ML18101A878: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 21: Line 21:
                                                       ~:; f. r:!:':::
                                                       ~:; f. r:!:':::
General Manager Salem Operations Attachment A SORC Mtg. 95-087 RJB c                            Distributuion LER File
General Manager Salem Operations Attachment A SORC Mtg. 95-087 RJB c                            Distributuion LER File
                  <
                    .
                    .....
                       ,)
                       ,)
                          *
                          .
                             ~  - .~ 1
                             ~  - .~ 1
                                       /
                                       /
I 9508150166 950809 The po\\*er is in your hands.            PDR ADOCK 05000272 S                PDR 95*2168 REV. 61 4
I 9508150166 950809 The po\\*er is in your hands.            PDR ADOCK 05000272 S                PDR 95*2168 REV. 61 4


                                ---- -------
** .
Attachment A PSE&G Commitments for LER 272/95-015 The following items represent PSE&G commitments made to the Nuclear Regulatory Commission related to LER 272/95-015-00.        The commitments are as follows:
Attachment A PSE&G Commitments for LER 272/95-015 The following items represent PSE&G commitments made to the Nuclear Regulatory Commission related to LER 272/95-015-00.        The commitments are as follows:
On Going
On Going

Latest revision as of 05:41, 3 February 2020

Forwards LER 95-015 Re Incompleted Documentation of EDG TS Surveillance
ML18101A878
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/09/1995
From: Warren C
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18101A879 List:
References
NUDOCS 9508150166
Download: ML18101A878 (2)


Text

OPS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit August 9, 1995 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Attn: Document Control Desk SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT NO. 95-015-00 This Licensee Event Report entitled "Incomplete Documentation of Emergency Diesel Generator Technical Specification Surveillance" is being submitted pursuant to the requirements of the Code of Federal Regulation 10CFR50. 73 (a) (2) (i) (B). Attachment A contains those commitments which are currently outstanding or on-going related to this issue.

Sincerely, 11/l \

~:; f. r:!:':::

General Manager Salem Operations Attachment A SORC Mtg.95-087 RJB c Distributuion LER File

,)

~ - .~ 1

/

I 9508150166 950809 The po\\*er is in your hands. PDR ADOCK 05000272 S PDR 95*2168 REV. 61 4

Attachment A PSE&G Commitments for LER 272/95-015 The following items represent PSE&G commitments made to the Nuclear Regulatory Commission related to LER 272/95-015-00. The commitments are as follows:

On Going

1. Maintain the appropriate Emergency Diesel Generator (EDG)

Surveillance Procedures which clarify the EDG start time methodology.

One Time Actions

1. Licensing basis (Tech Spec, UFSAR. etc.) criteria related to the EDG' s, along with its associated implementing procedures (e.g.,

Surveillance Testing Procedures), is being reviewed as an integral step in the Salem Station System Restart Readiness Program.

Inconsistencies found as a result of this review will be evaluated and corrected, as necessary, prior to the restart of each Salem Unit.

2. A revision request (Rll433) has been initiated to revise appropriate EDG ST procedures relative to clarifying the timing methodology. These procedures will be revised in the near future and prior to their future use.