ML18106A384: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-. *: . * ..:1* Public Service Electric and Gas Company
{{#Wiki_filter:*                                              *
* Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President  
    ~ - . *: .
-Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:
              ..:1*
In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1 ). Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1 ). Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222.  
Public Service Electric and Gas Company Louis F. Storz                             Public SeNice Electric and Gas Company     P.O. Box 236, Hancocks Bridge, NJ 08038   609-339-5700 Senior Vice President - Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:
\ (' kl"t)>> , )V Printedon Recycled-Paper  
In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1).
""* ,_, 
Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1).
* ,. Document Control Desk LR-N980128 C
Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222.                                       \ ('
* Mr. Hubert J. Miller, Administrator  
kl"t)>>
-Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager -Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans -Salem (S09) USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625
                                                                                                                              , )V
* 95-4933}}
                                                            -~- ,_,
~ Printedon
~ Recycled-Paper
 
Document Control Desk LR-N980128 C
* Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (S09)
USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 95-4933}}

Latest revision as of 04:57, 3 February 2020

Forwards Final Version of COLR for Salem,Unit 1 Cycle 13. Previously Submitted COLR Contained Error in Rod Insertion Limit for Bank C
ML18106A384
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/16/1998
From: Storz L
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18106A385 List:
References
LR-N980128, NUDOCS 9803240167
Download: ML18106A384 (2)


Text

  • *

~ - . *: .

..:1*

Public Service Electric and Gas Company Louis F. Storz Public SeNice Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-5700 Senior Vice President - Nuclear Operations MAR 16 1998 LR-N980128 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 CORE OPERATING LIMITS REPORT FOR SALEM UNIT 1 CYCLE 13 SALEM GENERATING STATION DOCKET NO. 50-272 Gentlemen:

In accordance with the Section 6.9.1.9 of the Salem Unit 1 Technical Specifications, Public Service Electric and Gas (PSE&,G) submitted the Core Operating Limits Report (COLR) on January 15, 1998. The COLR submitted was received by PSE&G as part of the Reload Safety Evaluation and contained an error in the Rod Insertion Limit for Bank C (Figure 1 Page 5 of 7 of attachment 1).

Attachment 1 to this letter contains the final version of the COLR for Salem Unit 1 Cycle 13 (NFS-0163, Rev 1).

Should there be any questions, please contact Mr. Tom Ross at (609) 339-1222. \ ('

kl"t)>>

, )V

-~- ,_,

~ Printedon

~ Recycled-Paper

Document Control Desk LR-N980128 C

  • Mr. Hubert J. Miller, Administrator - Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. P. Milano, Licensing Project Manager - Salem U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Mail Stop 14E21 Rockville, MD 20852 Ms. M. Evans - Salem (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 95-4933