|
|
(6 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML17317B002 | | | number = ML17317B002 |
| | issue date = 12/04/2017 | | | issue date = 12/04/2017 |
| | title = Brunswick Steam Electric Plant, Units 1 and 2 - Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) | | | title = Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) |
| | author name = Saba F E | | | author name = Saba F |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Gideon W R | | | addressee name = Gideon W |
| | addressee affiliation = Duke Energy Progress, Inc | | | addressee affiliation = Duke Energy Progress, Inc |
| | docket = 05000325, 05000324 | | | docket = 05000325, 05000324 |
| | license number = DPR-062, DPR-071 | | | license number = DPR-062, DPR-071 |
| | contact person = Saba F E, NRR/DORL/LPL2-2, 415-1447 | | | contact person = Saba F, NRR/DORL/LPL2-2, 415-1447 |
| | case reference number = CAC MF9905, CAC MF9906, EPID L-2017-LLA-0242 | | | case reference number = CAC MF9905, CAC MF9906, EPID L-2017-LLA-0242 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 4, 2017 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Rd., SE (M/C BNP001) Southport, NC 28461 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 4, 2017 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Rd., SE (M/C BNP001) |
| | Southport, NC 28461 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242) | | BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242) |
|
| |
|
| ==Dear Mr. Gideon:== | | ==Dear Mr. Gideon:== |
| By application dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17180A538), Duke Energy Progress, Inc. (Duke Energy or the licensee) requested changes to the technical specifications (TSs) for Brunswick Steam Electric Plant (Brunswick), Units 1 and 2. Duke Energy requested to revise Brunswick, Units 1 and 2, TSs to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 163438008). The proposed amendments would replace existing TS requirements related to "operations that have the potential for draining the reactor vessel" with new requirements on reactor pressure vessel water inventory control to protect Safety Limit 2.1.1.3. The NRC staff reviewed the licensee's submittal and determined that additional information is needed. On November 1, 2017, the NRC staff forwarded, by e-mail, a draft request for additional information to Duke Energy. On November 9, 2017, Duke Energy staff informed the NRC staff that a clarification conference was not needed. Also, the NRC staff agreed with the Duke Energy staff's request to respond to the request for additional information by January 8, 2018. If you have any questions, please contact me at 301-415-1447 or Farideh.Saba@nrc.gov. Docket Nos. 50-325 and 50-324 | | |
| | By application dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17180A538), Duke Energy Progress, Inc. (Duke Energy or the licensee) requested changes to the technical specifications (TSs) for Brunswick Steam Electric Plant (Brunswick), Units 1 and 2. Duke Energy requested to revise Brunswick, Units 1 and 2, TSs to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML163438008). The proposed amendments would replace existing TS requirements related to "operations that have the potential for draining the reactor vessel" with new requirements on reactor pressure vessel water inventory control to protect Safety Limit 2.1.1.3. |
| | The NRC staff reviewed the licensee's submittal and determined that additional information is needed. On November 1, 2017, the NRC staff forwarded, by e-mail, a draft request for additional information to Duke Energy. On November 9, 2017, Duke Energy staff informed the NRC staff that a clarification conference was not needed. Also, the NRC staff agreed with the Duke Energy staff's request to respond to the request for additional information by January 8, 2018. |
| | If you have any questions, please contact me at 301-415-1447 or Farideh.Saba@nrc.gov. |
| | Sincerely, f ,1,,* ~i c -Sc~(_ |
| | Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | |
| Request for Additional Information cc w/ | | Request for Additional Information cc w/ |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Distribution via Listserv Sincerely, f ,1,,* ~i c -Sc~(_ Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2 DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 By letter dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17180A538), Duke Energy Progress, LLC (the licensee) requested to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2, which would change the technical specifications (TSs) for Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick or BSEP). TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML 163438008). Brunswick TS Section 2.0, "Safety Limits (SLS)," 2.1.1.3 states, "Reactor vessel water level shall be greater than the top of active irradiated fuel." Safety Limit 2.1.1.3 is maintained through the TS limiting condition for operation (LCO), applicability, actions, and notes. The Brunswick TSs require certain safety systems to be operable during "operations with a potential for draining the reactor vessel." The proposed changes would replace existing TS requirements associated with operations with a potential for draining the reactor vessels with revised TSs providing an alternative requirement for reactor pressure vessel (RPV) water inventory control. These alternative requirements would comply with Safety Limit 2.1.1.3. The NRC staff has reviewed the proposed amendments and finds that additional information is needed to complete its review. BSEP-RAl-1 TSTF-542, Revision 2, Surveillance Requirement (SR) 3.5.2.8 states: "Verify the required ECCS [emergency core cooling system] injection/spray subsystem actuates on a manual initiation signal." In Section 2.2, "Variations," of Enclosure 1 to the license amendment request (LAR), the licensee provided the following variation and justification, in part: STS [Standard Technical Specifications] Table 3.3.5.1-1, Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, manual initiation functions for LPCI and CS are not being included in TS 3.3.5.3, Table 3.3.5.3-1. As a result of this design, proposed BSEP SR 3.5.2.8 is modified from the STS SR 3.5.2.8 to verification that the required ECCS injection/spray subsystem can be manually operated versus verifying that the subsystem actuates on a manual initiation signal. Enclosure The licensee further stated in its LAR that: Since the LPCI and CS subsystems can be placed in service using manual means in a short period of time (i.e., within the timeframes assumed in the development of TSTF-542), using controls and indications that are readily available in the Main Control Room, manual operation of the required subsystem would be an equivalent alternative to system initiation via manual initiation logic. However, it is not clear what type of manual operation is available or being used in the main control room that can provide actuation of the ECCS injection/spray subsystems. (a) Clarify whether the Brunswick design includes a pushbutton(s) or hand switch(s) for actuation of the ECCS subsystems. (b) Provide additional details and justification that support the use of the proposed alternative that includes manually aligning CS and LPCI components for injection and the associated timing of these actions. BSEP-RAl-2 In the proposed new Brunswick TS 3.3.5.3 (Brunswick TS page 3.3-48b of Enclosures 2 and 3 of the license amendment request), the note below "SURVEILLANCE REQUIREMENTS" is entitled "NOTES." Since there is only one note, the title should state "NOTE." Revise this TS page accordingly, or provide an explanation. BSEP-RAl-3 The allowable value (AV) in the current TS Table 3.3.5.1-1, Function 1.a (Core Spray System -Reactor Steam Dome Pressure -Low) and Function 2.a (Low Pressure Coolant Injection System -Reactor Steam Dome Pressure -Low) are 2: 402 pounds per square inch gauge (psig) ands 425 psig. This is consistent with STS Table 3.3.5.1-1 with an AV range of[.:: 390 psig and s 500 psig]. In TSTF-542, these functions are moved to STS Table 3.3.5.2-1 with an upper-end AV of[:::. 500 psig]. Also, TSTF-542, Revision 2 (page 41), states: | | Distribution via Listserv |
| * In LCO 3.3.5.2A, the Allowable Value is revised to eliminate the low pressure limit and to retain the high pressure limit. The RPV is well below the lower limit in Modes 4 and 5, so the low pressure limit is not needed. However, in the proposed Brunswick Table 3.3.5.3-1 (page 3.3-48c), Function 1.a and Function 2.a, AVs are 2: 402 psig, which is the lower limit for Brunswick. Revise the proposed changes to be consistent with TSTF-542, Revision 2, or provide a technical justification for this variation. BSEP-RAl-4 The licensee stated in Section 2.2, "Variations," of Enclosure 1 to the LAR, in part, the following variation and justification: STS Table 3.3.5.1-1, Function 1.d, "Core Spray Pump Discharge Flow -Low," and Function 2.g, "Low Pressure Coolant Injection Pump -Discharge Flow -Low," are not included in the BSEP TSs. Also, STS Table 3.3.5.1-1, Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, they are not being included in TS 3.3.5.3, "Reactor Pressure Vessel (RPV) Water Inventory Control," Table 3.3.5.3-1. As a result of this design, BSEP TS 3.3.5.3 does not contain a Condition equivalent to STS 3.3.5.2, Condition D. Furthermore, TSTF-542, Revision 2, relocates the CS and LPCI pump discharge flow-low requirements from STS Table 3.3.5.1-1, "Emergency Core Cooling System Instrumentation," to revised STS Table 3.3.5.2-1, "RPV Water Inventory Control Instrumentation." In particular, Section 3.3.4.2 of the TSTF-542, Revision 2, describes the purpose of the STS requirement: The minimum flow instruments are provided to protect the associated low pressure ECCS pump from overheating when the pump is operating and the associated injection valve is not fully open. The minimum flow line valve is opened when low flow is sensed, and the valve is automatically closed when the flow rate is adequate to protect the pump. The presence or absence of a requirement in a current TS is not in and of itself justification for the deviation from the TSTF-542, Revision 2. Provide technical justifications (i.e., a discussion of the differences) for not including the equivalent of CS and LPCI pump discharge flow-low functions as described in TSTF-542, STS Table 3.3.5.2-1, in the proposed Brunswick TS Table 3.3.5.3-1, or revise the proposed changes to include the functions along with a variation describing the technical justification for proposing to add the requirements to the Brunswick TSs. BSEP-RAl-5 Proposed TS 3.5.2, Required Action E.1 (BSEP TS page 3.5-10), states: Initiate action to restore Drain Time to 36 hours. Since "Drain Time" is a proposed defined term in BSEP TS 1.1, "Definitions," it should be capitalized, consistent with the Brunswick convention for defined terms throughout TSs. Revise the proposed change for consistency or provide a justification for this variation. BSEP-RAl-6 The licensee proposed on Brunswick TS page 3.5-12 of Enclosures 2 and 3 to the LAR deletion of SR 3.5.2.7 that is associated with the ECCS response time for each required ECCS injection/spray subsystem. This is a plant-specific change since it is not included in TSTF-542, Revision 2. Provide technical justifications that support deletion of SR 3.5.2.7. BSEP-RAl-7 Proposed Brunswick TS 3.3.5.3, Condition D, states (Brunswick TS page 3.3.48b): Required Action and associated Completion Time of Condition C or D not met. This appears to be an editorial error since Condition D should not state "or D". Correct this error or provide justification that "Condition C or D" is correct under the proposed Condition D. | | |
| | REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2 DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 By letter dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17180A538), Duke Energy Progress, LLC (the licensee) requested to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2, which would change the technical specifications (TSs) for Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick or BSEP). TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML163438008). |
| | Brunswick TS Section 2.0, "Safety Limits (SLS)," 2.1.1.3 states, "Reactor vessel water level shall be greater than the top of active irradiated fuel." Safety Limit 2.1.1.3 is maintained through the TS limiting condition for operation (LCO), applicability, actions, and notes. The Brunswick TSs require certain safety systems to be operable during "operations with a potential for draining the reactor vessel." |
| | The proposed changes would replace existing TS requirements associated with operations with a potential for draining the reactor vessels with revised TSs providing an alternative requirement for reactor pressure vessel (RPV) water inventory control. These alternative requirements would comply with Safety Limit 2.1.1.3. The NRC staff has reviewed the proposed amendments and finds that additional information is needed to complete its review. |
| | BSEP-RAl-1 TSTF-542, Revision 2, Surveillance Requirement (SR) 3.5.2.8 states: "Verify the required ECCS [emergency core cooling system] injection/spray subsystem actuates on a manual initiation signal." In Section 2.2, "Variations," of Enclosure 1 to the license amendment request (LAR), the licensee provided the following variation and justification, in part: |
| | STS [Standard Technical Specifications] Table 3.3.5.1-1, Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, manual initiation functions for LPCI and CS are not being included in TS 3.3.5.3, Table 3.3.5.3-1. As a result of this design, proposed BSEP SR 3.5.2.8 is modified from the STS SR 3.5.2.8 to verification that the required ECCS injection/spray subsystem can be manually operated versus verifying that the subsystem actuates on a manual initiation signal. |
| | Enclosure |
| | |
| | The licensee further stated in its LAR that: |
| | Since the LPCI and CS subsystems can be placed in service using manual means in a short period of time (i.e., within the timeframes assumed in the development of TSTF-542), using controls and indications that are readily available in the Main Control Room, manual operation of the required subsystem would be an equivalent alternative to system initiation via manual initiation logic. |
| | However, it is not clear what type of manual operation is available or being used in the main control room that can provide actuation of the ECCS injection/spray subsystems. |
| | (a) Clarify whether the Brunswick design includes a pushbutton(s) or hand switch(s) for actuation of the ECCS subsystems. |
| | (b) Provide additional details and justification that support the use of the proposed alternative that includes manually aligning CS and LPCI components for injection and the associated timing of these actions. |
| | BSEP-RAl-2 In the proposed new Brunswick TS 3.3.5.3 (Brunswick TS page 3.3-48b of Enclosures 2 and 3 of the license amendment request), the note below "SURVEILLANCE REQUIREMENTS" is entitled "NOTES." Since there is only one note, the title should state "NOTE." Revise this TS page accordingly, or provide an explanation. |
| | BSEP-RAl-3 The allowable value (AV) in the current TS Table 3.3.5.1-1, Function 1.a (Core Spray System - |
| | Reactor Steam Dome Pressure - Low) and Function 2.a (Low Pressure Coolant Injection System - Reactor Steam Dome Pressure - Low) are 2: 402 pounds per square inch gauge (psig) ands 425 psig. This is consistent with STS Table 3.3.5.1-1 with an AV range of[.:: 390 psig and s 500 psig]. In TSTF-542, these functions are moved to STS Table 3.3.5.2-1 with an upper-end AV of[:::. 500 psig]. Also, TSTF-542, Revision 2 (page 41), states: |
| | * In LCO 3.3.5.2A, the Allowable Value is revised to eliminate the low pressure limit and to retain the high pressure limit. The RPV is well below the lower limit in Modes 4 and 5, so the low pressure limit is not needed. |
| | However, in the proposed Brunswick Table 3.3.5.3-1 (page 3.3-48c), Function 1.a and Function 2.a, AVs are 2: 402 psig, which is the lower limit for Brunswick. Revise the proposed changes to be consistent with TSTF-542, Revision 2, or provide a technical justification for this variation. |
| | BSEP-RAl-4 The licensee stated in Section 2.2, "Variations," of Enclosure 1 to the LAR, in part, the following variation and justification: |
| | STS Table 3.3.5.1-1, Function 1.d, "Core Spray Pump Discharge Flow - Low," |
| | and Function 2.g, "Low Pressure Coolant Injection Pump - Discharge Flow - |
| | Low," are not included in the BSEP TSs. Also, STS Table 3.3.5.1-1, |
| | |
| | Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, they are not being included in TS 3.3.5.3, "Reactor Pressure Vessel (RPV) Water Inventory Control," Table 3.3.5.3-1. As a result of this design, BSEP TS 3.3.5.3 does not contain a Condition equivalent to STS 3.3.5.2, Condition D. |
| | Furthermore, TSTF-542, Revision 2, relocates the CS and LPCI pump discharge flow-low requirements from STS Table 3.3.5.1-1, "Emergency Core Cooling System Instrumentation," to revised STS Table 3.3.5.2-1, "RPV Water Inventory Control Instrumentation." In particular, Section 3.3.4.2 of the TSTF-542, Revision 2, describes the purpose of the STS requirement: |
| | The minimum flow instruments are provided to protect the associated low pressure ECCS pump from overheating when the pump is operating and the associated injection valve is not fully open. The minimum flow line valve is opened when low flow is sensed, and the valve is automatically closed when the flow rate is adequate to protect the pump. |
| | The presence or absence of a requirement in a current TS is not in and of itself justification for the deviation from the TSTF-542, Revision 2. |
| | Provide technical justifications (i.e., a discussion of the differences) for not including the equivalent of CS and LPCI pump discharge flow-low functions as described in TSTF-542, STS Table 3.3.5.2-1, in the proposed Brunswick TS Table 3.3.5.3-1, or revise the proposed changes to include the functions along with a variation describing the technical justification for proposing to add the requirements to the Brunswick TSs. |
| | BSEP-RAl-5 Proposed TS 3.5.2, Required Action E.1 (BSEP TS page 3.5-10), states: |
| | Initiate action to restore Drain Time to ~ 36 hours. |
| | Since "Drain Time" is a proposed defined term in BSEP TS 1.1, "Definitions," it should be capitalized, consistent with the Brunswick convention for defined terms throughout TSs. Revise the proposed change for consistency or provide a justification for this variation. |
| | BSEP-RAl-6 The licensee proposed on Brunswick TS page 3.5-12 of Enclosures 2 and 3 to the LAR deletion of SR 3.5.2.7 that is associated with the ECCS response time for each required ECCS injection/spray subsystem. This is a plant-specific change since it is not included in TSTF-542, Revision 2. Provide technical justifications that support deletion of SR 3.5.2.7. |
| | |
| | BSEP-RAl-7 Proposed Brunswick TS 3.3.5.3, Condition D, states (Brunswick TS page 3.3.48b): |
| | Required Action and associated Completion Time of Condition C or D not met. |
| | This appears to be an editorial error since Condition D should not state "or D". Correct this error or provide justification that "Condition C or D" is correct under the proposed Condition D. |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242) DATED DECEMBER 4, 2017 DISTRIBUTION: PUBLIC RidsNrrDorlLpl2-2 RidsNrrLABClayton RidsACRS_MailCTR RidsNrrPMBrunswick RidsRgn2MailCenter RidsNrrDssStsb RHaskell, NRR LWheeler, NRR ADAMS A ccess1on N ML 173178002 o.: OFFICE D0RL/LPL2-2/PM D0RL/LPL2-2/LA DSS/STSB/ BC(A)* NAME FSaba BClayton JWhitman (LRonewicz for) DATE 11/26/2017 11/16/2017 10/18/2017 OFFICIAL RECORD COPY DWarner, NRR RAlvarado, NRR SPeng, NRR JWhitman, NRR *b ., 1y e-ma1 D0RL/LPL2-2/BC D0RL/LPL2-2/PM UShoop FSaba 12/04/2017 12/04/2017}} | | BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242) |
| | DATED DECEMBER 4, 2017 DISTRIBUTION: |
| | PUBLIC RidsRgn2MailCenter DWarner, NRR RidsNrrDorlLpl2-2 RidsNrrDssStsb RAlvarado, NRR RidsNrrLABClayton RHaskell, NRR SPeng, NRR RidsACRS_MailCTR LWheeler, NRR JWhitman, NRR RidsNrrPMBrunswick ADAMS Access1on No.: ML173178002 *b1y e-ma1 OFFICE D0RL/LPL2-2/PM D0RL/LPL2-2/LA DSS/STSB/ D0RL/LPL2-2/BC D0RL/LPL2-2/PM BC(A)* |
| | FSaba BClayton JWhitman UShoop FSaba NAME (LRonewicz for) |
| | DATE 11/26/2017 11/16/2017 10/18/2017 12/04/2017 12/04/2017 OFFICIAL RECORD COPY}} |
Letter Sequence RAI |
---|
CAC:MF9905, Reactor Pressure Vessel Water Inventory Control (Approved, Closed) CAC:MF9906, Reactor Pressure Vessel Water Inventory Control (Approved, Closed) EPID:L-2017-LLA-0242, Reactor Pressure Vessel Water Inventory Control (Approved, Closed) |
|
MONTHYEARBSEP 17-0060, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-06-29029 June 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. Project stage: Request ML17200A0872017-07-18018 July 2017 NRR E-mail Capture - Acceptance Review of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Project stage: Acceptance Review ML17209A1682017-07-28028 July 2017 NRR E-mail Capture - Corrected Title: Acceptance Review of License Amendment Request Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, (CAC Nos. MF9905 and 9906) Project stage: Acceptance Review ML17317B0022017-12-0404 December 2017 Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) Project stage: RAI BSEP 17-0115, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-0404 January 2018 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Response to RAI BSEP 18-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-01-23023 January 2018 Supplement to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control Project stage: Supplement ML18039A4442018-04-13013 April 2018 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, Reactor Pressure Vessel Water Inventory Control Revision 2 Project stage: Approval ML18137A1432018-05-23023 May 2018 Correction to Issuance of Amendment Nos. 283 and 311 to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) Project stage: Approval ML18298A0782018-12-0303 December 2018 2nd Correction to Issuance of Amendments to Adopt Technical Specifications Task Force 542, Revision 2, Reactor Pressure Vessel Water Inventory Control Project stage: Approval 2018-01-23
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000324/20253012024-10-17017 October 2024 Notification of Licensed Operator Initial Examination 05000325/2025301 and 05000324/2025301 IR 05000324/20244012024-10-15015 October 2024 Security Baseline Inspection Report 05000324/2024401 and 05000325/2024401 ML24297A6262024-10-11011 October 2024 PCA Letter to NRC Brunswick Potential Tropical Storm Eight IR 05000324/20240102024-09-10010 September 2024 Focused Engineering Inspection Commercial Grade Dedication Report 05000324-2024010 and 05000325-2024010 ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000324/20240052024-08-23023 August 2024 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2024005 and 05000325/2024005) IR 05000324/20240022024-08-0505 August 2024 Integrated Inspection Report 05000324/2024002 and 05000325/2024002 and 07200006/2024001 ML24206A1062024-07-30030 July 2024 2024 Brunswick Requal Inspection Corporate Notification Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000324/20244202024-07-0202 July 2024 – Security Baseline Inspection Report 05000324/2024420 and 05000325/2024420 ML24108A0702024-06-0505 June 2024 – Issuance of License Amendments to Revise the 10 CFR 50.69 Categorization Process to Reflect an Alternative Seismic Approach IR 05000324/20244022024-05-17017 May 2024 Plan Material Control and Accounting Program Inspection Report 05000324/2024402 and 05000325/2024402 - Cover Letter IR 05000324/20240012024-05-0909 May 2024 Integrated Inspection Report 05000324/2024001 and 05000325/2024001 IR 05000324/20243012024-04-0303 April 2024 NRC Operator License Examination Report 05000325/2024301 and 05000324/2024301 ML24066A0132024-03-0505 March 2024 Bru 2024-002 Radiation Safety Baseline Inspection Information Request ML24026A0982024-03-0101 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0057 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000324/20230062024-02-28028 February 2024 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 – NRC Inspection Reports 05000324/2023006 and 05000325/2023006 IR 05000324/20244032024-02-14014 February 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perm Inspection 05000325/2024403; 05000324/2024403 ML24032A1392024-02-12012 February 2024 Correction of Errors within Authorized Alternative Request RA-22-0308 IR 05000324/20230042024-02-0606 February 2024 Integrated Inspection Report 05000324/2023004 and 05000325/2023004 IR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23202A0652023-07-19019 July 2023 NRR E-mail Capture - Request for Additional Information - Brunswick Steam Electric Plant, Units 1 and 2, Torus Liner Inspection Alternative Request (L-2022-LLR-0089) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23032A2472023-01-26026 January 2023 Document Request Letter for Brunswick Upcoming RP Inspection 2023002 ML23018A1892023-01-17017 January 2023 Document Request for RP Inspection at Brunswick Inspection Report 2023-01 ML22192A0862022-07-12012 July 2022 RQ Inspection Notification Letter ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21277A0952021-10-0101 October 2021 NRR E-mail Capture - Request for Additional Information - Brunswick Exemption Request from 10CFR 55.47 License Operator Exam Two-year Waiver Limit ML21239A0652021-09-0808 September 2021 Request for Additional Information Regarding Proposed Alternative to ASME Section XI Requirements for Repair - Replacement of Buried Service Water Piping (EPID L-021-LLR-0014) - Public ML21075A0032021-03-12012 March 2021 Emergency Preparedness Exercise Inspection Request for Information for - Brunswick, Catawba, North Anna, Oconee, Vogtle 1 & 2 ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21019A3772021-01-13013 January 2021 002 Radiation Safety Baseline Inspection Information Request ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20309A5212020-10-29029 October 2020 Request for Additional Information - Brunswick License Amendment Request to Modify Its Approved 10 CFR 50.69, Risk-Informed Categorization and Treatment of SSC Categorization Process ML20275A2972020-10-0101 October 2020 NRR E-mail Capture - Request for Additional Information - Brunswick Request for Alternate Examination of Reactor Vessel Nozzles ML20017A1602020-01-17017 January 2020 E-mail Notification of Inspection and Request for Additional Information ML19283C5532019-10-18018 October 2019 Redacted - Brunswick Steam Electric Plant, Units 1 and 2 - Request for Additional Information ML19283D0852019-10-0909 October 2019 Request for Additional Information - Brunswick Atrium 11 LAR ML19179A1312019-06-27027 June 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19177A0122019-06-25025 June 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS 5.5.12, Primary Containment Leakage Rate Testing Program for Permanent Extension of Maximum Appendix J Test Intervals (L 2019-LLA-0031) ML19081A0722019-03-21021 March 2019 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19067A2712019-03-0707 March 2019 NRR E-mail Capture - Brunswick 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19065A0962019-03-0606 March 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19058A0742019-02-26026 February 2019 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise Allowable Value for TS 3.3.8.1 Time Delay on Loss of Voltage ML19056A2212019-02-25025 February 2019 NRR E-mail Capture - Brunswick Draft 3rd Round RAI - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19015A0302019-01-14014 January 2019 NRR E-mail Capture - Brunswick 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML19010A3872019-01-10010 January 2019 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18360A0352018-12-21021 December 2018 NRR E-mail Capture - Brunswick Draft 2nd Round RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18360A0362018-12-21021 December 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TSs to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML18282A1492018-10-0909 October 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18263A3042018-09-20020 September 2018 NRR E-mail Capture - Brunswick Draft RAIs - LAR to Allow Implementation of the Provisions 10 CFR 50.69 ML18250A3082018-08-31031 August 2018 NRR E-mail Capture - Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report ML18225A0122018-08-10010 August 2018 NRR E-mail Capture - Draft Brunswick RAIs - LAR to Revise TS to Relocate the Pressure-Temperature Limits to the Pressure and Temperature Limits Report RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18130A8262018-05-15015 May 2018 Supplemental Information Needed for Acceptance. Amendment Request to Revise the Technical Specifications to Relocate the Pressure Temperature Limit Curves to a Pressure and Temperature Limits Report ML18088A0072018-03-27027 March 2018 NRR E-mail Capture - Brunswick Units 1 & 2 Request for Additional Information - Relief Request for RPV Shell Circumferential Weld Examination (L-2018-LLR-0001) ML18071A3732018-03-12012 March 2018 NRR E-mail Capture - Correction: Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18067A1032018-03-0808 March 2018 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Human Factors in the Mellla+ LAR (CACs MF8864 and MF8865, EPID: L-2016-LLA-0009) ML18010A0502018-01-0505 January 2018 E-mail Re. Brunswick Units 1 and Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) ML18010A0512018-01-0505 January 2018 Unit 2 - Request for Additional Information Related to the Mellla+ LAR (CACs MF8864 and MF8865) (Nonproprietary) ML17339A9132017-12-0505 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Human Factors (EPID: L- 2017- LLA- 0398) ML17339A0702017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - Electrical Engineering (EPID: L- 2017- LLA- 0398) ML17317B0022017-12-0404 December 2017 Request for Additional Information Related to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Revision 2 (CAC Nos. MF9905 and MF9906; EPID L-2017-LLA-0242) ML17339A0732017-12-0404 December 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related the Exigent Amendment Request for One-Time Extension of EDG Completions Time - PRA (EPID: L- 2017- LLA- 0398) ML17328A4872017-11-24024 November 2017 Unit 2 - Request for Additional Information Related the Emergency Amendment Request for One-Time Extension of EDG Completions Time ML17275A2772017-10-0202 October 2017 E-mail, Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CAC Nos. MF8864 and MF8865) (Non-Proprietary) ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17082A3042017-03-0909 March 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related Containment Accident Pressure in the Mellla+ LAR (CACs MF8864 and MF8865) ML17037A0022017-02-0303 February 2017 NRR E-mail Capture - Brunswick Unit 1 and Unit 2 Request for Additional Information Related to LAR to Modify the TS Requirements for End States Associated with the Implementation of the Approved TSTF Traveler TSTF-423-A (MF8466 and MF8467) ML16020A2632016-01-20020 January 2016 Brunswick Steam Electric Plant - Notification Of Inspection And Request For Information 2023-07-19
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 4, 2017 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Rd., SE (M/C BNP001)
Southport, NC 28461
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242)
Dear Mr. Gideon:
By application dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17180A538), Duke Energy Progress, Inc. (Duke Energy or the licensee) requested changes to the technical specifications (TSs) for Brunswick Steam Electric Plant (Brunswick), Units 1 and 2. Duke Energy requested to revise Brunswick, Units 1 and 2, TSs to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2. TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML163438008). The proposed amendments would replace existing TS requirements related to "operations that have the potential for draining the reactor vessel" with new requirements on reactor pressure vessel water inventory control to protect Safety Limit 2.1.1.3.
The NRC staff reviewed the licensee's submittal and determined that additional information is needed. On November 1, 2017, the NRC staff forwarded, by e-mail, a draft request for additional information to Duke Energy. On November 9, 2017, Duke Energy staff informed the NRC staff that a clarification conference was not needed. Also, the NRC staff agreed with the Duke Energy staff's request to respond to the request for additional information by January 8, 2018.
If you have any questions, please contact me at 301-415-1447 or Farideh.Saba@nrc.gov.
Sincerely, f ,1,,* ~i c -Sc~(_
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-325 and 50-324
Enclosure:
Request for Additional Information cc w/
Enclosure:
Distribution via Listserv
REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2 DUKE ENERGY PROGRESS, LLC BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 DOCKET NOS. 50-325 AND 50-324 By letter dated June 29, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17180A538), Duke Energy Progress, LLC (the licensee) requested to adopt Technical Specifications Task Force (TSTF) Traveler TSTF-542, "Reactor Pressure Vessel Water Inventory Control," Revision 2, which would change the technical specifications (TSs) for Brunswick Steam Electric Plant, Units 1 and 2 (Brunswick or BSEP). TSTF-542, Revision 2, was approved by the U.S. Nuclear Regulatory Commission (NRC) on December 20, 2016 (ADAMS Accession No. ML163438008).
Brunswick TS Section 2.0, "Safety Limits (SLS)," 2.1.1.3 states, "Reactor vessel water level shall be greater than the top of active irradiated fuel." Safety Limit 2.1.1.3 is maintained through the TS limiting condition for operation (LCO), applicability, actions, and notes. The Brunswick TSs require certain safety systems to be operable during "operations with a potential for draining the reactor vessel."
The proposed changes would replace existing TS requirements associated with operations with a potential for draining the reactor vessels with revised TSs providing an alternative requirement for reactor pressure vessel (RPV) water inventory control. These alternative requirements would comply with Safety Limit 2.1.1.3. The NRC staff has reviewed the proposed amendments and finds that additional information is needed to complete its review.
BSEP-RAl-1 TSTF-542, Revision 2, Surveillance Requirement (SR) 3.5.2.8 states: "Verify the required ECCS [emergency core cooling system] injection/spray subsystem actuates on a manual initiation signal." In Section 2.2, "Variations," of Enclosure 1 to the license amendment request (LAR), the licensee provided the following variation and justification, in part:
STS [Standard Technical Specifications] Table 3.3.5.1-1, Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, manual initiation functions for LPCI and CS are not being included in TS 3.3.5.3, Table 3.3.5.3-1. As a result of this design, proposed BSEP SR 3.5.2.8 is modified from the STS SR 3.5.2.8 to verification that the required ECCS injection/spray subsystem can be manually operated versus verifying that the subsystem actuates on a manual initiation signal.
Enclosure
The licensee further stated in its LAR that:
Since the LPCI and CS subsystems can be placed in service using manual means in a short period of time (i.e., within the timeframes assumed in the development of TSTF-542), using controls and indications that are readily available in the Main Control Room, manual operation of the required subsystem would be an equivalent alternative to system initiation via manual initiation logic.
However, it is not clear what type of manual operation is available or being used in the main control room that can provide actuation of the ECCS injection/spray subsystems.
(a) Clarify whether the Brunswick design includes a pushbutton(s) or hand switch(s) for actuation of the ECCS subsystems.
(b) Provide additional details and justification that support the use of the proposed alternative that includes manually aligning CS and LPCI components for injection and the associated timing of these actions.
BSEP-RAl-2 In the proposed new Brunswick TS 3.3.5.3 (Brunswick TS page 3.3-48b of Enclosures 2 and 3 of the license amendment request), the note below "SURVEILLANCE REQUIREMENTS" is entitled "NOTES." Since there is only one note, the title should state "NOTE." Revise this TS page accordingly, or provide an explanation.
BSEP-RAl-3 The allowable value (AV) in the current TS Table 3.3.5.1-1, Function 1.a (Core Spray System -
Reactor Steam Dome Pressure - Low) and Function 2.a (Low Pressure Coolant Injection System - Reactor Steam Dome Pressure - Low) are 2: 402 pounds per square inch gauge (psig) ands 425 psig. This is consistent with STS Table 3.3.5.1-1 with an AV range of[.:: 390 psig and s 500 psig]. In TSTF-542, these functions are moved to STS Table 3.3.5.2-1 with an upper-end AV of[:::. 500 psig]. Also, TSTF-542, Revision 2 (page 41), states:
- In LCO 3.3.5.2A, the Allowable Value is revised to eliminate the low pressure limit and to retain the high pressure limit. The RPV is well below the lower limit in Modes 4 and 5, so the low pressure limit is not needed.
However, in the proposed Brunswick Table 3.3.5.3-1 (page 3.3-48c), Function 1.a and Function 2.a, AVs are 2: 402 psig, which is the lower limit for Brunswick. Revise the proposed changes to be consistent with TSTF-542, Revision 2, or provide a technical justification for this variation.
BSEP-RAl-4 The licensee stated in Section 2.2, "Variations," of Enclosure 1 to the LAR, in part, the following variation and justification:
STS Table 3.3.5.1-1, Function 1.d, "Core Spray Pump Discharge Flow - Low,"
and Function 2.g, "Low Pressure Coolant Injection Pump - Discharge Flow -
Low," are not included in the BSEP TSs. Also, STS Table 3.3.5.1-1,
Function 1.e, and 2.h, "Manual Initiation," for the Core Spray (CS) System and Low Pressure Coolant Injection (LPCI) System are not included in the BSEP TSs. Therefore, they are not being included in TS 3.3.5.3, "Reactor Pressure Vessel (RPV) Water Inventory Control," Table 3.3.5.3-1. As a result of this design, BSEP TS 3.3.5.3 does not contain a Condition equivalent to STS 3.3.5.2, Condition D.
Furthermore, TSTF-542, Revision 2, relocates the CS and LPCI pump discharge flow-low requirements from STS Table 3.3.5.1-1, "Emergency Core Cooling System Instrumentation," to revised STS Table 3.3.5.2-1, "RPV Water Inventory Control Instrumentation." In particular, Section 3.3.4.2 of the TSTF-542, Revision 2, describes the purpose of the STS requirement:
The minimum flow instruments are provided to protect the associated low pressure ECCS pump from overheating when the pump is operating and the associated injection valve is not fully open. The minimum flow line valve is opened when low flow is sensed, and the valve is automatically closed when the flow rate is adequate to protect the pump.
The presence or absence of a requirement in a current TS is not in and of itself justification for the deviation from the TSTF-542, Revision 2.
Provide technical justifications (i.e., a discussion of the differences) for not including the equivalent of CS and LPCI pump discharge flow-low functions as described in TSTF-542, STS Table 3.3.5.2-1, in the proposed Brunswick TS Table 3.3.5.3-1, or revise the proposed changes to include the functions along with a variation describing the technical justification for proposing to add the requirements to the Brunswick TSs.
BSEP-RAl-5 Proposed TS 3.5.2, Required Action E.1 (BSEP TS page 3.5-10), states:
Initiate action to restore Drain Time to ~ 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
Since "Drain Time" is a proposed defined term in BSEP TS 1.1, "Definitions," it should be capitalized, consistent with the Brunswick convention for defined terms throughout TSs. Revise the proposed change for consistency or provide a justification for this variation.
BSEP-RAl-6 The licensee proposed on Brunswick TS page 3.5-12 of Enclosures 2 and 3 to the LAR deletion of SR 3.5.2.7 that is associated with the ECCS response time for each required ECCS injection/spray subsystem. This is a plant-specific change since it is not included in TSTF-542, Revision 2. Provide technical justifications that support deletion of SR 3.5.2.7.
BSEP-RAl-7 Proposed Brunswick TS 3.3.5.3, Condition D, states (Brunswick TS page 3.3.48b):
Required Action and associated Completion Time of Condition C or D not met.
This appears to be an editorial error since Condition D should not state "or D". Correct this error or provide justification that "Condition C or D" is correct under the proposed Condition D.
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATIONS TO ADOPT TSTF-542, REVISION 2, "REACTOR PRESSURE VESSEL WATER INVENTORY CONTROL" (CAC NOS. MF9905 AND MF9906; EPID L-2017-LLA-0242)
DATED DECEMBER 4, 2017 DISTRIBUTION:
PUBLIC RidsRgn2MailCenter DWarner, NRR RidsNrrDorlLpl2-2 RidsNrrDssStsb RAlvarado, NRR RidsNrrLABClayton RHaskell, NRR SPeng, NRR RidsACRS_MailCTR LWheeler, NRR JWhitman, NRR RidsNrrPMBrunswick ADAMS Access1on No.: ML173178002 *b1y e-ma1 OFFICE D0RL/LPL2-2/PM D0RL/LPL2-2/LA DSS/STSB/ D0RL/LPL2-2/BC D0RL/LPL2-2/PM BC(A)*
FSaba BClayton JWhitman UShoop FSaba NAME (LRonewicz for)
DATE 11/26/2017 11/16/2017 10/18/2017 12/04/2017 12/04/2017 OFFICIAL RECORD COPY