ML18101A871: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:PS~G                    *
* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT NO. 95-005-00 August 3, 1995 This Licensee Event Report entitled "Technical Specification Violation:
* Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit August 3, 1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn:             Document Control Desk SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT NO. 95-005-00 This Licensee Event Report entitled "Technical Specification Violation: Failure to Analyze Second Sample with Radiation Monitor Inoperable" is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73 (a) (2) (i) (B). Attachment A contains those commitments which are currently outstanding or on-going related to this issue.
Failure to Analyze Second Sample with Radiation Monitor Inoperable" is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73 (a) (2) (i) (B). Attachment A contains those commitments which are currently outstanding or on-going related to this issue. Attachment A SORC Mtg. 95-083 RJB C Distribution LER File The DOWf'r ir; in vnm h111rL 9508100192 PDR ADOCK s 950803 05000311 PDR Sincerely, Warren General Manager Salem Operations 95-2168 REV. 6/94
Sincerely, f/L,Ct~
*
C~~-        Warren General Manager Salem Operations Attachment A SORC Mtg. 95-083 RJB C         Distribution LER File The DOWf'r ir; in vnm h111rL 9508100192 950803 PDR ADOCK 05000311                                                                   95-2168 REV. 6/94 s                        PDR
* Attachment A PSE&G Commitments For LER 311/95-005 The following items represent PSE&G commitments made to the Nuclear Regulatory Commission related to LER 311/95-005.
* Attachment A PSE&G Commitments For LER 311/95-005 The following items represent PSE&G commitments made to             the Nuclear Regulatory Commission related to LER 311/95-005.           The commitments are as follows:
The commitments are as follows: Ongoing Actions 1. Chemistry Procedure SC. CH-TI. ZZ-0189 (R) , "Radiological Effluent Discharge Report Generation and Completion" has been revised to include a "checkoff" for the technician which states, "verify two independent samples have been are in agreement, and spectrum attached" to release documents.
Ongoing Actions
: 1. Chemistry   Procedure   SC. CH-TI. ZZ-0189 (R) ,     "Radiological Effluent Discharge Report Generation and Completion" has been revised to include a "checkoff" for the technician which states, "verify two independent samples have been analyzed~
are in agreement, and spectrum attached" to release documents.
This revision applies to both liquid and gaseous releases.
This revision applies to both liquid and gaseous releases.
: 2. Operations procedures for liquid and gaseous releases are being revised to require a verification signature.
: 2. Operations procedures for liquid and gaseous releases are being revised to require a verification signature.             This signature ensures that when a monitor is inoperable, a secon~
This signature ensures that when a monitor is inoperable, a independent sample is analyzed.
independent sample is analyzed. This signature also provides for a second barrier which further precludes the possibility of human error.
This signature also provides for a second barrier which further precludes the possibility of human error. One-time Actions 1. Those technicians which missed the Chemistry specific Human Error Reduction Training will discuss the concept of error reduction with their supervisor after they return. 2. Required reading of the LER by all Chemistry Technicians will be conducted upon issuance of the LER. 3. The new chemistry procedure revision will be reviewed with the Chemistry Technicians upon issuance.}}
One-time Actions
: 1. Those technicians which missed the Chemistry specific Human Error Reduction Training will discuss the concept of error reduction with their supervisor after they return.
: 2. Required reading of the LER by all Chemistry Technicians will be conducted upon issuance of the LER.
: 3. The new chemistry procedure revision will         be reviewed with the Chemistry Technicians upon issuance.}}

Latest revision as of 05:41, 3 February 2020

Forwards LER 95-005-00 Re Failure to Analyze Second Sample W/Radiation Monitor Inoperable
ML18101A871
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/03/1995
From: Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101A873 List:
References
NUDOCS 9508100192
Download: ML18101A871 (2)


Text

PS~G *

  • Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit August 3, 1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk SALEM GENERATING STATION LICENSE NO. DPR-75 DOCKET NO. 50-311 UNIT NO. 2 LICENSEE EVENT REPORT NO. 95-005-00 This Licensee Event Report entitled "Technical Specification Violation: Failure to Analyze Second Sample with Radiation Monitor Inoperable" is being submitted pursuant to the requirements of Code of Federal Regulation 10CFR50.73 (a) (2) (i) (B). Attachment A contains those commitments which are currently outstanding or on-going related to this issue.

Sincerely, f/L,Ct~

C~~- Warren General Manager Salem Operations Attachment A SORC Mtg.95-083 RJB C Distribution LER File The DOWf'r ir; in vnm h111rL 9508100192 950803 PDR ADOCK 05000311 95-2168 REV. 6/94 s PDR

  • Attachment A PSE&G Commitments For LER 311/95-005 The following items represent PSE&G commitments made to the Nuclear Regulatory Commission related to LER 311/95-005. The commitments are as follows:

Ongoing Actions

1. Chemistry Procedure SC. CH-TI. ZZ-0189 (R) , "Radiological Effluent Discharge Report Generation and Completion" has been revised to include a "checkoff" for the technician which states, "verify two independent samples have been analyzed~

are in agreement, and spectrum attached" to release documents.

This revision applies to both liquid and gaseous releases.

2. Operations procedures for liquid and gaseous releases are being revised to require a verification signature. This signature ensures that when a monitor is inoperable, a secon~

independent sample is analyzed. This signature also provides for a second barrier which further precludes the possibility of human error.

One-time Actions

1. Those technicians which missed the Chemistry specific Human Error Reduction Training will discuss the concept of error reduction with their supervisor after they return.
2. Required reading of the LER by all Chemistry Technicians will be conducted upon issuance of the LER.
3. The new chemistry procedure revision will be reviewed with the Chemistry Technicians upon issuance.