ML14154A527: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14154A527
| number = ML14154A527
| issue date = 06/03/2014
| issue date = 06/03/2014
| title = Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (Ist)/Preservice Test (Pst) Program
| title = NRR E-mail Capture - Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (Ist)/Preservice Test (Pst) Program
| author name = Dion J
| author name = Dion J
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
| addressee name = Arent G P
| addressee name = Arent G
| addressee affiliation = NRC/NRR/DORL
| addressee affiliation = NRC/NRR/DORL
| docket = 05000391
| docket = 05000391
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Tuesday, June 03, 2014 2:54 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov);
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Dion, Jeanne Sent:                       Tuesday, June 03, 2014 2:54 PM To:                         Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc:                         Poole, Justin; Lingam, Siva; Huang, John; Quichocho, Jessie; Lupold, Timothy
rhbryan@tva.gov Cc: Poole, Justin; Lingam, Siva; Huang, J ohn; Quichocho, Jessie; Lupold, Timothy


==Subject:==
==Subject:==
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4)
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)
Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4)
Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S.
Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staff's acceptance re view of this relief request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it does provide technical information in  
 
sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.  
 
If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole.
If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole.
Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349  
Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 1


Hearing Identifier: NRR_PMDA Email Number: 1333   Mail Envelope Properties   (0B8884532E5C074E972B443F6E8F592E7DE6017127)
Hearing Identifier:     NRR_PMDA Email Number:           1333 Mail Envelope Properties     (0B8884532E5C074E972B443F6E8F592E7DE6017127)


==Subject:==
==Subject:==
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118) Sent Date:   6/3/2014 2:54:05 PM Received Date: 6/3/2014 2:54:00 PM From:   Dion, Jeanne Created By:   Jeanne.Dion@nrc.gov Recipients:     "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Huang, John" <John.Huang@nrc.gov>
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov> Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov> Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> Tracking Status: None  
Sent Date:               6/3/2014 2:54:05 PM Received Date:           6/3/2014 2:54:00 PM From:                   Dion, Jeanne Created By:             Jeanne.Dion@nrc.gov Recipients:
 
"Poole, Justin" <Justin.Poole@nrc.gov>
Post Office:   HQCLSTR01.nrc.gov
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
 
Tracking Status: None "Huang, John" <John.Huang@nrc.gov>
Files     Size     Date & Time MESSAGE   2322     6/3/2014 2:54:00 PM
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
 
Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov>
Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>
Tracking Status: None Post Office:             HQCLSTR01.nrc.gov Files                           Size                     Date & Time MESSAGE                         2322                     6/3/2014 2:54:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Recipients Received:}}

Latest revision as of 05:51, 5 December 2019

NRR E-mail Capture - Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (Ist)/Preservice Test (Pst) Program
ML14154A527
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 06/03/2014
From: Dion J
Tennessee Valley Authority
To: Arent G
Division of Operating Reactor Licensing
References
MF4118
Download: ML14154A527 (2)


Text

NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Tuesday, June 03, 2014 2:54 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc: Poole, Justin; Lingam, Siva; Huang, John; Quichocho, Jessie; Lupold, Timothy

Subject:

Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)

Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4)

Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S.

Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole.

Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 1

Hearing Identifier: NRR_PMDA Email Number: 1333 Mail Envelope Properties (0B8884532E5C074E972B443F6E8F592E7DE6017127)

Subject:

Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)

Sent Date: 6/3/2014 2:54:05 PM Received Date: 6/3/2014 2:54:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients:

"Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>

Tracking Status: None "Huang, John" <John.Huang@nrc.gov>

Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>

Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>

Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov>

Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2322 6/3/2014 2:54:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: