ML17263A754: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/16/1994
| issue date = 08/16/1994
| title = Forwards Rev 20 to QA Program for Operation, Addressing Comments Provided by NRC During 940803 Telcon W/Respect to LAR Associated W/Administrative Controls Section 6.0 of TS, Dtd 940513
| title = Forwards Rev 20 to QA Program for Operation, Addressing Comments Provided by NRC During 940803 Telcon W/Respect to LAR Associated W/Administrative Controls Section 6.0 of TS, Dtd 940513
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 17
| page count = 17
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:PR.IC3R.I EY1ACCELERATED RIDSPROCESSING)
{{#Wiki_filter:PR.IC3R.I             EY 1 ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9408190180 DOC.DATE:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
94/08/16NOTARIZED:
ACCESSION NBR:9408190180               DOC.DATE: 94/08/16      NOTARIZED: NO            DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Ro hester                      G  05000244 AUTH. NAME            AUTHOR AFFILIATION MECREDY,R.C.         Rochester Gas 6 Electric Corp.                                               P RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document             Control Desk)
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,RohesterG05000244AUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION DocumentControlBranch(Document ControlDesk)PDISTRIBUTION CODE:Q004DTITLE:QATopicalReport,NOTES:License ExpdateinCOPIESRECEIVED:LTR LENCLQSIZE:Change,Amendment, orCorrespondence (D'Iaccordance with10CFR2,2.'109(9/19/72)
.


==SUBJECT:==
==SUBJECT:==
ForwardsrevisedQualityAssurance ProgramforStationOperation.
Forwards revised Quality Assurance Program for Station Operation.                                                                               I DISTRIBUTION CODE: Q004D TITLE:  QA COPIES RECEIVED:LTR      L ENCL Topical Report, Change, Amendment, or Correspondence Q  SIZE:
I+cket/Utili 005000244RRECIPIENT IDCODE/NAME JOHNSON,A RPEB01INTERNAL:
(D
DRS/RGN1DRS/RGN3EXTERNAL:
                                                                                            +
DMB/OSSNRCPDRCOPIESLTTRENCL11111111221111RECIPIENT IDCODE/NAME DRS/RGN2DRS/RGN4OC/LFDCBRGN1FILEIHSCOPIESLTTRENCL111,1'11111TY'0CUNNOTETOALL"RIDS"RECIPIENTS:
cket/Utili 0
PLEASEHELPUSTOREDUCEWASTE!CONTACTTHE DOCUMENTCONTROLDESK,ROOMPl-37(EXT.S04-2083)TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSI'ORDOCUMENTS YOUDON"I'EED!
                                                                      'I NOTES:License Exp date in accordance with 10CFR2, 2.'109 (9/19/72)                .      05000244 R
TOTALNUMBEROFCOPIESREQUIRED:
RECIPIENT                COPIES            RECIPIENT          COPIES ID  CODE/NAME             LTTR ENCL        ID  CODE/NAME      LTTR ENCL JOHNSON,A                       1      1 T
LTTR13ENCL13
INTERNAL: DRS/RGN1                        1      1    DRS/RGN2              1      1 DRS/RGN3 RPEB 1
'II ROCHESTER GASANDELECTRICCORPORATION
1 1
~89EASTAVENUE,ROCHESTER, N.Y.ld6d9-0001 AREACODE716546-2700ROBERTCMECREDYVicePresident ClnnaNuclearProduction August16,1994U.S.NuclearRegulatory Commission DocumentControlDeskAttn:AllenR.JohnsonProjectDirectorate I-3Washington, D.C.20555
1 DRS/RGN4 OC/LFDCB 1,     1 1
Y' 01          2    2      RGN1    FILE          1      1 EXTERNAL: DMB/OSS                          1      1    IHS                    1      1 NRC PDR                        1      1 0
C U
N NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. S04-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                  13  ENCL    13
 
'I I
 
ROCHESTER GAS AND ELECTRIC CORPORATION ~   89 EAST AVENUE, ROCHESTER, N.Y. ld6d9-0001     AREA CODE 716 546-2700 ROBERTC MECREDY Vice President                              August 16, 1994 Clnna Nuclear Production U.S. Nuclear Regulatory Commission Document                Control Desk Attn:                   Allen R. Johnson Project Directorate I-3 Washington, D.C.                   20555


==Subject:==
==Subject:==
RevisedSubmittal ofQualityAssurance StationOperation Rochester Gas&ElectricCorporation R.E.GinnaNuclearPowerPlantDocketNo.50-244Programfor
Revised    Submittal    of Quality Assurance                  Program      for Station Operation Rochester Gas & Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244


==References:==
==References:==
: a. Letter from R.C. Mecredy, RG&E, to A.R. Johnson, NRC, 


a.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,
==Subject:==
        "Revised Submittal of Quality Assurance Program for Station Operation," dated May 16, 1994.
: b. Letter from R.C. Mecredy,                 RG&E,       to A.R. Johnson, NRC,  


==Subject:==
==Subject:==
"RevisedSubmittal ofQualityAssurance ProgramforStationOperation,"
        "Application              for    Amendment        to Facility, Operating                  License,          Upgrade          of Administrative      Controls      Section        6.0," dated  May    13, 1994.
datedMay16,1994.b.LetterfromR.C.Mecredy,RG&E,toA.R.Johnson,NRC,
                            "c Letter from A.R. Johnson, NRC, to R.C. Mecredy,
                              ~
RG&E,  


==Subject:==
==Subject:==
"Application forAmendment toFacility, Operating License,UpgradeofAdministrative ControlsSection6.0,"datedMay13,1994."c~LetterfromA.R.Johnson,NRC,toR.C.Mecredy,RG&E,
        "Review of Proposed Amendment to Technical Specification 6.5.1, 'Plant Operations Review  Committee        (PORC)        Function,'.E. Ginna Nuclear  Power      Plant            Request for Additional Information (TAC No. M83569)", dated November 12, 1992.
 
==Dear Mr. Johnson,==
 
In accordance with 10CFR50.54(a)(3), enclosed is revision 20 to the Quality Assurance (QA)'rogram for Station Operation.                                                  This revision 20 supersedes in its entirety, the proposed revision 20 as submitted on May 16, 1994 (Ref. a.). This submittal addresses all comments provided by the NRC during a conference call held with RG&E on August 3, 1994 with respect                                to the License Amendment Request (LAR) associated with the Administrative Controls Section 6.0 of the Technical Specifications (Ref. b). In addition, the NRC comments provided in Reference c. are also addressed within the enclosed revision 20 as requested during the August 3rd conference call.                                                                                                            1 I
9408190180 940816 PDR ADOCK 05000244
          -=-P-    -  -  -        WAR
 
P
\
Ij
 
While the previously proposed revision 20 to the QA Program is superseded by the enclosed document, only certain sections have changed. These changes are summarized below by QA Program Section number:
: a. Section 1  References to ANSI/ANS 3.1-1987 and ANSI/ANS 3.2-1988 are provided.
: b. Section 2  Additional details concerning the PORC and NSARB are provided. This includes providing specific requirements for the PORC consistent with Technical Specification 6.5.1 and addressing NSARB member qualifications and record keeping requirements.
: c. Section  6  A  description of a new  procedure change review process  is provided.
The  changes  to the QA Program are described in the attached Synopsis    of Changes (Attachment 1) and in the enclosed program revision. Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50, Appendix B criteria and does not reduce the scope of the quality assurance program. Changes made to revision 19 of the QA Program for Station Operation are denoted by a single revision bar in the left margin. is a copy of the enclosure with changes highlighted or struck out.
We  request that upon NRC approval, the QA Program changes should be considered effective immediately and implemented concurrent with the implementation of the technical specification changes being requested in Reference a.
Very truly  yours, Robert C. Mecre MDFE625 xc:  Mr. Allen R. Johnson (Mail Stop  14D1)
PWR  Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475  Allendale  Road King of Prussia,   PA  19406 Ginna Senior Resident Inspector


==Subject:==
ATTACHMENT 1 S  no  sis of  Chan es Section  1  ualit  Assurance Pro ram References  to  NRC  Regulatory Guide 1.33, Revision 2, Regulatory Positions 1, 3, and 5a only was added to support the License Amendment Request (LAR) related to reformatting the Administrative Controls Section of Technical Specifications. Regulatory Positions 3 and 5a with respect to ANSI N18.7-1976, Sections 4.3.2 and 4.3.4, are related to changes discussed below while Regulatory Position 1 relates to the LAR which proposes to use Revision 2 of Appendix A to Regulatory Guide 1.33 instead of Revision 0 (Technical Specification 6.8.1.a).
"ReviewofProposedAmendment toTechnical Specification 6.5.1,'PlantOperations ReviewCommittee (PORC)Function,'.E.
References to ANSI/ANS 3.1-1987, Section 4.7, and ANSI/ANS 3.2-1988, Sections 4.2 and 4.3, were also added to support changes discussed in Section 2 below. These standards were added since they contain PORC and NSARB requirements not provided in earlier ANSI N18.7  editions.
GinnaNuclearPowerPlant-RequestforAdditional Information (TACNo.M83569)",
This change requires NRC approval prior to being implemented.
datedNovember12,1992.
Section 2 Or anization The description of the review and audit organizational units shown in Figure 2-6 is expanded since these items are being relocated from Technical Specifications to the QA Program. A reference to ANSI/ANS 3.2-1988 Section 4.3 is now provided for the onsite review function (i.e., the Plant Operations Review Committee) and ANSI N18.7-1976, Sections 4.3.2 and 4.3.4, and ANSI/ANS 3.1-1987 Section 4.7 for the offsite review and audit function (i.e., the Nuclear Safety Audit and Review Board). ANSI N18.7-1976 is an NRC endorsed standard while ANSI/ANS 3.1-1987 and ANSI/ANS 3.2-1988 are not.
However,    these ANSI standards          provide equivalent or more conservative requirements than those currently listed in Technical Specifications (TS).
Section 2 now includes the requirements under which the PORC and NSARB  are composed and function. These requirements were relocated from the Technical Specifications.              Several requirements were modified in order to conform to the ANSI Standards or to create a more efficient review and audit organizational unit. These changes do not result in any reduction in the level of detail or safety currently included in the Technical, Specifications.                    Where differences do exist, justification          is  presented  below. These differences are marked with an        asterisk    (*) . Itemized  below  is each existing Technical      Specification    in  6.5.1  and  6.5.2  and  its relationship to the QA Program.          References to the QA Program paragraphs  refer  to the  end  of Section  2 of the Program document.
(Please note that these paragraph numbers are removed in Attachment 2.)
 
ATTACHMENT 1 S  no  sis of Chan es TS  6.5.1.1    The    essence of this current specification is included in the QA Program paragraph 2. Paragraphs 1. and 2.
were taken    directly from ANSI Standard N18.7-1976, Section 4' '
    *TS 6.5.1.2  RG&E submitted an LAR dated March 23, 1992 requesting that the titles of PORC personnel be replaced with
  ~
functional areas under PORC review. This would allow PORC member title changes as long as the functional areas are maintained. The NRC responded to this LAR in a letter dated November 12, 1992 requesting additional information regarding the number of PORC members. In moving the requirements to the QA Program, paragraph 3., the functional areas of the PORC are included. These functional areas have been chosen to agree with the current PORC functions as performed by the personnel whose titles are listed in the Technical Specifications.          The number of regular members is now listed in the QA Program, paragraph 4, as a minimum of 5 and maximum of 9 (8 functional areas plus chairman). This resolves the comment in NRC letter dated November 12, 1992.          The number of functional areas delineated in the QA Program is 8. The current Technical Specifications list the Titles of 12 individuals.                This difference is not a reduction in safety, because the functional areas necessary to perform adequate reviews by PORC are encompassed.
: 3. TS  6.5.1.3    This  requirement is included in the    QA Program, paragraph 4.
4 ~ TS  6.5.1.4    This  requirement  is included in the  QA  Program, paragraph 4.
: 5.  *TS  6.5.1.5    This  requirement  is included in the QA Program, paragraph  3. and 4.      The QA Program  states that the quorum size meets ANSI/ANS 3.2-1988, Section 4.3, which requires a quorum consisting of a chairman or a duly appointed alternate and a majority of the remaining members or their duly appointed alternates.        In addition, paragraph 4. of the QA Program  requires that the number of alternates will not exceed a minority of the number making up the quorum.                  This combination of requirements meets both the ANSI standard and the comment made by the NRC in a letter dated November 12, 1992 that    if  the number of members "is not a fixed number, then the quorum requirement of Section 6.5.1.5 should be revised to reflect the staff position that the quorum should be a majority of the regular members." Procedure A-205, will implement this QA Program requirement.
 
ATTACHMENT 1 S no  sis of Chan es
: 6. TS 6.5.1.6  This specification covers the PORC scope of review. The QA Program requires that the PORC scope of review meet ANSI/ANS 3.2-1988, Section 4.3.1. In citing this ANSI Standard, not all of the specific items in the, existing Specification are individually listed, however, the PORC scope of review is not reduced. Additional information is provided in items 7. through 15. below.
7 ~ *TS 6.5.1.6 a, b, d  The ANSI Standard requires that the PORC review all safety evaluations required under 10CFR50.59.
RG&E's safety evaluation process requires an assessment      or screening of all plant changes to determine their safety significance and the need to perform a written safety evaluation. 10CFR50.59 encompasses changes to the facility, changes to procedures, and tests and experiments. Therefore, in citing the ANSI Standard, PORC review of the subject areas specified in TS 6.5.1.6.a, b, and d are encompassed.
With respect to procedure changes, many procedure changes are editorial or inconsequential and have no safety significance.
Therefore, it is appropriate to employ a process whereby an independent technical review is performed of the proposed procedure change. A qualified and independent    reviewer, appointed by PORC or the    Plant Manager, will also  conduct  a review of the proposed procedure change      to  determine  its potential safety significance and the need for a PORC review.
The absence of such an independent review essentially forces PORC to conduct a review of all proposed procedure changes that have no significance, instead of the group of those changes that potentially may impact safety. All changes that receive a written safety evaluation under 10CFR50.59 are required to be reviewed by PORC. Others may not result in an impact on safety and a written safety evaluation, but are selected for PORC review by the independent and qualified reviewer. The remaining changes have no safety significance, are editorial or inconsequential and do not require PORC review. This process is described in the QA Program, Section 6.
 
ATTACHMENT 1 S  no  sis of  Chan es TS 6.5.1.6.c    This  requirement is included in the QA Program, paragraph  3  (Section 4.3.1 of ANSI/ANS 3.2-1988).
TS 6.5.1.6.e  This requirement is included in the QA Program, paragraph    3    (Section      4.3.1 of ANSI/ANS 3.2-1988).
Notification of the Senior Vice President, Production and Engineering, and the Chairman, NSARB is encompassed by paragraph 7 in the QA Program.
TS 6.5.1.6.f  This requirement is included in paragraph 1. of the QA Program.
TS 6.5.1.6.g  This requirement is included in paragraph 2. of the QA Program. Figure 2.6 of the QA Program also shows that PORC is overseen by    NSARB.
*TS  6.5.1.6.h    Independent review of the Plant Security    Plan is required  by 10 CFR 50.54(p)(3) and 10 CFR 73.55(g)(4)      and does not need to be separately identified in the QA Program consistent. with Generic Letter 93-07.
*TS 6.5.1.6.i  Independent review of the Radiation Emergency Plan is required by 10 CFR 50.54(t) and does not need to be separately identified in the QA Program consistent with Generic Letter 93-07.
*TS 6.5.1.6.j  This requirement is included in Section 6 of the QA Program under the scope of procedure changes.            The periodic review of implementing procedures is addressed within plant procedures. The process described under item 7 above would encompass this requirement.
TS 6.5.1.6.k  This requirement is included in the QA Program, paragraph  3  (Section 4.3.1 of ANSI/ANS 3.2-1988).
*TS 6.5.1.6.l  Periodic review of the Fire Protection Program and implementing procedures is required by the QA Program Table 18-1, Audit List. Reviews of fire protection procedure changes are performed in conjunction with the process of plant procedure change review as discussed under item 7 above. As defined by the Fire Protection Program, changes to the Program having safety significance require a written safety evaluation under 10CFR50.59 and would therefore receive PORC review consistent with ANSI/ANS 3.2-1988, Section 4.3.1.          The QA Program paragraph 6. and 7. require that safety evaluations to the Chairman, NSARB.                              be'orwarded
 
ATTACHMENT 1 S  no  sis of  Chan es 17 ~ TS  6.5.1.7  This  requirement is included in the        QA Program  in paragraph 6.
: 18. TS 6.5.1.8    This  requirement is included in the        QA Program  in paragraph  3  and 7.
: 19. TS  6.5.2.1  The functional areas required for NSARB review and audit are described in the QA Program, paragraph 8.
(ANSI/ANS 3.1-1987, Section 4.7).
: 20.  *TS 6.5.2.2  The requirements are included in the QA Program, paragraph 8., with the exception that the requirement for at least one qualified non-company affiliated technical consultant (TS 6.5.2.2.c) is not included. ANSI N18.7-1976, Section 4.3.2.1 requires no less than 5 persons with no more than a minority from the onsite operating organization and does not require a non-company                affiliated consultant.
ANSI/ANS 3.1-1987, Section 4.7 states that "if sufficient expertise is not available from within the owner organization, independent reviews shall be supplemented by use of outside consultants or other qualified organizations."                  Since the functional areas in which        the NSARB  must  be  competent  has not been reduced,    this  change  is not  a reduction    in  safety. The need  for    an  outside    consultant    is  a    previous    Standard Technical Specification requirement which has since been deleted as owner organizations have gained experience and expertise.
: 21.  *TS 6.5.2.3        A limit on          the number of alternates participating in NSARB activities is not specified in Section 4.3.2.1 of N18.7-1976. Since the functional areas in which NSARB must contain competence has not been reduced, and the ANSI Standard restricts the use of alternates to "legitimate absences of principles", this change is not a reduction in safety.
: 22. TS 6.5.2.4  The qualification requirements of NSARB members is included in the QA Program, paragraph 8. Qualifications of members meet ANSI/ANS 3.1-1987, Section 4.7 except as noted for the functional areas of nuclear power plant operations and nuclear engineering.            The QA Program requires 8 years experience for these functional areas, which is consistent with the existing Technical Specification 6.5.2.4.a. and 6.5.2.4.b. For all other functional areas, the QA Program is consistent with the existing Technical Specifications.
Therefore, there is no reduction in the level of detail or qualifications for NSARB members in the QA Program as compared to the existing Technical Specifications.
 
f ATTACHMENT 1 S  no  sis of  Chan es
: 23. TS  6.5.2.5      This requirement is included in the    QA  Program, paragraph  8    (N18.7-1976, Section    4.3.2.2.).
: 24. *TS  6.5.2.6  The QA    Program, paragraph 8., is consistent with the existing Technical Specifications with the exception that a non-company affiliated technical consultant is not required in the quorum. Requiring this would not be consistent with the change made as discussed under item 20 above, since a non-company affiliated technical consultant              is no longer a required member of NSARB. For the same reasons as in item 20, this change is not a reduction in the level of safety.
: 25. TS 6.5.2.7.a-h  These requirements and included in the QA Program paragraph 8. (N18.7-1976, Section 4.3.4).
: 26. *TS 6.5.2.7.i  The requirement for NSARB to review the PORC meeting minutes is not specified in the scope of review under ANSI N18.7-1976.        This requirement is also not contained in Improved  Technical      Specifications (i.e., NUREG-1431). Since the NSARB is required to review the same items related to nuclear safety as the PORC in ANSI N18.7-1976, elimination of this requirement is not a reduction in safety. The PORC does submit meeting minutes to the Senior Vice President Production and Engineering and the Chairman, NSARB for information as stated in the QA,Program, paragraph 7.
: 27. *TS 6.5.2.8  These Technical Specifications are discussed under synopsis of changes for Section 18 and are also covered in the QA Program paragraph 8.
: 28. TS 6.5.2.9  This requirement is included in the QA Program under responsibilities of Senior Vice President, Production &
Engineering.
: 29. TS 6.5.2.10  The record requirements of NSARB activities are included in the QA Program, paragraph 9.
: 30. TS  6.5.2.11 
                  ,  Section  6  of the QA Program requires procedures for  each department responsible        for an activity. Procedures governing NSARB activities currently exist.              This is also addressed in ANSI N18.7-1972, Section 4.2.1.
 
ATTACHMENT 1 S no  sis of Chan  es The    specific reference      to Section    6.0 of the Technical Specifications was also deleted and replaced with "Administrative Controls section" to support expected near-term technical specification changes which will renumber most sections.        This change provides equivalent reference to the location of Plant Manager    responsibilities    as  delineated  within Technical Specifications.
The above changes to section 2 require NRC approval prior to being implemented.
Another change to the organization reassigns records management and document control activities from the Technical Services Division to Quality Performance Department. (see Section 17)
Section  3 Desi n Control The  reference to review of plant modifications by the onsite and offsite review    groups as required by Technical Specifications 6.5.1.6 and 6.5.2.7 is deleted. The changes to Section 2 which inserted a reference to ANSI N18.7-1976 and ANSI/ANS 3.2-1988 adequately addresses the review of significant proposed plant changes as part of the review responsibility.      This requires NRC approval prior to implementation.
Section 5 Instructions Procedures and Drawin s References to Revision 2 of NRC Regulatory Guide 1.33, Appendix A was added to support the License Amendment Request (LAR) related to reformatting the Administrative Controls Section of Technical Specifications. This LAR proposes to use Revision 2 of Appendix A to Regulatory Guide 1.33 instead of Revision 0 (Technical Specification 6.8.1.a).        Revision 2 is a NRC staff endorsed document.      This change requires NRC approval prior to implementation.
Section 6 Document Control Requirements for the review and approval process and temporary change process for plant procedures have been clarified with reference to the guidelines of ANSI N18.7-1972, Sections 5.4 and 5.5. Review of plant procedures is performed as described under item 7 of Section 2 above. For temporary changes to procedures, the QA Program includes the same requirements as currently in Technical Specification 6.8.3. Since the designated independent and  qualified reviewer meets the equivalent qualifications of a PORC  member, that individual constitutes one of the "two members of plant management staff" referred to in TS 6.8.3.b.        The Shift Supervisor is the second member. Therefore, this change does not result in a reduction in safety. ANSI N18.7-1972 further states
 
ATTACHMENT 1 S  no  sis of Chan es that each procedure shall be reviewed and approved prior to    initial use and retains the provisions for further review of procedures having safety-significance for any unreviewed safety question. The implementation of these requirements        are  delineated in plant procedures.      This change requires        NRC  approval prior to implementation.
Document  Control responsibilities have been reassigned from the Technical  Services Division to the Ginna Nuclear Production Division.
Section  11 Test Control The  specific reference to Section 4.0 of the Technical Specifications was deleted to support expected near-term technical specification changes which will renumber most sections.          The removal of this specific reference is acceptable since the requirement for a Ginna Station surveillance test program "as required by Technical Specifications" provides sufficient guidance without reducing any commitment.
The requirement for the PORC to review test procedures, and for the Plant Manager to approve the test procedures was deleted consistent with the basis for changes to Section 6 as presented above and recognition that this section includes reviews of test procedure by responsible technical personnel.      Quality Performance review was deleted from this section as responsibility for the Nuclear it  is redundant to a Section 2 Assurance  sub-section.
Section  17  ualit  Assurance Records A reference to maintaining plant operating records as required in Section 6.10 of Technical Specifications is being deleted from both this section and Technical Specifications.
The  existing record retention commitment to ANSI N45.2.9 as listed in Section 1 (i.e., Regulatory Guide 1.88) provides equivalent requirements. A reference to ANSI N45.2.9 is inserted in this section for clarification of the Ginna Station record extent. In addition, 10 CFR 20, Sub-part L, and 10 CFR 50.71 require the retention of certain records related to the operation of the nuclear plant.
The records management responsibilities have been reassigned from the Technical Services Division to the Quality Performance Department.


==DearMr.Johnson,==
r ~
Inaccordance with10CFR50.54(a)(3),
ATTACHMENT 1 S  no  sis of Chan es Section  18  Audits This section relocates from Technical Specification Section 6.5.2.8, to QA Program Table 18.1, the specific listing of required audits, not clearly addressed elsewhere, and their frequency.
enclosedisrevision20totheQualityAssurance (QA)'rogram forStationOperation.
Audit requirements are necessary to satisfy 10 CFR 50, Appendix B, Criterion XVIII. The relocation of the audit requirements from the technical specifications does not result in a reduction in any commitment since changes to the QA Program are controlled by 10 CFR 50.54. All audit requirements currently contained in Section 6.5.2.8 of Technical Specifications are listed in Table 18.1 except for the following:
Thisrevision20supersedes initsentirety, theproposedrevision20assubmitted onMay16,1994(Ref.a.).Thissubmittal addresses allcommentsprovidedbytheNRCduringaconference callheldwithRG&EonAugust3,1994withrespecttotheLicenseAmendment Request(LAR)associated withtheAdministrative ControlsSection6.0oftheTechnical Specifications (Ref.b).Inaddition, theNRCcommentsprovidedinReference c.arealsoaddressed withintheenclosedrevision20asrequested duringtheAugust3rdconference call.1I9408190180 940816PDRADOCK05000244-=-P-------WAR
1 ~  TS 6.5.2.8.e      Audit of the Radiation Emergency Plan is required by 10 CFR 50.54(t). Consistent with Generic Letter 93-07, frequency and unique requirements are described in the Radiation Emergency Plan. Section 18 makes reference to this audit.
\PIj Whilethepreviously proposedrevision20totheQAProgramissuperseded bytheencloseddocument, onlycertainsectionshavechanged.Thesechangesaresummarized belowbyQAProgramSectionnumber:a.Section1-References toANSI/ANS3.1-1987andANSI/ANS3.2-1988areprovided.
2 ~  TS 6.5.2.8.f    Audit  of the Station Security Plan is required by  10  CFR  50.54(p) (3), 10 CFR 73.56 (g) (2) and 10 CFR 73.55(g)(4). Consistent with Generic Letter 93-07, frequency and unique audit requirements are described in the Security Plan. Section 18 makes reference to this audit.
b.Section2-Additional detailsconcerning thePORCandNSARBareprovided.
3 ~  TS 6.5.2.8.m  Audits of other facility operations considered appropriate by NSARB or the Senior Vice President, Production and Engineering is no longer specifically identified.           As shown on Figure 2-1, NSARB and Quality Performance reports to the Senior Vice President, Production and Engineering. Figure 2-6 also shows that Quality Performance reports to NSARB regarding audit activities.         Since a section of Quality Performance (i.e., Quality Assurance) performs all audits, there is sufficient authority to request, additional audits as deemed necessary. Also, ANSI N18.7-1976, Section 4.3.4, item (5) allows NSARB to review "any matter involving safe operation of the nuclear power plant".
Thisincludesproviding specificrequirements forthePORCconsistent withTechnical Specification 6.5.1andaddressing NSARBmemberqualifications andrecordkeepingrequirements.
These changes require NRC approval prior to implementation.
c.Section6-Adescription ofanewprocedure changereviewprocessisprovided.
ThechangestotheQAProgramaredescribed intheattachedSynopsisofChanges(Attachment 1)andintheenclosedprogramrevision.
Attachment 1alsoprovidesthebasisforconcluding thattherevisedprogramcontinues tosatisfythe10CFR50,AppendixBcriteriaanddoesnotreducethescopeofthequalityassurance program.Changesmadetorevision19oftheQAProgramforStationOperation aredenotedbyasinglerevisionbarintheleftmargin.Attachment 2isacopyoftheenclosure withchangeshighlighted orstruckout.WerequestthatuponNRCapproval, theQAProgramchangesshouldbeconsidered effective immediately andimplemented concurrent withtheimplementation ofthetechnical specification changesbeingrequested inReference a.Verytrulyyours,RobertC.MecreMDFE625xc:Mr.AllenR.Johnson(MailStop14D1)PWRProjectDirectorate I-3Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector ATTACHMENT 1SnosisofChanesSection1ualitAssurance ProramReferences toNRCRegulatory Guide1.33,Revision2,Regulatory Positions 1,3,and5aonlywasaddedtosupporttheLicenseAmendment Request(LAR)relatedtoreformatting theAdministrative ControlsSectionofTechnical Specifications.
Regulatory Positions 3and5awithrespecttoANSIN18.7-1976, Sections4.3.2and4.3.4,arerelatedtochangesdiscussed belowwhileRegulatory Position1relatestotheLARwhichproposestouseRevision2ofAppendixAtoRegulatory Guide1.33insteadofRevision0(Technical Specification 6.8.1.a).
References toANSI/ANS3.1-1987, Section4.7,andANSI/ANS3.2-1988,Sections4.2and4.3,werealsoaddedtosupportchangesdiscussed inSection2below.Thesestandards wereaddedsincetheycontainPORCandNSARBrequirements notprovidedinearlierANSIN18.7editions.
ThischangerequiresNRCapprovalpriortobeingimplemented.
Section2Oranization Thedescription ofthereviewandauditorganizational unitsshowninFigure2-6isexpandedsincetheseitemsarebeingrelocated fromTechnical Specifications totheQAProgram.Areference toANSI/ANS3.2-1988Section4.3isnowprovidedfortheonsitereviewfunction(i.e.,thePlantOperations ReviewCommittee) andANSIN18.7-1976, Sections4.3.2and4.3.4,andANSI/ANS3.1-1987Section4.7fortheoffsitereviewandauditfunction(i.e.,theNuclearSafetyAuditandReviewBoard).ANSIN18.7-1976 isanNRCendorsedstandardwhileANSI/ANS3.1-1987andANSI/ANS3.2-1988arenot.However,theseANSIstandards provideequivalent ormoreconservative requirements thanthosecurrently listedinTechnical Specifications (TS).Section2nowincludestherequirements underwhichthePORCandNSARBarecomposedandfunction.
Theserequirements wererelocated fromtheTechnical Specifications.
Severalrequirements weremodifiedinordertoconformtotheANSIStandards ortocreateamoreefficient reviewandauditorganizational unit.Thesechangesdonotresultinanyreduction inthelevelofdetailorsafetycurrently includedintheTechnical, Specifications.
Wheredifferences doexist,justification ispresented below.Thesedifferences aremarkedwithanasterisk(*).ItemizedbelowiseachexistingTechnical Specification in6.5.1and6.5.2anditsrelationship totheQAProgram.References totheQAProgramparagraphs refertotheendofSection2oftheProgramdocument.
(Pleasenotethattheseparagraph numbersareremovedinAttachment 2.)


ATTACHMENT 1SnosisofChanesTS6.5.1.1-Theessenceofthiscurrentspecification isincludedintheQAProgramparagraph 2.Paragraphs 1.and2.weretakendirectlyfromANSIStandardN18.7-1976, Section4''~*TS6.5.1.2-RG&Esubmitted anLARdatedMarch23,1992requesting thatthetitlesofPORCpersonnel bereplacedwithfunctional areasunderPORCreview.ThiswouldallowPORCmembertitlechangesaslongasthefunctional areasaremaintained.
1 ~}}
TheNRCresponded tothisLARinaletterdatedNovember12,1992requesting additional information regarding thenumberofPORCmembers.Inmovingtherequirements totheQAProgram,paragraph 3.,thefunctional areasofthePORCareincluded.
Thesefunctional areashavebeenchosentoagreewiththecurrentPORCfunctions asperformed bythepersonnel whosetitlesarelistedintheTechnical Specifications.
ThenumberofregularmembersisnowlistedintheQAProgram,paragraph 4,asaminimumof5andmaximumof9(8functional areaspluschairman).
ThisresolvesthecommentinNRCletterdatedNovember12,1992.Thenumberoffunctional areasdelineated intheQAProgramis8.ThecurrentTechnical Specifications listtheTitlesof12individuals.
Thisdifference isnotareduction insafety,becausethefunctional areasnecessary toperformadequatereviewsbyPORCareencompassed.
3.4~5.TS6.5.1.3-Thisrequirement isincludedintheQAProgram,paragraph 4.TS6.5.1.4-Thisrequirement isincludedintheQAProgram,paragraph 4.*TS6.5.1.5-Thisrequirement isincludedintheQAProgram,paragraph 3.and4.TheQAProgramstatesthatthequorumsizemeetsANSI/ANS3.2-1988, Section4.3,whichrequiresaquorumconsisting ofachairmanoradulyappointed alternate andamajorityoftheremaining membersortheirdulyappointed alternates.
Inaddition, paragraph 4.oftheQAProgramrequiresthatthenumberofalternates willnotexceedaminorityofthenumbermakingupthequorum.Thiscombination ofrequirements meetsboththeANSIstandardandthecommentmadebytheNRCinaletterdatedNovember12,1992thatifthenumberofmembers"isnotafixednumber,thenthequorumrequirement ofSection6.5.1.5shouldberevisedtoreflectthestaffpositionthatthequorumshouldbeamajorityoftheregularmembers."
Procedure A-205,willimplement thisQAProgramrequirement.
ATTACHMENT 1SnosisofChanes6.TS6.5.1.6-Thisspecification coversthePORCscopeofreview.TheQAProgramrequiresthatthePORCscopeofreviewmeetANSI/ANS3.2-1988, Section4.3.1.IncitingthisANSIStandard, notallofthespecificitemsinthe,existingSpecification areindividually listed,however,thePORCscopeofreviewisnotreduced.Additional information isprovidedinitems7.through15.below.7~*TS6.5.1.6a,b,d-TheANSIStandardrequiresthatthePORCreviewallsafetyevaluations requiredunder10CFR50.59.
RG&E'ssafetyevaluation processrequiresanassessment orscreening ofallplantchangestodetermine theirsafetysignificance andtheneedtoperformawrittensafetyevaluation.
10CFR50.59 encompasses changestothefacility, changestoprocedures, andtestsandexperiments.
Therefore, incitingtheANSIStandard, PORCreviewofthesubjectareasspecified inTS6.5.1.6.a, b,anddareencompassed.
Withrespecttoprocedure changes,manyprocedure changesareeditorial orinconsequential andhavenosafetysignificance.
Therefore, itisappropriate toemployaprocesswherebyanindependent technical reviewisperformed oftheproposedprocedure change.Aqualified andindependent
: reviewer, appointed byPORCorthePlantManager,willalsoconductareviewoftheproposedprocedure changetodetermine itspotential safetysignificance andtheneedforaPORCreview.Theabsenceofsuchanindependent reviewessentially forcesPORCtoconductareviewofallproposedprocedure changesthathavenosignificance, insteadofthegroupofthosechangesthatpotentially mayimpactsafety.Allchangesthatreceiveawrittensafetyevaluation under10CFR50.59 arerequiredtobereviewedbyPORC.Othersmaynotresultinanimpactonsafetyandawrittensafetyevaluation, butareselectedforPORCreviewbytheindependent andqualified reviewer.
Theremaining changeshavenosafetysignificance, areeditorial orinconsequential anddonotrequirePORCreview.Thisprocessisdescribed intheQAProgram,Section6.
ATTACHMENT 1SnosisofChanesTS6.5.1.6.c
-Thisrequirement isincludedintheQAProgram,paragraph 3(Section4.3.1ofANSI/ANS3.2-1988).
TS6.5.1.6.e
-Thisrequirement isparagraph 3(Section4.3.1Notification oftheSeniorViceEngineering, andtheChairman, paragraph 7intheQAProgram.includedintheQAProgram,ofANSI/ANS3.2-1988).
President, Production andNSARBisencompassed byTS6.5.1.6.f
-Thisrequirement isincludedinparagraph 1.oftheQAProgram.TS6.5.1.6.g
-Thisrequirement isincludedinparagraph 2.oftheQAProgram.Figure2.6oftheQAProgramalsoshowsthatPORCisoverseenbyNSARB.*TS6.5.1.6.h
-Independent reviewofthePlantSecurityPlanisrequiredby10CFR50.54(p)(3) and10CFR73.55(g)(4) anddoesnotneedtobeseparately identified intheQAProgramconsistent.
withGenericLetter93-07.*TS6.5.1.6.i
-Independent reviewoftheRadiation Emergency Planisrequiredby10CFR50.54(t)anddoesnotneedtobeseparately identified intheQAProgramconsistent withGenericLetter93-07.*TS6.5.1.6.j
-Thisrequirement isincludedinSection6oftheQAProgramunderthescopeofprocedure changes.Theperiodicreviewofimplementing procedures isaddressed withinplantprocedures.
Theprocessdescribed underitem7abovewouldencompass thisrequirement.
TS6.5.1.6.k
-Thisrequirement isincludedintheQAProgram,paragraph 3(Section4.3.1ofANSI/ANS3.2-1988).
*TS6.5.1.6.l
-PeriodicreviewoftheFireProtection Programandimplementing procedures isrequiredbytheQAProgramTable18-1,AuditList.Reviewsoffireprotection procedure changesareperformed inconjunction withtheprocessofplantprocedure changereviewasdiscussed underitem7above.AsdefinedbytheFireProtection Program,changestotheProgramhavingsafetysignificance requireawrittensafetyevaluation under10CFR50.59 andwouldtherefore receivePORCreviewconsistent withANSI/ANS3.2-1988, Section4.3.1.TheQAProgramparagraph 6.and7.requirethatsafetyevaluations be'orwarded totheChairman, NSARB.
ATTACHMENT 1SnosisofChanes17~18.TS6.5.1.7-Thisrequirement isincludedintheQAPrograminparagraph 6.TS6.5.1.8-Thisrequirement isincludedintheQAPrograminparagraph 3and7.19.20.TS6.5.2.1-Thefunctional areasrequiredforNSARBreviewandauditaredescribed intheQAProgram,paragraph 8.(ANSI/ANS 3.1-1987, Section4.7).*TS6.5.2.2-Therequirements areincludedintheQAProgram,paragraph 8.,withtheexception thattherequirement foratleastonequalified non-company affiliated technical consultant (TS6.5.2.2.c) isnotincluded.
ANSIN18.7-1976, Section4.3.2.1requiresnolessthan5personswithnomorethanaminorityfromtheonsiteoperating organization anddoesnotrequireanon-company affiliated consultant.
ANSI/ANS3.1-1987, Section4.7statesthat"ifsufficient expertise isnotavailable fromwithintheownerorganization, independent reviewsshallbesupplemented byuseofoutsideconsultants orotherqualified organizations."
Sincethefunctional areasinwhichtheNSARBmustbecompetent hasnotbeenreduced,thischangeisnotareduction insafety.Theneedforanoutsideconsultant isapreviousStandardTechnical Specification requirement whichhassincebeendeletedasownerorganizations havegainedexperience andexpertise.
21.*TS6.5.2.3-Alimitonthenumberofalternates participating inNSARBactivities isnotspecified inSection4.3.2.1ofN18.7-1976.
Sincethefunctional areasinwhichNSARBmustcontaincompetence hasnotbeenreduced,andtheANSIStandardrestricts theuseofalternates to"legitimate absencesofprinciples",
thischangeisnotareduction insafety.22.TS6.5.2.4-Thequalification requirements ofNSARBmembersisincludedintheQAProgram,paragraph 8.Qualifications ofmembersmeetANSI/ANS3.1-1987, Section4.7exceptasnotedforthefunctional areasofnuclearpowerplantoperations andnuclearengineering.
TheQAProgramrequires8yearsexperience forthesefunctional areas,whichisconsistent withtheexistingTechnical Specification 6.5.2.4.a.
and6.5.2.4.b.
Forallotherfunctional areas,theQAProgramisconsistent withtheexistingTechnical Specifications.
Therefore, thereisnoreduction inthelevelofdetailorqualifications forNSARBmembersintheQAProgramascomparedtotheexistingTechnical Specifications.
f ATTACHMENT 1SnosisofChanes23.TS6.5.2.5-Thisrequirement isincludedintheQAProgram,paragraph 8(N18.7-1976, Section4.3.2.2.).
24.*TS6.5.2.6-TheQAProgram,paragraph 8.,isconsistent withtheexistingTechnical Specifications withtheexception thatanon-company affiliated technical consultant isnotrequiredinthequorum.Requiring thiswouldnotbeconsistent withthechangemadeasdiscussed underitem20above,sinceanon-companyaffiliated technical consultant isnolongerarequiredmemberofNSARB.Forthesamereasonsasinitem20,thischangeisnotareduction inthelevelofsafety.25.TS6.5.2.7.a-h
-Theserequirements andincludedintheQAProgramparagraph 8.(N18.7-1976, Section4.3.4).26.27.*TS6.5.2.7.i
-Therequirement forNSARBtoreviewthePORCmeetingminutesisnotspecified inthescopeofreviewunderANSIN18.7-1976.
Thisrequirement isalsonotcontained inImprovedTechnical Specifications (i.e.,NUREG-1431).
SincetheNSARBisrequiredtoreviewthesameitemsrelatedtonuclearsafetyasthePORCinANSIN18.7-1976, elimination ofthisrequirement isnotareduction insafety.ThePORCdoessubmitmeetingminutestotheSeniorVicePresident Production andEngineering andtheChairman, NSARBforinformation asstatedintheQA,Program, paragraph 7.*TS6.5.2.8-TheseTechnical Specifications arediscussed undersynopsisofchangesforSection18andarealsocoveredintheQAProgramparagraph 8.28.TS6.5.2.9-Thisrequirement isincludedintheQAProgramunderresponsibilities ofSeniorVicePresident, Production
&Engineering.
29.TS6.5.2.10-Therecordrequirements ofNSARBactivities areincludedintheQAProgram,paragraph 9.30.TS6.5.2.11-,Section6oftheQAProgramrequiresprocedures foreachdepartment responsible foranactivity.
Procedures governing NSARBactivities currently exist.Thisisalsoaddressed inANSIN18.7-1972, Section4.2.1.
ATTACHMENT 1SnosisofChanesThespecificreference toSection6.0oftheTechnical Specifications wasalsodeletedandreplacedwith"Administrative Controlssection"tosupportexpectednear-term technical specification changeswhichwillrenumbermostsections.
Thischangeprovidesequivalent reference tothelocationofPlantManagerresponsibilities asdelineated withinTechnical Specifications.
Theabovechangestosection2requireNRCapprovalpriortobeingimplemented.
Anotherchangetotheorganization reassigns recordsmanagement anddocumentcontrolactivities fromtheTechnical ServicesDivisiontoQualityPerformance Department.
(seeSection17)Section3DesinControlThereference toreviewofplantmodifications bytheonsiteandoffsitereviewgroupsasrequiredbyTechnical Specifications 6.5.1.6and6.5.2.7isdeleted.ThechangestoSection2whichinsertedareference toANSIN18.7-1976 andANSI/ANS3.2-1988adequately addresses thereviewofsignificant proposedplantchangesaspartofthereviewresponsibility.
ThisrequiresNRCapprovalpriortoimplementation.
Section5Instructions Procedures andDrawinsReferences toRevision2ofNRCRegulatory Guide1.33,AppendixAwasaddedtosupporttheLicenseAmendment Request(LAR)relatedtoreformatting theAdministrative ControlsSectionofTechnical Specifications.
ThisLARproposestouseRevision2ofAppendixAtoRegulatory Guide1.33insteadofRevision0(Technical Specification 6.8.1.a).
Revision2isaNRCstaffendorseddocument.
ThischangerequiresNRCapprovalpriortoimplementation.
Section6DocumentControlRequirements forthereviewandapprovalprocessandtemporary changeprocessforplantprocedures havebeenclarified withreference totheguidelines ofANSIN18.7-1972, Sections5.4and5.5.Reviewofplantprocedures isperformed asdescribed underitem7ofSection2above.Fortemporary changestoprocedures, theQAProgramincludesthesamerequirements ascurrently inTechnical Specification 6.8.3.Sincethedesignated independent andqualified reviewermeetstheequivalent qualifications ofaPORCmember,thatindividual constitutes oneofthe"twomembersofplantmanagement staff"referredtoinTS6.8.3.b.TheShiftSupervisor isthesecondmember.Therefore, thischangedoesnotresultinareduction insafety.ANSIN18.7-1972 furtherstates ATTACHMENT 1SnosisofChanesthateachprocedure shallbereviewedandapprovedpriortoinitialuseandretainstheprovisions forfurtherreviewofprocedures havingsafety-significance foranyunreviewed safetyquestion.
Theimplementation oftheserequirements aredelineated inplantprocedures.
ThischangerequiresNRCapprovalpriortoimplementation.
DocumentControlresponsibilities havebeenreassigned fromtheTechnical ServicesDivisiontotheGinnaNuclearProduction Division.
Section11TestControlThespecificreference toSection4.0oftheTechnical Specifications wasdeletedtosupportexpectednear-term technical specification changeswhichwillrenumbermostsections.
Theremovalofthisspecificreference isacceptable sincetherequirement foraGinnaStationsurveillance testprogram"asrequiredbyTechnical Specifications" providessufficient guidancewithoutreducinganycommitment.
Therequirement forthePORCtoreviewtestprocedures, andforthePlantManagertoapprovethetestprocedures wasdeletedconsistent withthebasisforchangestoSection6aspresented aboveandrecognition thatthissectionincludesreviewsoftestprocedure byresponsible technical personnel.
QualityPerformance reviewwasdeletedfromthissectionasitisredundant toaSection2responsibility fortheNuclearAssurance sub-section.
Section17ualitAssurance RecordsAreference tomaintaining plantoperating recordsasrequiredinSection6.10ofTechnical Specifications isbeingdeletedfromboththissectionandTechnical Specifications.
Theexistingrecordretention commitment toANSIN45.2.9aslistedinSection1(i.e.,Regulatory Guide1.88)providesequivalent requirements.
Areference toANSIN45.2.9isinsertedinthissectionforclarification oftheGinnaStationrecordextent.Inaddition, 10CFR20,Sub-partL,and10CFR50.71requiretheretention ofcertainrecordsrelatedtotheoperation ofthenuclearplant.Therecordsmanagement responsibilities havebeenreassigned fromtheTechnical ServicesDivisiontotheQualityPerformance Department.
r~ATTACHMENT 1SnosisofChanesSection18AuditsThissectionrelocates fromTechnical Specification Section6.5.2.8,toQAProgramTable18.1,thespecificlistingofrequiredaudits,notclearlyaddressed elsewhere, andtheirfrequency.
Auditrequirements arenecessary tosatisfy10CFR50,AppendixB,Criterion XVIII.Therelocation oftheauditrequirements fromthetechnical specifications doesnotresultinareduction inanycommitment sincechangestotheQAProgramarecontrolled by10CFR50.54.Allauditrequirements currently contained inSection6.5.2.8ofTechnical Specifications arelistedinTable18.1exceptforthefollowing:
1~TS6.5.2.8.e
-AuditoftheRadiation Emergency Planisrequiredby10CFR50.54(t).
Consistent withGenericLetter93-07,frequency anduniquerequirements aredescribed intheRadiation Emergency Plan.Section18makesreference tothisaudit.2~TS6.5.2.8.f
-AuditoftheStationSecurityPlanisrequiredby10CFR50.54(p)(3),10CFR73.56(g)(2)and10CFR73.55(g)(4).
Consistent withGenericLetter93-07,frequency anduniqueauditrequirements aredescribed intheSecurityPlan.Section18makesreference tothisaudit.3~TS6.5.2.8.m
-Auditsofotherfacilityoperations considered appropriate byNSARBortheSeniorVicePresident, Production andEngineering isnolongerspecifically identified.
AsshownonFigure2-1,NSARBandQualityPerformance reportstotheSeniorVicePresident, Production andEngineering.
Figure2-6alsoshowsthatQualityPerformance reportstoNSARBregarding auditactivities.
SinceasectionofQualityPerformance (i.e.,QualityAssurance) performsallaudits,thereissufficient authority torequest,additional auditsasdeemednecessary.
Also,ANSIN18.7-1976, Section4.3.4,item(5)allowsNSARBtoreview"anymatterinvolving safeoperation ofthenuclearpowerplant".ThesechangesrequireNRCapprovalpriortoimplementation.
1~}}

Latest revision as of 10:32, 4 February 2020

Forwards Rev 20 to QA Program for Operation, Addressing Comments Provided by NRC During 940803 Telcon W/Respect to LAR Associated W/Administrative Controls Section 6.0 of TS, Dtd 940513
ML17263A754
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/16/1994
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML17263A755 List:
References
NUDOCS 9408190180
Download: ML17263A754 (17)


Text

PR.IC3R.I EY 1 ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9408190180 DOC.DATE: 94/08/16 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Ro hester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp. P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards revised Quality Assurance Program for Station Operation. I DISTRIBUTION CODE: Q004D TITLE: QA COPIES RECEIVED:LTR L ENCL Topical Report, Change, Amendment, or Correspondence Q SIZE:

(D

+

cket/Utili 0

'I NOTES:License Exp date in accordance with 10CFR2, 2.'109 (9/19/72) . 05000244 R

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL JOHNSON,A 1 1 T

INTERNAL: DRS/RGN1 1 1 DRS/RGN2 1 1 DRS/RGN3 RPEB 1

1 1

1 DRS/RGN4 OC/LFDCB 1, 1 1

Y' 01 2 2 RGN1 FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 0

C U

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. S04-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 13 ENCL 13

'I I

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. ld6d9-0001 AREA CODE 716 546-2700 ROBERTC MECREDY Vice President August 16, 1994 Clnna Nuclear Production U.S. Nuclear Regulatory Commission Document Control Desk Attn: Allen R. Johnson Project Directorate I-3 Washington, D.C. 20555

Subject:

Revised Submittal of Quality Assurance Program for Station Operation Rochester Gas & Electric Corporation R.E. Ginna Nuclear Power Plant Docket No. 50-244

References:

a. Letter from R.C. Mecredy, RG&E, to A.R. Johnson, NRC,

Subject:

"Revised Submittal of Quality Assurance Program for Station Operation," dated May 16, 1994.

b. Letter from R.C. Mecredy, RG&E, to A.R. Johnson, NRC,

Subject:

"Application for Amendment to Facility, Operating License, Upgrade of Administrative Controls Section 6.0," dated May 13, 1994.

"c Letter from A.R. Johnson, NRC, to R.C. Mecredy,

~

RG&E,

Subject:

"Review of Proposed Amendment to Technical Specification 6.5.1, 'Plant Operations Review Committee (PORC) Function,'.E. Ginna Nuclear Power Plant Request for Additional Information (TAC No. M83569)", dated November 12, 1992.

Dear Mr. Johnson,

In accordance with 10CFR50.54(a)(3), enclosed is revision 20 to the Quality Assurance (QA)'rogram for Station Operation. This revision 20 supersedes in its entirety, the proposed revision 20 as submitted on May 16, 1994 (Ref. a.). This submittal addresses all comments provided by the NRC during a conference call held with RG&E on August 3, 1994 with respect to the License Amendment Request (LAR) associated with the Administrative Controls Section 6.0 of the Technical Specifications (Ref. b). In addition, the NRC comments provided in Reference c. are also addressed within the enclosed revision 20 as requested during the August 3rd conference call. 1 I

9408190180 940816 PDR ADOCK 05000244

-=-P- - - - WAR

P

\

Ij

While the previously proposed revision 20 to the QA Program is superseded by the enclosed document, only certain sections have changed. These changes are summarized below by QA Program Section number:

a. Section 1 References to ANSI/ANS 3.1-1987 and ANSI/ANS 3.2-1988 are provided.
b. Section 2 Additional details concerning the PORC and NSARB are provided. This includes providing specific requirements for the PORC consistent with Technical Specification 6.5.1 and addressing NSARB member qualifications and record keeping requirements.
c. Section 6 A description of a new procedure change review process is provided.

The changes to the QA Program are described in the attached Synopsis of Changes (Attachment 1) and in the enclosed program revision. Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50, Appendix B criteria and does not reduce the scope of the quality assurance program. Changes made to revision 19 of the QA Program for Station Operation are denoted by a single revision bar in the left margin. is a copy of the enclosure with changes highlighted or struck out.

We request that upon NRC approval, the QA Program changes should be considered effective immediately and implemented concurrent with the implementation of the technical specification changes being requested in Reference a.

Very truly yours, Robert C. Mecre MDFE625 xc: Mr. Allen R. Johnson (Mail Stop 14D1)

PWR Project Directorate I-3 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

ATTACHMENT 1 S no sis of Chan es Section 1 ualit Assurance Pro ram References to NRC Regulatory Guide 1.33, Revision 2, Regulatory Positions 1, 3, and 5a only was added to support the License Amendment Request (LAR) related to reformatting the Administrative Controls Section of Technical Specifications. Regulatory Positions 3 and 5a with respect to ANSI N18.7-1976, Sections 4.3.2 and 4.3.4, are related to changes discussed below while Regulatory Position 1 relates to the LAR which proposes to use Revision 2 of Appendix A to Regulatory Guide 1.33 instead of Revision 0 (Technical Specification 6.8.1.a).

References to ANSI/ANS 3.1-1987, Section 4.7, and ANSI/ANS 3.2-1988, Sections 4.2 and 4.3, were also added to support changes discussed in Section 2 below. These standards were added since they contain PORC and NSARB requirements not provided in earlier ANSI N18.7 editions.

This change requires NRC approval prior to being implemented.

Section 2 Or anization The description of the review and audit organizational units shown in Figure 2-6 is expanded since these items are being relocated from Technical Specifications to the QA Program. A reference to ANSI/ANS 3.2-1988 Section 4.3 is now provided for the onsite review function (i.e., the Plant Operations Review Committee) and ANSI N18.7-1976, Sections 4.3.2 and 4.3.4, and ANSI/ANS 3.1-1987 Section 4.7 for the offsite review and audit function (i.e., the Nuclear Safety Audit and Review Board). ANSI N18.7-1976 is an NRC endorsed standard while ANSI/ANS 3.1-1987 and ANSI/ANS 3.2-1988 are not.

However, these ANSI standards provide equivalent or more conservative requirements than those currently listed in Technical Specifications (TS).

Section 2 now includes the requirements under which the PORC and NSARB are composed and function. These requirements were relocated from the Technical Specifications. Several requirements were modified in order to conform to the ANSI Standards or to create a more efficient review and audit organizational unit. These changes do not result in any reduction in the level of detail or safety currently included in the Technical, Specifications. Where differences do exist, justification is presented below. These differences are marked with an asterisk (*) . Itemized below is each existing Technical Specification in 6.5.1 and 6.5.2 and its relationship to the QA Program. References to the QA Program paragraphs refer to the end of Section 2 of the Program document.

(Please note that these paragraph numbers are removed in Attachment 2.)

ATTACHMENT 1 S no sis of Chan es TS 6.5.1.1 The essence of this current specification is included in the QA Program paragraph 2. Paragraphs 1. and 2.

were taken directly from ANSI Standard N18.7-1976, Section 4' '

  • TS 6.5.1.2 RG&E submitted an LAR dated March 23, 1992 requesting that the titles of PORC personnel be replaced with

~

functional areas under PORC review. This would allow PORC member title changes as long as the functional areas are maintained. The NRC responded to this LAR in a letter dated November 12, 1992 requesting additional information regarding the number of PORC members. In moving the requirements to the QA Program, paragraph 3., the functional areas of the PORC are included. These functional areas have been chosen to agree with the current PORC functions as performed by the personnel whose titles are listed in the Technical Specifications. The number of regular members is now listed in the QA Program, paragraph 4, as a minimum of 5 and maximum of 9 (8 functional areas plus chairman). This resolves the comment in NRC letter dated November 12, 1992. The number of functional areas delineated in the QA Program is 8. The current Technical Specifications list the Titles of 12 individuals. This difference is not a reduction in safety, because the functional areas necessary to perform adequate reviews by PORC are encompassed.

3. TS 6.5.1.3 This requirement is included in the QA Program, paragraph 4.

4 ~ TS 6.5.1.4 This requirement is included in the QA Program, paragraph 4.

5. *TS 6.5.1.5 This requirement is included in the QA Program, paragraph 3. and 4. The QA Program states that the quorum size meets ANSI/ANS 3.2-1988, Section 4.3, which requires a quorum consisting of a chairman or a duly appointed alternate and a majority of the remaining members or their duly appointed alternates. In addition, paragraph 4. of the QA Program requires that the number of alternates will not exceed a minority of the number making up the quorum. This combination of requirements meets both the ANSI standard and the comment made by the NRC in a letter dated November 12, 1992 that if the number of members "is not a fixed number, then the quorum requirement of Section 6.5.1.5 should be revised to reflect the staff position that the quorum should be a majority of the regular members." Procedure A-205, will implement this QA Program requirement.

ATTACHMENT 1 S no sis of Chan es

6. TS 6.5.1.6 This specification covers the PORC scope of review. The QA Program requires that the PORC scope of review meet ANSI/ANS 3.2-1988, Section 4.3.1. In citing this ANSI Standard, not all of the specific items in the, existing Specification are individually listed, however, the PORC scope of review is not reduced. Additional information is provided in items 7. through 15. below.

7 ~ *TS 6.5.1.6 a, b, d The ANSI Standard requires that the PORC review all safety evaluations required under 10CFR50.59.

RG&E's safety evaluation process requires an assessment or screening of all plant changes to determine their safety significance and the need to perform a written safety evaluation. 10CFR50.59 encompasses changes to the facility, changes to procedures, and tests and experiments. Therefore, in citing the ANSI Standard, PORC review of the subject areas specified in TS 6.5.1.6.a, b, and d are encompassed.

With respect to procedure changes, many procedure changes are editorial or inconsequential and have no safety significance.

Therefore, it is appropriate to employ a process whereby an independent technical review is performed of the proposed procedure change. A qualified and independent reviewer, appointed by PORC or the Plant Manager, will also conduct a review of the proposed procedure change to determine its potential safety significance and the need for a PORC review.

The absence of such an independent review essentially forces PORC to conduct a review of all proposed procedure changes that have no significance, instead of the group of those changes that potentially may impact safety. All changes that receive a written safety evaluation under 10CFR50.59 are required to be reviewed by PORC. Others may not result in an impact on safety and a written safety evaluation, but are selected for PORC review by the independent and qualified reviewer. The remaining changes have no safety significance, are editorial or inconsequential and do not require PORC review. This process is described in the QA Program, Section 6.

ATTACHMENT 1 S no sis of Chan es TS 6.5.1.6.c This requirement is included in the QA Program, paragraph 3 (Section 4.3.1 of ANSI/ANS 3.2-1988).

TS 6.5.1.6.e This requirement is included in the QA Program, paragraph 3 (Section 4.3.1 of ANSI/ANS 3.2-1988).

Notification of the Senior Vice President, Production and Engineering, and the Chairman, NSARB is encompassed by paragraph 7 in the QA Program.

TS 6.5.1.6.f This requirement is included in paragraph 1. of the QA Program.

TS 6.5.1.6.g This requirement is included in paragraph 2. of the QA Program. Figure 2.6 of the QA Program also shows that PORC is overseen by NSARB.

  • TS 6.5.1.6.j This requirement is included in Section 6 of the QA Program under the scope of procedure changes. The periodic review of implementing procedures is addressed within plant procedures. The process described under item 7 above would encompass this requirement.

TS 6.5.1.6.k This requirement is included in the QA Program, paragraph 3 (Section 4.3.1 of ANSI/ANS 3.2-1988).

  • TS 6.5.1.6.l Periodic review of the Fire Protection Program and implementing procedures is required by the QA Program Table 18-1, Audit List. Reviews of fire protection procedure changes are performed in conjunction with the process of plant procedure change review as discussed under item 7 above. As defined by the Fire Protection Program, changes to the Program having safety significance require a written safety evaluation under 10CFR50.59 and would therefore receive PORC review consistent with ANSI/ANS 3.2-1988, Section 4.3.1. The QA Program paragraph 6. and 7. require that safety evaluations to the Chairman, NSARB. be'orwarded

ATTACHMENT 1 S no sis of Chan es 17 ~ TS 6.5.1.7 This requirement is included in the QA Program in paragraph 6.

18. TS 6.5.1.8 This requirement is included in the QA Program in paragraph 3 and 7.
19. TS 6.5.2.1 The functional areas required for NSARB review and audit are described in the QA Program, paragraph 8.

(ANSI/ANS 3.1-1987, Section 4.7).

20. *TS 6.5.2.2 The requirements are included in the QA Program, paragraph 8., with the exception that the requirement for at least one qualified non-company affiliated technical consultant (TS 6.5.2.2.c) is not included. ANSI N18.7-1976, Section 4.3.2.1 requires no less than 5 persons with no more than a minority from the onsite operating organization and does not require a non-company affiliated consultant.

ANSI/ANS 3.1-1987, Section 4.7 states that "if sufficient expertise is not available from within the owner organization, independent reviews shall be supplemented by use of outside consultants or other qualified organizations." Since the functional areas in which the NSARB must be competent has not been reduced, this change is not a reduction in safety. The need for an outside consultant is a previous Standard Technical Specification requirement which has since been deleted as owner organizations have gained experience and expertise.

21. *TS 6.5.2.3 A limit on the number of alternates participating in NSARB activities is not specified in Section 4.3.2.1 of N18.7-1976. Since the functional areas in which NSARB must contain competence has not been reduced, and the ANSI Standard restricts the use of alternates to "legitimate absences of principles", this change is not a reduction in safety.
22. TS 6.5.2.4 The qualification requirements of NSARB members is included in the QA Program, paragraph 8. Qualifications of members meet ANSI/ANS 3.1-1987, Section 4.7 except as noted for the functional areas of nuclear power plant operations and nuclear engineering. The QA Program requires 8 years experience for these functional areas, which is consistent with the existing Technical Specification 6.5.2.4.a. and 6.5.2.4.b. For all other functional areas, the QA Program is consistent with the existing Technical Specifications.

Therefore, there is no reduction in the level of detail or qualifications for NSARB members in the QA Program as compared to the existing Technical Specifications.

f ATTACHMENT 1 S no sis of Chan es

23. TS 6.5.2.5 This requirement is included in the QA Program, paragraph 8 (N18.7-1976, Section 4.3.2.2.).
24. *TS 6.5.2.6 The QA Program, paragraph 8., is consistent with the existing Technical Specifications with the exception that a non-company affiliated technical consultant is not required in the quorum. Requiring this would not be consistent with the change made as discussed under item 20 above, since a non-company affiliated technical consultant is no longer a required member of NSARB. For the same reasons as in item 20, this change is not a reduction in the level of safety.
25. TS 6.5.2.7.a-h These requirements and included in the QA Program paragraph 8. (N18.7-1976, Section 4.3.4).
26. *TS 6.5.2.7.i The requirement for NSARB to review the PORC meeting minutes is not specified in the scope of review under ANSI N18.7-1976. This requirement is also not contained in Improved Technical Specifications (i.e., NUREG-1431). Since the NSARB is required to review the same items related to nuclear safety as the PORC in ANSI N18.7-1976, elimination of this requirement is not a reduction in safety. The PORC does submit meeting minutes to the Senior Vice President Production and Engineering and the Chairman, NSARB for information as stated in the QA,Program, paragraph 7.
27. *TS 6.5.2.8 These Technical Specifications are discussed under synopsis of changes for Section 18 and are also covered in the QA Program paragraph 8.
28. TS 6.5.2.9 This requirement is included in the QA Program under responsibilities of Senior Vice President, Production &

Engineering.

29. TS 6.5.2.10 The record requirements of NSARB activities are included in the QA Program, paragraph 9.
30. TS 6.5.2.11

, Section 6 of the QA Program requires procedures for each department responsible for an activity. Procedures governing NSARB activities currently exist. This is also addressed in ANSI N18.7-1972, Section 4.2.1.

ATTACHMENT 1 S no sis of Chan es The specific reference to Section 6.0 of the Technical Specifications was also deleted and replaced with "Administrative Controls section" to support expected near-term technical specification changes which will renumber most sections. This change provides equivalent reference to the location of Plant Manager responsibilities as delineated within Technical Specifications.

The above changes to section 2 require NRC approval prior to being implemented.

Another change to the organization reassigns records management and document control activities from the Technical Services Division to Quality Performance Department. (see Section 17)

Section 3 Desi n Control The reference to review of plant modifications by the onsite and offsite review groups as required by Technical Specifications 6.5.1.6 and 6.5.2.7 is deleted. The changes to Section 2 which inserted a reference to ANSI N18.7-1976 and ANSI/ANS 3.2-1988 adequately addresses the review of significant proposed plant changes as part of the review responsibility. This requires NRC approval prior to implementation.

Section 5 Instructions Procedures and Drawin s References to Revision 2 of NRC Regulatory Guide 1.33, Appendix A was added to support the License Amendment Request (LAR) related to reformatting the Administrative Controls Section of Technical Specifications. This LAR proposes to use Revision 2 of Appendix A to Regulatory Guide 1.33 instead of Revision 0 (Technical Specification 6.8.1.a). Revision 2 is a NRC staff endorsed document. This change requires NRC approval prior to implementation.

Section 6 Document Control Requirements for the review and approval process and temporary change process for plant procedures have been clarified with reference to the guidelines of ANSI N18.7-1972, Sections 5.4 and 5.5. Review of plant procedures is performed as described under item 7 of Section 2 above. For temporary changes to procedures, the QA Program includes the same requirements as currently in Technical Specification 6.8.3. Since the designated independent and qualified reviewer meets the equivalent qualifications of a PORC member, that individual constitutes one of the "two members of plant management staff" referred to in TS 6.8.3.b. The Shift Supervisor is the second member. Therefore, this change does not result in a reduction in safety. ANSI N18.7-1972 further states

ATTACHMENT 1 S no sis of Chan es that each procedure shall be reviewed and approved prior to initial use and retains the provisions for further review of procedures having safety-significance for any unreviewed safety question. The implementation of these requirements are delineated in plant procedures. This change requires NRC approval prior to implementation.

Document Control responsibilities have been reassigned from the Technical Services Division to the Ginna Nuclear Production Division.

Section 11 Test Control The specific reference to Section 4.0 of the Technical Specifications was deleted to support expected near-term technical specification changes which will renumber most sections. The removal of this specific reference is acceptable since the requirement for a Ginna Station surveillance test program "as required by Technical Specifications" provides sufficient guidance without reducing any commitment.

The requirement for the PORC to review test procedures, and for the Plant Manager to approve the test procedures was deleted consistent with the basis for changes to Section 6 as presented above and recognition that this section includes reviews of test procedure by responsible technical personnel. Quality Performance review was deleted from this section as responsibility for the Nuclear it is redundant to a Section 2 Assurance sub-section.

Section 17 ualit Assurance Records A reference to maintaining plant operating records as required in Section 6.10 of Technical Specifications is being deleted from both this section and Technical Specifications.

The existing record retention commitment to ANSI N45.2.9 as listed in Section 1 (i.e., Regulatory Guide 1.88) provides equivalent requirements. A reference to ANSI N45.2.9 is inserted in this section for clarification of the Ginna Station record extent. In addition, 10 CFR 20, Sub-part L, and 10 CFR 50.71 require the retention of certain records related to the operation of the nuclear plant.

The records management responsibilities have been reassigned from the Technical Services Division to the Quality Performance Department.

r ~

ATTACHMENT 1 S no sis of Chan es Section 18 Audits This section relocates from Technical Specification Section 6.5.2.8, to QA Program Table 18.1, the specific listing of required audits, not clearly addressed elsewhere, and their frequency.

Audit requirements are necessary to satisfy 10 CFR 50, Appendix B, Criterion XVIII. The relocation of the audit requirements from the technical specifications does not result in a reduction in any commitment since changes to the QA Program are controlled by 10 CFR 50.54. All audit requirements currently contained in Section 6.5.2.8 of Technical Specifications are listed in Table 18.1 except for the following:

1 ~ TS 6.5.2.8.e Audit of the Radiation Emergency Plan is required by 10 CFR 50.54(t). Consistent with Generic Letter 93-07, frequency and unique requirements are described in the Radiation Emergency Plan. Section 18 makes reference to this audit.

2 ~ TS 6.5.2.8.f Audit of the Station Security Plan is required by 10 CFR 50.54(p) (3), 10 CFR 73.56 (g) (2) and 10 CFR 73.55(g)(4). Consistent with Generic Letter 93-07, frequency and unique audit requirements are described in the Security Plan. Section 18 makes reference to this audit.

3 ~ TS 6.5.2.8.m Audits of other facility operations considered appropriate by NSARB or the Senior Vice President, Production and Engineering is no longer specifically identified. As shown on Figure 2-1, NSARB and Quality Performance reports to the Senior Vice President, Production and Engineering. Figure 2-6 also shows that Quality Performance reports to NSARB regarding audit activities. Since a section of Quality Performance (i.e., Quality Assurance) performs all audits, there is sufficient authority to request, additional audits as deemed necessary. Also, ANSI N18.7-1976, Section 4.3.4, item (5) allows NSARB to review "any matter involving safe operation of the nuclear power plant".

These changes require NRC approval prior to implementation.

1 ~