ML18101A434: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/28/1994
| issue date = 12/28/1994
| title = Forwards Salem Generating Station Unit 2 ISI Program Long Term Plan, Vols A-E
| title = Forwards Salem Generating Station Unit 2 ISI Program Long Term Plan, Vols A-E
| author name = HAGAN J J
| author name = Hagan J
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| author affiliation = PUBLIC SERVICE ELECTRIC & GAS CO. OF NEW JERSEY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Public Service Electric and Gas Company Joseph J. Hagan Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President  
{{#Wiki_filter:Public Service Electric and Gas Company Joseph J. Hagan                     Public Service Electric and Gas Company     P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations DEC 2 8 1994 NLR-N94227 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
-Nuclear Operations DEC 2 8 1994 NLR-N94227 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
INSERVICE INSPECTION PH.OGRAM SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 By letter dated May 4, 1992 (Ref: NLR-N92045), Public Service Electric & Gas Company (PSE&G) submitted the Salem Generating Station, Unit No. 2, Inservice Inspection (ISI) Program, Second Ten-Year Interval, Rev:l.sion o. By letter dated June 13, 1994, a request for additional information (RAI) to support the NRC review of the ISI Program was transmitted to PSE&G. PSE&G's response to the RAI is being submitted concurrently by a separate letter (ref: NLR-N94226). PSE&G hereby submits revision 1 to the ISI Program for Salem Unit No. 2, Second Ten-Year Interval.
INSERVICE INSPECTION PH.OGRAM SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 By letter dated May 4, 1992 (Ref: NLR-N92045), Public Service Electric & Gas Company (PSE&G) submitted the Salem Generating Station, Unit No. 2, Inservice Inspection (ISI) Program, Second Ten-Year Interval, Rev:l.sion  
: o. By letter dated June 13, 1994, a request for additional information (RAI) to support the NRC review of the ISI Program was transmitted to PSE&G. PSE&G's response to the RAI is being submitted concurrently by a separate letter (ref: NLR-N94226).
PSE&G hereby submits revision 1 to the ISI Program for Salem Unit No. 2, Second Ten-Year Interval.
Revision 1 contains all changes that were made to the program as the result of the RAI response.
Revision 1 contains all changes that were made to the program as the result of the RAI response.
Enclosure 1 (five volumes) contains the Salem Unit 2 ISI Program, Second Ten-Year Interval, Revision 1. Should there be any questions with regard to this submittal, please do not hesitate to contact us. Sincerely, I 9501050085 94:1.228 \ I PDR ADOCK  
Enclosure 1 (five volumes) contains the Salem Unit 2 ISI Program, Second Ten-Year Interval, Revision 1. Should there be any questions with regard to this submittal, please do not hesitate to contact us.
: 1. 1 O! Q -* PDR I ., .. Document Control Desk 2 C (All without enclosure unless otherwise noted) Mr. T. T. Martin, Administrator  
Sincerely, r-*~o.;:;~~~;::----:~~~~~
-Region I u. S. Nuclear Regulatory Commission 475 Allendale Roa.c1 King of Prussia, --PA 19406 Mr. L. N. Olshan, *Licensing Project Manager -Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pi.ke Rockville, MD 20$52 Mr. c. Marschall  
I         9501050085 94:1.228                     \
.! Salem (S09) USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV
PDR ADOCK 050()0~ 1. 1 I
Q                          ~
O-
* PDR
 
I DEC 2 81994 Document Control Desk           2 NLR~N94227 C     (All without enclosure unless otherwise noted)
Mr. T. T. Martin, Administrator - Region I
: u. S. Nuclear Regulatory Commission 475 Allendale Roa.c1 King of Prussia, --PA 19406 Mr. L. N. Olshan, *Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pi.ke Rockville, MD 20$52 Mr. c. Marschall .! Salem (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV
* NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Assistant Director (w/enclosure)
* NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Assistant Director (w/enclosure)
New Jersey Departa3nt of Labor and Industry PO Box 1503, Laber and Industry Building Trenton, NJ 08625; DEC 2 81994 95-4933}}
New Jersey Departa3nt of Labor and Industry PO Box 1503, Laber and Industry Building Trenton, NJ 08625; 95-4933}}

Latest revision as of 05:48, 3 February 2020

Forwards Salem Generating Station Unit 2 ISI Program Long Term Plan, Vols A-E
ML18101A434
Person / Time
Site: Salem PSEG icon.png
Issue date: 12/28/1994
From: Hagan J
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101A435 List:
References
NLR-N94227, NUDOCS 9501050085
Download: ML18101A434 (2)


Text

Public Service Electric and Gas Company Joseph J. Hagan Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations DEC 2 8 1994 NLR-N94227 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

INSERVICE INSPECTION PH.OGRAM SALEM GENERATING STATION UNIT NO. 2 DOCKET NO. 50-311 By letter dated May 4, 1992 (Ref: NLR-N92045), Public Service Electric & Gas Company (PSE&G) submitted the Salem Generating Station, Unit No. 2, Inservice Inspection (ISI) Program, Second Ten-Year Interval, Rev:l.sion o. By letter dated June 13, 1994, a request for additional information (RAI) to support the NRC review of the ISI Program was transmitted to PSE&G. PSE&G's response to the RAI is being submitted concurrently by a separate letter (ref: NLR-N94226). PSE&G hereby submits revision 1 to the ISI Program for Salem Unit No. 2, Second Ten-Year Interval.

Revision 1 contains all changes that were made to the program as the result of the RAI response.

Enclosure 1 (five volumes) contains the Salem Unit 2 ISI Program, Second Ten-Year Interval, Revision 1. Should there be any questions with regard to this submittal, please do not hesitate to contact us.

Sincerely, r-*~o.;:;~~~;::----:~~~~~

I 9501050085 94:1.228 \

PDR ADOCK 050()0~ 1. 1 I

Q ~

O-

I DEC 2 81994 Document Control Desk 2 NLR~N94227 C (All without enclosure unless otherwise noted)

Mr. T. T. Martin, Administrator - Region I

u. S. Nuclear Regulatory Commission 475 Allendale Roa.c1 King of Prussia, --PA 19406 Mr. L. N. Olshan, *Licensing Project Manager - Salem U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pi.ke Rockville, MD 20$52 Mr. c. Marschall .! Salem (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV

  • NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Assistant Director (w/enclosure)

New Jersey Departa3nt of Labor and Industry PO Box 1503, Laber and Industry Building Trenton, NJ 08625; 95-4933