ML16120A007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16120A007
| number = ML16120A007
| issue date = 06/29/2016
| issue date = 06/29/2016
| title = Clinton Power Station, Unit 1 - Flood Hazard Mitigation Strategies Assessment (CAC No. MF7547)
| title = Flood Hazard Mitigation Strategies Assessment
| author name = Govan T V
| author name = Govan T
| author affiliation = NRC/NRR/JLD
| author affiliation = NRC/NRR/JLD
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000461
| docket = 05000461
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 29, 2016 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville , IL 60555
, IL 60555 June 29, 2016


==SUBJECT:==
==SUBJECT:==
CLINTON POWER STATION, UNIT NO. 1 - FLOOD HAZARD MITIGATION STRATEGIES ASSESSMENT (CAC NO. MF7547)


CLINTON POWER STATION, UNIT NO. 1 -FLOOD HAZARD MITIGATION STRATEGIES ASSESSMENT (CAC NO. MF7547)
==Dear Mr. Hanson:==


==Dear Mr. Hanson:==
The purpose of this letter is to provide the U.S. Nuclear Regulatory Commission 's (NRC's) assessment of the flood hazard mitigation strategies assessment (MSA) , as described in the March 24, 2016, letter (Agencywide Documents Access and Management System (ADAMS)
The purpose of this letter is to provide the U.S. Nuclear Regulatory Commission
Accession No. ML16084A859), subm itted by Exelon Generation Company, LLC (Exelon , the licensee) for Clinton Power Station , Unit No. 1 (Clinton). The MSA confirms that the licensee has adequately addressed the reevaluated flooding hazards within its mitigating strategies for beyond-design-basis external events.
's (NRC's) assessment of the flood hazard mitigation strategies assessment (MSA), as described in the March 24, 2016, letter (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 16084A859)
BACKGROUND By letter dated March 12, 2012 (ADAMS Accession No. ML12053A340), the NRC issued a request for information pursuant to Title 10 of the Code of Federal Regulations (10 CFR),
, submitted by Exelon Generation Company, LLC (Exelon, the licensee) for Clinton Power Station, Unit No. 1 (Clinton).
Section 50.54(f) (hereafter referred to as the 50.54(f) letter) . The 50.54(f) letter was issued as part of the lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. to the 50.54(f) letter requested that licensees reevaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrent with the reevaluation of flood hazards, licensees were required to develop and implement mitigating strategies using the most recent external hazard information in accordance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735). That order requires holders of operating reactor licenses and construction permits issued under 10 CFR Part 50 to modify the plants to provide additional capabilities and defense-in-depth for responding to beyond-design-basis external events, and to submit to the NRC for review a final integrated plan that describes how compliance with the requirements of Attachment 2 of the order was achieved. In order to proceed with implementation of Order EA-12-049, licensees used the current licensing basis flood hazard or the most recent flood hazard information , which may not be based on present day-methodologies and guidance, in the development of their mitigating strategies.
The MSA confirms that the licensee has adequately addressed the reevaluated flooding hazards within its mitigating strategies for beyond-design-basis external events. BACKGROUND By letter dated March 12, 2012 (ADAMS Accession No. ML 12053A340)
 
, the NRC issued a request for information pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 50.54(f) (hereafter referred to as the 50.54(f) letter). The 50.54(f) letter was issued as part of the lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. Enclosure 2 to the 50.54(f) letter requested that licensees reevaluate flood-causing mechanisms using present-day methodologies and guidance.
B. Hanson                                   The NRC staff and industry recognized the difficulty in developing and implementing mitigating strategies before completing the reevaluation of flood hazards. The NRC staff described this issue and provided recommendations to the Commission on integrating these related activities in COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flood Hazards," dated November 21, 2014 (ADAMS Accession No. ML14309A256). The Commission issued a staff requirements memorandum (SRM) on March 30, 2015 (ADAMS Accession No. ML15089A236), affirming that the Commission expects licensees for operating nuclear power plants to address the reevaluated flood hazards, which are considered beyond-design-basis external events, within their mitigating strategies.
Concurrent with the reevaluation of flood hazards, licensees were required to develop and implement mitigating strategies using the most recent external hazard information in accordance with NRC Order EA-12-049
Nuclear Energy Institute (NEI) 12-06, Revision 2, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" (ADAMS Accession No. ML16005A625), has been endorsed by the NRC as an appropriate methodology for licensees to perform assessments of the mitigating strategies against the reevaluated flood hazards developed in response to the March 12, 2012, 50.54(f) letter. The guidance in NEI 12-06, Revision 2, and Appendix Gin particular, supports the proposed Mitigation of Beyond-Design-Basis Events rulemaking. The endorsement, including exceptions, clarifications , and additions, is described in NRC Japan Lessons-Learned Division (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 , Revision 1, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15357A163).
, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 12054A735)
Therefore, Appendix G of NEI 12-06, Revision 2, describes acceptable methods for demonstrating that the reevaluated flooding hazard is addressed within the Clinton mitigating strategies for beyond-design-basis external events.
. That order requires holders of operating reactor licenses and construction permits issued under 10 CFR Part 50 to modify the plants to provide additional capabilities and defense-in-depth for responding to basis external events, and to submit to the NRC for review a final integrated plan that describes how compliance with the requirements of Attachment 2 of the order was achieved. In order to proceed with implementation of Order EA-12-049, licensees used the current licensing basis flood hazard or the most recent flood hazard information
MITIGATION STRATEGIES ASSESSMENT The licensee stated that the Clinton MSA was performed consistent with NEI 12-06, Revision 2, and that the mitigating strategies described in the MSA are consistent with the mitigation strategies that the NRC staff evaluated under NRC Order EA-12-049. As documented in a letter dated December 23, 2015 (ADAMS Accession No. ML15324A238), the NRC staff concluded that the licensee had developed guidance and proposed designs which, if implemented appropriately, will adequately address the requirements of Order EA-12-049. As discussed above, in developing these strategies, licensees ensured the strategies could be implemented under the conditions that would exist during a current licensing basis flood hazard, unless more recent flood hazard information was available.
, which may not be based on present day-methodologies and guidance, in the development of their mitigating strategies
By letter dated November 18, 2015 (ADAMS Accession No. ML15321A034), the staff concluded that the reevaluated flood hazard mechanisms for Clinton are bounded by the current design-basis. Therefore, the NRC staff concluded that it is appropriate to evaluate the mitigating strategies against the current design-basis flood hazard mechanisms. Subsequent to the NRC staff's review of Clinton's reevaluated flood hazards, the licensee revised the model used to develop the local intense precipitation (LIP) flood hazard parameters. The revision resulted in minor differences between the LIP parameters described in the MSA and the reevaluated LIP parameters described in the November 18, 2015, letter to the licensee. Specifically, the revised model resulted in an increase in the maximum flood elevation due to LIP from 736.8 feet to 737.1 feet (approximately a 4 inch increase), which exceeds the plant floor elevation at the northwest and west sides of the main building in the power block area by approximately 1 inch .
.
According to the licensee, this minor increase in maximum LIP elevation does not adversely impact Clinton's safe shutdown equipment or mitigating strategies equipment. The equipment,
B. Hanson The NRC staff and industry recognized the difficulty in developing and implementing mitigating strategies before completing the reevaluation of flood hazards.
 
The NRC staff described this issue and provided recommendations to the Commission on integrating these related activities in COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flood Hazards,"
B. Hanson                                 deployment, and connection points used for compliance with Order EA-12-049 are described in Clinton 's final integrated plan (ADAMS Accession No. ML15349A911 ), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA.
dated November 21, 2014 (ADAMS Accession No. ML 14309A256)
The NRC staff has reviewed the flood hazard MSA for Clinton . The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01 , Revision 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions .
. The Commission issued a staff requirements memorandum (SRM) on March 30, 2015 (ADAMS Accession No. ML 15089A236),
If you have any questions, please contact me at (301) 415-6197 or e-mail at Tekia .Govan@nrc.gov.
affirming that the Commission expects licensees for operating nuclear power plants to address the reevaluated flood hazards, which are considered beyond-design-basis external events, within their mitigating strategies
Sincerely, Tekia Govan , Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No.: 50-461 cc: Distribution via Listserv
. Nuclear Energy Institute (NEI) 12-06, Revision 2, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" (ADAMS Accession No. ML 16005A625),
 
has been endorsed by the NRC as an appropriate methodology for licensees to perform assessments of the mitigating strategies against the reevaluated flood hazards developed in response to the March 12, 2012, 50.54(f) letter. The guidance in NEI 12-06, Revision 2, and Appendix Gin particular, supports the proposed Mitigation of Beyond-Design-Basis Events rulemaking.
ML15349A911 ), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA.
The endorsement, including exceptions, clarifications
The NRC staff has reviewed the flood hazard MSA for Clinton . The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01, Revision 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions .
, and additions, is described in NRC Japan Lessons-Learned Division (JLD) interim staff guidance (ISG) JLD-ISG-2012-01
If you have any questions, please contact me at (301) 415-6197 or e-mail at Tekia .Govan@nrc.gov.
, Revision 1, "Compliance with Order EA-12-049
Sincerely, IRA/
, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML 15357A163).
Tekia Govan , Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No.: 50-461 cc: Distribution via Listserv DISTRIBUTION :
Therefore
See next page ADAMS Accession No.: ML16120A007                                    *via email OFFICE       NRR/JLD/JHMB/PM           NRR/JLD/JHMB/PM           NRR/JLD/JOMB/PM       NRR/JLD/LA NAME         MMarshall                 TGovan                   JBoska                 Slent DATE         05/02/2016               05/03/2016               05/03/2016             04/29/2016 OFFICE       NRR/JLD/JERB/BC           NRR/JLD/JOMB/BC           NRO/DSEA/RHM/BC       OGC NAME         SBailey                   JQuichocho               CCook                     NLO DATE         05/04/2016               05/09/2016               05/11/2016             06/07/2016 OFFICE       NRR/JLD/JHMB/BC           N5RR/JLD/JHMB/PM NAME         GBowman                   TGovan DATE         06/29/2016               06/29/2016 DISTRIBUTION :
, Appendix G of NEI 12-06, Revision 2, describes acceptable methods for demonstrating that the reevaluated flooding hazard is addressed within the Clinton mitigating strategies for beyond-design-basis external events. MITIGATION STRATEGIES ASSESSMENT The licensee stated that the Clinton MSA was performed consistent with NEI 12-06, Revision 2, and that the mitigating strategies described in the MSA are consistent with the mitigation strategies that the NRC staff evaluated under NRC Order EA-12-049
-                       --               --                                     l PUBLIC     -              JLD R/F           RidsNRRJLD Resource RidsNrrDorllpl3-2 Resource   RidsNrrDorl Resource RidsNrrPMClinton Resource RidsRgn3MailCenter Resource RidsNrrlaSLent Resource     RidsOgcMailCenter Resource RidsOpaMail Resource       RidsAcrsAcnw MailCtr     RidsNroDsea Resource Resource TGovan , NRR                 VHall , NRR             JBoska, NRR MShams, NRR                 SBailey, NRR           JQuichocho, NRR MWillinQham , NRO           PChaput, NRO           JThompson, NRO RRivera-Lug_g, N_BQ__        CCook, NRO          ARivera-Varona, NRO -
. As documented in a letter dated December 23, 2015 (ADAMS Accession No. ML 15324A238),
KErwin , NRO      -
the NRC staff concluded that the licensee had developed guidance and proposed designs which, if implemented appropriately, will adequately address the requirements of Order EA-12-049.
ACampbell , NRO      LQuinn-Willingham , NRO
As discussed above, in developing these strategies, licensees ensured the strategies could be implemented under the conditions that would exist during a current licensing basis flood hazard, unless more recent flood hazard information was available
                  -- -                                                         -}}
. By letter dated November 18, 2015 (ADAMS Accession No. ML 15321A034)
, the staff concluded that the reevaluated flood hazard mechanisms for Clinton are bounded by the current basis. Therefore
, the NRC staff concluded that it is appropriate to evaluate the mitigating strategies against the current design-basis flood hazard mechanisms
. Subsequent to the NRC staff's review of Clinton's reevaluated flood hazards, the licensee revised the model used to develop the local intense precipitation (LIP) flood hazard parameters.
The revision resulted in minor differences between the LIP parameters described in the MSA and the reevaluated LIP parameters described in the November 18, 2015, letter to the licensee. Specifically
, the revised model resulted in an increase in the maximum flood elevation due to LIP from 736.8 feet to 737.1 feet (approximately a 4 inch increase)
, which exceeds the plant floor elevation at the northwest and west sides of the main building in the power block area by approximately 1 inch. According to the licensee, this minor increase in maximum LIP elevation does not adversely impact Clinton's safe shutdown equipment or mitigating strategies equipment.
The equipment
,
B. Hanson deployment
, and connection points used for compliance with Order EA-12-049 are described in Clinton's final integrated plan (ADAMS Accession No. ML 15349A911
), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA. The NRC staff has reviewed the flood hazard MSA for Clinton. The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01
, Revision  
: 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions
. If you have any questions
, please contact me at (301) 415-6197 or e-mail at Tekia.Govan@nrc
.gov. Docket No.: 50-461 cc: Distribution via Listserv Sincerely
, Tekia Govan, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation B. Hanson deployment, and connection points used for compliance with Order EA-12-049 are described in Clinton's final integrated plan (ADAMS Accession No. ML 15349A911
), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating  
: strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA. The NRC staff has reviewed the flood hazard MSA for Clinton. The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01, Revision  
: 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions
. If you have any questions
, please contact me at (301) 415-6197 or e-mail at Tekia.Govan@nrc.gov
. Sincerely, IRA/ Tekia Govan, Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No.: 50-461 cc: Distribution via Listserv DISTRIBUTION
: See next page ADAMS Accession No.: ML 16120A007
*via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/PM NRR/JLD/JOMB/PM NRR/JLD/LA NAME MMarshall TGovan JBoska Slent DATE 05/02/2016 05/03/2016 05/03/2016 04/29/2016 OFFICE NRR/JLD/JERB/BC NRR/JLD/JOMB/BC NRO/DSEA/RHM/BC OGC NAME SBailey JQuichocho CCook NLO DATE 05/04/2016 05/09/2016 05/11/2016 06/07/2016 OFFICE NRR/JLD/JHMB/BC N5RR/JLD/JHMB/PM NAME GBowman TGovan DATE 06/29/2016 06/29/2016 OFFICIAL RECORD COPY DISTRIBUTION
: -----l PUBLIC JLD R/F RidsNRRJLD Resource  
-RidsNrrDorllpl3-2 Resource RidsNrrDorl Resource RidsNrrPMClinton Resource RidsRgn3MailCenter Resource RidsNrrlaSLent Resource RidsOgcMailCenter Resource RidsOpaMail Resource RidsAcrsAcnw MailCtr RidsNroDsea Resource Resource TGovan, NRR VHall, NRR JBoska, NRR MShams, NRR SBailey, NRR JQuichocho
, NRR MWillinQham
, NRO PChaput, NRO JThompson
, NRO RRivera-Lug_g
, N_BQ__ CCook, NRO ARivera-Varona, NRO -KErwin, NRO -ACampbell
, NRO LQuinn-Willingham
, NRO ----}}

Latest revision as of 03:19, 5 February 2020

Flood Hazard Mitigation Strategies Assessment
ML16120A007
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/29/2016
From: Tekia Govan
Japan Lessons-Learned Division
To: Bryan Hanson
Exelon Generation Co
References
CAC MF7547
Download: ML16120A007 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 29, 2016 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville , IL 60555

SUBJECT:

CLINTON POWER STATION, UNIT NO. 1 - FLOOD HAZARD MITIGATION STRATEGIES ASSESSMENT (CAC NO. MF7547)

Dear Mr. Hanson:

The purpose of this letter is to provide the U.S. Nuclear Regulatory Commission 's (NRC's) assessment of the flood hazard mitigation strategies assessment (MSA) , as described in the March 24, 2016, letter (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML16084A859), subm itted by Exelon Generation Company, LLC (Exelon , the licensee) for Clinton Power Station , Unit No. 1 (Clinton). The MSA confirms that the licensee has adequately addressed the reevaluated flooding hazards within its mitigating strategies for beyond-design-basis external events.

BACKGROUND By letter dated March 12, 2012 (ADAMS Accession No. ML12053A340), the NRC issued a request for information pursuant to Title 10 of the Code of Federal Regulations (10 CFR),

Section 50.54(f) (hereafter referred to as the 50.54(f) letter) . The 50.54(f) letter was issued as part of the lessons learned from the accident at the Fukushima Dai-ichi nuclear power plant. to the 50.54(f) letter requested that licensees reevaluate flood-causing mechanisms using present-day methodologies and guidance. Concurrent with the reevaluation of flood hazards, licensees were required to develop and implement mitigating strategies using the most recent external hazard information in accordance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML12054A735). That order requires holders of operating reactor licenses and construction permits issued under 10 CFR Part 50 to modify the plants to provide additional capabilities and defense-in-depth for responding to beyond-design-basis external events, and to submit to the NRC for review a final integrated plan that describes how compliance with the requirements of Attachment 2 of the order was achieved. In order to proceed with implementation of Order EA-12-049, licensees used the current licensing basis flood hazard or the most recent flood hazard information , which may not be based on present day-methodologies and guidance, in the development of their mitigating strategies.

B. Hanson The NRC staff and industry recognized the difficulty in developing and implementing mitigating strategies before completing the reevaluation of flood hazards. The NRC staff described this issue and provided recommendations to the Commission on integrating these related activities in COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flood Hazards," dated November 21, 2014 (ADAMS Accession No. ML14309A256). The Commission issued a staff requirements memorandum (SRM) on March 30, 2015 (ADAMS Accession No. ML15089A236), affirming that the Commission expects licensees for operating nuclear power plants to address the reevaluated flood hazards, which are considered beyond-design-basis external events, within their mitigating strategies.

Nuclear Energy Institute (NEI) 12-06, Revision 2, "Diverse and Flexible Coping Strategies (FLEX) Implementation Guide" (ADAMS Accession No. ML16005A625), has been endorsed by the NRC as an appropriate methodology for licensees to perform assessments of the mitigating strategies against the reevaluated flood hazards developed in response to the March 12, 2012, 50.54(f) letter. The guidance in NEI 12-06, Revision 2, and Appendix Gin particular, supports the proposed Mitigation of Beyond-Design-Basis Events rulemaking. The endorsement, including exceptions, clarifications , and additions, is described in NRC Japan Lessons-Learned Division (JLD) interim staff guidance (ISG) JLD-ISG-2012-01 , Revision 1, "Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events" (ADAMS Accession No. ML15357A163).

Therefore, Appendix G of NEI 12-06, Revision 2, describes acceptable methods for demonstrating that the reevaluated flooding hazard is addressed within the Clinton mitigating strategies for beyond-design-basis external events.

MITIGATION STRATEGIES ASSESSMENT The licensee stated that the Clinton MSA was performed consistent with NEI 12-06, Revision 2, and that the mitigating strategies described in the MSA are consistent with the mitigation strategies that the NRC staff evaluated under NRC Order EA-12-049. As documented in a letter dated December 23, 2015 (ADAMS Accession No. ML15324A238), the NRC staff concluded that the licensee had developed guidance and proposed designs which, if implemented appropriately, will adequately address the requirements of Order EA-12-049. As discussed above, in developing these strategies, licensees ensured the strategies could be implemented under the conditions that would exist during a current licensing basis flood hazard, unless more recent flood hazard information was available.

By letter dated November 18, 2015 (ADAMS Accession No. ML15321A034), the staff concluded that the reevaluated flood hazard mechanisms for Clinton are bounded by the current design-basis. Therefore, the NRC staff concluded that it is appropriate to evaluate the mitigating strategies against the current design-basis flood hazard mechanisms. Subsequent to the NRC staff's review of Clinton's reevaluated flood hazards, the licensee revised the model used to develop the local intense precipitation (LIP) flood hazard parameters. The revision resulted in minor differences between the LIP parameters described in the MSA and the reevaluated LIP parameters described in the November 18, 2015, letter to the licensee. Specifically, the revised model resulted in an increase in the maximum flood elevation due to LIP from 736.8 feet to 737.1 feet (approximately a 4 inch increase), which exceeds the plant floor elevation at the northwest and west sides of the main building in the power block area by approximately 1 inch .

According to the licensee, this minor increase in maximum LIP elevation does not adversely impact Clinton's safe shutdown equipment or mitigating strategies equipment. The equipment,

B. Hanson deployment, and connection points used for compliance with Order EA-12-049 are described in Clinton 's final integrated plan (ADAMS Accession No. ML15349A911 ), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA.

The NRC staff has reviewed the flood hazard MSA for Clinton . The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01 , Revision 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions .

If you have any questions, please contact me at (301) 415-6197 or e-mail at Tekia .Govan@nrc.gov.

Sincerely, Tekia Govan , Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No.: 50-461 cc: Distribution via Listserv

ML15349A911 ), which as discussed above, has been reviewed by the NRC staff. Since this difference is minor and has no impact on implementation of the licensee's mitigating strategy, it is reasonable to conclude that the flood hazards used in the MSA are equivalent to the design-basis of the facility and suitable for use in the MSA.

The NRC staff has reviewed the flood hazard MSA for Clinton . The NRC staff confirmed that the licensee's flood hazard MSA was performed consistent with the guidance in Appendix G of NEI 12-06, Revision 2, as endorsed, by JLD-ISG-2012-01, Revision 1. Based on the licensee's inclusion of an appropriate set of equipment and its use of an appropriate hazard and methodology in its MSA, the staff concludes that the licensee has demonstrated that the mitigation strategies are reasonably protected from reevaluated flood hazards conditions .

If you have any questions, please contact me at (301) 415-6197 or e-mail at Tekia .Govan@nrc.gov.

Sincerely, IRA/

Tekia Govan , Project Manager Hazards Management Branch Japan Lessons-Learned Division Office of Nuclear Reactor Regulation Docket No.: 50-461 cc: Distribution via Listserv DISTRIBUTION :

See next page ADAMS Accession No.: ML16120A007 *via email OFFICE NRR/JLD/JHMB/PM NRR/JLD/JHMB/PM NRR/JLD/JOMB/PM NRR/JLD/LA NAME MMarshall TGovan JBoska Slent DATE 05/02/2016 05/03/2016 05/03/2016 04/29/2016 OFFICE NRR/JLD/JERB/BC NRR/JLD/JOMB/BC NRO/DSEA/RHM/BC OGC NAME SBailey JQuichocho CCook NLO DATE 05/04/2016 05/09/2016 05/11/2016 06/07/2016 OFFICE NRR/JLD/JHMB/BC N5RR/JLD/JHMB/PM NAME GBowman TGovan DATE 06/29/2016 06/29/2016 DISTRIBUTION :

- -- -- l PUBLIC - JLD R/F RidsNRRJLD Resource RidsNrrDorllpl3-2 Resource RidsNrrDorl Resource RidsNrrPMClinton Resource RidsRgn3MailCenter Resource RidsNrrlaSLent Resource RidsOgcMailCenter Resource RidsOpaMail Resource RidsAcrsAcnw MailCtr RidsNroDsea Resource Resource TGovan , NRR VHall , NRR JBoska, NRR MShams, NRR SBailey, NRR JQuichocho, NRR MWillinQham , NRO PChaput, NRO JThompson, NRO RRivera-Lug_g, N_BQ__ CCook, NRO ARivera-Varona, NRO -

KErwin , NRO -

ACampbell , NRO LQuinn-Willingham , NRO

-- - -