ML12235B361: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML12235B361
| number = ML12235B361
| issue date = 08/20/2012
| issue date = 08/20/2012
| title = 2012/08/20 Watts Bar 2 OL - 2012-08-20 - WBN Project Plan - Unit 2.pdf
| title = OL - 2012-08-20 - WBN Project Plan - Unit 2.pdf
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]
{{#Wiki_filter:WBN2Public Resource From:                   Boyd, Desiree L [dlboyd@tva.gov]
Sent: Monday, August 20, 2012 8:22 AM To: Poole, Justin; Bryan, Robert H Jr; Arent, Gordon Cc: Boyd, Desiree L; Templeton, Pamela J
Sent:                   Monday, August 20, 2012 8:22 AM To:                     Poole, Justin; Bryan, Robert H Jr; Arent, Gordon Cc:                     Boyd, Desiree L; Templeton, Pamela J


==Subject:==
==Subject:==
2012-08-20  -  WBN Project Plan - Unit 2.pdf Attachments:
2012-08 WBN Project Plan - Unit 2.pdf Attachments:           2012-08 WBN Project Plan - Unit 2.pdf Please see attached for todays 9:15 phone call.
2012-08-20  -  WBN Project Plan - Unit 2.pdf Please see attached for today's 9:15 phone call.  
Thank you,
~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1


Thank you, 
Hearing Identifier:      Watts_Bar_2_Operating_LA_Public Email Number:            728 Mail Envelope Properties      (7AB41F650F76BD44B5BCAB7C0CCABFAF312F7DD4)
  ~*~*~*~*~*~*~*~*~*~*~
Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764


Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 728  Mail Envelope Properties  (7AB41F650F76BD44B5BCAB7C0CCABFAF312F7DD4) 
==Subject:==
2012-08 WBN Project Plan - Unit 2.pdf Sent Date:              8/20/2012 8:22:10 AM Received Date:          8/20/2012 8:22:17 AM From:                    Boyd, Desiree L Created By:              dlboyd@tva.gov Recipients:
"Boyd, Desiree L" <dlboyd@tva.gov>
Tracking Status: None "Templeton, Pamela J" <pjtempleton@tva.gov>
Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>
Tracking Status: None "Arent, Gordon" <garent@tva.gov>
Tracking Status: None Post Office:            TVANUCXVS2.main.tva.gov Files                          Size                  Date & Time MESSAGE                        260                    8/20/2012 8:22:17 AM 2012-08 WBN Project Plan - Unit 2.pdf                          214694 Options Priority:                      Standard Return Notification:            No Reply Requested:                Yes Sensitivity:                    Normal Expiration Date:
Recipients Received:


==Subject:==
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                            Page 2 of 38 I.      SUBMITTAL LOOK-AHEAD Item No.                                          Description                                    Resp. Person          Due Date License Amendments / Technical Specifications
2012-08-20  - WBN Project Plan  -  Unit 2.pdf  Sent Date:   8/20/2012 8:22:10 AM Received Date: 8/20/2012 8:22:17 AM From:   Boyd, Desiree L Created By:   dlboyd@tva.gov Recipients:     "Boyd, Desiree L" <dlboyd@tva.gov>
: 1. Common Service Station Transformer (CSST) A & B Credit                                      Shea        October 12, 2012
Tracking Status: None "Templeton, Pamela J" <pjtempleton@tva.gov>
: 3. U2 Hydrology FSAR & TS Update                                                            Stockton      August 26, 2012 SSER Open Item 32:
Tracking Status: None  "Poole, Justin" <Justin.Poole@nrc.gov>  Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov> Tracking Status: None  "Arent, Gordon" <garent@tva.gov>
: 4.                                                                                              Hilmes      January 13, 2013 Revise Diesel Generator Frequency Allowable Value.      [Commitment 113676066]
Tracking Status: None Post Office:   TVANUCXVS2.main.tva.gov 
SSER Appendix HH Open Items (requiring submittal)
SSER Open Item 1:
Following completion of cable pulls, submit letter to NRC either:
: 1.
* Affirming no power assisted cable pulls were made, or                                    Hilmes      TBD
* Documenting any power assisted cable pulls.
[Commitment 113676047]
SSER Open Item 13:
: 2. Submit an ASME Section XI Inservice Test Program for the first ten year interval      McDonald / Crouch March 2014 six months before receiving an Operating License. [Commitment NCO080008033:
Item 017 of Enclosure 2 of letter T90 080128 001]
SSER Open Item 25:
: 3. Submit documentation of liability insurance coverage pursuant to 10 CFR 140.11(a)(4).      Arent        June 2014
[Commitment 113676162]
SOURCE: POD UPDATES, COMMITMENTS
 
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                                Page 3 of 38 Item No.                                            Description                                        Resp. Person          Due Date SSER Open Item 37:
: 4. Submit changes to the Emergency Plan (REP) prior to fuel load.                              Detchemendy    June 2014
[Commitment 111032952]
SSER Open Item 41:
: 5. Update Plant design displays & dose assessment models to provide two unit capability.      Hilmes / Koontz December 2013
[Commitment 111033086]
SSER Open Item 43:
: 6. Submit Emergency Plan implementing procedures no less than 180 days before schedule        Detchemendy    TBD issuance of Operating License. [Commitment ____________]
SSER Open Item 61:
: 7. Fuel Thermal Conductivity Degradation Model (PAD Code) - Note: currently this is a            Koontz      October 26, 2012 License Condition - tracking PWROG activity to update code. [Commitment 113676152]
SSER Open Item 70:
: 8.                                                                                              McDonald / Crouch September 28, 2012 Submit Pre-Service Inspection program update.      [Commitment 113676155]
SSER Open Item 77:
: 9. Provide Electronic Filter Test Results for General Atomic High Range Rad Monitor.              Hilmes      August 31, 2012
[Commitment 113676079]
SSER Open Item 79:
Perform an EMI survey of the containment high range radiation monitors after they are
: 10.                                                                                                  Hilmes      March 4, 2014 installed in WBN Unit 2, and submit the results to the NRC within two weeks of the survey being completed. [Commitment 112177753]
SSER Open Item 83:
: 11. Provide Letter verifying completion of data storm test on DCS.                                Hilmes      January 2015
[Commitment 113676093]
SOURCE: POD UPDATES, COMMITMENTS
 
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                               Page 4 of 38 Item No.                                            Description                                          Resp. Person          Due Date SSER Open Item 115:
: 12. Incorporate U1 dose reduction plant changes that 2010 letter said were being done on Unit        Arent      TBD 2 into FSAR Chapter 12. Engineering to identify change packages showing what is done/planned.
SSER Open Item 117:
: 13. Provide calculational basis for access to vital areas - mission dose and update FSAR.        Koontz / Arent August 26, 2012 (Amendment 109) [Commitment 112046729]
SSER Open Item 132:
x    Submit letter documenting that plant modifications to add high VCT level alarm to main control room annunciator system have been completed. [Commitment 113111704]
: 14.                                                                                                Arent / Wallace May 24, 2013 x    Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been made. [Commitment 113111704]
SSER Open Item 134:
: 15. Provide resolution of dam stability analysis for Cherokee and Douglas Dams finite element        Ray        August 31, 2012 analysis.
SSER Open Item 138:
(Amendment 109)
: 16.                                                                                                    Bryan      August 26, 2012 NRC to verify that the ODCM average annual X/Q & D/Q values have been updated to match the FSAR. [Commitment 113676172]
SSER Open Item 139:
: 17. Include cost benefit analysis in next update to FSAR. (Amend 109)                                Bryan      August 26, 2012
[Commitment 113676181]
Submit a Technical Specification and Bases change package to TVA Licensing to change Table 3.3.3-1, Line item 6 (Reactor Vessel Water Level) to remove the reference to
: 18. note (g) and bases to show RVLIS as a Type A variable.                                          Bryan      August 26, 2012 PER 488815      [Commitment 113307292]
SOURCE: POD UPDATES, COMMITMENTS
 
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                            Page 5 of 38 Item No.                                        Description                                          Resp. Person     Due Date Submit a FSAR Change Package to TVA Licensing to Amendment 108, Table 7.5-2, Regulatory Guide 1.97 Post Accident Monitoring Variables Lists, will be updated to show
: 19. RVLIS as a Type A variable.                                                                Stockton August 26, 2012 PER 488815 [Commitment 113307350]
SOURCE: POD UPDATES, COMMITMENTS
 
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                                  Page 6 of 38 Item No.                                                Description                                          Resp. Person          Due Date Other Submittals
: 1. As-Constructed Fire Protection Report        [Commitment 113461862]                                Hilmes    July 2014
: 2. U2 FSAR With As-Constructed Figures          [Commitment 112068531]                                Arent    July 2014 Prior to fuel load, a final report will be submitted following certain validation activities as
: 3.                                                                                                     Koontz / Enis July 2014 described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893]
TVA will provide the NRC staff an updated [security] classification scheme that reflects
: 4. these changes for WBN Unit 2. [Commitment 111033038: RAI Response 3.r of                          Reynolds    May 2014 Enclosure 2. of Letter T02 100427 001]
: 5. Submit a merged U2 FSAR / U1 UFSAR              [Commitment 111360889]                            Licensing    April 2016
: 6. 10 CFR Part 70 License Extension                                                                    Bryan     August 26, 2012
: 7. Two Unit ODCM                                                                                    Woods / Shea September 14, 2012
: 8. As-Constructed PRA                                                                              Guey / Koontz October 2014
: 9. TMI Commitment Review Letter                                                                      Licensing  January 2014
: 10. Letter to terminate Part 30/40 License after receipt of Part 50 License                            Licensing  January 2015
: 11. ASME Section III N-3 Report                                                                        Crouch    September 2014
: 12. Letter to NRC for notification of Vital Area Boundary Restoration                                  Licensing  May 2014
: 13. Unit 2 Completion Letter                                                                          Licensing    December 2014 SOURCE: POD UPDATES, COMMITMENTS
 
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                    Page 7 of 38 Item No.                                         Description                Resp. Person          Due Date Other Submittals
: 14. Fire Protection Report                                          Hilmes / Wiggal September 13, 2012
: 15. PAM variable Calculation for EOP reviews.                           Partch      December 31, 2012
: 16. Regulatory Framework Update [for status as of 12/31/201207/31]      Elton      January 18, 2013 Regional Submittals 1.
SOURCE: POD UPDATES, COMMITMENTS


Files    Size      Date & Time MESSAGE    260      8/20/2012 8:22:17 AM  2012-08-20  -  WBN Project Plan  -  Unit 2.pdf    214694 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    Yes  Sensitivity:    Normal  Expiration Date:      Recipients Received:
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                                     Page 8 of 38 Item No.                                               Description                                               Resp. Person     Due Date Fukushima NRC Order EA-12-049; Mitigating Strategies Order:
WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 2 of 38 SOURCE: POD UPDATES, COMMITMENTS I. SUBMITTAL LOOK-AHEAD Item No. Description Resp. Person Due Date License Amendments / Technical Specifications
Licensees to develop, implement, and maintain guidance and strategies to maintain or restore core
: 1. Common Service Station Transformer (CSST) A & B Credit Shea Octob er 12, 2012
: 1.                                                                                                             Williams cooling, containment and SFP cooling capabilities following a beyond-design-basis external event.
: 3. U2 Hydrology FSAR & TS Update Stockton August 26, 2012
Must be implemented in all modes.
: 4. SSER Open Item 32: Revise Diesel Generator Frequency Allowable Value.    [Commitment 113676066] Hilmes January 13, 2013 SSER Appendix HH Open Items (requiring submittal)
NRC Order EA-12-049; Mitigating Strategies Order:
: 1. SSER Open Item 1: Following completion of cable pulls, submit letter to NRC either:
Strategies must be capable of mitigating a simultaneous loss of all alternating current (AC) power and
* Affirming no power assisted cable pulls were made, or
: 2.                                                                                                             Williams loss of normal access to the ultimate heat sink and have adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site.
* Documenting any power assisted cable pulls. [Commitment 113676047]
NRC Order EA-12-049; Mitigating Strategies Order:
Hilmes TBD
Provide reasonable protection for the associated equipment from external events. Such protection
: 2. SSER Open Item 13: Submit an ASME Section XI Inservice Test Program for the first ten year interval six months before receiving an Operating License.    [Commitment NCO080008033: Item 017 of Enclosure 2 of letter T90 080128 001] McDonald / Crouch March 2014
: 3.                                                                                                             Williams must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site.
: 3. SSER Open Item 25: Submit documentation of liability insurance coverage pursuant to 10 CFR 140.11(a)(4).     [Commitment 113676162] Arent June 2014 WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 3 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date 4. SSER Open Item 37: Submit changes to the Emergency Plan (REP) prior to fuel load.    [Commitment 111032952] Detchemendy June 2014
NRC Order EA-12-051; Order:
: 5. SSER Open Item 41: Update Plant design displays & dose assessment models to provide two unit capability.     [Commitment 111033086] Hilmes / Koontz December 2013
Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain
: 6. SSER Open Item 43: Submit Emergency Plan implementing procedures no less than 180 days before schedule issuance of Operating License.    [Commitment ____________]
: 4. reliable at temperature, humidity and radiation levels at saturation conditions, to monitor SFP water     Hilmes    08/13/2012 level from the control room.
Detchemendy TBD
DCN 59683, Spent Fuel Pool Level Indication 10% of package 10 CFR 50.54 F Letter Request for Information:
: 7. SSER Open Item 61: Fuel Thermal Conductivity Degradation Model (PAD Code) - Note:  currently this is a License Condition - tracking PWROG activity to update code.    [Commitment 113676152] Koontz October 26, 2012
Licensees to reevaluate the seismic hazards at their sites against current NRC requirements and
: 8. SSER Open Item 70: Submit Pre-Service Inspection program update.    [Commitment 113676155] McDonald / Crouch September 28, 2012
: 5.                                                                                                             Williams guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards.
: 9. SSER Open Item 77: Provide Electronic Filter Test Results for General Atomic High Range Rad Monitor.     [Commitment 113676079] Hilmes August 31, 2012
SOURCE: POD UPDATES, COMMITMENTS
: 10. SSER Open Item 79:
Perform an EMI survey of the containment high range radiation monitors after they are installed in WBN Unit 2, and submit the results to the NRC within two weeks of the survey being completed.     [Commitment 112177753] Hilmes March 4, 2014
: 11. SSER Open Item 83:
Provide Letter verifying completion of data storm test on DCS.    [Commitment 113676093] Hilmes January 2015 WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 4 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date 12. SSER Open Item 115: Incorporate U1 dose reduction plant changes that 2010 letter said were being done on Unit 2 into FSAR Chapter 12. Engineering to identify change packages showing what is done/planned. Arent TBD
: 13. SSER Open Item 117: Provide calculational basis for access to vital areas - mission dose and update FSAR.  (Amendment 109)     [Commitment 112046729] Koontz / Arent August 26, 2012
: 14. SSER Open Item 132:  Submit letter documenting that plant modifications to add high VCT level alarm to main control room annunciator system have been completed.     [Commitment 113111704]  Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been made.     [Commitment 113111704] Arent / Wallace May 24, 2013
: 15. SSER Open Item 134: Provide resolution of dam stability analysis for Cherokee and Douglas Dams finite element analysis. Ray August 31, 2012
: 16. SSER Open Item 138:  (Amendment 109) NRC to verify that the ODCM average annual X/Q & D/Q values have been updated to match the FSAR.    [Commitment 113676172] Bryan August 26, 2012
: 17. SSER Open Item 139:  Include cost benefit analysis in next update to FSAR. (Amend 109)    [Commitment 113676181] Bryan August 26, 2012
: 18. Submit a Technical Specification and Bases change package to TVA Licensing to change Table 3.3.3-1, Line item 6 (Reactor Vessel Water Level) to remove the reference to note (g) and bases to show RVLIS as a Type A variable. PER 488815    [Commitment 113307292] Bryan August 26, 2012 WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 5 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date 19. Submit a FSAR Change Package to TVA Licensing to Amendment 108, Table 7.5-2, Regulatory Guide 1.97 Post Accident Monitoring Variables Lists, will be updated to show RVLIS as a Type A variable. PER 488815  [Commitment 113307350] Stockton August 26, 2012


WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 6 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Other Submittals
WBN UNIT 2 PROJECT PLAN: 08/20/2012                                                             Page 9 of 38 Item No.                                             Description                                               Resp. Person Due Date Fukushima 10 CFR 50.54 F Letter Request for Information:
: 1. As-Constructed Fire Protection Report      [Commitment 113461862] Hilmes July 2014
Licensees to reevaluate the flooding hazards at their sites against current NRC requirements and
: 2. U2 FSAR With As-Constructed Figures
: 6.                                                                                                          Williams guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards.
[Commitment 112068531] Arent July 2014
10 CFR 50.54 F Letter Request for Information:
: 3. Prior to fuel load, a final report will be submitted following certain validation activities as described in the IPEEE Design Report (Enclosure 1).
: 7. Recommendation 9.3 requires licensees to evaluate communication and staffing needs for multi-unit     Williams events.
[Commitment 111027893]
SOURCE: POD UPDATES, COMMITMENTS
Koontz / Enis July 2014
: 4. TVA will provide the NRC staff an updated [security] classification scheme that reflects these changes for WBN Unit 2.    [Commitment 111033038:  RAI Response 3.r of Enclosure 2. of Letter T02 100427 001] Reynolds May 2014
: 5. Submit a merged U2 FSAR / U1 UFSAR    [Commitment 111360889] Licensing April 2016
: 6. 10 CFR Part 70 License Extension Bryan August 26, 2012
: 7. Two Unit ODCM Woods / Shea September 14, 2012
: 8. As-Constructed PRA Guey / Koontz October 2014
: 9. TMI Commitment Review Letter  Licensing January 2014
: 10. Letter to terminate Part 30/40 License after receipt of Part 50 License Licensing January 2015
: 11. ASME Section III N-3 Report Crouch September 2014
: 12. Letter to NRC for notification of Vital Area Boundary Restoration Licensing May 2014
: 13. Unit 2 Completion Letter Licensing December 2014 WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 7 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Other Submittals
: 14. Fire Protection Report Hilmes / Wiggal September 13, 2012
: 15. PAM variable Calculation for EOP reviews. Partch December 31, 2012
: 16. Regulatory Framework Update [for status as of 12/31/201207/31] Elton January 18, 2013 Regional Submittals
: 1.
WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 8 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Fukushima
: 1. NRC Order EA-12-049; Mitigating Strategies Order: Licensees to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment and SFP cooling capabilities following a beyond-design-basis external event.
Must be implemented in all modes. Williams
: 2. NRC Order EA-12-049; Mitigating Strategies Order:  Strategies must be capable of mitigating a simultaneous loss of all alternating current (AC) power and loss of normal access to the ultimate heat sink and have adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site. Williams
: 3. NRC Order EA-12-049; Mitigating Strategies Order:  Provide reasonable protection for the associated equipment from external events. Such protection must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site. Williams
: 4. NRC Order EA-12-051; Order: Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain reliable at temperature, humidity and radiation levels at saturation conditions, to monitor SFP water level from the control room. DCN 59683, Spent Fuel Pool Level Indication 10% of package Hilmes 08/13/2012
: 5. 10 CFR 50.54 F Letter Request for Information: Licensees to reevaluate the seismic hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. Williams WBN UNIT 2 PROJECT PLAN:  08/20/2012 Page 9 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Fukushima
: 6. 10 CFR 50.54 F Letter Request for Information: Licensees to reevaluate the flooding hazards at their sites against current NRC requirements and guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards. Williams
: 7. 10 CFR 50.54 F Letter Request for Information: Recommendation 9.3 requires licensees to evaluate communication and staffing needs for multi-unit events. Williams 


WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 10 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Waste Confidence
WBN UNIT 2 PROJECT PLAN: 08/20/2012                   Page 10 of 38 Item No.                                   Description         Resp. Person     Due Date Waste Confidence
: 1. Follow NRC response to Court Order Vigluicci 10/1/2012  
: 1. Follow NRC response to Court Order                   Vigluicci 10/1/2012 SOURCE: POD UPDATES, COMMITMENTS


WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 11 of 38 SOURCE: POD UPDATES, COMMITMENTS Item No. Description Resp. Person Due Date Significant New Regulatory Issues
WBN UNIT 2 PROJECT PLAN: 08/20/2012                             Page 11 of 38 Item No.                                       Description         Resp. Person           Due Date Significant New Regulatory Issues New Station Blackout Rule
: 1. New Station Blackout Rule  Ongoing rulemaking Hilmes  2. 10 CFR 50.46 Rule Change Oxidation limits Ongoing rulemaking Koontz/Westinghouse
: 1.                                                               Hilmes Ongoing rulemaking 10 CFR 50.46 Rule Change
: 3. NRC Bulletin 2012-01 Design Vulnerability in Electric Power Systems Fleet Response Shea 10/25/2012}}
: 2.          Oxidation limits                               Koontz/Westinghouse Ongoing rulemaking NRC Bulletin 2012-01
: 3.          Design Vulnerability in Electric Power Systems       Shea         10/25/2012 Fleet Response SOURCE: POD UPDATES, COMMITMENTS}}

Latest revision as of 19:36, 5 December 2019

OL - 2012-08-20 - WBN Project Plan - Unit 2.pdf
ML12235B361
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 08/20/2012
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML12235B361 (12)


Text

WBN2Public Resource From: Boyd, Desiree L [dlboyd@tva.gov]

Sent: Monday, August 20, 2012 8:22 AM To: Poole, Justin; Bryan, Robert H Jr; Arent, Gordon Cc: Boyd, Desiree L; Templeton, Pamela J

Subject:

2012-08 WBN Project Plan - Unit 2.pdf Attachments: 2012-08 WBN Project Plan - Unit 2.pdf Please see attached for todays 9:15 phone call.

Thank you,

~*~*~*~*~*~*~*~*~*~*~

Désireé L. Boyd WBN Unit 2 Licensing dlboyd@tva.gov 423-365-8764 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 728 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF312F7DD4)

Subject:

2012-08 WBN Project Plan - Unit 2.pdf Sent Date: 8/20/2012 8:22:10 AM Received Date: 8/20/2012 8:22:17 AM From: Boyd, Desiree L Created By: dlboyd@tva.gov Recipients:

"Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Templeton, Pamela J" <pjtempleton@tva.gov>

Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Bryan, Robert H Jr" <rhbryan@tva.gov>

Tracking Status: None "Arent, Gordon" <garent@tva.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov Files Size Date & Time MESSAGE 260 8/20/2012 8:22:17 AM 2012-08 WBN Project Plan - Unit 2.pdf 214694 Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date:

Recipients Received:

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 2 of 38 I. SUBMITTAL LOOK-AHEAD Item No. Description Resp. Person Due Date License Amendments / Technical Specifications

1. Common Service Station Transformer (CSST) A & B Credit Shea October 12, 2012
3. U2 Hydrology FSAR & TS Update Stockton August 26, 2012 SSER Open Item 32:
4. Hilmes January 13, 2013 Revise Diesel Generator Frequency Allowable Value. [Commitment 113676066]

SSER Appendix HH Open Items (requiring submittal)

SSER Open Item 1:

Following completion of cable pulls, submit letter to NRC either:

1.
  • Affirming no power assisted cable pulls were made, or Hilmes TBD
  • Documenting any power assisted cable pulls.

[Commitment 113676047]

SSER Open Item 13:

2. Submit an ASME Section XI Inservice Test Program for the first ten year interval McDonald / Crouch March 2014 six months before receiving an Operating License. [Commitment NCO080008033:

Item 017 of Enclosure 2 of letter T90 080128 001]

SSER Open Item 25:

3. Submit documentation of liability insurance coverage pursuant to 10 CFR 140.11(a)(4). Arent June 2014

[Commitment 113676162]

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 3 of 38 Item No. Description Resp. Person Due Date SSER Open Item 37:

4. Submit changes to the Emergency Plan (REP) prior to fuel load. Detchemendy June 2014

[Commitment 111032952]

SSER Open Item 41:

5. Update Plant design displays & dose assessment models to provide two unit capability. Hilmes / Koontz December 2013

[Commitment 111033086]

SSER Open Item 43:

6. Submit Emergency Plan implementing procedures no less than 180 days before schedule Detchemendy TBD issuance of Operating License. [Commitment ____________]

SSER Open Item 61:

7. Fuel Thermal Conductivity Degradation Model (PAD Code) - Note: currently this is a Koontz October 26, 2012 License Condition - tracking PWROG activity to update code. [Commitment 113676152]

SSER Open Item 70:

8. McDonald / Crouch September 28, 2012 Submit Pre-Service Inspection program update. [Commitment 113676155]

SSER Open Item 77:

9. Provide Electronic Filter Test Results for General Atomic High Range Rad Monitor. Hilmes August 31, 2012

[Commitment 113676079]

SSER Open Item 79:

Perform an EMI survey of the containment high range radiation monitors after they are

10. Hilmes March 4, 2014 installed in WBN Unit 2, and submit the results to the NRC within two weeks of the survey being completed. [Commitment 112177753]

SSER Open Item 83:

11. Provide Letter verifying completion of data storm test on DCS. Hilmes January 2015

[Commitment 113676093]

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 4 of 38 Item No. Description Resp. Person Due Date SSER Open Item 115:

12. Incorporate U1 dose reduction plant changes that 2010 letter said were being done on Unit Arent TBD 2 into FSAR Chapter 12. Engineering to identify change packages showing what is done/planned.

SSER Open Item 117:

13. Provide calculational basis for access to vital areas - mission dose and update FSAR. Koontz / Arent August 26, 2012 (Amendment 109) [Commitment 112046729]

SSER Open Item 132:

x Submit letter documenting that plant modifications to add high VCT level alarm to main control room annunciator system have been completed. [Commitment 113111704]

14. Arent / Wallace May 24, 2013 x Submit letter documenting that procedure changes associated with limiting the number of operating primary water pumps and isolating potential boron dilution paths have been made. [Commitment 113111704]

SSER Open Item 134:

15. Provide resolution of dam stability analysis for Cherokee and Douglas Dams finite element Ray August 31, 2012 analysis.

SSER Open Item 138:

(Amendment 109)

16. Bryan August 26, 2012 NRC to verify that the ODCM average annual X/Q & D/Q values have been updated to match the FSAR. [Commitment 113676172]

SSER Open Item 139:

17. Include cost benefit analysis in next update to FSAR. (Amend 109) Bryan August 26, 2012

[Commitment 113676181]

Submit a Technical Specification and Bases change package to TVA Licensing to change Table 3.3.3-1, Line item 6 (Reactor Vessel Water Level) to remove the reference to

18. note (g) and bases to show RVLIS as a Type A variable. Bryan August 26, 2012 PER 488815 [Commitment 113307292]

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 5 of 38 Item No. Description Resp. Person Due Date Submit a FSAR Change Package to TVA Licensing to Amendment 108, Table 7.5-2, Regulatory Guide 1.97 Post Accident Monitoring Variables Lists, will be updated to show

19. RVLIS as a Type A variable. Stockton August 26, 2012 PER 488815 [Commitment 113307350]

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 6 of 38 Item No. Description Resp. Person Due Date Other Submittals

1. As-Constructed Fire Protection Report [Commitment 113461862] Hilmes July 2014
2. U2 FSAR With As-Constructed Figures [Commitment 112068531] Arent July 2014 Prior to fuel load, a final report will be submitted following certain validation activities as
3. Koontz / Enis July 2014 described in the IPEEE Design Report (Enclosure 1). [Commitment 111027893]

TVA will provide the NRC staff an updated [security] classification scheme that reflects

4. these changes for WBN Unit 2. [Commitment 111033038: RAI Response 3.r of Reynolds May 2014 Enclosure 2. of Letter T02 100427 001]
5. Submit a merged U2 FSAR / U1 UFSAR [Commitment 111360889] Licensing April 2016
6. 10 CFR Part 70 License Extension Bryan August 26, 2012
7. Two Unit ODCM Woods / Shea September 14, 2012
8. As-Constructed PRA Guey / Koontz October 2014
9. TMI Commitment Review Letter Licensing January 2014
10. Letter to terminate Part 30/40 License after receipt of Part 50 License Licensing January 2015
11. ASME Section III N-3 Report Crouch September 2014
12. Letter to NRC for notification of Vital Area Boundary Restoration Licensing May 2014
13. Unit 2 Completion Letter Licensing December 2014 SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 7 of 38 Item No. Description Resp. Person Due Date Other Submittals

14. Fire Protection Report Hilmes / Wiggal September 13, 2012
15. PAM variable Calculation for EOP reviews. Partch December 31, 2012
16. Regulatory Framework Update [for status as of 12/31/201207/31] Elton January 18, 2013 Regional Submittals 1.

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 8 of 38 Item No. Description Resp. Person Due Date Fukushima NRC Order EA-12-049; Mitigating Strategies Order:

Licensees to develop, implement, and maintain guidance and strategies to maintain or restore core

1. Williams cooling, containment and SFP cooling capabilities following a beyond-design-basis external event.

Must be implemented in all modes.

NRC Order EA-12-049; Mitigating Strategies Order:

Strategies must be capable of mitigating a simultaneous loss of all alternating current (AC) power and

2. Williams loss of normal access to the ultimate heat sink and have adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site.

NRC Order EA-12-049; Mitigating Strategies Order:

Provide reasonable protection for the associated equipment from external events. Such protection

3. Williams must demonstrate that there is adequate capacity to address challenges to core cooling, containment, and SFP cooling capabilities at all units on a site.

NRC Order EA-12-051; Order:

Licensees to provide instrumentation, able to withstand design-basis natural phenomena and remain

4. reliable at temperature, humidity and radiation levels at saturation conditions, to monitor SFP water Hilmes 08/13/2012 level from the control room.

DCN 59683, Spent Fuel Pool Level Indication 10% of package 10 CFR 50.54 F Letter Request for Information:

Licensees to reevaluate the seismic hazards at their sites against current NRC requirements and

5. Williams guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards.

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 9 of 38 Item No. Description Resp. Person Due Date Fukushima 10 CFR 50.54 F Letter Request for Information:

Licensees to reevaluate the flooding hazards at their sites against current NRC requirements and

6. Williams guidance, and if necessary, update the design basis and SSCs important to safety to protect against the updated hazards.

10 CFR 50.54 F Letter Request for Information:

7. Recommendation 9.3 requires licensees to evaluate communication and staffing needs for multi-unit Williams events.

SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 10 of 38 Item No. Description Resp. Person Due Date Waste Confidence

1. Follow NRC response to Court Order Vigluicci 10/1/2012 SOURCE: POD UPDATES, COMMITMENTS

WBN UNIT 2 PROJECT PLAN: 08/20/2012 Page 11 of 38 Item No. Description Resp. Person Due Date Significant New Regulatory Issues New Station Blackout Rule

1. Hilmes Ongoing rulemaking 10 CFR 50.46 Rule Change
2. Oxidation limits Koontz/Westinghouse Ongoing rulemaking NRC Bulletin 2012-01
3. Design Vulnerability in Electric Power Systems Shea 10/25/2012 Fleet Response SOURCE: POD UPDATES, COMMITMENTS