(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML14154A527 | | | number = ML14154A527 |
| | issue date = 06/03/2014 | | | issue date = 06/03/2014 |
| | title = Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (Ist)/Preservice Test (Pst) Program | | | title = NRR E-mail Capture - Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (Ist)/Preservice Test (Pst) Program |
| | author name = Dion J | | | author name = Dion J |
| | author affiliation = Tennessee Valley Authority | | | author affiliation = Tennessee Valley Authority |
| | addressee name = Arent G P | | | addressee name = Arent G |
| | addressee affiliation = NRC/NRR/DORL | | | addressee affiliation = NRC/NRR/DORL |
| | docket = 05000391 | | | docket = 05000391 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Tuesday, June 03, 2014 2:54 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Tuesday, June 03, 2014 2:54 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc: Poole, Justin; Lingam, Siva; Huang, John; Quichocho, Jessie; Lupold, Timothy |
| rhbryan@tva.gov Cc: Poole, Justin; Lingam, Siva; Huang, J ohn; Quichocho, Jessie; Lupold, Timothy | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4) | | Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118) |
| | Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4) |
| Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S. | | Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S. |
| Nuclear Regulatory Commission (NRC) staff's acceptance re view of this relief request. The acceptance review was performed to determine if there is sufficient te chnical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. | | Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | | The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. |
| The NRC staff has reviewed your application and concluded that it does provide technical information in | |
| | |
| sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed te chnical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence. | |
| | |
| If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole. | | If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole. |
| Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 | | Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 1 |
|
| |
|
| Hearing Identifier: NRR_PMDA Email Number: 1333 Mail Envelope Properties (0B8884532E5C074E972B443F6E8F592E7DE6017127) | | Hearing Identifier: NRR_PMDA Email Number: 1333 Mail Envelope Properties (0B8884532E5C074E972B443F6E8F592E7DE6017127) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118) Sent Date: 6/3/2014 2:54:05 PM Received Date: 6/3/2014 2:54:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients: "Poole, Justin" <Justin.Poole@nrc.gov> Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> Tracking Status: None "Huang, John" <John.Huang@nrc.gov> | | Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118) |
| Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov> Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov> Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> Tracking Status: None | | Sent Date: 6/3/2014 2:54:05 PM Received Date: 6/3/2014 2:54:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients: |
| | | "Poole, Justin" <Justin.Poole@nrc.gov> |
| Post Office: HQCLSTR01.nrc.gov | | Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov> |
| | | Tracking Status: None "Huang, John" <John.Huang@nrc.gov> |
| Files Size Date & Time MESSAGE 2322 6/3/2014 2:54:00 PM | | Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov> |
| | | Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov> |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | | Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov> |
| | Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> |
| | Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2322 6/3/2014 2:54:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received:}} |
|
---|
Category:E-Mail
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 2024-09-24
[Table view] |
Text
NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Tuesday, June 03, 2014 2:54 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc: Poole, Justin; Lingam, Siva; Huang, John; Quichocho, Jessie; Lupold, Timothy
Subject:
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)
Mr. Arent, By letter dated May 8, 2014 (ADAMS Accession No. ML14133A296), TVA submitted the subject Request for Relief for Watts Bar Unit 2, per 10 CFR 50.55a(a)(3) and 10 CFR 50.55a(f)(5)(iii). The proposed Inservice Test (IST) Program and associated relief requests address 1) Pump Vibration Reference Values and Acceptance Criteria, 2) ERCW Screen Wash Pump Test Method, 3) Reactor Head Vent Valve stroke time testing and 4)
Unit 2 Pressurizer Safety Valve Test before Electric Generation. The submitted IST Program document is also related to HH Open Item No. 13 documented in the Watts Bar Unit 2 Supplement 22 of the Safety Evaluation Report (ADAMS Accession No. ML110390197). The purpose of this e-mail is to provide the results of the U.S.
Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
If you have any questions, please contact me or the Watts Bar Unit 2 senior project manager, Justin Poole.
Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 1
Hearing Identifier: NRR_PMDA Email Number: 1333 Mail Envelope Properties (0B8884532E5C074E972B443F6E8F592E7DE6017127)
Subject:
Accepted for Review: Relief Request for Watts Bar Nuclear Plant Unit 2 Inservice Test (IST)/Preservice Test (PST) Program (TAC MF4118)
Sent Date: 6/3/2014 2:54:05 PM Received Date: 6/3/2014 2:54:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients:
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Lingam, Siva" <Siva.Lingam@nrc.gov>
Tracking Status: None "Huang, John" <John.Huang@nrc.gov>
Tracking Status: None "Quichocho, Jessie" <Jessie.Quichocho@nrc.gov>
Tracking Status: None "Lupold, Timothy" <Timothy.Lupold@nrc.gov>
Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov>
Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 2322 6/3/2014 2:54:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: