{{#Wiki_filter:Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  Facility: VC SUMMER Scenario No:
{{#Wiki_filter:Appendix D                           Scenario Outline                           Form ES-D-1 Facility:   VC SUMMER           Scenario No:   2           Op Test No:   NRC-ILO-14-01 Examiners:                                     Operators:   CRS:
2 Op Test No:
RO:
NRC-ILO-1 4-01 Examiners:
BOP:
Operators: CRS:   RO:   BOP: Initial Conditions:
Initial Conditions:
100% Power, MOL.   "B" Train Work Week.
* 100% Power, MOL.
Alternate Seal Injection is OOS.
* B Train Work Week.
Turnover: Maintain 100% power.
* Alternate Seal Injection is OOS.
Turnover:
* Maintain 100% power.
Critical Tasks:
Critical Tasks:
Start back
* Start back-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.
-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.
* Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs.
Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs. Establish feed water flow into at least one SG before RCS bleed and Feed is required.
* Establish feed water flow into at least one SG before RCS bleed and Feed is required.
Event Malf No. Event Type*
Event         Malf No.       Event Type*       Event Description 1       FWM006B        N - BOP, CRS       Feedwater Booster Pump B trips, which requires R-RO              power reduction.
Event Description 1 FWM006 B N - BOP, CRS R-RO Feedwater Booster Pump "B" trips, which requires power reduction.
2       EH001B         C-BOP             Running EHC Pump Trip, standby EHC pump fails to EH002F                            auto start and must be manually started.
2 EH001B EH002F C-BOP Running EHC Pump Trip
3       NIS003D         I-RO, CRS         Power Range Channel N-44 fails high, causing TS-CRS            automatic control rod insertion.
, standby EHC pump fails to auto start and must be manually started
4       CW020B         I-BOP, CRS         The Turbine Lube Oil auto-controller fails low causing TUR002A                            Turbine Lube oil temperature to lower and Turbine TUR002B                            vibrations to increase.
. 3 NIS003D I-RO, CRS TS-CRS Power Range Channel N-44 fail s high, causing automatic control rod insertion. 4 CW020B TUR002A TUR002B TUR002 C TUR002 D TUR002 E I-BOP, CRS The Turbine Lube Oil auto
TUR002C TUR002D TUR002E 5       CS004S         C-RO, CRS         The running Charging Pump shaft shears, which TS-CRS            requires start of the standby Charging Pump and restoration of Charging and Letdown 6       FWM001A                           All Main Feedwater Pumps trip causing Reactor Trip.
-controller fails low causing Turbine Lube oil temperature to lower and Turbine vibrations to increase.
FWM001B FWM001C NUREG -1021 R10 Appendix D                           Scenario Outline                             Form ES-D-1 M-ALL           Reactor Trip, Loss of Secondary Heat sink, N/A recovery using Condensate.
5 CS004S C-RO, CRS TS-CRS The running Charging Pump shaft shears, which requires start of the standby Charging Pump and restoration of Charging and Letdown 6 FWM001A FWM001B FWM001 C  All Main Feedwater Pumps trip causing Reactor Trip.
Pressurizer Spray valve PCV-444C fails open on PRS003A reactor trip.
 
Turbine Driven EFW Pump steam supply fails MSS015 7                                              shut on reactor trip.
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  7 N/A M-ALL Reactor Trip, Loss of Secondary Heat sink
Engineered Safeguards Bus 1DB lockout actuates EPS167                                  causing a loss of Train B loads including the B Emergency Feedwater Pump.
, recovery using Condensate.
Motor Driven EFW Pump A sustains a sheared EF001S                                  shaft.
PRS003A Pressurizer Spray valve PCV
              * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG -1021 R10 Appendix D                               Scenario Outline                             Form ES-D-1 The following notation is used in the ES-D-2 form Time column:
-444C fails open on reactor trip.
IOA designates Immediate Operator Action steps.
MSS015 Turbine Driven EFW Pump steam supply fails shut on reactor trip.
* designates Continuous Action steps.
EPS167 Engineered Safeguards Bus 1DB lockout actuates causing a loss of Train "B" loads including the "B" Emergency Feedwater Pump.
TURNOVER:
EF001 S Motor Driven EFW Pump "A" sustains a sheared shaft. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
The crew will assume the watch having been pre-briefed on the Initial Conditions, the plan for this shift and any related operating procedures. The Unit will be in a normal full power configuration and the Crew will be instructed to maintain 100% power.
 
EVENT 1: Feedwater Booster Pump B trips.
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  The following notation is used in the ES
* TRIGGER 1 o MAL-FWM006B FW BOOSTER PUMP B TRIP On cue from the Examiner, the B Feedwater Booster pump will trip. This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP-625 1-2 FWBP A/B/C/D TRIP, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.
-D-2 form "Time" column:
EVENT 2: Running EHC Pump trips (standby does not auto start).
IOA designates Immediate Operator Action steps.
* PRELOAD o PMP-EH002F XPP0003-PP2 HFM PMP B FAIL TO START
* designates Continuous Action steps. TURNOVER: The crew will assume the watch having been pre
* TRIGGER 2 o PMP-EH001B XPP0003-PP1 HFM PMP A BRG FAILURE Final Value: 10 On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto.
-briefed on the Initial Conditions, the plan for this shift and any related operating procedures.
The BOP will respond to annunciator XCP-631 1-4, EHC PP A MOTOR OVRLD, determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing. A Turbine trip will occur within 2 minutes if the event is not mitigated.
The Unit will be in a normal full power configuration and the Crew will be instructed to maintain 100% power.
NUREG -1021 R10 Appendix D                                 Scenario Outline                       Form ES-D-1 EVENT 3: Power Range NI Channel N-44 fails HIGH.
EVENT 1: Feedwater Booster Pump "B" trips. TRIGGER 1  o MAL-FWM006B FW BOOSTER PUMP B TRIP On cue from the Examiner, the "B" Feedwater Booster pump will trip. This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP-625 1-2 FWBP A/B/C/D TRIP, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP
* TRIGGER 3 o   MAL-NIS003D POWER RANGE CHANNEL 44 FAILURE Final Value = 200%
-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.
On cue from the Examiner Power Range NI Channel N-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de-energized.
EVENT 2: Running EHC Pump trips (standby does not auto start)
. PRELOAD   o PMP-EH002F   XPP0003-PP2 HFM PMP B FAIL TO START TRIGGER 2  o PMP-EH001B XPP0003-PP1 HFM PMP A BRG FAILURE Final Value: 10 On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto. The BOP will respond to annunciator XCP
-631 1-4, EHC PP A MOTOR OVRLD , determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing.
A Turbine trip will occur within 2 minutes if the event is not mitigated.
 
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  EVENT 3: Power Range NI Channel N
-44 fails HIGH. TRIGGER 3 o MAL-NIS003D POWER RANGE CHANNEL 44 FAILURE Final Value = 20 0% On cue from the Examiner Power Range NI Channel N
-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP
-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de
-energized.
The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.
The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.
EVENT 4: Turbine Lube Oil Temperature control valve fails open. TRIGGER 4 o OVR-CW020B TC-4211 TURBINE ROOM CLOSE CYCLE HX POT Final Value = 0 o MAL-TUR002A TURBINE VIBRATION (BEARING 1)
EVENT 4: Turbine Lube Oil Temperature control valve fails open.
Ramp = 120 sec Final Value = 3.1MIL o MAL-TUR002B TURBINE VIBRATION (BEARING 3
* TRIGGER 4 o   OVR-CW020B TC-4211 TURBINE ROOM CLOSE CYCLE HX POT Final Value = 0 o   MAL-TUR002A TURBINE VIBRATION (BEARING 1)
) Ramp = 120 sec Final Value = 5.9 MIL o MAL-TUR002C TURBINE VIBRATION (BEARING 5
Ramp = 120 sec Final Value = 3.1MIL o   MAL-TUR002B TURBINE VIBRATION (BEARING 3)
) Ramp = 120 sec Final Value = 6.1 MIL o MAL-TUR002D TURBINE VIBRATION (BEARING 7
Ramp = 120 sec Final Value = 5.9 MIL o   MAL-TUR002C TURBINE VIBRATION (BEARING 5)
) Ramp = 120 sec Final Value
Ramp = 120 sec Final Value = 6.1 MIL o   MAL-TUR002D TURBINE VIBRATION (BEARING 7)
= 4.9 MIL o MAL-TUR002E TURBINE VIBRATION (BEARING 9
Ramp = 120 sec Final Value = 4.9 MIL o   MAL-TUR002E TURBINE VIBRATION (BEARING 9)
) Ramp = 120 sec Final Value = 5.2 MIL Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10    AUTO-TRIGGER 14 x11o064m==1 & x11d016m>=100, (bearing oil temp control in manual and bearing oil temperature greater than 100°F) o MAL-TUR002A TURBINE VIBRATION (BEARING 1)
Ramp = 120 sec Final Value = 5.2 MIL NUREG -1021 R10 Appendix D                               Scenario Outline                           Form ES-D-1
Ramp = 180 sec Final Value = 1.32 MIL o MAL-TUR002B TURBINE VIBRATION (BEARING 3
* AUTO-TRIGGER 14               x11o064m==1 & x11d016m>=100, (bearing oil temp control in manual and bearing oil temperature greater than 100°F) o   MAL-TUR002A TURBINE VIBRATION (BEARING 1)
) Ramp = 180 sec Final Value  
Ramp = 180 sec Final Value = 1.32 MIL o   MAL-TUR002B TURBINE VIBRATION (BEARING 3)
= 4 MIL o MAL-TUR002C TURBINE VIBRATION (BEARING 5
Ramp = 180 sec Final Value = 4 MIL o   MAL-TUR002C TURBINE VIBRATION (BEARING 5)
) Ramp = 1 80 sec Final Value  
Ramp = 180 sec Final Value = 3.2 MIL o   MAL-TUR002D TURBINE VIBRATION (BEARING 7)
= 3.2 MIL o MAL-TUR002D TURBINE VIBRATION (BEARING 7
Ramp = 180 sec Final Value = 2.9 MIL o   MAL-TUR002E TURBINE VIBRATION (BEARING 9)
) Ramp = 180 sec Final Value  
Ramp = 180 sec Final Value = 2.9 MIL On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temperature and cause vibrations to lower.
= 2.9 MIL o MAL-TUR002E TURBINE VIBRATION (BEARING 9
NUREG -1021 R10 Appendix D                             Scenario Outline                           Form ES-D-1 EVENT 5: A Charging Pump shaft shears.
) Ramp = 180 sec Final Value  
* TRIGGER 5 o   PMP-CS004S XPP0043A CHRG/SI PMP A SHEARED SHAFT
= 2.9 MIL On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temperature and cause vibrations to lower.  
* TRIGGER 15 o   LOA-CVC043 CHARGING PUMP C SUPPLY BRKR TRAIN A POSITION TO: RACKED IN
 
* TRIGGER 16 o   LOA-CVC041 CHARGING PUMP A SUPPLY BRKR POSITION TO: RACKED OUT On cue from the Examiner the running Charging Pump A shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the B or C Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System. The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems - Tavg > 350°F. Action a says: With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  EVENT 5: "A" Charging Pump shaft shears
EVENT 6: All 3 Main Feedwater Pumps trip.
. TRIGGER 5 o PMP-CS004S XPP0043A     CHRG/SI PMP A SHEARED SHAFT TRIGGER 1 5  o LOA-CVC043 CHARGING PUMP C SUPPLY BRKR TRAIN A POSITION TO: RACKED IN TRIGGER 16 o LOA-CVC041 CHARGING PUMP A SUPPLY BRKR POSITION TO: RACKED OUT On cue from the Examiner the running Charging Pump "A" shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the "B" or "C" Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System.
* TRIGGER 6 o   MAL- FWM001A MAIN FEEDWATER PUMP A TRIP o   MAL-FWM001B MAIN FEEDWATER PUMP B TRIP o   MAL-FWM001C MAIN FEEDWATER PUMP C TRIP On cue from the Examiner all 3 Main Feedwater Pumps will trip. This results in a Turbine Trip which in turn creates a Reactor Trip Signal. The crew will enter EOP-1.0, E-0, Reactor Trip or Safety Injection.
The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems  
NUREG -1021 R10 Appendix D                               Scenario Outline                           Form ES-D-1 EVENT 7: Loss of Heat sink.
- Tavg > 350°F. Action a says: With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours. EVENT 6: All 3 Main Feedwater Pump s trip. TRIGGER 6 o MAL- FWM001A MAIN FEEDWATER PUMP A TRIP o MAL-FWM001B MAIN FEEDWATER PUMP B TRIP o MAL-FWM001C MAIN FEEDWATER PUMP C TRIP On cue from the Examiner all 3 Main Feedwater Pump s will trip. This results in a Turbine Trip which in turn creates a Reactor Trip Signal.
* AUTO-TRIGGER 7               FNISPR(2) <= 5 (N-42 indicates < 5% Power) o   MAL-PRS003A PRESSURIZER SPRAY VALVE 444C FAILURE Final Value = 10%
The crew will enter EOP-1.0, E-0, Reactor Trip or Safety Injection.  
o   MAL-MSS015 STEAM FAILURE TO EFW TURBINE o   PMP-EF001S XPP0021 MOTOR DRIVEN EFW PMP A SHEARED SHAFT
 
* AUTO-TRIGGER 8             X05i081T == 1 (RCP A control switch taken to stop) o   LOA-EPS167           RELAY 51BX-1DB - 7.2 KV SWGR BUS 1DB OVERCURRENT Delay = 30 sec Position To: TRIP
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  EVENT 7: Loss of Heat sink. AUTO-TRIGGER 7 FNISPR(2) <= 5 (N-42 indicates  
* TRIGGER 9 o   LOA-FWM040           SS-FW61A XVG01611A,B,C KEY SWITCH Position To: BYPASS
< 5% Power)  o MAL-PRS003A   PRESSURIZER SPRAY VALVE 444C FAILURE Final Value = 1 0% o MAL-MSS015   STEAM FAILURE TO EFW TURBINE  
* TRIGGER 10 o   LOA-FWM041           SS-FW81A1 IFV03321,3331,3341 TRAIN A KEY SWITCH Position To: BYPASS
 
* TRIGGER 11 o   LOA-FWM042           SS-FW81B1 IFV03321,3331,3341 TRAIN B KEY SWITCH Position To: BYPASS
o PMP-EF001 S  XPP0021   MOTOR DRIVEN EFW PMP "A" SHEARED SHAFT AUTO-TRIGGER 8 X05 i081T == 1 (RCP "A" control switch taken to stop) o LOA-EPS167 RELAY 51BX
* TRIGGER 12 o   LOA-EPS133           DG B OVERSPEED TRIP DEVICE Position To: TRIP This event is automatically triggered following the reactor trip of Event 6. The crew will enter EOP-1.1 (ES-0.1) address the stuck open Pressurizer Spray valve and transition to EOP-15.0, Response to Loss of Secondary Heat Sink.
-1DB - 7.2 KV SWGR BUS 1D B OVERCURRENT Delay = 30 sec Position To: TRIP TRIGGER 9 o LOA-FWM040       SS-FW61A XVG01611A,B,C KEY SWITCH Position To: BYPASS TRIGGER 10 o LOA-FWM041     SS-FW81A1 IFV03321,3331,3341 TRAIN A KEY SWITCH Position To: BYPASS TRIGGER 11 o LOA-FWM042 SS-FW81B1 IFV03321,3331,3341 TRAIN B KEY SWITCH Position To: BYPASS TRIGGER 12 o LOA-EPS133 DG B OVERSPEED TRIP DEVICE Position To: TRIP This event is automatically triggered following the reactor trip of Event 6. The crew will enter EOP-1.1 (E S-0.1) address the stuck open Pressurizer Spray valve and transition to EOP
The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish Main Feedwater flow to one SG. The Main Feedwater pumps will not reset and the success path is to utilize Condensate Pump flow to restore SG level.
-15.0, Response to Loss of Secondary Heat Sink. The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish Main Feedwater flow to one SG. The Main Feedwater pumps will not reset and the success path is to utilize Condensate Pump flow to restore SG level.
CRITICAL TASKS:
CRITICAL TASKS:
Start the back-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.
Start the back-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.
Establish feed water flow into at least one SG before RCS bleed and feed is required.
Establish feed water flow into at least one SG before RCS bleed and feed is required.
Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs. TERMINATION:
Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs.
TERMINATION:
The scenario can be terminated after the crew has established feed flow via the Main Feedwater system to at least one Steam Generator or at any time at the discretion of the Examiner.
The scenario can be terminated after the crew has established feed flow via the Main Feedwater system to at least one Steam Generator or at any time at the discretion of the Examiner.
 
NUREG -1021 R10 Appendix D                           Scenario Outline                             Form ES-D-1 Scenario Attributes       Events
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10    Scenario Attributes Events Total Malfunctions (5-8) 8
* Feedwater Booster Pump trip.
* Feedwater Booster Pump trip
.
* Running EHC pump trip.
* Running EHC pump trip.
* Power Range NI channel N
* Power Range NI channel N-44 fails HIGH.
-44 fails HIGH.
Total Malfunctions
* Turbine lube oil temperature controller fails open
* Turbine lube oil temperature controller fails open.
.
8 (5-8)
* Running Charging pump sheared shaft.
* Running Charging pump sheared shaft.
* ESF bus 1DB lockout.
* ESF bus 1DB lockout.
* Pressurizer spray valve fails open after Reactor Trip.
* Pressurizer spray valve fails open after Reactor Trip.
* Loss of all Emergency Feedwater.
* Loss of all Emergency Feedwater.
Malfunctions after EOP entry (1
-2) 4
* Pressurizer spray valve fails open after Reactor Trip.
* Pressurizer spray valve fails open after Reactor Trip.
Malfunctions after
* ESF bus 1DB lockout.
* ESF bus 1DB lockout.
* TDEFPp steam supply fails after trip
4 EOP entry (1-2)
.
* TDEFPp steam supply fails after trip.
* MDEFW Pump shears shaft.
* MDEFW Pump shears shaft.
Abnormal Events (2-4) 5
* Running EHC pump trip
* Running EHC pump trip
* Power Range NI channel N
* Power Range NI channel N-44 fails HIGH.
-44 fails HIGH.
Abnormal Events 5
* Turbine lube oil temperature controller fails open
* Turbine lube oil temperature controller fails open.
.
(2-4)
* Running Charging pump sheared shaft.
* Running Charging pump sheared shaft.
* Feedwater Booster Pump trip
* Feedwater Booster Pump trip.
. Major Transient (1-2) 1
Major Transient
* Loss of Heat sink due to loss of all Emergency Feedwater and loss of ESF bus 1DB.
* Loss of Heat sink due to loss of all Emergency Feedwater and loss of 1
EOPs Entered (1
(1-2)                       ESF bus 1DB.
-2) 2
* EOP-1.1, Reactor Trip Recovery.
* EOP-1.1, Reactor Trip Recovery.
* EOP-15.0, Response to Loss of Secondary Heat Sink. (FR
EOPs Entered (1-2)      2
-H.1) EOP Contingencies (0-2) 1
* EOP-15.0, Response to Loss of Secondary Heat Sink. (FR-H.1)
* EOP-15.0, Response to Loss of Secondary Heat Sink. (FR
EOP Contingencies (0-2) 1
-H.1) Critical Tasks (2-3) 2
* EOP-15.0, Response to Loss of Secondary Heat Sink. (FR-H.1)
* Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs.
* Stop one or more RCPs as necessary to stop Pressurizer Spray flow Critical Tasks              before a low Pressurizer Pressure SI occurs.
2 (2-3)
* Establish feed water flow into at least one SG before RCS bleed and Feed is required.
* Establish feed water flow into at least one SG before RCS bleed and Feed is required.
 
NUREG -1021 R10 Appendix D                               Scenario Outline                           Form ES-D-1 SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:
Appendix D Scenario Outline Form ES-D-1 NUREG -1021 R10  SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:
* IC Set 302
IC Set 30 2 99.6% Power MOL Rod Position = 228 on control bank D FCV-113 Pot Setting = 4.2 Boron = 989 ppm Xe = -2744 pcm Burnup = 1013.2 MWD/MTU Prior to the scenario, crew should pre
* 99.6% Power MOL
-brief on conditions and expectations for the Shift; maintain power. PRE-EXERCISE: Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.)
* Rod Position = 228 on control bank D
VCS-TQP-0807 Attachment I
* FCV-113 Pot Setting = 4.2
-A, Unit 1 Booth Instructor Checklist, has been completed.
* Boron = 989 ppm
Verify the Hard Card for Turbine Load changes is in its proper storage location.
* Xe = -2744 pcm
Verify the Hard Card for borating via MVT
* Burnup = 1013.2 MWD/MTU
-8104 is in its proper storage location.
* Prior to the scenario, crew should pre-brief on conditions and expectations for the Shift; maintain power.
Hang Tags for equipment out of service.
PRE-EXERCISE:
Mark up procedures in use with "Circle and slash" as applicable.
* Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.)
A turnover sheet has been prepared for each position.
* VCS-TQP-0807 Attachment I-A, Unit 1 Booth Instructor Checklist, has been completed.
Conduct two
* Verify the Hard Card for Turbine Load changes is in its proper storage location.
-minute drill.
* Verify the Hard Card for borating via MVT-8104 is in its proper storage location.
* Hang Tags for equipment out of service.
* Mark up procedures in use with Circle and slash as applicable.
* A turnover sheet has been prepared for each position.
* Conduct two-minute drill.
PRE-LOAD:
PRE-LOAD:
STANDARD SIMULATOR SETUP: PMP-LD003P, XPP0138 LEAK DETECTION SUMP PMP LOSS OF POWER VLV-FW028W, XVG01676
STANDARD SIMULATOR SETUP:
-FW FW HDR RECIRC ISOL VLV LOSS OF POWER VLV-FW029W, XVG01679
* PMP-LD003P, XPP0138 LEAK DETECTION SUMP PMP LOSS OF POWER
-FW FW HTR RECIRC ISO VLV LOSS OF POWER SCENARIO RELATED:
* VLV-FW028W, XVG01676-FW FW HDR RECIRC ISOL VLV LOSS OF POWER
ANN-CS044, ALT SEAL INJ PUMP TRBL FAIL TO: ON ANN-CS046, ALT SL INJ DSL GEN TRBL FAIL TO: ON MAL-CVC027, ALT SEAL INJ D/G FAIL TO START MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START
* VLV-FW029W, XVG01679-FW FW HTR RECIRC ISO VLV LOSS OF POWER SCENARIO RELATED:
 
* ANN-CS044, ALT SEAL INJ PUMP TRBL                         FAIL TO: ON
Appendix D Operator Actions Form ES-D-2   Op Test No:
* ANN-CS046, ALT SL INJ DSL GEN TRBL                       FAIL TO: ON
NRC-ILO-14-01 Scenario #
* MAL-CVC027, ALT SEAL INJ D/G FAIL TO START
2 Event # 1 Page: 10 of 45 Event
* MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #   2   Event #   1   Page:   10 of 45 Event


== Description:==
== Description:==
 
Feedwater Booster Pump B trips Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner, the B Feedwater Booster pump will trip.
Feedwater Booster Pump "B" trips Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner, the "B" Feedwater Booster pump will trip. This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP
This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP-625 1-2 FWBP A/B/C/D TRIP, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.
-625 1-2 FWBP A/B/C/D TRIP
BOOTH OPERATOR:           When directed, insert Event 1 (TRIGGER 1)
, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP
Indications available:
-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.
XCP-625 1-2, FWBP A/B/C/D TRIP CORRECTIVE ACTIONS:                                                   XCP-625 1-2
BOOTH OPERATOR:
: 1. If the number of Feedwater Booster Pumps in operation is less than the number of Feedwater Pumps in operation, immediately trip the Reactor and enter EOP-1.0, REACTOR TRIP SAFETY INJECTION ACTUATION. (3 FW PUMPS AND 3 BOOSTER PUMPS ARE IN SERVICE NO TRIP REQUIRED)
When directed, insert Event 1 (TRIGGER 1) Indications available:
: 2. If three Feedwater Booster Pumps and three Feedwater Pumps are in operation, reduce Reactor power to 95% per GOP-4C, CRS RAPID POWER REDUCTION.
XCP-625 1-2, FWBP A/B/C/D TRIP CRS CORRECTIVE ACTIONS:
: 3. If available, start a standby Feedwater Booster Pump per SOP-210, FEEDWATER SYSTEM. (NO STANDBY BOOSTER PUMP AVAILBLE)
: 1. If the number of Feedwater Booster Pumps in operation is less than the number of Feedwater Pumps in operation, immediately trip the Reactor and enter EOP
: 4. If only two Feedwater Booster Pumps are in operation, reduce Reactor power to less than 48% per GOP-4C, RAPID POWER REDUCTION. (3 BOOSTER PUMPS ARE IN SERVICE)
-1.0, REACTOR TRIP SAFETY INJECTION ACTUATION
: 5. Ensure Deaerator wide range level is maintained greater than 4 as indicated on LI-3135, DEAER STOR TK WR LVL FEET.
. (3 FW PUMPS AND 3 BOOSTER PUMPS ARE IN SERVICE NO TRIP REQUIRED)
If requested to check status of the B Feedwater Booster Pump BOOTH OPERATOR:          and breaker, report no obvious problem with pump and that the breaker is tripped. (brief delay)
: 2. If three Feedwater Booster Pumps and three Feedwater Pumps are in operation, reduce Reactor power to 95% per GOP
EVALUATOR NOTE: The CRS may direct use of the emergency Boration valve MVT-8104 in order to expedite the power reduction.
-4C, RAPID POWER REDUCTION.
Direct a plant down power to 95% in accordance with GOP-4C, CRS RAPID POWER REDUCTION.
: 3. If available, start a standby Feedwater Booster Pump per SOP
NUREG -1021 R10 Appendix D                                   Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2   Event #   1   Page:   11 of 45 Event
-210, FEEDWATER SYSTEM.
(NO STANDBY BOOSTER PUMP AVAILBLE)
: 4. If only two Feedwater Booster Pumps are in operation, reduce Reactor power to less than 48% per GOP
-4C, RAPID POWER REDUCTION.
(3 BOOSTER PUMPS ARE IN SERVICE)
: 5. Ensure Deaerator wide range level is maintained greater than -3135, DEAER STOR TK WR LVL FEET.
XCP-625 1-2 BOOTH OPERATOR:
If requested to check status of the "B" Feedwater Booster Pump and breaker, report no obvious problem with pump and that the breaker is tripped. (brief delay)
EVALUATOR NOTE: The CRS may direct use of the emergency Boration valve M VT-8104 in order to expedite the power reduction.
CRS Direct a plant down power to 95% in accordance with GOP
-4C, RAPID POWER REDUCTION.  
 
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 1 Page: 11 of 45 Event


== Description:==
== Description:==
 
Feedwater Booster Pump B trips Time       Position                       Applicants Actions or Behavior GOP-4C NOTE 3.0                                             GOP-4C If time allows, load reductions should be discussed with the Load Dispatcher.
Feedwater Booster Pump "B" trips Time Position Applicant's Actions or Behavior NUREG -1021 R10    GOP-4C NOTE 3.0 If time allows, load reductions should be discussed with the Load Dispatcher.
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   1   Page:   12 of 45 Event
GOP-4C Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 1 Page: 12 of 45 Event


== Description:==
== Description:==
 
Feedwater Booster Pump B trips Time       Position                           Applicants Actions or Behavior CAUTION 3.1 through 3.12                                     GOP-4C
Feedwater Booster Pump "B" trips Time Position Applicant's Actions or Behavior NUREG -1021 R10  CAUTION 3.1 through 3.12
: a. Thermal Power changes of greater than 15% in any one-hour period requires completion of GTP-702 Attachment III.H.
: a. Thermal Power changes of greater than 15% in any one
: b. VCS PID Report, POWER CHANGE SEARCH, should be periodically performed to ensure a thermal power change of greater than 15% in any one-hour period is detected.
-hour period requires completion of GTP-702 Attachment III.H.
BOOTH OPERATOR:         If contacted as Shift Engineer regarding GTP-702 Attachment, report back I will complete the GTP-702 Attachment III.H.
: b. VCS PID Report, POWER CHANGE SEARCH, should be periodically performed to ensure a thermal power change of greater than 15% in any one
3.1 Commence rapid Plant Shutdown as follows:                         GOP-4C RO
-hour period is detected.
GOP-4C BOOTH OPERATOR:
If contacted as Shift Engineer regarding GTP
-702 Attachment, report back "I will complete the GTP
-702 Attachment III.H".
RO 3.1 Commence rapid Plant Shutdown as follows:
: a. Energize all Pressurizer Heaters.
: a. Energize all Pressurizer Heaters.
GOP-4C EVALUATOR NOTE:
EVALUATOR NOTE: The Reactor Operator may use either the blender or the Emergency Boration valve (MVT-8104) depending on CRS direction.
The Reactor Operator may use either the blender or the Emergency Boration valve (MVT-8104) depending on CRS direction.
Procedure guidance for Emergency Boration is found on PAGE 40 of this document.
Procedure guidance for Emergency Boration is found on PAGE 4 0 of this document.
Procedure guidance for use of the Blender is found on PAGES 41 - 44 of this document.
Procedure guidance for use of the Blender is found on PAGE S 4 1 - 4 4 of this document.
NOTE 3.1.b                                           GOP-4C Setting FCV-113 A&B, BA FLOW SET PT to 8.3 will yield 33 gpm Boration flow rate.
NOTE 3.1.b Setting FCV
: b. Maintain the following with rod motion or boron           GOP-4C concentration changes:
-113 A&B, BA FLOW SET PT to 8.3 will yield 33 gpm Boration flow rate
RO                1)   Tavg within 10&deg;F and trending to Tref.
. GOP-4C  RO b. Maintain the following with rod motion or boron concentration changes: 1) Tavg within 10&deg;F and trending to Tref.
: 2)  I within limits.
: 2)  3) Control Rods above the rod insertion limit.
: 3)   Control Rods above the rod insertion limit.
GOP-4C  BOP c. Using the Turbine HMI, Control/Load screen, reduce to the desired load, as low as 5% (50 MWe), as follows:
: c. Using the Turbine HMI, Control/Load screen, reduce to the   GOP-4C desired load, as low as 5% (50 MWe), as follows:
: 1) Under Rate %/min, select desired ramp rate up to 5% per minute. 2) Select Load (a dialog box opens).
: 1) Under Rate %/min, select desired ramp rate up to 5%
: 3) Enter desired load.
per minute.
: 4) Select OK.
: 2) Select Load (a dialog box opens).
: 5) Confirm setpoint.
BOP                3) Enter desired load.
: 6) Select OK.
: 4) Select OK.
: 7) Verify proper plant response.
: 5) Confirm setpoint.
GOP-4C EVALUATOR NOTE:
: 6) Select OK.
The next event may be insert ed after a significant power reduction is observed or at any time per the discretion of the Lead Evaluator.  
: 7) Verify proper plant response.
 
EVALUATOR NOTE: The next event may be inserted after a significant power reduction is observed or at any time per the discretion of the Lead Evaluator.
Appendix D Operator Actions Form ES-D-2   Op Test No:
NUREG -1021 R10 Appendix D                                       Operator Actions                       Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #     2     Event #   2   Page:     13   of   45 Event
NRC-ILO-14-01 Scenario #
2 Event # 2 Page: 13 of 45 Event


== Description:==
== Description:==
Running EHC Pump trips (standby does not auto start)
Running EHC Pump trips (standby does not auto start)
Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto. The BOP will respond to annunciator XCP
Time         Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto. The BOP will respond to annunciator XCP-631 1-4, EHC PP A MOTOR OVRLD, determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing. A Turbine trip will occur within 2 minutes if the event is not mitigated.
-631 1-4, EHC PP A MOTOR OVRLD , determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing.
BOOTH OPERATOR:               When directed, insert Event 2 (TRIGGER 2)
A Turbine trip will occur within 2 minutes if the event is not mitigated.
Indications available:
BOOTH OPERATOR:
XCP-631 1-4, EHC PP A MOTOR OVRLD If requested to check for EHC System Leaks report no leaks observed (brief delay).
When directed, insert Event 2 (TRIGGER 2) Indications available:
If requested to check the A EHC Pump, report the pump is hot BOOTH OPERATOR:
XCP-631 1-4, EHC PP A MOTOR OVRLD BOOTH OPERATOR: If requested to check for EHC System Leaks report no leaks observed (brief delay). If requested to check the "A" EHC Pump , report "the pump is hot and is not running and the breaker has opened" (brief delay)
and is not running and the breaker has opened (brief delay).
. If requested to check on the "B" EHC pump operation, report "B" EHC pump is operating normally" (brief delay)
If requested to check on the B EHC pump operation, report B EHC pump is operating normally (brief delay).
. BOP 1. If EHC PUMP A is still running, verify high amps.
XCP-631 1-4
(EHC PUMP A HAS ZERO AMPS)
: 1. If EHC PUMP A is still running, verify high amps. (EHC BOP PUMP A HAS ZERO AMPS)
XCP-631 1-4 CRITICAL TASK BOP 2. Start EHC PUMP B and observe motor amps.
XCP-631 1-4 CRITICAL BOP         2. Start EHC PUMP B and observe motor amps.
XCP-631 1-4  BOP 3. If EHC PUMP A is still running with higher amps than EHC PUMP B, secure EHC PUMP A and continue to monitor EHC PUMP B.
TASK
(EHC PUMP A IS NOT RUNNING)
: 3. If EHC PUMP A is still running with higher amps than EHC           XCP-631 1-4 PUMP B, secure EHC PUMP A and continue to monitor EHC PUMP B. (EHC PUMP A IS NOT RUNNING)
: 4. Dispatch an operator to check for EHC System leaks.
: 4. Dispatch an operator to check for EHC System leaks.
: 5. If EHC PUMP B is drawing high amps with EHC PUMP A tripped, attempt to restart EHC PUMP A and run both pumps until an external leak is located or a low level in the EHC fluid tank alarm is received.
: 5. If EHC PUMP B is drawing high amps with EHC PUMP A BOP              tripped, attempt to restart EHC PUMP A and run both pumps until an external leak is located or a low level in the EHC fluid tank alarm is received.
: 6. If EHC PUMP B overload annunciator is received after starting, commence a Turbine Runback at 5%
: 6. If EHC PUMP B overload annunciator is received after starting, commence a Turbine Runback at 5% per minute per GOP-4C.
per minute per GOP-4C. XCP-631 1-4  EVALUATOR NOTE:
EVALUATOR NOTE: The next event may be inserted after the B EHC pump is running and an operator has been dispatched to check the EHC System or at any time per the discretion of the Lead Evaluator.
The next event may be insert ed after the "B" EHC pump is running and an operator has been dispatched to check the EHC System or at any time per the discretion of the Lead Evaluator
NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #     2   Event #   3   Page:   14   of 45 Event
.
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 3 Page: 14 of 45 Event


== Description:==
== Description:==
 
Power Range NI Channel N-44 fails HIGH.
Power Range NI Channel N
Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner Power Range NI Channel N-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de-energized.
-44 fails HIGH. Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner Power Range NI Channel N
-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP
-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de
-energized.
The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.
The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.
BOOTH OPERATOR:
BOOTH OPERATOR:             When directed, insert Event 3 (TRIGGER 3)
When directed, insert Event 3 (TRIGGER 3) Indications available:
Indications available:
: 1. Abnormal indication on any of the following:
: 1. Abnormal indication on any of the following:
NI-41B(42B)(43B)(44B), % FULL POWER %.
NI-41B(42B)(43B)(44B), % FULL POWER %.
NI-41C(42C)(43C)(44C), FLUX %.
NI-41C(42C)(43C)(44C), FLUX %.
: 2. Any of the following Main Control Board annunciators in alarm:
: 2. Any of the following Main Control Board annunciators in alarm:
XCP-620 1-1, PR HI SETPT FLUX HI XCP-620 1-4, PR CHAN DEV XCP-620 2-2, PR FLUX HI RATE SINGLE CHAN ALERT XCP-621 2-4, PR FLUX HI ROD STP
XCP-620 1-1, PR HI SETPT FLUX HI XCP-620 1-4, PR CHAN DEV XCP-620 2-2, PR FLUX HI RATE SINGLE CHAN ALERT XCP-621 2-4, PR FLUX HI ROD STP
: 3. Any of the following status lights is bright:
: 3. Any of the following status lights is bright:
OTT - CHAN I(II,III) W/DRWL ROD BLCK.
OTT - CHAN I(II,III) W/DRWL ROD BLCK.
CHAN I(II,III) LP A(B, C) OTT. CHAN I(II,III,IV) PR FLUX RATE HI.
CHAN I(II,III) LP A(B, C) OTT.
CHAN I(II,III,IV) PR FLUX RATE HI.
CHAN I(II,III,IV) PR FLUX LO SET PT.
CHAN I(II,III,IV) PR FLUX LO SET PT.
CHAN I(II,III,IV) PR FLUX HI SET PT.
CHAN I(II,III,IV) PR FLUX HI SET PT.
Line 280: Line 238:
CHAN I(II,III,IV) P9.
CHAN I(II,III,IV) P9.
: 4. Failure of a Power Range channel may cause unwarranted rod motion.
: 4. Failure of a Power Range channel may cause unwarranted rod motion.
IOA RO 1 Verify normal indication on Power Range Channel N
IOA                       1   Verify normal indication on Power Range Channel N-44. (NO)     AOP-401.10 ALTERNATIVE ACTION RO 1   IF Power Range Channel N-44 has failed, THEN place the ROD CNTRL BANK SEL Switch in MAN.
-44. (NO) ALTERNATIVE ACTION 1 IF Power Range Channel N
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   3   Page:   15 of 45 Event
-44 has failed, THEN place the ROD CNTRL BANK SEL Switch in MAN.
AOP-401.10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 3 Page: 15 of 45 Event


== Description:==
== Description:==
 
Power Range NI Channel N-44 fails HIGH.
Power Range NI Channel N
Time       Position                           Applicants Actions or Behavior IOA         BOP       2   Stabilize any plant transients in progress.                     AOP-401.10 3  Maintain stable plant conditions.                               AOP-401.10
-44 fails HIGH. Time Position Applicant's Actions or Behavior NUREG -1021 R10  IOA BOP 2   Stabilize any plant transients in progress.
* RO,BOP 4   Verify no testing is in progress on the operable Power Range   AOP-401.10 CRS channels.
AOP-401.10
5   Place ROD STOP BYPASS Switch (on the                           AOP-401.10 BOP            MISCELLANEOUS CONTROL AND INDICATION PANEL) for the failed Power Range channel in BYPASS.
* RO,BOP 3  Maintain stable plant conditions.
6   Verify the appropriate Rod Stop Bypass status light is bright: AOP-401.10 RO              For N-44, B2 OP ROD STOP BYP (XCP-6111 4-4).
AOP-401.10 CRS 4 Verify no testing is in progress on the operable Power Range channels. AOP-401.10 BOP 5 Place ROD STOP BYPASS Switch (on the MISCELLANEOUS CONTROL AND INDICATION PANEL) for the failed Power Range channel in BYPASS.
7   Adjust Control Rods to maintain Tavg within 1.0&deg;F of Tref .
AOP-401.10  RO 6   Verify the appropriate Rod Stop Bypass status light is bright:
8   Notify the I&C Department to record detector currents and       AOP-401.10 CRS            status lights on POWER RANGE A and POWER RANGE B drawers.
For N-44, B2 OP ROD STOP BYP (XCP
When contacted as I&C, report that the detector currents and BOOTH OPERATOR:          status lights on POWER RANGE A and POWER RANGE B drawers for N-44 have been recorded. (brief delay)
-6111 4-4). 7 Adjust Control Rods to maintain Tavg within 1.0&deg;F of Tref .
CAUTION - Step 9                                       AOP-401.10 The empty fuse holders should NOT be reinstalled as this will allow a small amount of current flow through the blown fuse indicator.
AOP-401.10  CRS 8   Notify the I&C Department to record detector currents and status lights on POWER RANGE A and POWER RANGE B drawers. AOP-401.10 BOOTH OPERATOR:
9   Deenergize the failed Power Range channel:                     AOP-401.10
When contacted as I&C, report that "the detector currents and status lights on POWER RANGE A and POWER RANGE B drawers for N-44 have been recorded." (brief delay)
CAUTION - Step 9 The empty fuse holders should NOT be reinstalled as this will allow a small amount of current flow through the blown fuse indicator.
AOP-401.10  B O P 9 Deenergize the failed Power Range channel:
: a. Remove the CONTROL POWER fuses from the POWER RANGE A drawer.
: a. Remove the CONTROL POWER fuses from the POWER RANGE A drawer.
: b. Remove the INSTR POWER fuses from the POWER RANGE B drawer.
: b. Remove the INSTR POWER fuses from the POWER RANGE B drawer.
10 Align the Power Range channel comparator circuits:
10 Align the Power Range channel comparator circuits:
: a. Place the following switches to the failed Power Range channel position:
BOP            a. Place the following switches to the failed Power Range channel position:
: 1) COMPARATOR CHANNEL DEFEAT Switch (on the  
: 1)   COMPARATOR CHANNEL DEFEAT Switch (on the COMPARATOR AND RATE drawer).
 
: 2)   UPPER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).
COMPARATOR AND RATE drawer).
: 3)   LOWER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).
: 2) UPPER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).
NUREG -1021 R10 Appendix D                                   Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   3   Page:   16   of 45 Event
: 3) LOWER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).
AOP-401.10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 3 Page: 16 of 45 Event


== Description:==
== Description:==
 
Power Range NI Channel N-44 fails HIGH.
Power Range NI Channel N
Time       Position                       Applicants Actions or Behavior 11 Ensure NR-45 is selected to the appropriate operable             AOP-401.10 RO channels.
-44 fails HIGH. Time Position Applicant's Actions or Behavior NUREG -1021 R10    RO 11 Ensure NR-45 is selected to the appropriate operable channels. AOP-401.10 CRS 12 Check if Reactor power is LESS THAN 75%. (NO) ALTERNATIVE ACTION 12 Initiate GTP-702, Attachment IV.F.
12 Check if Reactor power is LESS THAN 75%. (NO)                     AOP-401.10 CRS                              ALTERNATIVE ACTION 12 Initiate GTP-702, Attachment IV.F.
AOP-401.10  RO 13 Check if Reactor power is LESS THAN 50%.
13 Check if Reactor power is LESS THAN 50%. (NO)                     AOP-401.10 RO                            ALTERNATIVE ACTION 13 Initiate GTP-702, Attachment IV.D.
(NO) ALTERNATIVE ACTION 1 3  Initiate GTP
14 Within 72 hours, place the failed channel protection bistables   AOP-401.10 in a tripped condition:
-702, Attachment IV.D.
: a. Identify the associated bistables for the failed channel.
AOP-401.10  CRS 14 Within 72 hours, place the failed channel protection bistables in a tripped condition:
REFER TO Attachment 1.
: a. Identify the associated bistables for the failed channel. REFER TO Attachment 1.
: b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:
: b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:
CRS Instrument.
Instrument.
Associated Bistable.
Associated Bistable. Bistable Location.
Bistable Location.
STPs. c. Notify the I&C Department to place the identified bistables in trip. AOP-401.10  CRS 15 Refer to Tech Spec 3.3.1.
STPs.
AOP-401.10 Appendix D Operator Actions Form ES-D-2   Op Test No:
: c. Notify the I&C Department to place the identified bistables in trip.
NRC-ILO-14-01 Scenario #
CRS       15 Refer to Tech Spec 3.3.1.                                         AOP-401.10 NUREG -1021 R10 Appendix D                                   Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   3   Page:   17 of 45 Event
2 Event # 3 Page: 17 of 45 Event


== Description:==
== Description:==
 
Power Range NI Channel N-44 fails HIGH.
Power Range NI Channel N
Time       Position                         Applicants Actions or Behavior Enters T.S. 3.3.1, REACTOR TRIP SYSTEM                             T.S. 3.3.1 INSTRUMENTATION.
-44 fails HIGH. Time Position Applicant's Actions or Behavior NUREG -1021 R10    CRS Enters T.S. 3.3.
Table 3.3-1; Reactor Trip System Instrumentation:
1 , REACTOR TRIP SYSTEM INSTRUMENTATION.
CRS        Function 2A; Power Range Neutron Flux - High Setpoint - action 2 Function 2B; Power Range Neutron Flux - Low Setpoint - action 2 Function 3; Power Range Neutron Flux - High Positive Rate -
Table 3.3-1; Reactor Trip System Instrumentation
Action 2 ACTION 2 - With the number of OPERABLE channels one less             T.S. 3.3.1 than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: Function 2 A; Power Range Neutron Flux - High Setpoint  
- action 2 Function 2B
; Power Range Neutron Flux - Low Setpoint  
- action 2 Function 3; Power Range Neutron Flux  
- High Positive Rate
- Action 2 T.S. 3.3.1 CRS ACTION 2 - With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: a. The inoperable channel is placed in the tripped condition within 72 hours.
: a. The inoperable channel is placed in the tripped condition within 72 hours.
: b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.1.1.
: b. The Minimum Channels OPERABLE requirement is met; CRS            however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.1.1.
: c. Either, THERMAL POWER is restricted to less than or equal to 75% of RATED THERMAL POWER and the Power Range Neutron Flux trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER within 4 hours; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours per Specification 4.2.4.2.
: c. Either, THERMAL POWER is restricted to less than or equal to 75% of RATED THERMAL POWER and the Power Range Neutron Flux trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER within 4 hours; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours per Specification 4.2.4.2.
T.S. 3.3.1 EVALUATOR NOTE:
EVALUATOR NOTE: The next event may be inserted after Technical Specification 3.3.1 has been addressed or at any time per the discretion of the Lead Evaluator.
The next event may be insert ed after Technical Specification 3.3.1 has been addressed or at any time per the discretion of the Lead Evaluator
NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #   2   Event #   4   Page:   18 of   45 Event
.
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 4 Page: 18 of 45 Event


== Description:==
== Description:==
 
Turbine Lube Oil Temperature control valve fails open Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temp and cause vibrations to lower.
Turbine Lube Oil Temperature control valve fails open Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temp and cause vibrations to lower.
BOOTH OPERATOR:           When directed, insert Event 4 (TRIGGER 4)
BOOTH OPERATOR:
Indications available:
When directed, insert Event 4 (TRIGGER 4) Indications available:
XCP-632, 1-4, TURB SUPERVISORY INSTR XCP-632, 4-2, MN TURB VIB HI CREW         Respond to ANNUNCIATOR XCP-632, 4-2 Determine that turbine vibration does not require a Turbine trip Monitor TI-4211, TURB OIL CLR TEMP &deg;F, to determine if Turbine oil temperature is in the normal operating range between 100&deg;F and 120&deg;F.
XCP-632, 1-4, TURB SUPERVISORY INSTR XCP-632, 4-2, MN TURB VIB HI CREW Respond to ANNUNCIATOR XCP
BOP         1. Evacuate all unnecessary personnel from the Turbine Building. XCP-632 4-2
-632, 4-2 Determine that turbine vibration does not require a Turbine trip Monitor TI
-4211, TURB OIL CLR TEMP &deg;F, to determine if Turbine oil temperature is in the normal operating range between 100&deg;F and 120&deg;F. BOP 1. Evacuate all unnecessary personnel from the Turbine Building.
: 2. Monitor Main Turbine vibration levels.
: 2. Monitor Main Turbine vibration levels.
: a. At the HMI: Select Monitor and as applicable:
: a. At the HMI: Select Monitor and as applicable:
: 1) LP Hoods TEMP
: 1) LP Hoods TEMP
: 2) Lube - Hyd Oil. 3) Vibration.
: 2) Lube - Hyd Oil.
: 4) Prox. b. IPCS, type in TURBRG.
: 3) Vibration.
XCP-632 4-2  BOP Take manual control of the Turbine Oil Temp Controller to increase TLO temperature to the normal operating range.
: 4) Prox.
BOP 2.2 If TI-4211, TURB OIL CLR TEMP &deg;F, reads less than 100&deg;F, perform the following:
: b. IPCS, type in TURBRG.
: a. Verify temperature on the following (TB
BOP         Take manual control of the Turbine Oil Temp Controller to increase TLO temperature to the normal operating range.
-436): 1) ITI15633, MN TB LUBE OIL CLR LO INLET TEMP IND.
BOP         2.2 If TI-4211, TURB OIL CLR TEMP &deg;F, reads less than 100&deg;F,         SOP-215 perform the following:
: a. Verify temperature on the following (TB-436):
: 1) ITI15633, MN TB LUBE OIL CLR LO INLET TEMP IND.
: 2) ITI15634, MN TB LUBE OIL CLR LO OUT TEMP IND.
: 2) ITI15634, MN TB LUBE OIL CLR LO OUT TEMP IND.
: 3) ITI04197, MAIN TURB OIL CLR A TC OUTLET TEMP IND. 4) ITI04207, MAIN TURB OIL CLR B TC OUTLET TEMP IND. SOP-215 Appendix D Operator Actions Form ES-D-2   Op Test No:
: 3) ITI04197, MAIN TURB OIL CLR A TC OUTLET TEMP IND.
NRC-ILO-14-01 Scenario #
: 4) ITI04207, MAIN TURB OIL CLR B TC OUTLET TEMP IND.
2 Event # 4 Page: 19 of 45 Event
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #     4   Page:   19   of 45 Event


== Description:==
== Description:==
 
Turbine Lube Oil Temperature control valve fails open Time       Position                         Applicants Actions or Behavior BOOTH OPERATOR:         Call up the TURBRG screen in SIPCS and be prepared to report back Bearing Oil temperatures as displayed when called.
Turbine Lube Oil Temperature control valve fails open Time Position Applicant's Actions or Behavior NUREG -1021 R10  BOOTH OPERATOR:
BOOTH OPERATOR:         If contacted as AO to check Main Turbine oil cooler conditions report All bearing oil temperatures are reading (as displayed) &deg;F (brief delay).
Call up the TURBRG screen in SIPCS and be prepared to report back Bearing Oil temperatures as displayed when called.
BOP             b. Verify the position of ITV04211-TC, TURBINE OIL CLR TC       SOP-215 OUTLET TEMP CONT VLV, and perform the following as necessary (TB-412):
BOOTH OPERATOR:
BOOTH OPERATOR:         If contacted as AO to check ITV-4211 position, report Valve appears to be fully open with no obvious problem with the operator (brief delay).
If contacted as AO to check Main Turbine oil cooler conditions report "All bearing oil temperatures are reading (as displayed) &deg;F(brief delay)
BOP                 1) If the valve is not fully closed, take manual control of SOP-215 the valve and restore temperature to normal.
. BOP b. Verify the position of ITV04211
EVALUATOR NOTE: After the BOP takes manual control of the TLO Temp Controller and restores TLO temp (control in manual with LO temp > 100&deg;F) high turbine vibrations will ramp back to normal. The next Event may be inserted after Turbine Lube Oil Temperature control has been re-established or at any time per the discretion of the Lead Evaluator.
-TC, TURBINE OIL CLR TC OUTLET TEMP CONT VLV, and perform the following as necessary (TB
NUREG -1021 R10 Appendix D                                       Operator Actions               Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   2   Event #   5   Page: 20   of 45 Event
-412): SOP-215 BOOTH OPERATOR:
If contacted as AO to check ITV-4211 position, report "Valve appears to be fully open with no obvious problem with the operator" (brief delay). BOP 1) If the valve is not fully closed, take manual control of the valve and restore temperature to normal.
SOP-215 EVALUATOR NOTE:
After the BOP takes manual control of the TLO Temp Controller and restores TLO temp (control in manual with LO temp > 100&deg;F) high turbine vibrations will ramp back to normal
. The next Event may be inserted after Turbine Lube Oil Temperature control has been re
-established or at any time per the discretion of the Lead Evaluator
.
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 20 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner the running Charging Pump A shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the B or C Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System. The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems - Tavg > 350&deg;F.
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner the running Charging Pump "A" shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the "B" or "C" Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System. The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems  
BOOTH OPERATOR:             When directed, insert Event 5 (TRIGGER 5)
- Tavg > 350&deg;F. BOOTH OPERATOR:
Indications available:
When directed, insert Event 5 (TRIGGER 5) Indications available:
XCP-617(618)(619) 2-2, RCP A(B)(C) #1 SL INJ FLO LO.
XCP-617(618)(619) 2
-2, RCP A(B)(C) #1 SL INJ FLO LO.
XCP-614 5-1, CHG LINE FLO HI/LO.
XCP-614 5-1, CHG LINE FLO HI/LO.
XCP-613 1-4 , REGEN HX LTDN OUT TEMP HI Abnormal indication on the following:
XCP-613 1-4, REGEN HX LTDN OUT TEMP HI Abnormal indication on the following:
FI-122A, CHG FLOW GPM.
FI-122A, CHG FLOW GPM.
FI-122C, CHARGING FLOW GPM
FI-122C, CHARGING FLOW GPM.
. PI-121, CHG PRESS PSIG.
PI-121, CHG PRESS PSIG.
LT-112A (115), % LEVEL.
LT-112A (115), % LEVEL.
LR-459, PZR % LEVEL & LEVEL SP.
LR-459, PZR % LEVEL & LEVEL SP.
RO CORRECTIVE ACTIONS
RO         CORRECTIVE ACTIONS:                                                XCP-614, 5-1
: 1. If the running Charging Pump suction flowpath has become isolated, secure the Charging Pump and go to AOP
: 1. If the running Charging Pump suction flowpath has become isolated, secure the Charging Pump and go to AOP-102.2, Loss of Charging.
-102.2, Loss of Charging.
: 2. If the PUMP A(B) or PUMP C TRAIN A(B) ammeter indication is abnormal for the running Charging Pump and the pump must be tripped, go to AOP-102.2, Loss of Charging.
: 2. If the PUMP A(B) or PUMP C TRAIN A(B) ammeter indication is abnormal for the running Charging Pump and the pump must be tripped, go to AOP
: 3. Monitor LT-112A and LT-115, % LEVEL, to verify proper VCT level.
-102.2, Loss of Charging. 3. Monitor LT
: 4. Monitor FI-122A, CHG FLOW GPM.
-112A and LT
-115, % LEVEL, to verify proper VCT level. 4. Monitor FI
-122A, CHG FLOW GPM.
: 5. Verify the Charging header valve lineup:
: 5. Verify the Charging header valve lineup:
: a. Verify the following valves are open:
: a. Verify the following valves are open:
: 1) FCV-122, CHG FLOW.
: 1) FCV-122, CHG FLOW.
: 2) MVG-8107, CHG LINE ISOL.
: 2) MVG-8107, CHG LINE ISOL.
: 3) MVG-8108, CHG LINE ISOL.
: 3) MVG-8108, CHG LINE ISOL.
: 4) Either of the following:
: 4) Either of the following:
a) PVT-8146, NORM CHG TO RCS LP B.
a) PVT-8146, NORM CHG TO RCS LP B.
b) PVT-8147, ALT CHG TO RCS LP A XCP-614, 5-1  RO SUPPLEMENTAL ACTIONS:
b) PVT-8147, ALT CHG TO RCS LP A RO         SUPPLEMENTAL ACTIONS:                                             XCP-614, 5-1 NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #   2   Event #   5   Page:   21   of 45 Event
XCP-614, 5-1 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 21 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                             Applicants Actions or Behavior
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10  1. If a malfunction of the Charging Pump is suspected, dispatch an operator to investigate.
: 1. If a malfunction of the Charging Pump is suspected, dispatch an operator to investigate.
: 2. If it is determined that low VCT level is the cause of the problem, the system must be filled and vented prior to starting an idle Charging Pump (refer to SOP
: 2. If it is determined that low VCT level is the cause of the problem, the system must be filled and vented prior to starting an idle Charging Pump (refer to SOP-102).
-102). 3. Check if PZR LVL MASTER CONTROLLER is responding appropriately:
: 3. Check if PZR LVL MASTER CONTROLLER is responding appropriately:
: a. Verify Charging flow is normal and responding to Pressurizer level error.
: a. Verify Charging flow is normal and responding to Pressurizer level error.
: b. Verify Pressurizer level is stable at program level.
: b. Verify Pressurizer level is stable at program level.
: 4. Monitor FI
: 4. Monitor FI-150, LO PRESS LTDN FLOW GPM.
-150, LO PRESS LTDN FLOW GPM.
: 5. Verify RCS heatup or cooldown is within limits.
: 5. Verify RCS heatup or cooldown is within limits.
: 6. If RCS leakage is indicated, determine the leak rate and refer to Tech Spec 3.4.6.2.
: 6. If RCS leakage is indicated, determine the leak rate and refer to Tech Spec 3.4.6.2.
: 7. If it has been determined that the Charging Pump has malfunctioned, refer to Tech Spec 3.5.2.
: 7. If it has been determined that the Charging Pump has malfunctioned, refer to Tech Spec 3.5.2.
BOOTH OPERATOR:
If contacted to investigate the Charging pumps report:
If contacted to investigate the Charging pumps report:
I f crew hasn't opened breaker report "
If crew hasnt opened breaker report The A Pump motor is running with no pump discharge pressure If crew has opened breaker report The A pump shaft appears to be sheared If contacted to check breaker for A Charging pump report BOOTH OPERATOR:                No evidence of breaker failure If contacted to rack C Charging Pump breaker to A bus wait for 2 minutes and report Ready to Rack C pump to A bus. Use Trigger 15 to rack the C breaker to A bus.
T he "A" Pump motor is running with no pump discharge pressure
If contacted to rack A Charging Pump breaker down wait for 2 minutes and report Ready to Rack down A pump breaker. Use Trigger 16 to rack the A breaker down.
If crew has opened breaker report "The "A" pump shaft appears to be sheared" If contacted to check breaker for "A" Charging pump report "No evidence of breaker failure" If contacted to rack "C" Charging Pump breaker to "A" bus wait for 2 minutes and report "Ready to Rack "C" pump to "A" bus." Use Trigger 15 to rack the "C" breaker to "A" bus.
CRS         Implement AOP-102.2, Loss of Charging.
If contacted to rack "A" Charging Pump breaker down wait for 2 minutes and report "Ready to Rack down "A" pump breaker." Use Trigger 16 to rack the "A" breaker down.
CAUTION                                             AOP-102.2 Seal water injection should be maintained any time the RCS is pressurized.
CRS Implement AOP
NOTE                                              AOP-102.2 The Alternate Seal Injection System should deliver 20 gpm of borated water from the RWST to the RCS.
-102.2, Loss of Charging.
NUREG -1021 R10 Appendix D                                   Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   5   Page: 22     of 45 Event
CAUTION Seal water injection should be maintained any time the RCS is pressurized.
AOP-102.2 NOTE The Alternate Seal Injection System should deliver 20 gpm of borated water from the RWST to the RCS.
AOP-102.2 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 22 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                         Applicants Actions or Behavior RO       1   Check if Charging Pump flow is normal: (NO)                     AOP-102.2 FI-122A, CHG FLOW GPM, between 30 gpm and 115 gpm.
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10    RO 1 Check if Charging Pump flow is normal: (NO) FI-122A, CHG FLOW GPM, between 30 gpm and 115 gpm. Pump amps between 30 amps and 50 amps.
Pump amps between 30 amps and 50 amps.
PI-121, CHG PRESS PSIG, between 2650 psig and 2850 psig. AOP-102.2 RO ALTERNATIVE ACTION 1 Perform the following:
PI-121, CHG PRESS PSIG, between 2650 psig and 2850 psig.
a) Ensure the Charging Pump is secured.
RO                            ALTERNATIVE ACTION                            AOP-102.2 1   Perform the following:
b) Close all Letdown Isolation Valves: 1) PVT-8149A(B)(C), LTDN ORIFICE A(B)(C) ISOL
a) Ensure the Charging Pump is secured.
b) Close all Letdown Isolation Valves:
: 1) PVT-8149A(B)(C), LTDN ORIFICE A(B)(C) ISOL
: 2) PVT-8152, LTDN LINE ISOL.
: 2) PVT-8152, LTDN LINE ISOL.
: 3) LCV-459, LTDN LINE ISOL.
: 3) LCV-459, LTDN LINE ISOL.
: 4) LCV-460, LTDN LINE ISOL.
: 4) LCV-460, LTDN LINE ISOL.
c) Close FCV-122, CHG FLOW.
c) Close FCV-122, CHG FLOW.
d) Verify CCW flow to the RCP Thermal Barriers is GREATER THAN 110 gpm on FI
d) Verify CCW flow to the RCP Thermal Barriers is GREATER THAN 110 gpm on FI-7273A(B), THERM BARR FLOW GPM.
-7273A(B), THERM BARR FLOW GPM.
e) Display Dedicated Display ZZRCPBRG on the IPCS to monitor RCP temperatures.
e) Display Dedicated Display ZZRCPBRG on the IPCS to monitor RCP temperatures.
f) Verify the Alternate Seal Injection System is in service as indicated by either of the following:
f)   Verify the Alternate Seal Injection System is in service as indicated by either of the following:
BOTH the following annunciators are lit:
BOTH the following annunciators are lit:
: 1) XCP-614 2-1 (ALT SL INJ PUMP RUN).
: 1) XCP-614 2-1 (ALT SL INJ PUMP RUN).
: 2) XCP-614 2-2 (ALT SL INJ DSL GEN RUN).
: 2) XCP-614 2-2 (ALT SL INJ DSL GEN RUN).
 
OR Seal Injection flow indicated on the following:
OR Seal Injection flow indicated on the following:
FT-130, SL INJ FLO on IUR01156.
FT-130, SL INJ FLO on IUR01156. FT-127, SL INJ FLO on IUR01155. FT-124, SL INJ FLO on IUR01154.
FT-127, SL INJ FLO on IUR01155.
FT-124, SL INJ FLO on IUR01154.
g) Contact Electrical and Mechanical Maintenance to investigate.
g) Contact Electrical and Mechanical Maintenance to investigate.
h) GO TO Step 3.
h) GO TO Step 3.
AOP-102.2 Appendix D Operator Actions Form ES-D-2   Op Test No:
NUREG -1021 R10 Appendix D                                   Operator Actions                 Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   5   Page: 23   of   45 Event
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 23 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                         Applicants Actions or Behavior RO       3   Verify Charging System valve lineup:                           AOP-102.2
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10    RO 3 Verify Charging System valve lineup:
: a. IF Charging Pump suction is aligned to the VCT, THEN ensure both LCV-115C(E), VCT OUTLET ISOL are open.
: a. IF Charging Pump suction is aligned to the VCT, THEN ensure both LCV
-115C(E), VCT OUTLET ISOL are open.
: b. Ensure the following valves are open:
: b. Ensure the following valves are open:
: 1) MVG-8106, CHG PP.
: 1)   MVG-8106, CHG PP.
: 2) MVT-8109A(B)(C), CHG PP A(B)(C).
: 2)   MVT-8109A(B)(C), CHG PP A(B)(C).
: 3) MVG-8130A(B), LP A SUCT TO CHG PP C.
: 3)   MVG-8130A(B), LP A SUCT TO CHG PP C.
: 4) MVG-8131A(B), LP B SUCT TO CHG PP C.
: 4)   MVG-8131A(B), LP B SUCT TO CHG PP C.
: 5) MVG-8132A(B), CHG PP C TO LP A DISCH.
: 5)   MVG-8132A(B), CHG PP C TO LP A DISCH.
: 6) MVG-8133A(B), CHG PP C TO LP B DISCH A OP-102.2  RO c. Check the Charging Header valve lineup as follows:
: 6)   MVG-8133A(B), CHG PP C TO LP B DISCH RO           c. Check the Charging Header valve lineup as follows:         AOP-102.2
: 1) Ensure MVG
: 1)   Ensure MVG-8107, CHG LINE ISOL, is open.
-8107, CHG LINE ISOL, is open.
: 2)   Ensure MVG-8108, CHG LINE ISOL, is open.
: 2) Ensure MVG
: 3)   Ensure FCV-122, CHG FLOW, is in MAN and CLOSE.
-8108, CHG LINE ISOL, is open.
: 4)   Ensure one of the following valves is open:
: 3) Ensure FCV
PVT-8146, NORM CHG TO RCS LP B.
-122, CHG FLOW, is in MAN and CLOSE.
OR PVT-8147, ALT CHG TO RCS LP A.
: 4) Ensure one of the following valves is open:
: 5)   Verify VCT level is GREATER THAN 20%.
PVT-8146, NORM CHG TO RCS LP B.
: 6)   Locally verify Charging Pump suction pressure meets the requirements in the table below as indicated on the following (AB-388):
OR PVT-8147, ALT CHG TO RCS LP A.
PI-151A, SUCTION PRESS, for Charging Pump A PI-152A, SUCTION PRESS, for Charging Pump B PI-153A, SUCTION PRESS, for Charging Pump C NUREG -1021 R10 Appendix D                                       Operator Actions                 Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   5   Page: 24   of   45 Event
: 5) Verify VCT level is GREATER THAN 20%.
: 6) Locally verify Charging Pump suction pressure meets the requirements in the table below as indicated on the following (AB
-388): PI-151A, SUC TION PRESS, for Charging Pump A PI-152A, SUCTION PRESS, for Charging Pump B PI-153A, SUCTION PRESS, for Charging Pump C AOP-102.2 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 24 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                           Applicants Actions or Behavior If directed to locally verify Charging suction pressure, and C OR BOOTH OPERATOR:          B pump ready for start, report Suction pressure on all gauges is approximately 57 psig and C OR B Charging pump is ready for start.
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10  BOOTH OPERATOR: If directed to locally verify Charging suction pressure, and "C" OR "B" pump ready for start, report "Suction pressure on all gauges is approximately 57 psig and "C" OR "B" Charging pump is ready for start."  BOOTH OPERATOR:
The CRS may assume authority for making the decision to start a BOOTH OPERATOR:          Charging Pump. If the CRS calls the Shift Manager for permission to start the pump as stated in the procedure, grant permission.
The CRS may assume authority for making the decision to start a Charging Pump. If the CRS calls the Shift Manager for permission to start the pump as stated in the procedure, grant permission.
CRS, RO         4 With Shift Manager's permission, start a Charging Pump, while     AOP-102.2 monitoring RCP temperatures. REFER TO SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM.
CRS, RO 4 With Shift Manager's permission, start a Charging Pump, while monitoring RCP temperatures. REFER TO SOP
EVALUATOR NOTE: The Operator will ensure the following as per SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM:
-102, CHEMICAL AND VOLUME CONTROL SYSTEM.
* Breaker Racked Up.
AOP-102.2 EVALUATOR NOTE: The Operator will ensure the following as per SOP
* Aux Oil Pump Running.
-102, CHEMICAL AND VOLUME CONTROL SYSTEM:
* CCW Operating.
Breaker Racked Up
* Chill water is Operating.
. Aux Oil Pump Running
* Suction Pressure > 30 psig (Local).
. CCW Operating
* Miniflow isol open.
. Chill water is Operating
RO       5 WHEN a Charging Pump is operating, THEN perform the following.           AOP-102.2 REFER TO SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM.
. Suction Pressure > 30 psig (Local)
: a. Place Charging and Normal Letdown in service.
. Miniflow isol open
: b. Secure Alternate Seal Injection.
. RO 5 WHEN a Charging Pump is operating, THEN perform the following. REFER TO SOP
RO       2.1 Place FCV-122, CHG FLOW, in MAN and close.                             SOP-102 2.2 Place PCV-145, LO PRESS LTDN, in MAN and open to 70%.
-102, CHEMICAL AND VOLUME CONTROL SYSTEM. a. Place Charging and Normal Letdown in service. b. Secure Alternate Seal Injection.
(PEER )
AOP-102.2  RO 2.1 Place FCV-122, CHG FLOW, in MAN and close.
2.3 Place TCV-144, CC TO LTDN HX, in MAN and open to 100%.
 
2.4 Place TCV-143, LTDN TO VCT OR DEMIN, in VCT.
===2.2 Place===
2.5 Open PVT-8152, LTDN LINE ISOL.
PCV-145, LO PRESS LTDN, in MAN and open to 70%.
2.6 Open the following:
(PEER ) 2.3 Place TCV-144, CC TO LTDN HX, in MAN and open to 100%.
 
===2.4 Place===
TCV-143, LTDN TO VCT OR DEMIN, in VCT.
2.5 Open PVT-8152, LTDN LINE ISOL.
2.6 Open the following:
: a. LCV-459, LTDN LINE ISOL.
: a. LCV-459, LTDN LINE ISOL.
: b. LCV-460, LTDN LINE ISOL.
: b. LCV-460, LTDN LINE ISOL.
 
2.7 Ensure the following Charging Line Isolation Valves are open:
===2.7 Ensure===
the following Charging Line Isolation Valves are open:
: a. MVG-8107, CHG LINE ISOL.
: a. MVG-8107, CHG LINE ISOL.
: b. MVG-8108, CHG LINE ISOL.
: b. MVG-8108, CHG LINE ISOL.
SOP-102  RO 2.8 Slowly open FCV
RO       2.8 Slowly open FCV-122, CHG FLOW, to establish 60 gpm flow as             SOP-102 indicated on FI-122A, CHG FLOW GPM.
-122, CHG FLOW, to establish 60 gpm flow as indicated on FI-122A, CHG FLOW GPM.
NUREG -1021 R10 Appendix D                                   Operator Actions                 Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   5   Page: 25   of   45 Event
SOP-102 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 25 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                         Applicants Actions or Behavior RO       2.9 Open Orifice Isolation Valves to obtain the desired Letdown flow   SOP-102 rate (60 gpm to 120 gpm):
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10    RO 2.9 Open Orifice Isolation Valves to obtain the desired Letdown flow rate (60 gpm to 120 gpm):
: a. PVT-8149A, LTDN ORIFICE A ISOL (45 gpm).
: a. PVT-8149A, LTDN ORIFICE A ISOL (45 gpm).
: b. PVT-8149B, LTDN ORIFICE B ISOL (60 gpm).
: b. PVT-8149B, LTDN ORIFICE B ISOL (60 gpm).
: c. PVT-8149C, LTDN ORIFICE C ISOL (60 gpm).
: c. PVT-8149C, LTDN ORIFICE C ISOL (60 gpm).
SOP-102  RO 2.10 Adjust FCV
RO       2.10 Adjust FCV-122, CHG FLOW, as required to maintain TI-140,         SOP-102 REGEN HXOUT TEMP &deg;F, between 250&deg;F and 350&deg;F while maintaining Pressurizer level.
-122, CHG FLOW, as required to maintain TI
2.11 Adjust PCV-145, LO PRESS LTDN, to maintain PI-145, LO PRESS LTDN PRESS PSIG, between 300 psig and 400 psig.
-140, REGEN HXOUT TEMP &deg;F, between 250&deg;F and 350&deg;F while maintaining Pressurizer level.
2.12 Place PCV-145, LO PRESS LTDN, in AUTO.
2.11 Adjust PCV-145, LO PRESS LTDN, to maintain PI
RO       2.13 Adjust TCV-144, CC TO LTDN HX, potentiometer as necessary to       SOP-102 maintain the desired VCT temperature. Refer to VCS Curve Book, Figure VII.15 2.14 Place TCV-144, CC TO LTDN HX, in AUTO.
-145, LO PRESS LTDN PRESS PSIG, between 300 psig and 400 psig.
RO       2.15 When Pressurizer level is within 1% of and trending to             SOP-102 programmed level, place the PZR LEVEL MASTER CONTROL in MAN.
2.12 Place PCV
2.16 Establish automatic FCV-122, CHG FLOW, control as follows:
-145, LO PRESS LTDN, in AUTO.
SOP-102  RO 2.13 Adjust TCV
-144, CC TO LTDN HX, potentiometer as necessary to maintain the desired VCT temperature. Refer to VCS Curve Book, Figure VII.15 2.14 Place TCV
-144, CC TO LTDN HX, in AUTO.
SOP-102  RO 2.15 When Pressurizer level is within 1% of and trending to programmed level, place the PZR LEVEL MASTER CONTROL in MAN. 2.16 Establish automatic FCV-122, CHG FLOW, control as follows:
: a. Determine the correct PZR LEVEL MASTER CONTROL setpoint by dividing the current Charging flow by 1.5.
: a. Determine the correct PZR LEVEL MASTER CONTROL setpoint by dividing the current Charging flow by 1.5.
: b. Manually adjust the PZR LEVEL MASTER CONTROL to this setpoint. c. Place FCV-122, CHG FLOW, in AUTO. (PEER ) 2.17 Adjust PZR LEVEL MASTER CONTROL in MAN, as necessary, to maintain Pressurizer level at or near programmed level.
: b. Manually adjust the PZR LEVEL MASTER CONTROL to this setpoint.
2.18 When Pressurizer level is within 1% of and trending to programmed level, place PZR LEVEL MASTER CONTROL in AUTO. (PEER ) 2.19 Monitor LR-459, PZR % LEVEL & LEVEL SP, recorder to verify that Charging flow is maintaining actual Pressurizer level at or near the programmed setpoint. 2.20 After the Letdown temperatures have stabilized, place TCV
: c. Place FCV-122, CHG FLOW, in AUTO. (PEER )
-143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO.
2.17 Adjust PZR LEVEL MASTER CONTROL in MAN, as necessary, to maintain Pressurizer level at or near programmed level.
SOP-102  CRS Refers T.S. 3.5.2, EMERGENCY CORE COOLING SYSTEMS, ECCS SUBSYTEMS  
2.18 When Pressurizer level is within 1% of and trending to programmed level, place PZR LEVEL MASTER CONTROL in AUTO. (PEER )
- TAVG => 350&deg;F T.S. 3.5.2
2.19 Monitor LR-459, PZR % LEVEL & LEVEL SP, recorder to verify that Charging flow is maintaining actual Pressurizer level at or near the programmed setpoint.
 
2.20 After the Letdown temperatures have stabilized, place TCV-143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO.
Appendix D Operator Actions Form ES-D-2   Op Test No:
CRS       Refers T.S. 3.5.2, EMERGENCY CORE COOLING SYSTEMS, ECCS                 T.S. 3.5.2 SUBSYTEMS - TAVG => 350&deg;F NUREG -1021 R10 Appendix D                                     Operator Actions               Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   5   Page: 26 of 45 Event
NRC-ILO-14-01 Scenario #
2 Event # 5 Page: 26 of 45 Event


== Description:==
== Description:==
 
A Charging Pump shaft shears Time     Position                           Applicants Actions or Behavior EVALUATOR NOTE: T.S. 3.5.2 action a. applied during the time NO charging pump was operable on Train A. The action will be exited once the C Charging Pump aligned to the A header and A Pump Breaker is racked down.
"A" Charging Pump shaft shears Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: T.S. 3.5.2 action a
T.S. 3.5.2;                                                           TS 3.5.2 ACTION:
. applied during the time NO charging pump was operable on Train A. The action will be exited once the "C" Charging Pump aligned to the "A" header and "A" Pump Breaker is racked down
: a. With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.
. T.S. 3.5.2; ACTION: a. With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours. TS 3.5.2 EVALUATOR NOTE: The next event may be initiated after normal charging and letdown is restored and Technical Specifications have been addresse d or at any time per the discretion of the Lead Evaluator
EVALUATOR NOTE: The next event may be initiated after normal charging and letdown is restored and Technical Specifications have been addressed or at any time per the discretion of the Lead Evaluator.
.
NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #   2   Event #   6   Page:   27 of 45 Event
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 6 Page: 27 of 45 Event


== Description:==
== Description:==
All Main Feedwater Pumps Trip.
All Main Feedwater Pumps Trip.
Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: On cue from the Examiner all three Main Feedwater Pump s will trip. This results in a turbine trip and a corresponding Reactor trip. The crew will enter EOP-1.0 (E-0) and verify the Reactor trip and that no SI is actuated or required.
Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner all three Main Feedwater Pumps will trip.
BOOTH OPERATOR:
This results in a turbine trip and a corresponding Reactor trip. The crew will enter EOP-1.0 (E-0) and verify the Reactor trip and that no SI is actuated or required.
When directed, insert Event 6 (TRIGGER 6)   EOP-1.0 NOTE Steps 1 through 5 are Immediate Operator Actions.
BOOTH OPERATOR:             When directed, insert Event 6 (TRIGGER 6)
EOP-1.0 IOA RO 1 Verify Reactor Trip:
EOP-1.0 NOTE                                             EOP-1.0 Steps 1 through 5 are Immediate Operator Actions.
Trip the Reactor using either Reactor Trip Switch.
IOA           RO         1 Verify Reactor Trip:                                               EOP-1.0 Trip the Reactor using either Reactor Trip Switch.
Verify all Reactor Trip and Bypass Breakers are open.
Verify all Reactor Trip and Bypass Breakers are open.
Verify all Rod Bottom Lights are lit.
Verify all Rod Bottom Lights are lit.
Verify Reactor Power level is decreasing.
Verify Reactor Power level is decreasing.
EOP-1.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
NUREG -1021 R10 Appendix D                                   Operator Actions                 Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   6   Page:   28 of   45 Event
NRC-ILO-14-01 Scenario #
2 Event # 6 Page: 28 of 45 Event


== Description:==
== Description:==
All Main Feedwater Pumps Trip.
All Main Feedwater Pumps Trip.
Time Position Applicant's Actions or Behavior NUREG -1021 R10  IOA BOP 2 Verify Turbine/Generator Trip:
Time       Position                       Applicants Actions or Behavior IOA         BOP       2 Verify Turbine/Generator Trip:                                   EOP-1.0
: a. Verify all Turbine STM STOP VLVs are closed.
: a. Verify all Turbine STM STOP VLVs are closed.
: b. Ensure Generator Trip (after 30 second delay):
: b. Ensure Generator Trip (after 30 second delay):
: 1) Ensure the GEN BKR is open.
: 1) Ensure the GEN BKR is open.
: 2) Ensure the GEN FIELD BKR is open.
: 2) Ensure the GEN FIELD BKR is open.
: 3) Ensure the EXC FIELD CNTRL is tripped.
: 3) Ensure the EXC FIELD CNTRL is tripped.
EOP-1.0 IOA BOP 3 Verify both ESF buses are energized.
EOP-1.0 IOA         BOP       3 Verify both ESF buses are energized.
EOP-1.0 IOA RO 4 Check if SI is actuated:
IOA           RO       4 Check if SI is actuated:                                         EOP-1.0
: a. Check if either:
: a. Check if either:
SI ACT status light is bright on XCP
SI ACT status light is bright on XCP-6107 1-1.
-6107 1-1. OR Any red first
OR Any red first-out SI annunciator is lit on XCP-626 top row.
-out SI annunciator is lit on XCP
-626 top row.
ALTERNATIVE ACTION
ALTERNATIVE ACTION
: a. GO TO Step 5.
: a. GO TO Step 5.
EOP-1.0 IOA RO 5 Check if SI is required:
IOA           RO       5 Check if SI is required:                                         EOP-1.0
: a. Check if any of the following conditions exist:
: a. Check if any of the following conditions exist:
PZR pressure LESS THAN 1850 psig.
PZR pressure LESS THAN 1850 psig.
OR RB pressure GREATER THAN 3.6 psig.
OR RB pressure GREATER THAN 3.6 psig.
OR Steamline pressure LESS THAN 675 psig.
OR Steamline pressure LESS THAN 675 psig.
OR Steamline differential pressure GREATER THAN 97 psid.
OR Steamline differential pressure GREATER THAN 97 psid.
ALTERNATIVE ACTION
ALTERNATIVE ACTION
: a. GO TO EOP1.1, ES0.1, REACTOR TRIP RECOVERY, Step 1. EOP-1.0 EVALUATOR NOTE:
: a. GO TO EOP1.1, ES0.1, REACTOR TRIP RECOVERY, Step 1.
The next event was automatically triggered on the Reactor Trip.
EVALUATOR NOTE: The next event was automatically triggered on the Reactor Trip.
 
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   29 of   45 Event
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 7 Page: 29 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                         Applicants Actions or Behavior EVALUATOR NOTE: This event is automatically triggered following the trip in Event 6.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE: This event is automatically triggered following the trip in Event 6. Failures during Event 7:
Failures during Event 7:
Pressurizer Spray valve PCV
Pressurizer Spray valve PCV-444C fails open on reactor trip.
-444C fails open on reactor trip.
Turbine Driven EFW Pump steam supply fails shut on reactor trip.
Turbine Driven EFW Pump steam supply fails shut on reactor trip. Engineered Safeguards Bus 1DB lockout actuates causing a loss of Train "B" loads including the "B" Emergency Feedwater Pump (30 second delay from RCP "A" stopped). Motor Driven EFW Pump "A" sustains a sheared shaft.
Engineered Safeguards Bus 1DB lockout actuates causing a loss of Train B loads including the B Emergency Feedwater Pump (30 second delay from RCP A stopped).
The crew will transition to EO P-1.1 (ES-0.1), address the stuck open Pressurizer Spray valve and then transition to EOP
Motor Driven EFW Pump A sustains a sheared shaft.
-15.0, FR-H.1, Response to Loss of Secondary Heat Sink.
The crew will transition to EOP-1.1 (ES-0.1), address the stuck open Pressurizer Spray valve and then transition to EOP-15.0, FR-H.1, Response to Loss of Secondary Heat Sink.
The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish flow to one SG. The Main Feedwater pumps will not be reset and the success path will be to utilize Condensate flow to restore SG level.
The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish flow to one SG. The Main Feedwater pumps will not be reset and the success path will be to utilize Condensate flow to restore SG level.
BOOTH OPERATOR:
BOOTH OPERATOR:               This event is automatically triggered on the Reactor Trip.
This event is automatically triggered on the Reactor Trip
EOP-1.1 NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   30 of 45 Event
. EOP-1.1 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 7 Page: 30 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                         Applicants Actions or Behavior CAUTION                                          EOP-1.1 If SI actuation occurs during this procedure, EOP1.0, E0, REACTOR TRIP OR SAFETY INJECTION, should be performed to stabilize the plant.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  CAUTION If SI actuation occurs during this procedure, EOP1.0, E0, REACTOR TRIP OR SAFETY INJECTION, should be performed to stabilize the plant.
NOTE                                            EOP-1.1 Main Turbine vibration should be monitored during coastdown.
EOP-1.1 NOTE  Main Turbine vibration should be monitored during coastdown.
The EOP REFERENCE PAGE should be monitored throughout the use of this procedure.
The EOP REFERENCE PAGE should be monitored throughout the use of this procedure.
EOP-1.1 CREW 1 Announce plant conditions over the page system.
EOP-1.1 CREW     1 Announce plant conditions over the page system.
EOP-1.1
2 Check if RCS Tavg is LESS THAN 564&deg;F.                             EOP-1.1 ALTERNATIVE ACTION
* RO 2 Check if RCS Tavg is LESS THAN 564&deg;F.
* RO      2 WHEN RCS Tavg is LESS THAN 564&deg;F, THEN COMPLETE Steps 3 and 4.
ALTERNATIVE ACTION 2 WHEN RCS Tavg is LESS THAN 564&deg;F, THEN COMPLETE Steps 3 and 4.
CONTINUE WITH Step 5.
CONTINUE WITH Step 5.
EOP-1.1   3 Close IPV-2231, MS/PEGGING STM TO DEAERATOR.
EOP-1.1 3 Close IPV-2231, MS/PEGGING STM TO DEAERATOR.
EOP-1.1 BOP 4  Check FW status:
4 Check FW status:                                                  EOP-1.1
: a. Verify FW Isolation:
: a. Verify FW Isolation:
Ensure the FW Flow Control Valves, FCV
* Ensure the FW Flow Control Valves, FCV-478(488)(498),
-478(488)(498), are closed.
are closed.
Ensure the Main FW Isolation Valves, PVG
* Ensure the Main FW Isolation Valves, PVG-1611A(B)(C),
-1611A(B)(C), are closed.
are closed.
Ensure the FW Flow Control Bypass Valves, FCV
* Ensure the FW Flow Control Bypass Valves, FCV-BOP              3321(3331)(3341), are closed.
-3321(3331)(3341), are closed.
: b. Ensure EFW Pumps are running:
: b. Ensure EFW Pumps are running:
: 1) Ensure both MD EFW Pumps are running.
: 1) Ensure both MD EFW Pumps are running.
: 2) Verify the TD EFW Pump is running if necessary to maintain SG levels.
: 2) Verify the TD EFW Pump is running if necessary to maintain SG levels.
: c. Verify total EFW flow is GREATER THAN 450 gpm. d. Trip all Main FW Pumps.
: c. Verify total EFW flow is GREATER THAN 450 gpm.
EOP-1.1 BOOTH OPERATOR:
: d. Trip all Main FW Pumps.
If contacted concerning TDEFW pump status, report "The steam supply to the pump is closed and I can't get it to manually open" If contacted concerning "A" MDEFW pump status, report " The "A" MDEFW pump appears to have a sheared shaft"
If contacted concerning TDEFW pump status, report The steam supply to the pump is closed and I cant get it to manually open BOOTH OPERATOR:
* RO 5 Check RCS temperature:
If contacted concerning A MDEFW pump status, report The A MDEFW pump appears to have a sheared shaft 5 Check RCS temperature:                                             EOP-1.1 With any RCP running, RCS Tavg is stable at OR trending to 557&deg;F.
With any RCP running, RCS Tavg is stable at OR trending to 557&deg;F. OR With no RCP running, RCS Tcold is stable at OR trending to 557&deg;F. EOP-1.1 Appendix D Operator Actions Form ES-D-2   Op Test No:
* RO OR With no RCP running, RCS Tcold is stable at OR trending to 557&deg;F.
NRC-ILO-14-01 Scenario #
NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   31 of 45 Event
2 Event # 7 Page: 31 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time         Position                         Applicants Actions or Behavior NOTE - Step 6                                         EOP-1.1 If a transition is made to AOP112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, the steps of EOP1.1 which do NOT conflict with AOP112.2 should be completed as time allows.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  NOTE - Step 6 If a transition is made to AOP112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, the steps of EOP1.1 which do NOT conflict with AOP112.2 should be completed as time allows.
6 IF EOP-1.0 was entered from AOP-112.2, THEN RETURN TO             EOP-1.1 AOP-112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, Step 15. (NO)
EOP-1.1  CRS 6 IF EOP-1.0 was entered from AOP
CRS ALTERNATIVE ACTION 6 GO TO Step 7.
-112.2, THEN RETURN TO A OP-112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, Step 15.
RO                                                                            EOP-1.1 7 Verify all Control Rods are fully inserted.
(NO) ALTERNATIVE ACTION 6 GO TO Step
8 Check DA level control:                                           EOP-1.1
: 7. EOP-1.1 RO 7 Verify all Control Rods are fully inserted.
: a. Open LCV-3235, DEAER START UP DRAIN CNTRL, as necessary to maintain DA level LESS THAN 10.5 ft as BOP            indicated on LI-3135, DEAER STOR TK WR LVL FEET.
EOP-1.1  BOP 8 Check DA level control:
: b. Locally adjust ITV-3062A(B)(C), BD COOLER A(B)(C)
: a. Open LCV
CDSTE OUT TEMP, to 90% (XPN-0029, NUCLEAR BLOWDOWN PROCESSING PANEL, AB-436).
-3235, DEAER START UP DRAIN CNTRL, as necessary to maintain DA level LESS THAN 10.5 ft as indicated on LI
9 Check PZR level control:
-3135, DEAER STOR TK WR LVL FEET.
: b. Locally adjust ITV
-3062A(B)(C), BD COOLER A(B)(C) CDSTE OUT TEMP, to 90% (XPN
-0029, NUCLEAR BLOWDOWN PROCESSING PANEL, AB
-436). EOP-1.1  RO 9 Check PZR level control:
: a. Verify PZR level is GREATER THAN 17%.
: a. Verify PZR level is GREATER THAN 17%.
RO                                                                            EOP-1.1
: b. Verify Charging and Letdown are in in service.
: b. Verify Charging and Letdown are in in service.
: c. Verify PZR level is trending to 25%. EOP-1.1  RO 10 Check PZR pressure control:
: c. Verify PZR level is trending to 25%.
10 Check PZR pressure control:
: a. Verify PZR pressure is GREATER THAN 1850 psig.
: a. Verify PZR pressure is GREATER THAN 1850 psig.
: b. Verify PZR pressure is stable at OR trending to 2230 psig 2230 psig (2220 psig to 2250 psig). (NO) EOP-1.1 Appendix D Operator Actions Form ES-D-2   Op Test No:
RO                                                                            EOP-1.1
NRC-ILO-14-01 Scenario #
: b. Verify PZR pressure is stable at OR trending to 2230 psig 2230 psig (2220 psig to 2250 psig). (NO)
2 Event # 7 Page: 32 of 45 Event
NUREG -1021 R10 Appendix D                                       Operator Actions                       Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #     2     Event #   7   Page:     32   of   45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time         Position                           Applicants Actions or Behavior ALTERNATIVE ACTION
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  CRITICAL  TASK BOP ALTERNATIVE ACTION
: b. IF PZR pressure is LESS THAN 2230 psig AND decreasing, THEN:
: b. IF PZR pressure is LESS THAN 2230 psig AND decreasing, THEN: 1) Ensure the PZR PORVs are closed. IF any PORV fails to close, THEN close its Block Valve. 2) Ensure PZR Spray Valves are closed. IF any valve fails to close, THEN perform the following:
: 1) Ensure the PZR PORVs are closed. IF any PORV fails to close, THEN close its Block Valve.
CRITICAL                        2) Ensure PZR Spray Valves are closed.
BOP                                                                                    EOP-1.1 TASK IF any valve fails to close, THEN perform the following:
a) Stop RCP A.
a) Stop RCP A.
b) IF PZR pressure continues to decrease, THEN perform the following:
b) IF PZR pressure continues to decrease, THEN perform the following:
IF PCV-444C, PZR SPR CNTRL FR LOOP C, will NOT close, THEN stop RCP C.
* IF PCV-444C, PZR SPR CNTRL FR LOOP C, will NOT close, THEN stop RCP C.
EOP-1.1 EVALUATOR NOTE: The Scenario design will result in Train "B" ESF bus de-energize d 30 seconds after the "A" RCP is stopped. The loss of Train "B" bus will result in no EFW pumps running. IF the crew stops RCP's prior to step 10 in EOP-1.1 this may prevent the associated steam generators from lowering to less than 26%
EVALUATOR NOTE: The Scenario design will result in Train B ESF bus de-energized 30 seconds after the A RCP is stopped. The loss of Train B bus will result in no EFW pumps running.
NR level which will prevent entry to EOP
IF the crew stops RCPs prior to step 10 in EOP-1.1 this may prevent the associated steam generators from lowering to less than 26% NR level which will prevent entry to EOP-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK. The Booth Operator may use malfunctions to stop the necessary RCPs, as directed by the Chief Examiner, to allow steam generators to steam and decrease to less than 26%.
-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK. The Booth Operator may use malfunction s to stop the necessary RCPs, as directed by the Chief Examiner
IF the crew does not Trip RCP A from the Main Control Board direct manual actuation of AUTO-TRIGGER 8 which will initiate the loss of Train B ESF bus 1DB and will result in the loss of all EFW.
, to allow steam generators to steam and decrease to less than 26%
IF directed by the Chief Examiner manually trigger AUTO-TRIGGER 8 to cause the loss of all EFW flow.
. IF the crew does not Trip RCP "A" from the Main Control Board direct manual actuation of AUTO-TRIGGER 8 which will initiate the loss of Train "B" ESF bus 1DB and will result in the loss of all EFW. BOOTH OPERATOR
IF directed by the Chief Examiner insert the malfunction to stop the BOOTH OPERATOR:            associated RCP:
: IF directed by the Chief Examiner manually trigger AUTO-TRIGGER 8 to cause the loss of all EFW flow. IF directed by the Chief Examiner insert the malfunction to stop the associated RCP: PMP-RC004T, XPP0030A RCP A TRIP ON COMMAND PMP-RC00 5T, XPP0030 B RCP B TRIP ON COMMAND PMP-RC00 6T, XPP0 030 C RCP C TRIP ON COMMAND BOOTH OPERATOR:
* PMP-RC004T, XPP0030A RCP A TRIP ON COMMAND
When contacted secure "B" Diesel Generator using TRIGGER 12
* PMP-RC005T, XPP0030B RCP B TRIP ON COMMAND
* BOP 11 Check SG levels:
* PMP-RC006T, XPP0030C RCP C TRIP ON COMMAND BOOTH OPERATOR:             When contacted secure B Diesel Generator using TRIGGER 12 11 Check SG levels:
: a. Verify Narrow Range level in all SGs is GREATER THAN 26%. (NO) ALTERNATIVE ACTION
: a. Verify Narrow Range level in all SGs is GREATER THAN 26%. (NO)
: a. Maintain total EFW flow GREATER THAN 450 gpm until Narrow Range level is GREATER THAN 26% in at least one SG. EOP-1.1 Appendix D Operator Actions Form ES-D-2   Op Test No:
* BOP                                  ALTERNATIVE ACTION EOP-1.1
NRC-ILO-14-01 Scenario #
: a. Maintain total EFW flow GREATER THAN 450 gpm until Narrow Range level is GREATER THAN 26% in at least one SG.
2 Event # 7 Page: 33 of 45 Event
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   33 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time         Position                         Applicants Actions or Behavior 11 b. Control EFW flow to maintain Narrow Range SG levels BOP                                                                          EOP-1.1 between 26% and 60%.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10    BOP 11 b. Control EFW flow to maintain Narrow Range SG levels between 26% and 60%.
EVALUATOR NOTE: Narrow range level in all SGs less than 26% [41%] and Total SG Feedwater flow less than 450 gpm is a red path to EOP-15.0.
EOP-1.1 EVALUATOR NOTE: Narrow range level in all SGs less than 26% [41%]
CRS     Direct implementation of EOP-15.0.
and Total SG Feedwater flow less than 450 gpm is a red path to EOP
CAUTION If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is           EOP-15.0 available.
-15.0. CRS Direct implementation of EOP
-15.0. CAUTION   If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is available.
If a NON-FAULTED SG is available, feed flow should NOT be reestablished to any FAULTED SG, to prevent thermal shock to SG tubes.
If a NON-FAULTED SG is available, feed flow should NOT be reestablished to any FAULTED SG, to prevent thermal shock to SG tubes.
EOP-15.0 NOTE Conditions for implementing Emergency Plan Procedures should be evaluated using EPP
NOTE EOP-15.0 Conditions for implementing Emergency Plan Procedures should be evaluated using EPP-001, ACTIVATION AND IMPLEMENTATION OF EMERGENCY PLAN.
-001, ACTIVATION AND IMPLEMENTATION OF EMERGENCY PLAN. EOP-15.0  BOP 1 Check if a secondary heat sink is required: a. Verify RCS pressure is GREATER THAN any NON
1   Check if a secondary heat sink is required:
-FAULTED SG pressure. b. Verify RCS Thot is GREATER THAN 350&deg;F. EOP-15.0  RO 2 Verify power is available to all PZR PORV Block Valves:
: a. Verify RCS pressure is GREATER THAN any NON-                 EOP-15.0 BOP              FAULTED SG pressure.
: b. Verify RCS Thot is GREATER THAN 350&deg;F.
2   Verify power is available to all PZR PORV Block Valves:
: a. MVG-8000A, RELIEF 445 A ISOL.
: a. MVG-8000A, RELIEF 445 A ISOL.
EOP-15.0 RO
: b. MVG-8000B, RELIEF 444 B ISOL.
: b. MVG-8000B, RELIEF 444 B ISOL.
: c. MVG-8000C, RELIEF 445 B ISOL.
: c. MVG-8000C, RELIEF 445 B ISOL.
EOP-15.0  RO 3 Open the Block Valve for any PZR PORV that has been isolated due to excessive seat leakage:
3   Open the Block Valve for any PZR PORV that has been isolated due to excessive seat leakage:
MVG-8000A, RELIEF 445 A ISOL.
MVG-8000A, RELIEF 445 A ISOL.                             EOP-15.0 RO MVG-8000B, RELIEF 444 B ISOL.
MVG-8000B, RELIEF 444 B ISOL.
MVG-8000C, RELIEF 445 B ISOL.
MVG-8000C, RELIEF 445 B ISOL
NUREG -1021 R10 Appendix D                                       Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #   2   Event #   7   Page:   34 of 45 Event
. EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # 7 Page: 34 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                           Applicants Actions or Behavior CAUTION - Steps 4 through 16 If Wide Range level in any two SGs is LESS THAN 12% [20%] OR PZR pressure is                     EOP-15.0 GREATER THAN 2330 psig due to loss of secondary heat sink, Steps 17 through 24 should be immediately initiated for bleed and feed cooling.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10      CAUTION - Steps 4 through 16 If Wide Range level in any two SGs is LESS THAN 12% [20%] OR PZR pressure is GREATER THAN 2330 psig due to loss of secondary heat sink, Steps 17 through 24 should be immediately initiated for bleed and feed cooling.
4     Ensure the following valves are closed:
EOP-15.0  RO 4 Ensure the following valves are closed:
EOP-15.0 RO                SG Blowdown, PVG-503A(B)(C).
SG Blowdown, PVG
SG Sample, SVX-9398A(B)(C).
-503A(B)(C).
NOTE - Step 5 EOP-15.0 If EFW flow control can NOT be reestablished from the Control Room, this procedure should be continued while local operator action is in progress to restore EFW flow.
SG Sample, SVX
5     Try to establish EFW flow to at least one SG:
-9398A(B)(C).
: a. Check Control Room indications for the cause of EFW failure:
EOP-15.0   NOTE - Step 5 If EFW flow control can NOT be reestablished from the Control Room, this procedure should be continued while local operator action is in progress to restore EFW flow.
: 1) Verify no EFW annunciators are lit:
EOP-15.0  BOP 5 Try to establish EFW flow to at least one SG:
XCP-621 3-5 (EFP SUCT HDR PRESS LO XFER EOP-15.0 BOP                          TO SW).
: a. Check Control Room indications for the cause of EFW failure: 1) Verify no EFW annunciators are lit:   XCP-621 3-5 (EFP SUCT HDR PRESS LO XFER TO SW). Any alarm on XCP
Any alarm on XCP-622.
-622. Any alarm on XCP
Any alarm on XCP-623.
-623. 2) Verify CST level is GREATER THAN 5 ft.
: 2) Verify CST level is GREATER THAN 5 ft.
: 3) Ensure power is available to both MD EFW Pumps.
: 3) Ensure power is available to both MD EFW Pumps.
EOP-15.0 CAUTION - Step 5.a.4 EFW valves should NOT be opened to SGs with Wide Range level LESS THAN 12% [20%]. If Wide Range level in all SGs is LESS THAN 12% [20%], EFW valves should be open to only one SG, until RCS temperatures are decreasing, to limit any failure to one SG.
CAUTION - Step 5.a.4 EFW valves should NOT be opened to SGs with Wide Range level LESS THAN 12%
EOP-15.0  BOP 4) Ensure all EFW valves are open:   FCV-3531(3541)(3551), MD EFP TO SG A(B)(C).
EOP-15.0
FCV-3536(3546)(3556), TD EFP TO SG A(B)(C).
[20%].
If Wide Range level in all SGs is LESS THAN 12% [20%], EFW valves should be open to only one SG, until RCS temperatures are decreasing, to limit any failure to one SG.
: 4)   Ensure all EFW valves are open:
FCV-3531(3541)(3551), MD EFP TO SG A(B)(C).
EOP-15.0 BOP FCV-3536(3546)(3556), TD EFP TO SG A(B)(C).
MVG-2802A(B), MS LOOP B(C) TO TD EFP.
MVG-2802A(B), MS LOOP B(C) TO TD EFP.
EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   35 of 45 Event
NRC-ILO-14-01 Scenario #
2 Event # 7 Page: 35 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                         Applicants Actions or Behavior PVG-2030, STM SPLY TO TD EFP TRN A(B).
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10    PVG-2030, STM SPLY TO TD EFP TRN A(B).
: b. Try to restore any EFW flow.
BOP b. Try to restore any EFW flow.
: c. Check total EFW flow to SGs GREATER THAN 450 gpm.
: c. Check total EFW flow to SGs GREATER THAN 450 gpm.
(NO) ALTERNATIVE ACTION
(NO)
ALTERNATIVE ACTION
: c. IF any feed flow to at least one SG verified, THEN perform the following:
: c. IF any feed flow to at least one SG verified, THEN perform the following:
: 1) Maintain flow to restore Narrow Range SG level to GREATER THAN 26%[41%].
BOP            1)   Maintain flow to restore Narrow Range SG level to       EOP-15.0 GREATER THAN 26%[41%].
: 2) When Narrow Range SG level is GREATER THAN 26%[41%], THEN RETURN TO the Procedure and Step in effect.
: 2)   When Narrow Range SG level is GREATER THAN 26%[41%], THEN RETURN TO the Procedure and Step in effect.
IF feed flow NOT verified, THEN perform the following:
IF feed flow NOT verified, THEN perform the following:
: 1) Locally restore EFW flow.
: 1)   Locally restore EFW flow.
: 2) GO TO Step 7.
: 2)   GO TO Step 7.
EOP-15.0 RO 7 Stop all RCPs.
EOP-15.0 RO     7   Stop all RCPs.
EOP-15.0 CAUTION - Step 8 Deaerator Storage Tank level should be monitored closely and maintained between 2.5 ft and 10.5 ft on LI
CAUTION - Step 8 Deaerator Storage Tank level should be monitored closely and maintained between 2.5 ft         EOP-15.0 and 10.5 ft on LI-3135, DEAER STOR TK WR LVL FEET, to prevent tripping Condensate and Feedwater Booster Pumps.
-3135, DEAER STOR TK WR LVL FEET, to prevent tripping Condensate and Feedwater Booster Pumps.
8   Align the MCB for establishing feed flow:
EOP-15.0  BOP 8 Align the MCB for establishing feed flow:
: a. Ensure one Condensate Pump is running.
: a. Ensure one Condensate Pump is running. b. Ensure two Feedwater Booster Pumps are running.
: b. Ensure two Feedwater Booster Pumps are running.
: c. Ensure Main FW Control Valves are closed:
: c. Ensure Main FW Control Valves are closed:
FCV-478, A FCV.
FCV-478, A FCV.
FCV-488, B FCV.
FCV-488, B FCV.                                         EOP-15.0 BOP FCV-498, C FCV.
FCV-498, C FCV.
: d. Place all Main FW Bypass Valve Controllers in MAN and closed:
: d. Place all Main FW Bypass Valve Controllers in MAN and closed:   FCV-3321, LOOP A MAIN FW BYP.
FCV-3321, LOOP A MAIN FW BYP.
FCV-3331, LOOP B MAIN FW BYP.
FCV-3331, LOOP B MAIN FW BYP.
FCV-3341, LOOP C MAIN FW BYP.
FCV-3341, LOOP C MAIN FW BYP.
EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
NUREG -1021 R10 Appendix D                                   Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   7   Page:   36 of 45 Event
NRC-ILO-14-01 Scenario #
2 Event # 7 Page: 36 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                       Applicants Actions or Behavior BOOTH OPERATOR           When contacted to place key switches in bypass, report I have the keys and a copy of EOP-15.0 in hand Triggers 9, 10 and 11 will accomplish placing the key switches in bypass.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  BOOTH OPERATOR When contacted to place key switches in bypass, report "I have the keys and a copy of EOP
: e. Locally place the following key switches in BYPASS (CB-448):
-15.0 in hand" Triggers 9, 10 and 11 will accomplish placing the key switches in bypass. BOOTH e. Locally place the following key switches in BYPASS (CB
XVG01611A,B,C (XPN 7114).                             EOP-15.0 BOOTH IFV03321,3331,3341 TRAIN A (XPN 7115).
-448):   XVG01611A,B,C (XPN 7114).
IFV03321,3331,3341 TRAIN A (XPN 7115).
IFV03321,3331,3341 TRAIN B (XPN 7121).
IFV03321,3331,3341 TRAIN B (XPN 7121).
EOP-15.0  BOP f. Verify XCP
: f. Verify XCP-612 2-1 is NOT lit (RB PRESS HI-2 STM LINE       EOP-15.0 BOP            ISOL).
-612 2-1 is NOT lit (RB PRESS HI
NOTE - Step 8.g SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible.                                                                             EOP-15.0 Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded.
-2 STM LINE ISOL). EOP-15.0 NOTE - Step 8.g SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible.
: g. Align the MS Isolation Valves to depressurize only one SG:
Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded. EOP-15.0  BOP g. Align the MS Isolation Valves to depressurize only one SG:
: 1) Verify the MS Isolation Valve, PVM-2801A(B)(C), is BOP                  open for the SG to be depressurized.                   EOP-15.0
: 1) Verify the MS Isolation Valve, PVM
: 2) Ensure the remaining two MS Isolation Valves, PVM-801A(B)(C), are closed.
-2801A(B)(C), is open for the SG to be depressurized.
ALTERNATIVE ACTION
: 2) Ensure the remaining two MS Isolation Valves, PVM-801A(B)(C), are closed.
EOP-15.0  BOP ALTERNATIVE ACTION
: g. Open the MS Isolation Bypass Valve for one SG:
: g. Open the MS Isolation Bypass Valve for one SG:
: 1) IF RCS Tavg is LESS THAN P-12 (552&deg;F), THEN place STMLN SI TRAIN A(B) Switches to BLOCK. 2) Depress both MAIN STEAM ISOL VALVES RESET TRAIN A (B). 3) Open the MS Isolation Bypass Valve, PVM
: 1) IF RCS Tavg is LESS THAN P-12 (552&deg;F), THEN place STMLN SI TRAIN A(B) Switches to BLOCK.
-2869A(B)(C), for only the SG to be depressurized.
BOP            2) Depress both MAIN STEAM ISOL VALVES RESET               EOP-15.0 TRAIN A(B).
: 4)   Ensure the remaining two MS Isolation Bypass Valves, PVM-2869A(B)(C), are closed.
: 3) Open the MS Isolation Bypass Valve, PVM-2869A(B)(C), for only the SG to be depressurized.
EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
: 4) Ensure the remaining two MS Isolation Bypass Valves, PVM-2869A(B)(C), are closed.
NRC-ILO-14-01 Scenario #
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   2   Event #   7   Page:   37 of 45 Event
2 Event # 7 Page: 37 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time         Position                         Applicants Actions or Behavior
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10    BOP h. Place the following switches in AUTO:   PVG-1611A(B)(C), A(B)(C) ISOL.
: h. Place the following switches in AUTO:
FCV-3321,3331,3341, FW CNTRL BYP VLVS, Train A Switch. FCV-3321,3331,3341, MAIN FW BYPASS VLVS, Train B Switch.
PVG-1611A(B)(C), A(B)(C) ISOL.
EOP-15.0 BOP 9 Reset both SI RESET TRAIN A(B) Switches.
FCV-3321,3331,3341, FW CNTRL BYP VLVS, Train A         EOP-15.0 BOP Switch.
EOP-15.0 NOTE - Step 10 Main Feed Pumps trip on SI. If an SI occurs, Steps 9 and 10 should be repeated to restart Main Feed Pumps.
FCV-3321,3331,3341, MAIN FW BYPASS VLVS, Train B Switch.
EOP-15.0  BOP 10 Establish Main Feedwater flow to the unisolated SG:
EOP-15.0 BOP       9 Reset both SI RESET TRAIN A(B) Switches.
: a. Verify PERMISV C
NOTE - Step 10 EOP-15.0 Main Feed Pumps trip on SI. If an SI occurs, Steps 9 and 10 should be repeated to restart Main Feed Pumps.
-9 status light is bright on XCP
10 Establish Main Feedwater flow to the unisolated SG:
-6114 1-3. b. Open MOV-1-5A(B)(C), TURB DRN VLV.
: a. Verify PERMISV C-9 status light is bright on XCP-6114 1-3.
: c. Ensure Feedwater Pump to be started is RESET (MCB or DCS (T ICON)).
: b. Open MOV-1-5A(B)(C), TURB DRN VLV.
(NO) ALTERNATIVE ACTION
: c. Ensure Feedwater Pump to be started is RESET (MCB or       EOP-15.0 BOP              DCS (T ICON)). (NO)
: 10. GO TO Step 11. Observe the NOTE prior to Step 11. EOP-15.0 NOTE - Step 11   Step 11 should NOT be performed as long as the Main Feed Pump is supplying sufficient flow to increase SG level.
ALTERNATIVE ACTION
Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded.
: 10. GO TO Step 11. Observe the NOTE prior to Step 11.
EOP-15.0  BOP 11 WHEN the Main Feed Pump will NOT supply adequate flow to the SG, THEN depressurize one SG to establish Condensate flow: a. WHEN RCS Tavg is LESS THAN P
NOTE - Step 11 Step 11 should NOT be performed as long as the Main Feed Pump is supplying sufficient flow to increase SG level.                                                       EOP-15.0 Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded.
-12 (552&deg;F), THEN: Place both STM DUMP INTERLOCK Switches to BYP INTLK. Place STMLN SI TRAIN A(B) Switches to BLOCK. EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
11 WHEN the Main Feed Pump will NOT supply adequate flow to the SG, THEN depressurize one SG to establish Condensate flow:
NRC-ILO-14-01 Scenario #
: a. WHEN RCS Tavg is LESS THAN P-12 (552&deg;F), THEN:               EOP-15.0 BOP Place both STM DUMP INTERLOCK Switches to BYP INTLK.
2 Event # 7 Page: 38 of 45 Event
Place STMLN SI TRAIN A(B) Switches to BLOCK.
NUREG -1021 R10 Appendix D                                         Operator Actions                       Form ES-D-2 Op Test No:   NRC-ILO-14-01         Scenario #     2     Event #   7   Page:     38   of   45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time         Position                           Applicants Actions or Behavior EVALUATOR NOTE: The Steam Generator must be depressurized to below approximately 350 psig before the Feedwater Booster/Condensate pumps can supply the Steam Generator.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10  EVALUATOR NOTE:
NOTE - Step 11.b EOP-15.0 SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible.
The Steam Generator must be depressurized to below approximately 350 psig before the Feedwater Booster/Condensate pumps can supply the Steam Generator.
: b. Open FCV-3321(3331)(3341), LOOP A(B)(C) MAIN FW BYP, to the SG to be depressurized.
NOTE - Step 11.b SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible. EOP-15.0 CRITICAL  TASK BOP b. Open FCV
-3321(3331)(3341), LOOP A(B)(C) MAIN FW BYP, to the SG to be depressurized.
: c. Dump steam to the Condenser at the maximum rate:
: c. Dump steam to the Condenser at the maximum rate:
: 1) Verify PERMISV C
: 1) Verify PERMISV C-9 status light is bright on XCP-6114 CRITICAL 1-3.
-9 status light is bright on XCP-6114 1-3. 2) Place the STM DUMP MODE SELECT Switch in STM PRESS. 3) Adjust the STM DUMP CNTRL Controller to fully open the Bank 1 Steam Dump Valves.
EOP-15.0 BOP                  2) Place the STM DUMP MODE SELECT Switch in STM TASK                                PRESS.
: 3) Adjust the STM DUMP CNTRL Controller to fully open the Bank 1 Steam Dump Valves.
: d. Adjust Condensate flow to restore SG Narrow Range level to between 26% [41%] and 60%.
: d. Adjust Condensate flow to restore SG Narrow Range level to between 26% [41%] and 60%.
EOP-15.0  BOP 12 Reset Containment Isolation:
12 Reset Containment Isolation:
RESET PHASE A  
BOP                  RESET PHASE A - TRAIN A(B) CNTMT ISOL.                           EOP-15.0 RESET PHASE B - TRAIN A(B) CNTMT ISOL.
- TRAIN A(B) CNTMT ISOL.
13 Place both ESF LOADING SEQ A(B) RESETS to:
RESET PHASE B  
BOP              a. NON-ESF LCKOUTS.                                                   EOP-15.0
- TRAIN A(B) CNTMT ISOL.
EOP-15.0  BOP 13 Place both ESF LOADING SEQ A(B)
RESETS to:
: a. NON-ESF LCKOUTS.
: b. AUTO-START BLOCKS.
: b. AUTO-START BLOCKS.
EOP-15.0  BOP 14 Establish Instrument Air to the RB: a. Start one Instrument Air Compressor and place the other in Standby. b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates GREATER THAN 60 psig.
14 Establish Instrument Air to the RB:
: c. Open PVA
: a. Start one Instrument Air Compressor and place the other in Standby.
-2659, INST AIR TO RB AIR SERV.
BOP              b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates                 EOP-15.0 GREATER THAN 60 psig.
: d. Open PVT
: c. Open PVA-2659, INST AIR TO RB AIR SERV.
-2660, AIR SPLY TO RB. EOP-15.0 Appendix D Operator Actions Form ES-D-2   Op Test No:
: d. Open PVT-2660, AIR SPLY TO RB.
NRC-ILO-14-01 Scenario #
NUREG -1021 R10 Appendix D                                     Operator Actions                   Form ES-D-2 Op Test No:   NRC-ILO-14-01     Scenario #   2   Event #   7   Page:   39 of 45 Event
2 Event # 7 Page: 39 of 45 Event


== Description:==
== Description:==
 
Loss of Heat Sink Time       Position                       Applicants Actions or Behavior NOTE - Steps 15 and 16 EOP-15.0 BOP    The specified SG level range (Narrow Range OR Wide Range) must be used in the following Steps.
Loss of Heat Sink Time Position Applicant's Actions or Behavior NUREG -1021 R10    BOP NOTE - Steps 15 and 16 The specified SG level range (Narrow Range OR Wide Range) must be used in the following Steps.
15 Check SG levels:
EOP-15.0  BOP 15  Check SG levels:
: a. Verify Narrow Range level is GREATER THAN 26%             EOP-15.0 BOP              [41%] in at least one SG.
: a. Verify Narrow Range level is GREATER THAN 26% [41%] in at least one SG.
: b. RETURN TO the Procedure and Step in effect.
: b. RETURN TO the Procedure and Step in effect.
EOP-15.0 EVALUATOR NOTE:
EVALUATOR NOTE: The scenario can be terminated after the crew has established feed flow via the Condensate system to at least one Steam Generator or at any time at the discretion of the Examiner.
The scenario can be terminated after the crew has established feed flow via the Condensate system to at least one Steam Generator or at any time at the discretion of the Examiner.
NUREG -1021 R10 Appendix D                                 Operator Actions           Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 40 of 45 SOP-106, Section IV, D, BORATING THE RCS USING THE Event
 
Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 40 of 45 Event


== Description:==
== Description:==
 
EMERGENCY BORATE VALVE NUREG -1021 R10 Appendix D                                 Operator Actions           Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 41 of 45 Event
SOP-106, Section IV, D, BORATING THE RCS USING THE EMERGENCY BORATE VALVE NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 41 of 45 Event


== Description:==
== Description:==
 
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D                                 Operator Actions           Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 42 of 45 Event
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 42 of 45 Event


== Description:==
== Description:==
 
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D                                 Operator Actions           Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 43 of 45 Event
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 43 of 45 Event


== Description:==
== Description:==
 
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D                                 Operator Actions           Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 44 of 45 Event
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 44 of 45 Event


== Description:==
== Description:==
 
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D                                                                 Form ES-D-2 Op Test No:   NRC-ILO-14-01   Scenario #   2     Event # NA Page: 45 of   45 Event
SOP-106, Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Form ES-D-2   Op Test No:
NRC-ILO-14-01 Scenario #
2 Event # NA Page: 45 of 45 Event


== Description:==
== Description:==
NA Procedure Revisions Used in this Scenario Guide Number                                  Title                Rev        Date ARP-001-XCP-625          FEEDWATER                                      9    02/11/16 GOP-4C                  RAPID POWER REDUCTION                        1C      1/21/16 ARP-001-XCP-632          GENERATOR                                    7H      05/29/14 AOP-401.10              POWER RANGE CHANNEL FAILURE                    3B    01/31/07 AOP-102.2                LOSS OF CHARGING                                1    11/24/15 SOP-102                  CHEMICAL AND VOLUME CONTROL SYSTEM            24C    11/22/15 EOP-1.0                  E-0, REACTOR TRIP OR SAFETY INJECTION          29    11/24/15 EOP-1.1                  ES0.1 REACTOR TRIP RESPONSE                  20      8/20/15 FR-H.1, RESPONSE TO LOSS OF SECONDARY EOP-15.0                                                                15      9/30/15 HEAT SINK ARP-001-XCP-614          CHARGING/LETDOWN                              6D        9/4/15 SOP-215                  MAIN TURBINE LUBE OIL SUPPLY SYSTEM          7D        9/4/15 ARP-001-XCP-631          MAIN TURBINE                                  5H      08/08/13 ARP-001-XCP-620          NUCLEAR INSTRUMENTATION                      8H      09/17/15 ARP-001-XCP-621          ROD CONTROL                                    5F    09/17/15 SOP-106                  REACTOR MAKEUP WATER SYSTEM                    12      11/9/15 NUREG -1021 R10 Appendix D                              Scenario Outline                              Form ES-D-1 Facility:  VC SUMMER          Scenario No:      3            Op Test No:    NRC-ILO-14-01 Examiners:                                        Operators:    CRS:
RO:
BOP:
Initial Conditions:  65% Power.
B1 Train Work week.
B and C MFW Pump Running - A MFW Pump shutdown.
Alternate Seal Injection is OOS.
Turnover:            Lower Power.
Critical Tasks:      Manually control A SG Feedwater without a Rx/Turbine Trip on SG level.
Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary.
Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running.
Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.
Event      Malf No.      Event Type*        EVENT DESCRIPTION 1      IA003T        C-RO, CRS          Reactor Building Instrument Air is lost and PVA-2569, RB IA004F                            Instrument Air Backup Isolation, will fail to open requiring IA001F                            manual operation of the backup supply isolation.
IA001F IA002 2      SI025L        C-RO              Safety Injection Accumulator B level and pressure will lower SI001L        TS-CRS            until pressure reaches 595 psig. The Operator will raise SI042A                            pressure to within Tech Spec limitations.
SI042B AUX024 3      NA            R-RO,              Reduce power from 65% to 55% power IAW GOP-4B.
N-BOP, CRS 4      FWM014D        C-BOP, CRS        Master MFW Speed Controller drifts LOW in AUTO requiring manual control of MFW Pump speed.
5      MS010O        I-BOP, CRS        LT-476 S/G A NR level transmitter fails LOW. Feed flow TS-CRS            rises as this is the controlling SG level channel. BOP takes manual control of FRV and matches FF and SF.
NRC 2016 Scenario 3                                                        NUREG -1021 R10


NA  NUREG -1021 R10      Procedure Revisions Used in this Scenario Guide Number Title Rev Date ARP-001-XCP-625 FEEDWATER 9 02/1 1/1 6 GOP-4C RAPID POWER REDUCTION 1 C 1/21/1 6 ARP-001-XCP-63 2 GENERATOR 7 H 0 5/29/1 4 AOP-401.10 POWER RANGE CHANNEL FAILURE 3B 01/31/07 AOP-102.2 LOSS OF CHARGING 1 11/2 4/1 5 SOP-102 CHEMICAL AND VOLUME CONTROL SYSTEM 2 4C 11/22/1 5 EOP-1.0 E-0, REACTOR TRIP OR SAFETY INJECTION 2 9 11/24/15 EOP-1.1 ES0.1 REACTOR TRIP RESPONSE 20 8/20/15 EOP-15.0 FR-H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK 1 5 9/30/15 ARP-001-XCP-614 CHARGING/LETDOWN 6 D 9/4/1 5 SOP-215 MAIN TURBINE LUBE OIL SUPPLY SYSTEM 7D 9/4/15 ARP-001-XCP-63 1 MAIN TURBINE 5H 08/08/13 ARP-001-XCP-6 20 NUCLEAR INSTRUMENTATION 8H 09/17/15 ARP-001-XCP-6 21 ROD CONTROL 5F 09/17/15 SOP-106 REACTOR MAKEUP WATER SYSTEM 12 11/9/15 Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 Facility: VC SUMMER Scenario No:3 Op Test No:NRC-ILO-14-01 Examiners:  Operators:CRS:    RO:    BOP:  Initial Conditions:  65% Power.  "B1" Train Work week.  "B" and "C" MFW Pump Running - "A" MFW Pump shutdown. Alternate Seal Injection is OOS. Turnover:  Lower Power.
Appendix D                               Scenario Outline                           Form ES-D-1 6       MSS016           M-ALL           MSLB Downstream of the MSIVs with All MSIVs failed MSS006A                            OPEN.
Critical Tasks:  Manually control "A" SG Feedwater without a Rx/Turbine Trip on SG level. Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary. Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running. Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.
MSS006B MSS006C                            The MSIVs can be closed locally when directed by the crew.
Event  Malf No. Event Type* EVENT DESCRIPTION 1 IA003T IA004F IA001F IA001F IA002 C-RO, CRS Reactor Building Instrument Air is lost and PVA-2569, RB Instrument Air Backup Isolation, will fail to open requiring manual operation of the backup supply isolation.
PCS005A                           Auto Safety Injection fails both trains, manual actuation PCS005B                            available on both trains from a single Main Control Board SI009                              switch.
2 SI025L SI001L SI042A SI042B AUX024 C-RO  TS-CRS Safety Injection Accumulator 'B' level and pressure will lower until pressure reaches 595 psig. The Operator will raise pressure to within Tech Spec limitations. 3 NA R-RO, N-BOP, CRS Reduce power from 65% to 55% power IAW GOP-4B. 4 FWM014D C-BOP, CRS Master MFW Speed Controller drifts LOW in AUTO requiring manual control of MFW Pump speed. 5 MS010O I-BOP, CRS TS-CRS LT-476 S/G 'A' NR level transmitter fails LOW. Feed flow rises as this is the controlling SG level channel. BOP takes manual control of FRV and matches FF and SF. 
RC005P                             Pressurizer PORV 445B fails open and requires block valve to be closed.
 
EF001P                             All Emergency Feedwater flow control valves failed in the EF002P                            open position until operator takes manual control.
Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 6 MSS016 MSS006A MSS006B MSS006C M-ALL MSLB Downstream of the MSIVs with All MSIVs failed OPEN.
EF003P EF004P EF005P EF006P TERMINATE: Verify SI flow NOT required in EOP-3.1 (ECA-2.1) or at the discretion of the Examiner.
The MSIVs can be closed locally when directed by the crew.
* (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor The following notation is used in the ES-D-2 form Time column:
PCS005A PCS005B SI009 Auto Safety Injection fails both trains, manual actuation available on both trains from a single Main Control Board  
IOA     designates Immediate Operator Action steps.
 
switch. RC005P Pressurizer PORV 445B fails open and requires block valve to be closed.
EF001P EF002P EF003P EF004P EF005P EF006P All Emergency Feedwater flow control valves failed in the open position until operator takes manual control. TERMINATE: Verify SI flow NOT required in EOP-3.1 (ECA-2.1) or at the discretion of the Examiner. * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor The following notation is used in the ES-D-2 form "Time" column:
IOA designates Immediate Operator Action steps.
* designates Continuous Action steps.
* designates Continuous Action steps.
TURNOVER: The crew will assume the watch having been pre-briefed on the Initial Conditions, the plan for this shift and any related operating procedures. The Unit will be at 65% power, holding for turnover. The Unit was being Shutdown to repair a minor non-isolable steam leak on the bottom of the Turbine. The "A" MFW Pump and the "A" FWBP have been secured. GOP-4B, Power Operation (Mode 1 Descending) is in progress and has been completed through step 3.2.d. The power reduction was halted at 65% to investigate the possibility of repairing the leak while online. The plant has been at 65% for 8 hours. The crew will be directed to maintain power at 65% pending further Management direction. Xenon is increasing slowly.
TURNOVER:
The simulator will be frozen prior to the crew entering the simulator. The Lead Evaluator may leave the simulator frozen or allow the simulator to be in run with surrogates in place to maintain stable plant conditions until the crew assumes the watch.  
The crew will assume the watch having been pre-briefed on the Initial Conditions, the plan for this shift and any related operating procedures. The Unit will be at 65% power, holding for turnover. The Unit was being Shutdown to repair a minor non-isolable steam leak on the bottom of the Turbine. The A MFW Pump and the A FWBP have been secured. GOP-4B, Power Operation (Mode 1 Descending) is in progress and has been completed through step 3.2.d. The power reduction was halted at 65% to investigate the possibility of repairing the leak while online. The plant has been at 65% for 8 hours. The crew will be directed to maintain power at 65% pending further Management direction. Xenon is increasing slowly.
The simulator will be frozen prior to the crew entering the simulator. The Lead Evaluator may leave the simulator frozen or allow the simulator to be in run with surrogates in place to maintain stable plant conditions until the crew assumes the watch.
NRC 2016 Scenario 3                                                          NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 EVENT 1: Loss of RB Instrument Air manual action required to restore.
Appendix D                               Scenario Outline                           Form ES-D-1 EVENT 1: Loss of RB Instrument Air manual action required to restore.
PRELOAD o PMP-IA004F XAC0004B RX BLDG AIR COMP B FAIL TO START o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS TRIGGER 1 o ANN-IA002 RB AIR CMPR A TRBL  
PRELOAD o PMP-IA004F XAC0004B RX BLDG AIR COMP B FAIL TO START o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS TRIGGER 1 o ANN-IA002 RB AIR CMPR A TRBL o PMP-IA003T XAC0004A RX BLDG AIR COMP A TRIP ON COMMAND AUTO-TRIGGER 11             X02i096o == 1 (PVA-2569 control switch taken to open) o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS Delete in: 1 sec On cue from the Examiner the Reactor Building Instrument Air is lost due to failure of the running compressor and fail of the back up to start. The backup supply from Plant Instrument Air, PVA-2569, will fail to auto open. The BOP must manually open PVA-2659 and restore Reactor Building Instrument Air.
 
o PMP-IA003T XAC0004A RX BLDG AIR COMP A TRIP ON COMMAND AUTO-TRIGGER 11 X02i096o == 1 (PVA-2569 control switch taken to open) o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS Delete in: 1 sec On cue from the Examiner the Reactor Building Instrument Air is lost due to failure of the running compressor and fail of the back up to start. The backup supply from Plant Instrument Air, PVA-2569, will fail to auto open. The BOP must manually open PVA-2659 and restore  
 
Reactor Building Instrument Air.
EVENT 2: Safety Injection Accumulator Pressure LOW.
EVENT 2: Safety Injection Accumulator Pressure LOW.
TRIGGER 2 o VLV-SI001L HCV00936-SI OPER-ACCU M VENT LEAKAGE Final Value: 100%
TRIGGER 2 o VLV-SI001L HCV00936-SI OPER-ACCUM VENT LEAKAGE Final Value: 100%
o VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final Value: 100%
o VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final Value: 100%
o OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Override To: On o OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Override To: Off o LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0.1  
o OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Override To: On o OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Override To: Off o LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0.1 NRC 2016 Scenario 3                                                      NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 AUTO-TRIGGER 12 PT_925 < 595 (Removes leakage at 595 psig in 'B' Accumulator) o VLV-SI001L HCV00936-SI OPER-ACCU M VENT LEAKAGE Final value: 0  
Appendix D                             Scenario Outline                           Form ES-D-1 AUTO-TRIGGER 12         PT_925 < 595 (Removes leakage at 595 psig in B Accumulator) o   VLV-SI001L HCV00936-SI OPER-ACCUM VENT LEAKAGE Final value: 0 o   VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final value: 0 o   OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Delete in: 1 sec o   OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Delete in: 1 sec o   LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0 On cue from the Examiner Safety Injection Accumulator B level and pressure will lower until pressure reaches 595 psig. The RO will receive XCP-611 2-3, ACCUM B PRESS HI/LO and will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d; A nitrogen cover pressure of between 600 and 656 psig. Action b of Tech Spec 3.5.1 requires restoration of the Accumulator pressure within 1 Hour.
 
EVENT 3: Lower Power from 65% to 55% per management discretion.
o VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final value: 0  
 
o OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Delete in: 1 sec o OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Delete in: 1 sec  
 
o LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0 On cue from the Examiner Safety Injection Accumulator 'B' level and pressure will lower until pressure reaches 595 psig. The RO will receive XCP-611 2-3, ACCUM B PRESS HI/LO and will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d; A nitrogen cover pressure of between 600 and 656 psig. Action b of Tech Spec 3.5.1 requires restoration of the  
 
Accumulator pressure within 1 Hour.  
 
EVENT 3: Lower Power from 65% to 55% per management discretion.
GOP-4B, Power Operation (Mode 1 Descending) will be used to guide the actions of the crew.
GOP-4B, Power Operation (Mode 1 Descending) will be used to guide the actions of the crew.
The CRS will direct a power reduction at 1% per minute or less and provide oversight as the load reduction proceeds towards 48% which is where GOP-4B proceeds to step 3.3. The RO will adjust RCS boron to maintain proper Delta I and Control Rod height as the BOP reduces turbine load.
The CRS will direct a power reduction at 1% per minute or less and provide oversight as the load reduction proceeds towards 48% which is where GOP-4B proceeds to step 3.3. The RO will adjust RCS boron to maintain proper Delta I and Control Rod height as the BOP reduces turbine load.
EVENT 4: Main Feed Pump master speed control fails LOW.
EVENT 4: Main Feed Pump master speed control fails LOW.
TRIGGER 4 o MAL-FWM014D FWP D (SC-509A) AUTO CONTROL FAILURE Ramp: 30 sec Final Value: 15%
TRIGGER 4 o   MAL-FWM014D FWP D (SC-509A) AUTO CONTROL FAILURE Ramp: 30 sec Final Value: 15%
 
On cue from the Examiner the master MFW Speed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band. The CRS will refer to AOP-210.3, Feedwater Pump Malfunction.
On cue from the Examiner the master MFW Speed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band. The CRS will refer to AOP-210.3, Feedwater Pump Malfunction.
NRC 2016 Scenario 3                                                      NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 EVENT 5: S/G "A" Controlling level channel fails LOW.
Appendix D                                 Scenario Outline                           Form ES-D-1 EVENT 5: S/G A Controlling level channel fails LOW.
TRIGGER 5 o XMT-MS010O ILT00476     SG A NR LVL LI-476 FAIL TO POSN Ramp: 2 min Final Value: 0% On cue from the Examiner Steam Generator "A" Narrow Range level transmitter, LT-476 fails LOW. This is the controlling SG level channel and the failure will cause feed flow to rise. The BOP takes manual control of FRV and matches FF and SF. Crew implements AOP-401.11, Steam Generator Level Control and Protection Channel Failure. The CRS will apply Tech Spec 3.3.1, Reactor Trip System Instrumentation and Tech Spec 3.3.3, Engineered Safety Feature Actuation System Instrumentation. Tech Spec 3.3.1 function 13, Steam Generator Water Level Low-Low is affected. This function invokes action 6 which requires; with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours. Tech Spec 3.3.3 Functions 5.a; Turbine Trip and Feedwater Isolation and 6.c; Emergency Feedwater Low Low Level start of EFW pumps are affected. Both functions invoke action 24 which requires: with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours. EVENT 6: MSLB downstream of the MSIVs with all MSIV failed open.
TRIGGER 5 o   XMT-MS010O ILT00476 SG A NR LVL LI-476 FAIL TO POSN Ramp: 2 min Final Value: 0%
PRELOAD o MAL-PCS005A SAFETY INJECTION FAILURE TRAIN A Fail To: FAIL TO AUTO INIT o MAL-PCS005B SAFETY INJECTION FAILURE TRAIN B Fail To: FAIL TO AUTO INIT o OVR-SI009 CS-CR01B SAFETY INJ ACTUATION ACTUATE Override To: False o VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Final Value: 100 o VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Final Value: 100 o VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Final Value: 100  
On cue from the Examiner Steam Generator A Narrow Range level transmitter, LT-476 fails LOW. This is the controlling SG level channel and the failure will cause feed flow to rise. The BOP takes manual control of FRV and matches FF and SF. Crew implements AOP-401.11, Steam Generator Level Control and Protection Channel Failure. The CRS will apply Tech Spec 3.3.1, Reactor Trip System Instrumentation and Tech Spec 3.3.3, Engineered Safety Feature Actuation System Instrumentation.
Tech Spec 3.3.1 function 13, Steam Generator Water Level Low-Low is affected. This function invokes action 6 which requires; with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours.
Tech Spec 3.3.3 Functions 5.a; Turbine Trip and Feedwater Isolation and 6.c; Emergency Feedwater Low Low Level start of EFW pumps are affected. Both functions invoke action 24 which requires: with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours.
EVENT 6: MSLB downstream of the MSIVs with all MSIV failed open.
PRELOAD o   MAL-PCS005A SAFETY INJECTION FAILURE TRAIN A Fail To: FAIL TO AUTO INIT o   MAL-PCS005B SAFETY INJECTION FAILURE TRAIN B Fail To: FAIL TO AUTO INIT o   OVR-SI009 CS-CR01B SAFETY INJ ACTUATION ACTUATE Override To: False o   VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Final Value: 100 o   VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Final Value: 100 o   VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Final Value: 100 NRC 2016 Scenario 3                                                          NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 o VLV- EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Final Value: 100 o VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Final Value: 100 o VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Final Value: 100 TRIGGER 6 o MAL-MSS016 STEAMLINE BREAK DOWNSTREAM THE MSIV'S Final Value: 4E6 LBM/HR o MAL-MSS006A MAIN STEAM ISOLATION VALVE (S/G A) FAILURE Fail To: FAILURE TO CLOSE o MAL-MSS006B MAIN STEAM ISOLATION VALVE (S/G B) FAILURE Fail To: FAILURE TO CLOSE o MAL-MSS006C MAIN STEAM ISOLATION VALVE (S/G C) FAILURE Fail To: FAILURE TO CLOSE AUTO-TRIGGER 10 fnispr(2)<=2 (Fails PZR PORV open at Reactor trip) o VLV-RC005P PCV00445B-RC PZR PWR REL VLV FAIL POSITION Final Value: 100% TRIGGER 14 o VLV-MS008W XVG02802A-MS MS LP B TO TD EF PMP LOSS OF POWER  
Appendix D                           Scenario Outline                         Form ES-D-1 o   VLV- EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Final Value: 100 o   VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Final Value: 100 o   VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Final Value: 100 TRIGGER 6 o   MAL-MSS016 STEAMLINE BREAK DOWNSTREAM THE MSIV'S Final Value: 4E6 LBM/HR o   MAL-MSS006A MAIN STEAM ISOLATION VALVE (S/G A) FAILURE Fail To: FAILURE TO CLOSE o   MAL-MSS006B MAIN STEAM ISOLATION VALVE (S/G B) FAILURE Fail To: FAILURE TO CLOSE o   MAL-MSS006C MAIN STEAM ISOLATION VALVE (S/G C) FAILURE Fail To: FAILURE TO CLOSE AUTO-TRIGGER 10         fnispr(2)<=2 (Fails PZR PORV open at Reactor trip) o   VLV-RC005P PCV00445B-RC PZR PWR REL VLV FAIL POSITION Final Value: 100%
TRIGGER 14 o VLV-MS008W XVG02802A-MS MS LP B TO TD EF PMP LOSS OF POWER TRIGGER 15 o VLV-MS008P XVG02802A-MS MS LP B TO TD EF PMP FAIL POSITION Final value: 0 TRIGGER 16 o VLV-MS009W XVG02802B-MS MS LP C TO TD EF PMP LOSS OF POWER TRIGGER 17 o VLV-MS009P XVG02802B-MS MS LP C TO TD EF PMP FAIL POSITION Final value: 0 NRC 2016 Scenario 3                                                NUREG -1021 R10


TRIGGER 15 o VLV-MS008P  XVG02802A-MS MS LP B TO TD EF PMP FAIL POSITION Final value: 0 TRIGGER 16 o VLV-MS009W  XVG02802B-MS MS LP C TO TD EF PMP LOSS OF POWER  TRIGGER 17 o VLV-MS009P  XVG02802B-MS MS LP C TO TD EF PMP FAIL POSITION Final value: 0
Appendix D                          Scenario Outline                      Form ES-D-1 AUTO-TRIGGER 18        x07i557R==1 (Removes MD EFW valves failed open when reset switch is operated) o   VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Delete in: 1 sec.
o  VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Delete in: 1 sec o   VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Delete in: 1 sec AUTO-TRIGGER 19        x07i556R==1 (Removes TD EFW valves failed open when reset switch is operated) o  VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Delete in: 1 sec o   VLV-EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Delete in: 1 sec o  VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Delete in: 1 sec TRIGGER 20 o  LOA-RHR006 ACCUM A ISO VLV 8808A BKR Position To: CLOSE o  LOA-RHR008 ACCUM C ISO VLV 8808C BKR Position To: CLOSE Delay: 60 sec TRIGGER 21 o  LOA-RHR007 ACCUM B ISO VLV 8808B BKR Position To: CLOSE Delay: 120 sec NRC 2016 Scenario 3                                              NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 AUTO-TRIGGER 18      x07i557R==1  (Removes MD EFW valves failed open when  reset switch is operated) o VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Delete in: 1 sec.
Appendix D                               Scenario Outline                           Form ES-D-1 TRIGGER 7 o VLV-MS021P XVM02801B-MS MS ISO VLV B FAIL POSITION Final Value: 0%
o VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Delete in: 1 sec o VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Delete in: 1 sec  AUTO-TRIGGER 19      x07i556R==1 (Removes TD EFW valves failed open when  reset switch is operated) o VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Delete in: 1 sec o VLV-EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Delete in: 1 sec o VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Delete in: 1 sec  TRIGGER 20 o LOA-RHR006 ACCUM A ISO VLV 8808A BKR Position To: CLOSE o LOA-RHR008 ACCUM C ISO VLV 8808C BKR Position To: CLOSE Delay: 60 sec  TRIGGER 21 o LOA-RHR007 ACCUM B ISO VLV 8808B BKR Position To: CLOSE
o   VLV-MS020P XVM02801A-MS MS ISO VLV A FAIL POSITION Final Value: 0%
 
Delay: 120 sec o   VLV-MS022P XVM02801C-MS MS ISO VLV C FAIL POSITION Final Value: 0%
Delay: 120 sec
Delay: 240 sec Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN. The crew will enter EOP-1.0 (E-0) address the failure of Automatic Safety Injection by operating the Train A manual switch and the stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, until the Operator takes the control to manual. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.
 
Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 TRIGGER 7 o VLV-MS021P XVM02801B-MS MS ISO VLV B FAIL POSITION Final Value: 0%
o VLV-MS020P XVM02801A-MS MS ISO VLV A FAIL POSITION Final Value: 0%
Delay: 120 sec o VLV-MS022P XVM02801C-MS MS ISO VLV C FAIL POSITION Final Value: 0%
Delay: 240 sec Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN. The crew will enter EOP-1.0 (E-0) address the failure of Automatic Safety Injection by operating the Train "A" manual switch and the stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, until the Operator takes the control to manual. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.
CRITICAL TASKS:
CRITICAL TASKS:
Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary. Manually control "A" SG Feedwater without a Rx/Turbine Trip on SG level.
Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary.
Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running. Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.
Manually control A SG Feedwater without a Rx/Turbine Trip on SG level.
Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running.
Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.
TERMINATION:
TERMINATION:
The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed or at the discretion of the Examiner.  
The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed or at the discretion of the Examiner.
NRC 2016 Scenario 3                                                        NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 2016 Exam - Scenario NRC-3 Scenario Attributes Events Total Malfunctions  (5-8) 8  Loss of RB Instrument Air manual action required to restore. Safety Injection Accumulator Pressure LOW. S/G 'A' Controlling level channel fails LOW. Main Feed Pump master speed control fails LOW. MSLB downstream of the MSIVs with all MSIV failed open. Automatic Safety Injection fails, manual required. All EFW valves remain full open until manually reset. Pressurizer PORV fails open after Reactor trip. Malfunctions after EOP entry (1-2) 3 Automatic Safety Injection fails, manual required. Pressurizer PORV fails open after Reactor trip.
Appendix D                           Scenario Outline                           Form ES-D-1 2016 Exam - Scenario NRC-3 Scenario Events Attributes Loss of RB Instrument Air manual action required to restore.
All EFW flow control valves fail open, manual action required to control. Abnormal Events  (2-4) 4 Loss of RB Instrument Air manual action required to restore. Safety Injection Accumulator Pressure LOW. S/G 'A' Controlling level channel fails LOW. Main Feed Pump master speed control fails LOW.
Safety Injection Accumulator Pressure LOW.
Major Transients (1-2) 1 MSLB downstream of the MSIVs with all MSIV failed open. EOPs Entered (1-2) 1 EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators.
S/G A Controlling level channel fails LOW.
EOP Contingencies  (0-2) 1 EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators.
Total Main Feed Pump master speed control fails LOW.
Critical Tasks (2-3) 3 Manually actuate at least one train of safeguards equipment prior to exit EOP-1.0. Manually close the open PZR PORV block valve before exit EOP-1.0.
Malfunctions  8 (5-8)              MSLB downstream of the MSIVs with all MSIV failed open.
Control the EFW flow rate and terminate Safety Injection, in order to minimize the RCS cool down rate before a severe (orange-path) challenge develops to the integrity CSF.  
Automatic Safety Injection fails, manual required.
All EFW valves remain full open until manually reset.
Pressurizer PORV fails open after Reactor trip.
Malfunctions     Automatic Safety Injection fails, manual required.
after EOP      3 Pressurizer PORV fails open after Reactor trip.
entry (1-2)      All EFW flow control valves fail open, manual action required to control.
Loss of RB Instrument Air manual action required to restore.
Abnormal Safety Injection Accumulator Pressure LOW.
Events        4 (2-4)            S/G A Controlling level channel fails LOW.
Main Feed Pump master speed control fails LOW.
Major Transients     1 MSLB downstream of the MSIVs with all MSIV failed open.
(1-2)
EOPs Entered    EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam 1
(1-2)           Generators.
EOP EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Contingencies 1 (0-2)           Generators.
Manually actuate at least one train of safeguards equipment prior to exit EOP-1.0.
Critical Tasks  Manually close the open PZR PORV block valve before exit EOP-1.0.
3 (2-3)
Control the EFW flow rate and terminate Safety Injection, in order to minimize the RCS cool down rate before a severe (orange-path) challenge develops to the integrity CSF.
NRC 2016 Scenario 3                                                  NUREG -1021 R10


Appendix D Scenario Outline Form ES-D-1 NRC 2016 Scenario 3 NUREG -1021 R10 SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:
Appendix D                               Scenario Outline                           Form ES-D-1 SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:
IC Set 303 65% Power MOL Burnup = 10,010 MWD/MTU RCS Boron Concentration = 1067 ppm FCV-113 Pot Setting = 4.58 Rod Position: Group D = 179 Tavg = 576.9 Xe = - 2581 pcm Prior to the scenario, crew should pre-brief on conditions and expectations for the Shift (maintain power, repairs estimated to be complete well before LCO action time expires.)
IC Set 303 65% Power MOL Burnup = 10,010 MWD/MTU RCS Boron Concentration = 1067 ppm FCV-113 Pot Setting = 4.58 Rod Position: Group D = 179 Tavg = 576.9 Xe = - 2581 pcm Prior to the scenario, crew should pre-brief on conditions and expectations for the Shift (maintain power, repairs estimated to be complete well before LCO action time expires.)
PRE-EXERCISE:
PRE-EXERCISE:
Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.). VCS-TQP-0807 Attachment I-A, Unit 1 Booth Instructor Checklist, has been completed. Verify the Hard Card for Turbine Load changes is in its proper storage location. Verify the Hard Card for borating via MVT-8104 is in its proper storage location. Hang Red Tags for equipment out of service. Mark up procedures in use with "Circle and slash" as applicable:
Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.).
o GOP-4B, POWER OPERATION (MODE 1 - DESCENDING) A turnover sheet has been prepared for each position. Conduct two-minute drill.
VCS-TQP-0807 Attachment I-A, Unit 1 Booth Instructor Checklist, has been completed.
PRE-LOAD: STANDARD SIMULATOR SETUP:
Verify the Hard Card for Turbine Load changes is in its proper storage location.
PMP-LD003P, XPP0138 Leak Detection Sump Pmp Loss of Power VLV-FW028W, XVG01676-FW FW Hdr Recirc Isol Vlv Loss of Power VLV-FW029W, XVG01679-FW FW HTR Recirc Isol Vlv Loss of Power SCENARIO RELATED:  
Verify the Hard Card for borating via MVT-8104 is in its proper storage location.
Hang Red Tags for equipment out of service.
Mark up procedures in use with Circle and slash as applicable:
o   GOP-4B, POWER OPERATION (MODE 1 - DESCENDING)
A turnover sheet has been prepared for each position.
Conduct two-minute drill.
PRE-LOAD:
STANDARD SIMULATOR SETUP:
PMP-LD003P, XPP0138 Leak Detection Sump Pmp Loss of Power VLV-FW028W, XVG01676-FW FW Hdr Recirc Isol Vlv Loss of Power VLV-FW029W, XVG01679-FW FW HTR Recirc Isol Vlv Loss of Power SCENARIO RELATED:
ANN-CS044, ALT SEAL INJ PUMP TRBL                        FAIL TO: ON ANN-CS046, ALT SL INJ DSL GEN TRBL                        FAIL TO: ON MAL-CVC027, ALT SEAL INJ D/G FAIL TO START MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START NRC 2016 Scenario 3                                                    NUREG -1021 R10


ANN-CS044, ALT SEAL INJ PUMP TRBL    FAIL TO: ON  ANN-CS046, ALT SL INJ DSL GEN TRBL                      FAIL TO: ON  MAL-CVC027, ALT SEAL INJ D/G FAIL TO START  MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 1 Page: 11 of 44 Event
Appendix D                                       Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01           Scenario #   3     Event #   1           Page: 11     of   44 Event


== Description:==
== Description:==
Loss of RB Instrument Air manual action required to restore Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: On Evaluator cue the "A" Reactor Building Instrument Air Compressor Trips and the "B" Reactor Building Instrument Air Compressor Fails to start automatically or manually. Valve PVA-2659, Instrument Air to RB Air Serv, fails to open in AUTO but PVA-2659 can be opened using the Control Switch on the MCB. BOOTH OPERATOR:
Loss of RB Instrument Air manual action required to restore Time       Position                               Applicants Actions or Behavior EVALUATOR NOTE:
When directed - initiate Event 1 (TRIGGER 1). Indications Available:
On Evaluator cue the A Reactor Building Instrument Air Compressor Trips and the B Reactor Building Instrument Air Compressor Fails to start automatically or manually. Valve PVA-2659, Instrument Air to RB Air Serv, fails to open in AUTO but PVA-2659 can be opened using the Control Switch on the MCB.
XCP-606 2-4, RB AIR COMP A TRBL XCP-606 2-5, RB AIR HDR PRESS LO CRS Enters ARP-001- XCP-606 2-5 XCP-606 2-5 BOOTH OPERATOR
BOOTH OPERATOR:             When directed - initiate Event 1 (TRIGGER 1).
: If contacted as an operator to check the air compressors report "No obvious problem detected on "A" compressor" and if asked to check status on standby compressor report "The "B" compressor is properly aligned for auto start and is ready for start".
Indications Available:
RO AUTOMATIC ACTIONS: 1. PVA-2659, INST AIR TO RB AIR SERV, opens to provide backup Instrument Air. CORRECTIVE ACTIONS: 1. Verify Reactor Building Instrument Air header pressure on PI-8386, RB AIR HDR PRESS. 2. Determine if both Reactor Building Air Compressors are stopped.
XCP-606 2-4, RB AIR COMP A TRBL XCP-606 2-5, RB AIR HDR PRESS LO CRS         Enters ARP-001- XCP-606 2-5                                                   XCP-606 2-5 If contacted as an operator to check the air compressors report No obvious problem detected on A compressor and if asked to check BOOTH OPERATOR:
status on standby compressor report The B compressor is properly aligned for auto start and is ready for start.
RO         AUTOMATIC ACTIONS:                                                            XCP-606 2-5
: 1. PVA-2659, INST AIR TO RB AIR SERV, opens to provide backup Instrument Air.
CORRECTIVE ACTIONS:
: 1. Verify Reactor Building Instrument Air header pressure on PI-8386, RB AIR HDR PRESS.
: 2. Determine if both Reactor Building Air Compressors are stopped.
: 3. Attempt to start the standby air compressor manually.
: 3. Attempt to start the standby air compressor manually.
: 4. Determine Reactor Building Instrument Air filter differential pressure off the following: a. IPI08383A, RB INSTR AIR FILTER A INLET PRESS IND. b. IPI08383B, RB INSTR AIR FILTER A OUTLET PRESS IND.
: 4. Determine Reactor Building Instrument Air filter differential pressure off the following:
: a. IPI08383A, RB INSTR AIR FILTER A INLET PRESS IND.
: b. IPI08383B, RB INSTR AIR FILTER A OUTLET PRESS IND.
: c. IPI08393A, RB INSTR AIR FILTER B INLET PRESS IND.
: c. IPI08393A, RB INSTR AIR FILTER B INLET PRESS IND.
: d. IPI08393B, RB INSTR AIR FILTER B OUTLET PRESS IND. XCP-606 2-5 RO Recognizes that PVA-2659 has failed to open on LOW Pressure and manually opens PVA-2659. XCP-606 2-5EVALUATOR NOTE: The next event may be inserted after air is restored to the RB or at any time per the discretion of the Lead Evaluator.
: d. IPI08393B, RB INSTR AIR FILTER B OUTLET PRESS IND.
Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 2 Page: 12 of 44 Event
RO         Recognizes that PVA-2659 has failed to open on LOW Pressure and               XCP-606 2-5 manually opens PVA-2659.
EVALUATOR NOTE:
The next event may be inserted after air is restored to the RB or at any time per the discretion of the Lead Evaluator.
NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #   3     Event #   2         Page: 12     of 44 Event


== Description:==
== Description:==
Safety Injection Accumulator Level and Pressure LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: On cue from the Examiner Safety Injection Accumulator 'B' level and pressure will lower until pressure reaches 595 psig. The RO will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d.
Safety Injection Accumulator Level and Pressure LOW Time         Position                             Applicants Actions or Behavior EVALUATOR NOTE:
BOOTH OPERATOR:
On cue from the Examiner Safety Injection Accumulator B level and pressure will lower until pressure reaches 595 psig. The RO will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d.
When directed - initiate Event 2 (TRIGGER 2). Indications Available: XCP-611 2-3, ACCUM B PRESS HI/LO CRS Enters ARP-001- XCP-611 2-3 XCP-611 2-3 RO CORRECTIVE ACTIONS: 1. Verify Accumulator pressure on PI-925 and PI-927, PRESS PSIG.
BOOTH OPERATOR:             When directed - initiate Event 2 (TRIGGER 2).
Indications Available:
XCP-611 2-3, ACCUM B PRESS HI/LO CRS       Enters ARP-001- XCP-611 2-3                                                 XCP-611 2-3 RO         CORRECTIVE ACTIONS:                                                        XCP-611 2-3
: 1. Verify Accumulator pressure on PI-925 and PI-927, PRESS PSIG.
: 2. Refer to SOP-112 for raising or lowering Accumulator pressure.
: 2. Refer to SOP-112 for raising or lowering Accumulator pressure.
: 3. Verify proper Accumulator valve alignment per SOP-112. XCP-611 2-3BOOTH OPERATOR:
: 3. Verify proper Accumulator valve alignment per SOP-112.
Call CRS as Chemistry and report "A liquid sample valve was left open on the "B" Accumulator Tank but it is now closed".
BOOTH OPERATOR:             Call CRS as Chemistry and report A liquid sample valve was left open on the B Accumulator Tank but it is now closed.
CRS SUPPLEMENTAL ACTIONS: 1. Refer to Technical Specification 3.5.1 for operating limitations. XCP-611 2-3 CRS Enters T.S. 3.5.1, ACCUMULATORS. d. A nitrogen cover-pressure of between 600 and 656 psig.
CRS       SUPPLEMENTAL ACTIONS:                                                      XCP-611 2-3
ACTION:   a. With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours. T.S. 3.5.1 CAUTION 2.0 When raising an accumulator pressure, the other accumulator pressures should be monitored to verify that they are not changing.
: 1. Refer to Technical Specification 3.5.1 for operating limitations.
SOP-112  RO 2.1 Ensure HCV-936, ACCUM N2 VENT, is closed.
CRS       Enters T.S. 3.5.1, ACCUMULATORS.                                           T.S. 3.5.1
SOP-112 RO 2.2 Open PVT-8880, N2 SUPPLY.
: d. A nitrogen cover-pressure of between 600 and 656 psig.
SOP-112 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 2 Page: 13 of 44 Event
ACTION:
: a. With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 6 hours.
CAUTION 2.0                                               SOP-112 When raising an accumulator pressure, the other accumulator pressures should be monitored to verify that they are not changing.
RO         2.1 Ensure HCV-936, ACCUM N2 VENT, is closed.                               SOP-112 RO         2.2 Open PVT-8880, N2 SUPPLY.                                               SOP-112 NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                       Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #   3       Event #   2         Page: 13   of   44 Event


== Description:==
== Description:==
Safety Injection Accumulator Level and Pressure LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 NOTE 2.3 through 2.4 If RB temperature is expected to rise after pressurizing the accumulators, accumulator pressure should be maintained between 600 psig and 625 psig.
Safety Injection Accumulator Level and Pressure LOW Time       Position                             Applicants Actions or Behavior NOTE 2.3 through 2.4                                       SOP-112 If RB temperature is expected to rise after pressurizing the accumulators, accumulator pressure should be maintained between 600 psig and 625 psig.
SOP-112  RO 2.3 Open PVT-8875B, N2 TO B. (PEER ) SOP-112 RO 2.4 When the accumulator pressure is at the desired pressure, close PVT-8875B, N2 TO B.
RO         2.3 Open PVT-8875B, N2 TO B. (PEER )                                     SOP-112 RO         2.4 When the accumulator pressure is at the desired pressure, close       SOP-112 PVT-8875B, N2 TO B.
SOP-112  RO 2.5 Repeat Steps 2.3 through 2.4 as necessary until all accumulators are at desired pressure.
RO         2.5 Repeat Steps 2.3 through 2.4 as necessary until all accumulators     SOP-112 are at desired pressure.
SOP-112  RO 2.6 Place PVT-8880, N2 SUPPLY to CLOSE/AUTO.
RO         2.6 Place PVT-8880, N2 SUPPLY to CLOSE/AUTO.                             SOP-112 EVALUATOR NOTE:
SOP-112 EVALUATOR NOTE: The next event may be inserted after Tech Specs have been addressed and the "B" SI Accumulator pressure has been restored or at any time per the discretion of the Lead Evaluator.
The next event may be inserted after Tech Specs have been addressed and the "B" SI Accumulator pressure has been restored or at any time per the discretion of the Lead Evaluator.
Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 3 Page: 14 of 44 Event
NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3       Event #   3           Page: 14   of   44 Event


== Description:==
== Description:==
Lower Power from 65% to 55% per management discretion.
Lower Power from 65% to 55% per management discretion.
Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOOTH OPERATOR:
Time       Position                             Applicants Actions or Behavior BOOTH OPERATOR:           No triggers for this event BOOTH OPERATOR:           When directed by the lead examiner call the CRS as the Shift Manager and provide the following information, This is the Shift Manager; Plant Management has requested a power reduction to provide more margin for the operating Main Feedwater pumps. You are to reduce power to 55% in accordance with GOP-4B, GOP-4B POWER OPERATION (MODE 1 - DESCENDING).
No triggers for this event BOOTH OPERATOR: When directed by the lead examiner call the CRS as the Shift Manager and provide the following information, "This is the Shift Manager; Plant Management has requested a power reduction to provide more margin for the operating Main Feedwater pumps. You are to reduce power to 55% in accordance with GOP-4B, GOP-4B POWER OPERATION (MODE 1 - DESCENDING)".
Indications Available:
Indications Available:
XCP-620 1-5, PR UP DET FLUX HI DEV AUTO DEFEAT XCP-632 3-1, GEN H 2 TEMP GAS HI/LO CRS Direct operators to perform power reduction at 1% per min., in accordance with GOP-4B, POWER OPERATIONS (MODE 1 -
XCP-620 1-5, PR UP DET FLUX HI DEV AUTO DEFEAT XCP-632 3-1, GEN H2 TEMP GAS HI/LO CRS       Direct operators to perform power reduction at 1% per min., in             GOP-4B accordance with GOP-4B, POWER OPERATIONS (MODE 1 -
DESCENDING).
DESCENDING).
GOP-4B  BOP Reduces turbine load using turbine controls, in accordance with GOP-4B, POWER OPERATIONS (MODE 1 - DESCENDING).
BOP       Reduces turbine load using turbine controls, in accordance with GOP-4B,     GOP-4B POWER OPERATIONS (MODE 1 - DESCENDING).
GOP-4B EVALUATOR NOTE: Procedure guidance for use of the blender for boration is found on PAGES 37 - 40 of this document.
EVALUATOR NOTE:
RO Borate or dilute, in accordance with SOP-106, REACTOR MAKEUP WATER SYSTEM to maintain Delta I within limits and control rods above the insertion limits.
Procedure guidance for use of the blender for boration is found on PAGES 37 - 40 of this document.
GOP-4B EVALUATOR NOTE: Procedure guidance for use of the Main Turbine HMI for load reduction is found on PAGES 41 - 43 of this document.
RO       Borate or dilute, in accordance with SOP-106, REACTOR MAKEUP               GOP-4B WATER SYSTEM to maintain Delta I within limits and control rods above the insertion limits.
BOP Decrease turbine load using load set or load limit at rate provided by CRS (up to 1% per min per GOP-4B step 3.2.a).
EVALUATOR NOTE:
GOP-4B  RO Maintains T AVG within control band by control rod motion and boron concentration changes.
Procedure guidance for use of the Main Turbine HMI for load reduction is found on PAGES 41 - 43 of this document.
GOP-4B Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 3 Page: 15 of 44 Event
BOP       Decrease turbine load using load set or load limit at rate provided by CRS GOP-4B (up to 1% per min per GOP-4B step 3.2.a).
RO       Maintains TAVG within control band by control rod motion and boron         GOP-4B concentration changes.
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3       Event #   3           Page: 15   of     44 Event


== Description:==
== Description:==
Lower Power from 65% to 55% per management discretion.
Lower Power from 65% to 55% per management discretion.
Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: IF at any time RCS pressure lowers to less than 2206 PSIG in Mode 1, then T.S. 3.2.5, DNB PARAMETERS must be entered.
Time         Position                         Applicants Actions or Behavior EVALUATOR NOTE:
T.S. 3.2.5, DNB PARAMETERS With any of the above parameters exceeding its limit, re store the parameter to within its limit within 2 hours or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours.
IF at any time RCS pressure lowers to less than 2206 PSIG in Mode 1, then T.S. 3.2.5, DNB PARAMETERS must be entered.
EVALUATOR NOTE: The next event may be inserted after a significant pow er change is observed or at any time per the discretion of the Lead Evaluator.
T.S. 3.2.5, DNB PARAMETERS With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours.
Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 4 Page: 16 of 44 Event
EVALUATOR NOTE:
The next event may be inserted after a significant power change is observed or at any time per the discretion of the Lead Evaluator.
NRC 2016 Scenario 3                                                    NUREG -1021 R10
 
Appendix D                                   Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     4           Page: 16   of 44 Event


== Description:==
== Description:==
Main Feed Pump master speed control fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE:
Main Feed Pump master speed control fails LOW Time       Position                           Applicants Actions or Behavior EVALUATOR NOTE:
On cue from the Examiner the master MFW Spe ed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band.
On cue from the Examiner the master MFW Speed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band.
BOOTH OPERATOR:
BOOTH OPERATOR:           When directed - initiate Event 4 (TRIGGER 4).
When directed - initiate Event 4 (TRIGGER 4). Indications Available: XCP-624 1-5, SG A LVL DEV. XCP-624 2-5, SG B LVL DEV. XCP-624 3-5, SG C LVL DEV. XCP-627 1-3, CO PP DISCH PRESS HI/HI-HI.
Indications Available:
XCP-624 1-5, SG A LVL DEV.
XCP-624 2-5, SG B LVL DEV.
XCP-624 3-5, SG C LVL DEV.
XCP-627 1-3, CO PP DISCH PRESS HI/HI-HI.
Feed Water flow lowering to ALL Steam Generators.
Feed Water flow lowering to ALL Steam Generators.
Narrow range level lowering on ALL Steam Generators
Narrow range level lowering on ALL Steam Generators Feed pump speed lowering on ALL Main Feedwater pumps.
FW PP DISCH HDR PRESS PSIG PI-508 lowering.
CRS        Enters AOP-210.3, FEEDWATER PUMP MALFUNCTION.                            AOP-210.3 AOP-210.3 IOA          BOP        1 Verify at least one Feedwater Pump is running.                          AOP-210.3 IOA          BOP        2 Check if a Feedwater Pump trip has occurred.                            AOP-210.3 2 ALTERNATIVE ACTION GO TO Step 4.
NRC 2016 Scenario 3                                                      NUREG -1021 R10


Feed pump speed lowering on ALL Main Feedwater pumps. FW PP DISCH HDR PRESS PSIG PI-508 lowering.
Appendix D                                   Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3         Event #   4           Page:   17   of   44 Event
CRS  Enters AOP-210.3, FEEDWATER PUMP MALFUNCTION. AOP-210.3 AOP-210.3 IOA BOP 1  Verify at least one Feedwater Pump is running. AOP-210.3 IOA BOP 2  Check if a Feedwater Pump trip has occurred.
2  ALTERNATIVE ACTION GO TO Step 4. AOP-210.3 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 4 Page: 17 of 44 Event


== Description:==
== Description:==
Main Feed Pump master speed control fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 IOA BOP 4 Check Main Feedwater Pump operation. a. Verify all Main Feedwater Pumps are affected.
Main Feed Pump master speed control fails LOW Time         Position                         Applicants Actions or Behavior IOA           BOP       4 Check Main Feedwater Pump operation.                                         AOP-210.3
: a. Verify all Main Feedwater Pumps are affected.
: b. Check if Reactor Power is GREATER THAN 50%.
: b. Check if Reactor Power is GREATER THAN 50%.
: c. Place the MCB MASTER SPEED CNTRL in MAN and adjust to between 50% and 60% demand OR as needed to control Feedwater Flow. d. Verify all Main Feedwater Pump speeds are stable. AOP-210.3 CRITICAL TASK NOTE - Step 5 Due to the slow operation of the Main Feedwater Pump Recirculation Valves, a constant Main Feedwater Pump speed should be maintained until the recirculation valves have become relatively stable while adjusting Feedwater Flow. AOP-210.3  BOP 5 Check if Main Feedwater Flow matches Main Steam Flow for each Steam Generator.
CRITICAL
5 ALTERNATIVE ACTION Perform the following for the AFFECTED Steam Generator(s): a) Place the Main Feed Regulating valve in Manual. b) Match Feedwater Flow and Steam Flow.
: c. Place the MCB MASTER SPEED CNTRL in MAN and adjust to between 50% and 60% demand OR as needed to control TASK Feedwater Flow.
c) Place the Main Feed Regulating valve in Automatic. AOP-210.3
: d. Verify all Main Feedwater Pump speeds are stable.
* BOP 6 Maintain Narrow Range Steam Generator Water level between 60%
NOTE - Step 5                                                  AOP-210.3 Due to the slow operation of the Main Feedwater Pump Recirculation Valves, a constant Main Feedwater Pump speed should be maintained until the recirculation valves have become relatively stable while adjusting Feedwater Flow.
and 65% AOP-210.3 EVALUATOR NOTE: If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the major event (Trigger 6) should be directed. EVALUATOR NOTE: The next event may be inserted after The Feed Pump speed control is in manual and the BOP has control of SG levels with level less than 65% Narrow Range or at any time per the discretion of the Lead Evaluator.
BOP       5 Check if Main Feedwater Flow matches Main Steam Flow for each                 AOP-210.3 Steam Generator.
Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 18 of 44 Event
5 ALTERNATIVE ACTION Perform the following for the AFFECTED Steam Generator(s):
a) Place the Main Feed Regulating valve in Manual.
b) Match Feedwater Flow and Steam Flow.
c) Place the Main Feed Regulating valve in Automatic.
BOP       6 Maintain Narrow Range Steam Generator Water level between 60%                 AOP-210.3
* and 65%
EVALUATOR NOTE:
If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the major event (Trigger 6) should be directed.
EVALUATOR NOTE:
The next event may be inserted after The Feed Pump speed control is in manual and the BOP has control of SG levels with level less than 65% Narrow Range or at any time per the discretion of the Lead Evaluator.
NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                     Operator Actions                               Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #     3       Event #   5       Page:     18     of   44 Event


== Description:==
== Description:==
S/G "A" Controlling level channel fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: On cue from the Examiner Steam Generator "A" Narrow Range level transmitter, LT-476 fails LOW. This is the controlling SG level channel and the failure will cause feed flow to rise.
S/G A Controlling level channel fails LOW Time         Position                             Applicants Actions or Behavior EVALUATOR NOTE:
BOOTH OPERATOR:
On cue from the Examiner Steam Generator A Narrow Range level transmitter, LT-476 fails LOW.
When directed - initiate Event 5 (TRIGGER 5). Indications Available: XCP-624 1-2, SG A LVL LO-LO. XCP-624 1-5, SG A LVL DEV.
This is the controlling SG level channel and the failure will cause feed flow to rise.
LI-476, NR LEVEL % "A" Steam Generator level indicates zero.
BOOTH OPERATOR:                 When directed - initiate Event 5 (TRIGGER 5).
PVT 478 SG A FWF, "A" Steam Generator flow control at maximum demand. Both "A" Steam Generator feed flow channels, FI-477 and FI-476 greater than Steam flow.
Indications Available:
EVALUATOR NOTE: CRS may directly enter AOP-401.11, STEAM GENERATOR LEVEL CONTROL AND PROTECTION CHANNEL FAILURE.
XCP-624 1-2, SG A LVL LO-LO.
CRS Enters ARP-001- XCP-624 1-5 XCP-624 1-5 EVALUATOR NOTE: The failed level channel cannot be de-selected. The "A" SG feed reg valve will be in manual for the remainder of the scenario. CRITICAL TASK RO CORRECTIVE ACTIONS: 1. If required, restore Steam Generator A level to between 60% and 65% by performing either or both of the following: a. Manually control PVT-478, SG A FWF, as required. b. Manually control Feedwater Pump speed as follows: 1) Place the Feedwater Pump MASTER SPEED CNTRL in MAN.
XCP-624 1-5, SG A LVL DEV.
: 2) Adjust the differential pressure between Feedwater Pump discharge header pressure and Main Steam header pressure, as required, to restore Steam Generator water level. XCP-624 1-5 CRS 5. If an instrument channel failed, go to AOP-401.11, Steam Generator Level Control And Protection Channel Failure. XCP-624 1-5
LI-476, NR LEVEL % A Steam Generator level indicates zero.
PVT 478 SG A FWF, A Steam Generator flow control at maximum demand.
Both A Steam Generator feed flow channels, FI-477 and FI-476 greater than Steam flow.
EVALUATOR NOTE:
CRS may directly enter AOP-401.11, STEAM GENERATOR LEVEL CONTROL AND PROTECTION CHANNEL FAILURE.
CRS       Enters ARP-001- XCP-624 1-5                                                       XCP-624 1-5 EVALUATOR NOTE:
The failed level channel cannot be de-selected. The A SG feed reg valve will be in manual for the remainder of the scenario.
RO         CORRECTIVE ACTIONS:                                                              XCP-624 1-5
: 1. If required, restore Steam Generator A level to between 60% and 65% by performing either or both of the following:
CRITICAL
: a. Manually control PVT-478, SG A FWF, as required.
: b. Manually control Feedwater Pump speed as follows:
TASK                              1) Place the Feedwater Pump MASTER SPEED CNTRL in MAN.
: 2) Adjust the differential pressure between Feedwater Pump discharge header pressure and Main Steam header pressure, as required, to restore Steam Generator water level.
CRS           5. If an instrument channel failed, go to AOP-401.11, Steam Generator           XCP-624 1-5 Level Control And Protection Channel Failure.
NRC 2016 Scenario 3                                                          NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 19 of 44 Event
Appendix D                                       Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #     3     Event #   5         Page:   19   of 44 Event


== Description:==
== Description:==
S/G "A" Controlling level channel fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 AOP-401.11 IOA RO 1 Adjust the Feedwater Flow Control Valve as necessary to restore Narrow Range level in the AFFECTED SG to between 60% and 65%. AOP-401.11  CRS 2 Perform the following:
S/G A Controlling level channel fails LOW Time         Position                               Applicants Actions or Behavior AOP-401.11 IOA           RO         1 Adjust the Feedwater Flow Control Valve as necessary to restore             AOP-401.11 Narrow Range level in the AFFECTED SG to between 60% and 65%.
CRS         2 Perform the following:                                                     AOP-401.11
: a. Determine the failed instrument channel. _________________
: a. Determine the failed instrument channel. _________________
: b. Record the time of the channel failure. __________________ AOP-401.11 NOTE - Step 3 Compliance with T.S. requires tripping failed instrument channel bistables within 72 hours of the channel failure. Time should be allowed for troubleshooting of the failed channel prior to tripping the bistables. AOP-401.11
: b. Record the time of the channel failure. __________________
* CRS 3 Place the failed channel protection bistables in a tripped condition within 72 hours of the channel failure: a. Write an R&R for the failed channel.
NOTE - Step 3                                              AOP-401.11 Compliance with T.S. requires tripping failed instrument channel bistables within 72 hours of the channel failure. Time should be allowed for troubleshooting of the failed channel prior to tripping the bistables.
: b. Select the attachment for the failed channel from the back of this procedure. c. Record the R&R number on the attachment.
CRS         3 Place the failed channel protection bistables in a tripped condition       AOP-401.11
* within 72 hours of the channel failure:
: a. Write an R&R for the failed channel.
: b. Select the attachment for the failed channel from the back of this procedure.
: c. Record the R&R number on the attachment.
: d. Determine the cause of the channel failure.
: d. Determine the cause of the channel failure.
: e. Notify the I&C Department to place the identified bistables in trip using the attachment. f. For channels LT-474, LT-485, and LT-496, initiate a 30 day R&R for placing AMSAC in BYPASS. AOP-401.11 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 20 of 44 Event
: e. Notify the I&C Department to place the identified bistables in trip using the attachment.
: f. For channels LT-474, LT-485, and LT-496, initiate a 30 day R&R for placing AMSAC in BYPASS.
NRC 2016 Scenario 3                                                          NUREG -1021 R10
 
Appendix D                                       Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #     3     Event #   5         Page:   20   of 44 Event


== Description:==
== Description:==
S/G "A" Controlling level channel fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 AOP-401.11   CRS Enters T.S. 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION. Function 13; Steam Generator Water Level - Low-Low - action 6 T.S. 3.3.1  CRS  Enters T.S. 3.3.2, ENGINEERED SAFETY FEATURE ACTUATION SYSTEM INSTRUMENTATION. Function 5.a; Steam Generator Water Level - High-High - action 24 Function 6.c; Steam Generator Water Level - Low-Low - action 24 T.S. 3.3.T.S. 3.3.1 Action 6  With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. The inoperable channel is placed in the tripped condition within 72 hours; and b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.1.1. T.S. 3.3.1
S/G A Controlling level channel fails LOW Time       Position                               Applicants Actions or Behavior AOP-401.11 Attachment 3 CRS         Enters T.S. 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION.                       T.S. 3.3.1 Function 13; Steam Generator Water Level - Low-Low - action 6 CRS        Enters T.S. 3.3.2, ENGINEERED SAFETY FEATURE ACTUATION                        T.S. 3.3.2 SYSTEM INSTRUMENTATION.
Function 5.a; Steam Generator Water Level - High-High - action 24 Function 6.c; Steam Generator Water Level - Low-Low - action 24 T.S. 3.3.1 Action 6                                                          T.S. 3.3.1 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: a. The inoperable channel is placed in the tripped condition within 72 hours; and
: b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.1.1.
NRC 2016 Scenario 3                                                           NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 21 of 44 Event
Appendix D                                       Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #     3     Event #   5         Page:   21   of 44 Event


== Description:==
== Description:==
S/G "A" Controlling level channel fails LOW Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 T.S. 3.3.2 Action 24 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. The inoperable channel is placed in the tripped condition within 72 hours; and b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.2.1. T.S. 3.3.2 EVALUATOR NOTE: If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the next event (Trigger 6) should be directed. EVALUATOR NOTE: The next event may be inserted after Tech Specs have been addressed and the "A" SG level has been restored or at any time per the discretion of the Lead Evaluator.    
S/G A Controlling level channel fails LOW Time         Position                               Applicants Actions or Behavior T.S. 3.3.2 Action 24                                                         T.S. 3.3.2 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:
: a. The inoperable channel is placed in the tripped condition within 72 hours; and
: b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours for surveillance testing of other channels per Specification 4.3.2.1.
EVALUATOR NOTE:
If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the next event (Trigger 6) should be directed.
EVALUATOR NOTE:
The next event may be inserted after Tech Specs have been addressed and the "A" SG level has been restored or at any time per the discretion of the Lead Evaluator.
NRC 2016 Scenario 3                                                          NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 22 of 44 Event
Appendix D                                       Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #     3       Event #   6         Page:   22   of 44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: On cue from the Examiner a Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN will occur. The crew will need to address the failure of Automatic Safety Injection by inserting a manual SI and a stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, even after the Operator takes the control to manual, until the Operator resets the sealed in full flow interlock. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                             Applicants Actions or Behavior EVALUATOR NOTE:
BOOTH OPERATOR:
On cue from the Examiner a Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN will occur. The crew will need to address the failure of Automatic Safety Injection by inserting a manual SI and a stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, even after the Operator takes the control to manual, until the Operator resets the sealed in full flow interlock. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.
When directed initiate Event 6 (TRIGGER 6). Indications Available: Pressures on ALL SG lowering. Steam Flow on ALL SG rising. Safety Injection First out annunciator lit.
BOOTH OPERATOR:                 When directed initiate Event 6 (TRIGGER 6).
Indications Available:
Pressures on ALL SG lowering.
Steam Flow on ALL SG rising.
Safety Injection First out annunciator lit.
NO Safety Injection equipment running.
NO Safety Injection equipment running.
EOP-1.0 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 23 of 44 Event
EOP-1.0 NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                   Operator Actions                               Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #     3       Event #   6         Page:     23   of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 NOTE  Steps 1 through 5 are Immediate Operator Actions.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                             Applicants Actions or Behavior NOTE                                                    EOP-1.0 Steps 1 through 5 are Immediate Operator Actions.
EOP-1.0 IOA RO 1 Verify Reactor Trip:
IOA           RO       1 Verify Reactor Trip:                                                           EOP-1.0
* Trip the Reactor using either Reactor Trip Switch.
* Trip the Reactor using either Reactor Trip Switch.
* Verify all Reactor Trip and Bypass Breakers are open.
* Verify all Reactor Trip and Bypass Breakers are open.
* Verify all Rod Bottom Lights are lit.
* Verify all Rod Bottom Lights are lit.
* Verify Reactor Power level is decreasing.
* Verify Reactor Power level is decreasing.
EOP-1.0 IOA BOP 2 Verify Turbine/Generator Trip: a. Verify all Turbine STM STOP VLVs are closed.
IOA           BOP       2 Verify Turbine/Generator Trip:                                                  EOP-1.0
: b. Ensure Generator Trip (after 30 second delay): 1) Ensure the GEN BKR is open. 2) Ensure the GEN FIELD BKR is open. 3) Ensure the EXC FIELD CNTRL is tripped.
: a. Verify all Turbine STM STOP VLVs are closed.
EOP-1.0 IOA BOP 3 Verify both ESF buses are energized.
: b. Ensure Generator Trip (after 30 second delay):
EOP-1.0 EVALUATOR NOTE:
: 1) Ensure the GEN BKR is open.
: 2) Ensure the GEN FIELD BKR is open.
: 3) Ensure the EXC FIELD CNTRL is tripped.
IOA           BOP       3 Verify both ESF buses are energized.                                           EOP-1.0 EVALUATOR NOTE:
Safety injection will not auto actuate and it should have at this point. Only the Train A Safety Injection switch, the one nearest the BOP, will function to actuate SI.
Safety injection will not auto actuate and it should have at this point. Only the Train A Safety Injection switch, the one nearest the BOP, will function to actuate SI.
IOA   RO 4 Check if SI is actuated:
IOA           RO       4 Check if SI is actuated:                                                       EOP-1.0
: a. Check if either:
: a. Check if either:
* SI ACT status light is bright on XCP-6107 1-1.
* SI ACT status light is bright on XCP-6107 1-1.
OR
OR CRITICAL
* Any red first-out SI annunciator is lit on XCP-626 top row. b. Actuate SI using either SI ACTUATION Switch.
* Any red first-out SI annunciator is lit on XCP-626 top row.
: c. GO TO Step 6 EOP-1.0  CRITICAL TASK EVALUATOR NOTE:
: b. Actuate SI using either SI ACTUATION Switch.
Attachment 3, SI Equipment Verification, is attached (Page 34). BOP 6 Initiate ATTACHMENT 3, SI EQUIPMENT VERIFICATION.
TASK                      c. GO TO Step 6 EVALUATOR NOTE: , SI Equipment Verification, is attached (Page 34).
EOP-1.0 CREW 7 Announce plant conditions over the page system.
EOP-1.0 BOP       6 Initiate ATTACHMENT 3, SI EQUIPMENT VERIFICATION.
EOP-1.0 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 24 of 44 Event
EOP-1.0 CREW       7 Announce plant conditions over the page system.
NRC 2016 Scenario 3                                                            NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     6         Page:   24 of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                           Applicants Actions or Behavior RO       8  Verify RB pressure has remained LESS THAN 12 psig on PR-951,             EOP-1.0
* RO 8  Verify RB pressure has remained LESS THAN 12 psig on PR-951, RB PSIG (P-951), red pen.
* RB PSIG (P-951), red pen.
EOP-1.0 EVALUATOR NOTE:
EVALUATOR NOTE:                                                                                      EOP-1.0 The CRS may direct EFW flow to be reduced to 50 gpm per Steam Generator based on EOP-1.0 Reference Page item 5.
The CRS may direct EFW flow to be reduced to 50 gpm per Steam Generator based on EOP-1.0 Reference Page item 5.
* RO       9 Check RCS temperature:                                                   EOP-1.0 With any RCP running, RCS Tavg is stable at OR trending to 557&deg;F.
EOP-1.0
OR With no RCP running, RCS Tcold is stable at OR trending to 557&deg;F.
* RO 9 Check RCS temperature:
9 ALTERNATIVE ACTION IF RCS temperature is LESS THAN 557&deg;F AND decreasing, THEN stabilize temperature by performing the following as required:
With any RCP running, RCS Tavg is stable at OR trending to 557&deg;F. OR With no RCP running, RCS Tcold is stable at OR trending to 557&deg;F. 9 ALTERNATIVE ACTION IF RCS temperature is LESS THAN 557&deg;F AND decreasing, THEN stabilize temperature by performing the following as required:
a) Close IPV2231, MS/PEGGING STM TO DEAERATOR.
a) Close IPV2231, MS/PEGGING STM TO DEAERATOR. b) Perform one of the following: IF Narrow Range SG level is LESS THAN 26% [41%] in all SGs, THEN reduce EFW flow as necessary to stop cooldown, while maintaining total EFW flow GREATER THAN 450 gpm. OR WHEN Narrow Range SG level is GREATER THAN 26% [41%] in at least one SG, THEN control EFW flow as necessary to stabilize RCS temperature at 557&deg;F. c) Initiate ATTACHMENT 6, STEAM VALVE ISOLATION, while continuing with this procedure. d) IF RCS cooldown continues, THEN close: MS Isolation Valves, PVM2801A(B)(C). MS Isolation Bypass Valves, PVM2869A(B)(C).
b) Perform one of the following:
EOP-1.0 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 25 of 44 Event
IF Narrow Range SG level is LESS THAN 26% [41%] in all SGs, THEN reduce EFW flow as necessary to stop cooldown, while maintaining total EFW flow GREATER THAN 450 gpm.
OR WHEN Narrow Range SG level is GREATER THAN 26% [41%]
in at least one SG, THEN control EFW flow as necessary to stabilize RCS temperature at 557&deg;F.
c) Initiate ATTACHMENT 6, STEAM VALVE ISOLATION, while continuing with this procedure.
d) IF RCS cooldown continues, THEN close:
MS Isolation Valves, PVM2801A(B)(C).
MS Isolation Bypass Valves, PVM2869A(B)(C).
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #     3       Event #   6       Page:     25   of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 EVALUATOR NOTE: PZR PORV PCV-445B failed open at the time of the Reactor Trip. The operator must close its block valve.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                           Applicants Actions or Behavior EVALUATOR NOTE: PZR PORV PCV-445B failed open at the time of the Reactor Trip. The operator must close its block valve.
CRITICAL TASK RO 10 Check PZR PORVs and Spray Valves: a. PZR PORVs are closed.
RO       10 Check PZR PORVs and Spray Valves:                                            EOP-1.0
10 a ALTERNATIVE ACTION
: a. PZR PORVs are closed.
: a. IF PZR pressure is LESS THAN 2330 psig, THEN close the PZR PORVs. IF any PZR PORV can NOT be closed, THEN close its Block Valve. IF the Block Valve can NOT be closed, THEN GO TO EOP2.0, E1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.
10 a ALTERNATIVE ACTION CRITICAL                    a. IF PZR pressure is LESS THAN 2330 psig, THEN close the PZR PORVs.
EOP-1.0  RO b. PZR Spray Valves are closed. c. Verify power is available to at least one PZR PORV Block Valve: MVG8000A, RELIEF 445 A ISOL. MVG8000B, RELIEF 444 B ISOL. MVG8000C, RELIEF 445 B ISOL. d. Ensure one of the following Block Valves is open unless it was closed to isolate an open PZR PORV: MVG8000A, RELIEF 445 A ISOL. MVG8000B, RELIEF 444 B ISOL.
TASK                          IF any PZR PORV can NOT be closed, THEN close its Block Valve.
EOP-1.0 NOTE - Step 11 Seal Injection flow should be maintained to all RCPs.
IF the Block Valve can NOT be closed, THEN GO TO EOP2.0, E1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.
EOP-1.0  RO 11 Check if RCPs should be stopped: a. Check if either of the following criteria is met: Annunciator XCP612 42 is lit (PHASE B ISOL). OR RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM.
RO           b. PZR Spray Valves are closed.                                             EOP-1.0
: c. Verify power is available to at least one PZR PORV Block Valve:
MVG8000A, RELIEF 445 A ISOL.
MVG8000B, RELIEF 444 B ISOL.
MVG8000C, RELIEF 445 B ISOL.
: d. Ensure one of the following Block Valves is open unless it was closed to isolate an open PZR PORV:
MVG8000A, RELIEF 445 A ISOL.
MVG8000B, RELIEF 444 B ISOL.
NOTE - Step 11                                                  EOP-1.0 Seal Injection flow should be maintained to all RCPs.
RO       11 Check if RCPs should be stopped:                                            EOP-1.0
: a. Check if either of the following criteria is met:
Annunciator XCP612 42 is lit (PHASE B ISOL).
OR RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM.
: b. Stop all RCPs.
: b. Stop all RCPs.
EOP-1.0 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 26 of 44 Event
NRC 2016 Scenario 3                                                          NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #   6         Page:   26 of     44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 12 Verify no SG is FAULTED:   No SG pressure is decreasing in an uncontrolled manner. No SG is completely depressurized.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                         Applicants Actions or Behavior BOP       12 Verify no SG is FAULTED:                                                 EOP-1.0 No SG pressure is decreasing in an uncontrolled manner.
12 ALTERNATIVE ACTION GO TO EOP3.0, E2, FAULTED STEAM GENERATOR ISOLATION, Step 1.
No SG is completely depressurized.
EOP-1.0  CRS  Implements EOP3.0, E2, Faulted Steam Generator Isolation.
12 ALTERNATIVE ACTION GO TO EOP-3.0, E-2, FAULTED STEAM GENERATOR ISOLATION, Step 1.
CRS      Implements EOP-3.0, E-2, Faulted Steam Generator Isolation.
EVALUATOR NOTE:
EVALUATOR NOTE:
Upon exit from EOP-1.0 Critical Safety Function status trees are in effect. If EFW has been throttled to 50 gpm per Steam Generator at this point then a Red Path on Heat Sink will exist and crew will exit EOP-1.0 to EOP-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK, read the first caution and then proceed to EOP-3.0.
Upon exit from EOP-1.0 Critical Safety Function status trees are in effect. If EFW has been throttled to 50 gpm per Steam Generator at this point then a Red Path on Heat Sink will exist and crew will exit EOP-1.0 to EOP-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK, read the first caution and then proceed to EOP-3.0.
CAUTION   If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is available.
CAUTION                                                 EOP-15.0 If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is available.
EOP-15.0 CAUTION  At least one SG must be maintained available for RCS cooldown. Any FAULTED SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown, to prevent reinitiating the break.
CAUTION                                                  EOP-3.0 At least one SG must be maintained available for RCS cooldown.
EOP-3.0 BOOTH OPERATOR:
Any FAULTED SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown, to prevent reinitiating the break.
If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 13 of EOP-3.1. If called by the Control Room regarding the steam leak report: "There is a Steam Leak in the Turbine Building but I can't identify its exact location".
BOOTH OPERATOR:             If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 13 of EOP-3.1.
BOP 1 Ensure all the following are closed:   MS Isolation Valves, PVM-2801A(B)(C). MS Isolation Bypass Valves, PVM-2869A(B)(C).
If called by the Control Room regarding the steam leak report:
EOP-3.0 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 27 of 44 Event
There is a Steam Leak in the Turbine Building but I can't identify its exact location.
BOP       1 Ensure all the following are closed:                                     EOP-3.0 MS Isolation Valves, PVM-2801A(B)(C).
MS Isolation Bypass Valves, PVM-2869A(B)(C).
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                 Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3       Event #   6       Page:   27 of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 2 Check if any SG is NON-FAULTED: Pressure in any SG is stable OR increasing. Any SG is NOT completely depressurized.
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                         Applicants Actions or Behavior BOP       2 Check if any SG is NON-FAULTED:                                         EOP-3.0 Pressure in any SG is stable OR increasing.
2 ALTERNATIVE ACTION IF all SG pressures are decreasing in an uncontrolled manner OR completely depressurized, THEN GO TO EOP-3.1, ECA-2.1 UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, Step 1.
Any SG is NOT completely depressurized.
EOP-3.0  CRS  Implements EOP3.1, Uncontrolled Depressurization of All Steam Generators.
2 ALTERNATIVE ACTION IF all SG pressures are decreasing in an uncontrolled manner OR completely depressurized, THEN GO TO EOP-3.1, ECA-2.1 UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, Step 1.
EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 28 of 44 Event
Implements EOP-3.1, Uncontrolled Depressurization of All Steam CRS Generators.
EOP-3.1 NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #     3     Event #   6         Page:   28 of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 1 Isolate secondary pressure boundaries for all SGs: a. Close all of the following valves: MS Isolation, PVM2801A(B)(C). MS Isolation Bypass, PVM2869A(B)(C). FW Flow Control, FCV478(488)(498). FW Isolation, PVG1611A(B)(C). SG Blowdown, PVG503A(B)(C). FW Flow Control Bypass, FCV3321(3331)(3341).
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                           Applicants Actions or Behavior BOP       1 Isolate secondary pressure boundaries for all SGs:                       EOP-3.1
EOP-3.1 CAUTION - Step 1.b If the TD EFW Pump is the only available source of feed flow, the steam supply to the TD EFW Pump must be maintained from at least one SG, to maintain a secondary heat sink.
: a. Close all of the following valves:
EOP-3.1  BOP b. Complete isolation of all SGs: 1) Close all the following valves: SG Chemical Feed Isolation, MVK1633A(B)(C). MS Drain Isolation, PVT2843A(B)(C) PVT2877A(B).
MS Isolation, PVM2801A(B)(C).
EOP-3.1 BOOTH OPERATOR:
MS Isolation Bypass, PVM2869A(B)(C).
When contacted to locally isolate the MS supply valves to the TDEFP, wait 3 minutes and then activate the appropriate trigger: TRIGGER 14 to de-energize XVG-2802A (XMC-1DA2X 05EH). (IB) TRIGGER 15 to isolate XVG-2802A. (IB) TRIGGER 16 to de-energize XVG-2802B (XMC-1DB2Y 05EH). (AB) TRIGGER 17 to isolate XVG-2802B (IB)
FW Flow Control, FCV478(488)(498).
Once the breaker is open report "Breaker for XVG-2802A(B) is open" Once the valve is isolated report "XVG-2802A(B) is locally closed" BOP 2) Locally open the following breakers: XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG2802A-MS (IB-463). XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463). 3) Locally close the following valves (IB.436 East Pen): XVG02802A.MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV. XVG02802B.MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV. EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 29 of 44 Event
FW Isolation, PVG1611A(B)(C).
SG Blowdown, PVG503A(B)(C).
FW Flow Control Bypass, FCV3321(3331)(3341).
CAUTION - Step 1.b                                             EOP-3.1 If the TD EFW Pump is the only available source of feed flow, the steam supply to the TD EFW Pump must be maintained from at least one SG, to maintain a secondary heat sink.
BOP         b. Complete isolation of all SGs:                                        EOP-3.1
: 1) Close all the following valves:
SG Chemical Feed Isolation, MVK1633A(B)(C).
MS Drain Isolation, PVT2843A(B)(C) PVT2877A(B).
BOOTH OPERATOR:               When contacted to locally isolate the MS supply valves to the TDEFP, wait 3 minutes and then activate the appropriate trigger:
TRIGGER 14 to de-energize XVG-2802A (XMC-1DA2X 05EH). (IB)
TRIGGER 15 to isolate XVG-2802A. (IB)
TRIGGER 16 to de-energize XVG-2802B (XMC-1DB2Y 05EH). (AB)
TRIGGER 17 to isolate XVG-2802B (IB)
Once the breaker is open report Breaker for XVG-2802A(B) is open Once the valve is isolated report XVG-2802A(B) is locally closed BOP         2) Locally open the following breakers:                                   EOP-3.1 XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG2802A-MS (IB-463).
XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).
: 3) Locally close the following valves (IB.436 East Pen):
XVG02802A.MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV.
XVG02802B.MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV.
NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                   Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3       Event #   6         Page:     29   of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 4) Place all Steamline PWR RELIEF A(B)(C) SETPT Controllers in MAN and closed. 5) Place all Steamline Power Relief A(B)(C) Mode Switches in PWR RLF. EOP-3.1 CAUTION - Step 2 A minimum EFW flow of 50 gpm must be maintained to each SG that has a Narrow Range level LESS THAN 26% [41%], to minimize thermal shock to SG components.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                           Applicants Actions or Behavior BOP         4) Place all Steamline PWR RELIEF A(B)(C) SETPT Controllers in               EOP-3.1 MAN and closed.
EOP-3.1 NOTE - Step 2 Shutdown margin should be monitored during RCS cooldown.
: 5) Place all Steamline Power Relief A(B)(C) Mode Switches in PWR RLF.
EOP-3.1 EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250&deg;F. Performance of this step will ensure control of EFW flow.
CAUTION - Step 2                                                EOP-3.1 A minimum EFW flow of 50 gpm must be maintained to each SG that has a Narrow Range level LESS THAN 26% [41%], to minimize thermal shock to SG components.
CRITICAL TASK BOP 2 Ensure the RCS cooldown is minimized: a. Place MD EFP RESET to RESET. b. Place TD EFP RESET to RESET.
NOTE - Step 2                                                  EOP-3.1 Shutdown margin should be monitored during RCS cooldown.
: c. Verify the cooldown rate in the RCS Cold Legs is LESS THAN 100&deg;F/hr.
EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250&deg;F. Performance of this step will ensure control of EFW flow.
2 c ALTERNATIVE ACTION Decrease EFW flow to 50 gpm to each SG.
BOP       2 Ensure the RCS cooldown is minimized:                                        EOP-3.1
: a. Place MD EFP RESET to RESET.
: b. Place TD EFP RESET to RESET.
: c. Verify the cooldown rate in the RCS Cold Legs is LESS THAN CRITICAL                      100&deg;F/hr.
TASK 2 c ALTERNATIVE ACTION Decrease EFW flow to 50 gpm to each SG.
GO TO Step 2.e.
GO TO Step 2.e.
: e. Verify RCS Thot is stable OR decreasing.
: e. Verify RCS Thot is stable OR decreasing.
EOP-3.1 NOTE - Step 3 Seal Injection flow should be maintained to all RCPs.
NOTE - Step 3                                                  EOP-3.1 Seal Injection flow should be maintained to all RCPs.
EOP-3.1
RO       3 Check if RCPs should be stopped:                                              EOP-3.1
* RO 3 Check if RCPs should be stopped: a. Verify annunciator XCP612 42 is NOT lit (PHASE B ISOL). b. Check if RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM EOP-3.1 NOTE - Step 3.c RCPs should NOT be stopped if the RCS pressure decrease is due solely to the cooldown.
: a. Verify annunciator XCP612 42 is NOT lit (PHASE B ISOL).
EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 30 of 44 Event
: b. Check if RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM NOTE - Step 3.c                                                EOP-3.1 RCPs should NOT be stopped if the RCS pressure decrease is due solely to the cooldown.
NRC 2016 Scenario 3                                                          NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #   6         Page:   30 of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                           Applicants Actions or Behavior
: c. Stop all RCPs.
: c. Stop all RCPs.                                                       EOP-3.1
: c. ALTERNATIVE ACTION IF an uncontrolled cooldown is in progress, THEN REPEAT Step 3 when RCS temperature is stable or increasing. GO TO Step 4.
: c. ALTERNATIVE ACTION IF an uncontrolled cooldown is in progress, THEN REPEAT Step 3 when RCS temperature is stable or increasing.
EOP-3.1
GO TO Step 4.
* RO 4 Check PZR PORVs and Block Valves: a. Verify power is available to the PZR PORV Block Valves:
RO       4 Check PZR PORVs and Block Valves:                                        EOP-3.1
: a. Verify power is available to the PZR PORV Block Valves:
: 1) MVG8000A, RELIEF 445 A ISOL.
: 1) MVG8000A, RELIEF 445 A ISOL.
: 2) MVG8000B, RELIEF 444 B ISOL.
: 2) MVG8000B, RELIEF 444 B ISOL.
: 3) MVG8000C, RELIEF 445 B ISOL.
: 3) MVG8000C, RELIEF 445 B ISOL.
EOP-3.1 CAUTION - Step 4.b If any PZR PORV opens because of high PZR pressure, Step 4.b should be repeated after pressure decreases to LESS THAN 2330 psig, to ensure the PORV recloses.
CAUTION - Step 4.b                                           EOP-3.1 If any PZR PORV opens because of high PZR pressure, Step 4.b should be repeated after pressure decreases to LESS THAN 2330 psig, to ensure the PORV recloses.
EOP-3.1  RO b. Verify all PZR PORVs are closed. c. Verify at least one PZR PORV Block Valve is open.
RO         b. Verify all PZR PORVs are closed.                                     EOP-3.1
EOP-3.1 RO 5 Reset both SI RESET TRAIN A(B) Switches.
: c. Verify at least one PZR PORV Block Valve is open.
EOP-3.1  RO 6 Reset Containment Isolation: RESET PHASE A TRAIN A(B) CNTMT ISOL. RESET PHASE B TRAIN A(B) CNTMT ISOL.
RO                                                                                  EOP-3.1 5 Reset both SI RESET TRAIN A(B) Switches.
EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 31 of 44 Event
RO       6 Reset Containment Isolation:                                             EOP-3.1 RESET PHASE A TRAIN A(B) CNTMT ISOL.
RESET PHASE B TRAIN A(B) CNTMT ISOL.
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     6         Page:   31   of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 NOTE - Step 7 Any high radiation level received on a radiation monitor that was unisolated at event initiation, may be considered a valid alarm.
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                           Applicants Actions or Behavior NOTE - Step 7                                             EOP-3.1 Any high radiation level received on a radiation monitor that was unisolated at event initiation, may be considered a valid alarm.
EOP-3.1  BOP 7 Check if Secondary radiation levels are normal: a. Check radiation levels normal on all unisolated radiation monitors: RMG19A(B)(C), STMLN HI RNG GAMMA. RML3, STEAM GENERATOR BLOWDOWN LIQUID MONITOR. RML10, SG BLOWDOWN CW DISCHARGE LIQUID MONITOR. RMA9, CNDSR EXHAUST GAS ATMOS MONITOR.
BOP       7 Check if Secondary radiation levels are normal:                          EOP-3.1
: b. Place SVX9398A(B)(C), SG A(B)(C) SMPL ISOL, in AUTO. c. Notify Chemistry to sample all SG secondary sides, and screen samples for abnormal activity using a frisker.
: a. Check radiation levels normal on all unisolated radiation monitors:
EOP-3.1 CAUTION - Step 8 RCS pressure should be monitored. If RCS pressure decreases in an uncontrolled manner to LESS THAN 325 psig, the RHR Pumps must be manually restarted to supply water to the RCS.
RMG19A(B)(C), STMLN HI RNG GAMMA.
EOP-3.1
RML3, STEAM GENERATOR BLOWDOWN LIQUID MONITOR.
* RO 8 Check if RHR Pumps should be stopped: a. Check if any RHR Pump is running with suction aligned to the RWST. b. Check RCS pressure: 1 ) RCS pressure is GREATER THAN 325 psig. 2) RCS pressure is stable OR increasing. c. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.
RML10, SG BLOWDOWN CW DISCHARGE LIQUID MONITOR.
EOP-3.1 RO 9 Verify RWST level is GREATER THAN 18%.
RMA9, CNDSR EXHAUST GAS ATMOS MONITOR.
EOP-3.1  RO 10 Establish Instrument Air to the RB: a. Start one Instrument Air Compressor and place the other in Standby. b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates GREATER THAN 60 psig.
: b. Place SVX9398A(B)(C), SG A(B)(C) SMPL ISOL, in AUTO.
: c. Notify Chemistry to sample all SG secondary sides, and screen samples for abnormal activity using a frisker.
CAUTION - Step 8                                            EOP-3.1 RCS pressure should be monitored. If RCS pressure decreases in an uncontrolled manner to LESS THAN 325 psig, the RHR Pumps must be manually restarted to supply water to the RCS.
RO       8 Check if RHR Pumps should be stopped:                                    EOP-3.1
: a. Check if any RHR Pump is running with suction aligned to the RWST.
: b. Check RCS pressure:
1 ) RCS pressure is GREATER THAN 325 psig.
: 2) RCS pressure is stable OR increasing.
: c. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.
RO                                                                                  EOP-3.1 9 Verify RWST level is GREATER THAN 18%.
RO       10 Establish Instrument Air to the RB:                                    EOP-3.1
: a. Start one Instrument Air Compressor and place the other in Standby.
: b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates GREATER THAN 60 psig.
: c. Open PVA2659, INST AIR TO RB AIR SERV.
: c. Open PVA2659, INST AIR TO RB AIR SERV.
: d. Open PVT2660, AIR SPLY TO RB.
: d. Open PVT2660, AIR SPLY TO RB.
EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 32 of 44 Event
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3       Event #   6         Page:   32 of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOOTH OPERATOR:
MSLB downstream of the MSIVs with all MSIV failed open Time       Position                           Applicants Actions or Behavior BOOTH OPERATOR:             IF contacted to locally close the Accumulator Discharge Isolation Valve breakers, wait 1 minute and then activate the appropriate trigger:
IF contacted to locally close the Accumulator Discharge Isolation Valve breakers, wait 1 minute and then activate the appropriate trigger:
Trigger 20 - Accumulator A and C (in the IB)
Trigger 20 - Accumulator "A" and "C" (in the IB)
Trigger 21 - Accumulator B (in the AB)
Trigger 21 - Accumulator "B" (in the AB)
When breakers are closed report Accumulator A(B)(C) isolation valve(s) have power restored RO       11 Check if SI Accumulators should be isolated:                             EOP-3.1
When breakers are closed report "Accumulator A(B)(C) isolation valve(s) have power restored" RO 11 Check if SI Accumulators should be isolated:
: a. Verify RCS pressure is LESS THAN 195 psig.
: a. Verify RCS pressure is LESS THAN 195 psig. b. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves: XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE XVG8808ASI (IB463). XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE XVG8808CSI (IB463). XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL XVG8808BSI (AB463). c. Close all Accumulator Discharge Isolation Valves, MVG8808A(B)(C).
: b. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves:
EOP-3.1
XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE XVG8808ASI (IB463).
* RO 12 Check if SI flow should be reduced: a. Verify RCS subcooling on TI499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F]. b. Verify RCS pressure is stable OR increasing.
XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE XVG8808CSI (IB463).
EOP-3.1 NOTE - Step 12.c If PZR level is LESS THAN 10% [28%], the PZR shoul d refill from SI flow after pressure is stabilized.
XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL XVG8808BSI (AB463).
EOP-3.1
: c. Close all Accumulator Discharge Isolation Valves, MVG8808A(B)(C).
* RO c. Verify PZR level is GREATER THAN 10% [28%].
RO       12 Check if SI flow should be reduced:                                      EOP-3.1
EOP-3.1 EVALUATOR NOTE: Reference page item 2 instructs the crew to not leave EOP 3.1 until they have completed step 18; Verify SI flow is NOT required.
: a. Verify RCS subcooling on TI499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F].
BOOTH OPERATOR AFTER operators have completed step 13, stopping all but one Charging pump, activate TRIGGER 7 which will cause the SG Main Steam Isolation valves to close on a staggered basis. Once all valves are closed report "All Main Steam Isolation valves have been locally closed". RO 13 Stop all but one Charging Pump and place in Standby.
: b. Verify RCS pressure is stable OR increasing.
EOP-3.1 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 33 of 44 Event
NOTE - Step 12.c                                           EOP-3.1 If PZR level is LESS THAN 10% [28%], the PZR should refill from SI flow after pressure is stabilized.
RO                                                                                  EOP-3.1
* c. Verify PZR level is GREATER THAN 10% [28%].
EVALUATOR NOTE: Reference page item 2 instructs the crew to not leave EOP 3.1 until they have completed step 18; Verify SI flow is NOT required.
BOOTH OPERATOR           AFTER operators have completed step 13, stopping all but one Charging pump, activate TRIGGER 7 which will cause the SG Main Steam Isolation valves to close on a staggered basis. Once all valves are closed report All Main Steam Isolation valves have been locally closed.
RO                                                                                   EOP-3.1 13 Stop all but one Charging Pump and place in Standby.
NRC 2016 Scenario 3                                                      NUREG -1021 R10
 
Appendix D                                   Operator Actions                             Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3       Event #   6         Page:     33   of   44 Event


== Description:==
== Description:==
MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 RO 14 Verify RCS pressure is stable OR increasing.
MSLB downstream of the MSIVs with all MSIV failed open Time         Position                           Applicants Actions or Behavior RO                                                                                      EOP-3.1 14 Verify RCS pressure is stable OR increasing.
EOP-3.1 EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250&deg;F. Performance of this step will terminate Safety Injection flow. CRITICAL TASK    RO 15 Establish Normal Charging:
EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250&deg;F. Performance of this step will terminate Safety Injection flow.
15 Establish Normal Charging:                                                   EOP-3.1 CRITICAL
: a. Close FCV122, CHG FLOW.
: a. Close FCV122, CHG FLOW.
: b. Open both MVG8107 and MVG8108, CHG LINE ISOL. c. Adjust FCV122, CHG FLOW, to obtain 70 gpm Charging flow. d. Close both MVG8801A(B), HI HEAD TO COLD LEG INJ.
RO          b. Open both MVG8107 and MVG8108, CHG LINE ISOL.
EOP-3.1  RO 16 Control FCV122, CHG FLOW, to maintain PZR level between 22% [39%] and 76% [69%].
TASK                      c. Adjust FCV122, CHG FLOW, to obtain 70 gpm Charging flow.
EOP-3.1  RO 17 Check if RHR Pumps should be stopped: a. Check if any RHR Pump is running with suction aligned to the RWST. b. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.
: d. Close both MVG8801A(B), HI HEAD TO COLD LEG INJ.
EOP-3.1  RO 18 Verify SI flow is NOT required: a. RCS subcooling on TI499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F]. b. PZR level is GREATER THAN 10% [28%].
RO       16 Control FCV122, CHG FLOW, to maintain PZR level between 22%                 EOP-3.1
EOP-3.1 EVALUATOR NOTE: Following completion of step 18 the CRS would transition back to EOP-3.0 based on Reference Page item 2.
[39%] and 76% [69%].
The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed) or at the discretion of the Examiner.  
RO       17 Check if RHR Pumps should be stopped:                                        EOP-3.1
: a. Check if any RHR Pump is running with suction aligned to the RWST.
: b. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.
RO       18 Verify SI flow is NOT required:                                             EOP-3.1
: a. RCS subcooling on TI499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F].
: b. PZR level is GREATER THAN 10% [28%].
EVALUATOR NOTE: Following completion of step 18 the CRS would transition back to EOP-3.0 based on Reference Page item 2.
The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed) or at the discretion of the Examiner.
NRC 2016 Scenario 3                                                          NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 34 of 44 Event
Appendix D                                   Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #   NA       Page:   34 of   44 Event


== Description:==
== Description:==
EOP-1.0, Attachment 3.
EOP-1.0, Attachment 3.
Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 1 Ensure EFW Pumps are running:
Time       Position                           Applicants Actions or Behavior BOP         1   Ensure EFW Pumps are running:                                           EOP-1.0 Attachment 3
: a. Ensure both MD EFW Pumps are running.
: a. Ensure both MD EFW Pumps are running.
: b. Verify the TD EFW Pump is running if necessary to maintain SG levels. EOP-1.0 Attachment 3 BOP 2 Ensure the following EFW valves are open:
: b. Verify the TD EFW Pump is running if necessary to maintain SG levels.
FCV-3531(3541)(3551), MD EFP TO SG A(B)(C). FCV-3536(3546)(3556), TD EFP TO SG A(B)(C). MVG-2802A(B), MS LOOP B(C) TO TD EFP. BOP 3 Verify total EFW flow is GREATER THAN 450 gpm. BOP 4 Ensure FW Isolation:
BOP         2   Ensure the following EFW valves are open:                               Attachment 3 FCV-3531(3541)(3551), MD EFP TO SG A(B)(C).
FCV-3536(3546)(3556), TD EFP TO SG A(B)(C).
MVG-2802A(B), MS LOOP B(C) TO TD EFP.
BOP         3   Verify total EFW flow is GREATER THAN 450 gpm.                         Attachment 3 BOP         4   Ensure FW Isolation:                                                   Attachment 3
: a. Ensure the following are closed:
: a. Ensure the following are closed:
FW Flow Control, FCV-478(488)(498). FW Isolation, PVG-1611A(B)(C). FW Flow Control Bypass, FCV-3321(3331)(3341). SG Blowdown, PVG-503A(B)(C). SG Sample, SVX-9398A(B)(C).
FW Flow Control, FCV-478(488)(498).
FW Isolation, PVG-1611A(B)(C).
FW Flow Control Bypass, FCV-3321(3331)(3341).
SG Blowdown, PVG-503A(B)(C).
SG Sample, SVX-9398A(B)(C).
: b. Ensure all Main FW Pumps are tripped.
: b. Ensure all Main FW Pumps are tripped.
BOP 5 Ensure SI Pumps are running:
BOP         5   Ensure SI Pumps are running:                                           Attachment 3 Two Charging Pumps are running.
Two Charging Pumps are running.
Both RHR Pumps are running.
Both RHR Pumps are running.
BOP 6 Ensure two RBCU Fans are running in slow speed (one per train).
Attachment 3 BOP         6   Ensure two RBCU Fans are running in slow speed (one per train).
Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 35 of 44 Event
NRC 2016 Scenario 3                                                        NUREG -1021 R10
 
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01         Scenario #     3     Event #   NA       Page:   35 of   44 Event


== Description:==
== Description:==
EOP-1.0, Attachment 3.
EOP-1.0, Attachment 3.
Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 7 Verify Service Water to the RBCUs:
Time       Position                             Applicants Actions or Behavior BOP         7   Verify Service Water to the RBCUs:                                       Attachment 3
: a. Ensure two Service Water Pumps are running.
: a. Ensure two Service Water Pumps are running.
: b. Verify that Service Water Booster Pump A is stopped.
: b. Verify that Service Water Booster Pump A is stopped.
Line 1,271: Line 1,337:
: e. ALTERNATIVE ACTION GO TO Step 7.h.
: e. ALTERNATIVE ACTION GO TO Step 7.h.
: h. Verify GREATER THAN 2000 gpm flow for each train on:
: h. Verify GREATER THAN 2000 gpm flow for each train on:
FI-4466, SWBP A DISCH FLOW GPM. FI-4496, SWBP B DISCH FLOW GPM. BOP 8 Verify two CCW Pumps are running.
FI-4466, SWBP A DISCH FLOW GPM.
Attachment 3 BOP 9 Ensure two Chilled Water Pumps and Chillers are running.
FI-4496, SWBP B DISCH FLOW GPM.
Attachment 3 BOP 10 Verify both trains of Control Room Ventilation are running in Emergency Mode. Attachment 3 BOOTH OPERATOR If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 14 of EOP-3.1.
BOP         8   Verify two CCW Pumps are running.                                       Attachment 3 BOP         9   Ensure two Chilled Water Pumps and Chillers are running.                 Attachment 3 BOP         10 Verify both trains of Control Room Ventilation are running in             Attachment 3 Emergency Mode.
BOP 11 Check if Main Steamlines should be isolated:
BOOTH OPERATOR             If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 14 of EOP-3.1.
BOP         11 Check if Main Steamlines should be isolated:                               Attachment 3
: a. Check if any of the following conditions are met:
: a. Check if any of the following conditions are met:
RB pressure GREATER THAN 6.35 psig. OR Steamline pressure LESS THAN 675 psig. OR Steamline flow GREATER THAN 1.6 MPPH AND Tavg LESS THAN 552&deg;F.
RB pressure GREATER THAN 6.35 psig.
: b. Ensure all the following are closed:  
OR Steamline pressure LESS THAN 675 psig.
OR Steamline flow GREATER THAN 1.6 MPPH AND Tavg LESS THAN 552&deg;F.
: b. Ensure all the following are closed:
MS Isolation Valves, PVM-2801A(B)(C).
MS Isolation Bypass Valves, PVM-2869A(B)(C).
NRC 2016 Scenario 3                                                          NUREG -1021 R10


MS Isolation Valves, PVM-2801A(B)(C). MS Isolation Bypass Valves, PVM-2869A(B)(C). Attachment 3 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 36 of 44 Event
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #     3     Event #   NA       Page:   36 of   44 Event


== Description:==
== Description:==
EOP-1.0, Attachment 3.
EOP-1.0, Attachment 3.
Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 BOP 12 Ensure Excess Letdown Isolation Valves are closed:
Time       Position                             Applicants Actions or Behavior BOP         12 Ensure Excess Letdown Isolation Valves are closed:                       Attachment 3 PVT-8153, XS LTDN ISOL.
PVT-8153, XS LTDN ISOL. PVT-8154, XS LTDN ISOL. BOP 13 Verify ESF monitor lights indicate Phase A AND Containment Ventilation Isolation on XCP-6103, 6104, and 6106.
PVT-8154, XS LTDN ISOL.
BOP         13 Verify ESF monitor lights indicate Phase A AND Containment               Attachment 3 Ventilation Isolation on XCP-6103, 6104, and 6106.
REFER TO ATTACHMENT 4, CONTAINMENT ISOLATION VALVE MCB STATUS LIGHT LOCATIONS, as needed.
REFER TO ATTACHMENT 4, CONTAINMENT ISOLATION VALVE MCB STATUS LIGHT LOCATIONS, as needed.
BOP 14 Verify proper SI alignment:
BOP         14 Verify proper SI alignment:                                               Attachment 3
: a. Verify SI valve alignment by verifying SAFETY INJECTION/PHASE A ISOL monitor lights are bright on XCP-6104.
: a. Verify SI valve alignment by verifying SAFETY INJECTION/PHASE A ISOL monitor lights are bright on XCP-6104.
: b. Verify all SAFETY INJECTION monitor lights are dim on XCP-6106.
: b. Verify all SAFETY INJECTION monitor lights are dim on XCP-6106.
: c. Verify SI flow on FI-943, CHG LOOP B CLD/HOT LG FLOW GPM.
: c. Verify SI flow on FI-943, CHG LOOP B CLD/HOT LG FLOW GPM.
: d. Check if RCS pressure is LESS THAN 325 psig. BOP Report completion of Attachment 3. EVALUATOR NOTE:
: d. Check if RCS pressure is LESS THAN 325 psig.
ATTACHMENT 3 is complete.  
BOP         Report completion of Attachment 3.
EVALUATOR NOTE: ATTACHMENT 3 is complete.
NRC 2016 Scenario 3                                                        NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 37 of 44 Event
Appendix D                                   Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3       Event #   NA       Page:   37 of   44 Event


== Description:==
== Description:==
SOP-106, Section III, F, BORATE OPERATIONS Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-106, Section III, F, BORATE OPERATIONS Time       Position                           Applicants Actions or Behavior NRC 2016 Scenario 3                                                       NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 38 of 44 Event
Appendix D                                   Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3       Event #   NA       Page:   38 of   44 Event


== Description:==
== Description:==
SOP-106, Section III, F, BORATE OPERATIONS Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-106, Section III, F, BORATE OPERATIONS Time       Position                           Applicants Actions or Behavior NRC 2016 Scenario 3                                                       NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 39 of 44 Event
Appendix D                                   Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3       Event #   NA       Page:   39 of   44 Event


== Description:==
== Description:==
SOP-106, Section III, F, BORATE OPERATIONS Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-106, Section III, F, BORATE OPERATIONS Time       Position                           Applicants Actions or Behavior NRC 2016 Scenario 3                                                       NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 40 of 44 Event
Appendix D                                   Operator Actions                         Form ES-D-2 Op Test No:     NRC-ILO-14-01     Scenario #   3       Event #   NA       Page:   40 of   44 Event


== Description:==
== Description:==
SOP-106, Section III, F, BORATE OPERATIONS Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-106, Section III, F, BORATE OPERATIONS Time       Position                           Applicants Actions or Behavior NRC 2016 Scenario 3                                                       NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 41 of 44 Event
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     NA       Page:   41 of   44 Event


== Description:==
== Description:==
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time       Position                             Applicants Actions or Behavior NRC 2016 Scenario 3                                                         NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 42 of 44 Event
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     NA       Page:   42 of   44 Event


== Description:==
== Description:==
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time       Position                             Applicants Actions or Behavior NRC 2016 Scenario 3                                                         NUREG -1021 R10


Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 43 of 44 Event
Appendix D                                     Operator Actions                           Form ES-D-2 Op Test No:     NRC-ILO-14-01       Scenario #   3     Event #     NA       Page:   43 of   44 Event


== Description:==
== Description:==
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10
SOP-214, Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time       Position                             Applicants Actions or Behavior NRC 2016 Scenario 3                                                         NUREG -1021 R10


Appendix D Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page
Appendix D                                                                         Form ES-D-2 Op Test No:     NRC-ILO-14-01   Scenario # 3     Event #     NA         Page   44 of   44 Event
: 44 of 44 Event


== Description:==
== Description:==
NA Time Position Applicant's Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10 Procedure Revisions used in this Scenario Guide Number Title Rev Date GOP-4B POWER OPERATION (MODE 1 - DESCENDING) 1E 9/22/15 ARP-001-XCP-606 RBCU/RB AIR 6E 8/25/15 ARP-001-XCP-611 SI ACCUMULATORS 6B 2/25/13 SOP-112 SAFETY INJECTION SYSTEM 18H 2/23/16 SOP-214 MAIN TURBINE AND CONTROLS 21 11/30/15 SOP-106 REACTOR MAKEUP WATER SYSTEM 12 11/9/15 ARP-001-XCP-624 STEAM GENERATORS 7C 2/25/13 AOP-401.11 STEAM GENERATOR LEVEL CONTROL AND  PROTECTION CHANNEL FAILURE 1 8/7/15 AOP-210.3 FEEDWATER PUMP MALFUNCTION 3 8/7/15 EOP-1.0 E0, REACTOR TRIP OR SAFETY INJECTION 29 11/24/15 EOP-3.0 E-2, FAULTED STEAM GENERATOR ISOLATION 12 2/23/16 EOP-3.1 ECA-2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS 17 11/25/15 (NRC JPM-a) Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)
NA Time       Position                       Applicants Actions or Behavior Procedure Revisions used in this Scenario Guide Number                                 Title                             Rev       Date GOP-4B               POWER OPERATION (MODE 1 - DESCENDING)                   1E     9/22/15 ARP-001-XCP-606       RBCU/RB AIR                                             6E     8/25/15 ARP-001-XCP-611       SI ACCUMULATORS                                         6B     2/25/13 SOP-112               SAFETY INJECTION SYSTEM                                 18H     2/23/16 SOP-214               MAIN TURBINE AND CONTROLS                               21     11/30/15 SOP-106               REACTOR MAKEUP WATER SYSTEM                             12     11/9/15 ARP-001-XCP-624       STEAM GENERATORS                                         7C     2/25/13 STEAM GENERATOR LEVEL CONTROL AND AOP-401.11                                                                     1       8/7/15 PROTECTION CHANNEL FAILURE AOP-210.3             FEEDWATER PUMP MALFUNCTION                               3       8/7/15 EOP-1.0               E-0, REACTOR TRIP OR SAFETY INJECTION                   29     11/24/15 EOP-3.0               E-2, FAULTED STEAM GENERATOR ISOLATION                   12     2/23/16 ECA-2.1, UNCONTROLLED DEPRESSURIZATION EOP-3.1                                                                        17     11/25/15 OF ALL STEAM GENERATORS NRC 2016 Scenario 3                                                  NUREG -1021 R10
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-086-N165/11/2016Page 1 of 14 JPSF-086-N16 TASK:000-024-05-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
 
10TIME CRITICAL:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-086-N16 (NRC JPM-a) Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)
NoTASK STANDARD:Emergency boration > 30 gpm is established and the use of applicable Human Performance tools (3-way communications, self checking, peer checking, phonetic alphabet, etc.) meet expectations..PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)8PERFORM EMERGENCY BORATIONTOOLS:EOP-1.1, Reactor Trip Recovery marked through Step 6.AOP-106.1, Emergency Boration
CANDIDATE:
EXAMINER:
5/11/2016                              JPSF-086-N16                                 Page 1 of 14
 
TASK: 000-024-05-01      PERFORM EMERGENCY BORATION TASK STANDARD:
Emergency boration > 30 gpm is established and the use of applicable Human Performance tools (3-way communications, self checking, peer checking, phonetic alphabet, etc.) meet expectations..
TERMINATING CUE: Boration flow is verified to the RCS.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-1.1, Reactor Trip Recovery marked through Step 6.
AOP-106.1, Emergency Boration


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Boration flow is verified to the RCS.CANDIDATE:EOP-1.1REACTOR TRIP RECOVERYAOP-106.1EMERGENCY BORATIONINDEX NO.ROSROK/A NO.004000A418Emergency borate valve4.34.1A4.185/11/2016Page 2 of 14 JPSF-086-N16 INITIATING CUES:The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:A Reactor Trip has occurred from 100% power. EOP-1.0,  E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE. EOP-1.1 has been completed through step 6.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/11/2016Page 3 of 14 JPSF-086-N16 Step 7. Verify all control rods are fully inserted.Evaluator Cue:  Go to RUN when the Examinee is ready.Evaluator Note: Examinee will implement Alternative Action.
 
YesDetermines that two control rods are NOT fully inserted on the DRPI display. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
EOP-1.1      REACTOR TRIP RECOVERY AOP-106.1    EMERGENCY BORATION INDEX NO.       K/A NO.                                                                   RO    SRO 004000A418      A4.18    Emergency borate valve                                            4.3    4.1 EVALUATION TIME: 10                      TIME CRITICAL: No                    10CFR55: 45(a)8 TIME START:                      TIME FINISH:                      PERFORMANCE TIME:
1ALTERNATIVE ACTIONAA Step 7. IF two or more Control Rods are NOT fully inserted, THEN:AA Step 7 a) Open MVT-8104, EMERGENCY BORATE.
PERFORMANCE RATING:                SAT:          UNSAT:
YesPlaces MVT-8104 control switch to OPEN. Determines valve will NOT OPEN as indicated by Green light ON, Red light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CANDIDATE:
25/11/2016Page 4 of 14 JPSF-086-N16 AA Step 7 b) Verify GREATER THAN 30 gpm flow on FI-110, EMERG BORATE FLOW GPM.                       IF LESS THAN 30 gpm flow is indicated, THEN REFER TO AOP-106.1, EMERGENCY                        BORATION.Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.
EXAMINER:
YesObserves that > 30 gpm is NOT indicated on FI-110. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
SIGNATURE              DATE 5/11/2016                                      JPSF-086-N16                                        Page 2 of 14
3AA Step 5 c)  If two control rods are NOT fully inserted, then borate 2500 gallons.Examiner Note: *** Alternate Path begins here ***
 
YesExaminee determines 2500 gallon boration is required. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
45/11/2016Page 5 of 14 JPSF-086-N16 IOA Step 1. Emergency Borate through the Boric Acid Blender:                  a. Check if the plant is in Mode 1 OR Mode 2.ALTERNATIVE ACTIONAA Step 1 GO TO Step 2.Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
YesUses AOP-106.1, Emergency Boration.Determines the plant is in Mode 3 and transitions to Step 2. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
5IOA Step 2. Emergency Borate via the Emergency Borate ValveStep 2 a. Ensure at least one charging pump running.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
YesVerifies one Charging Pump running indicated by mormal amps on associated  meter and Green light OFF, Red light ON. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
SAFETY CONSIDERATIONS:
65/11/2016Page 6 of 14 JPSF-086-N16 Step 2 b. Open MVT-8104, EMERGENCY BORATE.ALTERNATIVE ACTIONAA Step 2. GO TO Step 3.Examinee may not perform since valve did not open earlier. Transitions to step 3.
INITIAL CONDITION:
YesDetermines MVG-8104 will NOT open indicated by Green light ON, Red light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
A Reactor Trip has occurred from 100% power.
7Step 3. Emergency Borate through the Boric Acid Blender:Step 3 a. Close MVT-8104, EMERGENCY BORATE.
EOP-1.0, E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE.
YesMVG-8104 is already closed indicated by Green light ON, Red light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
EOP-1.1 has been completed through step 6.
85/11/2016Page 7 of 14 JPSF-086-N16 Step 3 b. Align the Chemical And Volume Control System for boration:Step 3 b. 1) Ensure both LCV-115C(E) VCT OUTLET ISOL, are OPEN.
INITIATING CUES:
YesVerifies LCV-115C  and LCV-115E are open indicated by Green light OFF, Red light ON. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.
9Step 3 b. 2) Open FCV113B, MU TO CHG PP.
A surrogate operator will respond to non-related alarms per your direction.
YesPlaces FCV-113B in OPEN position indicated by Green light OFF, Red light ON. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
105/11/2016Page 8 of 14 JPSF-086-N16 Step 3 c. Close FCV-168B, MU WTR TO BLENDER YesVerifies FCV-168B, MU WTR TO BLENDER is closed as indicated by Green light ON, Red light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
5/11/2016                                              JPSF-086-N16                                        Page 3 of 14
11Step 3 d. Ensure XPP-13A(B), BA XFER PP A (B) is running.
 
YesVerifies BA XFER PP A or BA XFER PP B is running as indicated by Green light OFF, Red light ON for either pump. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                      SAT        UNSAT JPM STEP: 1 Step 7. Verify all control rods are fully inserted.
125/11/2016Page 9 of 14 JPSF-086-N16 Step 3 e. Open FCV-113A, BA to BLENDER YesPlaces FCV-113A in OPEN position as indicated by Green light OFF, Red light ON. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
STEP STANDARD:
13Step 3 f. Ensure at least one Charging Pump is operating.
Determines that two control rods are NOT fully inserted on the DRPI display.
YesVerifies one Charging Pump running as indicated by Green light OFF, red light ON, and normal amps on associated  meter. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CUES:
145/11/2016Page 10 of 14 JPSF-086-N16 Step 3 g. Verify GREATER THAN 30 gpm flow on FR113, BA TO BLNDR AND TOTAL MU.
Evaluator Cue: Go to RUN when the Examinee is ready.
YesVerifies >30 gpm on FI-113. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator Note: Examinee will implement Alternative Action.
15Step 3 h. GO TO Step 5. Observe the NOTE prior to Step 5.
COMMENTS:
YesTransitions to step 5. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                      SAT        UNSAT JPM STEP: 2 ALTERNATIVE ACTION AA Step 7. IF two or more Control Rods are NOT fully inserted, THEN:
165/11/2016Page 11 of 14 JPSF-086-N16 Examiner ends JPM at this point.NOTE - Step 5:  If PZR level is above program, FCV122, CHG FLOW, will throttle closed and inhibit Emergency Boration flow to the RCS.* Step 5. Verify FI122A, CHG FLOW GPM, indicates GREATER THAN 30 gpm.This JPM may be terminated when Emergency Boration flow is verified at greater than 30 gpm.
AA Step 7 a) Open MVT-8104, EMERGENCY BORATE.
YesVerifies FI122A indicates GREATER THAN 30 gpm. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STEP STANDARD:
175/11/2016Page 12 of 14 JPSF-086-N16 JPM:JPSF-086-N16(NRC JPM-a)  Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)IC SET: 251INSTRUCTIONS:Load the designated IC Set.Provide EOP-1.1, Reactor Trip Recovery marked through Step 6.When Examinee is ready: RUN.-----------------To recreate this IC Set::
Places MVT-8104 control switch to OPEN.
1.Load IC-102. Insert the following malfunctions:    MAL-CRF007K10      (Stuck Rod K-10 fail to "untrippable")    MAL-CRF007K4        (Stuck Rod K-04 fail to "untrippable")    VLV-CS046P              Severity: 0        (XVT-8104 failed closed)3. RUN4. Manually trip reactor5. Complete steps of EOP-1.0 and EOP-1.1 up to step 5.6. FREEZECOMMENTS: JPM SETUP SHEET5/11/2016Page 13 of 14 JPSF-086-N16 INITIATING CUES:The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:A Reactor Trip has occurred from 100% power. EOP-1.0,  E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE. EOP-1.1 has been completed through step 6.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
Determines valve will NOT OPEN as indicated by Green light ON, Red light OFF.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
CUES:
JPM BRIEFING SHEET5/11/2016Page 14 of 14 JPSF-086-N16 (NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)
COMMENTS:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-046-N166/13/2016Page 1 of 13 JPSF-046-N16 TASK:000-022-05-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
5/11/2016                                            JPSF-086-N16                    Page 4 of 14
5TIME CRITICAL:
 
NOTASK STANDARD:The "A" Charging Pump stopped after starting with the "B" Charging pump running. The CRS must be notified of the "A" Charging pump failure. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)8RESPOND TO LOSS OF REACTOR COOLANT MAKEUP (CHARGING)TOOLS:SOP-102 Section III F, SHIFTING OPERATING CHARGING PUMPS, marked through step 2.1.SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step 2.3 h.
CRITICAL: No                SEQUENCED: Yes                          SAT          UNSAT JPM STEP: 3 AA Step 7 b) Verify GREATER THAN 30 gpm flow on FI-110, EMERG BORATE FLOW GPM.
IF LESS THAN 30 gpm flow is indicated, THEN REFER TO AOP-106.1, EMERGENCY BORATION.
STEP STANDARD:
Observes that > 30 gpm is NOT indicated on FI-110.
CUES:
Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                          SAT          UNSAT JPM STEP: 4 AA Step 5 c) If two control rods are NOT fully inserted, then borate 2500 gallons.
STEP STANDARD:
Examinee determines 2500 gallon boration is required.
CUES:
Examiner Note: *** Alternate Path begins here ***
COMMENTS:
5/11/2016                                          JPSF-086-N16                                Page 5 of 14
 
CRITICAL: No                SEQUENCED: Yes                    SAT                UNSAT JPM STEP: 5 IOA Step 1. Emergency Borate through the Boric Acid Blender:
: a. Check if the plant is in Mode 1 OR Mode 2.
ALTERNATIVE ACTION AA Step 1 GO TO Step 2.
STEP STANDARD:
Uses AOP-106.1, Emergency Boration.
Determines the plant is in Mode 3 and transitions to Step 2.
CUES:
Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                    SAT                UNSAT JPM STEP: 6 IOA Step 2. Emergency Borate via the Emergency Borate Valve Step 2 a. Ensure at least one charging pump running.
STEP STANDARD:
Verifies one Charging Pump running indicated by mormal amps on associated meter and Green light OFF, Red light ON.
CUES:
COMMENTS:
5/11/2016                                          JPSF-086-N16                               Page 6 of 14
 
CRITICAL: No            SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 7 Step 2 b. Open MVT-8104, EMERGENCY BORATE.
ALTERNATIVE ACTION AA Step 2. GO TO Step 3.
STEP STANDARD:
Determines MVG-8104 will NOT open indicated by Green light ON, Red light OFF.
CUES:
Examinee may not perform since valve did not open earlier. Transitions to step 3.
COMMENTS:
CRITICAL: No             SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 8 Step 3. Emergency Borate through the Boric Acid Blender:
Step 3 a. Close MVT-8104, EMERGENCY BORATE.
STEP STANDARD:
MVG-8104 is already closed indicated by Green light ON, Red light OFF.
CUES:
COMMENTS:
5/11/2016                                      JPSF-086-N16                            Page 7 of 14
 
CRITICAL: No              SEQUENCED: Yes                         SAT          UNSAT JPM STEP: 9 Step 3 b. Align the Chemical And Volume Control System for boration:
Step 3 b. 1) Ensure both LCV-115C(E) VCT OUTLET ISOL, are OPEN.
STEP STANDARD:
Verifies LCV-115C and LCV-115E are open indicated by Green light OFF, Red light ON.
CUES:
COMMENTS:
CRITICAL: Yes            SEQUENCED: Yes                          SAT          UNSAT JPM STEP: 10 Step 3 b. 2) Open FCV113B, MU TO CHG PP.
STEP STANDARD:
Places FCV-113B in OPEN position indicated by Green light OFF, Red light ON.
CUES:
COMMENTS:
5/11/2016                                      JPSF-086-N16                          Page 8 of 14
 
CRITICAL: No             SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 11 Step 3 c. Close FCV-168B, MU WTR TO BLENDER STEP STANDARD:
Verifies FCV-168B, MU WTR TO BLENDER is closed as indicated by Green light ON, Red light OFF.
CUES:
COMMENTS:
CRITICAL: No            SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 12 Step 3 d. Ensure XPP-13A(B), BA XFER PP A (B) is running.
STEP STANDARD:
Verifies BA XFER PP A or BA XFER PP B is running as indicated by Green light OFF, Red light ON for either pump.
CUES:
COMMENTS:
5/11/2016                                    JPSF-086-N16                                       Page 9 of 14
 
CRITICAL: Yes              SEQUENCED: Yes                      SAT              UNSAT JPM STEP: 13 Step 3 e. Open FCV-113A, BA to BLENDER STEP STANDARD:
Places FCV-113A in OPEN position as indicated by Green light OFF, Red light ON.
CUES:
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                      SAT              UNSAT JPM STEP: 14 Step 3 f. Ensure at least one Charging Pump is operating.
STEP STANDARD:
Verifies one Charging Pump running as indicated by Green light OFF, red light ON, and normal amps on associated meter.
CUES:
COMMENTS:
5/11/2016                                        JPSF-086-N16                                  Page 10 of 14
 
CRITICAL: No              SEQUENCED: Yes                    SAT        UNSAT JPM STEP: 15 Step 3 g. Verify GREATER THAN 30 gpm flow on FR113, BA TO BLNDR AND TOTAL MU.
STEP STANDARD:
Verifies >30 gpm on FI-113.
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: Yes                    SAT        UNSAT JPM STEP: 16 Step 3 h. GO TO Step 5. Observe the NOTE prior to Step 5.
STEP STANDARD:
Transitions to step 5.
CUES:
COMMENTS:
5/11/2016                                    JPSF-086-N16                      Page 11 of 14
 
CRITICAL: No              SEQUENCED: Yes                      SAT              UNSAT JPM STEP: 17 NOTE - Step 5: If PZR level is above program, FCV122, CHG FLOW, will throttle closed and inhibit Emergency Boration flow to the RCS.
* Step 5. Verify FI122A, CHG FLOW GPM, indicates GREATER THAN 30 gpm.
STEP STANDARD:
Verifies FI122A indicates GREATER THAN 30 gpm.
CUES:
This JPM may be terminated when Emergency Boration flow is verified at greater than 30 gpm.
COMMENTS:
Examiner ends JPM at this point.
5/11/2016                                      JPSF-086-N16                                   Page 12 of 14
 
JPM SETUP SHEET JPM: JPSF-086-N16            (NRC JPM-a) Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)
IC SET: 251 INSTRUCTIONS:
Load the designated IC Set.
Provide EOP-1.1, Reactor Trip Recovery marked through Step 6.
When Examinee is ready: RUN.
To recreate this IC Set::
1.Load IC-10
: 2. Insert the following malfunctions:
MAL-CRF007K10          (Stuck Rod K-10 fail to "untrippable")
MAL-CRF007K4          (Stuck Rod K-04 fail to "untrippable")
VLV-CS046P            Severity: 0      (XVT-8104 failed closed)
: 3. RUN
: 4. Manually trip reactor
: 5. Complete steps of EOP-1.0 and EOP-1.1 up to step 5.
: 6. FREEZE COMMENTS:
5/11/2016                                          JPSF-086-N16                                  Page 13 of 14
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
A Reactor Trip has occurred from 100% power.
EOP-1.0, E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE.
EOP-1.1 has been completed through step 6.
INITIATING CUES:
The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/11/2016                                          JPSF-086-N16                        Page 14 of 14
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-046-N16 (NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)
CANDIDATE:
EXAMINER:
6/13/2016                          JPSF-046-N16                          Page 1 of 13
 
TASK: 000-022-05-01        RESPOND TO LOSS OF REACTOR COOLANT MAKEUP (CHARGING)
TASK STANDARD:
The "A" Charging Pump stopped after starting with the "B" Charging pump running. The CRS must be notified of the "A" Charging pump failure. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
TERMINATING CUE: "A" Charging pump secured. CRS informed.
PREFERRED EVALUATION LOCATION                        PREFERRED EVALUATION METHOD SIMULATOR                                              PERFORM TOOLS: SOP-102 Section III F, SHIFTING OPERATING CHARGING PUMPS, marked through step 2.1.
SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step 2.3 h.


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:"A" Charging pump secured. CRS informed.CANDIDATE:SOP-102CHEMICAL AND VOLUME CONTROL SYSTEMINDEX NO.ROSROK/A NO.004000A408Charging3.83.4A4.086/13/2016Page 2 of 13 JPSF-046-N16 INITIATING CUES:The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102, Section III.F. beginning at step 2.2.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant is operating at 100% power. Train A is being established as the active loop.
 
"C" Charging pump is Out of Service.Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover. Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102." Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!6/13/2016Page 3 of 13 JPSF-046-N16 Step 2.2 To start XPP-0043A, PUMP A, on miniflow, proceed as follows:     a. If XSW1DA 05, CHARGING INJ PUMP A XPP0043A-CS, is racked down, then initiate         Attachment VC.If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.
SOP-102      CHEMICAL AND VOLUME CONTROL SYSTEM INDEX NO.       K/A NO.                                                                           RO    SRO 004000A408      A4.08    Charging                                                                  3.8    3.4 EVALUATION TIME: 5                        TIME CRITICAL: NO                      10CFR55: 45(a)8 TIME START:                       TIME FINISH:                        PERFORMANCE TIME:
YesNo action is necessary as the A Charging Pump is already racked up. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
PERFORMANCE RATING:                SAT:            UNSAT:
1Step 2.2 b. Ensure XPP-43A-PP1, CHG PP A AUX OIL PP, is running.
CANDIDATE:
YesVerifies XPP-43A-PP1, CHG PP A AUX OIL PP, switch in AUTO with red light ON, green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
EXAMINER:
26/13/2016Page 4 of 13 JPSF-046-N16 Step 2.2 c. Ensure Train A Component Cooling is operating per SOP-118.
SIGNATURE              DATE 6/13/2016                                        JPSF-046-N16                                        Page 2 of 13
YesVerifies that "A" CCW pp is running via red light ON and ammeter indication. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
 
3Step 2.2 d. Ensure Train A Chill Water is operating per SOP-501.
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
YesVerifies that 'A' Train Chill Water is running via red light ON on 'A' Train Chiller and Chill Water PP. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
46/13/2016Page 5 of 13 JPSF-046-N16 Step 2.2 e. Verify IPI00151A, CHARGING PUMP A SUCTION PRESS IND (AB-388), indicates                     pump suction pressure is greater than one of the following:     1) 15 psig if the Charging Pump suction is aligned to the RWST. 2) 30 psig if the Charging Pump suction is aligned to the VCT with VCT level 20% or greater.When contacted report "A" charging pump suction pressure as read on IPI00151A is 52 psig. If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
YesContacts field operator for pump suction pressure indication. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
5Step 2.2 f. Ensure MINIFLOW ISOL, MVT-8109A, CHG PP A, is open.
SAFETY CONSIDERATIONS:
YesVerifies that MVT-8109A is open via red light ON, green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
INITIAL CONDITION:
66/13/2016Page 6 of 13 JPSF-046-N16 Step 2.2 g. Start XPP-0043A, PUMP A. (Peer Check)Should request a peer check.
The plant is operating at 100% power.
Yes"A" charging pump indicates red light ON, green light OFF, and normal running amps. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Train A is being established as the active loop.
7Step 2.2 h. Verify XPP-43A-PP1, CHG PP A AUX OIL PP, stops automatically when the Charging                   Pump comes up to full speed.
  "C" Charging pump is Out of Service.
YesVerifies green Off light is ON and red AUTO light is OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover.
86/13/2016Page 7 of 13 JPSF-046-N16 Step 2.2 i. Monitor the following to verify proper pump operation:   1) Charging Pump A running current is between 30 amps and 50 amps. 2) PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig.
Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102."
YesVerifies current between 30 and 50 amps.Verifies PI-121, CHG PRESS PSIG, is between 2650 and 2850 psig. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.
9Step 2.2 i. Monitor the following to verify proper pump operation: (cont.)   3) XVG-9684A-CC, CCW TO CHG PP A, is open.Examiner Note: The annunciator is delayed 20 seconds after the A Charging Pump is started. The Examinee should investigate the status of XVG-9684A-CC until XCP-614 2-6 alarms.Examiner Note: *** Alternate Path begins here ***
INITIATING CUES:
YesRecognizes that XVG-9684A, CCW TO CHG PP A is NOT open (Green light ON, Red light OFF).Reponds to annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPEN. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102, Section III.F. beginning at step 2.2.
106/13/2016Page 8 of 13 JPSF-046-N16 Annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPENCORRECTIVE ACTIONS:Step 1. Check XVG-9684A-CC, CC WTR TO CHG PP A, position indication.
A surrogate operator will respond to non-related alarms per your direction.
YesRecognizes that XVG-9684A, CCW TO CHG PP A is NOT open (green light ON, red light OFF). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
11CAUTION 2:  Any Charging Pump can continue to be operated on a loss of Component Cooling Water to its oil coolers within one of the following:1) 20 minutes without local temperature monitoring.                                            OR
6/13/2016                                              JPSF-046-N16                                       Page 3 of 13
: 2)  No time limit as long as any maximum temperature of Attachment 5, Charging Pump    Temperature Monitoring, of AOP-118.1, Loss of Component Cooling, is NOT exceeded    AND local Charging Pump temperature monitoring remains in place.Examiner Note: The ARP allows examinee up to 20 minutes to secure the charging pump unmonitored and unlimited time if temperatures are being constantly monitored. If the examinee requests local temperature monitoring:*. CUE Examinee that local temperature monitoring is NOT available.
 
YesNo immediate action is necessary. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 1 Step 2.2 To start XPP-0043A, PUMP A, on miniflow, proceed as follows:
126/13/2016Page 9 of 13 JPSF-046-N16 Step  2. If the pump is running without Component Cooling Water, perform the following:  a. Check electrical alignment of C Charging Pump. If aligned to A Train, start C      Charging Pump per SOP-102.Examiner Note: The "C" Charging Pump is unavailable as stated in the Initial Conditions.
: a. If XSW1DA 05, CHARGING INJ PUMP A XPP0043A-CS, is racked down, then initiate Attachment VC.
Yes CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STEP STANDARD:
13Step 2 a (cont.)IF NOT:
No action is necessary as the A Charging Pump is already racked up.
: 1) Ensure a Train B Component Cooling Pump is running.      2) Start a Train B Charging Pump per SOP-102. b. Stop Charging Pump A.Examiner Note: The "B" Chaging pump should still be running. If it was stopped it must be restarted IAW SOP-102.
CUES:
YesTakes "A" Charging pump switch to STOP position. Verifies the "A" Charging pump has stopped. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.
146/13/2016Page 10 of 13 JPSF-046-N16 Examiner ends JPM at this point.Inform the CRS of failure on "A" charging pump.Examiner Note: This JPM may be terminated after the "A" charging pump is stopped.
COMMENTS:
YesInforms the CRS of failure of CCW valve to "A" Charging pump (XVG-9684A) to open. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 2 Step 2.2 b. Ensure XPP-43A-PP1, CHG PP A AUX OIL PP, is running.
156/13/2016Page 11 of 13 JPSF-046-N16 JPM:JPSF-046-N16(NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)IC SET: 252INSTRUCTIONS:Load the designated IC Set.Put Hold Tag on the "C" Charging pump.Ensure the CCW placard is on the "B" CCW Pump.Ensure the Charging Pump placard is on the "A" Charging Pump.Provide a copy of SOP-118 Section III B marked to step h.Provide a copy of SOP-102 Section III F marked through step 2.1.When the examinee is ready:  RUN-----------------To recreate this IC Set:1. Load IC-10
STEP STANDARD:
: 2. Start the "B" Charging Pump.3. Stop the "A" Charging Pump.4. Insert the following    OVR-CC046A                  9684A - GREEN ON    OVR-CC046B                  9684A - RED OFF    Trigger #1: Condition: X04I055S == 1 (A Charging Pump Started)                            ANN-CC045          ON           delay=20s    Trigger #2: JN14F02==1 & X04I055T==1 ("A" Charging Pump Breaker is opened and the annunciator is lit)
Verifies XPP-43A-PP1, CHG PP A AUX OIL PP, switch in AUTO with red light ON, green light OFF.
ANN-CC045   ON       Delete (deletes the alarm after the A Charging pump is stopped)3. FREEZECOMMENTS:NOTE TO BOOTH OPERATOR: Provide a copy or mark up :     SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step h. SOP-102 Section III F marked through step 2.1.
CUES:
JPM SETUP SHEET6/13/2016Page 12 of 13 JPSF-046-N16 INITIATING CUES:The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102, Section III.F. beginning at step 2.2.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant is operating at 100% power.
COMMENTS:
Train A is being established as the active loop."C" Charging pump is Out of Service.Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover. Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102."
6/13/2016                                        JPSF-046-N16                                     Page 4 of 13
Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
 
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
CRITICAL: No                  SEQUENCED: Yes                            SAT              UNSAT JPM STEP: 3 Step 2.2 c. Ensure Train A Component Cooling is operating per SOP-118.
JPM BRIEFING SHEET6/13/2016Page 13 of 13 JPSF-046-N16 (NRC JPM-c) Isolate the SI Accumulators and depressurize the "B" SI Accumulator by venting due to a failed open discharge isolation valve. (Alternate Path)
STEP STANDARD:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-142A-N166/13/2016Page 1 of 9 JPSF-142A-N16 TASK:006-005-01-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
Verifies that "A" CCW pp is running via red light ON and ammeter indication.
15TIME CRITICAL:
CUES:
NOTASK STANDARD:"A" AND "B" Si accumulators are isolated and "B" SI accumulator has been vented.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:41(b)2Adjust Accumulator PressureTOOLS:EOP-2.1, ES1.2, POSTLOCA COOLDOWN AND DEPRESSURIZATION, marked up to step 19.
COMMENTS:
CRITICAL: No                 SEQUENCED: Yes                            SAT              UNSAT JPM STEP: 4 Step 2.2 d. Ensure Train A Chill Water is operating per SOP-501.
STEP STANDARD:
Verifies that 'A' Train Chill Water is running via red light ON on 'A' Train Chiller and Chill Water PP.
CUES:
COMMENTS:
6/13/2016                                            JPSF-046-N16                                       Page 5 of 13
 
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 5 Step 2.2 e. Verify IPI00151A, CHARGING PUMP A SUCTION PRESS IND (AB-388), indicates pump suction pressure is greater than one of the following:
: 1) 15 psig if the Charging Pump suction is aligned to the RWST.
: 2) 30 psig if the Charging Pump suction is aligned to the VCT with VCT level 20% or greater.
STEP STANDARD:
Contacts field operator for pump suction pressure indication.
CUES:
When contacted report "A" charging pump suction pressure as read on IPI00151A is 52 psig.
If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 6 Step 2.2 f. Ensure MINIFLOW ISOL, MVT-8109A, CHG PP A, is open.
STEP STANDARD:
Verifies that MVT-8109A is open via red light ON, green light OFF.
CUES:
COMMENTS:
6/13/2016                                          JPSF-046-N16                                 Page 6 of 13
 
CRITICAL: Yes                SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 7 Step 2.2 g. Start XPP-0043A, PUMP A. (Peer Check)
STEP STANDARD:
"A" charging pump indicates red light ON, green light OFF, and normal running amps.
CUES:
Should request a peer check.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                       SAT            UNSAT JPM STEP: 8 Step 2.2 h. Verify XPP-43A-PP1, CHG PP A AUX OIL PP, stops automatically when the Charging Pump comes up to full speed.
STEP STANDARD:
Verifies green Off light is ON and red AUTO light is OFF.
CUES:
COMMENTS:
6/13/2016                                          JPSF-046-N16                             Page 7 of 13
 
CRITICAL: No                SEQUENCED: Yes                          SAT      UNSAT JPM STEP: 9 Step 2.2 i. Monitor the following to verify proper pump operation:
: 1) Charging Pump A running current is between 30 amps and 50 amps.
: 2) PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig.
STEP STANDARD:
Verifies current between 30 and 50 amps.
Verifies PI-121, CHG PRESS PSIG, is between 2650 and 2850 psig.
CUES:
COMMENTS:
CRITICAL: No                 SEQUENCED: Yes                          SAT      UNSAT JPM STEP: 10 Step 2.2 i. Monitor the following to verify proper pump operation: (cont.)
: 3) XVG-9684A-CC, CCW TO CHG PP A, is open.
STEP STANDARD:
Recognizes that XVG-9684A, CCW TO CHG PP A is NOT open (Green light ON, Red light OFF).
Reponds to annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPEN.
CUES:
Examiner Note: The annunciator is delayed 20 seconds after the A Charging Pump is started. The Examinee should investigate the status of XVG-9684A-CC until XCP-614 2-6 alarms.
Examiner Note: *** Alternate Path begins here ***
COMMENTS:
6/13/2016                                            JPSF-046-N16                              Page 8 of 13
 
CRITICAL: No                SEQUENCED: Yes                        SAT          UNSAT JPM STEP: 11 Annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPEN CORRECTIVE ACTIONS:
Step 1. Check XVG-9684A-CC, CC WTR TO CHG PP A, position indication.
STEP STANDARD:
Recognizes that XVG-9684A, CCW TO CHG PP A is NOT open (green light ON, red light OFF).
CUES:
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                        SAT          UNSAT JPM STEP: 12 CAUTION 2: Any Charging Pump can continue to be operated on a loss of Component Cooling Water to its oil coolers within one of the following:
: 1) 20 minutes without local temperature monitoring.
OR
: 2) No time limit as long as any maximum temperature of Attachment 5, Charging Pump Temperature Monitoring, of AOP-118.1, Loss of Component Cooling, is NOT exceeded AND local Charging Pump temperature monitoring remains in place.
STEP STANDARD:
No immediate action is necessary.
CUES:
Examiner Note: The ARP allows examinee up to 20 minutes to secure the charging pump unmonitored and unlimited time if temperatures are being constantly monitored.
If the examinee requests local temperature monitoring:
*. CUE Examinee that local temperature monitoring is NOT available.
COMMENTS:
6/13/2016                                        JPSF-046-N16                                Page 9 of 13
 
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 13 Step 2. If the pump is running without Component Cooling Water, perform the following:
: a. Check electrical alignment of C Charging Pump. If aligned to A Train, start C Charging Pump per SOP-102.
STEP STANDARD:
CUES:
Examiner Note: The "C" Charging Pump is unavailable as stated in the Initial Conditions.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 14 Step 2 a (cont.)
IF NOT:
: 1) Ensure a Train B Component Cooling Pump is running.
: 2) Start a Train B Charging Pump per SOP-102.
: b. Stop Charging Pump A.
STEP STANDARD:
Takes "A" Charging pump switch to STOP position. Verifies the "A" Charging pump has stopped.
CUES:
Examiner Note: The "B" Chaging pump should still be running. If it was stopped it must be restarted IAW SOP-102.
COMMENTS:
6/13/2016                                        JPSF-046-N16                                     Page 10 of 13
 
CRITICAL: No              SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 15 Inform the CRS of failure on "A" charging pump.
STEP STANDARD:
Informs the CRS of failure of CCW valve to "A" Charging pump (XVG-9684A) to open.
CUES:
Examiner Note: This JPM may be terminated after the "A" charging pump is stopped.
COMMENTS:
Examiner ends JPM at this point.
6/13/2016                                        JPSF-046-N16                          Page 11 of 13
 
JPM SETUP SHEET JPM: JPSF-046-N16            (NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)
IC SET: 252 INSTRUCTIONS:
Load the designated IC Set.
Put Hold Tag on the "C" Charging pump.
Ensure the CCW placard is on the "B" CCW Pump.
Ensure the Charging Pump placard is on the "A" Charging Pump.
Provide a copy of SOP-118 Section III B marked to step h.
Provide a copy of SOP-102 Section III F marked through step 2.1.
When the examinee is ready: RUN To recreate this IC Set:
: 1. Load IC-10
: 2. Start the "B" Charging Pump.
: 3. Stop the "A" Charging Pump.
: 4. Insert the following OVR-CC046A                9684A - GREEN ON OVR-CC046B                9684A - RED OFF Trigger #1: Condition: X04I055S == 1 (A Charging Pump Started)
ANN-CC045          ON      delay=20s Trigger #2: JN14F02==1 & X04I055T==1 ("A" Charging Pump Breaker is opened and the annunciator is lit)
ANN-CC045       ON     Delete (deletes the alarm after the A Charging pump is stopped)
: 3. FREEZE COMMENTS:
NOTE TO BOOTH OPERATOR:
Provide a copy or mark up :
SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step h.
SOP-102 Section III F marked through step 2.1.
6/13/2016                                        JPSF-046-N16                                     Page 12 of 13
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
The plant is operating at 100% power.
Train A is being established as the active loop.
    "C" Charging pump is Out of Service.
Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover.
Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102."
Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.
INITIATING CUES:
The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102, Section III.F. beginning at step 2.2.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
6/13/2016                                            JPSF-046-N16                                  Page 13 of 13
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-142A-N16 (NRC JPM-c) Isolate the SI Accumulators and depressurize the B SI Accumulator by venting due to a failed open discharge isolation valve.
(Alternate Path)
CANDIDATE:
EXAMINER:
6/13/2016                            JPSF-142A-N16                               Page 1 of 9
 
TASK: 006-005-01-01      Adjust Accumulator Pressure TASK STANDARD:
"A" AND "B" Si accumulators are isolated and "B" SI accumulator has been vented.
TERMINATING CUE: Task is complete when any unisolated SI Accumulator is vented.
PREFERRED EVALUATION LOCATION                      PREFERRED EVALUATION METHOD SIMULATOR                                            PERFORM TOOLS: EOP-2.1, ES1.2, POSTLOCA COOLDOWN AND DEPRESSURIZATION, marked up to step 19.


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Task is complete when any unisolated SI Accumulator is vented.CANDIDATE:EOP-2.1POST-LOCA COOLDOWN AND DEPRESSURIZATIONINDEX NO.ROSROK/A NO.006000A402Valves4.03.8A4.026/13/2016Page 2 of 9 JPSF-142A-N16 INITIATING CUES:Continue in EOP-2.1 at step 19.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:* A Small Break LOCA is in progress.* The Reactor has tripped and safety injection has initiated.* The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to   EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.* RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!6/13/2016Page 3 of 9 JPSF-142A-N16 Step 19 Check if SI Accumulators should be isolated:       a. Verify RCS subcooling on TI-499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F]. b. Verify PZR level is GREATER THAN 10% [28%].NOTE: Examinee must use bracketed values if adverse containment values (Hi-1 RB pressure 3.6 psig or Hi Rad) are exceeded.
 
YesExaminee verifies RCS subcooling and PZR level. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
EOP-2.1      POST-LOCA COOLDOWN AND DEPRESSURIZATION INDEX NO.       K/A NO.                                                                     RO    SRO 006000A402      A4.02    Valves                                                              4.0    3.8 EVALUATION TIME: 15                      TIME CRITICAL: NO                  10CFR55: 41(b)2 TIME START:                      TIME FINISH:                    PERFORMANCE TIME:
16/13/2016Page 4 of 9 JPSF-142A-N16 Step 19 c. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves:
PERFORMANCE RATING:                SAT:            UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE          DATE 6/13/2016                                      JPSF-142A-N16                                   Page 2 of 9
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A Small Break LOCA is in progress.
* The Reactor has tripped and safety injection has initiated.
* The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.
* RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.
INITIATING CUES:
Continue in EOP-2.1 at step 19.
A surrogate operator will respond to non-related alarms per your direction.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
6/13/2016                                              JPSF-142A-N16                                         Page 3 of 9
 
CRITICAL: No              SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 1 Step 19 Check if SI Accumulators should be isolated:
: a. Verify RCS subcooling on TI-499A(B), A(B) TEMP &deg;F, is GREATER THAN 52.5&deg;F [67.5&deg;F].
: b. Verify PZR level is GREATER THAN 10% [28%].
STEP STANDARD:
Examinee verifies RCS subcooling and PZR level.
CUES:
NOTE: Examinee must use bracketed values if adverse containment values (Hi-1 RB pressure 3.6 psig or Hi Rad) are exceeded.
COMMENTS:
6/13/2016                                      JPSF-142A-N16                                   Page 4 of 9
 
CRITICAL: No              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 Step 19 c. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves:
* XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE, XVG8808A-SI (IB-463).
* XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE, XVG8808A-SI (IB-463).
* XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE, XVG8808C-SI (IB-463).
* XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE, XVG8808C-SI (IB-463).
* XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463).Booth Operator:  Insert the following actions to complete the local operator task:     LOA-RHR006, LOA-RHR007, LOA-RHR008 or EVENT 1 if available.Wait approximately 1 minute and report that the breakers are closed.
* XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463).
YesDispatches an local operator to unlock and close the following breakers:
STEP STANDARD:
Dispatches an local operator to unlock and close the following breakers:
* XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE, XVG8808A-SI (IB-463).
* XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE, XVG8808A-SI (IB-463).
* XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE, XVG8808C-SI (IB-463).
* XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE, XVG8808C-SI (IB-463).
* XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
* XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463).
26/13/2016Page 5 of 9 JPSF-142A-N16 Step 19 d. Close all Accumulator Discharge Isolation Valves, MVG-8808A(B)(C).Examiner Note: *** Alternate Path begins here ***
CUES:
YesOperator takes the control switches for MVG-8808A(B)(C) to the CLOSE position. Each valve travels closed as indicated by the red light OFF and the green light ON. Identifies the 8808B does not go closed and implements Alternative Action. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Booth Operator: Insert the following actions to complete the local operator task:
3ALTERNATIVE ACTIONStep 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the                   AFFECTED Accumulator:    1) Close PVT-8880, N2 SUPPLY.NOTE: PVT-8880 is already closed.
LOA-RHR006, LOA-RHR007, LOA-RHR008 or EVENT 1 if available.
YesOperator takes the control switch for PVT-8880, N2 SUPPLY, to the CLOSE postion and verifies red light OFFgreen light ON. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Wait approximately 1 minute and report that the breakers are closed.
46/13/2016Page 6 of 9 JPSF-142A-N16 Examiner ends JPM at this point.AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the                   AFFECTED Accumulator: (cont.)     2) Open PVT-8875A(B)(C), N2 TO A(B)(C).
COMMENTS:
YesExaminee takes the control switch for PVT-8875B, N2 TO B, to OPEN. Vefiries red Light ON and green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
6/13/2016                                        JPSF-142A-N16                                  Page 5 of 9
5AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the                       AFFECTED Accumulator: (cont.)     3) Open HCV-936, ACCUM N2 VENT.This JPM may be terminated when "B" SI Accumulator Pressure decreases.
 
YesOperator opens HCV-936, ACCUM N2 VENT by increasing the Hagen controller output to approximately 100%. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 3 Step 19 d. Close all Accumulator Discharge Isolation Valves, MVG-8808A(B)(C).
66/13/2016Page 7 of 9 JPSF-142A-N16 JPM:JPSF-142A-N16(NRC JPM-c) Isolate the SI Accumulators and depressurize the "B" SI Accumulator by venting due to a failed open discharge isolation valve. (Alternate Path)IC SET: 253INSTRUCTIONS:Load designated IC Set.Provide EOP-2.1 marked through step 18.When student is ready:   RUNUse LOA RHR 006, 007, 008 when a local operator is dispatched to unlock and close accumulator breakers.-----------------------To recreate this IC set:1. Load IC-102. Activate    MAL-RCS006C        REACTOR COOLANT SYSTEM LEAK COLD LEG (LOOP 3)          Final: 2000    VLV SI006P              XVG08808B SI ACCUM B DSCHG VLV;  Fail Position SET=100% (Pre-exercise)3. RUN4. Perform actions of EOP-1.0 and 2.05. To shift CCW to fast speed:     LOA-CCW050    SELECT=FAST SPEED  'A' CCW Pump Speed Switch to fast      or LOA-CCW052    SELECT=FAST SPEED  'C' CCW Pump Speed Switch to fast6. Complete EOP-2.1 to step 19.7. FREEZECOMMENTS: JPM SETUP SHEET6/13/2016Page 8 of 9 JPSF-142A-N16 INITIATING CUES:Continue in EOP-2.1 at step 19.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:*  A Small Break LOCA is in progress.
STEP STANDARD:
* The Reactor has tripped and safety injection has initiated.*  The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to   EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.*  RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
Operator takes the control switches for MVG-8808A(B)(C) to the CLOSE position.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
Each valve travels closed as indicated by the red light OFF and the green light ON.
JPM BRIEFING SHEET6/13/2016Page 9 of 9 JPSF-142A-N16 (NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.
Identifies the 8808B does not go closed and implements Alternative Action.
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPS-002A-N165/11/2016Page 1 of 12 JPS-002A-N16 TASK:000-137-05-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
CUES:
10TIME CRITICAL:
Examiner Note: *** Alternate Path begins here ***
NoTASK STANDARD:Safety Injection system has been aligned for Hot Leg Recirculation. Charging pumps have not been runout or deadheaded. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)7TRANSFER RHR FROM COLD LEG TO HOT LEG RECIRCULATIONTOOLS: EOP-
COMMENTS:
CRITICAL: No               SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 4 ALTERNATIVE ACTION Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator:
: 1) Close PVT-8880, N2 SUPPLY.
STEP STANDARD:
Operator takes the control switch for PVT-8880, N2 SUPPLY, to the CLOSE postion and verifies red light OFF, green light ON.
CUES:
NOTE: PVT-8880 is already closed.
COMMENTS:
6/13/2016                                        JPSF-142A-N16                                  Page 6 of 9
 
CRITICAL: Yes             SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 5 AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator: (cont.)
: 2) Open PVT-8875A(B)(C), N2 TO A(B)(C).
STEP STANDARD:
Examinee takes the control switch for PVT-8875B, N2 TO B, to OPEN. Vefiries red Light ON and green light OFF.
CUES:
COMMENTS:
CRITICAL: Yes             SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 6 AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator: (cont.)
: 3) Open HCV-936, ACCUM N2 VENT.
STEP STANDARD:
Operator opens HCV-936, ACCUM N2 VENT by increasing the Hagen controller output to approximately 100%.
CUES:
This JPM may be terminated when "B" SI Accumulator Pressure decreases.
COMMENTS:
Examiner ends JPM at this point.
6/13/2016                                      JPSF-142A-N16                                  Page 7 of 9
 
JPM SETUP SHEET JPM: JPSF-142A-N16          (NRC JPM-c) Isolate the SI Accumulators and depressurize the B SI Accumulator by venting due to a failed open discharge isolation valve. (Alternate Path)
IC SET: 253 INSTRUCTIONS:
Load designated IC Set.
Provide EOP-2.1 marked through step 18.
When student is ready: RUN Use LOA RHR 006, 007, 008 when a local operator is dispatched to unlock and close accumulator breakers.
To recreate this IC set:
: 1. Load IC-10
: 2. Activate MAL-RCS006C          REACTOR COOLANT SYSTEM LEAK COLD LEG (LOOP 3)                      Final: 2000 VLV SI006P            XVG08808B SI ACCUM B DSCHG VLV; Fail Position SET=100% (Pre-exercise)
: 3. RUN
: 4. Perform actions of EOP-1.0 and 2.0
: 5. To shift CCW to fast speed:
LOA-CCW050        SELECT=FAST SPEED 'A' CCW Pump Speed Switch to fast or LOA-CCW052        SELECT=FAST SPEED 'C' CCW Pump Speed Switch to fast
: 6. Complete EOP-2.1 to step 19.
: 7. FREEZE COMMENTS:
6/13/2016                                      JPSF-142A-N16                                          Page 8 of 9
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A Small Break LOCA is in progress.
* The Reactor has tripped and safety injection has initiated.
* The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.
* RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.
INITIATING CUES:
Continue in EOP-2.1 at step 19.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
6/13/2016                                        JPSF-142A-N16                      Page 9 of 9
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-002A-N16 (NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.
CANDIDATE:
EXAMINER:
5/11/2016                          JPS-002A-N16                          Page 1 of 12
 
TASK: 000-137-05-01        TRANSFER RHR FROM COLD LEG TO HOT LEG RECIRCULATION TASK STANDARD:
Safety Injection system has been aligned for Hot Leg Recirculation. Charging pumps have not been runout or deadheaded. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.
TERMINATING CUE: Both trains are aligned for Hot Leg Recirculation.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-
 
==2.3 REFERENCES==
EOP-2.0      LOSS OF REACTOR OR SECONDARY COOLANT EOP-2.3      TRANSFER TO HOT LEG RECIRCULATION INDEX NO.        K/A NO.                                                                RO    SRO 006000A402      A4.02    Valves                                                        4.0    3.8 006000K418      K4.18    Valves normally isolated from their control power              3.6    3.7 EVALUATION TIME: 10                        TIME CRITICAL: No                      10CFR55: 45(a)7 TIME START:                        TIME FINISH:                      PERFORMANCE TIME:
PERFORMANCE RATING:                SAT:              UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE            DATE 5/11/2016                                        JPS-002A-N16                                    Page 2 of 12
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A LOCA occurred approximately 8 hours ago.
* The plant is in Cold Leg Recirculation mode.
* CHG/SI Pump "C" is aligned to "B" train.
* The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOP-2.0.
INITIATING CUES:
The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance with EOP-2.3.
A surrogate operator will respond to non-related alarms per your direction.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/11/2016                                              JPS-002A-N16                                        Page 3 of 12
 
CRITICAL: Yes              SEQUENCED: Yes                              SAT              UNSAT JPM STEP: 1 1 Align Train A Charging Pumps for Hot Leg Recirculation:
: a. Stop the operating Charging Pump on Train A (PUMP A or C).
STEP STANDARD:
Places CHG/SI Pump "A" control switch to STOP and verifies CHG/SI Pump "A" indicates OFF (Green light ON, Red light OFF and 0 amps).
CUES:
Procedure Note: "Hot Leg Recirculation should be established at eight hours after a Loss of Reactor Coolant Accident."
The eight (8) hours is given in the initial conditions, but if the candidate requests this information from the CRS cue the candidate that 8 hours have elapsed.
Examiner Note: Running Charging Pump "A" when 8885 is closed is a failure due to running the pump deadheaded. Running the charging pump with both 8885 and 8884 open is a failure due to pump runout flow.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                              SAT              UNSAT JPM STEP: 2 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)
: b. Check if Charging Pump C is aligned to Train A by verifying XFER switch XET 2002C ON TRAIN A IS LIT.
STEP STANDARD:
XFER SWITCH XET 2002C on Train A is not lit, goes to ALTERNATIVE ACTION.
CUES:
COMMENTS:
5/11/2016                                            JPS-002A-N16                                          Page 4 of 12
 
CRITICAL: No                SEQUENCED: Yes                        SAT    UNSAT JPM STEP: 3 ALTERNATIVE ACTION
: b. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed.
GO TO Step 1.d.
STEP STANDARD:
Verifies MVG-8132A and MVG-8132B CHG PP C TO LP A DISCH are closed, verifying green light ON and red light is OFF for each valve.
CUES:
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                        SAT    UNSAT JPM STEP: 4 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)
: d. Close MVG-8885, CHG LP A ALT TO COLD LEGS.
STEP STANDARD:
MVG-8885, CHG LP A TO COLD LEGS, indicates CLOSE (Green light ON and red light is OFF).
CUES:
COMMENTS:
5/11/2016                                      JPS-002A-N16                                Page 5 of 12
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 5 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)
: e. Open MVG-8884, CHG LP A TO HOT LEGS.
STEP STANDARD:
MVG-8884, CHG LP A TO HOT LEGS, indicates OPEN (Green light OFF, Red light ON).
CUES:
Examiner Note: Candidate must energize power lockout to change the position of MVG-8884.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 6 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)
: f. Start the Charging Pump on Train A (PUMP A or C).
STEP STANDARD:
Places CHG/SI Pump "A" control switch to START and verifies CHG/SI PUMP "A" is running (Green light OFF, Red light ON and normal running amps).
CUES:
Booth Operator: If called to check out the "A" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.
COMMENTS:
5/11/2016                                        JPS-002A-N16                                        Page 6 of 12
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT        UNSAT JPM STEP: 7 2 Align Train B Charging Pumps for Hot Leg Recirculation:
: a. Stop the operating Charging Pump on Train B (PUMP B or C).
STEP STANDARD:
Places CHG/SI Pump "B" control switch to STOP and verifies CHG/SI Pump "B" indicates OFF (Green light ON, Red light OFF with 0 amps).
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: Yes                          SAT        UNSAT JPM STEP: 8 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)
: b. Check if Charging Pump C is aligned to Train B by verifying XFER SWITCH XET2002C ON TRAIN B is lit.
STEP STANDARD:
Verifies XFER SWITCH XET2000C ON TRAIN B is lit.
CUES:
COMMENTS:
5/11/2016                                        JPS-002A-N16                                Page 7 of 12
 
CRITICAL: No                SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 9 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)
: c. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed.
: d. Ensure MVG-8801A, HI HEAD TO COLD LEG INJ, is closed.
STEP STANDARD:
MVG-8132A and MVG-8132B, CHG PP C TO LP A DISCH, indicates CLOSED (Green light ON, Red light OFF).
MVG-8801A, HI HEAD TO COLD LEG INJ indicates CLOSED (Green light ON, Red light OFF).
CUES:
COMMENTS:
CRITICAL: Yes                SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 10 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)
: e. Close MVG-8801B, HI HEAD TO COLD LEG INJ.
STEP STANDARD:
Takes control switch for MVG-8801B, HI HEAD TO COLD LEG INJ, to the closed position, checks Green light ON and Red light OFF.
CUES:
Examiner Note: If 8801B is closed with "B" Charging Pump running, this dead heads the pump and constitutes failure of the JPM.
COMMENTS:
5/11/2016                                        JPS-002A-N16                                  Page 8 of 12
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 11 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)
: f. Open MVG-8886, CHG LP B TO HOT LEGS.
STEP STANDARD:
Places TRN B PWR LCKOUT to ON (Green light OFF, Red light ON).
Places control switch for MVG-8886, CHG LP B TO HOT LEGS, to OPEN (Green light OFF, Red light ON).
Places TRN B PWR LCKOUT to OFF (Green light ON, Red light OFF).
CUES:
Examiner Note: Candidate must energize power lockout to change the position of MVG-8886. Placing the TRN B PWR LCKOUT to OFF is not critical.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 12 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)
: g. Start the Charging Pump on Train B (PUMP B or C).
STEP STANDARD:
Places CHG/SI Pump "B" control switch to START and verifies CHG/SI Pump "B" indicates ON (Green light OFF, Red light ON with normal running amps).
CUES:
Booth Operator: If called to check out the "B" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.
This JPM may be terminated after both charging are running and aligned for Hot Leg Recirculation.
COMMENTS:
5/11/2016                                        JPS-002A-N16                                        Page 9 of 12
 
Examiner ends JPM at this point.
5/11/2016                        JPS-002A-N16 Page 10 of 12
 
JPM SETUP SHEET JPM: JPS-002A-N16            (NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.
IC SET: 254 INSTRUCTIONS:
Load the designated IC set.
When examinee is ready: RUN To recreate this IC Set:
: 1. RUN
: 2. Activate:
MAL-RCS005A            RCS Loop 'A' DBA LOCA
: 3. Perform actions of EOP-1.0 and 2.0
: 4. Ensure RHR Sump Level >415', then activate LOA-AUX115 SEVERITY=0.17 (17% in RWST)
: 5. Transfer Cold Leg Injection to Cold Leg Recirculation IAW EOP-2.2.
: 6. To shift CCW to fast speed during EOP-2.2:
LOA-CCW050          SELECT=FAST SPEED 'A' CCW Pump Speed Switch to fast or LOA-CCW052          SELECT=FAST SPEED 'C' CCW Pump Speed Switch to fast
: 7. Swap C Charging pump to B Train:
LOA CVC045 Charging pump C disconnect switch SELECT= TRAIN B.
: 8. FREEZE COMMENTS:
Charging Pumps must be stopped before opening Hot Leg High Head Valves (8884/8886) to prevent pump runout.
5/11/2016                                        JPS-002A-N16                              Page 11 of 12
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A LOCA occurred approximately 8 hours ago.
* The plant is in Cold Leg Recirculation mode.
* CHG/SI Pump "C" is aligned to "B" train.
* The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOP-2.0.
INITIATING CUES:
The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance with EOP-2.3.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/11/2016                                          JPS-002A-N16                                    Page 12 of 12
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-149B-N16 (NRC JPM-e) Respond to Steam Generator Overpressure (Alternate Path)
CANDIDATE:
EXAMINER:
5/11/2016                          JPSF-149B-N16                              Page 1 of 11
 
TASK: 311-006-06-01          RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:
All feedwater flow to the "A" SG has been terminated and the "A" SG pressure is below 1230 psig.
TERMINATING CUE: The "B" SG pressure has been reduced below 1230 psig in accordance with EOP-15.1.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-
 
==15.1 REFERENCES==
EVALUATION TIME: 10                        TIME CRITICAL: NO                    10CFR55: 55.45.b.6 TIME START:                        TIME FINISH:                    PERFORMANCE TIME:
PERFORMANCE RATING:                  SAT:          UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE            DATE 5/11/2016                                        JPSF-149B-N16                                  Page 2 of 11


==2.3REFERENCES==
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
:TERMINATING CUE:Both trains are aligned for Hot Leg Recirculation.CANDIDATE:EOP-2.0LOSS OF REACTOR OR SECONDARY COOLANTEOP-2.3TRANSFER TO HOT LEG RECIRCULATIONINDEX NO.ROSROK/A NO.006000A402Valves4.03.8A4.02006000K418Valves normally isolated from their control power3.63.7K4.185/11/2016Page 2 of 12 JPS-002A-N16 INITIATING CUES:The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance withEOP-2.3.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:*  A LOCA occurred approximately 8 hours ago.*  The plant is in Cold Leg Recirculation mode.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
* CHG/SI Pump "C" is aligned to "B" train.*  The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOP-2.0.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/11/2016Page 3 of 12 JPS-002A-N16 1 Align Train A Charging Pumps for Hot Leg Recirculation:   a. Stop the operating Charging Pump on Train A (PUMP A or C).Procedure Note: "Hot Leg Recirculation should be established at eight hours after a Loss of Reactor Coolant Accident."  The eight (8) hours is given in the initial conditions, but if the candidate requests this information from the CRS cue the candidate that 8 hours have elapsed.Examiner Note: Running Charging Pump "A" when 8885 is closed is a failure due to running the pump deadheaded. Running the charging pump with both 8885 and 8884 open is a failure due to pump runout flow.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
YesPlaces CHG/SI Pump "A" control switch to STOP and verifies CHG/SI Pump "A" indicates OFF (Green light ON, Red light OFF and 0 amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
11 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)    b. Check if Charging Pump C is aligned to Train A by verifying XFER switch XET 2002C ON        TRAIN A IS LIT.
SAFETY CONSIDERATIONS:                     NONE INITIAL CONDITION:
YesXFER SWITCH XET 2002C on Train A is not lit, goes to ALTERNATIVE ACTION. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
The plant has tripped due to a turbine trip from 100% power.
25/11/2016Page 4 of 12 JPS-002A-N16 ALTERNATIVE ACTION    b. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed. GO TO Step 1.d.
The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.
YesVerifies MVG-8132A and MVG-8132B CHG PP C TO LP A DISCH are closed, verifying green light ON and red light is OFF for each valve. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
INITIATING CUES:
31 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)    d. Close MVG-8885, CHG LP A ALT TO COLD LEGS.
The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat Sink.
YesMVG-8885, CHG LP A TO COLD LEGS, indicates CLOSE (Green light ON and red light is OFF). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
A surrogate operator will respond to non-related alarms per your direction.
45/11/2016Page 5 of 12 JPS-002A-N16 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)    e. Open MVG-8884, CHG LP A TO HOT LEGS.Examiner Note: Candidate must energize power lockout to change the position of MVG-8884.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
YesMVG-8884, CHG LP A TO HOT LEGS, indicates OPEN (Green light OFF, Red light ON). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
5/11/2016                                              JPSF-149B-N16                                        Page 3 of 11
51 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)    f. Start the Charging Pump on Train A (PUMP A or C).Booth Operator:  If called to check out the "A" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.
YesPlaces CHG/SI Pump "A" control switch to START and verifies CHG/SI PUMP "A" is running (Green light OFF, Red light ON and normal running amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
65/11/2016Page 6 of 12 JPS-002A-N16 2 Align Train B Charging Pumps for Hot Leg Recirculation:    a. Stop the operating Charging Pump on Train B (PUMP B or C).
YesPlaces CHG/SI Pump "B" control switch to STOP and verifies CHG/SI Pump "B" indicates OFF (Green light ON, Red light OFF with 0 amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
72 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)    b. Check if Charging Pump C is aligned to Train B by verifying XFER SWITCH XET2002C ON TRAIN B        is lit.
YesVerifies XFER SWITCH XET2000C ON TRAIN B is lit. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
85/11/2016Page 7 of 12 JPS-002A-N16 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)    c. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed. d. Ensure MVG-8801A, HI HEAD TO COLD LEG INJ, is closed.
YesMVG-8132A and MVG-8132B, CHG PP C TO LP A DISCH, indicates CLOSED (Green light ON, Red light OFF).MVG-8801A, HI HEAD TO COLD LEG INJ indicates CLOSED (Green light ON, Red light OFF). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
92 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)    e. Close MVG-8801B, HI HEAD TO COLD LEG INJ.Examiner Note: If 8801B is closed with "B" Charging Pump running, this dead heads the pump and constitutes failure of the JPM.
YesTakes control switch for MVG-8801B, HI HEAD TO COLD LEG INJ, to the closed position, checks Green light ON and Red light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
105/11/2016Page 8 of 12 JPS-002A-N16 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)    f. Open MVG-8886, CHG LP B TO HOT LEGS.Examiner Note: Candidate must energize power lockout to change the position of MVG-8886. Placing the TRN B PWR LCKOUT to OFF is not critical.
YesPlaces TRN B PWR LCKOUT to ON (Green light OFF, Red light ON).Places control switch for MVG-8886, CHG LP B TO HOT LEGS, to OPEN (Green light OFF, Red light ON).Places TRN B PWR LCKOUT to OFF (Green light ON, Red light OFF). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
112 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)    g. Start the Charging Pump on Train B (PUMP B or C).Booth Operator:  If called to check out the "B" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.This JPM may be terminated after both charging are running and aligned for Hot Leg Recirculation.
YesPlaces CHG/SI Pump "B" control switch to START and verifies CHG/SI Pump "B" indicates ON  (Green light OFF, Red light ON with normal running amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
125/11/2016Page 9 of 12 JPS-002A-N16 Examiner ends JPM at this point.5/11/2016Page 10 of 12 JPS-002A-N16 JPM:JPS-002A-N16(NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.IC SET: 254INSTRUCTIONS:Load the designated IC set.When examinee is ready:  RUN------------------------To recreate this IC Set:1. RUN2. Activate:    MAL-RCS005A        RCS Loop 'A' DBA LOCA3. Perform actions of EOP-1.0 and 2.04. Ensure RHR Sump Level >415', then activate LOA-AUX115  SEVERITY=0.17 (17% in RWST)5. Transfer Cold Leg Injection to Cold Leg Recirculation IAW EOP-2.2.
: 6. To shift CCW to fast speed during EOP-2.2:      LOA-CCW050    SELECT=FAST SPEED  'A' CCW Pump Speed Switch to fast      or LOA-CCW052    SELECT=FAST SPEED  'C' CCW Pump Speed Switch to fast7. Swap C Charging pump to B Train:      LOA CVC045  Charging pump C disconnect switch  SELECT= TRAIN B.8. FREEZECOMMENTS:Charging Pumps must be stopped before opening Hot Leg High Head Valves (8884/8886) to prevent pump runout.JPM SETUP SHEET5/11/2016Page 11 of 12 JPS-002A-N16 INITIATING CUES:The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance withEOP-2.3.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:*  A LOCA occurred approximately 8 hours ago.
* The plant is in Cold Leg Recirculation mode.*  CHG/SI Pump "C" is aligned to "B" train.*  The CRS has entered EOP-2.3 (Hot Leg Recirculation) from EOP-2.0.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
JPM BRIEFING SHEET5/11/2016Page 12 of 12JPS-002A-N16 (NRC JPM-e)  Respond to Steam Generator Overpressure (Alternate Path)
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-149B-N165/11/2016Page 1 of 11 JPSF-149B-N16 TASK:311-006-06-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
10TIME CRITICAL:
NOTASK STANDARD:All feedwater flow to the "A" SG has been terminated and the "A" SG pressure is below 1230 psig.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:55.45.b.6RESPONSE TO LOSS OF SECONDARY HEAT SINKTOOLS: EOP-


==15.1REFERENCES==
CRITICAL: No                SEQUENCED: Yes                      SAT          UNSAT JPM STEP: 1 Step 1. Identify any SG with pressure GREATER THAN 1230 psig.
:TERMINATING CUE:The "B" SG pressure has been reduced below 1230 psig in accordance with EOP-15.1.CANDIDATE:5/11/2016Page 2 of 11 JPSF-149B-N16 INITIATING CUES:The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat Sink.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant has tripped due to a turbine trip from 100% power. The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.READ TO OPERATOR:SAFETY CONSIDERATIONS:
STEP STANDARD:
NONEWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/11/2016Page 3 of 11 JPSF-149B-N16 Step 1. Identify any SG with pressure GREATER THAN 1230 psig.
Identifies that the "B" SG pressure is greater than 1230 psig.
YesIdentifies that the "B" SG pressure is greater than 1230 psig. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CUES:
1Step 2. Ensure the following valves are closed to the AFFECTED SG(s):
COMMENTS:
CRITICAL: Yes                SEQUENCED: Yes                      SAT          UNSAT JPM STEP: 2 Step 2. Ensure the following valves are closed to the AFFECTED SG(s):
* FW Flow Control, FCV-488
* FW Flow Control, FCV-488
* FW Isolation, PVG-1611B
* FW Isolation, PVG-1611B
* FW Flow Control Bypass, FCV-3331Evaluator Note: FW Flow Control, FCV-488, FW Isolation, PVG-1611B, and FW Flow Control Bypass are open due to a failure of the FW Isolation to initiate.Closing either FCV-488 or PVG-1611B will isolate the Main Feedwater flowpath and prevent the affected SG from overfilling.Ensuring FW Flow Control Bypass FCV-3331 is closed is not critical.
* FW Flow Control Bypass, FCV-3331 STEP STANDARD:
YesCloses FCV-488 and PVG-1611B (green light ON, red light OFF).Verifies FCV-3331 is closed (green light ON, red light OFF). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Closes FCV-488 and PVG-1611B (green light ON, red light OFF).
25/11/2016Page 4 of 11 JPSF-149B-N16 Step 3. Check Narrow Range level in AFFECTED SG(s) is LESS THAN 90% [83%].
Verifies FCV-3331 is closed (green light ON, red light OFF).
YesDetermines that "B" SG Narrow Range level is less than 90%. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CUES:
3Step 4. Dump steam from each AFFECTED SG to the Condenser:            a. Verify PERMISV C-9 status light is bright on XCP-6114 1-3.
Evaluator Note: FW Flow Control, FCV-488, FW Isolation, PVG-1611B, and FW Flow Control Bypass are open due to a failure of the FW Isolation to initiate.
YesVerifies PERMISV C-9 status light is bright. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Closing either FCV-488 or PVG-1611B will isolate the Main Feedwater flowpath and prevent the affected SG from overfilling.
45/11/2016Page 5 of 11 JPSF-149B-N16 Step 4 b. Perform the following:
Ensuring FW Flow Control Bypass FCV-3331 is closed is not critical.
* Verify the MS Isolation Valves, PVM-2801A(B)(C), are open for the AFFECTED SG(s).                          OR
COMMENTS:
* Open MS Isolation Bypass Valves:                  1) Depress both MAIN STEAM ISOL VALVES RESET TRAIN A(B).
5/11/2016                                          JPSF-149B-N16                             Page 4 of 11
YesNotes that MS Isolation Valve PVM-2801B is closed (green light ON, red light OFF).Depresses both MAIN STEAM ISOL VALVES RESET TRAIN A(B). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
5Step 4 b. 2) Open MS Isolation Bypass Valves, PVM-2869A(B)(C), for the AFFECTED SG(s).Examiner Note: *** Alternate Path begins here ***
YesAttempts to open MS Isolation Bypass Valves, PVM-2869B. Notes the valve did not open (green light ON, red light OFF).Refers to ALTERNATIVE ACTION. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
65/11/2016Page 6 of 11 JPSF-149B-N16 ALTERNATIVE ACTIONAA Step 4. Dump steam from each AFFECTED SG using the Steamline PORV:                  a) Place the PWR RELIEF A(B)(C) SETPT Controller in MAN and closed.                  b) Place the Steamline Power Relief A(B)(C) Mode Switch in PWR RLF.                  c) Adjust the PWR RELIEF A(B)(C) SETPT Controller to reduce AFFECTED SG(s) pressure.B SG pressure lowers.
Yes*  PWR RELIEF B SETPT Controller in MAN and closed.*  Steamline Power Relief B Mode Switch in PWR RLF.
* PWR RELIEF B SETPT Controller adjusted to reduce B SG pressure. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
75/11/2016Page 7 of 11 JPSF-149B-N16 Examiner ends JPM at this point.Step 5. Check AFFECTED SG(s) pressures:          a. Verify each AFFECTED SG(s) pressure is decreasing.          b. Verify each AFFECTED SG(s) pressure is LESS THAN 1230 psig.This JPM may bew terminated when "B" SG pressure is less than 1230 psig.
YesSG pressure is decreasing. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
85/11/2016Page 8 of 11 JPSF-149B-N16 JPM:JPSF-149B-N16(NRC JPM-e)  Respond to Steam Generator Overpressure (Alternate Path)IC SET: 255INSTRUCTIONS:Load the designated IC Set.Provide a copy of EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE.When to examinee is ready:  RUN.------------------------To recreate this IC Set:1. Load IC-10.2. Insert failures:
* MAL-PCS014        INADVERTENT MS ISOLATION  (All MSIVs close)
* MAL-MSS006B    MAIN STEAM ISOLATION VALVE (S/G B) FAILURE  Fail to: INADV CLOSURE
* VLV-MS039F          XVT02869B-MS MS LINE B BYPASS ISO VLV FAIL AS IS (MSIV Bypass Valve)
* MAL-MSS010B    S/G B SAFETY VALVE FAILS (Fail to: 0)
* MAL-MSS007B    S/G B POWER OPERATED RELIEF VALVE FAILURE (Fail to: 0)
* BST-MS059ILS02806F    REL VLV MS  INHIBITED
* BST-MS060ILS02806G    REL VLV MS  INHIBITED
* BST-MS061ILS02806H    REL VLV MS  INHIBITED
* BST-MS062ILS02806I      REL VLV MS  INHIBITED
* BST-MS063ILS02806J    REL VLV MS  INHIBITED
* MAL-PCS013A      FW ISOL TRAIN A FAILURE    Failure_To_Initiate
* MAL-PCS013B      FW ISOL TRAIN B FAILURE    Failure_To_Initiate3. RUN4. Complete EOP-1.0 and EOP-1.13. Ensure "B" SG to raise is less than 90% NR.4. Freeze when B SG pressure is greater than 1230 psig..COMMENTS: JPM SETUP SHEET5/11/2016Page 9 of 11 JPSF-149B-N16 INITIATING CUES:The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat


Sink.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant has tripped due to a turbine trip from 100% power. The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.SAFETY CONSIDERATIONS:
CRITICAL: No              SEQUENCED: Yes                          SAT    UNSAT JPM STEP: 3 Step 3. Check Narrow Range level in AFFECTED SG(s) is LESS THAN 90% [83%].
NONEOPERATOR INSTRUCTIONS:
STEP STANDARD:
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
Determines that "B" SG Narrow Range level is less than 90%.
JPM BRIEFING SHEET5/11/2016Page 10 of 11 JPSF-149B-N16 (NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)
CUES:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-1003-N165/11/2016Page 1 of 9 JPSF-1003-N16 TASK:311-018-06-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
COMMENTS:
10TIME CRITICAL:
CRITICAL: No              SEQUENCED: Yes                          SAT    UNSAT JPM STEP: 4 Step 4. Dump steam from each AFFECTED SG to the Condenser:
NOTASK STANDARD:Both RBCU Filter Trains are operating.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:55.45(a)8Response to High RB Radiation LevelTOOLS:EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL
: a. Verify PERMISV C-9 status light is bright on XCP-6114 1-3.
STEP STANDARD:
Verifies PERMISV C-9 status light is bright.
CUES:
COMMENTS:
5/11/2016                                          JPSF-149B-N16                  Page 5 of 11
 
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 5 Step 4 b. Perform the following:
* Verify the MS Isolation Valves, PVM-2801A(B)(C), are open for the AFFECTED SG(s).
OR
* Open MS Isolation Bypass Valves:
: 1) Depress both MAIN STEAM ISOL VALVES RESET TRAIN A(B).
STEP STANDARD:
Notes that MS Isolation Valve PVM-2801B is closed (green light ON, red light OFF).
Depresses both MAIN STEAM ISOL VALVES RESET TRAIN A(B).
CUES:
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 6 Step 4 b. 2) Open MS Isolation Bypass Valves, PVM-2869A(B)(C), for the AFFECTED SG(s).
STEP STANDARD:
Attempts to open MS Isolation Bypass Valves, PVM-2869B. Notes the valve did not open (green light ON, red light OFF).
Refers to ALTERNATIVE ACTION.
CUES:
Examiner Note: *** Alternate Path begins here ***
COMMENTS:
5/11/2016                                        JPSF-149B-N16                                  Page 6 of 11
 
CRITICAL: Yes            SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 7 ALTERNATIVE ACTION AA Step 4. Dump steam from each AFFECTED SG using the Steamline PORV:
a) Place the PWR RELIEF A(B)(C) SETPT Controller in MAN and closed.
b) Place the Steamline Power Relief A(B)(C) Mode Switch in PWR RLF.
c) Adjust the PWR RELIEF A(B)(C) SETPT Controller to reduce AFFECTED SG(s) pressure.
STEP STANDARD:
* PWR RELIEF B SETPT Controller in MAN and closed.
* Steamline Power Relief B Mode Switch in PWR RLF.
* PWR RELIEF B SETPT Controller adjusted to reduce B SG pressure.
CUES:
B SG pressure lowers.
COMMENTS:
5/11/2016                                      JPSF-149B-N16                              Page 7 of 11
 
CRITICAL: Yes            SEQUENCED: Yes                      SAT      UNSAT JPM STEP: 8 Step 5. Check AFFECTED SG(s) pressures:
: a. Verify each AFFECTED SG(s) pressure is decreasing.
: b. Verify each AFFECTED SG(s) pressure is LESS THAN 1230 psig.
STEP STANDARD:
SG pressure is decreasing.
CUES:
This JPM may bew terminated when "B" SG pressure is less than 1230 psig.
COMMENTS:
Examiner ends JPM at this point.
5/11/2016                                    JPSF-149B-N16                    Page 8 of 11
 
JPM SETUP SHEET JPM: JPSF-149B-N16          (NRC JPM-e) Respond to Steam Generator Overpressure (Alternate Path)
IC SET: 255 INSTRUCTIONS:
Load the designated IC Set.
Provide a copy of EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE.
When to examinee is ready: RUN.
To recreate this IC Set:
: 1. Load IC-10.
: 2. Insert failures:
* MAL-PCS014        INADVERTENT MS ISOLATION (All MSIVs close)
* MAL-MSS006B      MAIN STEAM ISOLATION VALVE (S/G B) FAILURE Fail to: INADV CLOSURE
* VLV-MS039F        XVT02869B-MS MS LINE B BYPASS ISO VLV FAIL AS IS (MSIV Bypass Valve)
* MAL-MSS010B      S/G B SAFETY VALVE FAILS (Fail to: 0)
* MAL-MSS007B      S/G B POWER OPERATED RELIEF VALVE FAILURE (Fail to: 0)
* BST-MS059ILS02806F REL VLV MS INHIBITED
* BST-MS060ILS02806G REL VLV MS INHIBITED
* BST-MS061ILS02806H REL VLV MS INHIBITED
* BST-MS062ILS02806I      REL VLV MS INHIBITED
* BST-MS063ILS02806J REL VLV MS INHIBITED
* MAL-PCS013A      FW ISOL TRAIN A FAILURE Failure_To_Initiate
* MAL-PCS013B      FW ISOL TRAIN B FAILURE Failure_To_Initiate
: 3. RUN
: 4. Complete EOP-1.0 and EOP-1.1
: 3. Ensure "B" SG to raise is less than 90% NR.
: 4. Freeze when B SG pressure is greater than 1230 psig..
COMMENTS:
5/11/2016                                    JPSF-149B-N16                                  Page 9 of 11
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  NONE INITIAL CONDITION:
The plant has tripped due to a turbine trip from 100% power.
The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.
INITIATING CUES:
The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat Sink.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/11/2016                                          JPSF-149B-N16                              Page 10 of 11
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-1003-N16 (NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)
CANDIDATE:
EXAMINER:
5/11/2016                        JPSF-1003-N16                           Page 1 of 9
 
TASK: 311-018-06-01        Response to High RB Radiation Level TASK STANDARD:
Both RBCU Filter Trains are operating.
TERMINATING CUE: Both RBCU Filter Trains are operating.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Both RBCU Filter Trains are operating.CANDIDATE:EOP-17.2RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL5/11/2016Page 2 of 9 JPSF-1003-N16 INITIATING CUES:The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDINGRADIATION LEVEL.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:*  A LOCA is in progress.*  A Yellow Path on Containment exists due to Containment Radiation > 2 R/hrREAD TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/11/2016Page 3 of 9 JPSF-1003-N16 Step 1. Verify Containment Ventilation Isolation Valves closed by verifying the following SAFETY INJECTION monitor lights are dim:             a. XCP-6103 2-1 (POST ACCID HR EXH 6056/6066).             b. XCP-6103 3-4 (POST ACCID HR EXH 6057 & 6067).
 
YesVerifies Containment Ventilation Isolation Valves are closed (Lights are DIM on XCP-6103 2-1, POST ACCID HR EXH 6056/6066 and XCP-6103 3-4, POST ACCID HR EXH 6057 & 6067. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
EOP-17.2    RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL EVALUATION TIME: 10                      TIME CRITICAL: NO                  10CFR55: 55.45(a)8 TIME START:                      TIME FINISH:                  PERFORMANCE TIME:
15/11/2016Page 4 of 9 JPSF-1003-N16 Step 2. Start both RBCU HEPA Filter Trains:             a. Stop RBCU Normal Speed Fans:
PERFORMANCE RATING:                SAT:          UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE          DATE 5/11/2016                                      JPSF-1003-N16                               Page 2 of 9
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A LOCA is in progress.
* A Yellow Path on Containment exists due to Containment Radiation > 2 R/hr INITIATING CUES:
The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL.
A surrogate operator will respond to non-related alarms per your direction.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/11/2016                                              JPSF-1003-N16                                         Page 3 of 9
 
CRITICAL: No                SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 1 Step 1. Verify Containment Ventilation Isolation Valves closed by verifying the following SAFETY INJECTION monitor lights are dim:
: a. XCP-6103 2-1 (POST ACCID HR EXH 6056/6066).
: b. XCP-6103 3-4 (POST ACCID HR EXH 6057 & 6067).
STEP STANDARD:
Verifies Containment Ventilation Isolation Valves are closed (Lights are DIM on XCP-6103 2-1, POST ACCID HR EXH 6056/6066 and XCP-6103 3-4, POST ACCID HR EXH 6057 & 6067.
CUES:
COMMENTS:
5/11/2016                                        JPSF-1003-N16                                   Page 4 of 9
 
CRITICAL: No              SEQUENCED: Yes                    SAT          UNSAT JPM STEP: 2 Step 2. Start both RBCU HEPA Filter Trains:
: a. Stop RBCU Normal Speed Fans:
* XFN 0064A-AH, 1A NORM.
* XFN 0064A-AH, 1A NORM.
* XFN 0065A-AH, 2A NORM.
* XFN 0065A-AH, 2A NORM.
* XFN 0064B-AH, 1B NORM.
* XFN 0064B-AH, 1B NORM.
* XFN 0065B-AH, 2B NORM.
* XFN 0065B-AH, 2B NORM.
YesVerifies RBCU Normal Speed Fans are stopped (RBCU Normal Speed Fans; Green lights ON, Red lights OFF with 0 amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STEP STANDARD:
25/11/2016Page 5 of 9 JPSF-1003-N16 Step 2 b. Place RBCU HEPA Filters in service by placing the switches in FILTER:
Verifies RBCU Normal Speed Fans are stopped (RBCU Normal Speed Fans; Green lights ON, Red lights OFF with 0 amps).
CUES:
COMMENTS:
5/11/2016                                    JPSF-1003-N16                                 Page 5 of 9
 
CRITICAL: No              SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 3 Step 2 b. Place RBCU HEPA Filters in service by placing the switches in FILTER:
* XDP-110A, RBCU 64A HEPA FLTR BYP DMPR.
* XDP-110A, RBCU 64A HEPA FLTR BYP DMPR.
* XDP-111A, RBCU 65A HEPA FLTR BYP DMPR.
* XDP-111A, RBCU 65A HEPA FLTR BYP DMPR.
* XDP-110B, RBCU 64B HEPA FLTR BYP DMPR.
* XDP-110B, RBCU 64B HEPA FLTR BYP DMPR.
* XDP-111B, RBCU 65B HEPA FLTR BYP DMPR.Examiner Note:  RBCU 64B HEPA Filter Bypass damper fails to reposition to Filter (XCP-110B; 64B Red light ON, Green light OFF).Examiner Note: *** Alternate Path begins here ***
* XDP-111B, RBCU 65B HEPA FLTR BYP DMPR.
YesPlaces the switches for the RBCU HEPA Filters in FILTER and notes the following:
STEP STANDARD:
Places the switches for the RBCU HEPA Filters in FILTER and notes the following:
* XDP-110A; Green filter light ON and Red BYP light OFF
* XDP-110A; Green filter light ON and Red BYP light OFF
* XDP-111A; Green filter light ON and Red BYP light OFF
* XDP-111A; Green filter light ON and Red BYP light OFF
* XDP-110B; Green filter light OFF and Red BYP light ON
* XDP-110B; Green filter light OFF and Red BYP light ON
* XDP-111B; Green filter light ON and Red BYP light OFF CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
* XDP-111B; Green filter light ON and Red BYP light OFF CUES:
35/11/2016Page 6 of 9 JPSF-1003-N16 Examiner ends JPM at this point.ALTERNATIVE ACTIONAA Step 2 b. IF any HEPA Filter fails to position to FILTER, THEN ensure the RBCU TRAIN A(B) EMERG                     Switch is selected to the fan with its respective filter aligned.Evaluator Note: MVG-3109D, RBCU 65B OUTLET ISOL, will not open when RBCU TRAIN B EMERG switch is selected to XFN 65B. RBCU 65B provides RB HEPA Filtration and adequate RB heat removal is provided by the A Train RBCU and RB Spray.
Examiner Note: RBCU 64B HEPA Filter Bypass damper fails to reposition to Filter (XCP-110B; 64B Red light ON, Green light OFF).
YesSelects RBCU TRAIN A(B) EMERG Switch is selected to XFN65B (XFN 64B light OFF, XFN 65B light ON). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Examiner Note: *** Alternate Path begins here ***
4Step 2 c. Start the RBCU Slow Speed Fans selected on RBCU TRAIN A EMERG and RBCU TRAIN B               EMERG.The examinee may place XFN 0064B-AH to stop.This JPM may be terminated after the RBCU TRAIN B EMERG Switch is positioned to the operable Fan and 65B RBCU Slow Speed Fan is running.
COMMENTS:
YesStarts XFN 0065B-AH slow speed fan (Green light OFF, Red light ON, and normal amps). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
5/11/2016                                        JPSF-1003-N16                                 Page 6 of 9
55/11/2016Page 7 of 9 JPSF-1003-N16 JPM:JPSF-1003-N16(NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)IC SET: 10INSTRUCTIONS:Load the designated IC Set. Provide a copy of EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVELWhen the examinee is ready: RUN.-------------------To recreate this IC Set:1. Load IC set 10.2. Insert the following:
 
* OVR-AH026E   SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: False
CRITICAL: Yes              SEQUENCED: Yes                                SAT    UNSAT JPM STEP: 4 ALTERNATIVE ACTION AA Step 2 b. IF any HEPA Filter fails to position to FILTER, THEN ensure the RBCU TRAIN A(B) EMERG Switch is selected to the fan with its respective filter aligned.
* OVR-AH026A SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: OFF (GREEN)
STEP STANDARD:
* OVR-AH026B SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: ON (RED)
Selects RBCU TRAIN A(B) EMERG Switch is selected to XFN65B (XFN 64B light OFF, XFN 65B light ON).
* MAL-RCS010   GROSS ISOTOPIC CONCENTRATION IN THE RCS 1.42e+008
CUES:
* PLP-RMS027   Area Radiation Monitor RM-G7 = 2.1
Evaluator Note: MVG-3109D, RBCU 65B OUTLET ISOL, will not open when RBCU TRAIN B EMERG switch is selected to XFN 65B. RBCU 65B provides RB HEPA Filtration and adequate RB heat removal is provided by the A Train RBCU and RB Spray.
* PLP-RMS038   Area Radiation Monitor RM-G18 = 2.1
COMMENTS:
* MAL-RCS019C     DBA LOCA (HOT LEG) LOOP 3 3. Perform EOP-1.0, EOP-2.04. Run RWST is below 18%, RB Press < 11 psig, and the RCS is aliigned for Cold Leg Recirculation.5. FREEZECOMMENTS: JPM SETUP SHEET5/11/2016Page 8 of 9 JPSF-1003-N16 INITIATING CUES:The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDINGRADIATION LEVEL.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:*  A LOCA is in progress.
CRITICAL: Yes              SEQUENCED: Yes                               SAT    UNSAT JPM STEP: 5 Step 2 c. Start the RBCU Slow Speed Fans selected on RBCU TRAIN A EMERG and RBCU TRAIN B EMERG.
* A Yellow Path on Containment exists due to Containment Radiation > 2 R/hrSAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
STEP STANDARD:
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
Starts XFN 0065B-AH slow speed fan (Green light OFF, Red light ON, and normal amps).
JPM BRIEFING SHEET5/11/2016Page 9 of 9JPSF-1003-N16 (NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)
CUES:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPSF-029A-N165/19/2016Page 1 of 13 JPSF-029A-N16 TASK:000-033-05-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
The examinee may place XFN 0064B-AH to stop.
15TIME CRITICAL:
This JPM may be terminated after the RBCU TRAIN B EMERG Switch is positioned to the operable Fan and 65B RBCU Slow Speed Fan is running.
NoTASK STANDARD:Power level stable at approximately 10-3% reactor power. Level trip switch for N35 is in BYPASS.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)4RESPOND TO INTERMEDIATE RANGE INSTRUMENTATION CHANNEL FAILURETOOLS:AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILUREGOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) marked up to step 3.13.
COMMENTS:
Examiner ends JPM at this point.
5/11/2016                                            JPSF-1003-N16                             Page 7 of 9
 
JPM SETUP SHEET JPM: JPSF-1003-N16         (NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)
IC SET: 10 INSTRUCTIONS:
Load the designated IC Set.
Provide a copy of EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL When the examinee is ready: RUN.
To recreate this IC Set:
: 1. Load IC set 10.
: 2. Insert the following:
* OVR-AH026E SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: False
* OVR-AH026A SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: OFF (GREEN)
* OVR-AH026B SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: ON (RED)
* MAL-RCS010       GROSS ISOTOPIC CONCENTRATION IN THE RCS 1.42e+008
* PLP-RMS027       Area Radiation Monitor RM-G7 = 2.1
* PLP-RMS038       Area Radiation Monitor RM-G18 = 2.1
* MAL-RCS019C       DBA LOCA (HOT LEG) LOOP 3
: 3. Perform EOP-1.0, EOP-2.0
: 4. Run RWST is below 18%, RB Press < 11 psig, and the RCS is aliigned for Cold Leg Recirculation.
: 5. FREEZE COMMENTS:
5/11/2016                                      JPSF-1003-N16                                   Page 8 of 9
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
* A LOCA is in progress.
* A Yellow Path on Containment exists due to Containment Radiation > 2 R/hr INITIATING CUES:
The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/11/2016                                          JPSF-1003-N16                      Page 9 of 9
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-029A-N16 (NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)
CANDIDATE:
EXAMINER:
5/19/2016                            JPSF-029A-N16                               Page 1 of 13
 
TASK: 000-033-05-01        RESPOND TO INTERMEDIATE RANGE INSTRUMENTATION CHANNEL FAILURE TASK STANDARD:
Power level stable at approximately 10-3% reactor power. Level trip switch for N35 is in BYPASS.
TERMINATING CUE: Reactor power stabilized. NI-35 has been bypassed.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILURE GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) marked up to step 3.13.


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Reactor power stabilized. NI-35 has been bypassed.CANDIDATE:AOP-401.8INTERMEDIATE RANGE CHANNEL FAILUREINDEX NO.ROSROK/A NO.000033K302Guidance contained in EOP for loss of intermediate-range instrumentation3.63.9 AK3.02015000A102SUR3.53.6A1.02015000A403Trip bypasses3.83.9A4.035/19/2016Page 2 of 13 JPSF-029A-N16 INITIATING CUES:The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.INITIAL CONDITION:A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2). The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/19/2016Page 3 of 13 JPSF-029A-N16 Establish a stable Startup Rate of less than one decade per minute.Evaluator Note: It is expected that the candidate will leave power stable to block the source range and establish a positive startup rate after blocking the source range high flux trips and so establishing a positive startup rate is repeated at step 8 of this JPM. The candidate may increase power here. If so it is critical to block the source range prior to an automatic reactor trip at 1E5 counts on the source range.
 
YesWithdraws rods to establish a stable startup rate of less than one decade per minute. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
AOP-401.8    INTERMEDIATE RANGE CHANNEL FAILURE INDEX NO.       K/A NO.                                                                   RO    SRO 000033K302      AK3.02    Guidance contained in EOP for loss of intermediate-range         3.6    3.9 instrumentation 015000A102      A1.02      SUR                                                              3.5    3.6 015000A403      A4.03      Trip bypasses                                                    3.8    3.9 EVALUATION TIME: 15                        TIME CRITICAL: No                    10CFR55: 45(a)4 TIME START:                        TIME FINISH:                      PERFORMANCE TIME:
1At 7.5x10-6%, perform the following:1) Verify P6 Permissive energizes to bright.2) Verify a minimum of one decade overlap between Source Range Channels and Intermediate Range Channels.Evaluator Note: The overlap of channels was given in the initial conditions.
PERFORMANCE RATING:                SAT:          UNSAT:
YesVerifies P6 energize to bright and a one decade overlap exists between source and intermediate range power channels. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CANDIDATE:
25/19/2016Page 4 of 13 JPSF-029A-N16 Prior to 1E5 CPS, perform the following:Momentarily place SR TRAIN A Switch in BLOCK.
EXAMINER:
YesPlaces SR TRAIN A Switch to BLOCK. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
SIGNATURE              DATE 5/19/2016                                      JPSF-029A-N16                                        Page 2 of 13
3Verify SR A TRIP BLCK Permissive energizes to bright.
 
YesVerifies SR A TRIP BLCK Permissive energizes to bright. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
45/19/2016Page 5 of 13 JPSF-029A-N16 Momentarily place SR TRAIN B Switch in BLOCK.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
YesPlaces SR TRAIN B Switch to BLOCK. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
5Verify SR B TRIP BLCK Permissive energizes to bright.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
YesVerifies SR B TRIP BLCK Permissive energizes to bright. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
SAFETY CONSIDERATIONS:
65/19/2016Page 6 of 13 JPSF-029A-N16 Perform one of the following for continued monitoring of Intermediate and Power Range instrument:1) If available for use, select one Intermediate Range Channel and one Power Range Channel on NR-45, NIS RECORDER.2) Ensure at least one Intermediate Range and at least one Power Range instrument are selected for  continuous monitoring using computer display NR45.
INITIAL CONDITION:
YesSelects one power range and one intermediate range channel on NR-45. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2).
7Establish a stable Startup Rate of less than one decade per minute.Evaluator Note: The candidate may have established a SUR prior to blocking the source range, but if not power should be raised here.The critical aspect of this step is to raise reactor power.
The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.
NoWithdraws rods to establish a stable startup rate of less than one decade per minute. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
INITIATING CUES:
85/19/2016Page 7 of 13 JPSF-029A-N16 1 Stabilize Reactor power at the current level.Evaluator Note: The failure will occur at 1E-4% power or insert MAL-NIS008A (Channel 35 High Voltage Failure) fails low.Evaluator Note: The student may refer to ARP for directions to AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILURE.Examiner Note: *** Alternate Path begins here ***
The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.
YesNROATC drives control rods inward to achieve a stable 0 DPM SUR and stabilize reactor power. Examinee may use multiple indications to determine that power is stable at approximately 0 DPM. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.
92 Bypass the failed Intermediate Range channel:a. Place LEVEL TRIP Switch for the AFFECTED channel in BYPASS.Evaluator Cue: The surrogate operator will take over monitoring the Reactor.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
YesPositions the level trip switch for NI-35 to the BYPASS position. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
5/19/2016                                              JPSF-029A-N16                                        Page 3 of 13
105/19/2016Page 8 of 13 JPSF-029A-N16 2 Bypass the failed Intermediate Range channel:b. Verify IR&SR TRIP BYP (XCP-620 4-5), annunciator is lit.
 
YesObserves IR&SR TRIP BYP annunciator (XCP-620-4-5) energizes by visual observation and acknowledges alarm. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
CRITICAL: No                  SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 1 Establish a stable Startup Rate of less than one decade per minute.
113 Check if Reactor Power is less than 7.5 x 10-6%.
STEP STANDARD:
YesNotes that Reactor Power is GREATER than 7.5 x 10-6%. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Withdraws rods to establish a stable startup rate of less than one decade per minute.
125/19/2016Page 9 of 13 JPSF-029A-N16 3 ALTERNATIVE ACTION3 Within one hour verify P6, NIS IR. permissive is bright.IF Reactor power is LESS THAN P-10. THEN maintain Reactor power LESS THAN 10%.IF Reactor power is LESS THAN 5%, THEN maintain Reactor power LESSTHAN 5%.GOTO Step 6.
CUES:
YesVerifies P6 status light is illuminated. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator Note: It is expected that the candidate will leave power stable to block the source range and establish a positive startup rate after blocking the source range high flux trips and so establishing a positive startup rate is repeated at step 8 of this JPM. The candidate may increase power here. If so it is critical to block the source range prior to an automatic reactor trip at 1E5 counts on the source range.
136 Monitor the operable Intermediate Range channel.
COMMENTS:
NoVerifies NI-36 operating properly. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                  SEQUENCED: Yes                             SAT            UNSAT JPM STEP: 2 At 7.5x10-6%, perform the following:
145/19/2016Page 10 of 13 JPSF-029A-N16 Examiner ends JPM at this point.7 Ensure NR-45 is selected to the appropriate operable channels.
: 1) Verify P6 Permissive energizes to bright.
YesIf not already selected , selects NR-45 to NI-36 position and verifies NI-35 is not selected. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
: 2) Verify a minimum of one decade overlap between Source Range Channels and Intermediate Range Channels.
155/19/2016Page 11 of 13 JPSF-029A-N16 JPM:JPSF-029A-N16(NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)IC SET: 257INSTRUCTIONS:Load the designated IC Set.Setup SCIPS    - Select NSSS    - Select Window 1-2, Digital Reactivity
STEP STANDARD:
    - Disable Calc
Verifies P6 energize to bright and a one decade overlap exists between source and intermediate range power channels.
    - Select detector 1    - Select detector 2    - Save
CUES:
    - Enable Calc
Evaluator Note: The overlap of channels was given in the initial conditions.
    - Initialize CalcProvide a copy of GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2)When the examinee is ready:  RUN.When power is > 1E-4 % if Trigger 1 did not auto-activate, insert Trigger 1: ---------------------To recreate the IC Set:1. Load IC Set 62. Lower power and stablize conditions at approximately 5E-6% power with 0 SUR at critical rod height.3. Ensure that IPCS at NROATC postion is selected to RX Startup screen and that reactivity is being calculated based on NI 35A and 36A.4. Set trigger 1 for Event 1 at  fnispr (2) > 0.0001  (1E-4 %)
COMMENTS:
* MAL-NIS002A      FAILURE OF IR CHANNEL N-35 DETECTOR PREAMP A-4
5/19/2016                                            JPSF-029A-N16                                      Page 4 of 13
* ANN-NI003          SR/IR DETECTOR TROUBLE I  Fail to: ONCOMMENTS: JPM SETUP SHEET5/19/2016Page 12 of 13 JPSF-029A-N16 INITIATING CUES:The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.INITIAL CONDITION:A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2). The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:
 
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
CRITICAL: Yes            SEQUENCED: Yes                  SAT UNSAT JPM STEP: 3 Prior to 1E5 CPS, perform the following:
JPM BRIEFING SHEET5/19/2016Page 13 of 13 JPSF-029A-N16 (NRC JPM-h)  Establish Reactor Building Purge Supply and Exhaust V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPS-1001-N165/16/2016Page 1 of 15 JPS-1001-N16 TASK:088-505-01-04PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME:
Momentarily place SR TRAIN A Switch in BLOCK.
15TIME CRITICAL:
STEP STANDARD:
NOTASK STANDARD:The RB Purge System is in service with at least one Purge Exhaust Fan and no more than one Purge Supply Fan started.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)8Perform Line ups of the Reactor Building Ventilation Systems.TOOLS:*  JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System   Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial   Conditions checked.
Places SR TRAIN A Switch to BLOCK.
* JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit* JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.* HPP-709, Sampling and Release of Radioactive Gaseous Effluents.
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: Yes                  SAT UNSAT JPM STEP: 4 Verify SR A TRIP BLCK Permissive energizes to bright.
STEP STANDARD:
Verifies SR A TRIP BLCK Permissive energizes to bright.
CUES:
COMMENTS:
5/19/2016                                    JPSF-029A-N16          Page 5 of 13
 
CRITICAL: Yes            SEQUENCED: Yes                    SAT UNSAT JPM STEP: 5 Momentarily place SR TRAIN B Switch in BLOCK.
STEP STANDARD:
Places SR TRAIN B Switch to BLOCK.
CUES:
COMMENTS:
CRITICAL: No            SEQUENCED: Yes                   SAT UNSAT JPM STEP: 6 Verify SR B TRIP BLCK Permissive energizes to bright.
STEP STANDARD:
Verifies SR B TRIP BLCK Permissive energizes to bright.
CUES:
COMMENTS:
5/19/2016                                    JPSF-029A-N16          Page 6 of 13
 
CRITICAL: No                  SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 7 Perform one of the following for continued monitoring of Intermediate and Power Range instrument:
: 1) If available for use, select one Intermediate Range Channel and one Power Range Channel on NR-45, NIS RECORDER.
: 2) Ensure at least one Intermediate Range and at least one Power Range instrument are selected for continuous monitoring using computer display NR45.
STEP STANDARD:
Selects one power range and one intermediate range channel on NR-45.
CUES:
COMMENTS:
CRITICAL: Yes                SEQUENCED: No                          SAT            UNSAT JPM STEP: 8 Establish a stable Startup Rate of less than one decade per minute.
STEP STANDARD:
Withdraws rods to establish a stable startup rate of less than one decade per minute.
CUES:
Evaluator Note: The candidate may have established a SUR prior to blocking the source range, but if not power should be raised here.
The critical aspect of this step is to raise reactor power.
COMMENTS:
5/19/2016                                            JPSF-029A-N16                                Page 7 of 13
 
CRITICAL: Yes                SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 9 1 Stabilize Reactor power at the current level.
STEP STANDARD:
NROATC drives control rods inward to achieve a stable 0 DPM SUR and stabilize reactor power.
Examinee may use multiple indications to determine that power is stable at approximately 0 DPM.
CUES:
Evaluator Note: The failure will occur at 1E-4% power or insert MAL-NIS008A (Channel 35 High Voltage Failure) fails low.
Evaluator Note: The student may refer to ARP for directions to AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILURE.
Examiner Note: *** Alternate Path begins here ***
COMMENTS:
CRITICAL: Yes                SEQUENCED: Yes                      SAT            UNSAT JPM STEP: 10 2 Bypass the failed Intermediate Range channel:
: a. Place LEVEL TRIP Switch for the AFFECTED channel in BYPASS.
STEP STANDARD:
Positions the level trip switch for NI-35 to the BYPASS position.
CUES:
Evaluator Cue: The surrogate operator will take over monitoring the Reactor.
COMMENTS:
5/19/2016                                          JPSF-029A-N16                               Page 8 of 13
 
CRITICAL: Yes              SEQUENCED: Yes                    SAT            UNSAT JPM STEP: 11 2 Bypass the failed Intermediate Range channel:
: b. Verify IR&SR TRIP BYP (XCP-620 4-5), annunciator is lit.
STEP STANDARD:
Observes IR&SR TRIP BYP annunciator (XCP-620-4-5) energizes by visual observation and acknowledges alarm.
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: Yes                    SAT            UNSAT JPM STEP: 12 3 Check if Reactor Power is less than 7.5 x 10-6%.
STEP STANDARD:
Notes that Reactor Power is GREATER than 7.5 x 10-6%.
CUES:
COMMENTS:
5/19/2016                                        JPSF-029A-N16                        Page 9 of 13
 
CRITICAL: No                  SEQUENCED: Yes                  SAT        UNSAT JPM STEP: 13 3 ALTERNATIVE ACTION 3 Within one hour verify P6, NIS IR. permissive is bright.
IF Reactor power is LESS THAN P-10. THEN maintain Reactor power LESS THAN 10%.
IF Reactor power is LESS THAN 5%, THEN maintain Reactor power LESS THAN 5%.
GOTO Step 6.
STEP STANDARD:
Verifies P6 status light is illuminated.
CUES:
COMMENTS:
CRITICAL: No                  SEQUENCED: No                  SAT        UNSAT JPM STEP: 14 6 Monitor the operable Intermediate Range channel.
STEP STANDARD:
Verifies NI-36 operating properly.
CUES:
COMMENTS:
5/19/2016                                        JPSF-029A-N16                  Page 10 of 13
 
CRITICAL: No                SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 15 7 Ensure NR-45 is selected to the appropriate operable channels.
STEP STANDARD:
If not already selected , selects NR-45 to NI-36 position and verifies NI-35 is not selected.
CUES:
COMMENTS:
Examiner ends JPM at this point.
5/19/2016                                          JPSF-029A-N16                              Page 11 of 13
 
JPM SETUP SHEET JPM: JPSF-029A-N16         (NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)
IC SET: 257 INSTRUCTIONS:
Load the designated IC Set.
Setup SCIPS
    - Select NSSS
    - Select Window 1-2, Digital Reactivity
    - Disable Calc
    - Select detector 1
    - Select detector 2
    - Save
    - Enable Calc
    - Initialize Calc Provide a copy of GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2)
When the examinee is ready: RUN.
When power is > 1E-4 % if Trigger 1 did not auto-activate, insert Trigger 1:
To recreate the IC Set:
: 1. Load IC Set 6
: 2. Lower power and stablize conditions at approximately 5E-6% power with 0 SUR at critical rod height.
: 3. Ensure that IPCS at NROATC postion is selected to RX Startup screen and that reactivity is being calculated based on NI 35A and 36A.
: 4. Set trigger 1 for Event 1 at fnispr (2) > 0.0001 (1E-4 %)
* MAL-NIS002A      FAILURE OF IR CHANNEL N-35 DETECTOR PREAMP A-4
* ANN-NI003        SR/IR DETECTOR TROUBLE I Fail to: ON COMMENTS:
5/19/2016                                        JPSF-029A-N16                                  Page 12 of 13
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2).
The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.
INITIATING CUES:
The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.
A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/19/2016                                          JPSF-029A-N16                                  Page 13 of 13
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-1001-N16 (NRC JPM-h) Establish Reactor Building Purge Supply and Exhaust CANDIDATE:
EXAMINER:
5/16/2016                          JPS-1001-N16                          Page 1 of 15
 
TASK: 088-505-01-04          Perform Line ups of the Reactor Building Ventilation Systems.
TASK STANDARD:
The RB Purge System is in service with at least one Purge Exhaust Fan and no more than one Purge Supply Fan started.
TERMINATING CUE: The RB purge system is in service.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS:
* JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial Conditions checked.
* JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit
* JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.
* HPP-709, Sampling and Release of Radioactive Gaseous Effluents.
* Six yellow plastic "Test in progress" tags for Plant Status labeling on:
* Six yellow plastic "Test in progress" tags for Plant Status labeling on:
  - RM-A2 sample pump CMC switch   - RM-A4 sample pump CMC switch   - CMC switches and isolation valves PVA-9312A(B) CMC switches.
            - RM-A2 sample pump CMC switch
  - CMC switches and isolation valves PVA-9311A(B) CMC switches.
            - RM-A4 sample pump CMC switch
            - CMC switches and isolation valves PVA-9312A(B) CMC switches.
            - CMC switches and isolation valves PVA-9311A(B) CMC switches.
* Red hold tag for placement on XFN-13B, EXH FAN B.
* Red hold tag for placement on XFN-13B, EXH FAN B.


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:The RB purge system is in service.CANDIDATE:OAP-100.5GUIDELINES FOR CONFIGURATION CONTROL AND OPERATION OF PLANT EQUIPMENTHPP-709Sampling and Release of Radioactive Gaseous EffluentsSOP-114REACTOR BUILDING VENTILATION SYSTEMINDEX NO.ROSROK/A NO.029000A201Maintenance or other activity taking place inside containment2.93.6A2.015/16/2016Page 2 of 15 JPS-1001-N16 INITIATING CUES:You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .All applicable procedure Initial Conditions are completed.A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant is in Mode 5 with preparations for a refueling outage in progress.The equipment hatch is open.
 
The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.Reactor Building Purge had been in service but was shutdown on the previous shift.Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.READ TO OPERATOR:SAFETY CONSIDERATIONS:
OAP-100.5      GUIDELINES FOR CONFIGURATION CONTROL AND OPERATION OF PLANT EQUIPMENT HPP-709      Sampling and Release of Radioactive Gaseous Effluents SOP-114      REACTOR BUILDING VENTILATION SYSTEM INDEX NO.       K/A NO.                                                                     RO    SRO 029000A201      A2.01      Maintenance or other activity taking place inside                 2.9    3.6 containment EVALUATION TIME: 15                          TIME CRITICAL: NO                      10CFR55: 45(a)8 TIME START:                          TIME FINISH:                        PERFORMANCE TIME:
NoneWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/16/2016Page 3 of 15 JPS-1001-N16 Step 2.1; Ensure RMA0004, ATM GASEOUS IODINE-RB PURGE EXHAUST (gas channel) is in               service (Rad Monitoring Panel).Evaluator cue: Provide a marked copy of the following:
PERFORMANCE RATING:                    SAT:            UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE            DATE 5/16/2016                                          JPS-1001-N16                                     Page 2 of 15
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:                      None INITIAL CONDITION:
The plant is in Mode 5 with preparations for a refueling outage in progress.
The equipment hatch is open.
The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.
The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.
Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.
Reactor Building Purge had been in service but was shutdown on the previous shift.
Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.
INITIATING CUES:
You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .
All applicable procedure Initial Conditions are completed.
A surrogate operator will respond to non-related alarms per your direction.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/16/2016                                              JPS-1001-N16                                       Page 3 of 15
 
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 1 Step 2.1; Ensure RMA0004, ATM GASEOUS IODINE-RB PURGE EXHAUST (gas channel) is in service (Rad Monitoring Panel).
STEP STANDARD:
Ensures RMA-4 is in service by checking for power and indication at Rad Monitoring Panel.
CUES:
Evaluator cue: Provide a marked copy of the following:
* SOP-114, Reactor Building Ventilation System (Handout 1)
* SOP-114, Reactor Building Ventilation System (Handout 1)
* HPP-709, Attachment VI Reactor Building Purge Release Permit (Handout 2).
* HPP-709, Attachment VI Reactor Building Purge Release Permit (Handout 2).
* OAP-106.3 Locked Component Tracking sheets if not already provided.(Handout 3)Evaluator Note: A surrogate operator will provide plant monitoring and acknowledge all Main Control Board alarms when the examinee is at the Ventilation Control Panel.
* OAP-106.3 Locked Component Tracking sheets if not already provided.(Handout 3)
YesEnsures RMA-4 is in service by checking for power and indication at Rad Monitoring Panel. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator Note: A surrogate operator will provide plant monitoring and acknowledge all Main Control Board alarms when the examinee is at the Ventilation Control Panel.
1Step 2.2; If core alterations are in progress, ensure RMA0002, ATM GASEOUS IODINE RB SAMPLE               LINE (gas channel), is in service (Rad Monitoring Panel).Evaluator note: Since Unit is NOT in Mode 6 and no core alterations are in progress Steps 2.2 (Check of RMA-2) is N/A. Examinee may mark step complete as RM-A2 is in service and will be required in service once core alterations begin.
COMMENTS:
YesMarks step N/A and proceeds to step 2.3. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                 SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 2 Step 2.2; If core alterations are in progress, ensure RMA0002, ATM GASEOUS IODINE RB SAMPLE LINE (gas channel), is in service (Rad Monitoring Panel).
25/16/2016Page 4 of 15 JPS-1001-N16 Step 2.3; If RB atmosphere sample analysis dictates, place RB Charcoal Cleanup System in service               per Section III.                                     a. XFN-66A, FAN A (RB CHAR CLEANUP).                                     b. XFN-66B, FAN B (RB CHAR CLEANUP).Evaluator Note: Initial conditions states that RB Charcoal Cleanup is NOT required.
STEP STANDARD:
YesMarks step N/A and proceeds to step 2.4. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Marks step N/A and proceeds to step 2.3.
35/16/2016Page 5 of 15 JPS-1001-N16 Step 2.4; Align RMA0004 sample point for RB Purge Exhaust Fan operation as follows (AB-485):               a. Open XVA00006-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.               b. Close XVA00005-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.Booth Operator Cue: As Building Operator acknowledge request for sample valve alignment or verification and report task completed per the request. Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify sample valve alignment correct.
CUES:
YesCalls Building operator and directs OPEN XVA-6-AH and CLOSE XVA-5-AH. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator note: Since Unit is NOT in Mode 6 and no core alterations are in progress Steps 2.2 (Check of RMA-2) is N/A. Examinee may mark step complete as RM-A2 is in service and will be required in service once core alterations begin.
45/16/2016Page 6 of 15 JPS-1001-N16 Step 2.5; Ensure the following radiation monitors high radiation alarm setpoints are adjusted per               Reactor Building Purge Release Permit:               a. RMA0002, ATM GASEOUS IODINE RB SAMPLE LINE.               b. RMA0004, RB PURGE EXH GAS ATMOS MONITOR.Evaluator cue: Provide simulated Reactor Building Purge Release Permit, HPP-709, Attachment VI, (Handout 2) if not already done. Evaluator note: This was provided as complete in the initial conditions. The simulator does not model setpoint changes. Provide following cue if needed.Evaluator cue: If asked as CRS state that the alarm setpoints have been verified by another RO.
COMMENTS:
YesEnsures setpoint on RMA-2 and RMA-4 at Rad monitor panel match the Purge Release Permit values. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
5/16/2016                                          JPS-1001-N16                                    Page 4 of 15
5Step 2.6; Prior to placing RB Purge System in operation for the first time during an               outage, perform STP-130.005B, AH Valve Operability Testing (Mode 5).Evaluator note: Initiating cue provided information that RB Purge had been in service previously.
 
YesMarks step N/A and proceeds to step 2.7. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 3 Step 2.3; If RB atmosphere sample analysis dictates, place RB Charcoal Cleanup System in service per Section III.
65/16/2016Page 7 of 15 JPS-1001-N16 Step 2.7; Unlock and open the following:               a. XVB00001A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001A-AH (FB-479).               b. XVB00001B-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001B-AH (RB-463).               c. XVB00002B-AV2-AH, IA HDR ISOLATION VALVE FOR XVB00002B-AH (RB-463).               d. XVB00002A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00002A-AH (FB-479).Booth Operator cue: As Building Operator acknowledge requests for valve alignment or verification and report task completed per the request.Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify air header isolation valve alignment correct.Evaluator cue: Provide JPM h Handout 3 if Examinee requests OAP-106.3 Locked Component Tracking sheets if not already provided.
: a. XFN-66A, FAN A (RB CHAR CLEANUP).
YesCalls Building operators and directs opening XVB-1A(B) and XVB-2A(B) air header isolations.
: b. XFN-66B, FAN B (RB CHAR CLEANUP).
ORRequests OAP-106.3, Locked Component Tracking Sheets for the XVB-1A(B) and XVB-2A(B) air header isolations CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STEP STANDARD:
75/16/2016Page 8 of 15 JPS-1001-N16 Step 2.8; Ensure a Reactor Building Purge Release Permit has been issued per HPP-709.Evaluator note: The NJPS-1001 Handout 2 (Release Permit) already indicates a SAT source check.Evaluator note: Have a Copy of HPP-709 available for Examinee to refer to if they ask for it.
Marks step N/A and proceeds to step 2.4.
YesEnsures permit is current and less than 24 hours old. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CUES:
8Step 2.9; Start Reactor Building Purge as follows:a. Open PVB-2A, CNTMT EXH ISOLEvaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air.
Evaluator Note: Initial conditions states that RB Charcoal Cleanup is NOT required.
YesPlaces control switch to OPEN and holds in OPEN until Red light ON and Green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
COMMENTS:
95/16/2016Page 9 of 15 JPS-1001-N16 Procedure NOTE 2.9.b; If both trains of RB Purge are to be run, both exhaust fans should be started                                       simultaneously.Step 2.9 b; Hold PVB-2B, CNTMT EXH ISOL, to OPEN while simultaneously holding one or both of                     the following fan control switches in the START position:                       1) XFN-13A, EXH FAN A.                     2) XFN-13B, EXH FAN B.Evaluator note: Only Exh Fan A (XFN-13A) should be started. Examinee should ask for a peer check.Evaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air. Completion of the Purge Release Permit Data is NOT critical.
5/16/2016                                          JPS-1001-N16                                 Page 5 of 15
YesPlaces control switch for PVB-2B to OPEN and Holds in OPEN. Places control switches for  XFN-13A in START and holds in START until Red light ON and Green light OFF for fans and PVB-2B.Completes Section II, Actual Release Data on Purge Release Permit:1. Release Start Date and Time (current date and time)2. Start Readings on RM-A2 and RM-A4 in cps. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
 
105/16/2016Page 10 of 15 JPS-1001-N16 Step 2.9 c; Verify the following:                   1) XFN-13A(B)-AH inlet damper opens.                   2) XFN-13A(B)-AH outlet damper opens.Evaluator note: Fan inlet and outlet damper indications are on the mimic board above the control switches.YesVerifies White light ON for the INLET and OUTLET dampers for the Fan that was started (XFN-13A). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 4 Step 2.4; Align RMA0004 sample point for RB Purge Exhaust Fan operation as follows (AB-485):
11Step 2.9 d; Open XDP-28, INTAKE DMPR.
: a. Open XVA00006-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.
YesPlaces control Switch for XDP-28 to OPEN and verifies Red light ON and Green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
: b. Close XVA00005-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.
125/16/2016Page 11 of 15 JPS-1001-N16 Step 2.9 e; Open the following:                   1) PVB-1A, CNTMT SPLY ISOL.                                 2) PVB-1B, CNTMT SPLY ISOL.
STEP STANDARD:
YesPlaces control Switch for PVB-1A to OPEN and holds until Red light ON and Green light OFF.Places control Switch for PVB-1B to OPEN and holds until Red light ON and Green light OFF. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Calls Building operator and directs OPEN XVA-6-AH and CLOSE XVA-5-AH.
135/16/2016Page 12 of 15 JPS-1001-N16 Examiner ends JPM at this point. Step 2.9 f; Start one or both of the following, as necessary:                     1) XFN-11A, SPLY FAN A.                     2) XFN-11B, SPLY FAN B.Evaluator Cue: If asked as CRS which supply fan to start, state "Operate supply fans as required by SOP-114."Evaluator Note: There is a procedure note prior to the step which starts the Purge Supply Fans. The note informs the Operator that in order to maintain a negative pressure on the RB with the Equipment Hatch open, fewer Supply Fans than Exhaust Fans should be operated. In this case no supply fans or one supply fan should be started.Evaluator Note: Since the equipment hatch is open no more than ONE supply fan should be started. This step is critical because the Examinee must maintain negative pressure on the RB. It is only critical that 2 supply fans are NOT started.
CUES:
YesStarts NO MORE than one Purge Supply Fan. (May not start any) CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Booth Operator Cue: As Building Operator acknowledge request for sample valve alignment or verification and report task completed per the request.
145/16/2016Page 13 of 15 JPS-1001-N16 JPM:JPS-1001-N16(NRC JPM-h) Establish Reactor Building Purge Supply and ExhaustIC SET: 258INSTRUCTIONS:Reset to the designated IC Set.1. Place yellow plastic Test in Progress tags on sample pump CMC switches for RM-A2 and RM-A4 at     the rad monitor panel.2. Place yellow plastic Test in Progress tags on CMC switches for Containment isolation valves     PVA-9312A(B) and PVA-9311 A(B) on MCB Panel 2.3. Place red hold tag on CMC switch for XFN-13B, EXH FAN B at HVAC panel. 4. Verify SIPCS mode set to "CLD Shutdown"5. Go to run, clear any alarms. Use the HVAC acknowledge button not the LOA reset if HVAC alarms.When the examinee is ready: RUN------------------To recreate this IC Set:
Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify sample valve alignment correct.
: 1. Load IC Set 32. Verify the following at the HVAC Control Panel, XCP-6210:
COMMENTS:
5/16/2016                                          JPS-1001-N16                                    Page 6 of 15
 
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 5 Step 2.5; Ensure the following radiation monitors high radiation alarm setpoints are adjusted per Reactor Building Purge Release Permit:
: a. RMA0002, ATM GASEOUS IODINE RB SAMPLE LINE.
: b. RMA0004, RB PURGE EXH GAS ATMOS MONITOR.
STEP STANDARD:
Ensures setpoint on RMA-2 and RMA-4 at Rad monitor panel match the Purge Release Permit values.
CUES:
Evaluator cue: Provide simulated Reactor Building Purge Release Permit, HPP-709, Attachment VI, (Handout 2) if not already done.
Evaluator note: This was provided as complete in the initial conditions. The simulator does not model setpoint changes. Provide following cue if needed.
Evaluator cue: If asked as CRS state that the alarm setpoints have been verified by another RO.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 6 Step 2.6; Prior to placing RB Purge System in operation for the first time during an outage, perform STP-130.005B, AH Valve Operability Testing (Mode 5).
STEP STANDARD:
Marks step N/A and proceeds to step 2.7.
CUES:
Evaluator note: Initiating cue provided information that RB Purge had been in service previously.
COMMENTS:
5/16/2016                                          JPS-1001-N16                                     Page 7 of 15
 
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 7 Step 2.7; Unlock and open the following:
: a. XVB00001A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001A-AH (FB-479).
: b. XVB00001B-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001B-AH (RB-463).
: c. XVB00002B-AV2-AH, IA HDR ISOLATION VALVE FOR XVB00002B-AH (RB-463).
: d. XVB00002A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00002A-AH (FB-479).
STEP STANDARD:
Calls Building operators and directs opening XVB-1A(B) and XVB-2A(B) air header isolations.
OR Requests OAP-106.3, Locked Component Tracking Sheets for the XVB-1A(B) and XVB-2A(B) air header isolations CUES:
Booth Operator cue: As Building Operator acknowledge requests for valve alignment or verification and report task completed per the request.
Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify air header isolation valve alignment correct.
Evaluator cue: Provide JPM h Handout 3 if Examinee requests OAP-106.3 Locked Component Tracking sheets if not already provided.
COMMENTS:
5/16/2016                                          JPS-1001-N16                                   Page 8 of 15
 
CRITICAL: No                SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 8 Step 2.8; Ensure a Reactor Building Purge Release Permit has been issued per HPP-709.
STEP STANDARD:
Ensures permit is current and less than 24 hours old.
CUES:
Evaluator note: The NJPS-1001 Handout 2 (Release Permit) already indicates a SAT source check.
Evaluator note: Have a Copy of HPP-709 available for Examinee to refer to if they ask for it.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 9 Step 2.9; Start Reactor Building Purge as follows:
: a. Open PVB-2A, CNTMT EXH ISOL STEP STANDARD:
Places control switch to OPEN and holds in OPEN until Red light ON and Green light OFF.
CUES:
Evaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air.
COMMENTS:
5/16/2016                                            JPS-1001-N16                               Page 9 of 15
 
CRITICAL: Yes                SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 10 Procedure NOTE 2.9.b; If both trains of RB Purge are to be run, both exhaust fans should be started simultaneously.
Step 2.9 b; Hold PVB-2B, CNTMT EXH ISOL, to OPEN while simultaneously holding one or both of the following fan control switches in the START position:
: 1) XFN-13A, EXH FAN A.
: 2) XFN-13B, EXH FAN B.
STEP STANDARD:
Places control switch for PVB-2B to OPEN and Holds in OPEN. Places control switches for XFN-13A in START and holds in START until Red light ON and Green light OFF for fans and PVB-2B.
Completes Section II, Actual Release Data on Purge Release Permit:
: 1. Release Start Date and Time (current date and time)
: 2. Start Readings on RM-A2 and RM-A4 in cps.
CUES:
Evaluator note: Only Exh Fan A (XFN-13A) should be started. Examinee should ask for a peer check.
Evaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air. Completion of the Purge Release Permit Data is NOT critical.
COMMENTS:
5/16/2016                                            JPS-1001-N16                                 Page 10 of 15
 
CRITICAL: No                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 11 Step 2.9 c; Verify the following:
: 1) XFN-13A(B)-AH inlet damper opens.
: 2) XFN-13A(B)-AH outlet damper opens.
STEP STANDARD:
Verifies White light ON for the INLET and OUTLET dampers for the Fan that was started (XFN-13A).
CUES:
Evaluator note: Fan inlet and outlet damper indications are on the mimic board above the control switches.
COMMENTS:
CRITICAL: No                 SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 12 Step 2.9 d; Open XDP-28, INTAKE DMPR.
STEP STANDARD:
Places control Switch for XDP-28 to OPEN and verifies Red light ON and Green light OFF.
CUES:
COMMENTS:
5/16/2016                                        JPS-1001-N16                                   Page 11 of 15
 
CRITICAL: No              SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 13 Step 2.9 e; Open the following:
: 1) PVB-1A, CNTMT SPLY ISOL.
: 2) PVB-1B, CNTMT SPLY ISOL.
STEP STANDARD:
Places control Switch for PVB-1A to OPEN and holds until Red light ON and Green light OFF.
Places control Switch for PVB-1B to OPEN and holds until Red light ON and Green light OFF.
CUES:
COMMENTS:
5/16/2016                                      JPS-1001-N16                                 Page 12 of 15
 
CRITICAL: Yes                SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 14 Step 2.9 f; Start one or both of the following, as necessary:
: 1) XFN-11A, SPLY FAN A.
: 2) XFN-11B, SPLY FAN B.
STEP STANDARD:
Starts NO MORE than one Purge Supply Fan. (May not start any)
CUES:
Evaluator Cue: If asked as CRS which supply fan to start, state "Operate supply fans as required by SOP-114."
Evaluator Note: There is a procedure note prior to the step which starts the Purge Supply Fans. The note informs the Operator that in order to maintain a negative pressure on the RB with the Equipment Hatch open, fewer Supply Fans than Exhaust Fans should be operated. In this case no supply fans or one supply fan should be started.
Evaluator Note: Since the equipment hatch is open no more than ONE supply fan should be started.
This step is critical because the Examinee must maintain negative pressure on the RB. It is only critical that 2 supply fans are NOT started.
COMMENTS:
Examiner ends JPM at this point.
5/16/2016                                            JPS-1001-N16                                 Page 13 of 15
 
JPM SETUP SHEET JPM: JPS-1001-N16           (NRC JPM-h) Establish Reactor Building Purge Supply and Exhaust IC SET: 258 INSTRUCTIONS:
Reset to the designated IC Set.
: 1. Place yellow plastic Test in Progress tags on sample pump CMC switches for RM-A2 and RM-A4 at the rad monitor panel.
: 2. Place yellow plastic Test in Progress tags on CMC switches for Containment isolation valves PVA-9312A(B) and PVA-9311 A(B) on MCB Panel 2.
: 3. Place red hold tag on CMC switch for XFN-13B, EXH FAN B at HVAC panel.
: 4. Verify SIPCS mode set to "CLD Shutdown"
: 5. Go to run, clear any alarms. Use the HVAC acknowledge button not the LOA reset if HVAC alarms.
When the examinee is ready: RUN To recreate this IC Set:
: 1. Load IC Set 3
: 2. Verify the following at the HVAC Control Panel, XCP-6210:
* CMC switch for RB Purge Supply Fan A in STOP
* CMC switch for RB Purge Supply Fan A in STOP
* CMC switch for RB Purge Supply Fan B in STOP
* CMC switch for RB Purge Supply Fan B in STOP
Line 1,660: Line 2,707:
* CMC switch for XDP-28, Intake Damper in CLOSE
* CMC switch for XDP-28, Intake Damper in CLOSE
* CMC switch for RB Charcoal Cleanup fan A in STOP
* CMC switch for RB Charcoal Cleanup fan A in STOP
* CMC switch for RB Charcoal Cleanup fan B in STOP3. Insert: OVR-AH076A   Override To = Off     (SS-AH243 Purge Exh Fan (XFN-13B-AH) GREEN                 OVR-AH076C   Override To = Off     (SS-AH243 Purge Exh Fan (XFN-13B-AH) WHITECOMMENTS:Provide the following to the Examinee:* JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System     Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial     Conditions checked.* JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit.* JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.
* CMC switch for RB Charcoal Cleanup fan B in STOP
JPM SETUP SHEET5/16/2016Page 14 of 15 JPS-1001-N16 INITIATING CUES:You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .All applicable procedure Initial Conditions are completed.
: 3. Insert: OVR-AH076A Override To = Off         (SS-AH243 Purge Exh Fan (XFN-13B-AH) GREEN OVR-AH076C Override To = Off       (SS-AH243 Purge Exh Fan (XFN-13B-AH) WHITE COMMENTS:
A surrogate operator will respond to non-related alarms per your direction.INITIAL CONDITION:The plant is in Mode 5 with preparations for a refueling outage in progress.
Provide the following to the Examinee:
The equipment hatch is open. The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.Reactor Building Purge had been in service but was shutdown on the previous shift.Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.SAFETY CONSIDERATIONS:
* JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial Conditions checked.
NoneOPERATOR INSTRUCTIONS:
* JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
* JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.
JPM BRIEFING SHEET5/16/2016Page 15 of 15JPS-1001-N16 (NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)
5/16/2016                                        JPS-1001-N16                                 Page 14 of 15
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPP-006B-N165/18/2016Page 1 of 9 JPP-006B-N16 TASK:000-007-05-04PREFERRED EVALUATION METHOD SIMULATEEVALUATION TIME:TIME CRITICAL:TASK STANDARD:Train B of Solid State Protection is reset.PREFERRED EVALUATION LOCATION PLANTTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:Respond to Reactor Trip/Safety Injection ActuationTOOLS:SOP-112, SAFETY INJECTION SYSTEM Section V with Entry Conditions signed off.Safeguards cabinet key if specific authorization has been provided by the Shift Manager or pictures of:
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  None INITIAL CONDITION:
The plant is in Mode 5 with preparations for a refueling outage in progress.
The equipment hatch is open.
The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.
The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.
Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.
Reactor Building Purge had been in service but was shutdown on the previous shift.
Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.
INITIATING CUES:
You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .
All applicable procedure Initial Conditions are completed.
A surrogate operator will respond to non-related alarms per your direction.
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/16/2016                                            JPS-1001-N16                                  Page 15 of 15
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-006B-N16 (NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)
CANDIDATE:
EXAMINER:
5/18/2016                            JPP-006B-N16                               Page 1 of 9
 
TASK: 000-007-05-04        Respond to Reactor Trip/Safety Injection Actuation TASK STANDARD:
Train B of Solid State Protection is reset.
TERMINATING CUE: Train B of Solid State Protection is reset.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION SIMULATE PLANT TOOLS: SOP-112, SAFETY INJECTION SYSTEM Section V with Entry Conditions signed off.
Safeguards cabinet key if specific authorization has been provided by the Shift Manager or pictures of:
* XPN-7020 Logic Cabinet
* XPN-7020 Logic Cabinet
* XPN-7020 Output Cabinet
* XPN-7020 Output Cabinet
Line 1,673: Line 2,746:


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Train B of Solid State Protection is reset.CANDIDATE:SOP-112SAFETY INJECTION SYSTEM5/18/2016Page 2 of 9 JPP-006B-N16 INITIATING CUES:The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.INITIAL CONDITION:*  A LOCA is in progress.*  EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented    to Step 4, Reset both SI RESET TRAIN A(B) Switches.*  "B" Train of SI did not reset.READ TO OPERATOR:SAFETY CONSIDERATIONS:Personal Protection Equipment (PPE)When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
 
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!5/18/2016Page 3 of 9 JPP-006B-N16 Step 2.2 Reset Train B of Solid State Protection as follows:         a. Obtain the Train B key (located by the Page Phone).Evaluator Cue: Provide Examinee with SOP-112 Section V.A. with entry conditions completed.Evaluator Cue: After the examinee has located the Train B key inform the examinee that the key has been obtained. It is critical to identify the location of the key. If the Shift Manager has authorized the opening of the cabinets then provide the key to the examinee.
SOP-112        SAFETY INJECTION SYSTEM EVALUATION TIME:                            TIME CRITICAL:                      10CFR55:
YesObtains Train "B" key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
TIME START:                          TIME FINISH:                    PERFORMANCE TIME:
15/18/2016Page 4 of 9 JPP-006B-N16 Step 2.2 b. At the Logic Cabinet for XPN7020, Solid State Protection Cabinet Train B, perform the following                 (CB-436):                 1) Open the Logic Cabinet.                 2) Open the following power supply breakers:
PERFORMANCE RATING:                    SAT:          UNSAT:
a) PS1, 48VDC.                       b) PS2, 48VDC.Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Logic Cabinet.
CANDIDATE:
YesOpens power supply breakers PS1 and PS2. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
EXAMINER:
25/18/2016Page 5 of 9 JPP-006B-N16 Step 2.2 c. At XPN7021, Safeguards Test Cabinet Train A, perform the following (CB-436):                 1) Open the Test Cabinet.                 2) Momentarily place Reset Switch S-821 to the RESET position.Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7021 Cabinet and cabinet closeup.YesReset Switch S-821 is momentarily placed to RESET. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
SIGNATURE              DATE 5/18/2016                                          JPP-006B-N16                                       Page 2 of 9
3Step 2.2 d. At XPN7020, Solid State Protection Cabinet Train A, perform the following (CB-436):                 1) Open the Output Cabinet.                 2) On the Output Relay Test Panel place the Mode Selector Switch in the TEST position.Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Output Cabinet.
 
YesPlaces the Mode Selector Switch in the TEST position. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
45/18/2016Page 6 of 9 JPP-006B-N16 Examiner ends JPM at this point.Step 2.2 e. At the Main Control Board verify the SI ACT light is dim.Evaluator Note: Terminate the JPM when the Control Room is contacted.Evaluator Note: Ensure all cabinets are relocked.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
YesContacts the Control room and verifies that the SI ACT light is dim. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
55/18/2016Page 7 of 9 JPP-006B-N16 JPM:JPP-006B-N16(NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)IC SET:INSTRUCTIONS:COMMENTS: JPM SETUP SHEET5/18/2016Page 8 of 9 JPP-006B-N16 INITIATING CUES:The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.INITIAL CONDITION:* A LOCA is in progress.* EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented   to Step 4, Reset both SI RESET TRAIN A(B) Switches.* "B" Train of SI did not reset.SAFETY CONSIDERATIONS:Personal Protection Equipment (PPE)OPERATOR INSTRUCTIONS:
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
SAFETY CONSIDERATIONS:                      Personal Protection Equipment (PPE)
JPM BRIEFING SHEETAT NO TIME ARE YOU TO O PERATE ANY PLANT EQUIPMENT!5/18/2016Page 9 of 9JPP-006B-N16 (NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFP V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPP-107A-N163/31/2016Page 1 of 8JPP-107A-N16 TASK:000-169-05-04PREFERRED EVALUATION METHOD SIMULATEEVALUATION TIME 20TIME CRITICAL NoTASK STANDARD:Turbine driven emergency feed pump main steam loop "B" and "C" supply valve are manually closed and power removed from 2802A per EOP-3.0.PREFERRED EVALUATION LOCATION PLANTTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45.a.8Locally Isolate a Faulted Steam Generator per EOP-3.0.TOOLS:EOP-3.0, STEP 5.j. ALTERNATIVE ACTION
INITIAL CONDITION:
* A LOCA is in progress.
* EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented to Step 4, Reset both SI RESET TRAIN A(B) Switches.
  * "B" Train of SI did not reset.
INITIATING CUES:
The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!
5/18/2016                                              JPP-006B-N16                                         Page 3 of 9
 
CRITICAL: Yes                  SEQUENCED: Yes                              SAT            UNSAT JPM STEP: 1 Step 2.2 Reset Train B of Solid State Protection as follows:
: a. Obtain the Train B key (located by the Page Phone).
STEP STANDARD:
Obtains Train "B" key.
CUES:
Evaluator Cue: Provide Examinee with SOP-112 Section V.A. with entry conditions completed.
Evaluator Cue: After the examinee has located the Train B key inform the examinee that the key has been obtained. It is critical to identify the location of the key. If the Shift Manager has authorized the opening of the cabinets then provide the key to the examinee.
COMMENTS:
5/18/2016                                              JPP-006B-N16                                       Page 4 of 9
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 Step 2.2 b. At the Logic Cabinet for XPN7020, Solid State Protection Cabinet Train B, perform the following (CB-436):
: 1) Open the Logic Cabinet.
: 2) Open the following power supply breakers:
a) PS1, 48VDC.
b) PS2, 48VDC.
STEP STANDARD:
Opens power supply breakers PS1 and PS2.
CUES:
Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Logic Cabinet.
COMMENTS:
5/18/2016                                        JPP-006B-N16                                         Page 5 of 9
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 3 Step 2.2 c. At XPN7021, Safeguards Test Cabinet Train A, perform the following (CB-436):
: 1) Open the Test Cabinet.
: 2) Momentarily place Reset Switch S-821 to the RESET position.
STEP STANDARD:
Reset Switch S-821 is momentarily placed to RESET.
CUES:
Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7021 Cabinet and cabinet closeup.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                         SAT              UNSAT JPM STEP: 4 Step 2.2 d. At XPN7020, Solid State Protection Cabinet Train A, perform the following (CB-436):
: 1) Open the Output Cabinet.
: 2) On the Output Relay Test Panel place the Mode Selector Switch in the TEST position.
STEP STANDARD:
Places the Mode Selector Switch in the TEST position.
CUES:
Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Output Cabinet.
COMMENTS:
5/18/2016                                        JPP-006B-N16                                     Page 6 of 9
 
CRITICAL: No              SEQUENCED: Yes                            SAT UNSAT JPM STEP: 5 Step 2.2 e. At the Main Control Board verify the SI ACT light is dim.
STEP STANDARD:
Contacts the Control room and verifies that the SI ACT light is dim.
CUES:
Evaluator Note: Terminate the JPM when the Control Room is contacted.
Evaluator Note: Ensure all cabinets are relocked.
COMMENTS:
Examiner ends JPM at this point.
5/18/2016                                          JPP-006B-N16                 Page 7 of 9
 
JPM SETUP SHEET JPM: JPP-006B-N16 (NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)
IC SET:
INSTRUCTIONS:
COMMENTS:
5/18/2016                            JPP-006B-N16                                     Page 8 of 9
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                 Personal Protection Equipment (PPE)
INITIAL CONDITION:
* A LOCA is in progress.
* EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented to Step 4, Reset both SI RESET TRAIN A(B) Switches.
    * "B" Train of SI did not reset.
INITIATING CUES:
The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/18/2016                                        JPP-006B-N16                                      Page 9 of 9
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-107A-N16 (NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFP CANDIDATE:
EXAMINER:
3/31/2016                            JPP-107A-N16                               Page 1 of 8
 
TASK: 000-169-05-04        Locally Isolate a Faulted Steam Generator per EOP-3.0.
TASK STANDARD:
Turbine driven emergency feed pump main steam loop "B" and "C" supply valve are manually closed and power removed from 2802A per EOP-3.0.
TERMINATING CUE:           MVG-2802A and MVG-2802B are closed and deenergized per EOP-3.0.
PREFERRED EVALUATION LOCATION                          PREFERRED EVALUATION METHOD PLANT                                                  SIMULATE


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:MVG-2802A and MVG-2802B are closed and deenergized per EOP-3.0.CANDIDATE:EOP-3.0FAULTED STEAM GENERATOR ISOLATIONINDEX NO.ROSROK/A NO.035000A406S/G isolation on steam leak or tube rupture/leak4.54.6A4.06061000K103Main steam system3.53.9K1.03000040A104Isolation of all steam lines from header4.34.3 AA1.04000040A110AFW System4.14.1 AA1.103/31/2016Page 2 of 8JPP-107A-N16 INITIATING CUES:The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:*  Open breaker 05EH on XMC1DA2X.
 
* Locally close valves XVG02802A-MS.*  Locally close valvesXVG02802B-MS.INITIAL CONDITION:* The plant was at 100% power when a steamline break occurred inside containment. * "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
EOP-3.0             FAULTED STEAM GENERATOR ISOLATION INDEX NO.       K/A NO.                                                               RO    SRO 035000A406      A4.06    S/G isolation on steam leak or tube rupture/leak              4.5    4.6 061000K103      K1.03    Main steam system                                            3.5    3.9 000040A104      AA1.04    Isolation of all steam lines from header                      4.3    4.3 000040A110      AA1.10    AFW System                                                    4.1    4.1 TOOLS:          EOP-3.0, STEP 5.j. ALTERNATIVE ACTION EVALUATION TIME                    20          TIME CRITICAL        No    10CFR55: 45.a.8 TIME START:                      TIME FINISH:                    PERFORMANCE TIME:
PERFORMANCE RATING:                SAT:              UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE          DATE 3/31/2016                                          JPP-107A-N16                                 Page 2 of 8
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:                      Burn Hazard INITIAL CONDITION:
* The plant was at 100% power when a steamline break occurred inside containment.
  * "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
* Both motor driven emergency feedwater pumps have started.
* Both motor driven emergency feedwater pumps have started.
* The CRS has implemented EOP-3.0, FAULTED STEAM GENERATOR ISOLATION, after     exiting EOP-1.0, REACTOR TRIP/SAFETY INJECTION ACTUATION.* The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and     MVG-2802B, MS LOOP C TO TD EFP from the MCB.* The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency   condition.* The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in   accordance with EOP-3.0 step 5 j Alternative Action.READ TO OPERATOR:SAFETY CONSIDERATIONS:
* The CRS has implemented EOP-3.0, FAULTED STEAM GENERATOR ISOLATION, after exiting EOP-1.0, REACTOR TRIP/SAFETY INJECTION ACTUATION.
Burn HazardWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary toolswith which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
* The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and MVG-2802B, MS LOOP C TO TD EFP from the MCB.
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF TH E ELECTRICAL PANEL!AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!3/31/2016Page 3 of 8JPP-107A-N16 EOP-3.0 Alternative ActionAA Step 5.j. Locally deenergize and close the appropriate valve.
* The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency condition.
* For SG B:   1) Open XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG-2802A-MS (IB-463).Evaluator Cue: Hand a blank copy of EOP-3.0, E2, FAULTED STEAM GENERATOR ISOLATION, page 4 which includes step 5 j. Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
* The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in accordance with EOP-3.0 step 5 j Alternative Action.
YesOperator locates the power supply (1DA2X, 05EH) for XVG-02802A and opens the breaker by pulling the breaker control lever down. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
INITIATING CUES:
13/31/2016Page 4 of 8JPP-107A-N16 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)* For SG C:   1) Open XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS         (AB-463).Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:
YesDetermines that the AB operator has already opened XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463). CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
* Open breaker 05EH on XMC1DA2X.
2AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)   2) Close XVG02802A-MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
* Locally close valves XVG02802A-MS.
YesOperator locates and closes XVG02802A-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
* Locally close valvesXVG02802B-MS.
33/31/2016Page 5 of 8JPP-107A-N16 Examiner ends JPM at this point.AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)   2) Close XVG02802B-MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
YesOperator locates and closes XVG02802B-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
43/31/2016Page 6 of 8JPP-107A-N16 JPM:JPP-107A-N16(NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFPIC SET:INSTRUCTIONS:COMMENTS: JPM SETUP SHEET3/31/2016Page 7 of 8JPP-107A-N16 INITIATING CUES:The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:*  Open breaker 05EH on XMC1DA2X.*  Locally close valves XVG02802A-MS.*  Locally close valvesXVG02802B-MS.INITIAL CONDITION:* The plant was at 100% power when a steamline break occurred inside containment.  
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!
* "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
3/31/2016                                              JPP-107A-N16                                         Page 3 of 8
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 1 EOP-3.0 Alternative Action AA Step 5.j. Locally deenergize and close the appropriate valve.
* For SG B:
: 1) Open XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG-2802A-MS (IB-463).
STEP STANDARD:
Operator locates the power supply (1DA2X, 05EH) for XVG-02802A and opens the breaker by pulling the breaker control lever down.
CUES:
Evaluator Cue: Hand a blank copy of EOP-3.0, E2, FAULTED STEAM GENERATOR ISOLATION, page 4 which includes step 5 j.
Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
COMMENTS:
3/31/2016                                          JPP-107A-N16                                       Page 4 of 8
 
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)
* For SG C:
: 1) Open XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).
STEP STANDARD:
Determines that the AB operator has already opened XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).
CUES:
Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 3 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)
: 2) Close XVG02802A-MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).
STEP STANDARD:
Operator locates and closes XVG02802A-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate.
CUES:
Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
COMMENTS:
3/31/2016                                          JPP-107A-N16                                         Page 5 of 8
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 4 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)
: 2) Close XVG02802B-MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).
STEP STANDARD:
Operator locates and closes XVG02802B-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate.
CUES:
Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.
COMMENTS:
Examiner ends JPM at this point.
3/31/2016                                          JPP-107A-N16                                         Page 6 of 8
 
JPM SETUP SHEET JPM: JPP-107A-N16 (NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFP IC SET:
INSTRUCTIONS:
COMMENTS:
3/31/2016                            JPP-107A-N16                                   Page 7 of 8
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                 Burn Hazard INITIAL CONDITION:
* The plant was at 100% power when a steamline break occurred inside containment.
    * "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
* Both motor driven emergency feedwater pumps have started.
* Both motor driven emergency feedwater pumps have started.
* The CRS has implemented EOP-3.0, FAULTED STEAM GENERATOR ISOLATION, after     exiting EOP-1.0, REACTOR TRIP/SAFETY INJECTION ACTUATION.* The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and     MVG-2802B, MS LOOP C TO TD EFP from the MCB.* The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency   condition.* The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in   accordance with EOP-3.0 step 5 j Alternative Action.SAFETY CONSIDERATIONS:
* The CRS has implemented EOP-3.0, FAULTED STEAM GENERATOR ISOLATION, after exiting EOP-1.0, REACTOR TRIP/SAFETY INJECTION ACTUATION.
Burn HazardOPERATOR INSTRUCTIONS:
* The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and MVG-2802B, MS LOOP C TO TD EFP from the MCB.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
* The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency condition.
JPM BRIEFING SHEETAT NO TIME ARE YOU TO O PERATE ANY PLANT EQUIPMENT!3/31/2016Page 8 of 8JPP-107A-N16 (NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.
* The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in accordance with EOP-3.0 step 5 j Alternative Action.
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPP-052A-N165/12/2016Page 1 of 15 JPP-052A-N16 TASK:063-007-01-04PREFERRED EVALUATION METHOD SIMULATEEVALUATION TIME:
INITIATING CUES:
15TIME CRITICAL:
The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:
NoTASK STANDARD:Bus 1HA is supplied from the swing charger XBC-1A/1B in accordance with SOP-311.PREFERRED EVALUATION LOCATION PLANTTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:45(a)8PLACE A BATTERY CHARGER IN SERVICETOOLS:SOP-311 SECTION IV.C (Provide operator with copy of SOP-311 SECTION IV.C, page 5 initial conditions completed).SOP-311 SECTION IV.P (Provide operator with copy of SOP-311 SECTION IV.P)
* Open breaker 05EH on XMC1DA2X.
* Locally close valves XVG02802A-MS.
* Locally close valvesXVG02802B-MS.
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
3/31/2016                                        JPP-107A-N16                                        Page 8 of 8
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-052A-N16 (NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.
CANDIDATE:
EXAMINER:
5/12/2016                            JPP-052A-N16                             Page 1 of 15
 
TASK: 063-007-01-04        PLACE A BATTERY CHARGER IN SERVICE TASK STANDARD:
Bus 1HA is supplied from the swing charger XBC-1A/1B in accordance with SOP-311.
TERMINATING CUE: Examinee has completed SOP-311 to startup the swing charger XBC1A-1B in service on DPN1HA.
PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION SIMULATE PLANT TOOLS: SOP-311 SECTION IV.C (Provide operator with copy of SOP-311 SECTION IV.C, page 5 initial conditions completed).
SOP-311 SECTION IV.P (Provide operator with copy of SOP-311 SECTION IV.P)


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Examinee has completed SOP-311 to startup the swing charger XBC1A-1B in service on DPN1HA.CANDIDATE:ISP-027ELECTRICAL SAFETYSOP-311125 VDC SYSTEMINDEX NO.ROSROK/A NO.000068A110Power distribution: ac and dc3.73.9 AA1.105/12/2016Page 2 of 15 JPP-052A-N16 INITIATING CUES:Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.INITIAL CONDITION:* DPN-1HA is being powered from Battery Charger 1A.* Battery Charger XBC1A is to be removed from service for scheduled maintenance.
 
ISP-027      ELECTRICAL SAFETY SOP-311       125 VDC SYSTEM INDEX NO.       K/A NO.                                                                 RO    SRO 000068A110      AA1.10    Power distribution: ac and dc                                  3.7    3.9 EVALUATION TIME: 15                        TIME CRITICAL: No                  10CFR55: 45(a)8 TIME START:                        TIME FINISH:                  PERFORMANCE TIME:
PERFORMANCE RATING:                  SAT:          UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE                DATE 5/12/2016                                        JPP-052A-N16                                     Page 2 of 15
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:                      Energizing electrical equipment INITIAL CONDITION:
* DPN-1HA is being powered from Battery Charger 1A.
* Battery Charger XBC1A is to be removed from service for scheduled maintenance.
* DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
* DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
* XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.* The initial conditions for removing Battery Charger XBC1A from service, SOP-311   Section IV.C, are met:   - Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.   - The battery charger timer for XBC1A is set at zero hours and zero minutes.* A manual STTS for the electricians to adjust Battery Charger voltage has been generated.READ TO OPERATOR:SAFETY CONSIDERATIONS:Energizing electrical equipmentWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
* XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!5/12/2016Page 3 of 15 JPP-052A-N16 Section IV.C. REMOVING BATTERY CHARGER XBC1A FROM SERVICEINITIAL CONDITIONS Step 1.1 The FLOAT/EQUALIZER Switch is selected to FLOAT.Step 1.2 The battery charger timer for XBC1A is set at zero hours and zero minutes.Evaluator Note: Initial conditions are completed on the copy provided to the operator and the conditions are stated in the JPM Initial Conditions. Evaluator Cue: If requested, inform examinee of the following initial conditions:     The FLOAT/EQUALIZER switch is in the FLOAT position. The Battery Charger timer for XBC-1B is set at 0 hours and 0 minutes.
* The initial conditions for removing Battery Charger XBC1A from service, SOP-311 Section IV.C, are met:
YesVerifies the FLOAT/EQUALIZER Switch is selected to FLOAT and the battery charger timer for XBC1A is set at zero hours and zero minutes. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
    - Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.
1Step 2.1 Place XBC1A-1B, DC DISTRI BUS 1A-1B BACKUP BATTERY CHRG, in service per Section IV.
    - The battery charger timer for XBC1A is set at zero hours and zero minutes.
YesExaminee transitions to Section IV. P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HA. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
* A manual STTS for the electricians to adjust Battery Charger voltage has been generated.
25/12/2016Page 4 of 15 JPP-052A-N16 Section P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HAStep 2.1 Generate a manual STTS for the electricians to adjust Battery Charger voltage per STP-501.001A,               Battery XBA1A Weekly Test, at the conclusion of this procedure.Examiner Note: The Initial Conditions states that an STTS has been generated.Examiner Note: If the examinee starts at Section C, Step 2.1 directs the operator to place XBC1A-1B in service.
INITIATING CUES:
YesIndicates that this step has been completed. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.
4Step 2.2 Ensure the following breakers are open on the Swing Battery Charger, XBC1A-1B:           a. CB2, DC OUTPUT.           b. CB1, AC INPUT.Examiner Cue: XBC1A-1B CB2 and CB1 are open.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
YesVerifies that XBC1A-1B CB2 and CB1 are open. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
55/12/2016Page 5 of 15 JPP-052A-N16 Step 2.3  Ensure XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed (AB-412).Examiner Cue: XMC1DA2Y 08KM is closed.
FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!
YesVerifies that XMC1DA2Y 08KM is closed. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
5/12/2016                                              JPP-052A-N16                                       Page 3 of 15
6Step 2.4 Ensure the following breakers on XET-4003-ED are open:     a. TRAIN A-AC.         b. TRAIN A-DC.         c. TRAIN B-AC.         d. TRAIN B-DC.Examiner Cue: Breakers TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open.
 
YesVerifies that breakers; TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 1 Section IV.C. REMOVING BATTERY CHARGER XBC1A FROM SERVICE INITIAL CONDITIONS Step 1.1 The FLOAT/EQUALIZER Switch is selected to FLOAT.
75/12/2016Page 6 of 15 JPP-052A-N16 NOTE 2.5; The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower right hand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker YesNo further actions for this step. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Step 1.2 The battery charger timer for XBC1A is set at zero hours and zero minutes.
8Step 2.5 Align XET-4003-ED Transfer Switch to supply DPN1HA as follows:               a. Close TRAIN A-AC Breaker to Battery Charger XBC1A-1B.               b. Close TRAIN A-DC Breaker from Battery Charger XBC1A-1B.Evaluator Note: The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower righthand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker. (Train "A" AC to Train "B" DC and Train "A" DC goes to Train "B" AC). Evaluator Note: If the operator tries to swap AC to AC or DC to DC inform him that the key will not turn.
STEP STANDARD:
YesCloses TRAIN A-AC breaker and Train B-DC breaker for battery charger 1A-1B on XET-4003-ED using key interlocks. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Verifies the FLOAT/EQUALIZER Switch is selected to FLOAT and the battery charger timer for XBC1A is set at zero hours and zero minutes.
95/12/2016Page 7 of 15 JPP-052A-N16 Step 2.6  Verify the FLOAT/EQUALIZER is selected to FLOAT.Evaluator Cue: If asked cue examinee that the switch is in the 'Float' position or 'As Seen'.
CUES:
YesFLOAT/EQUALIZER Switch verified in the FLOAT position ON XBC1A-1B. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator Note: Initial conditions are completed on the copy provided to the operator and the conditions are stated in the JPM Initial Conditions.
10Note: 2.7; Breaker #13 controls the incoming line from XET-4003-ED.Step 2.7 Ensure DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA, is open.Evaluator Note: Breaker 13 aligns the incoming line from XET-4003-ED YesChecks DPN-1HA-ED BKR 13, BATTERY CHARGER 1A-1B FEED TO DPN 1HA is in the OPEN position. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Evaluator Cue: If requested, inform examinee of the following initial conditions:
115/12/2016Page 8 of 15 JPP-052A-N16 Step 2.8 Close the following on the front of the Swing Battery Charger, XBC1A-1B:               a. CB2, DC OUTPUT               b. CB1, AC INPUT YesCloses the DC OUTPUT (CB2) and AC INPUT (CB1) breakers on battery charger XBC1A-1B in the ON position. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
The FLOAT/EQUALIZER switch is in the FLOAT position.
12Note 2.9 through 2.14; Electrical Maintenance should be notified of abnormal output voltage fluctuations. Continued voltage fluctuations following the performance of Step 2.14 require the generation of an MWR to investigate and correct the cause of such fluctuationsStep 2.9 Verify DC OUPUT voltmeter is between 131 volts and 137 volts.Evaluator Cue: When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, inform the operator that voltage is 133 volts.
The Battery Charger timer for XBC-1B is set at 0 hours and 0 minutes.
YesChecks DC OUTPUT VOLTMETER stabilizes at 131-137 volts. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
COMMENTS:
135/12/2016Page 9 of 15 JPP-052A-N16 NOTE 2.10; Five to ten seconds should be allowed for the capacitors to fully charge and the battery charger to stabilize. Illumination of the red indicator lights indicates charged capacitors.Step 2.10 Verify the capacitors are fully charged by observing the red indicator lights on XPN5294,                   BATTERY CHARGER FILTER CAPACITOR BOX.Evaluator Cue: When the indicator lights are identified, inform the operator that the red indicator lights are ON.YesWaits approximately 5 to 10 seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 Step 2.1 Place XBC1A-1B, DC DISTRI BUS 1A-1B BACKUP BATTERY CHRG, in service per Section IV.
14Step 2.11 Close DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA.Evaluator Note: Located in the 1A Battery Charger Room.
STEP STANDARD:
YesClose DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Examinee transitions to Section IV. P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HA.
155/12/2016Page 10 of 15 JPP-052A-N16 Step 2.12 If XBC1A is in service, remove XBC1A from service per Section IV.
CUES:
YesOperator transitions to SOP-311, (Section IV.C) to complete steps. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
COMMENTS:
16Section IV.C. Step 2.2 To remove XBC1A, DC DISTRI BUS 1A BATTERY CHARGER, from service, open the following:               a. DPN1HA 11, BATTERY CHARGER 1A FEED TO DPN1HA.               b. CB2, DC OUTPUT, on XBC1A.               c. CB1, AC INPUT, on XBC1A.Transitions back to Section IV.P and continues at Step 2.13 when Section IV.C is complete.
5/12/2016                                          JPP-052A-N16                               Page 4 of 15
YesOpens DPN-1HA-ED 11, BATTERY CHARGER 1A FEED TO DPN1HA.Opens CB 2, DC OUTPUT, on XBC1A.Opens CB 1, AC INPUT, on XBC1A. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
 
175/12/2016Page 11 of 15 JPP-052A-N16 Examiner ends JPM at this point.Section IV.PStep 2.13 Verify XBC1A-1B, SWING BATTERY CHARGER, picks up any DC loads.Evaluator Cue: Inform operator that Swing Charger ammeter indicates 35 amps and voltmeter indicates 134 VDC when requested.The Evaluator may terminate the JPM at this point.
CRITICAL: No                SEQUENCED: Yes                        SAT              UNSAT JPM STEP: 4 Section P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HA Step 2.1 Generate a manual STTS for the electricians to adjust Battery Charger voltage per STP-501.001A, Battery XBA1A Weekly Test, at the conclusion of this procedure.
YesVerify XBC1A-1B, Swing Battery Charger, picks up any DC loads. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STEP STANDARD:
185/12/2016Page 12 of 15 JPP-052A-N16 JPM:JPP-052A-N16(NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.IC SET:INSTRUCTIONS:COMMENTS: JPM SETUP SHEET5/12/2016Page 13 of 15 JPP-052A-N16 INITIATING CUES:Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.INITIAL CONDITION:* DPN-1HA is being powered from Battery Charger 1A.* Battery Charger XBC1A is to be removed from service for scheduled maintenance.
Indicates that this step has been completed.
CUES:
Examiner Note: The Initial Conditions states that an STTS has been generated.
Examiner Note: If the examinee starts at Section C, Step 2.1 directs the operator to place XBC1A-1B in service.
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                        SAT              UNSAT JPM STEP: 5 Step 2.2 Ensure the following breakers are open on the Swing Battery Charger, XBC1A-1B:
: a. CB2, DC OUTPUT.
: b. CB1, AC INPUT.
STEP STANDARD:
Verifies that XBC1A-1B CB2 and CB1 are open.
CUES:
Examiner Cue: XBC1A-1B CB2 and CB1 are open.
COMMENTS:
5/12/2016                                        JPP-052A-N16                                   Page 5 of 15
 
CRITICAL: No              SEQUENCED: Yes                      SAT        UNSAT JPM STEP: 6 Step 2.3 Ensure XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed (AB-412).
STEP STANDARD:
Verifies that XMC1DA2Y 08KM is closed.
CUES:
Examiner Cue: XMC1DA2Y 08KM is closed.
COMMENTS:
CRITICAL: No               SEQUENCED: Yes                      SAT        UNSAT JPM STEP: 7 Step 2.4 Ensure the following breakers on XET-4003-ED are open:
: a. TRAIN A-AC.
: b. TRAIN A-DC.
: c. TRAIN B-AC.
: d. TRAIN B-DC.
STEP STANDARD:
Verifies that breakers; TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open.
CUES:
Examiner Cue: Breakers TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open.
COMMENTS:
5/12/2016                                      JPP-052A-N16                         Page 6 of 15
 
CRITICAL: No                SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 8 NOTE 2.5; The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower right hand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker STEP STANDARD:
No further actions for this step.
CUES:
COMMENTS:
CRITICAL: Yes                SEQUENCED: Yes                            SAT            UNSAT JPM STEP: 9 Step 2.5 Align XET-4003-ED Transfer Switch to supply DPN1HA as follows:
: a. Close TRAIN A-AC Breaker to Battery Charger XBC1A-1B.
: b. Close TRAIN A-DC Breaker from Battery Charger XBC1A-1B.
STEP STANDARD:
Closes TRAIN A-AC breaker and Train B-DC breaker for battery charger 1A-1B on XET-4003-ED using key interlocks.
CUES:
Evaluator Note: The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower right hand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker. (Train "A" AC to Train "B" DC and Train "A" DC goes to Train "B" AC).
Evaluator Note: If the operator tries to swap AC to AC or DC to DC inform him that the key will not turn.
COMMENTS:
5/12/2016                                          JPP-052A-N16                                        Page 7 of 15
 
CRITICAL: No              SEQUENCED: Yes                           SAT                UNSAT JPM STEP: 10 Step 2.6 Verify the FLOAT/EQUALIZER is selected to FLOAT.
STEP STANDARD:
FLOAT/EQUALIZER Switch verified in the FLOAT position ON XBC1A-1B.
CUES:
Evaluator Cue: If asked cue examinee that the switch is in the 'Float' position or 'As Seen'.
COMMENTS:
CRITICAL: No              SEQUENCED: Yes                            SAT                UNSAT JPM STEP: 11 Note: 2.7; Breaker #13 controls the incoming line from XET-4003-ED.
Step 2.7 Ensure DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA, is open.
STEP STANDARD:
Checks DPN-1HA-ED BKR 13, BATTERY CHARGER 1A-1B FEED TO DPN 1HA is in the OPEN position.
CUES:
Evaluator Note: Breaker 13 aligns the incoming line from XET-4003-ED COMMENTS:
5/12/2016                                        JPP-052A-N16                                 Page 8 of 15
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 12 Step 2.8 Close the following on the front of the Swing Battery Charger, XBC1A-1B:
: a. CB2, DC OUTPUT
: b. CB1, AC INPUT STEP STANDARD:
Closes the DC OUTPUT (CB2) and AC INPUT (CB1) breakers on battery charger XBC1A-1B in the ON position.
CUES:
COMMENTS:
CRITICAL: No                SEQUENCED: Yes                         SAT            UNSAT JPM STEP: 13 Note 2.9 through 2.14; Electrical Maintenance should be notified of abnormal output voltage fluctuations.
Continued voltage fluctuations following the performance of Step 2.14 require the generation of an MWR to investigate and correct the cause of such fluctuations Step 2.9 Verify DC OUPUT voltmeter is between 131 volts and 137 volts.
STEP STANDARD:
Checks DC OUTPUT VOLTMETER stabilizes at 131-137 volts.
CUES:
Evaluator Cue: When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, inform the operator that voltage is 133 volts.
COMMENTS:
5/12/2016                                          JPP-052A-N16                                     Page 9 of 15
 
CRITICAL: No                  SEQUENCED: Yes                            SAT          UNSAT JPM STEP: 14 NOTE 2.10; Five to ten seconds should be allowed for the capacitors to fully charge and the battery charger to stabilize. Illumination of the red indicator lights indicates charged capacitors.
Step 2.10 Verify the capacitors are fully charged by observing the red indicator lights on XPN5294, BATTERY CHARGER FILTER CAPACITOR BOX.
STEP STANDARD:
Waits approximately 5 to 10 seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit.
CUES:
Evaluator Cue: When the indicator lights are identified, inform the operator that the red indicator lights are ON.
COMMENTS:
CRITICAL: Yes                  SEQUENCED: Yes                            SAT          UNSAT JPM STEP: 15 Step 2.11 Close DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA.
STEP STANDARD:
Close DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA.
CUES:
Evaluator Note: Located in the 1A Battery Charger Room.
COMMENTS:
5/12/2016                                              JPP-052A-N16                                     Page 10 of 15
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 16 Step 2.12 If XBC1A is in service, remove XBC1A from service per Section IV.
STEP STANDARD:
Operator transitions to SOP-311, (Section IV.C) to complete steps.
CUES:
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                         SAT            UNSAT JPM STEP: 17 Section IV.C.
Step 2.2 To remove XBC1A, DC DISTRI BUS 1A BATTERY CHARGER, from service, open the following:
: a. DPN1HA 11, BATTERY CHARGER 1A FEED TO DPN1HA.
: b. CB2, DC OUTPUT, on XBC1A.
: c. CB1, AC INPUT, on XBC1A.
STEP STANDARD:
Opens DPN-1HA-ED 11, BATTERY CHARGER 1A FEED TO DPN1HA.
Opens CB 2, DC OUTPUT, on XBC1A.
Opens CB 1, AC INPUT, on XBC1A.
CUES:
Transitions back to Section IV.P and continues at Step 2.13 when Section IV.C is complete.
COMMENTS:
5/12/2016                                        JPP-052A-N16                             Page 11 of 15
 
CRITICAL: No            SEQUENCED: Yes                        SAT            UNSAT JPM STEP: 18 Section IV.P Step 2.13 Verify XBC1A-1B, SWING BATTERY CHARGER, picks up any DC loads.
STEP STANDARD:
Verify XBC1A-1B, Swing Battery Charger, picks up any DC loads.
CUES:
Evaluator Cue: Inform operator that Swing Charger ammeter indicates 35 amps and voltmeter indicates 134 VDC when requested.
The Evaluator may terminate the JPM at this point.
COMMENTS:
Examiner ends JPM at this point.
5/12/2016                                        JPP-052A-N16                             Page 12 of 15
 
JPM SETUP SHEET JPM: JPP-052A-N16 (NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.
IC SET:
INSTRUCTIONS:
COMMENTS:
5/12/2016                            JPP-052A-N16                                 Page 13 of 15
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  Energizing electrical equipment INITIAL CONDITION:
* DPN-1HA is being powered from Battery Charger 1A.
* Battery Charger XBC1A is to be removed from service for scheduled maintenance.
* DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
* DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
* XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.* The initial conditions for removing Battery Charger XBC1A from service, SOP-311   Section IV.C, are met:   - Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.   - The battery charger timer for XBC1A is set at zero hours and zero minutes.* A manual STTS for the electricians to adjust Battery Charger voltage has been generated.SAFETY CONSIDERATIONS:Energizing electrical equipmentOPERATOR INSTRUCTIONS:
* XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.
Hand this paper back to your Evaluator when you have satisfactorily comp leted the assigned task.
* The initial conditions for removing Battery Charger XBC1A from service, SOP-311 Section IV.C, are met:
JPM BRIEFING SHEETAT NO TIME ARE YOU TO O PERATE ANY PLANT EQUIPMENT!5/12/2016Page 14 of 15 JPP-052A-N16 2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume Determination V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-021A-(C)N165/6/2016Page 1 of 7 TASK:004-006-01-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 20TIME CRITICAL NOTASK STANDARD:Examinee determines that about 9359 gals (interpolated value) will be required for dilution. A range of 9250 to 9450 (~ +/- 100 gal or ~ 1%) would be acceptable. If the examinee elects to calculate vice interpolate, the calculated value is the same range. Examinee determines that available volume in Recycle Holdup Tank is NOT sufficient to accomodate the calculated dilution. Volume required exceeds the volume at overflow 44,353 gallons required vice 42,989 gallons at overflow.PREFERRED EVALUATION LOCATIONCLASSROOMTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55: 45b (1)(12)PERFORM BORON CHANGE CALCULATIONSTOOLS:Curve Book (Accessible via Desk Top Computers)
      - Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.
      - The battery charger timer for XBC1A is set at zero hours and zero minutes.
* A manual STTS for the electricians to adjust Battery Charger voltage has been generated.
INITIATING CUES:
Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.
AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!
Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.
5/12/2016                                          JPP-052A-N16                                Page 14 of 15
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-021A-(C)N16 2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume Determination CANDIDATE:
EXAMINER:
5/6/2016                                                                          Page 1 of 7
 
TASK: 004-006-01-01          PERFORM BORON CHANGE CALCULATIONS TASK STANDARD:
Examinee determines that about 9359 gals (interpolated value) will be required for dilution. A range of 9250 to 9450 (~ +/- 100 gal or ~ 1%) would be acceptable. If the examinee elects to calculate vice interpolate, the calculated value is the same range. Examinee determines that available volume in Recycle Holdup Tank is NOT sufficient to accomodate the calculated dilution. Volume required exceeds the volume at overflow 44,353 gallons required vice 42,989 gallons at overflow.
TERMINATING CUE:              Calculations completed.
PREFERRED EVALUATION LOCATION                            PREFERRED EVALUATION METHOD CLASSROOM                                                  PERFORM
 
==REFERENCES:==
 
SOP-106                REACTOR MAKEUP WATER SYSTEM INDEX NO.        K/A NO.                                                                  RO    SRO 1940012125      2.1.25      Ability to interpret reference materials such as graphs,      3.9    4.2 curves, tables, etc.
1940012137      2.1.37      Knowledge of procedures, guidelines, or limitations            4.3    4.6 associated with reactivity management.
TOOLS:           Curve Book (Accessible via Desk Top Computers)
Calculator JPM A1-a, Dilution Calculation hand out.
Calculator JPM A1-a, Dilution Calculation hand out.
EVALUATION TIME                      20          TIME CRITICAL        NO    10CFR55: 45b(1)(12)
TIME START:                        TIME FINISH:                      PERFORMANCE TIME:
PERFORMANCE RATING:                  SAT:              UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE            DATE 5/6/2016                                                                                              Page 2 of 7
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.
          - Latest RCS boron sample was 2038 ppm.
          - Estimated critical boron concentration is 1688 ppm.
          - "A" Recycle Holdup Tank is in service.
          - "A" Recycle Holdup Tank level is 83%.
INITIATING CUES:
The SM directs you to perform the following:
: 1. Determine the dilution volume required to establish the estimated critical boron concentration.
: 2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.
Show all work on the JPM A1-a Dilution Calculation hand out provided.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/6/2016                                                                                                      Page 3 of 7
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 1 Examinee determines that the amount of dilution required.
STEP STANDARD:
Determines Ci - Cf = 350 ppm dilution required.
CUES:
Evaluator note: Ci and Cf values are given in the initiating cue.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 Selects correct curve from curve book.
STEP STANDARD:
The examinee refers to Figure III-3, RCS Dilution Gallons (Vw) of Dilution Water Required, in the Curve Book.
CUES:
Evaluator note: Do NOT prompt Examinee on location of the dilution tables.
COMMENTS:
5/6/2016                                                                                              Page 4 of 7
CRITICAL: Yes              SEQUENCED: Yes                            SAT              UNSAT JPM STEP: 3 Examinee interpolates or calculates the volume of water required and reports the dilution volume required to the CRS.
STEP STANDARD:
Examinee determines that a dilution volume within a range of 9250 of 9450 gals is required.
CUES:
Evaluator note: The candidate may use either calculate of interpolate to determine the required volume. The range of 9250 to 9450 is acceptable for either method. See NJPA-021A(R1) Key for calculations.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                            SAT              UNSAT JPM STEP: 4 Examinee determines if adequate volume is available in the 'A' Recycle Holdup Tank.
STEP STANDARD:
Determines that a minimum volume is required = 35,000 + 9,250 = 43,750 gallons.
Volume at 100% = 42,235 gallons.
Volume at overflow = 42,989 gallons.
Required Volume > Volume available - >Recycle Holdup Volume is NOT Adequate CUES:
Evaluator note: 9250 gals is the lowest allowable value for the calculation in the previous step.
Examinee will refer to Curve Book Figure VI-24, Recycle Holdup Tank Volme XTK0006A/B to determine volume required and volume available. See NJPA-021A(R1) Key for calculations.
The candidate may use the 100% volume of 42235 gallons as the high level for the tank. Either is acceptable. The critical aspect of this step is to determine that adequate volume is NOT available.
COMMENTS:
Examiner ends JPM at this point.
5/6/2016                                                                                              Page 5 of 7
JPM SETUP SHEET JPM: JPA-021A-( 2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume Determination IC SET: NA INSTRUCTIONS:
COMMENTS:
5/6/2016                                                                                  Page 6 of 7
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.
      - Latest RCS boron sample was 2038 ppm.
      - Estimated critical boron concentration is 1688 ppm.
      - "A" Recycle Holdup Tank is in service.
      - "A" Recycle Holdup Tank level is 83%.
INITIATING CUES:
The SM directs you to perform the following:
: 1. Determine the dilution volume required to establish the estimated critical boron concentration.
: 2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.
Show all work on the JPM A1-a Dilution Calculation hand out provided.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/6/2016                                                                                                Page 7 of 7
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-050-(R)N16 2016 NRC A1-b (RO only): Verify Operability of Offsite Power Sources CANDIDATE:
EXAMINER:
5/18/2016                                                                      Page 1 of 8
TASK: 062-004-01-01        MONITOR THE AC ELECTRICAL DISTRIBUTION SYSTEM TASK STANDARD:
The applicant determines that the 230 KV source is NOT OPERABLE.
TERMINATING CUE:            Candidate determines that the 230 KV source is below the low voltage limit or the JPM is returned to the examiner.
PREFERRED EVALUATION LOCATION                          PREFERRED EVALUATION METHOD SIMULATOR                                                  PERFORM


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Calculations completed.CANDIDATE:SOP-106REACTOR MAKEUP WATER SYSTEMINDEX NO.ROSROK/A NO.1940012125Ability to interpret reference materials such as graphs, curves, tables, etc.3.94.22.1.251940012137Knowledge of procedures, guidelines, or limitations associated with reactivity management.4.34.62.1.375/6/2016Page 2 of 7 INITIATING CUES:The SM directs you to perform the following:1. Determine the dilution volume required to establish the estimated critical boron concentration. 2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.Show all work on the JPM A1-a Dilution Calculation hand out provided.INITIAL CONDITION:The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.- Latest RCS boron sample was 2038 ppm.- Estimated critical boron concentration is 1688 ppm.
 
- "A" Recycle Holdup Tank is in service.- "A" Recycle Holdup Tank level is 83%.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/6/2016Page 3 of 7 Examinee determines that the amount of dilution required.Evaluator note: Ci and Cf values are given in the initiating cue.
SOP-304              115KV/7.2KV OPERATIONS INDEX NO.       K/A NO.                                                                 RO    SRO 1940012132      2.1.32      Ability to explain and apply system limits and precautions. 3.8    4.0 TOOLS:          Partially completed hard copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST If performed as a table-top JPM, photgraphs of the Control Board with the required electrical alignments and voltages for the initial conditions.
YesDetermines Ci - Cf = 350 ppm dilution required. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
EVALUATION TIME                      15          TIME CRITICAL        No      10CFR55: 45b(1)(12)
1Selects correct curve from curve book.Evaluator note: Do NOT prompt Examinee on location of the dilution tables.
TIME START:                        TIME FINISH:                    PERFORMANCE TIME:
YesThe examinee refers to Figure III-3, RCS Dilution Gallons (Vw) of Dilution Water Required, in the Curve Book. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
PERFORMANCE RATING:                  SAT:            UNSAT:
25/6/2016Page 4 of 7 Examiner ends JPM at this point.Examinee interpolates or calculates the volume of water required and reports the dilution volume required to the CRS.Evaluator note: The candidate may use either calculate of interpolate to determine the required volume. The range of 9250 to 9450  is acceptable for either method. See NJPA-021A(R1) Key for calculations.
CANDIDATE:
YesExaminee determines that a dilution volume within a range of 9250 of 9450 gals is required. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
EXAMINER:
3Examinee determines if adequate volume is available in the 'A' Recycle Holdup Tank.Evaluator note: 9250 gals is the lowest allowable value for the calculation in the previous step. Examinee will refer to Curve Book Figure VI-24, Recycle Holdup Tank Volme XTK0006A/B to determine volume required and volume available. See NJPA-021A(R1) Key for calculations.The candidate may use the 100% volume of 42235 gallons as the high level for the tank. Either is acceptable. The critical aspect of this step is to determine that adequate volume is NOT available.
SIGNATURE          DATE 5/18/2016                                                                                            Page 2 of 8
YesDetermines that a minimum volume is required =  35,000 + 9,250 = 43,750 gallons. Volume at 100% = 42,235 gallons.Volume at overflow = 42,989 gallons.
 
Required Volume > Volume available  - >Recycle Holdup Volume is NOT Adequate CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
45/6/2016Page 5 of 7 JPM: JPA-021A-(2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume DeterminationIC SET: NAINSTRUCTIONS:COMMENTS: JPM SETUP SHEET5/6/2016Page 6 of 7 INITIATING CUES:The SM directs you to perform the following:1. Determine the dilution volume required to establish the estimated critical boron concentration. 2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.Show all work on the JPM A1-a Dilution Calculation hand out provided.INITIAL CONDITION:The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.- Latest RCS boron sample was 2038 ppm.- Estimated critical boron concentration is 1688 ppm.- "A" Recycle Holdup Tank is in service.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
- "A" Recycle Holdup Tank level is 83%.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
JPM BRIEFING SHEET5/6/2016Page 7 of 7 2016 NRC A1-b (RO only): Verify Operability of Offsite Power Sources V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-050-(R)N165/18/2016Page 1 of 8 TASK:062-004-01-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 15TIME CRITICAL NoTASK STANDARD:The applicant determines that the 230 KV source is NOT OPERABLE.PREFERRED EVALUATION LOCATIONSIMULATORTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55: 45b (1)(12)MONITOR THE AC ELECTRICAL DISTRIBUTION SYSTEMTOOLS:Partially completed hard copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST If performed as a table-top JPM, photgraphs of the Control Board with the required electrical alignments and voltages for the initial conditions.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS: NONE.
INITIAL CONDITION:
The plant is Mode 3 after an outage.
BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.
System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.
The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.
INITIATING CUES:
You have been directed to perform the following:
: 1) Using the partially completed copy of STP-125.001 that is provided to you:
          - Complete STP-125.001, Attachment I, page 1 of 2.
          - Complete STP-125.001, Attachment II, page 2 of 3.
: 2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/18/2016                                                                                                    Page 3 of 8
 
CRITICAL: No                SEQUENCED: Yes                              SAT            UNSAT JPM STEP: 1 Completes STP-125.001 Attachment I, page 1 of 2.
STEP STANDARD:
Records the following information obtained from the Main Control Board:
- ESF XFMR FEED KV (115 KV) as read on the Main Control Board.
- Section II Breaker positions BUS 1DA NORM FEED > OPEN BUS 1DB ALT FEED          > OPEN ESF XFMR 4 FEED CKT SW 1826 (XES 4) > CLOSED ESF XFMR 5 FEED CKT SW 1838 (XES 5) > CLOSED CUES:
Evaluator Notes:
Steps can be performed in any order.
Only Section II is required for this breaker configuration.
If this is performed as a tabletop, the candidate will verify the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.
COMMENTS:
5/18/2016                                                                                              Page 4 of 8
 
CRITICAL: Yes                SEQUENCED: Yes                              SAT              UNSAT JPM STEP: 2 Completes STP-125.001 Attachment II, page 2 of 3.
STEP STANDARD:
Records the following information obtained from the Main Control Board:
- INCOMING 230 KV BUS (230 KV voltage)
- EMERG AUX XFMR FEED XCB 8892 > CLOSED
- Section I Breaker positions BUS 1DB NORM FEED > CLOSED BUS 1DA ALT FEED          > CLOSED CUES:
Evaluator Notes:
Steps can be performed in any order.
Only Section I is required for this breaker configuration. The critical aspect of this step is the identification of the correct 230 KV voltage. If the candidate records breaker indications improperly and determines the correct voltage limit later, this is a non-critical error if the follow-on questions indicate that it was a simple recording error and that the candidate was aware of the current electric plant lineup.
If this is performed as a tabletop, the candidate will verify voltage and the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.
COMMENTS:
5/18/2016                                                                                                    Page 5 of 8
 
CRITICAL: Yes                SEQUENCED: No                          SAT            UNSAT JPM STEP: 3 Determines the voltage limits for the offsite power sources.
STEP STANDARD:
Refers to STP-125.001, Enclosure A. Refers to the 230 KV Source section, XTF-31, connected buses 1DA and 1DB, Generator Off Line. Determines a low voltage limit for the 230KV source of 225.7 KV.
CUES:
Evaluator Notes:
The candidate may refer to SOP-304, 115KV/7.2KV OPERATIONS. The voltage limits in that procedure are the same as in STP-125.001.
The limit is located on the far right column on the second row under the 230 KV Source section.
There is no applicable limit for 115 KV voltage on Enclosure A since neither 1DA or 1DB are supplied by that source.
COMMENTS:
CRITICAL: Yes                SEQUENCED: No                          SAT            UNSAT JPM STEP: 4 Compares the reading on INCOMING 230 KV BUS to the allowed limit from Attachment 1 and determines that actual voltage is below the limit.
STEP STANDARD:
Reports that the actual voltage read on INCOMING 230 KV BUS is less than the lower limt contained in STP-125.001.
CUES:
COMMENTS:
Examiner ends JPM at this point.
5/18/2016                                                                                            Page 6 of 8
 
JPM SETUP SHEET JPM: JPA-050-(R 2016 NRC A1-b (RO only): Verify Operability of Offsite Power Sources IC SET: IC-5 INSTRUCTIONS:
Use IC-290 for 2016 NRC exam. If not available, bring up a IC that is mode 3, TAVG 557&deg;F and perform the following:
Align IDA to breaker BUS 1DA ALT FEED using the BUS 1DA XFER INIT Switch (refer to SOP-304).
Adjust 230KV voltage until digital meter on XCP-6118 reads 225.4 KV.
Provide a partially completed copy of STP-125.001 that is marked-up as follows:
An entry is made for each component position on Attachment I, page 2 of 2 which is the same as the NORMAL POSITION".
An entry is made for each component position on Attachment II, page 1 of 3 which is the same as the NORMAL POSITION".
COMMENTS:
NOTE: This alignment can be photographed if the JPM will be run as a table top. After the setup, photgraph panels XCP-6117 and XCP-6118 showing breaker alignments and 115KV and 230KV voltages on digital meters 5/18/2016                                                                                          Page 7 of 8
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  NONE.
INITIAL CONDITION:
The plant is Mode 3 after an outage.
BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.
System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.
The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.
INITIATING CUES:
You have been directed to perform the following:
: 1) Using the partially completed copy of STP-125.001 that is provided to you:
      - Complete STP-125.001, Attachment I, page 1 of 2.
      - Complete STP-125.001, Attachment II, page 2 of 3.
: 2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/18/2016                                                                                              Page 8 of 8
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-051-(S)N16 2016 NRC A1-b (SRO only): Verify Operability of Offsite Power Sources CANDIDATE:
EXAMINER:
5/18/2016                                                                      Page 1 of 7
 
TASK: 341-032-03-02        EVALUATE PLANT SYSTEMS PERFORMANCE AND COORDINATE APPROPRIATE ACTIONS PER TECHNICAL SPECIFICATIONS IN THE EVENT AN LIMITING CONDITION FOR OPERATION IS ENTERED/NOT SATISFIED.
TASK STANDARD:
The applicant determines that both OFFSITE power sources are NOT OPERABLE and that T.S.
Action Statement 3.8.1.1.d is in effect.
TERMINATING CUE:           The applicant returns the JPM briefing sheet and completed handout to the examiner.
PREFERRED EVALUATION LOCATION                          PREFERRED EVALUATION METHOD CLASSROOM                                                  PERFORM


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Candidate determines that  the 230 KV source is below the low voltage limit or the JPM is returned to the examiner.CANDIDATE:SOP-304115KV/7.2KV OPERATIONSINDEX NO.ROSROK/A NO.1940012132Ability to explain and apply system limits and precautions.3.84.02.1.325/18/2016Page 2 of 8 INITIATING CUES:You have been directed to perform the following:1) Using the partially completed copy of STP-125.001 that is provided to you: - Complete STP-125.001, Attachment I, page 1 of 2. - Complete STP-125.001, Attachment II, page 2 of 3.2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.INITIAL CONDITION:The plant is Mode 3 after an outage. BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.READ TO OPERATOR:SAFETY CONSIDERATIONS:
 
NONE.When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/18/2016Page 3 of 8 Completes STP-125.001 Attachment I, page 1 of 2.Evaluator Notes:Steps can be performed in any order.Only Section II is required for this breaker configuration. If this is performed as a tabletop,  the candidate will verify the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.
SOP-304              115KV/7.2KV OPERATIONS INDEX NO.       K/A NO.                                                                 RO    SRO 1940012132      2.1.32      Ability to explain and apply system limits and precautions. 3.8     4.0 1940012240      2.2.40      Ability to apply technical specifications for a system.      3.4     4.7 TOOLS:         Partially completed copy STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST.
YesRecords the following information obtained from the Main Control Board:- ESF XFMR FEED KV (115 KV) as read on the Main Control Board.- Section II Breaker positions BUS 1DA NORM FEED  > OPEN  BUS 1DB ALT FEED       > OPEN  ESF XFMR 4 FEED CKT SW 1826 (XES 4)  >  CLOSED ESF XFMR 5 FEED CKT SW 1838 (XES 5)  >  CLOSED CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
Handout for recording Technical Specification.
15/18/2016Page 4 of 8 Completes STP-125.001 Attachment II, page 2 of 3.Evaluator Notes:Steps can be performed in any order.Only Section I is required for this breaker configuration. The critical aspect of this step is the identification of the correct 230 KV voltage. If the candidate records breaker indications improperly and determines the correct voltage limit later, this is a non-critical error if the follow-on questions indicate that it was a simple recording error and that the candidate was aware of the current electric plant lineup.If this is performed as a tabletop,  the candidate will verify voltage and the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.
YesRecords the following information obtained from the Main Control Board:- INCOMING 230 KV BUS (230 KV voltage)- EMERG AUX XFMR FEED XCB 8892  > CLOSED- Section I Breaker positions  BUS 1DB NORM FEED  > CLOSED  BUS 1DA ALT FEED      > CLOSED CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
25/18/2016Page 5 of 8 Examiner ends JPM at this point.Determines the voltage limits for the offsite power sources.Evaluator Notes:  The candidate may refer to SOP-304, 115KV/7.2KV OPERATIONS. The voltage limits in that procedure are the same as in STP-125.001.The limit is located on the far right column on the second row under the 230 KV Source section.
There is no applicable limit for 115 KV voltage on Enclosure A since neither 1DA or 1DB are supplied by that source.
NoRefers to STP-125.001, Enclosure A. Refers to the 230 KV Source section, XTF-31, connected buses 1DA and 1DB, Generator Off Line. Determines a low voltage limit for the 230KV source of 225.7 KV. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
3Compares the reading on INCOMING 230 KV BUS to the allowed limit from Attachment 1 and determines that actual voltage is below the limit.
NoReports that the actual voltage read on INCOMING 230 KV BUS is less than the lower limt contained in STP-125.001. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
45/18/2016Page 6 of 8 JPM: JPA-050-(R2016 NRC A1-b (RO only): Verify Operability of Offsite Power SourcesIC SET:IC-5INSTRUCTIONS:Use IC-290 for 2016 NRC exam. If not available, bring up a IC that is mode 3, TAVG 557&deg;F and perform the following:Align IDA to breaker BUS 1DA ALT FEED using the BUS 1DA XFER INIT Switch (refer to SOP-304).Adjust 230KV voltage until digital meter on XCP-6118 reads 225.4 KV.Provide a partially completed copy of STP-125.001 that is marked-up as follows:An entry is made for each component position on Attachment I, page 2 of 2  which is the same as the NORMAL POSITION".An entry is made for each component position on Attachment II, page 1 of 3  which is the same as the NORMAL POSITION".COMMENTS:NOTE:  This alignment can be photographed if the JPM will be run as a table top. After the setup, photgraph panels XCP-6117 and XCP-6118 showing breaker alignments and 115KV and 230KV voltages on digital meters JPM SETUP SHEET5/18/2016Page 7 of 8 INITIATING CUES:You have been directed to perform the following:1) Using the partially completed copy of STP-125.001 that is provided to you: - Complete STP-125.001, Attachment I, page 1 of 2.  - Complete STP-125.001, Attachment II, page 2 of 3.2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.INITIAL CONDITION:The plant is Mode 3 after an outage. BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.SAFETY CONSIDERATIONS:
NONE.OPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
JPM BRIEFING SHEET5/18/2016Page 8 of 8 2016 NRC A1-b (SRO only): Verify Operability of Offsite Power Sources V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-051-(S)N165/18/2016Page 1 of 7 TASK:341-032-03-02PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 15TIME CRITICAL NoTASK STANDARD:The applicant determines that both OFFSITE power sources are NOT OPERABLE and that T.S. Action Statement 3.8.1.1.d is in effect.PREFERRED EVALUATION LOCATIONCLASSROOMTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55: 45b (1)(12)EVALUATE PLANT SYSTEMS PERFORMANCE AND COORDINATE APPROPRIATE ACTIONS PER TECHNICAL SPECIFICATIONS IN THE EVENT AN LIMITING CONDITION FOR OPERATION IS ENTERED/NOT SATISFIED.TOOLS:Partially completed copy STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST.Handout for recording Technical Specification.
Hardcopy or electronic V.C. Summer procedures.
Hardcopy or electronic V.C. Summer procedures.
EVALUATION TIME                      15          TIME CRITICAL          No    10CFR55: 45b(1)(12)
TIME START:                        TIME FINISH:                      PERFORMANCE TIME:
PERFORMANCE RATING:                  SAT:            UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE          DATE 5/18/2016                                                                                            Page 2 of 7
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS: NONE.
INITIAL CONDITION:
The plant is mode 3 after an outage.
Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.
All Balance of Plant bus breakers are normally aligned.
STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.
INITIATING CUES:
You are directed to perform the following:
          - Review the partially completed copy of STP-125.001 Attachments I and II.
          - Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.
          - Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.
          - ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/18/2016                                                                                                    Page 3 of 7
CRITICAL: No                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 1 Reviews copy of STP-125.001.
STEP STANDARD:
N/A CUES:
Note to Examiner: The candidate should have been provided with the partially completed copy of STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST and JPM Handout as part of the initial briefing.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 2 Identifies that the 115 KV Offsite power source is NOT OPERABLE.
STEP STANDARD:
Checks the box for the second statement on Attachment I, page 2 of 2.
CUES:
Note to Examiner: This determination is made by noting that both BUS 1DA NORM FEED and BUS 1DB NORM FEED are open on Attachment I, page 1 of 2. This alignment fails to tie the 115 KV offsite power source to either 1DA or 1DB rendering that source inoperable.
If the candidate does not demonstrate this review, this can be probed by follow-on questions.
COMMENTS:
5/18/2016                                                                                          Page 4 of 7
CRITICAL: Yes              SEQUENCED: No                            SAT              UNSAT JPM STEP: 3 Determines that the 230 KV offsite power source is NOT OPERABLE.
STEP STANDARD:
Checks the box for the second statement on STP-125.001, Attachment II, page 3 of 3.
CUES:
Examiner note: This determination is made by comparing the voltage recorded on Attachment II, page 2 of 3, and the lower voltage limit of 225.7 KV. This is contained in Enclosure A, on the second row of the 230 KV section, far right column. Since actual voltage is less than the limit, this renders the 230 KV offsite power source inoperable.
If the candidate does not demonstrate this review, this can be probed by follow-on questioning.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                            SAT              UNSAT JPM STEP: 4 Candidate determines the applicable Technical Specification action statement.
STEP STANDARD:
The candidate, on the handout provided, checks the YES line and indicates that T.S. Action Statement 3.8.1.1.d. must be entered.
CUES:
The JPM can be terminated after the handout is completed or when the candidate returns the briefing sheet.
COMMENTS:
Examiner ends JPM at this point.
5/18/2016                                                                                                Page 5 of 7
JPM SETUP SHEET JPM: JPA-051-(S 2016 NRC A1-b (SRO only): Verify Operability of Offsite Power Sources IC SET:
INSTRUCTIONS:
Provide a partially completed copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST with the following items performed.
Complete Attachment I with ACTUAL VOLTS indicated as 115.0 KV, Section I lined through, OPEN indicated in Section II for both BUS 1DA NORM FEED and BUS 1DB ALT FEED. and ALL other items indicated the same as NORMAL POSITION.
Complete Attachment II with ACTUAL VOLTS indicated as 225.1 KV,Section II lined through, and ALL other items indicated the same as NORMAL POSITION.
Also provide a Handout sheet that contains the following text:
Name:
Date:
Technical Specification Action Statement for OFFSITE power sources in effect?
(Circle ONE)    YES    NO If YES, record the Technical Specification Action Statement that must be entered for the current condition and that will require taking the plant to a lower mode the soonest.
COMMENTS:
5/18/2016                                                                                        Page 6 of 7
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  NONE.
INITIAL CONDITION:
The plant is mode 3 after an outage.
Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.
All Balance of Plant bus breakers are normally aligned.
STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.
INITIATING CUES:
You are directed to perform the following:
      - Review the partially completed copy of STP-125.001 Attachments I and II.
      - Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.
      - Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.
      - ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/18/2016                                                                                        Page 7 of 7
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-81D-(R)N16 2016 NRC A2 (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available CANDIDATE:
EXAMINER:
5/18/2016                                                                    Page 1 of 10
TASK: 002-002-02-01        PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002 TASK STANDARD:
Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.
TERMINATING CUE:            The candidate has completed STP-114.002, ATTACHMENT I.
PREFERRED EVALUATION LOCATION                          PREFERRED EVALUATION METHOD CLASSROOM                                                  PERFORM


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:The applicant returns the JPM briefing sheet and completed handout to the examiner.CANDIDATE:SOP-304115KV/7.2KV OPERATIONSINDEX NO.ROSROK/A NO.1940012132Ability to explain and apply system limits and precautions.3.84.02.1.321940012240Ability to apply technical specifications for a system.3.44.72.2.405/18/2016Page 2 of 7 INITIATING CUES:You are directed to perform the following:- Review the partially completed copy of STP-125.001 Attachments I and II.- Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.- Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.- ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.INITIAL CONDITION:The plant is mode 3 after an outage.Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.All Balance of Plant bus breakers are normally aligned.STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.READ TO OPERATOR:SAFETY CONSIDERATIONS:
 
NONE.When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/18/2016Page 3 of 7 Reviews copy of STP-125.001.Note to Examiner: The candidate should have been provided with the partially completed copy of STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST and JPM Handout as part of the initial briefing.Yes N/A CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
STP-114.002          OPERATIONAL LEAK TEST INDEX NO.     K/A NO.                                                                     RO    SRO 1940012132    2.1.32      Ability to explain and apply system limits and precautions.       3.8    4.0 1940012240    2.2.40      Ability to apply technical specifications for a system.           3.4    4.7 TOOLS:         Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION VCS STATION CURVE BOOK EVALUATION TIME                    30          TIME CRITICAL          NO    10CFR55: 45b(1)(12)
1Identifies that the 115 KV Offsite power source is NOT OPERABLE.Note to Examiner: This determination is made by noting that both BUS 1DA NORM FEED and  BUS 1DB NORM FEED are open on Attachment I, page 1 of 2. This alignment fails to tie the 115 KV offsite power source to either 1DA or 1DB rendering that source inoperable.If the candidate does not demonstrate this review, this can be probed by follow-on questions.
TIME START:                      TIME FINISH:                      PERFORMANCE TIME:
YesChecks the box for the second statement on Attachment I, page 2 of 2. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
PERFORMANCE RATING:                SAT:            UNSAT:
25/18/2016Page 4 of 7 Examiner ends JPM at this point.Determines that the 230 KV offsite power source is NOT OPERABLE.Examiner note: This determination is made by comparing the voltage recorded on Attachment II, page 2 of 3, and the lower voltage limit of 225.7 KV. This is contained in Enclosure A, on the second row of the 230 KV section, far right column. Since actual voltage is less than the limit, this renders the 230 KV offsite power source inoperable.If the candidate does not demonstrate this review, this can be probed by follow-on questioning.
CANDIDATE:
NoChecks the box for the second statement on STP-125.001, Attachment II, page 3 of 3. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
EXAMINER:
3Candidate determines the applicable Technical Specification action statement.The JPM can be terminated after the handout is completed or when the candidate returns the briefing sheet.YesThe candidate, on the handout provided, checks the YES line and indicates that T.S. Action Statement 3.8.1.1.d. must be entered. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
SIGNATURE              DATE 5/18/2016                                                                                              Page 2 of 10
45/18/2016Page 5 of 7 JPM: JPA-051-(S2016 NRC A1-b (SRO only): Verify Operability of Offsite Power SourcesIC SET:INSTRUCTIONS:Provide a partially completed copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST with the following items performed.Complete Attachment I with ACTUAL VOLTS indicated as 115.0 KV, Section I lined through, OPEN indicated in Section II for both BUS 1DA NORM FEED and BUS 1DB ALT FEED. and ALL other items indicated the same as  NORMAL POSITION.Complete Attachment II with ACTUAL VOLTS indicated as 225.1 KV,Section II lined through, and ALL other items indicated the same as  NORMAL POSITION.Also provide a Handout sheet that contains the following text:Name:Date:Technical Specification Action Statement for OFFSITE power sources in effect?      (Circle ONE)    YES    NO If YES, record the Technical Specification Action Statement that must be entered for the current condition and that will require taking the plant to a lower mode the soonest.COMMENTS: JPM SETUP SHEET5/18/2016Page 6 of 7 INITIATING CUES:You are directed to perform the following:- Review the partially completed copy of STP-125.001 Attachments I and II.- Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.- Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.- ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.INITIAL CONDITION:The plant is mode 3 after an outage.Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.All Balance of Plant bus breakers are normally aligned.
 
STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.SAFETY CONSIDERATIONS:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
NONE.OPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
JPM BRIEFING SHEET5/18/2016Page 7 of 7 2016 NRC A2 (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-81D-(R)N165/18/2016Page 1 of 10 TASK:002-002-02-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 30TIME CRITICAL NOTASK STANDARD:Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.PREFERRED EVALUATION LOCATIONCLASSROOMTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55: 45b (1)(12)PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002TOOLS:Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION VCS STATION CURVE BOOK
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:
The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.
INITIATING CUES:
You are directed to perform the following:
USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b.
Another operator will complete STEP 6.4.c when required.
          - No RCS makeup or diversion to the recycle holdup tanks will occur.
          - No Chemical additions or primary samples will be performed.
          - RCS pressure will be maintained between 350 psig and 400 psig.
          - Primary to secondary leakage is 0 gpm.
          - There is no recorded leakage to atmosphere in the RB.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/18/2016                                                                                                  Page 3 of 10
 
CRITICAL: Yes                SEQUENCED: Yes                          SAT      UNSAT JPM STEP: 1 Inputs data into TEST DATA SHEET.
STEP STANDARD:
Student inputs data, initial and final.
CUES:
Note to examiner: The candidate should have the JPM Briefing Sheet, Handouts #1 and #2 and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.
COMMENTS:
CRITICAL: Yes               SEQUENCED: Yes                          SAT      UNSAT JPM STEP: 2 Calculates change in test data.
STEP STANDARD:
Student subtracts initial data from final to determine changes in parameters:
TAVG + 0.8&deg;F PZR LEVEL - 0.5%
VCT LEVEL - 2.6%
PRT LEVEL 0%
RCDT LEVEL 0% (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE)
CUES:
COMMENTS:
5/18/2016                                                                                    Page 4 of 10
 
CRITICAL: No                SEQUENCED: No                         SAT            UNSAT JPM STEP: 3 Perform one of the following:
: 1) If RCDT level is less than 60%, open the following:
a) PVD-7170, RCDT PP TO WPS (IRB).
b) PVD-7136, RCDT TO WPS.
STEP STANDARD:
N/A CUES:
If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.
COMMENTS:
CRITICAL: Yes                SEQUENCED: No                          SAT            UNSAT JPM STEP: 4 Determine the RCS inventory deviation due to Pressurizer level change.
STEP STANDARD:
Change/deviation calculated accurately with correct polarity as shown on answer key.
CUES:
COMMENTS:
5/18/2016                                                                                            Page 5 of 10
 
CRITICAL: Yes            SEQUENCED: No                            SAT          UNSAT JPM STEP: 5 Determine the RCS inventory deviation due to VCT level change.
STEP STANDARD:
Change/deviation calculated accurately as shown on answer key.
CUES:
COMMENTS:
CRITICAL: Yes             SEQUENCED: No                            SAT          UNSAT JPM STEP: 6 Determine the RCS inventory change due to change in TAVG.
STEP STANDARD:
Change/deviation calculated accurately with correct polarity as shown on answer key.
CUES:
COMMENTS:
5/18/2016                                                                                Page 6 of 10
 
CRITICAL: No              SEQUENCED: No                        SAT        UNSAT JPM STEP: 7 Determine the RCS inventory deviation due to PRT level change.
STEP STANDARD:
Recorded as zero.
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: No                        SAT        UNSAT JPM STEP: 8 Determine the RCS inventory deviation due to RCDT level change.
STEP STANDARD:
Change/deviation calculated accurately as shown on answer key.
CUES:
NOTE TO EXAMINER: The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.
COMMENTS:
5/18/2016                                                                                  Page 7 of 10
 
CRITICAL: Yes                SEQUENCED: Yes               SAT UNSAT JPM STEP: 9 Perform calculations as indicated on Attachment 1, Part 2.
STEP STANDARD:
Final leak rate is 1.8 +/- 0.1 GPM (1.7 TO 1.9)
CUES:
COMMENTS:
Examiner ends JPM at this point.
5/18/2016                                                            Page 8 of 10
 
JPM SETUP SHEET JPM: JPA-81D-(R2016 NRC A2 (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available IC SET:
INSTRUCTIONS:
Ensure that current procedures and curve book are available in hard copy or electronically.
Provide Handout 1 - STP-125.001, Attachment I Provide Handout 2 - sheet containing the following:
Name: ______________________________________
Date: _______________________________________
INITIAL DATA Start time 0400:
T0499A, RCL MEDIAN TAVG = 320.8&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%
L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
L1028, REACTOR COOL DR TNK LEV = 59%
FINAL DATA Stop time 0500:
T0499A, RCL MEDIAN TAVG = 321.6&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%
L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
L1028, REACTOR COOL DR TNK LEV = 58%
COMMENTS:
5/18/2016                                                                                    Page 9 of 10
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                 NONE INITIAL CONDITION:
The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.
INITIATING CUES:
You are directed to perform the following:
USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b.
Another operator will complete STEP 6.4.c when required.
      - No RCS makeup or diversion to the recycle holdup tanks will occur.
      - No Chemical additions or primary samples will be performed.
      - RCS pressure will be maintained between 350 psig and 400 psig.
      - Primary to secondary leakage is 0 gpm.
      - There is no recorded leakage to atmosphere in the RB.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/18/2016                                                                                      Page 10 of 10
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-81D-(S)N16 2016 NRC A2 (SRO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available CANDIDATE:
EXAMINER:
SRO ONLY 5/18/2016                                                                      Page 1 of 10
 
TASK: 002-002-02-01        PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002 TASK STANDARD:
Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.
TERMINATING CUE:           The candidate has completed STP-114.002, ATTACHMENT I, recorded information on the handout provided and returned the cue sheet to the examiner.
PREFERRED EVALUATION LOCATION                          PREFERRED EVALUATION METHOD CLASSROOM                                                  PERFORM


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:The candidate has completed STP-114.002, ATTACHMENT I.CANDIDATE:STP-114.002OPERATIONAL LEAK TESTINDEX NO.ROSROK/A NO.1940012132Ability to explain and apply system limits and precautions.3.84.02.1.321940012240Ability to apply technical specifications for a system.3.44.72.2.405/18/2016Page 2 of 10 INITIATING CUES:You are directed to perform the following:USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONALLEAKAGE CALCULATION starting at STEP 6.4.b.Another operator will complete STEP 6.4.c when required.- No RCS makeup or diversion to the recycle holdup tanks will occur.- No Chemical additions or primary samples will be performed.- RCS pressure will be maintained between 350 psig and 400 psig.
- Primary to secondary leakage is 0 gpm.
- There is no recorded leakage to atmosphere in the RB.INITIAL CONDITION:The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.READ TO OPERATOR:SAFETY CONSIDERATIONS:
NONEWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/18/2016Page 3 of 10 Inputs data into TEST DATA SHEET.Note to examiner:  The candidate should have the JPM Briefing Sheet, Handouts #1 and #2 and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.
YesStudent inputs data, initial and final. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
1Calculates change in test data.
YesStudent subtracts initial data from final to determine changes in parameters: TAVG  + 0.8&deg;FPZR LEVEL  - 0.5%
VCT LEVEL  - 2.6%
PRT LEVEL  0%
RCDT LEVEL 0%  (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE) CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
25/18/2016Page 4 of 10 Perform one of the following:1) If RCDT level is less than 60%, open the following:a) PVD-7170, RCDT PP TO WPS (IRB).b) PVD-7136, RCDT TO WPS.If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.
No N/A CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
3Determine the RCS inventory deviation due to Pressurizer level change.
NoChange/deviation calculated accurately with correct polarity as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
45/18/2016Page 5 of 10 Determine the RCS inventory deviation due to VCT level change.
NoChange/deviation calculated accurately as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
5Determine the RCS inventory change due to change in TAVG.
NoChange/deviation calculated accurately with correct polarity as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
65/18/2016Page 6 of 10 Determine the RCS inventory deviation due to PRT level change.
NoRecorded as zero. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
7Determine the RCS inventory deviation due to RCDT level change.NOTE TO EXAMINER:  The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.
NoChange/deviation calculated accurately as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
85/18/2016Page 7 of 10 Examiner ends JPM at this point.Perform calculations as indicated on Attachment 1, Part 2.
YesFinal leak rate is 1.8  +/-  0.1 GPM (1.7 TO 1.9) CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
95/18/2016Page 8 of 10 JPM: JPA-81D-(R2016 NRC A2  (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program AvailableIC SET:INSTRUCTIONS:Ensure that current procedures and curve book are available in hard copy or electronically.Provide Handout 1 - STP-125.001, Attachment IProvide Handout 2 - sheet containing the following:Name: ______________________________________Date: _______________________________________INITIAL DATA Start time 0400:T0499A, RCL MEDIAN TAVG = 320.8&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
L1028, REACTOR COOL DR TNK LEV = 59%FINAL DATA Stop time 0500:T0499A, RCL MEDIAN TAVG = 321.6&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%L1028, REACTOR COOL DR TNK LEV = 58%COMMENTS: JPM SETUP SHEET5/18/2016Page 9 of 10 INITIATING CUES:You are directed to perform the following:USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONALLEAKAGE CALCULATION starting at STEP 6.4.b.Another operator will complete STEP 6.4.c when required.- No RCS makeup or diversion to the recycle holdup tanks will occur.- No Chemical additions or primary samples will be performed.
- RCS pressure will be maintained between 350 psig and 400 psig.
- Primary to secondary leakage is 0 gpm.- There is no recorded leakage to atmosphere in the RB.INITIAL CONDITION:The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.SAFETY CONSIDERATIONS:
NONEOPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
JPM BRIEFING SHEET5/18/2016Page 10 of 10 2016 NRC A2  (SRO Only) Calculate Leakrate W/O IPCS Leak Rate ProgramAvailable V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-81D-(S)N16SRO ONLY5/18/2016Page 1 of 10 TASK:002-002-02-01PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 30TIME CRITICAL NOTASK STANDARD:Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.PREFERRED EVALUATION LOCATIONCLASSROOMTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:41b10PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002TOOLS:Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATIONVCS STATION CURVE BOOK


==REFERENCES:==
STP-114.002           OPERATIONAL LEAK TEST INDEX NO.     K/A NO.                                                                     RO    SRO 1940012132    2.1.32      Ability to explain and apply system limits and precautions.     3.8    4.0 1940012240    2.2.40      Ability to apply technical specifications for a system.         3.4    4.7 TOOLS:        Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION VCS STATION CURVE BOOK EVALUATION TIME                      30          TIME CRITICAL          NO    10CFR55: 41b10 TIME START:                        TIME FINISH:                      PERFORMANCE TIME:
TERMINATING CUE:The candidate has completed STP-114.002, ATTACHMENT I, recorded information on the handout provided and returned the cue sheet to the examiner.CANDIDATE:STP-114.002OPERATIONAL LEAK TESTINDEX NO.ROSROK/A NO.1940012132Ability to explain and apply system limits and precautions.3.84.02.1.321940012240Ability to apply technical specifications for a system.3.44.72.2.405/18/2016Page 2 of 10 INITIATING CUES:You are directed to perform the following:1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.PLANT CONDITIONS ARE AS FOLLOWS:- No RCS makeup or diversion to the recycle holdup tanks will occur.- No Chemical additions or primary samples will be performed.- RCS pressure will be maintained between 350 psig and 400 psig.
PERFORMANCE RATING:                  SAT:            UNSAT:
- Primary to secondary leakage is 0 gpm.
CANDIDATE:
- There is no recorded leakage to atmosphere in the RB.INITIAL CONDITION:The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.READ TO OPERATOR:SAFETY CONSIDERATIONS:
EXAMINER:
NONEWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/18/2016Page 3 of 10 Inputs data into TEST DATA SHEET.Note to Examiner: The candidate should have the JPM briefing sheet, Handouts 1 and 2, and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.
SIGNATURE              DATE 5/18/2016                                                                                              Page 2 of 10
YesStudent inputs data, initial and final. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
 
1Calculates change in test data.
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
NoStudent subtracts initial data from final to determine changes in parameters: TAVG   + 0.8&deg;FPZR LEVEL - 0.5%
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
VCT LEVEL - 2.6%
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
PRT LEVEL 0%
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
RCDT LEVEL 0% (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE) CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:
25/18/2016Page 4 of 10 Perform one of the following:1) If RCDT level is less than 60%, open the following:a) PVD-7170, RCDT PP TO WPS (IRB).b) PVD-7136, RCDT TO WPS.If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.
The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.
No N/A CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
INITIATING CUES:
3Determine the RCS inventory deviation due to Pressurizer level change.
You are directed to perform the following:
NoChange/deviation calculated accurately with correct polarity as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
: 1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.
45/18/2016Page 5 of 10 Determine the RCS inventory deviation due to VCT level change.
: 2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.
NoChange/deviation calculated accurately as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
PLANT CONDITIONS ARE AS FOLLOWS:
5Determine the RCS inventory change due to change in TAVG.
          - No RCS makeup or diversion to the recycle holdup tanks will occur.
NoChange/deviation calculated accurately with correct polarity as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
          - No Chemical additions or primary samples will be performed.
65/18/2016Page 6 of 10 Determine the RCS inventory deviation due to PRT level change.
          - RCS pressure will be maintained between 350 psig and 400 psig.
NoRecorded as zero. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
          - Primary to secondary leakage is 0 gpm.
7Determine the RCS inventory deviation due to RCDT level change.NOTE TO EXAMINER: The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.
          - There is no recorded leakage to atmosphere in the RB.
NoChange/deviation calculated accurately as shown on answer key. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: No JPM STEP:
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
85/18/2016Page 7 of 10 Examiner ends JPM at this point.Perform calculations as indicated on Attachment 1, Part 2.
5/18/2016                                                                                                  Page 3 of 10
YesFinal leak rate is 1.8 +/- 0.1 GPM (1.7 TO 1.9) CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
 
9Determine the required actions in accordance with Technical Specifications.NOTE TO EXAMINER: If the candidate indicates only that the leakage must be reduced within four (4) hours, provide the following cue: "The leakage has not been found and cannot be reduced." The candidate must then determine that the plant must be taken to COLD SHUTDOWN within 30 hours.If the candidate conservatively states that the plant must be taken to COLD SHUTDOWN within 30 hours with NO allowance for reduction of leakage, this is a NOT a critical error but can be clarified with followup questions.If the candidate indicates a time greater than 34 hours this is a CRITICAL ERROR and constitutes a FAILURE. A typical error is allowing an extra six (6) hours when the plant is already at or below HOT STANDBY.YesTechnical Specification 3.4.6.2, REACTOR COOLANT SYSTEM - OPERATION LEAKAGE is referenced. Candidate determines that the leakage must be reduced within 4 hours, and if not reduced, then the plant must be taken to COLD SHUTDOWN within the following 30 hours. The candidate enters the requirements on the Handout provided. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
CRITICAL: Yes                SEQUENCED: Yes                          SAT      UNSAT JPM STEP: 1 Inputs data into TEST DATA SHEET.
105/18/2016Page 8 of 10 JPM: JPA-81D-(S2016 NRC A2 (SRO Only) Calculate Leakrate W/O IPCS Leak Rate ProgramAvailableIC SET:INSTRUCTIONS:Ensure that current procedures and curve book are available in hard copy or electronically.Provide Handout 1 - STP-125.001, Attachment IProvide Handout 2 - sheet containing the following:Name: ______________________________________Date: _______________________________________
STEP STANDARD:
INITIAL DATA Start time 0400:T0499A, RCL MEDIAN TAVG = 320.8&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
Student inputs data, initial and final.
CUES:
Note to Examiner: The candidate should have the JPM briefing sheet, Handouts 1 and 2, and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.
COMMENTS:
CRITICAL: Yes               SEQUENCED: No                            SAT      UNSAT JPM STEP: 2 Calculates change in test data.
STEP STANDARD:
Student subtracts initial data from final to determine changes in parameters:
TAVG + 0.8&deg;F PZR LEVEL - 0.5%
VCT LEVEL - 2.6%
PRT LEVEL 0%
RCDT LEVEL 0% (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE)
CUES:
COMMENTS:
5/18/2016                                                                                    Page 4 of 10
 
CRITICAL: No                SEQUENCED: No                          SAT            UNSAT JPM STEP: 3 Perform one of the following:
: 1) If RCDT level is less than 60%, open the following:
a) PVD-7170, RCDT PP TO WPS (IRB).
b) PVD-7136, RCDT TO WPS.
STEP STANDARD:
N/A CUES:
If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.
COMMENTS:
CRITICAL: Yes                SEQUENCED: No                         SAT            UNSAT JPM STEP: 4 Determine the RCS inventory deviation due to Pressurizer level change.
STEP STANDARD:
Change/deviation calculated accurately with correct polarity as shown on answer key.
CUES:
COMMENTS:
5/18/2016                                                                                            Page 5 of 10
 
CRITICAL: Yes            SEQUENCED: No                            SAT          UNSAT JPM STEP: 5 Determine the RCS inventory deviation due to VCT level change.
STEP STANDARD:
Change/deviation calculated accurately as shown on answer key.
CUES:
COMMENTS:
CRITICAL: Yes             SEQUENCED: No                            SAT          UNSAT JPM STEP: 6 Determine the RCS inventory change due to change in TAVG.
STEP STANDARD:
Change/deviation calculated accurately with correct polarity as shown on answer key.
CUES:
COMMENTS:
5/18/2016                                                                                Page 6 of 10
 
CRITICAL: No              SEQUENCED: No                        SAT        UNSAT JPM STEP: 7 Determine the RCS inventory deviation due to PRT level change.
STEP STANDARD:
Recorded as zero.
CUES:
COMMENTS:
CRITICAL: No              SEQUENCED: No                         SAT        UNSAT JPM STEP: 8 Determine the RCS inventory deviation due to RCDT level change.
STEP STANDARD:
Change/deviation calculated accurately as shown on answer key.
CUES:
NOTE TO EXAMINER: The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.
COMMENTS:
5/18/2016                                                                                  Page 7 of 10
 
CRITICAL: Yes                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 9 Perform calculations as indicated on Attachment 1, Part 2.
STEP STANDARD:
Final leak rate is 1.8 +/- 0.1 GPM (1.7 TO 1.9)
CUES:
COMMENTS:
CRITICAL: Yes                SEQUENCED: Yes                           SAT            UNSAT JPM STEP: 10 Determine the required actions in accordance with Technical Specifications.
STEP STANDARD:
Technical Specification 3.4.6.2, REACTOR COOLANT SYSTEM - OPERATION LEAKAGE is referenced. Candidate determines that the leakage must be reduced within 4 hours, and if not reduced, then the plant must be taken to COLD SHUTDOWN within the following 30 hours. The candidate enters the requirements on the Handout provided.
CUES:
NOTE TO EXAMINER: If the candidate indicates only that the leakage must be reduced within four (4) hours, provide the following cue: "The leakage has not been found and cannot be reduced." The candidate must then determine that the plant must be taken to COLD SHUTDOWN within 30 hours.
If the candidate conservatively states that the plant must be taken to COLD SHUTDOWN within 30 hours with NO allowance for reduction of leakage, this is a NOT a critical error but can be clarified with followup questions.
If the candidate indicates a time greater than 34 hours this is a CRITICAL ERROR and constitutes a FAILURE. A typical error is allowing an extra six (6) hours when the plant is already at or below HOT STANDBY.
COMMENTS:
Examiner ends JPM at this point.
5/18/2016                                                                                                Page 8 of 10
 
JPM SETUP SHEET JPM: JPA-81D-(S2016 NRC A2 (SRO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available IC SET:
INSTRUCTIONS:
Ensure that current procedures and curve book are available in hard copy or electronically.
Provide Handout 1 - STP-125.001, Attachment I Provide Handout 2 - sheet containing the following:
Name: ______________________________________
Date: _______________________________________
INITIAL DATA Start time 0400:
T0499A, RCL MEDIAN TAVG = 320.8&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%
L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
L1028, REACTOR COOL DR TNK LEV = 59%
L1028, REACTOR COOL DR TNK LEV = 59%
FINAL DATA Stop time 0500:T0499A, RCL MEDIAN TAVG = 321.6&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%
FINAL DATA Stop time 0500:
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%L1028, REACTOR COOL DR TNK LEV = 58%Perform the following to complete this form:
T0499A, RCL MEDIAN TAVG = 321.6&deg;F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%
L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%
L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%
L1028, REACTOR COOL DR TNK LEV = 58%
Perform the following to complete this form:
1.Insert the time at which STP-114.002, Attachment 1 calculation completed: ________________.
1.Insert the time at which STP-114.002, Attachment 1 calculation completed: ________________.
2.Is entry into a Technical Specification action statement required as a result of the STP-114.002 results?   (Circle one)    YES     NO 2.If YES, indicate the V.C. Summer Technical Specification action(s) required and the longest time that can be taken to comply with any applicable action.COMMENTS: JPM SETUP SHEET5/18/2016Page 9 of 10 INITIATING CUES:You are directed to perform the following:1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.PLANT CONDITIONS ARE AS FOLLOWS:- No RCS makeup or diversion to the recycle holdup tanks will occur.- No Chemical additions or primary samples will be performed.
2.Is entry into a Technical Specification action statement required as a result of the STP-114.002 results?
- RCS pressure will be maintained between 350 psig and 400 psig.
(Circle one)    YES   NO 2.If YES, indicate the V.C. Summer Technical Specification action(s) required and the longest time that can be taken to comply with any applicable action.
- Primary to secondary leakage is 0 gpm.- There is no recorded leakage to atmosphere in the RB.INITIAL CONDITION:The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.SAFETY CONSIDERATIONS:
COMMENTS:
NONEOPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/18/2016                                                                                          Page 9 of 10
JPM BRIEFING SHEET5/18/2016Page 10 of 10 2016 NRC A3 (Common): Evaluate Worker Exposure V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-042-(C)-N165/6/2016Page 1 of 7 TASK:343-029-03-02PREFERRED EVALUATION METHOD PERFORMEVALUATION TIME 20TIME CRITICAL NOTASK STANDARD:DETERMINES THAT ONLY OPERATORS 2 AND 3 CAN BE ALLOWED TO PERFORM THE WORK DESCRIBED IN THE INITIAL CONDITIONS.PREFERRED EVALUATION LOCATIONCLASSROOMTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55:ASSESS EXPOSURE LIMITS OF PERSONNEL FOR ASSIGNED DUTIESTOOLS: CALCULATOR VCS-SAP-500, HEALTH PHYSICS MANUAL VCS-HPP-0153 ADMINISTRATIVE EXPOSURE LIMITS
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                  NONE INITIAL CONDITION:
The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.
INITIATING CUES:
You are directed to perform the following:
: 1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.
: 2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.
PLANT CONDITIONS ARE AS FOLLOWS:
      - No RCS makeup or diversion to the recycle holdup tanks will occur.
      - No Chemical additions or primary samples will be performed.
      - RCS pressure will be maintained between 350 psig and 400 psig.
      - Primary to secondary leakage is 0 gpm.
      - There is no recorded leakage to atmosphere in the RB.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/18/2016                                                                                      Page 10 of 10
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-042-(C)-N16 2016 NRC A3 (Common): Evaluate Worker Exposure CANDIDATE:
EXAMINER:
5/6/2016                                                      Page 1 of 7
 
TASK: 343-029-03-02      ASSESS EXPOSURE LIMITS OF PERSONNEL FOR ASSIGNED DUTIES TASK STANDARD:
DETERMINES THAT ONLY OPERATORS 2 AND 3 CAN BE ALLOWED TO PERFORM THE WORK DESCRIBED IN THE INITIAL CONDITIONS.
TERMINATING CUE:        EXAMINEE HAS DETERMINED RETURNS THE CUE SHEET AND CALCULATION TO THE EXAMINER.
PREFERRED EVALUATION LOCATION                    PREFERRED EVALUATION METHOD CLASSROOM                                          PERFORM


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:EXAMINEE HAS DETERMINED RETURNS THE CUE SHEET AND CALCULATION TO THE EXAMINER.CANDIDATE:VCS-HPP-153ADMINISTRATIVE EXPOSURE LIMITSINDEX NO.ROSROK/A NO.1940012304Knowledge of radiation exposure limits under normal or emergency conditions.3.23.72.3.45/6/2016Page 2 of 7 INITIATING CUES:Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits. Assume the following:ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.ALL dose received in transit is negligible.ANY extensions that may have been previously granted were the minimum allowed by procedure.SHOW ALL WORK.INITIAL CONDITION:Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.The work will take three and one half (3.5) hours to complete.The following are doses and work histories for 3 operators that are qualified to perform the work.Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.She has worked at V.C. Summer for 10 years.
 
She received 20 mrem yesterday and this is her ONLY exposure for the current year.Operator 2 is a male that was hired in March of this year.He has received 480 mrem at V.C. Summer.
VCS-HPP-153        ADMINISTRATIVE EXPOSURE LIMITS INDEX NO. K/A NO.                                                           RO    SRO 1940012304    2.3.4    Knowledge of radiation exposure limits under normal or   3.2    3.7 emergency conditions.
He DOES NOT have a completed NRC Form 4. Operator 3 is a male that was hired in January of this year.He has accumulated exposure of 780 mrem at V.C. Summer.
TOOLS:        CALCULATOR VCS-SAP-500, HEALTH PHYSICS MANUAL VCS-HPP-0153 ADMINISTRATIVE EXPOSURE LIMITS EVALUATION TIME                20          TIME CRITICAL        NO    10CFR55:
He has a completed NRC Form 4.READ TO OPERATOR:SAFETY CONSIDERATIONS:When I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/6/2016Page 3 of 7 Determines initial administrative exposure limits for each operator.Note to Evaluator: These limits may be applied from memory as long as work is shown for the required calculation.
TIME START:                  TIME FINISH:                    PERFORMANCE TIME:
NoDetermines or applies the limits contained in VCS-HPP-153, ADMINISTRATIVE EXPOSURE LIMITS.Operator 1: 500 mr per gestation period and 50 mr per calendar month.Operator 2: 500 mr without a completed Form 4.
PERFORMANCE RATING:            SAT:            UNSAT:
Operator 3: 1000 mr for first extension after Form 4 is complete. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
CANDIDATE:
1Determines current V.C. Summer exposure of each operator. (Given in initial conditions.)Note to Evaluator: This information will be shown in the required calculation.
EXAMINER:
YesOperator 1:  20 mrOperator 2:  480 mrOperator 3:  780 mr CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
SIGNATURE          DATE 5/6/2016                                                                                    Page 2 of 7
25/6/2016Page 4 of 7 Examiner ends JPM at this point.Determines expected exposure for the work to be performed.Note to Evaluator: This information will be shown in the required calculation. The applicant may incorrectly use 80 mrem/hr. This is the on-contact exposure rate. The initial cue directs that the applicant assume that the exposure rate at 1 foot from the valve be used.
 
Yes10 mr x 3.5 hours = 35 mrem per worker CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
3Determines workers that can perform the work.Evaluator Note: All work for the required calculation will be shown in the Handout provided to support this conclusion.
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
YesOperator 1: 50 mrem monthly limit - 20 VCS exposure this month = 30 mrem to reach limit.Operator 2: 500 mrem limit - 480 mrem VCS exposure = 20 mrem to reach limit.Operator 3: 1000 mrem limit - 780 mrem VCS = 220 mrem to reach limit.Identifies that only Operators 3 has the available exposure to work the required time. CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
45/6/2016Page 5 of 7 JPM: JPA-042-(C2016 NRC A3 (Common): Evaluate Worker ExposureIC SET:INSTRUCTIONS:Provide candidate with Handout 1 (Calculation worksheet) and Handout 2 (Survey map)Grade per JPM.COMMENTS: JPM SETUP SHEET5/6/2016Page 6 of 7 INITIATING CUES:Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits. Assume the following:ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.ALL dose received in transit is negligible.ANY extensions that may have been previously granted were the minimum allowed by procedure.SHOW ALL WORK.INITIAL CONDITION:Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.The work will take three and one half (3.5) hours to complete.The following are doses and work histories for 3 operators that are qualified to perform the work.Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.She has worked at V.C. Summer for 10 years.She received 20 mrem yesterday and this is her ONLY exposure for the current year.Operator 2 is a male that was hired in March of this year.He has received 480 mrem at V.C. Summer. He DOES NOT have a completed NRC Form 4. Operator 3 is a male that was hired in January of this year.He has accumulated exposure of 780 mrem at V.C. Summer.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
He has a completed NRC Form 4.SAFETY CONSIDERATIONS:OPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
SAFETY CONSIDERATIONS:
JPM BRIEFING SHEET5/6/2016Page 7 of 7 2016 NRC A4 (SRO only): Classify Emergency (ENF)
INITIAL CONDITION:
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURECANDIDATE:EXAMINER:JPM NO: JPA-1007(S)N16SRO ONLY TIME CRITICAL JPM5/31/2016Page 1 of 8 TASK:344-019-03-02PREFERRED EVALUATION METHOD SIMULATETASK STANDARD:Emergency Classification as a GENERAL EMERGENCY condition based on Loss of any two barriers AND Loss or Potential Loss of third barrier (FG1.1). This is a time critical JPM and the declaration must be made within 15 minutes after the emergency condition exists. Successful completion of EPP-002, (including PARs) Communication and Notification, Attachment I, Nuclear Power Plant Notification Form, must be made within 15 minutes after the emergency declaration.PREFERRED EVALUATION LOCATIONCLASSROOMCLASSIFY EMERGENCY EVENTS REQUIRING EMERGENCY PLAN IMPLEMENTATIONTOOLS:EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form. (JPA-807A Handout 1)
Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.
EPP-001.4, Attachment II, Protective Action Recommendations (JPA-807A Handout 2 or available via desk top computer)
The work will take three and one half (3.5) hours to complete.
The following are doses and work histories for 3 operators that are qualified to perform the work.
Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.
She has worked at V.C. Summer for 10 years.
She received 20 mrem yesterday and this is her ONLY exposure for the current year.
Operator 2 is a male that was hired in March of this year.
He has received 480 mrem at V.C. Summer.
He DOES NOT have a completed NRC Form 4.
Operator 3 is a male that was hired in January of this year.
He has accumulated exposure of 780 mrem at V.C. Summer.
He has a completed NRC Form 4.
INITIATING CUES:
Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits.
Assume the following:
ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.
ALL dose received in transit is negligible.
ANY extensions that may have been previously granted were the minimum allowed by procedure.
SHOW ALL WORK.
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/6/2016                                                                                                      Page 3 of 7
 
CRITICAL: Yes              SEQUENCED: No                            SAT          UNSAT JPM STEP: 1 Determines initial administrative exposure limits for each operator.
STEP STANDARD:
Determines or applies the limits contained in VCS-HPP-153, ADMINISTRATIVE EXPOSURE LIMITS.
Operator 1: 500 mr per gestation period and 50 mr per calendar month.
Operator 2: 500 mr without a completed Form 4.
Operator 3: 1000 mr for first extension after Form 4 is complete.
CUES:
Note to Evaluator: These limits may be applied from memory as long as work is shown for the required calculation.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                           SAT          UNSAT JPM STEP: 2 Determines current V.C. Summer exposure of each operator. (Given in initial conditions.)
STEP STANDARD:
Operator 1: 20 mr Operator 2: 480 mr Operator 3: 780 mr CUES:
Note to Evaluator: This information will be shown in the required calculation.
COMMENTS:
5/6/2016                                                                                          Page 4 of 7
 
CRITICAL: Yes              SEQUENCED: Yes                          SAT              UNSAT JPM STEP: 3 Determines expected exposure for the work to be performed.
STEP STANDARD:
10 mr x 3.5 hours = 35 mrem per worker CUES:
Note to Evaluator: This information will be shown in the required calculation. The applicant may incorrectly use 80 mrem/hr. This is the on-contact exposure rate. The initial cue directs that the applicant assume that the exposure rate at 1 foot from the valve be used.
COMMENTS:
CRITICAL: Yes              SEQUENCED: Yes                           SAT              UNSAT JPM STEP: 4 Determines workers that can perform the work.
STEP STANDARD:
Operator 1: 50 mrem monthly limit - 20 VCS exposure this month = 30 mrem to reach limit.
Operator 2: 500 mrem limit - 480 mrem VCS exposure = 20 mrem to reach limit.
Operator 3: 1000 mrem limit - 780 mrem VCS = 220 mrem to reach limit.
Identifies that only Operators 3 has the available exposure to work the required time.
CUES:
Evaluator Note: All work for the required calculation will be shown in the Handout provided to support this conclusion.
COMMENTS:
Examiner ends JPM at this point.
5/6/2016                                                                                              Page 5 of 7
 
JPM SETUP SHEET JPM: JPA-042-(C 2016 NRC A3 (Common): Evaluate Worker Exposure IC SET:
INSTRUCTIONS:
Provide candidate with Handout 1 (Calculation worksheet) and Handout 2 (Survey map)
Grade per JPM.
COMMENTS:
5/6/2016                                                                            Page 6 of 7
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:
INITIAL CONDITION:
Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.
The work will take three and one half (3.5) hours to complete.
The following are doses and work histories for 3 operators that are qualified to perform the work.
Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.
She has worked at V.C. Summer for 10 years.
She received 20 mrem yesterday and this is her ONLY exposure for the current year.
Operator 2 is a male that was hired in March of this year.
He has received 480 mrem at V.C. Summer.
He DOES NOT have a completed NRC Form 4.
Operator 3 is a male that was hired in January of this year.
He has accumulated exposure of 780 mrem at V.C. Summer.
He has a completed NRC Form 4.
INITIATING CUES:
Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits.
Assume the following:
ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.
ALL dose received in transit is negligible.
ANY extensions that may have been previously granted were the minimum allowed by procedure.
SHOW ALL WORK.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/6/2016                                                                                                Page 7 of 7
 
V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-1007(S)N16 2016 NRC A4 (SRO only): Classify Emergency (ENF)
CANDIDATE:
EXAMINER:
SRO ONLY TIME CRITICAL JPM 5/31/2016                                                        Page 1 of 8
 
TASK: 344-019-03-02        CLASSIFY EMERGENCY EVENTS REQUIRING EMERGENCY PLAN IMPLEMENTATION TASK STANDARD:
Emergency Classification as a GENERAL EMERGENCY condition based on Loss of any two barriers AND Loss or Potential Loss of third barrier (FG1.1). This is a time critical JPM and the declaration must be made within 15 minutes after the emergency condition exists. Successful completion of EPP-002, (including PARs) Communication and Notification, Attachment I, Nuclear Power Plant Notification Form, must be made within 15 minutes after the emergency declaration.
TERMINATING CUE:           Successful completion of the EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form.
PREFERRED EVALUATION LOCATION                        PREFERRED EVALUATION METHOD CLASSROOM                                                SIMULATE


==REFERENCES:==
==REFERENCES:==
TERMINATING CUE:Successful completion of the EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form.EPP-108EMERGENCY ACTION LEVEL TECHNICAL BASIS DOCUMENTEPP-001.04GENERAL EMERGENCY EPP-002COMMUNICATION AND NOTIFICATION EPP-001ACTIVATION AND IMPLEMENTATION OF THE EMERGENCY PLANINDEX NO.ROSROK/A NO.0000762429Knowledge of the emergency plan.3.14.42.4.290000762430Knowledge of events related to system operation/status that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.2.74.12.4.300000762440Knowledge of the SRO's responsibilities in emergency plan implementation.2.74.52.4.400000762441Knowledge of the emergency action level thresholds and classifications.2.94.62.4.410000762444Knowledge of emergency plan protective action recommendations.2.44.42.4.445/31/2016Page 2 of 8 EVALUATION TIME 25TIME CRITICAL YESTIME START:TIME FINISH:PERFORMANCE RATING:SAT:UNSAT:PERFORMANCE TIME:EXAMINER:SIGNATUREDATE10CFR55: 45 (a)(11)Stopwatch or other suitable timepieceEPP-001, Attachment 1 EAL Classification Matrix (available via desk top computer or as big board)CANDIDATE:5/31/2016Page 3 of 8 INITIATING CUES:1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.INITIAL CONDITION:30 MINUTES AGO:A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.Charging pumps and RHR pumps could NOT be started manually or automatically.10 MINUTES AGO:ALL Offsite Power was lost.Buses 1DA and 1DB reenergized automatically from the EDGs.
 
Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based onthe status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.CURRENT CONDITIONS:RCS pressure is 1150 psig Reactor Building pressure is 18 psig and rising.
EPP-108              EMERGENCY ACTION LEVEL TECHNICAL BASIS DOCUMENT EPP-001.04            GENERAL EMERGENCY EPP-002              COMMUNICATION AND NOTIFICATION EPP-001              ACTIVATION AND IMPLEMENTATION OF THE EMERGENCY PLAN INDEX NO.       K/A NO.                                                                     RO    SRO 0000762429      2.4.29    Knowledge of the emergency plan.                                 3.1    4.4 0000762430      2.4.30    Knowledge of events related to system operation/status           2.7    4.1 that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.
Core Exit Thermocouple temperatures are 780&deg;F and increasing.NR RVLIS is 30% and decreasing..SG Narrow Range Levels are stable at 45%, 43%, 47%.
0000762440      2.4.40    Knowledge of the SRO's responsibilities in emergency             2.7    4.5 plan implementation.
0000762441      2.4.41    Knowledge of the emergency action level thresholds and           2.9    4.6 classifications.
0000762444      2.4.44    Knowledge of emergency plan protective action                     2.4    4.4 recommendations.
TOOLS:          EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form. (JPA-807A Handout 1)
EPP-001.4, Attachment II, Protective Action Recommendations (JPA-807A Handout 2 or available via desk top computer) 5/31/2016                                                                                              Page 2 of 8
 
Stopwatch or other suitable timepiece EPP-001, Attachment 1 EAL Classification Matrix (available via desk top computer or as big board)
EVALUATION TIME                25          TIME CRITICAL      YES    10CFR55: 45(a)(11)
TIME START:                  TIME FINISH:                    PERFORMANCE TIME:
PERFORMANCE RATING:            SAT:            UNSAT:
CANDIDATE:
EXAMINER:
SIGNATURE          DATE 5/31/2016                                                                                  Page 3 of 8
 
INSTRUCTIONS TO OPERATOR READ TO OPERATOR:
When I tell you to begin, you are to perform the actions as directed in the initiating cues.
I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.
Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.
SAFETY CONSIDERATIONS: None INITIAL CONDITION:
30 MINUTES AGO:
A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.
Charging pumps and RHR pumps could NOT be started manually or automatically.
10 MINUTES AGO:
ALL Offsite Power was lost.
Buses 1DA and 1DB reenergized automatically from the EDGs.
Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based on the status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.
CURRENT CONDITIONS:
RCS pressure is 1150 psig Reactor Building pressure is 18 psig and rising.
Core Exit Thermocouple temperatures are 780&deg;F and increasing.
NR RVLIS is 30% and decreasing..
SG Narrow Range Levels are stable at 45%, 43%, 47%.
Operators have depressurized steam generators to 50 psig.
Operators have depressurized steam generators to 50 psig.
RM-G7 /G18 read 450 R/hr.ALL other radiation monitor readings are NORMAL.The System Controller reports that 230 KV will be restored in 2 hours.
RM-G7 /G18 read 450 R/hr.
Electricians report that a Charging pump can be restored in approximately 30 minutes.Met Data - Wind Direction is from 25 degreesMet Data - Wind Speed is 20 mphMet Data - Wind Stability is Class EREAD TO OPERATOR:SAFETY CONSIDERATIONS:
ALL other radiation monitor readings are NORMAL.
NoneWhen I tell you to begin, you are to perform the actions as directed in the initiating cues. I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task. Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.THIS IS A TIME CRITICAL JPM!INSTRUCTIONS TO OPERATORHAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!5/31/2016Page 4 of 8 Determine that conditions require classification as a GENERAL EMERGENCY.Evaluator Cue: A time can be provided to the candidate for Reactor trip that is the end of brief time (T0) minus 30 minutes for clarity. Normally this time would be obtained from IPCS screen.Evaluator note: This JPM is intended to be run on one Examinee at a time. If multiple Examinees are evaluated at one time then provisions to segregate them must be made. This allows verbalization of the classification as necessary.Evaluator note: The Examinee has 15 min from the end of the Plant Conditions brief (Time 0), tocomplete the event classification. Use the same clock or watch to record the time at the end of brief and the time of classification. Compute the difference between the two times as the elapsed time. This step is critical since proper classification must be made within 15 minutes.Evaluator cue: Provide a copy of JPA-1007-N16 Handout 2 (EPP-001.4 Attachment II) once theExaminee has determined that the event is a General Emergency.
The System Controller reports that 230 KV will be restored in 2 hours.
YesClassifies event as a GENERAL EMERGENCY within 15 minutes based on:EAL FG1.1 - Loss of any two barriers AND Loss or Potential Loss of third barrier (Table F-1).T0 = Time at end of brief    ______________T1 = Time of classification ______________Elapsed time (T1 - T0)      ______________ CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
Electricians report that a Charging pump can be restored in approximately 30 minutes.
15/31/2016Page 5 of 8 Examiner ends JPM at this point.Complete EPP-002, Attachment I, Nuclear Power Plant Emergency Notification Form and provide basis for classification.Evaluator cue: Hand Examinee their copy of EPP-002 Attachment 1 (JPA-1001 Handout) with the classification time entered. Commence timing for completion of Attachment 1.Evaluator cue: If asked provide 803-334-1234 as the confirmation phone number.Evaluator cue: Examinee must explain basis for classification. Ask Examinee for basis if it is not offered. If the basis is not correct, this constitutes failure even if the classification was correct and within 15 minutes. Evaluator note: Record elapsed time when Examinee hands you the EPP-002 Attachment as theApproved by time (line 17 on the EPP-002 Attachment 1). Must be within 15 minutes of time when their classification had been completed. Refer to JPA-1001 Key for critical items on EPP-002Attachment 1.
Met Data - Wind Direction is from 25 degrees Met Data - Wind Speed is 20 mph Met Data - Wind Stability is Class E INITIATING CUES:
YesCorrectly completes EPP-002 Attachment 1 within 15 minutes of declaring event classification.Classification Basis:1. (FUEL CLAD LOSS) Core Cooling Red Path conditions met. Item 2.A2. (RCS LOSS) EITHER RM-G7/ G18 > 100 R/hr - Item 3.A - OR -
: 1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.
Automatic ECCS actuation required by UNISOLABLE RCS leakage, Item 1.A.3. (CONTAINMENT POTENTIAL LOSS) Core Cooling Red Path conditions met and restoration procedure not effective within 15 min. Item 2.A.Referring to EPP-001.4, General Emergency, Attachment II, determines that evacuation of 2 mile radius and 5 miles downwind is required and that sheltering 5-10 mile downwind required.Determines sectors for evacuation/shelter:1. Evacuate EPZ zones A-0, E-12. Shelter zones D-1, D-2 and E-2T1 = Time of classification             ______________
: 2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.
T2 = Time Attachment II complete ______________Elapsed time (T2 - T1)                   ______________ CUES:SEQUENCED: STEP STANDARD: COMMENTS:SATUNSATCRITICAL: Yes JPM STEP:
ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.
25/31/2016Page 6 of 8 JPM: JPA-1007 (S2016 NRC A4 (SRO only): Classify Emergency (ENF)IC SET: NAINSTRUCTIONS:The following items, as indicated on the JPA -1006 key are considered as "Critical Items":- Class of Emergency- Description of Emergency
THIS IS A TIME CRITICAL JPM!
  - Wind Direction and Speed- Whether Offsite Protective Measures are necessary
HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!
5/31/2016                                                                                                    Page 4 of 8
 
CRITICAL: Yes                SEQUENCED: Yes                          SAT            UNSAT JPM STEP: 1 Determine that conditions require classification as a GENERAL EMERGENCY.
STEP STANDARD:
Classifies event as a GENERAL EMERGENCY within 15 minutes based on:
EAL FG1.1 - Loss of any two barriers AND Loss or Potential Loss of third barrier (Table F-1).
T0 = Time at end of brief    ______________
T1 = Time of classification ______________
Elapsed time (T1 - T0)      ______________
CUES:
Evaluator Cue: A time can be provided to the candidate for Reactor trip that is the end of brief time (T0) minus 30 minutes for clarity. Normally this time would be obtained from IPCS screen.
Evaluator note: This JPM is intended to be run on one Examinee at a time. If multiple Examinees are evaluated at one time then provisions to segregate them must be made. This allows verbalization of the classification as necessary.
Evaluator note: The Examinee has 15 min from the end of the Plant Conditions brief (Time 0), to complete the event classification. Use the same clock or watch to record the time at the end of brief and the time of classification. Compute the difference between the two times as the elapsed time. This step is critical since proper classification must be made within 15 minutes.
Evaluator cue: Provide a copy of JPA-1007-N16 Handout 2 (EPP-001.4 Attachment II) once the Examinee has determined that the event is a General Emergency.
COMMENTS:
5/31/2016                                                                                              Page 5 of 8
 
CRITICAL: Yes                SEQUENCED: Yes                              SAT              UNSAT JPM STEP: 2 Complete EPP-002, Attachment I, Nuclear Power Plant Emergency Notification Form and provide basis for classification.
STEP STANDARD:
Correctly completes EPP-002 Attachment 1 within 15 minutes of declaring event classification.
Classification Basis:
: 1. (FUEL CLAD LOSS) Core Cooling Red Path conditions met. Item 2.A
: 2. (RCS LOSS) EITHER RM-G7/ G18 > 100 R/hr - Item 3.A - OR -
Automatic ECCS actuation required by UNISOLABLE RCS leakage, Item 1.A.
: 3. (CONTAINMENT POTENTIAL LOSS) Core Cooling Red Path conditions met and restoration procedure not effective within 15 min. Item 2.A.
Referring to EPP-001.4, General Emergency, Attachment II, determines that evacuation of 2 mile radius and 5 miles downwind is required and that sheltering 5-10 mile downwind required.
Determines sectors for evacuation/shelter:
: 1. Evacuate EPZ zones A-0, E-1
: 2. Shelter zones D-1, D-2 and E-2 T1 = Time of classification           ______________
T2 = Time Attachment II complete ______________
Elapsed time (T2 - T1)               ______________
CUES:
Evaluator cue: Hand Examinee their copy of EPP-002 Attachment 1 (JPA-1001 Handout) with the classification time entered. Commence timing for completion of Attachment 1.
Evaluator cue: If asked provide 803-334-1234 as the confirmation phone number.
Evaluator cue: Examinee must explain basis for classification. Ask Examinee for basis if it is not offered. If the basis is not correct, this constitutes failure even if the classification was correct and within 15 minutes.
Evaluator note: Record elapsed time when Examinee hands you the EPP-002 Attachment as the Approved by time (line 17 on the EPP-002 Attachment 1). Must be within 15 minutes of time when their classification had been completed. Refer to JPA-1001 Key for critical items on EPP-002 Attachment 1.
COMMENTS:
Examiner ends JPM at this point.
5/31/2016                                                                                                  Page 6 of 8
 
JPM SETUP SHEET JPM: JPA-1007(S2016 NRC A4 (SRO only): Classify Emergency (ENF)
IC SET: NA INSTRUCTIONS:
The following items, as indicated on the JPA -1006 key are considered as "Critical Items":
- Class of Emergency
- Description of Emergency
  - Wind Direction and Speed
- Whether Offsite Protective Measures are necessary
  - Potentially affected population and areas
  - Potentially affected population and areas
  - Whether a release is taking place
  - Whether a release is taking place
  - Time of Emergency Declaration- Whether the event is a Drill or Actual EventCOMMENTS: JPM SETUP SHEET5/31/2016Page 7 of 8 INITIATING CUES:1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.INITIAL CONDITION:30 MINUTES AGO:A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.
  - Time of Emergency Declaration
Charging pumps and RHR pumps could NOT be started manually or automatically.10 MINUTES AGO:ALL Offsite Power was lost.
- Whether the event is a Drill or Actual Event COMMENTS:
5/31/2016                                                                                  Page 7 of 8
 
JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:
SAFETY CONSIDERATIONS:                   None INITIAL CONDITION:
30 MINUTES AGO:
A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.
Charging pumps and RHR pumps could NOT be started manually or automatically.
10 MINUTES AGO:
ALL Offsite Power was lost.
Buses 1DA and 1DB reenergized automatically from the EDGs.
Buses 1DA and 1DB reenergized automatically from the EDGs.
Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based onthe status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.CURRENT CONDITIONS:RCS pressure is 1150 psigReactor Building pressure is 18 psig and rising.Core Exit Thermocouple temperatures are 780&deg;F and increasing.
Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based on the status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.
CURRENT CONDITIONS:
RCS pressure is 1150 psig Reactor Building pressure is 18 psig and rising.
Core Exit Thermocouple temperatures are 780&deg;F and increasing.
NR RVLIS is 30% and decreasing..
NR RVLIS is 30% and decreasing..
SG Narrow Range Levels are stable at 45%, 43%, 47%.
SG Narrow Range Levels are stable at 45%, 43%, 47%.
Operators have depressurized steam generators to 50 psig.RM-G7 /G18 read 450 R/hr.ALL other radiation monitor readings are NORMAL.
Operators have depressurized steam generators to 50 psig.
RM-G7 /G18 read 450 R/hr.
ALL other radiation monitor readings are NORMAL.
The System Controller reports that 230 KV will be restored in 2 hours.
The System Controller reports that 230 KV will be restored in 2 hours.
Electricians report that a Charging pump can be restored in approximately 30 minutes.Met Data - Wind Direction is from 25 degreesMet Data - Wind Speed is 20 mph Met Data - Wind Stability is Class ESAFETY CONSIDERATIONS:
Electricians report that a Charging pump can be restored in approximately 30 minutes.
NoneOPERATOR INSTRUCTIONS:Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
Met Data - Wind Direction is from 25 degrees Met Data - Wind Speed is 20 mph Met Data - Wind Stability is Class E INITIATING CUES:
JPM BRIEFING SHEET5/31/2016Page 8 of 8}}
: 1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.
: 2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.
ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.
Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.
5/31/2016                                                                                            Page 8 of 8}}

Latest revision as of 16:35, 4 February 2020

(U1) 2016-301 Exam Final Items - Delay Release
ML17193A924
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/12/2017
From:
NRC/RGN-II
To:
South Carolina Electric & Gas Co
References
Download: ML17193A924 (272)


Text

Appendix D Scenario Outline Form ES-D-1 Facility: VC SUMMER Scenario No: 2 Op Test No: NRC-ILO-14-01 Examiners: Operators: CRS:

RO:

BOP:

Initial Conditions:

  • 100% Power, MOL.
  • B Train Work Week.
  • Alternate Seal Injection is OOS.

Turnover:

  • Maintain 100% power.

Critical Tasks:

  • Start back-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.
  • Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs.
  • Establish feed water flow into at least one SG before RCS bleed and Feed is required.

Event Malf No. Event Type* Event Description 1 FWM006B N - BOP, CRS Feedwater Booster Pump B trips, which requires R-RO power reduction.

2 EH001B C-BOP Running EHC Pump Trip, standby EHC pump fails to EH002F auto start and must be manually started.

3 NIS003D I-RO, CRS Power Range Channel N-44 fails high, causing TS-CRS automatic control rod insertion.

4 CW020B I-BOP, CRS The Turbine Lube Oil auto-controller fails low causing TUR002A Turbine Lube oil temperature to lower and Turbine TUR002B vibrations to increase.

TUR002C TUR002D TUR002E 5 CS004S C-RO, CRS The running Charging Pump shaft shears, which TS-CRS requires start of the standby Charging Pump and restoration of Charging and Letdown 6 FWM001A All Main Feedwater Pumps trip causing Reactor Trip.

FWM001B FWM001C NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 M-ALL Reactor Trip, Loss of Secondary Heat sink, N/A recovery using Condensate.

Pressurizer Spray valve PCV-444C fails open on PRS003A reactor trip.

Turbine Driven EFW Pump steam supply fails MSS015 7 shut on reactor trip.

Engineered Safeguards Bus 1DB lockout actuates EPS167 causing a loss of Train B loads including the B Emergency Feedwater Pump.

Motor Driven EFW Pump A sustains a sheared EF001S shaft.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 The following notation is used in the ES-D-2 form Time column:

IOA designates Immediate Operator Action steps.

  • designates Continuous Action steps.

TURNOVER:

The crew will assume the watch having been pre-briefed on the Initial Conditions, the plan for this shift and any related operating procedures. The Unit will be in a normal full power configuration and the Crew will be instructed to maintain 100% power.

EVENT 1: Feedwater Booster Pump B trips.

  • TRIGGER 1 o MAL-FWM006B FW BOOSTER PUMP B TRIP On cue from the Examiner, the B Feedwater Booster pump will trip. This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP-625 1-2 FWBP A/B/C/D TRIP, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.

EVENT 2: Running EHC Pump trips (standby does not auto start).

  • PRELOAD o PMP-EH002F XPP0003-PP2 HFM PMP B FAIL TO START
  • TRIGGER 2 o PMP-EH001B XPP0003-PP1 HFM PMP A BRG FAILURE Final Value: 10 On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto.

The BOP will respond to annunciator XCP-631 1-4, EHC PP A MOTOR OVRLD, determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing. A Turbine trip will occur within 2 minutes if the event is not mitigated.

NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 EVENT 3: Power Range NI Channel N-44 fails HIGH.

  • TRIGGER 3 o MAL-NIS003D POWER RANGE CHANNEL 44 FAILURE Final Value = 200%

On cue from the Examiner Power Range NI Channel N-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de-energized.

The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.

EVENT 4: Turbine Lube Oil Temperature control valve fails open.

  • TRIGGER 4 o OVR-CW020B TC-4211 TURBINE ROOM CLOSE CYCLE HX POT Final Value = 0 o MAL-TUR002A TURBINE VIBRATION (BEARING 1)

Ramp = 120 sec Final Value = 3.1MIL o MAL-TUR002B TURBINE VIBRATION (BEARING 3)

Ramp = 120 sec Final Value = 5.9 MIL o MAL-TUR002C TURBINE VIBRATION (BEARING 5)

Ramp = 120 sec Final Value = 6.1 MIL o MAL-TUR002D TURBINE VIBRATION (BEARING 7)

Ramp = 120 sec Final Value = 4.9 MIL o MAL-TUR002E TURBINE VIBRATION (BEARING 9)

Ramp = 120 sec Final Value = 5.2 MIL NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1

  • AUTO-TRIGGER 14 x11o064m==1 & x11d016m>=100, (bearing oil temp control in manual and bearing oil temperature greater than 100°F) o MAL-TUR002A TURBINE VIBRATION (BEARING 1)

Ramp = 180 sec Final Value = 1.32 MIL o MAL-TUR002B TURBINE VIBRATION (BEARING 3)

Ramp = 180 sec Final Value = 4 MIL o MAL-TUR002C TURBINE VIBRATION (BEARING 5)

Ramp = 180 sec Final Value = 3.2 MIL o MAL-TUR002D TURBINE VIBRATION (BEARING 7)

Ramp = 180 sec Final Value = 2.9 MIL o MAL-TUR002E TURBINE VIBRATION (BEARING 9)

Ramp = 180 sec Final Value = 2.9 MIL On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temperature and cause vibrations to lower.

NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 EVENT 5: A Charging Pump shaft shears.

  • TRIGGER 5 o PMP-CS004S XPP0043A CHRG/SI PMP A SHEARED SHAFT
  • TRIGGER 15 o LOA-CVC043 CHARGING PUMP C SUPPLY BRKR TRAIN A POSITION TO: RACKED IN
  • TRIGGER 16 o LOA-CVC041 CHARGING PUMP A SUPPLY BRKR POSITION TO: RACKED OUT On cue from the Examiner the running Charging Pump A shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the B or C Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System. The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems - Tavg > 350°F. Action a says: With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

EVENT 6: All 3 Main Feedwater Pumps trip.

NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 EVENT 7: Loss of Heat sink.

  • AUTO-TRIGGER 7 FNISPR(2) <= 5 (N-42 indicates < 5% Power) o MAL-PRS003A PRESSURIZER SPRAY VALVE 444C FAILURE Final Value = 10%

o MAL-MSS015 STEAM FAILURE TO EFW TURBINE o PMP-EF001S XPP0021 MOTOR DRIVEN EFW PMP A SHEARED SHAFT

  • AUTO-TRIGGER 8 X05i081T == 1 (RCP A control switch taken to stop) o LOA-EPS167 RELAY 51BX-1DB - 7.2 KV SWGR BUS 1DB OVERCURRENT Delay = 30 sec Position To: TRIP
  • TRIGGER 9 o LOA-FWM040 SS-FW61A XVG01611A,B,C KEY SWITCH Position To: BYPASS
  • TRIGGER 10 o LOA-FWM041 SS-FW81A1 IFV03321,3331,3341 TRAIN A KEY SWITCH Position To: BYPASS
  • TRIGGER 11 o LOA-FWM042 SS-FW81B1 IFV03321,3331,3341 TRAIN B KEY SWITCH Position To: BYPASS
  • TRIGGER 12 o LOA-EPS133 DG B OVERSPEED TRIP DEVICE Position To: TRIP This event is automatically triggered following the reactor trip of Event 6. The crew will enter EOP-1.1 (ES-0.1) address the stuck open Pressurizer Spray valve and transition to EOP-15.0, Response to Loss of Secondary Heat Sink.

The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish Main Feedwater flow to one SG. The Main Feedwater pumps will not reset and the success path is to utilize Condensate Pump flow to restore SG level.

CRITICAL TASKS:

Start the back-up EHC Pump prior to a Rx/Turbine Trip on low EHC pressure.

Establish feed water flow into at least one SG before RCS bleed and feed is required.

Stop one or more RCPs as necessary to stop Pressurizer Spray flow before a low Pressurizer Pressure SI occurs.

TERMINATION:

The scenario can be terminated after the crew has established feed flow via the Main Feedwater system to at least one Steam Generator or at any time at the discretion of the Examiner.

NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 Scenario Attributes Events

  • Running EHC pump trip.
  • Power Range NI channel N-44 fails HIGH.

Total Malfunctions

  • Turbine lube oil temperature controller fails open.

8 (5-8)

  • Running Charging pump sheared shaft.
  • ESF bus 1DB lockout.

Malfunctions after

  • ESF bus 1DB lockout.

4 EOP entry (1-2)

  • TDEFPp steam supply fails after trip.
  • Running EHC pump trip
  • Power Range NI channel N-44 fails HIGH.

Abnormal Events 5

  • Turbine lube oil temperature controller fails open.

(2-4)

  • Running Charging pump sheared shaft.

Major Transient

  • Loss of Heat sink due to loss of all Emergency Feedwater and loss of 1

(1-2) ESF bus 1DB.

EOPs Entered (1-2) 2

  • EOP-15.0, Response to Loss of Secondary Heat Sink. (FR-H.1)

EOP Contingencies (0-2) 1

  • EOP-15.0, Response to Loss of Secondary Heat Sink. (FR-H.1)
  • Stop one or more RCPs as necessary to stop Pressurizer Spray flow Critical Tasks before a low Pressurizer Pressure SI occurs.

2 (2-3)

  • Establish feed water flow into at least one SG before RCS bleed and Feed is required.

NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:

  • IC Set 302
  • 99.6% Power MOL
  • Rod Position = 228 on control bank D
  • FCV-113 Pot Setting = 4.2
  • Xe = -2744 pcm
  • Burnup = 1013.2 MWD/MTU
  • Prior to the scenario, crew should pre-brief on conditions and expectations for the Shift; maintain power.

PRE-EXERCISE:

  • Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.)
  • VCS-TQP-0807 Attachment I-A, Unit 1 Booth Instructor Checklist, has been completed.
  • Verify the Hard Card for Turbine Load changes is in its proper storage location.
  • Verify the Hard Card for borating via MVT-8104 is in its proper storage location.
  • Hang Tags for equipment out of service.
  • Mark up procedures in use with Circle and slash as applicable.
  • A turnover sheet has been prepared for each position.
  • Conduct two-minute drill.

PRE-LOAD:

STANDARD SIMULATOR SETUP:

  • PMP-LD003P, XPP0138 LEAK DETECTION SUMP PMP LOSS OF POWER
  • VLV-FW028W, XVG01676-FW FW HDR RECIRC ISOL VLV LOSS OF POWER
  • VLV-FW029W, XVG01679-FW FW HTR RECIRC ISO VLV LOSS OF POWER SCENARIO RELATED:
  • ANN-CS044, ALT SEAL INJ PUMP TRBL FAIL TO: ON
  • ANN-CS046, ALT SL INJ DSL GEN TRBL FAIL TO: ON
  • MAL-CVC027, ALT SEAL INJ D/G FAIL TO START
  • MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 1 Page: 10 of 45 Event

Description:

Feedwater Booster Pump B trips Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner, the B Feedwater Booster pump will trip.

This failure results in 3 Main Feedwater Pumps and 3 Feedwater Booster pumps in service at 100% power. The crew will refer to XCP-625 1-2 FWBP A/B/C/D TRIP, which will require a reduction of Reactor Power to 95%. The CRS will implement GOP-4C, Rapid Power Reduction to direct actions needed to accomplish the power reduction. The RO and BOP will perform actions necessary to reduce power from 100% to 95%.

BOOTH OPERATOR: When directed, insert Event 1 (TRIGGER 1)

Indications available:

XCP-625 1-2, FWBP A/B/C/D TRIP CORRECTIVE ACTIONS: XCP-625 1-2

1. If the number of Feedwater Booster Pumps in operation is less than the number of Feedwater Pumps in operation, immediately trip the Reactor and enter EOP-1.0, REACTOR TRIP SAFETY INJECTION ACTUATION. (3 FW PUMPS AND 3 BOOSTER PUMPS ARE IN SERVICE NO TRIP REQUIRED)
2. If three Feedwater Booster Pumps and three Feedwater Pumps are in operation, reduce Reactor power to 95% per GOP-4C, CRS RAPID POWER REDUCTION.
3. If available, start a standby Feedwater Booster Pump per SOP-210, FEEDWATER SYSTEM. (NO STANDBY BOOSTER PUMP AVAILBLE)
4. If only two Feedwater Booster Pumps are in operation, reduce Reactor power to less than 48% per GOP-4C, RAPID POWER REDUCTION. (3 BOOSTER PUMPS ARE IN SERVICE)
5. Ensure Deaerator wide range level is maintained greater than 4 as indicated on LI-3135, DEAER STOR TK WR LVL FEET.

If requested to check status of the B Feedwater Booster Pump BOOTH OPERATOR: and breaker, report no obvious problem with pump and that the breaker is tripped. (brief delay)

EVALUATOR NOTE: The CRS may direct use of the emergency Boration valve MVT-8104 in order to expedite the power reduction.

Direct a plant down power to 95% in accordance with GOP-4C, CRS RAPID POWER REDUCTION.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 1 Page: 11 of 45 Event

Description:

Feedwater Booster Pump B trips Time Position Applicants Actions or Behavior GOP-4C NOTE 3.0 GOP-4C If time allows, load reductions should be discussed with the Load Dispatcher.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 1 Page: 12 of 45 Event

Description:

Feedwater Booster Pump B trips Time Position Applicants Actions or Behavior CAUTION 3.1 through 3.12 GOP-4C

a. Thermal Power changes of greater than 15% in any one-hour period requires completion of GTP-702 Attachment III.H.
b. VCS PID Report, POWER CHANGE SEARCH, should be periodically performed to ensure a thermal power change of greater than 15% in any one-hour period is detected.

BOOTH OPERATOR: If contacted as Shift Engineer regarding GTP-702 Attachment, report back I will complete the GTP-702 Attachment III.H.

3.1 Commence rapid Plant Shutdown as follows: GOP-4C RO

a. Energize all Pressurizer Heaters.

EVALUATOR NOTE: The Reactor Operator may use either the blender or the Emergency Boration valve (MVT-8104) depending on CRS direction.

Procedure guidance for Emergency Boration is found on PAGE 40 of this document.

Procedure guidance for use of the Blender is found on PAGES 41 - 44 of this document.

NOTE 3.1.b GOP-4C Setting FCV-113 A&B, BA FLOW SET PT to 8.3 will yield 33 gpm Boration flow rate.

b. Maintain the following with rod motion or boron GOP-4C concentration changes:

RO 1) Tavg within 10°F and trending to Tref.

2) I within limits.
3) Control Rods above the rod insertion limit.
c. Using the Turbine HMI, Control/Load screen, reduce to the GOP-4C desired load, as low as 5% (50 MWe), as follows:
1) Under Rate %/min, select desired ramp rate up to 5%

per minute.

2) Select Load (a dialog box opens).

BOP 3) Enter desired load.

4) Select OK.
5) Confirm setpoint.
6) Select OK.
7) Verify proper plant response.

EVALUATOR NOTE: The next event may be inserted after a significant power reduction is observed or at any time per the discretion of the Lead Evaluator.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 2 Page: 13 of 45 Event

Description:

Running EHC Pump trips (standby does not auto start)

Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner, the running EHC pump will trip and the backup pump will not start in auto. The BOP will respond to annunciator XCP-631 1-4, EHC PP A MOTOR OVRLD, determine the cause of the event, and take corrective action by starting the backup EHC pump to prevent turbine stop valves from closing. A Turbine trip will occur within 2 minutes if the event is not mitigated.

BOOTH OPERATOR: When directed, insert Event 2 (TRIGGER 2)

Indications available:

XCP-631 1-4, EHC PP A MOTOR OVRLD If requested to check for EHC System Leaks report no leaks observed (brief delay).

If requested to check the A EHC Pump, report the pump is hot BOOTH OPERATOR:

and is not running and the breaker has opened (brief delay).

If requested to check on the B EHC pump operation, report B EHC pump is operating normally (brief delay).

XCP-631 1-4

1. If EHC PUMP A is still running, verify high amps. (EHC BOP PUMP A HAS ZERO AMPS)

XCP-631 1-4 CRITICAL BOP 2. Start EHC PUMP B and observe motor amps.

TASK

3. If EHC PUMP A is still running with higher amps than EHC XCP-631 1-4 PUMP B, secure EHC PUMP A and continue to monitor EHC PUMP B. (EHC PUMP A IS NOT RUNNING)
4. Dispatch an operator to check for EHC System leaks.
5. If EHC PUMP B is drawing high amps with EHC PUMP A BOP tripped, attempt to restart EHC PUMP A and run both pumps until an external leak is located or a low level in the EHC fluid tank alarm is received.
6. If EHC PUMP B overload annunciator is received after starting, commence a Turbine Runback at 5% per minute per GOP-4C.

EVALUATOR NOTE: The next event may be inserted after the B EHC pump is running and an operator has been dispatched to check the EHC System or at any time per the discretion of the Lead Evaluator.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 3 Page: 14 of 45 Event

Description:

Power Range NI Channel N-44 fails HIGH.

Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner Power Range NI Channel N-44 will fail HIGH. This will cause auto rod insertion. The crew will implement AOP-401.10, Power Range Channel Failure and place the Rod Control Bank Select switch in MAN. The channel will be removed from service and de-energized.

The CRS applies Tech Spec 3.3.1, Reactor Trip System Instrumentation. Action 2 requires that the inoperable channel be placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and Action 7 requires that within one hour determine by observation of the associated permissive annunciators window(s) that the interlock is in its required state for the existing plant condition.

BOOTH OPERATOR: When directed, insert Event 3 (TRIGGER 3)

Indications available:

1. Abnormal indication on any of the following:

NI-41B(42B)(43B)(44B), % FULL POWER %.

NI-41C(42C)(43C)(44C), FLUX %.

2. Any of the following Main Control Board annunciators in alarm:

XCP-620 1-1, PR HI SETPT FLUX HI XCP-620 1-4, PR CHAN DEV XCP-620 2-2, PR FLUX HI RATE SINGLE CHAN ALERT XCP-621 2-4, PR FLUX HI ROD STP

3. Any of the following status lights is bright:

OTT - CHAN I(II,III) W/DRWL ROD BLCK.

CHAN I(II,III) LP A(B, C) OTT.

CHAN I(II,III,IV) PR FLUX RATE HI.

CHAN I(II,III,IV) PR FLUX LO SET PT.

CHAN I(II,III,IV) PR FLUX HI SET PT.

CHAN I(II,III,IV) P10.

CHAN I(II,III,IV) P8.

CHAN I(II,III,IV) P9.

4. Failure of a Power Range channel may cause unwarranted rod motion.

IOA 1 Verify normal indication on Power Range Channel N-44. (NO) AOP-401.10 ALTERNATIVE ACTION RO 1 IF Power Range Channel N-44 has failed, THEN place the ROD CNTRL BANK SEL Switch in MAN.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 3 Page: 15 of 45 Event

Description:

Power Range NI Channel N-44 fails HIGH.

Time Position Applicants Actions or Behavior IOA BOP 2 Stabilize any plant transients in progress. AOP-401.10 3 Maintain stable plant conditions. AOP-401.10

5 Place ROD STOP BYPASS Switch (on the AOP-401.10 BOP MISCELLANEOUS CONTROL AND INDICATION PANEL) for the failed Power Range channel in BYPASS.

6 Verify the appropriate Rod Stop Bypass status light is bright: AOP-401.10 RO For N-44, B2 OP ROD STOP BYP (XCP-6111 4-4).

7 Adjust Control Rods to maintain Tavg within 1.0°F of Tref .

8 Notify the I&C Department to record detector currents and AOP-401.10 CRS status lights on POWER RANGE A and POWER RANGE B drawers.

When contacted as I&C, report that the detector currents and BOOTH OPERATOR: status lights on POWER RANGE A and POWER RANGE B drawers for N-44 have been recorded. (brief delay)

CAUTION - Step 9 AOP-401.10 The empty fuse holders should NOT be reinstalled as this will allow a small amount of current flow through the blown fuse indicator.

9 Deenergize the failed Power Range channel: AOP-401.10

a. Remove the CONTROL POWER fuses from the POWER RANGE A drawer.
b. Remove the INSTR POWER fuses from the POWER RANGE B drawer.

10 Align the Power Range channel comparator circuits:

BOP a. Place the following switches to the failed Power Range channel position:

1) COMPARATOR CHANNEL DEFEAT Switch (on the COMPARATOR AND RATE drawer).
2) UPPER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).
3) LOWER SECTION Switch (on the DETECTOR CURRENT COMPARATOR drawer).

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 3 Page: 16 of 45 Event

Description:

Power Range NI Channel N-44 fails HIGH.

Time Position Applicants Actions or Behavior 11 Ensure NR-45 is selected to the appropriate operable AOP-401.10 RO channels.

12 Check if Reactor power is LESS THAN 75%. (NO) AOP-401.10 CRS ALTERNATIVE ACTION 12 Initiate GTP-702, Attachment IV.F.

13 Check if Reactor power is LESS THAN 50%. (NO) AOP-401.10 RO ALTERNATIVE ACTION 13 Initiate GTP-702, Attachment IV.D.

14 Within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, place the failed channel protection bistables AOP-401.10 in a tripped condition:

a. Identify the associated bistables for the failed channel.

REFER TO Attachment 1.

b. Record the following for each associated bistable on SOP-401, REACTOR PROTECTION AND CONTROL SYSTEM, Attachment I:

CRS Instrument.

Associated Bistable.

Bistable Location.

STPs.

c. Notify the I&C Department to place the identified bistables in trip.

CRS 15 Refer to Tech Spec 3.3.1. AOP-401.10 NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 3 Page: 17 of 45 Event

Description:

Power Range NI Channel N-44 fails HIGH.

Time Position Applicants Actions or Behavior Enters T.S. 3.3.1, REACTOR TRIP SYSTEM T.S. 3.3.1 INSTRUMENTATION.

Table 3.3-1; Reactor Trip System Instrumentation:

CRS Function 2A; Power Range Neutron Flux - High Setpoint - action 2 Function 2B; Power Range Neutron Flux - Low Setpoint - action 2 Function 3; Power Range Neutron Flux - High Positive Rate -

Action 2 ACTION 2 - With the number of OPERABLE channels one less T.S. 3.3.1 than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
b. The Minimum Channels OPERABLE requirement is met; CRS however, the inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.
c. Either, THERMAL POWER is restricted to less than or equal to 75% of RATED THERMAL POWER and the Power Range Neutron Flux trip setpoint is reduced to less than or equal to 85% of RATED THERMAL POWER within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; or, the QUADRANT POWER TILT RATIO is monitored at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> per Specification 4.2.4.2.

EVALUATOR NOTE: The next event may be inserted after Technical Specification 3.3.1 has been addressed or at any time per the discretion of the Lead Evaluator.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 4 Page: 18 of 45 Event

Description:

Turbine Lube Oil Temperature control valve fails open Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner the automatic temperature control for the Main Turbine lube oil control valve will cause the flow control valve to fully open. The Main Turbine lube oil temperature will lower as a result of the open control valve and Main Turbine vibrations will rise. The BOP will take manual control of the Turbine Lube Oil controller and will lower cooling flow which will raise oil temp and cause vibrations to lower.

BOOTH OPERATOR: When directed, insert Event 4 (TRIGGER 4)

Indications available:

XCP-632, 1-4, TURB SUPERVISORY INSTR XCP-632, 4-2, MN TURB VIB HI CREW Respond to ANNUNCIATOR XCP-632, 4-2 Determine that turbine vibration does not require a Turbine trip Monitor TI-4211, TURB OIL CLR TEMP °F, to determine if Turbine oil temperature is in the normal operating range between 100°F and 120°F.

BOP 1. Evacuate all unnecessary personnel from the Turbine Building. XCP-632 4-2

2. Monitor Main Turbine vibration levels.
a. At the HMI: Select Monitor and as applicable:
1) LP Hoods TEMP
2) Lube - Hyd Oil.
3) Vibration.
4) Prox.
b. IPCS, type in TURBRG.

BOP Take manual control of the Turbine Oil Temp Controller to increase TLO temperature to the normal operating range.

BOP 2.2 If TI-4211, TURB OIL CLR TEMP °F, reads less than 100°F, SOP-215 perform the following:

a. Verify temperature on the following (TB-436):
1) ITI15633, MN TB LUBE OIL CLR LO INLET TEMP IND.
2) ITI15634, MN TB LUBE OIL CLR LO OUT TEMP IND.
3) ITI04197, MAIN TURB OIL CLR A TC OUTLET TEMP IND.
4) ITI04207, MAIN TURB OIL CLR B TC OUTLET TEMP IND.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 4 Page: 19 of 45 Event

Description:

Turbine Lube Oil Temperature control valve fails open Time Position Applicants Actions or Behavior BOOTH OPERATOR: Call up the TURBRG screen in SIPCS and be prepared to report back Bearing Oil temperatures as displayed when called.

BOOTH OPERATOR: If contacted as AO to check Main Turbine oil cooler conditions report All bearing oil temperatures are reading (as displayed) °F (brief delay).

BOP b. Verify the position of ITV04211-TC, TURBINE OIL CLR TC SOP-215 OUTLET TEMP CONT VLV, and perform the following as necessary (TB-412):

BOOTH OPERATOR: If contacted as AO to check ITV-4211 position, report Valve appears to be fully open with no obvious problem with the operator (brief delay).

BOP 1) If the valve is not fully closed, take manual control of SOP-215 the valve and restore temperature to normal.

EVALUATOR NOTE: After the BOP takes manual control of the TLO Temp Controller and restores TLO temp (control in manual with LO temp > 100°F) high turbine vibrations will ramp back to normal. The next Event may be inserted after Turbine Lube Oil Temperature control has been re-established or at any time per the discretion of the Lead Evaluator.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 20 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner the running Charging Pump A shaft will shear. This will cause a loss of charging flow and a lowering Pressurizer level. The crew will respond using AOP-102.2, Loss of Charging. Letdown will be isolated and either the B or C Charging pump will be started in accordance with SOP 102, Chemical and Volume Control System. The RO will maintain RCS inventory using the charging system. The CRS will refer to TS 3.5.2, Emergency Core Cooling Systems, ECCS Subsystems - Tavg > 350°F.

BOOTH OPERATOR: When directed, insert Event 5 (TRIGGER 5)

Indications available:

XCP-617(618)(619) 2-2, RCP A(B)(C) #1 SL INJ FLO LO.

XCP-614 5-1, CHG LINE FLO HI/LO.

XCP-613 1-4, REGEN HX LTDN OUT TEMP HI Abnormal indication on the following:

FI-122A, CHG FLOW GPM.

FI-122C, CHARGING FLOW GPM.

PI-121, CHG PRESS PSIG.

LT-112A (115), % LEVEL.

LR-459, PZR % LEVEL & LEVEL SP.

RO CORRECTIVE ACTIONS: XCP-614, 5-1

1. If the running Charging Pump suction flowpath has become isolated, secure the Charging Pump and go to AOP-102.2, Loss of Charging.
2. If the PUMP A(B) or PUMP C TRAIN A(B) ammeter indication is abnormal for the running Charging Pump and the pump must be tripped, go to AOP-102.2, Loss of Charging.
3. Monitor LT-112A and LT-115, % LEVEL, to verify proper VCT level.
4. Monitor FI-122A, CHG FLOW GPM.
5. Verify the Charging header valve lineup:
a. Verify the following valves are open:
1) FCV-122, CHG FLOW.
2) MVG-8107, CHG LINE ISOL.
3) MVG-8108, CHG LINE ISOL.
4) Either of the following:

a) PVT-8146, NORM CHG TO RCS LP B.

b) PVT-8147, ALT CHG TO RCS LP A RO SUPPLEMENTAL ACTIONS: XCP-614, 5-1 NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 21 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior

1. If a malfunction of the Charging Pump is suspected, dispatch an operator to investigate.
2. If it is determined that low VCT level is the cause of the problem, the system must be filled and vented prior to starting an idle Charging Pump (refer to SOP-102).
3. Check if PZR LVL MASTER CONTROLLER is responding appropriately:
a. Verify Charging flow is normal and responding to Pressurizer level error.
b. Verify Pressurizer level is stable at program level.
4. Monitor FI-150, LO PRESS LTDN FLOW GPM.
5. Verify RCS heatup or cooldown is within limits.
6. If RCS leakage is indicated, determine the leak rate and refer to Tech Spec 3.4.6.2.
7. If it has been determined that the Charging Pump has malfunctioned, refer to Tech Spec 3.5.2.

If contacted to investigate the Charging pumps report:

If crew hasnt opened breaker report The A Pump motor is running with no pump discharge pressure If crew has opened breaker report The A pump shaft appears to be sheared If contacted to check breaker for A Charging pump report BOOTH OPERATOR: No evidence of breaker failure If contacted to rack C Charging Pump breaker to A bus wait for 2 minutes and report Ready to Rack C pump to A bus. Use Trigger 15 to rack the C breaker to A bus.

If contacted to rack A Charging Pump breaker down wait for 2 minutes and report Ready to Rack down A pump breaker. Use Trigger 16 to rack the A breaker down.

CRS Implement AOP-102.2, Loss of Charging.

CAUTION AOP-102.2 Seal water injection should be maintained any time the RCS is pressurized.

NOTE AOP-102.2 The Alternate Seal Injection System should deliver 20 gpm of borated water from the RWST to the RCS.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 22 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior RO 1 Check if Charging Pump flow is normal: (NO) AOP-102.2 FI-122A, CHG FLOW GPM, between 30 gpm and 115 gpm.

Pump amps between 30 amps and 50 amps.

PI-121, CHG PRESS PSIG, between 2650 psig and 2850 psig.

RO ALTERNATIVE ACTION AOP-102.2 1 Perform the following:

a) Ensure the Charging Pump is secured.

b) Close all Letdown Isolation Valves:

1) PVT-8149A(B)(C), LTDN ORIFICE A(B)(C) ISOL
2) PVT-8152, LTDN LINE ISOL.
3) LCV-459, LTDN LINE ISOL.
4) LCV-460, LTDN LINE ISOL.

c) Close FCV-122, CHG FLOW.

d) Verify CCW flow to the RCP Thermal Barriers is GREATER THAN 110 gpm on FI-7273A(B), THERM BARR FLOW GPM.

e) Display Dedicated Display ZZRCPBRG on the IPCS to monitor RCP temperatures.

f) Verify the Alternate Seal Injection System is in service as indicated by either of the following:

BOTH the following annunciators are lit:

1) XCP-614 2-1 (ALT SL INJ PUMP RUN).
2) XCP-614 2-2 (ALT SL INJ DSL GEN RUN).

OR Seal Injection flow indicated on the following:

FT-130, SL INJ FLO on IUR01156.

FT-127, SL INJ FLO on IUR01155.

FT-124, SL INJ FLO on IUR01154.

g) Contact Electrical and Mechanical Maintenance to investigate.

h) GO TO Step 3.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 23 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior RO 3 Verify Charging System valve lineup: AOP-102.2

a. IF Charging Pump suction is aligned to the VCT, THEN ensure both LCV-115C(E), VCT OUTLET ISOL are open.
b. Ensure the following valves are open:
1) MVG-8106, CHG PP.
2) MVT-8109A(B)(C), CHG PP A(B)(C).
3) MVG-8130A(B), LP A SUCT TO CHG PP C.
4) MVG-8131A(B), LP B SUCT TO CHG PP C.
5) MVG-8132A(B), CHG PP C TO LP A DISCH.
6) MVG-8133A(B), CHG PP C TO LP B DISCH RO c. Check the Charging Header valve lineup as follows: AOP-102.2
1) Ensure MVG-8107, CHG LINE ISOL, is open.
2) Ensure MVG-8108, CHG LINE ISOL, is open.
3) Ensure FCV-122, CHG FLOW, is in MAN and CLOSE.
4) Ensure one of the following valves is open:

PVT-8146, NORM CHG TO RCS LP B.

OR PVT-8147, ALT CHG TO RCS LP A.

5) Verify VCT level is GREATER THAN 20%.
6) Locally verify Charging Pump suction pressure meets the requirements in the table below as indicated on the following (AB-388):

PI-151A, SUCTION PRESS, for Charging Pump A PI-152A, SUCTION PRESS, for Charging Pump B PI-153A, SUCTION PRESS, for Charging Pump C NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 24 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior If directed to locally verify Charging suction pressure, and C OR BOOTH OPERATOR: B pump ready for start, report Suction pressure on all gauges is approximately 57 psig and C OR B Charging pump is ready for start.

The CRS may assume authority for making the decision to start a BOOTH OPERATOR: Charging Pump. If the CRS calls the Shift Manager for permission to start the pump as stated in the procedure, grant permission.

CRS, RO 4 With Shift Manager's permission, start a Charging Pump, while AOP-102.2 monitoring RCP temperatures. REFER TO SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM.

EVALUATOR NOTE: The Operator will ensure the following as per SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM:

  • Breaker Racked Up.
  • Aux Oil Pump Running.
  • Chill water is Operating.
  • Suction Pressure > 30 psig (Local).
  • Miniflow isol open.

RO 5 WHEN a Charging Pump is operating, THEN perform the following. AOP-102.2 REFER TO SOP-102, CHEMICAL AND VOLUME CONTROL SYSTEM.

a. Place Charging and Normal Letdown in service.
b. Secure Alternate Seal Injection.

RO 2.1 Place FCV-122, CHG FLOW, in MAN and close. SOP-102 2.2 Place PCV-145, LO PRESS LTDN, in MAN and open to 70%.

(PEER )

2.3 Place TCV-144, CC TO LTDN HX, in MAN and open to 100%.

2.4 Place TCV-143, LTDN TO VCT OR DEMIN, in VCT.

2.5 Open PVT-8152, LTDN LINE ISOL.

2.6 Open the following:

a. LCV-459, LTDN LINE ISOL.
b. LCV-460, LTDN LINE ISOL.

2.7 Ensure the following Charging Line Isolation Valves are open:

a. MVG-8107, CHG LINE ISOL.
b. MVG-8108, CHG LINE ISOL.

RO 2.8 Slowly open FCV-122, CHG FLOW, to establish 60 gpm flow as SOP-102 indicated on FI-122A, CHG FLOW GPM.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 25 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior RO 2.9 Open Orifice Isolation Valves to obtain the desired Letdown flow SOP-102 rate (60 gpm to 120 gpm):

a. PVT-8149A, LTDN ORIFICE A ISOL (45 gpm).
b. PVT-8149B, LTDN ORIFICE B ISOL (60 gpm).
c. PVT-8149C, LTDN ORIFICE C ISOL (60 gpm).

RO 2.10 Adjust FCV-122, CHG FLOW, as required to maintain TI-140, SOP-102 REGEN HXOUT TEMP °F, between 250°F and 350°F while maintaining Pressurizer level.

2.11 Adjust PCV-145, LO PRESS LTDN, to maintain PI-145, LO PRESS LTDN PRESS PSIG, between 300 psig and 400 psig.

2.12 Place PCV-145, LO PRESS LTDN, in AUTO.

RO 2.13 Adjust TCV-144, CC TO LTDN HX, potentiometer as necessary to SOP-102 maintain the desired VCT temperature. Refer to VCS Curve Book, Figure VII.15 2.14 Place TCV-144, CC TO LTDN HX, in AUTO.

RO 2.15 When Pressurizer level is within 1% of and trending to SOP-102 programmed level, place the PZR LEVEL MASTER CONTROL in MAN.

2.16 Establish automatic FCV-122, CHG FLOW, control as follows:

a. Determine the correct PZR LEVEL MASTER CONTROL setpoint by dividing the current Charging flow by 1.5.
b. Manually adjust the PZR LEVEL MASTER CONTROL to this setpoint.
c. Place FCV-122, CHG FLOW, in AUTO. (PEER )

2.17 Adjust PZR LEVEL MASTER CONTROL in MAN, as necessary, to maintain Pressurizer level at or near programmed level.

2.18 When Pressurizer level is within 1% of and trending to programmed level, place PZR LEVEL MASTER CONTROL in AUTO. (PEER )

2.19 Monitor LR-459, PZR % LEVEL & LEVEL SP, recorder to verify that Charging flow is maintaining actual Pressurizer level at or near the programmed setpoint.

2.20 After the Letdown temperatures have stabilized, place TCV-143, LTDN TO VCT OR DEMIN, in DEMIN/AUTO.

CRS Refers T.S. 3.5.2, EMERGENCY CORE COOLING SYSTEMS, ECCS T.S. 3.5.2 SUBSYTEMS - TAVG => 350°F NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 5 Page: 26 of 45 Event

Description:

A Charging Pump shaft shears Time Position Applicants Actions or Behavior EVALUATOR NOTE: T.S. 3.5.2 action a. applied during the time NO charging pump was operable on Train A. The action will be exited once the C Charging Pump aligned to the A header and A Pump Breaker is racked down.

T.S. 3.5.2; TS 3.5.2 ACTION:

a. With one ECCS subsystem inoperable, restore the inoperable subsystem to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

EVALUATOR NOTE: The next event may be initiated after normal charging and letdown is restored and Technical Specifications have been addressed or at any time per the discretion of the Lead Evaluator.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 6 Page: 27 of 45 Event

Description:

All Main Feedwater Pumps Trip.

Time Position Applicants Actions or Behavior EVALUATOR NOTE: On cue from the Examiner all three Main Feedwater Pumps will trip.

This results in a turbine trip and a corresponding Reactor trip. The crew will enter EOP-1.0 (E-0) and verify the Reactor trip and that no SI is actuated or required.

BOOTH OPERATOR: When directed, insert Event 6 (TRIGGER 6)

EOP-1.0 NOTE EOP-1.0 Steps 1 through 5 are Immediate Operator Actions.

IOA RO 1 Verify Reactor Trip: EOP-1.0 Trip the Reactor using either Reactor Trip Switch.

Verify all Reactor Trip and Bypass Breakers are open.

Verify all Rod Bottom Lights are lit.

Verify Reactor Power level is decreasing.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 6 Page: 28 of 45 Event

Description:

All Main Feedwater Pumps Trip.

Time Position Applicants Actions or Behavior IOA BOP 2 Verify Turbine/Generator Trip: EOP-1.0

a. Verify all Turbine STM STOP VLVs are closed.
b. Ensure Generator Trip (after 30 second delay):
1) Ensure the GEN BKR is open.
2) Ensure the GEN FIELD BKR is open.
3) Ensure the EXC FIELD CNTRL is tripped.

EOP-1.0 IOA BOP 3 Verify both ESF buses are energized.

IOA RO 4 Check if SI is actuated: EOP-1.0

a. Check if either:

SI ACT status light is bright on XCP-6107 1-1.

OR Any red first-out SI annunciator is lit on XCP-626 top row.

ALTERNATIVE ACTION

a. GO TO Step 5.

IOA RO 5 Check if SI is required: EOP-1.0

a. Check if any of the following conditions exist:

PZR pressure LESS THAN 1850 psig.

OR RB pressure GREATER THAN 3.6 psig.

OR Steamline pressure LESS THAN 675 psig.

OR Steamline differential pressure GREATER THAN 97 psid.

ALTERNATIVE ACTION

a. GO TO EOP1.1, ES0.1, REACTOR TRIP RECOVERY, Step 1.

EVALUATOR NOTE: The next event was automatically triggered on the Reactor Trip.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 29 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior EVALUATOR NOTE: This event is automatically triggered following the trip in Event 6.

Failures during Event 7:

Pressurizer Spray valve PCV-444C fails open on reactor trip.

Turbine Driven EFW Pump steam supply fails shut on reactor trip.

Engineered Safeguards Bus 1DB lockout actuates causing a loss of Train B loads including the B Emergency Feedwater Pump (30 second delay from RCP A stopped).

Motor Driven EFW Pump A sustains a sheared shaft.

The crew will transition to EOP-1.1 (ES-0.1), address the stuck open Pressurizer Spray valve and then transition to EOP-15.0, FR-H.1, Response to Loss of Secondary Heat Sink.

The BOP will depressurize one Steam Generator, reset the Safety Injection actuation, and work to establish flow to one SG. The Main Feedwater pumps will not be reset and the success path will be to utilize Condensate flow to restore SG level.

BOOTH OPERATOR: This event is automatically triggered on the Reactor Trip.

EOP-1.1 NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 30 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior CAUTION EOP-1.1 If SI actuation occurs during this procedure, EOP1.0, E0, REACTOR TRIP OR SAFETY INJECTION, should be performed to stabilize the plant.

NOTE EOP-1.1 Main Turbine vibration should be monitored during coastdown.

The EOP REFERENCE PAGE should be monitored throughout the use of this procedure.

EOP-1.1 CREW 1 Announce plant conditions over the page system.

2 Check if RCS Tavg is LESS THAN 564°F. EOP-1.1 ALTERNATIVE ACTION

  • RO 2 WHEN RCS Tavg is LESS THAN 564°F, THEN COMPLETE Steps 3 and 4.

CONTINUE WITH Step 5.

EOP-1.1 3 Close IPV-2231, MS/PEGGING STM TO DEAERATOR.

4 Check FW status: EOP-1.1

a. Verify FW Isolation:
  • Ensure the FW Flow Control Valves, FCV-478(488)(498),

are closed.

  • Ensure the Main FW Isolation Valves, PVG-1611A(B)(C),

are closed.

  • Ensure the FW Flow Control Bypass Valves, FCV-BOP 3321(3331)(3341), are closed.
b. Ensure EFW Pumps are running:
1) Ensure both MD EFW Pumps are running.
2) Verify the TD EFW Pump is running if necessary to maintain SG levels.
c. Verify total EFW flow is GREATER THAN 450 gpm.
d. Trip all Main FW Pumps.

If contacted concerning TDEFW pump status, report The steam supply to the pump is closed and I cant get it to manually open BOOTH OPERATOR:

If contacted concerning A MDEFW pump status, report The A MDEFW pump appears to have a sheared shaft 5 Check RCS temperature: EOP-1.1 With any RCP running, RCS Tavg is stable at OR trending to 557°F.

  • RO OR With no RCP running, RCS Tcold is stable at OR trending to 557°F.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 31 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior NOTE - Step 6 EOP-1.1 If a transition is made to AOP112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, the steps of EOP1.1 which do NOT conflict with AOP112.2 should be completed as time allows.

6 IF EOP-1.0 was entered from AOP-112.2, THEN RETURN TO EOP-1.1 AOP-112.2, ARG3, STEAM GENERATOR TUBE LEAK NOT REQUIRING SI, Step 15. (NO)

CRS ALTERNATIVE ACTION 6 GO TO Step 7.

RO EOP-1.1 7 Verify all Control Rods are fully inserted.

8 Check DA level control: EOP-1.1

a. Open LCV-3235, DEAER START UP DRAIN CNTRL, as necessary to maintain DA level LESS THAN 10.5 ft as BOP indicated on LI-3135, DEAER STOR TK WR LVL FEET.
b. Locally adjust ITV-3062A(B)(C), BD COOLER A(B)(C)

CDSTE OUT TEMP, to 90% (XPN-0029, NUCLEAR BLOWDOWN PROCESSING PANEL, AB-436).

9 Check PZR level control:

a. Verify PZR level is GREATER THAN 17%.

RO EOP-1.1

b. Verify Charging and Letdown are in in service.
c. Verify PZR level is trending to 25%.

10 Check PZR pressure control:

a. Verify PZR pressure is GREATER THAN 1850 psig.

RO EOP-1.1

b. Verify PZR pressure is stable at OR trending to 2230 psig 2230 psig (2220 psig to 2250 psig). (NO)

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 32 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior ALTERNATIVE ACTION

b. IF PZR pressure is LESS THAN 2230 psig AND decreasing, THEN:
1) Ensure the PZR PORVs are closed. IF any PORV fails to close, THEN close its Block Valve.

CRITICAL 2) Ensure PZR Spray Valves are closed.

BOP EOP-1.1 TASK IF any valve fails to close, THEN perform the following:

a) Stop RCP A.

b) IF PZR pressure continues to decrease, THEN perform the following:

  • IF PCV-444C, PZR SPR CNTRL FR LOOP C, will NOT close, THEN stop RCP C.

EVALUATOR NOTE: The Scenario design will result in Train B ESF bus de-energized 30 seconds after the A RCP is stopped. The loss of Train B bus will result in no EFW pumps running.

IF the crew stops RCPs prior to step 10 in EOP-1.1 this may prevent the associated steam generators from lowering to less than 26% NR level which will prevent entry to EOP-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK. The Booth Operator may use malfunctions to stop the necessary RCPs, as directed by the Chief Examiner, to allow steam generators to steam and decrease to less than 26%.

IF the crew does not Trip RCP A from the Main Control Board direct manual actuation of AUTO-TRIGGER 8 which will initiate the loss of Train B ESF bus 1DB and will result in the loss of all EFW.

IF directed by the Chief Examiner manually trigger AUTO-TRIGGER 8 to cause the loss of all EFW flow.

IF directed by the Chief Examiner insert the malfunction to stop the BOOTH OPERATOR: associated RCP:

  • PMP-RC004T, XPP0030A RCP A TRIP ON COMMAND
  • PMP-RC005T, XPP0030B RCP B TRIP ON COMMAND
  • PMP-RC006T, XPP0030C RCP C TRIP ON COMMAND BOOTH OPERATOR: When contacted secure B Diesel Generator using TRIGGER 12 11 Check SG levels:
a. Verify Narrow Range level in all SGs is GREATER THAN 26%. (NO)
a. Maintain total EFW flow GREATER THAN 450 gpm until Narrow Range level is GREATER THAN 26% in at least one SG.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 33 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior 11 b. Control EFW flow to maintain Narrow Range SG levels BOP EOP-1.1 between 26% and 60%.

EVALUATOR NOTE: Narrow range level in all SGs less than 26% [41%] and Total SG Feedwater flow less than 450 gpm is a red path to EOP-15.0.

CRS Direct implementation of EOP-15.0.

CAUTION If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is EOP-15.0 available.

If a NON-FAULTED SG is available, feed flow should NOT be reestablished to any FAULTED SG, to prevent thermal shock to SG tubes.

NOTE EOP-15.0 Conditions for implementing Emergency Plan Procedures should be evaluated using EPP-001, ACTIVATION AND IMPLEMENTATION OF EMERGENCY PLAN.

1 Check if a secondary heat sink is required:

a. Verify RCS pressure is GREATER THAN any NON- EOP-15.0 BOP FAULTED SG pressure.
b. Verify RCS Thot is GREATER THAN 350°F.

2 Verify power is available to all PZR PORV Block Valves:

a. MVG-8000A, RELIEF 445 A ISOL.

EOP-15.0 RO

b. MVG-8000B, RELIEF 444 B ISOL.
c. MVG-8000C, RELIEF 445 B ISOL.

3 Open the Block Valve for any PZR PORV that has been isolated due to excessive seat leakage:

MVG-8000A, RELIEF 445 A ISOL. EOP-15.0 RO MVG-8000B, RELIEF 444 B ISOL.

MVG-8000C, RELIEF 445 B ISOL.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 34 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior CAUTION - Steps 4 through 16 If Wide Range level in any two SGs is LESS THAN 12% [20%] OR PZR pressure is EOP-15.0 GREATER THAN 2330 psig due to loss of secondary heat sink, Steps 17 through 24 should be immediately initiated for bleed and feed cooling.

4 Ensure the following valves are closed:

EOP-15.0 RO SG Blowdown, PVG-503A(B)(C).

SG Sample, SVX-9398A(B)(C).

NOTE - Step 5 EOP-15.0 If EFW flow control can NOT be reestablished from the Control Room, this procedure should be continued while local operator action is in progress to restore EFW flow.

5 Try to establish EFW flow to at least one SG:

a. Check Control Room indications for the cause of EFW failure:
1) Verify no EFW annunciators are lit:

XCP-621 3-5 (EFP SUCT HDR PRESS LO XFER EOP-15.0 BOP TO SW).

Any alarm on XCP-622.

Any alarm on XCP-623.

2) Verify CST level is GREATER THAN 5 ft.
3) Ensure power is available to both MD EFW Pumps.

CAUTION - Step 5.a.4 EFW valves should NOT be opened to SGs with Wide Range level LESS THAN 12%

EOP-15.0

[20%].

If Wide Range level in all SGs is LESS THAN 12% [20%], EFW valves should be open to only one SG, until RCS temperatures are decreasing, to limit any failure to one SG.

4) Ensure all EFW valves are open:

FCV-3531(3541)(3551), MD EFP TO SG A(B)(C).

EOP-15.0 BOP FCV-3536(3546)(3556), TD EFP TO SG A(B)(C).

MVG-2802A(B), MS LOOP B(C) TO TD EFP.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 35 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior PVG-2030, STM SPLY TO TD EFP TRN A(B).

b. Try to restore any EFW flow.
c. Check total EFW flow to SGs GREATER THAN 450 gpm.

(NO)

ALTERNATIVE ACTION

c. IF any feed flow to at least one SG verified, THEN perform the following:

BOP 1) Maintain flow to restore Narrow Range SG level to EOP-15.0 GREATER THAN 26%[41%].

2) When Narrow Range SG level is GREATER THAN 26%[41%], THEN RETURN TO the Procedure and Step in effect.

IF feed flow NOT verified, THEN perform the following:

1) Locally restore EFW flow.
2) GO TO Step 7.

EOP-15.0 RO 7 Stop all RCPs.

CAUTION - Step 8 Deaerator Storage Tank level should be monitored closely and maintained between 2.5 ft EOP-15.0 and 10.5 ft on LI-3135, DEAER STOR TK WR LVL FEET, to prevent tripping Condensate and Feedwater Booster Pumps.

8 Align the MCB for establishing feed flow:

a. Ensure one Condensate Pump is running.
b. Ensure two Feedwater Booster Pumps are running.
c. Ensure Main FW Control Valves are closed:

FCV-478, A FCV.

FCV-488, B FCV. EOP-15.0 BOP FCV-498, C FCV.

d. Place all Main FW Bypass Valve Controllers in MAN and closed:

FCV-3321, LOOP A MAIN FW BYP.

FCV-3331, LOOP B MAIN FW BYP.

FCV-3341, LOOP C MAIN FW BYP.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 36 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior BOOTH OPERATOR When contacted to place key switches in bypass, report I have the keys and a copy of EOP-15.0 in hand Triggers 9, 10 and 11 will accomplish placing the key switches in bypass.

e. Locally place the following key switches in BYPASS (CB-448):

XVG01611A,B,C (XPN 7114). EOP-15.0 BOOTH IFV03321,3331,3341 TRAIN A (XPN 7115).

IFV03321,3331,3341 TRAIN B (XPN 7121).

f. Verify XCP-612 2-1 is NOT lit (RB PRESS HI-2 STM LINE EOP-15.0 BOP ISOL).

NOTE - Step 8.g SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible. EOP-15.0 Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded.

g. Align the MS Isolation Valves to depressurize only one SG:
1) Verify the MS Isolation Valve, PVM-2801A(B)(C), is BOP open for the SG to be depressurized. EOP-15.0
2) Ensure the remaining two MS Isolation Valves, PVM-801A(B)(C), are closed.

ALTERNATIVE ACTION

g. Open the MS Isolation Bypass Valve for one SG:
1) IF RCS Tavg is LESS THAN P-12 (552°F), THEN place STMLN SI TRAIN A(B) Switches to BLOCK.

BOP 2) Depress both MAIN STEAM ISOL VALVES RESET EOP-15.0 TRAIN A(B).

3) Open the MS Isolation Bypass Valve, PVM-2869A(B)(C), for only the SG to be depressurized.
4) Ensure the remaining two MS Isolation Bypass Valves, PVM-2869A(B)(C), are closed.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 37 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior

h. Place the following switches in AUTO:

PVG-1611A(B)(C), A(B)(C) ISOL.

FCV-3321,3331,3341, FW CNTRL BYP VLVS, Train A EOP-15.0 BOP Switch.

FCV-3321,3331,3341, MAIN FW BYPASS VLVS, Train B Switch.

EOP-15.0 BOP 9 Reset both SI RESET TRAIN A(B) Switches.

NOTE - Step 10 EOP-15.0 Main Feed Pumps trip on SI. If an SI occurs, Steps 9 and 10 should be repeated to restart Main Feed Pumps.

10 Establish Main Feedwater flow to the unisolated SG:

a. Verify PERMISV C-9 status light is bright on XCP-6114 1-3.
b. Open MOV-1-5A(B)(C), TURB DRN VLV.
c. Ensure Feedwater Pump to be started is RESET (MCB or EOP-15.0 BOP DCS (T ICON)). (NO)

ALTERNATIVE ACTION

10. GO TO Step 11. Observe the NOTE prior to Step 11.

NOTE - Step 11 Step 11 should NOT be performed as long as the Main Feed Pump is supplying sufficient flow to increase SG level. EOP-15.0 Before the Low Steamline Pressure SI signal is blocked, Main Steam Isolation will occur if the Low Steam Pressure rate setpoint is exceeded.

11 WHEN the Main Feed Pump will NOT supply adequate flow to the SG, THEN depressurize one SG to establish Condensate flow:

a. WHEN RCS Tavg is LESS THAN P-12 (552°F), THEN: EOP-15.0 BOP Place both STM DUMP INTERLOCK Switches to BYP INTLK.

Place STMLN SI TRAIN A(B) Switches to BLOCK.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 38 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior EVALUATOR NOTE: The Steam Generator must be depressurized to below approximately 350 psig before the Feedwater Booster/Condensate pumps can supply the Steam Generator.

NOTE - Step 11.b EOP-15.0 SG B or C is preferred, so that a steam supply for the TD EFP will be restored as soon as possible.

b. Open FCV-3321(3331)(3341), LOOP A(B)(C) MAIN FW BYP, to the SG to be depressurized.
c. Dump steam to the Condenser at the maximum rate:
1) Verify PERMISV C-9 status light is bright on XCP-6114 CRITICAL 1-3.

EOP-15.0 BOP 2) Place the STM DUMP MODE SELECT Switch in STM TASK PRESS.

3) Adjust the STM DUMP CNTRL Controller to fully open the Bank 1 Steam Dump Valves.
d. Adjust Condensate flow to restore SG Narrow Range level to between 26% [41%] and 60%.

12 Reset Containment Isolation:

BOP RESET PHASE A - TRAIN A(B) CNTMT ISOL. EOP-15.0 RESET PHASE B - TRAIN A(B) CNTMT ISOL.

13 Place both ESF LOADING SEQ A(B) RESETS to:

BOP a. NON-ESF LCKOUTS. EOP-15.0

b. AUTO-START BLOCKS.

14 Establish Instrument Air to the RB:

a. Start one Instrument Air Compressor and place the other in Standby.

BOP b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates EOP-15.0 GREATER THAN 60 psig.

c. Open PVA-2659, INST AIR TO RB AIR SERV.
d. Open PVT-2660, AIR SPLY TO RB.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # 7 Page: 39 of 45 Event

Description:

Loss of Heat Sink Time Position Applicants Actions or Behavior NOTE - Steps 15 and 16 EOP-15.0 BOP The specified SG level range (Narrow Range OR Wide Range) must be used in the following Steps.

15 Check SG levels:

a. Verify Narrow Range level is GREATER THAN 26% EOP-15.0 BOP [41%] in at least one SG.
b. RETURN TO the Procedure and Step in effect.

EVALUATOR NOTE: The scenario can be terminated after the crew has established feed flow via the Condensate system to at least one Steam Generator or at any time at the discretion of the Examiner.

NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 40 of 45 SOP-106,Section IV, D, BORATING THE RCS USING THE Event

Description:

EMERGENCY BORATE VALVE NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 41 of 45 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 42 of 45 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 43 of 45 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 44 of 45 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS NUREG -1021 R10 Appendix D Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 2 Event # NA Page: 45 of 45 Event

Description:

NA Procedure Revisions Used in this Scenario Guide Number Title Rev Date ARP-001-XCP-625 FEEDWATER 9 02/11/16 GOP-4C RAPID POWER REDUCTION 1C 1/21/16 ARP-001-XCP-632 GENERATOR 7H 05/29/14 AOP-401.10 POWER RANGE CHANNEL FAILURE 3B 01/31/07 AOP-102.2 LOSS OF CHARGING 1 11/24/15 SOP-102 CHEMICAL AND VOLUME CONTROL SYSTEM 24C 11/22/15 EOP-1.0 E-0, REACTOR TRIP OR SAFETY INJECTION 29 11/24/15 EOP-1.1 ES0.1 REACTOR TRIP RESPONSE 20 8/20/15 FR-H.1, RESPONSE TO LOSS OF SECONDARY EOP-15.0 15 9/30/15 HEAT SINK ARP-001-XCP-614 CHARGING/LETDOWN 6D 9/4/15 SOP-215 MAIN TURBINE LUBE OIL SUPPLY SYSTEM 7D 9/4/15 ARP-001-XCP-631 MAIN TURBINE 5H 08/08/13 ARP-001-XCP-620 NUCLEAR INSTRUMENTATION 8H 09/17/15 ARP-001-XCP-621 ROD CONTROL 5F 09/17/15 SOP-106 REACTOR MAKEUP WATER SYSTEM 12 11/9/15 NUREG -1021 R10 Appendix D Scenario Outline Form ES-D-1 Facility: VC SUMMER Scenario No: 3 Op Test No: NRC-ILO-14-01 Examiners: Operators: CRS:

RO:

BOP:

Initial Conditions: 65% Power.

B1 Train Work week.

B and C MFW Pump Running - A MFW Pump shutdown.

Alternate Seal Injection is OOS.

Turnover: Lower Power.

Critical Tasks: Manually control A SG Feedwater without a Rx/Turbine Trip on SG level.

Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary.

Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running.

Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.

Event Malf No. Event Type* EVENT DESCRIPTION 1 IA003T C-RO, CRS Reactor Building Instrument Air is lost and PVA-2569, RB IA004F Instrument Air Backup Isolation, will fail to open requiring IA001F manual operation of the backup supply isolation.

IA001F IA002 2 SI025L C-RO Safety Injection Accumulator B level and pressure will lower SI001L TS-CRS until pressure reaches 595 psig. The Operator will raise SI042A pressure to within Tech Spec limitations.

SI042B AUX024 3 NA R-RO, Reduce power from 65% to 55% power IAW GOP-4B.

N-BOP, CRS 4 FWM014D C-BOP, CRS Master MFW Speed Controller drifts LOW in AUTO requiring manual control of MFW Pump speed.

5 MS010O I-BOP, CRS LT-476 S/G A NR level transmitter fails LOW. Feed flow TS-CRS rises as this is the controlling SG level channel. BOP takes manual control of FRV and matches FF and SF.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 6 MSS016 M-ALL MSLB Downstream of the MSIVs with All MSIVs failed MSS006A OPEN.

MSS006B MSS006C The MSIVs can be closed locally when directed by the crew.

PCS005A Auto Safety Injection fails both trains, manual actuation PCS005B available on both trains from a single Main Control Board SI009 switch.

RC005P Pressurizer PORV 445B fails open and requires block valve to be closed.

EF001P All Emergency Feedwater flow control valves failed in the EF002P open position until operator takes manual control.

EF003P EF004P EF005P EF006P TERMINATE: Verify SI flow NOT required in EOP-3.1 (ECA-2.1) or at the discretion of the Examiner.

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor The following notation is used in the ES-D-2 form Time column:

IOA designates Immediate Operator Action steps.

  • designates Continuous Action steps.

TURNOVER:

The crew will assume the watch having been pre-briefed on the Initial Conditions, the plan for this shift and any related operating procedures. The Unit will be at 65% power, holding for turnover. The Unit was being Shutdown to repair a minor non-isolable steam leak on the bottom of the Turbine. The A MFW Pump and the A FWBP have been secured. GOP-4B, Power Operation (Mode 1 Descending) is in progress and has been completed through step 3.2.d. The power reduction was halted at 65% to investigate the possibility of repairing the leak while online. The plant has been at 65% for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. The crew will be directed to maintain power at 65% pending further Management direction. Xenon is increasing slowly.

The simulator will be frozen prior to the crew entering the simulator. The Lead Evaluator may leave the simulator frozen or allow the simulator to be in run with surrogates in place to maintain stable plant conditions until the crew assumes the watch.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 EVENT 1: Loss of RB Instrument Air manual action required to restore.

PRELOAD o PMP-IA004F XAC0004B RX BLDG AIR COMP B FAIL TO START o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS TRIGGER 1 o ANN-IA002 RB AIR CMPR A TRBL o PMP-IA003T XAC0004A RX BLDG AIR COMP A TRIP ON COMMAND AUTO-TRIGGER 11 X02i096o == 1 (PVA-2569 control switch taken to open) o VLV-IA001F XVA02659-IA RB BACKUP AIR SUP VLV FAIL AS IS Delete in: 1 sec On cue from the Examiner the Reactor Building Instrument Air is lost due to failure of the running compressor and fail of the back up to start. The backup supply from Plant Instrument Air, PVA-2569, will fail to auto open. The BOP must manually open PVA-2659 and restore Reactor Building Instrument Air.

EVENT 2: Safety Injection Accumulator Pressure LOW.

TRIGGER 2 o VLV-SI001L HCV00936-SI OPER-ACCUM VENT LEAKAGE Final Value: 100%

o VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final Value: 100%

o OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Override To: On o OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Override To: Off o LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0.1 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 AUTO-TRIGGER 12 PT_925 < 595 (Removes leakage at 595 psig in B Accumulator) o VLV-SI001L HCV00936-SI OPER-ACCUM VENT LEAKAGE Final value: 0 o VLV-SI025L XVT08875B-SI ACCUM B N2 SUP VLV LEAKAGE Final value: 0 o OVR-SI042A SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) GREEN LAMP Delete in: 1 sec o OVR-SI042B SS-SI61 ACCUMULATOR B N2 SUPPLY (XVT-8875B) RED LAMP Delete in: 1 sec o LOA-AUX024 ACCUM B DRAIN TO RCDT Final Value: 0 On cue from the Examiner Safety Injection Accumulator B level and pressure will lower until pressure reaches 595 psig. The RO will receive XCP-611 2-3, ACCUM B PRESS HI/LO and will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d; A nitrogen cover pressure of between 600 and 656 psig. Action b of Tech Spec 3.5.1 requires restoration of the Accumulator pressure within 1 Hour.

EVENT 3: Lower Power from 65% to 55% per management discretion.

GOP-4B, Power Operation (Mode 1 Descending) will be used to guide the actions of the crew.

The CRS will direct a power reduction at 1% per minute or less and provide oversight as the load reduction proceeds towards 48% which is where GOP-4B proceeds to step 3.3. The RO will adjust RCS boron to maintain proper Delta I and Control Rod height as the BOP reduces turbine load.

EVENT 4: Main Feed Pump master speed control fails LOW.

TRIGGER 4 o MAL-FWM014D FWP D (SC-509A) AUTO CONTROL FAILURE Ramp: 30 sec Final Value: 15%

On cue from the Examiner the master MFW Speed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band. The CRS will refer to AOP-210.3, Feedwater Pump Malfunction.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 EVENT 5: S/G A Controlling level channel fails LOW.

TRIGGER 5 o XMT-MS010O ILT00476 SG A NR LVL LI-476 FAIL TO POSN Ramp: 2 min Final Value: 0%

On cue from the Examiner Steam Generator A Narrow Range level transmitter, LT-476 fails LOW. This is the controlling SG level channel and the failure will cause feed flow to rise. The BOP takes manual control of FRV and matches FF and SF. Crew implements AOP-401.11, Steam Generator Level Control and Protection Channel Failure. The CRS will apply Tech Spec 3.3.1, Reactor Trip System Instrumentation and Tech Spec 3.3.3, Engineered Safety Feature Actuation System Instrumentation.

Tech Spec 3.3.1 function 13, Steam Generator Water Level Low-Low is affected. This function invokes action 6 which requires; with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Tech Spec 3.3.3 Functions 5.a; Turbine Trip and Feedwater Isolation and 6.c; Emergency Feedwater Low Low Level start of EFW pumps are affected. Both functions invoke action 24 which requires: with the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied: a. the inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

EVENT 6: MSLB downstream of the MSIVs with all MSIV failed open.

PRELOAD o MAL-PCS005A SAFETY INJECTION FAILURE TRAIN A Fail To: FAIL TO AUTO INIT o MAL-PCS005B SAFETY INJECTION FAILURE TRAIN B Fail To: FAIL TO AUTO INIT o OVR-SI009 CS-CR01B SAFETY INJ ACTUATION ACTUATE Override To: False o VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Final Value: 100 o VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Final Value: 100 o VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Final Value: 100 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 o VLV- EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Final Value: 100 o VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Final Value: 100 o VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Final Value: 100 TRIGGER 6 o MAL-MSS016 STEAMLINE BREAK DOWNSTREAM THE MSIV'S Final Value: 4E6 LBM/HR o MAL-MSS006A MAIN STEAM ISOLATION VALVE (S/G A) FAILURE Fail To: FAILURE TO CLOSE o MAL-MSS006B MAIN STEAM ISOLATION VALVE (S/G B) FAILURE Fail To: FAILURE TO CLOSE o MAL-MSS006C MAIN STEAM ISOLATION VALVE (S/G C) FAILURE Fail To: FAILURE TO CLOSE AUTO-TRIGGER 10 fnispr(2)<=2 (Fails PZR PORV open at Reactor trip) o VLV-RC005P PCV00445B-RC PZR PWR REL VLV FAIL POSITION Final Value: 100%

TRIGGER 14 o VLV-MS008W XVG02802A-MS MS LP B TO TD EF PMP LOSS OF POWER TRIGGER 15 o VLV-MS008P XVG02802A-MS MS LP B TO TD EF PMP FAIL POSITION Final value: 0 TRIGGER 16 o VLV-MS009W XVG02802B-MS MS LP C TO TD EF PMP LOSS OF POWER TRIGGER 17 o VLV-MS009P XVG02802B-MS MS LP C TO TD EF PMP FAIL POSITION Final value: 0 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 AUTO-TRIGGER 18 x07i557R==1 (Removes MD EFW valves failed open when reset switch is operated) o VLV-EF001P IFV03531-EF EF ISO FRM MD PMPS TO SG A FAIL POSITION Delete in: 1 sec.

o VLV-EF003P IFV03541-EF EF ISO FRM MD PMPS TO SG B FAIL POSITION Delete in: 1 sec o VLV-EF005P IFV03551-EF EF ISO FRM MD PMPS TO SG C FAIL POSITION Delete in: 1 sec AUTO-TRIGGER 19 x07i556R==1 (Removes TD EFW valves failed open when reset switch is operated) o VLV-EF002P IFV03536-EF EF ISO FRM TD PMPS TO SG A FAIL POSITION Delete in: 1 sec o VLV-EF004P IFV03546-EF EF ISO FRM TD PMPS TO SG B FAIL POSITION Delete in: 1 sec o VLV-EF006P IFV03556-EF EF ISO FRM TD PMPS TO SG C FAIL POSITION Delete in: 1 sec TRIGGER 20 o LOA-RHR006 ACCUM A ISO VLV 8808A BKR Position To: CLOSE o LOA-RHR008 ACCUM C ISO VLV 8808C BKR Position To: CLOSE Delay: 60 sec TRIGGER 21 o LOA-RHR007 ACCUM B ISO VLV 8808B BKR Position To: CLOSE Delay: 120 sec NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 TRIGGER 7 o VLV-MS021P XVM02801B-MS MS ISO VLV B FAIL POSITION Final Value: 0%

o VLV-MS020P XVM02801A-MS MS ISO VLV A FAIL POSITION Final Value: 0%

Delay: 120 sec o VLV-MS022P XVM02801C-MS MS ISO VLV C FAIL POSITION Final Value: 0%

Delay: 240 sec Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN. The crew will enter EOP-1.0 (E-0) address the failure of Automatic Safety Injection by operating the Train A manual switch and the stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, until the Operator takes the control to manual. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.

CRITICAL TASKS:

Maintain SG Levels following the FWP Master Auto Control Failure such that a reactor trip is not necessary.

Manually control A SG Feedwater without a Rx/Turbine Trip on SG level.

Actuate one train of Safeguards equipment and close the block valve on the stuck open PORV before NR RVLIS decreases to less than 61% or WR RVLIS deceases to less than 60% with RCPs running.

Control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF.

TERMINATION:

The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed or at the discretion of the Examiner.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 2016 Exam - Scenario NRC-3 Scenario Events Attributes Loss of RB Instrument Air manual action required to restore.

Safety Injection Accumulator Pressure LOW.

S/G A Controlling level channel fails LOW.

Total Main Feed Pump master speed control fails LOW.

Malfunctions 8 (5-8) MSLB downstream of the MSIVs with all MSIV failed open.

Automatic Safety Injection fails, manual required.

All EFW valves remain full open until manually reset.

Pressurizer PORV fails open after Reactor trip.

Malfunctions Automatic Safety Injection fails, manual required.

after EOP 3 Pressurizer PORV fails open after Reactor trip.

entry (1-2) All EFW flow control valves fail open, manual action required to control.

Loss of RB Instrument Air manual action required to restore.

Abnormal Safety Injection Accumulator Pressure LOW.

Events 4 (2-4) S/G A Controlling level channel fails LOW.

Main Feed Pump master speed control fails LOW.

Major Transients 1 MSLB downstream of the MSIVs with all MSIV failed open.

(1-2)

EOPs Entered EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam 1

(1-2) Generators.

EOP EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Contingencies 1 (0-2) Generators.

Manually actuate at least one train of safeguards equipment prior to exit EOP-1.0.

Critical Tasks Manually close the open PZR PORV block valve before exit EOP-1.0.

3 (2-3)

Control the EFW flow rate and terminate Safety Injection, in order to minimize the RCS cool down rate before a severe (orange-path) challenge develops to the integrity CSF.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Scenario Outline Form ES-D-1 SIMULATOR SCENARIO SETUP INITIAL CONDITIONS:

IC Set 303 65% Power MOL Burnup = 10,010 MWD/MTU RCS Boron Concentration = 1067 ppm FCV-113 Pot Setting = 4.58 Rod Position: Group D = 179 Tavg = 576.9 Xe = - 2581 pcm Prior to the scenario, crew should pre-brief on conditions and expectations for the Shift (maintain power, repairs estimated to be complete well before LCO action time expires.)

PRE-EXERCISE:

Ensure simulator has been checked for hardware problems (DORT, burnt out light bulbs, switch malfunctions, chart recorders, etc.).

VCS-TQP-0807 Attachment I-A, Unit 1 Booth Instructor Checklist, has been completed.

Verify the Hard Card for Turbine Load changes is in its proper storage location.

Verify the Hard Card for borating via MVT-8104 is in its proper storage location.

Hang Red Tags for equipment out of service.

Mark up procedures in use with Circle and slash as applicable:

o GOP-4B, POWER OPERATION (MODE 1 - DESCENDING)

A turnover sheet has been prepared for each position.

Conduct two-minute drill.

PRE-LOAD:

STANDARD SIMULATOR SETUP:

PMP-LD003P, XPP0138 Leak Detection Sump Pmp Loss of Power VLV-FW028W, XVG01676-FW FW Hdr Recirc Isol Vlv Loss of Power VLV-FW029W, XVG01679-FW FW HTR Recirc Isol Vlv Loss of Power SCENARIO RELATED:

ANN-CS044, ALT SEAL INJ PUMP TRBL FAIL TO: ON ANN-CS046, ALT SL INJ DSL GEN TRBL FAIL TO: ON MAL-CVC027, ALT SEAL INJ D/G FAIL TO START MAL-CVC029, ALT SEAL INJ PUMP FAIL TO START NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 1 Page: 11 of 44 Event

Description:

Loss of RB Instrument Air manual action required to restore Time Position Applicants Actions or Behavior EVALUATOR NOTE:

On Evaluator cue the A Reactor Building Instrument Air Compressor Trips and the B Reactor Building Instrument Air Compressor Fails to start automatically or manually. Valve PVA-2659, Instrument Air to RB Air Serv, fails to open in AUTO but PVA-2659 can be opened using the Control Switch on the MCB.

BOOTH OPERATOR: When directed - initiate Event 1 (TRIGGER 1).

Indications Available:

XCP-606 2-4, RB AIR COMP A TRBL XCP-606 2-5, RB AIR HDR PRESS LO CRS Enters ARP-001- XCP-606 2-5 XCP-606 2-5 If contacted as an operator to check the air compressors report No obvious problem detected on A compressor and if asked to check BOOTH OPERATOR:

status on standby compressor report The B compressor is properly aligned for auto start and is ready for start.

RO AUTOMATIC ACTIONS: XCP-606 2-5

1. PVA-2659, INST AIR TO RB AIR SERV, opens to provide backup Instrument Air.

CORRECTIVE ACTIONS:

1. Verify Reactor Building Instrument Air header pressure on PI-8386, RB AIR HDR PRESS.
2. Determine if both Reactor Building Air Compressors are stopped.
3. Attempt to start the standby air compressor manually.
4. Determine Reactor Building Instrument Air filter differential pressure off the following:
a. IPI08383A, RB INSTR AIR FILTER A INLET PRESS IND.
b. IPI08383B, RB INSTR AIR FILTER A OUTLET PRESS IND.
c. IPI08393A, RB INSTR AIR FILTER B INLET PRESS IND.
d. IPI08393B, RB INSTR AIR FILTER B OUTLET PRESS IND.

RO Recognizes that PVA-2659 has failed to open on LOW Pressure and XCP-606 2-5 manually opens PVA-2659.

EVALUATOR NOTE:

The next event may be inserted after air is restored to the RB or at any time per the discretion of the Lead Evaluator.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 2 Page: 12 of 44 Event

Description:

Safety Injection Accumulator Level and Pressure LOW Time Position Applicants Actions or Behavior EVALUATOR NOTE:

On cue from the Examiner Safety Injection Accumulator B level and pressure will lower until pressure reaches 595 psig. The RO will align N2 to restore Accumulator pressure IAW SOP-112, Safety Injection System. The CRS will apply Tech Specs 3.5.1 Accumulators, Limiting Condition for Operation d.

BOOTH OPERATOR: When directed - initiate Event 2 (TRIGGER 2).

Indications Available:

XCP-611 2-3, ACCUM B PRESS HI/LO CRS Enters ARP-001- XCP-611 2-3 XCP-611 2-3 RO CORRECTIVE ACTIONS: XCP-611 2-3

1. Verify Accumulator pressure on PI-925 and PI-927, PRESS PSIG.
2. Refer to SOP-112 for raising or lowering Accumulator pressure.
3. Verify proper Accumulator valve alignment per SOP-112.

BOOTH OPERATOR: Call CRS as Chemistry and report A liquid sample valve was left open on the B Accumulator Tank but it is now closed.

CRS SUPPLEMENTAL ACTIONS: XCP-611 2-3

1. Refer to Technical Specification 3.5.1 for operating limitations.

CRS Enters T.S. 3.5.1, ACCUMULATORS. T.S. 3.5.1

d. A nitrogen cover-pressure of between 600 and 656 psig.

ACTION:

a. With one accumulator inoperable, except as a result of a closed isolation valve, restore the inoperable accumulator to OPERABLE status within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

CAUTION 2.0 SOP-112 When raising an accumulator pressure, the other accumulator pressures should be monitored to verify that they are not changing.

RO 2.1 Ensure HCV-936, ACCUM N2 VENT, is closed. SOP-112 RO 2.2 Open PVT-8880, N2 SUPPLY. SOP-112 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 2 Page: 13 of 44 Event

Description:

Safety Injection Accumulator Level and Pressure LOW Time Position Applicants Actions or Behavior NOTE 2.3 through 2.4 SOP-112 If RB temperature is expected to rise after pressurizing the accumulators, accumulator pressure should be maintained between 600 psig and 625 psig.

RO 2.3 Open PVT-8875B, N2 TO B. (PEER ) SOP-112 RO 2.4 When the accumulator pressure is at the desired pressure, close SOP-112 PVT-8875B, N2 TO B.

RO 2.5 Repeat Steps 2.3 through 2.4 as necessary until all accumulators SOP-112 are at desired pressure.

RO 2.6 Place PVT-8880, N2 SUPPLY to CLOSE/AUTO. SOP-112 EVALUATOR NOTE:

The next event may be inserted after Tech Specs have been addressed and the "B" SI Accumulator pressure has been restored or at any time per the discretion of the Lead Evaluator.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 3 Page: 14 of 44 Event

Description:

Lower Power from 65% to 55% per management discretion.

Time Position Applicants Actions or Behavior BOOTH OPERATOR: No triggers for this event BOOTH OPERATOR: When directed by the lead examiner call the CRS as the Shift Manager and provide the following information, This is the Shift Manager; Plant Management has requested a power reduction to provide more margin for the operating Main Feedwater pumps. You are to reduce power to 55% in accordance with GOP-4B, GOP-4B POWER OPERATION (MODE 1 - DESCENDING).

Indications Available:

XCP-620 1-5, PR UP DET FLUX HI DEV AUTO DEFEAT XCP-632 3-1, GEN H2 TEMP GAS HI/LO CRS Direct operators to perform power reduction at 1% per min., in GOP-4B accordance with GOP-4B, POWER OPERATIONS (MODE 1 -

DESCENDING).

BOP Reduces turbine load using turbine controls, in accordance with GOP-4B, GOP-4B POWER OPERATIONS (MODE 1 - DESCENDING).

EVALUATOR NOTE:

Procedure guidance for use of the blender for boration is found on PAGES 37 - 40 of this document.

RO Borate or dilute, in accordance with SOP-106, REACTOR MAKEUP GOP-4B WATER SYSTEM to maintain Delta I within limits and control rods above the insertion limits.

EVALUATOR NOTE:

Procedure guidance for use of the Main Turbine HMI for load reduction is found on PAGES 41 - 43 of this document.

BOP Decrease turbine load using load set or load limit at rate provided by CRS GOP-4B (up to 1% per min per GOP-4B step 3.2.a).

RO Maintains TAVG within control band by control rod motion and boron GOP-4B concentration changes.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 3 Page: 15 of 44 Event

Description:

Lower Power from 65% to 55% per management discretion.

Time Position Applicants Actions or Behavior EVALUATOR NOTE:

IF at any time RCS pressure lowers to less than 2206 PSIG in Mode 1, then T.S. 3.2.5, DNB PARAMETERS must be entered.

T.S. 3.2.5, DNB PARAMETERS With any of the above parameters exceeding its limit, restore the parameter to within its limit within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or reduce THERMAL POWER to less than 5% of RATED THERMAL POWER within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.

EVALUATOR NOTE:

The next event may be inserted after a significant power change is observed or at any time per the discretion of the Lead Evaluator.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 4 Page: 16 of 44 Event

Description:

Main Feed Pump master speed control fails LOW Time Position Applicants Actions or Behavior EVALUATOR NOTE:

On cue from the Examiner the master MFW Speed Controller drifts LOW in AUTO. The BOP will take manual control of MFW Pump speed and control speed to maintain Feed pump discharge pressure in the operating band.

BOOTH OPERATOR: When directed - initiate Event 4 (TRIGGER 4).

Indications Available:

XCP-624 1-5, SG A LVL DEV.

XCP-624 2-5, SG B LVL DEV.

XCP-624 3-5, SG C LVL DEV.

XCP-627 1-3, CO PP DISCH PRESS HI/HI-HI.

Feed Water flow lowering to ALL Steam Generators.

Narrow range level lowering on ALL Steam Generators Feed pump speed lowering on ALL Main Feedwater pumps.

FW PP DISCH HDR PRESS PSIG PI-508 lowering.

CRS Enters AOP-210.3, FEEDWATER PUMP MALFUNCTION. AOP-210.3 AOP-210.3 IOA BOP 1 Verify at least one Feedwater Pump is running. AOP-210.3 IOA BOP 2 Check if a Feedwater Pump trip has occurred. AOP-210.3 2 ALTERNATIVE ACTION GO TO Step 4.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 4 Page: 17 of 44 Event

Description:

Main Feed Pump master speed control fails LOW Time Position Applicants Actions or Behavior IOA BOP 4 Check Main Feedwater Pump operation. AOP-210.3

a. Verify all Main Feedwater Pumps are affected.
b. Check if Reactor Power is GREATER THAN 50%.

CRITICAL

c. Place the MCB MASTER SPEED CNTRL in MAN and adjust to between 50% and 60% demand OR as needed to control TASK Feedwater Flow.
d. Verify all Main Feedwater Pump speeds are stable.

NOTE - Step 5 AOP-210.3 Due to the slow operation of the Main Feedwater Pump Recirculation Valves, a constant Main Feedwater Pump speed should be maintained until the recirculation valves have become relatively stable while adjusting Feedwater Flow.

BOP 5 Check if Main Feedwater Flow matches Main Steam Flow for each AOP-210.3 Steam Generator.

5 ALTERNATIVE ACTION Perform the following for the AFFECTED Steam Generator(s):

a) Place the Main Feed Regulating valve in Manual.

b) Match Feedwater Flow and Steam Flow.

c) Place the Main Feed Regulating valve in Automatic.

BOP 6 Maintain Narrow Range Steam Generator Water level between 60% AOP-210.3

  • and 65%

EVALUATOR NOTE:

If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the major event (Trigger 6) should be directed.

EVALUATOR NOTE:

The next event may be inserted after The Feed Pump speed control is in manual and the BOP has control of SG levels with level less than 65% Narrow Range or at any time per the discretion of the Lead Evaluator.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 18 of 44 Event

Description:

S/G A Controlling level channel fails LOW Time Position Applicants Actions or Behavior EVALUATOR NOTE:

On cue from the Examiner Steam Generator A Narrow Range level transmitter, LT-476 fails LOW.

This is the controlling SG level channel and the failure will cause feed flow to rise.

BOOTH OPERATOR: When directed - initiate Event 5 (TRIGGER 5).

Indications Available:

XCP-624 1-2, SG A LVL LO-LO.

XCP-624 1-5, SG A LVL DEV.

LI-476, NR LEVEL % A Steam Generator level indicates zero.

PVT 478 SG A FWF, A Steam Generator flow control at maximum demand.

Both A Steam Generator feed flow channels, FI-477 and FI-476 greater than Steam flow.

EVALUATOR NOTE:

CRS may directly enter AOP-401.11, STEAM GENERATOR LEVEL CONTROL AND PROTECTION CHANNEL FAILURE.

CRS Enters ARP-001- XCP-624 1-5 XCP-624 1-5 EVALUATOR NOTE:

The failed level channel cannot be de-selected. The A SG feed reg valve will be in manual for the remainder of the scenario.

RO CORRECTIVE ACTIONS: XCP-624 1-5

1. If required, restore Steam Generator A level to between 60% and 65% by performing either or both of the following:

CRITICAL

a. Manually control PVT-478, SG A FWF, as required.
b. Manually control Feedwater Pump speed as follows:

TASK 1) Place the Feedwater Pump MASTER SPEED CNTRL in MAN.

2) Adjust the differential pressure between Feedwater Pump discharge header pressure and Main Steam header pressure, as required, to restore Steam Generator water level.

CRS 5. If an instrument channel failed, go to AOP-401.11, Steam Generator XCP-624 1-5 Level Control And Protection Channel Failure.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 19 of 44 Event

Description:

S/G A Controlling level channel fails LOW Time Position Applicants Actions or Behavior AOP-401.11 IOA RO 1 Adjust the Feedwater Flow Control Valve as necessary to restore AOP-401.11 Narrow Range level in the AFFECTED SG to between 60% and 65%.

CRS 2 Perform the following: AOP-401.11

a. Determine the failed instrument channel. _________________
b. Record the time of the channel failure. __________________

NOTE - Step 3 AOP-401.11 Compliance with T.S. requires tripping failed instrument channel bistables within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the channel failure. Time should be allowed for troubleshooting of the failed channel prior to tripping the bistables.

CRS 3 Place the failed channel protection bistables in a tripped condition AOP-401.11

  • within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> of the channel failure:
a. Write an R&R for the failed channel.
b. Select the attachment for the failed channel from the back of this procedure.
c. Record the R&R number on the attachment.
d. Determine the cause of the channel failure.
e. Notify the I&C Department to place the identified bistables in trip using the attachment.
f. For channels LT-474, LT-485, and LT-496, initiate a 30 day R&R for placing AMSAC in BYPASS.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 20 of 44 Event

Description:

S/G A Controlling level channel fails LOW Time Position Applicants Actions or Behavior AOP-401.11 Attachment 3 CRS Enters T.S. 3.3.1, REACTOR TRIP SYSTEM INSTRUMENTATION. T.S. 3.3.1 Function 13; Steam Generator Water Level - Low-Low - action 6 CRS Enters T.S. 3.3.2, ENGINEERED SAFETY FEATURE ACTUATION T.S. 3.3.2 SYSTEM INSTRUMENTATION.

Function 5.a; Steam Generator Water Level - High-High - action 24 Function 6.c; Steam Generator Water Level - Low-Low - action 24 T.S. 3.3.1 Action 6 T.S. 3.3.1 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; and
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels per Specification 4.3.1.1.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 5 Page: 21 of 44 Event

Description:

S/G A Controlling level channel fails LOW Time Position Applicants Actions or Behavior T.S. 3.3.2 Action 24 T.S. 3.3.2 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a. The inoperable channel is placed in the tripped condition within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />; and
b. The Minimum Channels OPERABLE requirement is met; however, the inoperable channel may be bypassed for up to 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.

EVALUATOR NOTE:

If the crew trips the reactor based on unsatisfactory Steam Generator water level control then initiation of the next event (Trigger 6) should be directed.

EVALUATOR NOTE:

The next event may be inserted after Tech Specs have been addressed and the "A" SG level has been restored or at any time per the discretion of the Lead Evaluator.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 22 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior EVALUATOR NOTE:

On cue from the Examiner a Main Steam Line Break downstream of the MSIVs with all MSIVs failed OPEN will occur. The crew will need to address the failure of Automatic Safety Injection by inserting a manual SI and a stuck open Pressurizer PORV by closing its block valve. All Emergency Feedwater flow control valves will remain full open, even after the Operator takes the control to manual, until the Operator resets the sealed in full flow interlock. A transition to EOP-3.0, Faulted Steam Generator Isolation (E-2) will be made. When it is recognized that all Steam Generators are faulted the crew will transition to EOP-3.1, ECA-2.1, Uncontrolled Depressurization of All Steam Generators. The MSIVs will be locally closed after the crew has stopped all but one Charging Pump at step 13 of EOP-3.1.

BOOTH OPERATOR: When directed initiate Event 6 (TRIGGER 6).

Indications Available:

Pressures on ALL SG lowering.

Steam Flow on ALL SG rising.

Safety Injection First out annunciator lit.

NO Safety Injection equipment running.

EOP-1.0 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 23 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior NOTE EOP-1.0 Steps 1 through 5 are Immediate Operator Actions.

IOA RO 1 Verify Reactor Trip: EOP-1.0

  • Verify all Rod Bottom Lights are lit.
  • Verify Reactor Power level is decreasing.

IOA BOP 2 Verify Turbine/Generator Trip: EOP-1.0

a. Verify all Turbine STM STOP VLVs are closed.
b. Ensure Generator Trip (after 30 second delay):
1) Ensure the GEN BKR is open.
2) Ensure the GEN FIELD BKR is open.
3) Ensure the EXC FIELD CNTRL is tripped.

IOA BOP 3 Verify both ESF buses are energized. EOP-1.0 EVALUATOR NOTE:

Safety injection will not auto actuate and it should have at this point. Only the Train A Safety Injection switch, the one nearest the BOP, will function to actuate SI.

IOA RO 4 Check if SI is actuated: EOP-1.0

a. Check if either:
  • SI ACT status light is bright on XCP-6107 1-1.

OR CRITICAL

b. Actuate SI using either SI ACTUATION Switch.

TASK c. GO TO Step 6 EVALUATOR NOTE: , SI Equipment Verification, is attached (Page 34).

EOP-1.0 BOP 6 Initiate ATTACHMENT 3, SI EQUIPMENT VERIFICATION.

EOP-1.0 CREW 7 Announce plant conditions over the page system.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 24 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior RO 8 Verify RB pressure has remained LESS THAN 12 psig on PR-951, EOP-1.0

EVALUATOR NOTE: EOP-1.0 The CRS may direct EFW flow to be reduced to 50 gpm per Steam Generator based on EOP-1.0 Reference Page item 5.

  • RO 9 Check RCS temperature: EOP-1.0 With any RCP running, RCS Tavg is stable at OR trending to 557°F.

OR With no RCP running, RCS Tcold is stable at OR trending to 557°F.

9 ALTERNATIVE ACTION IF RCS temperature is LESS THAN 557°F AND decreasing, THEN stabilize temperature by performing the following as required:

a) Close IPV2231, MS/PEGGING STM TO DEAERATOR.

b) Perform one of the following:

IF Narrow Range SG level is LESS THAN 26% [41%] in all SGs, THEN reduce EFW flow as necessary to stop cooldown, while maintaining total EFW flow GREATER THAN 450 gpm.

OR WHEN Narrow Range SG level is GREATER THAN 26% [41%]

in at least one SG, THEN control EFW flow as necessary to stabilize RCS temperature at 557°F.

c) Initiate ATTACHMENT 6, STEAM VALVE ISOLATION, while continuing with this procedure.

d) IF RCS cooldown continues, THEN close:

MS Isolation Valves, PVM2801A(B)(C).

MS Isolation Bypass Valves, PVM2869A(B)(C).

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 25 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior EVALUATOR NOTE: PZR PORV PCV-445B failed open at the time of the Reactor Trip. The operator must close its block valve.

RO 10 Check PZR PORVs and Spray Valves: EOP-1.0

a. PZR PORVs are closed.

10 a ALTERNATIVE ACTION CRITICAL a. IF PZR pressure is LESS THAN 2330 psig, THEN close the PZR PORVs.

TASK IF any PZR PORV can NOT be closed, THEN close its Block Valve.

IF the Block Valve can NOT be closed, THEN GO TO EOP2.0, E1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 1.

RO b. PZR Spray Valves are closed. EOP-1.0

c. Verify power is available to at least one PZR PORV Block Valve:

MVG8000A, RELIEF 445 A ISOL.

MVG8000B, RELIEF 444 B ISOL.

MVG8000C, RELIEF 445 B ISOL.

d. Ensure one of the following Block Valves is open unless it was closed to isolate an open PZR PORV:

MVG8000A, RELIEF 445 A ISOL.

MVG8000B, RELIEF 444 B ISOL.

NOTE - Step 11 EOP-1.0 Seal Injection flow should be maintained to all RCPs.

RO 11 Check if RCPs should be stopped: EOP-1.0

a. Check if either of the following criteria is met:

Annunciator XCP612 42 is lit (PHASE B ISOL).

OR RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM.

b. Stop all RCPs.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 26 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior BOP 12 Verify no SG is FAULTED: EOP-1.0 No SG pressure is decreasing in an uncontrolled manner.

No SG is completely depressurized.

12 ALTERNATIVE ACTION GO TO EOP-3.0, E-2, FAULTED STEAM GENERATOR ISOLATION, Step 1.

CRS Implements EOP-3.0, E-2, Faulted Steam Generator Isolation.

EVALUATOR NOTE:

Upon exit from EOP-1.0 Critical Safety Function status trees are in effect. If EFW has been throttled to 50 gpm per Steam Generator at this point then a Red Path on Heat Sink will exist and crew will exit EOP-1.0 to EOP-15.0, RESPONSE TO LOSS OF SECONDARY HEAT SINK, read the first caution and then proceed to EOP-3.0.

CAUTION EOP-15.0 If total EFW flow is LESS THAN 450 gpm due to operator action, this procedure should NOT be performed, since these actions are NOT appropriate if 450 gpm EFW flow is available.

CAUTION EOP-3.0 At least one SG must be maintained available for RCS cooldown.

Any FAULTED SG or secondary break should remain isolated during subsequent recovery actions unless needed for RCS cooldown, to prevent reinitiating the break.

BOOTH OPERATOR: If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 13 of EOP-3.1.

If called by the Control Room regarding the steam leak report:

There is a Steam Leak in the Turbine Building but I can't identify its exact location.

BOP 1 Ensure all the following are closed: EOP-3.0 MS Isolation Valves, PVM-2801A(B)(C).

MS Isolation Bypass Valves, PVM-2869A(B)(C).

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 27 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior BOP 2 Check if any SG is NON-FAULTED: EOP-3.0 Pressure in any SG is stable OR increasing.

Any SG is NOT completely depressurized.

2 ALTERNATIVE ACTION IF all SG pressures are decreasing in an uncontrolled manner OR completely depressurized, THEN GO TO EOP-3.1, ECA-2.1 UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS, Step 1.

Implements EOP-3.1, Uncontrolled Depressurization of All Steam CRS Generators.

EOP-3.1 NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 28 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior BOP 1 Isolate secondary pressure boundaries for all SGs: EOP-3.1

a. Close all of the following valves:

MS Isolation, PVM2801A(B)(C).

MS Isolation Bypass, PVM2869A(B)(C).

FW Flow Control, FCV478(488)(498).

FW Isolation, PVG1611A(B)(C).

SG Blowdown, PVG503A(B)(C).

FW Flow Control Bypass, FCV3321(3331)(3341).

CAUTION - Step 1.b EOP-3.1 If the TD EFW Pump is the only available source of feed flow, the steam supply to the TD EFW Pump must be maintained from at least one SG, to maintain a secondary heat sink.

BOP b. Complete isolation of all SGs: EOP-3.1

1) Close all the following valves:

SG Chemical Feed Isolation, MVK1633A(B)(C).

MS Drain Isolation, PVT2843A(B)(C) PVT2877A(B).

BOOTH OPERATOR: When contacted to locally isolate the MS supply valves to the TDEFP, wait 3 minutes and then activate the appropriate trigger:

TRIGGER 14 to de-energize XVG-2802A (XMC-1DA2X 05EH). (IB)

TRIGGER 15 to isolate XVG-2802A. (IB)

TRIGGER 16 to de-energize XVG-2802B (XMC-1DB2Y 05EH). (AB)

TRIGGER 17 to isolate XVG-2802B (IB)

Once the breaker is open report Breaker for XVG-2802A(B) is open Once the valve is isolated report XVG-2802A(B) is locally closed BOP 2) Locally open the following breakers: EOP-3.1 XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG2802A-MS (IB-463).

XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).

3) Locally close the following valves (IB.436 East Pen):

XVG02802A.MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV.

XVG02802B.MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 29 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior BOP 4) Place all Steamline PWR RELIEF A(B)(C) SETPT Controllers in EOP-3.1 MAN and closed.

5) Place all Steamline Power Relief A(B)(C) Mode Switches in PWR RLF.

CAUTION - Step 2 EOP-3.1 A minimum EFW flow of 50 gpm must be maintained to each SG that has a Narrow Range level LESS THAN 26% [41%], to minimize thermal shock to SG components.

NOTE - Step 2 EOP-3.1 Shutdown margin should be monitored during RCS cooldown.

EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250°F. Performance of this step will ensure control of EFW flow.

BOP 2 Ensure the RCS cooldown is minimized: EOP-3.1

a. Place MD EFP RESET to RESET.
b. Place TD EFP RESET to RESET.
c. Verify the cooldown rate in the RCS Cold Legs is LESS THAN CRITICAL 100°F/hr.

TASK 2 c ALTERNATIVE ACTION Decrease EFW flow to 50 gpm to each SG.

GO TO Step 2.e.

e. Verify RCS Thot is stable OR decreasing.

NOTE - Step 3 EOP-3.1 Seal Injection flow should be maintained to all RCPs.

RO 3 Check if RCPs should be stopped: EOP-3.1

a. Verify annunciator XCP612 42 is NOT lit (PHASE B ISOL).
b. Check if RCS pressure is LESS THAN 1418 psig AND SI flow is indicated on FI943, CHG LOOP B CLD/HOT LG FLOW GPM NOTE - Step 3.c EOP-3.1 RCPs should NOT be stopped if the RCS pressure decrease is due solely to the cooldown.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 30 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior

c. Stop all RCPs. EOP-3.1
c. ALTERNATIVE ACTION IF an uncontrolled cooldown is in progress, THEN REPEAT Step 3 when RCS temperature is stable or increasing.

GO TO Step 4.

RO 4 Check PZR PORVs and Block Valves: EOP-3.1

a. Verify power is available to the PZR PORV Block Valves:
1) MVG8000A, RELIEF 445 A ISOL.
2) MVG8000B, RELIEF 444 B ISOL.
3) MVG8000C, RELIEF 445 B ISOL.

CAUTION - Step 4.b EOP-3.1 If any PZR PORV opens because of high PZR pressure, Step 4.b should be repeated after pressure decreases to LESS THAN 2330 psig, to ensure the PORV recloses.

RO b. Verify all PZR PORVs are closed. EOP-3.1

c. Verify at least one PZR PORV Block Valve is open.

RO EOP-3.1 5 Reset both SI RESET TRAIN A(B) Switches.

RO 6 Reset Containment Isolation: EOP-3.1 RESET PHASE A TRAIN A(B) CNTMT ISOL.

RESET PHASE B TRAIN A(B) CNTMT ISOL.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 31 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior NOTE - Step 7 EOP-3.1 Any high radiation level received on a radiation monitor that was unisolated at event initiation, may be considered a valid alarm.

BOP 7 Check if Secondary radiation levels are normal: EOP-3.1

a. Check radiation levels normal on all unisolated radiation monitors:

RMG19A(B)(C), STMLN HI RNG GAMMA.

RML3, STEAM GENERATOR BLOWDOWN LIQUID MONITOR.

RML10, SG BLOWDOWN CW DISCHARGE LIQUID MONITOR.

RMA9, CNDSR EXHAUST GAS ATMOS MONITOR.

b. Place SVX9398A(B)(C), SG A(B)(C) SMPL ISOL, in AUTO.
c. Notify Chemistry to sample all SG secondary sides, and screen samples for abnormal activity using a frisker.

CAUTION - Step 8 EOP-3.1 RCS pressure should be monitored. If RCS pressure decreases in an uncontrolled manner to LESS THAN 325 psig, the RHR Pumps must be manually restarted to supply water to the RCS.

RO 8 Check if RHR Pumps should be stopped: EOP-3.1

a. Check if any RHR Pump is running with suction aligned to the RWST.
b. Check RCS pressure:

1 ) RCS pressure is GREATER THAN 325 psig.

2) RCS pressure is stable OR increasing.
c. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.

RO EOP-3.1 9 Verify RWST level is GREATER THAN 18%.

RO 10 Establish Instrument Air to the RB: EOP-3.1

a. Start one Instrument Air Compressor and place the other in Standby.
b. Verify PI-8342, INSTR AIR HDR PRESS PSIG, indicates GREATER THAN 60 psig.
c. Open PVA2659, INST AIR TO RB AIR SERV.
d. Open PVT2660, AIR SPLY TO RB.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 32 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior BOOTH OPERATOR: IF contacted to locally close the Accumulator Discharge Isolation Valve breakers, wait 1 minute and then activate the appropriate trigger:

Trigger 20 - Accumulator A and C (in the IB)

Trigger 21 - Accumulator B (in the AB)

When breakers are closed report Accumulator A(B)(C) isolation valve(s) have power restored RO 11 Check if SI Accumulators should be isolated: EOP-3.1

a. Verify RCS pressure is LESS THAN 195 psig.
b. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves:

XMC1DA2X 08AE, ACCUMULATOR A ISO VALVE XVG8808ASI (IB463).

XMC1DA2X 08FJ, ACCUMULATOR C ISO VALVE XVG8808CSI (IB463).

XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL XVG8808BSI (AB463).

c. Close all Accumulator Discharge Isolation Valves, MVG8808A(B)(C).

RO 12 Check if SI flow should be reduced: EOP-3.1

a. Verify RCS subcooling on TI499A(B), A(B) TEMP °F, is GREATER THAN 52.5°F [67.5°F].
b. Verify RCS pressure is stable OR increasing.

NOTE - Step 12.c EOP-3.1 If PZR level is LESS THAN 10% [28%], the PZR should refill from SI flow after pressure is stabilized.

RO EOP-3.1

  • c. Verify PZR level is GREATER THAN 10% [28%].

EVALUATOR NOTE: Reference page item 2 instructs the crew to not leave EOP 3.1 until they have completed step 18; Verify SI flow is NOT required.

BOOTH OPERATOR AFTER operators have completed step 13, stopping all but one Charging pump, activate TRIGGER 7 which will cause the SG Main Steam Isolation valves to close on a staggered basis. Once all valves are closed report All Main Steam Isolation valves have been locally closed.

RO EOP-3.1 13 Stop all but one Charging Pump and place in Standby.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # 6 Page: 33 of 44 Event

Description:

MSLB downstream of the MSIVs with all MSIV failed open Time Position Applicants Actions or Behavior RO EOP-3.1 14 Verify RCS pressure is stable OR increasing.

EVALUATOR NOTE: The critical task in the next step is to control the EFW flow rate and terminate Safety Injection before an ORANGE path exists on the INTEGRITY CSF. An ORANGE path will exist if the lowest cold leg temperature decreases below 250°F. Performance of this step will terminate Safety Injection flow.

15 Establish Normal Charging: EOP-3.1 CRITICAL

a. Close FCV122, CHG FLOW.

RO b. Open both MVG8107 and MVG8108, CHG LINE ISOL.

TASK c. Adjust FCV122, CHG FLOW, to obtain 70 gpm Charging flow.

d. Close both MVG8801A(B), HI HEAD TO COLD LEG INJ.

RO 16 Control FCV122, CHG FLOW, to maintain PZR level between 22% EOP-3.1

[39%] and 76% [69%].

RO 17 Check if RHR Pumps should be stopped: EOP-3.1

a. Check if any RHR Pump is running with suction aligned to the RWST.
b. Stop any RHR Pump which is running with suction aligned to the RWST and place in Standby.

RO 18 Verify SI flow is NOT required: EOP-3.1

a. RCS subcooling on TI499A(B), A(B) TEMP °F, is GREATER THAN 52.5°F [67.5°F].
b. PZR level is GREATER THAN 10% [28%].

EVALUATOR NOTE: Following completion of step 18 the CRS would transition back to EOP-3.0 based on Reference Page item 2.

The scenario may be terminated when Step 18 of EOP-3.1 (ECA-2.1), Verify SI flow is NOT required is completed) or at the discretion of the Examiner.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 34 of 44 Event

Description:

EOP-1.0, Attachment 3.

Time Position Applicants Actions or Behavior BOP 1 Ensure EFW Pumps are running: EOP-1.0 Attachment 3

a. Ensure both MD EFW Pumps are running.
b. Verify the TD EFW Pump is running if necessary to maintain SG levels.

BOP 2 Ensure the following EFW valves are open: Attachment 3 FCV-3531(3541)(3551), MD EFP TO SG A(B)(C).

FCV-3536(3546)(3556), TD EFP TO SG A(B)(C).

MVG-2802A(B), MS LOOP B(C) TO TD EFP.

BOP 3 Verify total EFW flow is GREATER THAN 450 gpm. Attachment 3 BOP 4 Ensure FW Isolation: Attachment 3

a. Ensure the following are closed:

FW Flow Control, FCV-478(488)(498).

FW Isolation, PVG-1611A(B)(C).

FW Flow Control Bypass, FCV-3321(3331)(3341).

SG Blowdown, PVG-503A(B)(C).

SG Sample, SVX-9398A(B)(C).

b. Ensure all Main FW Pumps are tripped.

BOP 5 Ensure SI Pumps are running: Attachment 3 Two Charging Pumps are running.

Both RHR Pumps are running.

Attachment 3 BOP 6 Ensure two RBCU Fans are running in slow speed (one per train).

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 35 of 44 Event

Description:

EOP-1.0, Attachment 3.

Time Position Applicants Actions or Behavior BOP 7 Verify Service Water to the RBCUs: Attachment 3

a. Ensure two Service Water Pumps are running.
b. Verify that Service Water Booster Pump A is stopped.
b. ALTERNATIVE ACTION GO TO Step 7.e.
e. Verify that Service Water Booster Pump B is stopped.
e. ALTERNATIVE ACTION GO TO Step 7.h.
h. Verify GREATER THAN 2000 gpm flow for each train on:

FI-4466, SWBP A DISCH FLOW GPM.

FI-4496, SWBP B DISCH FLOW GPM.

BOP 8 Verify two CCW Pumps are running. Attachment 3 BOP 9 Ensure two Chilled Water Pumps and Chillers are running. Attachment 3 BOP 10 Verify both trains of Control Room Ventilation are running in Attachment 3 Emergency Mode.

BOOTH OPERATOR If contacted to locally close the MS Isolation valves acknowledge the request and WAIT until completion of step 14 of EOP-3.1.

BOP 11 Check if Main Steamlines should be isolated: Attachment 3

a. Check if any of the following conditions are met:

RB pressure GREATER THAN 6.35 psig.

OR Steamline pressure LESS THAN 675 psig.

OR Steamline flow GREATER THAN 1.6 MPPH AND Tavg LESS THAN 552°F.

b. Ensure all the following are closed:

MS Isolation Valves, PVM-2801A(B)(C).

MS Isolation Bypass Valves, PVM-2869A(B)(C).

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 36 of 44 Event

Description:

EOP-1.0, Attachment 3.

Time Position Applicants Actions or Behavior BOP 12 Ensure Excess Letdown Isolation Valves are closed: Attachment 3 PVT-8153, XS LTDN ISOL.

PVT-8154, XS LTDN ISOL.

BOP 13 Verify ESF monitor lights indicate Phase A AND Containment Attachment 3 Ventilation Isolation on XCP-6103, 6104, and 6106.

REFER TO ATTACHMENT 4, CONTAINMENT ISOLATION VALVE MCB STATUS LIGHT LOCATIONS, as needed.

BOP 14 Verify proper SI alignment: Attachment 3

a. Verify SI valve alignment by verifying SAFETY INJECTION/PHASE A ISOL monitor lights are bright on XCP-6104.
b. Verify all SAFETY INJECTION monitor lights are dim on XCP-6106.
c. Verify SI flow on FI-943, CHG LOOP B CLD/HOT LG FLOW GPM.
d. Check if RCS pressure is LESS THAN 325 psig.

BOP Report completion of Attachment 3.

EVALUATOR NOTE: ATTACHMENT 3 is complete.

NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 37 of 44 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 38 of 44 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 39 of 44 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 40 of 44 Event

Description:

SOP-106,Section III, F, BORATE OPERATIONS Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 41 of 44 Event

Description:

SOP-214,Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 42 of 44 Event

Description:

SOP-214,Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Operator Actions Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page: 43 of 44 Event

Description:

SOP-214,Section III, D, TURBINE LOAD REDUCTION/SHUTDOWN Time Position Applicants Actions or Behavior NRC 2016 Scenario 3 NUREG -1021 R10

Appendix D Form ES-D-2 Op Test No: NRC-ILO-14-01 Scenario # 3 Event # NA Page 44 of 44 Event

Description:

NA Time Position Applicants Actions or Behavior Procedure Revisions used in this Scenario Guide Number Title Rev Date GOP-4B POWER OPERATION (MODE 1 - DESCENDING) 1E 9/22/15 ARP-001-XCP-606 RBCU/RB AIR 6E 8/25/15 ARP-001-XCP-611 SI ACCUMULATORS 6B 2/25/13 SOP-112 SAFETY INJECTION SYSTEM 18H 2/23/16 SOP-214 MAIN TURBINE AND CONTROLS 21 11/30/15 SOP-106 REACTOR MAKEUP WATER SYSTEM 12 11/9/15 ARP-001-XCP-624 STEAM GENERATORS 7C 2/25/13 STEAM GENERATOR LEVEL CONTROL AND AOP-401.11 1 8/7/15 PROTECTION CHANNEL FAILURE AOP-210.3 FEEDWATER PUMP MALFUNCTION 3 8/7/15 EOP-1.0 E-0, REACTOR TRIP OR SAFETY INJECTION 29 11/24/15 EOP-3.0 E-2, FAULTED STEAM GENERATOR ISOLATION 12 2/23/16 ECA-2.1, UNCONTROLLED DEPRESSURIZATION EOP-3.1 17 11/25/15 OF ALL STEAM GENERATORS NRC 2016 Scenario 3 NUREG -1021 R10

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-086-N16 (NRC JPM-a) Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)

CANDIDATE:

EXAMINER:

5/11/2016 JPSF-086-N16 Page 1 of 14

TASK: 000-024-05-01 PERFORM EMERGENCY BORATION TASK STANDARD:

Emergency boration > 30 gpm is established and the use of applicable Human Performance tools (3-way communications, self checking, peer checking, phonetic alphabet, etc.) meet expectations..

TERMINATING CUE: Boration flow is verified to the RCS.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-1.1, Reactor Trip Recovery marked through Step 6.

AOP-106.1, Emergency Boration

REFERENCES:

EOP-1.1 REACTOR TRIP RECOVERY AOP-106.1 EMERGENCY BORATION INDEX NO. K/A NO. RO SRO 004000A418 A4.18 Emergency borate valve 4.3 4.1 EVALUATION TIME: 10 TIME CRITICAL: No 10CFR55: 45(a)8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/11/2016 JPSF-086-N16 Page 2 of 14

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

A Reactor Trip has occurred from 100% power.

EOP-1.0, E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE.

EOP-1.1 has been completed through step 6.

INITIATING CUES:

The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/11/2016 JPSF-086-N16 Page 3 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 7. Verify all control rods are fully inserted.

STEP STANDARD:

Determines that two control rods are NOT fully inserted on the DRPI display.

CUES:

Evaluator Cue: Go to RUN when the Examinee is ready.

Evaluator Note: Examinee will implement Alternative Action.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 ALTERNATIVE ACTION AA Step 7. IF two or more Control Rods are NOT fully inserted, THEN:

AA Step 7 a) Open MVT-8104, EMERGENCY BORATE.

STEP STANDARD:

Places MVT-8104 control switch to OPEN.

Determines valve will NOT OPEN as indicated by Green light ON, Red light OFF.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 4 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 AA Step 7 b) Verify GREATER THAN 30 gpm flow on FI-110, EMERG BORATE FLOW GPM.

IF LESS THAN 30 gpm flow is indicated, THEN REFER TO AOP-106.1, EMERGENCY BORATION.

STEP STANDARD:

Observes that > 30 gpm is NOT indicated on FI-110.

CUES:

Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 AA Step 5 c) If two control rods are NOT fully inserted, then borate 2500 gallons.

STEP STANDARD:

Examinee determines 2500 gallon boration is required.

CUES:

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

5/11/2016 JPSF-086-N16 Page 5 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 IOA Step 1. Emergency Borate through the Boric Acid Blender:

a. Check if the plant is in Mode 1 OR Mode 2.

ALTERNATIVE ACTION AA Step 1 GO TO Step 2.

STEP STANDARD:

Uses AOP-106.1, Emergency Boration.

Determines the plant is in Mode 3 and transitions to Step 2.

CUES:

Evaluator note: Examinee should refer to AOP-106.1, Emergency Boration, to initiate boration.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 IOA Step 2. Emergency Borate via the Emergency Borate Valve Step 2 a. Ensure at least one charging pump running.

STEP STANDARD:

Verifies one Charging Pump running indicated by mormal amps on associated meter and Green light OFF, Red light ON.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 6 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 7 Step 2 b. Open MVT-8104, EMERGENCY BORATE.

ALTERNATIVE ACTION AA Step 2. GO TO Step 3.

STEP STANDARD:

Determines MVG-8104 will NOT open indicated by Green light ON, Red light OFF.

CUES:

Examinee may not perform since valve did not open earlier. Transitions to step 3.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 8 Step 3. Emergency Borate through the Boric Acid Blender:

Step 3 a. Close MVT-8104, EMERGENCY BORATE.

STEP STANDARD:

MVG-8104 is already closed indicated by Green light ON, Red light OFF.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 7 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Step 3 b. Align the Chemical And Volume Control System for boration:

Step 3 b. 1) Ensure both LCV-115C(E) VCT OUTLET ISOL, are OPEN.

STEP STANDARD:

Verifies LCV-115C and LCV-115E are open indicated by Green light OFF, Red light ON.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 10 Step 3 b. 2) Open FCV113B, MU TO CHG PP.

STEP STANDARD:

Places FCV-113B in OPEN position indicated by Green light OFF, Red light ON.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 8 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 11 Step 3 c. Close FCV-168B, MU WTR TO BLENDER STEP STANDARD:

Verifies FCV-168B, MU WTR TO BLENDER is closed as indicated by Green light ON, Red light OFF.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 12 Step 3 d. Ensure XPP-13A(B), BA XFER PP A (B) is running.

STEP STANDARD:

Verifies BA XFER PP A or BA XFER PP B is running as indicated by Green light OFF, Red light ON for either pump.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 9 of 14

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 13 Step 3 e. Open FCV-113A, BA to BLENDER STEP STANDARD:

Places FCV-113A in OPEN position as indicated by Green light OFF, Red light ON.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 14 Step 3 f. Ensure at least one Charging Pump is operating.

STEP STANDARD:

Verifies one Charging Pump running as indicated by Green light OFF, red light ON, and normal amps on associated meter.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 10 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 15 Step 3 g. Verify GREATER THAN 30 gpm flow on FR113, BA TO BLNDR AND TOTAL MU.

STEP STANDARD:

Verifies >30 gpm on FI-113.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 16 Step 3 h. GO TO Step 5. Observe the NOTE prior to Step 5.

STEP STANDARD:

Transitions to step 5.

CUES:

COMMENTS:

5/11/2016 JPSF-086-N16 Page 11 of 14

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 17 NOTE - Step 5: If PZR level is above program, FCV122, CHG FLOW, will throttle closed and inhibit Emergency Boration flow to the RCS.

  • Step 5. Verify FI122A, CHG FLOW GPM, indicates GREATER THAN 30 gpm.

STEP STANDARD:

Verifies FI122A indicates GREATER THAN 30 gpm.

CUES:

This JPM may be terminated when Emergency Boration flow is verified at greater than 30 gpm.

COMMENTS:

Examiner ends JPM at this point.

5/11/2016 JPSF-086-N16 Page 12 of 14

JPM SETUP SHEET JPM: JPSF-086-N16 (NRC JPM-a) Initiate Emergency Boration due to two stuck rods following a Reactor Trip (Alternate Path)

IC SET: 251 INSTRUCTIONS:

Load the designated IC Set.

Provide EOP-1.1, Reactor Trip Recovery marked through Step 6.

When Examinee is ready: RUN.

To recreate this IC Set::

1.Load IC-10

2. Insert the following malfunctions:

MAL-CRF007K10 (Stuck Rod K-10 fail to "untrippable")

MAL-CRF007K4 (Stuck Rod K-04 fail to "untrippable")

VLV-CS046P Severity: 0 (XVT-8104 failed closed)

3. RUN
4. Manually trip reactor
5. Complete steps of EOP-1.0 and EOP-1.1 up to step 5.
6. FREEZE COMMENTS:

5/11/2016 JPSF-086-N16 Page 13 of 14

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

A Reactor Trip has occurred from 100% power.

EOP-1.0, E-0 REACTOR TRIP OR SAFETY INJECTION was implemented and the crew has transitioned to EOP-1.1, ES-0.1 REACTOR TRIP RESPONSE.

EOP-1.1 has been completed through step 6.

INITIATING CUES:

The CRS has directed you to continue the actions of EOP-1.1, beginning with step 7.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/11/2016 JPSF-086-N16 Page 14 of 14

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-046-N16 (NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)

CANDIDATE:

EXAMINER:

6/13/2016 JPSF-046-N16 Page 1 of 13

TASK: 000-022-05-01 RESPOND TO LOSS OF REACTOR COOLANT MAKEUP (CHARGING)

TASK STANDARD:

The "A" Charging Pump stopped after starting with the "B" Charging pump running. The CRS must be notified of the "A" Charging pump failure. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

TERMINATING CUE: "A" Charging pump secured. CRS informed.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM TOOLS: SOP-102 Section III F, SHIFTING OPERATING CHARGING PUMPS, marked through step 2.1.

SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step 2.3 h.

REFERENCES:

SOP-102 CHEMICAL AND VOLUME CONTROL SYSTEM INDEX NO. K/A NO. RO SRO 004000A408 A4.08 Charging 3.8 3.4 EVALUATION TIME: 5 TIME CRITICAL: NO 10CFR55: 45(a)8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 6/13/2016 JPSF-046-N16 Page 2 of 13

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is operating at 100% power.

Train A is being established as the active loop.

"C" Charging pump is Out of Service.

Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover.

Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102."

Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.

INITIATING CUES:

The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102,Section III.F. beginning at step 2.2.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

6/13/2016 JPSF-046-N16 Page 3 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 2.2 To start XPP-0043A, PUMP A, on miniflow, proceed as follows:

a. If XSW1DA 05, CHARGING INJ PUMP A XPP0043A-CS, is racked down, then initiate Attachment VC.

STEP STANDARD:

No action is necessary as the A Charging Pump is already racked up.

CUES:

If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2.2 b. Ensure XPP-43A-PP1, CHG PP A AUX OIL PP, is running.

STEP STANDARD:

Verifies XPP-43A-PP1, CHG PP A AUX OIL PP, switch in AUTO with red light ON, green light OFF.

CUES:

COMMENTS:

6/13/2016 JPSF-046-N16 Page 4 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 2.2 c. Ensure Train A Component Cooling is operating per SOP-118.

STEP STANDARD:

Verifies that "A" CCW pp is running via red light ON and ammeter indication.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Step 2.2 d. Ensure Train A Chill Water is operating per SOP-501.

STEP STANDARD:

Verifies that 'A' Train Chill Water is running via red light ON on 'A' Train Chiller and Chill Water PP.

CUES:

COMMENTS:

6/13/2016 JPSF-046-N16 Page 5 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 2.2 e. Verify IPI00151A, CHARGING PUMP A SUCTION PRESS IND (AB-388), indicates pump suction pressure is greater than one of the following:

1) 15 psig if the Charging Pump suction is aligned to the RWST.
2) 30 psig if the Charging Pump suction is aligned to the VCT with VCT level 20% or greater.

STEP STANDARD:

Contacts field operator for pump suction pressure indication.

CUES:

When contacted report "A" charging pump suction pressure as read on IPI00151A is 52 psig.

If contacted to check out the "A" Charging pump report the "A" Charging pump is ready for start.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 Step 2.2 f. Ensure MINIFLOW ISOL, MVT-8109A, CHG PP A, is open.

STEP STANDARD:

Verifies that MVT-8109A is open via red light ON, green light OFF.

CUES:

COMMENTS:

6/13/2016 JPSF-046-N16 Page 6 of 13

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 7 Step 2.2 g. Start XPP-0043A, PUMP A. (Peer Check)

STEP STANDARD:

"A" charging pump indicates red light ON, green light OFF, and normal running amps.

CUES:

Should request a peer check.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 8 Step 2.2 h. Verify XPP-43A-PP1, CHG PP A AUX OIL PP, stops automatically when the Charging Pump comes up to full speed.

STEP STANDARD:

Verifies green Off light is ON and red AUTO light is OFF.

CUES:

COMMENTS:

6/13/2016 JPSF-046-N16 Page 7 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Step 2.2 i. Monitor the following to verify proper pump operation:

1) Charging Pump A running current is between 30 amps and 50 amps.
2) PI-121, CHG PRESS PSIG, is between 2650 psig and 2850 psig.

STEP STANDARD:

Verifies current between 30 and 50 amps.

Verifies PI-121, CHG PRESS PSIG, is between 2650 and 2850 psig.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 10 Step 2.2 i. Monitor the following to verify proper pump operation: (cont.)

3) XVG-9684A-CC, CCW TO CHG PP A, is open.

STEP STANDARD:

Recognizes that XVG-9684A, CCW TO CHG PP A is NOT open (Green light ON, Red light OFF).

Reponds to annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPEN.

CUES:

Examiner Note: The annunciator is delayed 20 seconds after the A Charging Pump is started. The Examinee should investigate the status of XVG-9684A-CC until XCP-614 2-6 alarms.

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

6/13/2016 JPSF-046-N16 Page 8 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 11 Annunciator XCP-614 2-6, CCW TO CHG PP A VLV NOT FULL OPEN CORRECTIVE ACTIONS:

Step 1. Check XVG-9684A-CC, CC WTR TO CHG PP A, position indication.

STEP STANDARD:

Recognizes that XVG-9684A, CCW TO CHG PP A is NOT open (green light ON, red light OFF).

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 12 CAUTION 2: Any Charging Pump can continue to be operated on a loss of Component Cooling Water to its oil coolers within one of the following:

1) 20 minutes without local temperature monitoring.

OR

2) No time limit as long as any maximum temperature of Attachment 5, Charging Pump Temperature Monitoring, of AOP-118.1, Loss of Component Cooling, is NOT exceeded AND local Charging Pump temperature monitoring remains in place.

STEP STANDARD:

No immediate action is necessary.

CUES:

Examiner Note: The ARP allows examinee up to 20 minutes to secure the charging pump unmonitored and unlimited time if temperatures are being constantly monitored.

If the examinee requests local temperature monitoring:

  • . CUE Examinee that local temperature monitoring is NOT available.

COMMENTS:

6/13/2016 JPSF-046-N16 Page 9 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 13 Step 2. If the pump is running without Component Cooling Water, perform the following:

a. Check electrical alignment of C Charging Pump. If aligned to A Train, start C Charging Pump per SOP-102.

STEP STANDARD:

CUES:

Examiner Note: The "C" Charging Pump is unavailable as stated in the Initial Conditions.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 14 Step 2 a (cont.)

IF NOT:

1) Ensure a Train B Component Cooling Pump is running.
2) Start a Train B Charging Pump per SOP-102.
b. Stop Charging Pump A.

STEP STANDARD:

Takes "A" Charging pump switch to STOP position. Verifies the "A" Charging pump has stopped.

CUES:

Examiner Note: The "B" Chaging pump should still be running. If it was stopped it must be restarted IAW SOP-102.

COMMENTS:

6/13/2016 JPSF-046-N16 Page 10 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 15 Inform the CRS of failure on "A" charging pump.

STEP STANDARD:

Informs the CRS of failure of CCW valve to "A" Charging pump (XVG-9684A) to open.

CUES:

Examiner Note: This JPM may be terminated after the "A" charging pump is stopped.

COMMENTS:

Examiner ends JPM at this point.

6/13/2016 JPSF-046-N16 Page 11 of 13

JPM SETUP SHEET JPM: JPSF-046-N16 (NRC JPM-b) Transfer In-Service Changing Pump (Alternate Path)

IC SET: 252 INSTRUCTIONS:

Load the designated IC Set.

Put Hold Tag on the "C" Charging pump.

Ensure the CCW placard is on the "B" CCW Pump.

Ensure the Charging Pump placard is on the "A" Charging Pump.

Provide a copy of SOP-118 Section III B marked to step h.

Provide a copy of SOP-102 Section III F marked through step 2.1.

When the examinee is ready: RUN To recreate this IC Set:

1. Load IC-10
2. Start the "B" Charging Pump.
3. Stop the "A" Charging Pump.
4. Insert the following OVR-CC046A 9684A - GREEN ON OVR-CC046B 9684A - RED OFF Trigger #1: Condition: X04I055S == 1 (A Charging Pump Started)

ANN-CC045 ON delay=20s Trigger #2: JN14F02==1 & X04I055T==1 ("A" Charging Pump Breaker is opened and the annunciator is lit)

ANN-CC045 ON Delete (deletes the alarm after the A Charging pump is stopped)

3. FREEZE COMMENTS:

NOTE TO BOOTH OPERATOR:

Provide a copy or mark up :

SOP-118 Section III B, ACTIVE LOOP SWITCHOVER, marked to step h.

SOP-102 Section III F marked through step 2.1.

6/13/2016 JPSF-046-N16 Page 12 of 13

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is operating at 100% power.

Train A is being established as the active loop.

"C" Charging pump is Out of Service.

Both the "A" and "B" CCW pumps are running in accordance with SOP-118, Component Cooling Water, section III. B. Active Loop Switchover.

Step III. B. 2.3.h directs "Transfer the inservice Charging Pump to Train A per SOP-102."

Procedure initial conditions have been met and it has been determined that there is no need to perform the 175 gallon flush of "A" Charging pump.

INITIATING CUES:

The CRS has directed you to place "A" Charging pump in service on "A" train and stop the "B" Charging pump, per SOP-102,Section III.F. beginning at step 2.2.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

6/13/2016 JPSF-046-N16 Page 13 of 13

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-142A-N16 (NRC JPM-c) Isolate the SI Accumulators and depressurize the B SI Accumulator by venting due to a failed open discharge isolation valve.

(Alternate Path)

CANDIDATE:

EXAMINER:

6/13/2016 JPSF-142A-N16 Page 1 of 9

TASK: 006-005-01-01 Adjust Accumulator Pressure TASK STANDARD:

"A" AND "B" Si accumulators are isolated and "B" SI accumulator has been vented.

TERMINATING CUE: Task is complete when any unisolated SI Accumulator is vented.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM TOOLS: EOP-2.1, ES1.2, POSTLOCA COOLDOWN AND DEPRESSURIZATION, marked up to step 19.

REFERENCES:

EOP-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION INDEX NO. K/A NO. RO SRO 006000A402 A4.02 Valves 4.0 3.8 EVALUATION TIME: 15 TIME CRITICAL: NO 10CFR55: 41(b)2 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 6/13/2016 JPSF-142A-N16 Page 2 of 9

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A Small Break LOCA is in progress.
  • The Reactor has tripped and safety injection has initiated.
  • The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.
  • RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.

INITIATING CUES:

Continue in EOP-2.1 at step 19.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

6/13/2016 JPSF-142A-N16 Page 3 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 19 Check if SI Accumulators should be isolated:

a. Verify RCS subcooling on TI-499A(B), A(B) TEMP °F, is GREATER THAN 52.5°F [67.5°F].
b. Verify PZR level is GREATER THAN 10% [28%].

STEP STANDARD:

Examinee verifies RCS subcooling and PZR level.

CUES:

NOTE: Examinee must use bracketed values if adverse containment values (Hi-1 RB pressure 3.6 psig or Hi Rad) are exceeded.

COMMENTS:

6/13/2016 JPSF-142A-N16 Page 4 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 19 c. Locally unlock and close the breakers for the Accumulator Discharge Isolation Valves:

  • XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463).

STEP STANDARD:

Dispatches an local operator to unlock and close the following breakers:

  • XMC1DB2Y 16IM, ACCUMULATOR B OUTLET ISOL, XVG8808B-SI (AB-463).

CUES:

Booth Operator: Insert the following actions to complete the local operator task:

LOA-RHR006, LOA-RHR007, LOA-RHR008 or EVENT 1 if available.

Wait approximately 1 minute and report that the breakers are closed.

COMMENTS:

6/13/2016 JPSF-142A-N16 Page 5 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 19 d. Close all Accumulator Discharge Isolation Valves, MVG-8808A(B)(C).

STEP STANDARD:

Operator takes the control switches for MVG-8808A(B)(C) to the CLOSE position.

Each valve travels closed as indicated by the red light OFF and the green light ON.

Identifies the 8808B does not go closed and implements Alternative Action.

CUES:

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 ALTERNATIVE ACTION Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator:

1) Close PVT-8880, N2 SUPPLY.

STEP STANDARD:

Operator takes the control switch for PVT-8880, N2 SUPPLY, to the CLOSE postion and verifies red light OFF, green light ON.

CUES:

NOTE: PVT-8880 is already closed.

COMMENTS:

6/13/2016 JPSF-142A-N16 Page 6 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 5 AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator: (cont.)

2) Open PVT-8875A(B)(C), N2 TO A(B)(C).

STEP STANDARD:

Examinee takes the control switch for PVT-8875B, N2 TO B, to OPEN. Vefiries red Light ON and green light OFF.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 6 AA Step 19 d. IF any Accumulator Discharge Isolation Valve can NOT be closed, THEN vent the AFFECTED Accumulator: (cont.)

3) Open HCV-936, ACCUM N2 VENT.

STEP STANDARD:

Operator opens HCV-936, ACCUM N2 VENT by increasing the Hagen controller output to approximately 100%.

CUES:

This JPM may be terminated when "B" SI Accumulator Pressure decreases.

COMMENTS:

Examiner ends JPM at this point.

6/13/2016 JPSF-142A-N16 Page 7 of 9

JPM SETUP SHEET JPM: JPSF-142A-N16 (NRC JPM-c) Isolate the SI Accumulators and depressurize the B SI Accumulator by venting due to a failed open discharge isolation valve. (Alternate Path)

IC SET: 253 INSTRUCTIONS:

Load designated IC Set.

Provide EOP-2.1 marked through step 18.

When student is ready: RUN Use LOA RHR 006, 007, 008 when a local operator is dispatched to unlock and close accumulator breakers.

To recreate this IC set:

1. Load IC-10
2. Activate MAL-RCS006C REACTOR COOLANT SYSTEM LEAK COLD LEG (LOOP 3) Final: 2000 VLV SI006P XVG08808B SI ACCUM B DSCHG VLV; Fail Position SET=100% (Pre-exercise)
3. RUN
4. Perform actions of EOP-1.0 and 2.0
5. To shift CCW to fast speed:

LOA-CCW050 SELECT=FAST SPEED 'A' CCW Pump Speed Switch to fast or LOA-CCW052 SELECT=FAST SPEED 'C' CCW Pump Speed Switch to fast

6. Complete EOP-2.1 to step 19.
7. FREEZE COMMENTS:

6/13/2016 JPSF-142A-N16 Page 8 of 9

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A Small Break LOCA is in progress.
  • The Reactor has tripped and safety injection has initiated.
  • The crew entered EOP-2.0,LOSS OF REACTOR OR SECONDARY COOLANT, when a transition to EOP-2.1, ES-2.1 POST-LOCA COOLDOWN AND DEPRESSURIZATION, was required.
  • RCS Cooldown and Depressurization has continued to step 19 of EOP-2.1.

INITIATING CUES:

Continue in EOP-2.1 at step 19.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

6/13/2016 JPSF-142A-N16 Page 9 of 9

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-002A-N16 (NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.

CANDIDATE:

EXAMINER:

5/11/2016 JPS-002A-N16 Page 1 of 12

TASK: 000-137-05-01 TRANSFER RHR FROM COLD LEG TO HOT LEG RECIRCULATION TASK STANDARD:

Safety Injection system has been aligned for Hot Leg Recirculation. Charging pumps have not been runout or deadheaded. The use of applicable Human Performance Tools (3-way communications, self checking, peer checking, phonetic alphabet, etc) and industrial safety practices meets expectations.

TERMINATING CUE: Both trains are aligned for Hot Leg Recirculation.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-

2.3 REFERENCES

EOP-2.0 LOSS OF REACTOR OR SECONDARY COOLANT EOP-2.3 TRANSFER TO HOT LEG RECIRCULATION INDEX NO. K/A NO. RO SRO 006000A402 A4.02 Valves 4.0 3.8 006000K418 K4.18 Valves normally isolated from their control power 3.6 3.7 EVALUATION TIME: 10 TIME CRITICAL: No 10CFR55: 45(a)7 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/11/2016 JPS-002A-N16 Page 2 of 12

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A LOCA occurred approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago.
  • The plant is in Cold Leg Recirculation mode.
  • CHG/SI Pump "C" is aligned to "B" train.

INITIATING CUES:

The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance with EOP-2.3.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/11/2016 JPS-002A-N16 Page 3 of 12

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 1 Align Train A Charging Pumps for Hot Leg Recirculation:

a. Stop the operating Charging Pump on Train A (PUMP A or C).

STEP STANDARD:

Places CHG/SI Pump "A" control switch to STOP and verifies CHG/SI Pump "A" indicates OFF (Green light ON, Red light OFF and 0 amps).

CUES:

Procedure Note: "Hot Leg Recirculation should be established at eight hours after a Loss of Reactor Coolant Accident."

The eight (8) hours is given in the initial conditions, but if the candidate requests this information from the CRS cue the candidate that 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> have elapsed.

Examiner Note: Running Charging Pump "A" when 8885 is closed is a failure due to running the pump deadheaded. Running the charging pump with both 8885 and 8884 open is a failure due to pump runout flow.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)

b. Check if Charging Pump C is aligned to Train A by verifying XFER switch XET 2002C ON TRAIN A IS LIT.

STEP STANDARD:

XFER SWITCH XET 2002C on Train A is not lit, goes to ALTERNATIVE ACTION.

CUES:

COMMENTS:

5/11/2016 JPS-002A-N16 Page 4 of 12

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 ALTERNATIVE ACTION

b. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed.

GO TO Step 1.d.

STEP STANDARD:

Verifies MVG-8132A and MVG-8132B CHG PP C TO LP A DISCH are closed, verifying green light ON and red light is OFF for each valve.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)

d. Close MVG-8885, CHG LP A ALT TO COLD LEGS.

STEP STANDARD:

MVG-8885, CHG LP A TO COLD LEGS, indicates CLOSE (Green light ON and red light is OFF).

CUES:

COMMENTS:

5/11/2016 JPS-002A-N16 Page 5 of 12

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 5 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)

e. Open MVG-8884, CHG LP A TO HOT LEGS.

STEP STANDARD:

MVG-8884, CHG LP A TO HOT LEGS, indicates OPEN (Green light OFF, Red light ON).

CUES:

Examiner Note: Candidate must energize power lockout to change the position of MVG-8884.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 6 1 Align Train A Charging Pumps for Hot Leg Recirculation: (continued)

f. Start the Charging Pump on Train A (PUMP A or C).

STEP STANDARD:

Places CHG/SI Pump "A" control switch to START and verifies CHG/SI PUMP "A" is running (Green light OFF, Red light ON and normal running amps).

CUES:

Booth Operator: If called to check out the "A" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.

COMMENTS:

5/11/2016 JPS-002A-N16 Page 6 of 12

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 7 2 Align Train B Charging Pumps for Hot Leg Recirculation:

a. Stop the operating Charging Pump on Train B (PUMP B or C).

STEP STANDARD:

Places CHG/SI Pump "B" control switch to STOP and verifies CHG/SI Pump "B" indicates OFF (Green light ON, Red light OFF with 0 amps).

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 8 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)

b. Check if Charging Pump C is aligned to Train B by verifying XFER SWITCH XET2002C ON TRAIN B is lit.

STEP STANDARD:

Verifies XFER SWITCH XET2000C ON TRAIN B is lit.

CUES:

COMMENTS:

5/11/2016 JPS-002A-N16 Page 7 of 12

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 9 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)

c. Ensure MVG-8132A(B), CHG PP C TO LP A DISCH, are closed.
d. Ensure MVG-8801A, HI HEAD TO COLD LEG INJ, is closed.

STEP STANDARD:

MVG-8132A and MVG-8132B, CHG PP C TO LP A DISCH, indicates CLOSED (Green light ON, Red light OFF).

MVG-8801A, HI HEAD TO COLD LEG INJ indicates CLOSED (Green light ON, Red light OFF).

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 10 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)

e. Close MVG-8801B, HI HEAD TO COLD LEG INJ.

STEP STANDARD:

Takes control switch for MVG-8801B, HI HEAD TO COLD LEG INJ, to the closed position, checks Green light ON and Red light OFF.

CUES:

Examiner Note: If 8801B is closed with "B" Charging Pump running, this dead heads the pump and constitutes failure of the JPM.

COMMENTS:

5/11/2016 JPS-002A-N16 Page 8 of 12

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 11 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)

f. Open MVG-8886, CHG LP B TO HOT LEGS.

STEP STANDARD:

Places TRN B PWR LCKOUT to ON (Green light OFF, Red light ON).

Places control switch for MVG-8886, CHG LP B TO HOT LEGS, to OPEN (Green light OFF, Red light ON).

Places TRN B PWR LCKOUT to OFF (Green light ON, Red light OFF).

CUES:

Examiner Note: Candidate must energize power lockout to change the position of MVG-8886. Placing the TRN B PWR LCKOUT to OFF is not critical.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 12 2 Align Train B Charging Pumps for Hot Leg Recirculation: (continued)

g. Start the Charging Pump on Train B (PUMP B or C).

STEP STANDARD:

Places CHG/SI Pump "B" control switch to START and verifies CHG/SI Pump "B" indicates ON (Green light OFF, Red light ON with normal running amps).

CUES:

Booth Operator: If called to check out the "B" charging pump for a start report the pump is ready for start and that suction pressure is 30 psig.

This JPM may be terminated after both charging are running and aligned for Hot Leg Recirculation.

COMMENTS:

5/11/2016 JPS-002A-N16 Page 9 of 12

Examiner ends JPM at this point.

5/11/2016 JPS-002A-N16 Page 10 of 12

JPM SETUP SHEET JPM: JPS-002A-N16 (NRC JPM-d) Initiate Hot Leg Recirculation following a LOCA.

IC SET: 254 INSTRUCTIONS:

Load the designated IC set.

When examinee is ready: RUN To recreate this IC Set:

1. RUN
2. Activate:

MAL-RCS005A RCS Loop 'A' DBA LOCA

3. Perform actions of EOP-1.0 and 2.0
4. Ensure RHR Sump Level >415', then activate LOA-AUX115 SEVERITY=0.17 (17% in RWST)
5. Transfer Cold Leg Injection to Cold Leg Recirculation IAW EOP-2.2.
6. To shift CCW to fast speed during EOP-2.2:

LOA-CCW050 SELECT=FAST SPEED 'A' CCW Pump Speed Switch to fast or LOA-CCW052 SELECT=FAST SPEED 'C' CCW Pump Speed Switch to fast

7. Swap C Charging pump to B Train:

LOA CVC045 Charging pump C disconnect switch SELECT= TRAIN B.

8. FREEZE COMMENTS:

Charging Pumps must be stopped before opening Hot Leg High Head Valves (8884/8886) to prevent pump runout.

5/11/2016 JPS-002A-N16 Page 11 of 12

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A LOCA occurred approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> ago.
  • The plant is in Cold Leg Recirculation mode.
  • CHG/SI Pump "C" is aligned to "B" train.

INITIATING CUES:

The CRS has directed you to transfer from Cold Leg to Hot Leg Recirculation in accordance with EOP-2.3.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/11/2016 JPS-002A-N16 Page 12 of 12

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-149B-N16 (NRC JPM-e) Respond to Steam Generator Overpressure (Alternate Path)

CANDIDATE:

EXAMINER:

5/11/2016 JPSF-149B-N16 Page 1 of 11

TASK: 311-006-06-01 RESPONSE TO LOSS OF SECONDARY HEAT SINK TASK STANDARD:

All feedwater flow to the "A" SG has been terminated and the "A" SG pressure is below 1230 psig.

TERMINATING CUE: The "B" SG pressure has been reduced below 1230 psig in accordance with EOP-15.1.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-

15.1 REFERENCES

EVALUATION TIME: 10 TIME CRITICAL: NO 10CFR55: 55.45.b.6 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/11/2016 JPSF-149B-N16 Page 2 of 11

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant has tripped due to a turbine trip from 100% power.

The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.

INITIATING CUES:

The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat Sink.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/11/2016 JPSF-149B-N16 Page 3 of 11

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 1. Identify any SG with pressure GREATER THAN 1230 psig.

STEP STANDARD:

Identifies that the "B" SG pressure is greater than 1230 psig.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2. Ensure the following valves are closed to the AFFECTED SG(s):

  • FW Flow Control, FCV-488
  • FW Isolation, PVG-1611B
  • FW Flow Control Bypass, FCV-3331 STEP STANDARD:

Closes FCV-488 and PVG-1611B (green light ON, red light OFF).

Verifies FCV-3331 is closed (green light ON, red light OFF).

CUES:

Evaluator Note: FW Flow Control, FCV-488, FW Isolation, PVG-1611B, and FW Flow Control Bypass are open due to a failure of the FW Isolation to initiate.

Closing either FCV-488 or PVG-1611B will isolate the Main Feedwater flowpath and prevent the affected SG from overfilling.

Ensuring FW Flow Control Bypass FCV-3331 is closed is not critical.

COMMENTS:

5/11/2016 JPSF-149B-N16 Page 4 of 11

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 3. Check Narrow Range level in AFFECTED SG(s) is LESS THAN 90% [83%].

STEP STANDARD:

Determines that "B" SG Narrow Range level is less than 90%.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Step 4. Dump steam from each AFFECTED SG to the Condenser:

a. Verify PERMISV C-9 status light is bright on XCP-6114 1-3.

STEP STANDARD:

Verifies PERMISV C-9 status light is bright.

CUES:

COMMENTS:

5/11/2016 JPSF-149B-N16 Page 5 of 11

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 4 b. Perform the following:

  • Verify the MS Isolation Valves, PVM-2801A(B)(C), are open for the AFFECTED SG(s).

OR

  • Open MS Isolation Bypass Valves:
1) Depress both MAIN STEAM ISOL VALVES RESET TRAIN A(B).

STEP STANDARD:

Notes that MS Isolation Valve PVM-2801B is closed (green light ON, red light OFF).

Depresses both MAIN STEAM ISOL VALVES RESET TRAIN A(B).

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 Step 4 b. 2) Open MS Isolation Bypass Valves, PVM-2869A(B)(C), for the AFFECTED SG(s).

STEP STANDARD:

Attempts to open MS Isolation Bypass Valves, PVM-2869B. Notes the valve did not open (green light ON, red light OFF).

Refers to ALTERNATIVE ACTION.

CUES:

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

5/11/2016 JPSF-149B-N16 Page 6 of 11

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 7 ALTERNATIVE ACTION AA Step 4. Dump steam from each AFFECTED SG using the Steamline PORV:

a) Place the PWR RELIEF A(B)(C) SETPT Controller in MAN and closed.

b) Place the Steamline Power Relief A(B)(C) Mode Switch in PWR RLF.

c) Adjust the PWR RELIEF A(B)(C) SETPT Controller to reduce AFFECTED SG(s) pressure.

STEP STANDARD:

  • PWR RELIEF B SETPT Controller in MAN and closed.
  • Steamline Power Relief B Mode Switch in PWR RLF.
  • PWR RELIEF B SETPT Controller adjusted to reduce B SG pressure.

CUES:

B SG pressure lowers.

COMMENTS:

5/11/2016 JPSF-149B-N16 Page 7 of 11

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 8 Step 5. Check AFFECTED SG(s) pressures:

a. Verify each AFFECTED SG(s) pressure is decreasing.
b. Verify each AFFECTED SG(s) pressure is LESS THAN 1230 psig.

STEP STANDARD:

SG pressure is decreasing.

CUES:

This JPM may bew terminated when "B" SG pressure is less than 1230 psig.

COMMENTS:

Examiner ends JPM at this point.

5/11/2016 JPSF-149B-N16 Page 8 of 11

JPM SETUP SHEET JPM: JPSF-149B-N16 (NRC JPM-e) Respond to Steam Generator Overpressure (Alternate Path)

IC SET: 255 INSTRUCTIONS:

Load the designated IC Set.

Provide a copy of EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE.

When to examinee is ready: RUN.

To recreate this IC Set:

1. Load IC-10.
2. Insert failures:
  • MAL-PCS014 INADVERTENT MS ISOLATION (All MSIVs close)
  • VLV-MS039F XVT02869B-MS MS LINE B BYPASS ISO VLV FAIL AS IS (MSIV Bypass Valve)
  • MAL-MSS010B S/G B SAFETY VALVE FAILS (Fail to: 0)
  • MAL-MSS007B S/G B POWER OPERATED RELIEF VALVE FAILURE (Fail to: 0)
  • BST-MS059ILS02806F REL VLV MS INHIBITED
  • BST-MS060ILS02806G REL VLV MS INHIBITED
  • BST-MS061ILS02806H REL VLV MS INHIBITED
  • BST-MS062ILS02806I REL VLV MS INHIBITED
  • BST-MS063ILS02806J REL VLV MS INHIBITED
  • MAL-PCS013A FW ISOL TRAIN A FAILURE Failure_To_Initiate
  • MAL-PCS013B FW ISOL TRAIN B FAILURE Failure_To_Initiate
3. RUN
4. Complete EOP-1.0 and EOP-1.1
3. Ensure "B" SG to raise is less than 90% NR.
4. Freeze when B SG pressure is greater than 1230 psig..

COMMENTS:

5/11/2016 JPSF-149B-N16 Page 9 of 11

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant has tripped due to a turbine trip from 100% power.

The Shift Engineer has identified a Yellow Path on Heat Sink due to Steam Generator overpressurization on the "B" SG.

INITIATING CUES:

The CRS directs you to implement EOP-15.1, RESPONSE TO STEAM GENERATOR OVERPRESSURE in response to a Yellow Path on the Critical Safety Function Status Tree for Heat Sink.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/11/2016 JPSF-149B-N16 Page 10 of 11

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-1003-N16 (NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)

CANDIDATE:

EXAMINER:

5/11/2016 JPSF-1003-N16 Page 1 of 9

TASK: 311-018-06-01 Response to High RB Radiation Level TASK STANDARD:

Both RBCU Filter Trains are operating.

TERMINATING CUE: Both RBCU Filter Trains are operating.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL

REFERENCES:

EOP-17.2 RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL EVALUATION TIME: 10 TIME CRITICAL: NO 10CFR55: 55.45(a)8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/11/2016 JPSF-1003-N16 Page 2 of 9

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A LOCA is in progress.
  • A Yellow Path on Containment exists due to Containment Radiation > 2 R/hr INITIATING CUES:

The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/11/2016 JPSF-1003-N16 Page 3 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 1. Verify Containment Ventilation Isolation Valves closed by verifying the following SAFETY INJECTION monitor lights are dim:

a. XCP-6103 2-1 (POST ACCID HR EXH 6056/6066).
b. XCP-6103 3-4 (POST ACCID HR EXH 6057 & 6067).

STEP STANDARD:

Verifies Containment Ventilation Isolation Valves are closed (Lights are DIM on XCP-6103 2-1, POST ACCID HR EXH 6056/6066 and XCP-6103 3-4, POST ACCID HR EXH 6057 & 6067.

CUES:

COMMENTS:

5/11/2016 JPSF-1003-N16 Page 4 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2. Start both RBCU HEPA Filter Trains:

a. Stop RBCU Normal Speed Fans:
  • XFN 0064A-AH, 1A NORM.
  • XFN 0065A-AH, 2A NORM.
  • XFN 0064B-AH, 1B NORM.
  • XFN 0065B-AH, 2B NORM.

STEP STANDARD:

Verifies RBCU Normal Speed Fans are stopped (RBCU Normal Speed Fans; Green lights ON, Red lights OFF with 0 amps).

CUES:

COMMENTS:

5/11/2016 JPSF-1003-N16 Page 5 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 2 b. Place RBCU HEPA Filters in service by placing the switches in FILTER:

  • XDP-110A, RBCU 64A HEPA FLTR BYP DMPR.
  • XDP-111A, RBCU 65A HEPA FLTR BYP DMPR.
  • XDP-110B, RBCU 64B HEPA FLTR BYP DMPR.
  • XDP-111B, RBCU 65B HEPA FLTR BYP DMPR.

STEP STANDARD:

Places the switches for the RBCU HEPA Filters in FILTER and notes the following:

  • XDP-110A; Green filter light ON and Red BYP light OFF
  • XDP-111A; Green filter light ON and Red BYP light OFF
  • XDP-110B; Green filter light OFF and Red BYP light ON
  • XDP-111B; Green filter light ON and Red BYP light OFF CUES:

Examiner Note: RBCU 64B HEPA Filter Bypass damper fails to reposition to Filter (XCP-110B; 64B Red light ON, Green light OFF).

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

5/11/2016 JPSF-1003-N16 Page 6 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 ALTERNATIVE ACTION AA Step 2 b. IF any HEPA Filter fails to position to FILTER, THEN ensure the RBCU TRAIN A(B) EMERG Switch is selected to the fan with its respective filter aligned.

STEP STANDARD:

Selects RBCU TRAIN A(B) EMERG Switch is selected to XFN65B (XFN 64B light OFF, XFN 65B light ON).

CUES:

Evaluator Note: MVG-3109D, RBCU 65B OUTLET ISOL, will not open when RBCU TRAIN B EMERG switch is selected to XFN 65B. RBCU 65B provides RB HEPA Filtration and adequate RB heat removal is provided by the A Train RBCU and RB Spray.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 2 c. Start the RBCU Slow Speed Fans selected on RBCU TRAIN A EMERG and RBCU TRAIN B EMERG.

STEP STANDARD:

Starts XFN 0065B-AH slow speed fan (Green light OFF, Red light ON, and normal amps).

CUES:

The examinee may place XFN 0064B-AH to stop.

This JPM may be terminated after the RBCU TRAIN B EMERG Switch is positioned to the operable Fan and 65B RBCU Slow Speed Fan is running.

COMMENTS:

Examiner ends JPM at this point.

5/11/2016 JPSF-1003-N16 Page 7 of 9

JPM SETUP SHEET JPM: JPSF-1003-N16 (NRC JPM-f) Respond to High RB Radiation Level (Alternate Path)

IC SET: 10 INSTRUCTIONS:

Load the designated IC Set.

Provide a copy of EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL When the examinee is ready: RUN.

To recreate this IC Set:

1. Load IC set 10.
2. Insert the following:
  • OVR-AH026E SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: False
  • OVR-AH026A SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: OFF (GREEN)
  • OVR-AH026B SS-AH282 RBCU HEPA FILTER BYPASS DAMPER Fail to: ON (RED)
  • MAL-RCS010 GROSS ISOTOPIC CONCENTRATION IN THE RCS 1.42e+008
  • PLP-RMS027 Area Radiation Monitor RM-G7 = 2.1
  • PLP-RMS038 Area Radiation Monitor RM-G18 = 2.1
3. Perform EOP-1.0, EOP-2.0
4. Run RWST is below 18%, RB Press < 11 psig, and the RCS is aliigned for Cold Leg Recirculation.
5. FREEZE COMMENTS:

5/11/2016 JPSF-1003-N16 Page 8 of 9

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

  • A LOCA is in progress.
  • A Yellow Path on Containment exists due to Containment Radiation > 2 R/hr INITIATING CUES:

The CRS has directed you to implement EOP-17.2, RESPONSE TO HIGH REACTOR BUILDING RADIATION LEVEL.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/11/2016 JPSF-1003-N16 Page 9 of 9

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPSF-029A-N16 (NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)

CANDIDATE:

EXAMINER:

5/19/2016 JPSF-029A-N16 Page 1 of 13

TASK: 000-033-05-01 RESPOND TO INTERMEDIATE RANGE INSTRUMENTATION CHANNEL FAILURE TASK STANDARD:

Power level stable at approximately 10-3% reactor power. Level trip switch for N35 is in BYPASS.

TERMINATING CUE: Reactor power stabilized. NI-35 has been bypassed.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS: AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILURE GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) marked up to step 3.13.

REFERENCES:

AOP-401.8 INTERMEDIATE RANGE CHANNEL FAILURE INDEX NO. K/A NO. RO SRO 000033K302 AK3.02 Guidance contained in EOP for loss of intermediate-range 3.6 3.9 instrumentation 015000A102 A1.02 SUR 3.5 3.6 015000A403 A4.03 Trip bypasses 3.8 3.9 EVALUATION TIME: 15 TIME CRITICAL: No 10CFR55: 45(a)4 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/19/2016 JPSF-029A-N16 Page 2 of 13

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2).

The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.

INITIATING CUES:

The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.

A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/19/2016 JPSF-029A-N16 Page 3 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Establish a stable Startup Rate of less than one decade per minute.

STEP STANDARD:

Withdraws rods to establish a stable startup rate of less than one decade per minute.

CUES:

Evaluator Note: It is expected that the candidate will leave power stable to block the source range and establish a positive startup rate after blocking the source range high flux trips and so establishing a positive startup rate is repeated at step 8 of this JPM. The candidate may increase power here. If so it is critical to block the source range prior to an automatic reactor trip at 1E5 counts on the source range.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 At 7.5x10-6%, perform the following:

1) Verify P6 Permissive energizes to bright.
2) Verify a minimum of one decade overlap between Source Range Channels and Intermediate Range Channels.

STEP STANDARD:

Verifies P6 energize to bright and a one decade overlap exists between source and intermediate range power channels.

CUES:

Evaluator Note: The overlap of channels was given in the initial conditions.

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 4 of 13

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Prior to 1E5 CPS, perform the following:

Momentarily place SR TRAIN A Switch in BLOCK.

STEP STANDARD:

Places SR TRAIN A Switch to BLOCK.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Verify SR A TRIP BLCK Permissive energizes to bright.

STEP STANDARD:

Verifies SR A TRIP BLCK Permissive energizes to bright.

CUES:

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 5 of 13

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Momentarily place SR TRAIN B Switch in BLOCK.

STEP STANDARD:

Places SR TRAIN B Switch to BLOCK.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 Verify SR B TRIP BLCK Permissive energizes to bright.

STEP STANDARD:

Verifies SR B TRIP BLCK Permissive energizes to bright.

CUES:

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 6 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 7 Perform one of the following for continued monitoring of Intermediate and Power Range instrument:

1) If available for use, select one Intermediate Range Channel and one Power Range Channel on NR-45, NIS RECORDER.
2) Ensure at least one Intermediate Range and at least one Power Range instrument are selected for continuous monitoring using computer display NR45.

STEP STANDARD:

Selects one power range and one intermediate range channel on NR-45.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 8 Establish a stable Startup Rate of less than one decade per minute.

STEP STANDARD:

Withdraws rods to establish a stable startup rate of less than one decade per minute.

CUES:

Evaluator Note: The candidate may have established a SUR prior to blocking the source range, but if not power should be raised here.

The critical aspect of this step is to raise reactor power.

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 7 of 13

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 9 1 Stabilize Reactor power at the current level.

STEP STANDARD:

NROATC drives control rods inward to achieve a stable 0 DPM SUR and stabilize reactor power.

Examinee may use multiple indications to determine that power is stable at approximately 0 DPM.

CUES:

Evaluator Note: The failure will occur at 1E-4% power or insert MAL-NIS008A (Channel 35 High Voltage Failure) fails low.

Evaluator Note: The student may refer to ARP for directions to AOP-401.8, INTERMEDIATE RANGE CHANNEL FAILURE.

Examiner Note: *** Alternate Path begins here ***

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 10 2 Bypass the failed Intermediate Range channel:

a. Place LEVEL TRIP Switch for the AFFECTED channel in BYPASS.

STEP STANDARD:

Positions the level trip switch for NI-35 to the BYPASS position.

CUES:

Evaluator Cue: The surrogate operator will take over monitoring the Reactor.

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 8 of 13

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 11 2 Bypass the failed Intermediate Range channel:

b. Verify IR&SR TRIP BYP (XCP-620 4-5), annunciator is lit.

STEP STANDARD:

Observes IR&SR TRIP BYP annunciator (XCP-620-4-5) energizes by visual observation and acknowledges alarm.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 12 3 Check if Reactor Power is less than 7.5 x 10-6%.

STEP STANDARD:

Notes that Reactor Power is GREATER than 7.5 x 10-6%.

CUES:

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 9 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 13 3 ALTERNATIVE ACTION 3 Within one hour verify P6, NIS IR. permissive is bright.

IF Reactor power is LESS THAN P-10. THEN maintain Reactor power LESS THAN 10%.

IF Reactor power is LESS THAN 5%, THEN maintain Reactor power LESS THAN 5%.

GOTO Step 6.

STEP STANDARD:

Verifies P6 status light is illuminated.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 14 6 Monitor the operable Intermediate Range channel.

STEP STANDARD:

Verifies NI-36 operating properly.

CUES:

COMMENTS:

5/19/2016 JPSF-029A-N16 Page 10 of 13

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 15 7 Ensure NR-45 is selected to the appropriate operable channels.

STEP STANDARD:

If not already selected , selects NR-45 to NI-36 position and verifies NI-35 is not selected.

CUES:

COMMENTS:

Examiner ends JPM at this point.

5/19/2016 JPSF-029A-N16 Page 11 of 13

JPM SETUP SHEET JPM: JPSF-029A-N16 (NRC JPM-g) Loss of Intermediate Range Instrumentation (Alternate Path)

IC SET: 257 INSTRUCTIONS:

Load the designated IC Set.

Setup SCIPS

- Select NSSS

- Select Window 1-2, Digital Reactivity

- Disable Calc

- Select detector 1

- Select detector 2

- Save

- Enable Calc

- Initialize Calc Provide a copy of GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2)

When the examinee is ready: RUN.

When power is > 1E-4 % if Trigger 1 did not auto-activate, insert Trigger 1:

To recreate the IC Set:

1. Load IC Set 6
2. Lower power and stablize conditions at approximately 5E-6% power with 0 SUR at critical rod height.
3. Ensure that IPCS at NROATC postion is selected to RX Startup screen and that reactivity is being calculated based on NI 35A and 36A.
4. Set trigger 1 for Event 1 at fnispr (2) > 0.0001 (1E-4 %)
  • MAL-NIS002A FAILURE OF IR CHANNEL N-35 DETECTOR PREAMP A-4
  • ANN-NI003 SR/IR DETECTOR TROUBLE I Fail to: ON COMMENTS:

5/19/2016 JPSF-029A-N16 Page 12 of 13

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

A reactor startup is in progress per GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2).

The crew has just brought the reactor critical and has leveled power at approximately 5E-6% power.

INITIATING CUES:

The CRS directs you to continue the startup to 10-3% in accordance with GOP-3, REACTOR STARTUP FROM HOT STANDBY TO STARTUP (MODE 3 TO MODE 2) starting at step 3.13.

A surrogate operator will respond to non-related alarms per your direction and will operate Emergency Feedwater to maintain SG level.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/19/2016 JPSF-029A-N16 Page 13 of 13

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPS-1001-N16 (NRC JPM-h) Establish Reactor Building Purge Supply and Exhaust CANDIDATE:

EXAMINER:

5/16/2016 JPS-1001-N16 Page 1 of 15

TASK: 088-505-01-04 Perform Line ups of the Reactor Building Ventilation Systems.

TASK STANDARD:

The RB Purge System is in service with at least one Purge Exhaust Fan and no more than one Purge Supply Fan started.

TERMINATING CUE: The RB purge system is in service.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION PERFORM SIMULATOR TOOLS:

  • JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial Conditions checked.
  • JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit
  • JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.
  • HPP-709, Sampling and Release of Radioactive Gaseous Effluents.
  • Six yellow plastic "Test in progress" tags for Plant Status labeling on:

- RM-A2 sample pump CMC switch

- RM-A4 sample pump CMC switch

- CMC switches and isolation valves PVA-9312A(B) CMC switches.

- CMC switches and isolation valves PVA-9311A(B) CMC switches.

  • Red hold tag for placement on XFN-13B, EXH FAN B.

REFERENCES:

OAP-100.5 GUIDELINES FOR CONFIGURATION CONTROL AND OPERATION OF PLANT EQUIPMENT HPP-709 Sampling and Release of Radioactive Gaseous Effluents SOP-114 REACTOR BUILDING VENTILATION SYSTEM INDEX NO. K/A NO. RO SRO 029000A201 A2.01 Maintenance or other activity taking place inside 2.9 3.6 containment EVALUATION TIME: 15 TIME CRITICAL: NO 10CFR55: 45(a)8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/16/2016 JPS-1001-N16 Page 2 of 15

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: None INITIAL CONDITION:

The plant is in Mode 5 with preparations for a refueling outage in progress.

The equipment hatch is open.

The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.

The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.

Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.

Reactor Building Purge had been in service but was shutdown on the previous shift.

Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.

INITIATING CUES:

You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .

All applicable procedure Initial Conditions are completed.

A surrogate operator will respond to non-related alarms per your direction.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/16/2016 JPS-1001-N16 Page 3 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 2.1; Ensure RMA0004, ATM GASEOUS IODINE-RB PURGE EXHAUST (gas channel) is in service (Rad Monitoring Panel).

STEP STANDARD:

Ensures RMA-4 is in service by checking for power and indication at Rad Monitoring Panel.

CUES:

Evaluator cue: Provide a marked copy of the following:

  • HPP-709, Attachment VI Reactor Building Purge Release Permit (Handout 2).
  • OAP-106.3 Locked Component Tracking sheets if not already provided.(Handout 3)

Evaluator Note: A surrogate operator will provide plant monitoring and acknowledge all Main Control Board alarms when the examinee is at the Ventilation Control Panel.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2.2; If core alterations are in progress, ensure RMA0002, ATM GASEOUS IODINE RB SAMPLE LINE (gas channel), is in service (Rad Monitoring Panel).

STEP STANDARD:

Marks step N/A and proceeds to step 2.3.

CUES:

Evaluator note: Since Unit is NOT in Mode 6 and no core alterations are in progress Steps 2.2 (Check of RMA-2) is N/A. Examinee may mark step complete as RM-A2 is in service and will be required in service once core alterations begin.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 4 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 2.3; If RB atmosphere sample analysis dictates, place RB Charcoal Cleanup System in service per Section III.

a. XFN-66A, FAN A (RB CHAR CLEANUP).
b. XFN-66B, FAN B (RB CHAR CLEANUP).

STEP STANDARD:

Marks step N/A and proceeds to step 2.4.

CUES:

Evaluator Note: Initial conditions states that RB Charcoal Cleanup is NOT required.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 5 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Step 2.4; Align RMA0004 sample point for RB Purge Exhaust Fan operation as follows (AB-485):

a. Open XVA00006-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.
b. Close XVA00005-AH, RMA0004 SAMPLE INLET ISOLATION VALVE.

STEP STANDARD:

Calls Building operator and directs OPEN XVA-6-AH and CLOSE XVA-5-AH.

CUES:

Booth Operator Cue: As Building Operator acknowledge request for sample valve alignment or verification and report task completed per the request.

Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify sample valve alignment correct.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 6 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 2.5; Ensure the following radiation monitors high radiation alarm setpoints are adjusted per Reactor Building Purge Release Permit:

a. RMA0002, ATM GASEOUS IODINE RB SAMPLE LINE.
b. RMA0004, RB PURGE EXH GAS ATMOS MONITOR.

STEP STANDARD:

Ensures setpoint on RMA-2 and RMA-4 at Rad monitor panel match the Purge Release Permit values.

CUES:

Evaluator cue: Provide simulated Reactor Building Purge Release Permit, HPP-709, Attachment VI, (Handout 2) if not already done.

Evaluator note: This was provided as complete in the initial conditions. The simulator does not model setpoint changes. Provide following cue if needed.

Evaluator cue: If asked as CRS state that the alarm setpoints have been verified by another RO.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 Step 2.6; Prior to placing RB Purge System in operation for the first time during an outage, perform STP-130.005B, AH Valve Operability Testing (Mode 5).

STEP STANDARD:

Marks step N/A and proceeds to step 2.7.

CUES:

Evaluator note: Initiating cue provided information that RB Purge had been in service previously.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 7 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 7 Step 2.7; Unlock and open the following:

a. XVB00001A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001A-AH (FB-479).
b. XVB00001B-AV2-AH, IA HDR ISOLATION VLV FOR XVB00001B-AH (RB-463).
c. XVB00002B-AV2-AH, IA HDR ISOLATION VALVE FOR XVB00002B-AH (RB-463).
d. XVB00002A-AV2-AH, IA HDR ISOLATION VLV FOR XVB00002A-AH (FB-479).

STEP STANDARD:

Calls Building operators and directs opening XVB-1A(B) and XVB-2A(B) air header isolations.

OR Requests OAP-106.3, Locked Component Tracking Sheets for the XVB-1A(B) and XVB-2A(B) air header isolations CUES:

Booth Operator cue: As Building Operator acknowledge requests for valve alignment or verification and report task completed per the request.

Evaluator note: Since Purge had previously been in service the building operator may only be asked to verify air header isolation valve alignment correct.

Evaluator cue: Provide JPM h Handout 3 if Examinee requests OAP-106.3 Locked Component Tracking sheets if not already provided.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 8 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 8 Step 2.8; Ensure a Reactor Building Purge Release Permit has been issued per HPP-709.

STEP STANDARD:

Ensures permit is current and less than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> old.

CUES:

Evaluator note: The NJPS-1001 Handout 2 (Release Permit) already indicates a SAT source check.

Evaluator note: Have a Copy of HPP-709 available for Examinee to refer to if they ask for it.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Step 2.9; Start Reactor Building Purge as follows:

a. Open PVB-2A, CNTMT EXH ISOL STEP STANDARD:

Places control switch to OPEN and holds in OPEN until Red light ON and Green light OFF.

CUES:

Evaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 9 of 15

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 10 Procedure NOTE 2.9.b; If both trains of RB Purge are to be run, both exhaust fans should be started simultaneously.

Step 2.9 b; Hold PVB-2B, CNTMT EXH ISOL, to OPEN while simultaneously holding one or both of the following fan control switches in the START position:

1) XFN-13A, EXH FAN A.
2) XFN-13B, EXH FAN B.

STEP STANDARD:

Places control switch for PVB-2B to OPEN and Holds in OPEN. Places control switches for XFN-13A in START and holds in START until Red light ON and Green light OFF for fans and PVB-2B.

CompletesSection II, Actual Release Data on Purge Release Permit:

1. Release Start Date and Time (current date and time)
2. Start Readings on RM-A2 and RM-A4 in cps.

CUES:

Evaluator note: Only Exh Fan A (XFN-13A) should be started. Examinee should ask for a peer check.

Evaluator note: This task is critical in order to ensure that the Reactor Building atmosphere is exchanged with fresh air. Completion of the Purge Release Permit Data is NOT critical.

COMMENTS:

5/16/2016 JPS-1001-N16 Page 10 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 11 Step 2.9 c; Verify the following:

1) XFN-13A(B)-AH inlet damper opens.
2) XFN-13A(B)-AH outlet damper opens.

STEP STANDARD:

Verifies White light ON for the INLET and OUTLET dampers for the Fan that was started (XFN-13A).

CUES:

Evaluator note: Fan inlet and outlet damper indications are on the mimic board above the control switches.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 12 Step 2.9 d; Open XDP-28, INTAKE DMPR.

STEP STANDARD:

Places control Switch for XDP-28 to OPEN and verifies Red light ON and Green light OFF.

CUES:

COMMENTS:

5/16/2016 JPS-1001-N16 Page 11 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 13 Step 2.9 e; Open the following:

1) PVB-1A, CNTMT SPLY ISOL.
2) PVB-1B, CNTMT SPLY ISOL.

STEP STANDARD:

Places control Switch for PVB-1A to OPEN and holds until Red light ON and Green light OFF.

Places control Switch for PVB-1B to OPEN and holds until Red light ON and Green light OFF.

CUES:

COMMENTS:

5/16/2016 JPS-1001-N16 Page 12 of 15

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 14 Step 2.9 f; Start one or both of the following, as necessary:

1) XFN-11A, SPLY FAN A.
2) XFN-11B, SPLY FAN B.

STEP STANDARD:

Starts NO MORE than one Purge Supply Fan. (May not start any)

CUES:

Evaluator Cue: If asked as CRS which supply fan to start, state "Operate supply fans as required by SOP-114."

Evaluator Note: There is a procedure note prior to the step which starts the Purge Supply Fans. The note informs the Operator that in order to maintain a negative pressure on the RB with the Equipment Hatch open, fewer Supply Fans than Exhaust Fans should be operated. In this case no supply fans or one supply fan should be started.

Evaluator Note: Since the equipment hatch is open no more than ONE supply fan should be started.

This step is critical because the Examinee must maintain negative pressure on the RB. It is only critical that 2 supply fans are NOT started.

COMMENTS:

Examiner ends JPM at this point.

5/16/2016 JPS-1001-N16 Page 13 of 15

JPM SETUP SHEET JPM: JPS-1001-N16 (NRC JPM-h) Establish Reactor Building Purge Supply and Exhaust IC SET: 258 INSTRUCTIONS:

Reset to the designated IC Set.

1. Place yellow plastic Test in Progress tags on sample pump CMC switches for RM-A2 and RM-A4 at the rad monitor panel.
2. Place yellow plastic Test in Progress tags on CMC switches for Containment isolation valves PVA-9312A(B) and PVA-9311 A(B) on MCB Panel 2.
3. Place red hold tag on CMC switch for XFN-13B, EXH FAN B at HVAC panel.
4. Verify SIPCS mode set to "CLD Shutdown"
5. Go to run, clear any alarms. Use the HVAC acknowledge button not the LOA reset if HVAC alarms.

When the examinee is ready: RUN To recreate this IC Set:

1. Load IC Set 3
2. Verify the following at the HVAC Control Panel, XCP-6210:
  • CMC switch for RB Purge Supply Fan A in STOP
  • CMC switch for RB Purge Supply Fan B in STOP
  • CMC switch for RB Purge Exhaust Fan A in STOP
  • CMC switch for RB Purge Exhaust Fan B in STOP
  • CMC switch for XDP-28, Intake Damper in CLOSE
  • CMC switch for RB Charcoal Cleanup fan A in STOP
  • CMC switch for RB Charcoal Cleanup fan B in STOP
3. Insert: OVR-AH076A Override To = Off (SS-AH243 Purge Exh Fan (XFN-13B-AH) GREEN OVR-AH076C Override To = Off (SS-AH243 Purge Exh Fan (XFN-13B-AH) WHITE COMMENTS:

Provide the following to the Examinee:

  • JPM Handout 1; Marked up copy of SOP-114, Reactor Building Ventilation System Section C, STARTUP REACTOR BUILDING PURGE SUPPLY AND EXHAUST, with Initial Conditions checked.
  • JPM Handout 2; HPP-709 Attachment VI, Reactor Building Purge Release Permit.
  • JPM Handout 3; OAP-106.3 Attachment II Locked Component Operating Sheet.

5/16/2016 JPS-1001-N16 Page 14 of 15

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None INITIAL CONDITION:

The plant is in Mode 5 with preparations for a refueling outage in progress.

The equipment hatch is open.

The RB atmosphere sample analysis has been completed and RB Charcoal Cleanup is NOT required.

The RM-A2 and RM-A4 setpoints have been adjusted for this release and source checks are completed on both channels.

Plant status labels have been placed on the radiation monitoring equipment required for RB ventilation operability; RMA-2 and RMA-4.

Reactor Building Purge had been in service but was shutdown on the previous shift.

Reactor Building Purge Exhaust Fan, XFN-13B is tagged out for corrective maintenance.

INITIATING CUES:

You are being directed to place Reactor Building Purge in service using SOP-114, Reactor Building Ventilation System Section III.C .

All applicable procedure Initial Conditions are completed.

A surrogate operator will respond to non-related alarms per your direction.

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/16/2016 JPS-1001-N16 Page 15 of 15

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-006B-N16 (NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)

CANDIDATE:

EXAMINER:

5/18/2016 JPP-006B-N16 Page 1 of 9

TASK: 000-007-05-04 Respond to Reactor Trip/Safety Injection Actuation TASK STANDARD:

Train B of Solid State Protection is reset.

TERMINATING CUE: Train B of Solid State Protection is reset.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION SIMULATE PLANT TOOLS: SOP-112, SAFETY INJECTION SYSTEM Section V with Entry Conditions signed off.

Safeguards cabinet key if specific authorization has been provided by the Shift Manager or pictures of:

  • XPN-7020 Logic Cabinet
  • XPN-7020 Output Cabinet
  • XPN-7021 Cabinet

REFERENCES:

SOP-112 SAFETY INJECTION SYSTEM EVALUATION TIME: TIME CRITICAL: 10CFR55:

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/18/2016 JPP-006B-N16 Page 2 of 9

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: Personal Protection Equipment (PPE)

INITIAL CONDITION:

  • A LOCA is in progress.
  • EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented to Step 4, Reset both SI RESET TRAIN A(B) Switches.
  • "B" Train of SI did not reset.

INITIATING CUES:

The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!

5/18/2016 JPP-006B-N16 Page 3 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Step 2.2 Reset Train B of Solid State Protection as follows:

a. Obtain the Train B key (located by the Page Phone).

STEP STANDARD:

Obtains Train "B" key.

CUES:

Evaluator Cue: Provide Examinee with SOP-112 Section V.A. with entry conditions completed.

Evaluator Cue: After the examinee has located the Train B key inform the examinee that the key has been obtained. It is critical to identify the location of the key. If the Shift Manager has authorized the opening of the cabinets then provide the key to the examinee.

COMMENTS:

5/18/2016 JPP-006B-N16 Page 4 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2.2 b. At the Logic Cabinet for XPN7020, Solid State Protection Cabinet Train B, perform the following (CB-436):

1) Open the Logic Cabinet.
2) Open the following power supply breakers:

a) PS1, 48VDC.

b) PS2, 48VDC.

STEP STANDARD:

Opens power supply breakers PS1 and PS2.

CUES:

Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Logic Cabinet.

COMMENTS:

5/18/2016 JPP-006B-N16 Page 5 of 9

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Step 2.2 c. At XPN7021, Safeguards Test Cabinet Train A, perform the following (CB-436):

1) Open the Test Cabinet.
2) Momentarily place Reset Switch S-821 to the RESET position.

STEP STANDARD:

Reset Switch S-821 is momentarily placed to RESET.

CUES:

Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7021 Cabinet and cabinet closeup.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Step 2.2 d. At XPN7020, Solid State Protection Cabinet Train A, perform the following (CB-436):

1) Open the Output Cabinet.
2) On the Output Relay Test Panel place the Mode Selector Switch in the TEST position.

STEP STANDARD:

Places the Mode Selector Switch in the TEST position.

CUES:

Examiner Cue; Unless previously arranged and specific authorization is provided by the Shift Manager then DO NOT OPEN CABINETS. If necessary then provide picture of XPN-7020 Output Cabinet.

COMMENTS:

5/18/2016 JPP-006B-N16 Page 6 of 9

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 2.2 e. At the Main Control Board verify the SI ACT light is dim.

STEP STANDARD:

Contacts the Control room and verifies that the SI ACT light is dim.

CUES:

Evaluator Note: Terminate the JPM when the Control Room is contacted.

Evaluator Note: Ensure all cabinets are relocked.

COMMENTS:

Examiner ends JPM at this point.

5/18/2016 JPP-006B-N16 Page 7 of 9

JPM SETUP SHEET JPM: JPP-006B-N16 (NRC JPM-i) Locally Reset Safety Injection IAW SOP-112 (B Train Only)

IC SET:

INSTRUCTIONS:

COMMENTS:

5/18/2016 JPP-006B-N16 Page 8 of 9

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: Personal Protection Equipment (PPE)

INITIAL CONDITION:

  • A LOCA is in progress.
  • EOP-2.0, LOSS OF REACTOR OR SECONDARY COOLANT, has been implemented to Step 4, Reset both SI RESET TRAIN A(B) Switches.
  • "B" Train of SI did not reset.

INITIATING CUES:

The CRS has directed you to manually reset Train B of Solid State Protection in accordance with SOP-112 Section V. A., MANUAL RESET OF SOLID STATE PROTECTION FROM THE RELAY ROOM.

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/18/2016 JPP-006B-N16 Page 9 of 9

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-107A-N16 (NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFP CANDIDATE:

EXAMINER:

3/31/2016 JPP-107A-N16 Page 1 of 8

TASK: 000-169-05-04 Locally Isolate a Faulted Steam Generator per EOP-3.0.

TASK STANDARD:

Turbine driven emergency feed pump main steam loop "B" and "C" supply valve are manually closed and power removed from 2802A per EOP-3.0.

TERMINATING CUE: MVG-2802A and MVG-2802B are closed and deenergized per EOP-3.0.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD PLANT SIMULATE

REFERENCES:

EOP-3.0 FAULTED STEAM GENERATOR ISOLATION INDEX NO. K/A NO. RO SRO 035000A406 A4.06 S/G isolation on steam leak or tube rupture/leak 4.5 4.6 061000K103 K1.03 Main steam system 3.5 3.9 000040A104 AA1.04 Isolation of all steam lines from header 4.3 4.3 000040A110 AA1.10 AFW System 4.1 4.1 TOOLS: EOP-3.0, STEP 5.j. ALTERNATIVE ACTION EVALUATION TIME 20 TIME CRITICAL No 10CFR55: 45.a.8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 3/31/2016 JPP-107A-N16 Page 2 of 8

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: Burn Hazard INITIAL CONDITION:

  • The plant was at 100% power when a steamline break occurred inside containment.
  • "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
  • Both motor driven emergency feedwater pumps have started.
  • The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and MVG-2802B, MS LOOP C TO TD EFP from the MCB.
  • The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency condition.
  • The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in accordance with EOP-3.0 step 5 j Alternative Action.

INITIATING CUES:

The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:

  • Open breaker 05EH on XMC1DA2X.
  • Locally close valves XVG02802A-MS.
  • Locally close valvesXVG02802B-MS.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!

3/31/2016 JPP-107A-N16 Page 3 of 8

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 EOP-3.0 Alternative Action AA Step 5.j. Locally deenergize and close the appropriate valve.

1) Open XMC1DA2X 05EH, EF PUMP MAIN STEAM BLOCK VLV XVG-2802A-MS (IB-463).

STEP STANDARD:

Operator locates the power supply (1DA2X, 05EH) for XVG-02802A and opens the breaker by pulling the breaker control lever down.

CUES:

Evaluator Cue: Hand a blank copy of EOP-3.0, E2, FAULTED STEAM GENERATOR ISOLATION, page 4 which includes step 5 j.

Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.

COMMENTS:

3/31/2016 JPP-107A-N16 Page 4 of 8

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)

1) Open XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).

STEP STANDARD:

Determines that the AB operator has already opened XMC1DB2Y 05EH, EMERG FEEDWATER PUMP MAIN STEAM BLOCK XVG2802B-MS (AB-463).

CUES:

Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)

2) Close XVG02802A-MS, MS HEADER B EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).

STEP STANDARD:

Operator locates and closes XVG02802A-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate.

CUES:

Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.

COMMENTS:

3/31/2016 JPP-107A-N16 Page 5 of 8

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 AA Step 5.j. Locally deenergize and close the appropriate valve. (cont.)

2) Close XVG02802B-MS, MS HEADER C EF PUMP TURBINE SUPPLY VLV (IB-436 East Pen).

STEP STANDARD:

Operator locates and closes XVG02802B-MS by pulling the manual engagement clutch lever down and turning the valve handwheel in the clockwise direction until the valve position arrow of the handwheel points to the right and the handwheel will no longer rotate.

CUES:

Evaluator Note: The only sequence that is important is to open each breaker before closing each valve. If the examinee repositions a valve prior to opening the breaker the JPM is considered unsat.

COMMENTS:

Examiner ends JPM at this point.

3/31/2016 JPP-107A-N16 Page 6 of 8

JPM SETUP SHEET JPM: JPP-107A-N16 (NRC JPM-j) Locally De-energize and Close MS Loop "B" and "C" to TDEFP IC SET:

INSTRUCTIONS:

COMMENTS:

3/31/2016 JPP-107A-N16 Page 7 of 8

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: Burn Hazard INITIAL CONDITION:

  • The plant was at 100% power when a steamline break occurred inside containment.
  • "B" and "C" SGs are faulted as indicated by steam pressure dropping in an uncontrolled manner.
  • Both motor driven emergency feedwater pumps have started.
  • The BOP has tried and failed to close MVG-2802A, MS LOOP B TO TD EFP and MVG-2802B, MS LOOP C TO TD EFP from the MCB.
  • The Shift Manager has approved the waiving of ISP-027 requirements due to the emergency condition.
  • The AB operator (Unit 6 upper) has already opened breaker 05EH on XMC1DB2Y in accordance with EOP-3.0 step 5 j Alternative Action.

INITIATING CUES:

The RO directs you as the IB operator (Unit 7) to complete the following actions in accordance with EOP-3.0 step 5 j Alternative Action:

  • Open breaker 05EH on XMC1DA2X.
  • Locally close valves XVG02802A-MS.
  • Locally close valvesXVG02802B-MS.

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

3/31/2016 JPP-107A-N16 Page 8 of 8

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPP-052A-N16 (NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.

CANDIDATE:

EXAMINER:

5/12/2016 JPP-052A-N16 Page 1 of 15

TASK: 063-007-01-04 PLACE A BATTERY CHARGER IN SERVICE TASK STANDARD:

Bus 1HA is supplied from the swing charger XBC-1A/1B in accordance with SOP-311.

TERMINATING CUE: Examinee has completed SOP-311 to startup the swing charger XBC1A-1B in service on DPN1HA.

PREFERRED EVALUATION METHOD PREFERRED EVALUATION LOCATION SIMULATE PLANT TOOLS: SOP-311 SECTION IV.C (Provide operator with copy of SOP-311 SECTION IV.C, page 5 initial conditions completed).

SOP-311 SECTION IV.P (Provide operator with copy of SOP-311 SECTION IV.P)

REFERENCES:

ISP-027 ELECTRICAL SAFETY SOP-311 125 VDC SYSTEM INDEX NO. K/A NO. RO SRO 000068A110 AA1.10 Power distribution: ac and dc 3.7 3.9 EVALUATION TIME: 15 TIME CRITICAL: No 10CFR55: 45(a)8 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/12/2016 JPP-052A-N16 Page 2 of 15

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: Energizing electrical equipment INITIAL CONDITION:

  • DPN-1HA is being powered from Battery Charger 1A.
  • Battery Charger XBC1A is to be removed from service for scheduled maintenance.
  • DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
  • XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.
  • The initial conditions for removing Battery Charger XBC1A from service, SOP-311 Section IV.C, are met:

- Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.

- The battery charger timer for XBC1A is set at zero hours and zero minutes.

  • A manual STTS for the electricians to adjust Battery Charger voltage has been generated.

INITIATING CUES:

Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

FOR ELECTRICAL MANIPULATIONS, AT NO TIME ARE YOU TO BREAK THE PLANE OF THE ELECTRICAL PANEL!

5/12/2016 JPP-052A-N16 Page 3 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Section IV.C. REMOVING BATTERY CHARGER XBC1A FROM SERVICE INITIAL CONDITIONS Step 1.1 The FLOAT/EQUALIZER Switch is selected to FLOAT.

Step 1.2 The battery charger timer for XBC1A is set at zero hours and zero minutes.

STEP STANDARD:

Verifies the FLOAT/EQUALIZER Switch is selected to FLOAT and the battery charger timer for XBC1A is set at zero hours and zero minutes.

CUES:

Evaluator Note: Initial conditions are completed on the copy provided to the operator and the conditions are stated in the JPM Initial Conditions.

Evaluator Cue: If requested, inform examinee of the following initial conditions:

The FLOAT/EQUALIZER switch is in the FLOAT position.

The Battery Charger timer for XBC-1B is set at 0 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> and 0 minutes.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Step 2.1 Place XBC1A-1B, DC DISTRI BUS 1A-1B BACKUP BATTERY CHRG, in service per Section IV.

STEP STANDARD:

Examinee transitions to Section IV. P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HA.

CUES:

COMMENTS:

5/12/2016 JPP-052A-N16 Page 4 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Section P. PLACING BATTERY CHARGER XBC1A-1B IN SERVICE ON DPN1HA Step 2.1 Generate a manual STTS for the electricians to adjust Battery Charger voltage per STP-501.001A, Battery XBA1A Weekly Test, at the conclusion of this procedure.

STEP STANDARD:

Indicates that this step has been completed.

CUES:

Examiner Note: The Initial Conditions states that an STTS has been generated.

Examiner Note: If the examinee starts at Section C, Step 2.1 directs the operator to place XBC1A-1B in service.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 5 Step 2.2 Ensure the following breakers are open on the Swing Battery Charger, XBC1A-1B:

a. CB2, DC OUTPUT.
b. CB1, AC INPUT.

STEP STANDARD:

Verifies that XBC1A-1B CB2 and CB1 are open.

CUES:

Examiner Cue: XBC1A-1B CB2 and CB1 are open.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 5 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 6 Step 2.3 Ensure XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed (AB-412).

STEP STANDARD:

Verifies that XMC1DA2Y 08KM is closed.

CUES:

Examiner Cue: XMC1DA2Y 08KM is closed.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 7 Step 2.4 Ensure the following breakers on XET-4003-ED are open:

a. TRAIN A-AC.
b. TRAIN A-DC.
c. TRAIN B-AC.
d. TRAIN B-DC.

STEP STANDARD:

Verifies that breakers; TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open.

CUES:

Examiner Cue: Breakers TRAIN A-AC, TRAIN A-DC, TRAIN B-AC, and TRAIN B-DC are open.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 6 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 8 NOTE 2.5; The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower right hand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker STEP STANDARD:

No further actions for this step.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Step 2.5 Align XET-4003-ED Transfer Switch to supply DPN1HA as follows:

a. Close TRAIN A-AC Breaker to Battery Charger XBC1A-1B.
b. Close TRAIN A-DC Breaker from Battery Charger XBC1A-1B.

STEP STANDARD:

Closes TRAIN A-AC breaker and Train B-DC breaker for battery charger 1A-1B on XET-4003-ED using key interlocks.

CUES:

Evaluator Note: The keys for the mechanical breaker interlocks fit in the breakers diagonally opposed to each other. The key that fits the upper left hand breaker also fits the lower right hand breaker and the key that fits the upper right hand breaker also fits the lower left hand breaker. (Train "A" AC to Train "B" DC and Train "A" DC goes to Train "B" AC).

Evaluator Note: If the operator tries to swap AC to AC or DC to DC inform him that the key will not turn.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 7 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 10 Step 2.6 Verify the FLOAT/EQUALIZER is selected to FLOAT.

STEP STANDARD:

FLOAT/EQUALIZER Switch verified in the FLOAT position ON XBC1A-1B.

CUES:

Evaluator Cue: If asked cue examinee that the switch is in the 'Float' position or 'As Seen'.

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 11 Note: 2.7; Breaker #13 controls the incoming line from XET-4003-ED.

Step 2.7 Ensure DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA, is open.

STEP STANDARD:

Checks DPN-1HA-ED BKR 13, BATTERY CHARGER 1A-1B FEED TO DPN 1HA is in the OPEN position.

CUES:

Evaluator Note: Breaker 13 aligns the incoming line from XET-4003-ED COMMENTS:

5/12/2016 JPP-052A-N16 Page 8 of 15

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 12 Step 2.8 Close the following on the front of the Swing Battery Charger, XBC1A-1B:

a. CB2, DC OUTPUT
b. CB1, AC INPUT STEP STANDARD:

Closes the DC OUTPUT (CB2) and AC INPUT (CB1) breakers on battery charger XBC1A-1B in the ON position.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 13 Note 2.9 through 2.14; Electrical Maintenance should be notified of abnormal output voltage fluctuations.

Continued voltage fluctuations following the performance of Step 2.14 require the generation of an MWR to investigate and correct the cause of such fluctuations Step 2.9 Verify DC OUPUT voltmeter is between 131 volts and 137 volts.

STEP STANDARD:

Checks DC OUTPUT VOLTMETER stabilizes at 131-137 volts.

CUES:

Evaluator Cue: When operator points to DC OUTPUT VOLTMETER and indicates expected voltage, inform the operator that voltage is 133 volts.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 9 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 14 NOTE 2.10; Five to ten seconds should be allowed for the capacitors to fully charge and the battery charger to stabilize. Illumination of the red indicator lights indicates charged capacitors.

Step 2.10 Verify the capacitors are fully charged by observing the red indicator lights on XPN5294, BATTERY CHARGER FILTER CAPACITOR BOX.

STEP STANDARD:

Waits approximately 5 to 10 seconds, then checks red indicator lights on capacitor cabinet XPN5294-ED lit.

CUES:

Evaluator Cue: When the indicator lights are identified, inform the operator that the red indicator lights are ON.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 15 Step 2.11 Close DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA.

STEP STANDARD:

Close DPN1HA 13, BATTERY CHARGER 1A-1B FEED TO DPN1HA.

CUES:

Evaluator Note: Located in the 1A Battery Charger Room.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 10 of 15

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 16 Step 2.12 If XBC1A is in service, remove XBC1A from service per Section IV.

STEP STANDARD:

Operator transitions to SOP-311, (Section IV.C) to complete steps.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 17 Section IV.C.

Step 2.2 To remove XBC1A, DC DISTRI BUS 1A BATTERY CHARGER, from service, open the following:

a. DPN1HA 11, BATTERY CHARGER 1A FEED TO DPN1HA.
b. CB2, DC OUTPUT, on XBC1A.
c. CB1, AC INPUT, on XBC1A.

STEP STANDARD:

Opens DPN-1HA-ED 11, BATTERY CHARGER 1A FEED TO DPN1HA.

Opens CB 2, DC OUTPUT, on XBC1A.

Opens CB 1, AC INPUT, on XBC1A.

CUES:

Transitions back to Section IV.P and continues at Step 2.13 when Section IV.C is complete.

COMMENTS:

5/12/2016 JPP-052A-N16 Page 11 of 15

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 18 Section IV.P Step 2.13 Verify XBC1A-1B, SWING BATTERY CHARGER, picks up any DC loads.

STEP STANDARD:

Verify XBC1A-1B, Swing Battery Charger, picks up any DC loads.

CUES:

Evaluator Cue: Inform operator that Swing Charger ammeter indicates 35 amps and voltmeter indicates 134 VDC when requested.

The Evaluator may terminate the JPM at this point.

COMMENTS:

Examiner ends JPM at this point.

5/12/2016 JPP-052A-N16 Page 12 of 15

JPM SETUP SHEET JPM: JPP-052A-N16 (NRC JPM-k) Startup the "Swing Battery Charger" and Place on DPN 1HA.

IC SET:

INSTRUCTIONS:

COMMENTS:

5/12/2016 JPP-052A-N16 Page 13 of 15

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: Energizing electrical equipment INITIAL CONDITION:

  • DPN-1HA is being powered from Battery Charger 1A.
  • Battery Charger XBC1A is to be removed from service for scheduled maintenance.
  • DPN-1HA must be transferred to the swing battery charger XBC-1A-1B.
  • XMC1DA2Y 08KM, BATTERY CHARGER 1A-1B XBC1A-1B-ED, is closed.
  • The initial conditions for removing Battery Charger XBC1A from service, SOP-311 Section IV.C, are met:

- Battery Charger XBC1A FLOAT/EQUALIZE Switch is selected to FLOAT.

- The battery charger timer for XBC1A is set at zero hours and zero minutes.

  • A manual STTS for the electricians to adjust Battery Charger voltage has been generated.

INITIATING CUES:

Control Room directs startup of the swing charger XBC1A-1B in service on DPN1HA in accordance with SOP-311 Section IV.C and IV.P.

AT NO TIME ARE YOU TO OPERATE ANY PLANT EQUIPMENT!

Hand this paper back to your Evaluator when you have satisfactorily completed the assigned task.

5/12/2016 JPP-052A-N16 Page 14 of 15

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-021A-(C)N16 2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume Determination CANDIDATE:

EXAMINER:

5/6/2016 Page 1 of 7

TASK: 004-006-01-01 PERFORM BORON CHANGE CALCULATIONS TASK STANDARD:

Examinee determines that about 9359 gals (interpolated value) will be required for dilution. A range of 9250 to 9450 (~ +/- 100 gal or ~ 1%) would be acceptable. If the examinee elects to calculate vice interpolate, the calculated value is the same range. Examinee determines that available volume in Recycle Holdup Tank is NOT sufficient to accomodate the calculated dilution. Volume required exceeds the volume at overflow 44,353 gallons required vice 42,989 gallons at overflow.

TERMINATING CUE: Calculations completed.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM PERFORM

REFERENCES:

SOP-106 REACTOR MAKEUP WATER SYSTEM INDEX NO. K/A NO. RO SRO 1940012125 2.1.25 Ability to interpret reference materials such as graphs, 3.9 4.2 curves, tables, etc.

1940012137 2.1.37 Knowledge of procedures, guidelines, or limitations 4.3 4.6 associated with reactivity management.

TOOLS: Curve Book (Accessible via Desk Top Computers)

Calculator JPM A1-a, Dilution Calculation hand out.

EVALUATION TIME 20 TIME CRITICAL NO 10CFR55: 45b(1)(12)

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/6/2016 Page 2 of 7

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.

- Latest RCS boron sample was 2038 ppm.

- Estimated critical boron concentration is 1688 ppm.

- "A" Recycle Holdup Tank is in service.

- "A" Recycle Holdup Tank level is 83%.

INITIATING CUES:

The SM directs you to perform the following:

1. Determine the dilution volume required to establish the estimated critical boron concentration.
2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.

Show all work on the JPM A1-a Dilution Calculation hand out provided.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/6/2016 Page 3 of 7

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Examinee determines that the amount of dilution required.

STEP STANDARD:

Determines Ci - Cf = 350 ppm dilution required.

CUES:

Evaluator note: Ci and Cf values are given in the initiating cue.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Selects correct curve from curve book.

STEP STANDARD:

The examinee refers to Figure III-3, RCS Dilution Gallons (Vw) of Dilution Water Required, in the Curve Book.

CUES:

Evaluator note: Do NOT prompt Examinee on location of the dilution tables.

COMMENTS:

5/6/2016 Page 4 of 7

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Examinee interpolates or calculates the volume of water required and reports the dilution volume required to the CRS.

STEP STANDARD:

Examinee determines that a dilution volume within a range of 9250 of 9450 gals is required.

CUES:

Evaluator note: The candidate may use either calculate of interpolate to determine the required volume. The range of 9250 to 9450 is acceptable for either method. See NJPA-021A(R1) Key for calculations.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Examinee determines if adequate volume is available in the 'A' Recycle Holdup Tank.

STEP STANDARD:

Determines that a minimum volume is required = 35,000 + 9,250 = 43,750 gallons.

Volume at 100% = 42,235 gallons.

Volume at overflow = 42,989 gallons.

Required Volume > Volume available - >Recycle Holdup Volume is NOT Adequate CUES:

Evaluator note: 9250 gals is the lowest allowable value for the calculation in the previous step.

Examinee will refer to Curve Book Figure VI-24, Recycle Holdup Tank Volme XTK0006A/B to determine volume required and volume available. See NJPA-021A(R1) Key for calculations.

The candidate may use the 100% volume of 42235 gallons as the high level for the tank. Either is acceptable. The critical aspect of this step is to determine that adequate volume is NOT available.

COMMENTS:

Examiner ends JPM at this point.

5/6/2016 Page 5 of 7

JPM SETUP SHEET JPM: JPA-021A-( 2016 NRC A1-a (Common): Perform Boric Acid Dilution Volume Determination IC SET: NA INSTRUCTIONS:

COMMENTS:

5/6/2016 Page 6 of 7

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

The plant is in MODE 3 preparing for reactor startup in accordance with GOP-3.

- Latest RCS boron sample was 2038 ppm.

- Estimated critical boron concentration is 1688 ppm.

- "A" Recycle Holdup Tank is in service.

- "A" Recycle Holdup Tank level is 83%.

INITIATING CUES:

The SM directs you to perform the following:

1. Determine the dilution volume required to establish the estimated critical boron concentration.
2. Determine if the necessary volume is available in 'A' Recycle Holdup Tank to accommodate the dilution. Assume that RCS temperature and Pressurizer Level remain constant. Show evidence to support your determination.

Show all work on the JPM A1-a Dilution Calculation hand out provided.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/6/2016 Page 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-050-(R)N16 2016 NRC A1-b (RO only): Verify Operability of Offsite Power Sources CANDIDATE:

EXAMINER:

5/18/2016 Page 1 of 8

TASK: 062-004-01-01 MONITOR THE AC ELECTRICAL DISTRIBUTION SYSTEM TASK STANDARD:

The applicant determines that the 230 KV source is NOT OPERABLE.

TERMINATING CUE: Candidate determines that the 230 KV source is below the low voltage limit or the JPM is returned to the examiner.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD SIMULATOR PERFORM

REFERENCES:

SOP-304 115KV/7.2KV OPERATIONS INDEX NO. K/A NO. RO SRO 1940012132 2.1.32 Ability to explain and apply system limits and precautions. 3.8 4.0 TOOLS: Partially completed hard copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST If performed as a table-top JPM, photgraphs of the Control Board with the required electrical alignments and voltages for the initial conditions.

EVALUATION TIME 15 TIME CRITICAL No 10CFR55: 45b(1)(12)

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/18/2016 Page 2 of 8

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: NONE.

INITIAL CONDITION:

The plant is Mode 3 after an outage.

BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.

System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.

The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.

INITIATING CUES:

You have been directed to perform the following:

1) Using the partially completed copy of STP-125.001 that is provided to you:

- Complete STP-125.001, Attachment I, page 1 of 2.

- Complete STP-125.001, Attachment II, page 2 of 3.

2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/18/2016 Page 3 of 8

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Completes STP-125.001 Attachment I, page 1 of 2.

STEP STANDARD:

Records the following information obtained from the Main Control Board:

- ESF XFMR FEED KV (115 KV) as read on the Main Control Board.

- Section II Breaker positions BUS 1DA NORM FEED > OPEN BUS 1DB ALT FEED > OPEN ESF XFMR 4 FEED CKT SW 1826 (XES 4) > CLOSED ESF XFMR 5 FEED CKT SW 1838 (XES 5) > CLOSED CUES:

Evaluator Notes:

Steps can be performed in any order.

Only Section II is required for this breaker configuration.

If this is performed as a tabletop, the candidate will verify the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.

COMMENTS:

5/18/2016 Page 4 of 8

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Completes STP-125.001 Attachment II, page 2 of 3.

STEP STANDARD:

Records the following information obtained from the Main Control Board:

- INCOMING 230 KV BUS (230 KV voltage)

- EMERG AUX XFMR FEED XCB 8892 > CLOSED

- Section I Breaker positions BUS 1DB NORM FEED > CLOSED BUS 1DA ALT FEED > CLOSED CUES:

Evaluator Notes:

Steps can be performed in any order.

Only Section I is required for this breaker configuration. The critical aspect of this step is the identification of the correct 230 KV voltage. If the candidate records breaker indications improperly and determines the correct voltage limit later, this is a non-critical error if the follow-on questions indicate that it was a simple recording error and that the candidate was aware of the current electric plant lineup.

If this is performed as a tabletop, the candidate will verify voltage and the electrical alignment for 1DA and 1DB using the photograph of the Main Control Board which is provided.

COMMENTS:

5/18/2016 Page 5 of 8

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 3 Determines the voltage limits for the offsite power sources.

STEP STANDARD:

Refers to STP-125.001, Enclosure A. Refers to the 230 KV Source section, XTF-31, connected buses 1DA and 1DB, Generator Off Line. Determines a low voltage limit for the 230KV source of 225.7 KV.

CUES:

Evaluator Notes:

The candidate may refer to SOP-304, 115KV/7.2KV OPERATIONS. The voltage limits in that procedure are the same as in STP-125.001.

The limit is located on the far right column on the second row under the 230 KV Source section.

There is no applicable limit for 115 KV voltage on Enclosure A since neither 1DA or 1DB are supplied by that source.

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 4 Compares the reading on INCOMING 230 KV BUS to the allowed limit from Attachment 1 and determines that actual voltage is below the limit.

STEP STANDARD:

Reports that the actual voltage read on INCOMING 230 KV BUS is less than the lower limt contained in STP-125.001.

CUES:

COMMENTS:

Examiner ends JPM at this point.

5/18/2016 Page 6 of 8

JPM SETUP SHEET JPM: JPA-050-(R 2016 NRC A1-b (RO only): Verify Operability of Offsite Power Sources IC SET: IC-5 INSTRUCTIONS:

Use IC-290 for 2016 NRC exam. If not available, bring up a IC that is mode 3, TAVG 557°F and perform the following:

Align IDA to breaker BUS 1DA ALT FEED using the BUS 1DA XFER INIT Switch (refer to SOP-304).

Adjust 230KV voltage until digital meter on XCP-6118 reads 225.4 KV.

Provide a partially completed copy of STP-125.001 that is marked-up as follows:

An entry is made for each component position on Attachment I, page 2 of 2 which is the same as the NORMAL POSITION".

An entry is made for each component position on Attachment II, page 1 of 3 which is the same as the NORMAL POSITION".

COMMENTS:

NOTE: This alignment can be photographed if the JPM will be run as a table top. After the setup, photgraph panels XCP-6117 and XCP-6118 showing breaker alignments and 115KV and 230KV voltages on digital meters 5/18/2016 Page 7 of 8

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: NONE.

INITIAL CONDITION:

The plant is Mode 3 after an outage.

BUS 1DA NORM FEED is racked down while a visual inspection requested by engineering is completed.

System Control reports that grid voltage transients may occur due to thunderstorms in other part of the state.

The Shift Manager has directed the crew to perform a verification that any requirement for Offsite Power source voltage is met in accordance with STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST.

INITIATING CUES:

You have been directed to perform the following:

1) Using the partially completed copy of STP-125.001 that is provided to you:

- Complete STP-125.001, Attachment I, page 1 of 2.

- Complete STP-125.001, Attachment II, page 2 of 3.

2) Report any voltage that does not meet the limits contained in STP-125.001 for the current system status, if any.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/18/2016 Page 8 of 8

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-051-(S)N16 2016 NRC A1-b (SRO only): Verify Operability of Offsite Power Sources CANDIDATE:

EXAMINER:

5/18/2016 Page 1 of 7

TASK: 341-032-03-02 EVALUATE PLANT SYSTEMS PERFORMANCE AND COORDINATE APPROPRIATE ACTIONS PER TECHNICAL SPECIFICATIONS IN THE EVENT AN LIMITING CONDITION FOR OPERATION IS ENTERED/NOT SATISFIED.

TASK STANDARD:

The applicant determines that both OFFSITE power sources are NOT OPERABLE and that T.S.

Action Statement 3.8.1.1.d is in effect.

TERMINATING CUE: The applicant returns the JPM briefing sheet and completed handout to the examiner.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM PERFORM

REFERENCES:

SOP-304 115KV/7.2KV OPERATIONS INDEX NO. K/A NO. RO SRO 1940012132 2.1.32 Ability to explain and apply system limits and precautions. 3.8 4.0 1940012240 2.2.40 Ability to apply technical specifications for a system. 3.4 4.7 TOOLS: Partially completed copy STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST.

Handout for recording Technical Specification.

Hardcopy or electronic V.C. Summer procedures.

EVALUATION TIME 15 TIME CRITICAL No 10CFR55: 45b(1)(12)

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/18/2016 Page 2 of 7

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: NONE.

INITIAL CONDITION:

The plant is mode 3 after an outage.

Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.

All Balance of Plant bus breakers are normally aligned.

STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.

INITIATING CUES:

You are directed to perform the following:

- Review the partially completed copy of STP-125.001 Attachments I and II.

- Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.

- Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.

- ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/18/2016 Page 3 of 7

CRITICAL: No SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Reviews copy of STP-125.001.

STEP STANDARD:

N/A CUES:

Note to Examiner: The candidate should have been provided with the partially completed copy of STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST and JPM Handout as part of the initial briefing.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Identifies that the 115 KV Offsite power source is NOT OPERABLE.

STEP STANDARD:

Checks the box for the second statement on Attachment I, page 2 of 2.

CUES:

Note to Examiner: This determination is made by noting that both BUS 1DA NORM FEED and BUS 1DB NORM FEED are open on Attachment I, page 1 of 2. This alignment fails to tie the 115 KV offsite power source to either 1DA or 1DB rendering that source inoperable.

If the candidate does not demonstrate this review, this can be probed by follow-on questions.

COMMENTS:

5/18/2016 Page 4 of 7

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 3 Determines that the 230 KV offsite power source is NOT OPERABLE.

STEP STANDARD:

Checks the box for the second statement on STP-125.001, Attachment II, page 3 of 3.

CUES:

Examiner note: This determination is made by comparing the voltage recorded on Attachment II, page 2 of 3, and the lower voltage limit of 225.7 KV. This is contained in Enclosure A, on the second row of the 230 KV section, far right column. Since actual voltage is less than the limit, this renders the 230 KV offsite power source inoperable.

If the candidate does not demonstrate this review, this can be probed by follow-on questioning.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Candidate determines the applicable Technical Specification action statement.

STEP STANDARD:

The candidate, on the handout provided, checks the YES line and indicates that T.S. Action Statement 3.8.1.1.d. must be entered.

CUES:

The JPM can be terminated after the handout is completed or when the candidate returns the briefing sheet.

COMMENTS:

Examiner ends JPM at this point.

5/18/2016 Page 5 of 7

JPM SETUP SHEET JPM: JPA-051-(S 2016 NRC A1-b (SRO only): Verify Operability of Offsite Power Sources IC SET:

INSTRUCTIONS:

Provide a partially completed copy of STP-125.001, ELECTRICAL SYSTEMS WEEKLY TEST with the following items performed.

Complete Attachment I with ACTUAL VOLTS indicated as 115.0 KV,Section I lined through, OPEN indicated in Section II for both BUS 1DA NORM FEED and BUS 1DB ALT FEED. and ALL other items indicated the same as NORMAL POSITION.

Complete Attachment II with ACTUAL VOLTS indicated as 225.1 KV,Section II lined through, and ALL other items indicated the same as NORMAL POSITION.

Also provide a Handout sheet that contains the following text:

Name:

Date:

Technical Specification Action Statement for OFFSITE power sources in effect?

(Circle ONE) YES NO If YES, record the Technical Specification Action Statement that must be entered for the current condition and that will require taking the plant to a lower mode the soonest.

COMMENTS:

5/18/2016 Page 6 of 7

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: NONE.

INITIAL CONDITION:

The plant is mode 3 after an outage.

Bus 1DA is being powered from breaker BUS 1DA ALT FEED to allow a visual inspection of BUS 1DA NORM FEED as requested by engineering.

All Balance of Plant bus breakers are normally aligned.

STP-125.001, ELECTRIC POWER SYSTEMS WEEKLY TEST is in progress.

INITIATING CUES:

You are directed to perform the following:

- Review the partially completed copy of STP-125.001 Attachments I and II.

- Check the box for the ONE applicable statement on STP-125.001, Attachment I, page 2 of 2.

- Check the box for the ONE applicable statement on STP-125.001, Attachment II, page 3 of 3.

- ON THE HANDOUT PROVIDED TO YOU, record your anwer(s) to the required information regarding Offsite Power Source OPERABILITY.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/18/2016 Page 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-81D-(R)N16 2016 NRC A2 (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available CANDIDATE:

EXAMINER:

5/18/2016 Page 1 of 10

TASK: 002-002-02-01 PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002 TASK STANDARD:

Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.

TERMINATING CUE: The candidate has completed STP-114.002, ATTACHMENT I.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM PERFORM

REFERENCES:

STP-114.002 OPERATIONAL LEAK TEST INDEX NO. K/A NO. RO SRO 1940012132 2.1.32 Ability to explain and apply system limits and precautions. 3.8 4.0 1940012240 2.2.40 Ability to apply technical specifications for a system. 3.4 4.7 TOOLS: Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION VCS STATION CURVE BOOK EVALUATION TIME 30 TIME CRITICAL NO 10CFR55: 45b(1)(12)

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/18/2016 Page 2 of 10

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.

INITIATING CUES:

You are directed to perform the following:

USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b.

Another operator will complete STEP 6.4.c when required.

- No RCS makeup or diversion to the recycle holdup tanks will occur.

- No Chemical additions or primary samples will be performed.

- RCS pressure will be maintained between 350 psig and 400 psig.

- Primary to secondary leakage is 0 gpm.

- There is no recorded leakage to atmosphere in the RB.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/18/2016 Page 3 of 10

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Inputs data into TEST DATA SHEET.

STEP STANDARD:

Student inputs data, initial and final.

CUES:

Note to examiner: The candidate should have the JPM Briefing Sheet, Handouts #1 and #2 and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Calculates change in test data.

STEP STANDARD:

Student subtracts initial data from final to determine changes in parameters:

TAVG + 0.8°F PZR LEVEL - 0.5%

VCT LEVEL - 2.6%

PRT LEVEL 0%

RCDT LEVEL 0% (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE)

CUES:

COMMENTS:

5/18/2016 Page 4 of 10

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 3 Perform one of the following:

1) If RCDT level is less than 60%, open the following:

a) PVD-7170, RCDT PP TO WPS (IRB).

b) PVD-7136, RCDT TO WPS.

STEP STANDARD:

N/A CUES:

If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 4 Determine the RCS inventory deviation due to Pressurizer level change.

STEP STANDARD:

Change/deviation calculated accurately with correct polarity as shown on answer key.

CUES:

COMMENTS:

5/18/2016 Page 5 of 10

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 5 Determine the RCS inventory deviation due to VCT level change.

STEP STANDARD:

Change/deviation calculated accurately as shown on answer key.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 6 Determine the RCS inventory change due to change in TAVG.

STEP STANDARD:

Change/deviation calculated accurately with correct polarity as shown on answer key.

CUES:

COMMENTS:

5/18/2016 Page 6 of 10

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 7 Determine the RCS inventory deviation due to PRT level change.

STEP STANDARD:

Recorded as zero.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 8 Determine the RCS inventory deviation due to RCDT level change.

STEP STANDARD:

Change/deviation calculated accurately as shown on answer key.

CUES:

NOTE TO EXAMINER: The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.

COMMENTS:

5/18/2016 Page 7 of 10

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Perform calculations as indicated on Attachment 1, Part 2.

STEP STANDARD:

Final leak rate is 1.8 +/- 0.1 GPM (1.7 TO 1.9)

CUES:

COMMENTS:

Examiner ends JPM at this point.

5/18/2016 Page 8 of 10

JPM SETUP SHEET JPM: JPA-81D-(R2016 NRC A2 (RO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available IC SET:

INSTRUCTIONS:

Ensure that current procedures and curve book are available in hard copy or electronically.

Provide Handout 1 - STP-125.001, Attachment I Provide Handout 2 - sheet containing the following:

Name: ______________________________________

Date: _______________________________________

INITIAL DATA Start time 0400:

T0499A, RCL MEDIAN TAVG = 320.8°F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%

L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%

L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%

L1028, REACTOR COOL DR TNK LEV = 59%

FINAL DATA Stop time 0500:

T0499A, RCL MEDIAN TAVG = 321.6°F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%

L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%

L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%

L1028, REACTOR COOL DR TNK LEV = 58%

COMMENTS:

5/18/2016 Page 9 of 10

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.

INITIATING CUES:

You are directed to perform the following:

USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b.

Another operator will complete STEP 6.4.c when required.

- No RCS makeup or diversion to the recycle holdup tanks will occur.

- No Chemical additions or primary samples will be performed.

- RCS pressure will be maintained between 350 psig and 400 psig.

- Primary to secondary leakage is 0 gpm.

- There is no recorded leakage to atmosphere in the RB.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/18/2016 Page 10 of 10

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-81D-(S)N16 2016 NRC A2 (SRO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available CANDIDATE:

EXAMINER:

SRO ONLY 5/18/2016 Page 1 of 10

TASK: 002-002-02-01 PERFORM AN RCS LEAKRATE CALCULATION WITH THE IPCS UNAVAILABLE IAW STP-114.002 TASK STANDARD:

Candidate correctly calculates the leak rate to within the specified tolarance contained in the answer key.

TERMINATING CUE: The candidate has completed STP-114.002, ATTACHMENT I, recorded information on the handout provided and returned the cue sheet to the examiner.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM PERFORM

REFERENCES:

STP-114.002 OPERATIONAL LEAK TEST INDEX NO. K/A NO. RO SRO 1940012132 2.1.32 Ability to explain and apply system limits and precautions. 3.8 4.0 1940012240 2.2.40 Ability to apply technical specifications for a system. 3.4 4.7 TOOLS: Calculator Complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION VCS STATION CURVE BOOK EVALUATION TIME 30 TIME CRITICAL NO 10CFR55: 41b10 TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/18/2016 Page 2 of 10

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.

INITIATING CUES:

You are directed to perform the following:

1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.
2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.

PLANT CONDITIONS ARE AS FOLLOWS:

- No RCS makeup or diversion to the recycle holdup tanks will occur.

- No Chemical additions or primary samples will be performed.

- RCS pressure will be maintained between 350 psig and 400 psig.

- Primary to secondary leakage is 0 gpm.

- There is no recorded leakage to atmosphere in the RB.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/18/2016 Page 3 of 10

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Inputs data into TEST DATA SHEET.

STEP STANDARD:

Student inputs data, initial and final.

CUES:

Note to Examiner: The candidate should have the JPM briefing sheet, Handouts 1 and 2, and a complete copy of STP-114.002, OPERATIONAL LEAKAGE CALCULATION.

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 2 Calculates change in test data.

STEP STANDARD:

Student subtracts initial data from final to determine changes in parameters:

TAVG + 0.8°F PZR LEVEL - 0.5%

VCT LEVEL - 2.6%

PRT LEVEL 0%

RCDT LEVEL 0% (NEGATIVE CHANGE RECORDED AS 0 PER PROCEDURE)

CUES:

COMMENTS:

5/18/2016 Page 4 of 10

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 3 Perform one of the following:

1) If RCDT level is less than 60%, open the following:

a) PVD-7170, RCDT PP TO WPS (IRB).

b) PVD-7136, RCDT TO WPS.

STEP STANDARD:

N/A CUES:

If operation of valves is requested, acknowledge and respond that another operator will perform step 6.4.c of STP-114.

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 4 Determine the RCS inventory deviation due to Pressurizer level change.

STEP STANDARD:

Change/deviation calculated accurately with correct polarity as shown on answer key.

CUES:

COMMENTS:

5/18/2016 Page 5 of 10

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 5 Determine the RCS inventory deviation due to VCT level change.

STEP STANDARD:

Change/deviation calculated accurately as shown on answer key.

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 6 Determine the RCS inventory change due to change in TAVG.

STEP STANDARD:

Change/deviation calculated accurately with correct polarity as shown on answer key.

CUES:

COMMENTS:

5/18/2016 Page 6 of 10

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 7 Determine the RCS inventory deviation due to PRT level change.

STEP STANDARD:

Recorded as zero.

CUES:

COMMENTS:

CRITICAL: No SEQUENCED: No SAT UNSAT JPM STEP: 8 Determine the RCS inventory deviation due to RCDT level change.

STEP STANDARD:

Change/deviation calculated accurately as shown on answer key.

CUES:

NOTE TO EXAMINER: The change is recorded as zero (0) in accordance with NOTE on page 11 of of STP-114.002.

COMMENTS:

5/18/2016 Page 7 of 10

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 9 Perform calculations as indicated on Attachment 1, Part 2.

STEP STANDARD:

Final leak rate is 1.8 +/- 0.1 GPM (1.7 TO 1.9)

CUES:

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 10 Determine the required actions in accordance with Technical Specifications.

STEP STANDARD:

Technical Specification 3.4.6.2, REACTOR COOLANT SYSTEM - OPERATION LEAKAGE is referenced. Candidate determines that the leakage must be reduced within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, and if not reduced, then the plant must be taken to COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. The candidate enters the requirements on the Handout provided.

CUES:

NOTE TO EXAMINER: If the candidate indicates only that the leakage must be reduced within four (4) hours, provide the following cue: "The leakage has not been found and cannot be reduced." The candidate must then determine that the plant must be taken to COLD SHUTDOWN within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

If the candidate conservatively states that the plant must be taken to COLD SHUTDOWN within 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> with NO allowance for reduction of leakage, this is a NOT a critical error but can be clarified with followup questions.

If the candidate indicates a time greater than 34 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> this is a CRITICAL ERROR and constitutes a FAILURE. A typical error is allowing an extra six (6) hours when the plant is already at or below HOT STANDBY.

COMMENTS:

Examiner ends JPM at this point.

5/18/2016 Page 8 of 10

JPM SETUP SHEET JPM: JPA-81D-(S2016 NRC A2 (SRO Only) Calculate Leakrate W/O IPCS Leak Rate Program Available IC SET:

INSTRUCTIONS:

Ensure that current procedures and curve book are available in hard copy or electronically.

Provide Handout 1 - STP-125.001, Attachment I Provide Handout 2 - sheet containing the following:

Name: ______________________________________

Date: _______________________________________

INITIAL DATA Start time 0400:

T0499A, RCL MEDIAN TAVG = 320.8°F L0480A, PRESSURIZER LEVEL-LT459 = 24.0%

L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 38.5%

L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%

L1028, REACTOR COOL DR TNK LEV = 59%

FINAL DATA Stop time 0500:

T0499A, RCL MEDIAN TAVG = 321.6°F L0480A, PRESSURIZER LEVEL-LT459 = 23.5%

L0112A, VOLUME CONTROL TANK LEVEL-LT-115 = 35.9%

L0485A, PRESSURIZER RELIEF TANK L-LT470 = 72.5%

L1028, REACTOR COOL DR TNK LEV = 58%

Perform the following to complete this form:

1.Insert the time at which STP-114.002, Attachment 1 calculation completed: ________________.

2.Is entry into a Technical Specification action statement required as a result of the STP-114.002 results?

(Circle one) YES NO 2.If YES, indicate the V.C. Summer Technical Specification action(s) required and the longest time that can be taken to comply with any applicable action.

COMMENTS:

5/18/2016 Page 9 of 10

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: NONE INITIAL CONDITION:

The plant is in Mode 4. The IPCS Leak Rate Program unavailable. IPCS can be used to obtain plant data.

INITIATING CUES:

You are directed to perform the following:

1) USING PLANT DATA ON THE HANDOUT PROVIDED, perform STP-114.002, OPERATIONAL LEAKAGE CALCULATION starting at STEP 6.4.b. Another operator will complete STEP 6.4.c when required.
2) USING THE HANDOUT PROVIDED, IF any Technical Specification Action Statement applies, record the MAXIMUM time allowed to complete the action.

PLANT CONDITIONS ARE AS FOLLOWS:

- No RCS makeup or diversion to the recycle holdup tanks will occur.

- No Chemical additions or primary samples will be performed.

- RCS pressure will be maintained between 350 psig and 400 psig.

- Primary to secondary leakage is 0 gpm.

- There is no recorded leakage to atmosphere in the RB.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/18/2016 Page 10 of 10

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-042-(C)-N16 2016 NRC A3 (Common): Evaluate Worker Exposure CANDIDATE:

EXAMINER:

5/6/2016 Page 1 of 7

TASK: 343-029-03-02 ASSESS EXPOSURE LIMITS OF PERSONNEL FOR ASSIGNED DUTIES TASK STANDARD:

DETERMINES THAT ONLY OPERATORS 2 AND 3 CAN BE ALLOWED TO PERFORM THE WORK DESCRIBED IN THE INITIAL CONDITIONS.

TERMINATING CUE: EXAMINEE HAS DETERMINED RETURNS THE CUE SHEET AND CALCULATION TO THE EXAMINER.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM PERFORM

REFERENCES:

VCS-HPP-153 ADMINISTRATIVE EXPOSURE LIMITS INDEX NO. K/A NO. RO SRO 1940012304 2.3.4 Knowledge of radiation exposure limits under normal or 3.2 3.7 emergency conditions.

TOOLS: CALCULATOR VCS-SAP-500, HEALTH PHYSICS MANUAL VCS-HPP-0153 ADMINISTRATIVE EXPOSURE LIMITS EVALUATION TIME 20 TIME CRITICAL NO 10CFR55:

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/6/2016 Page 2 of 7

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.

The work will take three and one half (3.5) hours to complete.

The following are doses and work histories for 3 operators that are qualified to perform the work.

Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.

She has worked at V.C. Summer for 10 years.

She received 20 mrem yesterday and this is her ONLY exposure for the current year.

Operator 2 is a male that was hired in March of this year.

He has received 480 mrem at V.C. Summer.

He DOES NOT have a completed NRC Form 4.

Operator 3 is a male that was hired in January of this year.

He has accumulated exposure of 780 mrem at V.C. Summer.

He has a completed NRC Form 4.

INITIATING CUES:

Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits.

Assume the following:

ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.

ALL dose received in transit is negligible.

ANY extensions that may have been previously granted were the minimum allowed by procedure.

SHOW ALL WORK.

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/6/2016 Page 3 of 7

CRITICAL: Yes SEQUENCED: No SAT UNSAT JPM STEP: 1 Determines initial administrative exposure limits for each operator.

STEP STANDARD:

Determines or applies the limits contained in VCS-HPP-153, ADMINISTRATIVE EXPOSURE LIMITS.

Operator 1: 500 mr per gestation period and 50 mr per calendar month.

Operator 2: 500 mr without a completed Form 4.

Operator 3: 1000 mr for first extension after Form 4 is complete.

CUES:

Note to Evaluator: These limits may be applied from memory as long as work is shown for the required calculation.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Determines current V.C. Summer exposure of each operator. (Given in initial conditions.)

STEP STANDARD:

Operator 1: 20 mr Operator 2: 480 mr Operator 3: 780 mr CUES:

Note to Evaluator: This information will be shown in the required calculation.

COMMENTS:

5/6/2016 Page 4 of 7

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 3 Determines expected exposure for the work to be performed.

STEP STANDARD:

10 mr x 3.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> = 35 mrem per worker CUES:

Note to Evaluator: This information will be shown in the required calculation. The applicant may incorrectly use 80 mrem/hr. This is the on-contact exposure rate. The initial cue directs that the applicant assume that the exposure rate at 1 foot from the valve be used.

COMMENTS:

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 4 Determines workers that can perform the work.

STEP STANDARD:

Operator 1: 50 mrem monthly limit - 20 VCS exposure this month = 30 mrem to reach limit.

Operator 2: 500 mrem limit - 480 mrem VCS exposure = 20 mrem to reach limit.

Operator 3: 1000 mrem limit - 780 mrem VCS = 220 mrem to reach limit.

Identifies that only Operators 3 has the available exposure to work the required time.

CUES:

Evaluator Note: All work for the required calculation will be shown in the Handout provided to support this conclusion.

COMMENTS:

Examiner ends JPM at this point.

5/6/2016 Page 5 of 7

JPM SETUP SHEET JPM: JPA-042-(C 2016 NRC A3 (Common): Evaluate Worker Exposure IC SET:

INSTRUCTIONS:

Provide candidate with Handout 1 (Calculation worksheet) and Handout 2 (Survey map)

Grade per JPM.

COMMENTS:

5/6/2016 Page 6 of 7

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS:

INITIAL CONDITION:

Work is to be done in the vicinity of the Spent Fuel Pit Purification Pump.

The work will take three and one half (3.5) hours to complete.

The following are doses and work histories for 3 operators that are qualified to perform the work.

Operator 1 is a female who formally declared a pregnancy and will deliver in August of this year.

She has worked at V.C. Summer for 10 years.

She received 20 mrem yesterday and this is her ONLY exposure for the current year.

Operator 2 is a male that was hired in March of this year.

He has received 480 mrem at V.C. Summer.

He DOES NOT have a completed NRC Form 4.

Operator 3 is a male that was hired in January of this year.

He has accumulated exposure of 780 mrem at V.C. Summer.

He has a completed NRC Form 4.

INITIATING CUES:

Calculate and report which of the 3 operators, if any, can be used to complete the work WITHOUT an additional approval for an increase in administrative exposure limits.

Assume the following:

ALL work will be done at 1 Foot (30 centimeters) from the indicated position on the Survey Map.

ALL dose received in transit is negligible.

ANY extensions that may have been previously granted were the minimum allowed by procedure.

SHOW ALL WORK.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/6/2016 Page 7 of 7

V.C. SUMMER NUCLEAR STATION JOB PERFORMANCE MEASURE JPM NO: JPA-1007(S)N16 2016 NRC A4 (SRO only): Classify Emergency (ENF)

CANDIDATE:

EXAMINER:

SRO ONLY TIME CRITICAL JPM 5/31/2016 Page 1 of 8

TASK: 344-019-03-02 CLASSIFY EMERGENCY EVENTS REQUIRING EMERGENCY PLAN IMPLEMENTATION TASK STANDARD:

Emergency Classification as a GENERAL EMERGENCY condition based on Loss of any two barriers AND Loss or Potential Loss of third barrier (FG1.1). This is a time critical JPM and the declaration must be made within 15 minutes after the emergency condition exists. Successful completion of EPP-002, (including PARs) Communication and Notification, Attachment I, Nuclear Power Plant Notification Form, must be made within 15 minutes after the emergency declaration.

TERMINATING CUE: Successful completion of the EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form.

PREFERRED EVALUATION LOCATION PREFERRED EVALUATION METHOD CLASSROOM SIMULATE

REFERENCES:

EPP-108 EMERGENCY ACTION LEVEL TECHNICAL BASIS DOCUMENT EPP-001.04 GENERAL EMERGENCY EPP-002 COMMUNICATION AND NOTIFICATION EPP-001 ACTIVATION AND IMPLEMENTATION OF THE EMERGENCY PLAN INDEX NO. K/A NO. RO SRO 0000762429 2.4.29 Knowledge of the emergency plan. 3.1 4.4 0000762430 2.4.30 Knowledge of events related to system operation/status 2.7 4.1 that must be reported to internal organizations or external agencies, such as the State, the NRC, or the transmission system operator.

0000762440 2.4.40 Knowledge of the SRO's responsibilities in emergency 2.7 4.5 plan implementation.

0000762441 2.4.41 Knowledge of the emergency action level thresholds and 2.9 4.6 classifications.

0000762444 2.4.44 Knowledge of emergency plan protective action 2.4 4.4 recommendations.

TOOLS: EPP-002, Communication and Notification, Attachment I, Nuclear Power Plant Notification Form. (JPA-807A Handout 1)

EPP-001.4, Attachment II, Protective Action Recommendations (JPA-807A Handout 2 or available via desk top computer) 5/31/2016 Page 2 of 8

Stopwatch or other suitable timepiece EPP-001, Attachment 1 EAL Classification Matrix (available via desk top computer or as big board)

EVALUATION TIME 25 TIME CRITICAL YES 10CFR55: 45(a)(11)

TIME START: TIME FINISH: PERFORMANCE TIME:

PERFORMANCE RATING: SAT: UNSAT:

CANDIDATE:

EXAMINER:

SIGNATURE DATE 5/31/2016 Page 3 of 8

INSTRUCTIONS TO OPERATOR READ TO OPERATOR:

When I tell you to begin, you are to perform the actions as directed in the initiating cues.

I will describe the general conditions under which this task is to be performed and provide the necessary tools with which to perform this task.

Before starting, I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, this Job Performance Measure will be satisfied.

SAFETY CONSIDERATIONS: None INITIAL CONDITION:

30 MINUTES AGO:

A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.

Charging pumps and RHR pumps could NOT be started manually or automatically.

10 MINUTES AGO:

ALL Offsite Power was lost.

Buses 1DA and 1DB reenergized automatically from the EDGs.

Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based on the status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.

CURRENT CONDITIONS:

RCS pressure is 1150 psig Reactor Building pressure is 18 psig and rising.

Core Exit Thermocouple temperatures are 780°F and increasing.

NR RVLIS is 30% and decreasing..

SG Narrow Range Levels are stable at 45%, 43%, 47%.

Operators have depressurized steam generators to 50 psig.

RM-G7 /G18 read 450 R/hr.

ALL other radiation monitor readings are NORMAL.

The System Controller reports that 230 KV will be restored in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Electricians report that a Charging pump can be restored in approximately 30 minutes.

Met Data - Wind Direction is from 25 degrees Met Data - Wind Speed is 20 mph Met Data - Wind Stability is Class E INITIATING CUES:

1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.
2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.

ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.

THIS IS A TIME CRITICAL JPM!

HAND JPM BRIEFING SHEET TO OPERATOR AT THIS TIME!

5/31/2016 Page 4 of 8

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 1 Determine that conditions require classification as a GENERAL EMERGENCY.

STEP STANDARD:

Classifies event as a GENERAL EMERGENCY within 15 minutes based on:

EAL FG1.1 - Loss of any two barriers AND Loss or Potential Loss of third barrier (Table F-1).

T0 = Time at end of brief ______________

T1 = Time of classification ______________

Elapsed time (T1 - T0) ______________

CUES:

Evaluator Cue: A time can be provided to the candidate for Reactor trip that is the end of brief time (T0) minus 30 minutes for clarity. Normally this time would be obtained from IPCS screen.

Evaluator note: This JPM is intended to be run on one Examinee at a time. If multiple Examinees are evaluated at one time then provisions to segregate them must be made. This allows verbalization of the classification as necessary.

Evaluator note: The Examinee has 15 min from the end of the Plant Conditions brief (Time 0), to complete the event classification. Use the same clock or watch to record the time at the end of brief and the time of classification. Compute the difference between the two times as the elapsed time. This step is critical since proper classification must be made within 15 minutes.

Evaluator cue: Provide a copy of JPA-1007-N16 Handout 2 (EPP-001.4 Attachment II) once the Examinee has determined that the event is a General Emergency.

COMMENTS:

5/31/2016 Page 5 of 8

CRITICAL: Yes SEQUENCED: Yes SAT UNSAT JPM STEP: 2 Complete EPP-002, Attachment I, Nuclear Power Plant Emergency Notification Form and provide basis for classification.

STEP STANDARD:

Correctly completes EPP-002 Attachment 1 within 15 minutes of declaring event classification.

Classification Basis:

1. (FUEL CLAD LOSS) Core Cooling Red Path conditions met. Item 2.A
2. (RCS LOSS) EITHER RM-G7/ G18 > 100 R/hr - Item 3.A - OR -

Automatic ECCS actuation required by UNISOLABLE RCS leakage, Item 1.A.

3. (CONTAINMENT POTENTIAL LOSS) Core Cooling Red Path conditions met and restoration procedure not effective within 15 min. Item 2.A.

Referring to EPP-001.4, General Emergency, Attachment II, determines that evacuation of 2 mile radius and 5 miles downwind is required and that sheltering 5-10 mile downwind required.

Determines sectors for evacuation/shelter:

1. Evacuate EPZ zones A-0, E-1
2. Shelter zones D-1, D-2 and E-2 T1 = Time of classification ______________

T2 = Time Attachment II complete ______________

Elapsed time (T2 - T1) ______________

CUES:

Evaluator cue: Hand Examinee their copy of EPP-002 Attachment 1 (JPA-1001 Handout) with the classification time entered. Commence timing for completion of Attachment 1.

Evaluator cue: If asked provide 803-334-1234 as the confirmation phone number.

Evaluator cue: Examinee must explain basis for classification. Ask Examinee for basis if it is not offered. If the basis is not correct, this constitutes failure even if the classification was correct and within 15 minutes.

Evaluator note: Record elapsed time when Examinee hands you the EPP-002 Attachment as the Approved by time (line 17 on the EPP-002 Attachment 1). Must be within 15 minutes of time when their classification had been completed. Refer to JPA-1001 Key for critical items on EPP-002 Attachment 1.

COMMENTS:

Examiner ends JPM at this point.

5/31/2016 Page 6 of 8

JPM SETUP SHEET JPM: JPA-1007(S2016 NRC A4 (SRO only): Classify Emergency (ENF)

IC SET: NA INSTRUCTIONS:

The following items, as indicated on the JPA -1006 key are considered as "Critical Items":

- Class of Emergency

- Description of Emergency

- Wind Direction and Speed

- Whether Offsite Protective Measures are necessary

- Potentially affected population and areas

- Whether a release is taking place

- Time of Emergency Declaration

- Whether the event is a Drill or Actual Event COMMENTS:

5/31/2016 Page 7 of 8

JPM BRIEFING SHEET OPERATOR INSTRUCTIONS:

SAFETY CONSIDERATIONS: None INITIAL CONDITION:

30 MINUTES AGO:

A Reactor Trip AND Safety Injection occurred due to PZR Pressure Low.

Charging pumps and RHR pumps could NOT be started manually or automatically.

10 MINUTES AGO:

ALL Offsite Power was lost.

Buses 1DA and 1DB reenergized automatically from the EDGs.

Operators entered EOP-14.0 FR-C.1 RESPONSE TO INADEQUATE CORE COOLING based on the status of CRITICAL SAFETY FUNCTIONS, as reported by the STA.

CURRENT CONDITIONS:

RCS pressure is 1150 psig Reactor Building pressure is 18 psig and rising.

Core Exit Thermocouple temperatures are 780°F and increasing.

NR RVLIS is 30% and decreasing..

SG Narrow Range Levels are stable at 45%, 43%, 47%.

Operators have depressurized steam generators to 50 psig.

RM-G7 /G18 read 450 R/hr.

ALL other radiation monitor readings are NORMAL.

The System Controller reports that 230 KV will be restored in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

Electricians report that a Charging pump can be restored in approximately 30 minutes.

Met Data - Wind Direction is from 25 degrees Met Data - Wind Speed is 20 mph Met Data - Wind Stability is Class E INITIATING CUES:

1. Classify the event and indicate the basis for the classification in accordance with EPP-001, Activation and Implementation of the Emergency Plan. Do NOT use ED Judgment as the basis for your classification.
2. Complete thEPP-002, Communication and Notification, Attachent I, Nuclear Power Plant Notification Form.

ASSUME THAT THE NOTIFICATION YOU ARE MAKING IS THE INITIAL NOTIFICATION.

Hand this paper back to your Evaluator when you feel that you have satisfactorily completed the assigned task.

5/31/2016 Page 8 of 8