| issue date = 03/12/1992
| issue date = 03/12/1992
| title = Special Rept 92-1:on 920223,fire Barriers Found Impaired for Greater than Seven Days.Caused by Equipment Failure.Fire Door Will Be Replaced Upon Receipt of New Door
| title = Special Rept 92-1:on 920223,fire Barriers Found Impaired for Greater than Seven Days.Caused by Equipment Failure.Fire Door Will Be Replaced Upon Receipt of New Door
| author name = VONDRA C A
| author name = Vondra C
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:..... *
{{#Wiki_filter:.....
* Public Service Electric and Gas Company P.O. Box 236 Hancock; Bridgs. New Jersey 08038 Salem Generating Station U. S.
PS~G                                *
Regulatory Commission Document Control Desk Washington, DC 20555  
* Public Service Electric and Gas Company P.O. Box 236 Hancock; Bridgs. New Jersey 08038 Salem Generating Station March '12; 1992 U. S. N~clear Regulatory Commission Document Control Desk Washington, DC                                       20555


==Dear Sir:==
==Dear Sir:==
SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 SPE.C-IAL REPORT 92-1 March '12; 1992 This report addresses a fire barrieJ*
 
which had not been to functi6nal status witbjn seven (7) days. This report ha£ been ih the reporting requiiements of Technical Statement 3.7.11.a purstiant to Specification 6.9.2. It is b2ing submitted within thirty (30) days as requiied.
SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 SPE.C-IAL REPORT                                   92-1 This report addresses a fire barrieJ* i~pairment which had not been resto~ed to functi6nal status witbjn seven (7) days.                                 This report ha£ been .prep~red ih ac~ordance ~ith the reporting requiiements of Technical Specification.Actio~ Statement 3.7.11.a purstiant to Te~hnical Specification 6.9.2.                             It is b2ing submitted within thirty (30) days as requiied.
* MJP:pc Distribution 9203200042 920312 PDR ADOCK 05000272 S PDR .. --. F**' {, .. 1-: ... * !,-..* ''""'.', ., -. ( '! ,_ -'-J u u
* Sincerely yours,
\.) Sincerely yours, /1 /:::l pl . . //' .. C' v C. A. Vondra General Manager -Salem Operations 95-2189 (10M) 12-89 ti' UNIT 1 SPECIAL REPORT.-1 PL!i,J:iT_
                                                                        /1 /:::l ~ pl . .
I_pENTIFICATION:
                                                                        //' .. C' v  c.~~;rt-'
Salem Generatin¢ Station -Unit 1 Public Service Electric & Gas Hancock's
tf!~-             u~
: Bridge, 08038
C. A. Vondra General Manager -
___ 9F_ OCC_URRENCE:
Salem Operations MJP:pc Distribution 9203200042 920312 PDR ADOCK 05000272 S                                                PDR
* Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than Seven (7) Days Event Dates: 2/23/92 Report Date: 3/12/92 This report was initiated by Incident Report No. 92-111. CONDITIONS PRIOR TO OCCURRENCE:
            ..- - .                   F**' {, .. 1- :
----* ----** -. . Mode 1 Reactor Power 100% -Unit Load 1155 MWe OF OCCURRENCE:
            ... * !,-..* ' ""'.', ., -. (   ~ '! ,_
Per Technical Specttication Report is required when fire greater than seven (7) days.
            -'- J        u u '~-~ \.)                                                                95-2189 (10M) 12-89
Statement 3.7.11.a, a Special barrier penetrations are impaired for This report satjsfies this requirewent.
 
On February 16, 1992, during normal power operation, the fire door between the 100' Elevation Mechanical Penetration Area and the Auxiliary Building was found impaired by a roving fire watch during patrol. The door's hinge screws were broken causing misalignment of the door. The door could not adequately close and latch. Therefore, it was declared inoperable and Specification 3.7.11 Action "a" was applied.
ti' UNIT 1 SPECIAL REPORT.-1 PL!i,J:iT_ I_pENTIFICATION:
inspection revealed that the internal hinge plate welds were broken and the internal frame was loose. It was determined to replace the door. *A new door was ordered; however, it was not received within the seven (7) day Technical Specification Action Statement time constraint.
Salem Generatin¢ Station - Unit 1 Public Service Electric & Gas Co~pany Hancock's Bridge, ~ew Jer~ey      08038 Il!J:~JIF_I_C:l>TJON___ 9F_ OCC_URRENCE:
An hourly rovi-ng fire watch had previously been established for the fire door (see Apparent Cause of Occurrence section);
Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than Seven (7) Days Event Dates:      2/23/92 Report Date:      3/12/92 This report was initiated by Incident Report No. 92-111.
therefore, the of Technical Specification Statement 3.7.11.a, were met. Technical Specification 3.7.11 states: "All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional." Action Statement 3.7.11.a states: "With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side* of UNIT 1 SPECIAL REPORT *-1
CONDITIONS
* ___ OF _QC CURRENCE: (cont'd) the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly watch patrol.
    ----* -- --** ~ -
the non-functional barrier to iunctional status within 7 days or, in lieu of any other report reqGired by Specification 6.9.1-,
PRIOR
and submit a Sp-ecial Report to the Commission pursuant to Specification 6.9.2 within the next _(30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire barrier penetration(s) to functional status." APPARENT CAUSE OF OCCURRENCE:
                        .     TO. OCCURRENCE:
-*----------
Mode 1       Reactor Power 100% - Unit Load 1155 MWe DESCRI~r~o~        OF OCCURRENCE:
----**-----*--*-*---*--
Per Technical Specttication ~ction Statement 3.7.11.a, a Special Report is required when fire barrier penetrations are impaired for greater than seven (7) days.      This report satjsfies this requirewent.
----------------
On February 16, 1992, during normal power operation, the fire door between the 100' Elevation Mechanical Penetration Area and the Auxiliary Building was found impaired by a roving fire watch during patrol.     The door's hinge screws were broken causing misalignment of the door.     The door could not adequately close and latch. Therefore, it was declared inoperable and Techni~al Specification 3.7.11 Action "a" was applied.
*----The cause of the door not-being returned to a functional condition is equipment failure. The damage was such that door replacement was necessary.
Detail~d    inspection revealed that the internal hinge plate welds were broken and the internal frame was     loose. It was determined to replace the door. *A new door was     ordered; however, it was not received within the seven (7) day     Technical Specification Action Statement time constraint.
A replacement door was ordered since these doors are not a stock It was not received withj_n seven (7) to satisfy the Technical Specification Action Statement.
An hourly rovi-ng fire watch had previously been established for the fire door (see Apparent Cause of Occurrence section); therefore, the requir~ments of Technical Specification A~tion Statement 3.7.11.a, were met.
identified that this door is found non-functional at least once each year. The door is of a high traffic pattern. Additionally, the Auxiliary Building is maintained at negative pressure.
Technical Specification 3.7.11 states:
Doors *such as this, which access the Auxiliary Building, tend to-close "hard" promoting a potentially higher failure rate. The concern for contihued functional reliability of these doors has been previously identified.
                  "All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional."
Until the ventilation concerns aie resolved, PSE&G has committed to maintaining an hourly fire watch rove for all subject fire do9rs (i.e., reference response to NRC Inspection Report 272/90-01)
Action Statement 3.7.11.a states:
OF,_ oc_<;l!RRENCE:
                  "With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side* of
The functional integrity of fire barrier penetrations ensures that fires will be confined or adequately retarded from spreading to _adjacent portions of the facility.
 
This design feature minimizes the possibility of a single fire involving several areas of the facility.
UNIT 1 SPECIAL REPORT * - 1 P_E&sect;~R.f_PTION            ___OF _QC CURRENCE:
Fire doors are a passive element in the facility fire protection program and are subject to periodic inspections.
(cont'd) the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly fi~e watch patrol.                             R~store the non-functional
This report reporting requirements of Technical Specification Action Statement 3.7.11.a, pursuant to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire door is greater than seven (7) days. Appropriate remedial actions were in place in accordance with the requirements of Technical Specification Action Statement 3.7.11.a to establish an hourly roving fire watch patrol for the impaired fire barriers once the impairments were identified.
          ~ire barrier penet~ation(s) to iunctional status within 7 days or, in lieu of any other report reqGired by Specification 6.9.1-, pr~pare and submit a Sp-ecial Report to the Commission pursuant to Specification 6.9.2 within the next _(30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire barrier penetration(s) to functional status."
The subject fire areas contain detection devices in addition to the roving fire watch patrol. A fire in the would be detected before it could involve an adjacent aiea.
APPARENT
occurrence, therefore, involved no undue risk to the health or safety of the public.
-*----------         CAUSE OF OCCURRENCE:
The repair of the impaired fire door was not accomplished within seven (7) days as discussed previously.
The cause of the door not-being returned to a functional condition is equipment failure.                          The damage was such that door replacement was necessary.                A replacement door was ordered since these doors are not a stock it~m.                     It was not received withj_n seven (7) day~ to satisfy the Technical Specification Action Statement.
The fire door will be replaced upon receipt of the new door.
Inv~stigation identified that this door is found non-functional at least once each year.                             The door is ~art of a high traffic pattern.
... UNIT 1. SPECIAL REPORT--1 .
Additionally, the Auxiliary Building is maintained at negative pressure.               Doors *such as this, which access the Auxiliary Building, tend to-close "hard" promoting a potentially higher failure rate.
* ACTION: _(cont I a) The concern for continued functional reliability of the subject fire doors has been previously_identified.
The concern for contihued functional reliability of these doors has been previously identified.                             Until the ventilation concerns aie resolved, PSE&G has committed to maintaining an hourly fire watch rove for all subject fire do9rs (i.e., reference response to NRC Inspection Report 272/90-01)
Implementation of c6rrective action, as committed to in PSE&G's response to NRC inspection 272/90-01, is coniinuing.
ANALY~._IS            OF,_ oc_<;l!RRENCE:
Actions have been to establish folio stock numbers for replacement fire doors and to maintain replacement doors in stock. The hourly fire watch will continue until the ventilation concerns, associated with the Auxiliary Building, are resolved.
The functional integrity of fire barrier penetrations ensures that fires will be confined or adequately retarded from spreading to
MJP:pc SORC Mtg. 92-031 /J/& ,, '
_adjacent portions of the facility.                             This design feature minimizes the possibility of a single fire involving several areas of the facility.               Fire doors are a passive element in the facility fire protection program and are subject to periodic inspections.                             This report s~tisfies reporting requirements of Technical Specification Action Statement 3.7.11.a, pursuant to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire door im~airment is greater than seven (7) days.                             Appropriate remedial actions were in place in accordance with the requirements of Technical Specification Action Statement 3.7.11.a to establish an hourly roving fire watch patrol for the impaired fire barriers once the impairments were identified.
* j/ r} v; . General Manager Salem Operations}}
The subject fire areas contain detection devices in addition to the roving fire watch patrol.                             A fire in the area~ would be detected before it could involve an adjacent aiea.                             Thi~ occurrence, therefore, involved no undue risk to the health or safety of the public.
CQRJ~--~_\:TI_Y0__ACTION:
The repair of the impaired fire door was not accomplished within seven (7) days as discussed previously.                             The fire door will be replaced upon receipt of the new door.
 
UNIT 1. SPECIAL REPORT--1 .
    ~O~RE_<;TIVE ACTION: _(cont I a)
The concern for continued functional reliability of the subject fire doors has been previously_identified. Implementation of c6rrective action, as committed to in PSE&G's response to NRC inspection Repo~t 272/90-01, is coniinuing.
Actions have been initiat~d to establish folio stock numbers for replacement fire doors and to maintain replacement doors in stock.
The hourly fire watch will continue until the ventilation concerns, associated with the Auxiliary Building, are resolved.
                                                /J/& ,                '
* j/ r} v; oL?~._
                                                . General Manager  ~/!_
Salem Operations MJP:pc SORC Mtg. 92-031}}

Latest revision as of 06:36, 3 February 2020

Special Rept 92-1:on 920223,fire Barriers Found Impaired for Greater than Seven Days.Caused by Equipment Failure.Fire Door Will Be Replaced Upon Receipt of New Door
ML18096A567
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/12/1992
From: Vondra C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
92-1, NUDOCS 9203200042
Download: ML18096A567 (4)


Text

.....

PS~G *

  • Public Service Electric and Gas Company P.O. Box 236 Hancock; Bridgs. New Jersey 08038 Salem Generating Station March '12; 1992 U. S. N~clear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 SPE.C-IAL REPORT 92-1 This report addresses a fire barrieJ* i~pairment which had not been resto~ed to functi6nal status witbjn seven (7) days. This report ha£ been .prep~red ih ac~ordance ~ith the reporting requiiements of Technical Specification.Actio~ Statement 3.7.11.a purstiant to Te~hnical Specification 6.9.2. It is b2ing submitted within thirty (30) days as requiied.

  • Sincerely yours,

/1 /:::l ~ pl . .

//' .. C' v c.~~;rt-'

tf!~- u~

C. A. Vondra General Manager -

Salem Operations MJP:pc Distribution 9203200042 920312 PDR ADOCK 05000272 S PDR

..- - . F**' {, .. 1- :

... * !,-..* ' ""'.', ., -. ( ~ '! ,_

-'- J u u '~-~ \.) 95-2189 (10M) 12-89

ti' UNIT 1 SPECIAL REPORT.-1 PL!i,J:iT_ I_pENTIFICATION:

Salem Generatin¢ Station - Unit 1 Public Service Electric & Gas Co~pany Hancock's Bridge, ~ew Jer~ey 08038 Il!J:~JIF_I_C:l>TJON___ 9F_ OCC_URRENCE:

Technical Specification 3.7.11; Fire Barriers Impaired For Greater Than Seven (7) Days Event Dates: 2/23/92 Report Date: 3/12/92 This report was initiated by Incident Report No.92-111.

CONDITIONS


* -- --** ~ -

PRIOR

. TO. OCCURRENCE:

Mode 1 Reactor Power 100% - Unit Load 1155 MWe DESCRI~r~o~ OF OCCURRENCE:

Per Technical Specttication ~ction Statement 3.7.11.a, a Special Report is required when fire barrier penetrations are impaired for greater than seven (7) days. This report satjsfies this requirewent.

On February 16, 1992, during normal power operation, the fire door between the 100' Elevation Mechanical Penetration Area and the Auxiliary Building was found impaired by a roving fire watch during patrol. The door's hinge screws were broken causing misalignment of the door. The door could not adequately close and latch. Therefore, it was declared inoperable and Techni~al Specification 3.7.11 Action "a" was applied.

Detail~d inspection revealed that the internal hinge plate welds were broken and the internal frame was loose. It was determined to replace the door. *A new door was ordered; however, it was not received within the seven (7) day Technical Specification Action Statement time constraint.

An hourly rovi-ng fire watch had previously been established for the fire door (see Apparent Cause of Occurrence section); therefore, the requir~ments of Technical Specification A~tion Statement 3.7.11.a, were met.

Technical Specification 3.7.11 states:

"All fire penetrations (including cable penetration barriers, fire doors and fire dampers), in fire zone boundaries, protecting safety related areas shall be functional."

Action Statement 3.7.11.a states:

"With one (1) or more of the above required fire barrier penetrations non-functional, within one (1) hour either establish a continuous fire watch on at least one (1) side* of

UNIT 1 SPECIAL REPORT * - 1 P_E§~R.f_PTION ___OF _QC CURRENCE:

(cont'd) the affected penetration, or verify the OPERABILITY of fire detectors on at least one (1) side of the non-functional fire barrier and establish an hourly fi~e watch patrol. R~store the non-functional

~ire barrier penet~ation(s) to iunctional status within 7 days or, in lieu of any other report reqGired by Specification 6.9.1-, pr~pare and submit a Sp-ecial Report to the Commission pursuant to Specification 6.9.2 within the next _(30) days outlining the action taken, the cause of the non-functional penetration and plans and schedule for restoring the fire barrier penetration(s) to functional status."

APPARENT

-*---------- CAUSE OF OCCURRENCE:

The cause of the door not-being returned to a functional condition is equipment failure. The damage was such that door replacement was necessary. A replacement door was ordered since these doors are not a stock it~m. It was not received withj_n seven (7) day~ to satisfy the Technical Specification Action Statement.

Inv~stigation identified that this door is found non-functional at least once each year. The door is ~art of a high traffic pattern.

Additionally, the Auxiliary Building is maintained at negative pressure. Doors *such as this, which access the Auxiliary Building, tend to-close "hard" promoting a potentially higher failure rate.

The concern for contihued functional reliability of these doors has been previously identified. Until the ventilation concerns aie resolved, PSE&G has committed to maintaining an hourly fire watch rove for all subject fire do9rs (i.e., reference response to NRC Inspection Report 272/90-01)

ANALY~._IS OF,_ oc_<;l!RRENCE:

The functional integrity of fire barrier penetrations ensures that fires will be confined or adequately retarded from spreading to

_adjacent portions of the facility. This design feature minimizes the possibility of a single fire involving several areas of the facility. Fire doors are a passive element in the facility fire protection program and are subject to periodic inspections. This report s~tisfies reporting requirements of Technical Specification Action Statement 3.7.11.a, pursuant to Technical Specification 6.9.2 since the time between discovery and eventual repair of the fire door im~airment is greater than seven (7) days. Appropriate remedial actions were in place in accordance with the requirements of Technical Specification Action Statement 3.7.11.a to establish an hourly roving fire watch patrol for the impaired fire barriers once the impairments were identified.

The subject fire areas contain detection devices in addition to the roving fire watch patrol. A fire in the area~ would be detected before it could involve an adjacent aiea. Thi~ occurrence, therefore, involved no undue risk to the health or safety of the public.

CQRJ~--~_\:TI_Y0__ACTION:

The repair of the impaired fire door was not accomplished within seven (7) days as discussed previously. The fire door will be replaced upon receipt of the new door.

UNIT 1. SPECIAL REPORT--1 .

~O~RE_<;TIVE ACTION: _(cont I a)

The concern for continued functional reliability of the subject fire doors has been previously_identified. Implementation of c6rrective action, as committed to in PSE&G's response to NRC inspection Repo~t 272/90-01, is coniinuing.

Actions have been initiat~d to establish folio stock numbers for replacement fire doors and to maintain replacement doors in stock.

The hourly fire watch will continue until the ventilation concerns, associated with the Auxiliary Building, are resolved.

/J/& , '

  • j/ r} v; oL?~._

. General Manager ~/!_

Salem Operations MJP:pc SORC Mtg.92-031