ML16014A750: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16014A750
| number = ML16014A750
| issue date = 01/14/2016
| issue date = 01/14/2016
| title = Oconee - Notification of Licensed Operator Initial Examination 05000269/2016301, 05000270/2016301 and 05000287/2016301
| title = Notification of Licensed Operator Initial Examination 05000269/2016301, 05000270/2016301 and 05000287/2016301
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Batson S
| addressee name = Batson S
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000269/2016301]]
See also: [[see also::IR 05000269/2016301]]


=Text=
=Text=
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 January 14, 2016 Mr. Scott Batson Vice President, Oconee Nuclear Station  
{{#Wiki_filter:UNITED STATES
Duke Energy Corporation  
                                  NUCLEAR REGULATORY COMMISSION
7800 Rochester Highway  
                                                REGION II
Seneca, SC 29672-0752  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000269/2016301, 05000270/2016301 AND  
                                      ATLANTA, GEORGIA 30303-1257
05000287/2016301
                                            January 14, 2016
Dear Mr. Batson: In a telephone conversation on January 12, 2016, between Mr. Christopher Rop, Operations  
Mr. Scott Batson
Training Manager, Mr. Sam S. Lark, Examination Author, Mr. Kenneth Schaaf, Exam Writer and  
Vice President, Oconee Nuclear Station
Mr. Richard S. Baldwin, Senior Operations Engineer, arrangements were made for the  
Duke Energy Corporation
administration of licensing examinations at the Oconee Nuclear Station. The operating test is scheduled to be administered during the week of June 13, 2016. The written examination is scheduled to be administered the week of June 20, 2016. The on-site preparatory week is  
7800 Rochester Highway
scheduled for the week of May 16, 2016.  
Seneca, SC 29672-0752
SUBJECT:       OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR
As agreed during the telephone conversation, your staff will prepare both the operating test and  
                INITIAL EXAMINATION 05000269/2016301, 05000270/2016301 AND
written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination. To meet the above schedule, it will be necessary for your staff to furnish the operating test outlines by March 15, 2016. Mr. Micahel Meeks provided written examination outlines to your staff in December 2015. The written examinations, operating test and the supporting reference  
                05000287/2016301
materials identified in Attachment 3 to ES-201 will be due by .April 14, 2016. Pursuant to Title  
Dear Mr. Batson:
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized  
In a telephone conversation on January 12, 2016, between Mr. Christopher Rop, Operations
representative of the facility licensee shall approve the examinations, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.  
Training Manager, Mr. Sam S. Lark, Examination Author, Mr. Kenneth Schaaf, Exam Writer and
Mr. Richard S. Baldwin, Senior Operations Engineer, arrangements were made for the
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
administration of licensing examinations at the Oconee Nuclear Station. The operating test is
S. Batson 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
scheduled to be administered during the week of June 13, 2016. The written examination is
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
scheduled to be administered the week of June 20, 2016. The on-site preparatory week is
scheduled for the week of May 16, 2016.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget
As agreed during the telephone conversation, your staff will prepare both the operating test and
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the first examination date, a postponement may be necessary.  Signed applications certifying that all
written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator
training has been completed should be submitted at least 14 days before the first examination
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
date. 
Commission (NRC) regional office will discuss with your staff any changes that might be
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for
necessary before the examinations are administered. Your staff has also agreed to make
this collection of information is estimated to average 2500 hours per response, including the
copies of all examination materials that are necessary for administering the examination.
time for reviewing instructions, gathering and maintaining the data needed, writing the
To meet the above schedule, it will be necessary for your staff to furnish the operating test
examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
outlines by March 15, 2016. Mr. Micahel Meeks provided written examination outlines to your
Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk
staff in December 2015. The written examinations, operating test and the supporting reference
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
materials identified in Attachment 3 to ES-201 will be due by .April 14, 2016. Pursuant to Title
Management and Budget, Washington, DC 20503.  The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
information collection, unless it displays a currently valid OMB control number.
representative of the facility licensee shall approve the examinations, and test before they are
submitted to the NRC for review and approval. All materials shall be complete and ready-to-
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
use.
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
Management System (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). 
your response be contained in a separate enclosure and appropriately marked. Any delay in
S. Batson 3  Thank you for your cooperation in this matter.  Mr. Christopher Rop has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov)  Sincerely,        /RA/  Eugene F. Guthrie, Chief      Operations Branch 2
receiving the required examination and reference materials, or the submittal of inadequate or
      Division of Reactor Safety
incomplete materials, may cause the examinations to be rescheduled.
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
cc: Distribution via Listserv 
S. Batson 2  Thank you for your cooperation in this matter.  Mr. Christopher Rop has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642, (Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov)  Sincerely,
/RA/  Eugene F. Guthrie, Chief      Operations Branch 2
      Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287 License Nos.: DPR-38, DPR-47, DPR-55
cc: Distribution via Listserv
 
 
 
  PUBLICLY AVAILABLE  NON-PUBLICLY AVAILABLE  SENSITIVE  NON-SENSITIVE ADAMS:  Yes ACCESSION NUMBER:________________________  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RSB2 VIA EMAIL EFG      NAME BALDWIN GUTHRIE      DATE 1/14/2016 1/14/2016      E-MAIL COPY?    YES NO      YES NO    YES NO      YES NO      YES NO      YES NO      YES NO    OFFICIAL RECORD COPY          DOCUMENT NAME:  G:\OLEXAMS\OCONEE EXAMINATIONS\INITIAL EXAM 2016-301\CORRESPONDENCE\OCONEE  2016-301 CORPORATE NOTIFICATION LETTER_R00(RSB).DOCX     


S. Batson                                      2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the first
examination date, a postponement may be necessary. Signed applications certifying that all
training has been completed should be submitted at least 14 days before the first examination
date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk
Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of
Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC Public Document Room or from the Publicly
Available Records (PARS) component of the NRCs Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the NRC Website at
http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
S. Batson                                    3
Thank you for your cooperation in this matter. Mr. Christopher Rop has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642,
(Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov)
                                              Sincerely,
                                              /RA/
                                              Eugene F. Guthrie, Chief
                                              Operations Branch 2
                                              Division of Reactor Safety
Docket Nos.: 50-269, 50-270, 50-287
License Nos.: DPR-38, DPR-47, DPR-55
cc: Distribution via Listserv
________________________        SUNSI REVIEW COMPLETE  FORM 665 ATTACHED
OFFICE            RII:DRS          RII:DRS
SIGNATURE        RSB2 VIA EMAIL    EFG
NAME              BALDWIN          GUTHRIE
DATE                  1/14/2016    1/14/2016
E-MAIL COPY?        YES    NO      YES    NO YES    NO    YES  NO    YES    NO    YES    NO    YES NO
}}
}}

Latest revision as of 20:01, 4 December 2019

Notification of Licensed Operator Initial Examination 05000269/2016301, 05000270/2016301 and 05000287/2016301
ML16014A750
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/14/2016
From: Eugene Guthrie
Division of Reactor Safety II
To: Batson S
Duke Energy Corp
References
Download: ML16014A750 (4)


See also: IR 05000269/2016301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

January 14, 2016

Mr. Scott Batson

Vice President, Oconee Nuclear Station

Duke Energy Corporation

7800 Rochester Highway

Seneca, SC 29672-0752

SUBJECT: OCONEE NUCLEAR STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION 05000269/2016301, 05000270/2016301 AND

05000287/2016301

Dear Mr. Batson:

In a telephone conversation on January 12, 2016, between Mr. Christopher Rop, Operations

Training Manager, Mr. Sam S. Lark, Examination Author, Mr. Kenneth Schaaf, Exam Writer and

Mr. Richard S. Baldwin, Senior Operations Engineer, arrangements were made for the

administration of licensing examinations at the Oconee Nuclear Station. The operating test is

scheduled to be administered during the week of June 13, 2016. The written examination is

scheduled to be administered the week of June 20, 2016. The on-site preparatory week is

scheduled for the week of May 16, 2016.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examinations based on the guidelines in Revision 10, of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outlines by March 15, 2016. Mr. Micahel Meeks provided written examination outlines to your

staff in December 2015. The written examinations, operating test and the supporting reference

materials identified in Attachment 3 to ES-201 will be due by .April 14, 2016. Pursuant to Title

10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the examinations, and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

S. Batson 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the first

examination date, a postponement may be necessary. Signed applications certifying that all

training has been completed should be submitted at least 14 days before the first examination

date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the

time for reviewing instructions, gathering and maintaining the data needed, writing the

examinations, and completing and reviewing the collection of information. Send comments on

any aspect of this collection of information, including suggestions for reducing the burden, to the

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at BJS1@nrc.gov; and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of

Management and Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Website at

http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

S. Batson 3

Thank you for your cooperation in this matter. Mr. Christopher Rop has been advised of the

policies and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 997-4642,

(Internet E-mail: Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov)

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-269, 50-270, 50-287

License Nos.: DPR-38, DPR-47, DPR-55

cc: Distribution via Listserv

________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RSB2 VIA EMAIL EFG

NAME BALDWIN GUTHRIE

DATE 1/14/2016 1/14/2016

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO