MONTHYEARRS-15-064, Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report2015-03-12012 March 2015 Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report Project stage: Request ML15093A3112015-03-16016 March 2015 NRR E-mail Capture - Request for Additional Information: Clinton Flooding Hazard Reevaluation Report Project stage: RAI RS-15-110, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report2015-05-0505 May 2015 Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report Project stage: Response to RAI ML15148A2862015-07-21021 July 2015 Nuclear Regulatory Commission Plan for the Audit of Exelon Generation Company, Llc'S Flood Hazard Reevaluation Report Submittal Relating to the Near-Term Task Force Recommendation 2.1 -Flooding Project stage: Other ML15219A6452015-09-0303 September 2015 Tables 1 and 2 Project stage: Other ML15212A0102015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation Project stage: Other ML15212A7272015-09-0404 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request Flood-Causing Mechanism Reevaluation Project stage: Other ML15219A6672015-09-0404 September 2015 Tables 1 and 2 Project stage: Request ML15279A1342015-10-27027 October 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request-Flood-Causing Mechanism Reevaluation Project stage: Other ML15321A0342015-11-18018 November 2015 Correction to Staff Assessment of Response to Request for Information Pursuant to 10 CFR 50.54(f)-Flood Causing Mechanisms Reevaluation Project stage: RAI RS-16-055, Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal2016-03-24024 March 2016 Mitigating Strategies Flood Hazard Assessment (Msfha) Submittal Project stage: Other 2015-05-05
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-087, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2024-09-0909 September 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report RS-24-050, Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2024-05-0909 May 2024 Additional Information Supporting Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. RS-24-005, Additional Information Supporting Request for Partial Site Release2024-02-0808 February 2024 Additional Information Supporting Request for Partial Site Release RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-090, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2023-09-0707 September 2023 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-081, Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation2023-08-21021 August 2023 Request for License Amendment to Revise Technical Specifications Related to Reactor Water Cleanup Isolation Instrumentation RS-23-085, Supplemental Information Related to Request for Partial Site Release2023-08-0303 August 2023 Supplemental Information Related to Request for Partial Site Release RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-073, Request for Partial Site Release2023-06-0707 June 2023 Request for Partial Site Release RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-039, Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air2023-03-0101 March 2023 Request for License Amendment to Revise Technical Specifications Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-002, Application to Adopt TSTF-332, ECCS Response Time Testing2023-01-13013 January 2023 Application to Adopt TSTF-332, ECCS Response Time Testing RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-107, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2022-09-29029 September 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-089, Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-07-25025 July 2022 Additional Information Supporting Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-060, Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling RS-22-061, Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves2022-05-24024 May 2022 Request for License Amendment to Adopt TSTF-269, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves RS-22-068, Constellation Radiological Emergency Plan Addendum Revision2022-05-19019 May 2022 Constellation Radiological Emergency Plan Addendum Revision RS-22-055, Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan2022-04-18018 April 2022 Submittal of Preliminary Decommissioning Cost Estimate and Spent Fuel Management Plan RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-020, Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock2022-04-0707 April 2022 Request for License Amendment to Revise the Secondary Containment Design Basis to Credit the Fuel Building Railroad Airlock RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-102, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-09-29029 September 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-087, Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values2021-08-31031 August 2021 Additional Information Supporting Request for License Amendment to Revise Degraded Voltage Relay Allowable Values RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-076, Application to Adopt TSTF-273, Safety Function Determination Program Clarifications2021-07-30030 July 2021 Application to Adopt TSTF-273, Safety Function Determination Program Clarifications RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-069, Third Inservice Inspection Interval Relief Request I3R-182021-06-28028 June 2021 Third Inservice Inspection Interval Relief Request I3R-18 2024-09-09
[Table view] |
Text
Exelon Generation Order No. EA-12-049 RS-16-055 March 24, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
Subject:
Mitigating Strategies Flood Hazard Assessment (MSFHA) Submittal
References:
- 1. NRC Letter, Request for Information Pursuant to Title 1O of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident; dated March 12, 2012
- 2. Exelon Generation Company, LLC Letter to USN RC, Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flooding Hazard Reevaluation Report, dated March 12, 2014 (RS-14-054)
- 3. Exelon Generation Company, LLC Letter to USN RC, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report, dated July 14, 2014 (RS-14-194)
- 4. Exelon Generation Company, LLC Letter to USN RC, Response to Request for Additional Information Regarding Fukushima Lessons Learned - Flood Hazard Reevaluation Report, dated November 3, 2014 (RS-14-312)
- 5. Exelon Generation Company, LLC Letter to USNRC, Response to Request for Additional Information Regarding Fukushima Lessons Learned- Flood Hazard Reevaluation Report, dated May 5, 2015 (RS-15-110)
- 6. NRC Letter, Supplemental Information Related to Request for Information Pursuant to Title 1O of the Code of Federal Regulations 50.54(f) regarding Flooding Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 1, 2013
- 7. NRC Staff Requirements Memoranda to COMSECY-14-0037, "Integration of Mitigating Strategies for Beyond-Design-Basis External Events and the Reevaluation of Flooding Hazards", dated March 30, 2015
U.S. Nuclear Regulatory Commission Mitigating Strategies Flood Hazard Assessment (MSFHA) Submittal March 24, 2016 Page2
- 8. NRC Letter, Coordination of Requests for Information Regarding Flooding Hazard Reevaluations and Mitigating Strategies tor Beyond-Design-Basis External Events, dated September 1, 2015
- 9. Nuclear Energy Institute (NEI), Report NEI 12-06 [Rev 2], Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, dated December 2015
- 10. U.S. Nuclear Regulatory Commission, JLD-ISG-2012-01, Revision 1, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events, dated January 22, 2016
- 11. NRC Letter, Clinton Power Station, Unit No. 1 - Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (TAC NO. MF3654), dated September 3, 2015
- 12. NRC Letter, Clinton Power Station, Unit No. 1 - Correction to Staff Assessment of Response to Request for Information Pursuant to 10 CFR 50.54(f) - Flood-Causing Mechanisms Reevaluation (TAC NO. MF3654), dated November 18, 2015
- 13. Clinton Power Station, Unit 1, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated July 15, 2015 (RS-15-138)
On March 12, 2012, the NRC issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding. One of the Required Responses in Reference 1 directed licensees to submit a Flood Hazard Reevaluation Report (FHRR). For Clinton Power Station (CPS), Unit 1, the FHRR was submitted on March 12, 2014 (Reference 2). Additional information was provided with References 3, 4, and 5. Per Reference 6, the NRC considers the reevaluated flood hazard to be "beyond the current design/licensing basis of operating plants".
Concurrent to the flood hazard reevaluation, CPS developed and implemented mitigating strategies in accordance with NRC Order EA-12-049, "Order Modifying Licenses with Regard to Requirements tor Mitigation Strategies for Beyond-Design-Basis External Events". In Reference 7, the NRC affirmed that licensees need to address the reevaluated flooding hazards within their mitigating strategies for beyond-design-basis (BDB) external events, including the reevaluated flood hazards. This requirement was confirmed by the NRC in Reference 8. Guidance for performing mitigating strategies flood hazard assessments (MSFHAs) is contained in Appendix G of Reference 9, endorsed by the NRC in Reference 10. For the purpose of the MSFHAs and in Reference 8, the NRC termed the reevaluated flood hazard, summarized in References 11 and 12, as the "Mitigating Strategies Flood Hazard Information" (MSFHI). Reference 9, Appendix G, describes the MSFHA tor flooding as containing the following elements:
U.S. Nuclear Regulatory Commission Mitigating Strategies Flood Hazard Assessment (MSFHA) Submittal March 24, 2016 Page3
- Section G.2 - Characterization of the MSFHI
- Section G.4.1 - Assessment of Current FLEX Strategies (if necessary)
- Section G.4.2 -Assessment for Modifying FLEX Strategies (if necessary)
- Section G.4.3-Assessment of Alternative Mitigating Strategies (if necessary)
- Section G.4.4 - Assessment of Targeted Hazard Mitigating Strategies (if necessary)
If G.3 determines that the MSFHI is bounded by the FLEX DB Flood, then no further action is needed and remaining sections (G.4.1 through G.4.4) are not necessary.
The following provides the MS FHA results for the CPS.
Reference 9, Section G.2 - Characterization of the MSFHI Characterization of the Mitigating Strategies Flood Hazard Information (MSFHI) is summarized in References 11 and 12; the NRC's responses to the flood hazard reevaluation submittal provided in Reference 2 and additional information submittals in References 3, 4, and 5. A more detailed description of the reevaluated flood hazard (i.e., MSFHI), along with the basis for inputs, assumptions, methodologies, and models, is provided in the following references:
- Local Intense Precipitation (LIP): See Section 3.1 of Reference 2, Enclosure 1.
- Flooding in Streams and Rivers: See Section 3.2 of Reference 2, Enclosure 1.
- Dam Breaches and Failures: See Section 3.4 of Reference 2, Enclosure 1.
- Storm Surge: See Section 3.3 of Reference 2, Enclosure 1.
- Seiche: See Section 3.3 of Reference 2, Enclosure 1.
- Tsunami: See Section 3.8 of Reference 2, Enclosure 1.
- Ice-Induced Flooding: See Section 3.6 of Reference 2, Enclosure 1.
- Channel Migration or Diversion: See Section 3.7 of Reference 2, Enclosure 1.
- Combined Effects (including wind-waves and runup effects): See Section 3.5 of Reference 2, Enclosure 1.
- Other Associated Effects (i.e. hydrodynamic loading, including debris; effects caused by sediment deposition and erosion; concurrent site conditions; and groundwater ingress): See Sections 3.1 O and 4 of Reference 2, Enclosure 1.
- Flood Event Duration Parameters (i.e. warning time, period of site preparation, period of inundation, and period of recession): See Sections 3.1 O and 4 of Reference 2, Enclosure 1.
At CPS, the seiche, tsunami, ice-induced flooding, channel migration or diversion, and NUREG/CR-7046, Appendix H combined-effect floods H.2 (seismically-induced dam failure) and H.4.1 (floods along the shores of enclosed bodies of water, shore location) flood-causing mechanisms were either determined to be not applicable or completely bounded by other mechanisms. Some individual flood-causing mechanisms (i.e., flooding in streams and rivers, dam breaches and failures, and surge) are addressed in one or more of the combined-effect floods. Only Local Intense Precipitation (LIP) and the NUREG/CR-7046, Appendix H, H.1 combined-effect flood (floods caused by precipitation events, including hydrologic dam failure) and H.4.2 (flooding along shores of enclosed bodies of water, stream location) for Lake Clinton were determined to be applicable flood-causing mechanisms at CPS.
U.S. Nuclear Regulatory Commission Mitigating Strategies Flood Hazard Assessment (MSFHA) Submittal March 24, 2016 Page4 In Reference 11, the NRC concluded that the "reevaluated flood hazards information, as summarized in the Enclosure [Summary Table of the Reevaluated Flood Hazard Levels], is suitable for the assessment of mitigating strategies developed in response to Order EA-12-049" for CPS. This conclusion is reaffirmed in Reference 12.
Reference 9, Section G.3 - Basis for Mitigating Strategies Assessment (FLEX Design Basis Comparison)
For CPS the FLEX design basis (FLEX DB) flood, described in Reference 13, is equivalent to the plant's current design basis (COB) flood. A complete comparison of the COB and reevaluated flood hazards is provided in Section 4 of Reference 2, Enclosure 1. As described in Reference 2, the COB and, by relationship, FLEX DB floods bound the reevaluated flood (i.e.
MSFHI) for all applicable flood-causing mechanisms, including associated effects and flood event duration parameters.
The NRC further affirms in References 11 and 12 that the reevaluated flood hazard mechanisms are bounded by the COB and it is unnecessary for CPS to perform an integrated assessment or focused evaluation.
Therefore, since the MSFHI is bounded by the FLEX DB (equivalent to the COB), as affirmed by the NRC, CPS considers the requirement to address the reevaluated flooding hazards within its BOB mitigating strategies as being satisfied with no further action required.
It should be noted that, subsequent to the flood hazard reevaluation being submitted in Reference 2, the model used to develop the LIP flood-causing mechanism was found to incorrectly simulate rain-on-buildings. The issue was entered into the plant's corrective action program (Issue Report (IA) No. 2406577) and the model was corrected to conservatively assume building runoff is conveyed directly to adjacent grade, ignoring storage on the roofs.
The corrections resulted in maximum LIP flood elevations next to the main building in the power block area to generally range from 713.2 feet (NGVD29) at the southeast side of the main building to 737.1 feet (NGVD29) at the northeast and west sides of the main building, which is higher than the corresponding COB LIP flood elevation. The increases also resulted in the maximum LIP flood exceeding the plant floor elevation of 737.0 feet (NGVD29) at the northeast and west sides of the main building by 0.1 foot, specifically near a roll-up door at the Radwaste Building and an airlock door. An evaluation was conducted in Calculation No. IP-S-0282 to assess the impact of potential LIP floodwater ingress on the plant, which concluded:
- The water depth inside the Radwaste Building, due to LIP flood ingress at the roll-up door, was conservatively calculated to be only approximately 1.1 inches.
- Minimal or no flow is expected through the airlock door, located at the west side of the main building, due to the air tight feature of these type of structures.
Additionally, no safe shutdown SSC's are located in the Radwaste Building. Therefore, the evaluation concluded that the potential ingress of LIP floodwater, using results from the corrected LIP model, would have no adverse impact on the plant's safety functions or FLEX equipment.
U.S. Nuclear Regulatory Commission Mitigating Strategies Flood Hazard Assessment (MSFHA) Submittal March 24, 2016 Page 5 This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Ron Gaston at (630) 657-3359.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 24th day of March 2016.
Respectfully submitted,
~F¥ Director - Licensing & Regulatory Affairs Exelon Generation Company, LLC cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator - Region Ill NRC Senior Resident Inspector - Clinton Power Station, Unit 1 NRC Project Manager, NRA - Clinton Power Station, Unit 1 Ms. Tekia Govan, NRR/JLD/JHMB, NRC Illinois Emergency Management Agency - Division of Nuclear Safety