ML080220290: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML080220290
| number = ML080220290
| issue date = 01/28/2008
| issue date = 01/28/2008
| title = 02/13/2008 - Notice of Meeting with Exelon (Byron Station) on Pre-submittal of Relaxation Request from First Revised NRC Order EA-03-009
| title = Notice of Meeting with Exelon (Byron Station) on Pre-submittal of Relaxation Request from First Revised NRC Order EA-03-009
| author name = Thorpe-Kavanaugh M M
| author name = Thorpe-Kavanaugh M
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| addressee name = Gibbs R A
| addressee name = Gibbs R
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| addressee affiliation = NRC/NRR/ADRO/DORL/LPLIII-2
| docket = 05000455
| docket = 05000455
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 28, 2008  
{{#Wiki_filter:January 28, 2008 MEMORANDUM TO: Russell Gibbs, Branch Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:               Meghan M. Thorpe-Kavanaugh, Project Manager         /RA/
 
Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Russell Gibbs, Branch Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
FROM:   Meghan M. Thorpe-Kavanaugh, Project Manager /RA/ Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
FORTHCOMING MEETING WITH EXELON GENERATION COMPANY, LLC (EXELON) REGARDING PRE-SUBMITTAL OF RELAXATION REQUEST FROM FIRST REVISED NRC ORDER EA-03-009
FORTHCOMING MEETING WITH EXELON GENERATION COMPANY, LLC (EXELON) REGARDING PRE-SUBMITTAL OF RELAXATION REQUEST FROM FIRST REVISED NRC ORDER EA-03-009 DATE & TIME:         Wednesday, February 13, 2008 09:30 a.m. - 11:30 a.m.
 
LOCATION:           U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-09F5 Rockville, Maryland PURPOSE:             To discuss pre-submittal regarding a relaxation request from first revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel (RPV) Head at Pressurized Water Reactors for Byron Station (Byron), Unit No. 2. They will be submitting a relaxation request to alter the inspection frequency.
DATE & TIME: Wednesday, February 13, 2008 09:30 a.m. - 11:30 a.m.  
 
LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-09F5 Rockville, Maryland  
 
PURPOSE: To discuss pre-submittal regarding a relaxation request from first revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel (RPV) Head at Pressurized Water Reactors for Byron Station (Byron), Unit No. 2. They will be submitting a relaxation request to alter the inspection frequency.  
 
CATEGORY 1:
CATEGORY 1:
* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
Interested members of the public can also participate in this meeting via audio teleconference. To connect to the conference call 1-888-795-2173 and connect to conference bridge 58424. (This line opens promptly at 9:30 AM EST.)  
Interested members of the public can also participate in this meeting via audio teleconference. To connect to the conference call 1-888-795-2173 and connect to conference bridge 58424. (This line opens promptly at 9:30 AM EST.)
MEETING CONTACTS:          Meghan Thorpe-Kavanaugh, NRR            Cameron Goodwin, NRR 301-415-5735                            301-415-3719 mmt@nrc.gov                            csg1@nrc.gov Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@
(67 FR 36920), May 28, 2002


MEETING CONTACTS:  Meghan Thorpe-Kavanaugh, NRR      Cameron Goodwin, NRR 301-415-5735          301-415-3719 mmt@nrc.gov              csg1@nrc.gov
R. Gibbs                                  PARTICIPANTS:       Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
 
NRC                               EXELON M. Evans, NRR                     D. Czufin W. Bateman, NRR                   R. Gesior T. Chan, NRR                       R. Hall R. Gibbs, NRR                     G. DeBoo J. Collins, NRR                   J. Smith M. Thorpe-Kavanaugh, NRR           P. Simpson C. Goodwin, NRR                   D. Chrzanowski S. Greenlee Docket No. 50-455
Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings
@ (67 FR 36920), May 28, 2002 
 
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC     EXELON M. Evans, NRR   D. Czufin W. Bateman, NRR   R. Gesior T. Chan, NRR   R. Hall R. Gibbs, NRR   G. DeBoo J. Collins, NRR   J. Smith M. Thorpe-Kavanaugh, NRR P. Simpson C. Goodwin, NRR   D. Chrzanowski S. Greenlee
 
Docket No. 50-455  


==Enclosure:==
==Enclosure:==
Agenda
Agenda cc w/encl: See next page
 
cc w/encl: See next page  
 
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC    EXELON M. Evans, NRR  D. Czufin W. Bateman, NRR  R. Gesior T. Chan, NRR    R. Hall R. Gibbs, NRR  G. DeBoo J. Collins, NRR  J. Smith M. Thorpe-Kavanaugh, NRR  P. Simpson C. Goodwin, NRR  D. Chrzanowski S. Greenlee 


Docket No. 50-455  
R. Gibbs                                  PARTICIPANTS:        Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)
NRC                                  EXELON M. Evans, NRR                        D. Czufin W. Bateman, NRR                      R. Gesior T. Chan, NRR                          R. Hall R. Gibbs, NRR                        G. DeBoo J. Collins, NRR                      J. Smith M. Thorpe-Kavanaugh, NRR              P. Simpson C. Goodwin, NRR                      D. Chrzanowski S. Greenlee Docket No. 50-455


==Enclosure:==
==Enclosure:==
Agenda
Agenda cc w/encl: See next page DISTRIBUTION:
 
PUBLIC               RidsNrrDorl           RidsNrrPMMThorpe-Kavanaugh LPL3-2 R/F           RidsNrrDorlLpl3-2     RidsOgcMailCenter RidsNrrAdro         RidsNrrLAEWhitt       RidsRgn3MailCenter RidsOpaMail         CGoodwin, NRR         JStrasma, OPA, Region III DJackson, EDO, Region III                   PMNS RidsAcrsAcnwMailCenter                     Receptionist (OWFN and TWFN)
cc w/encl: See next page  
Adams Accession Number:     ML080220290 OFFICE LPL3-2/PM           LPL3-2/PM               LPL3-2/LA       LPL3-2/BC NAME       CGoodwin       MThorpe-Kavanaugh       EWhitt           RGibbs DATE       1/25/08         1/28/08                 1/25/08         1/28/08
 
DISTRIBUTION:
PUBLIC RidsNrrDorl RidsNrrPMMThorpe-Kavanaugh LPL3-2 R/F RidsNrrDorlLpl3-2 RidsOgcMailCenter RidsNrrAdro RidsNrrLAEWhitt RidsRgn3MailCenter RidsOpaMail CGoodwin, NRR JStrasma, OPA, Region III DJackson, EDO, Region III PMNS RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)  
 
Adams Accession Number: ML080220290 OFFICE LPL3-2/PM LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME CGoodwin MThorpe-Kavanaugh EWhitt RGibbs DATE 1/25/08 1/28/08 1/25/08 1/28/08  


AGENDA PRE-SUBMITTAL OF RELAXATION REQUEST FEBRUARY 13, 2008 9:30 AM - 11:30 AM
AGENDA PRE-SUBMITTAL OF RELAXATION REQUEST FEBRUARY 13, 2008 9:30 AM - 11:30 AM
* Introductions
* Introductions
* Licensee's Presentation o Executive summary o Introduction/Background Material Reliability Program low susceptibility heads and inspection requirements   Byron, Unit No. 2 inspection findings for nozzle 68 o Byron, Unit No. 2 Penetration #68 Examination And Metallurgical Results Non-destructive examination and Surface examination Results Boat Sample Excavation Pressure Test Met Lab Results o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Inspection Results Inspection methods, scope and results for 4 RPV heads o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Crack Growth Study Evaluate uphill and downhill sides of 4 nozzle locations from center to max radial location Define postulated flaw size and location Present time for postulated flaw to grow large enough to leak.
* Licensees Presentation o Executive summary o Introduction/Background Material Reliability Program low susceptibility heads and inspection requirements Byron, Unit No. 2 inspection findings for nozzle 68 o Byron, Unit No. 2 Penetration #68 Examination And Metallurgical Results Non-destructive examination and Surface examination Results Boat Sample Excavation Pressure Test Met Lab Results o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Inspection Results Inspection methods, scope and results for 4 RPV heads o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Crack Growth Study Evaluate uphill and downhill sides of 4 nozzle locations from center to max radial location Define postulated flaw size and location Present time for postulated flaw to grow large enough to leak.
o Recommendations/Conclusions Inspection interval based on crack growth studies
o Recommendations/Conclusions Inspection interval based on crack growth studies
* Comments, Question, and Discussion
* Comments, Question, and Discussion
* End of Meeting
* End of Meeting
* Public Comments Byron Station, Unit Nos. 1 and 2 
* Public Comments
 
cc: Corporate Distribution Exelon Generation Company, LLC via e-mail
 
Byron Distribution Exelon Generation Company, LLC via e-mail
 
Illinois Emergency Management Agency Division of Disaster Assistance &
Preparedness via e-mail
 
Mr. Dwain W. Alexander, Project Manager Westinghouse Electric Corporation via e-mail
 
Howard A. Learner Environmental Law and Policy Center of the Midwest via e-mail
 
Byron Senior Resident Inspector U.S. Nuclear Regulatory Commission via e-mail
 
Byron Resident Inspectors U. S. Nuclear Regulatory Commission via e-mail
 
Ms. Lorraine Creek RR 1, Box 182 Manteno, IL  60950
 
Chairman, Ogle County Board P.O. Box 357 Oregon, IL  61061
 
Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL  61107
 
Attorney General 500 S. Second Street Springfield, IL  62701
 
Chairman Will County Board of Supervisors Will County Boar d Courthouse Joliet, IL  60434


Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108}}
Byron Station, Unit Nos. 1 and 2 cc:
Corporate Distribution                  Byron Resident Inspectors Exelon Generation Company, LLC          U. S. Nuclear Regulatory Commission via e-mail                              via e-mail Byron Distribution                      Ms. Lorraine Creek Exelon Generation Company, LLC          RR 1, Box 182 via e-mail                              Manteno, IL 60950 Illinois Emergency Management Agency    Chairman, Ogle County Board Division of Disaster Assistance &      P.O. Box 357 Preparedness                          Oregon, IL 61061 via e-mail Mrs. Phillip B. Johnson Mr. Dwain W. Alexander, Project Manager 1907 Stratford Lane Westinghouse Electric Corporation      Rockford, IL 61107 via e-mail Attorney General Howard A. Learner                      500 S. Second Street Environmental Law and Policy            Springfield, IL 62701 Center of the Midwest via e-mail                              Chairman Will County Board of Supervisors Byron Senior Resident Inspector        Will County Board Courthouse U.S. Nuclear Regulatory Commission      Joliet, IL 60434 via e-mail Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108}}

Latest revision as of 08:40, 7 December 2019

Notice of Meeting with Exelon (Byron Station) on Pre-submittal of Relaxation Request from First Revised NRC Order EA-03-009
ML080220290
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/28/2008
From: Thorpe-Kavanaugh M
NRC/NRR/ADRO/DORL/LPLIII-2
To: Russell Gibbs
NRC/NRR/ADRO/DORL/LPLIII-2
Goodwin C
References
EA-03-009
Download: ML080220290 (5)


Text

January 28, 2008 MEMORANDUM TO: Russell Gibbs, Branch Chief Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: Meghan M. Thorpe-Kavanaugh, Project Manager /RA/

Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH EXELON GENERATION COMPANY, LLC (EXELON) REGARDING PRE-SUBMITTAL OF RELAXATION REQUEST FROM FIRST REVISED NRC ORDER EA-03-009 DATE & TIME: Wednesday, February 13, 2008 09:30 a.m. - 11:30 a.m.

LOCATION: U.S. Nuclear Regulatory Commission Two White Flint North 11545 Rockville Pike, Room T-09F5 Rockville, Maryland PURPOSE: To discuss pre-submittal regarding a relaxation request from first revised NRC Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel (RPV) Head at Pressurized Water Reactors for Byron Station (Byron), Unit No. 2. They will be submitting a relaxation request to alter the inspection frequency.

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Interested members of the public can also participate in this meeting via audio teleconference. To connect to the conference call 1-888-795-2173 and connect to conference bridge 58424. (This line opens promptly at 9:30 AM EST.)

MEETING CONTACTS: Meghan Thorpe-Kavanaugh, NRR Cameron Goodwin, NRR 301-415-5735 301-415-3719 mmt@nrc.gov csg1@nrc.gov Commission's Policy Statement on AEnhancing Public Participation in NRC Meetings@

(67 FR 36920), May 28, 2002

R. Gibbs PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC EXELON M. Evans, NRR D. Czufin W. Bateman, NRR R. Gesior T. Chan, NRR R. Hall R. Gibbs, NRR G. DeBoo J. Collins, NRR J. Smith M. Thorpe-Kavanaugh, NRR P. Simpson C. Goodwin, NRR D. Chrzanowski S. Greenlee Docket No. 50-455

Enclosure:

Agenda cc w/encl: See next page

R. Gibbs PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR)

NRC EXELON M. Evans, NRR D. Czufin W. Bateman, NRR R. Gesior T. Chan, NRR R. Hall R. Gibbs, NRR G. DeBoo J. Collins, NRR J. Smith M. Thorpe-Kavanaugh, NRR P. Simpson C. Goodwin, NRR D. Chrzanowski S. Greenlee Docket No. 50-455

Enclosure:

Agenda cc w/encl: See next page DISTRIBUTION:

PUBLIC RidsNrrDorl RidsNrrPMMThorpe-Kavanaugh LPL3-2 R/F RidsNrrDorlLpl3-2 RidsOgcMailCenter RidsNrrAdro RidsNrrLAEWhitt RidsRgn3MailCenter RidsOpaMail CGoodwin, NRR JStrasma, OPA, Region III DJackson, EDO, Region III PMNS RidsAcrsAcnwMailCenter Receptionist (OWFN and TWFN)

Adams Accession Number: ML080220290 OFFICE LPL3-2/PM LPL3-2/PM LPL3-2/LA LPL3-2/BC NAME CGoodwin MThorpe-Kavanaugh EWhitt RGibbs DATE 1/25/08 1/28/08 1/25/08 1/28/08

AGENDA PRE-SUBMITTAL OF RELAXATION REQUEST FEBRUARY 13, 2008 9:30 AM - 11:30 AM

  • Introductions
  • Licensees Presentation o Executive summary o Introduction/Background Material Reliability Program low susceptibility heads and inspection requirements Byron, Unit No. 2 inspection findings for nozzle 68 o Byron, Unit No. 2 Penetration #68 Examination And Metallurgical Results Non-destructive examination and Surface examination Results Boat Sample Excavation Pressure Test Met Lab Results o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Inspection Results Inspection methods, scope and results for 4 RPV heads o Byron and Braidwood Station, Units 1 and 2 RPV Head Penetration Crack Growth Study Evaluate uphill and downhill sides of 4 nozzle locations from center to max radial location Define postulated flaw size and location Present time for postulated flaw to grow large enough to leak.

o Recommendations/Conclusions Inspection interval based on crack growth studies

  • Comments, Question, and Discussion
  • End of Meeting
  • Public Comments

Byron Station, Unit Nos. 1 and 2 cc:

Corporate Distribution Byron Resident Inspectors Exelon Generation Company, LLC U. S. Nuclear Regulatory Commission via e-mail via e-mail Byron Distribution Ms. Lorraine Creek Exelon Generation Company, LLC RR 1, Box 182 via e-mail Manteno, IL 60950 Illinois Emergency Management Agency Chairman, Ogle County Board Division of Disaster Assistance & P.O. Box 357 Preparedness Oregon, IL 61061 via e-mail Mrs. Phillip B. Johnson Mr. Dwain W. Alexander, Project Manager 1907 Stratford Lane Westinghouse Electric Corporation Rockford, IL 61107 via e-mail Attorney General Howard A. Learner 500 S. Second Street Environmental Law and Policy Springfield, IL 62701 Center of the Midwest via e-mail Chairman Will County Board of Supervisors Byron Senior Resident Inspector Will County Board Courthouse U.S. Nuclear Regulatory Commission Joliet, IL 60434 via e-mail Mr. Barry Quigley 3512 Louisiana Rockford, IL 61108