| "An evaluation of the reportability of this issue in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due the need to verify and validate the latest version of the software and then complete all the analysis required for updating the calculation. This evaluation is being tracked by CAR 2016-0335 and will be completed no later than February 10, 2017. | | "An evaluation of the reportability of this issue in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due the need to verify and validate the latest version of the software and then complete all the analysis required for updating the calculation. This evaluation is being tracked by CAR 2016-0335 and will be completed no later than February 10, 2017. |
| "If you have any questions or need further clarifying information, please contact Nick Eggemeyer, Corporate Quality Assurance Manager, at (770) 590-2031." | | "If you have any questions or need further clarifying information, please contact Nick Eggemeyer, Corporate Quality Assurance Manager, at (770) 590-2031." |
| ********************************************************************************************************************************
| |
|
| |
|
| Hoc, HOOX From: Nick Eggemeyer < neggemeyer@enercon.com > | | Hoc, HOOX From: Nick Eggemeyer < neggemeyer@enercon.com > |
Line 40: |
Line 39: |
| _ ~- - Pk.J.)>> cori~~,_:.yr U'\d l.f'!*1*i.:or~ .. nt b4tc"'o P4"~..:1:-rg tihl .. m..t:1 1 | | _ ~- - Pk.J.)>> cori~~,_:.yr U'\d l.f'!*1*i.:or~ .. nt b4tc"'o P4"~..:1:-rg tihl .. m..t:1 1 |
|
| |
|
| F.J | | F.J ENERCON Excellence-Every project Every day. |
| '-'--'
| |
| ENERCON Excellence-Every project Every day. | |
| Timothy P. Cleary Vice President 500 TownPark Lane Kennesaw, GA 30144 678-354-8359 Office 910-547-2800 Mobile November 23, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | Timothy P. Cleary Vice President 500 TownPark Lane Kennesaw, GA 30144 678-354-8359 Office 910-547-2800 Mobile November 23, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
Similar Documents at Perry |
---|
Category:Deficiency Correspondence (per 10CFR50.55e and Part 21)
MONTHYEARML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML17006A0142016-12-13013 December 2016 Enercon - Part 21 - Notification-Design Basis Errors Using Flo-2D Software ML16342A9812016-11-23023 November 2016 Enercon - Part 21 Notification - Design Basis Errors Using FLO-2D Software ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML13246A0872013-08-23023 August 2013 Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology ML12319A0122012-09-27027 September 2012 Error in Main Steam Line High Flow Calculational Methodology ML12158A4472012-06-0606 June 2012 Part 21 60-Day Interim Report Notification - Closufailure of CRD Collet Retainer Tube/Outer Tube Weld ML1127000672011-09-26026 September 2011 GE-Hitachi Part 21 Reportable Condition Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance ML1025202192010-09-0303 September 2010 Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance ML0907611882009-03-11011 March 2009 Part 21 Notification - Defective Hk and K-Line Circuit Breaker Tension Springs ML0511100872005-04-12012 April 2005 10 CFR 21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10CFR21-0089, Rev. 0 ML0228102902002-09-30030 September 2002 Main Steam Line Valve Out-of-Service Final Report 2020-02-11
[Table view] Category:Deficiency Report (per 10CFR50.55e and Part 21)
MONTHYEARML23241A0022023-08-25025 August 2023 Paragon Final Part 21 Report on Defect with Eaton/Cutler Hammer Size 4 and 5 Freedom Series Contactors Modified by Paragon with Special Coils And/Or with RTV to Improve the Securing of Shading Coils ML23221A3702023-08-0303 August 2023 Paragon Energy Solutions, 10CFR Part 21 Initial Notification: P21-08032023-IN, Rev. 0 ML23038A0192023-02-0606 February 2023 Curtiss-Wright Part 21 Notification for Qualtech Np Supplied Eaton TMR5 Timing Relays ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML21168A2172021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors M210077, GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors2021-06-17017 June 2021 GE Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Fuel Support Side Entry Orifice Meta-Stable Flow for 2 Beam Locations in the BWR/6 Reactors ML20366A0482020-12-0707 December 2020 10CFR21 Reporting of Defects and Non-Compliance - Engine Systems, Inc. Report No. 10 CFR21-0114, Rev. 1 ML20366A0472020-11-18018 November 2020 Curtiss-Wright 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 M200087, GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients2020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20176A4322020-06-24024 June 2020 GE-Hitachi Nuclear Energy Americas, LLC - 10 CFR Part 21.21(d)-Reportable Condition: Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients ML20049A0752020-02-11011 February 2020 C&D Technologies, Inc. -10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries ML19121A1552019-04-15015 April 2019 Curtiss-Wright Nuclear Division, Enertech - 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid ML17194A8252017-07-11011 July 2017 Part 21 Report Re Wedge Pin Failure in Anchor Darling Motor Operated Double Disc Gate Valves with Threaded Stem to Upper Wedge Connections ML17090A3982017-03-27027 March 2017 Engine Systems, Inc. - Part 21 Report Regarding Identification of Failed Diode Surge Suppressor with Internal Manufacturing Defect ML17081A4532017-03-20020 March 2017 Part 21 - Plastic Jar Dedication Sampling ML17055C1772017-02-0909 February 2017 10 CFR 21 Evaluation Regarding Design Basis Calculation Error Using FL0-2D Software ML17026A4142017-01-20020 January 2017 C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling ML17032A0802016-12-30030 December 2016 Engine Systems, Inc., 10CFR21 Reporting of Defects and Non-Compliance, Report No. 10CFR21-0114, Rev. 0 ML17006A0102016-12-29029 December 2016 Engine Systems, Inc. - Part 21 Issues Identified with the Enterprise Diesel Engine Subcover ML17006A0142016-12-13013 December 2016 Enercon - Part 21 - Notification-Design Basis Errors Using Flo-2D Software ML16342A9812016-11-23023 November 2016 Enercon - Part 21 Notification - Design Basis Errors Using FLO-2D Software ML16251A0982016-09-0202 September 2016 Part 21 - Potential Failure of Battery System Connections ML16252A2742016-08-29029 August 2016 Azz/Nli - Part 21 Report - Potential Allen Bradley Timing Relay ML16243A4742016-08-26026 August 2016 Potential Part 21 Unqualified Component in Certain Allen Bradley Timing Relays ML16232A6042016-08-15015 August 2016 Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML16238A1862016-08-15015 August 2016 Update - Report of Potential l0CFR Part 21, Allen Bradley Timing Relay Model 700RTC-NRC Event Number 51030, Accession Number ML15134A016 ML16188A3742016-06-30030 June 2016 Part 21 - Inadequate Swaging and Adherence of Silicone O-Ring and Silicone PAD Soft Seat Main Disc and Pilot Disc Assemblies ML16154A2072016-05-26026 May 2016 Part 21, Azz/Nli Nuclear Logistics, Inc., Potentially Unqualified Component in Certain Allen Bradley Timing Relays Model 700RTC ML16111A4202016-04-0808 April 2016 Part 21 Report No. P21-04302015, Rev. 1 Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays, Per Browns Ferry, Ginna, Millstone, Nine Mile Point, North Anna, Ft. Calhoun, Perry, River Bend, South Texas Project ML16098A4462016-03-22022 March 2016 United Controls International - Part 21 Report Regarding Defective Fuses, Per Perry Nuclear Power Plant ML15217A3032015-08-0404 August 2015 Notification of Part 21 - Report - Ferraz Shawmut/Mersen Fuses P/N: AJT25 and AJT60 ML15140A2182015-05-11011 May 2015 Part 21 Report Regarding Defect Identified 6 Inch Gear Operated Ball Valves (Part Number GBV-B2-60-0020 & GBV-B2-60-0112), Notification No. 15-1 ML15134A0162015-05-0101 May 2015 Part 21 Report Regarding Potentially Unqualified Component in Certain Allen Bradley Timing Relays ML15159A5682015-04-30030 April 2015 Report of Potential 10CFR Part 21, Allen Bradley Timing Relay Model 700RTC ML15022A6502015-01-20020 January 2015 Letter from Steven R. Eisenberg USNRC 10CFR Part 21 Notification ML14274A0522014-09-22022 September 2014 Final Report 10CFR Part 21 Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries, Revision 1 - Original Letter Did Not Include the List of Affected Utilities ML14210A0102014-07-23023 July 2014 Part 21 - Unseating of Valve Spring on Scram Solenoid Pilot Valve ML14204A7072014-07-23023 July 2014 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Unseating of Valve Spring on SSPV ML14204A7082014-07-23023 July 2014 Enclosure 2, Description of Closure Evaluation, Non-Proprietary Information - Class I (Public) ML14134A0792014-05-0808 May 2014 Part 21 - Potential Defect in NUS-710DU Trip Unit to Produce a Valid Trip Output Signal ML14139A2592014-05-0808 May 2014 10 CFR Part 21 Report Notification, NUS710DU Trip Units ML13324A3912013-11-0808 November 2013 Part 21 - Machining Error Identified in Geared Limit Switches ML13284A0842013-10-0303 October 2013 Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302 ML13165A3422013-06-12012 June 2013 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML13064A0122013-02-25025 February 2013 Notification of Potential Part 21 Report Re Wedge Pin Failure of an Anchor/Darling Double-Disc Gate Valve ML13044A0752013-02-0808 February 2013 Part 21 - Completed Evaluation for Potential Error in Main Steam Line High Flow Calculational Methodology ML13042A0962013-02-0808 February 2013 Completed Evaluation of Part 21 Potentially Reportable Condition Notification: Error in Main Steam Line High Flow Calculational Methodology ML12348A1362012-12-13013 December 2012 Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers ML12352A1232012-12-13013 December 2012 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers ML12347A3082012-12-12012 December 2012 Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology 2023-08-03
[Table view] |
Text
1112312016 U.S. Nuclear Regulatory Commission Operations Center Event Report Pagel Part 21 (PAR) Event# 52394 Rep Org: ENERCON Notification Date I Time: 11/23/2016 11 :56 (EST)
Supplier: ENERCON Event Date I Time: 09/28/2016 (EST}
Last Modification: 11/23/2016 Region: 1 Docket#:
City: KENNESAW Agreement State: Yes County: License#:
State: GA NRC Notified by: NICK EGGEMEYER Notifications: JAMES DWYER R1DO HQ Ops Officer: MARK ABRAMOVITZ AARON McGRAW R3DO Emergency Class: NON EMERGENCY PART 21/50.55 REACTORS EMAIL 10 CFR Section:
21.21 (a)(2) INTERIM EVAL OF DEVIATION PART-21 NOTIFICATION - DESIGN BASIS ERRORS USING FL0-2D SOFTWARE The following report was received via e-mail:
"This letter serves as an Interim Report in accordance with 10 CFR 21.21 pertaining to a potential defect associated with a design basis calculation delivered to First Energy Nuclear Operating Company's Perry Nuclear Power Plant. Subsequent to delivering this calculation, FL0-20 software errors were identified which resulted in erroneous outputs that affect the local intense precipitation calculation. These errors were discovered on September 28, 2016, at which time, ENERCON generated a Corrective Action Report (CAR) to address the issue.
ENERCON has initiated a reevaluation of the calculation using the latest version of the software that will correct the errors in the calculation.
"An evaluation of the reportability of this issue in accordance with 10 CFR Part 21 is not able to be completed within the 60-day evaluation period due the need to verify and validate the latest version of the software and then complete all the analysis required for updating the calculation. This evaluation is being tracked by CAR 2016-0335 and will be completed no later than February 10, 2017.
"If you have any questions or need further clarifying information, please contact Nick Eggemeyer, Corporate Quality Assurance Manager, at (770) 590-2031."
Hoc, HOOX From: Nick Eggemeyer < neggemeyer@enercon.com >
Sent: Wednesday, November 23, 2016 11:56 AM To: Hoc, HOOX
Subject:
[External_Sender] 10 CFR Part 21 Interim Report Attachments: 10CFR Part 21 Interim Report - Perry Nuclear Plant Calculation Error.pdf To: NRC Operations Center Attached find a 10 CFR Part 21 Interim Report regarding a design basis calculation error using FL0-20 software.
Please acknowledge receipt of this email.
Best regards,
~~
Corporate Quality Assurance Manager 500 TownPark Lane Kennesaw, GA 30144 Office: 770.590.2031 Cell: 678.800.3630
~ ENERCON
_ ~- - Pk.J.)>> cori~~,_:.yr U'\d l.f'!*1*i.:or~ .. nt b4tc"'o P4"~..:1:-rg tihl .. m..t:1 1
F.J ENERCON Excellence-Every project Every day.
Timothy P. Cleary Vice President 500 TownPark Lane Kennesaw, GA 30144 678-354-8359 Office 910-547-2800 Mobile November 23, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
10 CPR 21 Interim Report Regarding Design Basis Calculation Error Using FL0-2D Software This letter serves as an Interim Report in accordance with 10 CPR 21.21 pertaining to a potential defect associated with a design basis calculation delivered to First Energy Nuclear Operating Company's Perry Nuclear Power Plant. Subsequent to delivering this calculation, FL0-2D software errors were identified which resulted in erroneous outputs that affect the local intense precipitation calculation. These errors were discovered on September 28, 2016, at which time ENERCON generated a Corrective Action Report (CAR) to address the issue.
ENERCON has initiated a reevaluation of the calculation using the latest version of the software that will correct the errors in the calculation.
An evaluation of the reportability of this issue in accordance with 10 CPR Part 21 is not able to be completed within the 60-day evaluation period due the need to verify and validate the latest version of the software and then complete all the analysis required for updating the calculation. This evaluation is being tracked by CAR 2016-0335 and will be completed no later than February 10, 2017.
If you have any questions or need further clarifying information, please contact Nick Eggemeyer, Corporate Quality Assurance Manager, at (770) 590-2031.
Respectfully, Timothy P. Cleary Vice President Cc: John D. Richardson, President Robert H. Bryan, Chief Operating Officer Jim J. Gannon, Chief Nuclear Officer Nick C. Eggemeyer, Corporate QA Manager 500 Townpark Lane Suite 275 Kennesaw, GA 30144 phone 770.919.1930 fax 770.919.1932 enercon.com