ML110070330: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110070330
| number = ML110070330
| issue date = 12/20/2010
| issue date = 12/20/2010
| title = 2010/12/20 Watts Bar 2 OL - FW: 20101203 Open Item List Mastertva Update 12-14-10r2.docx
| title = OL - FW: 20101203 Open Item List Mastertva Update 12-14-10r2.docx
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Monday, December 20, 2010 4:31 PM To: Crouch, William D Cc: Clark, Mark Steven; Hilmes, St even A; WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                       Poole, Justin Sent:                       Monday, December 20, 2010 4:31 PM To:                         Crouch, William D Cc:                         Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Attachments:
FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Attachments:               20101203 Open Item List MasterTVA Update 12-14-10r2.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Singh, Gursharan Sent: Monday, December 20, 2010 2:48 PM To: Poole, Justin Cc: Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry; Stattel, Richard
20101203 Open Item List MasterTVA Update 12-14-10r2.docx JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Singh, Gursharan Sent: Monday, December 20, 2010 2:48 PM To: Poole, Justin Cc: Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry; Stattel, Richard  


==Subject:==
==Subject:==
20101203 Open Item List MasterTVA Update 12-14-10r2.docx Justin, Attached file is ready for sending to TVA. I have updated item 343 as discussed in the meeting.  
20101203 Open Item List MasterTVA Update 12-14-10r2.docx
: Justin, Attached file is ready for sending to TVA. I have updated item 343 as discussed in the meeting.
Gush 1


Gush Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 230   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7A6D25B243)
Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         230 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D7A6D25B243)


==Subject:==
==Subject:==
FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Sent Date:   12/20/2010 4:31:27 PM Received Date: 12/20/2010 4:31:33 PM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "Clark, Mark Steven" <msclark0@tva.gov> Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Sent Date:             12/20/2010 4:31:27 PM Received Date:         12/20/2010 4:31:33 PM From:                 Poole, Justin Created By:           Justin.Poole@nrc.gov Recipients:
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov> Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None  
"Clark, Mark Steven" <msclark0@tva.gov>
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Tracking Status: None Post Office:          HQCLSTR02.nrc.gov Files                          Size                  Date & Time MESSAGE                        543                    12/20/2010 4:31:33 PM 20101203 Open Item List MasterTVA Update 12-14-10r2.docx                  422159 Options Priority:                      Standard Return Notification:          No Reply Requested:              No Sensitivity:                  Normal Expiration Date:
Recipients Received:


Post Office:  HQCLSTR02.nrc.gov Files    Size      Date & Time MESSAGE    543      12/20/2010 4:31:33 PM 20101203 Open Item List MasterTVA Update 12-14-10r2.docx    422159 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEE311.docx                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
LIC-110 Rev. 1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2 Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 7 Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 8 Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12 , 2010 (Enclosure 1
, Item No. 9 Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 10 Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 11 Y Closed Closed EICB RAI ML101680598
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 12 Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 13 Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
, if an y, for the solid state p rotection Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10 Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10 Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a Y Closed Closed  NRC Meetin g N/A - Re q uest for NNC 4/30/10:
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
, verif y that the Date: 4/27/10 Y Closed Closed NRC Meetin g ML101230248
,  026    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10 Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction Y Close Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  Y Close Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
A ll Other S ystems Re quired for Safet y  Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10 Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10 Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10 Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10 Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010. Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19 contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
N Open  Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version.  (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM. Open-NRC Review Due:  (3) 12/3/10  (4) 12/10/10 TVA to docket information indentified in ISG6. NRC Meeting Summary NRC


Meeting Summary
===Response===
SE      FSAR        NRC No.                                                                          Issue                                                    TVA Response(s)                        Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec.        POC                                                                                                                                              Y/N B        (
001      All      All              A        The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency          12/15/2009 Presentation Slides                          Y              Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains B        (
002      All      All              A        Are there I&C components and systems that have changed to a          12/15/2009 Presentation Slides                          Y              Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains B        (
003      All      All              A        Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides                                Y              Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains
(        B 004      All      All                      Please identify the information that will be submitted for each      Responder: Webb      1/13/10 Public Meeting             Y              Closed                        Closed              EICB RAI          January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005    7.1.3.1                              By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb                                            Y              Closed                        Closed              EICB RAI          TVA Letter dated D
( ( ( (
006                                          Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2        Y              Closed                        Closed              EICB RAI          TVA Letter dated NNC: WCAP-12096 Rev. 7 007    7.1.3.1          a        (        The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 Y                    Closed                        Closed              EICB RAI          TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008      7.3                G G G G          There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 Y                Closed                        Closed              EICB RAI          TVA Letter dated r        A 009    7.3.2    5.6,                      Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 Y                  Closed                        Closed              EICB RAI          3/12/10,
(
010      7.3      7.3                      The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 Y                    Closed                        Closed              EICB RAI          3/12/10, D
a r
(
011    7.3.2    5.6,                      NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 Y            Closed                        Closed              EICB RAI          ML101680598, D
a r
(
012      7.4      7.4    ( D                The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 Y                    Closed                        Closed              EICB RAI          TVA Letter dated G a r
013    7.1.3.1                              Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not          TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 Y            Closed                        Closed              EICB RAI          TVA Letter dated TS have been docketed.
014      All      All    (    B            Provide the justification for any hardware and software changes      Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated 015                      D (                Verify that the refurbishment of the power range nuclear              Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated
(
016                      a C  (            Identify the precedents in license amendment requests (LARs), if      Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated G
r a  A 017    7.3.1    7.3.1,                    Identify precedents in LARs, if any, for the solid state protection  Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated
(
018                                          Identify any changes made to any instrumentation and control          Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated 019                                          Verify that the containment purge isolation radiation monitor is the Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated 020                      (  D              Provide environmental qualification information pursuant to Section Date: 4/27/10                                              Y              Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
021                7.3      (  ( ( ( (      For the Foxboro Spec 200 platform, identify any changes in            Date: 5/25/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated The resolution of this item will be C  a G  G G G G 022    7.3.2    5.6,                      Verify the auxiliary feedwater control refurbishment results in a    Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated a  r 023                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                              Y              Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
024                                          Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a        Y              Closed                        Closed              NRC Meeting        N/A - Request for NNC 4/30/10: Carte to address
( ( (  (  (  (
025    7.5.2    7.5.1                      For the containment radiation high radiation monitor, verify that the Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        ML101230248, 026                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                              Y              Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
(      (  (  (
027    7.7.1.4                              For Foxboro I/A provide information regarding safety/non-safety-      Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated 028                                          For the turbine control AEH system, verify that the refurbishment    Responder: Mark Scansen                                  Y              Closed                        Closed              NRC Meeting        TVA Letter dated C C C  C  C  S 029                                          For the rod control system, verify that the refurbishment results in a Date: 4/27/10                                          Y              Closed                        Closed              NRC Meeting        TVA Letter dated G      G  G  G 030                                          Regarding the refurbishment of I&C equipment, identify any            Responder: Clark                                        Y              Closed                        Closed              NRC Meeting        TVA Letter dated 031                                          For the rod position indication system (CERPI), provide information Date: 4/27/10                                              Y              Closed                        Closed              NRC Meeting        TVA Letter dated CERPI is non-safety related.
a a a  a  a  i 032                                          For the process computer, need to consider cyber security issues Date: 4/27/10                                                Y              Closed                        Closed              NRC Meeting        TVA Letter dated EICB will no longer consider cyber 033                                          For the loose parts monitoring system, provide information            Date: 4/27/10                                            Y              Closed                        Closed              NRC Meeting        TVA Letter dated The loose parts monitoring system is 034                                          2/4/2010                                                              Responder: TVA                                          Y              Closed                        Closed              N/A                TVA Letter dated 034.1                      (                  Chapter 7.1 - Introduction                                                                                                  Y              Close                        Closed              N/A                N/A
(    a 034.2                      D                  Chapter 7.2 - Reactor Trip System                                                                                          Y              Close                        Closed              N/A                N/A M  ( r 034.3    7.3      7.3      a                  Chapter 7.3 - ESFAS                                                                                                        Y              Closed                        Closed              N/A                N/A a  G g r
034.4 7.5.1.1    7.5.2                        Chapter 7.5 - Instrumentation Systems Important to Safety                                                                  Y              Closed                        Closed              N/A                N/A                Closed 034.5 7.5.1.1    7.5.2                        Chapter 7.6 - All Other Systems Required for Safety                                                                        Y              Closed                        Closed              N/A                N/A                Closed r
c u
034.6                                          Chapter 7.7 Control Systems                                                                                                Y              Closed                        Closed              N/A                N/A n
g h
                          /
035                        (                2/18/2010                                                            Responder: Clark                                        Y              Closed                        Closed              RAI No. 1          TVA Letter dated LIC-110 Section 6.2.2 states: Design
( (
M 036    7.5.2    7.5.1      C S            February 18, 2010                                                    Date: 5/25/10                                            Y              Closed                        Closed              NRC Meeting                          NNC: Unit 2 FSAR Section 7.5.1, Post a
a i 037    7.5.1.1  7.5.2                      2/18/2010                                                            Responder: Clark                Date: 5/25/10          Y              Closed                        Closed              N/A                TVA Letter dated FSAR Amendment 100 provides


ML093560019, Item No. 11 TVA Letter dated 6/18/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                      radEE311.docx                                                                                              Open Items to be Resolved for SER Approval


TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
===Response===
042 All All B (AFebruar y 25 , 2010: Telecom Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information  
SE      FSAR        NRC No.                                                                      Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec.      POC                                                                                                                                                    Y/N 038    7.5.1.1  7.5.2      (              2/18/2010                                                          Responder: Clark            Date: 5/25/10                      Y            Closed                            Closed                EICB RAI            TVA Letter dated The slides presented at the December 039                      ( ( M              January 13, 2010                                                    Responder: Clark                      Date: 5/25/10             Y            Closed                            Closed                EICB RAI            FSAR amendment The equation for the calculation of the G G a 040                                        January 13, 2010                                                    Responder: Clark                      Date: 5/25/10              Y            Closed                            Closed                EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041    7.5.2    7.5.1                      2/19/2010                                                          Responder: WEC                                                  N            Open                              Open-NRC Review        NRC Meeting        TVA Letter dated See also Open Item Nos. 226 & 270.
EICB (Carte)
Summary NRC        6/18/10 Please provide the following Westinghouse documents:                Items (1) and (2) were docketed by TVA letter dated April 8,                  Final Response included in        Due:                  Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements              2010.                                                                        letter dated 12/3/10              (3) 12/3/10            ML093560019, Item  TVA Letter dated Specification"                                                                                                                                                                      (4) 12/10/10          No. 11              10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                    Item (3) will be addressed by Revision 2 of the Licensing Specification"                                                      Technical Report. Due 12/3/10                                                Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                          letter dated 10/5/10.          information indentified Please provide the following Westinghouse documents or pointers    Item (4) will be addressed by Westinghouse developing a                      The SysRS and SRS              in ISG6.
to where the material was reviewed and approved in the CQ TR or    WBN2 Specific Test Plan to compensate for the fact that the                  incorporate requirements from SPM:                                                                NRC disapproved WNA-PT-00058-GEN during the original                          many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q          Common Q review. Due 12/7/10                                                  reference.
Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test                Item (5) Procedures that are listed in the SPM compliance                    NNC 8/25/10: (3) An earlier Procedure"                                                          table in the Licensing Technical Report revision 1 supersede                  version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10                            docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19 contains the Westinghouse                          should be no problem to docket document Post-Accident Monitoring System (PAMS)                              this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision                      ML091560352, the testing 2, dated December 2010. Attachment 20 contains the                            process document does not Westinghouse Application for Withholding for the Post-                      address the test plan Accident Monitoring System (PAMS) Licensing Technical                        requirements of the SPM.
Report, WNA-LI-00058-WBT, Revision 2, dated December                        Please provide a test plan that 2010.                                                                        implements the requirements of the SPM.
For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
B        (
042     All     All             A        February 25, 2010: Telecom                                         Date: 5/25/10                                                   Y           Closed                             Closed                 EICB RAI           TVA Letter dated The drawing provided did not have the 043   7.5.2     7.5.1                     2/19/2010                                                          Responder: WEC                    Date: 5/25/10                  N            Open                              Open-TVA/WEC          EICB RAI            TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
ML102910002        2/5/10          compliance matrix was docketed on: (1)
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to           The PAMS ISG6 compliance matrix supplied as Enclosure 1                    Revised response included in      Due 12/1/10            Item No. 2                          February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the                letter dated 12/22/10.                                                        TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed.                                                                                                                                        5/12/10          expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a    By letter dated April 8, 2010 TVA provided the PAMS                          Response is included in letter                                                TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not      Licensing Technical Report provided additional information.                  dated 10/5/10.                                                                6/18/10          evaluation.
approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that      Attachment 3 contains the revised Common Q PAMS ISG-6                        Revised compliance matrix is                                                  TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed    Compliance Matrix, dated June 11, 2010, that addresses                        unacceptable.                                                                10/5/10          Rev. 1 Section 7 does not include the and approved.                                                      these items (Reference 13).                                                                                                                                                  RSED documents, and it should. Table NNC 8/12/10: It is not quite                                                                  6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA                              enough to provide all of the                                                                  RSED RTMs.
but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                        documents requested. There SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as          Compliance Matrix."                                                          are two possible routes to being SRP acceptance criteria for PAMS.                                                                                                          review that the NRC can


needed. The shortcomings of the firs t three lines in the matrix are:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radEE311.docx                                                                                                      Open Items to be Resolved for SER Approval
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed


and approved.  
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable        Status/ Current Actions              Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                        Y/N It is TVAs understanding that this comment is focused on                    undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity    the fact that there are documents that NRC has requested                    (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC          that are currently listed as being available for audit at the                TVA response that was noted that this report is applicable for a system in a plant, and the  Westinghouse offices. For those Common Q PAMS                                originally pursued was to follow CQ topical report did no specifically address this PAMS system at      documents that are TVA deliverable documents from                            ISG6, but some of the Watts Bar Unit 2.                                                      Westinghouse, TVA has agreed to provide those to NRC.                        compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will                  addressed by referencing the NRC then concluded that TVA should go through and provide a            be available for audit as stated above. Requirements                        SPM. The NRC approved the more complete and thorough compliance matrix.                          Traceability Matrix issues will be tracked under NRC RAI                    CQ TR and associated SPM; it Matrix Items 142 (Software Requirements Specification) and                  may be more appropriate to 145 (System Design Specification). Commercial Item                          review the WBN2 PAMS Dedication issues will be tracked under NRC RAI Matrix                      application to for adherence to Item 138. This item is considered closed.                                    the SPM that to ISG6. In either path chosen, the applicant WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                    should provide documents and a System (PAMS) Licensing Technical Report submitted in                      justification for the acceptability TVA Letter to NRC dated December 3, 2010, Watts Bar                        of any deviation from the path Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls                    chosen. For example, it Staff Information Requests, (Reference 1) contains the                      appears that the following changes to address the NRC requests:                              Westinghouse's CDIs are commercial grade dedication (1) While RSEDs are not specifically mentioned, Section 7                    plans, but Westinghouse has been revised to be applicable to both hardware and                  maintains that they are software which includes the RSEDs.                                      commercial grade dedication (2) Table 6-1 item 15 reference added for WNA-VR-00280-                      reports; this apparent deviation WBT (RESD)                                                              should be justified or explained.
( ( ( ( ( (
044    7.5.2  7.5.1                  February 25, 2010                                                      Date: 5/25/10                                                  Y            Closed                                Closed                      EICB RAI            TVA Letter dated 045                                    February 25, 2010                                                      Date: 5/25/10                                                  Y            Closed                                Closed                      EICB RAI            TVA Letter dated C C C C C C 046                                    February 25, 2010                                                      Date: 5/25/10                                                  Y            Closed                                Closed                      N/A - Request for  N/A 047    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC/Hilmes              Date: 5/25/10                Y            Closed                                Closed                      EICB RAI            TVA Letter dated a a a a a a 048    7.5.2  7.5.1                  April 8, 2010                                                          Date: 5/25/10                                                  Y            Closed                                Closed                      EICB RAI            TVA Letter dated 049    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC            Date: 5/25/10                        Y            Closed                                Closed                      EICB RAI            TVA Letter dated 050    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC                  Date: 5/25/10                  N            Open                                  Open-TVA/WEC                EICB RAI            TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)
ML102910002        6/18/10          several Reference 8, however, How should the "shall" statements outside of the bracketed              These sections are descriptive text and not requirements.                    Revised response included in          Due12/22/10                Item No. 8                          Reference 8 has been deleted.
requirements in Common Q requirements documents be                      The next revision of the Watts Bar Unit 2 PAMS System                        letter dated 12/22/10.                Discuss at 11/22 phone                          TVA Letter dated interpreted?                                                            Requirements Specification will remove shall from the                                                            call.                                          10/29/10 wording in those sections. A date for completing the next                                                                                                          Enclosure 1 Item revision of the System Requirements Specification will be                    TVA response is inconsistent          This will be corrected in                      No. 1 provided no later than August 31, 2010.                                      (e.g., WNA-DS-01667-WBT              the Revision 3 Rev. 1 page 1-1, Section 1.3.1        document due to TVA The System Requirements Specification will be revised by                    implies that "SysRS Section          12/10/10 September 30, 2010 and submitted within two of receipt from                  ###" has requirements. See Westinghouse.                                                                also SDS4.4.2.1-1 on page 4-32).
TVA Revised Response Is there a requirement on the Shall statements within the scope of the System                              shall referenced above??
Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The                    Response is provided in letter statements were either relocated to the numbered                            dated 10/29/10.
requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by                      TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS                          Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).                  1 Item No. 1 is Acceptable


Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                             radEE311.docx                                                                                          Open Items to be Resolved for SER Approval
Responder: WEC                        Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.
By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.
Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."
N Open Revised response included in letter dated 12/22/10.
Response is included in letter dated 10/5/10.
Revised compliance matrix is unacceptable.
NNC 8/12/10:
It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can Open-TVA/WEC Due 12/1/10 EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated


5/12/10 TVA Letter dated  
===Response===
SE    FSAR    NRC No.                                          Issue                            TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                Y/N TVA Response to Follow-up NRC Request:                                    NNC 11/18/10: Revised Response is not a statement of This item is corrected in the revision 3 requirements                      fact. SysRS Rev. 2 (i.e., WNA-documents.                                                                DS-01617-WBT Rev. 2) contains many shalls that are Attachment Error! Reference source not found. contains                    not within numbered the proprietary version of WNA-DS-01617-WBT-P, Revision                    requirements sections, for 3, Post Accident Monitoring System- System Requirements                  example:
Specification, dated November 2010. Attachment 2                          (1) Page 2-1, Section 2.3.1 -
contains the non-proprietary version of WNA-DS-01617-                      See guidance statement WBT-P, Revision 3, Post Accident Monitoring System -                      (2) Page 2-10, top of page 1 -
System Requirements Specification, dated December 2010.                  See guidance statement Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary)
Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010. Attachment 5 contains the non-proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary)
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010. Attachment 8 contains the non-proprietary version of WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary)
(
051                    G    April 15, 2010              Date: 5/25/10                                                Y            Closed                            Closed              N/A                N/A                Review addressed by another Open
(
052    7.5.2  7.5.1        April 19, 2010              Date: 5/25/10                                                Y            Closed                            Closed              RAI No. 12 S
i
(
053    7.5.2  7.5.1        April 19, 2010              Date: 5/25/10                                                 Y            Closed                            Closed              RAI No. 13 S
i
(
054    7.5.2  7.5.1        4/19/2010                    Responder: Slifer/Clark            Date: 5/25/10            Y            Closed                            Closed              RAI No. 14        TVA Letter dated S
i
(
055    7.5.2  7.5.1        4/19/2010                    Responder: Slifer/Clark            Date: 5/25/10            Y            Closed                            Closed              RAI No. 15        TVA Letter dated S
i
(
056                          April 19, 2010              Date: 5/25/10                                                Y            Closed                            Closed              RAI No. 16        TVA Letter dated Sorrento Radiation Monitoring S
i
(
057    7.5.2  7.5.1        4/19/2010                    Responder: TVA I&C Staff                Date: 5/25/10        Y            Closed                            Closed              RAI No. 17        TVA Letter dated S
i
(
058    7.5.0    7.5          April 19, 2010              Date: 5/25/10                                                Y            Closed                            Closed              RAI No. 18        TVA Letter dated S
i 059    7.5.2  7.5.1  ( (  April 19, 2010              Date:                                                        Y            Closed                            Closed              RAI No. 19        TVA Letter dated C S a i 060    7.5.2  7.5.1        April 19, 2010              Date: 5/25/10                                                Y            Closed                            Closed              N/A                N/A                Addressed by Open Item No. 47


6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEE311.docx                                                                                            Open Items to be Resolved for SER Approval
A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2) March 12, 2010,
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.


NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.
===Response===
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at
SE     FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                 Y/N
 
( ( ( ( ( (
Watts Bar Unit 2.
061   7.5.2   7.5.1                  April 19, 2010                                                   Date: 5/25/10                                                   Y           Closed                             Closed               N/A                 N/A               Addressed by Open Item No. 48 062   7.5.2   7.5.1                   April 19, 2010                                                   Date: 5/25/10                                                   Y           Closed                             Closed               N/A                 N/A               Addressed by Open Item No. 49 C C C C C C 063   7.5.2   7.5.1                   April 19, 2010                                                   Date: 5/25/10                                                   Y           Closed                             Closed               N/A                 N/A               Addressed by Open Item No. 50 064   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb   Date: 4/8/2010                           Y           Closed                             Closed               N/A - No question  TVA Letter dated a a a a a a 065   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC           Date: 5/25/10                       Y           Closed                             Closed               N/A - No question  TVA Letter dated 066   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                 Date: 5/25/10               Y           Closed                             Closed               N/A - No question  TVA Letter dated 067   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  N            Open                              Open-TVA/WEC        N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                                                     was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q                             Response included in letter        Due 12/3/10          was opened to track 28, 2010.                                                          PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                         made by applicant.
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix. It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.
This item is addressed in Rev. 2
Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be  tracked under NRC RAI Matrix Item 138. This item is considered closed.
: a. AI687, AI688 - Scheduled for September 28, 2010                           of the Licensing Technical Report
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following changes to address the NRC requests:
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software which includes the RSEDs. 
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 046    (C aFebruar y 25 , 2010 Date: 5/25/10 Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010  How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
 
Responder: WEC                        Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
TVA Revised Response Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
N Open  Revised response included in letter dated 12/22/10.
TVA response is inconsistent (e.g., WNA-DS-01667-WBT Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See also SDS4.4.2.1-1 on page 4-32). Is there a requirement on the shall referenced above??
Response is provided in letter dated 10/29/10.
TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable Open-TVA/WEC Due12/22/10 Discuss at 11/22 phone call. This will be corrected in the Revision 3 document due to TVA 12/10/10  EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated
 
10/29/10 Enclosure 1 Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
This item is corrected in the revision 3 requirements documents.
Attachment Error! Reference source not found.
contains the proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated November 2010. Attachment 2 contains the non-proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated December 2010.
Attachment 3 contains the "Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification" (Proprietary)"
Attachment 4 contains  the proprietary version of WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated November 2010. Attachment 5 contains the non-proprietary version of WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 6 contains the "Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification" (Proprietary)"
Attachment 7 contains  the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated November 2010. Attachment 8 contains the non-proprietary version of WWNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the "Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System" (Proprietary)" NNC 11/18/10:
Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are not within numbered requirements sections, for example:  (1) Page 2-1, Section 2.3.1 - See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 051   (G Ap ril 15 , 2010 Date: 5/25/10 Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10 Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                   Date: 5/25/10 Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10 Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10 Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Webb     Date: 4/8/2010 Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res ponder: WEC               Date: 5/25/10 Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                         Date: 5/25/10 Y Closed Closed N/A - No q uestion TVA Letter dated 067 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010  
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following change to address the NRC request:
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following change to address the NRC request:
Section 7, "Commercial Grade Dedication Process," has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
N Open   Response included in letter dated 12/22/10.
068    7.5.2   7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10             N            Open                              Open-TVA/WEC         N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                           was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                    Response included in letter        Due 12/3/10          was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                    dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                          made by applicant.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10
: a. AI687, AI688 - Scheduled for September 28, 2010                          This item is addressed in Rev. 2 of the Licensing Technical
 
: b. Upgraded PC node box - Per Westinghouse letter WBT-                      Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10  068 7.5.2 7.5.1 EICB (Carte)
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was  
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the


September 28, 2010.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                             radEE311.docx                                                                        Open Items to be Resolved for SER Approval
Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43: 
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.  
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.   
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the N Open  Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10


N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Westinghouse Rockville office.
===Response===
SE   FSAR   NRC No.                                       Issue                               TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:
For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in the 12/22 letter, NRC Matrix Item 067.
For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in the 12/22 letter, NRC Matrix Item 067.
The component level EQ/Seismic summary reports for the hardware listed above are available for review/audit as described below:  
The component level EQ/Seismic summary reports for the hardware listed above are available for review/audit as described below:
(1) AI687, AI688, the following documents were submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN)
(1) AI687, AI688, the following documents were submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN)
Unit 2 - Instrumentation and Controls Staff Information Requests, dated October 26, 2010 (Reference 6:
Unit 2 - Instrumentation and Controls Staff Information Requests, dated October 26, 2010 (Reference 6:
: a. "Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements" (EQ-EV-62-WBT, Revision 0), dated September 10, 2010
: a. Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010
: b. "Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS" (EQLR-171, Revision 0), dated September 10, 2010
: b. Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS (EQLR-171, Revision 0), dated September 10, 2010
: c. "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," CN-EQT-10-44, Revision 0, dated September 28, 2010 (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024, "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:  
: c. Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CN-EQT-10-44, Revision 0, dated September 28, 2010 (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024, NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:
: a. "Next Generation PC Node Box Commercial Dedication Instruction," CDI-3722, Revision 7  
: a. Next Generation PC Node Box Commercial Dedication Instruction, CDI-3722, Revision 7
: b. "PC Node BoxlFlat Panel Display System Components Qualification Summary" LTR-EQ 50 (3) Flat panel displays - Per Westinghouse letter WBT-D-2024, "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:  
: b. PC Node BoxlFlat Panel Display System Components Qualification Summary LTR-EQ                                                                     50 (3) Flat panel displays - Per Westinghouse letter WBT-D-2024, NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:
: a. "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction" CDI-3803, Revision 8  
: a. Next Generation Flat Panel Display (FPD)
: b. "PC Node BoxlFlat Panel Display System Components Qualification Summary" LTR-EQ 50 (4) Power supplies - Per Westinghouse letter WBT-D-2035 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated June 11, 2010 (Reference 8 ), the following documents are available for audit at the Westinghouse Rockville office:  
Commercial Dedication Instruction CDI-3803, Revision 8
: a. "Commercial Dedication Instruction," CDI- 4057, Revision 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: b. PC Node BoxlFlat Panel Display System Components Qualification Summary LTR-EQ                                                                     50 (4) Power supplies - Per Westinghouse letter WBT-D-2035 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 11, 2010 (Reference 8 ), the following documents are available for audit at the Westinghouse Rockville office:
: b. "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter", EQ-TP-1 05-GEN, Revision 0
: a. Commercial Dedication Instruction, CDI- 4057, Revision 4
: c. "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 &
4 Circuit Breakers," EQ-TP-114-GEN, Revision 0
: d. "Environmental Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, and Line Filter Assemblies," EQ-TP-117-GEN, Revision 0 069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October
 
2010. Responder: WEC                    Date: 5/25/10 N Open Awaiting for document to be
 
docketed by TVA.
Open-TVA/WEC


Due 2/18/11 N/A - No question was asked. Item
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              radEE311.docx                                                                                          Open Items to be Resolved for SER Approval


was opened to track comm8ittment made by applicant.
===Response===
N/A  070 7.5.2 7.5.1 EICB (Carte)
SE    FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                  Y/N
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was  
: b. Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter, EQ-TP-1 05-GEN, Revision 0
 
: c. Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 &
March 31, 2010.
4 Circuit Breakers, EQ-TP-114-GEN, Revision 0
Responder: WEC                      Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.
: d. Environmental Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, and Line Filter Assemblies, EQ-TP-117-GEN, Revision 0 069    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  N            Open                              Open-TVA/WEC        N/A - No question N/A EICB          date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                                                        was asked. Item (Carte)        2010.                                                                                                                                          Awaiting for document to be      Due 2/18/11          was opened to track docketed by TVA.                                      comm8ittment made by applicant.
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.
070   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                N            Open                              Open-NRC Review      N/A - No question    TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was                                                                                                                                             was asked. Item      6/18/10          open item does not agree with the due March 31, 2010.                                                     Per Westinghouse letter WBT-D-1961, this document is                       Final Response included in        Due 12/17/10        was opened to track                    dated in Open Item No. 71.
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
available for audit at the Westinghouse Rockville office.                   letter dated 12/3/10                                  comm8ittment          TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter                       Partial Response is included in to the NRC dated August 20, 2010.                                           letter dated 10/5/10.                                                        TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements                         Regulations require that the Traceability Matrix and did not summarize anomalies. At the                 NRC review be based on September 15th public meeting, Westinghouse agreed to                       docketed material. Awaiting for include the Concept and Definitions Phase Requirements                     document to be docketed by Traceability Matrix (RTM) in the next IV&V report along with               TVA.
TVA Revised Response: TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
partial Design Phase updates to the RTM.
Attachment 14contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
NNC 8/25/10: Requirements TVA Revised Response:                                                       Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in                           letter dated 8/20/10.
dated November 8, 2010.
letter dated August 20, 2010 (Reference 6).                                                             NNC 11/23/10: The The next Independent Verification and Validation (IV&V)                     requirements Phase SVVR report will include the Design                                             provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase                   not complete. This report IV&V Report will be submitted                                               should address the RTM, which to NRC by February 11, 2011.                                               it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document                             in the next revision.
Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
N Open  Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA. NNC 8/25/10:
Requirements Phase SVVR provided by TVA letter dated 8/20/10.
NNC 11/23/10:  The requirements Phase SVVR provided by TVA on 8/20/10, is not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.
Open-NRC Review Due 12/17/10 N/A - No question was asked. Item


was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                          radEE311.docx                                                                                      Open Items to be Resolved for SER Approval


TVA Letter dated 8/20/10 TVA Letter dated
===Response===
 
SE     FSAR   NRC No.                                                                 Issue                                                   TVA Response(s)                       Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                              Y/N 071   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                N            Open                          Open-NRC Review      N/A - No question N/A                  NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and                                                                                                                             was asked. Item                        open item does not agree with the due Implementation phases was July 30, 2010.                           Attachment 16 contains the Westinghouse document IV&V                 Response included in letter  Due 12/10/10        was opened to track                    dated in Open Item No. 70.
10/5/10 NNC 11/23/10:  The dues date in this open item does not agree with the due
Summary Report for the Post Accident Monitoring System,               dated 12/3/10                                      commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010.                                                                        by applicant.
 
Attachment 17 contains the Westinghouse Application for               Awaiting for document to be withholding for the IV&V Summary Report for the Post                 docketed by TVA.
dated in Open Item No. 71.
Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 071 7.5.2 7.5.1 EICB (Carte)
By letter dated March 12, 2010 TVA stated that the target submittal date for Revision 2 of the I V&V Report" covering the Design and Implementation phases was July 30, 2010. Responder: WEC              Date: 5/25/10 Attachment 16 contains the Westinghouse document "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
Attachment 17 contains the Westinghouse Application for withholding for the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
N Open  Response included in letter dated 12/3/10 Awaiting for document to be docketed by TVA.
(
Open-NRC Review Due 12/10/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
072   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC             Date: 5/25/10                 Y             Closed                       Closed               N/A - No question  N/A C
N/A NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 70.
a 073   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10              N            Open                          Open-TVA/WEC        N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration                                                                                                                               was asked. Item phase was October 29, 2010.                                         IV&V Summary Report for the Post Accident Monitoring                 Response included in letter  Due 12/22/10        was opened to track System, WNA-VR-00283-WBT, Revision 3, covers the                     dated 12/22/10                                    commitment made Integration phase. Attachment 10 contains the proprietary                                                                 by applicant.
072 7.5.2 7.5.1 (C a B y letter dated March 12
version of IV&V Summary Report for the Post Accident                 Awaiting for document to be Monitoring System, WNA-VR-00283-WBT, Revision 3,                     docketed by TVA.
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                     Date: 5/25/10 Y Closed Closed N/A - No q uestion N/A 073 7.5.2 7.5.1 EICB (Carte)
dated December 2010. Attachment 11contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 10, 2010.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration phase was October 29, 2010.
074   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                  N            Open                          Open-TVA/WEC        N/A - No question N/A EICB          date for the Post FAT IV&V Phase Summary Report was                                                                                                                                           was asked. Item (Carte)        November 30, 2010.                                                                                                                         TVA to provide due date.     Due 2/21/11         was opened to track commitment made by applicant.
Responder: WEC                    Date: 5/25/10 "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 3, covers the Integration phase. Attachment 10 contains the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 3, dated December 2010. Attachment 11contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System" (Proprietary), dated December 10, 2010."
075   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10                N            Open                          Open-NRC Review      N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was                                                                                                                                   was asked. Item September 30, 2010.                                                 Attachment 12 contains the Westinghouse document                       Response included in letter  Due 12/3/10          was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion                   dated 12/3/10                                      commitment made Program I&C Projects, Post Accident Monitoring System                                                                     by applicant.
N Open  Response included in letter dated 12/22/10 Awaiting for document to be docketed by TVA.
Channel Integration Test/Factory Acceptance Test, WNA-               Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010.                        docketed by TVA.
Open-TVA/WEC Due 12/22/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.
N/A  074 7.5.2 7.5.1 EICB (Carte) By letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC                  Date: 5/25/10 N Open  TVA to provide due date.
076   7.5.2   7.5.1       ( (         By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark           Date: 5/25/10                 Y             Closed                       Closed               N/A - No question  N/A 077   7.5.2   7.5.1   ( (            By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC               Date: 5/25/10             Y             Closed                       Closed               N/A - No question  TVA Letter dated C C 078                   G G             4/26/2010                                                         Responder: Clark               Date: 5/25/10             Y             Closed                       Closed               EICB RAI           TVA Letter dated a a 079                                   4/26/2010                                                         Responder: Clark                 Date: 5/25/10           Y             Closed                       Closed               EICB RAI           TVA Letter dated Reviewed under Item 154
Open-TVA/WEC Due 2/21/11 N/A - No question was asked. Item was opened to track commitment made by applicant.
(
N/A  075 7.5.2 7.5.1 EICB (Carte)
080                                   4/26/2010                                                         Responder: WEC                                             Y             Closed                       Closed               RAI No. 2           TVA Letter dated S
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was September 30, 2010. Responder: WEC                  Date: 5/25/10 Attachment 12 contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010.
i
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,"Nuclear Automation Watts Bar Unit 2 NSSS Completion Pro g ram I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010. N Open  Response included in letter dated 12/3/10 Awaiting for document to be docketed by TVA.
Open-NRC Review Due 12/3/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  076 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Clark                     Date: 5/25/10 Y Closed Closed N/A - No q uestion N/A 077 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                           Date: 5/25/10 Y Closed Closed N/A - No q uestion TVA Letter dated 078   (G 4/26/2010 Res p onder: Clark                           Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 079   (G 4/26/2010 Res p onder: Clark                             Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080   (S i 4/26/2010 Res p onder: WEC Y Closed Closed RAI No. 2 TVA Letter dated  
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:  (1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 


endorses 323-1974)
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              radEE311.docx                                                                                              Open Items to be Resolved for SER Approval
However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
 
Bechtel to develop a matrix and work with Westinghouse to provide justification.
N Open  ML101600092 Item No.1:  There are three sets of regulatory criteria that relate to a Common
 
Q application (e.g. WBN2 PAMS): (a) Common Q platform
 
components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current
 
regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).
The Common Q SER states:
 
'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and
 
conceptual design approach for upgrading an existing PAMS based on Common Q
 
components (page 58, Section
 
4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient
 
information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS
 
Evaluation")-'
 
The NRC did not approve the proposed PAMS design. 
 
Section 6, "References," and
 
Section 7, "Codes and Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical
 
Report contain items that are not the current regulatory criteria.


===Response===
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path        RAI No. & Date    RAI Resp. Date    Comments Sec. Sec. POC                                                                                                                                                    Y/N 081    7.5.2  7.5.1                  5/6/2010                                                                Responder: Merten/WEC                                        N            Open                              Open-TVA/WEC              EICB RAI          TVA Letter dated EICB (Carte)
ML102910002      6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.              The codes and standards documents listed in Section 7 of                  ML101600092 Item No.1: There Due 12/22/10                  Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards          the Common Q PAMS Licensing Technical Report are the                      are three sets of regulatory applicable to the Common Q PAMS. This list contains references          documents that the Common Q platform was licensed to                      criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example:          when the NRC approved the original topical report and                    Q application (e.g. WBN2          requested information.
(1) RG 1.29 - September 1978 vs. March 2007                            issued the approved SER. The WBN Unit 2 Common Q                          PAMS):
(2) RG 1.53 - June 1973 vs. November 2003                              PAMS is designed in accordance with the approved                          (a) Common Q platform (a) IEEE 379-1994 vs. -2000                                            Common Q topical report and approved SER and the codes                    components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005                          and standards on which the SER was based. Since the                      (b) Application Development (a) IEEE 384-1992 vs. -1992                                            current versions referenced are not applicable to WBN Unit                Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009                            2, there is no basis for a comparison review.                            (c) Application Specific - current (a) IEEE 344-1987 vs. -2004                                                                                                                      regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006                            Bechtel to develop a matrix and work with Westinghouse to                The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                        provide justification.                                                    and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                                  primarily addressed (a) and (b).
(a) IEEE 1012-1986 vs. -1998                                                                                                                      The Common Q SER states:
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                                                                                                    Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984                                                                                            Monitoring Systems, provides endorses 323-1974)                                                                                                                                the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"                                                                                  conceptual design approach for states: "Design features and administrative programs that are                                                                                    upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                                  based on Common Q current staff positions." Please identify all differences between the                                                                            components (page 58, Section versions referenced and the current staff positions. Please provide                                                                              4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these                                                                                  basis of the above review, the differences.                                                                                                                                      staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
603-1991 Clause 5.6.3, "Independence Between Safety  
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application


Systems and Other Systems,"
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                                Open Items to be Resolved for SER Approval
and Clause 6.3, "Interaction Between the Sense and Command Features and Other


Systems," contain application Open-TVA/WEC Due 12/22/10
===Response===
 
SE     FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                  Y/N specific requirements that must be addressed by a PAMS system.
TVA to provide
 
requested information.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
Awaiting TVA Response.
082 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
082   7.5.2   7.5.1                 5/6/2010                                                          Responder: WEC                        Date: 6/18/10            N            Open                                Open-TVA/WEC            EICB RAI          TVA Letter dated NNC 11/18/10: See also Open Item No.
0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:
EICB (Carte)
 
ML102910002      7/30/10          41, Item No. 3.
2.c - CI527 AF100 Peripheral Component Interconnect (PCI) interface card 3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.         These components can be found in the Summary                                Revised response included in        Due 12/3/10            Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software     Qualification Report Of Hardware Testing For Common Q                        letter dated 12/22/10 changes to the Common Q PAMS previously reviewed by the           Applications, 00000-ICE-37764, Rev 3 and                                                                    Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not         TWICE Qualification Status Report, WNAQR-00011-SSP                           Regulations require that the    Dedication to be contain activities that address qualification of all changes      Per Westinghouse letter WBT-D-2024, (Reference __) dated                     NRC review be based on          addressed in LTR Rev.
 
specifically:                                                      June 9, 2010, these documents are available for audit at the                 docketed material. Awaiting for 2, Westinghouse Rockville Office.                                              document to be docketed by 2.c - CI527 AF100 Peripheral Component Interconnect (PCI)                                                                                      TVA.
Product Maintenance/Improvements) 4.a - PM646A Processor Module 4.b - CI631 AF100 Communication Interface Module 4.e - DO620 Digital Output Card
interface card                                                    TVA provided information by letter dated July 30, 2010
 
: 3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary        (ML102160349) - See Enclosure 1 Item No. 7.                                 NNC 8/9/10: per telephone Product Maintenance/Improvements)                                                                                                              conversation on 8/5/10, it is not 4.a - PM646A Processor Module                                      Revision 1 of the Licensing Technical Report provides                       clear how Westinghouse 4.b - CI631 AF100 Communication Interface Module                  additional detail on the platform specific to WBN2 and                       Commercial Grade Dedication 4.e - DO620 Digital Output Card                                    references to the evaluation documentation.                                 Plans and Reports for Digital I&C. Westinghouse agree to Please provide sufficient detail regarding the changes for the NRC TVA Response to Follow-up NRC Request:                                       present to the NRC in a public to independently evaluate the acceptability of the changes.                                                                                    meeting on August 17, 2010, Please see the response to Request for Additional                           and explanation of how their Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix               system addresses regulatory Item 067.                                                                   criteria for both commercial grade dedication and equipment qualification.
Please provide sufficient detail regarding the changes for the NRC to independently evaluate the acceptability of the changes.
Responder: WEC                                Date: 6/18/10 These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.
Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and references to the evaluation documentation.
TVA Response to Follow-up NRC Request:
Please see the response to Request for Additional Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix Item 067.
N Open  Revised response included in letter dated 12/22/10 Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA. NNC 8/9/10:
per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 11/18/10:
NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
083    7.5.2  7.5.1  ( (            May 6, 2010                                                        Date: 6/18/10                                                  Y            Closed                              Closed                  EICB RAI          TVA Letter dated C C 084    7.5.2  7.5.1  a a            May 6, 2010                                                        Date: 6/18/10                                                  Y            Closed                              Closed                  EICB RAI          TVA Letter dated 085    7.5.2  7.5.1                  5/6/2010                                                          Responder: WEC                                                  N            Open                                Open-TVA/WEC           EICB RAI EICB (Carte)
Open-TVA/WEC Due 12/3/10  
ML102910002 Please provide a detailed description of the PAMS MTP data link    Is the WEC ISG4 evaluation inadequate?                                      Revised response included in        Due 12/3/10             Item No. 13 to the plant computer. This description should identify all                                                                                    letter dated 12/22/10 equipment (model & version) and describe the functions that each  Operation of the MTP as a barrier device. MTP Fails as a                                                        Hardware is in Rev. 1 piece of equipment performs. This description should be of        barrier device. Describe what prevents a MTP failure from                    A response will be provided by      of the Licensing sufficient detail for the NRC to independently evaluate the        propagating to the AC160?                                                    10/31/10                            Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.                                                                                                                            10/22.
Node loss on the bus? Bus loss?                                              NNC 8/11/10: Design information should be available NNC 8/25/10:
Revise the ISG4 section of the Licensing Technical Report                    now. By letter dated July 30,  Disagree with path


Commercial Grade Dedication to be addressed in LTR Rev.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                      radEE311.docx                                                                                                    Open Items to be Resolved for SER Approval
2,  EICB RAI ML102910002 Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.
41, Item No. 3.
083 7.5.2 7.5.1  (C a Ma y 6 , 2010 Date:  6/18/10 Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1  (C a May 6, 2010 Date:  6/18/10 Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010 Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.
Responder: WEC Is the WEC ISG4 evaluation inadequate?
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160?
Node loss on the bus?  Bus loss?
Revise the ISG4 section of the Licensing Technical Report N Open  Revised response included in letter dated 12/22/10 A response will be provided by 10/31/10  NNC 8/11/10:
Design information should be available now. By letter dated July 30, Open-TVA/WEC


Due 12/3/10 Hardware is in Rev. 1  
===Response===
SE      FSAR      NRC No.                                                                    Issue                                                          TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                          Y/N (Rev. 2) to provide a more detailed description of the MTP as                  2010 (ML102160349) TVA            forward input by TVA a barrier device.                                                              stated that the MTP was            above. An explanation connected to a Red Hat Linux      is about the design is TVA Response to Follow-up NRC Request:                                        Server (see Enclosure 1, Item      needed.
No. 14 part b.). It is presumed WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                      that this server is not safety-    FAT test procedure to System (PAMS) Licensing Technical Report submitted in                        related. IEEE 603-1991 Clause      include data storm TVA Letter to NRC dated December 3, 2010, Watts Bar                          5.6.3(1) states, "Isolation        testing of the MTP Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls                      devices used to affect a safety    interface Staff Information Requests, (Reference Error! Reference                      system boundary shall be source not found.) contains the following changes to                          classified as part of the safety  NNC 11/18/10: WEC address the NRC requests:                                                      system."                          response states that CQ PAMS LTR Rev. 2 Section 2.2, System Description page 2-3 provides a                          Please describe how the MTP        will contain relevant description of the MTP Fiber-Optic (FO) data link to the plant                serves as the isolation device. information.
computer. Section 2.2.1.4, Hardware has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, Software has been expanded to include a table detailing all software changes that have occurred since the initial submittal.
086    7.5.2    7.5.1                    5/6/2010                                                                Responder: WEC                      Date: 5/24/10                N            Open                              Open-TVA/WEC            EICB RAI            TVA Letter dated EICB (Carte)
ML102910002        6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.              The regulatory documents listed in the Common Q PAMS                          TVA to address with item OI        Due 12/22/10             Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the  Licensing Technical Report are the documents that the                          81.
Common Q PAMS. This list contains references to old revisions of        Common Q platform was licensed to when the NRC several regulatory documents, for example:                              approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                        SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                                            accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review,"        approved SER and the regulatory documents on which the states: "Design features and administrative programs that are            SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the          not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the    comparison review.
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these        Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                            ISG4
(
087    7.5.2    7.5.1                    May 6, 2010                                                              Date: 5/24/10                                                    Y            Closed                            Closed                  RAI No. 20          TVA Letter dated S
i 088    7.5.2    7.5.1  (                May 6, 2010                                                              Date: 5/24/10                                                    Y            Closed                            Closed                  RAI No. 21          TVA Letter dated 089                    D ( ( (          5/6/2010                                                                Responder: Clark                                                  Y            Closed                            Closed                  EICB RAI            TVA Letter dated NNC: Docketed response states that 090                    a C C S          5/6/2010                                                                Responder: Clark                  Date: 5/25/10                  Y            Closed                            Closed                  EICB RAI            TVA Letter dated r a a i 091    7.4      7.4                    May 20, 2010                                                            Date: 5/25/10                                                    Y            Closed                            Closed                  EICB RAI No.1      TVA Letter dated 092                                      5/20/2010                                                                Responder: Hilmes                                                Y            Open                              Open-TVA                                                        Continuous review as items are added DORL (Poole)        TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                                      Due: SER Issue are proprietary.                                                document as a communications tool.
093                    (                May 20, 2010                                                            Date: 5/25/10                                                    Y            Closed                            Closed                  N/A                N/A                Will be reviewed under item 154 D ( (
094                    a                5/20/2010                                                                Responder: Clark                  Date: 5/25/10                  Y            Closed                            Closed                  N/A                N/A                Information was found in FSAR r G G 095    7.8.1,    XX                      May 20, 2010                                                            Date:                                                            Y            Closed                            Closed                  EICB RAI No. 2      TVA Letter dated
(
096    7.7.5    XX                      5/20/2010                                                                Responder:                                                        Y            Closed                            Closed                  EICB RAI No.3      TVA Letter dated D
a r
(
097    7.4.2    7.4                    May 20, 2010                                                            Date:                                                            Y            Closed                            Closed                  EICB RAI No.4      TVA Letter dated D
a r
(
098    7.4.2    7.4                    May 25, 2010                                                            Date:                                                            Y            Closed                            Closed                  EICB RAI No.5      TVA Letter dated D
a r
099                    ( (
B              April 12, 2010                                                          Date:                                                            Y            Closed                            Closed                                                          Closed to Item 129 C a a
100                                      5/20/2010                                                                Responder: WEC                                                    Y            Closed                            Closed                  N/A - No question  N/A


of the Licensing
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              radEE311.docx                                                                                                Open Items to be Resolved for SER Approval


Technical Report due 10/22.
===Response===
NNC 8/25/10:
SE    FSAR        NRC No.                                                                    Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec.        POC                                                                                                                                              Y/N 101                                        4/12/2010                                                      Responder: Slifer                                              Y            Open                          Open-NRC Review            N/A                                  TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000,          The documents, and affidavits for withholding for the listed                Documents provided in letter  Due 10/14/10                                                      potential this will slip to 7/14.
Disagree with path EICB RAI ML102910002
Containment High Range Post Accident Radiation Monitor          documents were submitted to the NRC on TVA letter to the                    dated 07/15/10 documents will be provided by June 30, 2010.                    NRC dated July 15, 2010.                                                                                  Confirm receipt.
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR
(
102                  D (                  May 24, 2010                                                    Date: 5/24/10                                                 Y            Closed                        Closed                      N/A                TVA Letter dated Request for schedule not information.
a C r a 103    7.4    7.4                        5/27/2010                                                      Responder: Ayala              Date: 5/27/10                  Y            Closed                        Closed                      EICB RAI No.1      TVA Letter dated Submittal date is based on current
(
104    7.4    7.4  ( D                  5/27/2010                                                      Responder: Merten              Date: 5/27/10                  Y            Closed                        Closed                      EICB RAI No.1      TVA Letter dated Submittal date is based on current G a r
105                                        April 29, 2010                                                  Date:                                                          Y            Closed                        Closed                      N/A                N/A              Will be reviewed under item 154.
106                                        May 6, 2010                                                    Date: 5/25/10                                                  Y            Closed                        Closed                      RAI No. 9          TVA Letter dated
(
S i
107                                        May 6, 2010                                                    Date: 5/28/10                                                  Y            Closed                        Closed                      RAI No. 22         TVA Letter dated
(
108                                        May 6, 2010                                                    Date: 5/25/10                                                  Y            Closed                        Closed                      N/A                N/A                Will be reviewed under OI#154 109.a  7.8    XX                          5/6/2010                                                        Responder: N/A                                                Y            Closed                        Closed                      N/A                N/A
(      (  ( D  (
109.b                                      5/6/2010                                                        Responder: N/A                                                Y            Closed                        Closed                      N/A                N/A                Duplicate of another open Item.
(  ( ( (  (    (
110                                        May 6, 2010                                                    Date:                                                          Y            Closed                        Closed                      N/A                N/A              Information was found.
111                                        May 6, 2010                                                    Date: 5/28/10                                                  Y            Closed                        Closed                      N/A                TVA Letter dated Request to help find, not a request for C      C  C a  S 112                                        June 1, 2010                                                    Date:                                                          Y            Closed                        Closed                      N/A                N/A                Information was received G  G G G  G    G 113                                        6/1/2010                                                        Responder: Clark                                              Y            Closed                        Closed                      EICB RAI          TVA Letter dated a      a  a r  i 114    7.2    7.2                        6/1/2010                                                        Responder: WEC                                                Y            Close                          Closed                      EICB RAI          TVA Letter dated 115                                        2/25/2010                                                      Responder: Clark                                              Y            Closed                        Closed                      EICB RAI          TVA Letter dated 116                                        6/3/2010                                                        Responder: WEC                                                Y            Closed                        Closed                      EICB RAI          TVA Letter dated Letter sent to Westinghouse requesting 117    7.1    7.1                        6/3/2010                                                        Responder: Hilmes                                              Y            Open                          Open-TVA/A102              EICB RAI          TVA Letter dated EICB (Garg)
ML102910008        10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip                  Revised response is included in Pending FSAR              Item#21            Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7)      (RPS) and Engineered Safety Features Actuation System                      letter dated 10/29/10          Amendment 102                                No. 7 (ESFAS)) setpoint values are monitored by periodic                                                          submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-                                                    Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR                                                TVA needs to address amendment 100.                                                                                            that trip setpoint and allowable value TVA Revised Response:                                                                                     uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double                                                        reduction factor for the sided correction factors. Attachment 3 contains the revised                                                single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR                                                      factor. TVA response Amendment 102 that reflects this change.                                                                  not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
(
118    7.4    7.4                        6/8/2010                                                        Responder: Merten                                              Y            Closed                        Closed                      EICB RAI No.1      TVA Letter dated Submittal date is based on current D
a r


Item No. 13
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                radEE311.docx                                                                                                      Open Items to be Resolved for SER Approval


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (Rev. 2) to provide a more detailed description of the MTP as a barrier device.
===Response===
TVA Response to Follow-up NRC Request:
SE       FSAR       NRC No.                                                                     Issue                                                     TVA Response(s)                         Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date       RAI Resp. Date               Comments Sec.      Sec.      POC                                                                                                                                                Y/N 119                      (                June 10, 2010                                                      Date:                                                        Y            Closed                            Closed                    RAI No. 23            TVA Letter dated 120                                        5/6/2010                                                          Responder: Hilmes/Merten/Costley                              Y            Closed                            Closed                    EICB RAI              TVA Letter dated D ( ( ( (
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests," (Reference Error! Reference source not found.
121                                        5/6/2010                                                          Responder: Webb/Webber                                        Y            Closed                            Closed                    EICB RAI              TVA Letter dated a C C C S 122                                        June 14, 2010                                                      Date:                                                        Y            Closed                            Closed                    N/A - Request for    N/A r a a a i 123    7.7.3    7.4.1,                    6/14/2010                                                          Responder:                                                    Y            Closed                            Closed                    ML101720589,          TVA Letter dated
) contains the following changes to address the NRC requests:
(
Section 2.2, "System Description" page 2-3 provides a description of the MTP Fiber-Optic (FO) data link to the plant computer. Section 2.2.1.4, "Hardware" has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, "Software" has been expanded to include a table detailing all software changes that have occurred since the initial submittal. 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause 5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."  Please describe how the MTP serves as the isolation device. forward input by TVA above. An explanation is about the design is needed.  
124    7.7.5      XX                      6/14/2010                                                          Responder:                                                    Y            Closed                            Closed                    ML101720589, Item TVA Letter dated D
a r
(
125    7.7.8    7.7.1.12                  6/14/2010                                                          Responder:                                                    Y            Closed                            Closed                    ML101720589, Item TVA Letter dated D
a r
126    7.8      7.8        (            June 14, 2010                                                      Date:                                                        Y            Closed                            Closed                    ML101720589, Item TVA Letter dated
( ( D 127    7.2      7.2        a            6/16/2010                                                          Responder: WEC/Clark                                          Y            Closed                            Closed                    EICB RAI              TVA Letter dated G G r 128    7.2      7.2                      6/18/2010                                                          Responder: WEC Drake /TVA Craig                              Y            Closed                            Closed                    EICB RAI              TVA Letter dated Track through SE open item
(
129                                        6/12/2010                                                          Responder: WEC                                                Y            Closed                            Closed                    N/A                  TVA Letter dated P
o
(
130                                        6/28/2010                                                          Responder: Clark                                              Y            Closed                            Closed                    N/A                  TVA Letter dated P
o
(
131                                        6/28/2010                                                          Responder: Clark                                              Y            Closed                            Closed                    N/A                  TVA Letter dated P
o
(
132                                        6/28/2010                                                          Responder: Clark                                              Y            Closed                            Closed                    N/A                  TVA Letter dated P
o
(
133                                        6/28/2010                                                          Responder: Clark                                              Y            Closed                            Closed                                          TVA Letter dated P
o 134                        ( (            6/28/2010                                                          Responder: Clark                                              Y            Closed                            Closed                                          TVA Letter dated 135    7.3.1    7.3.1  ( D D (          6/30/2010                                                          Responder: Clark                                              Y            Closed                            Closed                    RAI not necessary TVA Letter dated 136    7.3.2,  7.4, 5.6,C a a P          6/30/2010                                                          Responder: Clark                                              Y            Closed                            Closed                    RAI not necessary TVA Letter dated a r r o 137                                        Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                                    Y            Closed                            Closed                    ML101650255, Item TVA Letter dated 138                                        By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                                  N            Open                              Open-TVA/WEC              ML101650255, Item EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                              No. 2 This item is used to track all Commercial Grade                              Revised response included in      Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                                          letter dated 12/22/10 should be provided with an application for a Tier 2 review.                                                                                                                       To be addressed by
: a. WNA-LI-00058-WT-P, Revision 2, Post-Accident                             TVA agreed to include a            Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial      Monitoring System (PAMS) Licensing Technical Report                     description of the generic        Technical Report.
grade dedication plan was included in the Common Q Topical            submitted in TVA Letter to NRC dated December 3,                         Westinghouse hardware Report Section 11, Commercial Grade Dedication Program.            2010, Watts Bar Nuclear Plant (WBN) Unit 2 -                           commercial grade dedication Section 11 includes a description of the Common Q Commercial          Instrumentation and Controls Staff Information                           process in the PAMS licensing Grade Dedication Program, and states: A detailed review plan is      Requests, (Reference 1) contains the following                         technical report. (see developed for each Common Q hardware or software component            changes to address the NRC request:                                     ML102920031 Item No 1) that requires commercial grade dedication.
Section 7, Commercial Grade Dedication Process has                    TVA agreed to include (in the Please provide the commercial grade dedication plans for each        been revised to describe the general commercial grade                    PAMS licensing technical report)
Common Q hardware or software component that has not been            dedication process for both hardware and software and                    an evaluation of WBN2 critical previously reviewed and approved by the NRC.                         uses a description of the AI687 dedication process as                    characteristics for commercial an example of how the process is applied.                                Westinghouse hardware (b) The draft ISG6 states that a commercial grade dedication                                                                                  components against the generic report should be provided within 12 months of requested approval      As listed in Table 6-3. Westinghouse Watts Bar 2                       critical characteristics. (see for a Tier 2 review.                                                 Common Q PAMS Documents at Westinghouse                                  ML102920031 Item No 2)
Rockville Office, the following commercial grade (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade          dedication documents are available for NRC audit at the                  TVA agreed to include a Dedication Report for the QNX Operating System for Common Q          Westinghouse Rockville office:                                          description of the generic Applications.                                                                                                                                 Westinghouse software
: b. It is TVAs understanding that the submittal of the                      commercial grade dedication (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial              documents listed in (b.i) and (b.ii) is no longer required.             process in the PAMS licensing Dedication Report for QNX 4.25G for Common Q Applications.           Rather, it was agreed, that the inclusion of a description              technical report. (see of the commercial grade dedication process in revision                  ML102920031 Item No 3) 2 of the Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WT-P,                          TVA agreed to include (in the would be sufficient to address this request.                             PAMS licensing technical report)


FAT test procedure to include data storm testing of the MTP
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                              Open Items to be Resolved for SER Approval


interface
===Response===
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                  Y/N an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)
(
139                                  The WBN2 PAMS System Requirements Specification (WBN2                Responder: WEC                                                Y            Closed                            Closed                ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements C
a 140                                  The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)          Responder: Clark                                              N            Open                              Open-TVA/WEC          ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal                                                                                                                                            No. 4            10/29/10        Specification and abnormal environments and plant operating modes. The            WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post                      Revised response included in      Due 12/3/10                              Enclosure 1 Item rational for this requirement is that it is necessary to meet        Accident Monitoring System (PAMS) specifies the Reg.                      letter dated 12/22/10                                                      No. 10          TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97.                                          Guide 1.97 variables implemented in the Common Q based                                                      TVA to docket PAMS                                        Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS                                                            NNC 11/3/10: The origin of the Licensing Technical                                          Completion Program I&C Projects Post What document specifies which RG 1.97 variables are                                                                                            requirements in the SysRS are Report Rev. 2.                                                Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS?                        TVA Response to Follow-up NRC Request:                                    not clearly document. Rev. 1 of                                                              Requirements Specification, dated the Common Q PAMS Licensing                                                                  December 2009.
WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring                  Technical Report contains an System (PAMS) Licensing Technical Report was submitted                    open item that will be addressed on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2                  in Rev. 2; this open item is to
                                                                                                          - Instrumentation and Controls Staff Information Requests,                include TVAs enhanced dated December 3, 2010 (Reference 1). Revision 2 contains                  contract compliance matrix. It the following change to address this request:                              is expected that this matrix will address this open item.
Section 11, TVA Contract Compliance Matrix has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).
(
141                                  Deleted by DORL                                                      Date:                                                        Y            Closed                            Closed                ML101650255, Item                    WBN2 PAMS System Requirements C
a 142                                  The applicable regulatory guidance for reviewing the WBN2 PAMS      Responder: WEC                                                N            Open                              Open-TVA/WEC          ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
SysRS would be IEEE 830 as endorsed by Regulatory Guide                                                                                                                                                  No. 6                                Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -        This item is used to track all traceability issues with the                TVA/Westinghouse agreed to        Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section        Software Requirements Specification (SRS).                                include the V&V evaluation of                                                                  TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is                                                                                  their reusable software element    To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear      At the September 15 public meeting in Rockville, the                      development process in the        Revision of the RTM,                                        Completion Program I&C Projects Post following actions were agreed to. These items address the                  V&V design phase summary          SRS, SysRS, and                                            Accident Monitoring System- System
: 1. How did TVA ensure the traceability of each requirement in      traceability concerns with the Software Requirements                      report. This evaluation would      SysDS.                                                      Requirements Specification, dated the WBN2 PAMS SysRS.                                            Specification.                                                            include an evaluation against                                                                  December 2009.
the development process
: 2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the                  requirements. This evaluation Accident Monitoring Systems Software Requirements                  Requirements Traceability Matrix(RT), using the issues                would also include an evaluation Specification. To clarify, many documents have                      identified at the 9/15 public meeting as a guide                      of how the WBN2 specific requirements that are incorporated by reference into the            (documented below) and update the RTM as required.                    requirements were addressed SRS, but what served to direct the author to include those                                                                                by the reusable software various documents in the SRS or, if the requirement is based 2.      The next issue of the IV&V report will include the                    elements. (see ML102920031 on the System Requirements Specification, what directed the          Requirements phase review of the RTM and a partial                    Item No 5) author to include the requirement there?                            review for the Design phase.
: 3. Clarify whether the unnumbered paragraphs in the Post          3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements                  Requirements Traceability Matrix (RTM) to address Specification, such as in the section headings, or are all such      items not in the SRS or SysRS.
sections simply considered to be informative?
: 4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS?              in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program                  information.
Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                    5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the                      remove these requirements.


NNC 11/18/10:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   radEE311.docx                                                                    Open Items to be Resolved for SER Approval
WEC response states that CQ PAMS LTR Rev. 2 will contain relevant information.
086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example: 
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Responder: WEC                            Date: 5/24/10


The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the
===Response===
 
SE   FSAR  NRC No.                                                     Issue                                                     TVA Response(s)                       Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                        Y/N requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems                  6. Westinghouse will perform and document an evaluation (reference 5).]                                                    of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental        have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were              at the revisions reviewed by V&V. Have these been verified.                                                           addressed? Yes. The next revisions of the SDS and SRS address these issues.
 
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements        8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or         instead of the System Design Specification (SDS).
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 N Open TVA to address with item OI
by reference, all the requirements that were used in the           These will be removed from the SRS and incorporated design phase for the application specific software, or do          into the next revision of the SDS.
: 81. Open-TVA/WEC
software design phase activities use requirements found in any other source or document? If so, what are these            9. RTM item R4.2-2 protection class software set to 0.
 
sources or documents?                                              Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
Due 12/22/10 EICB RAI ML102910002
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification        10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element.               that are performed with the function enable (FE) switch in the ENABLE position.
 
These references are used in the body of the SRS, for example:                                                     11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR              12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software              (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference              documents are used. Describe in 1.1 of the SysRS.
Item No. 14 TVA Letter dated 6/18/10  087 7.5.2 7.5.1  (S i Ma y 6 , 2010 Date:  5/24/10 Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1  (S i May 6, 2010 Date:  5/24/10 Y Closed Closed RAI No. 21 TVA Letter dated 089    (C a 5/6/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated NNC:  Docketed res p onse states that 090    (C a 5/6/2010 Res p onder: Clark                        Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date:  5/25/10 Y Closed Closed EICB RAI No.1 TVA Letter dated 092  DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
12]).]                                                            Need a good write up of how the process works.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
They are also included via tables such as found in             13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1                                              for document submittals and provide it to the NRC no later than 9/30/10
Y Open Open-TVA Due: SER Issue  Continuous review as items are added 093    (G Ma y 20 , 2010 Date:  5/25/10 Y Closed Closed N/A N/A Will be reviewed under item 154 094   (G 5/20/2010 Res p onder: Clark                          Date: 5/25/10 Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:   Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: Y Closed Closed  EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:  Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:  Y Closed Closed EICB RAI No.5 TVA Letter dated 099  (B a April 12, 2010 Date:  Y Closed Closed  Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC Y Closed Closed N/A - No q uestion N/A Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 101  DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.  
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]  14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include            design meets the contract requirements.
: 1. V&V Report 04508006A  2. System Description 04508100-1TM 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
requirements not explicitly stated in the SRS? If so what is their origin?                                                              15. Westinghouse to add the Software Design Descriptions to the RTM
: 4. Functional Testing Report 04507007-1TR Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
 
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
NRC dated July 15, 2010.
: 18. Westinghouse to resolve the following questions concerning SDDs
Y Open  Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
 
: b. What are the SDDs?
Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
102    (C a Ma y 24 , 2010 Date:  5/24/10 Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten                    Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105    (G Ap ril 29 , 2010 Date:  Y Closed Closed N/A N/A Will be reviewed under item 154.
106    (S i May 6, 2010 Date:  5/25/10 Y Closed Closed RAI No. 9 TVA Letter dated 107    (S i May 6, 2010 Date:  5/28/10 Y Closed Closed RAI No. 22 TVA Letter dated 108    (G Ma y 6 , 2010 Date:  5/25/10 Y Closed Closed N/A N/A Will be reviewed under OI#154 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A Y Closed Closed N/A N/A  109.b    (C a 5/6/2010 Res ponder: N/A Y Closed Closed N/A N/A Du plicate of another o p en Item. 110    (G Ma y 6 , 2010 Date:  Y Closed Closed N/A N/A Information was found.
111    (C a May 6, 2010 Date: 5/28/10 Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112    (G June 1, 2010 Date:  Y Closed Closed N/A N/A Information was received 113    (G 6/1/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2  (G 6/1/2010 Res p onder: WEC Y Close Closed EICB RAI TVA Letter dated 115    (C a 2/25/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 116    (G 6/3/2010 Res p onder: WEC Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1 EICB (Garg) 6/3/2010  Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values.  (RIS2006-7)
Responder: Hilmes Reactor Protection S y stem (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor Trip and
 
ESFAS trip setpoint surveillance tests as described in FSAR amendment 100.
 
TVA Revised Response:
 
For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open  Revised response is included in letter dated 10/29/10 Open-TVA/A102 Pending FSAR Amendment 102
 
submittal
 
Due 12/17/10
 
TVA needs to address that trip setpoint and
 
allowable value uncertainties are not reduced by the
 
reduction factor for the
 
single sided reduction factor. TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
EICB RAI ML102910008 Item#21 TVA Letter dated 10/29/10 Enclosure 1 Item No. 7  118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 119    (S i June 10 , 2010 Date:  Y Closed Closed RAI No. 23 TVA Letter dated 120    (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y Y Closed Closed EICB RAI TVA Letter dated 121    (C a 5/6/2010 Res p onder: Webb/Webber Y Closed Closed EICB RAI TVA Letter dated 122    (C a June 14 , 2010 Date:  Y Closed Closed N/A - Re quest for N/A  123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: Y Closed Closed ML101720589
, TVA Letter dated 124 7.7.5 XX (D a r 6/14/2010 Res p onder: Y Closed Closed ML101720589
, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: Y Closed Closed ML101720589
, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date:  Y Closed Closed ML101720589
, Item TVA Letter dated 127 7.2 7.2  (G 6/16/2010 Res p onder: WEC/Clar k Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2  (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129    (P o 6/12/2010 Res p onder: WEC Y Closed Closed N/A TVA Letter dated 130    (P o 6/28/2010 Res p onder: Clark Y Closed Closed N/A TVA Letter dated 131    (P o 6/28/2010 Res p onder: Clark Y Closed Closed N/A TVA Letter dated 132    (P o 6/28/2010 Res p onder: Clark Y Closed Closed N/A TVA Letter dated 133    (P o 6/28/2010 Res p onder: Clark Y Closed Closed  TVA Letter dated 134    (P o 6/28/2010 Res p onder: Clark Y Closed Closed  TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark Y Closed Closed RAI not necessar y TVA Letter dated 137    (C aSeveral WBN2 PAMS documents contain a table titled
, "Document Res p onder: WEC Y Closed Closed ML101650255
, Item TVA Letter dated 138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.  
 
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
 
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.  
 
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
 
(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
 
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications."
Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following changes to address the NRC request:
Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: 
: b. It is TVA's understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required. Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS) Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
N Open  Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)
TVA agreed to include (in the PAMS licensin g technical report) Open-TVA/WEC Due 12/3/10


To be addressed by Rev. 2 of the Licensing Technical Report.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              radEE311.docx                                                                                        Open Items to be Resolved for SER Approval


ML101650255, Item No. 2 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 139   (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC Y Closed Closed ML101650255
===Response===
, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 140  EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal
SE   FSAR    NRC No.                                                               Issue                                                       TVA Response(s)                         Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                   Y/N
 
and abnormal environments and plant operating modes."  The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97. 
 
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?
Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg. Guide 1.97 variables implemented in the Common Q  based WBN Unit 2 PAMS TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2
- Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1). Revision 2 contains the following change to address this request:
Section 11, "TVA Contract Compliance Matrix" has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).
N Open  Revised response included in letter dated 12/22/10 NNC 11/3/10:
The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.
Open-TVA/WEC 
 
Due 12/3/10
 
TVA to docket PAMS Licensing Technical Report Rev. 2.
 
ML101650255, Item No. 4 TVA Letter dated 10/29/10  Item
 
No. 10 WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
141    (C a Deleted b y DORL Date:  Y Closed Closed ML101650255
, Item  WBN2 PAMS S y stem Re q uirements 142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is
 
traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?
Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS). 
 
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification. 
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 4. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this
 
information.
: 5. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to
 
remove these requirements.
N Open  TVA/Westinghouse agreed to include the V&V evaluation of
 
their reusable software element
 
development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation
 
of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031
 
Item No 5)
Open-TVA/WEC Due 12/22/10
 
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
 
ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in
 
any other source or document?  If so, what are these
 
sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for
 
example:"
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference
 
12]).]    They are also included via tables such as found in requirement R7.1.2-1
 
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
 
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin?  6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Re
: g. Guide 1.172 and justify any deviations.
: 7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the revisions reviewed by V&V. Have these been
 
addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). 
 
These will be removed from the SRS and incorporated into the next revision of the SDS.
: 9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
: 10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.
Need a good write up of how the process works.
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no
 
later than 9/30/10
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 15. Westinghouse to add the Software Design Descriptions to the RTM
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 17. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to
 
ensure that all requirements are captured and clearly identified.
: 18. Westinghouse to resolve the following questions concerning SDDs
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified usin g the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed  
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.
 
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.
under the AP1000 RSED concept is not in the SPM.
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD  
143                                 The WBN2 PAMS Software Requirements Specification (WBN2              Responder: WEC                                                N            Open                          Open-TVA/WEC          ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
 
PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                       No. 7                                Specification Document Traceability & Compliance, which states that the           Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                Response included in letter  Due 12/22/10 WBN2 PAMS SRS was created to support the three documents             A detailed explanation will be provided.                                    dated 12/22/10                                                                            TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                 To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document               TVA Response:                                                                                            Revision of the RTM,                                        Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                     SRS, SysRS, and                                            Accident Monitoring System- System (a) and (b) The requested information is provided in the                                                  SysDS.                                                      Requirements Specification, dated (a) Please list and describe each of the major software                 following documents:                                                                                                                                              December 2009.
References.
components. Please include a description of any NRC review for each of these components.                                                   i. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing (b) Please list and describe each of the other software                           Technical Report, Table 6-1, Document components. Please include a description of any NRC review for                     Requirements which lists the software each of these components.                                                         documentation requirements for the Common Q PAMS and section 11 TVA Contract (c) What other documents contain the requirements for the other                   Compliance Matrix submitted in TVA Letter to software components?                                                               NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation The WBN2 PAMS System Design Specification (WBN2 PAMS                               and Controls Staff Information Requests SDS) contains a table (see page iii) titled, Document Traceability
143   EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"
                                    & Compliance, which states that the WBN2 PAMS SysRS was                   ii. WNA-DS-01617-WBT-P, Revision 3, Post created to support the WBN2 PAMS SysRS. Section 1.1,                               Accident Monitoring System- System Purpose, of the WBN2 PAMS SDS states: The purpose of this                       Requirements Specification, dated December document is to define the hardware design requirements                           2010 (Attachment 1).
 
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of               iii. WNA-SD-00239-WBT-P, Revision 3, Software the requirements in the WBN2 PAMS SysRS?                                          Requirements Specification for the Post Accident Monitoring System, dated December (e) Please briefly describe all of the documents that implement                    2010 (Attachment 7) the WBN2 PAMS SysRS.
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.  
iv. WNA-VR-00279-WBT, Requirements Traceability Matrix (available for NRC audit at the Westinghouse Rockville office To the best of TVAs knowledge, no prior NRC review of the software components has been performed.
 
(c) WNA-VR-00280-WBT, Requirements Traceability Matrix (RSED) (available for NRC audit at the Westinghouse Rockville office (d) Need WEC to respond
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.  
 
(c) What other documents contain the requirements for the other  
 
software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
& Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"
 
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
 
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. A detailed explanation will be provided.
TVA Response:
  (a) and (b) The requested information is provided in the following documents:
: i. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Table 6-1, "Document Requirements" which lists the software documentation requirements for the Common Q PAMS and section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests" ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December 2010 (Attachment 1).
iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010 (Attachment 7) iv. WNA-VR-00279-WBT, Requirements Traceability Matrix (available for NRC audit at the Westinghouse Rockville office To the best of TVA's knowled ge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Requirements Traceability Matrix (RSED) (available for NRC audit at the Westinghouse Rockville office (d) Need WEC to respond N Open  Response included in letter dated 12/22/10 Open-TVA/WEC Due 12/22/10
 
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
 
ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (e) The requested information is contained in: 
: i. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Tables 6-1 through 6-3 submitted in TVA Letter to NRC, dated December 3, 2010 "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests" ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated November 2010 (Attachment Error! Reference source not found.)    iii. WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated November 2010 (Attachment 4) iv. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated November 2010 (Attachment 7) 144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems"). 
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident N Open  Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
b-d to be addressed at public meeting and audit. Will require information to be docketed.
Open-TVA/WEC
 
Due 12/3/10
 
Responses to items a and e provided.
 
NNC 11/18/10:
  (1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the origin of the


requirements in the
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                                Open Items to be Resolved for SER Approval


requirements specifications were documented. TVA stated that the origin of the requirements would  
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date  RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                    Y/N (e) The requested information is contained in:
: i. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Tables 6-1 through 6-3 submitted in TVA Letter to NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests ii. WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System- System Requirements Specification, dated November 2010 (Attachment Error! Reference source not found.)
iii. WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010 (Attachment 4) iv. WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010 (Attachment 7) 144                                  The WBN2 PAMS Software Requirements Specification (WBN2            Responder: WEC                                                  N            Open                            Open-TVA/WEC              ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)
PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                                  No. 8            10/5/10          Specification Traceability & Compliance, which states that the WBN2 PAMS        (a) The purpose of NABU-DP-00014-GEN document is to                          Revised response included in    Due 12/3/10 SRS was created to support the three documents identified (two of  define the process for system level design, software design                  letter dated 12/22/10                                                                          By letter dated April 8, 2010 these documents have been provided on the docket).                  and implementation, and hardware design and                                                                    Responses to items a                                          (ML10101050203), TVA docketed implementation for Common Q safety system development.                        Response provided in letter      and e provided.                                                WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-        This document supplements the Common Q SPM, WCAP-                            dated 10/5/10                                                                                  "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety                16096-NP-A. The scope of NABU-DP-00014-GEN includes                                                          NNC 11/18/10:                                                  Program I&C Projects, Software Systems).                                                          the design and implementation processes for the application                  NRC Review and WEC to          (1) Items b-d closed to                                        Requirements Specification for the Post development. For a fuller description of the design process                  complete response.              other Open Item nos.                                            Accident Monitoring System, dated (b) Please describe the flow of information between these three    described in NABU-DP-00014-GEN please refer to the                                                            (2) The point of these                                          February 2010 (ML101050202).
documents.                                                          Design Process for AP1000 Common Q Safety Systems,                            b-d to be addressed at public  questions was to WCAP-15927 on the AP1000 docket. Since this is a                              meeting and audit. Will require understand how the (c) Does the PAMS SRS implement the requirements in these          Westinghouse process document that is not specifically                        information to be docketed. origin of the three documents?                                                    referenced in the SRS, it will be removed in the next revision                                                requirements in the of the document.                                                                                              requirements (d) Please describe if and how these three documents are used in                                                                                                                  specifications were the development of the PAMS Software Design Description.            (b) - Closed to items 142 and 145                                                                            documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the        (c) - Closed 142                                                                                              the requirements would requirements of these three documents have been incorporated                                                                                                                      be demonstrated in into the WBN2 PAMS SRS.                                            (d) - Closed to Item 142                                                                                      Rev. 2 of the CQ PAMS LTR.
(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident


be demonstrated in Rev. 2 of the CQ PAMS LTR. ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                        radEE311.docx                                                                                              Open Items to be Resolved for SER Approval


By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1,
===Response===
""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).
SE   FSAR   NRC No.                                                               Issue                                                   TVA Response(s)                         Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                              Y/N Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
TVA Response to Follow-up NRC Request:
  (1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.
  (2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following change to address the NRC request:
Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.
145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
This item is used to track all traceability issues with the System Design Specification (SDS).
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
Responder: WEC (1) The review and update of the RTM is complete. If requested by the NRC reviewer, the revised RTM will be made available for audit at the Westinghouse office in Rockville.
(2) Hardware requirements were moved from the SRS to the SDS. 
(3) The missin g requirements identified b y V&V for the SDS and SRS have been incorporated.
(4) Section 11 "TVA Contract Compliance Matrix" was added to the Licensing Technical Report Revision 2.
(5) Revision 1 of the IV&V report, submitted on TVA to NRC letter "Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests," dated December 3, 2010 includes the Requirements phase review.
(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference ) "System N Open  Response included in letter dated 12/22/10 During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
TVA would provide the RSED RTM. (see ML102920031 Item No 6)  TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see Open-TVA/WEC Due 12/22/10
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 9  WBN2 PAMS System Design Specification TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December
2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next
revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the
revisions reviewed by V&V. Have these been addressed?
Yes. The next revisions of the SDS and SRS address these issues. 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications. 
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a
good write up of how the process works. Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.
WEC to identify AC160 document (7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.
(8) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit. If a description of the flow of documentation information in a project document is required, it will be added to a future revision of the Licensing Technical Report.
ML102920031 Item No 7)
TVA would revise and resubmit the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8) 146    (C a 6/17/2010 Res p onder: Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 147    (C a 6/17/2010 Res p onder: Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 148    (C a 6/17/2010 Res p onder: Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 149 7.2 7.2  (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell Y Close Closed ML101720589
, Item TVA Letter dated 150 7.2 7.2  (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark Y Close Closed ML101720589
, Item TVA Letter dated 151 7.2 7.2  (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark Y Close Closed ML101720589
, Item TVA Letter dated 152 7.2 7.2  (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark Y Close Closed ML101720589
, Item TVA Letter dated 153 7.2 7.2  (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb Y Close Closed ML101720589
, Item TVA Letter dated 154 7.2 7.2 EICB (Garg) FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and include this discussion in this section. Also, by letter dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item
: 51.  (Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.
Y Open Response is not acceptable. A
revised response will be submitted in the letter dated 10/29/10.
Open-TVA/A102
Due 12/17/10
Pending FSAR Amendment 102 submittal.
FSAR AMD 100. Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA ML101720589, Item No. 6 and EICB RAI
ML102861885 Item
No. 8 TVA Letter dated 10/5/10
TVA Letter dated 10/29/10 Enclosure 1 Item
No. 13 EICB RAI ML102861885 sent to DORL Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments uncertainties or justify how you m eet the 95/95 criteria given in RG 1.105. TVA Revised Response:
In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request. However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.
  (Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9. 
(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations,  single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where onl y 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as "high."
. needs to address the latest criteria and that include 95/95 criteria. Why the last sentence
has been modified by adding TI-28. It was NRC's understanding that all setpoints have to meet TI-28 155 7.2 7.2  (G Summar y of FSAR chan ge document section 7.2 states that Date:  Y Closed Closed ML101720589
, Item  156 7.2 7.2 EICB (Garg) FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1--designed to prevent exceeding 121% of power--.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change.
Responder: WEC Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment.
TVA Response to Follow-up NRC Request:
The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 "Follow Up -NRC Request on 118% and 121 % FSAR Power Levels
", dated December 6, 2010 (Reference 2).
A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Ran g e Hi gh Neutron Flux, Hi g h Settin g , the value of 118% is correct. In the context of the peak core N Open  Revised response included in letter dated 12/22/10.
Response is included in letter dated 10/5/10 Open-TVA/WEC Due 12/22/10 Amendment 101 Submitted 10/29/10.
TVA needs to justify wh y some places 121% is used and other places 118% is used . What does 121% or 118% means.
ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, "Limiting Power Distributions."
157 7.2 7.2  (GFSAR section 7.2.2.1.1
, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell Y Close Closed ML101720589
, Item TVA Letter dated 158 7.2 7.2  (GFSAR section 7.2.2.1.1
, p ara g ra p h six was chan g ed to state that Res ponder: Tindell Y Closed Closed ML101720589
, Item TVA Letter dated 159 7.2 7.2  (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g Y Close Closed ML101720589
, Item TVA Letter dated 160 7.2 7.2  (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell Y Close Closed ML101720589
, Item TVA Letter dated 161 7.2 7.2  (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark Y Closed Closed ML101720589
, Item TVA Letter dated 162 7.2 7.2  (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell Y Closed Closed ML101720589
, Item TVA Letter dated 163 7.2 7.2  (G Deleted b y DORL Date:  Y Closed Closed ML101720589
, Item  164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins Y Closed Closed ML101720589
, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2  (GFSAR section 7.2.2.3.2
, last p ara g ra p h of this section has been Res p onder: Clark Y Closed Closed ML101720589
, Item TVA Letter dated 166 7.2 7.2  (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark Y Closed Closed ML101720589
, Item TVA Letter dated 167 7.2 7.2  (GFSAR section 7.2.2.4
, p rovide an anal y sis or reference to cha p ter Res p onder: Clark Y Close Closed ML101720589
, Item TVA Letter dated 168 7.2 7.2  (G FSAR table 7.2-4
, item 9 deleted loss of offsite p ower to station Res p onder: Clark Y Close Closed ML101720589
, Item TVA Letter dated 169    (G 6/18/2010 Res p onder: Clark Y Closed Closed    170    (G 6/17/2010 Res p onder: Clark Y Closed Closed    171 7.2 7.2  (G 6/17/2010 Res p onder: Crai g Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172    (G 6/17/2010 Res p onder: Crai g Y Closed Closed EICB RAI  173 7.1 7.1  (G 6/17/2010 Res p onder: Crai g/Webb/Powers Y Closed Closed  EICB RAI  174    (G 6/28/2010 Res p onder: Hilmes/Crai g Y Closed Closed EICB RAI  175    (G June 28 , 2010 Res p onder:  Y Closed Closed EICB RAI  176 7.1 7.1  (G 6/28/2010 Res p onder: Crai g/Webb Y Closed Closed  EICB RAI  177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark Y Closed Closed N/A TVA Letter dated RAI not re q uired 179    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC Y Closed  Closed N/A - Closed to NA  180    (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC Y Closed Closed N/A - Closed to NA  181    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC Y Closed Closed N/A - Closed to NA  182    (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC Y Closed Closed N/A - Closed to NA  183  EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in
Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document"  referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?
Responder: WEC The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 14 in letter dated 12/222/10, NRC Matrix Item 144.
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.
Y Open  Revised response included in letter dated 12/22/10.
(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Response provided in letter dated 10/21/10 Open-TVA/WEC Due 12/3/10  
Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following change to address the NRC request:
 
Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.
NNC 11/18/10:  The point behind this open item was that TVA must demonstrate that the  
145                                  The WBN2 PAMS System Design Specification (WBN2 PAMS                Responder: WEC                                            N            Open                                Open-TVA/WEC          ML101650255, Item                   WBN2 PAMS System Design EICB (Carte)
 
SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                    No. 9                                Specification
origin of each
                                    & Compliance, which states that the WBN2 PAMS SDS was              (1) The review and update of the RTM is complete. If                    Response included in letter         Due 12/22/10 created to support the WBN2 PAMS SysRS.                                 requested by the NRC reviewer, the revised RTM will                dated 12/22/10                                                                                 TVA docketed WNA-DS-01667-WBT be made available for audit at the Westinghouse office                                                  To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware                in Rockville.                                                       During the September 20-21,        Revision of the RTM,                                        Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                (2) Hardware requirements were moved from the SRS to                   2010 audit at Westinghouse, it      SRS, SysRS, and                                            Accident Monitoring System- System the SDS.                                                           was acknowledged that              SysDS.                                                     Design Specification, dated December (b) Please briefly describe all of the documents that implement the (3) The missing requirements identified by V&V for the SDS              TVA/Westinghouse had                                                                            2009.
 
hardware requirements of the WBN2 PAMS SysRS.                           and SRS have been incorporated.                                     previously (in September 15, (4) Section 11 TVA Contract Compliance Matrix was                    2010 public meeting) stated:
requirement in the WEC requirements specification is known
This item is used to track all traceability issues with the            added to the Licensing Technical Report Revision 2.
 
System Design Specification (SDS).                                  (5) Revision 1 of the IV&V report, submitted on TVA to                  TVA would provide the RSED NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 -                 RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following          Instrumentation and Controls Staff Information                      No 6) actions were agreed to. These items partially address the               Requests, dated December 3, 2010 includes the traceability concerns with the System Design Specification.            Requirements phase review.                                         TVA would revise and resubmit This item will be updated with the results of the September 20 (6) Per Westinghouse letter WBT-D-2268 NRC Access to                        the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit.                  Common Q Documents at the Westinghouse Rockville                    types of issues identified in the Office dated August 16, 2010 (Reference ) System                  public meeting. (see
and documented. TVA
 
stated that this information would be in CQ PAMS LTR Rev. 2.
EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1 Item No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If there are additional changes, what is their origin?
184    (C a 7/15/2010 Res p onder: WEC Y Closed Closed N/A - Closed to N/A  185  EICB (Carte) 7/15/2010  
 
An emphasis is placed on the traceability of requirements in Software Requirements Specifications  in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say


"Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies"    Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    radEE311.docx                                                                                                Open Items to be Resolved for SER Approval


requirements.  
===Response===
SE    FSAR    NRC No.                                                                  Issue                                                          TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                          Y/N
: 1. Westinghouse will perform completed a review of the                        Requirements Specification for the Common Q Generic                      ML102920031 Item No 7)
Requirements Traceability Matrix(RT), using the issues                    Flat Panel Display, 00000-ICE-30155, Revision 9 is identified at the 9/15 public meeting as a guide (documented              available for audit at the Westinghouse Rockville office.                TVA would revise and resubmit below) and update the RTM as required.                                                                                                              the Software Verification and WEC to identify AC160 document                                                    Validation phase summary
: 2. Some hardware requirements are contained in the SRS                                                                                                report for the requirements instead of the System Design Specification (SDS). These will (7) A schedule was developed and is reviewed weekly by                                phase to document the be removed from the SRS and incorporated into the next          Westinghouse and TVA project management.                                          completion of the requirements revision of the SDS.                                                                                                                                phase review. (see (8) The flow of documentation information was provided to                              ML102920031 Item No 8)
: 3. 25 issues identified by V&V where some requirements have        the NRC inspector during the Common Q PAMS audit.
not been included in the SDS (14) and SRS (11) at the            If a description of the flow of documentation information revisions reviewed by V&V. Have these been addressed?            in a project document is required, it will be added to a Yes. The next revisions of the SDS and SRS address these        future revision of the Licensing Technical Report.
issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
( ( (
146                                  6/17/2010                                                                  Responder:                                                      Y            Closed                          Closed                    ML101650255, Item                    PAMS System Requirements 147                                  6/17/2010                                                                  Responder:                                                      Y            Closed                          Closed                    ML101650255, Item                    PAMS System Requirements
( ( ( ( (
148                                  6/17/2010                                                                  Responder:                                                      Y            Closed                          Closed                    ML101650255, Item                    PAMS System Requirements C C C 149    7.2    7.2                    FSAR Section 7.1.1.2(2), Overtemperature delta T and                      Responder: Tindell                                              Y            Close                            Closed                    ML101720589, Item TVA Letter dated G G G G G 150    7.2    7.2                    Many of the changes were based on the Westinghouse document Responder: Clark                                                                Y            Close                            Closed                    ML101720589, Item TVA Letter dated a a a 151    7.2    7.2                    Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark                                                            Y            Close                            Closed                    ML101720589, Item TVA Letter dated 152    7.2    7.2                    Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR                Responder: Merten/Clark                                          Y            Close                            Closed                    ML101720589, Item TVA Letter dated 153    7.2    7.2                    FSAR section 7.2.1.1.7 added the reference to FSAR section                Responder: Craig/Webb                                            Y            Close                            Closed                    ML101720589, Item TVA Letter dated 154    7.2    7.2                    FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS              Responder: Craig/Webb                                            Y            Open                            Open-TVA/A102              ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the                                                                                                                                                            No. 6 and EICB RAI 10/5/10 instrument setpoint methodology which complies with 10 CFR                (Q1) Refer to the response to letter item 13, RAI Matrix Item                Response is not acceptable. A Due 12/17/10                  ML102861885 Item 50.36 requirements. Provide the information on how the WBN2                51.                                                                          revised response will be                                    No. 8              TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and                                                                                              submitted in the letter dated Pending FSAR                                    10/29/10 include this discussion in this section. Also, by letter dated May        (Q2) EEB-TI-28's single sided methodology conforms with                      10/29/10.                    Amendment 102                                    Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff        WBN's design basis commitment to ensure that 95% of the                                                    submittal.                                      No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction          analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that      limits as defined in NRC Reg Guide 1.105, Revision 2, 1986                                                    FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for        that was in affect during WBN Unit 1 licensing. The single                                                    all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified  sided methodology is not used for any TSTF-493 setpoints                                                      allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met.              that use TI-28 methodology.                                                                                    2 is calculated and Therefore, either remove this reduction factor for single sided                                                                                                                          added to TS, TVA


References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              radEE311.docx                                                                                                  Open Items to be Resolved for SER Approval


These references are used in the body of the SRS, for example:"
===Response===
 
SE    FSAR    NRC No.                                                               Issue                                                        TVA Response(s)                           Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                      Y/N uncertainties or justify how you meet the 95/95 criteria given in RG TVA Revised Response:                                                                                            needs to address the 1.105.                                                                                                                                                                               latest criteria and that In order to respond to other NRC comments on the setpoint                                                        include 95/95 criteria.
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).
methodology discussion in FSAR Amendment 100, TVA                                                                Why the last sentence reviewed the previous response to this RAI. This resulted in                                                    has been modified by a complete rewrite of the responses to this question as                                                          adding TI-28. It was shown below. As a result, the response does not specifically                                                    NRCs understanding address the NRC Follow-up Request. However, the overall                                                          that all setpoints have responses to all of the NRC RAIs on setpoint methodology                                                        to meet TI-28 addresses this item.
 
(Q1)    WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
They are also included via tables such as found in requirement R7.1.2-1  [The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
(Q2)     Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
 
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their
(
 
155    7.2     7.2    G            Summary of FSAR change document section 7.2 states that                Date:                                                          Y            Closed                          Closed                    ML101720589, Item 156    7.2    7.2                  FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-        Responder: WEC                                                  N            Open                            Open-TVA/WEC              ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The                                                                                                                                                            No. 8            10/5/10          Westinghouse review.
origin? Responder: WEC Steve Clark to look at how to combine traceability items.
value of 121% is changed from 118%. The justification for this          Per Westinghouse letter WBT-D-2340, TENNESSEE                                Revised response included in    Due 12/22/10 change states that this was done to bring the text of this section in  VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT                                    letter dated 12/22/10.
Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit. TVA Response to Follow-up NRC Request:
agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1.            UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and                                                          Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as    Correction to RAI Response SNPB 4.3.2-7, (Reference 17)                      Response is included in letter  Submitted 10/29/10.
  (1) Please see the response to Item 14 in this letter (NRC Matrix Item 144).  
118%. Justify the change.                                              the 118% value should be 121%. Depending on the use in                      dated 10/5/10 the FSAR either 118% or 121% are the correct values. As a                                                    TVA needs to justify result of the question, Westinghouse reviewed all locations                                                  why some places 121%
(2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 "Document Requirements" of WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC, dated December 3, 2010 "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests" a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.
where either 118% or 121% are used and the context of use                                                    is used and other and provided a FSAR markup to reflect the correct value at                                                    places 118% is used .
N Open  Response included in letter dated 12/22/10.
the specific location. These changes will be incorporated in                                                  What does 121% or a future FSAR amendment.                                                                                      118% means.
Open-TVA/WEC Due (1) 12/3/10        (2) 12/22/10 NNC 11/18/10
(1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item
 
No. 17  186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark Y Closed Closed EICB RAI No.6 TVA Letter dated 187  EICB (Carte)
By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.  
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.  
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket. Responder: Merten
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
: 2) This is a duplicate of closed RAI Matrix Item 45.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
A review of the following documents determined that the connection between the OM and the plant computer has been revised to show a connection to a printer instead of the plant computer:
The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 Follow Up -NRC Request on 118% and 121 % FSAR Power Levels, dated December 6, 2010 (Reference 2).
: 1. WNA-DS-01617-WBT-P, Revision 2, "Post Accident Monitoring System - System Requirements N Open  Revised response included in letter dated 12/22/10.
A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Range High Neutron Flux, High Setting, the value of 118% is correct. In the context of the peak core
Partial Response provided in letter dated 10/5/10 NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Open-TVA/WEC Due 12/22/10


Revise Response ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                 radEE311.docx                                                                                                 Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification", dated August 2010
: 2. WNA-DS-01667-WBT-P, Revision 2, "Post Accident Monitoring System - System Design Specification,"
dated September 2010
: 3. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" dated December 2010 Review of the newly released Common Q PAMS documents listed below confirmed the y correctl y show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration. 
(1) "Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010 (2) "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," WNA-AR-00180-WBT-P, Revision 0, dated October 2010 188    (C a B y letter dated June 30
, 2010 , TVA docketed
, "Tennessee Valle y Res p onder: Clark Y Closed Closed  ML101970033
, Item TVA Letter dated 189  7.6.7  (S i 7/20/2010 Res p onder: Clark Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9  (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133
, Ma y 1981 Res p onder: Clark Y Closed Closed  RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9  (C aNUREG-0800 Cha p ter 7 , Section 7.9
, "Data Communication Res p onder: Jimmie Perkins Y Closed  Closed ML10197016
, Item TVA Letter dated 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800
) Cha p ter 7 Section Res p onder: Clark Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR
, Section 7.5.2
, "Plant Com p uter S y stem ," Res p onder: Clark Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1
, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197  X O pen Item 197 was never issued.
Y Closed Closed    198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5
, Subsection III
, "Review Procedures" states:
Res p onder: Costle y/Norman Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3
, "Technical Su pport Center and Res p onder: Costle y/Norman Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2  7/21/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11  (C a 7/21/2010 Res p onder: Webb Y Closed Closed EICB RAI TVA Letter dated 202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.


Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
===Response===
N Open Partial Response provided in letter dated 10/5/10 Open-TVA/WEC Due 12/3/10  
SE      FSAR              NRC No.                                                                                    Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.              POC                                                                                                                                                          Y/N power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, Limiting Power Distributions.
( ( ( ( ( ( (
157    7.2      7.2                                    FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell                                                Y            Close                          Closed                    ML101720589, Item TVA Letter dated 158    7.2      7.2                                    FSAR section 7.2.2.1.1, paragraph six was changed to state that      Responder: Tindell                                              Y            Closed                        Closed                    ML101720589, Item TVA Letter dated 159    7.2      7.2                                    FSAR section 7.2.2.1.2 discusses reactor coolant flow                Responder: Craig                                                Y            Close                          Closed                    ML101720589, Item TVA Letter dated 160    7.2      7.2                                    FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell                                                  Y            Close                          Closed                    ML101720589, Item TVA Letter dated G G G G G G G 161    7.2      7.2                                    FSAR section 7.2.2.3 states that changes to the control function    Responder: Clark                                                Y            Closed                        Closed                    ML101720589, Item TVA Letter dated 162    7.2      7.2                                    FSAR section 7.2.2.2(14) states that bypass of a protection          Responder: Tindell                                              Y            Closed                        Closed                    ML101720589, Item TVA Letter dated 163    7.2      7.2                                    Deleted by DORL                                                      Date:                                                            Y            Closed                        Closed                    ML101720589, Item 164    7.2      7.2                                    FSAR section 7.2.2.2(20) has been revised to include the plant      Responder: Perkins                                              Y            Closed                        Closed                    ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a
165    7.2      7.2                                    FSAR section 7.2.2.3.2, last paragraph of this section has been      Responder: Clark                                                Y            Closed                        Closed                    ML101720589, Item TVA Letter dated 166    7.2      7.2                                    Changes to FSAR section 7.2.2.2(20) are justified based on the      Responder: Clark                                                Y            Closed                        Closed                    ML101720589, Item TVA Letter dated
( (
167    7.2      7.2                                    FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark                                                    Y            Close                          Closed                    ML101720589, Item TVA Letter dated 168    7.2      7.2                                    FSAR table 7.2-4, item 9 deleted loss of offsite power to station    Responder: Clark                                                Y            Close                          Closed                    ML101720589, Item TVA Letter dated
( ( ( (                            r 169                                                      6/18/2010                                                            Responder: Clark                                                Y            Closed                        Closed 170                                                      6/17/2010                                                            Responder: Clark                                                Y            Closed                        Closed M M ( ( ( ( ( ( ( ( ( ( ( (
171    7.2      7.2                                    6/17/2010                                                            Responder: Craig                                                Y            Closed                        Closed                    EICB RAI            TVA Letter dated Closed to SE Open Item 172                                                      6/17/2010                                                            Responder: Craig                                                Y            Closed                        Closed                    EICB RAI 173    7.1      7.1                                    6/17/2010                                                            Responder: Craig/Webb/Powers                                    Y            Closed                        Closed                    EICB RAI C C C C                            g 174                                                      6/28/2010                                                            Responder: Hilmes/Craig                                          Y            Closed                        Closed                    EICB RAI 175                                                      June 28, 2010                                                        Responder:                                                      Y            Closed                        Closed                    EICB RAI a a G G G G G G G G G G G G 176    7.1      7.1                                    6/28/2010                                                            Responder: Craig/Webb                                            Y            Closed                        Closed                    EICB RAI 177    7.5.2.1  7.5.1                                  7/15/2010                                                            Responder: Clark                                                Y            Closed                        Closed                    N/A                TVA Letter dated RAI not required a a a a                            l 178    7.5.2.1  7.5.1                                  7/15/2010                                                            Responder: Clark                                                Y            Closed                        Closed                    N/A                TVA Letter dated RAI not required 179                                                      An emphasis is placed on traceability in System Requirements        Responder: WEC                                                  Y            Closed                        Closed                    N/A - Closed to    NA 180                                                      The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC                                                        Y            Closed                        Closed                    N/A - Closed to    NA 181                                                      An emphasis is placed on traceability in System Requirements        Responder: WEC                                                  Y            Closed                        Closed                    N/A - Closed to    NA 182                                                      Characteristics that the SRP states that a Software Requirements Responder: WEC                                                      Y            Closed                        Closed                    N/A - Closed to    NA 183                                                      7/15/2010                                                            Responder: WEC                                                  Y            Open                           Open-TVA/WEC              EICB RAI        TVA Letter dated EICB (Carte)
ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements        The generic Software Requirements Specification applies                      Revised response included in  Due 12/3/10              No. 9            Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993,      except as modified by the WBN Unit 2 System Requirements                      letter dated 12/22/10.                                                    No. 4 and even more so given the modifications to the standard listed in  Specification.                                                                                              NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                                  point behind this open word should to say Each identifiable requirement in an SRS        TVA Response to Follow-up NRC Request:                                        Response provided in letter    item was that TVA must must be traceable backwards to the system requirements and the                                                                                    dated 10/21/10                demonstrate that the design bases or regulatory requirements that is satisfies          Please see the response to RAI item 14 in letter dated                                                      origin of each 12/222/10, NRC Matrix Item 144.                                                                              requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                                    WEC requirements Requirements Specification in the background section, is the                                                                                                                      specification is known sentence Those sections of the above references that require                                                                                                                    and documented. TVA modification from the generic PAMS are defined in the document                                                                                                                  stated that this referring purely to the changes from WNA-DS-01617-WBT Post                                                                                                                      information would be in Accident Monitoring System-System Requirements Specification                                                                                                                    CQ PAMS LTR Rev. 2.
or is it saying that there are additional changes beyond those and that the SRS defines them?


Licensing Technical Report R2 EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10  203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radEE311.docx                                                                                                    Open Items to be Resolved for SER Approval


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205    (G 7/26/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207    (C a Jul y 27 , 2010 Date:  Y Closed Closed    208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1  (C a 7/27/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
===Response===
212 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case.  
SE     FSAR     NRC No.                                                                     Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions         Resolution Path         RAI No. & Date     RAI Resp. Date               Comments Sec.     Sec. POC                                                                                                                                                    Y/N If there are additional changes, what is their origin?
(
184                                      7/15/2010                                                             Responder: WEC                                                  Y           Closed                           Closed                    N/A - Closed to     N/A C
a 185                                      7/15/2010                                                             Responder: WEC                                                  N            Open                              Open-TVA/WEC              EICB RAI EICB (Carte)
ML102980066 Item An emphasis is placed on the traceability of requirements in          Steve Clark to look at how to combine traceability items.                   Response included in letter      Due (1) 12/3/10          No. 17 Software Requirements Specifications in the SRP, in the                                                                                            dated 12/22/10.                       (2) 12/22/10 unmodified IEEE std 830-1993, and even more so given the              Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172,      audit.                                                                                                         NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say                                                                                                                        point behind this open Each identifiable requirement in an SRS must be traceable            TVA Response to Follow-up NRC Request:                                                                         item was that TVA must backwards to the system requirements and the design bases or                                                                                                                        demonstrate that the regulatory requirements that is satisfies Also the NRC considers    (1) Please see the response to Item 14 in this letter (NRC                                                    origin of each that the SRS is the complete set of requirements used for the            Matrix Item 144).                                                                                          requirement in the design of the software, whether it is contained within one                                                                                                                          WEC requirements document or many. In order to evaluate an SRS against the        (2) There is no RTM for development of the individual                                                              specification is known guidance in the SRP the staff needs access to all the                reusable software elements. As listed in item 15 of                                                            and documented. TVA requirements.                                                       Table 6-1 Document Requirements of WNA-LI-00058-                                                              stated that this WT-P, Revision 2, Post-Accident Monitoring System                                                              information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring    (PAMS) Licensing Technical Report submitted in TVA                                                             CQ PAMS LTR Rev. 2.
Systems Software Requirements Specification are various types      Letter to NRC, dated December 3, 2010 Watts Bar                                                                (2) TVA also said it of Reusable Software Element.                                    Nuclear Plant (WBN) Unit 2 - Instrumentation and                                                                would provide a RTM Controls Staff Information Requests a RTM for                                                                  for the RSED These references are used in the body of the SRS, for example:      implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been R5.3.14-2 [The Addressable Constants CRC error signal shall be      developed. This document is available for NRC audit at TRUE when any CAL CRC's respective ERROR terminal = TRUE            the Westinghouse Rockville office.
(WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
(
186    7.7.8  7.7.1.12                  7/15/2010                                                             Responder: Perkins/Clark                                       Y           Closed                           Closed                   EICB RAI No.6      TVA Letter dated D
a r
187                                      By letter dated June 18, 2010, TVA docketed responses to NRC          Responder: Merten                                              N            Open                              Open-TVA/WEC              ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information.                                                                                                                                                                                     No. 1 & 2         10/5/10          docketed?
: 1) Please refer to the revised response to letter dated                        Revised response included in      Due 12/22/10
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115).                                          letter dated 12/22/10.
did not identify any connection from the PAMS Operator Modules                                                                                                                      Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of                                                                                Partial Response provided in the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45.                                    letter dated 10/5/10 WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.            TVA Response to Follow-up NRC Request:
NNC 8/25/10: Why did TVA not
: 2) Please clarify whether any digital safety-related systems or      A review of the following documents determined that the                      catch this on the review of the components have a digital communications path to non-safety-          connection between the OM and the plant computer has                        PAMS SysRS or SRS? Does related systems or with safety related systems in another division. been revised to show a connection to a printer instead of the                TVA check that the CQ PAMS If so, NRC staff will need these paths identified on the docket.      plant computer:                                                              system meets the requirements in its purchase specifications?
: 1. WNA-DS-01617-WBT-P, Revision 2, Post Accident Monitoring System - System Requirements


(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEE311.docx                                                                                              Open Items to be Resolved for SER Approval
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.
WEC to provide the information and determine where the information will be located.
Attachment 13 contains a detailed response to the individual sections of IEEE 603-1991 and IEEE 7-4.3.2 that demonstrates how the hardware complies with the IEEE standards.
N Open  Response included in letter dated 12/22/10.
Open-TVA/WEC Due 12/22/10


To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item No. 10  213 7.5.2  EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
===Response===
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.
SE      FSAR        NRC No.                                                                        Issue                                                          TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path      RAI No. & Date        RAI Resp. Date                Comments Sec.     Sec.       POC                                                                                                                                                      Y/N Specification, dated August 2010
For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
: 2. WNA-DS-01667-WBT-P, Revision 2, Post Accident Monitoring System - System Design Specification, dated September 2010
Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
: 3. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report dated December 2010 Review of the newly released Common Q PAMS documents listed below confirmed they correctly show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.
Attachment 1 contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
(1) Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, WNA-TP-02988-WBT, Revision 0, dated November 2010 (2) Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, WNA-AR-00180-WBT-P, Revision 0, dated October 2010
N Open  Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
(
Open-NRC Review Due 12/31/10.
188                                          By letter dated June 30, 2010, TVA docketed, Tennessee Valley          Responder: Clark                                              Y            Closed                        Closed                ML101970033, Item TVA Letter dated C
EICB RAI ML102980066 Item No. 18  214    (C a 7/27/2010 Res p onder: WEC Y Closed Closed EICB RAI TVA Letter dated 215    (P o 7/29/2010 Res p onder: WEC Y Closed Closed    216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217   (G 7/6/2010 Res p onder: Clark Y Close Closed EICB RAI TVA Letter dated 218   (G 7/6/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 219   (G 8/4/2010 Res ponder: TVA Licensin g Y Closed Closed EICB RAI  220    (G 8/4/2010 Res p onder: A y ala Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222   (G 8/4/2010 Res p onder: Clark Y Close Closed EICB RAI TVA Letter dated 223   (G 8/4/2010 Res p onder: Clark Y Closed Closed EICB RAI  224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL
a
(
189              7.6.7                      7/20/2010                                                              Responder: Clark                                              Y            Closed                        Closed                RAI No. 3              TVA Letter dated S
i
( ( ( ( (
190    7.9                                  FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981              Responder: Clark                                              Y           Closed                         Closed               RAI No. 4              TVA Letter dated Closed to OI-331.
( (
191    7.9                                  NUREG-0800 Chapter 7, Section 7.9, "Data Communication                  Responder: Jimmie Perkins                                      Y           Closed                         Closed               ML10197016, Item TVA Letter dated M M M M M 192   7.5.1.1   7.5.2                       The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section              Responder: Clark                                               Y           Closed                         Closed               Item No. 1 sent to    TVA Letter dated EICB RAI ML1028618855 sent to C S 193   7.5.1.1  7.5.2                      The WBU2 FSAR, Section 7.5.2, Plant Computer System,                  Responder: Clark                                               Y           Closed                        Closed               Item No. 2 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194   7.5.1.1  7.5.2.1                    The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display                Responder: Costley/Norman                                      Y           Closed                         Closed               Item No. 3 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a i 195   7.5.1.1  7.5.2.2                    Bypassed and Inoperable Status Indication (BISI)                        Responder: Costley/Norman                                      Y           Closed                         Closed               Item No. 4 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 196    7.5.1.1   7.5.2.2                    Bypassed and Inoperable Status Indication (BISI)                        Responder: Costley/Norman                                      Y           Closed                         Closed               Item No. 5 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 197                        ( (              Open Item 197 was never issued.                                                                                                        Y            Closed                        Closed 198    7.5.1.1  7.5.2.2  M M X            SRP Section 7.5, Subsection III, Review Procedures states:            Responder: Costley/Norman                                      Y            Closed                        Closed                Item No. 6 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a 199    7.5.1.1  7.5.2.3                    The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                                                Y            Closed                        Closed                Item No. 7 sent to    TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200    7.2                                  7/21/2010                                                               Responder: Clark                                              Y           Closed                         Closed               EICB RAI               TVA Letter dated
(
201   7.7.1.1  7.7.11                      7/21/2010                                                               Responder: Webb                                                Y           Closed                         Closed                EICB RAI               TVA Letter dated C
a 202   7.5.2                                7/22/2010                                                               Responder: WEC                                                N            Open                          Open-TVA/WEC          EICB RAI         TVA Letter dated EICB (Carte)
ML102980066 Item 10/5/10 The letter (ML0003740165) which transmitted the Safety                  Revision 1 of the Licensing Technical Report will provide                  Partial Response provided in   Due 12/3/10          No. 4 Evaluation for the Common Q topical report to Westinghouse              more detailed information on the changes to the platform.                  letter dated 10/5/10 stated: "Should our criteria or regulations change so that our                                                                                                                    Licensing Technical conclusions as to the acceptability of the report are invalidated, CE  Rev. 2 of the Licensing Technical Report will include the                                                  Report R2 Nuclear Power and/or the applicant referencing the topical report      applicability of guidance.
will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
(
203    7.5.1.1   7.5.2                       7/26/2010                                                               Responder: Clark                                              Y           Closed                         Closed               EICB RAI               TVA Letter dated EICB RAI ML102861885 sent to DORL M
a


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 225    (G 8/4/2010 Res p onder: Scansen Y Close Closed EICB RAI TVA Letter dated 226    (C a 8/4/2010 Res ponder: TVA Licensin g Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radEE311.docx                                                                                               Open Items to be Resolved for SER Approval
227    (G 8/4/2010 Res p onder: Clark Y Close Closed EICB RAI TVA Letter dated 228    (C a 8/4/2010 Res p onder: Clark Y Closed  Closed EICB RAI TVA Letter dated 229    (C a 8/4/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 230    (C a 8/4/2010 Res p onder: Webb Y Closed Closed EICB RAI TVA Letter dated 231    (G 8/4/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 232    (S i 8/4/2010 Res p onder: Clark Y Closed Closed RAI No. 5 TVA Letter dated 233    (C a 8/4/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 234    (C a 8/4/2010 Res p onder: Y Closed Closed N/A - Du p licate N/A  235    (G 8/4/2010 Res ponder: TVA Licensin g Y Closed Closed N/A N/A  236    (G 8/4/2010 Res p onder: Clark Y Close Closed EICB RAI TVA Letter dated 237    (C a 8/4/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated 238    (C a 8/4/2010 Res p onder: Webb/Hilmes Y Closed Closed N/A - Du p licate N/A  239    (C a 8/4/2010 Res p onder: Hilmes Y Closed Closed N/A - Meetin g N/A  240    (G 8/4/2010 Res p onder: Clark Y Close Closed Ml102910008 TVA Letter dated 241    (S i 8/4/2010 Res p onder: Davies Y Closed Closed RAI No. 10 TVA Letter dated 242    (G 8/4/2010 Res p onder: Hilmes Y Close Closed EICB RAI TVA Letter dated 243    (C a 8/3/2010 Res p onder: WEC Y Closed Closed N/A - Closed to N/A  244  EICB (Carte) 8/3/2010  Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.
Contrary to these two statements in the SPM, the WBN2 PAMS


SRS (ML101050202
===Response===
) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
SE      FSAR          NRC No.                                                                          Issue                                                        TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.        POC                                                                                                                                                      Y/N
( ( (  (  (
204    7.5.1.1  7.5.2                        7/26/2010                                                            Responder: Costley/Norman                                      Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL
(      (
205                                            7/26/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated Question B related to prior NRC 206    7.5.1.1  7.5.2                        7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 207                          M M M  M ( M    July 27, 2010                                                        Date:                                                          Y            Closed                          Closed 208    7.5.2.1  7.5.1    C      C          7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 209    7.5.2.1  7.5.1      a a a  a G a    7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL a      a 210    7.5.2.1  7.5.1                        7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 211    7.5.1.1                                7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated Relates to SE Sections:
212    7.5.2                                  7/27/2010                                                            Responder: WEC                                                  N            Open                            Open-TVA/WEC              EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated                Application specific requirements for testing. This cannot be                Response included in letter      Due 12/22/10              No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system          addressed in a topical report. Evaluation of how the                        dated 12/22/10.
design specification and software requirements specification          hardware meets the regulatory requirements.                                                                  To be addressed by contain information to address the "Design Report on Computer                                                                                                                      WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these      WEC to provide the information and determine where the documents, and it is not clear how this is the case.                  information will be located.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.          Attachment 13 contains a detailed response to the individual (2) Please describe how the information provided demonstrates        sections of IEEE 603-1991 and IEEE 7-4.3.2 that conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.                  demonstrates how the hardware complies with the IEEE standards.
213    7.5.2                                  7/27/2010                                                            Responder: WEC                                                  N            Open                            Open-NRC Review          EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated                Conformance with IEEE 603 is documented in the revised                      Response is included in letter  Due 12/31/10.            No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system          Common Q PAMS Licensing Technical Report and the                            dated 10/25/10 design specification and software requirements specification          Common Q PAMS System Design Specification.
contain information to address the "Theory of Operation                                                                                            NNC to review and revise this Description." The staff has reviewed these documents, and it is      Attachment 1 contains the proprietary version of                            question after LTR R2 is not clear how this is the case. The docketed material does not        Westinghouse document Tennessee Valley Authority                            received.
appear to contain the design basis information that is required to    (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603.                      System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604        WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs            Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory  Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                        NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the        Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents      DS-01667-WBT, Rev. 2 dated September 2010.
identified demonstrate compliance with this clause?
(
214                                            7/27/2010                                                            Responder: WEC                                                  Y            Closed                          Closed                    EICB RAI          TVA Letter dated C
a
(    (        (
215                                            7/29/2010                                                            Responder: WEC                                                  Y            Closed                          Closed 216    7.5.1.1  7.5.2                        7/29/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL
(
217                                            7/6/2010                                                              Responder: Clark                                                Y            Close                            Closed                    EICB RAI          TVA Letter dated M ( ( M ( ( ( ( M 218                                            7/6/2010                                                              Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated 219                                            8/4/2010                                                              Responder: TVA Licensing                                        Y            Closed                          Closed                    EICB RAI P
220                                            8/4/2010                                                              Responder: Ayala                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated a G G a G G G G a 221    7.7.1.2  7.7.1.3                      8/4/2010                                                              Responder: Trelease                                            Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL o
222                                            8/4/2010                                                              Responder: Clark                                                Y            Close                            Closed                    EICB RAI          TVA Letter dated 223                                            8/4/2010                                                              Responder: Clark                                                Y            Closed                          Closed                    EICB RAI 224    7.5.1.1  7.5.2                        8/4/2010                                                              Responder: Norman (TVA CEG)                                    Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL


Please explain how the above meets the intent of the approved SPM. Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                                Open Items to be Resolved for SER Approval
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.
TVA Response to Follow-up NRC Request:
Process related requirements have been deleted from the SRS and SysRS in revision 3.
Attachment 1 contains WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification", dated December 2010. Attachment 2 contains WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification", dated December 2010. Attachment 3 contains the "Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3."
Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the N Open  Revised response is included in letter dated 12/22/10 Response is provided in letter dated 10/25/10.
NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.
Open-TVA/WEC Due 12/22/10 EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must


be docketed correspondence."
===Response===
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory  
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                  Y/N
( ( (  (
225                                    8/4/2010                                                            Responder: Scansen                                            Y            Close                            Closed              EICB RAI              TVA Letter dated 226                                                                                                                                                                      Y
(      (
8/4/2010
(
Responder: TVA Licensing                                                    Closed                            Closed              N/A - Information    TVA Letter dated See also Open Item Nos. 41 & 270.
227                                    8/4/2010                                                            Responder: Clark                                              Y            Close                            Closed              EICB RAI              TVA Letter dated 228                    C C C  C      8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              EICB RAI              TVA Letter dated 229                  G      G  G    8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              EICB RAI              TVA Letter dated a a a  a 230                                    8/4/2010                                                            Responder: Webb                                                Y            Closed                            Closed              EICB RAI              TVA Letter dated 231                                    8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              EICB RAI              TVA Letter dated
( ( (    ( ( (
232                                    8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              RAI No. 5            TVA Letter dated 233                                    8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              EICB RAI              TVA Letter dated
(      ( (
234                                    8/4/2010                                                            Responder:                                                    Y            Closed                            Closed              N/A - Duplicate      N/A C C C    C C S 235                                    8/4/2010                                                            Responder: TVA Licensing                                      Y            Closed                            Closed              N/A                  N/A 236                                    8/4/2010                                                            Responder: Clark                                              Y            Close                            Closed              EICB RAI              TVA Letter dated G      G G 237                                    8/4/2010                                                            Responder: Clark                                              Y            Closed                            Closed              EICB RAI              TVA Letter dated a a a    a a i 238                                    8/4/2010                                                            Responder: Webb/Hilmes                                        Y            Closed                            Closed              N/A - Duplicate      N/A 239                                    8/4/2010                                                            Responder: Hilmes                                              Y            Closed                            Closed              N/A - Meeting        N/A 240                                    8/4/2010                                                            Responder: Clark                                              Y            Close                            Closed              Ml102910008          TVA Letter dated 241                  (  (            8/4/2010                                                            Responder: Davies                                              Y            Closed                            Closed              RAI No. 10            TVA Letter dated
(
242                  C  S            8/4/2010                                                            Responder: Hilmes                                              Y            Close                            Closed              EICB RAI              TVA Letter dated G
a  i 243                                    8/3/2010                                                            Responder: WEC                                                Y            Closed                            Closed              N/A - Closed to      N/A 244                                    8/3/2010                                                            Responder: WEC                                                N            Open                              Open-TVA/WEC        EICB RAI        Response is            LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter      "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that        The process related requirements have been removed from                    Revised response is included in Due 12/22/10          No. 14          dated 10/25/10.        information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed    revision 2 of the Software Requirements Specification (SRS).                letter dated 12/22/10                                                                          be docketed correspondence."
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS        Attachment 3 of letter dated 10/25/10 contains the                          Response is provided in letter                                                                  LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing  proprietary version of Westinghouse document Nuclear                      dated 10/25/10.                                                                                analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any    Automation, Watts Bar 2 NSSS Completion Program, I&C                                                                                                                        requested should include technical alternatives to the SPM processes or additional project specific    Projects, Software Requirements Specification for the Post                  NNC 11/18/10: SysRS Rev. 2                                                                      information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.        Accident Monitoring System, WNA-SD-00239-WBT,                              also contains process                                                                          the NRC staff to make an independent Revision 2, Dated September 2010.                                          requirements that are more                                                                      assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                      appropriately incorporated into                                                                of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, TVA Response to Follow-up NRC Request:                                            process documentation.                                                                          requirements and the protection of for example all seventeen requirements in Section 2.3.2,                                                                                                                                                                                        public health and safety."
                                      "Configuration Control," address process requirements for    Process related requirements have been deleted from the configuration control.                                        SRS and SysRS in revision 3.
Please explain how the above meets the intent of the approved      Attachment 1 contains WNA-DS-01617-WBT-P, Revision 3, SPM.                                                                Post Accident Monitoring System- System Requirements Specification, dated December 2010. Attachment 2 contains WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System - System Requirements Specification, dated December 2010. Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3.
Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the


requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEE311.docx                                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments "Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3."
245  EICB (Carte) 8/3/2010  Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.
N Open  Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10 EICB RAI ML102980066 Item No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must


be docketed correspondence."
===Response===
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability  
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                  Y/N Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3.
245                                  8/3/2010                                                            Responder: WEC                                                N            Open                            Open-NRC Review            EICB RAI                              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item                      "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the        Relates to the commitment to provide the test plan and the                Response included in letter      Due 12/22/10              No. 119                              information relied upon in the SE must required test documentation for systems developed using the          SPM compliance matrix                                                      dated 12/3/10                                                                                    be docketed correspondence."
Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2    Attachment 9 contains the Westinghouse document Post                                                                                                                        LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).              Accident Monitoring System Test Plan, WNA-PT-00138-                                                                                                                        analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10                                                                                                                          requested should include technical contains the Westinghouse Application for Withholding for                                                                                                                    information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT-                                                                                                                    the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010.                                                                                                                                  assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246                                  8/3/2010                                                            Responder: WEC                                                N            Open                            Open-NRC Review            EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM              As agreed ISG6 does not apply to the Common Q PAMS                        Response is provided in letter  Due 10/22/10              No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be          platform. The information required to address this question                dated 10/25/10                                                                                    be docketed correspondence."
developed. Many other section of the SPM identify that this PQP      concerning the PQP and SPM has been added to                                                                NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the      compliance matrix in revision 1 of the Licensing Technical                NNC 11/18/10: PQP has not        go to WEC Rockville                                              LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,        Report.                                                                    been provided and CQ PAMS        Offices and look at                                              analysis that supports the change please describe the documentation produced and provide the                                                                                      LTR Rev. 1 does not contain      PQP to decide if it must                                        requested should include technical information that the SPM states should be in the PQP.                Attachment 1 of letter dated 10/25/10 contains the                        comparable information.          docketed.                                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                                                                                                                      the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                                                                                      assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                                                                                                                      of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                                                                                                                        requirements and the protection of 2010                                                                                                                                                                        public health and safety."
247                  ( ( (          8/8/2010                                                            Responder: WEC                                                Y            Closed                          Closed                    EICB RAI          Response is        LIC-101 Rev. 3 Appendix B Section 4, 248                  C C C          8/8/2010                                                            Responder: WEC                                                Y            Closed                          Closed                                        Response is        LIC-101 Rev. 3 Appendix B Section 4, a a a 249                                  8/8/2010                                                            Responder: WEC                                                Y            Closed                          Closed                                                          LIC-101 Rev. 3 Appendix B Section 4, 250                                  8/8/2010                                                            Responder: WEC                                                N            Open                            Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                      "Safety Evaluation" states: "the The SPM describes the software and documents that will be            Westinghouse develops Software Release Reports/Records                    Revised response included in    Due 12/22/10                                                    information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,      and a Configuration Management Release Report. Describe                    letter dated 12/22/10                                                                            be docketed correspondence."
SPM Section 6, Software Configuration Management Plan)            the documents and when they will be produced. Summarize                                                    10/25/10 is a partial describes the implementation tasks that are to be carried out. The  guidance on how to produce these records, focus on project                Response included in letter      response. Still waiting                                          LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the      specific requirements in SPM etc.                                          dated 10/25/10.                  on Software Test Plan                                            analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                      and all other testing                                            requested should include technical Documentation should exist that shows that the configuration        TVA Response to Follow-up NRC Request:                                                                      documentation.                                                  information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                                  the NRC staff to make an independent accomplished. Please provide information that shows that the CM      The following documentation shows that the configuration                                                                                                                    assessment regarding the acceptability tasks have been successfully accomplished for each life cycle        management tasks for that activity group have been                                                                                                                          of the proposal in terms of regulatory activity group.                                                      successfully accomplished.                                                                                                                                                  requirements and the protection of public health and safety."
: 1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following changes to address the NRC requests:
: a. Section 2.2.1 Hardware/Software Change Process


of the proposal in terms of regulatory
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                            Open Items to be Resolved for SER Approval


requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
===Response===
Responder: WEC
SE    FSAR   NRC No.                                                               Issue                                                       TVA Response(s)                         Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                Y/N has been added to describe the process of how changes are evaluated.
 
: b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
As agreed ISG6 does not apply to the Common Q PAMS
: 2. Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), WNA-PT-00138-WBT, Revision 0, dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, (Reference 1.
 
251                                 8/8/2010                                                           Responder: WEC                                                N            Open                              Open-TVA/WEC                                                LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
                                                                                                                                                                                                                                                                                  "Safety Evaluation" states: "the The SPM describes the software testing and documents that will     The software testing performed and documents created are                  Revised response included in      Due 12/22/10.                                              information relied upon in the SE must be created. The SPM also describes the testing tasks that are to   addressed by the SPM Compliance matrix contained in                        letter dated 12/22/10                                                                        be docketed correspondence."
Attachment 1 of letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" N Open Response is provided in letter
be carried out. The acceptance criterion for software test         Revision 1 of the Licensing Technical Report.                                                                10/25/10 is a partial implementation is that the tasks in the SPM have been carried out                                                                             Partial response is provided in  response. Still waiting                                    LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that       Attachment 1 of the letter dated 10/25/10 contains the                     letter dated 10/25/10            on Software Test Plan                                      analysis that supports the change testing been successfully accomplished.                            Proprietary version of Westinghouses document titled:                                                       and all other testing                                      requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                                                         documentation.                                              information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS),                                                                                                                         the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                                                                                   assessment regarding the acceptability WBT-P, Dated October 2010                                                                                                                                               of the proposal in terms of regulatory requirements and the protection of TVA Response to Follow-up NRC Request:                                                                                                                                   public health and safety."
 
dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.
Open-NRC Review
 
Due 10/22/10
 
NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.
EICB RAI ML102980066 Item
 
No. 15 Response is provided in letter
 
dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the
 
information relied upon in the SE must
 
be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory requirements and the protection of public health and safety." 247   (C a 8/8/2010 Res p onder: WEC Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 248   (C a 8/8/2010 Res p onder: WEC Y Closed Closed  Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 249    (C a 8/8/2010 Res p onder: WEC Y Closed  Closed  LIC-101 Rev. 3 A ppendix B Section 4
, 250  EICB (Carte) 8/8/2010  The SPM describes the software and documents that will be
 
created and placed under configuration control. The SCMP (e.g.,
SPM Section 6, "Software Configuration Management Plan") describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
TVA Response to Follow-up NRC Request:
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished. 
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following changes to address the NRC requests:
: a. Section 2.2.1 Hardware/Software Change Process N Open  Revised response included in letter dated 12/22/10 Response included in letter dated 10/25/10.
Open-TVA/WEC Due 12/22/10
 
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments has been added to describe the process of how changes are evaluated.  
: b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," (Proprietary), WNA-PT-00138-WBT, Revision 0, dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 "Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests," (Reference  
: 1. 251   EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to  
 
be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in Revision 1 of the Licensing Technical Report.
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:
"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" TVA Response to Follow-up NRC Request:
Please see the response to RAI item 23 in letter dated 12/22/10, NRC Matrix Item 250.
Please see the response to RAI item 23 in letter dated 12/22/10, NRC Matrix Item 250.
N Open Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-TVA/WEC Due 12/22/10.  
252                                  8/8/2010                                                            Responder: WEC                                                N           Open                             Open-TVA/WEC                                                LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                  "Safety Evaluation" states: "the The SPM contain requirements for software requirements              Explain response to AP1000 audit report.                                  Response included in letter       Due 12/22/10                                               information relied upon in the SE must traceability analysis and associated documentation (see Section    RTM docketed NRC awaiting V&V evaluation of RTM.                          dated 12/22/10                                                                               be docketed correspondence."
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability        Software requirements traceability analysis is described in                Read ML091560352                  Check on this Hilmes                                        LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished.                        the following documents:                                                                                                                                                analysis that supports the change requested should include technical
: 1. WNA-LI-00058-WT-P, Revision 2, Post-Accident                                                                                                                      information in sufficient detail to enable Monitoring System (PAMS) Licensing Technical Report                                                                                                                the NRC staff to make an independent submitted in TVA Letter to NRC dated December 3,                                                                                                                    assessment regarding the acceptability 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -                                                                                                                       of the proposal in terms of regulatory Instrumentation and Controls Staff Information                                                                                                                      requirements and the protection of Requests, (Reference 1) contains the following change                                                                                                              public health and safety."
to address the NRC request:
Section 11, TVA Contract Compliance Matrix has been added.
: 2. The Independent Verification &Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010)


10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    radEE311.docx                                                                                            Open Items to be Resolved for SER Approval


be docketed correspondence."
===Response===
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
SE   FSAR      NRC No.                                                                       Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                          Y/N was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1).
 
: 3. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010) was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1).
of the proposal in terms of regulatory
: 4. The integration phase is covered in Attachment 10IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 3, dated December 2010. Attachment 11 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
 
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
requirements and the protection of public health and safety." 252  EICB (Carte) 8/8/2010  The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
253                                           8/8/2010                                                             Responder: Clark                                               Y           Closed                       Closed                                   TVA Letter dated Related to Open Item no. 83.
Responder: WEC Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.
254                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     TVA Letter dated 255                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     TVA Letter dated 256                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     TVA Letter dated 257                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     N/A C C C C C C C C C C C C C C C 258                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     N/A 259                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     TVA Letter dated 260                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     N/A 261                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Closed to     TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
Software requirements traceability analysis is described in the following documents:
262                                           8/10/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               N/A - Request to     N/A a a a a a a a a a a a a a a a 263                                           8/11/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               ML101650255, Item 264                                           8/11/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               ML101650255, Item 265                                           8/11/2010                                                           Responder: WEC                                                 Y           Closed                       Closed               ML101650255, Item 266                                           8/11/2010                                                           Responder: Webb/Webber                                         Y           Closed                       Closed                                   TVA Letter dated 267                                           8/11/2010                                                           Responder: WEC                                                 Y           Closed                       Closed 268                                           8/19/2010                                                            Responder: WEC                                                N            Open                          Open-NRC Review EICB (Carte)
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
By letter dated March 12, 2010 (ML101680577), TVA stated that        11/18/10 Warren Odess-Gillett took action to discuss with                  Response included in letter  Due 12/22/10 the application specific hardware and software architecture          Design Engineering to generate a non-prop figure                            dated 12/3/10 descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482)              Attachment 18 contains the non-proprietary version of the and Software Requirements Specification (ML101050202,                Westinghouse document Watts Bar 2 Common Q PAMS ML102040486, & ML1022040487).                                        Block Diagram.
Instrumentation and Controls Staff Information Requests," (Reference 1) contains the following change to address the NRC request:
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
Section 11, "TVA Contract Compliance Matrix" has been added. 
: 2. The Independent Verification &Validation (IV&V) report covering the Concept and Definition phases ("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010)
N Open  Response included in letter dated 12/22/10 Read ML091560352 Open-TVA/WEC Due 12/22/10 Check on this Hilmes  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1). 3. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases  
("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010) was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1). 4. The inte gration phase is covered in Attachment 10"IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 3, dated December 2010. Attachment 11 contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010.
253   (C a 8/8/2010 Res p onder: Clark Y Closed Closed TVA Letter dated Related to O pen Item no. 83.
254   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to TVA Letter dated 255   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to TVA Letter dated 256   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to TVA Letter dated 257   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to N/A 258   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to N/A 259   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to TVA Letter dated 260   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to N/A 261   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262   (C a 8/10/2010 Res p onder: WEC Y Closed Closed N/A - Re quest to N/A 263   (C a 8/11/2010 Res p onder: WEC Y Closed Closed ML101650255
, Item   264   (C a 8/11/2010 Res p onder: WEC Y Closed Closed ML101650255
, Item   265   (C a 8/11/2010 Res p onder: WEC Y Closed Closed ML101650255
, Item   266   (C a 8/11/2010 Res p onder: Webb/Webber Y Closed Closed TVA Letter dated 267   (C a 8/11/2010 Res p onder: WEC Y Closed Closed   268   EICB (Carte) 8/19/2010


By letter dated March 12, 2010 (ML101680577), TVA stated that the application specific hardw are and software architecture descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radEE311.docx                                                                                                      Open Items to be Resolved for SER Approval


Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
===Response===
Responder: WEC 11/18/10 Warren Odess-Gillett took action to discuss with Design Engineering to generate a non-prop figure Attachment 18 contains the non-proprietary version of the Westinghouse document "Watts Bar 2 Common Q PAMS Block Diagram."
SE      FSAR    NRC No.                                                                    Issue                                                          TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                        Y/N
N Open  Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10
( (
269                                      8/20/2010                                                              Responder: NRC                                                  Y            Closed                            Closed                      N/A                N/A 270                          ( ( (      8/23/2010                                                              Responder: Clark                                                Y            Closed                            Closed                                                            See also Open Item Nod. 41 & 245.
M M 271                          C C P      8/23/2010                                                              Responder: WEC                                                  Y            Closed                            Closed                      N/A - Closed to    NA 272    7.5.2.1  7.5.1  a a            8/26/2010                                                              Responder: Clark                                                Y            Closed                            Closed                      EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL a a o 273    7.5.2.1  7.5.1                  8/26/2010                                                              Responder: Clark                                                Y            Closed                            Closed                      EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b                    ( (            8/26/2010                                                              Responder: Stockton                                              Y            Closed                            Closed                      RAI No. 6          TVA Letter dated M S a i 274.a 7.5.2.1    7.5.1                  8/26/2010                                                              Responder: Clark                                                Y            Closed                            Closed                      EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL
(
275                                      8/27/2010                                                              Responder: Clark                                                Y            Closed                            Closed                      Not Required        N/A S
i 276      7.6      7.6                    8/27/2010                                                              Responder: Webb                                                  Y            Open                              Open-TVA/Bechtel            EICB RAI            TVA Letter dated EICB (Garg)
ML102910008        10/21/10 In order for the staff to review the effects of multi control systems                                                                                Revised response provided in      Due 11/24/10                Item#60            Enclosure 1 Item failure, provide the summary of the analyses documenting the            The NRC reviewer confirmed this question applies to non-                     letter dated 12/22/10                                                            No. 13 effect on the plant based on the following events: (1) loss of power    safety systems.                                                                                                 TVA to provide to all control systems powered by a single power supply; (2)                                                                                          Response provided in letter      justification for non-failure of each instrument sensor which provides signal to two or      The Distributed Control System (DCS) implemented using                        dated 10/21/10                    safety system other more control systems; (3) Break of any sensor impulse line which        Foxboro I/A hardware, replaces most of the non-safety                                                          than DCS.
is used for sensors providing signals to two or more control            related control systems for WBN Unit 2. The other non-                        Revised response provided in systems; and (4) failure of digital system based on the common          safety-related control systems within the scope of this                      letter dated 11/24/10              The statement that cause software failure affecting two or more control systems. For      question are:                                                                                                   failure of sense line each of these events, confirm that the consequences of these                                                                                          Response Acceptable. 11/17/10 where more than one events will not be outside chapter 15 analyses or beyond the            a. Rod Control - Failures of this system are addressed in                                                      transmitter is connected capability of operators or safety systems.                                  FSAR Chapter 15.                                                                                            would be bounded by
: b. Main Turbine Electro-Hydraulic Control System                            TVA changed the response in the failure of a single the latest writeup. The scope of transmitter does not The following provides the requested summaries for the four                  the question applies to all non make sense.
events listed:                                                                safety related control systems and is not limited to just three TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA                          system listed by the TVA. TVA statement that all non-letter to NRC dated August 11, 2010, Enclosure 2                          could use to envelope other        safety control systems (Reference 7) demonstrates that the loss of any single                    control systems by Unit 1          have been evaluated power source does not result in a loss of any DCS                        analysis if they applies to Unit 2 against these criteria function. The other systems within the scope of this                      systems also.                      and have determined question are configured in the same manner as Unit 1,                                                        that their failure does with redundant power sources such that the failure of a                                                      not have consequences single power source does not cause a loss of function.                                                      which will put the plant outside chapter 15 (2) Signals shared by more than one control function                                                            analyses.
within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.
The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 269    (P o 8/20/2010 Res p onder: NRC Y Closed Closed N/A N/A  270    (C a 8/23/2010 Res p onder: Clark Y Closed Closed  See also O p en Item Nod. 41 & 245.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                 radEE311.docx                                                                                         Open Items to be Resolved for SER Approval
271    (C a 8/23/2010 Res p onder: WEC Y Closed Closed N/A - Closed to NA  272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b    (S i 8/26/2010 Res p onder: Stockton Y Closed Closed RAI No. 6 TVA Letter dated 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 275    (S i 8/27/2010 Res p onder: Clark Y Closed Closed Not Re q uired  N/A  276 7.6 7.6 EICB (Garg) 8/27/2010 In order for the staff to review the effects of multi control systems failure, provide the summary of the analyses documenting the effect on the plant based on the followin g events: 
(1) loss of power to all control systems powered by a single power supply;  (2) failure of each instrument sensor which provides signal to two or more control systems;  (3)  Break of any sensor impulse line which is used for sensors providing signals to two or more control systems;  and (4)  failure of digital system based on the common cause software failure affecting two or more control systems. For each of these events, confirm that the consequences of these events will not be outside chapter 15 analyses or beyond the capability of operators or safety systems.
Responder: Webb The NRC reviewer confirmed this question applies to non-safety systems.
The Distributed Control System (DCS) implemented using Foxboro I/A hardware, replaces most of the non-safety related control systems for WBN Unit 2. The other non-safety-related control systems within the scope of this question are: 
: a. Rod Control - Failures of this system are addressed in FSAR Chapter 15.
: b. Main Turbine Electro-Hydraulic Control System The following provides the requested summaries for the four events listed: 
(1) The (DCS) segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) demonstrates that the loss of any single power source does not result in a loss of any DCS function. The other systems within the scope of this question are configured in the same manner as Unit 1, with redundant power sources such that the failure of a single power source does not cause a loss of function.
  (2) Signals shared by more than one control function within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function. The impact of a loss of signal to the other systems within the scope of this question is bounded b y the loss of that signal to the individual system and has the same effect as for Unit 1. 
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identif y multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions Y Open  Revised response provided in letter dated 12/22/10 Response provided in letter dated 10/21/10 Revised response provided in letter dated 11/24/10 Response Acceptable. 11/17/10 TVA changed the response in the latest writeup. The scope of the question applies to all non safety related control systems and is not limited to just three system listed by the TVA. TVA could use to envelope other control systems by Unit 1 analysis if they applies to Unit 2 systems also.
Open-TVA/Bechtel Due 11/24/10 TVA to provide justification for non-safety system other than DCS.
The statement that failure of sense line where more than one transmitter is connected would be bounded by the failure of a single transmitter does not make sense.
TVA needs to make a statement that all non-safety control systems have been evaluated against these criteria and have determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
EICB RAI ML102910008 Item#60 TVA Letter dated 10/21/10 Enclosure 1 Item


No. 13 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments impacted by a sense line failure.
===Response===
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
SE     FSAR         NRC No.                                                           Issue                                                 TVA Response(s)                           Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date                   Comments Sec. Sec.        POC                                                                                                                                  Y/N impacted by a sense line failure.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
). The other s y stems within the scope of this question are analog and therefore this question is not applicable.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
All non-safety related control systems were reviewed in the context of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
All non-safety related control systems were reviewed in the context of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
277 7.6 7.6.3 (G 8/27/2010 Res p onder: Clark Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 (G 8/27/2010 Res ponder: Mather Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8 (G 8/27/2010 Res p onder: Webb Y Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9 (G 8/27/2010 Res ponder: Trelease Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton Y Closed Closed ML102390538
(
, Item Res p onse  288 7.3   (G 9/2/2010 Res p onder: McNeil Y Closed Closed EICB RAI   289   (S i 9/2/2010 Res ponder: Faulkner Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 (C a 9/7/2010 Res p onder: Clark Y Closed Closed N/A N/A This item is a du plicate of item 291.
277   7.6     7.6.3             8/27/2010                                                   Responder: Clark                                               Y           Close                         Closed               EICB RAI           TVA Letter dated 278   7.6     7.6.6             8/27/2010                                                   Responder: Trelease                                             Y           Close                         Closed               EICB RAI           TVA Letter dated 279   7.6     7.6.6   D          8/27/2010                                                   Responder: Mather                                               Y           Close                         Closed               EICB RAI           TVA Letter dated 280   7.6     7.6.6     ( ( ( ( ( (
291 7.7 (C a 9/7/2010 Res p onder: Clark Y Closed Closed TVA Letter dated 292 7.2.5 7.2 (G 9/7/2010 Res p onder: Crai g Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton Y Closed Closed ML102390538
8/27/2010                                                   Responder: Trelease                                             Y           Closed                       Closed               EICB RAI           TVA Letter dated a
, Item Res p onse  295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton Y Closed Closed ML102390538
G G G G G G 281   7.6     7.6.8             8/27/2010                                                   Responder: Webb                                                 Y           Closed                       Closed               EICB RAI           TVA Letter dated r
, Item Res p onse  296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton Y Closed Closed ML102390538
282   7.6     7.6.9             8/27/2010                                                   Responder: Trelease                                             Y           Close                         Closed               EICB RAI           TVA Letter dated 283   7.7.5     XX               8/27/2010                                                   Responder: Clark                                               Y           Closed                       Closed               EICB RAI No.13     TVA Letter dated This item is a follow-up question to item
, Item Res p onse  297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton Y Closed Closed ML102390538
(
, Item Res p onse  298 7.3 XX (D a r 9/9/2010 Res p onder: Clark Y Closed Closed ML102390538
284   7.7.3   7.4.1             8/27/2010                                                   Responder: Webber                                               Y           Closed                       Closed               EICB RAI No.14     TVA Letter dated This item is a follow-up question to item D
, Item Res p onse  299   (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q Y Closed Closed TVA Letter dated  
a r
(
285   7.3.3     7.3               8/27/2010                                                   Responder: McNeil                                               Y           Closed                       Closed               EICB RAI No.15     TVA Letter dated This item is a follow-up question to item D
a r
(
286   7.7.3   9.3.4.2.           8/27/2010                                                   Responder: Webber                                               Y           Closed                       Closed               EICB RAI No.16     TVA Letter dated D
a r
(
287   7.3     7.3-1   ( D       8/27/2010                                                   Responder: Elton                                               Y           Closed                       Closed               ML102390538, Item Response G a r
288   7.3                         9/2/2010                                                   Responder: McNeil                                               Y           Closed                       Closed               EICB RAI
(
289                               9/2/2010                                                   Responder: Faulkner                                             Y           Closed                       Closed               RAI No. 24         TVA Letter dated 290             7.7     (       9/7/2010                                                   Responder: Clark                                               Y           Closed                       Closed               N/A               N/A               This item is a duplicate of item 291.
D    ( ( (
M (
291             7.7               9/7/2010                                                   Responder: Clark                                               Y           Closed                       Closed                                 TVA Letter dated 292   7.2.5     7.2   a    C C S9/7/2010                                                   Responder: Craig                                                Y           Closed                       Closed               EICB RAI           TVA Letter dated 293   7.7.4   7.2.2.3. a G      9/8/2010                                                   Responder: Craig                                                Y           Closed                       Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL r    a a i 294   7.3     7.3.1.1.           9/9/2010                                                   Responder: Elton                                               Y           Closed                       Closed               ML102390538, Item Response
(
295   7.3     7.3.1.1.           9/9/2010                                                   Responder: Elton                                               Y           Closed                       Closed               ML102390538, Item Response D
a r
(
296   7.3     7.3.1.2.           9/9/2010                                                   Responder: Elton                                               Y           Closed                       Closed               ML102390538, Item Response D
a r
297   7.3     7.3.1.2.   ( (     9/9/2010                                                   Responder: Elton                                               Y           Closed                       Closed               ML102390538, Item Response
( D D 298   7.3       XX     C a a     9/9/2010                                                   Responder: Clark                                               Y           Closed                       Closed               ML102390538, Item Response a r r 299                               Provide Common Q Software Requirements Specification Post   Attachment 41 of the 10/5 letter contains the Common Q         Y           Closed                       Closed                                 TVA Letter dated
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radEE311.docx                                                                                                    Open Items to be Resolved for SER Approval


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300   EICB (Singh) Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.
===Response===
Are there any commercially dedicated parts in the RM-1000?  If so, how are they dedicated?
SE   FSAR   NRC No.                                                                 Issue                                                           TVA Response(s)                           Acceptable       Status/ Current Actions             Resolution Path       RAI No. & Date   RAI Resp. Date                   Comments Sec. Sec. POC                                                                                                                                                          Y/N 300                                 Need Radiation Monitoring System Description/Design Criteria             Responder: Temples/Mather                                        Y            Closed                              Closed                    RAI No. 25        TVA Letter ML102980005      11/24/10, item 4, Are detectors different from Unit 1. Describe any differences.   (1) The Radiation Monitoring Design Criteria Document,                               Response is included in letter      Due 11/24/10              10/26/2010        and TVA letter WB-DC-40-24, Revision 21 is contained in Attachment                               dated 10/29/10                                                                  10/29/10 Are there any commercially dedicated parts in the RM-1000? If so,    6 to letter dated October 31, 2010.                                                                                   TVA to address the                          Enclosure 1 Item how are they dedicated?                                                                                                                                Revised response Included in        following comments:                          No. 20 (2) Attachment 7 contains the General Atomics detector                               letter dated 11/24/10 Please confirm that digital communication ports available in RM-      differences report. The containment high range                                                                       (1) Is it Att. 5 or Att.
Please confirm that digital communication ports available in RM-1000 are not used. Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to letter dated October 31, 2010.  
1000 are not used.                                                    radiation monitors are loops 271-274.                                                                                     6?
(2) Attachment 7 contains the General Atomics detector differences report.
(2) Pl. confirm that (3) For safety-related applications, General Atomics                                                                 HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module                                                             271-274.
The containment high range radiation monitors are loops 271-274.
assembly as a Basic Component. This assembly does                                                             (3) TVA to clarify that contain component parts that are Safety-Related                                                                   GA has a Commercial Grade Items (SRCGI). Because these                                                                     commercial EICB (Singh)
  (3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.
SRCGI components are assembled into the delivered                                                                 dedication Basic Component, they are dedicated to the assembly                                                               program in place by virtue of the acceptance test of the full RM-1000                                                             and that GA is an assembly. Safety-related commercial grade items are                                                               approved dedicated in accordance with General Atomics                                                                     10CFR50, App. B approved 10 CFR 50 Appendix B program.                                                                            supplier.
  (4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.
App B does not (4) The digital communications ports on the safety-related                                                           address RM-1000 radiation monitors are not used.                                                                          commercial grade dedication .
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
General Atomics Electronics Systems, Inc. is an approved 10 CFR 50 Appendix B supplier. They have a commercial grade dedication program.
Revised response General Atomics Electronics Systems, Inc. is an approved                                                               is acceptable.
Y Closed  Response is included in letter dated 10/29/10 Revised response Included in letter dated 11/24/10 Closed  Due 11/24/10 TVA to address the following comments:
10 CFR 50 Appendix B supplier. They have a commercial                                                                 Please submit grade dedication program.                                                                                             response.
(1) Is it Att. 5 or Att.
(4) Response acceptable.
6? (2) Pl. confirm that HRRMs are loops 271-274. (3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved 10CFR50, App. B supplier.
301                                 1.TVA is requested to address the consequences of software               Responder: WEC/Davies/Clark                                      N            Open                                Open-TVA/WEC              RAI No. 11        TVA Letter dated Note 1:
App B does not address commercial grade dedication .
common cause failure including all potential resulting failures (i.e.                                                                                                                                                 ML102980005      10/29/10 total loss of CERPI, system fail as-is).                                 TVA Partial Response:                                                        Revised response included in        Due 12/22/10              10/26/2010        Enclosure 1 Item Effects of common cause software letter dated 12/22/10.                                                          No. 21          failure are addressed in DI&C-ISG-02
Revised response is acceptable.
: 2. In addition, address how the actions stipulated in the plant           For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15,                                                        1)  Please address                                          (ML091590268) Section 4 on pages 8 Technical Specifications will be taken when the CERPI system             no credit is taken for the rod position indication system. For                Revised response included in            how fail-as-is is                                        and 9. This document is publically indications are lost. Information notice IN 2010-10 (ML100080281)         all continuous rod withdrawal accidents analyzed in WBN                      letter dated 11/24/10.                  detected i.e.                                            available. Some excerpts are as addresses the need to consider software failures and the actions         Unit 2 FSAR, Chapter 15, no credit is taken for any rod                                                                alarms, rod                                              follows:
Please submit response.
required to assure that the plant will stay within its licensing basis. stop/block.                                                                  Partial response in 10/29 letter.        position deviation alarms, etc.                                                For example, a failure to trip might
(4) Response acceptable. RAI No. 25 ML102980005 10/26/2010 TVA Letter 11/24/10, item 4, and TVA letter 10/29/10 Enclosure 1 Item No. 20  301   EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).  
: 3. Provide FMEA in support of your response.                       (1) Technical Specification 3.1.8, Rod Position Indication,                                                            2)  Response                                                    not be as limiting as a partial EICB (Singh) does not have an action for total loss of indication;                                                                  acceptable.                                                actuation of an emergency core
: 2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281
: 4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock     therefore, a total loss of CERPI puts the plant into LCO                                                          3)  Response                                                    cooling system, with digital indications of a successful actuation.
) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.  
C-11 to block automatic rod withdrawal when 1/1 Control Bank D           3.0.3 which states:                                                                                                    acceptable.                                                In cases such as this, it may take an rod position is above setpoint. This interlock capability would be                                                                                                                         4)  a. Response                                                operator longer to evaluate and lost in case of total loss of CERPI. How is the rod block assured       When an LCO is not met and the associated ACTIONS                                                                      acceptable.                                                correct the safety system failure than for this event?                                                         are not met, an associated ACTION is not provided, or if                                                                b. Pl. address                                              it would if there was a total failure to directed by the associated ACTIONS the unit shall be                                                                    failure mode on                                            send any actuation signal. For this
: 3. Provide FMEA in support of your response.  
: 5. How is automatic rod withdrawal affected in case of total loss of     placed in a MODE or other specified condition in which                                                                  fail-as-is.                                                reason, the evaluation of failure signals from the CERPI to the ICS? Is this interlock fail safe?         the LCO is not applicable. Action shall be initiated within                                                            5) Response                                                modes as a result of software CCF 1 hour to place the unit, as applicable, in:                                                                            acceptable.                                                should include the possibility of 6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the                                                                                                                              6) Response                                                partial actuation and failure to actuate with false indications, as well rod position indicator channel is 5% of span (7.2 inches). The                MODE 3 within 7 hours;                                                                                            acceptable.
: 4. FSAR Table 7.7-1, Plant Control S ystem Interlocks lists interlock C-11 to block automatic rod withdrawal when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?  
as a total failure to actuate.
: 5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS? Is this interlock fail safe?  
CERPI system accuracy specified in the CERPI System                          MODE 4 within 13 hours; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12                  MODE 5 within 37 hours.                                                                                      TVA to address                                                  The primary concern is that an


6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 Responder: WEC/Davies/Clark TVA Partial Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                     radEE311.docx                                                                               Open Items to be Resolved for SER Approval
For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block. 
(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:
When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in:
MODE 3 within 7 hours; MODE 4 within 13 hours; and MODE 5 within 37 hours.
N Open  Revised response included in letter dated 12/22/10.
Revised response included in letter dated 11/24/10.
Partial response in 10/29 letter.
Open-TVA/WEC Due 12/22/10
: 1) Please address how fail-as-is is detected i.e.
alarms, rod position deviation alarms, etc.
: 2) Response acceptable.
: 3) Response acceptable.
: 4) a. Response acceptable.
: b. Pl. address failure mode on fail-as-is.
: 5) Response acceptable.
: 6) Response acceptable.
TVA to address RAI No. 11 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item No. 21 Note 1:
Effects of common cause software failure are addressed in DI&C-ISG-02 (ML091590268) Section 4 on pages 8 and 9. This document is publically available. Some excerpts are as follows:
"For example, a failure to trip might not be as limiting as a partial actuation of an emergency core cooling system, with digital indications of a successful actuation. In cases such as this, it may take an operator longer to evaluate and correct the safety system failure than it would if there was a total failure to send any actuation signal. For this reason, the evaluation of failure modes as a result of software CCF should include the possibility of partial actuation and failure to actuate with false indications, as well as a total failure to actuate.
The primary concern is that an Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assum ed in the FSAR Chapter 15. Please clarify this anomaly.


Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
===Response===
(2) CERPI common mode software failure Description of the CERPI systems installed at Watts Bar (Unit 1 & 2):
SE    FSAR  NRC No.                                                  Issue                                              TVA Response(s)                        Acceptable Status/ Current Actions    Resolution Path    RAI No. & Date  RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                              Y/N steps or 5.19%. The specified system accuracy seems to be                                                                                                  common cause failure                                  undetected failure within the digital greater than the accuracy assumed in the FSAR Chapter 15.      Exceptions to this Specification are stated in the                                           as stated under                                        system could prevent proper system Please clarify this anomaly.                                  individual Specifications. Where corrective measures                                         response item 2.                                      operation. A failure or fault that is are completed that permit operation in accordance with                                                                                             detected can be addressed; however, failures that are non-the LCO or ACTIONS, completion of the actions                                               Please explain how                                    detectable may prevent a system required by LCO 3.0.3 is not required.                                                       various alarms will                                    actuation when required.
Each Programmable Logic Controller (PLC), Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train. Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.
continue to annunciate                                Consequently, non-detectable faults (2) CERPI common mode software failure                                                           on software lockup?                                    are of concern.
History of CERPI:
Need better Description of the CERPI systems installed at Watts                                           explanation to Bar (Unit 1 & 2):                                                                             understand the rationale behind the Each Programmable Logic Controller (PLC),                                                     response.
The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.
Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod                                           Further response position information is provided to the OMs in the main                                       required to address control room via redundant data links. Each train (PLC,                                       CCF:
CERPI Software Failure Analysis With regard to the CERPI system software:
MTP, and OM) is electrically isolated from the other train.                                                                                       Total failure of software and lock-up Communications within a CERPI train (PLC, MTP, and                                           alone would normally OM) are continuously monitored. If communication is                                          be detected. Staff is interrupted, this condition is annunciated to the operator                                   also concerned by in the control room. The MTP and OM display screens                                           undetected failure have rotating cursors in the upper right-hand corner of                                       within the digital the display to indicate that the system is operating.                                         system that could prevent proper system History of CERPI:                                                                             operation. A failure or fault that is detected The basic PLC software associated with the CERPI                                             can be addressed; system has been in use for over ten years. The first                                         however, failures that plant to utilize the CERPI PLC software was Beaver                                           are non-detectable Valley. In 2003, the CERPI software was deployed with                                         may prevent a system interfaces to the Common Q MTP and OM interfaces                                             actuation when within the systems for Surry Units 1 & 2, and Watts Bar                                       required or may result Unit 1. In 2009, the Watts Bar Unit 1 CERPI system                                           in a partial actuation.
The software used on PLC-A is identical to that used on PLC-B. The software used on MTP-A is identical to that used on MTP-B   The software used on OM-A is identical to that used on OM-B.
was modified to allow for two independent trains of                                           Please address the CERPI. The Watts Bar Unit 2 CERPI system is based                                             consequences of an on the Unit 1 design. Only the detectors and the                                             undetected failures on detector interface boards are not redundant within the                                       system operation and Watts Bar CERPI systems.                                                                     alarms and interlocks including control bank CERPI Software Failure Analysis                                                               D interlock. (See note 1 in the Comments With regard to the CERPI system software:                                                     column of this open item for reference)
* The software used on PLC-A is identical to that used on PLC-B.
* The software used on MTP-A is identical to that used on MTP-B
* The software used on OM-A is identical to that used on OM-B.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and common cause failure as stated under response item 2.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and
Please explain how various alarms will continue to annunciate on software lockup?
 
Need better explanation to understand the rationale behind the response.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                              radEE311.docx                                                                        Open Items to be Resolved for SER Approval
Further response required to address CCF:  Total failure of software and lock-up alone would normally be detected. Staff is also concerned by undetected failure within the digital system that could prevent proper system operation. A failure or fault that is detected can be addressed; however, failures that are non-detectable may prevent a system actuation when required or may result in a partial actuation. Please address the consequences of an undetected failures on system operation and alarms and interlocks including control bank D interlock.  (See note 1 in the Comments column of this open item for reference) undetected failure within the digital system could prevent proper system operation. A failure or fault that is detected can be addressed; however, failures that are non-detectable may prevent a system actuation when required. Consequently, non-detectable faults are of concern."


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm). A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.
===Response===
A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.
SE   FSAR   NRC No.                                       Issue                               TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                      Y/N site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).
(3) There is no FMEA for the CERPI system.
A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
(3) There is no FMEA for the CERPI system.
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are "active low" requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show "C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments consistency of parameter (and units) with the deviation alarm and position indicator uncertaint y , the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.
"The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 st eps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications."
Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                             radEE311.docx                                                                                       Open Items to be Resolved for SER Approval
 
===Response===
SE     FSAR     NRC No.                                           Issue                           TVA Response(s)                             Acceptable       Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date             Comments Sec.      Sec. POC                                                                                                  Y/N consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
The resolution of the rod position indicator channel is +/-
12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The following response is based on the response in Westinghouse letter WBT-D-2722 "Response To Question On CERPI RAI  
The following response is based on the response in Westinghouse letter WBT-D-2722 Response To Question On CERPI RAI #301 dated December 6, 2010 (Reference 4).
#301" dated December 6, 2010 (Reference 4). TVA believes the question is related to the statement found in the response submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated November 24, 2010 , (Reference 9) "Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm)"    The CERPI system will not annunciate various system alarms if the software is in a lockup condition. However, the system will annunciate an alarm based on the PLC watchdo g relay dropping out because the software has "locked up" the processor. So, even if the PLC locks up, an alarm is generated to alert the operators in the Main Control Room (MCR). All of the CERPI system alarms (that connect to the plant annunciator system) are wired to specific alarm relays within the CERPI system. With the exception of the watchdog alarm relay, the alarm relay coils are actuated by the PLC Digital Output Module. The plant annunciator wiring connects to either the Normally Open (NO) or the Normally Closed (NC) contacts of the associated alarm relay. The watchdog relay is configured such that when a timeout condition occurs (the PLC locks up), the watchdog relay de-energizes, and a CERPI System Trouble alarm is annunciated in the MCR.
TVA believes the question is related to the statement found in the response submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated November 24, 2010, (Reference 9) Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm)
302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL
The CERPI system will not annunciate various system alarms if the software is in a lockup condition. However, the system will annunciate an alarm based on the PLC watchdog relay dropping out because the software has locked up the processor. So, even if the PLC locks up, an alarm is generated to alert the operators in the Main Control Room (MCR).
All of the CERPI system alarms (that connect to the plant annunciator system) are wired to specific alarm relays within the CERPI system. With the exception of the watchdog alarm relay, the alarm relay coils are actuated by the PLC Digital Output Module. The plant annunciator wiring connects to either the Normally Open (NO) or the Normally Closed (NC) contacts of the associated alarm relay. The watchdog relay is configured such that when a timeout condition occurs (the PLC locks up), the watchdog relay de-energizes, and a CERPI System Trouble alarm is annunciated in the MCR.
302   7.5.2.1   7.5.1   ( ( ( (   09/17/2010             Responder: Tindell                                               Y           Closed                       Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL 303   7.5.2.1   7.5.1             09/17/2010             Responder: Tindell                                               Y           Closed                       Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M 304   7.5.2.1   7.5.1             09/17/2010             Responder: Tindell                                               Y           Closed                       Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 305   7.5.2.1   7.5.1             09/17/2010             Responder: Tindell                                               Y           Closed                       Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 306 7.1 7.1 EICB (Garg) FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radEE311.docx                                                                                         Open Items to be Resolved for SER Approval
Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102. 


===Response===
SE    FSAR        NRC No.                                                                  Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date    Comments Sec. Sec.      POC                                                                                                                                              Y/N 306    7.1      7.1                    FSAR amendment 100, page 7.1-12 provides the definition of        Responder: Hilmes                                            Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Allowable value which is not consistent with TSTF-493 as                                                                                                                                            ML102910008      10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is    The FSAR Allowable Value definition will be revised to be                  Response is included in letter  Due 12/17/10        Item#69          Enclosure 1 Item declared inoperable.                                              consistent with the TSTF-493 in FSAR Amendment 102.                        dated 10/29/10                                                          No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9                                                    Pending FSAR that will be included in FSAR Amendment 102 that reflects                                                  Amendment 102 this change.                                                                                                submittal 307    7.1      7.1                    (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes                                              Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493                                                                                                                                    ML102910008      10/29/10 as AAF is the limit beyond which the instrument channel is          (1) The Acceptable As Found (AAF) definition will be                    Response is included in letter  Due 12/17/10        Item#70          Enclosure 1 Item degraded but may be operable and its operability must be                revised to be consistent with TSTF-493 in FSAR                      dated 10/29/10                                                          No. 27 evaluated. (2) Also it states that AAF is based on measurable            Amendment 102. Attachment 3 contains the revised                                                      Pending FSAR instrument channel uncertainties, such as drift, expected during the    FSAR section 7.1.2.1.9 that will be included in FSAR                                                  Amendment 102 surveillance interval. These wording should be revised to agree          Amendment 102 that reflects this change.                                                              submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided        (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be      in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean            Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue.                                        Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
 
308   7.1     7.1                     (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes                                                Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Acceptable as left tolerance is not in accordance with TSTF-493 as                                                                                                                                 ML102910008      10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to                    Response is included in letter  Due 12/17/10        Item#71          Enclosure 1 Item EICB (Garg)
Pending FSAR
This is very vague and ambiguous. (2) Also it states that RPS           determine the Acceptable As Left (AAL) will be deleted              dated 10/29/10                                                          No. 28 functions use double sided tolerance limits. Since ALF is a band it     in FSAR Amendment 102. Attachment 3 contains the                                                      Pending FSAR will always be double sided and therefore, this clarification does       revised FSAR section 7.1.2.1.9 that will be included in                                               Amendment 102 not mean anything and clouds the issue.                                  FSAR Amendment 102 that reflects this change.                                                         submittal (2) See response to letter item 27 (NRC Matrix Item 307).
 
309    7.1    7.1.2.1.                  (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes                                                    Y           Open                             Open-TVA/A102        EICB RAI          TVA Letter dated 9.1                    methodology, states that AAF is the algebraic sum of the .. This                                                                                                                                  ML102910008      10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint                            Response is included in letter   Due 12/17/10        Item#72          Enclosure 1 Item to the SRSS method and will mask the operability of the instrument        methodology calculations in TI-28 for TSTF-493 will be              dated 10/29/10                                                         No. 29 channel and therefore, it is not acceptable to the staff. (2) It also    revised to use the Square Root Sum of the Squares                                                    Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into            (SRSS) method.                                                                                      Amendment 102 consideration which is vague and ambiguous.                                                                                                                                    submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
Amendment 102 submittal EICB RAI ML102910008 Item#69 TVA Letter dated 10/29/10 Enclosure 1 Item No. 26  307 7.1 7.1 EICB (Garg) (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493
310    7.1    7.1.2.1. EICB          (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                  Responder: Hilmes                                            Y            Open                            Open-TVA/A102       EICB RAI          TVA Letter dated 9.2      (Garg          methodology, states that for AAF .and other measurable                                                                                                                                            ML102910008      10/29/10
 
                          )
as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2) Also it states that AAF is based on measurable instrument channel uncertainties, such as drift, expected durin g the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the issue.
uncertainties as appropriate (i.e., those present during            TVA Response:                                                            Response is included in letter  Due 12/17/10        Item#73          Enclosure 1 Item
Responder: Hilmes
 
(1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR
 
Amendment 102 that reflects this change. 
(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology. These sections will be revised to clarify the AAF calculations in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open Response is included in letter
 
dated 10/29/10 Open-TVA/A102
 
Due 12/17/10
 
Pending FSAR Amendment 102
 
submittal
 
EICB RAI ML102910008 Item#70 TVA Letter dated 10/29/10  Item
 
No. 27  308 7.1 7.1 EICB (Garg) (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration. This is very vague and ambiguous. (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.
Responder: Hilmes
 
(1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) See response to letter item 27 (NRC Matrix Item 307).
Y Open Response is included in letter dated 10/29/10 Open-TVA/A102  


Due 12/17/10 Pending FSAR
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radEE311.docx                                                                                            Open Items to be Resolved for SER Approval


Amendment 102  
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                                  Y/N calibration.) should be changed to present during normal                                                                                        dated 10/29/10                                                            No. 30 operation (2) Also on page 7.1-15, states that ALT may take        (1) The AAF definition will be revised in FSAR Amendment                                                     Pending FSAR calibration history into consideration which is vague and                102 to read:                                                                                            Amendment 102 ambiguous.                                                                                                                                                                        submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
311    7.1        7.1                    Both Westinghouse and TVA setpoint methodology do not have          Responder: Hilmes                                              Y            Open                            Open-TVA/A102        EICB RAI            TVA Letter dated any discussion on single sided calculation. Please confirm that                                                                                                                                        ML102910008        10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with  A statement that single-sided corrections are not used for                  Response is included in letter  Due 12/17/10        Item#74            Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR.        TSTF-493 setpoints will be included in FSAR Amendment                        dated 10/29/10                                                            No. 31 102. Attachment 3 contains the revised FSAR section                                                          Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that                                                    Amendment 102 reflects this change.                                                                                        submittal
(
312                7.0    D (              By letter dated September 10,2010, TVA provided the summary        Responder: Stockton                                            Y            Close                            Closed              EICB RAI            TVA Letter dated a G r
313    7.7.8    7.7.1.12                  EDCR 52408 (installation of AMSAC in Unit 2) states that Design    Responder: Ayala                                                Y            Closed                          Closed              EICB RAI No.18      TVA Letter dated
(
314    7.3        7.3    ( D              The following 50.59 changes were listed in the March 12 RAI        Responder: Stockton                                            Y            Closed                          Closed              EICB RAI No. 19    TVA Letter dated Related to OI 10 G a r
315    7.5.3      7.5.3                    IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations)                              Y            Close                            Closed              EICB RAI            TVA Letter dated
(
316    7.5.2.3    7.5                    TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather                                            Y            Closed                          Closed              RAI No. 26 S
i
(
317    7.5.2.3    7.5                    TVA has provided a proprietary and a non-proprietary version of    Responder: Temples                                              Y            Closed                          Closed              RAI No. 27          TVA Letter dated S
i 318    7.5.2.3    7.5      EICB          TVA has provided the following documents for RM-1000                Responder: Temples                                              N            Open                            Open-TVA/GA          RAI No. 28          TVA Letter dated (Sing h)          equipment qualification:                                                                                                                                                                              ML102980005        10/29/10 (i)  Applicable to WBN Unit 2. 04508905-1QR is                              Revised response is included in Due 12/22/10          10/26/2010          Enclosure 1 Item


submittal EICB RAI ML102910008 Item#71 TVA Letter dated 10/29/10  Item No. 28  309 7.1 7.1.2.1.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                   radEE311.docx                                                                                  Open Items to be Resolved for SER Approval
9.1 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the -.. This is not acceptable. As algebraic sum is non conservative compared to the SRSS method and will mask the operabilit y of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes


(1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method.
===Response===
(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR
SE    FSAR  NRC No.                                                    Issue                                                        TVA Response(s)                    Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                                                      Y/N (i)  Qualification Test Report for RM-1000 Processor Module                applicable only in regards to the RM-1000, with the              letter dated 12/22/10.                                                No. 34 and Current-To-Frequency Converter 04508905-QR                        exception of re-qualification of certain RM-1000                                                Response update (January 2001)                                                        equipment differences covered in the -1SP report.                Note check 04508905-1QR or required. It is clear that (ii)  Qualification Test Report Supplement, RM-1000 Upgrades                The Current-to-Frequency (I-F) converter module                  QR. Staff version is QR only. 04508903-2SP and -
04508905-1SP (June 2006)                                              qualifications in the base report and the -1SP report                                          3SP are not applicable.
(iii) Qualification Test Report Supplement, RM-1000 Upgrades                are not applicable to the RM-1000s, and will be used            Response is included in letter The response for 04508905-2SP (June 2008)                                              later as references in the WBN Unit 2 specific                  dated 10/29/10                applicability of (iv)  Qualification Test Report Supplement, RM-1000 Upgrades                qualification reports.                                                                          04508905-QR and -
04508905-3SP (May 2008)                                      (ii)    Applicable to WBN Unit 2.                                                                      1SP to RM-1000 and IF (iii)  Not applicable to WBN Unit 2                                                                    converter is not clear.
Please clarify whether all of these are fully applicable to WBN2 or (iv)    Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then                                                                                                              Check page numbers of please clarify what those are.                                      The 04508905-3SP report was prepared for another TVA                                                    Appendix F plant, as a monitor system-level report, where the system                                              (missing/duplicate Supplement 3 was issued one month prior to supplement 2.            included equipment mostly based on the base report                                                      pages).
Please explain the reason for the same.                            equipment items. These two -2SP and -3SP supplement                                                    Check applicability of reports were essentially worked concurrently, but the -2SP                                              Appendix C to RM1000 document review/release process resulted in the release                                                instead of RM2300?
time difference.                                                                                        See items 336 and 337.
TVA Response to Follow-up NRC Request:                                                                  All equipment qualification reports (1) 04508905-QR and -1SP are applicable to the RM-1000.                                                including supplements 04508905-1SP is not applicable to the current to                                                  2SP and 3SP have frequency (I to F) converter.                                                                    been reviewed as vendor drawings for Based on a further review by General Atomics,                                                    WBN-2. Please explain the04508905-QR and -2SP reports are applicable to the                                            the reason for current to frequency (I toF) converter used for the WBN                                          applicability of one Unit 2 monitors                                                                                  report and not the other.
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010                                                        Further all TVA/Bechtel (Reference 9)                                                                                    reviews seems to be dispositioned as Code (3) This is addressed by response to RAI Question 337 in                                                4, Review not required.
TVA to NRC letter dated November 24, 2010                                                        Work may proceed.
(Reference 9)                                                                                    The applicable reports should have been (4) Responder: P. Berner GAESI                                                                          reviewed prior to dispositioning them.
(5) To expedite the commitment to submit the documents,                                                Please explain the a formal review was not performed when the                                                        apparent lack of review documents were received. The documents are in                                                    of WBN-2 applicable formal review by the Bechtel Civil group.                                                        documents. Was appropriate review (6) At the time the decision was made to not perform a                                                  guidance used?
formal review, it was believed that the documents had already been reviewed for Browns Ferry and there was                                              Further update required little risk in delaying the formal review. It was later found that only the 04508905-QR and -1SP documents                                                Provide model had been reviewed.                                                                                number/part number for the RM-1000 and I/F converter used for WBN-2.
Submit a copy of the relevant reviewed versions of the


Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    radEE311.docx                                                                                                  Open Items to be Resolved for SER Approval
Y Open Response is included in letter dated 10/29/10 Open-TVA/A102


Due 12/17/10 Pending FSAR  
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                      Y/N qualification reports.
(
319    7.5.2.3    7.5                    TVA provided System Verification Test Results 04507007-1TR          Responder: Temples                                                Y            Closed                            Closed                    RAI No. 29        TVA Letter dated S
i E
320                        I              Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY                Responder: Clark                                                  Y            Closed                            Closed                    N/A                N/A                Duplicate of item 156 321                        ( E            For the purposes of measuring reactor coolant flow for Reactor      Responder: Clark                                                  Y            Closed                            Closed                    N/A                N/A                Duplicate of OI# 157 C I a
322              7.7.1.11                  Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark                                                      Y            Closed                            Closed 323                                        WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1                                                  Y            Open                              Open-TVA Unit 1                              TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                      10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to                          Response is included in letter    Due: 12/22/10                                Enclosure 1 Item to the NRC by November 15, 2010                                      Revision 2 Change Analysis.                                                  dated 10/29/10                                                                  No. 36 EICB(Garg)
The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 B
324                      (
G
(
M              Per the NRC reviewer, the BISI calculation is not required to be                                                                      Y            Closed                            Closed a a 325                                        The Unit 2 loops in service for Unit 1 that are scheduled to be      Responder: TVA Startup Olson                                      Y            Closed                            Closed                                                          Closed to open item ?
326                                        TVA uses double-sided methodology for as-found and as-left          Responder: Webb                                                  Y            Open October 22, 2010            Open-TVA/A102                                TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR                                                                                                                                                                        10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology    Attachment 3 contains the revised FSAR section 7.1.2.1.9                      Response is included in letter    Due 12/17/10                                  Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects                      dated 10/29/10                                                                  No. 37 this change.                                                                                                    Pending FSAR Amendment 102 submittal 327                                        Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                Y                  Open                              Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                          Response Included in letter      Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-                        dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
(
328    7.5.2.3    7.5                    Provide the model number for the four containment high range        Responder: Temples                                                Y            Closed                            Closed                    RAI No. 30        TVA Letter dated S
i 329    7.6.1      7.6.7                    Section 7.6.7 of the FSAR (Amendment 100) states that, The          Responder: Clark                                                  N            Open                              Open-TVA/A102              RAI No. 1          TVA Letter dated EICB (Singh)
DMIMS-DX' audio and visual alarm capability will remain                                                                                                                                                          ML102980005        10/29/10 functional after an Operating Basis Earthquake (OBE). All of the      The title of FSAR Section 3.10 is Seismic Design of                          Response is included in letter                              10/26/2010        Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity            Category I Instrumentation and Electrical Equipment. Since                  dated 10/29/10                    Due 12/17/10                                 No. 39 during a Safe Shutdown Earthquake (SSE) and will not                  the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment.                    system, it is not included in the scope of 3.10. FSAR Section                                                  Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System                                                            Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria                                                  submittal.
system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR.                                Criteria, WB-DC-30-31, Loose Parts Monitoring System. As                                                      TVA to confirm that the identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC                                                    equipment has been Regulatory Guide Conformance, the system conforms to                                                          seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133                                                      required and that TVA identifies the seismic requirements and Note 12 does not                                                      reviewed and found the contain any exception to the Regulatory Guide seismic                                                          report acceptable.
requirements.
TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT,                                                              list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact                                                      document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will                                                        acceptance by TVA.
be added as Reference 7 to FSAR section 7.6 in amendment                                                        FSAR should reference


Amendment 102
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radEE311.docx                                                                                            Open Items to be Resolved for SER Approval


submittal EICB RAI ML102910008 Item#72 TVA Letter dated 10/29/10   Item No. 29  310 7.1 7.1.2.1.
===Response===
9.2 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF -.and other measurable uncertainties as appropriate (i.e., those present during Responder: Hilmes TVA Response:
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                Y/N 102.                                                                                                      the test document as the source document for tracking conformance.
Y Open Response is included in letter Open-TVA/A102
(
330    7.3      7.3                  Related to Item 298                                                Responder: Hilmes/Faulkner                                    Y            Closed                        Closed                  EICB RAI No.20    Item 7, TVA letter D
a r
331    7.6.1  7.6.7                  As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                                N            Open                          Open-TVA/WEC            RAI No. 8          TVA Letter dated Follow-up of OI-190.
of the DMIMS-DX system description to verify the conformance                                                                                                                                          ML102980005        10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response:                                                                                      Due 12/22/10            10/26/2010        Enclosure 1 Item and discrepancies between the FSAR and the proprietary version                                                                                                                                                          No. 40 of the system description for loose parts monitoring system            1) The source of the information is the DMIMS-DXTM                                                  Pending FSAR provided by TVA.                                                          Operations and Maintenance Manual, TS3176, Revision                                              Amendment 102 0, dated August 2010. Attachment 14 contains the                                                  submittal
: 1) FSAR, Amendment 100, page 7.6-5 states, During baseline                revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted          DXTM Loose Part Detection System Description,                                                    TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose          Revision 1. The Westinghouse DIMMS-DXTM Loose                                                    DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20        Part Detection System Description, Revision 1 will be                                            Operations Manual in kHz, where background signals from the RCS are acceptable.           added as Reference 9 to section 7.6 in FSAR                                                      the FSAR as the source Spurious alarming from control rod stepping is prevented by a        Amendment 102.                                                                                    document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.        2) The source of the information is the DMIMS-DXTM                                                  TVA to reference the seismic qualification report, Westinghouse report EQ-                                            source document for The online sensitivity of the DMIMS-DX' is such that the              QR-33-WBT, Revision 0, Seismic Evaluation of the                                                  item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib        Digital Metal Impact Monitoring System (DMIMS-DXTM)                                               response.
and impacts with a kinetic energy of 0.5 ft-lb on the inside          for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor.        revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in    Revision 1.
the system description. TVA to provide the source of the information and update the system description as needed.          3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g          Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental              Section 7.6.7, Loose Part Monitoring System (LPMS)
Conditions. Components of the loose-part detection system            System Description.
within containment should be designed and installed to perform their function following all seismic events that do not      Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating      Softline Cable (In Containment)
Basis Earthquake (OBE). Recording equipment need not                  Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains          Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate            Change Markups that reflect these changes.
by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity          4) The source of the information is Westinghouse Letter environment.                                                          WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS-                  (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional          DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the                Description, Revision 1.
DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not                  In responding to Item 4, conflicting information was mechanically impact any safety-related equipment.                    found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not              section and various Westinghouse technical consistent with the seismic qualifications described in the          documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information                    the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as            frequency response from 5 Hz to 10 Hz. Attachment 3 EICB (Singh) needed.                                                              contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the
: 3) The system description clearly describes the In-containment            sensor.
equipment and DIMMS-DX Cabinet equipment. The FSAR


Due 12/17/10 EICB RAI ML102910008 Item#73 TVA Letter dated 10/29/10  Item
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radEE311.docx                                                                                              Open Items to be Resolved for SER Approval


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments calibration-.) should be changed to present during normal operation--  (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous.
===Response===
(1) The AAF definition will be revised in FSAR Amendment 102 to read:
SE     FSAR   NRC No.                                                                     Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions       Resolution Path     RAI No. & Date       RAI Resp. Date                 Comments Sec.     Sec. POC                                                                                                                                                       Y/N should be updated to reflect the equipment locations for             Westinghouse document 1TS3182, Revision 0, Watts clarification purposes.                                              Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference
"A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for
: 4)   The information regarding frequency ranges of the sensors is        8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but              Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information.           revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the         provide the basis for the frequency response values in system description to reflect the appropriate information.          the FSAR.
 
: 5)   Please provide information as to how the in-containment         5)  In-containment component qualification for vibration as components are qualified for vibration as addressed in              addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133.                              be addressed in a future RAI response letter.
operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the
 
SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable."
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
  "A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable."
 
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR
 
Amendment 102 that reflects this change.
dated 10/29/10 Pending FSAR Amendment 102 submittal
 
No. 30 311 7.1 7.1 EICB (Garg) Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation. Please confirm that single sided calculation has not been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR.
Responder: Hilmes A statement that single-sided corrections are not used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open  Response is included in letter
 
dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR Amendment 102 submittal EICB RAI ML102910008 Item#74 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 31  312  7.0  (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2
) states that Desi g n Res p onder: A y ala Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3  (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5  (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather Y Closed Closed RAI No. 26 317 7.5.2.3 7.5  (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples Y Closed Closed RAI No. 27 TVA Letter dated 318 7.5.2.3 7.5 EICB (Sing h) TVA has provided the following documents for  RM-1000 equipment qualification:
 
Responder: Temples (i) Applicable to WBN Unit 2.
04508905-1QR is N Open  Revised response is included in Open-TVA/GA
 
Due 12/22/10 RAI No. 28 ML102980005
 
10/26/2010 TVA Letter dated 10/29/10  Item
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
 
Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
TVA Response to Follow-up NRC Request:
  (1) 04508905-QR and -1SP are applicable to the RM-1000.
04508905-1SP is not applicable to the current to frequency (I to F) converter.
Based on a further review by General Atomics, the04508905-QR and -2SP reports are applicable to the current to frequency (I toF) converter used for the WBN Unit 2 monitors (2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 9)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 9)
(4) Responder: P. Berner GAESI (5) To expedite the commitment to submit the documents, a formal review was not performed when the documents were received. The documents are in formal review by the Bechtel Civil group. 
(6) At the time the decision was made to not perform a formal review, it was believed that the documents had already been reviewed for Browns Ferry and there was little risk in delaying the formal review. It was later found that only the 04508905-QR and -1SP documents had been reviewed.
letter dated 12/22/10.
Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter dated 10/29/10 Response update required. It is clear that 04508903-2SP and -
 
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF
 
converter is not clear.
Check pa g e numbers of Appendix F (missing/duplicate pages). Check applicability of
 
Appendix C to RM1000
 
instead of RM2300? See items 336 and 337.
 
All equipment qualification reports including supplements 2SP and 3SP have
 
been reviewed as
 
vendor drawings for
 
WBN-2. Please explain the reason for applicability of one report and not the
 
other. Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.
Work may proceed."
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was 
 
appropriate review guidance used?
Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. Submit a copy of the relevant reviewed versions of the No. 34 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments qualification reports.
319 7.5.2.3 7.5  (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples Y Closed Closed RAI No. 29 TVA Letter dated 320  E I Per Westin g house letter WBT-D-2340
, TENNESSEE VALLEY Res p onder: Clark Y Closed Closed N/A N/A Du plicate of item 156 321  E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark Y Closed Closed N/A N/A Du plicate of OI# 157 322  7.7.1.11  (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark Y Closed Closed    323  EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
Y Open Response is included in letter dated 10/29/10
 
The staff is confused with the response since both units have reference leg  not insulated Rev 2 should apply to Unit 1 also
 
and there should be no
 
difference between Unit 1 and 2 Open-TVA Unit 1 
 
Due: 12/22/10 TVA Letter dated 10/29/10  Item No. 36  324  (M aPer the NRC reviewer
, the BISI calculation is not re q uired to be Y Closed Closed    325  B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson Y Closed Closed  Closed to o p en item ? 326  EICB(Garg)
TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open October 22, 2010
 
Response is included in letter
 
dated 10/29/10 Open-TVA/A102 
 
Due 12/17/10
 
Pending FSAR Amendment 102
 
submittal  TVA Letter dated 10/29/10  Item
 
No. 37  327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January
 
31, 2011.
Responder: Webber In accordance with correspondence from Foxboro, there is
 
no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
Y Open  Response Included in letter
 
dated 11/24/10 Open-NRC Review Due 11/24/10    328 7.5.2.3 7.5  (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7 EICB (Singh) Section 7.6.7 of the FSAR (Amendment 100) states that, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment."
 
TVA to clarif y the seismic qualification of the loose parts monitorin g system and include the appropriate information in Table 3.10 (or another suitable section) of the FSAR.
Responder: Clark
 
The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section
 
7.6.7, "Loose Parts Monitoring System (LPMS) System Description," identifies basic system seismic design criteria which are consistent with the requirements of TVA Design
 
Criteria, WB-DC-30-31, Loose Parts Monitoring System. As identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not
 
contain any exception to the Regulatory Guide seismic requirements. 
 
The Westinghouse LPMS seis mic report, EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX TM) for Watts Bar Unit 2, will be added as Reference 7 to FSAR section 7.6 in amendment N Open Response is included in letter dated 10/29/10 Open-TVA/A102
 
Due 12/17/10
 
Pending FSAR
 
Amendment 102 submittal.
 
TVA to confirm that the equipment has been seismically qualified as required and that TVA
 
reviewed and found the
 
report acceptable.
TVA response does not list the seismic test document and its acceptance by TVA.
FSAR should reference RAI No. 1 ML102980005
 
10/26/2010 TVA Letter dated 10/29/10  Item No. 39 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 102. the test document as the source document for tracking conformance.
330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7 EICB (Singh)
As a follow up of OI 190, Staff has reviewed the proprietar y version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies and discrepancies between the FSAR and the proprietary version of the system description for loose parts monitoring system
 
provided by TVA.
: 1) FSAR, Amendment 100, page 7.6-5 states, "During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20 kHz, where background si gnals from the RCS are acceptable.
Spurious alarming from control rod stepping is prevented by a
 
module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.
The online sensitivity of the DMIMS-DX&#x17d; is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic energy of 0.5 ft-lb on the inside surface of the RCS pressure boundary within 3 ft of a sensor."
The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, "Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional. The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity environment.
FSAR, Amendment 100, page 7.6-5 states, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment." 
 
Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as
 
needed.
: 3) The system description clearly describes the "In-containment equipment" and "DIMMS-DX Cabinet equipment. The FSAR Responder: WEC/Harless/Clark TVA Partial Response: 
: 1) The source of the information is the DMIMS-DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1. The Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1 will be added as Reference 9 to section 7.6 in FSAR Amendment 102.
: 2) The source of the information is the DMIMS-DXTM seismic qualification repor t, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM
) for Watts Bar Unit 2. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1. 
: 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in  for draft revision to WBN Unit 2 FSAR Section 7.6.7, "Loose Part Monitoring System (LPMS) System Description."
Sensors (In Containment)
Softline Cable (In Containment)
Preamplifier (In Containment)
Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect these changes. 
: 4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents. To fully respond to this item, a change to the FSAR is required to chan ge the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the sensor. N Open Open-TVA/WEC Due 12/22/10
 
Pending FSAR
 
Amendment 102 submittal
 
TVA to reference the DMIMS-DXTM Operations Manual in the FSAR as the source document TVA to reference the source document for item# 4 per the
 
response. RAI No. 8 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item No. 40 Follow-up of OI-190.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments should be updated to reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.  
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133. Westinghouse document 1TS3182, Revision 0, Watts Bar Unit 2 DMIMS-DXTM System Validation Data Packa ge, dated Jul y 2010 has been added as reference 8 to FSAR Section 7.6 in amendment 102. Per Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz minimum frequency and provide the basis for the frequency response values in the FSAR. 5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.
TVA Final Partial Response:
TVA Final Partial Response:
Items 1) through 4) were addressed in the partial response provided in TVA to NRC letter dated October 29, 2010.
Items 1) through 4) were addressed in the partial response provided in TVA to NRC letter dated October 29, 2010. Item 5 is addressed as follows:
Item 5 is addressed as follows:
WEC to provide
WEC to provide 332 7.5.2.1 7.5.1 (M a 10/26/2010 Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.1 7.5.1 (M a 10/27/2010 Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.
( (                                                                                                                                                    Y 332   7.5.2.1   7.5.1   M M               10/26/2010                                                                                                                                       Closed                       Closed               ML103000105 Item TBD                   EICB RAI ML103000105 sent to DORL a a 333   7.5.2.1   7.5.1                     10/27/2010                                                                                                                           Y           Closed                       Closed               ML103000105 Item TBD                   EICB RAI ML103000105 sent to DORL 334     7       7                       FSAR Figure 7A-3 Mechanical Flow and Control Diagram             Responder: Stockton                                                Y            Open                          Open-TVA/A102        RAI not required. N/A              RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves.                                                                                                                                                                            not part of any SE section.
Please correct this in a future FSAR amendment.
EICB (Darbali)
Responder: Stockton Y Open Figure will be corrected in FSAR  
Please correct this in a future FSAR amendment.                                                                                                   Figure will be corrected in FSAR Due 12/17/10 Amendment 102.
 
Pending FSAR Amendment 102 submittal.
Amendment 102.
335   7.6.1     7.6.7                     LPMS: Reference to OI-331, sub item 2.                               Responder: WEC                                                  N            Open                          Open-TVA/WEC EICB (Singh)
Open-TVA/A102 
Provide analysis, test, or combined analysis and test for normal WEC to provide                                                                                                Due 12/22/10 operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
 
(
Due 12/17/10  
336   7.5.2.3   7.5                     Re: RM-1000 Report 04508905-QR                                       Responder: GA                                                   Y           Closed                       Closed S
 
i
Pending FSAR Amendment 102 submittal. RAI not required. N/A RAI not required because the figure is not part of any SE section.
(
335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
337   7.5.2.3   7.5                     Re: RM-1000 Report 04508905-QR                                       Responder: GA                                                   Y           Closed                       Closed S
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
i 338   7.5.2.3   7.5                     In page 3-15 and appendix B of Qualification Test Report           Responder: Civil EQB                                              N            Open                          Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown                                                                                          Due: 12/22/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).
Responder: WEC WEC to provide N Open Open-TVA/WEC Due 12/22/10   336 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA Y Closed Closed    337 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA Y Closed Closed    338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
Responder: Civil EQB Get date from Bob Brown N Open Open-TVA/Bechtel Due: 12/22/10   339 7.5.2.3 7.5 CB (Si n gIn the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Responder: Bob Brown N Open Open-TVA/Bechtel  
339   7.5.2.3   7.5   CB (Si               In the Qualification Test Report 04508905-QR, the licensee           Responder: Bob Brown                                           N           Open                         Open-TVA/Bechtel ng                provided only eight Safe Shutdown Earthquake (SSE) Test


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               radEE311.docx                                                                                     Open Items to be Resolved for SER Approval
Due: 12/22/10 340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA (1) The EMI/RFI test described in Table 3-2 are based on GA-ESI report 04509050 and only summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050. Subsequent to the writing of GA-ESI report 0458905-QR additional EMC testing was conducted to TVA specific requirements. The results of that testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and is the report used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274).
(2) ENV 50140, EN 55011, and EN 55022 are British Standards Institution publications concernin g equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test 
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement 
: c. EN 55022- Information technology equipment -
Radio disturbance characteristics - Limits and methods of measurement N Open  Response included in letter dated 12/22/10. Open-TVA/GA


Due:12/22/10    341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables.
===Response===
Open-TVA Open-TVA   342 7.5.2.3 7.5 EICB (Singh) Please confirm that RM-1000 monitors and the associated equipment is supplied power from redundant battery backed class 1E power sources.
SE      FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path  RAI No. & Date  RAI Resp. Date      Comments Sec.      Sec. POC                                                                                                                                                  Y/N Response Spectra (TRS) as mentioned in the previous open item                                                                                                                Due: 12/22/10 (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
Open-TVA Open-TVA   343 7.5.2.3 7.5 EICB (Singh) Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 show Required Response Spectra (RRS) to be greater than 20 g's. The Test Response Spectra (TRS) in Figures 4-11 and 4-12 appears to be limited to about 15 g maximum. Please explain this apparent lack of consistency between the RRS and the TRS. Will this document be revised to take care of this inconsistency?
340   7.5.2.3   7.5                   Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                                              N            Open                          Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents (1) The EMI/RFI test described in Table 3-2 are based on                      Response included in letter  Due:12/22/10 used as the source for ENV 50140, ENV 55011 Class A, and EN                GA-ESI report 04509050 and only summarized in GA-                    dated 12/22/10.
Open-TVA Open-TVA}}
55022 Class B.                                                            ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
Subsequent to the writing of GA-ESI report 0458905-QR additional EMC testing was conducted to TVA specific requirements. The results of that testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and is the report used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation EICB (Singh)
Monitors (2-RE-90-271 through -274).
(2) ENV 50140, EN 55011, and EN 55022 are British Standards Institution publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: b. EN 55011 - Industrial, scientific and medical equipment  Radio-frequency disturbance characteristics  Limits and methods of measurement
: c. EN 55022- Information technology equipment Radio disturbance characteristics  Limits and methods of measurement 341    7.5.2.3    7.5                  FSAR Tables 3.10 list seismically qualified equipment. However,                                                                                 Open-TVA                      Open-TVA EICB (Singh) these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables.
342   7.5.2.3   7.5                   Please confirm that RM-1000 monitors and the associated                                                                                         Open-TVA                      Open-TVA EICB (Singh) equipment is supplied power from redundant battery backed class 1E power sources.
343   7.5.2.3   7.5                   Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3                                                                                       Open-TVA                      Open-TVA show Required Response Spectra (RRS) to be greater than 20 EICB (Singh) gs. The Test Response Spectra (TRS) in Figures 4-11 and 4-12 appears to be limited to about 15 g maximum. Please explain this apparent lack of consistency between the RRS and the TRS. Will this document be revised to take care of this inconsistency?}}

Latest revision as of 11:20, 6 December 2019

OL - FW: 20101203 Open Item List Mastertva Update 12-14-10r2.docx
ML110070330
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/20/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML110070330 (43)


Text

WBN2Public Resource From: Poole, Justin Sent: Monday, December 20, 2010 4:31 PM To: Crouch, William D Cc: Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource

Subject:

FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Attachments: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)4152048 email: Justin.Poole@nrc.gov From: Singh, Gursharan Sent: Monday, December 20, 2010 2:48 PM To: Poole, Justin Cc: Garg, Hukam; Carte, Norbert; Darbali, Samir; Singh, Gursharan; Marcus, Barry; Stattel, Richard

Subject:

20101203 Open Item List MasterTVA Update 12-14-10r2.docx

Justin, Attached file is ready for sending to TVA. I have updated item 343 as discussed in the meeting.

Gush 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 230 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7A6D25B243)

Subject:

FW: 20101203 Open Item List MasterTVA Update 12-14-10r2.docx Sent Date: 12/20/2010 4:31:27 PM Received Date: 12/20/2010 4:31:33 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Clark, Mark Steven" <msclark0@tva.gov>

Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 543 12/20/2010 4:31:33 PM 20101203 Open Item List MasterTVA Update 12-14-10r2.docx 422159 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B (

001 All All A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

002 All All A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

003 All All A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains

( B 004 All All Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.1 By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb Y Closed Closed EICB RAI TVA Letter dated D

( ( ( (

006 Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2 Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 a ( The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3 G G G G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 Y Closed Closed EICB RAI TVA Letter dated r A 009 7.3.2 5.6, Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 Y Closed Closed EICB RAI 3/12/10,

(

010 7.3 7.3 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 Y Closed Closed EICB RAI 3/12/10, D

a r

(

011 7.3.2 5.6, NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 Y Closed Closed EICB RAI ML101680598, D

a r

(

012 7.4 7.4 ( D The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 Y Closed Closed EICB RAI TVA Letter dated G a r

013 7.1.3.1 Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All ( B Provide the justification for any hardware and software changes Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 015 D ( Verify that the refurbishment of the power range nuclear Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated

(

016 a C ( Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated G

r a A 017 7.3.1 7.3.1, Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated

(

018 Identify any changes made to any instrumentation and control Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 019 Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 020 ( D Provide environmental qualification information pursuant to Section Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3 ( ( ( ( ( For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be C a G G G G G 022 7.3.2 5.6, Verify the auxiliary feedwater control refurbishment results in a Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated a r 023 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024 Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address

( ( ( ( ( (

025 7.5.2 7.5.1 For the containment radiation high radiation monitor, verify that the Date: 4/27/10 Y Closed Closed NRC Meeting ML101230248, 026 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

( ( ( (

027 7.7.1.4 For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 028 For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen Y Closed Closed NRC Meeting TVA Letter dated C C C C C S 029 For the rod control system, verify that the refurbishment results in a Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated G G G G 030 Regarding the refurbishment of I&C equipment, identify any Responder: Clark Y Closed Closed NRC Meeting TVA Letter dated 031 For the rod position indication system (CERPI), provide information Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

a a a a a i 032 For the process computer, need to consider cyber security issues Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033 For the loose parts monitoring system, provide information Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034 2/4/2010 Responder: TVA Y Closed Closed N/A TVA Letter dated 034.1 ( Chapter 7.1 - Introduction Y Close Closed N/A N/A

( a 034.2 D Chapter 7.2 - Reactor Trip System Y Close Closed N/A N/A M ( r 034.3 7.3 7.3 a Chapter 7.3 - ESFAS Y Closed Closed N/A N/A a G g r

034.4 7.5.1.1 7.5.2 Chapter 7.5 - Instrumentation Systems Important to Safety Y Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 Chapter 7.6 - All Other Systems Required for Safety Y Closed Closed N/A N/A Closed r

c u

034.6 Chapter 7.7 Control Systems Y Closed Closed N/A N/A n

g h

/

035 ( 2/18/2010 Responder: Clark Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design

( (

M 036 7.5.2 7.5.1 C S February 18, 2010 Date: 5/25/10 Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post a

a i 037 7.5.1.1 7.5.2 2/18/2010 Responder: Clark Date: 5/25/10 Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 038 7.5.1.1 7.5.2 ( 2/18/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 ( ( M January 13, 2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the G G a 040 January 13, 2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041 7.5.2 7.5.1 2/19/2010 Responder: WEC N Open Open-NRC Review NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Final Response included in Due: Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. letter dated 12/3/10 (3) 12/3/10 ML093560019, Item TVA Letter dated Specification" (4) 12/10/10 No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing Specification" Technical Report. Due 12/3/10 Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" letter dated 10/5/10. information indentified Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a The SysRS and SRS in ISG6.

to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the incorporate requirements from SPM: NRC disapproved WNA-PT-00058-GEN during the original many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 reference.

Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance NNC 8/25/10: (3) An earlier Procedure" table in the Licensing Technical Report revision 1 supersede version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10 docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19 contains the Westinghouse should be no problem to docket document Post-Accident Monitoring System (PAMS) this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision ML091560352, the testing 2, dated December 2010. Attachment 20 contains the process document does not Westinghouse Application for Withholding for the Post- address the test plan Accident Monitoring System (PAMS) Licensing Technical requirements of the SPM.

Report, WNA-LI-00058-WBT, Revision 2, dated December Please provide a test plan that 2010. implements the requirements of the SPM.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

B (

042 All All A February 25, 2010: Telecom Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to The PAMS ISG6 compliance matrix supplied as Enclosure 1 Revised response included in Due 12/1/10 Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the letter dated 12/22/10. TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed. 5/12/10 expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a By letter dated April 8, 2010 TVA provided the PAMS Response is included in letter TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not Licensing Technical Report provided additional information. dated 10/5/10. 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that Attachment 3 contains the revised Common Q PAMS ISG-6 Revised compliance matrix is TVA Letter dated NNC 11/23/10: WNA-LI-00058-WT-P TVA should identified what they believe was previously reviewed Compliance Matrix, dated June 11, 2010, that addresses unacceptable. 10/5/10 Rev. 1 Section 7 does not include the and approved. these items (Reference 13). RSED documents, and it should. Table NNC 8/12/10: It is not quite 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA enough to provide all of the RSED RTMs.

but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 documents requested. There SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as Compliance Matrix." are two possible routes to being SRP acceptance criteria for PAMS. review that the NRC can

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N It is TVAs understanding that this comment is focused on undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the TVA response that was noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS originally pursued was to follow CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from ISG6, but some of the Watts Bar Unit 2. Westinghouse, TVA has agreed to provide those to NRC. compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will addressed by referencing the NRC then concluded that TVA should go through and provide a be available for audit as stated above. Requirements SPM. The NRC approved the more complete and thorough compliance matrix. Traceability Matrix issues will be tracked under NRC RAI CQ TR and associated SPM; it Matrix Items 142 (Software Requirements Specification) and may be more appropriate to 145 (System Design Specification). Commercial Item review the WBN2 PAMS Dedication issues will be tracked under NRC RAI Matrix application to for adherence to Item 138. This item is considered closed. the SPM that to ISG6. In either path chosen, the applicant WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring should provide documents and a System (PAMS) Licensing Technical Report submitted in justification for the acceptability TVA Letter to NRC dated December 3, 2010, Watts Bar of any deviation from the path Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls chosen. For example, it Staff Information Requests, (Reference 1) contains the appears that the following changes to address the NRC requests: Westinghouse's CDIs are commercial grade dedication (1) While RSEDs are not specifically mentioned, Section 7 plans, but Westinghouse has been revised to be applicable to both hardware and maintains that they are software which includes the RSEDs. commercial grade dedication (2) Table 6-1 item 15 reference added for WNA-VR-00280- reports; this apparent deviation WBT (RESD) should be justified or explained.

( ( ( ( ( (

044 7.5.2 7.5.1 February 25, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 045 February 25, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated C C C C C C 046 February 25, 2010 Date: 5/25/10 Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated a a a a a a 048 7.5.2 7.5.1 April 8, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)

ML102910002 6/18/10 several Reference 8, however, How should the "shall" statements outside of the bracketed These sections are descriptive text and not requirements. Revised response included in Due12/22/10 Item No. 8 Reference 8 has been deleted.

requirements in Common Q requirements documents be The next revision of the Watts Bar Unit 2 PAMS System letter dated 12/22/10. Discuss at 11/22 phone TVA Letter dated interpreted? Requirements Specification will remove shall from the call. 10/29/10 wording in those sections. A date for completing the next Enclosure 1 Item revision of the System Requirements Specification will be TVA response is inconsistent This will be corrected in No. 1 provided no later than August 31, 2010. (e.g., WNA-DS-01667-WBT the Revision 3 Rev. 1 page 1-1, Section 1.3.1 document due to TVA The System Requirements Specification will be revised by implies that "SysRS Section 12/10/10 September 30, 2010 and submitted within two of receipt from ###" has requirements. See Westinghouse. also SDS4.4.2.1-1 on page 4-32).

TVA Revised Response Is there a requirement on the Shall statements within the scope of the System shall referenced above??

Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The Response is provided in letter statements were either relocated to the numbered dated 10/29/10.

requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10). 1 Item No. 1 is Acceptable

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N TVA Response to Follow-up NRC Request: NNC 11/18/10: Revised Response is not a statement of This item is corrected in the revision 3 requirements fact. SysRS Rev. 2 (i.e., WNA-documents. DS-01617-WBT Rev. 2) contains many shalls that are Attachment Error! Reference source not found. contains not within numbered the proprietary version of WNA-DS-01617-WBT-P, Revision requirements sections, for 3, Post Accident Monitoring System- System Requirements example:

Specification, dated November 2010. Attachment 2 (1) Page 2-1, Section 2.3.1 -

contains the non-proprietary version of WNA-DS-01617- See guidance statement WBT-P, Revision 3, Post Accident Monitoring System - (2) Page 2-10, top of page 1 -

System Requirements Specification, dated December 2010. See guidance statement Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification (Proprietary)

Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010. Attachment 5 contains the non-proprietary version of WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (Proprietary)

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010. Attachment 8 contains the non-proprietary version of WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System (Proprietary)

(

051 G April 15, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Review addressed by another Open

(

052 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 12 S

i

(

053 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 13 S

i

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 Y Closed Closed RAI No. 14 TVA Letter dated S

i

(

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 Y Closed Closed RAI No. 15 TVA Letter dated S

i

(

056 April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring S

i

(

057 7.5.2 7.5.1 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 Y Closed Closed RAI No. 17 TVA Letter dated S

i

(

058 7.5.0 7.5 April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 18 TVA Letter dated S

i 059 7.5.2 7.5.1 ( ( April 19, 2010 Date: Y Closed Closed RAI No. 19 TVA Letter dated C S a i 060 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 47

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( ( ( (

061 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 49 C C C C C C 063 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 Y Closed Closed N/A - No question TVA Letter dated a a a a a a 065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated 067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question TVA Letter dated EICB (Carte) date for the "Commercial Grade Dedication Instructions for AI687, was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

This item is addressed in Rev. 2

a. AI687, AI688 - Scheduled for September 28, 2010 of the Licensing Technical Report
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following change to address the NRC request:

Section 7, Commercial Grade Dedication Process, has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

a. AI687, AI688 - Scheduled for September 28, 2010 This item is addressed in Rev. 2 of the Licensing Technical
b. Upgraded PC node box - Per Westinghouse letter WBT- Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see the response to Request for Additional Information (RAI) item 3 in the 12/22 letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for review/audit as described below:

(1) AI687, AI688, the following documents were submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN)

Unit 2 - Instrumentation and Controls Staff Information Requests, dated October 26, 2010 (Reference 6:

a. Common Q PAMS Comparison of Tested Conditions for the AI687 and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements (EQ-EV-62-WBT, Revision 0), dated September 10, 2010
b. Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS (EQLR-171, Revision 0), dated September 10, 2010
c. Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS), CN-EQT-10-44, Revision 0, dated September 28, 2010 (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024, NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:
a. Next Generation PC Node Box Commercial Dedication Instruction, CDI-3722, Revision 7
b. PC Node BoxlFlat Panel Display System Components Qualification Summary LTR-EQ 50 (3) Flat panel displays - Per Westinghouse letter WBT-D-2024, NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 9, 2010 (Reference 7 ), the following documents are available for audit at the Westinghouse Rockville office:
a. Next Generation Flat Panel Display (FPD)

Commercial Dedication Instruction CDI-3803, Revision 8

b. PC Node BoxlFlat Panel Display System Components Qualification Summary LTR-EQ 50 (4) Power supplies - Per Westinghouse letter WBT-D-2035 NRC Access to Common Q Documents at the Westinghouse Rockville Office dated June 11, 2010 (Reference 8 ), the following documents are available for audit at the Westinghouse Rockville office:
a. Commercial Dedication Instruction, CDI- 4057, Revision 4

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

b. Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter, EQ-TP-1 05-GEN, Revision 0
c. Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 &

4 Circuit Breakers, EQ-TP-114-GEN, Revision 0

d. Environmental Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, and Line Filter Assemblies, EQ-TP-117-GEN, Revision 0 069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for the "Watts Bar 2 PAMS Specific FAT Report" was October was asked. Item (Carte) 2010. Awaiting for document to be Due 2/18/11 was opened to track docketed by TVA. comm8ittment made by applicant.

070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-NRC Review N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was was asked. Item 6/18/10 open item does not agree with the due March 31, 2010. Per Westinghouse letter WBT-D-1961, this document is Final Response included in Due 12/17/10 was opened to track dated in Open Item No. 71.

available for audit at the Westinghouse Rockville office. letter dated 12/3/10 comm8ittment TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter Partial Response is included in to the NRC dated August 20, 2010. letter dated 10/5/10. TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements Regulations require that the Traceability Matrix and did not summarize anomalies. At the NRC review be based on September 15th public meeting, Westinghouse agreed to docketed material. Awaiting for include the Concept and Definitions Phase Requirements document to be docketed by Traceability Matrix (RTM) in the next IV&V report along with TVA.

partial Design Phase updates to the RTM.

NNC 8/25/10: Requirements TVA Revised Response: Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated 8/20/10.

letter dated August 20, 2010 (Reference 6). NNC 11/23/10: The The next Independent Verification and Validation (IV&V) requirements Phase SVVR report will include the Design provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase not complete. This report IV&V Report will be submitted should address the RTM, which to NRC by February 11, 2011. it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document in the next revision.

Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-NRC Review N/A - No question N/A NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and was asked. Item open item does not agree with the due Implementation phases was July 30, 2010. Attachment 16 contains the Westinghouse document IV&V Response included in letter Due 12/10/10 was opened to track dated in Open Item No. 70.

Summary Report for the Post Accident Monitoring System, dated 12/3/10 commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010. by applicant.

Attachment 17 contains the Westinghouse Application for Awaiting for document to be withholding for the IV&V Summary Report for the Post docketed by TVA.

Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.

(

072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question N/A C

a 073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration was asked. Item phase was October 29, 2010. IV&V Summary Report for the Post Accident Monitoring Response included in letter Due 12/22/10 was opened to track System, WNA-VR-00283-WBT, Revision 3, covers the dated 12/22/10 commitment made Integration phase. Attachment 10 contains the proprietary by applicant.

version of IV&V Summary Report for the Post Accident Awaiting for document to be Monitoring System, WNA-VR-00283-WBT, Revision 3, docketed by TVA.

dated December 2010. Attachment 11contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 10, 2010.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for the Post FAT IV&V Phase Summary Report was was asked. Item (Carte) November 30, 2010. TVA to provide due date. Due 2/21/11 was opened to track commitment made by applicant.

075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-NRC Review N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was was asked. Item September 30, 2010. Attachment 12 contains the Westinghouse document Response included in letter Due 12/3/10 was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion dated 12/3/10 commitment made Program I&C Projects, Post Accident Monitoring System by applicant.

Channel Integration Test/Factory Acceptance Test, WNA- Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010. docketed by TVA.

Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.

076 7.5.2 7.5.1 ( ( By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1 ( ( By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated C C 078 G G 4/26/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated a a 079 4/26/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154

(

080 4/26/2010 Responder: WEC Y Closed Closed RAI No. 2 TVA Letter dated S

i

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102910002 6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There Due 12/22/10 Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and Q application (e.g. WBN2 requested information.

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q PAMS):

(2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved (a) Common Q platform (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the (b) Application Development (a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. (c) Application Specific - current (a) IEEE 344-1987 vs. -2004 regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. and associated appendices (6) RG 1.168 - September 1997 vs. February 2004 primarily addressed (a) and (b).

(a) IEEE 1012-1986 vs. -1998 The Common Q SER states:

(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 Monitoring Systems, provides endorses 323-1974) the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review," conceptual design approach for states: "Design features and administrative programs that are upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the based on Common Q current staff positions." Please identify all differences between the components (page 58, Section versions referenced and the current staff positions. Please provide 4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these basis of the above review, the differences. staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 6/18/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

EICB (Carte)

ML102910002 7/30/10 41, Item No. 3.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary Revised response included in Due 12/3/10 Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software Qualification Report Of Hardware Testing For Common Q letter dated 12/22/10 changes to the Common Q PAMS previously reviewed by the Applications, 00000-ICE-37764, Rev 3 and Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not TWICE Qualification Status Report, WNAQR-00011-SSP Regulations require that the Dedication to be contain activities that address qualification of all changes Per Westinghouse letter WBT-D-2024, (Reference __) dated NRC review be based on addressed in LTR Rev.

specifically: June 9, 2010, these documents are available for audit at the docketed material. Awaiting for 2, Westinghouse Rockville Office. document to be docketed by 2.c - CI527 AF100 Peripheral Component Interconnect (PCI) TVA.

interface card TVA provided information by letter dated July 30, 2010

3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary (ML102160349) - See Enclosure 1 Item No. 7. NNC 8/9/10: per telephone Product Maintenance/Improvements) conversation on 8/5/10, it is not 4.a - PM646A Processor Module Revision 1 of the Licensing Technical Report provides clear how Westinghouse 4.b - CI631 AF100 Communication Interface Module additional detail on the platform specific to WBN2 and Commercial Grade Dedication 4.e - DO620 Digital Output Card references to the evaluation documentation. Plans and Reports for Digital I&C. Westinghouse agree to Please provide sufficient detail regarding the changes for the NRC TVA Response to Follow-up NRC Request: present to the NRC in a public to independently evaluate the acceptability of the changes. meeting on August 17, 2010, Please see the response to Request for Additional and explanation of how their Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix system addresses regulatory Item 067. criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

083 7.5.2 7.5.1 ( ( May 6, 2010 Date: 6/18/10 Y Closed Closed EICB RAI TVA Letter dated C C 084 7.5.2 7.5.1 a a May 6, 2010 Date: 6/18/10 Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1 5/6/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102910002 Please provide a detailed description of the PAMS MTP data link Is the WEC ISG4 evaluation inadequate? Revised response included in Due 12/3/10 Item No. 13 to the plant computer. This description should identify all letter dated 12/22/10 equipment (model & version) and describe the functions that each Operation of the MTP as a barrier device. MTP Fails as a Hardware is in Rev. 1 piece of equipment performs. This description should be of barrier device. Describe what prevents a MTP failure from A response will be provided by of the Licensing sufficient detail for the NRC to independently evaluate the propagating to the AC160? 10/31/10 Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. 10/22.

Node loss on the bus? Bus loss? NNC 8/11/10: Design information should be available NNC 8/25/10:

Revise the ISG4 section of the Licensing Technical Report now. By letter dated July 30, Disagree with path

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (Rev. 2) to provide a more detailed description of the MTP as 2010 (ML102160349) TVA forward input by TVA a barrier device. stated that the MTP was above. An explanation connected to a Red Hat Linux is about the design is TVA Response to Follow-up NRC Request: Server (see Enclosure 1, Item needed.

No. 14 part b.). It is presumed WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring that this server is not safety- FAT test procedure to System (PAMS) Licensing Technical Report submitted in related. IEEE 603-1991 Clause include data storm TVA Letter to NRC dated December 3, 2010, Watts Bar 5.6.3(1) states, "Isolation testing of the MTP Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls devices used to affect a safety interface Staff Information Requests, (Reference Error! Reference system boundary shall be source not found.) contains the following changes to classified as part of the safety NNC 11/18/10: WEC address the NRC requests: system." response states that CQ PAMS LTR Rev. 2 Section 2.2, System Description page 2-3 provides a Please describe how the MTP will contain relevant description of the MTP Fiber-Optic (FO) data link to the plant serves as the isolation device. information.

computer. Section 2.2.1.4, Hardware has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, Software has been expanded to include a table detailing all software changes that have occurred since the initial submittal.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102910002 6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI Due 12/22/10 Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the 81.

Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC several regulatory documents, for example: approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185) accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the states: "Design features and administrative programs that are SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the comparison review.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of differences. ISG4

(

087 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 Y Closed Closed RAI No. 20 TVA Letter dated S

i 088 7.5.2 7.5.1 ( May 6, 2010 Date: 5/24/10 Y Closed Closed RAI No. 21 TVA Letter dated 089 D ( ( ( 5/6/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090 a C C S 5/6/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated r a a i 091 7.4 7.4 May 20, 2010 Date: 5/25/10 Y Closed Closed EICB RAI No.1 TVA Letter dated 092 5/20/2010 Responder: Hilmes Y Open Open-TVA Continuous review as items are added DORL (Poole) TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due: SER Issue are proprietary. document as a communications tool.

093 ( May 20, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Will be reviewed under item 154 D ( (

094 a 5/20/2010 Responder: Clark Date: 5/25/10 Y Closed Closed N/A N/A Information was found in FSAR r G G 095 7.8.1, XX May 20, 2010 Date: Y Closed Closed EICB RAI No. 2 TVA Letter dated

(

096 7.7.5 XX 5/20/2010 Responder: Y Closed Closed EICB RAI No.3 TVA Letter dated D

a r

(

097 7.4.2 7.4 May 20, 2010 Date: Y Closed Closed EICB RAI No.4 TVA Letter dated D

a r

(

098 7.4.2 7.4 May 25, 2010 Date: Y Closed Closed EICB RAI No.5 TVA Letter dated D

a r

099 ( (

B April 12, 2010 Date: Y Closed Closed Closed to Item 129 C a a

100 5/20/2010 Responder: WEC Y Closed Closed N/A - No question N/A

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 101 4/12/2010 Responder: Slifer Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the dated 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR

(

102 D ( May 24, 2010 Date: 5/24/10 Y Closed Closed N/A TVA Letter dated Request for schedule not information.

a C r a 103 7.4 7.4 5/27/2010 Responder: Ayala Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

(

104 7.4 7.4 ( D 5/27/2010 Responder: Merten Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current G a r

105 April 29, 2010 Date: Y Closed Closed N/A N/A Will be reviewed under item 154.

106 May 6, 2010 Date: 5/25/10 Y Closed Closed RAI No. 9 TVA Letter dated

(

S i

107 May 6, 2010 Date: 5/28/10 Y Closed Closed RAI No. 22 TVA Letter dated

(

108 May 6, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Will be reviewed under OI#154 109.a 7.8 XX 5/6/2010 Responder: N/A Y Closed Closed N/A N/A

( ( ( D (

109.b 5/6/2010 Responder: N/A Y Closed Closed N/A N/A Duplicate of another open Item.

( ( ( ( ( (

110 May 6, 2010 Date: Y Closed Closed N/A N/A Information was found.

111 May 6, 2010 Date: 5/28/10 Y Closed Closed N/A TVA Letter dated Request to help find, not a request for C C C a S 112 June 1, 2010 Date: Y Closed Closed N/A N/A Information was received G G G G G G 113 6/1/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated a a a r i 114 7.2 7.2 6/1/2010 Responder: WEC Y Close Closed EICB RAI TVA Letter dated 115 2/25/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated 116 6/3/2010 Responder: WEC Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1 6/3/2010 Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip Revised response is included in Pending FSAR Item#21 Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7) (RPS) and Engineered Safety Features Actuation System letter dated 10/29/10 Amendment 102 No. 7 (ESFAS)) setpoint values are monitored by periodic submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double- Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR TVA needs to address amendment 100. that trip setpoint and allowable value TVA Revised Response: uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double reduction factor for the sided correction factors. Attachment 3 contains the revised single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR factor. TVA response Amendment 102 that reflects this change. not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.

(

118 7.4 7.4 6/8/2010 Responder: Merten Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current D

a r

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 119 ( June 10, 2010 Date: Y Closed Closed RAI No. 23 TVA Letter dated 120 5/6/2010 Responder: Hilmes/Merten/Costley Y Closed Closed EICB RAI TVA Letter dated D ( ( ( (

121 5/6/2010 Responder: Webb/Webber Y Closed Closed EICB RAI TVA Letter dated a C C C S 122 June 14, 2010 Date: Y Closed Closed N/A - Request for N/A r a a a i 123 7.7.3 7.4.1, 6/14/2010 Responder: Y Closed Closed ML101720589, TVA Letter dated

(

124 7.7.5 XX 6/14/2010 Responder: Y Closed Closed ML101720589, Item TVA Letter dated D

a r

(

125 7.7.8 7.7.1.12 6/14/2010 Responder: Y Closed Closed ML101720589, Item TVA Letter dated D

a r

126 7.8 7.8 ( June 14, 2010 Date: Y Closed Closed ML101720589, Item TVA Letter dated

( ( D 127 7.2 7.2 a 6/16/2010 Responder: WEC/Clark Y Closed Closed EICB RAI TVA Letter dated G G r 128 7.2 7.2 6/18/2010 Responder: WEC Drake /TVA Craig Y Closed Closed EICB RAI TVA Letter dated Track through SE open item

(

129 6/12/2010 Responder: WEC Y Closed Closed N/A TVA Letter dated P

o

(

130 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated P

o

(

131 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated P

o

(

132 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated P

o

(

133 6/28/2010 Responder: Clark Y Closed Closed TVA Letter dated P

o 134 ( ( 6/28/2010 Responder: Clark Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 ( D D ( 6/30/2010 Responder: Clark Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,C a a P 6/30/2010 Responder: Clark Y Closed Closed RAI not necessary TVA Letter dated a r r o 137 Several WBN2 PAMS documents contain a table titled, Document Responder: WEC Y Closed Closed ML101650255, Item TVA Letter dated 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC N Open Open-TVA/WEC ML101650255, Item EICB (Carte) certain PAMS documentation has been completed. No. 2 This item is used to track all Commercial Grade Revised response included in Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. letter dated 12/22/10 should be provided with an application for a Tier 2 review. To be addressed by

a. WNA-LI-00058-WT-P, Revision 2, Post-Accident TVA agreed to include a Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial Monitoring System (PAMS) Licensing Technical Report description of the generic Technical Report.

grade dedication plan was included in the Common Q Topical submitted in TVA Letter to NRC dated December 3, Westinghouse hardware Report Section 11, Commercial Grade Dedication Program. 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - commercial grade dedication Section 11 includes a description of the Common Q Commercial Instrumentation and Controls Staff Information process in the PAMS licensing Grade Dedication Program, and states: A detailed review plan is Requests, (Reference 1) contains the following technical report. (see developed for each Common Q hardware or software component changes to address the NRC request: ML102920031 Item No 1) that requires commercial grade dedication.

Section 7, Commercial Grade Dedication Process has TVA agreed to include (in the Please provide the commercial grade dedication plans for each been revised to describe the general commercial grade PAMS licensing technical report)

Common Q hardware or software component that has not been dedication process for both hardware and software and an evaluation of WBN2 critical previously reviewed and approved by the NRC. uses a description of the AI687 dedication process as characteristics for commercial an example of how the process is applied. Westinghouse hardware (b) The draft ISG6 states that a commercial grade dedication components against the generic report should be provided within 12 months of requested approval As listed in Table 6-3. Westinghouse Watts Bar 2 critical characteristics. (see for a Tier 2 review. Common Q PAMS Documents at Westinghouse ML102920031 Item No 2)

Rockville Office, the following commercial grade (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade dedication documents are available for NRC audit at the TVA agreed to include a Dedication Report for the QNX Operating System for Common Q Westinghouse Rockville office: description of the generic Applications. Westinghouse software

b. It is TVAs understanding that the submittal of the commercial grade dedication (ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial documents listed in (b.i) and (b.ii) is no longer required. process in the PAMS licensing Dedication Report for QNX 4.25G for Common Q Applications. Rather, it was agreed, that the inclusion of a description technical report. (see of the commercial grade dedication process in revision ML102920031 Item No 3) 2 of the Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WT-P, TVA agreed to include (in the would be sufficient to address this request. PAMS licensing technical report)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)

(

139 The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements C

a 140 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal No. 4 10/29/10 Specification and abnormal environments and plant operating modes. The WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post Revised response included in Due 12/3/10 Enclosure 1 Item rational for this requirement is that it is necessary to meet Accident Monitoring System (PAMS) specifies the Reg. letter dated 12/22/10 No. 10 TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97. Guide 1.97 variables implemented in the Common Q based TVA to docket PAMS Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS NNC 11/3/10: The origin of the Licensing Technical Completion Program I&C Projects Post What document specifies which RG 1.97 variables are requirements in the SysRS are Report Rev. 2. Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS? TVA Response to Follow-up NRC Request: not clearly document. Rev. 1 of Requirements Specification, dated the Common Q PAMS Licensing December 2009.

WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring Technical Report contains an System (PAMS) Licensing Technical Report was submitted open item that will be addressed on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 in Rev. 2; this open item is to

- Instrumentation and Controls Staff Information Requests, include TVAs enhanced dated December 3, 2010 (Reference 1). Revision 2 contains contract compliance matrix. It the following change to address this request: is expected that this matrix will address this open item.

Section 11, TVA Contract Compliance Matrix has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).

(

141 Deleted by DORL Date: Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements C

a 142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide No. 6 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - This item is used to track all traceability issues with the TVA/Westinghouse agreed to Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS). include the V&V evaluation of TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is their reusable software element To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear At the September 15 public meeting in Rockville, the development process in the Revision of the RTM, Completion Program I&C Projects Post following actions were agreed to. These items address the V&V design phase summary SRS, SysRS, and Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in traceability concerns with the Software Requirements report. This evaluation would SysDS. Requirements Specification, dated the WBN2 PAMS SysRS. Specification. include an evaluation against December 2009.

the development process

2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the requirements. This evaluation Accident Monitoring Systems Software Requirements Requirements Traceability Matrix(RT), using the issues would also include an evaluation Specification. To clarify, many documents have identified at the 9/15 public meeting as a guide of how the WBN2 specific requirements that are incorporated by reference into the (documented below) and update the RTM as required. requirements were addressed SRS, but what served to direct the author to include those by the reusable software various documents in the SRS or, if the requirement is based 2. The next issue of the IV&V report will include the elements. (see ML102920031 on the System Requirements Specification, what directed the Requirements phase review of the RTM and a partial Item No 5) author to include the requirement there? review for the Design phase.
3. Clarify whether the unnumbered paragraphs in the Post 3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements Requirements Traceability Matrix (RTM) to address Specification, such as in the section headings, or are all such items not in the SRS or SysRS.

sections simply considered to be informative?

4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS? in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program information.

Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS. 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the remove these requirements.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems 6. Westinghouse will perform and document an evaluation (reference 5).] of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were at the revisions reviewed by V&V. Have these been verified. addressed? Yes. The next revisions of the SDS and SRS address these issues.

4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements 8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or instead of the System Design Specification (SDS).

by reference, all the requirements that were used in the These will be removed from the SRS and incorporated design phase for the application specific software, or do into the next revision of the SDS.

software design phase activities use requirements found in any other source or document? If so, what are these 9. RTM item R4.2-2 protection class software set to 0.

sources or documents? Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification 10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element. that are performed with the function enable (FE) switch in the ENABLE position.

These references are used in the body of the SRS, for example: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR 12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference documents are used. Describe in 1.1 of the SysRS.

12]).] Need a good write up of how the process works.

They are also included via tables such as found in 13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1 for document submittals and provide it to the NRC no later than 9/30/10

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.] 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include design meets the contract requirements.

requirements not explicitly stated in the SRS? If so what is their origin? 15. Westinghouse to add the Software Design Descriptions to the RTM

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
18. Westinghouse to resolve the following questions concerning SDDs
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.

Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.

WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

143 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

PAMS SRS - ML101050202) contains a table (see page iii) titled, No. 7 Specification Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Response included in letter Due 12/22/10 WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. dated 12/22/10 TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document TVA Response: Revision of the RTM, Completion Program I&C Projects Post describes requirements for the major software components SRS, SysRS, and Accident Monitoring System- System (a) and (b) The requested information is provided in the SysDS. Requirements Specification, dated (a) Please list and describe each of the major software following documents: December 2009.

components. Please include a description of any NRC review for each of these components. i. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing (b) Please list and describe each of the other software Technical Report, Table 6-1, Document components. Please include a description of any NRC review for Requirements which lists the software each of these components. documentation requirements for the Common Q PAMS and section 11 TVA Contract (c) What other documents contain the requirements for the other Compliance Matrix submitted in TVA Letter to software components? NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation The WBN2 PAMS System Design Specification (WBN2 PAMS and Controls Staff Information Requests SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SysRS was ii. WNA-DS-01617-WBT-P, Revision 3, Post created to support the WBN2 PAMS SysRS. Section 1.1, Accident Monitoring System- System Purpose, of the WBN2 PAMS SDS states: The purpose of this Requirements Specification, dated December document is to define the hardware design requirements 2010 (Attachment 1).

(c) Do the WBN2 PAMS SRS and SDS, together, implement all of iii. WNA-SD-00239-WBT-P, Revision 3, Software the requirements in the WBN2 PAMS SysRS? Requirements Specification for the Post Accident Monitoring System, dated December (e) Please briefly describe all of the documents that implement 2010 (Attachment 7) the WBN2 PAMS SysRS.

iv. WNA-VR-00279-WBT, Requirements Traceability Matrix (available for NRC audit at the Westinghouse Rockville office To the best of TVAs knowledge, no prior NRC review of the software components has been performed.

(c) WNA-VR-00280-WBT, Requirements Traceability Matrix (RSED) (available for NRC audit at the Westinghouse Rockville office (d) Need WEC to respond

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (e) The requested information is contained in:

i. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report, Tables 6-1 through 6-3 submitted in TVA Letter to NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests ii. WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System- System Requirements Specification, dated November 2010 (Attachment Error! Reference source not found.)

iii. WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated November 2010 (Attachment 4) iv. WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated November 2010 (Attachment 7) 144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)

PAMS SRS) contains a table (see page iii) titled, Document No. 8 10/5/10 Specification Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Revised response included in Due 12/3/10 SRS was created to support the three documents identified (two of define the process for system level design, software design letter dated 12/22/10 By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and Responses to items a (ML10101050203), TVA docketed implementation for Common Q safety system development. Response provided in letter and e provided. WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014- This document supplements the Common Q SPM, WCAP- dated 10/5/10 "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety 16096-NP-A. The scope of NABU-DP-00014-GEN includes NNC 11/18/10: Program I&C Projects, Software Systems). the design and implementation processes for the application NRC Review and WEC to (1) Items b-d closed to Requirements Specification for the Post development. For a fuller description of the design process complete response. other Open Item nos. Accident Monitoring System, dated (b) Please describe the flow of information between these three described in NABU-DP-00014-GEN please refer to the (2) The point of these February 2010 (ML101050202).

documents. Design Process for AP1000 Common Q Safety Systems, b-d to be addressed at public questions was to WCAP-15927 on the AP1000 docket. Since this is a meeting and audit. Will require understand how the (c) Does the PAMS SRS implement the requirements in these Westinghouse process document that is not specifically information to be docketed. origin of the three documents? referenced in the SRS, it will be removed in the next revision requirements in the of the document. requirements (d) Please describe if and how these three documents are used in specifications were the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the (c) - Closed 142 the requirements would requirements of these three documents have been incorporated be demonstrated in into the WBN2 PAMS SRS. (d) - Closed to Item 142 Rev. 2 of the CQ PAMS LTR.

(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, Design Process for Common Q Safety Systems, is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following change to address the NRC request:

Section 11, TVA Contract Compliance Matrix showing the origin of the requirements was added.

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was (1) The review and update of the RTM is complete. If Response included in letter Due 12/22/10 created to support the WBN2 PAMS SysRS. requested by the NRC reviewer, the revised RTM will dated 12/22/10 TVA docketed WNA-DS-01667-WBT be made available for audit at the Westinghouse office To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware in Rockville. During the September 20-21, Revision of the RTM, Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? (2) Hardware requirements were moved from the SRS to 2010 audit at Westinghouse, it SRS, SysRS, and Accident Monitoring System- System the SDS. was acknowledged that SysDS. Design Specification, dated December (b) Please briefly describe all of the documents that implement the (3) The missing requirements identified by V&V for the SDS TVA/Westinghouse had 2009.

hardware requirements of the WBN2 PAMS SysRS. and SRS have been incorporated. previously (in September 15, (4) Section 11 TVA Contract Compliance Matrix was 2010 public meeting) stated:

This item is used to track all traceability issues with the added to the Licensing Technical Report Revision 2.

System Design Specification (SDS). (5) Revision 1 of the IV&V report, submitted on TVA to TVA would provide the RSED NRC letter Watts Bar Nuclear Plant (WBN) Unit 2 - RTM. (see ML102920031 Item At the September 15 public meeting in Rockville, the following Instrumentation and Controls Staff Information No 6) actions were agreed to. These items partially address the Requests, dated December 3, 2010 includes the traceability concerns with the System Design Specification. Requirements phase review. TVA would revise and resubmit This item will be updated with the results of the September 20 (6) Per Westinghouse letter WBT-D-2268 NRC Access to the PAMS RTM to address all and 21 Commercial Grade Dedication and SDS RTM audit. Common Q Documents at the Westinghouse Rockville types of issues identified in the Office dated August 16, 2010 (Reference ) System public meeting. (see

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

1. Westinghouse will perform completed a review of the Requirements Specification for the Common Q Generic ML102920031 Item No 7)

Requirements Traceability Matrix(RT), using the issues Flat Panel Display, 00000-ICE-30155, Revision 9 is identified at the 9/15 public meeting as a guide (documented available for audit at the Westinghouse Rockville office. TVA would revise and resubmit below) and update the RTM as required. the Software Verification and WEC to identify AC160 document Validation phase summary

2. Some hardware requirements are contained in the SRS report for the requirements instead of the System Design Specification (SDS). These will (7) A schedule was developed and is reviewed weekly by phase to document the be removed from the SRS and incorporated into the next Westinghouse and TVA project management. completion of the requirements revision of the SDS. phase review. (see (8) The flow of documentation information was provided to ML102920031 Item No 8)
3. 25 issues identified by V&V where some requirements have the NRC inspector during the Common Q PAMS audit.

not been included in the SDS (14) and SRS (11) at the If a description of the flow of documentation information revisions reviewed by V&V. Have these been addressed? in a project document is required, it will be added to a Yes. The next revisions of the SDS and SRS address these future revision of the Licensing Technical Report.

issues.

4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

( ( (

146 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements 147 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements

( ( ( ( (

148 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements C C C 149 7.2 7.2 FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated G G G G G 150 7.2 7.2 Many of the changes were based on the Westinghouse document Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated a a a 151 7.2 7.2 Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2 Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2 FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb Y Open Open-TVA/A102 ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the No. 6 and EICB RAI 10/5/10 instrument setpoint methodology which complies with 10 CFR (Q1) Refer to the response to letter item 13, RAI Matrix Item Response is not acceptable. A Due 12/17/10 ML102861885 Item 50.36 requirements. Provide the information on how the WBN2 51. revised response will be No. 8 TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and submitted in the letter dated Pending FSAR 10/29/10 include this discussion in this section. Also, by letter dated May (Q2) EEB-TI-28's single sided methodology conforms with 10/29/10. Amendment 102 Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff WBN's design basis commitment to ensure that 95% of the submittal. No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for that was in affect during WBN Unit 1 licensing. The single all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified sided methodology is not used for any TSTF-493 setpoints allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met. that use TI-28 methodology. 2 is calculated and Therefore, either remove this reduction factor for single sided added to TS, TVA

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N uncertainties or justify how you meet the 95/95 criteria given in RG TVA Revised Response: needs to address the 1.105. latest criteria and that In order to respond to other NRC comments on the setpoint include 95/95 criteria.

methodology discussion in FSAR Amendment 100, TVA Why the last sentence reviewed the previous response to this RAI. This resulted in has been modified by a complete rewrite of the responses to this question as adding TI-28. It was shown below. As a result, the response does not specifically NRCs understanding address the NRC Follow-up Request. However, the overall that all setpoints have responses to all of the NRC RAIs on setpoint methodology to meet TI-28 addresses this item.

(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.

(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.

There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..

(

155 7.2 7.2 G Summary of FSAR change document section 7.2 states that Date: Y Closed Closed ML101720589, Item 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC N Open Open-TVA/WEC ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The No. 8 10/5/10 Westinghouse review.

value of 121% is changed from 118%. The justification for this Per Westinghouse letter WBT-D-2340, TENNESSEE Revised response included in Due 12/22/10 change states that this was done to bring the text of this section in VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT letter dated 12/22/10.

agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as Correction to RAI Response SNPB 4.3.2-7, (Reference 17) Response is included in letter Submitted 10/29/10.

118%. Justify the change. the 118% value should be 121%. Depending on the use in dated 10/5/10 the FSAR either 118% or 121% are the correct values. As a TVA needs to justify result of the question, Westinghouse reviewed all locations why some places 121%

where either 118% or 121% are used and the context of use is used and other and provided a FSAR markup to reflect the correct value at places 118% is used .

the specific location. These changes will be incorporated in What does 121% or a future FSAR amendment. 118% means.

TVA Response to Follow-up NRC Request:

The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 Follow Up -NRC Request on 118% and 121 % FSAR Power Levels, dated December 6, 2010 (Reference 2).

A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Range High Neutron Flux, High Setting, the value of 118% is correct. In the context of the peak core

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, Limiting Power Distributions.

( ( ( ( ( ( (

157 7.2 7.2 FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2 FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2 FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2 FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated G G G G G G G 161 7.2 7.2 FSAR section 7.2.2.3 states that changes to the control function Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2 FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2 Deleted by DORL Date: Y Closed Closed ML101720589, Item 164 7.2 7.2 FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL a

165 7.2 7.2 FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated 166 7.2 7.2 Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated

( (

167 7.2 7.2 FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated 168 7.2 7.2 FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated

( ( ( ( r 169 6/18/2010 Responder: Clark Y Closed Closed 170 6/17/2010 Responder: Clark Y Closed Closed M M ( ( ( ( ( ( ( ( ( ( ( (

171 7.2 7.2 6/17/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172 6/17/2010 Responder: Craig Y Closed Closed EICB RAI 173 7.1 7.1 6/17/2010 Responder: Craig/Webb/Powers Y Closed Closed EICB RAI C C C C g 174 6/28/2010 Responder: Hilmes/Craig Y Closed Closed EICB RAI 175 June 28, 2010 Responder: Y Closed Closed EICB RAI a a G G G G G G G G G G G G 176 7.1 7.1 6/28/2010 Responder: Craig/Webb Y Closed Closed EICB RAI 177 7.5.2.1 7.5.1 7/15/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated RAI not required a a a a l 178 7.5.2.1 7.5.1 7/15/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated RAI not required 179 An emphasis is placed on traceability in System Requirements Responder: WEC Y Closed Closed N/A - Closed to NA 180 The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC Y Closed Closed N/A - Closed to NA 181 An emphasis is placed on traceability in System Requirements Responder: WEC Y Closed Closed N/A - Closed to NA 182 Characteristics that the SRP states that a Software Requirements Responder: WEC Y Closed Closed N/A - Closed to NA 183 7/15/2010 Responder: WEC Y Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Revised response included in Due 12/3/10 No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements letter dated 12/22/10. No. 4 and even more so given the modifications to the standard listed in Specification. NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the point behind this open word should to say Each identifiable requirement in an SRS TVA Response to Follow-up NRC Request: Response provided in letter item was that TVA must must be traceable backwards to the system requirements and the dated 10/21/10 demonstrate that the design bases or regulatory requirements that is satisfies Please see the response to RAI item 14 in letter dated origin of each 12/222/10, NRC Matrix Item 144. requirement in the On page 1-2 of the Post Accident Monitoring Systems Software WEC requirements Requirements Specification in the background section, is the specification is known sentence Those sections of the above references that require and documented. TVA modification from the generic PAMS are defined in the document stated that this referring purely to the changes from WNA-DS-01617-WBT Post information would be in Accident Monitoring System-System Requirements Specification CQ PAMS LTR Rev. 2.

or is it saying that there are additional changes beyond those and that the SRS defines them?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N If there are additional changes, what is their origin?

(

184 7/15/2010 Responder: WEC Y Closed Closed N/A - Closed to N/A C

a 185 7/15/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Response included in letter Due (1) 12/3/10 No. 17 Software Requirements Specifications in the SRP, in the dated 12/22/10. (2) 12/22/10 unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172, audit. NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say point behind this open Each identifiable requirement in an SRS must be traceable TVA Response to Follow-up NRC Request: item was that TVA must backwards to the system requirements and the design bases or demonstrate that the regulatory requirements that is satisfies Also the NRC considers (1) Please see the response to Item 14 in this letter (NRC origin of each that the SRS is the complete set of requirements used for the Matrix Item 144). requirement in the design of the software, whether it is contained within one WEC requirements document or many. In order to evaluate an SRS against the (2) There is no RTM for development of the individual specification is known guidance in the SRP the staff needs access to all the reusable software elements. As listed in item 15 of and documented. TVA requirements. Table 6-1 Document Requirements of WNA-LI-00058- stated that this WT-P, Revision 2, Post-Accident Monitoring System information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring (PAMS) Licensing Technical Report submitted in TVA CQ PAMS LTR Rev. 2.

Systems Software Requirements Specification are various types Letter to NRC, dated December 3, 2010 Watts Bar (2) TVA also said it of Reusable Software Element. Nuclear Plant (WBN) Unit 2 - Instrumentation and would provide a RTM Controls Staff Information Requests a RTM for for the RSED These references are used in the body of the SRS, for example: implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been R5.3.14-2 [The Addressable Constants CRC error signal shall be developed. This document is available for NRC audit at TRUE when any CAL CRC's respective ERROR terminal = TRUE the Westinghouse Rockville office.

(WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

(

186 7.7.8 7.7.1.12 7/15/2010 Responder: Perkins/Clark Y Closed Closed EICB RAI No.6 TVA Letter dated D

a r

187 By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten N Open Open-TVA/WEC ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information. No. 1 & 2 10/5/10 docketed?

1) Please refer to the revised response to letter dated Revised response included in Due 12/22/10
1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115). letter dated 12/22/10.

did not identify any connection from the PAMS Operator Modules Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of Partial Response provided in the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45. letter dated 10/5/10 WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain. TVA Response to Follow-up NRC Request:

NNC 8/25/10: Why did TVA not

2) Please clarify whether any digital safety-related systems or A review of the following documents determined that the catch this on the review of the components have a digital communications path to non-safety- connection between the OM and the plant computer has PAMS SysRS or SRS? Does related systems or with safety related systems in another division. been revised to show a connection to a printer instead of the TVA check that the CQ PAMS If so, NRC staff will need these paths identified on the docket. plant computer: system meets the requirements in its purchase specifications?
1. WNA-DS-01617-WBT-P, Revision 2, Post Accident Monitoring System - System Requirements

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Specification, dated August 2010

2. WNA-DS-01667-WBT-P, Revision 2, Post Accident Monitoring System - System Design Specification, dated September 2010
3. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report dated December 2010 Review of the newly released Common Q PAMS documents listed below confirmed they correctly show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.

(1) Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, WNA-TP-02988-WBT, Revision 0, dated November 2010 (2) Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System, WNA-AR-00180-WBT-P, Revision 0, dated October 2010

(

188 By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark Y Closed Closed ML101970033, Item TVA Letter dated C

a

(

189 7.6.7 7/20/2010 Responder: Clark Y Closed Closed RAI No. 3 TVA Letter dated S

i

( ( ( ( (

190 7.9 FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

( (

191 7.9 NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins Y Closed Closed ML10197016, Item TVA Letter dated M M M M M 192 7.5.1.1 7.5.2 The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to C S 193 7.5.1.1 7.5.2 The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194 7.5.1.1 7.5.2.1 The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to a i 195 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 ( ( Open Item 197 was never issued. Y Closed Closed 198 7.5.1.1 7.5.2.2 M M X SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a 199 7.5.1.1 7.5.2.3 The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated

(

201 7.7.1.1 7.7.11 7/21/2010 Responder: Webb Y Closed Closed EICB RAI TVA Letter dated C

a 202 7.5.2 7/22/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/5/10 The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide Partial Response provided in Due 12/3/10 No. 4 Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. letter dated 10/5/10 stated: "Should our criteria or regulations change so that our Licensing Technical conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the Report R2 Nuclear Power and/or the applicant referencing the topical report applicability of guidance.

will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

(

203 7.5.1.1 7.5.2 7/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL M

a

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( ( (

204 7.5.1.1 7.5.2 7/26/2010 Responder: Costley/Norman Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( (

205 7/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207 M M M M ( M July 27, 2010 Date: Y Closed Closed 208 7.5.2.1 7.5.1 C C 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 a a a a G a 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a 210 7.5.2.1 7.5.1 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

212 7.5.2 7/27/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Response included in letter Due 12/22/10 No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the dated 12/22/10.

design specification and software requirements specification hardware meets the regulatory requirements. To be addressed by contain information to address the "Design Report on Computer WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5. Attachment 13 contains a detailed response to the individual (2) Please describe how the information provided demonstrates sections of IEEE 603-1991 and IEEE 7-4.3.2 that conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57. demonstrates how the hardware complies with the IEEE standards.

213 7.5.2 7/27/2010 Responder: WEC N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Response is included in letter Due 12/31/10. No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the dated 10/25/10 design specification and software requirements specification Common Q PAMS System Design Specification.

contain information to address the "Theory of Operation NNC to review and revise this Description." The staff has reviewed these documents, and it is Attachment 1 contains the proprietary version of question after LTR R2 is not clear how this is the case. The docketed material does not Westinghouse document Tennessee Valley Authority received.

appear to contain the design basis information that is required to (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

(

214 7/27/2010 Responder: WEC Y Closed Closed EICB RAI TVA Letter dated C

a

( ( (

215 7/29/2010 Responder: WEC Y Closed Closed 216 7.5.1.1 7.5.2 7/29/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

(

217 7/6/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated M ( ( M ( ( ( ( M 218 7/6/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated 219 8/4/2010 Responder: TVA Licensing Y Closed Closed EICB RAI P

220 8/4/2010 Responder: Ayala Y Closed Closed EICB RAI TVA Letter dated a G G a G G G G a 221 7.7.1.2 7.7.1.3 8/4/2010 Responder: Trelease Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL o

222 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated 223 8/4/2010 Responder: Clark Y Closed Closed EICB RAI 224 7.5.1.1 7.5.2 8/4/2010 Responder: Norman (TVA CEG) Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( ( ( (

225 8/4/2010 Responder: Scansen Y Close Closed EICB RAI TVA Letter dated 226 Y

( (

8/4/2010

(

Responder: TVA Licensing Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated 228 C C C C 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated 229 G G G 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated a a a a 230 8/4/2010 Responder: Webb Y Closed Closed EICB RAI TVA Letter dated 231 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

232 8/4/2010 Responder: Clark Y Closed Closed RAI No. 5 TVA Letter dated 233 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated

( ( (

234 8/4/2010 Responder: Y Closed Closed N/A - Duplicate N/A C C C C C S 235 8/4/2010 Responder: TVA Licensing Y Closed Closed N/A N/A 236 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated G G G 237 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated a a a a a i 238 8/4/2010 Responder: Webb/Hilmes Y Closed Closed N/A - Duplicate N/A 239 8/4/2010 Responder: Hilmes Y Closed Closed N/A - Meeting N/A 240 8/4/2010 Responder: Clark Y Close Closed Ml102910008 TVA Letter dated 241 ( ( 8/4/2010 Responder: Davies Y Closed Closed RAI No. 10 TVA Letter dated

(

242 C S 8/4/2010 Responder: Hilmes Y Close Closed EICB RAI TVA Letter dated G

a i 243 8/3/2010 Responder: WEC Y Closed Closed N/A - Closed to N/A 244 8/3/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Revised response is included in Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). letter dated 12/22/10 be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the Response is provided in letter LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear dated 10/25/10. analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post NNC 11/18/10: SysRS Rev. 2 information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, also contains process the NRC staff to make an independent Revision 2, Dated September 2010. requirements that are more assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS appropriately incorporated into of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, TVA Response to Follow-up NRC Request: process documentation. requirements and the protection of for example all seventeen requirements in Section 2.3.2, public health and safety."

"Configuration Control," address process requirements for Process related requirements have been deleted from the configuration control. SRS and SysRS in revision 3.

Please explain how the above meets the intent of the approved Attachment 1 contains WNA-DS-01617-WBT-P, Revision 3, SPM. Post Accident Monitoring System- System Requirements Specification, dated December 2010. Attachment 2 contains WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System - System Requirements Specification, dated December 2010. Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3.

Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3.

245 8/3/2010 Responder: WEC N Open Open-NRC Review EICB RAI LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Response included in letter Due 12/22/10 No. 119 information relied upon in the SE must required test documentation for systems developed using the SPM compliance matrix dated 12/3/10 be docketed correspondence."

Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). Accident Monitoring System Test Plan, WNA-PT-00138- analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10 requested should include technical contains the Westinghouse Application for Withholding for information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT- the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010. assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 8/3/2010 Responder: WEC N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Response is provided in letter Due 10/22/10 No. 15 dated 10/25/10 information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question dated 10/25/10 be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical NNC 11/18/10: PQP has not go to WEC Rockville LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. been provided and CQ PAMS Offices and look at analysis that supports the change please describe the documentation produced and provide the LTR Rev. 1 does not contain PQP to decide if it must requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the comparable information. docketed. information in sufficient detail to enable proprietary version of Westinghouse document Tennessee the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October requirements and the protection of 2010 public health and safety."

247 ( ( ( 8/8/2010 Responder: WEC Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248 C C C 8/8/2010 Responder: WEC Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, a a a 249 8/8/2010 Responder: WEC Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 250 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Revised response included in Due 12/22/10 information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe letter dated 12/22/10 be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize 10/25/10 is a partial describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project Response included in letter response. Still waiting LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. dated 10/25/10. on Software Test Plan analysis that supports the change tasks in the SCMP have been carried out in their entirety. and all other testing requested should include technical Documentation should exist that shows that the configuration TVA Response to Follow-up NRC Request: documentation. information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM The following documentation shows that the configuration assessment regarding the acceptability tasks have been successfully accomplished for each life cycle management tasks for that activity group have been of the proposal in terms of regulatory activity group. successfully accomplished. requirements and the protection of public health and safety."

1. WNA-LI-00058-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report submitted in TVA Letter to NRC dated December 3, 2010, Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests, (Reference 1) contains the following changes to address the NRC requests:

a. Section 2.2.1 Hardware/Software Change Process

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N has been added to describe the process of how changes are evaluated.

b. Section 2.2.2, Software has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle.
2. Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, (Proprietary), WNA-PT-00138-WBT, Revision 0, dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, (Reference 1.

251 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software testing and documents that will The software testing performed and documents created are Revised response included in Due 12/22/10. information relied upon in the SE must be created. The SPM also describes the testing tasks that are to addressed by the SPM Compliance matrix contained in letter dated 12/22/10 be docketed correspondence."

be carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. 10/25/10 is a partial implementation is that the tasks in the SPM have been carried out Partial response is provided in response. Still waiting LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the letter dated 10/25/10 on Software Test Plan analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: and all other testing requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 documentation. information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- assessment regarding the acceptability WBT-P, Dated October 2010 of the proposal in terms of regulatory requirements and the protection of TVA Response to Follow-up NRC Request: public health and safety."

Please see the response to RAI item 23 in letter dated 12/22/10, NRC Matrix Item 250.

252 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Response included in letter Due 12/22/10 information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. dated 12/22/10 be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability Software requirements traceability analysis is described in Read ML091560352 Check on this Hilmes LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished. the following documents: analysis that supports the change requested should include technical

1. WNA-LI-00058-WT-P, Revision 2, Post-Accident information in sufficient detail to enable Monitoring System (PAMS) Licensing Technical Report the NRC staff to make an independent submitted in TVA Letter to NRC dated December 3, assessment regarding the acceptability 2010, Watts Bar Nuclear Plant (WBN) Unit 2 - of the proposal in terms of regulatory Instrumentation and Controls Staff Information requirements and the protection of Requests, (Reference 1) contains the following change public health and safety."

to address the NRC request:

Section 11, TVA Contract Compliance Matrix has been added.

2. The Independent Verification &Validation (IV&V) report covering the Concept and Definition phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010)

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1).

3. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases (Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010) was submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated December 3, 2010 (Reference 1).
4. The integration phase is covered in Attachment 10IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 3, dated December 2010. Attachment 11 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

253 8/8/2010 Responder: Clark Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated 255 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated 256 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated 257 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A C C C C C C C C C C C C C C C 258 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A 259 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated 260 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A 261 8/10/2010 Responder: WEC Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A a a a a a a a a a a a a a a a 263 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item 264 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item 265 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item 266 8/11/2010 Responder: Webb/Webber Y Closed Closed TVA Letter dated 267 8/11/2010 Responder: WEC Y Closed Closed 268 8/19/2010 Responder: WEC N Open Open-NRC Review EICB (Carte)

By letter dated March 12, 2010 (ML101680577), TVA stated that 11/18/10 Warren Odess-Gillett took action to discuss with Response included in letter Due 12/22/10 the application specific hardware and software architecture Design Engineering to generate a non-prop figure dated 12/3/10 descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) Attachment 18 contains the non-proprietary version of the and Software Requirements Specification (ML101050202, Westinghouse document Watts Bar 2 Common Q PAMS ML102040486, & ML1022040487). Block Diagram.

Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( (

269 8/20/2010 Responder: NRC Y Closed Closed N/A N/A 270 ( ( ( 8/23/2010 Responder: Clark Y Closed Closed See also Open Item Nod. 41 & 245.

M M 271 C C P 8/23/2010 Responder: WEC Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 a a 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a o 273 7.5.2.1 7.5.1 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b ( ( 8/26/2010 Responder: Stockton Y Closed Closed RAI No. 6 TVA Letter dated M S a i 274.a 7.5.2.1 7.5.1 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

(

275 8/27/2010 Responder: Clark Y Closed Closed Not Required N/A S

i 276 7.6 7.6 8/27/2010 Responder: Webb Y Open Open-TVA/Bechtel EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/21/10 In order for the staff to review the effects of multi control systems Revised response provided in Due 11/24/10 Item#60 Enclosure 1 Item failure, provide the summary of the analyses documenting the The NRC reviewer confirmed this question applies to non- letter dated 12/22/10 No. 13 effect on the plant based on the following events: (1) loss of power safety systems. TVA to provide to all control systems powered by a single power supply; (2) Response provided in letter justification for non-failure of each instrument sensor which provides signal to two or The Distributed Control System (DCS) implemented using dated 10/21/10 safety system other more control systems; (3) Break of any sensor impulse line which Foxboro I/A hardware, replaces most of the non-safety than DCS.

is used for sensors providing signals to two or more control related control systems for WBN Unit 2. The other non- Revised response provided in systems; and (4) failure of digital system based on the common safety-related control systems within the scope of this letter dated 11/24/10 The statement that cause software failure affecting two or more control systems. For question are: failure of sense line each of these events, confirm that the consequences of these Response Acceptable. 11/17/10 where more than one events will not be outside chapter 15 analyses or beyond the a. Rod Control - Failures of this system are addressed in transmitter is connected capability of operators or safety systems. FSAR Chapter 15. would be bounded by

b. Main Turbine Electro-Hydraulic Control System TVA changed the response in the failure of a single the latest writeup. The scope of transmitter does not The following provides the requested summaries for the four the question applies to all non make sense.

events listed: safety related control systems and is not limited to just three TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA system listed by the TVA. TVA statement that all non-letter to NRC dated August 11, 2010, Enclosure 2 could use to envelope other safety control systems (Reference 7) demonstrates that the loss of any single control systems by Unit 1 have been evaluated power source does not result in a loss of any DCS analysis if they applies to Unit 2 against these criteria function. The other systems within the scope of this systems also. and have determined question are configured in the same manner as Unit 1, that their failure does with redundant power sources such that the failure of a not have consequences single power source does not cause a loss of function. which will put the plant outside chapter 15 (2) Signals shared by more than one control function analyses.

within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.

The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.

(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N impacted by a sense line failure.

There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.

(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.

All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.

TVA Response to Follow-up NRC Request:

All non-safety related control systems were reviewed in the context of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.

(

277 7.6 7.6.3 8/27/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 8/27/2010 Responder: Trelease Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 D 8/27/2010 Responder: Mather Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 ( ( ( ( ( (

8/27/2010 Responder: Trelease Y Closed Closed EICB RAI TVA Letter dated a

G G G G G G 281 7.6 7.6.8 8/27/2010 Responder: Webb Y Closed Closed EICB RAI TVA Letter dated r

282 7.6 7.6.9 8/27/2010 Responder: Trelease Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX 8/27/2010 Responder: Clark Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item

(

284 7.7.3 7.4.1 8/27/2010 Responder: Webber Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item D

a r

(

285 7.3.3 7.3 8/27/2010 Responder: McNeil Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item D

a r

(

286 7.7.3 9.3.4.2. 8/27/2010 Responder: Webber Y Closed Closed EICB RAI No.16 TVA Letter dated D

a r

(

287 7.3 7.3-1 ( D 8/27/2010 Responder: Elton Y Closed Closed ML102390538, Item Response G a r

288 7.3 9/2/2010 Responder: McNeil Y Closed Closed EICB RAI

(

289 9/2/2010 Responder: Faulkner Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 ( 9/7/2010 Responder: Clark Y Closed Closed N/A N/A This item is a duplicate of item 291.

D ( ( (

M (

291 7.7 9/7/2010 Responder: Clark Y Closed Closed TVA Letter dated 292 7.2.5 7.2 a C C S9/7/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3. a G 9/8/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL r a a i 294 7.3 7.3.1.1. 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response

(

295 7.3 7.3.1.1. 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response D

a r

(

296 7.3 7.3.1.2. 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response D

a r

297 7.3 7.3.1.2. ( ( 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response

( D D 298 7.3 XX C a a 9/9/2010 Responder: Clark Y Closed Closed ML102390538, Item Response a r r 299 Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q Y Closed Closed TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather Y Closed Closed RAI No. 25 TVA Letter ML102980005 11/24/10, item 4, Are detectors different from Unit 1. Describe any differences. (1) The Radiation Monitoring Design Criteria Document, Response is included in letter Due 11/24/10 10/26/2010 and TVA letter WB-DC-40-24, Revision 21 is contained in Attachment dated 10/29/10 10/29/10 Are there any commercially dedicated parts in the RM-1000? If so, 6 to letter dated October 31, 2010. TVA to address the Enclosure 1 Item how are they dedicated? Revised response Included in following comments: No. 20 (2) Attachment 7 contains the General Atomics detector letter dated 11/24/10 Please confirm that digital communication ports available in RM- differences report. The containment high range (1) Is it Att. 5 or Att.

1000 are not used. radiation monitors are loops 271-274. 6?

(2) Pl. confirm that (3) For safety-related applications, General Atomics HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module 271-274.

assembly as a Basic Component. This assembly does (3) TVA to clarify that contain component parts that are Safety-Related GA has a Commercial Grade Items (SRCGI). Because these commercial EICB (Singh)

SRCGI components are assembled into the delivered dedication Basic Component, they are dedicated to the assembly program in place by virtue of the acceptance test of the full RM-1000 and that GA is an assembly. Safety-related commercial grade items are approved dedicated in accordance with General Atomics 10CFR50, App. B approved 10 CFR 50 Appendix B program. supplier.

App B does not (4) The digital communications ports on the safety-related address RM-1000 radiation monitors are not used. commercial grade dedication .

TVA Response to Follow-up NRC Request:

Revised response General Atomics Electronics Systems, Inc. is an approved is acceptable.

10 CFR 50 Appendix B supplier. They have a commercial Please submit grade dedication program. response.

(4) Response acceptable.

301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark N Open Open-TVA/WEC RAI No. 11 TVA Letter dated Note 1:

common cause failure including all potential resulting failures (i.e. ML102980005 10/29/10 total loss of CERPI, system fail as-is). TVA Partial Response: Revised response included in Due 12/22/10 10/26/2010 Enclosure 1 Item Effects of common cause software letter dated 12/22/10. No. 21 failure are addressed in DI&C-ISG-02

2. In addition, address how the actions stipulated in the plant For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, 1) Please address (ML091590268) Section 4 on pages 8 Technical Specifications will be taken when the CERPI system no credit is taken for the rod position indication system. For Revised response included in how fail-as-is is and 9. This document is publically indications are lost. Information notice IN 2010-10 (ML100080281) all continuous rod withdrawal accidents analyzed in WBN letter dated 11/24/10. detected i.e. available. Some excerpts are as addresses the need to consider software failures and the actions Unit 2 FSAR, Chapter 15, no credit is taken for any rod alarms, rod follows:

required to assure that the plant will stay within its licensing basis. stop/block. Partial response in 10/29 letter. position deviation alarms, etc. For example, a failure to trip might

3. Provide FMEA in support of your response. (1) Technical Specification 3.1.8, Rod Position Indication, 2) Response not be as limiting as a partial EICB (Singh) does not have an action for total loss of indication; acceptable. actuation of an emergency core
4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock therefore, a total loss of CERPI puts the plant into LCO 3) Response cooling system, with digital indications of a successful actuation.

C-11 to block automatic rod withdrawal when 1/1 Control Bank D 3.0.3 which states: acceptable. In cases such as this, it may take an rod position is above setpoint. This interlock capability would be 4) a. Response operator longer to evaluate and lost in case of total loss of CERPI. How is the rod block assured When an LCO is not met and the associated ACTIONS acceptable. correct the safety system failure than for this event? are not met, an associated ACTION is not provided, or if b. Pl. address it would if there was a total failure to directed by the associated ACTIONS the unit shall be failure mode on send any actuation signal. For this

5. How is automatic rod withdrawal affected in case of total loss of placed in a MODE or other specified condition in which fail-as-is. reason, the evaluation of failure signals from the CERPI to the ICS? Is this interlock fail safe? the LCO is not applicable. Action shall be initiated within 5) Response modes as a result of software CCF 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in: acceptable. should include the possibility of 6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the 6) Response partial actuation and failure to actuate with false indications, as well rod position indicator channel is 5% of span (7.2 inches). The MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; acceptable.

as a total failure to actuate.

CERPI system accuracy specified in the CERPI System MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. TVA to address The primary concern is that an

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N steps or 5.19%. The specified system accuracy seems to be common cause failure undetected failure within the digital greater than the accuracy assumed in the FSAR Chapter 15. Exceptions to this Specification are stated in the as stated under system could prevent proper system Please clarify this anomaly. individual Specifications. Where corrective measures response item 2. operation. A failure or fault that is are completed that permit operation in accordance with detected can be addressed; however, failures that are non-the LCO or ACTIONS, completion of the actions Please explain how detectable may prevent a system required by LCO 3.0.3 is not required. various alarms will actuation when required.

continue to annunciate Consequently, non-detectable faults (2) CERPI common mode software failure on software lockup? are of concern.

Need better Description of the CERPI systems installed at Watts explanation to Bar (Unit 1 & 2): understand the rationale behind the Each Programmable Logic Controller (PLC), response.

Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod Further response position information is provided to the OMs in the main required to address control room via redundant data links. Each train (PLC, CCF:

MTP, and OM) is electrically isolated from the other train. Total failure of software and lock-up Communications within a CERPI train (PLC, MTP, and alone would normally OM) are continuously monitored. If communication is be detected. Staff is interrupted, this condition is annunciated to the operator also concerned by in the control room. The MTP and OM display screens undetected failure have rotating cursors in the upper right-hand corner of within the digital the display to indicate that the system is operating. system that could prevent proper system History of CERPI: operation. A failure or fault that is detected The basic PLC software associated with the CERPI can be addressed; system has been in use for over ten years. The first however, failures that plant to utilize the CERPI PLC software was Beaver are non-detectable Valley. In 2003, the CERPI software was deployed with may prevent a system interfaces to the Common Q MTP and OM interfaces actuation when within the systems for Surry Units 1 & 2, and Watts Bar required or may result Unit 1. In 2009, the Watts Bar Unit 1 CERPI system in a partial actuation.

was modified to allow for two independent trains of Please address the CERPI. The Watts Bar Unit 2 CERPI system is based consequences of an on the Unit 1 design. Only the detectors and the undetected failures on detector interface boards are not redundant within the system operation and Watts Bar CERPI systems. alarms and interlocks including control bank CERPI Software Failure Analysis D interlock. (See note 1 in the Comments With regard to the CERPI system software: column of this open item for reference)

  • The software used on PLC-A is identical to that used on PLC-B.
  • The software used on MTP-A is identical to that used on MTP-B
  • The software used on OM-A is identical to that used on OM-B.

A common cause failure affecting the software of one CERPI train would affect the other train as well.

Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).

A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.

A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.

(3) There is no FMEA for the CERPI system.

(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:

a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.

Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.

(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.

(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:

The resolution of the rod position indicator channel is +/-

12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.

This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.

TVA Response to Follow-up NRC Request:

The following response is based on the response in Westinghouse letter WBT-D-2722 Response To Question On CERPI RAI #301 dated December 6, 2010 (Reference 4).

TVA believes the question is related to the statement found in the response submitted on TVA Letter to NRC Watts Bar Nuclear Plant (WBN) Unit 2 - Instrumentation and Controls Staff Information Requests, dated November 24, 2010, (Reference 9) Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm)

The CERPI system will not annunciate various system alarms if the software is in a lockup condition. However, the system will annunciate an alarm based on the PLC watchdog relay dropping out because the software has locked up the processor. So, even if the PLC locks up, an alarm is generated to alert the operators in the Main Control Room (MCR).

All of the CERPI system alarms (that connect to the plant annunciator system) are wired to specific alarm relays within the CERPI system. With the exception of the watchdog alarm relay, the alarm relay coils are actuated by the PLC Digital Output Module. The plant annunciator wiring connects to either the Normally Open (NO) or the Normally Closed (NC) contacts of the associated alarm relay. The watchdog relay is configured such that when a timeout condition occurs (the PLC locks up), the watchdog relay de-energizes, and a CERPI System Trouble alarm is annunciated in the MCR.

302 7.5.2.1 7.5.1 ( ( ( ( 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M 304 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 305 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Allowable value which is not consistent with TSTF-493 as ML102910008 10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is The FSAR Allowable Value definition will be revised to be Response is included in letter Due 12/17/10 Item#69 Enclosure 1 Item declared inoperable. consistent with the TSTF-493 in FSAR Amendment 102. dated 10/29/10 No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9 Pending FSAR that will be included in FSAR Amendment 102 that reflects Amendment 102 this change. submittal 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493 ML102910008 10/29/10 as AAF is the limit beyond which the instrument channel is (1) The Acceptable As Found (AAF) definition will be Response is included in letter Due 12/17/10 Item#70 Enclosure 1 Item degraded but may be operable and its operability must be revised to be consistent with TSTF-493 in FSAR dated 10/29/10 No. 27 evaluated. (2) Also it states that AAF is based on measurable Amendment 102. Attachment 3 contains the revised Pending FSAR instrument channel uncertainties, such as drift, expected during the FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 surveillance interval. These wording should be revised to agree Amendment 102 that reflects this change. submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue. Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.

Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Acceptable as left tolerance is not in accordance with TSTF-493 as ML102910008 10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to Response is included in letter Due 12/17/10 Item#71 Enclosure 1 Item EICB (Garg)

This is very vague and ambiguous. (2) Also it states that RPS determine the Acceptable As Left (AAL) will be deleted dated 10/29/10 No. 28 functions use double sided tolerance limits. Since ALF is a band it in FSAR Amendment 102. Attachment 3 contains the Pending FSAR will always be double sided and therefore, this clarification does revised FSAR section 7.1.2.1.9 that will be included in Amendment 102 not mean anything and clouds the issue. FSAR Amendment 102 that reflects this change. submittal (2) See response to letter item 27 (NRC Matrix Item 307).

309 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.1 methodology, states that AAF is the algebraic sum of the .. This ML102910008 10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint Response is included in letter Due 12/17/10 Item#72 Enclosure 1 Item to the SRSS method and will mask the operability of the instrument methodology calculations in TI-28 for TSTF-493 will be dated 10/29/10 No. 29 channel and therefore, it is not acceptable to the staff. (2) It also revised to use the Square Root Sum of the Squares Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into (SRSS) method. Amendment 102 consideration which is vague and ambiguous. submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.

310 7.1 7.1.2.1. EICB (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.2 (Garg methodology, states that for AAF .and other measurable ML102910008 10/29/10

)

uncertainties as appropriate (i.e., those present during TVA Response: Response is included in letter Due 12/17/10 Item#73 Enclosure 1 Item

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N calibration.) should be changed to present during normal dated 10/29/10 No. 30 operation (2) Also on page 7.1-15, states that ALT may take (1) The AAF definition will be revised in FSAR Amendment Pending FSAR calibration history into consideration which is vague and 102 to read: Amendment 102 ambiguous. submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.

This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) The AAL definition will be revised in FSAR Amendment 102 to read:

A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.

This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated any discussion on single sided calculation. Please confirm that ML102910008 10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with A statement that single-sided corrections are not used for Response is included in letter Due 12/17/10 Item#74 Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR. TSTF-493 setpoints will be included in FSAR Amendment dated 10/29/10 No. 31 102. Attachment 3 contains the revised FSAR section Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that Amendment 102 reflects this change. submittal

(

312 7.0 D ( By letter dated September 10,2010, TVA provided the summary Responder: Stockton Y Close Closed EICB RAI TVA Letter dated a G r

313 7.7.8 7.7.1.12 EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala Y Closed Closed EICB RAI No.18 TVA Letter dated

(

314 7.3 7.3 ( D The following 50.59 changes were listed in the March 12 RAI Responder: Stockton Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 G a r

315 7.5.3 7.5.3 IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) Y Close Closed EICB RAI TVA Letter dated

(

316 7.5.2.3 7.5 TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather Y Closed Closed RAI No. 26 S

i

(

317 7.5.2.3 7.5 TVA has provided a proprietary and a non-proprietary version of Responder: Temples Y Closed Closed RAI No. 27 TVA Letter dated S

i 318 7.5.2.3 7.5 EICB TVA has provided the following documents for RM-1000 Responder: Temples N Open Open-TVA/GA RAI No. 28 TVA Letter dated (Sing h) equipment qualification: ML102980005 10/29/10 (i) Applicable to WBN Unit 2. 04508905-1QR is Revised response is included in Due 12/22/10 10/26/2010 Enclosure 1 Item

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (i) Qualification Test Report for RM-1000 Processor Module applicable only in regards to the RM-1000, with the letter dated 12/22/10. No. 34 and Current-To-Frequency Converter 04508905-QR exception of re-qualification of certain RM-1000 Response update (January 2001) equipment differences covered in the -1SP report. Note check 04508905-1QR or required. It is clear that (ii) Qualification Test Report Supplement, RM-1000 Upgrades The Current-to-Frequency (I-F) converter module QR. Staff version is QR only. 04508903-2SP and -

04508905-1SP (June 2006) qualifications in the base report and the -1SP report 3SP are not applicable.

(iii) Qualification Test Report Supplement, RM-1000 Upgrades are not applicable to the RM-1000s, and will be used Response is included in letter The response for 04508905-2SP (June 2008) later as references in the WBN Unit 2 specific dated 10/29/10 applicability of (iv) Qualification Test Report Supplement, RM-1000 Upgrades qualification reports. 04508905-QR and -

04508905-3SP (May 2008) (ii) Applicable to WBN Unit 2. 1SP to RM-1000 and IF (iii) Not applicable to WBN Unit 2 converter is not clear.

Please clarify whether all of these are fully applicable to WBN2 or (iv) Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then Check page numbers of please clarify what those are. The 04508905-3SP report was prepared for another TVA Appendix F plant, as a monitor system-level report, where the system (missing/duplicate Supplement 3 was issued one month prior to supplement 2. included equipment mostly based on the base report pages).

Please explain the reason for the same. equipment items. These two -2SP and -3SP supplement Check applicability of reports were essentially worked concurrently, but the -2SP Appendix C to RM1000 document review/release process resulted in the release instead of RM2300?

time difference. See items 336 and 337.

TVA Response to Follow-up NRC Request: All equipment qualification reports (1) 04508905-QR and -1SP are applicable to the RM-1000. including supplements 04508905-1SP is not applicable to the current to 2SP and 3SP have frequency (I to F) converter. been reviewed as vendor drawings for Based on a further review by General Atomics, WBN-2. Please explain the04508905-QR and -2SP reports are applicable to the the reason for current to frequency (I toF) converter used for the WBN applicability of one Unit 2 monitors report and not the other.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 Further all TVA/Bechtel (Reference 9) reviews seems to be dispositioned as Code (3) This is addressed by response to RAI Question 337 in 4, Review not required.

TVA to NRC letter dated November 24, 2010 Work may proceed.

(Reference 9) The applicable reports should have been (4) Responder: P. Berner GAESI reviewed prior to dispositioning them.

(5) To expedite the commitment to submit the documents, Please explain the a formal review was not performed when the apparent lack of review documents were received. The documents are in of WBN-2 applicable formal review by the Bechtel Civil group. documents. Was appropriate review (6) At the time the decision was made to not perform a guidance used?

formal review, it was believed that the documents had already been reviewed for Browns Ferry and there was Further update required little risk in delaying the formal review. It was later found that only the 04508905-QR and -1SP documents Provide model had been reviewed. number/part number for the RM-1000 and I/F converter used for WBN-2.

Submit a copy of the relevant reviewed versions of the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N qualification reports.

(

319 7.5.2.3 7.5 TVA provided System Verification Test Results 04507007-1TR Responder: Temples Y Closed Closed RAI No. 29 TVA Letter dated S

i E

320 I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark Y Closed Closed N/A N/A Duplicate of item 156 321 ( E For the purposes of measuring reactor coolant flow for Reactor Responder: Clark Y Closed Closed N/A N/A Duplicate of OI# 157 C I a

322 7.7.1.11 Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark Y Closed Closed 323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 Y Open Open-TVA Unit 1 TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Response is included in letter Due: 12/22/10 Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. dated 10/29/10 No. 36 EICB(Garg)

The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 B

324 (

G

(

M Per the NRC reviewer, the BISI calculation is not required to be Y Closed Closed a a 325 The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson Y Closed Closed Closed to open item ?

326 TVA uses double-sided methodology for as-found and as-left Responder: Webb Y Open October 22, 2010 Open-TVA/A102 TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR 10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology Attachment 3 contains the revised FSAR section 7.1.2.1.9 Response is included in letter Due 12/17/10 Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects dated 10/29/10 No. 37 this change. Pending FSAR Amendment 102 submittal 327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber Y Open Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Response Included in letter Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC- dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

(

328 7.5.2.3 7.5 Provide the model number for the four containment high range Responder: Temples Y Closed Closed RAI No. 30 TVA Letter dated S

i 329 7.6.1 7.6.7 Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark N Open Open-TVA/A102 RAI No. 1 TVA Letter dated EICB (Singh)

DMIMS-DX' audio and visual alarm capability will remain ML102980005 10/29/10 functional after an Operating Basis Earthquake (OBE). All of the The title of FSAR Section 3.10 is Seismic Design of Response is included in letter 10/26/2010 Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity Category I Instrumentation and Electrical Equipment. Since dated 10/29/10 Due 12/17/10 No. 39 during a Safe Shutdown Earthquake (SSE) and will not the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment. system, it is not included in the scope of 3.10. FSAR Section Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria submittal.

system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR. Criteria, WB-DC-30-31, Loose Parts Monitoring System. As TVA to confirm that the identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC equipment has been Regulatory Guide Conformance, the system conforms to seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 required and that TVA identifies the seismic requirements and Note 12 does not reviewed and found the contain any exception to the Regulatory Guide seismic report acceptable.

requirements.

TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT, list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will acceptance by TVA.

be added as Reference 7 to FSAR section 7.6 in amendment FSAR should reference

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 102. the test document as the source document for tracking conformance.

(

330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner Y Closed Closed EICB RAI No.20 Item 7, TVA letter D

a r

331 7.6.1 7.6.7 As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark N Open Open-TVA/WEC RAI No. 8 TVA Letter dated Follow-up of OI-190.

of the DMIMS-DX system description to verify the conformance ML102980005 10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response: Due 12/22/10 10/26/2010 Enclosure 1 Item and discrepancies between the FSAR and the proprietary version No. 40 of the system description for loose parts monitoring system 1) The source of the information is the DMIMS-DXTM Pending FSAR provided by TVA. Operations and Maintenance Manual, TS3176, Revision Amendment 102 0, dated August 2010. Attachment 14 contains the submittal

1) FSAR, Amendment 100, page 7.6-5 states, During baseline revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted DXTM Loose Part Detection System Description, TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose Revision 1. The Westinghouse DIMMS-DXTM Loose DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20 Part Detection System Description, Revision 1 will be Operations Manual in kHz, where background signals from the RCS are acceptable. added as Reference 9 to section 7.6 in FSAR the FSAR as the source Spurious alarming from control rod stepping is prevented by a Amendment 102. document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping. 2) The source of the information is the DMIMS-DXTM TVA to reference the seismic qualification report, Westinghouse report EQ- source document for The online sensitivity of the DMIMS-DX' is such that the QR-33-WBT, Revision 0, Seismic Evaluation of the item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib Digital Metal Impact Monitoring System (DMIMS-DXTM) response.

and impacts with a kinetic energy of 0.5 ft-lb on the inside for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor. revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in Revision 1.

the system description. TVA to provide the source of the information and update the system description as needed. 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in

2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental Section 7.6.7, Loose Part Monitoring System (LPMS)

Conditions. Components of the loose-part detection system System Description.

within containment should be designed and installed to perform their function following all seismic events that do not Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating Softline Cable (In Containment)

Basis Earthquake (OBE). Recording equipment need not Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate Change Markups that reflect these changes.

by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity 4) The source of the information is Westinghouse Letter environment. WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS- (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the Description, Revision 1.

DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not In responding to Item 4, conflicting information was mechanically impact any safety-related equipment. found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not section and various Westinghouse technical consistent with the seismic qualifications described in the documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as frequency response from 5 Hz to 10 Hz. Attachment 3 EICB (Singh) needed. contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the

3) The system description clearly describes the In-containment sensor.

equipment and DIMMS-DX Cabinet equipment. The FSAR

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N should be updated to reflect the equipment locations for Westinghouse document 1TS3182, Revision 0, Watts clarification purposes. Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference

4) The information regarding frequency ranges of the sensors is 8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information. revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the provide the basis for the frequency response values in system description to reflect the appropriate information. the FSAR.
5) Please provide information as to how the in-containment 5) In-containment component qualification for vibration as components are qualified for vibration as addressed in addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133. be addressed in a future RAI response letter.

TVA Final Partial Response:

Items 1) through 4) were addressed in the partial response provided in TVA to NRC letter dated October 29, 2010. Item 5 is addressed as follows:

WEC to provide

( ( Y 332 7.5.2.1 7.5.1 M M 10/26/2010 Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL a a 333 7.5.2.1 7.5.1 10/27/2010 Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton Y Open Open-TVA/A102 RAI not required. N/A RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves. not part of any SE section.

EICB (Darbali)

Please correct this in a future FSAR amendment. Figure will be corrected in FSAR Due 12/17/10 Amendment 102.

Pending FSAR Amendment 102 submittal.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC N Open Open-TVA/WEC EICB (Singh)

Provide analysis, test, or combined analysis and test for normal WEC to provide Due 12/22/10 operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

(

336 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA Y Closed Closed S

i

(

337 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA Y Closed Closed S

i 338 7.5.2.3 7.5 In page 3-15 and appendix B of Qualification Test Report Responder: Civil EQB N Open Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown Due: 12/22/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

339 7.5.2.3 7.5 CB (Si In the Qualification Test Report 04508905-QR, the licensee Responder: Bob Brown N Open Open-TVA/Bechtel ng provided only eight Safe Shutdown Earthquake (SSE) Test

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radEE311.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Response Spectra (TRS) as mentioned in the previous open item Due: 12/22/10 (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

340 7.5.2.3 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA N Open Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents (1) The EMI/RFI test described in Table 3-2 are based on Response included in letter Due:12/22/10 used as the source for ENV 50140, ENV 55011 Class A, and EN GA-ESI report 04509050 and only summarized in GA- dated 12/22/10.

55022 Class B. ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to the writing of GA-ESI report 0458905-QR additional EMC testing was conducted to TVA specific requirements. The results of that testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and is the report used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation EICB (Singh)

Monitors (2-RE-90-271 through -274).

(2) ENV 50140, EN 55011, and EN 55022 are British Standards Institution publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
b. EN 55011 - Industrial, scientific and medical equipment Radio-frequency disturbance characteristics Limits and methods of measurement
c. EN 55022- Information technology equipment Radio disturbance characteristics Limits and methods of measurement 341 7.5.2.3 7.5 FSAR Tables 3.10 list seismically qualified equipment. However, Open-TVA Open-TVA EICB (Singh) these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables.

342 7.5.2.3 7.5 Please confirm that RM-1000 monitors and the associated Open-TVA Open-TVA EICB (Singh) equipment is supplied power from redundant battery backed class 1E power sources.

343 7.5.2.3 7.5 Seismic RRS in the 04508905-QR report Figures 3-2 and 3-3 Open-TVA Open-TVA show Required Response Spectra (RRS) to be greater than 20 EICB (Singh) gs. The Test Response Spectra (TRS) in Figures 4-11 and 4-12 appears to be limited to about 15 g maximum. Please explain this apparent lack of consistency between the RRS and the TRS. Will this document be revised to take care of this inconsistency?