Category:Meeting Notice
MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-11-0606 November 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations ML24149A1422024-05-29029 May 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Byron Station, Units 1 and 2 Nuclear Plant for Performance for 2023 Calendar Year ML24127A2362024-05-0707 May 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood Nuclear Plant for Performance for 2023 Calendar Year ML24100A0552024-04-15015 April 2024 Constellation - Closed Meeting Notice Regarding a Future Topical Report Submittal PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 ML24058A1042024-03-22022 March 2024 Closed Forthcoming Meeting with Constellation Energy Generation, LLC PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks ML24047A2592024-02-20020 February 2024 Public Meeting Notice for Regulatory Conference to Discuss Risk Associated with 2B Auxiliary Feedwater Pump Diesel Engine Fuel Oil Leak PMNS20231393, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.22023-12-13013 December 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.2 PMNS20231313, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.52023-11-24024 November 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Delete Byron and Braidwood Station Technical Specification 5.6.5.b.5 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20230972, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink2023-10-0202 October 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding a Future Amendment Request to Revise the Braidwood Station, Units 1 and 2, Technical Specification 3.7.9 for the Ultimate Heat Sink PMNS20230952, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections2023-09-13013 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20230930, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-752023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingbyron Station, Unit 2, Core Exit Thermocouple Penetration P-75 PMNS20230931, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections2023-08-29029 August 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regardingextension of Byron Station, Unit 1, Reactor Pressure Vessel (RPV) Inspections PMNS20230744, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-06-22022 June 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss the Denial of Its Requests for Alternatives for Certain Steam Generator Weld Inspections ML23138A1892023-05-18018 May 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood and Byron Nuclear Plants for Performance for 2022 Calendar Year PMNS20230225, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools2023-03-0606 March 2023 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station New Criticality Analysis for Spent Fuel Pools PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels PMNS20230063, Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections2023-01-19019 January 2023 Notice of Meeting with Constellation Energy Generation, LLC, (Constellation) to Discuss Its Requests for Alternatives for Certain Steam Generator Weld Inspections PMNS20220954, Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel2022-09-20020 September 2022 Notice of Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Byron Station and Braidwood Station Change to Framatome Nuclear Fuel PMNS20220805, Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds2022-08-22022 August 2022 Notice of Meeting with Constellation Energy Generation, LLC, to Discuss Its Performance Monitoring Plan for Certain Steam Generator Welds ML22136A1212022-05-17017 May 2022 Notice of Significant Public Meeting to Discuss NRC End of Cycle Performance Assessment of Braidwood and Byron Power Plants for Performance for 2021 Calendar Year ML22136A1312022-05-17017 May 2022 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance of Braidwood Station, Units 1 and 2 and Byron Station, Units 1 and 2 PMNS20220359, Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-04-0707 April 2022 Second Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20220331, Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood)2022-03-31031 March 2022 Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Performance Monitoring of Pressurizer Welds at Byron Nuclear Station (Byron) and Braidwood Nuclear Station (Braidwood) PMNS20220320, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 22022-03-29029 March 2022 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) to Discuss Placement of a Twice Burned Accident Tolerant Fuel (ATF) Lead Test Assembly (LTA) in a High Burnup Core Location in Byron, Unit 2 PMNS20211388, Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License2021-11-16016 November 2021 Pre-application Meeting Regarding Removal of the License Condition 2.C.(12)(D) That Requires Repair of Stud Hole Number 35 Prior to the Period of Extended Operation from the Unit 2 License PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards ML21145A1682021-05-25025 May 2021 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Braidwood Station and Byron Station for Performance for 2020 Calendar Year PMNS20210423, Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications2021-05-11011 May 2021 Notice of Meeting with Exelon Generation Company, LLC Regarding a Future Amendment Request to Revise Braidwood Station Ultimate Heat Sink Technical Specifications PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20183A1312020-06-30030 June 2020 7/14/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Braidwood Station and Byron Station Performance for the 2019 Calendar Year ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19158A3742019-06-0606 June 2019 7/2/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Braidwood Station Performance for the 2018 Calendar Year ML19133A1582019-05-13013 May 2019 5/28/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2018 Calendar Year ML18088A0522018-03-29029 March 2018 5/10/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2017 Calendar Year ML18067A2732018-03-0808 March 2018 4/18/2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of Byron Station, Units 1 and 2 Performance for the 2017 Calendar Year ML17335A0442017-12-0404 December 2017 Tvel Lead Test Assembly 3rd Closed Meeting ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML17258A0222017-09-14014 September 2017 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Exelon Sites (CMS) ML17072A2162017-03-0909 March 2017 3/09/2017 Notice of Meeting with Exelon Generation Company, LLC to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2016 Calendar Year ML17069A0702017-03-0707 March 2017 4/28/17 Notice of Significant Public Meeting with Braidwood Station to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2016 Calendar Year ML16209A3062016-08-0101 August 2016 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC ML16172A2872016-06-20020 June 2016 7/12/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Byron Station Performance for the 2015 Calendar Year ML16172A2982016-06-20020 June 2016 7/14/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Braidwood Station Performance for the 2015 Calendar Year 2024-05-07
[Table view] |
Text
May 25, 2021 NOTICE OF PUBLIC MEETING Licensee(s): Exelon Generation Company, LLC Facility(ies): Braidwood Station, Units 1 and 2; Byron Station Units 1 and 2 Docket No(s): 50-456; 50-457 (Braidwood); 50-454; 50-455 (Byron)
Date and Time: Tuesday, June 8, 2021 5:00pm to 6:00 pm (CDT)
Location: Webinar (via Microsoft Teams)
Purpose:
The NRC staff will host a webinar to present the NRCs assessment of safety performance at Braidwood Station and Byron Station for 2020, as described in the 2020 annual assessment letter. Following the presentation, the NRC will respond to questions specific to the safety performance of the stations and the NRCs role in ensuring safe plant operations.
NRC Attendees: H. Peterson, Chief, Branch 3, Division of Reactor Projects (DRP)
D. Kimble, Senior Resident Inspector, Braidwood P. Smagacz, Resident Inspector, Braidwood D. Betancourt, Senior Resident Inspector, Byron J. Weigandt, Resident Inspector, Bryon J. Wiebe, Senior Licensing Manager, Office of Nuclear Reactor Regulation N. Shah, Senior Project Engineer V. Mitlyng, Senior Public Affairs Officer P. Chandrathil, Public Affairs Officer Others, as designated
Notice of Significant 2 Licensee Meeting Public Participation: This is an information meeting with a question and answer session.
The purpose of this meeting is for the NRC staff to meet directly with individuals to discuss regulatory and technical issues.
Attendees will have an opportunity to ask questions of the NRC staff or make comments about the issues discussed throughout the meeting, however the NRC is not actively soliciting comments towards regulatory decisions at this meeting. The NRC staff will provide guidance during the webinar on the methods available to ask a question. Alternatively, questions may be submitted in advance to Hironori.Peterson@nrc.gov.
Interested members of the public should use the internet link below to see the visual portion of the presentation. In addition, interested members of the public must call in at 1-888-603-9743, passcode 7300217 in order to hear the audio portion of the presentation because the video portion of the presentation will have no sound.
This is a virtual public meeting where participants will be able to see the presentation on a computer screen and hear the presenters through their telephone. There is also the option to join via phone only by calling in to the number above.
The link for the public meeting is:
2020 Byron and Braidwood public end-of-cycle meeting System requirements for attendees of the webinar:
https://docs.microsoft.com/en-us/microsoftteams/hardware-requirements-for-the-teams-app.
If you have any questions concerning the meeting, please call or email the meeting contact.
Meeting
Contact:
Hironori Peterson, Chief DRP, Branch 3 (630) 829-9707 Hironori.Peterson@nrc.gov The NRCs annual assessment letter regarding Braidwood Station and Byron Station performance during 2020 can be found using ADAMS Accession Nos. ML21060B561 and ML21060B575, respectively. Additional information related to the NRCs annual assessment process and the safety performance of each site can be found on the NRCs website at:
https://www.nrc.gov/reactors/operating/oversight.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective March 19, 2021, applies to this meeting. The policy statement may be found on the NRC website https://www.nrc.gov/reading-rm/doc-collections/commission/policy/index.html and on Federal Register 14964 https://www.govinfo.gov/content/pkg/FR-2021-03-19/pdf/2021-05787.pdf.
Notice of Significant 3 Licensee Meeting The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website (www.NRC.gov) under public meetings.
Approved by: /RA/
Hironori Peterson, Chief Branch 3 Division of Reactor Projects Meeting
Contact:
Hironori Peterson, Chief DRP, Branch3 630-829-9707 Hironori.Peterson@nrc.gov
Notice of Significant 4 Licensee Meeting DISTRIBUTION:
Aaron McCraw, Region III Coordinator, OEDO Russell Felts, Deputy Director, Division of Reactor Oversight, NRR RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrPMByron Resource Julio Lara, Director, Division of Reactor Projects, RIII Jamie Heisserer, Deputy Director, Division of Reactor Projects, RIII Mohammed Shuaibi, Director, Division of Reactor Safety, RIII David Curtis, Deputy Director, Division of Reactor Safety, RIII Hironori Peterson, DRP Branch Chief Daniel Kimble, SRI, Braidwood Diana Betancourt SRI, Byron DRS Branch Chiefs:
Ann Marie Stone Karla Stoedter Richard Skokowski Patricia Pelke Steven Orth Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs ADAMS Accession Number: ML21145A168 OFFICE RIII RIII NAME NShah:ve via email HPeterson via email DATE 05/25/2021 05/25/2021 OFFICIAL RECORD COPY