Line 2: |
Line 2: |
| | number = ML103140214 | | | number = ML103140214 |
| | issue date = 11/01/2010 | | | issue date = 11/01/2010 |
| | title = 2010/11/01 Diablo Canyon Lr - Regional Inspection Spreadsheet | | | title = Lr - Regional Inspection Spreadsheet |
| | author name = | | | author name = |
| | author affiliation = - No Known Affiliation | | | author affiliation = - No Known Affiliation |
|
---|
Category:E-Mail
MONTHYEARML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML23165A2702023-06-14014 June 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML23157A2392023-06-0505 June 2023 Limited Appearance Statement from Nina Babiarz in the Matter of the Diablo Canyon ISFSI License Renewal Application ML23096A1792023-04-0606 April 2023 NRR E-mail Capture - Request for Additional Information Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23094A1032023-04-0404 April 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Exemption Request Regarding Senior Reactor Operator License Application ML23076A0932023-03-16016 March 2023 16-2023 Email - Estimate of Spent Nuclear Fuel in Tons ML23067A0202023-03-0808 March 2023 NRR E-mail Capture - Diablo Canyon Nuclear Power Plant Evacuation Time Estimate Analysis Review ML23046A1042023-02-13013 February 2023 Transmittal Email, Diane Curran to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23046A1132023-02-13013 February 2023 Transmittal Email, Paul Bessette to Gibson, 2/13/23, Filing of Formal Opposition to PG&E Exemption Request ML23052A2042023-01-10010 January 2023 E-mail from Paul Bessette Dated 01/10/2023 Regarding Diablo Canyon ML22326A1632022-11-21021 November 2022 Licensee Comment Email on Post-Shutdown Emergency Plan Amendment ML22266A0012022-09-22022 September 2022 (External Sender) E-Mail Diablo Canyon Power Plant, Unit Nos. 1 and 2 - Total Amount of Spent Nuclear Fuel Stored in Tons ML22241A1142022-08-29029 August 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Application to Revise Technical Specifications to Adopt TSTF-569, Revision of Response Time Testing Definitions ML22194A8872022-07-11011 July 2022 September 2022 Emergency Preparedness Exercise Inspection - Request for Information Email ML22187A2652022-07-0606 July 2022 NRR E-mail Capture - Request for Additional Information: Diablo Canyon Exemption Request for Part 73 force-on-force Training Due to COVID-19 ML22105A0702022-04-15015 April 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF 577, Revised Frequencies for Steam Generator Tube Inspections ML22090A0832022-03-31031 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of a Certified Fuel Handler Training and Retraining Program ML22089A1672022-03-29029 March 2022 Email - Acknowledgement of NRC Receipt of Diablo Canyon ISFSI Renewal Application ML22087A0412022-03-25025 March 2022 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval of Alternative Security Measures for Early Warning System ML22061A2192022-03-0202 March 2022 NRR E-mail Capture - Request for Additional Information - Diablo Canyon Proposed Changes to Emergency Plan for post-shutdown and Permanently Defueled Condition ML21323A0652021-11-19019 November 2021 NRR E-mail Capture - Acceptance Review - Diablo Canyon Revision of Emergency Plan for post-shutdown Condition 2024-09-06
[Table view] |
Text
DiabloCanyonNPEm Resource From: Tan, Miranda [M1TF@pge.com]
Sent: Monday, November 01, 2010 12:07 PM To: Pick, Greg Cc: Grebel, Terence
Subject:
RE: Regional Inspection Spreadsheet Attachments: deg jw pp U1.pdf; RESPONSE TO NRC QUESTIONS ON DEG JW PUMPS.doc
- Greg, Attached are information relating to Closed Cycle Cooling Water question. These are on IMS as well under # 199. We are still working on getting a copy of EPRI TR-107390 to you.
- Best, Miranda Tan 805 781 9415 From: Pick, Greg [1]
Sent: Wednesday, October 27, 2010 9:07 AM To: Tan, Miranda Cc: DiabloCanyonNPEm Resource
Subject:
RE: Regional Inspection Spreadsheet See the attached questions from review of Closed Cooling Water, Open Cycle Cooling Water & FO Chemistry From: Tan, Miranda [2]
Sent: Wednesday, October 27, 2010 8:14 AM To: Pick, Greg Cc: Grebel, Terence
Subject:
Regional Inspection Spreadsheet
- Greg, Attached is the regional inspection spreadsheet.
- Best, Miranda Tan 805 781 9415
<<NRC Regional Inspection QA Spreadsheet 102610.xls>>
1
Hearing Identifier: DiabloCanyon_LicenseRenewal_NonPublic Email Number: 2160 Mail Envelope Properties (D065043718A59C4B99DDA1862BB067DE01BA2429)
Subject:
RE: Regional Inspection Spreadsheet Sent Date: 11/1/2010 12:07:22 PM Received Date: 11/1/2010 12:07:31 PM From: Tan, Miranda Created By: M1TF@pge.com Recipients:
"Grebel, Terence" <TLG1@pge.com>
Tracking Status: None "Pick, Greg" <Greg.Pick@nrc.gov>
Tracking Status: None Post Office: exchange12.Utility.pge.com Files Size Date & Time MESSAGE 881 11/1/2010 12:07:31 PM deg jw pp U1.pdf 323424 RESPONSE TO NRC QUESTIONS ON DEG JW PUMPS.doc 30272 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
RESPONSE TO NRC QUESTIONS ON DEG JW PUMPS
-Larry Price 10/29/10 The Tell Tale leakage from the JW or oil seal - what causes leakage of this sort or leakage and what does it mean (i.e., what is wearing out)?
The "tell-tale" is a drain ported into the annulus which is the atmospheric side of both the mechanical seal and the lip seal. The mechanical seal is the pressure boundary for the Jacket Water Pump and seals the chromated jacket water within the pump pressure boundary. The lip seal forms a seal around the gear driven pump shaft at the atmosphere end of the bearing housing. The pump bearings are lubricated by the engine crankcase oil. Any leakage from the mechanical seal and / or the lip seal is allowed to drain out of the annulus between these two seals for the following reasons:
- 1. Prevents jacket water from getting into the crankcase in the event of mechanical seal leakage.
- 2. Prevents lube oil from getting into the jacket water system in the event of a lip seal failure.
- 3. Allows detection of jacket water leakage through the mechanical seal and or oil leakage through the lip seal.
What does tell-tale leakage mean (what is wearing out)?
Jacket water leakage from the tell-tale means that jacket water is leaking across the dynamic seal faces (between the rotating and stationary seal faces), between the shaft sleeve and mechanical seal bellows, or through the gasket that seals the Seal Plate to the Bearing Frame. Minor drips are normal for a mechanical seal as leakage across the seal face is required for lubrication and cooling. Leakage of oil out of the tell tale indicates oil is leaking past the lip seal. Minor seepage across a lip seal is normal and typically wouldn't result in any visible drips.
In conclusion the tell-tale will normally show signs of minor seepage. Significant leakage reveals there is a problem in the mechanical seal area of the pump and/or the oil seal. Oil seal leakage across the lip seal is never a catastrophic failure. The oil fed to this area is by splash lubrication rather than a pressurized source.
Can I get a vendor drawing or vendor manual drawing of the jacket water cooling pump? Specifically, I am interested in the location of the tell tale drain?
The Jacket Water Pump parts exploded view is attached to the email. The first page has been marked up with explanatory notes. The tell-tale drain is a port in the bearing frame which connects to the annulus between the mechanical seal and the oil lip seal.
For pump 1-1 shaft sleeve corrosion noted - what caused the corrosion? Is this expected?
Years ago the Maintenance Engineer noted a correlation between jacket water seepage out of the tell-tale and finding corrosion on the shaft sleeve under the mechanical seal bellows. Also it was noted that this leakage typically occurred following maintenance where the JW System was drained below the JW Pump. It was determined that draining down the system to support maintenance allowed oxygen access to the shaft sleeve area. The crevices between the mechanical seal bellows and the carbon steel shaft sleeve support corrosion in the presence of oxygen. This was confirmed by the fact that this condition did not occur when the JW level was kept above the mechanical seal elevation. Once the shaft sleeves were converted to stainless steel, this problem did not recur even when the JW system was drained below the seal elevation.
What is the average life of the JW pumps if we remove the pump 2-1 July 1992 mechanical seal problem from the data? I assume this failure resulted from the maintenance error that we discussed?
13 years Can I get a vendor drawing or vendor manual drawing of the jacket water cooling pump? Specifically, I am interested in the location of the tell tale drain?
Vendor manual parts drawing attached.
Copy of EPRI TR-107390, Technical Basis of Treatment Chemicals Used for Corrosion Control Copy to be provided by others.