| {{#Wiki_filter:Appendbc 3 Page 1 of 3 | | {{#Wiki_filter:Appendbc 3 Page 1 of 3 August 20, 1968 Mr. Samuel W. Jonsch, Chairman Atomic Licencing and Safety Board United States Atomic Enorgy Commicsion Washington, D. C. 20545 Ron Florida Power Corporation (Cryctal Rive No. 3) |
| . .
| | Dockot No. 50-302 Daar Mr. Chairman Your lettor dated August 12, 1968, ackc that the City of Gainesvillo and the Gainesvillo Utilitics Department ("Gainecville "2 Intervenor, respond to three questions. In reply Gainocville submits tha following: |
| .
| |
| August 20, 1968 Mr. Samuel W. Jonsch, Chairman Atomic Licencing and Safety Board United States Atomic Enorgy Commicsion Washington, D. C. 20545 Ron Florida Power Corporation (Cryctal Rive No. 3) | |
| Dockot No. 50-302 | |
| ,
| |
| Daar Mr. Chairman Your lettor dated August 12, 1968, ackc that the City of Gainesvillo and the Gainesvillo Utilitics Department ("Gainecville "2 Intervenor, respond to three questions. In reply Gainocville submits tha following: | |
| : 1. The purpoco of the offer of the statomont of Mr. A. P. | | : 1. The purpoco of the offer of the statomont of Mr. A. P. |
| Pero: is to chew that the Applicant, through its chiof executivo of2iccr, docc not in any way doncminato, ovaluato, or treat this projcct cr the application under which it cocks construction authorizac tion as falling within the intent or purpoco of Section 104 (b) . | | Pero: is to chew that the Applicant, through its chiof executivo of2iccr, docc not in any way doncminato, ovaluato, or treat this projcct cr the application under which it cocks construction authorizac tion as falling within the intent or purpoco of Section 104 (b) . |
Line 30: |
Line 25: |
| 8008170fb h | | 8008170fb h |
|
| |
|
| .
| | Appendix 3 Page 2 cf 3 Mr. Samuel W. Joncch, Chairman August 20, 1968 While the Applicant on the ono hand cook: quthcrication under Section 104 (b) for a facility " involved in the ccnduct of roccarch and development loading to c dc=c :ur; tion of practical valuo," the Applican =ckcc av;ilchic in conncc ica with and at the ti=o of the application hearing a ~ctatc=cnt by Mr. Porce which negatos tho subct;nco of the application as it pcrtains to Scction 104 (b) . |
| Appendix 3 | |
| .
| |
| Page 2 cf 3 | |
| * Mr. Samuel W. Joncch, Chairman August 20, 1968 While the Applicant on the ono hand cook: quthcrication under Section 104 (b) for a facility " involved in the ccnduct of roccarch and development loading to c dc=c :ur; tion of practical valuo," the Applican =ckcc av;ilchic in conncc ica with and at the ti=o of the application hearing a ~ctatc=cnt by Mr. Porce which negatos tho subct;nco of the application as it pcrtains to Scction 104 (b) .
| |
| This statomont containing an extensivo and detailed outline of unit evaluations as to operation and comparativo ecccc cvor selected plant lifetimes is cc=pletely devoid of any c:stod need requiremont or declared intention to conduct research and development in sc=cnctration of practical valuo, cither to corve the objectivos of che Act or advanco the knowledge of the Applicant or the nuclear industry. (Statomont, pp. 1-6). , | | This statomont containing an extensivo and detailed outline of unit evaluations as to operation and comparativo ecccc cvor selected plant lifetimes is cc=pletely devoid of any c:stod need requiremont or declared intention to conduct research and development in sc=cnctration of practical valuo, cither to corve the objectivos of che Act or advanco the knowledge of the Applicant or the nuclear industry. (Statomont, pp. 1-6). , |
| The caly reference to research Which mighu proporly be the hallmark of Section 104 (b) nuclec projects wac : join: progrc= | | The caly reference to research Which mighu proporly be the hallmark of Section 104 (b) nuclec projects wac : join: progrc= |
Line 40: |
Line 31: |
| =any alternato power gonoration sources the final selection of the Crystal River unit was an optimum design in which no aspect of the facility required such activity or concern'with safety or demonstra-tion or practical value as to requiro the incorporation of research and devolep=ent arising *f o= the use of nuclear energy in this particular application.--7 | | =any alternato power gonoration sources the final selection of the Crystal River unit was an optimum design in which no aspect of the facility required such activity or concern'with safety or demonstra-tion or practical value as to requiro the incorporation of research and devolep=ent arising *f o= the use of nuclear energy in this particular application.--7 |
| : 3. Gaingsvillo contende the prepared ctatement of Mr. Pere: is an cd=ission agcinct innerect. That this project is not involved with research and icvolopment within tho = caning of Section 104 (b) soo=c abundantly clear frc= the pocition taken in this state =cnt. What constitutoc resocrch and development and | | : 3. Gaingsvillo contende the prepared ctatement of Mr. Pere: is an cd=ission agcinct innerect. That this project is not involved with research and icvolopment within tho = caning of Section 104 (b) soo=c abundantly clear frc= the pocition taken in this state =cnt. What constitutoc resocrch and development and |
| * _/ It is interecting to note that Ficrida Pcwer on the strength of having Crystal River No. 3 in "cc==orcial" operation by 1972 has new announced plans to build a 500,000 volt trcnc=ission lino,
| | _/ It is interecting to note that Ficrida Pcwer on the strength of having Crystal River No. 3 in "cc==orcial" operation by 1972 has new announced plans to build a 500,000 volt trcnc=ission lino, originating at Cryct:1 River, to carry the pcwor cutput 130 miles into the utility's 32-ccunty cyctc=. (Wall Stroot Journcl, Thursday, August 15, 1968, p. 24). |
| <
| |
| originating at Cryct:1 River, to carry the pcwor cutput 130 miles into the utility's 32-ccunty cyctc=. (Wall Stroot Journcl, Thursday, August 15, 1968, p. 24). | |
| ,
| |
| M_ | | M_ |
|
| |
|
| !
| | Appendix B Page 3 of 3 Mr. Samuel W. Joncch, Chairman Auguct 20, 1963 whether it b procent in thic application wac of : jot', juctifishic concern to the acard (Tr. 33L-347), cnd in Gaine ville 'c view dotorminativo of the quantion whather authorization is propor under Section 104 (b) . Oh, .pnlication tscortc thero is cuch activity. Tactirc.c :lesadf in the raccrd (coo C inocvillo's Findings of Fac- - ni 4) cad t'.c c st;;c an support the view , |
| .
| |
| Appendix B Page 3 of 3 | |
| .
| |
| * Mr. Samuel W. Joncch, Chairman Auguct 20, 1963 whether it b procent in thic application wac of : jot', juctifishic concern to the acard (Tr. 33L-347), cnd in Gaine ville 'c view dotorminativo of the quantion whather authorization is propor under Section 104 (b) . Oh, .pnlication tscortc thero is cuch activity. Tactirc.c :lesadf in the raccrd (coo C inocvillo's Findings of Fac- - ni 4) cad t'.c c st;;c an support the view ,
| |
| that there is as cuch nativity co bring the cyplication within the scopo of auction 104 (b) . | | that there is as cuch nativity co bring the cyplication within the scopo of auction 104 (b) . |
| Rospectfully cuhmitecd, CITY OF GAINESVILLE, FLORIDA and GAINESVILLE UTILITIES DEPARTMENT | | Rospectfully cuhmitecd, CITY OF GAINESVILLE, FLORIDA and GAINESVILLE UTILITIES DEPARTMENT By James F. Fairman, Jr. |
| ,
| |
| By James F. Fairman, Jr. | |
| Their Attorney 2600 Virginia Avenue, N. W. | | Their Attorney 2600 Virginia Avenue, N. W. |
| Washington, D. C. | | Washington, D. C. |
Line 62: |
Line 44: |
| T. T. Turnbull, Esq. | | T. T. Turnbull, Esq. |
| A. A. Wells, Esq. | | A. A. Wells, Esq. |
| Secretary, AEC | | Secretary, AEC l |
| ,
| |
| l | |
|
| |
|
| '
| | . UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Matter of i |
| .
| |
| . UNITED STATES OF AMERICA | |
| .
| |
| ATOMIC ENERGY COMMISSION In the Matter of i | |
| ) | | ) |
| Florida Powe r Corporation i Docket No. 50-302 i | | Florida Powe r Corporation i Docket No. 50-302 i |
| Crystal River Unit 3 ) | | Crystal River Unit 3 ) |
| AFFIDAVIT James F. Fairman, Jr., being first duly sworn, deposes and says that he is the attorney for the City of Gainesville, Florida and Gainesville Utilities Department; and that as such he has signed the foregoing Exceptions by "Gainesville" to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board, and Request for Relief for and on behalf of said parties; that he is authorized so to do; that he | | AFFIDAVIT James F. Fairman, Jr., being first duly sworn, deposes and says that he is the attorney for the City of Gainesville, Florida and Gainesville Utilities Department; and that as such he has signed the foregoing Exceptions by "Gainesville" to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board, and Request for Relief for and on behalf of said parties; that he is authorized so to do; that he has read said Exceptions and Requests and is familiar with the conten;s thereof; and that the matters and things therein set forth are true and correct to the best of his knowledge, information or belief. |
| '
| |
| has read said Exceptions and Requests and is familiar with the conten;s thereof; and that the matters and things therein set forth are true and correct to the best of his knowledge, information or belief. | |
| --es F.'+. r -b . | | --es F.'+. r -b . |
| Fairman, Jr. | | Fairman, Jr. |
| Subscribed and sworn to before f | | Subscribed and sworn to before f |
| me this 14th day of October,1968. | | me this 14th day of October,1968. |
| '
| |
| ,. - y ,. | | ,. - y ,. |
| .
| |
| -/ ; j '~) | | -/ ; j '~) |
| / L.D W .c/ \/ 7.tL d' Ju ,c., | | / L.D W .c/ \/ 7.tL d' Ju ,c., |
| i Notar/ Public'/ D. C. | | i Notar/ Public'/ D. C. |
| 14 c e-t - . : . .., o, y,9 | | 14 c e-t - . : . .., o, y,9 |
| -
| |
| :
| |
| -
| |
|
| |
|
| .
| | UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Ms.tter of ) |
| .
| |
| UNITED STATES OF AMERICA | |
| .
| |
| .
| |
| ATOMIC ENERGY COMMISSION In the Ms.tter of ) | |
| ) | | ) |
| Florida Power Corporation ) Docket No. 50-302 | | Florida Power Corporation ) Docket No. 50-302 |
Line 104: |
Line 68: |
| Nuclear Generating Plant ) | | Nuclear Generating Plant ) |
| CERTIFICATE OF SERVICE I hereby certify that the Exceptions by Gainesville to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board; and Request for Relief, in the above-captioned matter, was served upon the follwoing by deposit in the United Statec mail, first class or air mail, this 14th day of October,1968. , | | CERTIFICATE OF SERVICE I hereby certify that the Exceptions by Gainesville to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board; and Request for Relief, in the above-captioned matter, was served upon the follwoing by deposit in the United Statec mail, first class or air mail, this 14th day of October,1968. , |
| ,
| |
| A. A. Wells, Esq. , Chairman Dr. Rolf Eliassen Atomic Safety and Licensing Board Department of Civil Engineering Panel Stanford University U. S. Atomic Energy Commission Palo Alto, California 94305 Washington, D. C. 20545 Gerald F. Hadlock, Esq. | | A. A. Wells, Esq. , Chairman Dr. Rolf Eliassen Atomic Safety and Licensing Board Department of Civil Engineering Panel Stanford University U. S. Atomic Energy Commission Palo Alto, California 94305 Washington, D. C. 20545 Gerald F. Hadlock, Esq. |
| Samuel W. Jensch, Esq. Trial Counsel, Regulatory Staff Chairman, Atomic Safety and U. S. Atomic Energy Commission Licensing Board Washington, D. C. 20545 U. S. Atomic Energy Commiss}on Washington, D. C. 20545 T. T. Turnbull, Esq. | | Samuel W. Jensch, Esq. Trial Counsel, Regulatory Staff Chairman, Atomic Safety and U. S. Atomic Energy Commission Licensing Board Washington, D. C. 20545 U. S. Atomic Energy Commiss}on Washington, D. C. 20545 T. T. Turnbull, Esq. |
| .
| | Assistant Attorney General Dr. Eugene Greuling The Capitol Professor of Physics Tallahassee, Florida 32304 Duke University Durham, North Carolina 27706 Mr. Stanley T. Robinson, Jr. s2 copie Office of the Secretary Dr. Hugh Panon U. S. Atomic Energy Commiss..:n Los Alamos Scientific Laboratory ' Wa shington, D. C. 20545 Los Alamos, New Mexico 87544 Roy B. Snapp, Esq. |
| Assistant Attorney General Dr. Eugene Greuling The Capitol Professor of Physics Tallahassee, Florida 32304 Duke University Durham, North Carolina 27706 Mr. Stanley T. Robinson, Jr. s2 copie Office of the Secretary Dr. Hugh Panon U. S. Atomic Energy Commiss..:n Los Alamos Scientific Laboratory ' Wa shington, D. C. 20545 Los Alamos, New Mexico 87544 | |
| * Roy B. Snapp, Esq.
| |
| St nley A. Brandimore , Esq. 172 5 "K" Street, N. W. | | St nley A. Brandimore , Esq. 172 5 "K" Street, N. W. |
| Florida Power Corporation Washington, D. C. 20006 St. Petersburg, Florida I | | Florida Power Corporation Washington, D. C. 20006 St. Petersburg, Florida I |
| bhf 0' M- | | bhf 0' M-0 WWhe*~ % i/ |
| -
| |
| 0 WWhe*~ % i/ | |
| \ | | \ |
| Law Offices: | | Law Offices: |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F9941999-10-15015 October 1999 Discusses FPC 970819 Request for Temporary Relief from ASME Code Section XI Requirements to Repair ASME Class 3 Nuclear Service & Decay Heat Sea Water System Piping.Forwards SE Containing Results of Staff Review ML20217J5171999-10-13013 October 1999 Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 3 & Did Not Identify Any New Areas That Warranted More than Core Insp Program.Previously Planned Regional Initiative Insp of safety-related Mod Will Be Performed 3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made ML20212L0771999-10-0404 October 1999 Forwards SER Accepting Licensee Relief Requests 98-012 Through 98-018 Involving Containment Insps at Crystal River Unit 3 Pursuant to 10CFR50.55a(a)(3)(i) & 10CFR50.55a(a)(3)(ii) ML20217D6551999-10-0101 October 1999 Requests That Natl Communication Sys Arrange for Licensee Participation in Government Emergency Telecommunications Service,Per NRC Info Notice 99-025 ML20212J8481999-10-0101 October 1999 Forwards Safety Evaluation Re Second 10 Yr Interval ISI Program Requests for Relief 98-009-II.Reliefs Granted for 98-009-II,Parts B & C & 98-010-II & 98-011-II 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 ML20212F7251999-09-23023 September 1999 Discusses Staff Review of Util 980330 Response,As Suppl on 990514,to GL 97-06, Degradation of SG Internals. Staff Concludes That Licensee Responses to GL Provide Reasonable Assurance That Condition of SG Internals Acceptable ML20212F7331999-09-23023 September 1999 Discusses Util Licensing Action for GL 98-01, Year 2000 Readiness of Computer Systems at Nuclear Power Plants. NRC Ack Efforts Util Completed to Date in Preparing Crystal River,Unit 3 for Y2K Transition 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 ML20212E6741999-09-21021 September 1999 Forwards Safety Evaluation Accepting Proposed EAL Changes Submitted by ,As Supplemented by 981120,990713 & 0831 Ltrs,Incorporating Guidance in NUMARC/NESP-007,Rev 2, Methodology for Development of Eals 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief ML20212F3141999-09-13013 September 1999 Forwards Insp Rept 50-302/99-05 on 990704-0814.Violations Noted,But Being Treated as non-cited Violations ML20211L9081999-09-0303 September 1999 Informs of Completion of Licensing Action for GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Crystal River Unit 3 ML20211Q7581999-09-0101 September 1999 Forwards Summary of 990812-13 Training Managers Conference in Atlanta,Georgia Re Recent Changes to Operator Licensing Program.List Conference Attendees,Copy of Presentation Slides & List of Participant Questions Encl 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20211G7111999-08-30030 August 1999 Modifies Approval of 980521 Request for Exception to 10CFR50.4(b)(6) & Grants Util Approval to Submit Copies of Future Updates to FSAR as Listed ML20211G7031999-08-30030 August 1999 Informs of Approval of Util 980521 Request for Exception to 10CFR50.4(b)(6),allowing Util to Submit Updates to Plant Ufsar.Ltr Modifies That Approval & Grants Util Approval 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented ML20210Q4511999-08-0505 August 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 991006 ML20210P0741999-08-0505 August 1999 Forwards SE Accepting Licensee 980416 & 1130 Ltrs Re Third 10-year Interval ISI Program Plan & Associated Requests for Relief for Plant,Unit 3 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 ML20210G8551999-07-27027 July 1999 Forwards Insp Rept 50-302/99-04 on 990523-0703.One Violation Identified & Being Treated as Noncited Violation 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209H5211999-07-16016 July 1999 Forwards Request for Addl Info Re Licensee Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in CR-3 once-through Steam Generators in Order to Complete Review ML20209G3231999-07-15015 July 1999 Forwards Biological Opinion Issued by Natl Marine Fisheries (NMFS) of Dept of Commerce.Nmfs Concluded That Operation of Cw Intake Sys of Crystal River Not Likely to Jeopardize Existence of Species Listed in Biological Opinion ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 ML20196L1261999-07-0707 July 1999 Discusses Closeout of TAC MA0538 Re License Response to RAI Re GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Plant,Unit 3 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20196J4991999-07-0101 July 1999 Advises That Info Contained in ,Which Included TR BAW-2346P,will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR3F1099-14, Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed1999-10-13013 October 1999 Requests Copy of NRC Radtrad Code & Copy of User Instructions.Conditions for Receiving Code Listed 3F1099-11, Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made1999-10-0404 October 1999 Provides Info on Requested Minor Permit Mod of Encl NPDES Permit.No New Regulatory Commitments Are Made 3F0999-03, Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment1999-09-27027 September 1999 Notifies of Approved Change to NPDES Permit Applicable to Crystal River Unit 3 IAW Section 3.2.3 of Epp.Proposed Change Was Approved on 990914 by State of Fl & Provided in Attachment 3F0999-18, Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 0003311999-09-27027 September 1999 Notifies NRC That Due Date for Commitment Common to Ltrs 980115 & 980209 Will Be Extended.Revised Completion Date for Cable Ampacity Project Is 000331 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 3F0999-01, Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv)1999-09-17017 September 1999 Forwards FPC Crystal River Unit 3 Plant Reference Simulator Four-Year Simulator Certification Rept Sept 1995-Sept 1999, Per 10CFR55.45(b)(5)(ii) & 10CFR55.45(b)(5)(iv) 3F0999-19, Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief1999-09-15015 September 1999 Provides Clarification of Minor Inconsistency Identified During Review of NRC SE for Plant Third 10-year Interval Inservice Insp Program Plan & Associated Requests for Relief 3F0899-23, Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals1999-08-31031 August 1999 Provides Addl Info in Response to Several NRC Staff Questions Needed to Complete Review of Request to Adopt NEI 97-03,Draft Final Rev 3, Methodology for Development of Eals ML20212C1351999-08-27027 August 1999 Requests Withholding of Proprietary Version of Enhanced Spent Fuel Storage Project Engineering Input 3F0899-07, Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 20021999-08-27027 August 1999 Provides Formal Notification to NRC of FPC Plans Relative to Renewal of Crystal River Unit 3,FOL DPR-72.FPC Plans to Submit Application for License Renewal by End of 2002 3F0899-20, Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.711999-08-26026 August 1999 Forwards six-month fitness-for-duty Program Performance Data for Period 990101-990630,IAW 10CFR26.71 3F0899-05, Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 31999-08-20020 August 1999 Forwards Response to NRC 990716 RAI Re Proposed Alternate Repair Criteria for Axial Tube End crack-like Indications in Crystal River Unit 3 3F0899-16, Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal1999-08-19019 August 1999 Informs That Licensee Is Requesting State of Fl Dept of Environ Protection to Make Changes in Plant NPDES Permit to Modify Conditions on Use of Biocide in Instrument Air Compressor Sys.No New Commitments Are Made in Submittal 3F0899-17, Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-051999-08-19019 August 1999 Submits Relief Request 99-0001-RR,seeking NRC Approval for Evaluation Performed by Util on through-wall Flaw in Nuclear Svc & Decay Heat Sea Water (RW) Sys,Per Guidance of GL 90-05 3F0899-02, Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 21999-08-16016 August 1999 Forwards Rev 2 to Cycle 11 COLR IAW Plant TS Section 5.6.2.18.Rev 1 of Cycle 11 COLR Was Not Submitted Due to Administrative Error.Changes Made in Rev 1 Listed & Incorporated in Encl Rev 2 05000302/LER-1997-038, Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented1999-08-13013 August 1999 Forwards LER 97-038-01,IAW 10CFR50.73(c).Submittal Also Provides Notification That Commitment Common to LER 97-038-00 & Reply to NOV 50-302/97-16 Has Been Revised & Revised Commitment Has Been Implemented 3F0899-06, Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Crystal River,Unit 3,per ITS 5.7.1.2.Revised Repts for Apr,May & June 1999,also Encl.Data on Line Item 6 Updated to Agree with More Accurate Computer Point That Measures Value 3F0799-30, Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 9906031999-07-29029 July 1999 Forwards List of Licensing Actions Currently Estimated for Fys 2000 & 2001,in Response to Administrative Ltr 99-02,dtd 990603 3F0799-09, Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments1999-07-19019 July 1999 Provides Response to NRC 990625 Telcon RAI Re Util Use of Relief Request 98-009-II for Plant ASME Section XI, Inservice Insp Second Interval.Ltr Established No New Regulatory Commitments ML20209G3481999-07-15015 July 1999 Transmits Natl Marine Fisheries Svc (NMFS) Biological Opinion Based on Review of Continued Use of Cw Intake Sys at Crystal River Energy Complex.Concludes That Continued Use of Cw Intake Sys Not Likely to Adversely Affect Gulf Sturgeon 3F0799-25, Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl1999-07-14014 July 1999 Forwards License Renewal Applications for Four Individuals, IAW 10CFR55.57.Without Encl 3F0799-21, Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl1999-07-14014 July 1999 Forwards Copy of Revised NPDES Permit IAW Section 3.2.3 of Unit 3 Environ Protection Plan,Per 990430 Request to Allow Use of Biocide in Station Air Compressor Cooling Sys. Wastewater Permit FL0000159 Issued 990630 Also Encl 3F0799-05, Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl1999-07-14014 July 1999 Requests Exemption from 10CFR70.51, Matl Balance,Inventory & Records Requirements, as It Relates to 10CFR70.51(d) Re Physical Inventory of SNM for Crystal River Unit 3.Detailed Justification for Request,Encl 3F0799-26, Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 9907301999-07-14014 July 1999 Provides Notice of Change in Status for Senior Operator,Iaw 10CFR50.74(a).RD Demontfort,License Number SOP 20528-2,has Been Reassigned & No Longer Requires License Effective 990730 3F0799-22, Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held1999-07-13013 July 1999 Provides Update & Rev to Submittal Made by Util Ltr with Regard to EAL Classification Methodology for Unit 3.Reponses to NRC Staff Questions Provided as Attachment D to Ltr & Reflects Discussions Held 3F0799-02, Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Submits Rev 7-3 to Physical Security Plan,Replacing Current Rev to CR-3 Physical Security Plan,Rev 7-2,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-03, Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.211999-07-0808 July 1999 Forwards Rev 5-0 to Safeguards Contingency Plan,Replacing Current Rev to Safeguards Contingency Plan,Rev 4,in Entirety.Rev Withheld,Per 10CFR73.21 3F0799-10, Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 31999-07-0707 July 1999 Submits Copy of Historical NPDES Permit Rev That Was Made in 1997 Re Use of Biocide at Crystal River Unit 3 ML20209C0811999-06-25025 June 1999 Forwards Overdue Controlled Document Transmittals for Listed Documents 3F0699-12, Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested1999-06-23023 June 1999 Provides Suppl Info for LAR 240,rev 0 & Pump Curve for EFP-3 to Facilitate Review,As Requested 3F0699-06, Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl1999-06-23023 June 1999 Submits Final Response to GL 98-01,Suppl 1 Re Year 2000 Readiness of Nuclear Power Plants.Year 2000 Readiness Disclosure for Crystal River,Unit 3,encl 3F0699-08, Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments1999-06-21021 June 1999 Provides Updated Info to Licensee Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions. Ltr Establishes No New Regulatory Commitments 3F0699-09, Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl1999-06-0404 June 1999 Forwards FPC 1998 Annual Financial Repts for Two Participating co-owners of Crystal River Unit 3.Financial Statements & Independent Auditors Repts for City of Alachua,Fl,Encl 3F0599-21, Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads1999-05-28028 May 1999 Submits Addendum to B&W Owners Group Topical Rept BAW-2346P, Rev 0.Addendum Includes Leak Rate Values Based on CR-3 Plant Specific Main Steam Line Break Tube Loads 3F0599-10, Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl1999-05-26026 May 1999 Submits Changes Made to Crystal River,Unit 3 Its,As Required by ITS 5.6.2.17.Encl Provides Revs to Plant ITS Bases That Will Update NRC Copies of Its.Instructions for Updating ITS, Encl ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 3F0599-22, Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs1999-05-21021 May 1999 Forwards non-proprietary Version of B&Wog Topical Rept BAW-2346NP, Alternate Repair Criteria for Tube End Cracking in Tube-to-Tubesheet Roll Joint of Once-Through Sgs 3F0599-18, Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM1999-05-14014 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept for Crystal River,Unit 3. Rept Is Submitted in Accordance with CR-3 ITS 5.7.1.1(b) & Section 6.6 of ODCM 3F0599-17, Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments1999-05-14014 May 1999 Submits Update Response to GL 97-06, Degradation of SG Internals. Ltr Establishes No New Regulatory Commitments 3F0599-07, Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 19781999-05-14014 May 1999 Submits Guarantee of Payment of Deferred Premiums for CR-3 in Accordance with 10CFR140.21.Internal Cash Flow Projection Was Prepared in Accordance with Suggested Format Outlined in Reg Guide 9.4 Dtd Sept 1978 3F0599-03, Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR1999-05-12012 May 1999 Provides Update Curves for Facility Pressure/Temp Limits Rept,Rev 2 & Updated Rev Bar ITS Pages Associated with LAR, in Response to NRC RAI Re Subject LAR 3F0599-05, Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl1999-05-12012 May 1999 Responds to 990402 RAI Re Third 10-year Interval ISI Program Plan Requests for Relief.Util Revised Relief Requests 98-010-II,98-003-PT,98-005-PT & 98-001-SS Based on Responses to Rai.Revised Relief Requests Encl 3F0599-08, Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments1999-05-0303 May 1999 Forwards Licensee Clarification of Info Provided in Amend 171 Re post-LOCA Boron Dilution Precipitation Prevention.Ltr Establishes No New Regulatory Commitments 3F0599-09, Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 19981999-05-0101 May 1999 Forwards Crystal River Unit 3 Radioactive Effluent Release Rept - 1998 & Revised Crystal River Unit 3 Radioactive Effluent Release Rept - 1997. Licensee Informs That ODCM & PCP Were Not Revised During 1998 3F0499-24, Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent1999-04-30030 April 1999 Forwards Summary of Proposed Changes to Crystal River,Unit 3 NPDES Permit,That Are Being Submitted to Florida Dept of Environ Protection.Proposed Change Will Allow Use of Scale Inhibitor,Biocides & Foam Control Agent 3F0499-09, Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 9907301999-04-30030 April 1999 Forwards FPC Annual Financial Rept & Annual Financial Repts for Eight of Ten Participating co-owners of Crystal River Unit 3 Nuclear Station.Outstanding Annual Financial Rept Will Be Submitted by 990730 3F0499-23, Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements1999-04-23023 April 1999 Submits Repts Required by App B,Environ Protection Plan,Of Crystal River,Unit 3 Operating License.Fl Dept of Environ Protection Has Provided Clarification Re Ph Monitoring Requirements 3F0499-18, Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl1999-04-20020 April 1999 Informs of Recent Senior Management Change at Fpc,Which Will Not Affect Std Recipients of Incoming NRC Correspondence. Updated Util Mailing List,Encl 3F0499-05, Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin1999-04-16016 April 1999 Forwards Rev 19 to Radiological Emergency Response Plan. Changes to Plan Marked with Vertical Bars in Left Margin 3F0499-08, Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 19981999-04-16016 April 1999 Forwards FPC Annual ITS Dose Rept for Period Jan-Dec 1998. Rept Provides person-rem Radiation Exposures,According to Work & Job Function,At CR-3 for Period Jan-Dec 1998 1999-09-27
[Table view] Category:STATE/LOCAL GOVERNMENT TO NRC
MONTHYEARML17347A5661987-06-0505 June 1987 Advises That Verbal Notification of Release of Amends to NRC Licenses in State of Fl Not Necessary.Written Notification of Proposed Amends Soliciting Comments & Written Rept of Release Adequate ML20197A5791986-08-12012 August 1986 Requests That Correspondence Be Addressed to Either Gj Allen,Director of Div of Disaster Preparedness or Chairman of Board of County Commissioners Due to Rotation of Chairman on Annual Basis.Nrc to Util Encl ML17206A5751978-12-18018 December 1978 Requests Placement on Distribution List for Correspondence & Repts Dealing W/Oper Status for Subj Facils ML19308E1601972-11-20020 November 1972 Forwards Comments from State Agencies,Private Organizations & Individuals Re Environ Repts & Des.Comments Should Be Appended to Fes.Copy of Fes Requested ML19308E1571972-11-20020 November 1972 Ack Receipt of AEC 721108 Request for Response by 721201 to Comments on Des by Federal,State & Local Agencies.Extension to Response Submittal Date to 730115 Requested Due to Nature & Scope of Comments ML19308E1591972-10-30030 October 1972 Notifies That Archaeological & Historical Survey of Site Revealed Unrecorded Archaeological Sites.Facility Const Will Not Encroach Upon Known Archaeological,Historical or Architecturally Significant Properties ML19309A0321972-09-11011 September 1972 Ack Receipt of Dr Muller 720911 Request for Comments on Des. Comments to Be Submitted to Div of State Planning for Consolidated State Position ML19308D9431972-02-23023 February 1972 Ack Receipt of Applicant Environ Rept ML19308D9291971-12-22022 December 1971 Ack Receipt of AEC 711206 Ltr Re Review Procedures & Requests Environ Repts Be Sent to Fl Dept of Pollution Control ML19340A4011971-01-26026 January 1971 Notifies That FSARs Not Received.Requests Investigation of Delay ML19308D9171970-09-30030 September 1970 Responds to AEC 700731 Request for Name of Coordinating Agency Per Nepa.Fl Dept of Air & Water Pollution Control Responsible for Control & Abatement of Air & Water Pollution in Fl ML19319D6051968-08-20020 August 1968 Submits City of Gainesville Response to NRC 760812 Questions Re AP Perez Statement.Ap Perez Statement Admission Against Interest;Project Not Involved W/R&D within Meaning of Section 104(b) ML19319D5921968-08-20020 August 1968 Responds to ASLB 680812 Ltr Re Facility Authorization. Affidavit & Certificate of Svc Encl ML19308E1991968-06-13013 June 1968 Requests Withdrawal of Certificate of Svc Requirement Due to 680611 Petition for Limited Appearance Being Redirected to Attorney General.Certificate of Svc Encl ML19308E2061968-06-11011 June 1968 Requests Permission to Make Limited Appearance on Behalf of Citizens,Representatives of Citrus County,Fl & Board of County Commissioners.Certificate of Svc Encl ML19308E2051968-06-0606 June 1968 Forwards Info Re Proposed Plant at Turkey Point for Transmittal to Citizens of Citrus County.Crystal River Area Could Be Critically Affected by Action of Hot Water Expelled in Gulf.Conference Scheduled 680619 Will Discuss Problem ML19340A4491967-09-20020 September 1967 Ack Receipt of Proposed Facility Application & Rept.Governor Kirk to Respond Re Designation of Coordinator 1987-06-05
[Table view] |
Text
Appendbc 3 Page 1 of 3 August 20, 1968 Mr. Samuel W. Jonsch, Chairman Atomic Licencing and Safety Board United States Atomic Enorgy Commicsion Washington, D. C. 20545 Ron Florida Power Corporation (Cryctal Rive No. 3)
Dockot No. 50-302 Daar Mr. Chairman Your lettor dated August 12, 1968, ackc that the City of Gainesvillo and the Gainesvillo Utilitics Department ("Gainecville "2 Intervenor, respond to three questions. In reply Gainocville submits tha following:
- 1. The purpoco of the offer of the statomont of Mr. A. P.
Pero: is to chew that the Applicant, through its chiof executivo of2iccr, docc not in any way doncminato, ovaluato, or treat this projcct cr the application under which it cocks construction authorizac tion as falling within the intent or purpoco of Section 104 (b) .
- 2. Gainesville, by the Board's order of June 28, 1958, i.- limited in its intorventica to the quection of anchorization under Scction 104 (b) . Tho contral iscuo ic Whether the applicaticn for the Crystal River plant, a fccility cccontially identical to four other units already licenced or undcr construction, cno or core of Ohich will be operating beforo thic plant, cnd t'.a design of which the Applicant acknowledges in "baced on exicting technology and not c:: tended beyond known information or operating experience,"
10 properly within the ccopo of the Section 104 (b) provicien c::-
prcccly urging project approvals that lead to major advancam in nuclocr application for ccm=creial purpoccc.
8008170fb h
Appendix 3 Page 2 cf 3 Mr. Samuel W. Joncch, Chairman August 20, 1968 While the Applicant on the ono hand cook: quthcrication under Section 104 (b) for a facility " involved in the ccnduct of roccarch and development loading to c dc=c :ur; tion of practical valuo," the Applican =ckcc av;ilchic in conncc ica with and at the ti=o of the application hearing a ~ctatc=cnt by Mr. Porce which negatos tho subct;nco of the application as it pcrtains to Scction 104 (b) .
This statomont containing an extensivo and detailed outline of unit evaluations as to operation and comparativo ecccc cvor selected plant lifetimes is cc=pletely devoid of any c:stod need requiremont or declared intention to conduct research and development in sc=cnctration of practical valuo, cither to corve the objectivos of che Act or advanco the knowledge of the Applicant or the nuclear industry. (Statomont, pp. 1-6). ,
The caly reference to research Which mighu proporly be the hallmark of Section 104 (b) nuclec projects wac : join: progrc=
discontinued in 1961. (Statement, pp. 2-3 ) . Gainesville believec the statement cupports itc contention that in the careful study cf
=any alternato power gonoration sources the final selection of the Crystal River unit was an optimum design in which no aspect of the facility required such activity or concern'with safety or demonstra-tion or practical value as to requiro the incorporation of research and devolep=ent arising *f o= the use of nuclear energy in this particular application.--7
- 3. Gaingsvillo contende the prepared ctatement of Mr. Pere: is an cd=ission agcinct innerect. That this project is not involved with research and icvolopment within tho = caning of Section 104 (b) soo=c abundantly clear frc= the pocition taken in this state =cnt. What constitutoc resocrch and development and
_/ It is interecting to note that Ficrida Pcwer on the strength of having Crystal River No. 3 in "cc==orcial" operation by 1972 has new announced plans to build a 500,000 volt trcnc=ission lino, originating at Cryct:1 River, to carry the pcwor cutput 130 miles into the utility's 32-ccunty cyctc=. (Wall Stroot Journcl, Thursday, August 15, 1968, p. 24).
M_
Appendix B Page 3 of 3 Mr. Samuel W. Joncch, Chairman Auguct 20, 1963 whether it b procent in thic application wac of : jot', juctifishic concern to the acard (Tr. 33L-347), cnd in Gaine ville 'c view dotorminativo of the quantion whather authorization is propor under Section 104 (b) . Oh, .pnlication tscortc thero is cuch activity. Tactirc.c :lesadf in the raccrd (coo C inocvillo's Findings of Fac- - ni 4) cad t'.c c st;;c an support the view ,
that there is as cuch nativity co bring the cyplication within the scopo of auction 104 (b) .
Rospectfully cuhmitecd, CITY OF GAINESVILLE, FLORIDA and GAINESVILLE UTILITIES DEPARTMENT By James F. Fairman, Jr.
Their Attorney 2600 Virginia Avenue, N. W.
Washington, D. C.
Law Offices George Spiegel 2600 Virginia Avenue, N. W, Washington, D. C. 20037 cc Edgar H. Dunn, Jr., Ecq.
Harry A. Evert =, III, Esq.
Gerald F. Hadlock, Esq.
T. T. Turnbull, Esq.
A. A. Wells, Esq.
Secretary, AEC l
. UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Matter of i
)
Florida Powe r Corporation i Docket No. 50-302 i
Crystal River Unit 3 )
AFFIDAVIT James F. Fairman, Jr., being first duly sworn, deposes and says that he is the attorney for the City of Gainesville, Florida and Gainesville Utilities Department; and that as such he has signed the foregoing Exceptions by "Gainesville" to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board, and Request for Relief for and on behalf of said parties; that he is authorized so to do; that he has read said Exceptions and Requests and is familiar with the conten;s thereof; and that the matters and things therein set forth are true and correct to the best of his knowledge, information or belief.
--es F.'+. r -b .
Fairman, Jr.
Subscribed and sworn to before f
me this 14th day of October,1968.
,. - y ,.
-/ ; j '~)
/ L.D W .c/ \/ 7.tL d' Ju ,c.,
i Notar/ Public'/ D. C.
14 c e-t - . : . .., o, y,9
UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION In the Ms.tter of )
)
Florida Power Corporation ) Docket No. 50-302
)
Crystal River Unit 3 )
Nuclear Generating Plant )
CERTIFICATE OF SERVICE I hereby certify that the Exceptions by Gainesville to Prehearing Order and Initial Decision of Atomic Safety and Licensing Board; and Request for Relief, in the above-captioned matter, was served upon the follwoing by deposit in the United Statec mail, first class or air mail, this 14th day of October,1968. ,
A. A. Wells, Esq. , Chairman Dr. Rolf Eliassen Atomic Safety and Licensing Board Department of Civil Engineering Panel Stanford University U. S. Atomic Energy Commission Palo Alto, California 94305 Washington, D. C. 20545 Gerald F. Hadlock, Esq.
Samuel W. Jensch, Esq. Trial Counsel, Regulatory Staff Chairman, Atomic Safety and U. S. Atomic Energy Commission Licensing Board Washington, D. C. 20545 U. S. Atomic Energy Commiss}on Washington, D. C. 20545 T. T. Turnbull, Esq.
Assistant Attorney General Dr. Eugene Greuling The Capitol Professor of Physics Tallahassee, Florida 32304 Duke University Durham, North Carolina 27706 Mr. Stanley T. Robinson, Jr. s2 copie Office of the Secretary Dr. Hugh Panon U. S. Atomic Energy Commiss..:n Los Alamos Scientific Laboratory ' Wa shington, D. C. 20545 Los Alamos, New Mexico 87544 Roy B. Snapp, Esq.
St nley A. Brandimore , Esq. 172 5 "K" Street, N. W.
Florida Power Corporation Washington, D. C. 20006 St. Petersburg, Florida I
bhf 0' M-0 WWhe*~ % i/
\
Law Offices:
ame s F. Fairman, Jr.
Attorney
/ j George Spiegel, Esq.
2600 Virginia Avenue, N. W. City of Gainesville, Florida Washington, D. C. -20037 and Gainesville Utilities Department 4