FENOC Beaver Valley PowerStation P. O. Box 4 Shzippingport, PA 15077 L-05-004 January 7, 2005 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
In accordance with NRC Generic Letter 97-02, "Revised Contents of. the Monthly Operating' iRepdort";,'and' Unit 1 and 2 Technical -Specification 6.9.4, the. "Monthly Operating Report" is-submittfd for Unit 1 and Unit 2 for the month of December, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.
Respectfully, L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures      ;.        .
                                              ..                . i  .1~ +              t-  d        I[..-wtt, cc:-- `NRC Regional Officd.. iJ;;      ;. j        ifM.'    :s>
                                                                  'i  ,      C:C.rG    j ,      S Cr    2.-!KingofPrussia6,PA  l:i",  d, ,  iiC.!'T        -                '    ;  ;    t                VIL-.
                      .                                    C
 
OPERATING DATA REPORT DOCKET NO.            50-334 UNIT NAME            Beaver Vaill I DATE                  January 0,28 COMPLETED BY          David T. Jones TELEPHONE              724-682-4962 REPORTING PERIC                December 2004
: 1. Design Electrical Rating                              835.00
: 2. Maximum Dependable Capacity (MWe-Net)                  821.00 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical              744.00        8,135.87      176,163.14
: 4. Number of Hours Generator On-line                    744.00        8,119.32      173,617.14
: 5. Reserve Shutdown Hours                                0.00          0.00            0.00 6.7 Net Electrical 'EnergyGenerated (MWHrs)    ---    629,800.00  ~-6,678;547.00    131,319,919.0-UNIT SHUTDOWNS Type                        Method of F: Forced Duration              Shutting        Cause & Corrective Action No.      Date      S: Scheduled (Hours) Reason 1 Down 2                        Comments NONE.
1                                                      2 Reason:                                              Method:
A Equipment Failure (Explain)                        1  Manual B Maintenance or Test                                2 Manual Trip/Scram C Refueling                                          3 Automatic Trip/Scram D  Regulatory Restriction                            4 Continuation E Operator Training & License Examination            5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
 
==SUMMARY==
:
The Unitoperated at a-nominal value-of 100%-output for the entire report period. -                  -
Page 1 of 1
 
OPERATING DATA REPORT DOCKET NO.          50-412 UNIT NAME            Beaver Valley 2 DATE                January 03, 2005 COMPLETED BY        David T. Jones TELEPHONE            724-682-4962 REPORTING PERIO              December 2004
: 1. Design Electrical Rating                              836.00
: 2. Maximum Dependable Capacity (MWe-Net)                  831.00 This Month      Yr-to-Date      Cumulative
: 3. Number of Hours the Reactor was Critical          744.00        8,784.00      126,392.48
: 4. Number of Hours Generator On-line                  744.00        8,784.00      125,648.38
: 5. Reserve Shutdown Hours                              0.00          0.00            0.00
: 6. Net Electri calIEnrgj Generitdd (MWHrs)      - -630,418.00 - -7 314;832.00 -99,134,230.00  -
UNIT SHUTDOWNS Type                      Method of F: Forced Duration            Shutting        Cause & Corrective Action No.      Date    S: Scheduled (Hours) Reason 1 Down 2                      Comments NONE.
1                                                    2 Reason:                                            Method:
A Equipment Failure (Explain)                      1 Manual B Maintenance or Test                              2 Manual Trip/Scram C Refueling                                        3 Automatic Trip/Scram D Regulatory Restriction                            4 Continuation E Operator Training & License Examination          5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
 
==SUMMARY==
:
T~The Unit began the rep6ort perod operatini-at a nomin-al va          of 10Ooutput7On 12-4104at 0041 hours, the Unit began to reduce output in order to gain extra margin as a conservative measure in order to prevent a possible Turbine runback or plant trip during the planned calibration of Loops 2 and 3 Delta-T/Tavg with Loop 1 experiencing fluctuations high. An output of approximately 97% was achieved at 0100 hours on 12/4/04. Following completion of the planned calibrations, the Unit commenced to return to full power at 1300 hours on 12/4/04. A nominal value of 100% output was achieved at 1329 hours on 12/4/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.
Page 1 of 1}}

Revision as of 22:56, 11 January 2020

December 2004 Monthly Operating Report for Beaver Valley Power Station Units 1 and 2
ML050310347
Person / Time
Site: Beaver Valley
Issue date: 01/07/2005
From: Pearce L
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-05-004
Download: ML050310347 (3)


Text

-

FENOC Beaver Valley PowerStation P. O. Box 4 Shzippingport, PA 15077 L-05-004 January 7, 2005 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of. the Monthly Operating' iRepdort";,'and' Unit 1 and 2 Technical -Specification 6.9.4, the. "Monthly Operating Report" is-submittfd for Unit 1 and Unit 2 for the month of December, 2004. This information has also been inputted into the INPO Consolidated Data Entry (CDE) System. No regulatory commitments are contained in this submittal.

Respectfully, L. W. Pearce Vice-President BVPS DTJ/cmg Enclosures  ;. .

.. . i .1~ + t- d I[..-wtt, cc:-- `NRC Regional Officd.. iJ;;  ;. j ifM.' :s>

'i , C:C.rG j , S Cr 2.-!KingofPrussia6,PA l:i", d, , iiC.!'T - '  ;  ; t VIL-.

. C

OPERATING DATA REPORT DOCKET NO. 50-334 UNIT NAME Beaver Vaill I DATE January 0,28 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIC December 2004

1. Design Electrical Rating 835.00
2. Maximum Dependable Capacity (MWe-Net) 821.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 8,135.87 176,163.14
4. Number of Hours Generator On-line 744.00 8,119.32 173,617.14
5. Reserve Shutdown Hours 0.00 0.00 0.00 6.7 Net Electrical 'EnergyGenerated (MWHrs) --- 629,800.00 ~-6,678;547.00 131,319,919.0-UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

The Unitoperated at a-nominal value-of 100%-output for the entire report period. - -

Page 1 of 1

OPERATING DATA REPORT DOCKET NO. 50-412 UNIT NAME Beaver Valley 2 DATE January 03, 2005 COMPLETED BY David T. Jones TELEPHONE 724-682-4962 REPORTING PERIO December 2004

1. Design Electrical Rating 836.00
2. Maximum Dependable Capacity (MWe-Net) 831.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Critical 744.00 8,784.00 126,392.48
4. Number of Hours Generator On-line 744.00 8,784.00 125,648.38
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electri calIEnrgj Generitdd (MWHrs) - -630,418.00 - -7 314;832.00 -99,134,230.00 -

UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason 1 Down 2 Comments NONE.

1 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

SUMMARY

T~The Unit began the rep6ort perod operatini-at a nomin-al va of 10Ooutput7On 12-4104at 0041 hours4.74537e-4 days <br />0.0114 hours <br />6.779101e-5 weeks <br />1.56005e-5 months <br />, the Unit began to reduce output in order to gain extra margin as a conservative measure in order to prevent a possible Turbine runback or plant trip during the planned calibration of Loops 2 and 3 Delta-T/Tavg with Loop 1 experiencing fluctuations high. An output of approximately 97% was achieved at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 12/4/04. Following completion of the planned calibrations, the Unit commenced to return to full power at 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br /> on 12/4/04. A nominal value of 100% output was achieved at 1329 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.056845e-4 months <br /> on 12/4/04. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

Page 1 of 1