPS Page 47 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i! PN
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: , :ii!':ii: : B LEicr f:: :: 3 -..... rob beEFaIG HT........ .IN G: ....:i == : ,.' :=' :,;: :...:::::..  
: 4.       Tables
',: ' ..1 NLO #3 Fire Brigade Training 2 NLO #4 Fire Brigade Training 3 NLO #5 Fire Brigade Training 4 FB #1 Fire Brigade Training 5 FB #2 Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.PNPS Page 48 PNPS Page 48 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance Time Period After. Emergency Declarato (mnte)I In-Plant Survey: 2 On-site Survey: 3 Personnel Monitoring:
:*:*.:*~~~~NPS :AL*t*O*HFiP*OSITiONSI!!:*                        i *:ii ,:
____T Job Coverage: 5 Offsite Rad Assessment: (Included in Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1 (,describe) 8Chemistry Function task #2 (describe)
  -          ________Aayi                                                #8-Aircraft*    Prbale''* Threa,**=!!l**t _________                ______-_____*      ,.
Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.PNPS Page 49 PNPS Page 49 PNPS ON-SHIFT STAFFING ANALYSIS REPORT'I!"i;:~PN PS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION!
                    *:::::;*::*!i~:*ii:**::***iii
i !,.: =.' :;Function.ITask*
:      ; : :: * * ::: *'i:'              Augme:ntation Role :in Table # ! Unana*lyzd i TMS Required?
Position:  
Line # On-shift Position ;* E-Plan Reference                                *Elapsed ;Time          I
! l i"Task  " " ....
::Line    #:I          :;:ask?
Co tr lln M ethod Emergency Planning Declare the emergency classification level SitMngrriigPormIE (ECL)Drills 2 Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program] Emergency Planning 3 &pprove content of State/local notifications Shift Manager Training Program 4 &prov exenson o alowale oseN/AEmergency Planning 4 ppove xtesionto llowbledoseN/Araining Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program I Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notficaionShif MangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Eraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 Ofsie raiolgicl asessentraining Program Emergency Planning 13 Perform NRC notifications NILO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.) Program_____
T          %*          ' :,, *...
____________
T2/L1 T5/LI T5/L3 1Shift Manager                    Emergency Plan                             60              T15No                                              Yes Table B-I                                                  T5/L6 T5/L8
15 Personnel Accountability N/A Security Training Program PNPS Page 50 PNPS Page 50 PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 -Control Room Evacuation and Alternate Shutdown 1. Accident Summary* Fire in the Main Control occurs that requires control room evacuation.
                                                                      ._                              T5/L1 0
* Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.2. Accident Specific Assumptions Made* The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.* Subsequent actions are performed from outside the control room.3. N Procedures for Accident Response* 2.4.143, Shutdown From Outside the Main Control Room* EP-IP-1 00, Classification and .Notifications
________________                      T5/L14          _    _    _  _  _  _
* EP-IP-1 00.1, EALs PNPS Page 51 PNPS Page 51 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables ILine # On-shift Reference Elapsed Yim+e!.  
2      Control Room                    Emergency Plan                            N/A              T2/L2                      No                       No
# i Task?,:;::
___Supervisor                        Table    B-i                                        _______              _______                    ______
T2/LI T5/Ll T5/L3 1 Shift Manager Emergency Plan 60T5/L5 N e Table B-I 6 T5/L6 N e T5/L8 T5/LI10________________
Shift Technical                EegnyPa 3      Advisor/Shift                  Emrec ln60                                                  T2/L3                      No                      No
~~~T5/L 14 __ _ _ _ __ _ _ _ _ _ _2Control Room Emergency PlanN/T2LNoo Supervisor Table B-i / 2L oN Shift Technical EegnyPa 3 Advisor/Shift EegnyPa___Tnier(r R) able B-i 60 T2/L3 No No Licensed Nuclear 4 Plant Operator (RO Emrec lnNAT/4No No#1 ) able B-i Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo Table B-1i/ 2L oN Non-Licensed 6 Nuclear Plant Emergency PlanN/T26Noo
___Engineer          ( 3 rd SRO)      TaleB-Licensed Nuclear                EegnyPa                                      /               2L 4      Plant Operator (RO               ablrenc B-I/AT2L                                                                    No                      No Licensed Nuclear                EegnyPa                                      /                2L 5      Plant Operator (RO                ablrenc B-i                                /AT2                                     No                       No 2)
___Operator (NLO #1) al -Non-Licensed T51L9 7 Nuclear Plant Emergency Plan60T/iNoo Table B-i 0T/1 oN Operator (NLO #2) _______T5/L13______
Non-Licensed                   EegnyPa                                                                                 oN 6     Nuclear Plant                   EegnyPa                                     /               2L                         oN
Non-Licensed 8 Nuclear Plant Emergency PlanN/T3LNoo Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency PlanN/T32Noo
___Operator            (NLO #1)         al       -                               /               2L Non-Licensed 7       *lulear lant         Emergency Plan60T/1Noo T5/L9 7 Nucler Plant             Table B-i10T/I                                                                           oN
___Operator (NLO #/4) al -Non-Licensed EegnyPa 10 Nuclear Plant NoegecNola
___)perator           (NLO #2)         ________T5/L1                                                   3         _____                    _____
___Operator (NLO #5) al -/ 3L 11 Fire Brigade #1 Emergency PlanNAT34Noo T_________
Non-Licensed                   EegnyPa                                     /               3L                         oN 8       Nuclear Plant                 EegnyPa                                     /               3L                         oN
able B-i N__AT3/L4
___Operator          (NLO #3)         al       -
_ No______ No_____12 Fire Brigade #2 Emergency Plan N/A T3/L5 No No_____ _____ ___ Table B-I1_ _ _ _ _ _ _ _ _ _ _ _ _ ______13 RP / Chemistry Emergency Plan 6 / oN Technician Table B-i 60______ N/A_____ No____No _14 RP Technician Emergenc Plan 60 T4/L4 No No Security 15 Security Contingency Plan/I 60 N/A No No______________E-Plan Table B-1 _______ ______ ______ ______PNPS Page 52 PNPS ON-SHIFT STAFFING ANALYSIS REPORT*PNPS TABLE 2 _-: PLANT OPERATIONS  
Non-Licensed                   EegnyPa                                     /               3L                         oN 9       Nuclear Plant                 EegnyPa                                     /               3L                         oN
& SAFE SHUTDOWN : , i:: : :i illAnalysis  
___Operator          (NLO #4)         al       -
#9- CR,,Evacuation  
Non-Licensed                   EegnyPa 10       Nuclear Plant                 EegnyPa                                     /               3L                         oN Operator (NLO #5                 al -                                       /               3L                         oN 11 11Fr rgd 1
&Alternate Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !if Applicable
_FireBrigade#1 Emergency Table B-i1______
;,= Line # Generic Title/Role On-Shift Position Task Analysis_________________________Controlling Method Licensed Operator 1 Shift Manager Shift Manager Training Program SuperisorLicensed Operator 2 Unit Supervisor Control Room Sprio Training Program Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 eco peao 1Operator  
Plan                 N/A             T3/L4                     No               ______
#1 Training Program 5 Ractr pertor#2Licensed Nuclear Plant Licensed Operator 5 eco peao 2Operator  
No 12        Fire Brigade #2               Emergency Plan                             N/A             T3/L5 "No                                           No able B-i T________                          _______                                                             _   __ _ _   _
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
13        RP / Chemistry                 Emergency Plan                             60               N/A                     No                       No Technician                   Table     B-i1______
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role IOn-Shift Position Task Analysis_____ __________________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 53 PNPS Page 53 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade: .. ..i: :': : ::.... ...i : : : P : NPS TABLE .. .. ...C ~~3:- FIREFIGHTIT NG : at n it r te$ " ' : ::o. :., :: L .. ...ne ..... Per......
14       RPehiin                       Emergency Plan                             60             T4/L6                     No                       No RP Technician           able B-I1______                                                                                       ______
fo iirmed llllil by ' i Taski A ay is Co toln Method 1 NLO#3 Fire Brigade Training 2 NO4Fire Brigade Training 5 FB2Fire Brigade Training PNPS Page 54 PNPS Page 54 PNPS ON-SHIFT STAFFING ANALYSIS REPORT:: .....PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,=  
Security Contingency 15       Security                       Plan / E-Plan Table                         60               N/A                     No                      No
.. ,:=,=..... Analysis #9 CR Evacuation  
_______________               EB-I__                                   _   _ _ _   __   _ _ _     _   _   _   _   _   _   _ _    _   _ _   _   _
& Alternate E 0-5atigfas:i:
Page 46 PNPS                                                                                                                                             Page 46
2.:: 10- :i 1'5- 20-.125. 35 '45- 50-~ 55 i65- 70-1"75-180- ______.___  
 
"., 101::f5.20.'25;-30=:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole                                     'On-Shift Position                 Task Analysis
35: '40 4:5: :50: 55 :601 6570 ,o:75'80 o/85,:90: 1 In-Plant Survey: 2 On-site Survey: 3 Personnel Monitoring:
_____ _________________________         ________________Controlling                   Method 1     Ishift Manager                                       Ishift Manager                     Licensed Operator
___4 Job Coverage: RP#lSupport X X X X X X X X X X X X X X X X X FB 50Offsite Rad Assessment: (Included in Table 5 6 Other site specific RP (describe):
______    __________________________   ________________Training                   Program 2 Jnit Supervisor                                       Control Room Supervisor           Lricnsed OPeraogra 3 hitTechnical Advisor                               Shift Engineer/STA                 Licensed Operator ShiftTraining                                                           Program 4 Ractr pertor#1Licensed                                     Nuclear Plant       Licensed Operator 4 ecorOeatr#                               perator #1                       Training Program 5 Reactor Operator #2                                   Licensed Nuclear Plant             Licensed Operator
____uiiayOeao                                          Operator #2           Nuler         raining Program 6 uxliryOpraor#1Non-licensed                                   Ncer       Non-Licensed Operator P~lant Operator #1                 Training Program 7       *,xlayOperator #2                                   N/A                               N/A 8       Other needed for Safe Shutdown                       N/A                               N/A 9       Other needed for Safe Shutdown                       N/A                               N/A 10     Other needed for Safe Shutdown                       N/A                               N/A Other (non-Operations) Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line #     Generic Title/Role                                   On-Shift Position               Task Analysis
___   ___   ___     ___     ___   ___     ___ ___ Controlling Method 11         Mechanic                                             N/A                             NI/A 12         Electrician                                         N/A                             N/A 13         I&C Technician                                       N/A                             N,/A 14         Other                                                 N/A                             N/A 15         Other                                                 N/A                             Nl/A Page 47 PNPS PNPS                                                                                                                  Page 47
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i!:::*:!: :::*:... : , :ii!':ii: PNPS!*'i::!*::
:TA''=*I~
::B LEicr 3 -.....
f:: rob beEFaIG FI:**      .IN G: ....
HT........  :* ==
:i : ::*:,.' :=' :,;: :...:::::..
1                          NLO #3                                        Fire Brigade Training 2                          NLO #4                                        Fire Brigade Training 3                          NLO #5                                        Fire Brigade Training 4                            FB #1                                        Fire Brigade Training 5                            FB #2                                        Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.
Page 48 PNPS                                                                                                         Page 48
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance                           Time Period After. Emergency Declarato (mnte)
I In-Plant Survey:
2 On-site Survey:
3 Personnel Monitoring: ____
Job Coverage:
5 Offsite Rad Assessment:
(Includedin Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1
(,describe) 8Chemistry Function task #2 (describe)
Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.
Page 49 PNPS                                                                                         Page 49
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
                      'I!"i;:~PNPS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION! i !,.:                               *,  =.' :;
*Line
* Function.ITask* ,.,* :i*.:.... *o::,r,,On-Shift Position: !                l i"Task Analysis!*~!i**!::
                                  " " ....*':i:__...............______:                              Co tr lln        M ethod Emergency Planning Declare the emergency classification level                      SitMngrriigPormIE (ECL)Drills 2 *pprove Offsite Protective Action                                NAEmergency                              Planning 2 Recommendations                                                  N/Araining                           Program
                                                                      ]                        Emergency Planning 3    &pprove content of State/local notifications                    Shift Manager          Training Program 4      &prov o alowale    exensonoseN/AEmergency                                              Planning 4      ppove llowbledoseN/Araining xtesionto                                                        Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager                         Program I Emergency to assemble, evacuate, etc.)                                                             Planning Training Program 6     ER     notficaionShif                         MangerEmergency                     Planning 6     ER     notficaionShif Mangerraining                                         Program Licensed Operator Training 7     Abbreviated NRC notification for DBT event                       N/APrga Emergency Planning 8     Complete State/local notification form                           Shift ManagerrangPorm Emrgencyg       Planning 9     Perform State/local notifications                               NLO#2                   Eraining       Progamnn Licensed Operator Training 10   Complete NRC event notification form                             Shift ManagerPrga 11       civae EDS                             NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl                                                             Program Emergency Planning 13   Perform NRC notifications                                       NILO#2                 Emraining       Progamnn Perform other site-specific event notifications                                         Licensed Operator Training 14                                                                     Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.)                                             Program_____
15   Personnel Accountability                                         N/A                     Security Training Program Page 50 PNPS                                                                                                                   Page 50
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown
: 1. Accident Summary
* Fire in the Main Control occurs that requires control room evacuation.
* Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.
: 2. Accident Specific Assumptions Made
* The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.
* Subsequent actions are performed from outside the control room.
: 3. N Procedures for Accident Response
* 2.4.143, Shutdown From Outside the Main Control Room
* EP-IP-1 00, Classification and .Notifications
* EP-IP-1 00.1, EALs Page 51 PNPS                                                                                     Page 51
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.         Tables ILine # On-shift P*ositioni~        *"E-lan Reference             Elapsed Yim+e!. *ii,!;LJine~f~i #   i     Task?,:;::   ;'i*!,*i*:~;;
T2/LI T5/Ll T5/L3 1     Shift Manager                 Emergency Plan                     60T5/L5                               N                 e Table B-I                         6               T5/L6               N                 e T5/L8 T5/LI10
________________                                          ~~~T5/L 14   __     _   _ _ __ _   _ _ _   _
2Control Room                     Emergency PlanN/T2LNoo Supervisor                     Table B-i                           /                 2L                 oN Shift Technical               EegnyPa 3     Advisor/Shift                 EegnyPa
___Tnier(r         R)         able B-i                         60               T2/L3               No               No Licensed Nuclear 4     Plant Operator (RO             Emrec               lnNAT/4No                                                             No
                    #1 )                 able B-i Licensed Nuclear 5     Plant Operator (RO             Emergency PlanN/T2LNoo Table B-1i/                                           2L                 oN Non-Licensed 6     Nuclear Plant                 Emergency PlanN/T26Noo
___Operator         (NLO #1)         al -
Non-Licensed                                                                       T51L9 7     Nuclear Plant                 Emergency Plan60T/iNoo Table B-i                           0T/1                                 oN Operator (NLO #2)               _______T5/L13______
Non-Licensed 8     Nuclear Plant                 Emergency PlanN/T3LNoo Operator (NLO #3)               al       -
Non-Licensed 9     Nuclear Plant                 Emergency PlanN/T32Noo
___Operator         (NLO #/4) al -
Non-Licensed                   EegnyPa 10     Nuclear Plant                                                                                           NoegecNola
___Operator         (NLO #5)         al -                               /                 3L 11     Fire Brigade #1               Emergency PlanNAT34Noo able B-i T_________                        N__AT3/L4                   _         No______         No_____
12    Fire Brigade #2               Emergency Plan                     N/A               T3/L5               No                No
_____   ___     Table   B-I1_               _ _   _ _ _ _ _ _   _ _ _ _                     ______
13    RP / Chemistry                 Emergency Plan                     6                   /                 oN Technician                   Table   B-i                       60______           N/A_____           No____No                 _
14    RP Technician                 Emergenc Plan                       60               T4/L4               No               No Security 15     Security                       Contingency Plan/I                 60                 N/A               No               No
______________E-Plan         Table B-1       _______             ______              ______           ______
PNPS                                                                                                                      Page 52
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
*PNPS                             TABLE 2 _-:PLANT OPERATIONS & SAFE SHUTDOWN :                                 , i:: :ii!:** l**i
:illAnalysis
            *! ;i* :i                                      #9- CR,,Evacuation &Alternate SDi;*:*';
Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !ifApplicable                                  ;,=   *,'
Line # Generic Title/Role                                                 On-Shift Position           Task Analysis
_________________________Controlling                                                Method Licensed Operator 1 Shift Manager                                                     Shift Manager               Training Program SuperisorLicensed Operator 2 Unit Supervisor                                                   Control Room Sprio         Training Program Shift Technical Advisor                                         Shift Engineer/STA         Lricnsed OPeraogra 4 Ractr pertor#1Licensed                                               Nuclear Plant   Licensed Operator 4 ecopeao 1Operator                                                 #1               Training Program 5 Ractr pertor#2Licensed                                               Nuclear Plant   Licensed Operator 5 ecopeao 2Operator                                                 #2               Training Program 6     Auxiliary Operator #1                                             Non-licensed Nuclear     Non-Licensed Operator
_______________________Plant                              Operator #1         Training Program 7     Auxiliary Operator #2                                             N/A                       N/A 8     Other needed for Safe Shutdown                                     N/A                       N/A 9     Other needed for Safe Shutdown                                     N/A                       N/A 10     Other needed for Safe Shutdown                                     N/A                       N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line #     Generic Title/Role                                               IOn-Shift Position         Task Analysis
_____          __________________________Controlling                                         Method 11         Mechanic                                                           N/A                       N/A 12         Electrician                                                       N/A                       N/A 13         I&C Technician                                                     N/A                       N/A 14         Other                                                             N/A                       N/A 15         Other                                                             N/A                       N/A Page 53 PNPS                                                                                                                         Page 53
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
: .. ..* i*:i:*
:':       : i:,-.*:::....
:*:i : :,:,*,
:...* : als*#9:
: PNPS  .. *TABLE ~~3:- FIREFIGHTIT
                                                                ..C ... at n     it NG r te$
:    "         ': ,**  ::o. :.,::
Lne.. ... .....               Per......
fo           byllllil' iirmed         i                 Taski A ay   is Co toln     Method 1                                   NLO#3                                             Fire Brigade Training 2                                   NO4Fire                                               Brigade Training 5                                     FB2Fire                                               Brigade Training Page 54 PNPS PNPS                                                                                                                  Page 54
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
:: .....         PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,=                         .. ,:=,=
                'i:*    ..... Analysis #9 CR Evacuation & Alternate ,SD~*:::'-'** i*
E                       0-5atigfas:i:
2.::     :i10- 1'5- 20-.125. :30-* 35 '45- 50-~ 55 i65- 70-1"75-180- *85-;,
______.___           "., 101::f5.20.'25;-30=: 35:     '40 4:5: :50: 55 :601 6570 ,o:75'80o/85,:90:
1 In-Plant Survey:
2 On-site Survey:
3 Personnel Monitoring:  ___
4 Job Coverage:
RP#lSupport            X    X  X    X    X    X    X  X    X  X  X  X    X  X  X    X    X FB 50Offsite Rad Assessment:
(Includedin Table 5 6 Other site specific RP (describe):
7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)
7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)
PNPS Page 55 PNPS ON-SHIFT STAFFING ANALYSIS REPORT! ":PN PS 5- ERGEN CYi PLEAN I1M PLEM ENTATI O i, Declre he mergncyclasifiatin lvelEmergency Planning DECLar)h mrec lasfcto ee Shift Manager Training Program i EP (ECL)Drills ,pprove Offsite Protective Action Emergency Planning 2 Recommendations N/A Training Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Notiicaionand iretio to n-siftstaf.(eg.,Licensed Operator Training Noiia5naddrcin oo-hf tf egShift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga 8 Complete State/local notification form Shift Manager Emraining Progamnn 9 Perform State/local notifications NLO#2 Emergency Planning Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 Ativae EDS NO#2Emergency Planning 12 Offsite radiological assessment N/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) _______rogram____________
PNPS                                                                                               Page 55
15 Personnel Accountability N/A Security Training Program PNPS Page 56 PNPS Page 56 PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10 -Station Blackout 1. Accident Summary* At power, normal lineups and no additionai events* RCIC starts to restore level and SRVs lift in the relief mode to control pressure 2. Accident Specific Assumptions Made* Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.3. Procedures for Accident Response* 5.3.31, Station Blackout* EP-IP-1 00, Classification and Notifications
 
* EP-IP-1 00.1, EALs* EP-IP-410, Evacuation and Assembly PNPS Page 57 PNPS Page 57 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables i  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
,: PN PS:; :)i E ON DS I :
              ! .!;;:!::* :.:* ":PNPS *TABLE 5- *EM ERGEN CYi PLEAN I1M PLEM ENTATI ON*            i, Declre he mergncyclasifiatin lvelEmergency                                     Planning DECLar)h             mrec         lasfcto ee             Shift Manager             Training Program i EP (ECL)Drills
:i:; ':-___________
      ,pprove Offsite Protective Action                                                   Emergency Planning 2   Recommendations                                           N/A                       Training Program 3   Approve content of State/local notifications               Shift Manager             Emraining Progamnn Emrgencyg   Planning 4   Approve extension to allowable dose                       N/A                       Emraining Progamnn Notiicaionand to n-siftstaf.(eg.,Licensed iretio                                            Operator Training Noiia5naddrcin oo-hf tf                               egShift Manager                 Program / Emergency to assemble, evacuate, etc.)                                                         Planning Training Program Emergency Planning 6   ERO notification                                           Shift ManagerrangPorm Licensed Operator Training 7   Abbreviated NRC notification for DBT event                 N/APrga 8   Complete State/local notification form                     Shift Manager             Emraining   Progamnn 9   Perform State/local notifications                         NLO#2                     Emergency Planning Licensed Operator Training 10   Complete NRC event notification form                       Shift ManagerPrga 11   civae EDS                 NO#2raiingProgram 11 Ativae EDS                   NO#2Emergency                           Planning 12   Offsite radiological assessment                           N/A                       Emraining   Progamnn Emrgencyg   Planning 13   Perform NRC notifications                                 NLO#2                     Emraining   Progamnn 14Perform other site-specific event notifications SitMngrLicensed                                 Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                 _______rogram____________
Anaysis#10 Staton BackoT2/L1___
15   Personnel Accountability                                   N/A                       Security Training Program Page 56 PNPS PNPS                                                                                                            Page 56
T5/L5 T5/L8 T5/L31 T5/L14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-I 3AvsrShiftTehia Emergency Plan 60 T2/L3 No, No Engineer (3 rd SRO) Table B-I iLcensed Nuclear 4 Plant Operator (RO Emergency Plan N/A T2/L4 No No-~Table B-i Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B-i n N/A T2/L5 No No Non-Licensed EegnyPa /6 Nluclear Plant Emrec lnNAT2/L6 No No Operator (NLO #1) al -Non-Licensed EegnyPa60T5/L9 7 Nuclear Plant -EegnyPa60T5/LI I No No Table B-I Operator (NLO #2) T5/L13_____
 
Non-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -Non-Licensed EegnyPa / oN 9 Nuclear Plant EegnyPa / / oN Operator (NLO #4) al -/Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -11Fr rgd 1 Emergency Plan N/A N/A No No 12 Fire Brigade #2 ,Emergency PlanN/NANoo
PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10   - Station Blackout
_______ _____ Table B-I1/ / oN 13RP / Chemistry Emergency Plan 60 N/A No No 13 Technician Fable B-I1________
: 1. Accident Summary
____ _____14 RP Technician Emergency Plan 60 N/A No No_____________
* At power, normal lineups and no additionai events
TableB-I1_____________
* RCIC starts to restore level and SRVs lift in the relief mode to control pressure
Security 15 Security Contingency Plan / 60 T5/L15 No No______________E-Plan Table B-i1 ________ _____ ______ _____PNPS Page 58 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 ~- PLANT OPERATIONS  
: 2. Accident Specific Assumptions Made
& SAPE SHUTPOWN One Unit -One Control Room Analysis #10 -Station Blackout.Mnim~um Oper#ations Cirew N e essary: to Imple6m ent: AO Ps .and EOPs or .SA Ms Iif  
* Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.
:;i;Line # Generic Title/Role On-Shift Position Task Analysis________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator I Shft Mnage Shit Maagerraining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor Shift Engineer/STA Training Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator  
: 3. Procedures for Accident Response
#1 Program ,5 RatrOperator  
* 5.3.31, Station Blackout
#2 Licensed Nuclear Plant Licensed Operator RatrOperator  
* EP-IP-1 00, Classification and Notifications
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_____ _______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
* EP-IP-1 00.1, EALs
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_____ _______________
* EP-IP-410, Evacuation and Assembly Page 57 PNPS                                                                                       Page 57
ontrolling Method 1 1 Mechanic N/A N/A 1 2 Electrician N/A N/A 1 3 l&C Technician N/A N/A 1 4 Other N/A N/A 1 5 Other N/A N/A PNPS Page 59 PNPS Page 59 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade TABLE
 
:L:f&#xb8;ilG 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The Station Blackout Analysis does not include the need for firefighting.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
PNPS Page 60 PNPS Page 60 PNPS ON-SHIFT STAFFING ANALYSIS REPORT E -, :10 ,:15i i25 30: 35!: 40 4:5 150' :55; 75 80 :85': 90,-1 In-Plant Survey: N/A 2 On-site Survey: N/A 3 Personnel Monitoring:
: 4.           Tables i       *l~i::**::*i:          ,:   PN PS:;T*        E ON DS I FT.~ili*::;i
_N/A T Job Coverage: N/A__50Offsite Rad Assessment:
:)i '**ABL                        :ii,**      :*!" : ii*!::*':*    :i:; ':
._Included in Table 5 6 Other site specific RP (describe):
                        -     ___________             Anaysis#10 Staton BackoT2/L1___
N/A 7 Chemistry----------------------------  
T5/L5 T5/L8 T5/L31 T5/L14 2   Control Room                     Emergency Plan                     N/A             T2/L2             No                 No Supervisor                       Table B-I 3AvsrShiftTehia                   Emergency Plan                       60             T2/L3             No,                 No Engineer ( 3 rd SRO)             Table B-I iLcensed Nuclear 4   Plant Operator (RO               Emergency Plan                     N/A             T2/L4             No                 No
----Function task #1 (describe)
        -         ~Table                     B-i Licensed Nuclear                 EegnyPa 5   Plant Operator (RO                 ablrenc B-i       n               N/A             T2/L5             No                 No Non-Licensed                     EegnyPa                               /
N/A___8 Chemistry Function task #2 (describe)
6   Nluclear Plant                   Emrec             lnNAT2/L6                                           No                 No Operator (NLO #1)                   al     -
N/A__Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.PNPS Page 61 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca nsfialyisn
Non-Licensed                     EegnyPa60T5/L9 7 Nuclear Plant -                   EegnyPa60T5/LI                                               I         No                 No Table B-I Operator (NLO #2)                                                                   T5/L13_____
#10e EmStationBlackout Delr1h megnycasfiainlvl Shift Manager Training Program I EP (ECL) D:rills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emergencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Lricnsed OPeraorgra inn Notification and direction to on-shift staff (e.g., ShitcanaerProra
Non-Licensed                     EegnyPa                               /                   /             oN 8 Nuclear Plant                     EegnyPa                               /                   /             oN Operator (NLO #3)                   al     -
/OEergerrancy g 5 to assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 EDS kLO#2Emergency Planning 12 Offsite radiological assessment Nl/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NiLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training (4re.g., Duty Plant Manager, INPO, ANI, etc.) __hift ____Manager_____Program___
Non-Licensed                     EegnyPa                                                   /             oN 9 Nuclear Plant                     EegnyPa                               /                   /             oN Operator (NLO #4)                   al     -                         /
15 Personnel Accountability Security Security Training Program PNPS Page 62 PNPS Page 62 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11 -LOCA/General Emergency with Release and PAR 1. Accident Summary (Assumed for Staffing Analysis Purpose)* The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.2. Accident Specific Assumptions Made* All actions for SAE are complete.* No transients other than LOCA are considered.
Non-Licensed 10 Nuclear Plant                     Emergency Plan                     N/A               N/A             No                 No Operator (NLO #5)                   al     -
* The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.3. Procedures for Accident Response* EP-IP-1 00, Emergency Classification and Notification
11Fr rgd         1           Emergency Plan                     N/A               N/A             No                 No 12 Fire Brigade #2                   ,Emergency PlanN/NANoo
* EP-IP-1 00.1, Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
_______   _____           Table   B-I1/                                             /             oN 13RP / Chemistry                   Emergency Plan                       60               N/A             No                 No 13 Technician                       Fable B-I1________                             ____          _____
* EOP-05, Radiological Release* EOP-01, RPV Control* EOP-03, Primary Containment Control* EOP-04, Secondary Containment Control* EP-IP-400, PAR PNPS Page 63 PNPS Page 63 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables::' : * !:
14 RP Technician                     Emergency Plan                       60               N/A             No                  No
:!I P EN I B !: : :: : APPENDIX ''
_____________            TableB-I1_____________
Role inTable #
Security 15 Security                           Contingency Plan /                   60             T5/L15             No                  No
TMS Req'uired?
______________E-Plan               Table B-i1       ________               _____       ______               _____
T2/L1 T5/L1 T5/L2 T5/L3 1 Shift Manager Emergency Plan 60 T5/L4 No No Fable B-i T5/L5 T5/L8 T5/LI10____ ____ ____ __ _ ____ ____ ___ ____ ____ ___ T5/L14 _ _ _ _ _ _ _ _ _ _ _ _ _2 Control Room Emergency Plan N/A T2/L2 No No____Supervisor Fable B-I1______
PNPS                                                                                                                            Page 58
______Shift Technical EegnyPa oN 3 Advisor/Shift EerecPan6T2LNoo
 
___Eng]ineer (3 rd SRO) 'able B-i10T2L Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Emrec lnNAT/4No No_____ 1)able B-I Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo T__ )able B-I / 2L oN Non-Licensed EegnyPa / 2L oN 6 Nuclear Plant EegnyPa / 2L oN___Operator (NLO #1) al -Non-Licensed -mrec lnT5/L9 7 EmergencyPPlan 60 T5/L1 1 No No Nuclear Plantable B-i15L3 _______ _________Operator (NLO #2) TS/L13_________________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 PLANT OPERATIONS & SAPE SHUTPOWN
Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No___Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No'O p e ra to r (N L O # 4 ) _ __ab le_ _ _ _ _ __B-1_ _ _Non-Licensed EegnyPa 10 Nuclear Plant Emrec lnNANANo No___Operator (NLO #5) ___able_ _ __ _ __ __ _ ___-1_ __ _Emergency PlanN/NANoo 11 Fire Brigade #1 Nobl No" ~~~Emergency PlanNAN/Noo 12 Fire Brigade #2 Nobl No 13RP / Chemistry Emergency Plan 6T5L2No No 13 rechnician Table B-i1______
                                                ~-
______ ______14 RP Technician Emergency Plan 60T4/L2Noo
One Unit One Control Room Analysis #10 Station Blackout.
___able____
Mnim~um Oper#ations Cirew Ne essary: to Imple6m ent: AOPs .and EOPs or .SAMs Iif App#licab#le:j.';*::]:.**.: :;i; Line # Generic Title/Role                                     On-Shift Position                     Task Analysis
B-1_____ ________ T4/L6Noo 15 Security Contingency Plan / 60 N/A No No______________E-Plan Table B-i1 _______PNPS Page 64 PNPS Page 64 PNPS ON-SHIFT STAFFING ANALYSIS REPORT: ...... PNPS.- T.ABLE 2- IPL'ANT OPERATIONS SAFE SHUTDOWN:i ":: :*i : , M.nim m .Opeation Crew. Ne.essar to....mpl........e.....
________________Controlling              Method 1     Shft anaer                     SiftMangerLicensed                               Operator I     Shft Mnage                     Shit Maagerraining                               Program 2     Unit Supervisor                                       Control Room Supervisor               Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor                               Shift Engineer/STA                     Training Program 4 Ractr pertor#1Licensed                                         Nuclear Plant           Licensed Operator 4 RatrOeao#1Operator                                       #1                       Trainin* Program
..A.. ..... a ....d EO " ...r ......fA plcal.. .. ....I Line # Generic Title/Role On-Shift Position Task Analysis_____ ________________________________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator 1__ iftMange Shift_______________
      ,5 RatrOperator #2                                       Licensed Nuclear Plant                 Licensed Operator RatrOperator                                           #2                       Training Program 6     Auxiliary Operator #1                                 Non-licensed Nuclear                 Non-Licensed Operator
Manager_______Training Program 2 Unit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator
_____    _______________________Plant                     Operator #1                   Training Program 7     Auxiliary Operator #2                                 N/A                                   N/A 8     Other needed for Safe Shutdown                         N/A                                   N/A 9     Other needed for Safe Shutdown                         N/A                                   N/A 10   Other needed for Safe Shutdown                         N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                       On-Shift Position                     Task Analysis
#1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator______________________Operator
_____                                      _______________                       ontrolling Method 11        Mechanic                                               N/A                                   N/A 12        Electrician                                           N/A                                   N/A 13        l&C Technician                                         N/A                                   N/A 14      Other                                                   N/A                                   N/A 15        Other                                                 N/A                                   N/A Page 59 PNPS PNPS                                                                                                                      Page 59
#2 Nuler raining Program 6 &uxiliary Operator #1 Non-licensed Ncer Non-Licensed Operator Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
 
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_____ _______________Controlling Method 11 IMechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 O:ther N/A N/A PNPS Page 65 PNPS Page 65 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade..........
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
:'" ...... ... "..... "' ... PN , 3 -. F REFIGHTiNG.':::
        *:*:i:**i!%***:*:*~yi*!::i*:&deg;*L*i!***P!NPs TABLE 3-FIREFIGHTING*?i!: :L:f&#xb8;ilG *:i~i!*~i!**iiii 1                                   N/A                                      N/A 2                                   N/A                                      N/A 3                                   N/A                                      N/A 4                                  N/A                                     N/A 5                                   N/A                                     N/A Note: The Station Blackout Analysis does not include the need for firefighting.
:: 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.
Page 60 PNPS PNPS                                                                                          Page 60
PNPS Page 66 PNPS Page 66 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ': I In-Plant Survey: N/A___2 On-site Survey: RP#1 onsite & XX XX XX XX X__SB surveys 3 'Personnel Monitoring:
 
N/A T Job Coverage:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT E  -                   , :10 ,:15i '!20* i25 30: 35!: 40 4:5 150' :55; *60.! *65 *70* 75 80 :85': 90,-
_N/A 5 Offsite Rad Ssessment:
1 In-Plant Survey:
Se._e Tble 5 6 Other site specific RP (describe):
N/A 2 On-site Survey:
RP#1 Issue X X X X X KI 7 Chemistry Function task #1 (describe)
N/A 3 Personnel Monitoring: _N/A T  Job Coverage:
N/A__
50Offsite Rad Assessment:
    ._Included in Table 5 6 Other site specific RP (describe):
N/A 7 Chemistry----------------------------                                                        ----
Function task #1 (describe)
N/A___
8 Chemistry Function task #2 (describe)
N/A__
Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.
PNPS                                                                                                Page 61
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca          nsfialyisn#10e                                        EmStationBlackout Delr1h          megnycasfiainlvl                    Shift Manager                        Training Program I EP (ECL)                                                                                  D:rills 2 pprove Offsite Protective Action                  NAEmergency                                        Planning 2 Recommendations                                    N/Araining                                      Program 3    Approve content of State/local notifications        Shift Manager                       Emraining    Progamnn Emergencyg  Planning 4    Approve extension to allowable dose                N/A                                  Emraining    Progamnn Lricnsed    OPeraorgra  inn Notification and direction to on-shift staff (e.g., ShitcanaerProra                                  /OEergerrancy    g 5 to assemble, evacuate, etc.)                        SitMngrPlanigTra                                    inin Pmrogramy EegnyPlanning Tann        rga 6    ERO notification                                    Shift Manager                       Emraining Progamnn Licensed Operator Training 7    Abbreviated NRC notification for DBT event          N/APrga Emrogenya      lnnn 8    Complete State/local notification form              Shift Manager                        Emraining    Progamnn Emrgencyg    Planning 9    Perform State/local notifications                  NLO#2                                Emraining    Progamnn Licensed Operator Training 10  Complete NRC event notification form                Shift ManagerPrga 11    civae EDS                    NO#2raiingProgram 11    *ctivte      EDS            kLO#2Emergency                                      Planning 12  Offsite radiological assessment                    Nl/A                                Emraining    Progamnn Emrgencyg    Planning 13  Perform NRC notifications                          NiLO#2                              Emraining    Progamnn Perform other site-specific event notifications                                        Licensed Operator Training (4re.g.,Duty Plant Manager, INPO, ANI, etc.)        __hift    ____Manager_____Program___
15    Personnel Accountability                          Security                            Security Training Program Page 62 PNPS                                                                                                                 Page 62
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11    - LOCA/General Emergency with Release and PAR
: 1. Accident Summary (Assumed for Staffing Analysis Purpose)
* The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.
: 2. Accident Specific Assumptions Made
* All actions for SAE are complete.
* No transients other than LOCA are considered.
* The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.
: 3. Procedures for Accident Response
* EP-IP-1 00, Emergency Classification and Notification
* EP-IP-1 00.1, Emergency Action Levels
* EP-IP-300, Offsite Radiological Dose Assessment
* EOP-05, Radiological Release
* EOP-01, RPV Control
* EOP-03, Primary Containment Control
* EOP-04, Secondary Containment Control
* EP-IP-400, PAR Page 63 PNPS PNPS                                                                                Page 63
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.          Tables
::'        *ii'      i**    : *          !:;:!:*ii*:*~     :!I APPENDIX P EN I B*,B !: : ::    :        *,i                      *~ '' ***        *.
                                                                          *!~Augmentationi    Role inTable # !*Unanalyzed:' TMS Req'uired?
T2/L1 T5/L1 T5/L2 T5/L3 1      Shift Manager                        Emergency Plan                         60               T5/L4                      No                      No Fable B-i                                              T5/L5 T5/L8 T5/LI10
____    ____      ___    ____    ____ ___        T5/L14            _  _  _  _  _  _  _  _  _    _  _  _ _
2     Control Room                          Emergency Plan                        N/A              T2/L2                      No                      No
____Supervisor                              Fable    B-I1______                                                                                ______
Shift Technical                      EegnyPa                                                                              oN 3      Advisor/Shift                        EerecPan6T2LNoo
___Eng]ineer          ( 3 rd SRO)            'able B-i10T2L Licensed Nuclear                      EegnyPa                                  /                2L 4      Plant Operator (RO                    Emrec                lnNAT/4No                                                                              No 1)able
_____                                          B-I Licensed Nuclear 5      Plant Operator (RO                    Emergency PlanN/T2LNoo
          )able                            T__      B-I                            /                2L                          oN Non-Licensed                          EegnyPa                                  /                 2L                        oN 6      Nuclear Plant                         EegnyPa                                  /                2L                          oN
___Operator          (NLO #1)              al        -
Non-Licensed                          -mrec                lnT5/L9 7                                            EmergencyPPlan                          60              T5/L1 1                    No                      No Nuclear Plantable B-i15L3                                                                                _______                  ______
___Operator          (NLO #2)                                                                    TS/L13_________________
Non-Licensed 8    Nuclear Plant                         Emergency Plan                          N/A                N/A                      No                      No
___Operator          (NLO #3)              al        -
Non-Licensed 9    Nuclear Plant                        Emergency Plan                          N/A               N/A                     No                      No
      'Op era to r (N L O # 4 )                  le_
___ab                                              _  _  __    __B-1_                                        __
Non-Licensed                          EegnyPa 10      Nuclear Plant                        Emrec                lnNANANo                                                                              No
___Operator          (NLO        #5)                                    ___able_              _  __  _  __          __    _  ___-1_                __  _
Emergency PlanN/NANoo 11     Fire Brigade #1                                                                                                          Nobl                    No
                    "                      ~~~Emergency PlanNAN/Noo 12     Fire Brigade #2                                                                                                          Nobl                    No 13RP      / Chemistry 13rechnician Emergency Table B-i1______
Plan                6T5L2No                            ______                  ______
No 14    RP Technician                         Emergency Plan                          60T4/L2Noo
___able____                          B-1_____            ________                  T4/L6Noo 15     Security                              Contingency Plan /                     60                N/A                     No                      No
______________E-Plan                  Table B-i1          _______
Page 64 PNPS                                                                                                                                              Page 64
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
        .=.:*;.:.=:=:*:.....*:" PNPS.- T.ABLE 2- IPL'ANT OPERATIONS *&SAFE SHUTDOWN:i                                                            i:*i*..   ":::*i : ,
M.nimm            .Opeation Crew. Ne.essar              to....mpl........e.....
                                                                                ..      A..
                                                                                          .      ....a d EO  ....    "r ... . fA .....plcal..      ..  .... I Line # Generic Title/Role                                                              On-Shift Position                      Task Analysis
_____      ________________________________________Controlling                                                    Method 1__            iftMange 1      Shft        anaer                          SiftMangerLicensed Shift_______________
Manager_______Training Operator Program 2 Unit Supervisor                                                            Control Room Supervisor                Lricnsed OPeraogra 3 Shift Technical Advisor                                                    Shift Engineer/STA                      Lricnsed OPeraogra 4          RatrOeao#1Licensed                                                                      Nuclear Plant          Licensed Operator RatrOeao#1Operator                                                    #1                      Training Program 5 Reactor Operator #2                                                        Licensed Nuclear Plant                  Licensed Operator
______________________Operator                                        #2      Nuler            raining Program 6          &uxiliary Operator #1                                                  Non-licensed Ncer                      Non-Licensed Operator Plant Operator #1                      Training Program 7          &uxiliary Operator #2                                                    N/A                                    N/A 8          Other needed for Safe Shutdown                                          N/A                                    N/A 9          Other needed for Safe Shutdown                                          N/A                                    N/A 10          Other needed for Safe Shutdown                                          N/A                                    N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line #          Generic Title/Role                                                      On-Shift Position                      Task Analysis
_____                                                    _______________Controlling                              Method 11              IMechanic                                                                N/A                                  N/A 12              Electrician                                                              N/A                                  N/A 13              l&C Technician                                                            N/A                                  N/A 14              Other                                                                    N/A                                  N/A 15              O:ther                                                                  N/A                                    N/A Page 65 PNPS                                                                                                                                                        Page 65
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
:'" "'  ... *- PN , *TABLE 3 -. F REFIGHTiNG.':::        ::
1                          N/A                                        N/A 2                          N/A                                        N/A 3                          N/A                                        N/A 4                          N/A                                        N/A 5                          N/A                                        N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.
Page 66 PNPS                                                                              Page 66
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ':
I In-Plant Survey:
N/A___
2 On-site Survey:
RP#1        onsite &                                  XX      XX      XX    XX        X
__SB  surveys 3 'Personnel Monitoring:
N/A T   Job Coverage: _N/A 5 Offsite Rad Ssessment: Se._e Tble 5 6 Other site specific RP (describe): RP#1 Issue         X X X X           X KI 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A*Times are estimated.
N/A
Note: RP tasks are as directed by the Shift Manager and are not time critical.Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.
*Times are estimated.
PNPS Page 67 PNPS Page 67 PNPS ON-SHIFT STAFFING ANALYSIS REPORT L ine
Note: RP tasks are as directed by the Shift Manager and are not time critical.
; On-Shift  
Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.
::ii'!:Task Analysis'  
Page 67 PNPS PNPS                                                                                          Page 67
:, Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 ,pprove Ofisite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift Manager Training Program Emergency Planning 4 Approve extension to allowable dose Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notfictionN/AEmergency Planning 6 ER notfictionN/Araining Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann Program Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae ERS NO#2 ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 Ofsie raiolgicl asessentraining Program 12 Ofsie rdiolgicl asessentCheistr Tehniian Emergency Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 (,e.g., Duty Plant Manager, INPO, ANI, etc.) Shift Manager Program 15 Personnel Accountability N/A Security Training Program PNPS Page 68 PNPS Page 68 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER PNPS Page 69 PNPS Page 69 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE: Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.LOCATION: Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:
 
A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions PNPS Page 70 PNPS Page 70 PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown Site: PNPS Position:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line    i),::i*=:FUnction/ITask*;:':*;**:i              ; On-Shift Positioni*i ::ii'!:Task Analysis'     :,
Shift Mana~qer Line #: 1 Function jResponsibility (Task) Action Step ]Duration 1 .Safe Shutdown 1.1 Perform the procedure steps assigned the Shift Manager in procedure 2.4.143 Rev 48, Shutdown from Outside the Control Room.T=0 SM leaves the CR and directs his staff to implement assigned shutdown tasks[step 16(a), (b)] SM arrives at 1 minute power supply panel C511I (TB 23' (T=+I)RPS MG Room) and* Opens Reactor Protection System (RPS) logic Channel A, breaker A3* Opens RPS Channel B, breaker B3* Closes RPS Channel A, breaker A3* Closes RPS Channel B, breaker B3+2 -SM leaves 23' RPS MG 1 minute Room and obtains fuse pullers (T=+2)and safety equipment from the 23'Switchgear Room-SM leaves 23' Switchgear Room 1 minute________________________ (T=+3)[Step 16(d)] T+3 -SM arrives at 23' Cable Spreading Room.Opens panels C941 and C942* Removes fuse 1 6A-F10OA* Removes fuse 16A-F11A* Removes fuse 1 6A-FI12A* Removes fuse 16A-F10B* Removes fuse 16A-F11B* Removes fuse 1 6A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.TASK : :,, :, 1 minute (T=+4)PNPS Page 71 PNPS Page 71 PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION:
Emergency Planning 1     Declare the emergency classification level         Shift Manager           Training Program / EP (ECL)                                                                     Drills 2 ,pprove Ofisite Protective Action                 SitMngrEmergency                     Planning 2 Recommendations                                     ShfTangrraining                   Program Emergency Planning 3     Approve content of State/local notifications       Shift Manager           Training Program Emergency Planning 4     Approve extension to allowable dose                 Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager           Program / Emergency to assemble, evacuate, etc.)                                               Planning Training Program 6   ER       notfictionN/AEmergency                                   Planning 6     ER     notfictionN/Araining                                 Program 7   Abbreviated NRC notification for DBT event         N/A                     Lcne         prtrTann Program Emergency Planning 8     Complete State/local notification form             Shift ManagerrangPorm Emrgencyg   Planning 9   Perform State/local notifications                   NLO#2                   Emraining   Progamnn Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11 civae ERS                     NO#2                       ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl                                               Program 12 asessentCheistr Ofsie rdiolgicl                         Tehniian     Emergency Planning 13     Perform NRC notifications                         NLO#2                   Emraining   Progamnn Perform other site-specific event notifications                           Licensed Operator Training 14     (,e.g., Duty Plant Manager, INPO, ANI, etc.)       Shift Manager           Program 15     Personnel Accountability                           N/A                     Security Training Program Page 68 PNPS                                                                                                   Page 68
6 minutes Function Responsibility (Task) Action Step Duration 2.Emergency  
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER Page 69 PNPS PNPS                                                    Page 69
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE:
Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.
NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.
LOCATION:
Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:
A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions Page 70 PNPS                                                                                           Page 70
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)
Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown                   Site:     PNPS Position:   Shift Mana~qer               Line #:   1 Function         jResponsibility (Task)             Action Step                           ]Duration 1 .Safe           1.1 Perform the procedure       T=0 Shutdown          steps assigned the Shift         SM leaves the CR and directs his Manager in procedure             staff to implement assigned 2.4.143 Rev 48, Shutdown         shutdown tasks from Outside the Control Room.
[step 16(a), (b)] SM arrives at         1 minute power supply panel C511I (TB 23'         (T=+I)
RPS MG Room) and
* Opens Reactor Protection System (RPS) logic Channel A, breaker A3
* Opens RPS Channel B, breaker B3
* Closes RPS Channel A, breaker A3
* Closes RPS Channel B, breaker B3
                                                    +2 - SM leaves 23' RPS MG               1 minute Room and obtains fuse pullers           (T=+2) and safety equipment from the 23' Switchgear Room
                                                    - SM leaves 23' Switchgear Room         1 minute
________________________      (T=+3)
[Step 16(d)] T+3   - SM arrives at     1 minute 23' Cable Spreading Room.               (T=+4)
Opens panels C941 and C942
* Removes fuse 16A-F10OA
* Removes fuse 16A-F11A
* Removes fuse 1 6A-FI12A
* Removes fuse 16A-F10B
* Removes fuse 16A-F11B
* Removes fuse 16A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed
[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.
TASK:                         :,,   :,
Page 71 PNPS PNPS                                                                                                  Page 71
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION:               6 minutes Function             Responsibility (Task)               Action Step                             Duration 2.Emergency         2.1 Maintain emergency              1                                      The Shift Direction and        direction and control of the        Oversight of the emergency              Manager Control              event response.                    response.                              maintains radio 2                                      contact with crew Initiate any emergency actions,        for updates and NOTE                    directions The TMS is for the overlap period.
The total time considered for this task should be concurrent with Task 1.
              ....                                          D..FEMERGENCY
: di====,=*ii*::"*==:*i:* .......=*!*TOTAL              TASK DURATION          6 Miue RESULT:
Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks:
The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.
The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.
The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.
Task Performer                  Richard Probasco            Shift Manager              August 23, 2012 Evaluators                      Stephen Reid                Operations Training        August 23, 2012 Fred Guynn                  Fleet EP Project          August 23, 2012 S______________________        Manager                  ___________
SThomas      Diorio            Pilgrim I&C (EP)          August 23, 2012 Page 72 PNPS PNPS                                                                                                        Page 72


===2.1 Maintain===
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures
emergency 1 The Shift Direction and direction and control of the Oversight of the emergency Manager Control event response.
: 1.     The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function. It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.
response.
: 2.     The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.
maintains radio 2 contact with crew Initiate any emergency actions, for updates and NOTE directions The TMS is for the overlap period.The total time considered for this task should be concurrent with Task 1.....D..FEMERGENCY
: 3.     The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.
:
Page 73 PNPS PNPS                                                                                            Page 73
.......
 
TASK DURATION 6 Miue RESULT: Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks: The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES
The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.Task Performer Richard Probasco Shift Manager August 23, 2012 Evaluators Stephen Reid Operations Training August 23, 2012 Fred Guynn Fleet EP Project August 23, 2012 S______________________
* NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities
Manager ___________
* NSIR DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants
SThomas Diorio Pilgrim I&C (EP) August 23, 2012 PNPS Page 72 PNPS Page 72 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures 1. The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function.
* PNPS Emergency Plan, Rev 39 XI. STAFFING ANALYIS TEAM
It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.2. The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.3. The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.PNPS Page 73 PNPS Page 73 PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES
* Fred Guynn, Entergy ECH Sr Project Manager, EP
* NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities
* Myra Jones, CMCG Contractor
* NSIR DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants* PNPS Emergency Plan, Rev 39 XI. STAFFING ANALYIS TEAM* Fred Guynn, Entergy ECH Sr Project Manager, EP* Myra Jones, CMCG Contractor
* Tom White, PNPS Manager   - EP
* Tom White, PNPS Manager -EP* Mike McDonnell, PNPS AOM, Operations Support* Barbara Nadeau, PNPS Radiation Protection
* Mike McDonnell, PNPS AOM, Operations Support
* Kenneth Sejkora, PNPS Chemistry* Ashley Ohrenberger, PNPS Ops Training* Karen Sullivan, PNPS EP Planner* Robert Emmitt, PNPS ERO Training PNPS Page 74 PNPS Page 74 Entegyi Nuclear OPoer SationsIc* 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001
* Barbara Nadeau, PNPS Radiation Protection
* Kenneth Sejkora, PNPS Chemistry
* Ashley Ohrenberger, PNPS Ops Training
* Karen Sullivan, PNPS EP Planner
* Robert Emmitt, PNPS ERO Training Page 74 PNPS                                                                                 Page 74
 
EntegyiNuclear OPoerSationsIc
* 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.
Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001


==SUBJECT:==
==SUBJECT:==
Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001  
Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001


==Reference:==
==Reference:==
Line 578: Line 1,209:


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1).using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration.
 
The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference  
Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).
: 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).
The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).
Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment days.If you have any questions regarding the subject matter, please contact Everett P.Perkins at (508) 830-8323.This letter contains no new or revised regulatory commitments.
The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1)
I declare under penalty of perjury that the foregoing is true and correct.Executed on the /'4" day of (_/2,j z ~,2016.A. Dent, Jr.;ite Vice President Attachment 1: Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission one White Flint North O-8C2-A 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station John Priest, Director, Massachusetts Department of Public Health Radiation Control Program Commonwealth of Massachusetts 529 Main Street, Suite 1 M2A Charlestown, MA 02129-1121 John Giarrusso, Jr.Planning and Preparedness Section Chief Mass Emergency Management Agency 400 Worcester Road Framingham, MA 01702 ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)
.using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration. The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS  
 
Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment within*30 days.
If you have any questions regarding the subject matter, please contact Everett P.
Perkins at (508) 830-8323.
This letter contains no new or revised regulatory commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the         /'4"   day of     (_/2,j     z
                                                  ~,2016.
  !*hn A. Dent, Jr.
  ;ite Vice President Attachment 1: Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization."
Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman,                          John Priest, Director, Project Manager                                 Massachusetts Department of Public Health Division of Operating Reactor Licensing         Radiation Control Program Office of Nuclear Reactor Regulation           Commonwealth of Massachusetts U. S. Nuclear Regulatory Commission             529 Main Street, Suite 1M2A one White Flint North O-8C2-A                   Charlestown, MA 02129-1121 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1               John Giarrusso, Jr.
U.S. Nuclear Regulatory Commission             Planning and Preparedness Section Chief 2100 Renaissance Blvd, Suite 100               Mass Emergency Management Agency King of Prussia, PA 19406-2713                 400 Worcester Road Framingham, MA 01702 NRC Resident Inspector Pilgrim Nuclear Power Station
 
ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)
 
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==
Line 591: Line 1,237:
==3.0 BACKGROUND==
==3.0 BACKGROUND==


===4.0 TECHNICAL===
==4.0 TECHNICAL ANALYSIS==


ANALYSIS 5.0 REGULATORY ANALYSIS AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination
==5.0 REGULATORY ANALYSIS==
AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination 5.3 Environmental Consideration


===5.3 Environmental===
==6.0 REFERENCES==
 
Consideration


==6.0 REFERENCES==
1


1 Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT  
Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT


==1.0 DESCRIPTION==
==1.0 DESCRIPTION==


Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.
Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.
Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b)and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."  
Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b) and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."


==2.0 PROPOSED CHANGE==
==2.0 PROPOSED CHANGE==
Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician.
 
Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event._Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks: o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area)o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.
Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician. Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).
Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event.
_Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks:
o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.


==3.0 BACKGROUND==
==3.0 BACKGROUND==


The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2 Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..." 10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.
The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2
NUREG-0654 (Reference 6.2), Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements.
 
The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I,"Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks). -The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments.
Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..."
The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations.
10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.
NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.
NUREG-0654 (Reference 6.2), Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements. The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks).             -
On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions.
The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments. The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations. NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.
Specifically, Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan." Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance -Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis.
On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions. Specifically, Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan."
The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).
Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance         - Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis. The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.
3 Attachment I to PNPS Letter 2.16.001 4.0 TECHNICAL ANALYSIS 4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant)functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s);
The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).
and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians.
3
This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations.
 
The basis for our conclusion is contained in the enclosed safety evaluation.
Attachment I to PNPS Letter 2.16.001
In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation.
 
Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4 Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.
==4.0 TECHNICAL ANALYSIS==
Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal.
 
The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.
4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.
Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.*The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.*The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area)o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training.
The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant) functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).
Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment." 5 Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position.
In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s); and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians. This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).
The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.
In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations. The basis for our conclusion is contained in the enclosed safety evaluation. In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.
The OSA is included in this submittal as Attachment
At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation. Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4
: 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.
 
Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.
Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.
Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal. The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.
Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.
      *The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.
      *The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.
o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.
4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training. Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment."
5


===5.0 REGULATORY===
Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.
The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position. The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.
The OSA is included in this submittal as Attachment 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.


ANALYSIS AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,*10 CFR 50.47(b)(2)  
==5.0 REGULATORY ANALYSIS==
-On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
AND ENVIRONMENTAL REVIEW 5.1     Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,
*10 CFR 50, Appendix E, Section IV.A (in part) -The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
      *10 CFR 50.47(b)(2)     - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
*NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part"The criteria and recommendations in this regulatory guide are methods that the 6 Attachment 1Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness." In NUREG-0654, Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard.
      *10 CFR 50, Appendix E, Section IV.A (in part) - The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement.
      *NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part "The criteria and recommendations in this regulatory guide are methods that the 6
Evaluation Criteria l1.B.5 states, in part, that: Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity.
Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*
For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies." Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q).
met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness."
In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.
In NUREG-0654, Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard. Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement. Evaluation Criteria l1.B.5 states, in part, that:
Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2).
Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity. For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies."
The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement.
Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q). In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.
As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.
Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2). The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement. As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.
Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.7 Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.5.2 No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.
Response:
7
No.The proposed training requirements change has no effect on normal plant operation or on any accident initiator.
 
The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.
Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.
Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the"on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.
5.2     No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:
: 1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?
Response: No.
The proposed training requirements change has no effect on normal plant operation or on any accident initiator. The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.
Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the "on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.
Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
: 2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
Response: No.
No.The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency.
The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency. It has been evaluated and determined not to significantly affect the ability to perform required or related functions. It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions. The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.
It has been evaluated and determined not to significantly affect the ability to perform required or related functions.
8
It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions.
The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.
8 Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.
: 3. Does the proposed change involve a significant reduction in a margin of safety?Response:
No.The proposed change does not affect plant design or method of operation.
10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability.
Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel.
A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9).
Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
9 Attachment I to PNPS Letter 2.16.001 6. REFERENCES


===6.1. Entergy===
Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.
Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062)6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).
: 3. Does the proposed change involve a significant reduction in a margin of safety?
Response: No.
The proposed change does not affect plant design or method of operation.
10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability. Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel. A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.
The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.
Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
*5.3      Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.
9


===6.4. James===
Attachment I to PNPS Letter 2.16.001
Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station -Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule." 6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance -Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).
: 6. REFERENCES 6.1. Entergy Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062) 6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.
6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).
6.4. James Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station - Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule."
6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance   - Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).
6.7. Entergy Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007) 10


===6.7. Entergy===
ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page) to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i:         Minimum Staffino Renuirements for the PNPS ERO-( 1 )
Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007)10 ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page)
Functional Area                                   Major Task                       TOnshift
Attachment 2 to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i: Minimum Staffino Renuirements for the PNPS ERO-(1)Functional Area Major Task TOnshift Position Title Rs+/-Pos.No. ________________
                                                                                              +/-Pos.No.                     Position Title                    Rs
ponse Plant. Operations Plant Stabilization  
________________                               ponse Plant.Operations                       Plant Stabilization                               +/-       1         Shift Manager                                   On Shift#
+/- 1 Shift Manager On Shift#Assessment of Operational Accident Mitigation 2 Control Room Supervisor On Shift#Aspects 3,4 Lic. Nuc. Plant Operator (2) On Shift#______________________
Assessment of Operational               Accident Mitigation                                       2         Control Room Supervisor                         On Shift#
5.6 Unlic. Nuc. Prant Operator (2)**FB On Shift#"Emerg'ency Direction Emergency Classification j1) Shift Manager On Shift#Emergency Control PARs t (1) Shift Manager On Shift#IEmergency Director 60 mai.
Aspects                                                                                           3,4       Lic. Nuc. Plant Operator (2)                   On Shift#
Plant Ops Supv 60 min.Notification and Notification of PNPS, Local, (1) Shift Manager On Shift#Communications Commonwealth, and Federal personnel 7 Unlic. Nuc. Plant Operator On Shift#and Maintain Communications Offsite Communicator 30 min.EOF Communicator 60 min.ENS Communicator 60 mai.Rad Accident Assessment!....
______________________                     5.6         Unlic. Nuc. Prant Operator (2)**FB             On Shift#
EOF Direction EOF Managter, 60 mai.Ops Accident Assessment Offsite Dose Assessment (8) RP Technician***
  "Emerg'ency Direction                   Emergency Classification                                 j1)         Shift Manager                                   On Shift#
On Shift#Support (9) Radio Chem. Technician**" On Shift#Radiolog:ical Assessment Coord 30 mai.Offsite Surveys OMT Member (2) 30 mai.OMT Member (2) 60 min.Onsite and'ln-plan't Surveys 8 RP Technician On Shift#RP Technician (2) 30 min.RP Technician (2) 60 mmn.Chemistry  
Emergency Control                     PARs                                               t IEmergency (1)       Shift Manager Director On Shift#
/ Radiochemistry 9 Radio Chem. Technician On Shlft#_____Radio Chem. Technician 60 mai.Plant System Engineering TSC / OSC Direction Emergency Plant Manager 60 mai.Repair and Corrective Actions Technical Support 10 Engineer (Shift Control Rm)* On Shift#Engineer (Reactor) 30 mai.Engineer (Mechanical) 60 mai._________________________Englineer (Electrical) 60 min.Eguipment Repairs _____Nuclear Maint. Technician 30 min.Corrective Actions Nuclear Maint, Technician 60 main 11 Unlic. Nuc. Plant Operator On Shift#12 Nuc. Plant Reactor Operator m*FB On Shift#Nuc. Plant Reactor Operator 60 min.Nuclear Maint. (ElectnicalX2) 30 mai.Nuclear Maint. (Electrical) 60 min.___________________
60 mai.
________________________________Nuclear Control Technician(2) 30 mai.Protective Actions (In Plant) Radiation Protection, Access Control, (8), (9) RP Technician (2)*0 On Shift#RP Coverage, Personnel Monitoring, RP Technician (2) 30 mai.and Dosimetry
Emerg*ency Plant Ops Supv                       60 min.
_____RP Technician (2) 60 mai.Fire Fighting 13, 14 Fire Brigade*, (3 **, 2 [NLO or Sec]) On Shift#____________________
Notification and                       Notification of PNPS, Local,                             (1)       Shift Manager                                   On Shift#
_____Plymouth Fire Dept. On Call Rescue Ops and First Aid On Shitt#___________________
Communications                         Commonwealth, and Federal personnel                       7         Unlic. Nuc. Plant Operator                     On Shift#
________________________Ambulance Service ... On Call Site Access Control and Security Security Force* On Shift#Personnel Accountability
and Maintain Communications                                         Offsite Communicator                           30 min.
_____________________un onirt -person as saiu ro oe on snurt wnen, ounng normar or au~nonrzeo oventime nours, that person is witnin tie PNPS owner controlled areas or on the connecting roads between them with Station Management approval.* Position staffed In accordance with technical specifications.
EOF Communicator                               60 min.
** Position staffed in accordance with technical specifications and station procedures.
ENS Communicator                               60 mai.
** May be provided by shift personnel assigned other functions.
Rad Accident Assessment!....           EOF Direction                                                       EOF Managter,                                   60 mai.
.. .(EMP) Emergency Medical Personnel:
Ops Accident Assessment                 Offsite Dose Assessment                                   (8)       RP Technician***                               On Shift#
individuals qualified as EMPs, RNs, First Responders, and Paramedics.
Support                                                                                           (9)       Radio Chem. Technician**"                       On Shift#
Radiolog:ical Assessment Coord                 30 mai.
Offsite Surveys                                                       OMT Member (2)                                 30 mai.
OMT Member (2)                                 60 min.
Onsite and'ln-plan't Surveys                               8         RP Technician                                   On Shift#
RP Technician (2)                               30 min.
RP Technician (2)                               60 mmn.
Chemistry / Radiochemistry                                 9         Radio Chem. Technician                         On Shlft#
_____Radio     Chem. Technician                       60 mai.
Plant System Engineering               TSC / OSC Direction                                                   Emergency Plant Manager                         60 mai.
Repair and Corrective Actions         Technical Support                                         10         Engineer (Shift Control Rm)*                   On Shift#
Engineer (Reactor)                             30 mai.
Engineer (Mechanical)                           60 mai.
_________________________Englineer                               (Electrical)                       60 min.
Eguipment Repairs                                     _____Nuclear               Maint. Technician                   30 min.
Corrective Actions                                                   Nuclear Maint, Technician                       60 main 11         Unlic. Nuc. Plant Operator                     On Shift#
m 12         Nuc. Plant Reactor Operator *FB                 On Shift#
Nuc. Plant Reactor Operator                     60 min.
Nuclear Maint. (ElectnicalX2)                   30 mai.
Nuclear Maint. (Electrical)                     60 min.
________________________________Nuclear                                         Control Technician(2)               30 mai.
Protective Actions (In Plant)         Radiation Protection, Access Control,                   (8), (9)     RP Technician (2)*0                             On Shift#
RP Coverage, Personnel Monitoring,                                   RP Technician (2)                               30 mai.
and Dosimetry                                         _____RP             Technician (2)                             60 mai.
Fire Fighting                                           13, 14       Fire Brigade*, (3 **, 2 [NLO or Sec])           On Shift#
____________________                 _____Plymouth               Fire Dept.                         On Call Rescue Ops and First Aid                                             EMP**                                          On Shitt#
________________________Ambulance                                                   Service         ...               On Call Site Access Control and               Security                                                             Security Force*                                 On Shift#
Personnel Accountability                                                                     _____________________
n*        un  onirtowner PNPS      - person     assaiu controlled      ro oe areas  or on on snurt wnen, ounng the connecting      normar roads        or au~nonrzeo between                    Station nours, them withoventime            that person Management            is witnin tie approval.
* Position staffed In accordance with technical specifications.
      **         Position staffed in accordance with technical specifications and station procedures.
            ** May be provided by shift personnel assigned other functions.
            .. .(EMP) Emergency Medical Personnel: individuals qualified as EMPs, RNs, First Responders, and Paramedics.
NOTES: Response times are based on optimum travel conditions.
NOTES: Response times are based on optimum travel conditions.
On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions  
On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.
#13 and #14 are available to support Shift Manager, where qualified, in non-fire events.(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E, Section IV. A. 9 and maintained as a separate document.B-7 Revision 44 ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)
On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions #13 and #14 are available to support Shift Manager, where qualified, in non-fire events.
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training I Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task On-site
(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E, Section IV. A. 9 and maintained as a separate document.
B-7                                                       Revision 44
 
ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)
 
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)
NUREG 0654         Chemistry Technician Training             Chemistry Technician Training     Justification for Reduced Training I Table B-I       Identified in 2006 Submittal                   Identified in 2016                       Comments "On-Shift"                                                                                     (See OSA Analysis notes below)
Task On-site
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool *The 2012 OSA ensured that PNPS and In- Member Qualification Member Qualification ERO team members can accomplish Plant
* Operations Support Center Pool *The     2012 OSA ensured that PNPS and In-     Member Qualification                       Member Qualification               ERO team members can accomplish Plant
* Respirator User Qualification
* Respirator User Qualification
* Perform Radiation Surveys the required mission in the first 90 Surveys
* Perform Radiation Surveys           the required mission in the first 90 Surveys
* Self-Contained Breathing Apparatus
* Self-Contained Breathing Apparatus
* Perform Contamination Surveys minutes of ERO activation with the User Qualification
* Perform Contamination Surveys       minutes of ERO activation with the User Qualification
* Operate Basic Dose Rate Meters current on-shift ERO staff defined in* Walkdown EOP-4 survey point * -Operate Basic Count Rate Meters Table B-I.locations* Perform Radiation Surveys* Perform Contamination Surveys* Collect an Airborne Radioactivity Sample* Analyze Smears for contamination levels* Analyze Air Samples* Operate Basic Dose Rate Meters* Operate Basic Count Rate Meters* Operate the Scintillation Alpha Counter* Operate the Beta Counter* Operate the Gamma Spec System* Operate the Regulated Air Sample Pump* Operate the Radeco Air Sampler 1 Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task Access *Operations Support Center Pool
* Operate Basic Dose Rate Meters     current on-shift ERO staff defined in
* Operations Support Center Pool *The 2012 OSA ensured that PNPS Control Member Qualification Member Qualification ERO team members can accomplish
* Walkdown EOP-4 survey point             * -Operate Basic Count Rate Meters     Table B-I.
* Control High Radiation Areas the required mission in the first 90* RWP Briefing minutes of ERO activation with the* Perform Stay Time Calculations current on-shift ERO staff defined in* Issue and Return Respirators Table B-i.RP .Operations Support Center Pool
locations
* Operations Support Center Pool *The 2012 OSA ensured that PNPS Coverage Member Qualification Member Qualification ERO team members can accomplish for repair,
* Perform Radiation Surveys
* Perform Contamination Surveys
* Collect an Airborne Radioactivity Sample
* Analyze Smears for contamination levels
* Analyze Air Samples
* Operate Basic Dose Rate Meters
* Operate Basic Count Rate Meters
* Operate the Scintillation Alpha Counter
* Operate the Beta Counter
* Operate the Gamma Spec System
* Operate the Regulated Air Sample Pump
* Operate the Radeco Air Sampler 1
 
Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)
NUREG 0654         Chemistry Technician Training           Chemistry Technician Training       Justification for Reduced Training /
Table B-I         Identified in 2006 Submittal                   Identified in 2016                       Comments "On-Shift"                                                                                     (See OSA Analysis notes below)
Task Access     *Operations     Support Center Pool
* Operations Support Center Pool *The     2012 OSA ensured that PNPS Control       Member Qualification                       Member Qualification               ERO team members can accomplish
* Control High Radiation Areas                                                   the required mission in the first 90
* RWP Briefing                                                                   minutes of ERO activation with the
* Perform Stay Time Calculations                                                 current on-shift ERO staff defined in
* Issue and Return Respirators                                                   Table B-i.
RP     . Operations Support Center Pool
* Operations Support Center Pool *The     2012 OSA ensured that PNPS Coverage       Member Qualification                       Member Qualification               ERO team members can accomplish for repair,
* Respirator User Qualification
* Respirator User Qualification
* Perform Radiation Surveys the required mission in the first 90 corrective
* Perform Radiation Surveys           the required mission in the first 90 corrective
* SCBA User Qualification
* SCBA User Qualification
* Perform Contamination Surveys minutes of ERO activation with the actions,
* Perform Contamination Surveys       minutes of ERO activation with the actions,
* RP Job Coverage
* RP Job Coverage
* Operate Basic Dose Rate Meters current on-shift ERO staff defined in search and
* Operate Basic Dose Rate Meters     current on-shift ERO staff defined in search and
* Control High Radiation Areas
* Control High Radiation Areas
* Operate Basic Count Rate Meters Table B-I.rescue first
* Operate Basic Count Rate Meters     Table B-I.
* RWP Briefing aid & Perform Stay Time Calculations firefighting
rescue first
* Perform Radiation Surveys* Perform Contamination Surveys* Collect an Airborne Sample* Analyze Smears* Analyze Air Samples* Operate Basic Dose Rate Meters* Operate Basic Count Rate Meters* Operate the SAC-4* Operate the BC-4* Operate the Gamma Spec System* Operate the RAS Pump* Operate the Radeco* Perform RP Duties in Response to a Plant Fire___________________
* RWP Briefing aid
2 Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /Table B-I Identified in 2006 Submittal Identified in 2016 Comments"On-Shift" (See OSA Analysis notes below)Task Personnel
        &       Perform Stay Time Calculations firefighting
* Perform Radiation Surveys
* Perform Contamination Surveys
* Collect an Airborne Sample
* Analyze Smears
* Analyze Air Samples
* Operate Basic Dose Rate Meters
* Operate Basic Count Rate Meters
* Operate the SAC-4
* Operate the BC-4
* Operate the Gamma Spec System
* Operate the RAS Pump
* Operate the Radeco
* Perform RP Duties in Response to a Plant Fire___________________
2
 
Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)
NUREG 0654                 Chemistry Technician Training                               Chemistry Technician Training                             Justification for Reduced Training /
Table B-I                 Identified in 2006 Submittal                                         Identified in 2016                                                 Comments "On-Shift"                                                                                                                                         (See OSA Analysis notes below)
Task Personnel
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* The 2012 OSA ensured that PNPS Monitoring Member Qualification Member Qualification ERO team members can accomplish
* The 2012 OSA ensured that PNPS Monitoring             Member Qualification                                         Member Qualification                                         ERO team members can accomplish
* RP Job Coverage the required mission in the first 90* RWP Briefing minutes of ERO activation with the* Perform Personnel Decontamination current on-shift ERO staff defined in Table B-I.Dosimetry
* RP Job Coverage                                                                                                           the required mission in the first 90
* RWP Briefing                                                                                                               minutes of ERO activation with the
* Perform Personnel Decontamination                                                                                         current on-shift ERO staff defined in Table B-I.
Dosimetry
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* Operations Support Center Pool
* No effective change is identified Member Qualification Member Qualification
* No effective change is identified Member Qualification                                         Member Qualification
* Issue and Control Personnel
* Issue and Control Personnel
* Issue Dosimetry Dosimetry OSA Notes: 1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities.
* Issue Dosimetry Dosimetry OSA Notes:
This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.
: 1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear PowerPlants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician.
: 2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.
The PNPS SEP is consistent with the NEI guidance.4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders.
: 3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position. NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician. The PNPS SEP is consistent with the NEI guidance.
Tasks for event response were reviewed for 90 minutes following the declaration.
: 4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.
No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
: 6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
: 7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
3*
ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)
ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)
PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by: Myra Jones Fred Guynn PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION.....................................................................................
 
4 II. ANALYSIS  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by:
Myra Jones Fred Guynn
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION.....................................................................................                           4 II. ANALYSIS  


==SUMMARY==
==SUMMARY==
  .............................................................................
  ............................................................................. 4 A. Emergency Plan Minimum Staffing.................................................................... 5 B. Other Commitments to Shift Staffing........................................................... ....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) .............................................. 6 D. Emergency Plan Tasks Not Analyzed ................................................................ 7 III. ANALYSIS PROCESS .............................................................................. 8 IV. ACCIDENT SCENARIOS ......             .....................................................................                     9 A. Accident Selection........................................................................................ 9 B. Accident Scenarios included in the Analysis ,...................................................... .. 9 C. Accident Scenarios Not Included in the Analysis .................................................. 10 V.     GENERAL ASSUMPTIONS AND LIMITATIONS................................................ 11 A. Notes and Assumptions Applicable to Pilgrim OSA: .............................................. 11 B. NEI 10-05 Assumptions ..................           .........     ................................................... 11 VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS ..................................... 14 Vii APPENDIX B         - ON-SHIFT STAFFING ANALYSIS............................................. 16 A. Accident Analysis #1 - Design Basis Threat (DBT)............................................... 16 B. Design Basis Accident Analysis #2       - Control Rod Drop Accident.............................. 21 C. Design Basis Accident Analysis #4       - Loss of Coolant Accident................................ 27 D. Design Basis Accident Analysis #5       - Main Steam Line Break .................................. 33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident .................................. 39 F. Accident Analysis #8 -   Aircraft Probable Threat .................................................. 45 G. Accident Analysis #9 -   Control Room Evacuation and Alternate Shutdown.................. 51 H. Accident Analysis #10   - Station Blackout........................................................... 57 I. Accident Analysis #11   - LOCA/General Emergency with Release and PAR ................ 63 VIIIAPPENDIX C TIME MOTIONS STUDIES....................................................... 69 A. TMS Shift Manager Safe Shutdown Task........................................................... 69 PNPS                                                                                                               Page 2
4 A. Emergency Plan Minimum Staffing....................................................................
 
5 B. Other Commitments to Shift Staffing...........................................................  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED ............... 73 A. Overlap Requiring Compensatory Measures ..................................................... 73 X. REFERENCES ...................................................................................     74 XI. STAFFING ANALYIS TEAM .................................................................... 74 Page 3 PNPS                                                                                       Page 3
....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) ..............................................
 
6 D. Emergency Plan Tasks Not Analyzed ................................................................
PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19         - 22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstratingthat on-shift personnel assigned emergency plan implementation functions are not assigned responsibilitiesthat would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
7 III. ANALYSIS PROCESS ..............................................................................
I. ANALYSIS  
8 IV. ACCIDENT SCENARIOS  
...... .....................................................................
9 A. Accident Selection........................................................................................
9 B. Accident Scenarios included in the Analysis ,......................................................  
..9 C. Accident Scenarios Not Included in the Analysis ..................................................
10 V. GENERAL ASSUMPTIONS AND LIMITATIONS................................................
11 A. Notes and Assumptions Applicable to Pilgrim OSA: ..............................................
11 B. NEI 10-05 Assumptions  
..................  
.........  
...................................................
11 VI. APPENDIX A -ANALYZED EVENTS AND ACCIDENTS  
.....................................
14 Vii APPENDIX B -ON-SHIFT STAFFING ANALYSIS.............................................
16 A. Accident Analysis #1 -Design Basis Threat (DBT)...............................................
16 B. Design Basis Accident Analysis #2 -Control Rod Drop Accident..............................
21 C. Design Basis Accident Analysis #4 -Loss of Coolant Accident................................
27 D. Design Basis Accident Analysis #5 -Main Steam Line Break ..................................
33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident ..................................
39 F. Accident Analysis #8 -Aircraft Probable Threat ..................................................
45 G. Accident Analysis #9 -Control Room Evacuation and Alternate Shutdown..................
51 H. Accident Analysis #10 -Station Blackout...........................................................
57 I. Accident Analysis #11 -LOCA/General Emergency with Release and PAR ................
63 VIIIAPPENDIX C TIME MOTIONS STUDIES.......................................................
69 A. TMS Shift Manager Safe Shutdown Task...........................................................
69 PNPS Page 2 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED  
...............
73 A. Overlap Requiring Compensatory Measures .....................................................
73 X. REFERENCES  
...................................................................................
74 XI. STAFFING ANALYIS TEAM ....................................................................
74 PNPS Page 3 PNPS Page 3 PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19 -22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities.
This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.I. ANALYSIS  


==SUMMARY==
==SUMMARY==
The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:* Emergency Direction and Control* Plant Operations and Safe Shutdown (SSD)* Fire Fighting (FB)* Accident Assessment
 
* Radiation Protection and Chemistry* Notification/Comnmunication
The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:
* Technical Support* Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks.
* Emergency Direction and Control
These include Repair and Corrective Action, Rescue Operations and First Aid.PNPS Page 4 PNPS Page 4 PNPS ON-SHIFT STAFFING ANALYSIS REPORT A. Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of &sect; 50.47(b).The following table indicates the result of the NEI 10-05 staffing analysis of on-shift-personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.Licensing Basis On-Shift Position 4 Requirement E-Plan Functional Area Staffing Analysis Results 50.54m Emergency Direction and Shift Manager (SM) E-plan Table B-I Control SSD (TMS for SSD1 actions)Control Room Supervisor 50.54m (CRS) E-plan Table B-I1S Shift Control Room E-plan Table B-I1ehia upr Engineer (STA)Licensed Nuclear Plant 50.54m SSD -Operator (RO #1 ) E-plan Table B-i Licensed Nuclear Plant 50.54m SSD1 Operator (RO #2) E-plan Table B-i Non-Licensed Nuclear E-plan Table B-i SSD 2 Plant Operator (NLO #1")1 Non-Licensed Nuclear E-plan Table B-i E-Plan Communicator Plant Operator (NLO #2)______
* Plant Operations and Safe Shutdown (SSD)
Notifications 3 1 Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #3)Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #4)Non-Licensed Nuclear E-plan Table B-i1B PlantOperator_(NLO_#5)
* Fire Fighting (FB)
_________Chemist E-plan Table B-1 Accident1 Assessment/Chemistry1 RP #1 E-plan Table B-i Radiation Protection 1 Fire Brigade #11 E-plan Table B-i FB 1 Fire Brigade #21 E-plan Table B-i FB 1 E-plan Table B-i Per Security Security Security Accountability Contingency
* Accident Assessment
_____________
* Radiation Protection and Chemistry
Contingency Plan _____________
* Notification/Comnmunication
Plan TOTAL 14 1 Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.2 SSD NLO can be filled by RO or SRO.3 E-Plan Communicator can be replaced by SRO that is qualified for the task.4 One of the 5 NLOs is a Radwaste Operator PNPS Page 5 PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)1. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment.
* Technical Support
In addition, the RP Technician shares the responsibility for dose assessment.
* Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks. These include Repair and Corrective Action, Rescue Operations and First Aid.
It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment.
Page 4 PNPS                                                                                                   Page 4
No further analysis or TMS is required.2. The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.3. The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
 
No further analysis TMS is required.4. A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT A.         Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of &sect; 50.47(b).
Details of the TMS are found in section VIII Appendix C.PNPS Page 6 PNPS Page 6 PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed:' 1. Repair and Corrective Action -Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks.
The following table indicates the result of the NEI 10-05 staffing analysis of on-shift
Repair and corrective action is defined as:*An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:
              -personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.
* Unplanned/unexpected actions that address equipment failures.
Licensing Basis                                       On-Shift Position 4                 Requirement           E-Plan Functional Area       Staffing Analysis Results 50.54m           Emergency Direction and Shift Manager (SM)               E-plan Table B-I                   Control SSD (TMS for SSD1 actions)
These actions are contingent in nature and cannot be specified in advance.* Planned/expected actions performed in support of operating procedure implementation, including severe accident management guidelines.
Control Room Supervisor                   50.54m (CRS)                   E-plan Table B-I1S Shift Control Room               E-plan Table B-I1ehia                     upr Engineer (STA)
At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.Initial corrective actions are contained in and controlled by plant operating procedures.
Licensed Nuclear Plant                   50.54m                         SSD                 -
The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required.
Operator (RO #1 )               E-plan Table B-i Licensed Nuclear Plant                   50.54m                         SSD1 Operator (RO #2)               E-plan Table B-i Non-Licensed Nuclear               E-plan Table B-i                     SSD2 Plant Operator (NLO #1")1 Non-Licensed Nuclear               E-plan Table B-i         E-Plan Communicator Plant Operator (NLO #2)______                                       Notifications 3           1 Non-Licensed         Nuclear     E-plan Table B-i1B Plant Operator       (NLO #3)
Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed 2. Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response.
Non-Licensed         Nuclear     E-plan Table B-i1B Plant Operator       (NLO #4)
Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks.
Non-Licensed         Nuclear     E-plan Table B-i1B PlantOperator_(NLO_#5)         _________
The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed.
Chemist                  E-plan Table B-1                   Accident1 Assessment/Chemistry1 RP #1                 E-plan Table B-i           Radiation Protection           1 Fire Brigade #11               E-plan Table B-i                       FB                 1 Fire Brigade #21               E-plan Table B-i                       FB                 1 E-plan Table B-i                                     Per Security Security                       Security                 Accountability     Contingency
Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.PNPS Page 7 PNPS Page 7 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP)personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments.
_____________             Contingency Plan       _____________                     Plan TOTAL                                                                             14 1
Additionally, personnel from Security provided input to the analysis when necessary.
Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.
The team members are identified in Section Xl of this report.The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.
2 SSD NLO can be filled by RO or SRO.
Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation.
3 E-Plan Communicator can be replaced by SRO that is qualified for the task.
These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate.
4 One of the 5 NLOs is a Radwaste Operator PNPS                                                                                                       Page 5
In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.
 
The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -ON-SHIFT STAFFING ANALYSIS.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)
Note that NSIR DPR-ISG-01 states that only DBA accidents"which would result in an emergency declaration" should be evaluated in the staffing assessment.
: 1.       The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment. In addition, the RP Technician shares the responsibility for dose assessment. It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment. No further analysis or TMS is required.
Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description.
: 2.       The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.
If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds.
: 3.       The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function. No further analysis TMS is required.
In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.PNPS Page 8 PNPS Page 8 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection 1. The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance -Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents.
: 4.       A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.
The scenarios considered were:* Design Basis Threat (DBT) ground assault* DBA Control Rod Drop Accident* DBA Loading Error Accident* DBA Loss of Coolant Accident* DBA Main Steam Line Break Accident* DBA Fuel Handling Accident* DBA Radwaste System Accident* Aircraft Probable Threat* Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,* Station Blackout, (SBO)* LOCA/General Emergency with release and PAR a LOCA with entry into Severe Accident Management
Details of the TMS are found in section VIII Appendix C.
* Fire Resulting in Reactor Trip (Appendix R fire)B. Accident Scenarios included in the Analysis 1. Design Basis Threat as described in NE! 10-05* Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed 2. Control Rod Drop Accident as described in FSAR 14.5.1* One control rod drops and reactor trips on APRM 120% flux scram.Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment.
Page 6 PNPS                                                                                             Page 6
EAL is based on condenser release information in FSAR.3. Loss of Coolant Accident as described in FSAR 14.5.3* Double ended guillotine break of a recirculation line. All ECCS operate-as designed.
 
EAL is based on fission product barrier EALs.4. Main Steam Line Break Accident as described in FSAR 14.5.4* Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).PNPS Page 9 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.5. Fuel Handling Accident as described in FSAR 14.5.5* The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.6. Aircraft Probable Threat (50.54hh)* Notification is received from the NRC that a probable aircraft threat exists (>5 minutes, <30 minutes)7. Control Room Fire and Alternate Shutdown* A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.8. Station Blackout* A loss of all offsite AC power occurs and the failure of the emergency diesel generators.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed
: 9. General Emergency with release and "PAR* Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).C. Accident Scenarios Not Included in the Analysis 1. Loading Error Accident as described in ESAR 14.1.5.2* Misloaded bundle in the core. No EAL condition is met.2. Radwaste System Accident as described in FSAR 14.5.6* No EAL condition is met.3. Implement SAMG* A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators.
:' 1. Repair and Corrective Action - Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks. Repair and corrective action is defined as:
No analysis required.4. Appendix R Fire* Fire leading to reactor trip with complications.
                    *An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.
The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis.
In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:
No additional analysis required.PNPS Page 10 PNPS Page 10 PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA: 1. The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.2. The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders.
* Unplanned/unexpected actions that address equipment failures. These actions are contingent in nature and cannot be specified in advance.
Tasks for event response were reviewed for 90 minutes following the declaration.
* Planned/expected actions performed in support of operating procedure implementation, including severe accident management guidelines.
No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.
: 3. The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated.
Initial corrective actions are contained in and controlled by plant operating procedures. The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required. Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed
No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration.
: 2.     Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response. Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks. The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed. Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.
Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.4. All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.
Page 7 PNPS                                                                                               Page 7
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP) personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments. Additionally, personnel from Security provided input to the analysis when necessary. The team members are identified in Section Xl of this report.
The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.
Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation. These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate. In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.
The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -
ON-SHIFT STAFFING ANALYSIS. Note that NSIR DPR-ISG-01 states that only DBA accidents "which would result in an emergency declaration" should be evaluated in the staffing assessment.
Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description. If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds. In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.
Page 8 PNPS                                                                                                 Page 8
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection
: 1.     The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance       - Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents. The scenarios considered were:
* Design Basis Threat (DBT) ground assault
* DBA Control Rod Drop Accident
* DBA Loading Error Accident
* DBA Loss of Coolant Accident
* DBA Main Steam Line Break Accident
* DBA Fuel Handling Accident
* DBA Radwaste System Accident
* Aircraft Probable Threat
* Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,
* Station Blackout, (SBO)
* LOCA/General Emergency with release and PAR a       LOCA with entry into Severe Accident Management
* Fire Resulting in Reactor Trip (Appendix R fire)
B. Accident Scenarios included in the Analysis
: 1.     Design Basis Threat as described in NE! 10-05
* Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed
: 2.     Control Rod Drop Accident as described in FSAR 14.5.1
* One control rod drops and reactor trips on APRM 120% flux scram.
Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment. EAL is based on condenser release information in FSAR.
: 3.     Loss of Coolant Accident as described in FSAR 14.5.3
* Double ended guillotine break of a recirculation line. All ECCS operate
                      -     as designed. EAL is based on fission product barrier EALs.
: 4.     Main Steam Line Break Accident as described in FSAR 14.5.4
* Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).
PNPS                                                                                                 Page 9
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.
: 5.     Fuel Handling Accident as described in FSAR 14.5.5
* The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.
: 6.     Aircraft Probable Threat (50.54hh)
* Notification is received from the NRC that a probable aircraft threat exists
(>5 minutes, <30 minutes)
: 7.     Control Room Fire and Alternate Shutdown
* A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.
: 8.     Station Blackout
* A loss of all offsite AC power occurs and the failure of the emergency diesel generators.
: 9.     General Emergency with release and "PAR
* Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).
C. Accident Scenarios Not Included in the Analysis
: 1.     Loading Error Accident as described in ESAR 14.1.5.2
* Misloaded bundle in the core. No EAL condition is met.
: 2.     Radwaste System Accident as described in FSAR 14.5.6
* No EAL condition is met.
: 3.       Implement SAMG
* A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators. No analysis required.
: 4.     Appendix R Fire
* Fire leading to reactor trip with complications. The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis. No additional analysis required.
Page 10 PNPS                                                                                         Page 10
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA:
: 1.     The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).
Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.
: 2.     The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
: 3.     The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated. No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration. Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.
: 4.     All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.
B. NEI 10-05 Assumptions
B. NEI 10-05 Assumptions
: 1. Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)2. On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
: 1.     Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)
: 3. Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.4. Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.5. On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.PNPS Page 11 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas)without the aid of a RP technician.
: 2.     On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
: 7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.12. Communications, briefings, and peer checks are acceptable collateral duties.13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
: 3.     Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.
: 15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as"Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation.
: 4.     Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.
As a result, a greater number and variety of actions would need to be implemented by plant personnel." 17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.PNPS Page 12 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.21. Severe Accident Management Guideline (SAMG) -It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.22. SAMG -The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure), and there is not actual or imminent challenge to containment integrity.
: 5.     On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.
PNPS Page 13 PNPS Page 13 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI. APPENDIX A -ANALYZED EVENTS AND ACCIDENTS E e t E e t S~ummary Descriptioniof~i Plant... .... ...... '"== ..:I ....:* : Refe~rence = ......' "= '
PNPS                                                                                             Page 11
iEn t ype- ::::::: :;:, Event.Mode..Document:s)
 
Event ECL.1 DBT Land and/or waterborne 1 NEI 10-05 Site Area Yes HOSTILE ACTION Emergency directed against the ISG IV.C Protected Area by a HOSTILE FORCE.2 DBA Control Rod Drop Accident 1 FSAR 14.5.1 Site Area Yes Emergency 3 DBA Loading Error Accident 1 FSAR 14.5.2 None Noz (misloaded bundle in the______core) 4 DBA Loss of Coolant Accident 1 FSAR 14.5.3 General Yes______Emergency 5 DBA Main Steam Line Break 1 FSAR 14.5.4 Site Area Yes Emergency 6 DBA Fuel Handling Accident 5 FSAR 14.5.5 Site Area Yes Emergency 7 DBA Radwaste System 1 FSAR 14.5.6 None Accident 8 Assumed Aircraft Probable Threat 1 10CFR50.54hh Alert Yes for (1)analysis purpose RG 1.214 9 Assumed Control Room Evacuation 1 FSAR 14.6.1 Alert Yes for and Alternate Shutdown Analysis (fire in main control room) I0CFR50 Purpose Appendix R Fire Hazard Analysis 10 Assumed Station Blackout 1 ISG IV.C Site Area Yes for Emergency analysis purpose 11 Assumed LOCA -General 1 ISG IV.C General Yes for Emergency with Emergency Analysis radiological release and____Purpose PAR 12 Assumed LOCA with entry into 1 ISG IV.C General for severe accident Emergency Analysis procedures.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
Purpose ________________________
: 6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas) without the aid of a RP technician.
_____PNPS Page 14 PNPS Page 1.4 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13 Assumed Appendix R Fire I ISG IV.C AlertNo for Analysis____ Purpose _____________
: 7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.
____ _______1 Plant mode per FSAR or assumed for anaiysis purpose 2 No EAL met on plant condition or dose.3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators.
: 8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.
The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity.
: 9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.
PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.
: 10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown.
: 11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.
Analysis is not required.PNPS Page 15 PNPS Page 15 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] -ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 -Design Basis Threat (DBT)1. Accident Summary* Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition 2. Accident Specific Assumptions Made* This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.* Assume at power in Mode 1* Security notifies the Shift Manager of condition Security Code RED.* Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.* Assume all systems function and the core remains covered. No fuel damage and no release.3. Procedures Reviewed for Accident Response* Procedure 5.3.14, Security Incident* EP-IP-1 00, Classification and Notifications
: 12. Communications, briefings, and peer checks are acceptable collateral duties.
* EP-IP-1 00.1, EAL* EP-IP-410, Evacuation and Assembly* Procedure 2.1.6, Reactor Scram PNPS Page 16 PNPS Page 16 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables PNPS TABLE V-ON-SHIFT POSITION T2/L1 T5/L1 T5/L3 1 Shift Manager Emergency Plan 60 T5/L5. No Yes Table B-i T5/L6 T5/L8 T5/L10________________
: 13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]
_______________T5/L 14 _ _ _ _ _ _ _ _2Control Room Emergency PlanN/T2LNoo Supervisor Table B-I Shift Technical EegnyPa 2L 3 Advisor/Shift Engineer ablrenc B-i n 60 T2/L3 No No (3 rd SRO) Table_____B-1
: 14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
___T5___L__
: 15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.
Licensed Nuclear EegnyPa / 2L oN 4 Plant Operator (RO ablrenc B-iN/ 24NoN Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B lai N/A T2/L5 No No*Non-Licensed 6 Nuclear Plant Emergency Plan N/A T2/L6 No No O)perator (NLO #1) abe-Nlon-Licensed T5/L9 7 .cea lat Emergency Plan 60 T5/L1 1 No No Nuclea Plant able B-i Operator (NLO #2) _______ T5/L1 3 ____Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #f4) al -Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -ii Fire Brigade #1 Emergency Plan N/A N/A No No______________
: 16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as "Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation. As a result, a greater number and variety of actions would need to be implemented by plant personnel."
Table B-I1________
: 17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -
_____12 Fire Brigade #2 Emergency Plan N/A N/A No No______________
Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.
Table B-I1________
PNPS                                                                                   Page 12
_____13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-I1________
 
_____14 RP Technician Emergency Plan 60 N/A No No_____ _____ ____ Table B-I1________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
_____Security Contingenc) 15 Security Plan / E-Plan Table 60 T5/Li15 No No_____ _____ ____ B-i1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PNPS Page 17 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS  
: 18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.
& SAFE SHUTDOWN.~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable
: 19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.
:Licensed Operator Training 1 Shift Manager Shift Manager Program Superisoricensed Operator Training 2 Unit Supervisor Control Room Sprio Program Licensed Operator Training 3 Shift Technical Advisor Shift Engineer/STA Program 4Licensed Nuclear Plant ~Licensed Operator Training RatrOeao#1Operator  
: 20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.
#1 Program 5Licensed Nuclear Plant Licensed Operator Training RatrOeao#2Operator  
: 21. Severe Accident Management Guideline (SAMG)             - It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.
#2 Program 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6___ Auxi___iary
: 22. SAMG - The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure),
___Operator_______Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 IOther needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
and there is not actual or imminent challenge to containment integrity.
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A Nl/A 13 I&C Technician N/A Nl/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 18 PNPS Page 18 PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie PeromdbrakAayi ontetoProligramehd 1 N/A Fire Protection Program 2 N/A Fire Protection Program 3 N/A Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.1n-#ntSrvy DBTiThreati 2 n-it Srvy 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):
Page 13 PNPS                                                                                           Page 13
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI.         APPENDIX A - ANALYZED EVENTS AND ACCIDENTS tEe      E e t                     ...... '"== . . :I Plant...
S~ummary....Descriptioniof~i      .... :* : Refe~rence=......i'*:'     "=   **: ' Analysis*:i*
iEn       t:;:, ype- :::::::           Event.Mode..Document:s)                                 Event ECL.
1             DBT     Land and/or waterborne               1     NEI 10-05                 Site Area       Yes HOSTILE ACTION                                                       Emergency directed against the                       ISG IV.C Protected Area by a HOSTILE FORCE.
2             DBA     Control Rod Drop Accident             1     FSAR 14.5.1             Site Area       Yes Emergency 3             DBA     Loading Error Accident               1     FSAR 14.5.2             None             Noz (misloaded bundle in the
______core) 4             DBA     Loss of Coolant Accident             1     FSAR 14.5.3             General         Yes
______Emergency 5             DBA       Main Steam Line Break               1     FSAR 14.5.4             Site Area       Yes Emergency 6             DBA       Fuel Handling Accident               5     FSAR 14.5.5             Site Area       Yes Emergency 7             DBA       Radwaste System                     1     FSAR 14.5.6             None             No*
Accident 8         Assumed       Aircraft Probable Threat             1     10CFR50.54hh           Alert           Yes for                                                 (1) analysis purpose                                                 RG 1.214 9         Assumed       Control Room Evacuation             1     FSAR 14.6.1             Alert           Yes for     and Alternate Shutdown Analysis     (fire in main control room)                 I0CFR50 Purpose                                                 Appendix R Fire Hazard Analysis 10         Assumed       Station Blackout                     1     ISG IV.C               Site Area       Yes for                                                                         Emergency analysis purpose 11         Assumed       LOCA - General                       1     ISG IV.C               General         Yes for     Emergency with                                                     Emergency Analysis     radiological release and
____Purpose          PAR 12         Assumed       LOCA with entry into                 1     ISG IV.C               General           No*
for     severe accident                                                     Emergency Analysis     procedures.
Purpose     ________________________                                             _____
Page 14 PNPS                                                                                                             Page 1.4
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13     Assumed     Appendix R Fire                     I ISG IV.C           AlertNo for Analysis
____ Purpose     _____________                 ____    _______
1 Plant mode per FSAR or assumed for anaiysis purpose 2
No EAL met on plant condition or dose.
3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators. The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity. PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.
4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown. Analysis is not required.
Page 15 PNPS                                                                                               Page 15
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] - ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 - Design Basis Threat (DBT)
: 1. Accident Summary
* Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition
: 2.     Accident Specific Assumptions Made
* This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.
* Assume at power in Mode 1
* Security notifies the Shift Manager of condition Security Code RED.
* Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.
* Assume all systems function and the core remains covered. No fuel damage and no release.
: 3.     Procedures Reviewed for Accident Response
* Procedure 5.3.14, Security Incident
* EP-IP-1 00, Classification and Notifications
* EP-IP-1 00.1, EAL
* EP-IP-410, Evacuation and Assembly
* Procedure 2.1.6, Reactor Scram Page 16 PNPS                                                                                           Page 16
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.       Tables PNPS V-ON-SHIFT TABLE POSITION T2/L1 T5/L1 T5/L3 1     Shift Manager             Emergency Plan                     60           T5/L5.           No       Yes Table B-i                                     T5/L6 T5/L8 T5/L10
_______________T5/L                               14     _    _ _ _ _ _ _ _
2Control Room                 Emergency PlanN/T2LNoo Supervisor                 Table B-I Shift Technical           EegnyPa                                         2L 3 Advisor/Shift Engineer ablrenc         B-i       n             60           T2/L3           No       No (3 rd SRO)               Table_____B-1             ___T5___L__
Licensed Nuclear           EegnyPa                             /           2L               oN 4     Plant Operator (RO           ablrencB-iN/                                   24NoN Licensed Nuclear           EegnyPa 5   Plant Operator (RO           ablrencB      lai             N/A           T2/L5           No       No*
Non-Licensed 6     Nuclear Plant             Emergency Plan                   N/A           T2/L6           No       No O)perator (NLO #1)           abe-Nlon-Licensed                                                             T5/L9 7 .       cea lat             Emergency Plan                     60         T5/L1 1           No       No Nuclea Plant           able B-i Operator (NLO #2)                                 _______               T5/L1 3   ____
Non-Licensed 8     Nuclear Plant             Emergency Plan                   N/A           N/A             No       No Operator (NLO #3)           al       -
Non-Licensed 9 Nuclear Plant                 Emergency Plan                   N/A           N/A             No       No Operator (NLO #f4)         al       -
Non-Licensed 10 Nuclear Plant                 Emergency Plan                   N/A           N/A             No       No Operator (NLO #5)           al -
ii     Fire Brigade #1           Emergency Plan                   N/A           N/A             No        No
______________    Table   B-I1________                                     _____
12 Fire Brigade #2               Emergency Plan                   N/A           N/A             No        No
______________    Table   B-I1________                                     _____
13 RP / Chemistry                 Emergency Plan                   60           N/A             No       No Technician               Table   B-I1________                                     _____
14 RP Technician                 Emergency Plan                   60           N/A             No       No
_____ ____   Table   B-I1________                                     _____
Security Contingenc) 15 Security                     Plan / E-Plan Table               60         T5/Li15           No        No
_____ ____   B-i1_                         _ _   _ _ _ _ _   _ _ _ _   _   _ _ _
PNPS                                                                                                        Page 17
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS &SAFE SHUTDOWN.
                                          ~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable
:Licensed Operator Training 1   Shift Manager                                       Shift Manager                       Program Superisoricensed Operator Training 2   Unit Supervisor                                     Control Room Sprio                 Program Licensed Operator Training 3   Shift Technical Advisor                             Shift Engineer/STA                 Program 4Licensed                                             Nuclear Plant           ~Licensed Operator Training RatrOeao#1Operator                                 #1                       Program 5Licensed                                             Nuclear Plant           Licensed Operator Training RatrOeao#2Operator                                 #2                       Program 6 uiliry pertor#1Non-licensed                                                       Non-Licensed Operator 6___ Auxi___iary       ___Operator_______Plant                 Operator Nuclear
                                                                                #1             Training Program 7   Auxiliary Operator #2                               N/A                               N/A 8   Other needed for Safe Shutdown                       N/A                               N/A 9   IOther needed for Safe Shutdown                     N/A                               N/A 10     Other needed for Safe Shutdown                     N/A                               N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                   On-Shift Position                 Task Analysis
_______________Controlling              Method 11   Mechanic                                             N/A                               N/A 12   Electrician                                         N/A                               Nl/A 13   I&C Technician                                       N/A                               Nl/A 14   Other                                               N/A                               N/A 15   Other                                               N/A                               Nl/A Page 18 PNPS PNPS                                                                                                                Page 18
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie                                     PeromdbrakAayi ontetoProligramehd 1                         N/A                                       Fire Protection Program 2                         N/A                                       Fire Protection Program 3                         N/A                                       Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.
1n-#ntSrvy                         DBTiThreati 2 Srvy n-it 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):
N/A N/A 6 Othermistey spectific task #1 (describe)
N/A N/A 6 Othermistey spectific task #1 (describe)
N/__ A__Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions.
N/__
RP and Chemistry take cover as directed.I:.. PNSTAL~5-EMERGENCY  
A__
:PLAN I:MPLEMENTATION  
Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions. RP and Chemistry take cover as directed.
:::, :: .PNPS Page 19 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level Shift Manager Emergency Planning Training 1 ECL)Program  
I:..               PNSTAL~5-EMERGENCY :PLAN I:MPLEMENTATION :::, ::                         .
/ EP Drills Approve Offsite Protective Action NAEmergency Planning Training N/AcmenaiosProgram 3 Approve content of State/local notifications Shift Manager Pmrogram Plnin rann Emergency Planning Training 4 Approve extension to allowable dose N/A Program Licensed Operator Training Notification and direction to on-shift staff SitMngr Porm/EegnyPann ( e.g., to assemble, evacuate, etc.) SitMngr .raiigra P mrogram ,Pnnn Emergency Planning Training 6 ERO notification Shift Manager Program Abbreviated NRC notification for DBT SALicensed Operator Training 7event TAProgram 8 Complete State/local notification form Shift Manager Pmrogram Plnin rann EmrogenyPlninarann 9 Perform State/local notifications NLO#2 Pmrogram Plnin rann Program 11 Ativae EDS NO#2Emergency Planning Training 11 civae ERS NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment asmtos rga Ememtns rogenyPlninarann 13 Perform NRC notifications NLO#2 Pmrogram Plnin rann Perform other site-specific event Licensed Operator Training 14 notifications (e.g., Duty Plant Manager, Shift Manager Prga INPO, ANI, etc.) Program_________________
PNPS                                                                                             Page 19
15 Iersnne Accuntbilty SecuityOffcer Security Training Program / EP 15 Prsonel ccontablit Secrit Offcer Drills PNPS Page 20 PNPS Page 20 (PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2 -Control Rod Drop Accident 1. Accident Summary* The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position.
 
It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level   Shift Manager     Emergency Planning Training 1       ECL)Program                                       / EP Drills Approve Offsite Protective Action           NAEmergency                   Planning Training N/AcmenaiosProgram 3   Approve content of State/local notifications Shift Manager     Pmrogram     Plnin     rann Emergency Planning Training 4   Approve extension to allowable dose           N/A               Program Licensed Operator Training Notification and direction to on-shift staff SitMngr           Porm/EegnyPann
The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
( e.g., to assemble, evacuate, etc.)         SitMngr           .raiigra P mrogram     ,Pnnn Emergency Planning Training 6   ERO notification                             Shift Manager     Program Abbreviated NRC notification for DBT         SALicensed                   Operator Training 7event                                         TAProgram 8   Complete State/local notification form       Shift Manager     Pmrogram     Plnin     rann EmrogenyPlninarann 9   Perform State/local notifications           NLO#2             Pmrogram     Plnin     rann Program 11 Ativae EDS                 NO#2Emergency                 Planning Training 11 civae ERS                   NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment               asmtos               rga Ememtns rogenyPlninarann 13   Perform NRC notifications                   NLO#2             Pmrogram   Plnin     rann Perform other site-specific event                               Licensed Operator Training 14   notifications (e.g., Duty Plant Manager,     Shift Manager     Prga INPO, ANI, etc.)                                               Program_________________
* The worst case CRDA occurs during mechanical vacuum pump operation.
15 Iersnne Accuntbilty         SecuityOffcer     Security Training Program / EP 15 Prsonel ccontablit         Secrit Offcer     Drills Page 20 PNPS                                                                                             Page 20
The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment.
 
The condenser leakage scenario is bounding for PNPS.2. Accident Specific Assumptions Made* The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.* The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.* The EAL is based on 1-hr (1/2) of the FSAR EAB dose.3. Procedures Reviewed for Accident Response* 2.4.40, Rapid Increase in main Steam Line or Offgas Activity* EIP-IP-1 00, Classification and Notification
(
* EIP-100.1, EALs* EIP-EP-410, Evacuation and Assembly* 2.1.6, Reactor Scram* EOP-5, Radiological Release Control* 6.1-220, Radiological Controls for Risk Evolutions
PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2     - Control Rod Drop Accident
* ARP-C904LC Alarm Response Procedure* 7.4.64, PRM Alarm Response* 7.3.11, Reactor and Hotwell Water Analysis Preparation PNPS Page 21 PNPS Page 21 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables T5/L3 T5/L5 Emergency Plan 60 No5Yes I Shift Manager Table B-I T5/L6 NoYe T5/L8 T5/L 10______ ______ ___ __ ______ ______T5/L14
: 1. Accident Summary
______2Control Room Emergency PlanN/T/LNoo Supervisor Table B-I Shift Technical EegnyPa 2L oN 3 Advisor/Shift EmrecPan6T2L Noo Eng]ineer (3 rd SRO) Table B-I16 Licensed Nuclear EegnyPa /4 Plant Operator (RO Emrec lnNAT2/L4 No No I) ~~~~able B-I1______
* The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position. It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity. The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
Licensed Nuclear EegnyPa /5 Plant Operator (RO Emrec lnNAT2/L5 No No 2)Table B-i Non-Licensed EegnyPa /6 Nuclear Plant Emrec lnNAT2/L6 No No'O p e ra to r (N L O # 1 ) T a b le B -I1_ _ _ _ _ _ _ _ _ _ _ _ _Nlon-Licensed Emrec lnT5/L9 7 Nluclear Plant Emrec ln60 T5/L11I No No Fable B-I Operator (NLO #2) _________T5/L13 Nlon-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -Non-Licensed Emergency PlanN/NANoo 9 Nuclear Plant aeB-N/NA Noo Operator (NLO #4) al -Non-Licensed IEmergency PlanN/Noo 10 Nuclear PlantN/NA Noo Operator (NLO #5) beB- /11 Fire Brigade #1 Emergency PlanN/NANoo
* The worst case CRDA occurs during mechanical vacuum pump operation. The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment. The condenser leakage scenario is bounding for PNPS.
_______ _______ able B-i1/ / oN 12 Fire Brigade #2 Emergency Plan N/A N/A No No______________
: 2. Accident Specific Assumptions Made
Fable B-I1________
* The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.
13 RP / Chemistry IEmergency Plan 60 T5/L12 No No Technician B-i1________
* The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.
_____14 RP Technician Emergency Plan 60 T4/L1 No No_____ _____ _____ able B-I1_ _ _ __ _ _ _Security Contingencyl 15 Security / E-Plan Table 60 T5/L1 5 No No L PNP TABLE E2 -PLANT p OE RkTIQNS SH
* The EAL is based on 1-hr (1/2) of the FSAR EAB dose.
&deg; I PNPS Page 22 PNPS ON-SHIFT STAFFING ANALYSIS REPORT%
: 3. Procedures Reviewed for Accident Response
e nit ne Control R oom :,"..... ..........  
* 2.4.40, Rapid Increase in main Steam Line or Offgas Activity
:  
* EIP-IP-1 00, Classification and Notification
:= = =::; 2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method Licensed Operator Training 1 Shift Manager Shift Manager Program SuperisorLicensed Operator Training 2 U~nit Supervisor Control Room SuevsrProgram 3 Shft echicalAdvsorLicensed Operator Training 3 Sif Tchica AviorShift Engineer/STA Program Licensed Nuclear Plant Licensed Operator Training 4 Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant Licensed Operator Training 5 Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6 uxliryOpraor#1Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
* EIP-100.1, EALs
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A ,14 O3ther N/A N/A 15 Other N/A N/A PNPS Page 23 PNPS Page 23 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade:;: : ::::} :.: i , Analysis~#
* EIP-EP-410, Evacuation and Assembly
2 Control Rod Drop  
* 2.1.6, Reactor Scram
=, ;= i&#xa2; J: 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The CRDA does not include the need for firefighting.
* EOP-5, Radiological Release Control
PNS ag 2 PNPS Page 24 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio Prfomig Aalyis#2 onrolRo DrpAccid I In-Plant Survey:_RP#1X X X X X X X X X X X X X X X X X X 2 On-site Survey:_-NI/A 3 Personnel Mlonitoring:
* 6.1-220, Radiological Controls for Risk Evolutions
N/A _T Job Coverage: N/A 5 Offsite Rad ,ssessment: (Included in Table , 5 6 Other site specific RP (describe):
* ARP-C904LC Alarm Response Procedure
N/A 7 Chemistry Function task #1 (describe)
* 7.4.64, PRM Alarm Response
* 7.3.11, Reactor and Hotwell Water Analysis Preparation Page 21 PNPS                                                                                         Page 21
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.           Tables T5/L3 T5/L5 Emergency Plan                       60                           No5Yes I   Shift Manager                         Table B-I                                         T5/L6           NoYe T5/L8 T5/L 10
______     ______T5/L14                           ______
2Control Room                         Emergency PlanN/T/LNoo Supervisor                           Table B-I Shift Technical                       EegnyPa                                             2L             oN 3   Advisor/Shift                         EmrecPan6T2L                                                     Noo Eng]ineer (3 rdSRO)                 Table B-I16 Licensed Nuclear                     EegnyPa                               /
4   Plant Operator (RO                   Emrec lnNAT2/L4                                                   No       No I)                         ~~~~able B-I1______
Licensed Nuclear                     EegnyPa                               /
5   Plant Operator (RO                   Emrec lnNAT2/L5                                                   No       No 2)Table                             B-i Non-Licensed                         EegnyPa                               /
6   Nuclear Plant                       Emrec lnNAT2/L6                                                   No       No
    'Op e ra to r   (NLO #1)             T a b le B-I1_                                     _ _ _   _ _ _ _ _ _ _ _ _
Nlon-Licensed                       Emrec             lnT5/L9 7   Nluclear Plant                       Emrec               ln60                         T5/L11I         No       No Operator (NLO #2)                     Fable B-I
_________T5/L13 Nlon-Licensed                       EegnyPa                               /             /           oN 8   Nuclear Plant                         EegnyPa                               /             /           oN Operator (NLO #3)                     al -
Non-Licensed                 Emergency PlanN/NANoo 9   Nuclear Plant                         aeB-N/NA                                                       Noo Operator (NLO #4)                     al -
Non-Licensed                         IEmergency PlanN/Noo 10 Nuclear PlantN/NA                                                                                       Noo Operator (NLO #5)                       beB-                               /
11 Fire Brigade #1                       Emergency PlanN/NANoo
_______     _______         able B-i1/                                         /           oN 12 Fire Brigade #2                         Emergency Plan                     N/A           N/A           No      No
______________              Fable     B-I1________
13 RP / Chemistry                         IEmergency Plan                       60         T5/L12         No       No Technician                         *able    B-i1________                                     _____
14 RP Technician                         Emergency Plan                       60           T4/L1         No      No
__________        _____       able B-I1_                     _ _ __ _ _ _
Security Contingencyl 15 Security                               P*lan / E-Plan Table                 60         T5/L1 5         No       No L /,:*:**!
        !iS*'I::::!**!:*i    *!* PNPS* TABLEE2            - PLANT OE    p RkTIQNS :&* SAoFE* SHUTDO*WN!*I          &deg;    I PNPS                                                                                                                Page 22
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
        %i~~~~ii*~O                    e  nit -*O..........
ne :Control
                                                                *=*      R*.......:
oom :,".....
:=,,*=::;=*
2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole                                 On-Shift Position                       Task Analysis Controlling Method Licensed Operator Training 1   Shift Manager                                     Shift Manager                           Program SuperisorLicensed Operator Training 2   U~nit Supervisor                                 Control Room SuevsrProgram 3   Shft     echicalAdvsorLicensed                                                   Operator Training 3   Sif Tchica AviorShift                             Engineer/STA                     Program Licensed Nuclear Plant                   Licensed Operator Training 4   Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant                   Licensed Operator Training 5   Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed                                       Nuclear             Non-Licensed Operator 6 uxliryOpraor#1Plant                             Operator #1                       Training Program 7   &uxiliary Operator #2                               N/A                                   N/A 8   Other needed for Safe Shutdown                     N/A                                   N/A 9   Other needed for Safe Shutdown                     N/A                                   N/A 10   Other needed for Safe Shutdown                     N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole                                   On-Shift Position                     Task Analysis
________________Controlling                Method 11   Mechanic                                             N/A                                   N/A 12   Electrician                                         N/A                                   N/A 13   l&C Technician                                       N/A                                   N/A
  ,14   O3ther                                               N/A                                   N/A 15   Other                                               N/A                                   N/A Page 23 PNPS                                                                                                                   Page 23
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade h*":::::}:;: *:    :.: i   , Analysis~#2 Control Rod Drop =Accident=',,*:' =,;= :.:!*- i&#xa2; J:
1                             N/A                                         N/A 2                             N/A                                         N/A 3                             N/A                                         N/A 4                             N/A                                         N/A 5                             N/A                                         N/A Note: The CRDA does not include the need for firefighting.
PNS                                                                                           ag 2 PNPS                                                                                         Page 24
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio PrfomigAalyis#2 onrolRo DrpAccident**ii!
In-Plant Survey:_
RP#1X                         X   X   X   X   X     X   X   X   X   X   X   X   X   X   X   X   X 2 On-site Survey:_-
NI/A 3 Personnel Mlonitoring:
N/A      _
T  Job Coverage:
N/A 5 Offsite Rad
    ,ssessment:
(Includedin Table              ,
5 6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A*Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.* Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete*Onsite surveys after enter EOP-5* As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.* Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)* Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.Takes =30 minutes to complete.* Procedure2.1.6 directs Offgas sample (not time critical) but it isolates.
N/A
Sample not required during the 60 minutes.PNPS Page 25 PNPS Page 25 PNPS ON-SHIFT STAFFING ANALYSIS REPORT~.NSTBE5EMRECPLNIMPLEMENTATIOQN  
              *Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.
-:: -i: 'Declre he mergncyclasifiatin lvelEmergency Planning Delr1h megnycasfiainivlShift Manager ' raining Program / EP (ECL) Drills 2 pprove Offsite Protective Action N/ .Emergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Eraining Progamnn Licensed Operator INotification and direction to on-shift staff Training Program /5 Shift Manager EegnyPann (e.g., to assemble, evacuate, etc.) TingmrenYoralang Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator 7 ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8 Complete State/local notification form Shift Manager Tann rga Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Lricnsed OPeraogra 10 Complete NRC event notification form Shift Manager raiicnge POgeramo 11 EnS Planning 11 ctvateERDS LO#Training Program 12 Offsite radiological assessment Chemistry Tcnia Eeraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NILO#2 Eraining Progamnn Perform other site-specific event Licensed Operator 14 notifications (e.g., Duty Plant Manager, Shift Manager Training Program INPO, ANI, etc.) __________
* Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete
15 Personnel Accountability Security Security Training Program PNPS Page 26 PNPS Page 26 PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 -Loss of Coolant Accident 1. Accident Summary* This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location.
    *Onsite       surveys after enter EOP-5
Break of a large .recirculation pipe represents the limiting pipe break inside the containment.
* As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.
Reactor scram, MSIVs isolate, ECCS initiates and injects.* Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.2. Accident Specific Assumptions Made* No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.* EAL is based on FSAR EAB dose.3. Procedures for Accident Response* EP-IP-1 00, Emergency Classification and Notification
* Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)
* EP-IP-100.1.
* Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.
Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
Takes =30 minutes to complete.
* EOP-01, RPV Control* EOP-3, Primary Containment Control* EOP-4, Secondary Containment Control* EOP-5, Radiological Release* 2.1.6, Reactor Scram* EP-IP-240, Emergency Security Organization Activation and Response* 6.3-064, EOP-4 Surveys* EP-I P-400, Protective Action Recommendation PNPS Page 27 PNPS Page 27 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables T2/LI T5/L1 T5/L3 T5/L4 1 Shift Manager Emergency Plan Table 60 T5/L5 No Yes B-i T51L6 T5/L8 T5/L10____ ____ ____ ___ ___ ____ ____ ___ ____ ___ T5/L14_ _ _ _ _ _2 ontrol Room Emergency Plan Table N/T2LNoo Supervisor B-i Shift Technical EmrecPlnTbe 6T2LNoo 3 EmrecPlnTbe 6T2LNoo__ _Engineer (3 rd SRO) B-i Licensed Nuclear EegnyPa al / 2L oN Liceanse Nueratr(R Emergency Plan Table N/A T2/L4 No No NnLicensedNula 65 ula Plant Oeao R Emergency Plan Table N/A T2/L6 No No Operatr (NL #1) -i Non-LicensedT5L 6 Nucler Plant Emergency Plan Table NAT2LNoo Operator (NLO #2) ______ TL1 ______Non-Licensed Emrgnc/PanTal 8 Nuclear Plant B-ignc N/ATale 6 N5/A1 No No Operator (NLO #3) T5/L13____
* Procedure2.1.6 directs Offgas sample (not time critical) but it isolates. Sample not required during the 60 minutes.
_____________
Page 25 PNPS                                                                                                   Page 25
Non-Licensed 9 ula ln Emergency Plan Table N/A N/A No No Nuclar Pant B-i Operator (NLO #4) ______Non-Licensed EegnyPa al 10 Nuclear Plant B-igny la abe N/A N/A No No Operator (NLO #4)______10 FireBiade  
 
#1an Emergency Plan Table N/A N/A No No_____ _____ ____ B-i1_ _ _ _ _ _12 Fire Brigade #2 Emergency Plan Table N/A N/A No No 13 RP / Chemistry Emergency Plan Table 60 T5/L12 No No Technician B-i1______
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
______14 RP Technician Emergency Plan Table 60 T4/L1 No No B-i1______
                  ~.NSTBE5EMRECPLNIMPLEMENTATIOQN - *                                        :: -   i:   '
T4/L2 __ ____ ______15 Security Security Contingency 60 T5/L1 5 No No______________Plan
Declre he mergncyclasifiatin lvelEmergency                                 Planning Delr1h         megnycasfiainivlShift Manager '                           raining Program / EP (ECL)                                                                   Drills 2 pprove Offsite Protective Action               N/           .Emergency                 Planning 2 Recommendations                                 N/Araining                         Program 3   Approve content of State/local notifications   Shift Manager           Eraining     Progamnn Emrgencyg     Planning 4   Approve extension to allowable dose             N/A                     Eraining     Progamnn Licensed Operator INotification and direction to on-shift staff                           Training Program /
/ E-Plan Table B-i1 ______ _______ ____________
5   (e.g., to assemble, evacuate, etc.)             Shift Manager          EegnyPann TingmrenYoralang Emergency Planning 6   ERO notification                               Shift ManagerrangPorm Licensed Operator 7     ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8   Complete State/local notification form         Shift Manager           Tann         rga Emrgencyg Planning 9   Perform State/local notifications               NLO#2                   Emraining Progamnn Lricnsed OPeraogra 10   Complete NRC event notification form           Shift Manager             raiicnge POgeramo 11     *tivae    EnS           *IO#2Emergency                        Planning 11     ctvateERDS                 LO#Training                     Program 12   Offsite radiological assessment               Chemistry Tcnia         Eeraining     Progamnn Emrgencyg     Planning 13   Perform NRC notifications                     NILO#2                 Eraining     Progamnn Perform other site-specific event                                       Licensed Operator 14   notifications (e.g., Duty Plant Manager,       Shift Manager         Training Program INPO, ANI, etc.)                                                       __________
PNPS Page 28 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role On-Shift Position Task Analysis 1 Shift Manager Shift Manager raiicnge POperamo______ ___ ____ ___ ___ ____ ___ ___ ___ ___ ___ ____ ___ __ TrainingProg~ram 3 Licensed Operator Shift TuehialAvisor Shiftro Engine uer/STA r Trainingl Program Licesed uclar Pant Licensed Operator 4 SReato Operhiat dior #Shperto #1inerSTraining Prog~ram 5 eco prtr# Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
15   Personnel Accountability                       Security               Security Training Program Page 26 PNPS                                                                                                 Page 26
#12 Training Program 6 uxiciary Operator #1 NnLicensed Nuclear Pl n on-Licensed Operator Pln Operator #1 Training Program 7 Auxiliary Operator #21/8 Other needed for Safe Shutdown N/A X/9 Other needed for Safe Shutdown N/A X/10 Other needed for Safe Shutdown N/A /Other (non-Operations)
 
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 29 PNPS Page 29 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5 N/A N/A Note: The LOCA does not include a fire.PNPS Page 30 PNPS Page 30 PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements)  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 - Loss of Coolant Accident
& as directed by SM _2 On-site Survey:X X X X X X X X 3 Personnel Monitoring:
: 1. Accident Summary
N/A T Job Coverage: N/A__50Offsite Rad Assessment: (Included in Table 5 6 Other site specific RP (describe):
* This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location. Break of a large     .
N/A 7 Chemistry Function task #1 (describe)
recirculation pipe represents the limiting pipe break inside the containment. Reactor scram, MSIVs isolate, ECCS initiates and injects.
* Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.
MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.
: 2. Accident Specific Assumptions Made
* No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.
* EAL is based on FSAR EAB dose.
: 3. Procedures for Accident Response
* EP-IP-1 00, Emergency Classification and Notification
* EP-IP-100.1. Emergency Action Levels
* EP-IP-300, Offsite Radiological Dose Assessment
* EOP-01, RPV Control
* EOP-3, Primary Containment Control
* EOP-4, Secondary Containment Control
* EOP-5, Radiological Release
* 2.1.6, Reactor Scram
* EP-IP-240, Emergency Security Organization Activation and Response
* 6.3-064, EOP-4 Surveys
* EP-I P-400, Protective Action Recommendation Page 27 PNPS PNPS                                                                                      Page 27
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.     Tables T2/LI T5/L1 T5/L3 T5/L4 1       Shift Manager               Emergency Plan Table             60                 T5/L5             No       Yes B-i                                                 T51L6 T5/L8 T5/L10
____ ____ ____   ___     ____     ___       T5/L14_                   _  _ _ _ _
2      ontrol Room             Emergency Plan Table             N/T2LNoo Supervisor                 B-i Shift Technical             EmrecPlnTbe                       6T2LNoo 3       *dvisor/Shift              EmrecPlnTbe                       6T2LNoo
__ _Engineer       ( 3 rd SRO)   B-i Licensed Nuclear           EegnyPa           al               /                 2L                 oN Liceanse     Nueratr(R     Emergency Plan Table             N/A               T2/L4             No         No NnLicensedNula 65         ula Plant Oeao R             Emergency Plan Table             N/A               T2/L6             No         No Operatr (NL #1) -i Non-LicensedT5L 6 NuclerPlant          Emergency Plan Table             NAT2LNoo Operator (NLO #2)                                     ______                   TL1       ______
Non-Licensed               Emrgnc/PanTal 8     Nuclear Plant               B-ignc                           N/ATale 6                   N5/A1           No         No Operator (NLO #3)                                     _____________            T5/L13____
Non-Licensed 9         ula         ln         Emergency Plan Table             N/A                 N/A             No         No Nuclar Pant           B-i Operator (NLO #4)                                   ______
Non-Licensed               EegnyPa           al 10     Nuclear Plant               B-igny la         abe           N/A                 N/A             No         No Operator (NLO #4)______
10      FireBiade #1an             Emergency Plan Table             N/A                 N/A             No          No
_____     ____ B-i1_                         _ _   _ _ _
12      Fire Brigade #2             Emergency Plan Table             N/A                 N/A             No         No 13     RP / Chemistry             Emergency Plan Table             60               T5/L12             No         No Technician                 B-i1______                                   ______
14      RP Technician               Emergency Plan Table               60               T4/L1             No         No B-i1______                                           T4/L2     __     ____ ______
15      Security                   Security Contingency               60               T5/L1 5           No          No
______________Plan      / E-Plan Table B-i1   ______               _______       ____________
PNPS                                                                                                               Page 28
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role                       On-Shift Position             Task Analysis 1   Shift Manager                           Shift Manager                   raiicnge POperamo
____ ___ ___ ___   ___   ___   ____   ___ __   TrainingProg~ram 3                                                     Licensed Operator Shift TuehialAvisor                     Shiftro Engine       uer/STA r Trainingl Program Licesed uclar Pant       Licensed Operator 4 SReato Operhiat dior#Shperto                       #1inerSTrainingProg~ram 5     eco       prtr#                       Licensed Nuclear Plant       Licensed Operator RatrOeao#2Operator                     #12                 Training Program 6     uxiciary Operator #1                     NnLicensed Nuclear Pl     n   on-Licensed Operator PlnOperator #1               Training Program 7   Auxiliary Operator #21/
8   Other needed for Safe Shutdown           N/A                         X/
9   Other needed for Safe Shutdown           N/A                         X/
10   Other needed for Safe Shutdown           N/A                           /
Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole                         On-Shift Position           Task Analysis Controlling Method 11   Mechanic                                 N/A                         N/A 12   Electrician                               N/A                         N/A 13   I&C Technician                           N/A                         N/A 14   Other                                     N/A                         N/A 15   Other                                     N/A                         N/A Page 29 PNPS                                                                                                 Page 29
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5                     N/A                   N/A Note: The LOCA does not include a fire.
Page 30 PNPS                                                 Page 30
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements) & as directed by SM       _
2 On-site Survey:X                           X X X X X X X 3 Personnel Monitoring:
N/A T Job Coverage:
N/A__
50Offsite Rad Assessment:
(Included in Table 5
6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
.__N/A*Prorac Times are estimated PNPS Page 31 PNPS Page 31 PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ! Func ion. Task O rrS it i P A nalysis:................
      . __N/A
Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift ManagerrangPorm Emrgencyg Planning 4 Approve extension to allowable dose Shift Manager Emraining Progamnn Notiicaionand iretio to n-siftstaf (eg.,Licensed Operator Training to assembleio evacuaireten etc.) siftff(. Shift Manager Program I Emergency_____assemb
              *Prorac     Times are estimated Page 31 PNPS                                                         Page 31
_____e,__evacuate,______et___.___Planning Training Program Emergency Planning 6 ERO notification Shift Manager Training Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann____ ___ ___ ___ ___ ___ ___ ____ ___ ___ ___ ___ ___ ___ __ rogram Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civat ERD raiingProgram 11 AciTechnicianO#2Emergency Planning 12' Offsite radiological assessment Chemistry ehnca Emraining Progamnn 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#2Training Program 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) Program__________________
 
15 Personnel Accountability Security Security Training Program PNPS Page 32 PNPS Page 32 PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 -Main Steam Line Break 1. Accident Summary* This event involves the postulation of a large steam line pipe break outside containment.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ne* !                   Func ion.       Task                               O rrS it i P osition*iji          Task*: Analysis:................
It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features.
Emergency Planning 1 Declare the emergency classification level                         Shift Manager               Training Program / EP (ECL)                                                                                         Drills 2 pprove Offsite Protective Action                                   SitMngrEmergency                           Planning 2 Recommendations                                                     ShfTangrraining                       Program Emergency Planning 3     Approve content of State/local notifications                       Shift ManagerrangPorm Emrgencyg   Planning 4     Approve extension to allowable dose                               Shift Manager               Emraining   Progamnn Notiicaionand to n-siftstaf     iretio(eg.,Licensed                                   Operator Training to assembleio   evacuairetenetc.) siftff(.                       Shift Manager               Program I Emergency
This postulated event represents the envelope evaluation of steam line failures outside containment.
_____assemb        _____e,__evacuate,______et___.___Planning                                           Training Program Emergency Planning 6     ERO notification                                                   Shift Manager               Training Program 7     Abbreviated NRC notification for DBT event                         N/A                         Lcne           prtrTann
: 2. Accident Specific Assumptions Made* Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.3. Procedures for Accident Response* EP-IP-IO00, Emergency Classification and Notification
_____________ ___ ______    ____       ___ ___ ___ ___ ___ ___ __   rogram Emergency Planning 8     Complete State/local notification form                             Shift ManagerrangPorm Emrgencyg     Planning 9     Perform State/local notifications                                 NLO#2                       Emraining   Progamnn Licensed Operator Training 10   Complete NRC event notification form                               Shift ManagerPrga 11 civat ERD                                                                 raiingProgram 11     AciTechnicianO#2Emergency                                                               Planning 12' Offsite radiological assessment                                     Chemistry   ehnca         Emraining     Progamnn 13     Prfom NR                   noifiatios NO#2Emergency                               Planning 13     Prfom NR                   noifiatios NO#2Training                             Program 14Perform other site-specific event notifications SitMngrLicensed                                             Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                                                   Program__________________
* EP-IP-1 00.1. Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
15     Personnel Accountability                                         Security                   Security Training Program Page 32 PNPS                                                                                                                           Page 32
* EOP-01, RPV Control* EOP-3, Primary Containment Control* EOP-5, Radiological Release* 2.1.6, Reactor Scram* EP-IP-300, Offsite Radiological Dose Assessment
 
* 6.3-064, EOP-4 Surveys PNPS Page 33 PNPS Page 33 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tablesi : ,,
PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 - Main Steam Line Break
= A P PE.N D IX B =:=:, i ::'On-shift Pos =itin E-Pan:= Reference..
: 1. Accident Summary
=Augnmertation Role In Tlable Unana...................yzed............
* This event involves the postulation of a large steam line pipe break outside containment. It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features. This postulated event represents the envelope evaluation of steam line failures outside containment.
T2/LI T5/L1 T5/L3 1 SitMngr Emergency Plan 60 TISNo Yes Shf aae able B-I T5/L6 T5/L8 T5/L10 T5/L 14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-i Shift Technical 3 Advisor/Shift Emergency Plan 6 2L oN____Engineer,_(3 rd SRO) Table B-I 0T/L oN Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Tablgenc B-I/AT2L No No______ 1)Licensed Nuclear EegnyPa / 2L 5 lant Operator (RO Emrec ln NAT/5No No____2) Table B-I Non-Licensed 6 Nuclear Plant Emergenc Plan N/A T2/L6 No No____Operator (NLO #1)TalB-Non-Licensed T5/L9 7 Nuclear Plant Emergency Plan 6 5L oN Operator (NLO #2)al -T5/L1 3 _____Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3)TalB-Non-Licensed 9 Nuclear Plant Emergency Plan N/A NIA No No____Operator (NLO #4) al -Non-Licensed 10 NcerPat Emergency Plan N/A N/A No No____Operator (NLO #5 al -11 Fire Brigade #1 Emergency Plan NIA N/A No No_____ _____________
: 2. Accident Specific Assumptions Made
Table B-i1______
* Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.
______12 Fire Brigade #2 Emergency Plan N/A N/A No No_____ _____________
: 3. Procedures for Accident Response
Table B-I1______
* EP-IP-IO00, Emergency Classification and Notification
______13 RP / Chemistry Emergency Plan 60 T5/L12 No No____echnician Table B-I 14 RP Technician Emergency Plan 60 T4/L1 No No T____________able B-I T4/L2 Security 15 Security Contingency Plan 60 T5/L15 No No___________________
* EP-IP-1 00.1. Emergency Action Levels
/ E-Plan Table B-i1 _____________
* EP-IP-300, Offsite Radiological Dose Assessment
_____________
* EOP-01, RPV Control
PNPS Page 34 PNPS Page 34 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2- =PLANT OPERATIONS  
* EOP-3, Primary Containment Control
& SAFE SHUTDOWN=i : ;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole  
* EOP-5, Radiological Release
'!:: : = On-Shift i :i Tsk Anialysisl , 1 Shft anaer SiftMangerLicensed Operator ShiftManagerShiftManager raining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator_______Training Program 3 Licensed Operator Shift Technical Advisor Shift Engineer/STA Training Program 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator  
* 2.1.6, Reactor Scram
#1 Training Program 5 RatrOeao#2Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
* EP-IP-300, Offsite Radiological Dose Assessment
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 jOther needed for Safe Shutdown N/A N/A Other (non-Operations)
* 6.3-064, EOP-4 Surveys Page 33 PNPS                                                                                     Page 33
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role On-Shift Position Task Analysis_________________________
 
_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 35 PNPS Page 35 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The MSLB analysis does not include a fire.PNPS Page 36 PNPS Page 36 PNPS ON-SHIFT STAFFING ANALYSIS REPORT: ......... ,.,:,;Analysis  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
#5 M ain Steam : Line ,Break: M  
: 4.         Tables
.... ..........  
:,'*i      i      ;*.;:*:* : ,, ==:*
...I Function / Task __ __ ___;____! N 5 15 25 35 45 55 65 75 85-E 010 15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:_RP#1 X X X X X X 2 On-site Survey:X X X X X X X X X RP#1 3 Personnel Monitoring:
:i!**!==:
N/A_4 Job Coverage: N/A.50Offsite Rad Assessment:
                                                          =   A P PE.N D IX B ,;*; =:=:,              =*                i :*! ::'
On-shift Pos                  E-Pan:=
                                    =itin        Reference.. =Augnmertation Role In Tlable  Unana...................yzed............
TMS.....**
T2/LI T5/L1 T5/L3 1 SitMngr                   Emergency Plan               60             TISNo                             Yes Shfaae                able B-I                                   T5/L6 T5/L8 T5/L10 T5/L 14 2       Control Room                 Emergency Plan               N/A             T2/L2       No                   No Supervisor                   Table B-i Shift Technical 3       Advisor/Shift                 Emergency Plan                 6               2L           oN
____Engineer,_(
3 rd SRO) Table B-I                         0T/L                         oN Licensed Nuclear             EegnyPa                       /               2L 4       Plant Operator (RO Tablgenc           B-I/AT2L                                           No                    No
______  1)
Licensed Nuclear             EegnyPa                       /               2L 5 lant Operator (RO Emrec ln                                   NAT/5No                                             No
____2)                               Table B-I Non-Licensed 6       Nuclear Plant                 Emergenc Plan               N/A             T2/L6       No                   No
____Operator          (NLO #1)TalB-Non-Licensed                                                               T5/L9 7       Nuclear Plant                 Emergency Plan               6               5L           oN Operator (NLO #2)al                     -                                 T5/L1 3                     _____
Non-Licensed 8       Nuclear Plant                 Emergency Plan               N/A             N/A         No                   No Operator (NLO #3)TalB-Non-Licensed 9       Nuclear Plant                 Emergency Plan               N/A             NIA         No                   No
____Operator          (NLO #4) al             -
Non-Licensed 10 NcerPat                   Emergency Plan               N/A             N/A         No                   No
____Operator          (NLO #5 al -
11       Fire Brigade #1               Emergency Plan               NIA             N/A         No                    No
_____________               Table   B-i1______                                                       ______
12        Fire Brigade #2               Emergency Plan               N/A             N/A         No                   No
_____________               Table   B-I1______                                                       ______
13        RP / Chemistry               Emergency Plan               60             T5/L12       No                    No
____echnician                      Table   B-I 14       RP Technician                 Emergency Plan               60             T4/L1       No                   No B-I T____________able                              T4/L2 Security 15       Security                     Contingency Plan               60             T5/L15       No                    No
___________________            / E-Plan Table B-i1   _____________                 _____________
Page 34 PNPS                                                                                                                     Page 34
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-=PLANT OPERATIONS & SAFE SHUTDOWN=
i ;*i:iil:;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole             '!:: *!:: : *i; = On-Shift *Posit~ion,:;' i :i Tsk Anialysisl :i*-:=      ,
1       Shft         anaer         SiftMangerLicensed                       Operator ShiftManagerShiftManager                                             raining Program 2   Unit Supervisor                                   Control Room Supervisor     Licensed Operator
_______Training                                                                Program 3                                                               Licensed Operator Shift Technical Advisor                           Shift Engineer/STA           Training Program 4   RatrOeao#1Licensed                                               Nuclear Plant Licensed Operator RatrOeao#1Operator                                   #1             Training Program 5   RatrOeao#2Licensed                                               Nuclear Plant Licensed Operator RatrOeao#2Operator                                   #2             Training Program 6   Auxiliary Operator #1                               Non-licensed Nuclear       Non-Licensed Operator Plant Operator #1           Training Program 7   Auxiliary Operator #2                               N/A                         N/A 8   Other needed for Safe Shutdown                     N/A                         N/A 9   Other needed for Safe Shutdown                     N/A                         N/A 10   jOther needed for Safe Shutdown                     N/A                         N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role                                 On-Shift Position           Task Analysis
_________________________  _______________Controlling               Method 11   Mechanic                                           N/A                         N/A 12   Electrician                                         N/A                         N/A 13   l&C Technician                                     N/A                         N/A 14   Other                                               N/A                         N/A 15   Other                                               N/A                         Nl/A Page 35 PNPS                                                                                                         Page 35
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1                     N/A                     N/A 2                     N/A                     N/A 3                     N/A                     N/A 4                     N/A                     N/A 5                     N/A                     N/A Note: The MSLB analysis does not include a fire.
Page 36 PNPS PNPS                                                Page 36
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
              <*+,:,<,  ,:,*: ,.,:,;Analysis #5 M ain Steam :Line ,Break: M SLB)...:*,:          ....   :*:, ..........       ...
I Function / Task               __   __         ___;____!           '**                ::;*<;1                    ;::*,.*!':,
N                                     5 15 25 35 45 55 65 75 85-E                               010       15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:
_RP#1                                 X   X   X   X   X   X 2 On-site Survey:X                                                        X  X  X      X      X      X      X      X RP#1 3 Personnel Monitoring:
N/A_
4 Job Coverage:
N/A.
50Offsite Rad Assessment:
Tabie 5 6 Other site specific RP (describe):
Tabie 5 6 Other site specific RP (describe):
N/A 7 Chemistry Function task #1 (describe)
N/A 7 Chemistry Function task #1 (describe)
_N/A_8 Chemistry Function task #2 (describe)
_N/A_
N/A___*Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM PNPS Page 37 PNPS Page 37 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLEIF 5-TEMERGNCY PANAMLYSISREPORT I a;I~ plI Q Line#iucto  
8 Chemistry Function task #2 (describe)
.......OnShif PostionTask Analys Emergency Planning Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn I Emergency Planning 4 Approve extension to allowable dose IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff Shift Manager Program /Emergency
N/A___
,(e.g., to assemble, evacuate, etc.) Planning Training Program 6 IEO ntifcaton SiftMangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event NI/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Eeraining Progamnn 9 P)erform State/local notifications NLO#2 Emergency Planning_____________________________
    *Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM Page 37 PNPS                                                                                                               Page 37
________________
 
Training Program" Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 EDS NO#2Emergency Planning 11 ctvateERDS LO#Training Program Techncian Emergency Planning 12 Offsite radiological assessment Chemistryi Tcnia Training Program 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#Training Program 14 Perform other site-specific event notifications Shift Manager Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) ___________Program 15 Personnel Accountability Security Security Training Program PNPS Page 38 PNPS Page 38 PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 -Fuel Handling Accident 1. Accident Summary* The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.* The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT a;I~
* The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.2. Accident Specific Assumptions Made* Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
PNPS TABLEIF     I 5-TEMERGNCY             PANAMLYSISREPORT plI       Q Line#iucto                                                       OnShif PostionTask .......             Analys Emergency Planning Declare the emergency classification level         Shift Manager                     Training Program / EP (ECL)                                                                                 Drills 2 pprove Offsite Protective Action                   NAEmergency                                   Planning 2 Recommendations                                     N/Araining                                 Program 3   Approve content of State/local notifications       Shift Manager                     Eraining   Progamnn I                     Emergency Planning 4 Approve extension to allowable dose                 IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff       Shift Manager                     Program /Emergency
: 3. Procedures for Accident Response* EOP-5, Radioactive Release Control* 5.4.3, Refueling Floor High Radiation PNPS Page 39 PNPS Page 39 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables APPENDX B! TABL I N-SHIFT POSITIONS; inel Au m naio... ... ....Ro....l in.. Unana..yzed TMSII T2/L1 T5/L1 T5/L3 Emergency Plan 60T5/L5 No Yes I Shift Manager Table B-i16 T5/L6 T51L8 T5/L1 0____ ___ ___ ___ __ ___ ___ ___ __ ___ ___ ___ ___ T5/L 14 2 Control Room Supervisor Emergency Plan N/A T2/L2 No No Table B-i Shift Technical EegnyPa 3 Advisor/Shift Engineer Table B-i2/ / / /___(3 rd SRO)__ ______4Licensed Nuclear Plant Emergency Plan N/A T21L4 No No Operator (RO #1) Table B-i1_________
      ,(e.g., to assemble, evacuate, etc.)                                                 Planning Training Program 6   IEO ntifcaton                 SiftMangerEmergency                           Planning 6     ER notficaionShif Mangerraining                                         Program Licensed Operator Training 7   Abbreviated NRC notification for DBT event NI/APrga Emrogenya     lnnn 8   Complete State/local notification form             Shift Manager                     Eeraining Progamnn 9   P)erform State/local notifications                 NLO#2                             Emergency Planning
_____Licensed Nuclear Plant Emergency PlanN/T2LNoo Operator (RO #2) Table B-i1____ ______ _____6Non-Licensed Nuclear Emergency Plan N/A T21L6 No No Plant Operator (NLO #1) Table B-i______
_____________________________    ________________               Training Program
__________
                                                          "                                 Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11     *ctivte        EDS         NO#2Emergency                                 Planning 11     ctvateERDS                     LO#Training                             Program Techncian Emergency Planning 12   Offsite radiological assessment                     Chemistryi Tcnia                 Training Program 13     Prfom NR noifiatiosNO#2Emergency                                           Planning 13     Prfom NR           noifiatios NO#Training                                 Program 14   Perform other site-specific event notifications Shift Manager                       Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)         ___________Program 15   Personnel Accountability                           Security                         Security Training Program Page 38 PNPS                                                                                                           Page 38
_____T5/L9 7Non-Licensed Nuclear Emergency Plan 60 T5/L11I No No Plant Operator (NLO #2) 'able B-i T5/L1 3_____ ____8 Nlon-Licensed Nuclear iEmergency Plan N/A N/A No No Plant Operator (NLO #3) Fable B-i1________
 
____ ___________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 - Fuel Handling Accident
Non-Licensed Nuclear Emergency Plan N/A N/A No No Pl:)ant Operator (NLO #4) B-i1________
: 1. Accident Summary
___________
* The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.
10 Non-Licensed Nuclear IEmergency Plan N/A N/A No No Plant Operator (NLO #5) rable B-i1________
* The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
____ ___________
* The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.
11 Fire Brigade #1 Emergenc Plan N/A N/A No No 12Fr rgd 2Emergency Plan N/A N/A No No__2 __ire _Brigade_#2_Table B-i1________
: 2. Accident Specific Assumptions Made
_ _ _ _ ______ _____13 RP / Chemistry Emergency Plan 60 T5/L12 No No Technician Iable B-i_________
* Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
_____ ___ ____ _____14 RPTechnician Emergenfcy Plan 60 T4/L3 No No able B-i1_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _Security 15 Security Contingency Plan / 60 T5/L1 5 No No_________________E-Plan Table B-I_______
: 3. Procedures for Accident Response
_____PNPS Page 40 PNPS Page 40 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN OPERATION  
* EOP-5, Radioactive Release Control
& SAF SHU.TDOWN " .........  
* 5.4.3, Refueling Floor High Radiation Page 39 PNPS                                                                                       Page 39
:::.. ...I J.. ........ .. ...................  
 
........I LO neI ...UItI -l O n e.. n tro R o o m. ..... ....I ...... .... ...I [. .:::: ::,,:... ...
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
#: 8 -F elH nd ig.c id n Line # Generic Title/Role On-Shift Position task Analysis_________________________________________
: 4.           Tables APPENDX B!                                                               PNPS*TABL I             N-SHIFT POSITIONS;                 -;***
ontrolling Method Licensed Operator I Shift Manager Shift Manager Training Program 2 Unt Speriso CotrolRoo SuervsorLicensed Operator___ nit Supervisor______ontrol__Roo__
inel              ...                   .   .   .       .Ro....l        Au m naio...                     in.. Unana..yzed                   TMSII T2/L1 T5/L1 T5/L3 Emergency Plan                 60T5/L5                                   No                     Yes I     Shift Manager                         Table B-i16                                           T5/L6 T51L8 T5/L1 0
Supervisor_____
____ __ ___ ___ _________    ___   __ ___ ___   ___   ___       T5/L 14 2     Control Room Supervisor Emergency Plan                                 N/A                   T2/L2               No                     No Table B-i Shift Technical                       EegnyPa 3     Advisor/Shift Engineer                 Table B-i2/                                               /                 /                       /
Training Program 3 Licensed Operator Shift Technical Advisor ]Shift Engineer/STA Training Program 4 Ractr Oeraor 1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator  
___( 3 rd SRO)__                                   ______
#1 Training Program.5 Leco prtr# icensed Nuclear Plant Licensed Operator RatrOeao#2Operator  
4Licensed Nuclear Plant                   Emergency Plan                 N/A                   T21L4               No                     No Operator (RO #1)                       Table   B-i1_________                                                                       _____
#2 Training Program 6 ,uxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_____ _______________________Plant Operator #1 Training Program 7 ,uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other' needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
Licensed Nuclear Plant                 Emergency PlanN/T2LNoo Operator (RO #2)                       Table B-i1____                                                     ______                 _____
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis________________________
6Non-Licensed Nuclear                     Emergency Plan                 N/A                   T21L6               No                     No Plant Operator (NLO #1)               Table   B-i______                     __________                                           _____
_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 41 PNPS Page 41 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade:i:~~~~PNPS ,TABLE :3'-:FIREFIGHTING::I, .:, I N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A-5 N/A N/A Note: FHA does not include a fire.PNPS Page 42 PNPS Page 42 PNPS ON-SHIFT STAFFING ANALYSIS REPORT N ; 5 30-: 35 45- 50-" 55-' 60 :70 80- I In-Plant Survey: N/A___2 On-site Survey: N/A 3 Personnel Monitoring:
T5/L9 7Non-Licensed Nuclear                     Emergency Plan                 60                   T5/L11I               No                     No Plant Operator (NLO #2) 'able B-i                                                           T5/L1 3_____                         ____
RP#1X X X X X T Job Coverage: N/A 50Offsite Rad Assessment: (Included in Table 6 IOther site specific RP (,describe):N/A  
8    Nlon-Licensed Nuclear                 iEmergency Plan                 N/A                     N/A               No                     No Plant Operator (NLO #3)                 Fable   B-i1________                               ____           ___________
.7 Chemistry Function task #1 (describe)
Non-Licensed Nuclear                   Emergency Plan                 N/A                     N/A               No                     No Pl:)ant Operator (NLO #4)             *able    B-i1________                               ___________
10 Non-Licensed Nuclear                     IEmergency Plan                 N/A                     N/A               No                     No Plant Operator (NLO #5)                 rable   B-i1________                               ____           ___________
11   Fire Brigade #1                       Emergenc         Plan         N/A                     N/A               No                     No 12Fr rgd         2Emergency                         Plan         N/A                     N/A               No                      No
__2 __ire     _Brigade_#2_Table               B-i1________                               _   _   _   _   ______                 _____
13 RP     / Chemistry                       Emergency Plan                   60                 T5/L12               No                     No Technician                             Iable   B-i_________                             _____           ___         ____           _____
14 RPTechnician                               Emergenfcy Plan                 60                   T4/L3               No                     No able B-i1_               _ _ _ _ _   _   _ _   _   _   __   _   _   _   _ _         _   _   _ _
Security 15 Security                                 Contingency Plan /               60                 T5/L1 5               No                     No
_________________E-Plan                 Table B-I_______                                                                 _____
Page 40 PNPS PNPS                                                                                                                                Page 40
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN                     OPERATION               & SAF         SHU.TDOWN           :''*': "         .........
            .. ... *1"I ..ILO J.....................
                                    ........           ........     .   . .neI UItI   -l O n e.. n tro R o o m...... .     ... I. . ....         . ... .   ..I [.   .
:::**i*]*:':  ':'*
                                    . ::*:*::Analysis*
                                            . .             * *:;;!::**;          #:-8     F elH nd ig.c                 id n Line # Generic Title/Role                                                                   On-Shift Position                       task Analysis
_________________________________________                                          ontrolling Method Licensed Operator I Shift Manager                                                                     Shift Manager                           Training Program 2 Unt Speriso                                 CotrolRoo SuervsorLicensed Operator
___      nit Supervisor______ontrol__Roo__                                                                   Supervisor_____ Training       Program 3                                                                                     Licensed Operator Shift Technical Advisor                                                         ]Shift Engineer/STA                     Training Program 4 Oeraor Ractr               1Licensed                                         Nuclear Plant           Licensed Operator 4 RatrOeao#1Operator                                                           #1                       Training Program.
5                                 prtr#                                                 Leco icensed Nuclear Plant                 Licensed Operator RatrOeao#2Operator                                                 #2                       Training Program 6         ,uxiliary Operator #1                                                           Non-licensed Nuclear                   Non-Licensed Operator
_____                  _______________________Plant                              Operator #1                   Training       Program 7         ,uxiliary Operator #2                                                           N/A                                   N/A 8       Other needed for Safe Shutdown                                                   N/A                                   N/A 9       Other' needed for Safe Shutdown                                                   N/A                                   N/A 10       Other needed for Safe Shutdown                                                   N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                                                   On-Shift Position                     Task Analysis
________________________                  _______________Controlling                                   Method 11       Mechanic                                                                         N/A                                   N/A 12       Electrician                                                                       N/A                                   N/A 13       l&C Technician                                                                     N/A                                   N/A 14       Other                                                                             N/A                                   N/A 15       Other                                                                             N/A                                   N/A Page 41 PNPS                                                                                                                                                             Page 41
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
          *                      :i:~~~~PNPS ,TABLE:3'-:FIREFIGHTING::I, .:,
I                     N/A                                                   N/A 2                     N/A                                                   N/A 3                     N/A                                                   N/A 4                     N/A                                                   N/A-5                     N/A                                                   N/A Note: FHA does not include a fire.
Page 42 PNPS                                                                               Page 42
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT N                         * ; 5- 1*0.-.15- '20-* 25- 30-: 35 45- 50-" 55-' 60 :70 80- *85-;
I In-Plant Survey:
N/A___
2 On-site Survey:
N/A 3 Personnel Monitoring:
RP#1X                                   X   X   X   X T Job Coverage:
N/A 50Offsite Rad Assessment:
(Included in Table 6 IOther site specific RP
(,describe):N/A                                                                     .
7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A _*Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.Additional RP on shift for refueling/outage to assist with tasks PNPS Page 43  
N/A       _
.PNPS ON-SHIFT STAFFING ANALYSIS REPORT i =iio: PN=: PS TABLE EMERGENCY IM PLEM ENTATION~i:; i LieFuncto I Tsk*I On-Shift Positio 1 Declare the emergency classification level ShftMaagrraining ProgamnniEP (ECL) Drills 2 ,pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 &pprove content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 &pprove extension to allowable dose N/A Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra OpEergerrancy g t o assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 /bbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 raningProgram 11 Planning 12 Offsite radiological assessment Chemistry Tcnia Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) rga 15 Personnel Accountability Security Security Training Program PNPS Page 44 PNPS Page 44 PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 -Aircraft Probable Threat 1. Accident Summary* The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
              *Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.
* The analysis does not include a scenario or response actions taken during or after a crash.2. Accident Specific Assumptions Made* The Shift Manager receives the call from the NRC of probable aircraft threat.* All non-security on-shift personnel are inside the protected area fence at their normal workstation.
Additional RP on shift for refueling/outage to assist with tasks PNPS                                                                                             Page 43
: 3. Procedures for Accident Response* 5.3.1 4.1, Airborne Threat PNP Pae 4 PNPS Page 45 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables i ,:-________Aayi
 
_________
                  .PNPS ON-SHIFT STAFFING ANALYSIS REPORT i i*      =iio:
,.
il:*  PN=:
: ; : :: ::: A ugme:ntation Role :in Table # !
PS TABLE 5.*- EMERGENCY PL*AN IM PLEM ENTATION~i:;                             'i** i LieFuncto                   I Tsk*I                     On-Shift Positio     .*Task Analysis*.!
i TMS Required?Line # On-shift Position E-Plan Reference ;Time I ::Line #:I T :;:ask? ' :,, T2/L1 T5/LI T5/L3 1Shift Manager Emergency Plan 60 T15No Yes Table B-I T5/L6 T5/L8._ T5/L1 0________________
* 1 Declare the emergency classification level           ShftMaagrraining                     ProgamnniEP (ECL)                                                                     Drills 2 ,pprove Offsite Protective Action                   NAEmergency                             Planning 2 Recommendations                                     N/Araining                         Program 3     &pprove content of State/local notifications       Shift Manager         Emraining Progamnn Emrgencyg Planning 4     &pprove extension to allowable dose                 N/A                   Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra                     OpEergerrancy     g t o assemble, evacuate, etc.)                       SitMngrPlanigTra                         inin Pmrogramy EegnyPlanning Tann       rga 6     ERO notification                                   Shift Manager         Emraining Progamnn Licensed Operator Training 7     /bbreviated NRC notification for DBT event         N/APrga Emrogenya           lnnn 8     Complete State/local notification form             Shift Manager         Emraining       Progamnn Emrgencyg       Planning 9     Perform State/local notifications                   NLO#2                 Emraining       Progamnn Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11                                                       raningProgram 11       /*tiTechnicianO#2Emergency                                            Planning 12   Offsite radiological assessment                     Chemistry Tcnia       Emraining     Progamnn Emrgencyg     Planning 13   Perform NRC notifications                           NLO#2                 Emraining     Progamnn 14Perform other site-specific event notifications SitMngrLicensed                           Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                                 rga 15 Personnel Accountability                               Security               Security Training Program Page 44 PNPS                                                                                                     Page 44
T5/L14 _ _ _ _ _ _2 Control Room Emergency Plan N/A T2/L2 No No__ _Supervisor Table B-i _______ _______ ______Shift Technical EegnyPa 3 Advisor/Shift Emrec ln60 T2/L3 No No___Engineer (3 rd SRO) TaleB-Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO ablrenc B-I/AT2L No No Licensed Nuclear EegnyPa / 2L 5 Plant Operator (RO ablrenc B-i /AT2 No No#___ 2) _________Non-Licensed EegnyPa oN 6 Nuclear Plant EegnyPa / 2L oN___Operator (NLO #1) al -/ 2L Non-Licensed T5/L9 7 lant Emergency Plan60T/1Noo 7 Nucler Plant Table B-i10T/I oN___)perator (NLO #2) ________T5/L1 3 _____ _____Non-Licensed EegnyPa / 3L oN 8 Nuclear Plant EegnyPa / 3L oN___Operator (NLO #3) al -Non-Licensed EegnyPa / 3L oN 9 Nuclear Plant EegnyPa / 3L oN___Operator (NLO #4) al -Non-Licensed EegnyPa 10 Nuclear Plant EegnyPa / 3L oN Operator (NLO #5 al -/ 3L oN 11Fr rgd 1 Emergency Plan N/A T3/L4 No No 11 _FireBrigade#1 Table B-i1______
 
______12 Fire Brigade #2 Emergency Plan N/A T3/L5 "No No T________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 - Aircraft Probable Threat
able B-i _______ _ __ _ _ _13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-i1______
: 1. Accident Summary
14 RPehiin Emergency Plan 60 T4/L6 No No RP Technician able B-I1______
* The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
______Security Contingency 15 Security Plan / E-Plan Table 60 N/A No No____ _______________
* The analysis does not include a scenario or response actions taken during or after a crash.
EB-I__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _PNPS Page 46 PNPS Page 46 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole  
: 2. Accident Specific Assumptions Made
'On-Shift Position Task Analysis_____ _________________________
* The Shift Manager receives the call from the NRC of probable aircraft threat.
________________Controlling Method 1 Ishift Manager Ishift Manager Licensed Operator______ __________________________
* All non-security on-shift personnel are inside the protected area fence at their normal workstation.
________________Training Program 2 Jnit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 hitTechnical Advisor Shift Engineer/STA Licensed Operator ShiftTraining Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecorOeatr#
: 3. Procedures for Accident Response
perator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator____uiiayOeao Operator #2 Nuler raining Program 6 uxliryOpraor#1Non-licensed Ncer Non-Licensed Operator P~lant Operator #1 Training Program 7  
* 5.3.1 4.1, Airborne Threat Pae   4 PNP PNPS                                                                                       Page 45
#2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
 
Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis____ _ _ ___ ___ ____ ___ ___ ___ ___ ___ ___ ___ ___ ___ Controlling Method 11 Mechanic N/A NI/A 12 Electrician N/A N/A 13 I&C Technician N/A N,/A 14 Other N/A N/A 15 Other N/A Nl/A PNPS Page 47 PNPS Page 47 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i! PN
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: , :ii!':ii: : B LEicr f:: :: 3 -..... rob beEFaIG HT........ .IN G: ....:i == : ,.' :=' :,;: :...:::::..  
: 4.       Tables
',: ' ..1 NLO #3 Fire Brigade Training 2 NLO #4 Fire Brigade Training 3 NLO #5 Fire Brigade Training 4 FB #1 Fire Brigade Training 5 FB #2 Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.PNPS Page 48 PNPS Page 48 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance Time Period After. Emergency Declarato (mnte)I In-Plant Survey: 2 On-site Survey: 3 Personnel Monitoring:
:*:*.:*~~~~NPS :AL*t*O*HFiP*OSITiONSI!!:*                        i *:ii ,:
____T Job Coverage: 5 Offsite Rad Assessment: (Included in Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1 (,describe) 8Chemistry Function task #2 (describe)
  -          ________Aayi                                                #8-Aircraft*    Prbale''* Threa,**=!!l**t _________                ______-_____*      ,.
Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.PNPS Page 49 PNPS Page 49 PNPS ON-SHIFT STAFFING ANALYSIS REPORT'I!"i;:~PN PS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION!
                    *:::::;*::*!i~:*ii:**::***iii
i !,.: =.' :;Function.ITask*
:      ; : :: * * ::: *'i:'              Augme:ntation Role :in Table # ! Unana*lyzd i TMS Required?
Position:  
Line # On-shift Position ;* E-Plan Reference                                *Elapsed ;Time          I
! l i"Task  " " ....
::Line    #:I          :;:ask?
Co tr lln M ethod Emergency Planning Declare the emergency classification level SitMngrriigPormIE (ECL)Drills 2 Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program] Emergency Planning 3 &pprove content of State/local notifications Shift Manager Training Program 4 &prov exenson o alowale oseN/AEmergency Planning 4 ppove xtesionto llowbledoseN/Araining Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program I Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notficaionShif MangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Eraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 Ofsie raiolgicl asessentraining Program Emergency Planning 13 Perform NRC notifications NILO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.) Program_____
T          %*          ' :,, *...
____________
T2/L1 T5/LI T5/L3 1Shift Manager                    Emergency Plan                             60              T15No                                              Yes Table B-I                                                  T5/L6 T5/L8
15 Personnel Accountability N/A Security Training Program PNPS Page 50 PNPS Page 50 PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 -Control Room Evacuation and Alternate Shutdown 1. Accident Summary* Fire in the Main Control occurs that requires control room evacuation.
                                                                      ._                              T5/L1 0
* Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.2. Accident Specific Assumptions Made* The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.* Subsequent actions are performed from outside the control room.3. N Procedures for Accident Response* 2.4.143, Shutdown From Outside the Main Control Room* EP-IP-1 00, Classification and .Notifications
________________                      T5/L14          _    _    _  _  _  _
* EP-IP-1 00.1, EALs PNPS Page 51 PNPS Page 51 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables ILine # On-shift Reference Elapsed Yim+e!.  
2      Control Room                    Emergency Plan                            N/A              T2/L2                      No                       No
# i Task?,:;::
___Supervisor                        Table    B-i                                        _______              _______                    ______
T2/LI T5/Ll T5/L3 1 Shift Manager Emergency Plan 60T5/L5 N e Table B-I 6 T5/L6 N e T5/L8 T5/LI10________________
Shift Technical                EegnyPa 3      Advisor/Shift                  Emrec ln60                                                  T2/L3                      No                      No
~~~T5/L 14 __ _ _ _ __ _ _ _ _ _ _2Control Room Emergency PlanN/T2LNoo Supervisor Table B-i / 2L oN Shift Technical EegnyPa 3 Advisor/Shift EegnyPa___Tnier(r R) able B-i 60 T2/L3 No No Licensed Nuclear 4 Plant Operator (RO Emrec lnNAT/4No No#1 ) able B-i Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo Table B-1i/ 2L oN Non-Licensed 6 Nuclear Plant Emergency PlanN/T26Noo
___Engineer          ( 3 rd SRO)      TaleB-Licensed Nuclear                EegnyPa                                      /               2L 4      Plant Operator (RO               ablrenc B-I/AT2L                                                                    No                      No Licensed Nuclear                EegnyPa                                      /                2L 5      Plant Operator (RO                ablrenc B-i                                /AT2                                     No                       No 2)
___Operator (NLO #1) al -Non-Licensed T51L9 7 Nuclear Plant Emergency Plan60T/iNoo Table B-i 0T/1 oN Operator (NLO #2) _______T5/L13______
Non-Licensed                   EegnyPa                                                                                 oN 6     Nuclear Plant                   EegnyPa                                     /               2L                         oN
Non-Licensed 8 Nuclear Plant Emergency PlanN/T3LNoo Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency PlanN/T32Noo
___Operator            (NLO #1)         al       -                               /               2L Non-Licensed 7       *lulear lant         Emergency Plan60T/1Noo T5/L9 7 Nucler Plant             Table B-i10T/I                                                                           oN
___Operator (NLO #/4) al -Non-Licensed EegnyPa 10 Nuclear Plant NoegecNola
___)perator           (NLO #2)         ________T5/L1                                                   3         _____                    _____
___Operator (NLO #5) al -/ 3L 11 Fire Brigade #1 Emergency PlanNAT34Noo T_________
Non-Licensed                   EegnyPa                                     /               3L                         oN 8       Nuclear Plant                 EegnyPa                                     /               3L                         oN
able B-i N__AT3/L4
___Operator          (NLO #3)         al       -
_ No______ No_____12 Fire Brigade #2 Emergency Plan N/A T3/L5 No No_____ _____ ___ Table B-I1_ _ _ _ _ _ _ _ _ _ _ _ _ ______13 RP / Chemistry Emergency Plan 6 / oN Technician Table B-i 60______ N/A_____ No____No _14 RP Technician Emergenc Plan 60 T4/L4 No No Security 15 Security Contingency Plan/I 60 N/A No No______________E-Plan Table B-1 _______ ______ ______ ______PNPS Page 52 PNPS ON-SHIFT STAFFING ANALYSIS REPORT*PNPS TABLE 2 _-: PLANT OPERATIONS  
Non-Licensed                   EegnyPa                                     /               3L                         oN 9       Nuclear Plant                 EegnyPa                                     /               3L                         oN
& SAFE SHUTDOWN : , i:: : :i illAnalysis  
___Operator          (NLO #4)         al       -
#9- CR,,Evacuation  
Non-Licensed                   EegnyPa 10       Nuclear Plant                 EegnyPa                                     /               3L                         oN Operator (NLO #5                 al -                                       /               3L                         oN 11 11Fr rgd 1
&Alternate Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !if Applicable
_FireBrigade#1 Emergency Table B-i1______
;,= Line # Generic Title/Role On-Shift Position Task Analysis_________________________Controlling Method Licensed Operator 1 Shift Manager Shift Manager Training Program SuperisorLicensed Operator 2 Unit Supervisor Control Room Sprio Training Program Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 eco peao 1Operator  
Plan                 N/A             T3/L4                     No               ______
#1 Training Program 5 Ractr pertor#2Licensed Nuclear Plant Licensed Operator 5 eco peao 2Operator  
No 12        Fire Brigade #2               Emergency Plan                             N/A             T3/L5 "No                                           No able B-i T________                          _______                                                             _   __ _ _   _
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
13        RP / Chemistry                 Emergency Plan                             60               N/A                     No                       No Technician                   Table     B-i1______
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role IOn-Shift Position Task Analysis_____ __________________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A PNPS Page 53 PNPS Page 53 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade: .. ..i: :': : ::.... ...i : : : P : NPS TABLE .. .. ...C ~~3:- FIREFIGHTIT NG : at n it r te$ " ' : ::o. :., :: L .. ...ne ..... Per......
14       RPehiin                       Emergency Plan                             60             T4/L6                     No                       No RP Technician           able B-I1______                                                                                       ______
fo iirmed llllil by ' i Taski A ay is Co toln Method 1 NLO#3 Fire Brigade Training 2 NO4Fire Brigade Training 5 FB2Fire Brigade Training PNPS Page 54 PNPS Page 54 PNPS ON-SHIFT STAFFING ANALYSIS REPORT:: .....PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,=  
Security Contingency 15       Security                       Plan / E-Plan Table                         60               N/A                     No                      No
.. ,:=,=..... Analysis #9 CR Evacuation  
_______________               EB-I__                                   _   _ _ _   __   _ _ _     _   _   _   _   _   _   _ _    _   _ _   _   _
& Alternate E 0-5atigfas:i:
Page 46 PNPS                                                                                                                                             Page 46
2.:: 10- :i 1'5- 20-.125. 35 '45- 50-~ 55 i65- 70-1"75-180- ______.___  
 
"., 101::f5.20.'25;-30=:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole                                     'On-Shift Position                 Task Analysis
35: '40 4:5: :50: 55 :601 6570 ,o:75'80 o/85,:90: 1 In-Plant Survey: 2 On-site Survey: 3 Personnel Monitoring:
_____ _________________________         ________________Controlling                   Method 1     Ishift Manager                                       Ishift Manager                     Licensed Operator
___4 Job Coverage: RP#lSupport X X X X X X X X X X X X X X X X X FB 50Offsite Rad Assessment: (Included in Table 5 6 Other site specific RP (describe):
______    __________________________   ________________Training                   Program 2 Jnit Supervisor                                       Control Room Supervisor           Lricnsed OPeraogra 3 hitTechnical Advisor                               Shift Engineer/STA                 Licensed Operator ShiftTraining                                                           Program 4 Ractr pertor#1Licensed                                     Nuclear Plant       Licensed Operator 4 ecorOeatr#                               perator #1                       Training Program 5 Reactor Operator #2                                   Licensed Nuclear Plant             Licensed Operator
____uiiayOeao                                          Operator #2           Nuler         raining Program 6 uxliryOpraor#1Non-licensed                                   Ncer       Non-Licensed Operator P~lant Operator #1                 Training Program 7       *,xlayOperator #2                                   N/A                               N/A 8       Other needed for Safe Shutdown                       N/A                               N/A 9       Other needed for Safe Shutdown                       N/A                               N/A 10     Other needed for Safe Shutdown                       N/A                               N/A Other (non-Operations) Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line #     Generic Title/Role                                   On-Shift Position               Task Analysis
___   ___   ___     ___     ___   ___     ___ ___ Controlling Method 11         Mechanic                                             N/A                             NI/A 12         Electrician                                         N/A                             N/A 13         I&C Technician                                       N/A                             N,/A 14         Other                                                 N/A                             N/A 15         Other                                                 N/A                             Nl/A Page 47 PNPS PNPS                                                                                                                  Page 47
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i!:::*:!: :::*:... : , :ii!':ii: PNPS!*'i::!*::
:TA''=*I~
::B LEicr 3 -.....
f:: rob beEFaIG FI:**      .IN G: ....
HT........  :* ==
:i : ::*:,.' :=' :,;: :...:::::..
1                          NLO #3                                        Fire Brigade Training 2                          NLO #4                                        Fire Brigade Training 3                          NLO #5                                        Fire Brigade Training 4                            FB #1                                        Fire Brigade Training 5                            FB #2                                        Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.
Page 48 PNPS                                                                                                         Page 48
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance                           Time Period After. Emergency Declarato (mnte)
I In-Plant Survey:
2 On-site Survey:
3 Personnel Monitoring: ____
Job Coverage:
5 Offsite Rad Assessment:
(Includedin Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1
(,describe) 8Chemistry Function task #2 (describe)
Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.
Page 49 PNPS                                                                                         Page 49
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
                      'I!"i;:~PNPS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION! i !,.:                               *,  =.' :;
*Line
* Function.ITask* ,.,* :i*.:.... *o::,r,,On-Shift Position: !                l i"Task Analysis!*~!i**!::
                                  " " ....*':i:__...............______:                              Co tr lln        M ethod Emergency Planning Declare the emergency classification level                      SitMngrriigPormIE (ECL)Drills 2 *pprove Offsite Protective Action                                NAEmergency                              Planning 2 Recommendations                                                  N/Araining                           Program
                                                                      ]                        Emergency Planning 3    &pprove content of State/local notifications                    Shift Manager          Training Program 4      &prov o alowale    exensonoseN/AEmergency                                              Planning 4      ppove llowbledoseN/Araining xtesionto                                                        Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager                         Program I Emergency to assemble, evacuate, etc.)                                                             Planning Training Program 6     ER     notficaionShif                         MangerEmergency                     Planning 6     ER     notficaionShif Mangerraining                                         Program Licensed Operator Training 7     Abbreviated NRC notification for DBT event                       N/APrga Emergency Planning 8     Complete State/local notification form                           Shift ManagerrangPorm Emrgencyg       Planning 9     Perform State/local notifications                               NLO#2                   Eraining       Progamnn Licensed Operator Training 10   Complete NRC event notification form                             Shift ManagerPrga 11       civae EDS                             NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl                                                             Program Emergency Planning 13   Perform NRC notifications                                       NILO#2                 Emraining       Progamnn Perform other site-specific event notifications                                         Licensed Operator Training 14                                                                     Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.)                                             Program_____
15   Personnel Accountability                                         N/A                     Security Training Program Page 50 PNPS                                                                                                                   Page 50
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown
: 1. Accident Summary
* Fire in the Main Control occurs that requires control room evacuation.
* Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.
: 2. Accident Specific Assumptions Made
* The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.
* Subsequent actions are performed from outside the control room.
: 3. N Procedures for Accident Response
* 2.4.143, Shutdown From Outside the Main Control Room
* EP-IP-1 00, Classification and .Notifications
* EP-IP-1 00.1, EALs Page 51 PNPS                                                                                     Page 51
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.         Tables ILine # On-shift P*ositioni~        *"E-lan Reference             Elapsed Yim+e!. *ii,!;LJine~f~i #   i     Task?,:;::   ;'i*!,*i*:~;;
T2/LI T5/Ll T5/L3 1     Shift Manager                 Emergency Plan                     60T5/L5                               N                 e Table B-I                         6               T5/L6               N                 e T5/L8 T5/LI10
________________                                          ~~~T5/L 14   __     _   _ _ __ _   _ _ _   _
2Control Room                     Emergency PlanN/T2LNoo Supervisor                     Table B-i                           /                 2L                 oN Shift Technical               EegnyPa 3     Advisor/Shift                 EegnyPa
___Tnier(r         R)         able B-i                         60               T2/L3               No               No Licensed Nuclear 4     Plant Operator (RO             Emrec               lnNAT/4No                                                             No
                    #1 )                 able B-i Licensed Nuclear 5     Plant Operator (RO             Emergency PlanN/T2LNoo Table B-1i/                                           2L                 oN Non-Licensed 6     Nuclear Plant                 Emergency PlanN/T26Noo
___Operator         (NLO #1)         al -
Non-Licensed                                                                       T51L9 7     Nuclear Plant                 Emergency Plan60T/iNoo Table B-i                           0T/1                                 oN Operator (NLO #2)               _______T5/L13______
Non-Licensed 8     Nuclear Plant                 Emergency PlanN/T3LNoo Operator (NLO #3)               al       -
Non-Licensed 9     Nuclear Plant                 Emergency PlanN/T32Noo
___Operator         (NLO #/4) al -
Non-Licensed                   EegnyPa 10     Nuclear Plant                                                                                           NoegecNola
___Operator         (NLO #5)         al -                               /                 3L 11     Fire Brigade #1               Emergency PlanNAT34Noo able B-i T_________                        N__AT3/L4                   _         No______         No_____
12    Fire Brigade #2               Emergency Plan                     N/A               T3/L5               No                No
_____   ___     Table   B-I1_               _ _   _ _ _ _ _ _   _ _ _ _                     ______
13    RP / Chemistry                 Emergency Plan                     6                   /                 oN Technician                   Table   B-i                       60______           N/A_____           No____No                 _
14    RP Technician                 Emergenc Plan                       60               T4/L4               No               No Security 15     Security                       Contingency Plan/I                 60                 N/A               No               No
______________E-Plan         Table B-1       _______             ______              ______           ______
PNPS                                                                                                                      Page 52
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
*PNPS                             TABLE 2 _-:PLANT OPERATIONS & SAFE SHUTDOWN :                                 , i:: :ii!:** l**i
:illAnalysis
            *! ;i* :i                                      #9- CR,,Evacuation &Alternate SDi;*:*';
Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !ifApplicable                                  ;,=   *,'
Line # Generic Title/Role                                                 On-Shift Position           Task Analysis
_________________________Controlling                                                Method Licensed Operator 1 Shift Manager                                                     Shift Manager               Training Program SuperisorLicensed Operator 2 Unit Supervisor                                                   Control Room Sprio         Training Program Shift Technical Advisor                                         Shift Engineer/STA         Lricnsed OPeraogra 4 Ractr pertor#1Licensed                                               Nuclear Plant   Licensed Operator 4 ecopeao 1Operator                                                 #1               Training Program 5 Ractr pertor#2Licensed                                               Nuclear Plant   Licensed Operator 5 ecopeao 2Operator                                                 #2               Training Program 6     Auxiliary Operator #1                                             Non-licensed Nuclear     Non-Licensed Operator
_______________________Plant                              Operator #1         Training Program 7     Auxiliary Operator #2                                             N/A                       N/A 8     Other needed for Safe Shutdown                                     N/A                       N/A 9     Other needed for Safe Shutdown                                     N/A                       N/A 10     Other needed for Safe Shutdown                                     N/A                       N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line #     Generic Title/Role                                               IOn-Shift Position         Task Analysis
_____          __________________________Controlling                                         Method 11         Mechanic                                                           N/A                       N/A 12         Electrician                                                       N/A                       N/A 13         I&C Technician                                                     N/A                       N/A 14         Other                                                             N/A                       N/A 15         Other                                                             N/A                       N/A Page 53 PNPS                                                                                                                         Page 53
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
: .. ..* i*:i:*
:':       : i:,-.*:::....
:*:i : :,:,*,
:...* : als*#9:
: PNPS  .. *TABLE ~~3:- FIREFIGHTIT
                                                                ..C ... at n     it NG r te$
:    "         ': ,**  ::o. :.,::
Lne.. ... .....               Per......
fo           byllllil' iirmed         i                 Taski A ay   is Co toln     Method 1                                   NLO#3                                             Fire Brigade Training 2                                   NO4Fire                                               Brigade Training 5                                     FB2Fire                                               Brigade Training Page 54 PNPS PNPS                                                                                                                  Page 54
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
:: .....         PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,=                         .. ,:=,=
                'i:*    ..... Analysis #9 CR Evacuation & Alternate ,SD~*:::'-'** i*
E                       0-5atigfas:i:
2.::     :i10- 1'5- 20-.125. :30-* 35 '45- 50-~ 55 i65- 70-1"75-180- *85-;,
______.___           "., 101::f5.20.'25;-30=: 35:     '40 4:5: :50: 55 :601 6570 ,o:75'80o/85,:90:
1 In-Plant Survey:
2 On-site Survey:
3 Personnel Monitoring:  ___
4 Job Coverage:
RP#lSupport            X    X  X    X    X    X    X  X    X  X  X  X    X  X  X    X    X FB 50Offsite Rad Assessment:
(Includedin Table 5 6 Other site specific RP (describe):
7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)
7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)
PNPS Page 55 PNPS ON-SHIFT STAFFING ANALYSIS REPORT! ":PN PS 5- ERGEN CYi PLEAN I1M PLEM ENTATI O i, Declre he mergncyclasifiatin lvelEmergency Planning DECLar)h mrec lasfcto ee Shift Manager Training Program i EP (ECL)Drills ,pprove Offsite Protective Action Emergency Planning 2 Recommendations N/A Training Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Notiicaionand iretio to n-siftstaf.(eg.,Licensed Operator Training Noiia5naddrcin oo-hf tf egShift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga 8 Complete State/local notification form Shift Manager Emraining Progamnn 9 Perform State/local notifications NLO#2 Emergency Planning Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 Ativae EDS NO#2Emergency Planning 12 Offsite radiological assessment N/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) _______rogram____________
PNPS                                                                                               Page 55
15 Personnel Accountability N/A Security Training Program PNPS Page 56 PNPS Page 56 PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10 -Station Blackout 1. Accident Summary* At power, normal lineups and no additionai events* RCIC starts to restore level and SRVs lift in the relief mode to control pressure 2. Accident Specific Assumptions Made* Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.3. Procedures for Accident Response* 5.3.31, Station Blackout* EP-IP-1 00, Classification and Notifications
 
* EP-IP-1 00.1, EALs* EP-IP-410, Evacuation and Assembly PNPS Page 57 PNPS Page 57 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables i  
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
,: PN PS:; :)i E ON DS I :
              ! .!;;:!::* :.:* ":PNPS *TABLE 5- *EM ERGEN CYi PLEAN I1M PLEM ENTATI ON*            i, Declre he mergncyclasifiatin lvelEmergency                                     Planning DECLar)h             mrec         lasfcto ee             Shift Manager             Training Program i EP (ECL)Drills
:i:; ':-___________
      ,pprove Offsite Protective Action                                                   Emergency Planning 2   Recommendations                                           N/A                       Training Program 3   Approve content of State/local notifications               Shift Manager             Emraining Progamnn Emrgencyg   Planning 4   Approve extension to allowable dose                       N/A                       Emraining Progamnn Notiicaionand to n-siftstaf.(eg.,Licensed iretio                                            Operator Training Noiia5naddrcin oo-hf tf                               egShift Manager                 Program / Emergency to assemble, evacuate, etc.)                                                         Planning Training Program Emergency Planning 6   ERO notification                                           Shift ManagerrangPorm Licensed Operator Training 7   Abbreviated NRC notification for DBT event                 N/APrga 8   Complete State/local notification form                     Shift Manager             Emraining   Progamnn 9   Perform State/local notifications                         NLO#2                     Emergency Planning Licensed Operator Training 10   Complete NRC event notification form                       Shift ManagerPrga 11   civae EDS                 NO#2raiingProgram 11 Ativae EDS                   NO#2Emergency                           Planning 12   Offsite radiological assessment                           N/A                       Emraining   Progamnn Emrgencyg   Planning 13   Perform NRC notifications                                 NLO#2                     Emraining   Progamnn 14Perform other site-specific event notifications SitMngrLicensed                                 Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.)                 _______rogram____________
Anaysis#10 Staton BackoT2/L1___
15   Personnel Accountability                                   N/A                       Security Training Program Page 56 PNPS PNPS                                                                                                            Page 56
T5/L5 T5/L8 T5/L31 T5/L14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-I 3AvsrShiftTehia Emergency Plan 60 T2/L3 No, No Engineer (3 rd SRO) Table B-I iLcensed Nuclear 4 Plant Operator (RO Emergency Plan N/A T2/L4 No No-~Table B-i Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B-i n N/A T2/L5 No No Non-Licensed EegnyPa /6 Nluclear Plant Emrec lnNAT2/L6 No No Operator (NLO #1) al -Non-Licensed EegnyPa60T5/L9 7 Nuclear Plant -EegnyPa60T5/LI I No No Table B-I Operator (NLO #2) T5/L13_____
 
Non-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -Non-Licensed EegnyPa / oN 9 Nuclear Plant EegnyPa / / oN Operator (NLO #4) al -/Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -11Fr rgd 1 Emergency Plan N/A N/A No No 12 Fire Brigade #2 ,Emergency PlanN/NANoo
PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10   - Station Blackout
_______ _____ Table B-I1/ / oN 13RP / Chemistry Emergency Plan 60 N/A No No 13 Technician Fable B-I1________
: 1. Accident Summary
____ _____14 RP Technician Emergency Plan 60 N/A No No_____________
* At power, normal lineups and no additionai events
TableB-I1_____________
* RCIC starts to restore level and SRVs lift in the relief mode to control pressure
Security 15 Security Contingency Plan / 60 T5/L15 No No______________E-Plan Table B-i1 ________ _____ ______ _____PNPS Page 58 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 ~- PLANT OPERATIONS  
: 2. Accident Specific Assumptions Made
& SAPE SHUTPOWN One Unit -One Control Room Analysis #10 -Station Blackout.Mnim~um Oper#ations Cirew N e essary: to Imple6m ent: AO Ps .and EOPs or .SA Ms Iif  
* Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.
:;i;Line # Generic Title/Role On-Shift Position Task Analysis________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator I Shft Mnage Shit Maagerraining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor Shift Engineer/STA Training Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator  
: 3. Procedures for Accident Response
#1 Program ,5 RatrOperator  
* 5.3.31, Station Blackout
#2 Licensed Nuclear Plant Licensed Operator RatrOperator  
* EP-IP-1 00, Classification and Notifications
#2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator_____ _______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
* EP-IP-1 00.1, EALs
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_____ _______________
* EP-IP-410, Evacuation and Assembly Page 57 PNPS                                                                                       Page 57
ontrolling Method 1 1 Mechanic N/A N/A 1 2 Electrician N/A N/A 1 3 l&C Technician N/A N/A 1 4 Other N/A N/A 1 5 Other N/A N/A PNPS Page 59 PNPS Page 59 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade TABLE
 
:L:f&#xb8;ilG 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The Station Blackout Analysis does not include the need for firefighting.
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
PNPS Page 60 PNPS Page 60 PNPS ON-SHIFT STAFFING ANALYSIS REPORT E -, :10 ,:15i i25 30: 35!: 40 4:5 150' :55; 75 80 :85': 90,-1 In-Plant Survey: N/A 2 On-site Survey: N/A 3 Personnel Monitoring:
: 4.           Tables i       *l~i::**::*i:          ,:   PN PS:;T*        E ON DS I FT.~ili*::;i
_N/A T Job Coverage: N/A__50Offsite Rad Assessment:
:)i '**ABL                        :ii,**      :*!" : ii*!::*':*    :i:; ':
._Included in Table 5 6 Other site specific RP (describe):
                        -     ___________             Anaysis#10 Staton BackoT2/L1___
N/A 7 Chemistry----------------------------  
T5/L5 T5/L8 T5/L31 T5/L14 2   Control Room                     Emergency Plan                     N/A             T2/L2             No                 No Supervisor                       Table B-I 3AvsrShiftTehia                   Emergency Plan                       60             T2/L3             No,                 No Engineer ( 3 rd SRO)             Table B-I iLcensed Nuclear 4   Plant Operator (RO               Emergency Plan                     N/A             T2/L4             No                 No
----Function task #1 (describe)
        -         ~Table                     B-i Licensed Nuclear                 EegnyPa 5   Plant Operator (RO                 ablrenc B-i       n               N/A             T2/L5             No                 No Non-Licensed                     EegnyPa                               /
N/A___8 Chemistry Function task #2 (describe)
6   Nluclear Plant                   Emrec             lnNAT2/L6                                           No                 No Operator (NLO #1)                   al     -
N/A__Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.PNPS Page 61 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca nsfialyisn
Non-Licensed                     EegnyPa60T5/L9 7 Nuclear Plant -                   EegnyPa60T5/LI                                               I         No                 No Table B-I Operator (NLO #2)                                                                   T5/L13_____
#10e EmStationBlackout Delr1h megnycasfiainlvl Shift Manager Training Program I EP (ECL) D:rills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emergencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Lricnsed OPeraorgra inn Notification and direction to on-shift staff (e.g., ShitcanaerProra
Non-Licensed                     EegnyPa                               /                   /             oN 8 Nuclear Plant                     EegnyPa                               /                   /             oN Operator (NLO #3)                   al     -
/OEergerrancy g 5 to assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 EDS kLO#2Emergency Planning 12 Offsite radiological assessment Nl/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NiLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training (4re.g., Duty Plant Manager, INPO, ANI, etc.) __hift ____Manager_____Program___
Non-Licensed                     EegnyPa                                                   /             oN 9 Nuclear Plant                     EegnyPa                               /                   /             oN Operator (NLO #4)                   al     -                         /
15 Personnel Accountability Security Security Training Program PNPS Page 62 PNPS Page 62 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11 -LOCA/General Emergency with Release and PAR 1. Accident Summary (Assumed for Staffing Analysis Purpose)* The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.2. Accident Specific Assumptions Made* All actions for SAE are complete.* No transients other than LOCA are considered.
Non-Licensed 10 Nuclear Plant                     Emergency Plan                     N/A               N/A             No                 No Operator (NLO #5)                   al     -
* The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.3. Procedures for Accident Response* EP-IP-1 00, Emergency Classification and Notification
11Fr rgd         1           Emergency Plan                     N/A               N/A             No                 No 12 Fire Brigade #2                   ,Emergency PlanN/NANoo
* EP-IP-1 00.1, Emergency Action Levels* EP-IP-300, Offsite Radiological Dose Assessment
_______   _____           Table   B-I1/                                             /             oN 13RP / Chemistry                   Emergency Plan                       60               N/A             No                 No 13 Technician                       Fable B-I1________                             ____          _____
* EOP-05, Radiological Release* EOP-01, RPV Control* EOP-03, Primary Containment Control* EOP-04, Secondary Containment Control* EP-IP-400, PAR PNPS Page 63 PNPS Page 63 PNPS ON-SHIFT STAFFING ANALYSIS REPORT 4. Tables::' : * !:
14 RP Technician                     Emergency Plan                       60               N/A             No                  No
:!I P EN I B !: : :: : APPENDIX ''
_____________            TableB-I1_____________
Role inTable #
Security 15 Security                           Contingency Plan /                   60             T5/L15             No                  No
TMS Req'uired?
______________E-Plan               Table B-i1       ________               _____       ______               _____
T2/L1 T5/L1 T5/L2 T5/L3 1 Shift Manager Emergency Plan 60 T5/L4 No No Fable B-i T5/L5 T5/L8 T5/LI10____ ____ ____ __ _ ____ ____ ___ ____ ____ ___ T5/L14 _ _ _ _ _ _ _ _ _ _ _ _ _2 Control Room Emergency Plan N/A T2/L2 No No____Supervisor Fable B-I1______
PNPS                                                                                                                            Page 58
______Shift Technical EegnyPa oN 3 Advisor/Shift EerecPan6T2LNoo
 
___Eng]ineer (3 rd SRO) 'able B-i10T2L Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Emrec lnNAT/4No No_____ 1)able B-I Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo T__ )able B-I / 2L oN Non-Licensed EegnyPa / 2L oN 6 Nuclear Plant EegnyPa / 2L oN___Operator (NLO #1) al -Non-Licensed -mrec lnT5/L9 7 EmergencyPPlan 60 T5/L1 1 No No Nuclear Plantable B-i15L3 _______ _________Operator (NLO #2) TS/L13_________________
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 PLANT OPERATIONS & SAPE SHUTPOWN
Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No___Operator (NLO #3) al -Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No'O p e ra to r (N L O # 4 ) _ __ab le_ _ _ _ _ __B-1_ _ _Non-Licensed EegnyPa 10 Nuclear Plant Emrec lnNANANo No___Operator (NLO #5) ___able_ _ __ _ __ __ _ ___-1_ __ _Emergency PlanN/NANoo 11 Fire Brigade #1 Nobl No" ~~~Emergency PlanNAN/Noo 12 Fire Brigade #2 Nobl No 13RP / Chemistry Emergency Plan 6T5L2No No 13 rechnician Table B-i1______
                                                ~-
______ ______14 RP Technician Emergency Plan 60T4/L2Noo
One Unit One Control Room Analysis #10 Station Blackout.
___able____
Mnim~um Oper#ations Cirew Ne essary: to Imple6m ent: AOPs .and EOPs or .SAMs Iif App#licab#le:j.';*::]:.**.: :;i; Line # Generic Title/Role                                     On-Shift Position                     Task Analysis
B-1_____ ________ T4/L6Noo 15 Security Contingency Plan / 60 N/A No No______________E-Plan Table B-i1 _______PNPS Page 64 PNPS Page 64 PNPS ON-SHIFT STAFFING ANALYSIS REPORT: ...... PNPS.- T.ABLE 2- IPL'ANT OPERATIONS SAFE SHUTDOWN:i ":: :*i : , M.nim m .Opeation Crew. Ne.essar to....mpl........e.....
________________Controlling              Method 1     Shft anaer                     SiftMangerLicensed                               Operator I     Shft Mnage                     Shit Maagerraining                               Program 2     Unit Supervisor                                       Control Room Supervisor               Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor                               Shift Engineer/STA                     Training Program 4 Ractr pertor#1Licensed                                         Nuclear Plant           Licensed Operator 4 RatrOeao#1Operator                                       #1                       Trainin* Program
..A.. ..... a ....d EO " ...r ......fA plcal.. .. ....I Line # Generic Title/Role On-Shift Position Task Analysis_____ ________________________________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator 1__ iftMange Shift_______________
      ,5 RatrOperator #2                                       Licensed Nuclear Plant                 Licensed Operator RatrOperator                                           #2                       Training Program 6     Auxiliary Operator #1                                 Non-licensed Nuclear                 Non-Licensed Operator
Manager_______Training Program 2 Unit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator
_____    _______________________Plant                     Operator #1                   Training Program 7     Auxiliary Operator #2                                 N/A                                   N/A 8     Other needed for Safe Shutdown                         N/A                                   N/A 9     Other needed for Safe Shutdown                         N/A                                   N/A 10   Other needed for Safe Shutdown                         N/A                                   N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role                                       On-Shift Position                     Task Analysis
#1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator______________________Operator
_____                                      _______________                       ontrolling Method 11        Mechanic                                               N/A                                   N/A 12        Electrician                                           N/A                                   N/A 13        l&C Technician                                         N/A                                   N/A 14      Other                                                   N/A                                   N/A 15        Other                                                 N/A                                   N/A Page 59 PNPS PNPS                                                                                                                      Page 59
#2 Nuler raining Program 6 &uxiliary Operator #1 Non-licensed Ncer Non-Licensed Operator Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations)
 
Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis_____ _______________Controlling Method 11 IMechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 O:ther N/A N/A PNPS Page 65 PNPS Page 65 PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade..........
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
:'" ...... ... "..... "' ... PN , 3 -. F REFIGHTiNG.':::
        *:*:i:**i!%***:*:*~yi*!::i*:&deg;*L*i!***P!NPs TABLE 3-FIREFIGHTING*?i!: :L:f&#xb8;ilG *:i~i!*~i!**iiii 1                                   N/A                                      N/A 2                                   N/A                                      N/A 3                                   N/A                                      N/A 4                                  N/A                                     N/A 5                                   N/A                                     N/A Note: The Station Blackout Analysis does not include the need for firefighting.
:: 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.
Page 60 PNPS PNPS                                                                                          Page 60
PNPS Page 66 PNPS Page 66 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ': I In-Plant Survey: N/A___2 On-site Survey: RP#1 onsite & XX XX XX XX X__SB surveys 3 'Personnel Monitoring:
 
N/A T Job Coverage:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT E  -                   , :10 ,:15i '!20* i25 30: 35!: 40 4:5 150' :55; *60.! *65 *70* 75 80 :85': 90,-
_N/A 5 Offsite Rad Ssessment:
1 In-Plant Survey:
Se._e Tble 5 6 Other site specific RP (describe):
N/A 2 On-site Survey:
RP#1 Issue X X X X X KI 7 Chemistry Function task #1 (describe)
N/A 3 Personnel Monitoring: _N/A T  Job Coverage:
N/A__
50Offsite Rad Assessment:
    ._Included in Table 5 6 Other site specific RP (describe):
N/A 7 Chemistry----------------------------                                                        ----
Function task #1 (describe)
N/A___
8 Chemistry Function task #2 (describe)
N/A__
Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.
PNPS                                                                                                Page 61
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca          nsfialyisn#10e                                        EmStationBlackout Delr1h          megnycasfiainlvl                    Shift Manager                        Training Program I EP (ECL)                                                                                  D:rills 2 pprove Offsite Protective Action                  NAEmergency                                        Planning 2 Recommendations                                    N/Araining                                      Program 3    Approve content of State/local notifications        Shift Manager                       Emraining    Progamnn Emergencyg  Planning 4    Approve extension to allowable dose                N/A                                  Emraining    Progamnn Lricnsed    OPeraorgra  inn Notification and direction to on-shift staff (e.g., ShitcanaerProra                                  /OEergerrancy    g 5 to assemble, evacuate, etc.)                        SitMngrPlanigTra                                    inin Pmrogramy EegnyPlanning Tann        rga 6    ERO notification                                    Shift Manager                       Emraining Progamnn Licensed Operator Training 7    Abbreviated NRC notification for DBT event          N/APrga Emrogenya      lnnn 8    Complete State/local notification form              Shift Manager                        Emraining    Progamnn Emrgencyg    Planning 9    Perform State/local notifications                  NLO#2                                Emraining    Progamnn Licensed Operator Training 10  Complete NRC event notification form                Shift ManagerPrga 11    civae EDS                    NO#2raiingProgram 11    *ctivte      EDS            kLO#2Emergency                                      Planning 12  Offsite radiological assessment                    Nl/A                                Emraining    Progamnn Emrgencyg    Planning 13  Perform NRC notifications                          NiLO#2                              Emraining    Progamnn Perform other site-specific event notifications                                        Licensed Operator Training (4re.g.,Duty Plant Manager, INPO, ANI, etc.)        __hift    ____Manager_____Program___
15    Personnel Accountability                          Security                            Security Training Program Page 62 PNPS                                                                                                                 Page 62
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11    - LOCA/General Emergency with Release and PAR
: 1. Accident Summary (Assumed for Staffing Analysis Purpose)
* The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.
: 2. Accident Specific Assumptions Made
* All actions for SAE are complete.
* No transients other than LOCA are considered.
* The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.
: 3. Procedures for Accident Response
* EP-IP-1 00, Emergency Classification and Notification
* EP-IP-1 00.1, Emergency Action Levels
* EP-IP-300, Offsite Radiological Dose Assessment
* EOP-05, Radiological Release
* EOP-01, RPV Control
* EOP-03, Primary Containment Control
* EOP-04, Secondary Containment Control
* EP-IP-400, PAR Page 63 PNPS PNPS                                                                                Page 63
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
: 4.          Tables
::'        *ii'      i**    : *          !:;:!:*ii*:*~     :!I APPENDIX P EN I B*,B !: : ::    :        *,i                      *~ '' ***        *.
                                                                          *!~Augmentationi    Role inTable # !*Unanalyzed:' TMS Req'uired?
T2/L1 T5/L1 T5/L2 T5/L3 1      Shift Manager                        Emergency Plan                         60               T5/L4                      No                      No Fable B-i                                              T5/L5 T5/L8 T5/LI10
____    ____      ___    ____    ____ ___        T5/L14            _  _  _  _  _  _  _  _  _    _  _  _ _
2     Control Room                          Emergency Plan                        N/A              T2/L2                      No                      No
____Supervisor                              Fable    B-I1______                                                                                ______
Shift Technical                      EegnyPa                                                                              oN 3      Advisor/Shift                        EerecPan6T2LNoo
___Eng]ineer          ( 3 rd SRO)            'able B-i10T2L Licensed Nuclear                      EegnyPa                                  /                2L 4      Plant Operator (RO                    Emrec                lnNAT/4No                                                                              No 1)able
_____                                          B-I Licensed Nuclear 5      Plant Operator (RO                    Emergency PlanN/T2LNoo
          )able                            T__      B-I                            /                2L                          oN Non-Licensed                          EegnyPa                                  /                 2L                        oN 6      Nuclear Plant                         EegnyPa                                  /                2L                          oN
___Operator          (NLO #1)              al        -
Non-Licensed                          -mrec                lnT5/L9 7                                            EmergencyPPlan                          60              T5/L1 1                    No                      No Nuclear Plantable B-i15L3                                                                                _______                  ______
___Operator          (NLO #2)                                                                    TS/L13_________________
Non-Licensed 8    Nuclear Plant                         Emergency Plan                          N/A                N/A                      No                      No
___Operator          (NLO #3)              al        -
Non-Licensed 9    Nuclear Plant                        Emergency Plan                          N/A               N/A                     No                      No
      'Op era to r (N L O # 4 )                  le_
___ab                                              _  _  __    __B-1_                                        __
Non-Licensed                          EegnyPa 10      Nuclear Plant                        Emrec                lnNANANo                                                                              No
___Operator          (NLO        #5)                                    ___able_              _  __  _  __          __    _  ___-1_                __  _
Emergency PlanN/NANoo 11     Fire Brigade #1                                                                                                          Nobl                    No
                    "                      ~~~Emergency PlanNAN/Noo 12     Fire Brigade #2                                                                                                          Nobl                    No 13RP      / Chemistry 13rechnician Emergency Table B-i1______
Plan                6T5L2No                            ______                  ______
No 14    RP Technician                         Emergency Plan                          60T4/L2Noo
___able____                          B-1_____            ________                  T4/L6Noo 15     Security                              Contingency Plan /                     60                N/A                     No                      No
______________E-Plan                  Table B-i1          _______
Page 64 PNPS                                                                                                                                              Page 64
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT
        .=.:*;.:.=:=:*:.....*:" PNPS.- T.ABLE 2- IPL'ANT OPERATIONS *&SAFE SHUTDOWN:i                                                            i:*i*..   ":::*i : ,
M.nimm            .Opeation Crew. Ne.essar              to....mpl........e.....
                                                                                ..      A..
                                                                                          .      ....a d EO  ....    "r ... . fA .....plcal..      ..  .... I Line # Generic Title/Role                                                              On-Shift Position                      Task Analysis
_____      ________________________________________Controlling                                                    Method 1__            iftMange 1      Shft        anaer                          SiftMangerLicensed Shift_______________
Manager_______Training Operator Program 2 Unit Supervisor                                                            Control Room Supervisor                Lricnsed OPeraogra 3 Shift Technical Advisor                                                    Shift Engineer/STA                      Lricnsed OPeraogra 4          RatrOeao#1Licensed                                                                      Nuclear Plant          Licensed Operator RatrOeao#1Operator                                                    #1                      Training Program 5 Reactor Operator #2                                                        Licensed Nuclear Plant                  Licensed Operator
______________________Operator                                        #2      Nuler            raining Program 6          &uxiliary Operator #1                                                  Non-licensed Ncer                      Non-Licensed Operator Plant Operator #1                      Training Program 7          &uxiliary Operator #2                                                    N/A                                    N/A 8          Other needed for Safe Shutdown                                          N/A                                    N/A 9          Other needed for Safe Shutdown                                          N/A                                    N/A 10          Other needed for Safe Shutdown                                          N/A                                    N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line #          Generic Title/Role                                                      On-Shift Position                      Task Analysis
_____                                                    _______________Controlling                              Method 11              IMechanic                                                                N/A                                  N/A 12              Electrician                                                              N/A                                  N/A 13              l&C Technician                                                            N/A                                  N/A 14              Other                                                                    N/A                                  N/A 15              O:ther                                                                  N/A                                    N/A Page 65 PNPS                                                                                                                                                        Page 65
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade
:'" "'  ... *- PN , *TABLE 3 -. F REFIGHTiNG.':::        ::
1                          N/A                                        N/A 2                          N/A                                        N/A 3                          N/A                                        N/A 4                          N/A                                        N/A 5                          N/A                                        N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.
Page 66 PNPS                                                                              Page 66
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ':
I In-Plant Survey:
N/A___
2 On-site Survey:
RP#1        onsite &                                  XX      XX      XX    XX        X
__SB  surveys 3 'Personnel Monitoring:
N/A T   Job Coverage: _N/A 5 Offsite Rad Ssessment: Se._e Tble 5 6 Other site specific RP (describe): RP#1 Issue         X X X X           X KI 7 Chemistry Function task #1 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A 8 Chemistry Function task #2 (describe)
N/A*Times are estimated.
N/A
Note: RP tasks are as directed by the Shift Manager and are not time critical.Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.
*Times are estimated.
PNPS Page 67 PNPS Page 67 PNPS ON-SHIFT STAFFING ANALYSIS REPORT L ine
Note: RP tasks are as directed by the Shift Manager and are not time critical.
; On-Shift  
Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.
::ii'!:Task Analysis'  
Page 67 PNPS PNPS                                                                                          Page 67
:, Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 ,pprove Ofisite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift Manager Training Program Emergency Planning 4 Approve extension to allowable dose Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notfictionN/AEmergency Planning 6 ER notfictionN/Araining Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann Program Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae ERS NO#2 ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 Ofsie raiolgicl asessentraining Program 12 Ofsie rdiolgicl asessentCheistr Tehniian Emergency Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 (,e.g., Duty Plant Manager, INPO, ANI, etc.) Shift Manager Program 15 Personnel Accountability N/A Security Training Program PNPS Page 68 PNPS Page 68 PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER PNPS Page 69 PNPS Page 69 PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE: Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.LOCATION: Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:
 
A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions PNPS Page 70 PNPS Page 70 PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown Site: PNPS Position:
PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line    i),::i*=:FUnction/ITask*;:':*;**:i              ; On-Shift Positioni*i ::ii'!:Task Analysis'     :,
Shift Mana~qer Line #: 1 Function jResponsibility (Task) Action Step ]Duration 1 .Safe Shutdown 1.1 Perform the procedure steps assigned the Shift Manager in procedure 2.4.143 Rev 48, Shutdown from Outside the Control Room.T=0 SM leaves the CR and directs his staff to implement assigned shutdown tasks[step 16(a), (b)] SM arrives at 1 minute power supply panel C511I (TB 23' (T=+I)RPS MG Room) and* Opens Reactor Protection System (RPS) logic Channel A, breaker A3* Opens RPS Channel B, breaker B3* Closes RPS Channel A, breaker A3* Closes RPS Channel B, breaker B3+2 -SM leaves 23' RPS MG 1 minute Room and obtains fuse pullers (T=+2)and safety equipment from the 23'Switchgear Room-SM leaves 23' Switchgear Room 1 minute________________________ (T=+3)[Step 16(d)] T+3 -SM arrives at 23' Cable Spreading Room.Opens panels C941 and C942* Removes fuse 1 6A-F10OA* Removes fuse 16A-F11A* Removes fuse 1 6A-FI12A* Removes fuse 16A-F10B* Removes fuse 16A-F11B* Removes fuse 1 6A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.TASK : :,, :, 1 minute (T=+4)PNPS Page 71 PNPS Page 71 PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION:
Emergency Planning 1     Declare the emergency classification level         Shift Manager           Training Program / EP (ECL)                                                                     Drills 2 ,pprove Ofisite Protective Action                 SitMngrEmergency                     Planning 2 Recommendations                                     ShfTangrraining                   Program Emergency Planning 3     Approve content of State/local notifications       Shift Manager           Training Program Emergency Planning 4     Approve extension to allowable dose                 Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager           Program / Emergency to assemble, evacuate, etc.)                                               Planning Training Program 6   ER       notfictionN/AEmergency                                   Planning 6     ER     notfictionN/Araining                                 Program 7   Abbreviated NRC notification for DBT event         N/A                     Lcne         prtrTann Program Emergency Planning 8     Complete State/local notification form             Shift ManagerrangPorm Emrgencyg   Planning 9   Perform State/local notifications                   NLO#2                   Emraining   Progamnn Licensed Operator Training 10   Complete NRC event notification form               Shift ManagerPrga 11 civae ERS                     NO#2                       ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl                                               Program 12 asessentCheistr Ofsie rdiolgicl                         Tehniian     Emergency Planning 13     Perform NRC notifications                         NLO#2                   Emraining   Progamnn Perform other site-specific event notifications                           Licensed Operator Training 14     (,e.g., Duty Plant Manager, INPO, ANI, etc.)       Shift Manager           Program 15     Personnel Accountability                           N/A                     Security Training Program Page 68 PNPS                                                                                                   Page 68
6 minutes Function Responsibility (Task) Action Step Duration 2.Emergency  
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER Page 69 PNPS PNPS                                                    Page 69
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE:
Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.
NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.
LOCATION:
Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:
A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions Page 70 PNPS                                                                                           Page 70
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)
Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown                   Site:     PNPS Position:   Shift Mana~qer               Line #:   1 Function         jResponsibility (Task)             Action Step                           ]Duration 1 .Safe           1.1 Perform the procedure       T=0 Shutdown          steps assigned the Shift         SM leaves the CR and directs his Manager in procedure             staff to implement assigned 2.4.143 Rev 48, Shutdown         shutdown tasks from Outside the Control Room.
[step 16(a), (b)] SM arrives at         1 minute power supply panel C511I (TB 23'         (T=+I)
RPS MG Room) and
* Opens Reactor Protection System (RPS) logic Channel A, breaker A3
* Opens RPS Channel B, breaker B3
* Closes RPS Channel A, breaker A3
* Closes RPS Channel B, breaker B3
                                                    +2 - SM leaves 23' RPS MG               1 minute Room and obtains fuse pullers           (T=+2) and safety equipment from the 23' Switchgear Room
                                                    - SM leaves 23' Switchgear Room         1 minute
________________________      (T=+3)
[Step 16(d)] T+3   - SM arrives at     1 minute 23' Cable Spreading Room.               (T=+4)
Opens panels C941 and C942
* Removes fuse 16A-F10OA
* Removes fuse 16A-F11A
* Removes fuse 1 6A-FI12A
* Removes fuse 16A-F10B
* Removes fuse 16A-F11B
* Removes fuse 16A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed
[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.
TASK:                         :,,   :,
Page 71 PNPS PNPS                                                                                                  Page 71
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION:               6 minutes Function             Responsibility (Task)               Action Step                             Duration 2.Emergency         2.1 Maintain emergency              1                                      The Shift Direction and        direction and control of the        Oversight of the emergency              Manager Control              event response.                    response.                              maintains radio 2                                      contact with crew Initiate any emergency actions,        for updates and NOTE                    directions The TMS is for the overlap period.
The total time considered for this task should be concurrent with Task 1.
              ....                                          D..FEMERGENCY
: di====,=*ii*::"*==:*i:* .......=*!*TOTAL              TASK DURATION          6 Miue RESULT:
Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks:
The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.
The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.
The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.
Task Performer                  Richard Probasco            Shift Manager              August 23, 2012 Evaluators                      Stephen Reid                Operations Training        August 23, 2012 Fred Guynn                  Fleet EP Project          August 23, 2012 S______________________        Manager                  ___________
SThomas      Diorio            Pilgrim I&C (EP)          August 23, 2012 Page 72 PNPS PNPS                                                                                                        Page 72
 
PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures
: 1.      The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function. It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.
: 2.      The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.
: 3.      The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.
Page 73 PNPS PNPS                                                                                            Page 73


===2.1 Maintain===
PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES
emergency 1 The Shift Direction and direction and control of the Oversight of the emergency Manager Control event response.
* NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities
response.
* NSIR DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants
maintains radio 2 contact with crew Initiate any emergency actions, for updates and NOTE directions The TMS is for the overlap period.The total time considered for this task should be concurrent with Task 1.....D..FEMERGENCY
* PNPS Emergency Plan, Rev 39 XI. STAFFING ANALYIS TEAM
:
* Fred Guynn, Entergy ECH Sr Project Manager, EP
.......
* Myra Jones, CMCG Contractor
TASK DURATION 6 Miue RESULT: Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks: The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.
* Tom White, PNPS Manager   - EP
The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.Task Performer Richard Probasco Shift Manager August 23, 2012 Evaluators Stephen Reid Operations Training August 23, 2012 Fred Guynn Fleet EP Project August 23, 2012 S______________________
* Mike McDonnell, PNPS AOM, Operations Support
Manager ___________
* Barbara Nadeau, PNPS Radiation Protection
SThomas Diorio Pilgrim I&C (EP) August 23, 2012 PNPS Page 72 PNPS Page 72 PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures 1. The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function.
* Kenneth Sejkora, PNPS Chemistry
It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.2. The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.3. The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.PNPS Page 73 PNPS Page 73 PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES
* Ashley Ohrenberger, PNPS Ops Training
* NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities
* Karen Sullivan, PNPS EP Planner
* NSIR DPR-ISG-01, Interim Staff Guidance -Emergency Planning for Nuclear Power Plants* PNPS Emergency Plan, Rev 39 XI. STAFFING ANALYIS TEAM* Fred Guynn, Entergy ECH Sr Project Manager, EP* Myra Jones, CMCG Contractor
* Robert Emmitt, PNPS ERO Training Page 74 PNPS                                                                                 Page 74}}
* Tom White, PNPS Manager -EP* Mike McDonnell, PNPS AOM, Operations Support* Barbara Nadeau, PNPS Radiation Protection
* Kenneth Sejkora, PNPS Chemistry* Ashley Ohrenberger, PNPS Ops Training* Karen Sullivan, PNPS EP Planner* Robert Emmitt, PNPS ERO Training PNPS Page 74 PNPS Page 74}}

Latest revision as of 06:54, 5 February 2020

Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-Shift Chemistry Technician
ML16021A459
Person / Time
Site: Pilgrim
Issue date: 01/14/2016
From: Dent J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.16.001
Download: ML16021A459 (94)


Text

EntegyiNuclear OPoerSationsIc

  • 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.

Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001

SUBJECT:

Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001

Reference:

1. PNPS Letter to NRC,

Subject:

"Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (2.06.062).

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).

The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).

The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1)

.using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration. The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).

Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment within*30 days.

If you have any questions regarding the subject matter, please contact Everett P.

Perkins at (508) 830-8323.

This letter contains no new or revised regulatory commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the /'4" day of (_/2,j z

~,2016.

!*hn A. Dent, Jr.

ite Vice President Attachment 1
Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization."

Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman, John Priest, Director, Project Manager Massachusetts Department of Public Health Division of Operating Reactor Licensing Radiation Control Program Office of Nuclear Reactor Regulation Commonwealth of Massachusetts U. S. Nuclear Regulatory Commission 529 Main Street, Suite 1M2A one White Flint North O-8C2-A Charlestown, MA 02129-1121 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 John Giarrusso, Jr.

U.S. Nuclear Regulatory Commission Planning and Preparedness Section Chief 2100 Renaissance Blvd, Suite 100 Mass Emergency Management Agency King of Prussia, PA 19406-2713 400 Worcester Road Framingham, MA 01702 NRC Resident Inspector Pilgrim Nuclear Power Station

ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)

Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS

1.0 DESCRIPTION

2.0 PROPOSED CHANGE

3.0 BACKGROUND

4.0 TECHNICAL ANALYSIS

5.0 REGULATORY ANALYSIS

AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination 5.3 Environmental Consideration

6.0 REFERENCES

1

Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT

1.0 DESCRIPTION

Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.

Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b) and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."

2.0 PROPOSED CHANGE

Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician. Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).

Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event.

_Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks:

o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.

3.0 BACKGROUND

The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2

Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..."

10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.

NUREG-0654 (Reference 6.2),Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements. The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks). -

The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments. The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations. NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.

On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions. Specifically,Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan."

Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance - Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis. The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.

The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).

3

Attachment I to PNPS Letter 2.16.001

4.0 TECHNICAL ANALYSIS

4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.

The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant) functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).

In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s); and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians. This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).

In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations. The basis for our conclusion is contained in the enclosed safety evaluation. In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.

At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation. Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4

Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.

Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.

Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal. The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.

Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.

  • The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.
  • The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.

o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.

4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training. Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment."

5

Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.

The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position. The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.

The OSA is included in this submittal as Attachment 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.

5.0 REGULATORY ANALYSIS

AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,

  • 10 CFR 50.47(b)(2) - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
  • 10 CFR 50, Appendix E,Section IV.A (in part) - The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
  • NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part "The criteria and recommendations in this regulatory guide are methods that the 6

Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*

met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness."

In NUREG-0654,Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard. Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement. Evaluation Criteria l1.B.5 states, in part, that:

Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity. For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies."

Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q). In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.

Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2). The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement. As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.

Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.

7

Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.

5.2 No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed training requirements change has no effect on normal plant operation or on any accident initiator. The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.

Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the "on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.

Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency. It has been evaluated and determined not to significantly affect the ability to perform required or related functions. It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions. The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.

8

Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change does not affect plant design or method of operation.

10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability. Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel. A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.

The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.

Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

  • 5.3 Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.

9

Attachment I to PNPS Letter 2.16.001

6. REFERENCES 6.1. Entergy Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062) 6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.

6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).

6.4. James Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station - Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule."

6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance - Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).

6.7. Entergy Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007) 10

ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page) to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i: Minimum Staffino Renuirements for the PNPS ERO-( 1 )

Functional Area Major Task TOnshift

+/-Pos.No. Position Title Rs

________________ ponse Plant.Operations Plant Stabilization +/- 1 Shift Manager On Shift#

Assessment of Operational Accident Mitigation 2 Control Room Supervisor On Shift#

Aspects 3,4 Lic. Nuc. Plant Operator (2) On Shift#

______________________ 5.6 Unlic. Nuc. Prant Operator (2)**FB On Shift#

"Emerg'ency Direction Emergency Classification j1) Shift Manager On Shift#

Emergency Control PARs t IEmergency (1) Shift Manager Director On Shift#

60 mai.

Emerg*ency Plant Ops Supv 60 min.

Notification and Notification of PNPS, Local, (1) Shift Manager On Shift#

Communications Commonwealth, and Federal personnel 7 Unlic. Nuc. Plant Operator On Shift#

and Maintain Communications Offsite Communicator 30 min.

EOF Communicator 60 min.

ENS Communicator 60 mai.

Rad Accident Assessment!.... EOF Direction EOF Managter, 60 mai.

Ops Accident Assessment Offsite Dose Assessment (8) RP Technician*** On Shift#

Support (9) Radio Chem. Technician**" On Shift#

Radiolog:ical Assessment Coord 30 mai.

Offsite Surveys OMT Member (2) 30 mai.

OMT Member (2) 60 min.

Onsite and'ln-plan't Surveys 8 RP Technician On Shift#

RP Technician (2) 30 min.

RP Technician (2) 60 mmn.

Chemistry / Radiochemistry 9 Radio Chem. Technician On Shlft#

_____Radio Chem. Technician 60 mai.

Plant System Engineering TSC / OSC Direction Emergency Plant Manager 60 mai.

Repair and Corrective Actions Technical Support 10 Engineer (Shift Control Rm)* On Shift#

Engineer (Reactor) 30 mai.

Engineer (Mechanical) 60 mai.

_________________________Englineer (Electrical) 60 min.

Eguipment Repairs _____Nuclear Maint. Technician 30 min.

Corrective Actions Nuclear Maint, Technician 60 main 11 Unlic. Nuc. Plant Operator On Shift#

m 12 Nuc. Plant Reactor Operator *FB On Shift#

Nuc. Plant Reactor Operator 60 min.

Nuclear Maint. (ElectnicalX2) 30 mai.

Nuclear Maint. (Electrical) 60 min.

________________________________Nuclear Control Technician(2) 30 mai.

Protective Actions (In Plant) Radiation Protection, Access Control, (8), (9) RP Technician (2)*0 On Shift#

RP Coverage, Personnel Monitoring, RP Technician (2) 30 mai.

and Dosimetry _____RP Technician (2) 60 mai.

Fire Fighting 13, 14 Fire Brigade*, (3 **, 2 [NLO or Sec]) On Shift#

____________________ _____Plymouth Fire Dept. On Call Rescue Ops and First Aid EMP** On Shitt#

________________________Ambulance Service ... On Call Site Access Control and Security Security Force* On Shift#

Personnel Accountability _____________________

n* un onirtowner PNPS - person assaiu controlled ro oe areas or on on snurt wnen, ounng the connecting normar roads or au~nonrzeo between Station nours, them withoventime that person Management is witnin tie approval.

  • Position staffed In accordance with technical specifications.
    • Position staffed in accordance with technical specifications and station procedures.
    • May be provided by shift personnel assigned other functions.

.. .(EMP) Emergency Medical Personnel: individuals qualified as EMPs, RNs, First Responders, and Paramedics.

NOTES: Response times are based on optimum travel conditions.

On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.

On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions #13 and #14 are available to support Shift Manager, where qualified, in non-fire events.

(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E,Section IV. A. 9 and maintained as a separate document.

B-7 Revision 44

ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)

Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training I Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task On-site

  • Operations Support Center Pool
  • Operations Support Center Pool *The 2012 OSA ensured that PNPS and In- Member Qualification Member Qualification ERO team members can accomplish Plant
  • Respirator User Qualification
  • Perform Radiation Surveys the required mission in the first 90 Surveys
  • Self-Contained Breathing Apparatus
  • Perform Contamination Surveys minutes of ERO activation with the User Qualification
  • Operate Basic Dose Rate Meters current on-shift ERO staff defined in
  • Walkdown EOP-4 survey point * -Operate Basic Count Rate Meters Table B-I.

locations

  • Perform Radiation Surveys
  • Perform Contamination Surveys
  • Collect an Airborne Radioactivity Sample
  • Analyze Smears for contamination levels
  • Analyze Air Samples
  • Operate Basic Dose Rate Meters
  • Operate Basic Count Rate Meters
  • Operate the Scintillation Alpha Counter
  • Operate the Beta Counter
  • Operate the Gamma Spec System
  • Operate the Regulated Air Sample Pump
  • Operate the Radeco Air Sampler 1

Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /

Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task Access *Operations Support Center Pool

  • Operations Support Center Pool *The 2012 OSA ensured that PNPS Control Member Qualification Member Qualification ERO team members can accomplish
  • RWP Briefing minutes of ERO activation with the
  • Perform Stay Time Calculations current on-shift ERO staff defined in
  • Issue and Return Respirators Table B-i.

RP . Operations Support Center Pool

  • Operations Support Center Pool *The 2012 OSA ensured that PNPS Coverage Member Qualification Member Qualification ERO team members can accomplish for repair,
  • Respirator User Qualification
  • Perform Radiation Surveys the required mission in the first 90 corrective
  • SCBA User Qualification
  • Perform Contamination Surveys minutes of ERO activation with the actions,
  • RP Job Coverage
  • Operate Basic Dose Rate Meters current on-shift ERO staff defined in search and
  • Operate Basic Count Rate Meters Table B-I.

rescue first

  • RWP Briefing aid

& Perform Stay Time Calculations firefighting

  • Perform Radiation Surveys
  • Perform Contamination Surveys
  • Collect an Airborne Sample
  • Analyze Smears
  • Analyze Air Samples
  • Operate Basic Dose Rate Meters
  • Operate Basic Count Rate Meters
  • Operate the SAC-4
  • Operate the BC-4
  • Operate the Gamma Spec System
  • Operate the RAS Pump
  • Operate the Radeco
  • Perform RP Duties in Response to a Plant Fire___________________

2

Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /

Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task Personnel

  • Operations Support Center Pool
  • Operations Support Center Pool
  • The 2012 OSA ensured that PNPS Monitoring Member Qualification Member Qualification ERO team members can accomplish
  • RP Job Coverage the required mission in the first 90
  • RWP Briefing minutes of ERO activation with the
  • Perform Personnel Decontamination current on-shift ERO staff defined in Table B-I.

Dosimetry

  • Operations Support Center Pool
  • Operations Support Center Pool
  • No effective change is identified Member Qualification Member Qualification
  • Issue and Control Personnel
  • Issue Dosimetry Dosimetry OSA Notes:
1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear PowerPlants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.
3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position. NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician. The PNPS SEP is consistent with the NEI guidance.
4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.
5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.

3*

ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)

PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by:

Myra Jones Fred Guynn

PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION..................................................................................... 4 II. ANALYSIS

SUMMARY

............................................................................. 4 A. Emergency Plan Minimum Staffing.................................................................... 5 B. Other Commitments to Shift Staffing........................................................... ....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) .............................................. 6 D. Emergency Plan Tasks Not Analyzed ................................................................ 7 III. ANALYSIS PROCESS .............................................................................. 8 IV. ACCIDENT SCENARIOS ...... ..................................................................... 9 A. Accident Selection........................................................................................ 9 B. Accident Scenarios included in the Analysis ,...................................................... .. 9 C. Accident Scenarios Not Included in the Analysis .................................................. 10 V. GENERAL ASSUMPTIONS AND LIMITATIONS................................................ 11 A. Notes and Assumptions Applicable to Pilgrim OSA: .............................................. 11 B. NEI 10-05 Assumptions .................. ......... ................................................... 11 VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS ..................................... 14 Vii APPENDIX B - ON-SHIFT STAFFING ANALYSIS............................................. 16 A. Accident Analysis #1 - Design Basis Threat (DBT)............................................... 16 B. Design Basis Accident Analysis #2 - Control Rod Drop Accident.............................. 21 C. Design Basis Accident Analysis #4 - Loss of Coolant Accident................................ 27 D. Design Basis Accident Analysis #5 - Main Steam Line Break .................................. 33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident .................................. 39 F. Accident Analysis #8 - Aircraft Probable Threat .................................................. 45 G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown.................. 51 H. Accident Analysis #10 - Station Blackout........................................................... 57 I. Accident Analysis #11 - LOCA/General Emergency with Release and PAR ................ 63 VIIIAPPENDIX C TIME MOTIONS STUDIES....................................................... 69 A. TMS Shift Manager Safe Shutdown Task........................................................... 69 PNPS Page 2

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED ............... 73 A. Overlap Requiring Compensatory Measures ..................................................... 73 X. REFERENCES ................................................................................... 74 XI. STAFFING ANALYIS TEAM .................................................................... 74 Page 3 PNPS Page 3

PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19 - 22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstratingthat on-shift personnel assigned emergency plan implementation functions are not assigned responsibilitiesthat would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.

I. ANALYSIS

SUMMARY

The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:

  • Emergency Direction and Control
  • Fire Fighting (FB)
  • Accident Assessment
  • Radiation Protection and Chemistry
  • Notification/Comnmunication
  • Technical Support
  • Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks. These include Repair and Corrective Action, Rescue Operations and First Aid.

Page 4 PNPS Page 4

PNPS ON-SHIFT STAFFING ANALYSIS REPORT A. Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of § 50.47(b).

The following table indicates the result of the NEI 10-05 staffing analysis of on-shift

-personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.

Licensing Basis On-Shift Position 4 Requirement E-Plan Functional Area Staffing Analysis Results 50.54m Emergency Direction and Shift Manager (SM) E-plan Table B-I Control SSD (TMS for SSD1 actions)

Control Room Supervisor 50.54m (CRS) E-plan Table B-I1S Shift Control Room E-plan Table B-I1ehia upr Engineer (STA)

Licensed Nuclear Plant 50.54m SSD -

Operator (RO #1 ) E-plan Table B-i Licensed Nuclear Plant 50.54m SSD1 Operator (RO #2) E-plan Table B-i Non-Licensed Nuclear E-plan Table B-i SSD2 Plant Operator (NLO #1")1 Non-Licensed Nuclear E-plan Table B-i E-Plan Communicator Plant Operator (NLO #2)______ Notifications 3 1 Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #3)

Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #4)

Non-Licensed Nuclear E-plan Table B-i1B PlantOperator_(NLO_#5) _________

Chemist E-plan Table B-1 Accident1 Assessment/Chemistry1 RP #1 E-plan Table B-i Radiation Protection 1 Fire Brigade #11 E-plan Table B-i FB 1 Fire Brigade #21 E-plan Table B-i FB 1 E-plan Table B-i Per Security Security Security Accountability Contingency

_____________ Contingency Plan _____________ Plan TOTAL 14 1

Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.

2 SSD NLO can be filled by RO or SRO.

3 E-Plan Communicator can be replaced by SRO that is qualified for the task.

4 One of the 5 NLOs is a Radwaste Operator PNPS Page 5

PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)

1. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment. In addition, the RP Technician shares the responsibility for dose assessment. It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment. No further analysis or TMS is required.
2. The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.
3. The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function. No further analysis TMS is required.
4. A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.

Details of the TMS are found in section VIII Appendix C.

Page 6 PNPS Page 6

PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed

' 1. Repair and Corrective Action - Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks. Repair and corrective action is defined as:
  • An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.

In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:

  • Unplanned/unexpected actions that address equipment failures. These actions are contingent in nature and cannot be specified in advance.

At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.

Initial corrective actions are contained in and controlled by plant operating procedures. The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required. Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed

2. Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response. Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks. The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed. Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.

Page 7 PNPS Page 7

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP) personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments. Additionally, personnel from Security provided input to the analysis when necessary. The team members are identified in Section Xl of this report.

The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.

Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation. These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate. In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.

The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -

ON-SHIFT STAFFING ANALYSIS. Note that NSIR DPR-ISG-01 states that only DBA accidents "which would result in an emergency declaration" should be evaluated in the staffing assessment.

Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description. If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds. In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.

Page 8 PNPS Page 8

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection

1. The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance - Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents. The scenarios considered were:
  • Design Basis Threat (DBT) ground assault
  • DBA Loading Error Accident
  • DBA Loss of Coolant Accident
  • DBA Fuel Handling Accident
  • DBA Radwaste System Accident
  • Aircraft Probable Threat
  • Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,
  • Station Blackout, (SBO)
  • LOCA/General Emergency with release and PAR a LOCA with entry into Severe Accident Management

B. Accident Scenarios included in the Analysis

1. Design Basis Threat as described in NE! 10-05
  • Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed
2. Control Rod Drop Accident as described in FSAR 14.5.1

Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment. EAL is based on condenser release information in FSAR.

3. Loss of Coolant Accident as described in FSAR 14.5.3
  • Double ended guillotine break of a recirculation line. All ECCS operate

- as designed. EAL is based on fission product barrier EALs.

4. Main Steam Line Break Accident as described in FSAR 14.5.4
  • Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).

PNPS Page 9

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.

5. Fuel Handling Accident as described in FSAR 14.5.5
  • The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.
6. Aircraft Probable Threat (50.54hh)
  • Notification is received from the NRC that a probable aircraft threat exists

(>5 minutes, <30 minutes)

7. Control Room Fire and Alternate Shutdown
  • A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.
8. Station Blackout
9. General Emergency with release and "PAR
  • Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).

C. Accident Scenarios Not Included in the Analysis

1. Loading Error Accident as described in ESAR 14.1.5.2
  • Misloaded bundle in the core. No EAL condition is met.
2. Radwaste System Accident as described in FSAR 14.5.6
  • No EAL condition is met.
3. Implement SAMG
  • A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators. No analysis required.
4. Appendix R Fire
  • Fire leading to reactor trip with complications. The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis. No additional analysis required.

Page 10 PNPS Page 10

PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA:

1. The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).

Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.

2. The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
3. The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated. No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration. Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.
4. All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.

B. NEI 10-05 Assumptions

1. Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)
2. On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
3. Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.
4. Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.
5. On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.

PNPS Page 11

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas) without the aid of a RP technician.
7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.
8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.
9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.
10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.
12. Communications, briefings, and peer checks are acceptable collateral duties.
13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]
14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.
16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as "Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation. As a result, a greater number and variety of actions would need to be implemented by plant personnel."
17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -

Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.

PNPS Page 12

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.
19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.
20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.
21. Severe Accident Management Guideline (SAMG) - It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.
22. SAMG - The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure),

and there is not actual or imminent challenge to containment integrity.

Page 13 PNPS Page 13

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS tEe E e t ...... '"== . . :I Plant...

S~ummary....Descriptioniof~i .... :* : Refe~rence=......i'*:' "= **: ' Analysis*:i*

iEn t:;:, ype- ::::::: Event.Mode..Document:s) Event ECL.

1 DBT Land and/or waterborne 1 NEI 10-05 Site Area Yes HOSTILE ACTION Emergency directed against the ISG IV.C Protected Area by a HOSTILE FORCE.

2 DBA Control Rod Drop Accident 1 FSAR 14.5.1 Site Area Yes Emergency 3 DBA Loading Error Accident 1 FSAR 14.5.2 None Noz (misloaded bundle in the

______core) 4 DBA Loss of Coolant Accident 1 FSAR 14.5.3 General Yes

______Emergency 5 DBA Main Steam Line Break 1 FSAR 14.5.4 Site Area Yes Emergency 6 DBA Fuel Handling Accident 5 FSAR 14.5.5 Site Area Yes Emergency 7 DBA Radwaste System 1 FSAR 14.5.6 None No*

Accident 8 Assumed Aircraft Probable Threat 1 10CFR50.54hh Alert Yes for (1) analysis purpose RG 1.214 9 Assumed Control Room Evacuation 1 FSAR 14.6.1 Alert Yes for and Alternate Shutdown Analysis (fire in main control room) I0CFR50 Purpose Appendix R Fire Hazard Analysis 10 Assumed Station Blackout 1 ISG IV.C Site Area Yes for Emergency analysis purpose 11 Assumed LOCA - General 1 ISG IV.C General Yes for Emergency with Emergency Analysis radiological release and

____Purpose PAR 12 Assumed LOCA with entry into 1 ISG IV.C General No*

for severe accident Emergency Analysis procedures.

Purpose ________________________ _____

Page 14 PNPS Page 1.4

PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13 Assumed Appendix R Fire I ISG IV.C AlertNo for Analysis

____ Purpose _____________ ____ _______

1 Plant mode per FSAR or assumed for anaiysis purpose 2

No EAL met on plant condition or dose.

3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators. The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity. PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.

4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown. Analysis is not required.

Page 15 PNPS Page 15

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] - ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 - Design Basis Threat (DBT)

1. Accident Summary
  • Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition
2. Accident Specific Assumptions Made
  • This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.
  • Assume at power in Mode 1
  • Security notifies the Shift Manager of condition Security Code RED.
  • Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.
  • Assume all systems function and the core remains covered. No fuel damage and no release.
3. Procedures Reviewed for Accident Response
  • Procedure 5.3.14, Security Incident
  • EP-IP-1 00, Classification and Notifications
  • Procedure 2.1.6, Reactor Scram Page 16 PNPS Page 16

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables PNPS V-ON-SHIFT TABLE POSITION T2/L1 T5/L1 T5/L3 1 Shift Manager Emergency Plan 60 T5/L5. No Yes Table B-i T5/L6 T5/L8 T5/L10

_______________T5/L 14 _ _ _ _ _ _ _ _

2Control Room Emergency PlanN/T2LNoo Supervisor Table B-I Shift Technical EegnyPa 2L 3 Advisor/Shift Engineer ablrenc B-i n 60 T2/L3 No No (3 rd SRO) Table_____B-1 ___T5___L__

Licensed Nuclear EegnyPa / 2L oN 4 Plant Operator (RO ablrencB-iN/ 24NoN Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrencB lai N/A T2/L5 No No*

Non-Licensed 6 Nuclear Plant Emergency Plan N/A T2/L6 No No O)perator (NLO #1) abe-Nlon-Licensed T5/L9 7 . cea lat Emergency Plan 60 T5/L1 1 No No Nuclea Plant able B-i Operator (NLO #2) _______ T5/L1 3 ____

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #f4) al -

Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -

ii Fire Brigade #1 Emergency Plan N/A N/A No No

______________ Table B-I1________ _____

12 Fire Brigade #2 Emergency Plan N/A N/A No No

______________ Table B-I1________ _____

13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-I1________ _____

14 RP Technician Emergency Plan 60 N/A No No

_____ ____ Table B-I1________ _____

Security Contingenc) 15 Security Plan / E-Plan Table 60 T5/Li15 No No

_____ ____ B-i1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

PNPS Page 17

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS &SAFE SHUTDOWN.

~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable

Licensed Operator Training 1 Shift Manager Shift Manager Program Superisoricensed Operator Training 2 Unit Supervisor Control Room Sprio Program Licensed Operator Training 3 Shift Technical Advisor Shift Engineer/STA Program 4Licensed Nuclear Plant ~Licensed Operator Training RatrOeao#1Operator #1 Program 5Licensed Nuclear Plant Licensed Operator Training RatrOeao#2Operator #2 Program 6 uiliry pertor#1Non-licensed Non-Licensed Operator 6___ Auxi___iary ___Operator_______Plant Operator Nuclear
  1. 1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 IOther needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A Nl/A 13 I&C Technician N/A Nl/A 14 Other N/A N/A 15 Other N/A Nl/A Page 18 PNPS PNPS Page 18

PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie PeromdbrakAayi ontetoProligramehd 1 N/A Fire Protection Program 2 N/A Fire Protection Program 3 N/A Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.

1n-#ntSrvy DBTiThreati 2 Srvy n-it 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):

N/A N/A 6 Othermistey spectific task #1 (describe)

N/__

A__

Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions. RP and Chemistry take cover as directed.

I:.. PNSTAL~5-EMERGENCY :PLAN I:MPLEMENTATION :::, :: .

PNPS Page 19

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level Shift Manager Emergency Planning Training 1 ECL)Program / EP Drills Approve Offsite Protective Action NAEmergency Planning Training N/AcmenaiosProgram 3 Approve content of State/local notifications Shift Manager Pmrogram Plnin rann Emergency Planning Training 4 Approve extension to allowable dose N/A Program Licensed Operator Training Notification and direction to on-shift staff SitMngr Porm/EegnyPann

( e.g., to assemble, evacuate, etc.) SitMngr .raiigra P mrogram ,Pnnn Emergency Planning Training 6 ERO notification Shift Manager Program Abbreviated NRC notification for DBT SALicensed Operator Training 7event TAProgram 8 Complete State/local notification form Shift Manager Pmrogram Plnin rann EmrogenyPlninarann 9 Perform State/local notifications NLO#2 Pmrogram Plnin rann Program 11 Ativae EDS NO#2Emergency Planning Training 11 civae ERS NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment asmtos rga Ememtns rogenyPlninarann 13 Perform NRC notifications NLO#2 Pmrogram Plnin rann Perform other site-specific event Licensed Operator Training 14 notifications (e.g., Duty Plant Manager, Shift Manager Prga INPO, ANI, etc.) Program_________________

15 Iersnne Accuntbilty SecuityOffcer Security Training Program / EP 15 Prsonel ccontablit Secrit Offcer Drills Page 20 PNPS Page 20

(

PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2 - Control Rod Drop Accident

1. Accident Summary
  • The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position. It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity. The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
  • The worst case CRDA occurs during mechanical vacuum pump operation. The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment. The condenser leakage scenario is bounding for PNPS.
2. Accident Specific Assumptions Made
  • The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.
  • The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.
  • The EAL is based on 1-hr (1/2) of the FSAR EAB dose.
3. Procedures Reviewed for Accident Response
  • EIP-IP-1 00, Classification and Notification
  • EIP-EP-410, Evacuation and Assembly
  • EOP-5, Radiological Release Control
  • 6.1-220, Radiological Controls for Risk Evolutions
  • ARP-C904LC Alarm Response Procedure
  • 7.4.64, PRM Alarm Response
  • 7.3.11, Reactor and Hotwell Water Analysis Preparation Page 21 PNPS Page 21

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables T5/L3 T5/L5 Emergency Plan 60 No5Yes I Shift Manager Table B-I T5/L6 NoYe T5/L8 T5/L 10

______ ______T5/L14 ______

2Control Room Emergency PlanN/T/LNoo Supervisor Table B-I Shift Technical EegnyPa 2L oN 3 Advisor/Shift EmrecPan6T2L Noo Eng]ineer (3 rdSRO) Table B-I16 Licensed Nuclear EegnyPa /

4 Plant Operator (RO Emrec lnNAT2/L4 No No I) ~~~~able B-I1______

Licensed Nuclear EegnyPa /

5 Plant Operator (RO Emrec lnNAT2/L5 No No 2)Table B-i Non-Licensed EegnyPa /

6 Nuclear Plant Emrec lnNAT2/L6 No No

'Op e ra to r (NLO #1) T a b le B-I1_ _ _ _ _ _ _ _ _ _ _ _ _

Nlon-Licensed Emrec lnT5/L9 7 Nluclear Plant Emrec ln60 T5/L11I No No Operator (NLO #2) Fable B-I

_________T5/L13 Nlon-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -

Non-Licensed Emergency PlanN/NANoo 9 Nuclear Plant aeB-N/NA Noo Operator (NLO #4) al -

Non-Licensed IEmergency PlanN/Noo 10 Nuclear PlantN/NA Noo Operator (NLO #5) beB- /

11 Fire Brigade #1 Emergency PlanN/NANoo

_______ _______ able B-i1/ / oN 12 Fire Brigade #2 Emergency Plan N/A N/A No No

______________ Fable B-I1________

13 RP / Chemistry IEmergency Plan 60 T5/L12 No No Technician *able B-i1________ _____

14 RP Technician Emergency Plan 60 T4/L1 No No

__________ _____ able B-I1_ _ _ __ _ _ _

Security Contingencyl 15 Security P*lan / E-Plan Table 60 T5/L1 5 No No L /,:*:**!

!iS*'I::::!**!:*i *!* PNPS* TABLEE2 - PLANT OE p RkTIQNS :&* SAoFE* SHUTDO*WN!*I ° I PNPS Page 22

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

%i~~~~ii*~O e nit -*O..........

ne :Control

  • =* R*.......:

oom :,".....

=,,*=::;=*

2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method Licensed Operator Training 1 Shift Manager Shift Manager Program SuperisorLicensed Operator Training 2 U~nit Supervisor Control Room SuevsrProgram 3 Shft echicalAdvsorLicensed Operator Training 3 Sif Tchica AviorShift Engineer/STA Program Licensed Nuclear Plant Licensed Operator Training 4 Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant Licensed Operator Training 5 Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6 uxliryOpraor#1Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis

________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A

,14 O3ther N/A N/A 15 Other N/A N/A Page 23 PNPS Page 23

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade h*":::::}:;: *:  :.: i , Analysis~#2 Control Rod Drop =Accident=',,*:' =,;= :.:!*- i¢ J:

1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The CRDA does not include the need for firefighting.

PNS ag 2 PNPS Page 24

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio PrfomigAalyis#2 onrolRo DrpAccident**ii!

I In-Plant Survey:_

RP#1X X X X X X X X X X X X X X X X X X 2 On-site Survey:_-

NI/A 3 Personnel Mlonitoring:

N/A _

T Job Coverage:

N/A 5 Offsite Rad

,ssessment:

(Includedin Table ,

5 6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A

  • Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.
  • Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete
  • Onsite surveys after enter EOP-5
  • As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.
  • Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)
  • Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.

Takes =30 minutes to complete.

  • Procedure2.1.6 directs Offgas sample (not time critical) but it isolates. Sample not required during the 60 minutes.

Page 25 PNPS Page 25

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

~.NSTBE5EMRECPLNIMPLEMENTATIOQN - *  :: - i: '

Declre he mergncyclasifiatin lvelEmergency Planning Delr1h megnycasfiainivlShift Manager ' raining Program / EP (ECL) Drills 2 pprove Offsite Protective Action N/ .Emergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Eraining Progamnn Licensed Operator INotification and direction to on-shift staff Training Program /

5 (e.g., to assemble, evacuate, etc.) Shift Manager EegnyPann TingmrenYoralang Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator 7 ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8 Complete State/local notification form Shift Manager Tann rga Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Lricnsed OPeraogra 10 Complete NRC event notification form Shift Manager raiicnge POgeramo 11 *tivae EnS *IO#2Emergency Planning 11 ctvateERDS LO#Training Program 12 Offsite radiological assessment Chemistry Tcnia Eeraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NILO#2 Eraining Progamnn Perform other site-specific event Licensed Operator 14 notifications (e.g., Duty Plant Manager, Shift Manager Training Program INPO, ANI, etc.) __________

15 Personnel Accountability Security Security Training Program Page 26 PNPS Page 26

PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 - Loss of Coolant Accident

1. Accident Summary
  • This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location. Break of a large .

recirculation pipe represents the limiting pipe break inside the containment. Reactor scram, MSIVs isolate, ECCS initiates and injects.

  • Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.

MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.

2. Accident Specific Assumptions Made
  • No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.
3. Procedures for Accident Response
  • EP-IP-1 00, Emergency Classification and Notification
  • EP-IP-300, Offsite Radiological Dose Assessment
  • EOP-5, Radiological Release
  • EP-IP-240, Emergency Security Organization Activation and Response
  • EP-I P-400, Protective Action Recommendation Page 27 PNPS PNPS Page 27

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables T2/LI T5/L1 T5/L3 T5/L4 1 Shift Manager Emergency Plan Table 60 T5/L5 No Yes B-i T51L6 T5/L8 T5/L10

____ ____ ____ ___ ____ ___ T5/L14_ _ _ _ _ _

2 ontrol Room Emergency Plan Table N/T2LNoo Supervisor B-i Shift Technical EmrecPlnTbe 6T2LNoo 3 *dvisor/Shift EmrecPlnTbe 6T2LNoo

__ _Engineer ( 3 rd SRO) B-i Licensed Nuclear EegnyPa al / 2L oN Liceanse Nueratr(R Emergency Plan Table N/A T2/L4 No No NnLicensedNula 65 ula Plant Oeao R Emergency Plan Table N/A T2/L6 No No Operatr (NL #1) -i Non-LicensedT5L 6 NuclerPlant Emergency Plan Table NAT2LNoo Operator (NLO #2) ______ TL1 ______

Non-Licensed Emrgnc/PanTal 8 Nuclear Plant B-ignc N/ATale 6 N5/A1 No No Operator (NLO #3) _____________ T5/L13____

Non-Licensed 9 ula ln Emergency Plan Table N/A N/A No No Nuclar Pant B-i Operator (NLO #4) ______

Non-Licensed EegnyPa al 10 Nuclear Plant B-igny la abe N/A N/A No No Operator (NLO #4)______

10 FireBiade #1an Emergency Plan Table N/A N/A No No

_____ ____ B-i1_ _ _ _ _ _

12 Fire Brigade #2 Emergency Plan Table N/A N/A No No 13 RP / Chemistry Emergency Plan Table 60 T5/L12 No No Technician B-i1______ ______

14 RP Technician Emergency Plan Table 60 T4/L1 No No B-i1______ T4/L2 __ ____ ______

15 Security Security Contingency 60 T5/L1 5 No No

______________Plan / E-Plan Table B-i1 ______ _______ ____________

PNPS Page 28

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role On-Shift Position Task Analysis 1 Shift Manager Shift Manager raiicnge POperamo

____ ___ ___ ___ ___ ___ ____ ___ __ TrainingProg~ram 3 Licensed Operator Shift TuehialAvisor Shiftro Engine uer/STA r Trainingl Program Licesed uclar Pant Licensed Operator 4 SReato Operhiat dior#Shperto #1inerSTrainingProg~ram 5 eco prtr# Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator #12 Training Program 6 uxiciary Operator #1 NnLicensed Nuclear Pl n on-Licensed Operator PlnOperator #1 Training Program 7 Auxiliary Operator #21/

8 Other needed for Safe Shutdown N/A X/

9 Other needed for Safe Shutdown N/A X/

10 Other needed for Safe Shutdown N/A /

Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 29 PNPS Page 29

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5 N/A N/A Note: The LOCA does not include a fire.

Page 30 PNPS Page 30

PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements) & as directed by SM _

2 On-site Survey:X X X X X X X X 3 Personnel Monitoring:

N/A T Job Coverage:

N/A__

50Offsite Rad Assessment:

(Included in Table 5

6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

. __N/A

  • Prorac Times are estimated Page 31 PNPS Page 31

PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ne* ! Func ion. Task O rrS it i P osition*iji Task*: Analysis:................

Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift ManagerrangPorm Emrgencyg Planning 4 Approve extension to allowable dose Shift Manager Emraining Progamnn Notiicaionand to n-siftstaf iretio(eg.,Licensed Operator Training to assembleio evacuairetenetc.) siftff(. Shift Manager Program I Emergency

_____assemb _____e,__evacuate,______et___.___Planning Training Program Emergency Planning 6 ERO notification Shift Manager Training Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann

_____________ ___ ______ ____ ___ ___ ___ ___ ___ ___ __ rogram Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civat ERD raiingProgram 11 AciTechnicianO#2Emergency Planning 12' Offsite radiological assessment Chemistry ehnca Emraining Progamnn 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#2Training Program 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) Program__________________

15 Personnel Accountability Security Security Training Program Page 32 PNPS Page 32

PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 - Main Steam Line Break

1. Accident Summary
  • This event involves the postulation of a large steam line pipe break outside containment. It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features. This postulated event represents the envelope evaluation of steam line failures outside containment.
2. Accident Specific Assumptions Made
  • Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.
3. Procedures for Accident Response
  • EP-IP-IO00, Emergency Classification and Notification
  • EP-IP-1 00.1. Emergency Action Levels
  • EP-IP-300, Offsite Radiological Dose Assessment
  • EOP-5, Radiological Release
  • EP-IP-300, Offsite Radiological Dose Assessment

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
,'*i i  ;*.;:*:* : ,, ==:*
i!**!==:

= A P PE.N D IX B ,;*; =:=:, =* i :*! ::'

On-shift Pos E-Pan:=

=itin Reference.. =Augnmertation Role In Tlable Unana...................yzed............

TMS.....**

T2/LI T5/L1 T5/L3 1 SitMngr Emergency Plan 60 TISNo Yes Shfaae able B-I T5/L6 T5/L8 T5/L10 T5/L 14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-i Shift Technical 3 Advisor/Shift Emergency Plan 6 2L oN

____Engineer,_(

3 rd SRO) Table B-I 0T/L oN Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Tablgenc B-I/AT2L No No

______ 1)

Licensed Nuclear EegnyPa / 2L 5 lant Operator (RO Emrec ln NAT/5No No

____2) Table B-I Non-Licensed 6 Nuclear Plant Emergenc Plan N/A T2/L6 No No

____Operator (NLO #1)TalB-Non-Licensed T5/L9 7 Nuclear Plant Emergency Plan 6 5L oN Operator (NLO #2)al - T5/L1 3 _____

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3)TalB-Non-Licensed 9 Nuclear Plant Emergency Plan N/A NIA No No

____Operator (NLO #4) al -

Non-Licensed 10 NcerPat Emergency Plan N/A N/A No No

____Operator (NLO #5 al -

11 Fire Brigade #1 Emergency Plan NIA N/A No No

_____________ Table B-i1______ ______

12 Fire Brigade #2 Emergency Plan N/A N/A No No

_____________ Table B-I1______ ______

13 RP / Chemistry Emergency Plan 60 T5/L12 No No

____echnician Table B-I 14 RP Technician Emergency Plan 60 T4/L1 No No B-I T____________able T4/L2 Security 15 Security Contingency Plan 60 T5/L15 No No

___________________ / E-Plan Table B-i1 _____________ _____________

Page 34 PNPS Page 34

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-=PLANT OPERATIONS & SAFE SHUTDOWN=

i ;*i:iil:;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole '!:: *!:: : *i; = On-Shift *Posit~ion,:;' i :i Tsk Anialysisl :i*-:= ,

1 Shft anaer SiftMangerLicensed Operator ShiftManagerShiftManager raining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator

_______Training Program 3 Licensed Operator Shift Technical Advisor Shift Engineer/STA Training Program 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator #1 Training Program 5 RatrOeao#2Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 jOther needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role On-Shift Position Task Analysis

_________________________ _______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A Nl/A Page 35 PNPS Page 35

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The MSLB analysis does not include a fire.

Page 36 PNPS PNPS Page 36

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

<*+,:,<, ,:,*: ,.,:,;Analysis #5 M ain Steam :Line ,Break: M SLB)...:*,: ....  :*:, .......... ...

I Function / Task __ __ ___;____! '**  ::;*<;1  ;::*,.*!':,

N 5 15 25 35 45 55 65 75 85-E 010 15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:

_RP#1 X X X X X X 2 On-site Survey:X X X X X X X X X RP#1 3 Personnel Monitoring:

N/A_

4 Job Coverage:

N/A.

50Offsite Rad Assessment:

Tabie 5 6 Other site specific RP (describe):

N/A 7 Chemistry Function task #1 (describe)

_N/A_

8 Chemistry Function task #2 (describe)

N/A___

  • Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM Page 37 PNPS Page 37

PNPS ON-SHIFT STAFFING ANALYSIS REPORT a;I~

PNPS TABLEIF I 5-TEMERGNCY PANAMLYSISREPORT plI Q Line#iucto OnShif PostionTask ....... Analys Emergency Planning Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn I Emergency Planning 4 Approve extension to allowable dose IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff Shift Manager Program /Emergency

,(e.g., to assemble, evacuate, etc.) Planning Training Program 6 IEO ntifcaton SiftMangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event NI/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Eeraining Progamnn 9 P)erform State/local notifications NLO#2 Emergency Planning

_____________________________ ________________ Training Program

" Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 *ctivte EDS NO#2Emergency Planning 11 ctvateERDS LO#Training Program Techncian Emergency Planning 12 Offsite radiological assessment Chemistryi Tcnia Training Program 13 Prfom NR noifiatiosNO#2Emergency Planning 13 Prfom NR noifiatios NO#Training Program 14 Perform other site-specific event notifications Shift Manager Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) ___________Program 15 Personnel Accountability Security Security Training Program Page 38 PNPS Page 38

PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 - Fuel Handling Accident

1. Accident Summary
  • The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.
  • The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
  • The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.
2. Accident Specific Assumptions Made
  • Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
3. Procedures for Accident Response
  • EOP-5, Radioactive Release Control
  • 5.4.3, Refueling Floor High Radiation Page 39 PNPS Page 39

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables APPENDX B! PNPS*TABL I N-SHIFT POSITIONS; -;***

inel ... . . . .Ro....l Au m naio... in.. Unana..yzed TMSII T2/L1 T5/L1 T5/L3 Emergency Plan 60T5/L5 No Yes I Shift Manager Table B-i16 T5/L6 T51L8 T5/L1 0

____ __ ___ ___ _________ ___ __ ___ ___ ___ ___ T5/L 14 2 Control Room Supervisor Emergency Plan N/A T2/L2 No No Table B-i Shift Technical EegnyPa 3 Advisor/Shift Engineer Table B-i2/ / / /

___( 3 rd SRO)__ ______

4Licensed Nuclear Plant Emergency Plan N/A T21L4 No No Operator (RO #1) Table B-i1_________ _____

Licensed Nuclear Plant Emergency PlanN/T2LNoo Operator (RO #2) Table B-i1____ ______ _____

6Non-Licensed Nuclear Emergency Plan N/A T21L6 No No Plant Operator (NLO #1) Table B-i______ __________ _____

T5/L9 7Non-Licensed Nuclear Emergency Plan 60 T5/L11I No No Plant Operator (NLO #2) 'able B-i T5/L1 3_____ ____

8 Nlon-Licensed Nuclear iEmergency Plan N/A N/A No No Plant Operator (NLO #3) Fable B-i1________ ____ ___________

Non-Licensed Nuclear Emergency Plan N/A N/A No No Pl:)ant Operator (NLO #4) *able B-i1________ ___________

10 Non-Licensed Nuclear IEmergency Plan N/A N/A No No Plant Operator (NLO #5) rable B-i1________ ____ ___________

11 Fire Brigade #1 Emergenc Plan N/A N/A No No 12Fr rgd 2Emergency Plan N/A N/A No No

__2 __ire _Brigade_#2_Table B-i1________ _ _ _ _ ______ _____

13 RP / Chemistry Emergency Plan 60 T5/L12 No No Technician Iable B-i_________ _____ ___ ____ _____

14 RPTechnician Emergenfcy Plan 60 T4/L3 No No able B-i1_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _

Security 15 Security Contingency Plan / 60 T5/L1 5 No No

_________________E-Plan Table B-I_______ _____

Page 40 PNPS PNPS Page 40

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN OPERATION & SAF SHU.TDOWN  :*': " .........

.. ... *1"I ..ILO J.....................

........ ........ . . .neI UItI -l O n e.. n tro R o o m...... . ... I. . .... . ... . ..I [. .

    • i*]*:': ':'*

. ::*:*::Analysis*

. . * *:;;!::**; #:-8 F elH nd ig.c id n Line # Generic Title/Role On-Shift Position task Analysis

_________________________________________ ontrolling Method Licensed Operator I Shift Manager Shift Manager Training Program 2 Unt Speriso CotrolRoo SuervsorLicensed Operator

___ nit Supervisor______ontrol__Roo__ Supervisor_____ Training Program 3 Licensed Operator Shift Technical Advisor ]Shift Engineer/STA Training Program 4 Oeraor Ractr 1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator #1 Training Program.

5 prtr# Leco icensed Nuclear Plant Licensed Operator RatrOeao#2Operator #2 Training Program 6 ,uxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_____ _______________________Plant Operator #1 Training Program 7 ,uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other' needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

________________________ _______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 41 PNPS Page 41

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

  • :i:~~~~PNPS ,TABLE:3'-:FIREFIGHTING::I, .:,

I N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A-5 N/A N/A Note: FHA does not include a fire.

Page 42 PNPS Page 42

PNPS ON-SHIFT STAFFING ANALYSIS REPORT N * ; 5- 1*0.-.15- '20-* 25- 30-: 35 45- 50-" 55-' 60 :70 80- *85-;

I In-Plant Survey:

N/A___

2 On-site Survey:

N/A 3 Personnel Monitoring:

RP#1X X X X X T Job Coverage:

N/A 50Offsite Rad Assessment:

(Included in Table 6 IOther site specific RP

(,describe):N/A .

7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A _

  • Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.

Additional RP on shift for refueling/outage to assist with tasks PNPS Page 43

.PNPS ON-SHIFT STAFFING ANALYSIS REPORT i i* =iio:

il:* PN=:

PS TABLE 5.*- EMERGENCY PL*AN IM PLEM ENTATION~i:; 'i** i LieFuncto I Tsk*I On-Shift Positio .*Task Analysis*.!

  • 1 Declare the emergency classification level ShftMaagrraining ProgamnniEP (ECL) Drills 2 ,pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 &pprove content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 &pprove extension to allowable dose N/A Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra OpEergerrancy g t o assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 /bbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 raningProgram 11 /*tiTechnicianO#2Emergency Planning 12 Offsite radiological assessment Chemistry Tcnia Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) rga 15 Personnel Accountability Security Security Training Program Page 44 PNPS Page 44

PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 - Aircraft Probable Threat

1. Accident Summary
  • The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
  • The analysis does not include a scenario or response actions taken during or after a crash.
2. Accident Specific Assumptions Made
  • The Shift Manager receives the call from the NRC of probable aircraft threat.
  • All non-security on-shift personnel are inside the protected area fence at their normal workstation.
3. Procedures for Accident Response
  • 5.3.1 4.1, Airborne Threat Pae 4 PNP PNPS Page 45

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
    • .:*~~~~NPS :AL*t*O*HFiP*OSITiONSI!!:* i *:ii ,:

- ________Aayi #8-Aircraft* Prbale* Threa,**=!!l**t _________ ______-_____* ,.

  • !i~
      • *ii:**::***iii
; : :: * * ::: *'i:' Augme:ntation Role :in Table # ! Unana*lyzd i TMS Required?

Line # On-shift Position ;* E-Plan Reference *Elapsed ;Time I

Line #:I  :;:ask?

T  %* ' :,, *...

T2/L1 T5/LI T5/L3 1Shift Manager Emergency Plan 60 T15No Yes Table B-I T5/L6 T5/L8

._ T5/L1 0

________________ T5/L14 _ _ _ _ _ _

2 Control Room Emergency Plan N/A T2/L2 No No

___Supervisor Table B-i _______ _______ ______

Shift Technical EegnyPa 3 Advisor/Shift Emrec ln60 T2/L3 No No

___Engineer ( 3 rd SRO) TaleB-Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO ablrenc B-I/AT2L No No Licensed Nuclear EegnyPa / 2L 5 Plant Operator (RO ablrenc B-i /AT2 No No 2)

Non-Licensed EegnyPa oN 6 Nuclear Plant EegnyPa / 2L oN

___Operator (NLO #1) al - / 2L Non-Licensed 7 *lulear lant Emergency Plan60T/1Noo T5/L9 7 Nucler Plant Table B-i10T/I oN

___)perator (NLO #2) ________T5/L1 3 _____ _____

Non-Licensed EegnyPa / 3L oN 8 Nuclear Plant EegnyPa / 3L oN

___Operator (NLO #3) al -

Non-Licensed EegnyPa / 3L oN 9 Nuclear Plant EegnyPa / 3L oN

___Operator (NLO #4) al -

Non-Licensed EegnyPa 10 Nuclear Plant EegnyPa / 3L oN Operator (NLO #5 al - / 3L oN 11 11Fr rgd 1

_FireBrigade#1 Emergency Table B-i1______

Plan N/A T3/L4 No ______

No 12 Fire Brigade #2 Emergency Plan N/A T3/L5 "No No able B-i T________ _______ _ __ _ _ _

13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-i1______

14 RPehiin Emergency Plan 60 T4/L6 No No RP Technician able B-I1______ ______

Security Contingency 15 Security Plan / E-Plan Table 60 N/A No No

_______________ EB-I__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Page 46 PNPS Page 46

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole 'On-Shift Position Task Analysis

_____ _________________________ ________________Controlling Method 1 Ishift Manager Ishift Manager Licensed Operator

______ __________________________ ________________Training Program 2 Jnit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 hitTechnical Advisor Shift Engineer/STA Licensed Operator ShiftTraining Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecorOeatr# perator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator

____uiiayOeao Operator #2 Nuler raining Program 6 uxliryOpraor#1Non-licensed Ncer Non-Licensed Operator P~lant Operator #1 Training Program 7 *,xlayOperator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

___ ___ ___ ___ ___ ___ ___ ___ Controlling Method 11 Mechanic N/A NI/A 12 Electrician N/A N/A 13 I&C Technician N/A N,/A 14 Other N/A N/A 15 Other N/A Nl/A Page 47 PNPS PNPS Page 47

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i!:::*:!: :::*:... : , :ii!':ii: PNPS!*'i::!*::

TA=*I~
B LEicr 3 -.....

f:: rob beEFaIG FI:** .IN G: ....

HT........  :* ==

i : ::*:,.' :=' :,;: :...:::::..

1 NLO #3 Fire Brigade Training 2 NLO #4 Fire Brigade Training 3 NLO #5 Fire Brigade Training 4 FB #1 Fire Brigade Training 5 FB #2 Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.

Page 48 PNPS Page 48

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance Time Period After. Emergency Declarato (mnte)

I In-Plant Survey:

2 On-site Survey:

3 Personnel Monitoring: ____

T Job Coverage:

5 Offsite Rad Assessment:

(Includedin Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1

(,describe) 8Chemistry Function task #2 (describe)

Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.

Page 49 PNPS Page 49

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

'I!"i;:~PNPS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION! i !,.: *, =.' :;

  • Line
  • Function.ITask* ,.,* :i*.:.... *o::,r,,On-Shift Position: ! l i"Task Analysis!*~!i**!::

" " ....*':i:__...............______: Co tr lln M ethod Emergency Planning Declare the emergency classification level SitMngrriigPormIE (ECL)Drills 2 *pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program

] Emergency Planning 3 &pprove content of State/local notifications Shift Manager Training Program 4 &prov o alowale exensonoseN/AEmergency Planning 4 ppove llowbledoseN/Araining xtesionto Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program I Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notficaionShif MangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Eraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl Program Emergency Planning 13 Perform NRC notifications NILO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.) Program_____

15 Personnel Accountability N/A Security Training Program Page 50 PNPS Page 50

PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown

1. Accident Summary
  • Fire in the Main Control occurs that requires control room evacuation.
  • Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.
2. Accident Specific Assumptions Made
  • The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.
  • Subsequent actions are performed from outside the control room.
3. N Procedures for Accident Response
  • 2.4.143, Shutdown From Outside the Main Control Room
  • EP-IP-1 00, Classification and .Notifications

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables ILine # On-shift P*ositioni~ *"E-lan Reference Elapsed Yim+e!. *ii,!;LJine~f~i # i Task?,:;::  ;'i*!,*i*:~;;

T2/LI T5/Ll T5/L3 1 Shift Manager Emergency Plan 60T5/L5 N e Table B-I 6 T5/L6 N e T5/L8 T5/LI10

________________ ~~~T5/L 14 __ _ _ _ __ _ _ _ _ _ _

2Control Room Emergency PlanN/T2LNoo Supervisor Table B-i / 2L oN Shift Technical EegnyPa 3 Advisor/Shift EegnyPa

___Tnier(r R) able B-i 60 T2/L3 No No Licensed Nuclear 4 Plant Operator (RO Emrec lnNAT/4No No

  1. 1 ) able B-i Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo Table B-1i/ 2L oN Non-Licensed 6 Nuclear Plant Emergency PlanN/T26Noo

___Operator (NLO #1) al -

Non-Licensed T51L9 7 Nuclear Plant Emergency Plan60T/iNoo Table B-i 0T/1 oN Operator (NLO #2) _______T5/L13______

Non-Licensed 8 Nuclear Plant Emergency PlanN/T3LNoo Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency PlanN/T32Noo

___Operator (NLO #/4) al -

Non-Licensed EegnyPa 10 Nuclear Plant NoegecNola

___Operator (NLO #5) al - / 3L 11 Fire Brigade #1 Emergency PlanNAT34Noo able B-i T_________ N__AT3/L4 _ No______ No_____

12 Fire Brigade #2 Emergency Plan N/A T3/L5 No No

_____ ___ Table B-I1_ _ _ _ _ _ _ _ _ _ _ _ _ ______

13 RP / Chemistry Emergency Plan 6 / oN Technician Table B-i 60______ N/A_____ No____No _

14 RP Technician Emergenc Plan 60 T4/L4 No No Security 15 Security Contingency Plan/I 60 N/A No No

______________E-Plan Table B-1 _______ ______ ______ ______

PNPS Page 52

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

  • PNPS TABLE 2 _-:PLANT OPERATIONS & SAFE SHUTDOWN : , i:: :ii!:** l**i
illAnalysis
  • ! ;i* :i #9- CR,,Evacuation &Alternate SDi;*:*';

Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !ifApplicable  ;,= *,'

Line # Generic Title/Role On-Shift Position Task Analysis

_________________________Controlling Method Licensed Operator 1 Shift Manager Shift Manager Training Program SuperisorLicensed Operator 2 Unit Supervisor Control Room Sprio Training Program Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecopeao 1Operator #1 Training Program 5 Ractr pertor#2Licensed Nuclear Plant Licensed Operator 5 ecopeao 2Operator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role IOn-Shift Position Task Analysis

_____ __________________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 53 PNPS Page 53

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

.. ..* i*:i:*
':  : i:,-.*:::....
  • i : :,:,*,
...* : als*#9:
PNPS .. *TABLE ~~3:- FIREFIGHTIT

..C ... at n it NG r te$

" ': ,**  ::o. :.,::

Lne.. ... ..... Per......

fo byllllil' iirmed i Taski A ay is Co toln Method 1 NLO#3 Fire Brigade Training 2 NO4Fire Brigade Training 5 FB2Fire Brigade Training Page 54 PNPS PNPS Page 54

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

..... PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,= .. ,:=,=

'i:* ..... Analysis #9 CR Evacuation & Alternate ,SD~*:::'-'** i*

E 0-5atigfas:i:

2.:: :i10- 1'5- 20-.125. :30-* 35 '45- 50-~ 55 i65- 70-1"75-180- *85-;,

______.___ "., 101::f5.20.'25;-30=: 35: '40 4:5: :50: 55 :601 6570 ,o:75'80o/85,:90:

1 In-Plant Survey:

2 On-site Survey:

3 Personnel Monitoring: ___

4 Job Coverage:

RP#lSupport X X X X X X X X X X X X X X X X X FB 50Offsite Rad Assessment:

(Includedin Table 5 6 Other site specific RP (describe):

7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)

PNPS Page 55

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

! .!;;:!::* :.:* ":PNPS *TABLE 5- *EM ERGEN CYi PLEAN I1M PLEM ENTATI ON* i, Declre he mergncyclasifiatin lvelEmergency Planning DECLar)h mrec lasfcto ee Shift Manager Training Program i EP (ECL)Drills

,pprove Offsite Protective Action Emergency Planning 2 Recommendations N/A Training Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Notiicaionand to n-siftstaf.(eg.,Licensed iretio Operator Training Noiia5naddrcin oo-hf tf egShift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga 8 Complete State/local notification form Shift Manager Emraining Progamnn 9 Perform State/local notifications NLO#2 Emergency Planning Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 Ativae EDS NO#2Emergency Planning 12 Offsite radiological assessment N/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) _______rogram____________

15 Personnel Accountability N/A Security Training Program Page 56 PNPS PNPS Page 56

PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10 - Station Blackout

1. Accident Summary
  • At power, normal lineups and no additionai events
  • RCIC starts to restore level and SRVs lift in the relief mode to control pressure
2. Accident Specific Assumptions Made
  • Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.
3. Procedures for Accident Response
  • 5.3.31, Station Blackout
  • EP-IP-1 00, Classification and Notifications

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables i *l~i::**::*i: ,: PN PS:;T* E ON DS I FT.~ili*::;i
)i '**ABL :ii,**  :*!" : ii*!::*':* :i:; ':

- ___________ Anaysis#10 Staton BackoT2/L1___

T5/L5 T5/L8 T5/L31 T5/L14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-I 3AvsrShiftTehia Emergency Plan 60 T2/L3 No, No Engineer ( 3 rd SRO) Table B-I iLcensed Nuclear 4 Plant Operator (RO Emergency Plan N/A T2/L4 No No

- ~Table B-i Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B-i n N/A T2/L5 No No Non-Licensed EegnyPa /

6 Nluclear Plant Emrec lnNAT2/L6 No No Operator (NLO #1) al -

Non-Licensed EegnyPa60T5/L9 7 Nuclear Plant - EegnyPa60T5/LI I No No Table B-I Operator (NLO #2) T5/L13_____

Non-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -

Non-Licensed EegnyPa / oN 9 Nuclear Plant EegnyPa / / oN Operator (NLO #4) al - /

Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -

11Fr rgd 1 Emergency Plan N/A N/A No No 12 Fire Brigade #2 ,Emergency PlanN/NANoo

_______ _____ Table B-I1/ / oN 13RP / Chemistry Emergency Plan 60 N/A No No 13 Technician Fable B-I1________ ____ _____

14 RP Technician Emergency Plan 60 N/A No No

_____________ TableB-I1_____________

Security 15 Security Contingency Plan / 60 T5/L15 No No

______________E-Plan Table B-i1 ________ _____ ______ _____

PNPS Page 58

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 PLANT OPERATIONS & SAPE SHUTPOWN

~-

One Unit One Control Room Analysis #10 Station Blackout.

Mnim~um Oper#ations Cirew Ne essary: to Imple6m ent: AOPs .and EOPs or .SAMs Iif App#licab#le:j.';*::]:.**.: :;i; Line # Generic Title/Role On-Shift Position Task Analysis

________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator I Shft Mnage Shit Maagerraining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor Shift Engineer/STA Training Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator #1 Trainin* Program

,5 RatrOperator #2 Licensed Nuclear Plant Licensed Operator RatrOperator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_____ _______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_____ _______________ ontrolling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 59 PNPS PNPS Page 59

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

    • i:**i!%***:*:*~yi*!::i*:°*L*i!***P!NPs TABLE 3-FIREFIGHTING*?i!: :L:f¸ilG *:i~i!*~i!**iiii 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The Station Blackout Analysis does not include the need for firefighting.

Page 60 PNPS PNPS Page 60

PNPS ON-SHIFT STAFFING ANALYSIS REPORT E - , :10 ,:15i '!20* i25 30: 35!: 40 4:5 150' :55; *60.! *65 *70* 75 80 :85': 90,-

1 In-Plant Survey:

N/A 2 On-site Survey:

N/A 3 Personnel Monitoring: _N/A T Job Coverage:

N/A__

50Offsite Rad Assessment:

._Included in Table 5 6 Other site specific RP (describe):

N/A 7 Chemistry---------------------------- ----

Function task #1 (describe)

N/A___

8 Chemistry Function task #2 (describe)

N/A__

Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.

PNPS Page 61

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca nsfialyisn#10e EmStationBlackout Delr1h megnycasfiainlvl Shift Manager Training Program I EP (ECL) D:rills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emergencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Lricnsed OPeraorgra inn Notification and direction to on-shift staff (e.g., ShitcanaerProra /OEergerrancy g 5 to assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 *ctivte EDS kLO#2Emergency Planning 12 Offsite radiological assessment Nl/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NiLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training (4re.g.,Duty Plant Manager, INPO, ANI, etc.) __hift ____Manager_____Program___

15 Personnel Accountability Security Security Training Program Page 62 PNPS Page 62

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11 - LOCA/General Emergency with Release and PAR

1. Accident Summary (Assumed for Staffing Analysis Purpose)
  • The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.
2. Accident Specific Assumptions Made
  • All actions for SAE are complete.
  • The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.
3. Procedures for Accident Response
  • EP-IP-1 00, Emergency Classification and Notification
  • EP-IP-1 00.1, Emergency Action Levels
  • EP-IP-300, Offsite Radiological Dose Assessment

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
' *ii' i**  : *  !:;:!:*ii*:*~  :!I APPENDIX P EN I B*,B !: : ::  : *,i *~ *** *.
  • !~Augmentationi Role inTable # !*Unanalyzed:' TMS Req'uired?

T2/L1 T5/L1 T5/L2 T5/L3 1 Shift Manager Emergency Plan 60 T5/L4 No No Fable B-i T5/L5 T5/L8 T5/LI10

____ ____ ___ ____ ____ ___ T5/L14 _ _ _ _ _ _ _ _ _ _ _ _ _

2 Control Room Emergency Plan N/A T2/L2 No No

____Supervisor Fable B-I1______ ______

Shift Technical EegnyPa oN 3 Advisor/Shift EerecPan6T2LNoo

___Eng]ineer ( 3 rd SRO) 'able B-i10T2L Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Emrec lnNAT/4No No 1)able

_____ B-I Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo

)able T__ B-I / 2L oN Non-Licensed EegnyPa / 2L oN 6 Nuclear Plant EegnyPa / 2L oN

___Operator (NLO #1) al -

Non-Licensed -mrec lnT5/L9 7 EmergencyPPlan 60 T5/L1 1 No No Nuclear Plantable B-i15L3 _______ ______

___Operator (NLO #2) TS/L13_________________

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No

___Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No

'Op era to r (N L O # 4 ) le_

___ab _ _ __ __B-1_ __

Non-Licensed EegnyPa 10 Nuclear Plant Emrec lnNANANo No

___Operator (NLO #5) ___able_ _ __ _ __ __ _ ___-1_ __ _

Emergency PlanN/NANoo 11 Fire Brigade #1 Nobl No

" ~~~Emergency PlanNAN/Noo 12 Fire Brigade #2 Nobl No 13RP / Chemistry 13rechnician Emergency Table B-i1______

Plan 6T5L2No ______ ______

No 14 RP Technician Emergency Plan 60T4/L2Noo

___able____ B-1_____ ________ T4/L6Noo 15 Security Contingency Plan / 60 N/A No No

______________E-Plan Table B-i1 _______

Page 64 PNPS Page 64

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

.=.:*;.:.=:=:*:.....*:" PNPS.- T.ABLE 2- IPL'ANT OPERATIONS *&SAFE SHUTDOWN:i i:*i*.. ":::*i : ,

M.nimm .Opeation Crew. Ne.essar to....mpl........e.....

.. A..

. ....a d EO .... "r ... . fA .....plcal.. .. .... I Line # Generic Title/Role On-Shift Position Task Analysis

_____ ________________________________________Controlling Method 1__ iftMange 1 Shft anaer SiftMangerLicensed Shift_______________

Manager_______Training Operator Program 2 Unit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator

______________________Operator #2 Nuler raining Program 6 &uxiliary Operator #1 Non-licensed Ncer Non-Licensed Operator Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_____ _______________Controlling Method 11 IMechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 O:ther N/A N/A Page 65 PNPS Page 65

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

'" "' ... *- PN , *TABLE 3 -. F REFIGHTiNG.':::  ::

1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.

Page 66 PNPS Page 66

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ':

I In-Plant Survey:

N/A___

2 On-site Survey:

RP#1 onsite & XX XX XX XX X

__SB surveys 3 'Personnel Monitoring:

N/A T Job Coverage: _N/A 5 Offsite Rad Ssessment: Se._e Tble 5 6 Other site specific RP (describe): RP#1 Issue X X X X X KI 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A

  • Times are estimated.

Note: RP tasks are as directed by the Shift Manager and are not time critical.

Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.

Page 67 PNPS PNPS Page 67

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line i),::i*=:FUnction/ITask*;:':*;**:i  ; On-Shift Positioni*i ::ii'!:Task Analysis'  :,

Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 ,pprove Ofisite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift Manager Training Program Emergency Planning 4 Approve extension to allowable dose Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notfictionN/AEmergency Planning 6 ER notfictionN/Araining Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann Program Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae ERS NO#2 ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl Program 12 asessentCheistr Ofsie rdiolgicl Tehniian Emergency Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 (,e.g., Duty Plant Manager, INPO, ANI, etc.) Shift Manager Program 15 Personnel Accountability N/A Security Training Program Page 68 PNPS Page 68

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER Page 69 PNPS PNPS Page 69

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE:

Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.

NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.

LOCATION:

Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:

A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions Page 70 PNPS Page 70

PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)

Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown Site: PNPS Position: Shift Mana~qer Line #: 1 Function jResponsibility (Task) Action Step ]Duration 1 .Safe 1.1 Perform the procedure T=0 Shutdown steps assigned the Shift SM leaves the CR and directs his Manager in procedure staff to implement assigned 2.4.143 Rev 48, Shutdown shutdown tasks from Outside the Control Room.

[step 16(a), (b)] SM arrives at 1 minute power supply panel C511I (TB 23' (T=+I)

RPS MG Room) and

  • Opens RPS Channel B, breaker B3
  • Closes RPS Channel A, breaker A3
  • Closes RPS Channel B, breaker B3

+2 - SM leaves 23' RPS MG 1 minute Room and obtains fuse pullers (T=+2) and safety equipment from the 23' Switchgear Room

- SM leaves 23' Switchgear Room 1 minute

________________________ (T=+3)

[Step 16(d)] T+3 - SM arrives at 1 minute 23' Cable Spreading Room. (T=+4)

Opens panels C941 and C942

  • Removes fuse 16A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed

[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.

TASK:  :,,  :,

Page 71 PNPS PNPS Page 71

PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION: 6 minutes Function Responsibility (Task) Action Step Duration 2.Emergency 2.1 Maintain emergency 1 The Shift Direction and direction and control of the Oversight of the emergency Manager Control event response. response. maintains radio 2 contact with crew Initiate any emergency actions, for updates and NOTE directions The TMS is for the overlap period.

The total time considered for this task should be concurrent with Task 1.

.... D..FEMERGENCY

di====,=*ii*::"*==:*i:* .......=*!*TOTAL TASK DURATION 6 Miue RESULT:

Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks:

The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.

The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.

The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.

Task Performer Richard Probasco Shift Manager August 23, 2012 Evaluators Stephen Reid Operations Training August 23, 2012 Fred Guynn Fleet EP Project August 23, 2012 S______________________ Manager ___________

SThomas Diorio Pilgrim I&C (EP) August 23, 2012 Page 72 PNPS PNPS Page 72

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures

1. The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function. It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.
2. The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.
3. The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.

Page 73 PNPS PNPS Page 73

PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES

  • NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities
  • NSIR DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants
  • Fred Guynn, Entergy ECH Sr Project Manager, EP
  • Myra Jones, CMCG Contractor
  • Barbara Nadeau, PNPS Radiation Protection
  • Kenneth Sejkora, PNPS Chemistry
  • Ashley Ohrenberger, PNPS Ops Training
  • Karen Sullivan, PNPS EP Planner

EntegyiNuclear OPoerSationsIc

  • 600 Rocky Hill Road PyotMA 02360 John A. Dent, Jr.

Site Vice President January 14, 2016 U.S. Nuclear Regulatory Commission Attn: Docuriient Control Desk Washington, DC 20555-0001

SUBJECT:

Proposed License Amendment Request to Modify Emergency Response Organization (ERO) Training for the On-shift Chemistry Technician Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.001

Reference:

1. PNPS Letter to NRC,

Subject:

"Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (2.06.062).

Dear Sir or Madam:

Pursuant to 10 CFR 50.90, Entergy Nuclear Operations, Inc. (Entergy) hereby proposes to amend Operating License No. DPR-35 for the Pilgrim Nuclear Power Station (PNPS).

The proposed license amendment reflects a change in the Emergency Response Organization (ERO) as it relates to staff training requirements applicable to the on-shift Chemistry Technician identified in Table B-I of the Site Emergency Plan (SEP). This change was reviewed by Entergy and determined to b.e a reduction in effectiveness of the PNPS SEP. This change i~s submitted to the NRC Staff in accordance with 10 CER 50.54(q).

The proposed change has been evaluated in accordance with 10 CFR 50.91 (a)(1)

.using criteria specified in 10 CFR 50.92(c), and Entergy has determined that this change involves no significant hazards consideration. The bases for this determination are included in Attachment 1, which provides a description of the proposed change, a background discussion, a technical analysis, a regulatory analysis, and an environmental consideration review. Attachment 2 provides a copy of the current SEP Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." Attachment 3 provides a comparison of proposed training and training previously proposed in letter Reference 1. Attachment 4 provides the current PNPS Emergency Response On-shift Staffing Analysis (OSA).

Letter 2.16.001 Page 2 Entergy requests approval of the proposed amendment by January 14, 2017. Once approved, Entergy will implement this amendment within*30 days.

If you have any questions regarding the subject matter, please contact Everett P.

Perkins at (508) 830-8323.

This letter contains no new or revised regulatory commitments.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the /'4" day of (_/2,j z

~,2016.

!*hn A. Dent, Jr.

ite Vice President Attachment 1
Analysis of Proposed License Amendment Attachment 2: PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization."

Attachment 3: Chemistry Technician Training, 2006 Submittal vs 2016 Submittal Attachment 4: PNPS Emergency Response Organization On-shift Staffing Analysis cc: Ms. Booma Venkataraman, John Priest, Director, Project Manager Massachusetts Department of Public Health Division of Operating Reactor Licensing Radiation Control Program Office of Nuclear Reactor Regulation Commonwealth of Massachusetts U. S. Nuclear Regulatory Commission 529 Main Street, Suite 1M2A one White Flint North O-8C2-A Charlestown, MA 02129-1121 11555 Rockville Pike Rockville, MD 20852 Regional Administrator, Region 1 John Giarrusso, Jr.

U.S. Nuclear Regulatory Commission Planning and Preparedness Section Chief 2100 Renaissance Blvd, Suite 100 Mass Emergency Management Agency King of Prussia, PA 19406-2713 400 Worcester Road Framingham, MA 01702 NRC Resident Inspector Pilgrim Nuclear Power Station

ATTACHMENT 1 To Entergy Letter No. 2.16.001 Analysis of Proposed License Amendment (10 Pages)

Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT TABLE OF CONTENTS

1.0 DESCRIPTION

2.0 PROPOSED CHANGE

3.0 BACKGROUND

4.0 TECHNICAL ANALYSIS

5.0 REGULATORY ANALYSIS

AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria 5.2 No Significant Hazards Consideration Determination 5.3 Environmental Consideration

6.0 REFERENCES

1

Attachment I to PNPS Letter 2.16.001 ANALYSIS OF PROPOSED LICENSE AMENDMENT

1.0 DESCRIPTION

Pursuant to 10 CFR 50.90, "Amendment of License or Construction Permit at Request of Holder," Entergy Nuclear Operations, Inc. (Entergy) requests Nuclear Regulatory Commission (NRC) Staff review and approval of a revision to the Pilgrim Nuclear Power Plant (PNPS) Site Emergency Plan (SEP) to decrease the Emergency Response Organization (ERO) staff training provided for the "on-site" Chemistry Technician.

Entergy has reviewed the proposed changes against the standards in 10 CFR 50.47(b) and requirements in 10 CER 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities."

2.0 PROPOSED CHANGE

Entergy is proposing to revise the Emergency Response Organization (ERO) staff training requirements identified for the "on-shift" Chemistry Technician. Attachment 3 identifies the proposed staff training requirements and provides a comparison to the training requirements previously identified in our 2006 submittal to the NRC Staff, dated July 14, 2006 (Reference 6.1).

Subsequent review of the Pilgrim On-shift Staffing Analysis (OSA) dated December 2012 (Reference 6.3) and the job performance requirements for the "on-shift" Chemistry Technician indicate that previously identified training tasks and task qualification functions listed in the 2006 ERO submittal are not necessary for the "on-shift" Chemistry Technician to support the "on-shift" RP Technician function/position at the onset of an ERO event.

_Proposed Trainingc Chancie We are proposing that the scope of the Chemistry Technician job training that is needed to support initial "on-shift" RP Technician functions be limited to the following general RP support tasks:

o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry A list of plant specific training to support these functions is provided in Attachment 3.

3.0 BACKGROUND

The specific standard for establishing a shift emergency organization to respond to emergency events appears in 10 CFR 50.47(b)(2) which states, in part, "On-shift facility 2

Attachment I to PNPS Letter 2.16.001 licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times..."

10 CFR Part 50, Appendix E, Section IV, requires licensee emergency plans to contain, in part, the organization for coping with radiological emergencies and the activation of the emergency organization.

NUREG-0654 (Reference 6.2),Section II.B, "Onsite Emergency Organization," presents guidance for meeting these requirements. The guidance describes the onsite emergency organization, including the staffing requirements found in Table B-I, "Minimum Staffing Requirements for NRC Licensees for Nuclear Power Plant Emergencies." This table specifies a minimum of ten on-shift responders in four Major Functional Areas. It also specifies seven on-shift response tasks where the duties may be performed by shift personnel who are assigned other tasks (i.e., there are no dedicated responders to perform these tasks). -

The on-shift staff must be able to cope with a spectrum of events until augmenting ERO personnel arrive in accordance with the site's emergency plan commitments. The augmenting ERO responders assume many managerial, engineering, and administrative duties from the on-shift personnel, allowing on-shift personnel to focus more fully on plant operations. NUREG-0654 guidance recommends that there be, in addition to on-shift personnel, 30 and 60-minute responders.

On November 23, 2011, the NRC published a final rule in the Federal Register amending certain' emergency preparedness (EP) requirements in its regulations that govern domestic licensing of production and utilization facilities (Reference 6.5). This final rule amended 10 CFR Part 50, Appendix E, Section IV.A, "Organization," to address the assignment of tasks or responsibilities to on-shift ERO personnel that could potentially overburden them and prevent the timely performance of their emergency plan functions. Specifically,Section IV.A.9 states that licensees shall perform "... a detailed analysis demonstrating that on-shift personnel assigned emergency plan implementation functions are not assigned responsibilities that would prevent the timely performance of their assigned functions as specified in the emergency plan."

Coincident with the rule change in 10 CFR 50, Appendix E, Section IV.A.9, the NRC issued NSIR/DPR-ISG-01, "Interim Staff Guidance - Emergency Planning for Nuclear Power Plants" (Reference 6.6). This Interim Staff Guidance (ISG) provides information relevant to performing the on-shift staffing analysis. The ISG states that the Nuclear Energy Institute (NEI) developed the document NEI 10-05, "Assessment of On-Shift Emergency Response Organization Staffing and Capabilities," to establish a standard methodology for a licensee to perform the required staffing analysis, and that the NRC reviewed NEI 10-05 and found it to be an acceptable methodology for this purpose.

The ISG also indicates that the completed staffing analyses are required to be part of the emergency plan and the results documented and submitted to the NRC in accordance with 10 CFR 50.54(q)(5).

3

Attachment I to PNPS Letter 2.16.001

4.0 TECHNICAL ANALYSIS

4.1 Pilgrim-Specific Background Information The Pilgrim SEP (Rev 0) was originally issued in 1983. The SEP Table B-I plant staffing figure, indicated that one (1) "on-shift" RP Technician and one (1) "on-shift" 1 Chemistry Technician would be available for ERO response to support in-plant surveys and radio chemistry tasks under the Radiological Accident Assessment functional area.

The SEP Table B-I was updated in 1990 (rev 10) and indicated a staff change from one (1) to two (2) "on-shift" RP Technicians in the Accident Assessment Support functional area. The purpose of the revision was identified as an editorial table change to credit the additional RP Technician that was listed in the Protective Action(s) (in Plant) functional area of the table and "to better reflect the format" of NUREG 0654. This SEP revision was submitted to the NRC (Reference 6.7).

In a letter dated July 14, 2006 (Reference 6.1), Entergy proposed to the NRC Staff to substitute the "on-shift" Chemistry Technician for the second "on-shift" RP Technician to handleERO responsibilities during the first thirty (30) minutes of an event. As part of that proposal, Entergy stated that PNPS would (1) provide additional training for the "on-shift" Chemistry Technician(s); and (2) remove the second "on-shift" RP Technician from the shift when appropriate training was provided for the "on-shift" Chemistry Technicians. This prior SEP submittal supported the removal of one (1) of two (2) "on-shift" RP Technicians listed in SEP, Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization." This Table B-i change was consistent with our original 1983 SEP and the guidance contained in NUREG 0654/FEMA-REP-I., Rev. 1, dated November 1980 (Reference 6.2).

In a letter dated February 5, 2007 (Reference 6.4), the NRC Staff responded to our July 14, 2006 request. The letter stated "The NRC staff has concluded that incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet the standards of Section 50.47(b) and the requirements of Appendix E to Title 10 Part 50 of the Code of federal Regulations. The basis for our conclusion is contained in the enclosed safety evaluation. In light of the above, no NRC approval is necessary." On the top of Page 3, the NRC Staff's SE restates the conclusion that the incorporation of the proposed changes do not decrease the effectiveness of the PNPS Emergency Plan and the plan, as changed, continues to meet standards of Section 50.47(b) and the requirements of Appendix E to 10 CFR 50.

At Pilgrim Station since 2007, an on-shift Chemistry Technician supplements the on-shift Radiation Protection (RP) Technician in fulfilling the RP duties of the ERO during the early phase of ERO activation. Four (4) additional RP Technicians are currently required to report to the site within 30 minutes, with the addition of four (4) more RP Technicians reporting to the site in 60 minutes. These additional RP Technicians provide support roles in the ERO Accident Assessment functional area after the first 30 4

Attachment I to PNPS Letter 2.16.001 minutes. In Reference 6.1, Entergy outlined to the NRC Staff the specific training to be provided to the Chemistry Technicians to support their fulfillment of the RP role for the early phase of ERG activation.

Recently, Entergy discovered we were not providing the in-depth training for the on-shift Chemistry Technicians as documented in our letter dated July 14, 2006. A condition report was written and immediate actions were taken to address the issue. Specifically, a second RP Technician was added to each shift to restore the staffing levels that were defined prior to F'ebruary 5, 2007 Table B-I revision.

Subsequently, Entergy has determined we could provide a reduced scope of RP training for the on-shift Chemistry Technicians from that previously proposed in our 2006 ERG submittal. The reduction in training is supported by the 2012 SEP On-shift Staffing An alysis (GSA) which is provided in Attachment 4 (Reference 6.3). The OSA evaluated the on-shift ERG staff positions and verified that assigned personnel can complete required ERG functions/tasks in a timely manner; The GSA does not rely on the on-shift Chemistry Technician to perform the required ERG functions/tasks specifically assigned to the on-shift RP Technician.

Entergy is proposing to reduce the level of training provided to the "on-shift" Chemistry Technicians who may be relied on to perform an initial ERG RP Technician support role.

  • The scope of training proposed in 2006 is documented in Reference 6.1 and summarized in Attachment 3.
  • The scope of training proposed in 2016 is identified in Attachment 3 and involves training in the following specific task areas.

o Perform on-site radiation surveys o Perform on-site contamination surveys o Set up the Operations Support Center (RP Technician work area) o Issue dosimetry This revised training scope is consistent with the responsibilities and actions that would be required of the on-shift Chemistry Technician during the first 30 minutes of an ERG event consistent with the Gn-shift Staffing Analysis.

4.2 Analysis of Reduced ERG Training Requirements for the "On-shift" Chemistry Technician The GSA provides the basis for a proposed reduction in on-site Chemistry Technician Training. Section 2.14 of NEI 10-05 states "Although developed to meet the requirements of 10 CFR 50, Appendix E, Section IV.A.9, the staffing assessment methodology may be used to evaluate proposed changes to on-shift staffing levels or augmented ERG response times. For example, an analysis could be performed with a desired response time for the augmenting ERG (e.g., 90 minutes), and the results then used to support the basis for changing a staffing or augmentation time commitment."

5

Attachment I to PNPS Letter 2.16.001 The OSA indicates that the primary responsibility of the on-shift Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry sampling tasks were noted as being time critical in the first 90 minutes of~any of the analyzed events. As such, the Chemistry Technician is available to assist the RP Technician in performance of directed RP task work in the Operations Accident Assessment or Protective Action functional areas as determined appropriate by the Shift Manager.

The OSA has ensured that the PNPS ERO team members can accomplish the required mission in the first 90 minutes of ERO activation with the staffing and training of on-shift staff members proposed herein. The OSA assumed that the RP and Chemistry Technicians are qualified to perform the range of tasks expected of their position. The OSA does not credit additional RP training for the "on-shift" Chemistry Technician in order to ensure that the "on-shift" RP Technician can complete assigned emergency plan functions in a timely manner. As such, assignment of any additional RP training to the "on-shift" Chemistry Technician is not necessary and is considered to be an enhancement to the overall ERO organization.

The OSA is included in this submittal as Attachment 4. Based on the OSA, the proposed reduction in "on-shift Chemistry Technician training is acceptable and does not adversely affect the effectiveness of the PNPS Emergency Plan or the ability of assigned on-shift personnel to perform their assigned functions.

5.0 REGULATORY ANALYSIS

AND ENVIRONMENTAL REVIEW 5.1 Applicable Regulatory Requirements/Criteria The regulatory standards, requirements and guidance involving ERO staffing and augmentation are as follows:,

  • 10 CFR 50.47(b)(2) - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
  • 10 CFR 50, Appendix E,Section IV.A (in part) - The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency.
  • NRC Regulatory Guide 1.101, "Emergency Response Planning and Preparedness for Nuclear Power Reactors," Revision 5, Section C, stated in part "The criteria and recommendations in this regulatory guide are methods that the 6

Ito PNPS Letter 2.16.001 NRC staff considers acceptable for complying with the requirements in Appendix E to 10 CFR Part 50 and the planning standards in 10 CFR 50.47(b) that must be*

met in onsite and offsite emergency response plans. These criteria provide a basis for NRC licensees and State and local governments to develop acceptable radiological emergency plans and improve emergency preparedness."

In NUREG-0654,Section II, "Planning Standards and Evaluation Criteria," Evaluation Criteria ll.B.1 and ll.B.5 address the 10 CFR 50.47(b)(2) planning standard. Evaluation Criteria ll.B. 1 specifies the on-site emergency organization of plant staff personnel for all shifts, and its relation to the responsibilities and duties of the normal shift complement. Evaluation Criteria l1.B.5 states, in part, that:

Each licensee shall specify the positions or title and major tasks to be performed by the persons to be assigned to the functional areas of emergency activity. For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table B-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies."

Regulatory Guide 1.219, "Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors," November 2011, describes a method that the NRC considers to be acceptable to implement the requirements in 10 CFR 50.54(q). In Section C.2.a.(2), the NRC encourages licensees to arrange a conference call with the NRC staff to clarify 10 CFR 50.54(q) requirements and guidance within this regulatory guide for EP changes to ERO staffing that reduce the licensee's capability to staff positions.

Entergy completed and issued an OSA to satisfy the requirements in 10 CFR 50, Appendix E, Section IV.A.9 and standards in 10 CFR 50.47(b)(2). The OSA was performed using the guidance in NEI 10-05, which has been reviewed by the NRC and found to be an acceptable methodology to satisfy the regulatory requirement. As a result of the OSA, Revision 44 of the SEP increased the minimum on-shift staffing level to fourteen (14). There were no changes implemented to revise the current on-shift RP and Chemistry Technician staffing listed in Table B-I. The OSA was conducted assuming a response time of 90 minutes for the augmented ERO to allow the use of this analysis for a possible future extension in ERO augmentation times as addressed in Section 2.14 of NEI 10-05. No specific emergency response tasks requiring the augmented ERO were identified in the OSA prior to the 90-minute period following the emergency declaration.

Based on the considerations above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will continue to be conducted in accordance with the site licensing basis, and (3) the approval of the proposed change will not be inimical to the health and safety of the public.

7

Attachment I to PNPS Letter 2.16.001 In conclusion, Entergy has determined that the proposed training requirement change does not require any exemptions or relief from regulatory requirements, and does not affect conformance with any regulatory requirements or criteria.

5.2 No Significant Hazards Consideration Determination Entergy has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below:

1. Does the proposed change involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No.

The proposed training requirements change has no effect on normal plant operation or on any accident initiator. The change affects the response to radiological emergencies addressed in the SEP. The ability of the emergency response organization to respond adequately to radiological emergencies has been evaluated.

Changes in the training provided to the on-shift organization, such as the reassignment of key on-shift emergency personnel to perform related RP functions, provide assurance of an effective emergency response without competing or conflicting duties. An analysis was also performed on the effect of the proposed change on the timeliness of performing major tasks for the major functional areas of the SEP. The analysis concluded that the reduction in training requirements for the "on-shift" Chemistry Technician to support the initial RP support tasks does not affect the ability to perform the required RP Technician or Chemistry Technician tasks.

Therefore, the change in ERG staff training does not increase the probability or consequences of an accident previously evaluated.

2. Does the proposed change create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No.

The proposed change affects the training requirements for the "on-shift" Chemistry Technician and for supplementing onsite personnel in response to a radiological emergency. It has been evaluated and determined not to significantly affect the ability to perform required or related functions. It has no effect on the plant design or on the normal operation of the plant and does not affect how the plant is physically operated under emergency conditions. The reduction in ERG training requirements for the "on-shift" Chemistry Technician in the SEP does not affect the plant operating procedures which are performed by plant staff during all plant conditions.

8

Attachment I to PNPS Letter 2.16.001 No new or different accidents are postulated to occur and there are no changes in any of the accidents previously evaluated.

3. Does the proposed change involve a significant reduction in a margin of safety?

Response: No.

The proposed change does not affect plant design or method of operation.

10 CFR 50.47 (b) and 10 CFR 50 Appendix E establish emergency planning standards and requirements that require adequate staffing, satisfactory performance of key functional areas and critical tasks, and timely augmentation of the response capability. Since the SEP was originally developed, there have been improvements in the technology used to support the SEP functions and in the capabilities of onsite personnel. A functional analysis was performed on the effect of the proposed change on the timeliness of performing major tasks for the functional areas of the SEP. The analysis concluded that a reduction in training requirements for the "on-shift" Chemistry Technician would not significantly affect the ability to perform the required SEP tasks. Thus, the proposed change has been determined not to adversely affect the ability to meet the emergency planning standards as described in 10 CER 50.47 (b) and requirements in 10 CFR 50 Appendix E.

The proposed ERO staff training change does not involve a reduction in any margin of safety. The proposed change is consistent with the original and current ERO staffing levels implemented at PNPS.

Based on the above, Entergy concludes that the proposed amendment presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

  • 5.3 Environmental Consideration The proposed changes do not involve (i) a significant hazards consideration, (ii) any changes in the types or any increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure. Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51 .22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment needs to be prepared in connection with the proposed amendment.

9

Attachment I to PNPS Letter 2.16.001

6. REFERENCES 6.1. Entergy Letter to the NRC, "Emergency Plan Changes to the Minimum Staffing Requirements for the Emergency Response Organization (ERO)", dated July 14, 2006 (Ltr 2.06.062) 6.2. NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1, published November 1980.

6.3. Pilgrim Nuclear Power Station, 10 CFR 50 Appendix E, On-Shift Staffing Analysis Final Report, dated December 20, 2012. Incorporated by reference in Emergency Plan Rev 40, submitted to NRC on January 14, 2013 (Ltr 2.13.001).

6.4. James Kim (USNRC) Letter to Mr. Michael Kansler (Entergy), "Pilgrim Nuclear Power Station - Revision to Emergency Plan to Change Emergency Support O~rganizatiOn Staffing", (TAC No. MD2814) dated February 5, 2007 6.5. Federal Register Volume 76, Number 226, Wednesday, November 23, 2011, Rules and Regulations, "Enhancements to Emergency Preparedness Regulations; Final Rule."

6.6. NSIR/DPR-ISG-01, "Interim Staff Guidance - Emergency Planning for Nuclear Power Plants," Revision 0, November 2011 (ADAMS Accession Number ML1l13010523).

6.7. Entergy Letter to the NRC, "10 CFR 50, Appendix E, Section V,: Submittal of Revised Emergency Plan or Emergency Plan Implementing Procedures", dated January 30, 1991 (Ltr 2.91 .007) 10

ATTACHMENT 2 To Entergy Letter No. 2.16.001 PNPS Emergency Plan Table B-I, "Minimum Staffing Requirements for the Emergency Response Organization" (1 Page) to PNP.S Letter 2.16.001 PNPS EMERGENCY PLAN Table B-1i: Minimum Staffino Renuirements for the PNPS ERO-( 1 )

Functional Area Major Task TOnshift

+/-Pos.No. Position Title Rs

________________ ponse Plant.Operations Plant Stabilization +/- 1 Shift Manager On Shift#

Assessment of Operational Accident Mitigation 2 Control Room Supervisor On Shift#

Aspects 3,4 Lic. Nuc. Plant Operator (2) On Shift#

______________________ 5.6 Unlic. Nuc. Prant Operator (2)**FB On Shift#

"Emerg'ency Direction Emergency Classification j1) Shift Manager On Shift#

Emergency Control PARs t IEmergency (1) Shift Manager Director On Shift#

60 mai.

Emerg*ency Plant Ops Supv 60 min.

Notification and Notification of PNPS, Local, (1) Shift Manager On Shift#

Communications Commonwealth, and Federal personnel 7 Unlic. Nuc. Plant Operator On Shift#

and Maintain Communications Offsite Communicator 30 min.

EOF Communicator 60 min.

ENS Communicator 60 mai.

Rad Accident Assessment!.... EOF Direction EOF Managter, 60 mai.

Ops Accident Assessment Offsite Dose Assessment (8) RP Technician*** On Shift#

Support (9) Radio Chem. Technician**" On Shift#

Radiolog:ical Assessment Coord 30 mai.

Offsite Surveys OMT Member (2) 30 mai.

OMT Member (2) 60 min.

Onsite and'ln-plan't Surveys 8 RP Technician On Shift#

RP Technician (2) 30 min.

RP Technician (2) 60 mmn.

Chemistry / Radiochemistry 9 Radio Chem. Technician On Shlft#

_____Radio Chem. Technician 60 mai.

Plant System Engineering TSC / OSC Direction Emergency Plant Manager 60 mai.

Repair and Corrective Actions Technical Support 10 Engineer (Shift Control Rm)* On Shift#

Engineer (Reactor) 30 mai.

Engineer (Mechanical) 60 mai.

_________________________Englineer (Electrical) 60 min.

Eguipment Repairs _____Nuclear Maint. Technician 30 min.

Corrective Actions Nuclear Maint, Technician 60 main 11 Unlic. Nuc. Plant Operator On Shift#

m 12 Nuc. Plant Reactor Operator *FB On Shift#

Nuc. Plant Reactor Operator 60 min.

Nuclear Maint. (ElectnicalX2) 30 mai.

Nuclear Maint. (Electrical) 60 min.

________________________________Nuclear Control Technician(2) 30 mai.

Protective Actions (In Plant) Radiation Protection, Access Control, (8), (9) RP Technician (2)*0 On Shift#

RP Coverage, Personnel Monitoring, RP Technician (2) 30 mai.

and Dosimetry _____RP Technician (2) 60 mai.

Fire Fighting 13, 14 Fire Brigade*, (3 **, 2 [NLO or Sec]) On Shift#

____________________ _____Plymouth Fire Dept. On Call Rescue Ops and First Aid EMP** On Shitt#

________________________Ambulance Service ... On Call Site Access Control and Security Security Force* On Shift#

Personnel Accountability _____________________

n* un onirtowner PNPS - person assaiu controlled ro oe areas or on on snurt wnen, ounng the connecting normar roads or au~nonrzeo between Station nours, them withoventime that person Management is witnin tie approval.

  • Position staffed In accordance with technical specifications.
    • Position staffed in accordance with technical specifications and station procedures.
    • May be provided by shift personnel assigned other functions.

.. .(EMP) Emergency Medical Personnel: individuals qualified as EMPs, RNs, First Responders, and Paramedics.

NOTES: Response times are based on optimum travel conditions.

On Shift Position #7 is Assistant to Offsite Communicator and can be replaced by an SRO that is qualified for the task.

On Shift Position #11 can be filled by an RO or SRO that is gualified for the task On Shift Positions #13 and #14 are available to support Shift Manager, where qualified, in non-fire events.

(1) Thls table B-i is incorporated Into the Emergency Plan In accordance with USNRC Generic Letter 82-33 dated 12/17/82 and Incorporates within 30 days of approval the conclusions of the PNPS On Shift Staffing Analysis Report which is a part of the Emergency Plan in accordance with 10CFR5O Appendix E,Section IV. A. 9 and maintained as a separate document.

B-7 Revision 44

ATTACHMENT 3 To Entergy Letter No. 2.16.001 Chemistry Technician Training 2006 Submittal vs 2016 Submittal (3 Pages)

Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training I Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task On-site

  • Operations Support Center Pool
  • Operations Support Center Pool *The 2012 OSA ensured that PNPS and In- Member Qualification Member Qualification ERO team members can accomplish Plant
  • Respirator User Qualification
  • Perform Radiation Surveys the required mission in the first 90 Surveys
  • Self-Contained Breathing Apparatus
  • Perform Contamination Surveys minutes of ERO activation with the User Qualification
  • Operate Basic Dose Rate Meters current on-shift ERO staff defined in
  • Walkdown EOP-4 survey point * -Operate Basic Count Rate Meters Table B-I.

locations

  • Perform Radiation Surveys
  • Perform Contamination Surveys
  • Collect an Airborne Radioactivity Sample
  • Analyze Smears for contamination levels
  • Analyze Air Samples
  • Operate Basic Dose Rate Meters
  • Operate Basic Count Rate Meters
  • Operate the Scintillation Alpha Counter
  • Operate the Beta Counter
  • Operate the Gamma Spec System
  • Operate the Regulated Air Sample Pump
  • Operate the Radeco Air Sampler 1

Attachment 3 to PNPS Letter 2.16.001 Augmented Radiological Protection (RP) Training needed for the "On-Shift" Chemistry Technician to Support Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /

Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task Access *Operations Support Center Pool

  • Operations Support Center Pool *The 2012 OSA ensured that PNPS Control Member Qualification Member Qualification ERO team members can accomplish
  • RWP Briefing minutes of ERO activation with the
  • Perform Stay Time Calculations current on-shift ERO staff defined in
  • Issue and Return Respirators Table B-i.

RP . Operations Support Center Pool

  • Operations Support Center Pool *The 2012 OSA ensured that PNPS Coverage Member Qualification Member Qualification ERO team members can accomplish for repair,
  • Respirator User Qualification
  • Perform Radiation Surveys the required mission in the first 90 corrective
  • SCBA User Qualification
  • Perform Contamination Surveys minutes of ERO activation with the actions,
  • RP Job Coverage
  • Operate Basic Dose Rate Meters current on-shift ERO staff defined in search and
  • Operate Basic Count Rate Meters Table B-I.

rescue first

  • RWP Briefing aid

& Perform Stay Time Calculations firefighting

  • Perform Radiation Surveys
  • Perform Contamination Surveys
  • Collect an Airborne Sample
  • Analyze Smears
  • Analyze Air Samples
  • Operate Basic Dose Rate Meters
  • Operate Basic Count Rate Meters
  • Operate the SAC-4
  • Operate the BC-4
  • Operate the Gamma Spec System
  • Operate the RAS Pump
  • Operate the Radeco
  • Perform RP Duties in Response to a Plant Fire___________________

2

Attachment 3 to PNPS Letter 2.16.001 Augmented RadiologQical Protection (RP) Training needed for the "On-Shift" Chemistry Technician to SupDport Initial ERO Duties (during first 30 minutes)

NUREG 0654 Chemistry Technician Training Chemistry Technician Training Justification for Reduced Training /

Table B-I Identified in 2006 Submittal Identified in 2016 Comments "On-Shift" (See OSA Analysis notes below)

Task Personnel

  • Operations Support Center Pool
  • Operations Support Center Pool
  • The 2012 OSA ensured that PNPS Monitoring Member Qualification Member Qualification ERO team members can accomplish
  • RP Job Coverage the required mission in the first 90
  • RWP Briefing minutes of ERO activation with the
  • Perform Personnel Decontamination current on-shift ERO staff defined in Table B-I.

Dosimetry

  • Operations Support Center Pool
  • Operations Support Center Pool
  • No effective change is identified Member Qualification Member Qualification
  • Issue and Control Personnel
  • Issue Dosimetry Dosimetry OSA Notes:
1. The 2012 OSA satisfies the requirements of 10 CFR 50 Appendix E Section IV.A.9. A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response Organization Staffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-i of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIR/DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear PowerPlants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.
2. The OSA review team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel.
3. NEI 10-05 staffing analysis of on-shift personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position. NEI 10-05 recommends one (1) on-shift RP Technician and one (1) on-shift Chemistry Technician. The PNPS SEP is consistent with the NEI guidance.
4. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events.
5. The 2012 OSA analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10CFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event, Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function.
6. Augmentation time for some ERO positions is 30 minutes. The OSA analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for current 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
7. The 2012 OSA assumed individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.

3*

ATTACHMENT 4 To Entergy Letter No. 2.16.001 PNPS Emergency Response Organization On-Shift Staffing Analysis (74 Pages)

PNPS ON-SHIFT STAFFING ANALYSIS REPORT ENTERGY PILGRIM NUCLEAR POWER STATION 10CFR5O APPENDIX E ON-SHIFT STAFFING ANALYSIS FINAL REPORT December 20, 2012 Prepared by:

Myra Jones Fred Guynn

PNPS ON-SHIFT STAFFING ANALYSIS REPORT TABLE OF CONTENTS I. INTRODUCTION..................................................................................... 4 II. ANALYSIS

SUMMARY

............................................................................. 4 A. Emergency Plan Minimum Staffing.................................................................... 5 B. Other Commitments to Shift Staffing........................................................... ....... 6 C. Staffing Exceptions and Time Motion Studies (TMS) .............................................. 6 D. Emergency Plan Tasks Not Analyzed ................................................................ 7 III. ANALYSIS PROCESS .............................................................................. 8 IV. ACCIDENT SCENARIOS ...... ..................................................................... 9 A. Accident Selection........................................................................................ 9 B. Accident Scenarios included in the Analysis ,...................................................... .. 9 C. Accident Scenarios Not Included in the Analysis .................................................. 10 V. GENERAL ASSUMPTIONS AND LIMITATIONS................................................ 11 A. Notes and Assumptions Applicable to Pilgrim OSA: .............................................. 11 B. NEI 10-05 Assumptions .................. ......... ................................................... 11 VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS ..................................... 14 Vii APPENDIX B - ON-SHIFT STAFFING ANALYSIS............................................. 16 A. Accident Analysis #1 - Design Basis Threat (DBT)............................................... 16 B. Design Basis Accident Analysis #2 - Control Rod Drop Accident.............................. 21 C. Design Basis Accident Analysis #4 - Loss of Coolant Accident................................ 27 D. Design Basis Accident Analysis #5 - Main Steam Line Break .................................. 33 E. Design Basis Accident Analysis #6 -Fuel Handling Accident .................................. 39 F. Accident Analysis #8 - Aircraft Probable Threat .................................................. 45 G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown.................. 51 H. Accident Analysis #10 - Station Blackout........................................................... 57 I. Accident Analysis #11 - LOCA/General Emergency with Release and PAR ................ 63 VIIIAPPENDIX C TIME MOTIONS STUDIES....................................................... 69 A. TMS Shift Manager Safe Shutdown Task........................................................... 69 PNPS Page 2

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED ............... 73 A. Overlap Requiring Compensatory Measures ..................................................... 73 X. REFERENCES ................................................................................... 74 XI. STAFFING ANALYIS TEAM .................................................................... 74 Page 3 PNPS Page 3

PNPS ON-SHIFT STAFFING ANALYSIS REPORT I. INTRODUCTION This report is the finai report for the On-shift Staffing Analysis (OSA) that commenced at Pilgrim Nuclear Power Station (PNPS) during the week of March 19 - 22, 2012. This OSA satisfies the requirement of 10 CFR 50 Appendix E Section IV.A.9, which states that nuclear power licensees shall perform "a detailed analysis demonstratingthat on-shift personnel assigned emergency plan implementation functions are not assigned responsibilitiesthat would prevent the timely performance of their assigned functions as specified in the emergency plan. "A structured approach was utilized to perform this analysis using the guidance found in NEI 10-05, Rev. 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities. This analysis examined the capability of the minimum staff listed in Table B-I of the PNPS Emergency Plan (E-Plan) to perform the actions for the key functional areas of events described in NSIRIDPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants, until augmenting Emergency Response Organization (ERO) staff arrives in accordance with the E-plan.

I. ANALYSIS

SUMMARY

The OSA team determined that an on-shift staff of fourteen (14) is required to respond to the most limiting accident scenario reviewed, main control room fire and shutdown at the remote shutdown panel. The on-shift staff consists of individuals necessary to support each of the E-Plan functional areas or tasks:

  • Emergency Direction and Control
  • Fire Fighting (FB)
  • Accident Assessment
  • Radiation Protection and Chemistry
  • Notification/Comnmunication
  • Technical Support
  • Accountability NEI 10-05 states it is acceptable for certain functions or tasks to be assigned to personnel already assigned other primary functions/tasks. These include Repair and Corrective Action, Rescue Operations and First Aid.

Page 4 PNPS Page 4

PNPS ON-SHIFT STAFFING ANALYSIS REPORT A. Emergency Plan Minimum Staffing Per 10 CFR 50.54 (q)(1)(iii), Emergency planning function means a capability or resource necessary to prepare for and respond to a radiological emergency, as set forth in the elements of section IV of Appendix E and, for nuclear power reactor licensees, the planning standards of § 50.47(b).

The following table indicates the result of the NEI 10-05 staffing analysis of on-shift

-personnel to perform the required emergency planning functions and the licensing basis requirement for each on-shift position.

Licensing Basis On-Shift Position 4 Requirement E-Plan Functional Area Staffing Analysis Results 50.54m Emergency Direction and Shift Manager (SM) E-plan Table B-I Control SSD (TMS for SSD1 actions)

Control Room Supervisor 50.54m (CRS) E-plan Table B-I1S Shift Control Room E-plan Table B-I1ehia upr Engineer (STA)

Licensed Nuclear Plant 50.54m SSD -

Operator (RO #1 ) E-plan Table B-i Licensed Nuclear Plant 50.54m SSD1 Operator (RO #2) E-plan Table B-i Non-Licensed Nuclear E-plan Table B-i SSD2 Plant Operator (NLO #1")1 Non-Licensed Nuclear E-plan Table B-i E-Plan Communicator Plant Operator (NLO #2)______ Notifications 3 1 Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #3)

Non-Licensed Nuclear E-plan Table B-i1B Plant Operator (NLO #4)

Non-Licensed Nuclear E-plan Table B-i1B PlantOperator_(NLO_#5) _________

Chemist E-plan Table B-1 Accident1 Assessment/Chemistry1 RP #1 E-plan Table B-i Radiation Protection 1 Fire Brigade #11 E-plan Table B-i FB 1 Fire Brigade #21 E-plan Table B-i FB 1 E-plan Table B-i Per Security Security Security Accountability Contingency

_____________ Contingency Plan _____________ Plan TOTAL 14 1

Fire Brigade #1 and Fire Brigade #2 positions did not have any actions or tasks identified in this OSA other than Fire Brigade. These on-shift members (e.g., NLO, Security) are available to support the Shift Manager, where qualified, in non-fire events.

2 SSD NLO can be filled by RO or SRO.

3 E-Plan Communicator can be replaced by SRO that is qualified for the task.

4 One of the 5 NLOs is a Radwaste Operator PNPS Page 5

PNPS ON-SHIFT STAFFING ANALYSIS REPORT I-7 B. Other Commitments to Shift Staffing None C. Staffing Exceptions and Time Motion Studies (TMS)

1. The primary responsibility for the Chemistry Technician is chemistry/radiochemistry sampling; however no chemistry job tasks were noted as being time critical or required during the first 90 minutes of any of the analyzed events. It is therefore acceptable to assign the Chemistry Technician the E-Plan function of dose assessment. In addition, the RP Technician shares the responsibility for dose assessment. It is recognized, however, that the Shift Manager will prioritize and utilize the on-shift staff as needed for RP, Chemistry and dose assessment. No further analysis or TMS is required.
2. The Shift Manager is assigned the responsibility to make some notifications per procedure 1.3.12. The notifications by phone are considered communications that are approximately one minute in length and are acceptable tasks for the Shift Manager. No further analysis or TMS is required.
3. The analysis included a review of the implementation of the requirement to maintain continuous communications with the notification source during an aircraft threat in accordance with 10OCFR50.54(hh) and Reg. Guide 1.214. There are no specific qualifications required to perform this task and the function is not required to be assigned in advance. The review of the Aircraft Threat Accident identified that there are sufficient personnel on-shift to perform this action during the event. Specifically, a licensed or non-licensed nuclear plant operator, the rad protection technician, and chemistry technician were all available to fill this function. No further analysis TMS is required.
4. A time motion study was completed for the Shift Manager action to perform the safe shutdown actions to initiate a scram and close the MSIVs by manipulating RPS breakers and pulling fuses. The Shift Manager leaves the control room and passes the equipment on the way to the Technical Support Center. The Shift Manager demonstrated the safe shutdown actions can be completed in approximately six (6) minutes while maintaining emergency direction and control through radio contact with other operators aligning safe shutdown equipment.

Details of the TMS are found in section VIII Appendix C.

Page 6 PNPS Page 6

PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Emergency Plan Tasks Not Analyzed

' 1. Repair and Corrective Action - Per the guidance of NUREG-0654, Table B-I, repair and corrective action tasks may be performed by dedicated shift personnel or qualified shift personnel assigned other functions/tasks. Repair and corrective action is defined as:
  • An action that can be performed promptly to restore a non-functional component to functional status (e.g., resetting a breaker), or to place a component in a desired configuration (e.g., open a valve), and which does not require work planning or implementation of lockout/tagout controls to complete.

In accordance with NEI 10-05 section 2.5, the analysis included a review of the repair and corrective action tasks. For the purpose of this analysis, the tasks were considered to fall into two broad categories:

  • Unplanned/unexpected actions that address equipment failures. These actions are contingent in nature and cannot be specified in advance.

At PNPS, a Nuclear Plant Reactor Operator on shift will primarily be available to the Shift Manager to perform actions to assist in controlling/mitigating the event.

Initial corrective actions are contained in and controlled by plant operating procedures. The Nuclear Plant Operators have been trained to perform specific actions within the Abnormal and Emergency Operating Procedures and maintenance support is not required. Maintenance is not included in the on-shift staff. Repair and Corrective Action is an acceptable collateral duty per the guidance of NEI 10-05 and was not analyzed

2. Rescue Operations and First Aid: in accordance with NEI 10-05 section 2.6, the analysis also included a review of rescue operations and first aid response. Per the guidance of NUREG-0654, Table B-i, rescue operations and first aid may be performed by shift personnel assigned other functions/tasks. The fire brigade members (NLOs) are trained to perform rescue operations and are assigned the task should the need arise. Additionally, select Security staff members are trained to First Responder standards and meet the basic requirements to render first aid and CPR. Should first aid be required during a hostile action security event, first aid actions will be performed after the security threat is neutralized and the site is secure. Rescue operations and first aid were not required in any of the accident scenarios reviewed. Rescue operation and first aid are acceptable collateral duties per the guidance of NEI 10-05 and was not analyzed.

Page 7 PNPS Page 7

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Ill. ANALYSIS PROCESS This analysis was conducted by a joint team of corporate Emergency Preparedness (EP) personnel and station personnel from the Operations, Operations Training, EP Training, Radiation Protection, Chemistry and Emergency Preparedness (EP) departments. Additionally, personnel from Security provided input to the analysis when necessary. The team members are identified in Section Xl of this report.

The emergency response to each event scenario was determined by conducting a tabletop of the event using the emergency plan and procedures and the applicable department procedures such as Operations emergency and abnormal operating procedures.

Each scenario was reviewed by the cross disciplinary team to determine what plant actions and emergency plan implementation actions were required based on plant procedures prior to staff augmentation. These actions were then compared to the minimum staffing for Emergency Plan implementation as described in the Emergency Plan Table B-I, ensuring that no actions were assigned to staff members that conflicted with either their dedicated emergency plan role or their dedicated operational role as appropriate. In cases where multiple tasks were assigned to an individual in their role, the team evaluated timing of the' tasks to ensure that they could be performed by the individual in series within any specified time requirements.

The results of the analysis for each of the scenarios are included in Section VII, APPENDIX B -

ON-SHIFT STAFFING ANALYSIS. Note that NSIR DPR-ISG-01 states that only DBA accidents "which would result in an emergency declaration" should be evaluated in the staffing assessment.

Each of PNPS DBA's were evaluated and classified according to its FSAR Chapter 14 description. If the accident description alone did not result in a classification, the projected accident EAB dose found in the ESAR was utilized to determine if an EAL threshold would be exceeded within the first 60 minutes using the Abnormal Rad Level EAL thresholds. In cases where several projected dose rates were provided or release data was not detailed significantly to determine an EAL, the assessment used the radiological consequences associated with the realistic case in accordance with NEI 10-05.

Page 8 PNPS Page 8

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IV. ACCIDENT SCENARIOS A. Accident Selection

1. The OSA scenarios were chosen using the guidance of NE1 10-05 and NSIR/DPR-ISG-01, "interim Staff Guidance - Emergency Planning for Nuclear Power Plants." The evaluation considered the station Design Basis Accidents (DBA) described in the FSAR along with additional scenarios specified by the guidance documents. The scenarios considered were:
  • Design Basis Threat (DBT) ground assault
  • DBA Loading Error Accident
  • DBA Loss of Coolant Accident
  • DBA Fuel Handling Accident
  • DBA Radwaste System Accident
  • Aircraft Probable Threat
  • Fire Requiring Evacuation of the Control Room and Plant Shutdown From Alternate Location,
  • Station Blackout, (SBO)
  • LOCA/General Emergency with release and PAR a LOCA with entry into Severe Accident Management

B. Accident Scenarios included in the Analysis

1. Design Basis Threat as described in NE! 10-05
  • Land and/or waterborne Hostile Action directed against the Protected Area by a Hostile Force. This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed
2. Control Rod Drop Accident as described in FSAR 14.5.1

Credit is not taken for MSIV closure. Release pathway is through condenser, turbine building then to environment. EAL is based on condenser release information in FSAR.

3. Loss of Coolant Accident as described in FSAR 14.5.3
  • Double ended guillotine break of a recirculation line. All ECCS operate

- as designed. EAL is based on fission product barrier EALs.

4. Main Steam Line Break Accident as described in FSAR 14.5.4
  • Break of one main steam line and followed by MSIV closure. Release is to the atmosphere through the top of the turbine building (puff release).

PNPS Page 9

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Reactor coolant activity at TS limit. No EAL On the accident but on the USAR EAB 2-hr dose.

5. Fuel Handling Accident as described in FSAR 14.5.5
  • The accident involves a dropped fuel bundle on top of the core. Initial EAL is based on the event.
6. Aircraft Probable Threat (50.54hh)
  • Notification is received from the NRC that a probable aircraft threat exists

(>5 minutes, <30 minutes)

7. Control Room Fire and Alternate Shutdown
  • A fire occurs in the main control room requiring the evacuation and the procedure implemented to perform shutdown from the alternate shutdown panels.
8. Station Blackout
9. General Emergency with release and "PAR
  • Assume GE condition with dose projection indication of a release greater than the protective action guideline (PAG).

C. Accident Scenarios Not Included in the Analysis

1. Loading Error Accident as described in ESAR 14.1.5.2
  • Misloaded bundle in the core. No EAL condition is met.
2. Radwaste System Accident as described in FSAR 14.5.6
  • No EAL condition is met.
3. Implement SAMG
  • A review of the SAMGs associated with the initial site-specific Candidate High Level Actions concluded that no actions would require on-shift personnel other than licensed and non-licensed operators. No analysis required.
4. Appendix R Fire
  • Fire leading to reactor trip with complications. The control room fire and alternate shutdown requires more resources and actions outside the control room than this fire. The team concluded the control room fire bounds the fire analysis. No additional analysis required.

Page 10 PNPS Page 10

PNPS ON-SHIFT STAFFING ANALYSIS REPORT V. GENERAL ASSUMPTIONS AND LIMITATIONS A. Notes and Assumptions Applicable to Pilgrim OSA:

1. The RP and Chemistry tasks reviewed were those directed by the Shift Manager to support actions in Abnormal Operating Procedures (AOP), Emergency Operating Procedures (EOP), and Emergency Implementing Procedures (EIP).

Any additional tasks directed by the Technical Support Center (TSC), Operations Support Center (OSC), or Emergency Operations Facility (EOF') procedures were not reviewed.

2. The augmentation time for some ERO positions is 30 minutes. The analysis was completed for the 90 minute period since the emergency response facilities are required to be operational in 60 minutes. No credit was taken for 30 minute responders. Tasks for event response were reviewed for 90 minutes following the declaration. No specific emergency response tasks requiring the augmented ERO were identified during the 90 minutes following the emergency declaration.
3. The OSA team determined there are no time critical RP and Chemistry tasks and that task performance is directed and prioritized by the Shift Manager. The time RP or Chemistry is directed to perform a task and the amount of time taken to complete tasks are estimated. No Chemistry samples are required by Tech Specs within the 90 minute period after a declaration. Since the Shift Manager directs when the tasks are performed, there are no overlapping RP or chemistry tasks.
4. All crews have one individual filling the SM and one individual filling the STA roles therefore the analysis did not consider using a dual-role individual.

B. NEI 10-05 Assumptions

1. Response time used for this analysis was the maximum acceptable number of minutes elapsed between emergency declaration and the augmented ERO position holder at a location necessary to relieve an on-shift position of the emergency response task. (60 mmn.)
2. On-shift personnel complement was limited to the minimum required number and composition as described in the site emergency plan. If the plan commitments allow for different minimum staffing levels (e.g., a variance between a normal dayshift and a backshift), use the staffing with the smallest total number of personnel.
3. Although the temporary absence of a position may be allowed by Tech Specs, the analysis was performed assuming that all required on-shift positions are filled.
4. Event occurred during off-normal work hours where ERO was offsite and all required minimum on-shift positions were filled.
5. On-shift personnel reported to their assigned response locations within timeframes sufficient to allow for performance of assigned actions.

PNPS Page 11

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

6. On-shift staff has necessary Radiation Worker qualification to obtain normal dosimetry and enter the RCA (but not locked high or very high radiation areas) without the aid of a RP technician.
7. Personnel assigned plant operations and safe shutdown meets the requirements and guidance (analyzed through other programs such as operator training) and was evaluated as part of this assessment unless a role/function/task from another major response area was assigned as collateral duty.
8. In-plant (manual) safety related operator actions to manipulate components and equipment from locations outside the control room to achieve and maintain safe shutdown was done by a member of the on-shift staff as defined in the unit's Tech Specs.
9. Fire brigade (FB) staff performance is analyzed through other station programs (e.g., fire drills) and was not evaluated as part of this assessment unless a role/function/task from another major response area was assigned as a collateral duty.
10. Individuals holding the position of RP technician or Chemistry technician are qualified to perform the range of tasks expected of their position.
11. Security was not evaluated unless a role or function from another major response area was assigned as a collateral duty.
12. Communications, briefings, and peer checks are acceptable collateral duties.
13. All on-shift staff positions were evaluated, even if they had no known collateral duties, to ensure they can perform the tasks assigned to them. [Ref NSIRIDPR-ISG-01]
14. The Staffing Analysis specified the resources available to perform "Repair and Corrective Actions" and "Rescue Operations and First Aid" but these may be assigned as collateral duty to a designated on-shift responder.
15. For assessment purposes, NRC notifications were treated as a continuous action per 10OCFR50.72(c)(3) and 73.71 (b)(1). This means once the initial NRC communications are established, the NRC will request an open line be maintained with the NRC Operations Center.
16. DBA (postulated accident, Condition IV event, or limiting fault) is considered as "Unanticipated occurrences that are postulated for accident analysis purposes but not expected to occur during the life of the plant. A postulated accident could result in sufficient damage to preclude resumption of plant operation. As a result, a greater number and variety of actions would need to be implemented by plant personnel."
17. Unless otherwise specified in NSIR/DPR-ISG-01, Interim Staff Guidance -

Emergency Planning for Nuclear Power Plants, or by the FSAR initial conditions of a DBA analysis, it was assumed that the unit was in Mode 1, Power.

PNPS Page 12

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

18. DBT assumed a hostile force breached the protected area fence but was neutralized with no adverse consequen~ces to plant safety. Damage inflicted on plant systems, structures and components was not sufficient to prevent safe shutdown or cause a radiological release. There was no fire significant enough to warrant firefighting efforts prior to arrival of offsite resources and/or the augmented ERO.
19. The Staffing Analysis used DBA analysis assumptions, inputs, and timing of events as documented in the FSAR.
20. In cases where a DBA analysis included a radiological release, and the starting point of the release was not clearly defined, the staffing analysis assumed that the release began at the time of declaration of the initiating event.
21. Severe Accident Management Guideline (SAMG) - It is sufficient to simply assume that the accident progressed to conditions requiring a severe accident response; it is not necessary to determine specific failures and the accident sequence.
22. SAMG - The actions to be analyzed include those that implement the initial site-specific actions assuming the core is no ex-vessel (i.e., no reactor vessel failure),

and there is not actual or imminent challenge to containment integrity.

Page 13 PNPS Page 13

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VI. APPENDIX A - ANALYZED EVENTS AND ACCIDENTS tEe E e t ...... '"== . . :I Plant...

S~ummary....Descriptioniof~i .... :* : Refe~rence=......i'*:' "= **: ' Analysis*:i*

iEn t:;:, ype- ::::::: Event.Mode..Document:s) Event ECL.

1 DBT Land and/or waterborne 1 NEI 10-05 Site Area Yes HOSTILE ACTION Emergency directed against the ISG IV.C Protected Area by a HOSTILE FORCE.

2 DBA Control Rod Drop Accident 1 FSAR 14.5.1 Site Area Yes Emergency 3 DBA Loading Error Accident 1 FSAR 14.5.2 None Noz (misloaded bundle in the

______core) 4 DBA Loss of Coolant Accident 1 FSAR 14.5.3 General Yes

______Emergency 5 DBA Main Steam Line Break 1 FSAR 14.5.4 Site Area Yes Emergency 6 DBA Fuel Handling Accident 5 FSAR 14.5.5 Site Area Yes Emergency 7 DBA Radwaste System 1 FSAR 14.5.6 None No*

Accident 8 Assumed Aircraft Probable Threat 1 10CFR50.54hh Alert Yes for (1) analysis purpose RG 1.214 9 Assumed Control Room Evacuation 1 FSAR 14.6.1 Alert Yes for and Alternate Shutdown Analysis (fire in main control room) I0CFR50 Purpose Appendix R Fire Hazard Analysis 10 Assumed Station Blackout 1 ISG IV.C Site Area Yes for Emergency analysis purpose 11 Assumed LOCA - General 1 ISG IV.C General Yes for Emergency with Emergency Analysis radiological release and

____Purpose PAR 12 Assumed LOCA with entry into 1 ISG IV.C General No*

for severe accident Emergency Analysis procedures.

Purpose ________________________ _____

Page 14 PNPS Page 1.4

PNPS ON-SHIFT STAFFING ANALYSIS REPORT 13 Assumed Appendix R Fire I ISG IV.C AlertNo for Analysis

____ Purpose _____________ ____ _______

1 Plant mode per FSAR or assumed for anaiysis purpose 2

No EAL met on plant condition or dose.

3 pNPS does not meet the NEI110-05 intent for the analysis of implementing SAMG. NEI 10-05 Section 2.11 states that the analysis of the ability to implement SAMG focuses on the reasonably expected initial mitigation action that would be performed by on-shift personnel other than licensed and non-licensed operators. The actions assessed by NEI 10-05 are those which implement the initial site-specific Candidate High Level Action assuming the core is not ex-vessel (i.e., no reactor vessel failure), and there is no actual or imminent challenge to containment integrity. PNPS does include maintenance qualified to perform maintenance job tasks in minimum staffing and does not have contingency actions that must be completed by maintenance in the severe accident procedures.

4 Appendix R Fire is bound by the Control Room Fire and Alternate Shutdown. Analysis is not required.

Page 15 PNPS Page 15

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VII. APPENDIX B] - ON-SHIFT STAFFING ANALYSIS A. Accident Analysis #1 - Design Basis Threat (DBT)

1. Accident Summary
  • Land and/or waterborne HOSTILE ACTION directed against the Protected Area by a HOSTILE FORCE. Assume adversary characteristics defined by the Design Basis Threat. Security Code Red condition
2. Accident Specific Assumptions Made
  • This event assumes the threat is neutralized immediately when inside the protected area fence, no significant damage to equipment or systems that require corrective actions before the ERO is staffed, no radiological release, and no fire that requires firefighting response before the ERO is staffed.
  • Assume at power in Mode 1
  • Security notifies the Shift Manager of condition Security Code RED.
  • Assume all non-security staff is located inside the protected area at their normal work station when the event occurs.
  • Assume all systems function and the core remains covered. No fuel damage and no release.
3. Procedures Reviewed for Accident Response
  • Procedure 5.3.14, Security Incident
  • EP-IP-1 00, Classification and Notifications
  • Procedure 2.1.6, Reactor Scram Page 16 PNPS Page 16

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables PNPS V-ON-SHIFT TABLE POSITION T2/L1 T5/L1 T5/L3 1 Shift Manager Emergency Plan 60 T5/L5. No Yes Table B-i T5/L6 T5/L8 T5/L10

_______________T5/L 14 _ _ _ _ _ _ _ _

2Control Room Emergency PlanN/T2LNoo Supervisor Table B-I Shift Technical EegnyPa 2L 3 Advisor/Shift Engineer ablrenc B-i n 60 T2/L3 No No (3 rd SRO) Table_____B-1 ___T5___L__

Licensed Nuclear EegnyPa / 2L oN 4 Plant Operator (RO ablrencB-iN/ 24NoN Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrencB lai N/A T2/L5 No No*

Non-Licensed 6 Nuclear Plant Emergency Plan N/A T2/L6 No No O)perator (NLO #1) abe-Nlon-Licensed T5/L9 7 . cea lat Emergency Plan 60 T5/L1 1 No No Nuclea Plant able B-i Operator (NLO #2) _______ T5/L1 3 ____

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #f4) al -

Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -

ii Fire Brigade #1 Emergency Plan N/A N/A No No

______________ Table B-I1________ _____

12 Fire Brigade #2 Emergency Plan N/A N/A No No

______________ Table B-I1________ _____

13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-I1________ _____

14 RP Technician Emergency Plan 60 N/A No No

_____ ____ Table B-I1________ _____

Security Contingenc) 15 Security Plan / E-Plan Table 60 T5/Li15 No No

_____ ____ B-i1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

PNPS Page 17

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-~ PLANT OPERATIONS &SAFE SHUTDOWN.

~ One Unit-One Control Room Analysis #1 beT Security Thr~at Minimuin~Operat;ons Crew Necessary to Implement AOPs and ~9~s orSAMGs if Applicable

Licensed Operator Training 1 Shift Manager Shift Manager Program Superisoricensed Operator Training 2 Unit Supervisor Control Room Sprio Program Licensed Operator Training 3 Shift Technical Advisor Shift Engineer/STA Program 4Licensed Nuclear Plant ~Licensed Operator Training RatrOeao#1Operator #1 Program 5Licensed Nuclear Plant Licensed Operator Training RatrOeao#2Operator #2 Program 6 uiliry pertor#1Non-licensed Non-Licensed Operator 6___ Auxi___iary ___Operator_______Plant Operator Nuclear
  1. 1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 IOther needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A Nl/A 13 I&C Technician N/A Nl/A 14 Other N/A N/A 15 Other N/A Nl/A Page 18 PNPS PNPS Page 18

PNPS ON-SHIFT STAFFING ANALYSIS REPORT LinAFie PeromdbrakAayi ontetoProligramehd 1 N/A Fire Protection Program 2 N/A Fire Protection Program 3 N/A Fire Protection Program Note: This accident does not include the need for firefighting, first aid or search & rescue.

1n-#ntSrvy DBTiThreati 2 Srvy n-it 1 In-lan Surveyae N/A 25On-site SRvey N/A 3 Ptersonnelseii Monitosring):

N/A N/A 6 Othermistey spectific task #1 (describe)

N/__

A__

Note: No chemistry or RP job function tasks for the conditions described in the DBT assumptions. RP and Chemistry take cover as directed.

I:.. PNSTAL~5-EMERGENCY :PLAN I:MPLEMENTATION :::, :: .

PNPS Page 19

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declare the emergency classification level Shift Manager Emergency Planning Training 1 ECL)Program / EP Drills Approve Offsite Protective Action NAEmergency Planning Training N/AcmenaiosProgram 3 Approve content of State/local notifications Shift Manager Pmrogram Plnin rann Emergency Planning Training 4 Approve extension to allowable dose N/A Program Licensed Operator Training Notification and direction to on-shift staff SitMngr Porm/EegnyPann

( e.g., to assemble, evacuate, etc.) SitMngr .raiigra P mrogram ,Pnnn Emergency Planning Training 6 ERO notification Shift Manager Program Abbreviated NRC notification for DBT SALicensed Operator Training 7event TAProgram 8 Complete State/local notification form Shift Manager Pmrogram Plnin rann EmrogenyPlninarann 9 Perform State/local notifications NLO#2 Pmrogram Plnin rann Program 11 Ativae EDS NO#2Emergency Planning Training 11 civae ERS NO#2Program N/A (per scenario Emergency Planning Training 12 Offsite radiological assessment asmtos rga Ememtns rogenyPlninarann 13 Perform NRC notifications NLO#2 Pmrogram Plnin rann Perform other site-specific event Licensed Operator Training 14 notifications (e.g., Duty Plant Manager, Shift Manager Prga INPO, ANI, etc.) Program_________________

15 Iersnne Accuntbilty SecuityOffcer Security Training Program / EP 15 Prsonel ccontablit Secrit Offcer Drills Page 20 PNPS Page 20

(

PNPS ON-SHIFT STAFFING ANALYSIS REPORT B. Design Basis Accident Analysis #2 - Control Rod Drop Accident

1. Accident Summary
  • The control rod drop accident (CRDA) results from an assumed failure of the control rod-to-drive mechanism coupling after the control rod (very reactive rod) becomes stuck in its fully inserted position. It is assumed that the control rod drive is then fully withdrawn before the stuck rod falls out of the core. The control rod velocity limiter, an engineered safeguard, limits the control rod drop velocity. The resultant radioactive material release is maintained far below the guideline values of 10OCFR50.67.
  • The worst case CRDA occurs during mechanical vacuum pump operation. The mechanical vacuum pump trips and the radionuclides are trapped in the condenser at atmospheric pressure to leak directly to the environment. The condenser leakage scenario is bounding for PNPS.
2. Accident Specific Assumptions Made
  • The FSAR assumes the MSIVs, MSL drains, and reactor water sample valves remain open.
  • The OSA assumes a realistic case of an immediate release from the condenser to the environment via the turbine building roof resulting in the condenser leakage EAB dose.
  • The EAL is based on 1-hr (1/2) of the FSAR EAB dose.
3. Procedures Reviewed for Accident Response
  • EIP-IP-1 00, Classification and Notification
  • EIP-EP-410, Evacuation and Assembly
  • EOP-5, Radiological Release Control
  • 6.1-220, Radiological Controls for Risk Evolutions
  • ARP-C904LC Alarm Response Procedure
  • 7.4.64, PRM Alarm Response
  • 7.3.11, Reactor and Hotwell Water Analysis Preparation Page 21 PNPS Page 21

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables T5/L3 T5/L5 Emergency Plan 60 No5Yes I Shift Manager Table B-I T5/L6 NoYe T5/L8 T5/L 10

______ ______T5/L14 ______

2Control Room Emergency PlanN/T/LNoo Supervisor Table B-I Shift Technical EegnyPa 2L oN 3 Advisor/Shift EmrecPan6T2L Noo Eng]ineer (3 rdSRO) Table B-I16 Licensed Nuclear EegnyPa /

4 Plant Operator (RO Emrec lnNAT2/L4 No No I) ~~~~able B-I1______

Licensed Nuclear EegnyPa /

5 Plant Operator (RO Emrec lnNAT2/L5 No No 2)Table B-i Non-Licensed EegnyPa /

6 Nuclear Plant Emrec lnNAT2/L6 No No

'Op e ra to r (NLO #1) T a b le B-I1_ _ _ _ _ _ _ _ _ _ _ _ _

Nlon-Licensed Emrec lnT5/L9 7 Nluclear Plant Emrec ln60 T5/L11I No No Operator (NLO #2) Fable B-I

_________T5/L13 Nlon-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -

Non-Licensed Emergency PlanN/NANoo 9 Nuclear Plant aeB-N/NA Noo Operator (NLO #4) al -

Non-Licensed IEmergency PlanN/Noo 10 Nuclear PlantN/NA Noo Operator (NLO #5) beB- /

11 Fire Brigade #1 Emergency PlanN/NANoo

_______ _______ able B-i1/ / oN 12 Fire Brigade #2 Emergency Plan N/A N/A No No

______________ Fable B-I1________

13 RP / Chemistry IEmergency Plan 60 T5/L12 No No Technician *able B-i1________ _____

14 RP Technician Emergency Plan 60 T4/L1 No No

__________ _____ able B-I1_ _ _ __ _ _ _

Security Contingencyl 15 Security P*lan / E-Plan Table 60 T5/L1 5 No No L /,:*:**!

!iS*'I::::!**!:*i *!* PNPS* TABLEE2 - PLANT OE p RkTIQNS :&* SAoFE* SHUTDO*WN!*I ° I PNPS Page 22

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

%i~~~~ii*~O e nit -*O..........

ne :Control

  • =* R*.......:

oom :,".....

=,,*=::;=*

2Anlyis#1Control Robd DroD Accident i Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method Licensed Operator Training 1 Shift Manager Shift Manager Program SuperisorLicensed Operator Training 2 U~nit Supervisor Control Room SuevsrProgram 3 Shft echicalAdvsorLicensed Operator Training 3 Sif Tchica AviorShift Engineer/STA Program Licensed Nuclear Plant Licensed Operator Training 4 Reactor Operator #1Oprtr#Prga Licensed Nuclear Plant Licensed Operator Training 5 Reactor Operator #2Oprtr2Poga 6 uiliry pertor#1Non-licensed Nuclear Non-Licensed Operator 6 uxliryOpraor#1Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis

________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A

,14 O3ther N/A N/A 15 Other N/A N/A Page 23 PNPS Page 23

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade h*":::::}:;: *:  :.: i , Analysis~#2 Control Rod Drop =Accident=',,*:' =,;= :.:!*- i¢ J:

1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The CRDA does not include the need for firefighting.

PNS ag 2 PNPS Page 24

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Postio PrfomigAalyis#2 onrolRo DrpAccident**ii!

I In-Plant Survey:_

RP#1X X X X X X X X X X X X X X X X X X 2 On-site Survey:_-

NI/A 3 Personnel Mlonitoring:

N/A _

T Job Coverage:

N/A 5 Offsite Rad

,ssessment:

(Includedin Table ,

5 6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A

  • Performance Times are estimated Notes: The following RP and Chemistry tasks are performed as prioritized by the Shift Manager and are not time critical for the first 120 minutes.
  • Post scram in plant surveys (6.1.-220 Att 1.0) directed by the CRS (2.1.6) RB in area of scram headers and tanks. =3 hours to complete
  • Onsite surveys after enter EOP-5
  • As directed by SM from checklist (EP-IP-100), RP techs assume the responsibility for onsite radiological controls using RP coordinators procedure EP-IP-261 Att 9.6.
  • Chemistry secure oxygen injection to condensate pumps as directed by the CRS (2.1.6)
  • Rx coolant sample (7.4.64, 7.3.11) directed in 2.1.6'as one of the methods to confirm rad increase, however, ARP-C904LC directs operators to close the sample valves because of radiation indication (MSL hi-hi rad). Coolant sample cannot be obtained until conditions allow opening the sample valves. T.S coolant sample is not required until 2-6 hours after shutdown.

Takes =30 minutes to complete.

  • Procedure2.1.6 directs Offgas sample (not time critical) but it isolates. Sample not required during the 60 minutes.

Page 25 PNPS Page 25

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

~.NSTBE5EMRECPLNIMPLEMENTATIOQN - *  :: - i: '

Declre he mergncyclasifiatin lvelEmergency Planning Delr1h megnycasfiainivlShift Manager ' raining Program / EP (ECL) Drills 2 pprove Offsite Protective Action N/ .Emergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Eraining Progamnn Licensed Operator INotification and direction to on-shift staff Training Program /

5 (e.g., to assemble, evacuate, etc.) Shift Manager EegnyPann TingmrenYoralang Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator 7 ,bbreviated NRC notification for DBT event N/ArangPorm Emergency Planning 8 Complete State/local notification form Shift Manager Tann rga Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Lricnsed OPeraogra 10 Complete NRC event notification form Shift Manager raiicnge POgeramo 11 *tivae EnS *IO#2Emergency Planning 11 ctvateERDS LO#Training Program 12 Offsite radiological assessment Chemistry Tcnia Eeraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NILO#2 Eraining Progamnn Perform other site-specific event Licensed Operator 14 notifications (e.g., Duty Plant Manager, Shift Manager Training Program INPO, ANI, etc.) __________

15 Personnel Accountability Security Security Training Program Page 26 PNPS Page 26

PNPS ON-SHIFT STAFFING ANALYSIS REPORT C. Design Basis Accident Analysis #4 - Loss of Coolant Accident

1. Accident Summary
  • This event involves the postulation of a spectrum of piping breaks inside containment varying in size, type, and location. Break of a large .

recirculation pipe represents the limiting pipe break inside the containment. Reactor scram, MSIVs isolate, ECCS initiates and injects.

  • Radiological release to the atmosphere was assumed to occur via drywell leakage, MSIV leakage, and ECCS leakage. DW and ECCS flow through SGTS and released to the environment through the main stack.

MSIV leakage is ground level, unfiltered release through the condenser and high pressure turbine.

2. Accident Specific Assumptions Made
  • No operator action for the first 10 minutes when they initiate one RHR in Containment Cooling.
3. Procedures for Accident Response
  • EP-IP-1 00, Emergency Classification and Notification
  • EP-IP-300, Offsite Radiological Dose Assessment
  • EOP-5, Radiological Release
  • EP-IP-240, Emergency Security Organization Activation and Response
  • EP-I P-400, Protective Action Recommendation Page 27 PNPS PNPS Page 27

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables T2/LI T5/L1 T5/L3 T5/L4 1 Shift Manager Emergency Plan Table 60 T5/L5 No Yes B-i T51L6 T5/L8 T5/L10

____ ____ ____ ___ ____ ___ T5/L14_ _ _ _ _ _

2 ontrol Room Emergency Plan Table N/T2LNoo Supervisor B-i Shift Technical EmrecPlnTbe 6T2LNoo 3 *dvisor/Shift EmrecPlnTbe 6T2LNoo

__ _Engineer ( 3 rd SRO) B-i Licensed Nuclear EegnyPa al / 2L oN Liceanse Nueratr(R Emergency Plan Table N/A T2/L4 No No NnLicensedNula 65 ula Plant Oeao R Emergency Plan Table N/A T2/L6 No No Operatr (NL #1) -i Non-LicensedT5L 6 NuclerPlant Emergency Plan Table NAT2LNoo Operator (NLO #2) ______ TL1 ______

Non-Licensed Emrgnc/PanTal 8 Nuclear Plant B-ignc N/ATale 6 N5/A1 No No Operator (NLO #3) _____________ T5/L13____

Non-Licensed 9 ula ln Emergency Plan Table N/A N/A No No Nuclar Pant B-i Operator (NLO #4) ______

Non-Licensed EegnyPa al 10 Nuclear Plant B-igny la abe N/A N/A No No Operator (NLO #4)______

10 FireBiade #1an Emergency Plan Table N/A N/A No No

_____ ____ B-i1_ _ _ _ _ _

12 Fire Brigade #2 Emergency Plan Table N/A N/A No No 13 RP / Chemistry Emergency Plan Table 60 T5/L12 No No Technician B-i1______ ______

14 RP Technician Emergency Plan Table 60 T4/L1 No No B-i1______ T4/L2 __ ____ ______

15 Security Security Contingency 60 T5/L1 5 No No

______________Plan / E-Plan Table B-i1 ______ _______ ____________

PNPS Page 28

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic Title/Role On-Shift Position Task Analysis 1 Shift Manager Shift Manager raiicnge POperamo

____ ___ ___ ___ ___ ___ ____ ___ __ TrainingProg~ram 3 Licensed Operator Shift TuehialAvisor Shiftro Engine uer/STA r Trainingl Program Licesed uclar Pant Licensed Operator 4 SReato Operhiat dior#Shperto #1inerSTrainingProg~ram 5 eco prtr# Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator #12 Training Program 6 uxiciary Operator #1 NnLicensed Nuclear Pl n on-Licensed Operator PlnOperator #1 Training Program 7 Auxiliary Operator #21/

8 Other needed for Safe Shutdown N/A X/

9 Other needed for Safe Shutdown N/A X/

10 Other needed for Safe Shutdown N/A /

Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic TitlelRole On-Shift Position Task Analysis Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 29 PNPS Page 29

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 5 N/A N/A Note: The LOCA does not include a fire.

Page 30 PNPS Page 30

PNPS ON-SHIFT STAFFING ANALYSIS REPORT LRP#1(ositionPromen requirements) & as directed by SM _

2 On-site Survey:X X X X X X X X 3 Personnel Monitoring:

N/A T Job Coverage:

N/A__

50Offsite Rad Assessment:

(Included in Table 5

6 Other site specific RP (describe): N/A 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

. __N/A

  • Prorac Times are estimated Page 31 PNPS Page 31

PNPS ON-SHIFT STAFFING ANALYSIS REPORT i ne* ! Func ion. Task O rrS it i P osition*iji Task*: Analysis:................

Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift ManagerrangPorm Emrgencyg Planning 4 Approve extension to allowable dose Shift Manager Emraining Progamnn Notiicaionand to n-siftstaf iretio(eg.,Licensed Operator Training to assembleio evacuairetenetc.) siftff(. Shift Manager Program I Emergency

_____assemb _____e,__evacuate,______et___.___Planning Training Program Emergency Planning 6 ERO notification Shift Manager Training Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann

_____________ ___ ______ ____ ___ ___ ___ ___ ___ ___ __ rogram Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civat ERD raiingProgram 11 AciTechnicianO#2Emergency Planning 12' Offsite radiological assessment Chemistry ehnca Emraining Progamnn 13 Prfom NR noifiatios NO#2Emergency Planning 13 Prfom NR noifiatios NO#2Training Program 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) Program__________________

15 Personnel Accountability Security Security Training Program Page 32 PNPS Page 32

PNPS ON-SHIFT STAFFING ANALYSIS REPORT D. Design Basis Accident Analysis #5 - Main Steam Line Break

1. Accident Summary
  • This event involves the postulation of a large steam line pipe break outside containment. It is assumed that the largest steam line instantaneously and circumferentially breaks at a location downstream of the outermost isolation valve. The plant is designed to detect immediately such an occurrence, initiate isolation of the broken line, and actuate the necessary protective features. This postulated event represents the envelope evaluation of steam line failures outside containment.
2. Accident Specific Assumptions Made
  • Emergency Classification is not required based on the break of the main steam line. This analysis EAL is based on the FSAR MSLB accident EAB dose.
3. Procedures for Accident Response
  • EP-IP-IO00, Emergency Classification and Notification
  • EP-IP-1 00.1. Emergency Action Levels
  • EP-IP-300, Offsite Radiological Dose Assessment
  • EOP-5, Radiological Release
  • EP-IP-300, Offsite Radiological Dose Assessment

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
,'*i i  ;*.;:*:* : ,, ==:*
i!**!==:

= A P PE.N D IX B ,;*; =:=:, =* i :*! ::'

On-shift Pos E-Pan:=

=itin Reference.. =Augnmertation Role In Tlable Unana...................yzed............

TMS.....**

T2/LI T5/L1 T5/L3 1 SitMngr Emergency Plan 60 TISNo Yes Shfaae able B-I T5/L6 T5/L8 T5/L10 T5/L 14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-i Shift Technical 3 Advisor/Shift Emergency Plan 6 2L oN

____Engineer,_(

3 rd SRO) Table B-I 0T/L oN Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Tablgenc B-I/AT2L No No

______ 1)

Licensed Nuclear EegnyPa / 2L 5 lant Operator (RO Emrec ln NAT/5No No

____2) Table B-I Non-Licensed 6 Nuclear Plant Emergenc Plan N/A T2/L6 No No

____Operator (NLO #1)TalB-Non-Licensed T5/L9 7 Nuclear Plant Emergency Plan 6 5L oN Operator (NLO #2)al - T5/L1 3 _____

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #3)TalB-Non-Licensed 9 Nuclear Plant Emergency Plan N/A NIA No No

____Operator (NLO #4) al -

Non-Licensed 10 NcerPat Emergency Plan N/A N/A No No

____Operator (NLO #5 al -

11 Fire Brigade #1 Emergency Plan NIA N/A No No

_____________ Table B-i1______ ______

12 Fire Brigade #2 Emergency Plan N/A N/A No No

_____________ Table B-I1______ ______

13 RP / Chemistry Emergency Plan 60 T5/L12 No No

____echnician Table B-I 14 RP Technician Emergency Plan 60 T4/L1 No No B-I T____________able T4/L2 Security 15 Security Contingency Plan 60 T5/L15 No No

___________________ / E-Plan Table B-i1 _____________ _____________

Page 34 PNPS Page 34

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2-=PLANT OPERATIONS & SAFE SHUTDOWN=

i ;*i:iil:;i;i Analysis # 5 MaIn SteamrLneBak(LB Minimum Operations Crew Necessary to Implement AQPs and EOPs or SAMGs if Applicable Line =# Generic Titl~elRole '!:: *!:: : *i; = On-Shift *Posit~ion,:;' i :i Tsk Anialysisl :i*-:= ,

1 Shft anaer SiftMangerLicensed Operator ShiftManagerShiftManager raining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator

_______Training Program 3 Licensed Operator Shift Technical Advisor Shift Engineer/STA Training Program 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator #1 Training Program 5 RatrOeao#2Licensed Nuclear Plant Licensed Operator RatrOeao#2Operator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 jOther needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line'# Generic Title/Role On-Shift Position Task Analysis

_________________________ _______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A Nl/A Page 35 PNPS Page 35

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The MSLB analysis does not include a fire.

Page 36 PNPS PNPS Page 36

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

<*+,:,<, ,:,*: ,.,:,;Analysis #5 M ain Steam :Line ,Break: M SLB)...:*,: ....  :*:, .......... ...

I Function / Task __ __ ___;____! '**  ::;*<;1  ;::*,.*!':,

N 5 15 25 35 45 55 65 75 85-E 010 15 20 25 30 35 4045 50 55 60 65 70 75 8085 90 1 In-Plant Survey:

_RP#1 X X X X X X 2 On-site Survey:X X X X X X X X X RP#1 3 Personnel Monitoring:

N/A_

4 Job Coverage:

N/A.

50Offsite Rad Assessment:

Tabie 5 6 Other site specific RP (describe):

N/A 7 Chemistry Function task #1 (describe)

_N/A_

8 Chemistry Function task #2 (describe)

N/A___

  • Performance times are estimated Notes: RP Survey RX bldg. around scram valves (6.2-064) then performs onsite surveys Chemistry secure oxygen injection as directed by SM Page 37 PNPS Page 37

PNPS ON-SHIFT STAFFING ANALYSIS REPORT a;I~

PNPS TABLEIF I 5-TEMERGNCY PANAMLYSISREPORT plI Q Line#iucto OnShif PostionTask ....... Analys Emergency Planning Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Eraining Progamnn I Emergency Planning 4 Approve extension to allowable dose IN/ArangPorm Licensed Operator Training Notification and direction to on-shift staff Shift Manager Program /Emergency

,(e.g., to assemble, evacuate, etc.) Planning Training Program 6 IEO ntifcaton SiftMangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event NI/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Eeraining Progamnn 9 P)erform State/local notifications NLO#2 Emergency Planning

_____________________________ ________________ Training Program

" Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 *ctivte EDS NO#2Emergency Planning 11 ctvateERDS LO#Training Program Techncian Emergency Planning 12 Offsite radiological assessment Chemistryi Tcnia Training Program 13 Prfom NR noifiatiosNO#2Emergency Planning 13 Prfom NR noifiatios NO#Training Program 14 Perform other site-specific event notifications Shift Manager Licensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) ___________Program 15 Personnel Accountability Security Security Training Program Page 38 PNPS Page 38

PNPS ON-SHIFT STAFFING ANALYSIS REPORT E. Design Basis Accident Analysis #6 - Fuel Handling Accident

1. Accident Summary
  • The fuel handling accident is assumed to occur as a consequence of a failure of the fuel assembly lifting mechanism, resulting in the dropping of a raised fuel assembly onto the core. The drop causes mechanical damage to the bundle being dropped.
  • The drywell and reactor building are open with ventilation running. All releases to the environment are through the reactor building ventilation.
  • The drop of a fuel bundle in containment over the reactor pressure vessel bounds a drop of a fuel bundle in the fuel building due to the greater drop height.
2. Accident Specific Assumptions Made
  • Onsite personnel will be in accordance with the refuel outage staffing plan that includes additional SROs, ROs, NLOs, RP Techs, and Maintenance.
3. Procedures for Accident Response
  • EOP-5, Radioactive Release Control
  • 5.4.3, Refueling Floor High Radiation Page 39 PNPS Page 39

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables APPENDX B! PNPS*TABL I N-SHIFT POSITIONS; -;***

inel ... . . . .Ro....l Au m naio... in.. Unana..yzed TMSII T2/L1 T5/L1 T5/L3 Emergency Plan 60T5/L5 No Yes I Shift Manager Table B-i16 T5/L6 T51L8 T5/L1 0

____ __ ___ ___ _________ ___ __ ___ ___ ___ ___ T5/L 14 2 Control Room Supervisor Emergency Plan N/A T2/L2 No No Table B-i Shift Technical EegnyPa 3 Advisor/Shift Engineer Table B-i2/ / / /

___( 3 rd SRO)__ ______

4Licensed Nuclear Plant Emergency Plan N/A T21L4 No No Operator (RO #1) Table B-i1_________ _____

Licensed Nuclear Plant Emergency PlanN/T2LNoo Operator (RO #2) Table B-i1____ ______ _____

6Non-Licensed Nuclear Emergency Plan N/A T21L6 No No Plant Operator (NLO #1) Table B-i______ __________ _____

T5/L9 7Non-Licensed Nuclear Emergency Plan 60 T5/L11I No No Plant Operator (NLO #2) 'able B-i T5/L1 3_____ ____

8 Nlon-Licensed Nuclear iEmergency Plan N/A N/A No No Plant Operator (NLO #3) Fable B-i1________ ____ ___________

Non-Licensed Nuclear Emergency Plan N/A N/A No No Pl:)ant Operator (NLO #4) *able B-i1________ ___________

10 Non-Licensed Nuclear IEmergency Plan N/A N/A No No Plant Operator (NLO #5) rable B-i1________ ____ ___________

11 Fire Brigade #1 Emergenc Plan N/A N/A No No 12Fr rgd 2Emergency Plan N/A N/A No No

__2 __ire _Brigade_#2_Table B-i1________ _ _ _ _ ______ _____

13 RP / Chemistry Emergency Plan 60 T5/L12 No No Technician Iable B-i_________ _____ ___ ____ _____

14 RPTechnician Emergenfcy Plan 60 T4/L3 No No able B-i1_ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _

Security 15 Security Contingency Plan / 60 T5/L1 5 No No

_________________E-Plan Table B-I_______ _____

Page 40 PNPS PNPS Page 40

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNS.A.E2-PLN OPERATION & SAF SHU.TDOWN  :*': " .........

.. ... *1"I ..ILO J.....................

........ ........ . . .neI UItI -l O n e.. n tro R o o m...... . ... I. . .... . ... . ..I [. .

    • i*]*:': ':'*

. ::*:*::Analysis*

. . * *:;;!::**; #:-8 F elH nd ig.c id n Line # Generic Title/Role On-Shift Position task Analysis

_________________________________________ ontrolling Method Licensed Operator I Shift Manager Shift Manager Training Program 2 Unt Speriso CotrolRoo SuervsorLicensed Operator

___ nit Supervisor______ontrol__Roo__ Supervisor_____ Training Program 3 Licensed Operator Shift Technical Advisor ]Shift Engineer/STA Training Program 4 Oeraor Ractr 1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator #1 Training Program.

5 prtr# Leco icensed Nuclear Plant Licensed Operator RatrOeao#2Operator #2 Training Program 6 ,uxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_____ _______________________Plant Operator #1 Training Program 7 ,uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other' needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

________________________ _______________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 41 PNPS Page 41

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

  • :i:~~~~PNPS ,TABLE:3'-:FIREFIGHTING::I, .:,

I N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A-5 N/A N/A Note: FHA does not include a fire.

Page 42 PNPS Page 42

PNPS ON-SHIFT STAFFING ANALYSIS REPORT N * ; 5- 1*0.-.15- '20-* 25- 30-: 35 45- 50-" 55-' 60 :70 80- *85-;

I In-Plant Survey:

N/A___

2 On-site Survey:

N/A 3 Personnel Monitoring:

RP#1X X X X X T Job Coverage:

N/A 50Offsite Rad Assessment:

(Included in Table 6 IOther site specific RP

(,describe):N/A .

7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A _

  • Times are estimated Note: RP#1 assist in monitoring and decon Of building evacuees at the Green Line.

Additional RP on shift for refueling/outage to assist with tasks PNPS Page 43

.PNPS ON-SHIFT STAFFING ANALYSIS REPORT i i* =iio:

il:* PN=:

PS TABLE 5.*- EMERGENCY PL*AN IM PLEM ENTATION~i:; 'i** i LieFuncto I Tsk*I On-Shift Positio .*Task Analysis*.!

  • 1 Declare the emergency classification level ShftMaagrraining ProgamnniEP (ECL) Drills 2 ,pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 &pprove content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 &pprove extension to allowable dose N/A Emraining Progamnn LcneOprtrTrainingPrga Notification and direction to on-shift staff (e.g., ShitcanaerProra OpEergerrancy g t o assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 /bbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 raningProgram 11 /*tiTechnicianO#2Emergency Planning 12 Offsite radiological assessment Chemistry Tcnia Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) rga 15 Personnel Accountability Security Security Training Program Page 44 PNPS Page 44

PNPS ON-SHIFT STAFFING ANALYSIS REPORT F. Accident Analysis #8 - Aircraft Probable Threat

1. Accident Summary
  • The analysis includes all emergency response actions taken prior to an aircraft impact in accordance with RG 1.214 for an aircraft threat that is greater than 5 minutes, but less than 30 minutes from the site, and considers the dispersal of the site fire brigade away from target areas for firefighting.
  • The analysis does not include a scenario or response actions taken during or after a crash.
2. Accident Specific Assumptions Made
  • The Shift Manager receives the call from the NRC of probable aircraft threat.
  • All non-security on-shift personnel are inside the protected area fence at their normal workstation.
3. Procedures for Accident Response
  • 5.3.1 4.1, Airborne Threat Pae 4 PNP PNPS Page 45

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
    • .:*~~~~NPS :AL*t*O*HFiP*OSITiONSI!!:* i *:ii ,:

- ________Aayi #8-Aircraft* Prbale* Threa,**=!!l**t _________ ______-_____* ,.

  • !i~
      • *ii:**::***iii
; : :: * * ::: *'i:' Augme:ntation Role :in Table # ! Unana*lyzd i TMS Required?

Line # On-shift Position ;* E-Plan Reference *Elapsed ;Time I

Line #:I  :;:ask?

T  %* ' :,, *...

T2/L1 T5/LI T5/L3 1Shift Manager Emergency Plan 60 T15No Yes Table B-I T5/L6 T5/L8

._ T5/L1 0

________________ T5/L14 _ _ _ _ _ _

2 Control Room Emergency Plan N/A T2/L2 No No

___Supervisor Table B-i _______ _______ ______

Shift Technical EegnyPa 3 Advisor/Shift Emrec ln60 T2/L3 No No

___Engineer ( 3 rd SRO) TaleB-Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO ablrenc B-I/AT2L No No Licensed Nuclear EegnyPa / 2L 5 Plant Operator (RO ablrenc B-i /AT2 No No 2)

Non-Licensed EegnyPa oN 6 Nuclear Plant EegnyPa / 2L oN

___Operator (NLO #1) al - / 2L Non-Licensed 7 *lulear lant Emergency Plan60T/1Noo T5/L9 7 Nucler Plant Table B-i10T/I oN

___)perator (NLO #2) ________T5/L1 3 _____ _____

Non-Licensed EegnyPa / 3L oN 8 Nuclear Plant EegnyPa / 3L oN

___Operator (NLO #3) al -

Non-Licensed EegnyPa / 3L oN 9 Nuclear Plant EegnyPa / 3L oN

___Operator (NLO #4) al -

Non-Licensed EegnyPa 10 Nuclear Plant EegnyPa / 3L oN Operator (NLO #5 al - / 3L oN 11 11Fr rgd 1

_FireBrigade#1 Emergency Table B-i1______

Plan N/A T3/L4 No ______

No 12 Fire Brigade #2 Emergency Plan N/A T3/L5 "No No able B-i T________ _______ _ __ _ _ _

13 RP / Chemistry Emergency Plan 60 N/A No No Technician Table B-i1______

14 RPehiin Emergency Plan 60 T4/L6 No No RP Technician able B-I1______ ______

Security Contingency 15 Security Plan / E-Plan Table 60 N/A No No

_______________ EB-I__ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Page 46 PNPS Page 46

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line # Generic TitlelRole 'On-Shift Position Task Analysis

_____ _________________________ ________________Controlling Method 1 Ishift Manager Ishift Manager Licensed Operator

______ __________________________ ________________Training Program 2 Jnit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 hitTechnical Advisor Shift Engineer/STA Licensed Operator ShiftTraining Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecorOeatr# perator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator

____uiiayOeao Operator #2 Nuler raining Program 6 uxliryOpraor#1Non-licensed Ncer Non-Licensed Operator P~lant Operator #1 Training Program 7 *,xlayOperator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

___ ___ ___ ___ ___ ___ ___ ___ Controlling Method 11 Mechanic N/A NI/A 12 Electrician N/A N/A 13 I&C Technician N/A N,/A 14 Other N/A N/A 15 Other N/A Nl/A Page 47 PNPS PNPS Page 47

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade i!:::*:!: :::*:... : , :ii!':ii: PNPS!*'i::!*::

TA=*I~
B LEicr 3 -.....

f:: rob beEFaIG FI:** .IN G: ....

HT........  :* ==

i : ::*:,.' :=' :,;: :...:::::..

1 NLO #3 Fire Brigade Training 2 NLO #4 Fire Brigade Training 3 NLO #5 Fire Brigade Training 4 FB #1 Fire Brigade Training 5 FB #2 Fire Brigade Training Note: FB goes to hardened facility outside the reactor building after performing tasks directed by the CRS.

Page 48 PNPS Page 48

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Lv PoitonPefomance Time Period After. Emergency Declarato (mnte)

I In-Plant Survey:

2 On-site Survey:

3 Personnel Monitoring: ____

T Job Coverage:

5 Offsite Rad Assessment:

(Includedin Table 5 6Other site specific RP#1 goes to outside PA TChemistry Function task #1

(,describe) 8Chemistry Function task #2 (describe)

Note: RP relocates to outside the protected area but stays on PNPS property and Chemistry evacuates the process building and takes cover in a secure area.

Page 49 PNPS Page 49

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

'I!"i;:~PNPS TABLE 5- E MERGENCY PLAN IMPLEM ENTATION! i !,.: *, =.' :;

  • Line
  • Function.ITask* ,.,* :i*.:.... *o::,r,,On-Shift Position: ! l i"Task Analysis!*~!i**!::

" " ....*':i:__...............______: Co tr lln M ethod Emergency Planning Declare the emergency classification level SitMngrriigPormIE (ECL)Drills 2 *pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program

] Emergency Planning 3 &pprove content of State/local notifications Shift Manager Training Program 4 &prov o alowale exensonoseN/AEmergency Planning 4 ppove llowbledoseN/Araining xtesionto Program Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program I Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notficaionShif MangerEmergency Planning 6 ER notficaionShif Mangerraining Program Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Eraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram ChemistryteTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl Program Emergency Planning 13 Perform NRC notifications NILO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 Shift ManagerPrga (e.g., Duty Plant Manager, INPO, ANI, etC.) Program_____

15 Personnel Accountability N/A Security Training Program Page 50 PNPS Page 50

PNPS ON-SHIFT STAFFING ANALYSIS REPORT G. Accident Analysis #9 - Control Room Evacuation and Alternate Shutdown

1. Accident Summary
  • Fire in the Main Control occurs that requires control room evacuation.
  • Station personnel evacuate the control room taking time only for those immediate actions within the control room that can be accomplished in seconds. Station personnel take all subsequent action required to bring the reactor to a cold shutdown condition using controls and equipment located outside the control room.
2. Accident Specific Assumptions Made
  • The ATC operator will perform the immediate actions of the procedure to initiate a manual scram and verify all rods in before evacuating the control room.
  • Subsequent actions are performed from outside the control room.
3. N Procedures for Accident Response
  • 2.4.143, Shutdown From Outside the Main Control Room
  • EP-IP-1 00, Classification and .Notifications

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables ILine # On-shift P*ositioni~ *"E-lan Reference Elapsed Yim+e!. *ii,!;LJine~f~i # i Task?,:;::  ;'i*!,*i*:~;;

T2/LI T5/Ll T5/L3 1 Shift Manager Emergency Plan 60T5/L5 N e Table B-I 6 T5/L6 N e T5/L8 T5/LI10

________________ ~~~T5/L 14 __ _ _ _ __ _ _ _ _ _ _

2Control Room Emergency PlanN/T2LNoo Supervisor Table B-i / 2L oN Shift Technical EegnyPa 3 Advisor/Shift EegnyPa

___Tnier(r R) able B-i 60 T2/L3 No No Licensed Nuclear 4 Plant Operator (RO Emrec lnNAT/4No No

  1. 1 ) able B-i Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo Table B-1i/ 2L oN Non-Licensed 6 Nuclear Plant Emergency PlanN/T26Noo

___Operator (NLO #1) al -

Non-Licensed T51L9 7 Nuclear Plant Emergency Plan60T/iNoo Table B-i 0T/1 oN Operator (NLO #2) _______T5/L13______

Non-Licensed 8 Nuclear Plant Emergency PlanN/T3LNoo Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency PlanN/T32Noo

___Operator (NLO #/4) al -

Non-Licensed EegnyPa 10 Nuclear Plant NoegecNola

___Operator (NLO #5) al - / 3L 11 Fire Brigade #1 Emergency PlanNAT34Noo able B-i T_________ N__AT3/L4 _ No______ No_____

12 Fire Brigade #2 Emergency Plan N/A T3/L5 No No

_____ ___ Table B-I1_ _ _ _ _ _ _ _ _ _ _ _ _ ______

13 RP / Chemistry Emergency Plan 6 / oN Technician Table B-i 60______ N/A_____ No____No _

14 RP Technician Emergenc Plan 60 T4/L4 No No Security 15 Security Contingency Plan/I 60 N/A No No

______________E-Plan Table B-1 _______ ______ ______ ______

PNPS Page 52

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

  • PNPS TABLE 2 _-:PLANT OPERATIONS & SAFE SHUTDOWN : , i:: :ii!:** l**i
illAnalysis
  • ! ;i* :i #9- CR,,Evacuation &Alternate SDi;*:*';

Minimu'm Operations Crew Necessary to Im plemnent AOPs :an~d EOs o=r =SAMGs !ifApplicable  ;,= *,'

Line # Generic Title/Role On-Shift Position Task Analysis

_________________________Controlling Method Licensed Operator 1 Shift Manager Shift Manager Training Program SuperisorLicensed Operator 2 Unit Supervisor Control Room Sprio Training Program Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 ecopeao 1Operator #1 Training Program 5 Ractr pertor#2Licensed Nuclear Plant Licensed Operator 5 ecopeao 2Operator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role IOn-Shift Position Task Analysis

_____ __________________________Controlling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 I&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 53 PNPS Page 53

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

.. ..* i*:i:*
':  : i:,-.*:::....
  • i : :,:,*,
...* : als*#9:
PNPS .. *TABLE ~~3:- FIREFIGHTIT

..C ... at n it NG r te$

" ': ,**  ::o. :.,::

Lne.. ... ..... Per......

fo byllllil' iirmed i Taski A ay is Co toln Method 1 NLO#3 Fire Brigade Training 2 NO4Fire Brigade Training 5 FB2Fire Brigade Training Page 54 PNPS PNPS Page 54

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

..... PNPS.TABLE 4- RADIATION PROTECTION ANDi CHEMISTRY/,,:,= .. ,:=,=

'i:* ..... Analysis #9 CR Evacuation & Alternate ,SD~*:::'-'** i*

E 0-5atigfas:i:

2.:: :i10- 1'5- 20-.125. :30-* 35 '45- 50-~ 55 i65- 70-1"75-180- *85-;,

______.___ "., 101::f5.20.'25;-30=: 35: '40 4:5: :50: 55 :601 6570 ,o:75'80o/85,:90:

1 In-Plant Survey:

2 On-site Survey:

3 Personnel Monitoring: ___

4 Job Coverage:

RP#lSupport X X X X X X X X X X X X X X X X X FB 50Offsite Rad Assessment:

(Includedin Table 5 6 Other site specific RP (describe):

7 Chemistry Function task #1 (describe) 8 Chemistry-Function task #2 (describe)

PNPS Page 55

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

! .!;;:!::* :.:* ":PNPS *TABLE 5- *EM ERGEN CYi PLEAN I1M PLEM ENTATI ON* i, Declre he mergncyclasifiatin lvelEmergency Planning DECLar)h mrec lasfcto ee Shift Manager Training Program i EP (ECL)Drills

,pprove Offsite Protective Action Emergency Planning 2 Recommendations N/A Training Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emrgencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Notiicaionand to n-siftstaf.(eg.,Licensed iretio Operator Training Noiia5naddrcin oo-hf tf egShift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program Emergency Planning 6 ERO notification Shift ManagerrangPorm Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga 8 Complete State/local notification form Shift Manager Emraining Progamnn 9 Perform State/local notifications NLO#2 Emergency Planning Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 Ativae EDS NO#2Emergency Planning 12 Offsite radiological assessment N/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn 14Perform other site-specific event notifications SitMngrLicensed Operator Training (e.g., Duty Plant Manager, INPO, ANI, etc.) _______rogram____________

15 Personnel Accountability N/A Security Training Program Page 56 PNPS PNPS Page 56

PNPS ON-SHIFT STAFFING ANALYSIS REPORT H. Accident Analysis #10 - Station Blackout

1. Accident Summary
  • At power, normal lineups and no additionai events
  • RCIC starts to restore level and SRVs lift in the relief mode to control pressure
2. Accident Specific Assumptions Made
  • Assume the Shift Manager recognizes power cannot be restored within 15 minutes after the loss before the 15 minute SBO EAL period has expired.
3. Procedures for Accident Response
  • 5.3.31, Station Blackout
  • EP-IP-1 00, Classification and Notifications

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables i *l~i::**::*i: ,: PN PS:;T* E ON DS I FT.~ili*::;i
)i '**ABL :ii,**  :*!" : ii*!::*':* :i:; ':

- ___________ Anaysis#10 Staton BackoT2/L1___

T5/L5 T5/L8 T5/L31 T5/L14 2 Control Room Emergency Plan N/A T2/L2 No No Supervisor Table B-I 3AvsrShiftTehia Emergency Plan 60 T2/L3 No, No Engineer ( 3 rd SRO) Table B-I iLcensed Nuclear 4 Plant Operator (RO Emergency Plan N/A T2/L4 No No

- ~Table B-i Licensed Nuclear EegnyPa 5 Plant Operator (RO ablrenc B-i n N/A T2/L5 No No Non-Licensed EegnyPa /

6 Nluclear Plant Emrec lnNAT2/L6 No No Operator (NLO #1) al -

Non-Licensed EegnyPa60T5/L9 7 Nuclear Plant - EegnyPa60T5/LI I No No Table B-I Operator (NLO #2) T5/L13_____

Non-Licensed EegnyPa / / oN 8 Nuclear Plant EegnyPa / / oN Operator (NLO #3) al -

Non-Licensed EegnyPa / oN 9 Nuclear Plant EegnyPa / / oN Operator (NLO #4) al - /

Non-Licensed 10 Nuclear Plant Emergency Plan N/A N/A No No Operator (NLO #5) al -

11Fr rgd 1 Emergency Plan N/A N/A No No 12 Fire Brigade #2 ,Emergency PlanN/NANoo

_______ _____ Table B-I1/ / oN 13RP / Chemistry Emergency Plan 60 N/A No No 13 Technician Fable B-I1________ ____ _____

14 RP Technician Emergency Plan 60 N/A No No

_____________ TableB-I1_____________

Security 15 Security Contingency Plan / 60 T5/L15 No No

______________E-Plan Table B-i1 ________ _____ ______ _____

PNPS Page 58

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNPS TABLE 2 PLANT OPERATIONS & SAPE SHUTPOWN

~-

One Unit One Control Room Analysis #10 Station Blackout.

Mnim~um Oper#ations Cirew Ne essary: to Imple6m ent: AOPs .and EOPs or .SAMs Iif App#licab#le:j.';*::]:.**.: :;i; Line # Generic Title/Role On-Shift Position Task Analysis

________________Controlling Method 1 Shft anaer SiftMangerLicensed Operator I Shft Mnage Shit Maagerraining Program 2 Unit Supervisor Control Room Supervisor Licensed Operator Training Program Licensed Operator 3 Shift Technical Advisor Shift Engineer/STA Training Program 4 Ractr pertor#1Licensed Nuclear Plant Licensed Operator 4 RatrOeao#1Operator #1 Trainin* Program

,5 RatrOperator #2 Licensed Nuclear Plant Licensed Operator RatrOperator #2 Training Program 6 Auxiliary Operator #1 Non-licensed Nuclear Non-Licensed Operator

_____ _______________________Plant Operator #1 Training Program 7 Auxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_____ _______________ ontrolling Method 11 Mechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 Other N/A N/A Page 59 PNPS PNPS Page 59

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

    • i:**i!%***:*:*~yi*!::i*:°*L*i!***P!NPs TABLE 3-FIREFIGHTING*?i!: :L:f¸ilG *:i~i!*~i!**iiii 1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The Station Blackout Analysis does not include the need for firefighting.

Page 60 PNPS PNPS Page 60

PNPS ON-SHIFT STAFFING ANALYSIS REPORT E - , :10 ,:15i '!20* i25 30: 35!: 40 4:5 150' :55; *60.! *65 *70* 75 80 :85': 90,-

1 In-Plant Survey:

N/A 2 On-site Survey:

N/A 3 Personnel Monitoring: _N/A T Job Coverage:

N/A__

50Offsite Rad Assessment:

._Included in Table 5 6 Other site specific RP (describe):

N/A 7 Chemistry---------------------------- ----

Function task #1 (describe)

N/A___

8 Chemistry Function task #2 (describe)

N/A__

Note: RP and Chemistry do not have an assigned task for SBO. Chemistry is available for dose assessment if a release occurs.

PNPS Page 61

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Declre te emrgeny ca nsfialyisn#10e EmStationBlackout Delr1h megnycasfiainlvl Shift Manager Training Program I EP (ECL) D:rills 2 pprove Offsite Protective Action NAEmergency Planning 2 Recommendations N/Araining Program 3 Approve content of State/local notifications Shift Manager Emraining Progamnn Emergencyg Planning 4 Approve extension to allowable dose N/A Emraining Progamnn Lricnsed OPeraorgra inn Notification and direction to on-shift staff (e.g., ShitcanaerProra /OEergerrancy g 5 to assemble, evacuate, etc.) SitMngrPlanigTra inin Pmrogramy EegnyPlanning Tann rga 6 ERO notification Shift Manager Emraining Progamnn Licensed Operator Training 7 Abbreviated NRC notification for DBT event N/APrga Emrogenya lnnn 8 Complete State/local notification form Shift Manager Emraining Progamnn Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae EDS NO#2raiingProgram 11 *ctivte EDS kLO#2Emergency Planning 12 Offsite radiological assessment Nl/A Emraining Progamnn Emrgencyg Planning 13 Perform NRC notifications NiLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training (4re.g.,Duty Plant Manager, INPO, ANI, etc.) __hift ____Manager_____Program___

15 Personnel Accountability Security Security Training Program Page 62 PNPS Page 62

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Accident Analysis #11 - LOCA/General Emergency with Release and PAR

1. Accident Summary (Assumed for Staffing Analysis Purpose)
  • The unit is in a Site Area Emergency ASI when the Shift Manager is given a dose assessment update that projects >1 Rem TEDE dose at the site boundary.
2. Accident Specific Assumptions Made
  • All actions for SAE are complete.
  • The ERO would be activated at an Alert or SAE. For Staffing Analysis purpose, the T=0 clock is used for the emergency plan actions to evaluate the capability to implement the GE classification, PAR and notification functions before the ERO arrives.
3. Procedures for Accident Response
  • EP-IP-1 00, Emergency Classification and Notification
  • EP-IP-1 00.1, Emergency Action Levels
  • EP-IP-300, Offsite Radiological Dose Assessment

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

4. Tables
' *ii' i**  : *  !:;:!:*ii*:*~  :!I APPENDIX P EN I B*,B !: : ::  : *,i *~ *** *.
  • !~Augmentationi Role inTable # !*Unanalyzed:' TMS Req'uired?

T2/L1 T5/L1 T5/L2 T5/L3 1 Shift Manager Emergency Plan 60 T5/L4 No No Fable B-i T5/L5 T5/L8 T5/LI10

____ ____ ___ ____ ____ ___ T5/L14 _ _ _ _ _ _ _ _ _ _ _ _ _

2 Control Room Emergency Plan N/A T2/L2 No No

____Supervisor Fable B-I1______ ______

Shift Technical EegnyPa oN 3 Advisor/Shift EerecPan6T2LNoo

___Eng]ineer ( 3 rd SRO) 'able B-i10T2L Licensed Nuclear EegnyPa / 2L 4 Plant Operator (RO Emrec lnNAT/4No No 1)able

_____ B-I Licensed Nuclear 5 Plant Operator (RO Emergency PlanN/T2LNoo

)able T__ B-I / 2L oN Non-Licensed EegnyPa / 2L oN 6 Nuclear Plant EegnyPa / 2L oN

___Operator (NLO #1) al -

Non-Licensed -mrec lnT5/L9 7 EmergencyPPlan 60 T5/L1 1 No No Nuclear Plantable B-i15L3 _______ ______

___Operator (NLO #2) TS/L13_________________

Non-Licensed 8 Nuclear Plant Emergency Plan N/A N/A No No

___Operator (NLO #3) al -

Non-Licensed 9 Nuclear Plant Emergency Plan N/A N/A No No

'Op era to r (N L O # 4 ) le_

___ab _ _ __ __B-1_ __

Non-Licensed EegnyPa 10 Nuclear Plant Emrec lnNANANo No

___Operator (NLO #5) ___able_ _ __ _ __ __ _ ___-1_ __ _

Emergency PlanN/NANoo 11 Fire Brigade #1 Nobl No

" ~~~Emergency PlanNAN/Noo 12 Fire Brigade #2 Nobl No 13RP / Chemistry 13rechnician Emergency Table B-i1______

Plan 6T5L2No ______ ______

No 14 RP Technician Emergency Plan 60T4/L2Noo

___able____ B-1_____ ________ T4/L6Noo 15 Security Contingency Plan / 60 N/A No No

______________E-Plan Table B-i1 _______

Page 64 PNPS Page 64

PNPS ON-SHIFT STAFFING ANALYSIS REPORT

.=.:*;.:.=:=:*:.....*:" PNPS.- T.ABLE 2- IPL'ANT OPERATIONS *&SAFE SHUTDOWN:i i:*i*.. ":::*i : ,

M.nimm .Opeation Crew. Ne.essar to....mpl........e.....

.. A..

. ....a d EO .... "r ... . fA .....plcal.. .. .... I Line # Generic Title/Role On-Shift Position Task Analysis

_____ ________________________________________Controlling Method 1__ iftMange 1 Shft anaer SiftMangerLicensed Shift_______________

Manager_______Training Operator Program 2 Unit Supervisor Control Room Supervisor Lricnsed OPeraogra 3 Shift Technical Advisor Shift Engineer/STA Lricnsed OPeraogra 4 RatrOeao#1Licensed Nuclear Plant Licensed Operator RatrOeao#1Operator #1 Training Program 5 Reactor Operator #2 Licensed Nuclear Plant Licensed Operator

______________________Operator #2 Nuler raining Program 6 &uxiliary Operator #1 Non-licensed Ncer Non-Licensed Operator Plant Operator #1 Training Program 7 &uxiliary Operator #2 N/A N/A 8 Other needed for Safe Shutdown N/A N/A 9 Other needed for Safe Shutdown N/A N/A 10 Other needed for Safe Shutdown N/A N/A Other (non-Operations) Personnel Necessary to Implement AOPs and EOPs or SAMGs if Applicable Line # Generic Title/Role On-Shift Position Task Analysis

_____ _______________Controlling Method 11 IMechanic N/A N/A 12 Electrician N/A N/A 13 l&C Technician N/A N/A 14 Other N/A N/A 15 O:ther N/A N/A Page 65 PNPS Page 65

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Fire Brigade

'" "' ... *- PN , *TABLE 3 -. F REFIGHTiNG.':::  ::

1 N/A N/A 2 N/A N/A 3 N/A N/A 4 N/A N/A 5 N/A N/A Note: The LOCA/GE with PAR Analysis does not include the need for firefighting.

Page 66 PNPS Page 66

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PNP TBLE4-RADIATION PROTECTION AND'CHEI'ASTRY, ':

I In-Plant Survey:

N/A___

2 On-site Survey:

RP#1 onsite & XX XX XX XX X

__SB surveys 3 'Personnel Monitoring:

N/A T Job Coverage: _N/A 5 Offsite Rad Ssessment: Se._e Tble 5 6 Other site specific RP (describe): RP#1 Issue X X X X X KI 7 Chemistry Function task #1 (describe)

N/A 8 Chemistry Function task #2 (describe)

N/A

  • Times are estimated.

Note: RP tasks are as directed by the Shift Manager and are not time critical.

Chemistry does not have an assigned chemistry task for LOCA with PAR. Chemistry is available for dose assessment.

Page 67 PNPS PNPS Page 67

PNPS ON-SHIFT STAFFING ANALYSIS REPORT Line i),::i*=:FUnction/ITask*;:':*;**:i  ; On-Shift Positioni*i ::ii'!:Task Analysis'  :,

Emergency Planning 1 Declare the emergency classification level Shift Manager Training Program / EP (ECL) Drills 2 ,pprove Ofisite Protective Action SitMngrEmergency Planning 2 Recommendations ShfTangrraining Program Emergency Planning 3 Approve content of State/local notifications Shift Manager Training Program Emergency Planning 4 Approve extension to allowable dose Shift ManagerrangPorm Licensed Operator Training 5 Notification and direction to on-shift staff (e.g., Shift Manager Program / Emergency to assemble, evacuate, etc.) Planning Training Program 6 ER notfictionN/AEmergency Planning 6 ER notfictionN/Araining Program 7 Abbreviated NRC notification for DBT event N/A Lcne prtrTann Program Emergency Planning 8 Complete State/local notification form Shift ManagerrangPorm Emrgencyg Planning 9 Perform State/local notifications NLO#2 Emraining Progamnn Licensed Operator Training 10 Complete NRC event notification form Shift ManagerPrga 11 civae ERS NO#2 ainng rogram ChemAcstrytTechnician#2Emergency Planning 12 asessentraining Ofsie raiolgicl Program 12 asessentCheistr Ofsie rdiolgicl Tehniian Emergency Planning 13 Perform NRC notifications NLO#2 Emraining Progamnn Perform other site-specific event notifications Licensed Operator Training 14 (,e.g., Duty Plant Manager, INPO, ANI, etc.) Shift Manager Program 15 Personnel Accountability N/A Security Training Program Page 68 PNPS Page 68

PNPS ON-SHIFT STAFFING ANALYSIS REPORT VIII, APPENDIX C TIME MOTIONS STUDIES A. TMS Shift Manager Safe Shutdown Task PILGRIM NUCLEAR POWER STATION TIME MOTION STUDY OF OVERLAPPING TASKS TASK 1: PERFORM THE ASSIGNED SAFE SHUTDOWN ACTIONS JOB: SHIFT MANAGER TASK 2: PERFORM EMERGENCY DIRECTION AND CONTROL JOB: SHIFT MANAGER Page 69 PNPS PNPS Page 69

PNPS ON-SHIFT STAFFING ANALYSIS REPORT PURPOSE:

Perform a Time Motion Study to evaluate whether the performance of safe shutdown actions assigned to the Shift Manager is an acceptable task overlap to the Shift Manager's primary emergency plan function of emergency direction and control.

NOTE The Time Motion Study should be completed by simulation of performing the safe shutdown steps while the Shift Manager is demonstrating the Emergency Director function.

LOCATION:

Control Room to TB 23' RPS MG room to 23' Cable Spreading Room to TSC REQUIRED TOOLS/EQUIPMENT:

A. Procedure 2.4.143, Shutdown from Outside Control Room B. Stopwatch or watch to time actions Page 70 PNPS Page 70

PNPS ON-SHIFT STAFFING ANALYSIS REPORT APPENDIX D (NEI 10-05)

Function I Responsibility (Task) Analysis Template Event: #9 Control Room Evacuation and Alternate Shutdown Site: PNPS Position: Shift Mana~qer Line #: 1 Function jResponsibility (Task) Action Step ]Duration 1 .Safe 1.1 Perform the procedure T=0 Shutdown steps assigned the Shift SM leaves the CR and directs his Manager in procedure staff to implement assigned 2.4.143 Rev 48, Shutdown shutdown tasks from Outside the Control Room.

[step 16(a), (b)] SM arrives at 1 minute power supply panel C511I (TB 23' (T=+I)

RPS MG Room) and

  • Opens RPS Channel B, breaker B3
  • Closes RPS Channel A, breaker A3
  • Closes RPS Channel B, breaker B3

+2 - SM leaves 23' RPS MG 1 minute Room and obtains fuse pullers (T=+2) and safety equipment from the 23' Switchgear Room

- SM leaves 23' Switchgear Room 1 minute

________________________ (T=+3)

[Step 16(d)] T+3 - SM arrives at 1 minute 23' Cable Spreading Room. (T=+4)

Opens panels C941 and C942

  • Removes fuse 16A-F1 2B SM verbalizes all fuses removed, reactor scrammed and MSIV's closed

[step 16(g)] SM arrives and gains access to the TSC. SM confirms status of HCU scram valve position from field reports or EPIC.

TASK:  :,,  :,

Page 71 PNPS PNPS Page 71

PNPS ON-SHIFT STAFFING ANALYSIS REPORT TOTAL TASK DURATION: 6 minutes Function Responsibility (Task) Action Step Duration 2.Emergency 2.1 Maintain emergency 1 The Shift Direction and direction and control of the Oversight of the emergency Manager Control event response. response. maintains radio 2 contact with crew Initiate any emergency actions, for updates and NOTE directions The TMS is for the overlap period.

The total time considered for this task should be concurrent with Task 1.

.... D..FEMERGENCY

di====,=*ii*::"*==:*i:* .......=*!*TOTAL TASK DURATION 6 Miue RESULT:

Explain why it is acceptable or not acceptable for the Shift Manager to perform the safe shutdown tasks:

The procedure Subsequent Action step 13(a) states that the performance of the procedure is an Alert classification and to activate the ERO per EP-IP-100 from the TSC. In step 13(e), the Shift Manager is assigned the tasks to initiate scram, EAL notifications, MSIV closure, and verify scram valve positions.

The Shift Manager passes the RPS panels to initiate the scram and close MSIVs when traveling to the TSC from the control room. The Shift Manager performs steps 16(a), 16(c), 16(d), and 16(g) which take approximately 6 minutes. Verification of control rod position may be verified from the TSC using EPIC.

The performance of the SSD steps does not delay the classification of the emergency and the Shift Manager is able to maintain emergency direction and control by communicating with the crew by radio while they are aligning the alternate shutdown panels. Therefore, performing the safe shutdown steps is an acceptable overlapping task.

Task Performer Richard Probasco Shift Manager August 23, 2012 Evaluators Stephen Reid Operations Training August 23, 2012 Fred Guynn Fleet EP Project August 23, 2012 S______________________ Manager ___________

SThomas Diorio Pilgrim I&C (EP) August 23, 2012 Page 72 PNPS PNPS Page 72

PNPS ON-SHIFT STAFFING ANALYSIS REPORT IX. OVERLAP OF TASKS ACTIVITIES OR OTHER CONFLICTS IDENTIFIED A. Overlap Requiring Compensatory Measures

1. The Shift Engineer / STA has a collateral duty to fill out the notification message forms and to make all notifications which may detract the STA from the performance of his/her primary STA function. It is acceptable for the STA to make the abbreviated NRC notification in a Design Basis Threat but may not maintain the open line with the NRC.
2. The Shift Engineer has a collateral task to perform safe shutdown actions which may detract from the capability to perform the primary STA function.
3. The Shift Engineer has a collateral task to perform dose assessment which may detract from the capability to perform the primary STA function.

Page 73 PNPS PNPS Page 73

PNPS ON-SHIFT STAFFING ANALYSIS REPORT X. " REFERENCES

  • NEI 10-05, Rev 0, Assessment of On-Shift Emergency Response OrganizationStaffing and Capabilities
  • NSIR DPR-ISG-01, Interim Staff Guidance - Emergency Planning for Nuclear Power Plants
  • Fred Guynn, Entergy ECH Sr Project Manager, EP
  • Myra Jones, CMCG Contractor
  • Barbara Nadeau, PNPS Radiation Protection
  • Kenneth Sejkora, PNPS Chemistry
  • Ashley Ohrenberger, PNPS Ops Training
  • Karen Sullivan, PNPS EP Planner