ML18139C027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I~ * * ' VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND., VIRGINIA 23261 R.H.L;BASBURO VxcE PRESIDENT NUCLEAR OPERATXONS September 21, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:
{{#Wiki_filter:I~
Serial No. 544 NO/GSS:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROPOSED TECHNICAL SPECIFICATION CHANGE By the letter dated February 14, 1979, we proposed changes to the Technical Specifications for Surry Power Station, Unit Nos. 1 and 2 to meet the new inservice inspection and testing requirements for nuclear power plant components.
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND., VIRGINIA 23261 R.H.L;BASBURO VxcE PRESIDENT                       September 21, 1982 NUCLEAR OPERATXONS Mr. Harold R. Denton, Director                             Serial No. 544 Office of Nuclear Reactor Regulation                       NO/GSS:acm Attn: Mr. Steven A. Varga, Chief                           Docket Nos. 50-280 Operating Reactors Branch No. 1                               50-281 Division of Licensing                             License Nos. DPR-32 U. S. Nuclear Regulatory Commission                                     DPR-37 Washington, D. C. 20555 Gentlemen:
The enclosed proposed changes supplement our above referenced license amendment application.
AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROPOSED TECHNICAL SPECIFICATION CHANGE By the letter dated February 14, 1979, we proposed changes to the Technical Specifications for Surry Power Station, Unit Nos. 1 and 2 to meet the new inservice inspection and testing requirements for nuclear power plant components. The enclosed proposed changes supplement our above referenced license amendment application.
The enclosed changes revise the Technical Specifications for Inservice Inspection and Testing in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
The enclosed changes revise the Technical Specifications for Inservice Inspection and Testing in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.
This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.
We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request supplements our previous license amendment application referenced above, no additional license amendment fee is required.
We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request supplements our previous license amendment application referenced above, no additional license amendment fee is required.
Attachments:
A-oo I Attachments:   Proposed Technical Specification Change cc:   Mr. James P. O'Reilly Regional Administrator Region II
Proposed Technical Specification Change cc: Mr. James P. O'Reilly Regional Administrator Region II ~~2 9~Eg~~8 o~586~§o p PDR A-oo I 
  ~~2 p
----------_-
9
__ -_----------e COMMONWEALTH OF VIRGINIA) ) CITY OF RICHMOND ) e The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief. Acknowledged before me this d?. /,;:;I-day of .Je~ , 19
          ~Eg~~ 8 o~586~§o PDR
* My Commission expires: , 19 .s' ----------
 
o2.. -~6 Notary Public (SEAL) _-"S-"o***--R-
e                                                                    e COMMONWEALTH OF VIRGINIA)
,,., ... ,,. ..... ,.,-.... ,, ... -0,*r--* ....... -~,o*-~-*
                                                                                                                              )
_*, ,-,*,*-.*-,.--.,*-*--..----*  
CITY OF RICHMOND                                                                       )
-* *:_-__:__::______:_ . *~-~ ,.__ *~ *-__:_~ --*~-,-'--.''
The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.
__}}
Acknowledged before me this                                                                 d?. /,;:;I-day of           .Je~ ,               19 ~~
* My Commission expires:                                                                 o2.. - ~6             , 19 ~ .s' Notary Public (SEAL)
_-"S-"o***--R- ,,., ... ,,. ..... , . , -.... ,,... -0,*r--*....... - ~ , o * - ~ -
* _*, ,-,*,*-.*-,.--.,*-*--..----* -* *:_-__:__::______:_   . *~-~   ,.__ *~ *-__:_~ --*~-,-'--.'' __}}

Latest revision as of 00:55, 3 February 2020

Application to Amend Licenses DPR-32 & DPR-37,revising Tech Specs for Inservice Insp & Testing Per Section XI of ASME Boiler & Pressure Vessel Code & Applicable Addenda as Required by 10CFR50.55a,except Where Written Relief Granted
ML18139C027
Person / Time
Site: Surry, 05000381  Dominion icon.png
Issue date: 09/21/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139C028 List:
References
544, NUDOCS 8209230348
Download: ML18139C027 (2)


Text

I~

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND., VIRGINIA 23261 R.H.L;BASBURO VxcE PRESIDENT September 21, 1982 NUCLEAR OPERATXONS Mr. Harold R. Denton, Director Serial No. 544 Office of Nuclear Reactor Regulation NO/GSS:acm Attn: Mr. Steven A. Varga, Chief Docket Nos. 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos. DPR-32 U. S. Nuclear Regulatory Commission DPR-37 Washington, D. C. 20555 Gentlemen:

AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROPOSED TECHNICAL SPECIFICATION CHANGE By the letter dated February 14, 1979, we proposed changes to the Technical Specifications for Surry Power Station, Unit Nos. 1 and 2 to meet the new inservice inspection and testing requirements for nuclear power plant components. The enclosed proposed changes supplement our above referenced license amendment application.

The enclosed changes revise the Technical Specifications for Inservice Inspection and Testing in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50, Section 50.55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR 50, Section 50.55a(g)(6)(i).

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question.

We have reviewed this request in accordance with the criteria in 10 CFR 170.22. Since this request supplements our previous license amendment application referenced above, no additional license amendment fee is required.

A-oo I Attachments: Proposed Technical Specification Change cc: Mr. James P. O'Reilly Regional Administrator Region II

~~2 p

9

~Eg~~ 8 o~586~§o PDR

e e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this d?. /,;:;I-day of .Je~ , 19 ~~

  • My Commission expires: o2.. - ~6 , 19 ~ .s' Notary Public (SEAL)

_-"S-"o***--R- ,,., ... ,,. ..... , . , -.... ,,... -0,*r--*....... - ~ , o * - ~ -

  • _*, ,-,*,*-.*-,.--.,*-*--..----* -* *:_-__:__::______:_ . *~-~ ,.__ *~ *-__:_~ --*~-,-'--. __