Letter Sequence RAI |
---|
EPID:L-2017-LLA-0427, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) (Approved, Closed) |
|
MONTHYEARML17263A1332017-05-26026 May 2017 Submittal of NEI 16-03, Guidance for Monitoring of Fixed Neutron Absorbers in Spent Fuel Pools Project stage: Request CNL-17-144, Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)2017-12-20020 December 2017 Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) Project stage: Request CNL-17-154, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 342017-12-27027 December 2017 Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 34 Project stage: Request ML18031A6592018-02-0606 February 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Revise Technical Specification 4.2.1 and Technical Specifications Related to Fuel Storage Project stage: Acceptance Review CNL-18-018, Supplement to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)2018-02-15015 February 2018 Supplement to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) Project stage: Supplement ML18060A0542018-03-0101 March 2018 Acceptance of Requested Licensing Action Amendment to Revise Technical Specification 4.2.1, Fuel Assemblies, and Technical Specifications Related to Fuel Storage Project stage: Acceptance Review CNL-18-051, Correction to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028)2018-04-0909 April 2018 Correction to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) Project stage: Request CNL-18-049, Clinch River Nuclear Site, Response to NRC Request for Additional Information 12 in Support of Early Site Permit Application for Clinch River Nuclear Site2018-04-0909 April 2018 Clinch River Nuclear Site, Response to NRC Request for Additional Information 12 in Support of Early Site Permit Application for Clinch River Nuclear Site Project stage: Response to RAI CNL-18-069, Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 362018-05-0808 May 2018 Tennessee Valley Authority - Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revisions 35 and 36 Project stage: Request ML18128A2932018-05-30030 May 2018 Letter, Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML18128A3062018-06-0404 June 2018 Federal Register Notice on Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Application; Opportunity to Request a Hearing and to Petition for Leave to Intervene; Order Imposing Procedures (Docket Nos. 50-390 and 50-391; NRC-2018-01 Project stage: Other ML18240A0702018-08-27027 August 2018 NRR E-mail Capture - RAI for Watts Bar Unit 2 Tpbars LAR and Watts Bar Units 1 and 2 LAR Related to Fuel Storage Project stage: RAI CNL-18-113, Response to Request for Additional Information Regarding Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) .2018-10-0404 October 2018 Response to Request for Additional Information Regarding Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage (WBN-TS-17-028) ... Project stage: Response to RAI ML17291A5472018-11-0808 November 2018 Clinch River Early Site Permit Safety Evaluation, Section 17.0 Project stage: Request ML18332A0142019-02-0606 February 2019 Environmental Assessment and Finding of No Significant Impact Related to Application to Revise Watts Bar Unit 2 Technical Specification 4.2.1, Fuel Assemblies, Project stage: Other ML18332A0132019-02-0606 February 2019 Federal Register Notice Project stage: Request ML18347B3302019-05-22022 May 2019 Issuance of Amendment Regarding Revision to Watts Bar Unit 2 Technical Specification 4.2.1 Fuel Assemblies, and Watts Bar Units 1 and 2 Technical Specifications Related to Fuel Storage Project stage: Approval 2018-03-01
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24317A2202024-11-12012 November 2024 Re_ WBN Unit 2 - Notification of Readiness for Supplemental Inspection ML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24318A8602024-10-29029 October 2024 NRR E-mail Capture - Draft Request for Additional Information -Tennessee Valley Authority (TVA) License Amendment Request (LAR) to Revise Watts Bar TS 3.7.11 for Main Control Room Chiller Extension of Completion Time ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24274A2762024-09-24024 September 2024 Email from K.Green to S.Hughes, Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, Hydrologic LAR to Revise the UFSAR ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24215A3152024-07-24024 July 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-276-A, Revision 2 TS 3.8.1, AC Sources ML24177A1412024-06-11011 June 2024 NRR E-mail Capture - Audit Plan Related to Review of the Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, LAR to Revise Technical Specification Table 3.3.2-1 Function 5 ML24157A3152024-06-0303 June 2024 2024 Sequoyah Commercial Grade Dedication Inspection Information Request ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24156A0062024-05-22022 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Recapture Low-Power Testing Time ML24130A0132024-05-0707 May 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.11 for MCR Chiller Completion Time ML24123A0882024-05-0202 May 2024 NRR E-mail Capture - Correction Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24122B4872024-04-30030 April 2024 NRR E-mail Capture - Acceptance Review Results for the Browns Ferry, Sequoyah, and Watts Bar License Amendment Request to Revise TS 5.4.1 or 5.7.1 (L-2024-LLA-0039) ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24082A0662024-04-17017 April 2024 Email to Stuart Rymer on Exemption Decision for Watts Bar ML24082A0682024-04-10010 April 2024 Email to Stuart Rymer Re_ Availability of EA-FONSI for Watts Bar ML24100A8392024-04-0909 April 2024 Response from State of Tn Regarding Review of Environmental Assessment for Watts Bar Exemption Request ML24100A8402024-04-0808 April 2024 Email to State of Tn Requesting Review of Environmental Assessment for Watts Bar Exemption Request ML24071A0982024-03-0707 March 2024 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate ML24058A0962024-02-26026 February 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant License Amendment Request to Revise UFSAR for Hydrologic Analysis ML24047A2792024-02-15015 February 2024 RAI Related to the Exemption Request for 10 CFR 37.11 ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML24033A0562024-02-0101 February 2024 NRR E-mail Capture - Correction Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-427-A, Revision 2 Regarding Degraded Barriers ML24036A0132024-01-23023 January 2024 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar Nuclear Plants, License Amendment Request to Revise TS Table 3.3.2-1, Function 5, Turbine Trip and Feedwater Isolation ML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24309A0552024-11-0101 November 2024 NRR E-mail Capture - Request for Additional Information - TVA LAR to Revised Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 Re TS Table 3.3.2-1, Function 5 ML24304A3752024-10-29029 October 2024 NRR E-mail Capture - Request for Additional Information - License Amendment Request (LAR) to Revise Watts Bar Updated Final Safety Analysis Report (UFSAR) for Hydrologic Analysis ML24318A8602024-10-29029 October 2024 NRR E-mail Capture - Draft Request for Additional Information -Tennessee Valley Authority (TVA) License Amendment Request (LAR) to Revise Watts Bar TS 3.7.11 for Main Control Room Chiller Extension of Completion Time ML24260A0322024-09-10010 September 2024 NRR E-mail Capture - Request for Additional Information Regarding the Watts Bar Unit 2 Steam Generator Tube Inspection Report for U2R5 ML24155A1372024-05-29029 May 2024 Email from K. Green to S. Hughes Request for Additional Information Related to License Amendment Request to Revise Residual Heat Removal Flow Rate ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information ML24116A2012024-04-17017 April 2024 Nrctva ISFSI CBS (RFI) ML24045A0312024-02-14014 February 2024 NRR E-mail Capture - Request for Additional Information Related to the Exemption Request for the 10 CFR Part 73 Enhanced Weapons Rule ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23030A3512023-01-25025 January 2023 Notification of Watts Bar Nuclear Plant - Design Bases Assurance Inspection (Programs) and Initial Information Request ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to TVAs Request to Revised the TVA Plants Radiological Emergency Plans ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to TVAs Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21102A1312021-04-19019 April 2021 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Unit 1 ML21095A0402021-04-0202 April 2021 NRR E-mail Capture - Request for Additional Information Re Generic Letter 95-05 90-Day Report and LAR to Adjust Growth Rate for Thot (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0422021-04-0202 April 2021 NRR E-mail Capture - Added Clarification to RAI 2 for Thot LAR ML21091A0772021-04-0101 April 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Technical Specification 5.7.2.19, Containment Leakage Rate Testing Program ML21095A0442021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0412021-04-0101 April 2021 NRR E-mail Capture - Revised Draft RAI - Combined RAI Set for Watts Bar Unit 2 90-Day Report and Thot LAR (EPIDs L-2021-LRO-0003 and L-2021-LLA-0026) ML21095A0462021-03-22022 March 2021 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Generic Letter 95-05 90-Day Report for Watts Bar Unit 2 ML21039A6402021-02-0808 February 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 1 Technical Specifications Related to Steam Generator Tube Inspection Frequency ML21012A2032021-01-11011 January 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar UFSAR to Use Alternate Probability of Detection ML20350B5592020-12-15015 December 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Adopt Traveler TSTF-490 Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec ML20338A3202020-12-0303 December 2020 Notification of an NRC Fire Protection Team Inspection (NRC Inspection Report 05000390/2021011 and 05000391/2021011) and Request for Information ML20322A4412020-11-17017 November 2020 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20322A4392020-11-0505 November 2020 NRR E-mail Capture - Draft Request for Additional Information Regarding Tva'S Request to Revise TS 3.7.11 Related to the MCR Chiller Replacement ML20308A3512020-11-0202 November 2020 Request for Additional Information on WBN Request for Exemption from 10 CFR Part 73, Appendix B, Section VI for the Conduct of an Annual Force-on-Force Exercise (EPID L-2020-LLE-0165 (COVID-19)) ML20253A1782020-09-0909 September 2020 Emergency Preparedness Program Inspection Request for Information ML20266G4592020-08-14014 August 2020 Notification of Inspection and Request for Information ML20196L8622020-07-14014 July 2020 NRR E-mail Capture - Watts Bar Nuclear Plant, Units 1 and 2 - Request for Additional Information Regarding Request to Implement the Full Spectrum LOCA Methodology ML20086G4802020-03-26026 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) - Part 2 ML20085G3572020-03-25025 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20084M1942020-03-24024 March 2020 NRR E-mail Capture - Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML20083J3952020-03-12012 March 2020 NRR E-mail Capture - Draft Request for Additional Information for WBN2 Request Measurement Uncertainty Recapture Power Uprate (L-2019-LLS-0000) ML19340A6842019-12-0505 December 2019 NRR E-mail Capture - Request for Additional Information for WBN2 Request for One-Time Extension of Completion Time for TS 3.7.8 (L-2019-LLA-0020) ML19218A0302019-08-0505 August 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19218A0282019-07-25025 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Draft Second-Round Request for Additional Information Related to Application to Revise Technical Specifications Regarding DC Electrical Systems, TSTF-500, Revision 2 ML19186A4352019-07-0505 July 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Correction to Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19169A3592019-06-18018 June 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Application to Adopt 10 CFR 50.69 ML19148A7912019-05-28028 May 2019 NRR E-mail Capture - Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request for Alternative to OM Code Requirements ML19106A0462019-04-15015 April 2019 NRR E-mail Capture - Watts BAR, Units 1 and 2 Request for Additional Informatin (RAI) Regarding Changes to Technical Specifications Sections 3.8.1, 3.8.7, 3.8.8, and 3.8.9 ML19071A3542019-03-0808 March 2019 NRR E-mail Capture - Watts Bar Nuclear Plant - Final Request for Additional Information Related to Request to Adopt TSTF-425 to Relocate Specific Surveillance Frequency Requirements to Licensee-Controlled Program ML18313A2202018-11-0707 November 2018 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML18282A6372018-10-0909 October 2018 NRR E-mail Capture - RAIs (Final) - LAR to Revise the Steam Generator Technical Specifications for Watts Bar Nuclear Plant, Unit 2 2024-09-10
[Table view] |
Text
NRR-DMPSPEm Resource From: Lamb, John Sent: Monday, August 27, 2018 3:57 PM To: rdwells0@tva.gov
Subject:
RAI for Watts Bar Unit 2 TPBARs LAR and Watts Bar Units 1 and 2 LAR Related to Fuel Storage (EPID: L-2017-LLA-0427)
Importance: High Mr. Wells:
By application dated December 20, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17354B282), as supplemented February 15, and April 9, 2018 (ADAMS Accession Nos.
ML18047A181 and ML18100A953, respectively), Tennessee Valley Authority (TVA or the licensee) submitted a proposed license amendment request (LAR) to authorize up 1,792 tritium producing burnable absorber rods (TPBARs) that can be irradiated in the reactor for Watts Bae Nuclear Plant (WBN), Unit 2. In addition, the proposed LAR requests changes to WBN Unit 1 and 2 Technical Specifications (TSs) related to fuel storage.
The requested changes would revise WBN Unit 2 TS 4.2.1, Fuel Assemblies, to authorize up to 1,792 Tritium Producing Burnable Absorber Rods (TPBARs) that can be irradiated in the reactor.
Specifically, the requested changes revise WBN Units 1 and 2 TS 3.7.15, Spent Fuel Assembly Storage, to simplify the fuel storage limitations on fuel assemblies by eliminating the burnup-related criteria. The requested changes add WBN Units 1 and 2 TS 3.7.18, Fuel Storage Pool Boron Concentration, to specify the minimum fuel storage pool boron concentration when fuel is stored in the pool. The requested changes revise WBN Units 1 and 2 TS 3.9.9, Spent Fuel Pool Boron Concentration, to modify the minimum fuel storage pool boron concentration during refueling operations when fuel is stored in the pool. The requested changes revise WBN Units 1 and 2 TS 4.3, Fuel Storage, to replace the storage limitations on fuel assembly burnup and storage with a single requirement to maintain a specified boron concentration in the spent fuel pool (SFP). The requested changes add WBN Units 1 and 2 TS 5.7.2.21, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.
The NRC staff has reviewed TVAs submittal, as well as supplements, and determined that additional information is required to enable the U.S. Nuclear Regulatory Commission (NRC) staff to make an independent assessment regarding its technical review.
On August 13, 2018, the NRC staff held a clarifying call with TVA to ensure that TVA understood the questions. TVA stated that it would respond to the below RAIs within 45 days from date of the RAI email.
Thanks.
John ENCLOSURE REQUEST FOR ADDITIONAL INFORMATION RELATED TO TRITIUM PRODUCING BURNABLE ABSORBER RODS FOR WAATS BAR NUCLEAR PLANT, UNIT 2 AND FUEL STORAGE LICENSE AMENDMENTS REQUEST FOR WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 1
TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-390 and 50-391 By application dated December 20, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML17354B282), as supplemented February 15, and April 9, 2018 (ADAMS Accession Nos.
ML18047A181 and ML18100A953, respectively), Tennessee Valley Authority (TVA or the licensee) submitted a proposed license amendment request (LAR) to authorize up 1,792 tritium producing burnable absorber rods (TPBARs) that can be irradiated in the reactor for Watts Bae Nuclear Plant (WBN), Unit 2. In addition, the proposed LAR requests changes to WBN Unit 1 and 2 Technical Specifications (TSs) related to fuel storage.
The requested changes would revise WBN Unit 2 TS 4.2.1, Fuel Assemblies, to authorize up to 1,792 Tritium Producing Burnable Absorber Rods (TPBARs) that can be irradiated in the reactor.
Specifically, the requested changes revise WBN Units 1 and 2 TS 3.7.15, Spent Fuel Assembly Storage, to simplify the fuel storage limitations on fuel assemblies by eliminating the burnup-related criteria. The requested changes add WBN Units 1 and 2 TS 3.7.18, Fuel Storage Pool Boron Concentration, to specify the minimum fuel storage pool boron concentration when fuel is stored in the pool. The requested changes revise WBN Units 1 and 2 TS 3.9.9, Spent Fuel Pool Boron Concentration, to modify the minimum fuel storage pool boron concentration during refueling operations when fuel is stored in the pool. The requested changes revise WBN Units 1 and 2 TS 4.3, Fuel Storage, to replace the storage limitations on fuel assembly burnup and storage with a single requirement to maintain a specified boron concentration in the spent fuel pool (SFP). The requested changes add WBN Units 1 and 2 TS 5.7.2.21, Spent Fuel Storage Rack Neutron Absorber Monitoring Program.
The NRC staff has reviewed TVAs submittal, as well as supplements, and determined that additional information is required to enable the U.S. Nuclear Regulatory Commission (NRC) staff to make an independent assessment regarding its technical review.
ARCB-RAI-1 In the application on page E1-23 of 116 in the Primary and Secondary Coolant Concentrations section it states:
The concentration of tritium for a TPC was calculated using the same methodology as used for WBN U1, which involved 1,792 TPBARs with a permeation rate of 5 Ci/TPBAR/year and two failures The total annual tritium expected from TPBARs is based on 1792 TPBARs and a permeation rate of 5 Ci/TPBAR/year (8960 Ci/year). This results in an average tritium concentration of 11.4 Ci/gm. The concentration with 2 TPBAR failures was determined by adding the inventory of 2 TPBARs to the average amount of tritium in the RCS and dividing by the RCS mass. The average amount of tritium was determined by multiplying the average tritium concentration determined above by the RCS mass. Each TPBAR is assumed to have a maximum of 11,600 Ci at the end of a cycle. This resulted in an expected tritium concentration in the primary coolant of approximately 120 Ci/gm for 2 TPBAR failures.
In the application it is also states numerous times that this LAR is based on WBN unit 1 license amendment
- 40. However, WBN unit 1 license amendment 40 has been superseded by license amendment 107 and in supplement to the application dated March 31, 2016 (ADAMS Accession number ML16095A064) on page , page 8 of 40, it states:
Non-LOCA Accident Source Term: This source term is used for evaluation of abnormal operational occurrences (AOOs) and postulated accidents (PAs). It was updated to reflect a 2
new permeation rate of 10 Ci/TPBAR/year, which bounds the realistic permeation rate with 100% margin. It also has increased margin by assuming ~40% more TPBARs are loaded (i.e.,
2,500 TPBARs). It continues to retain conservatism regarding the inclusion of two failed TPBARs. This bounding approach to source term assumptions for accidents is consistent with the accident evaluation methodology. The modified source term provides sufficient margin to bound AOO and PA cases.
Furthermore, Enclosure 2, page 37 of 40 states:
the source term is the primary and secondary coolant activity. The primary and secondary coolant activities are in accordance with ANSI/ANS-18.1-1984, except for tritium. ... This source term was updated to reflect a new permeation rate of 10 Ci/TPBAR/year, which bounds the realistic permeation rate with 100% margin. It continues to retain conservatism regarding the inclusion of two failed TPBARs.
WBN Unit 1 License Amendment 40 and the current licensing basis determined the expected tritium concentration assuming a permeation rate of 1 Ci/TPBAR/year, 2,304 total TPBARs, and two failed TPBARs. ... The assumed RCS tritium activity to support the requested changes is based on 2,500 TPBARs with an assumed permeation rate of 10 Ci/TPBAR/year and two failed TPBARs. This results in a concentration of 124.9 Ci/gm.
The design basis accident assumptions for WBN Unit 1 appears to be different from that stated for WBN Unit 2, and the NRC staff is unclear which one is being requested in this license amendment request.
Please clarify, for the DBAs that assume primary and secondary coolant concentrations as their source term, what reactor coolant system tritium concentration is assumed and what is it based on, such as a permeation rate, total TPBARs, and how many failed TPBARs.
ARCB-RAI-2 In the application on page E1-26 of 116 it states:
Table 4.1-6 and 4.1-7 contain a tabulation of common control room parameters and the atmospheric dispersion factors, respectively, used in each of the design basis analyses. These are the same parameters that supported the review for NUREG-0847 Supplement 25 except for the control room isolation time, which has been corrected to account for an error.
Table 4.1-7, Atmospheric Dispersion Factors states:
1 - This is used for the Containment FHA [Fuel Handling Accident]
2 - This is used for the Containment FHA after containment is isolated and for the Auxiliary Building FHA In NUREG-0847 Supplement 25 Tables 15.5 and 15.6 it states that the control room atmospheric dispersion factor for the FHA in closed containment, FHA inside open containment, and FHA in the Auxiliary Building for the time period 0 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> is 2.59E-3 seconds per cubic meter. This control room atmospheric dispersion factor is different from those stated in the license amendment request for the FHA.
3
Explain which control room atmospheric dispersion factor(s) for the FHA are being requested in this license amendment. If they differ from the current licensing basis as stated in Tables 15.5 and 15.6 of NUREG-0847 Supplement 25 then provide the technical basis for the change.
MCCB RAI #1:
Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68, Criticality accident requirements, provides the regulatory requirements for maintaining sub-criticality in the spent fuel pool (SFP). Specifically, 10 CFR 50.68(b)(4) states that the k-effective in the SFP:
must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 confidence level, if flooded with unborated water.
In the proposed Technical Specification (TS) 5.7.2.21 Spent Fuel Storage Rack Neutron Absorber Monitoring Program, the licensee states that the program will be used to verify the neutron absorber density is consistent with the assumptions in the spent fuel pool [SFP] criticality analysis. However, the Boron-10 (B-10) areal density (AD), is the main property of the neutron absorbing material (NAM) that needs to be verified with respect to the SFP criticality analysis, not the neutron absorber density. Explain why the density of the NAM is specifically cited in the proposed TS, instead of the B-10 AD, which is more important assumption used in the SFP criticality analysis.
DORL RAI #1 In the submittal dated December 20, 2017, Enclosure 6 contains a commitment to replace the Containment Isolation Thermal Relief Check Valves on the WBN Unit 2 supply lines to Containment for the Component Cooling Water (CCW) System and Essential Raw Cooling Water (ERCW) System with simple relief valves.
TVA states that the simple relief valves will be installed prior to loading TPBARs in the WBN Unit 2 reactor core. The WBN Unit 2 Facility Operating License (FOL) NPF-96 expires October 21, 2055. There are numerous refueling outages (RFOs) between now and the end of the FOL. Has TVA scheduled a RFO to replace the Containment Isolation Thermal Relief Check Valves with simple relief valves? If so, which RFO is this work planned to be completed? If the valves are not replaced prior to the completion of this LAR, the NRC will add this as a license condition to FOL NPR-96.
DORL RAI #2 In the submittal dated December 20, 2017, TVA requests that the license amendment be implemented prior to startup from the outage where any number of TPBARs is inserted in the WBN Unit 2 reactor core. The WBN Unit 2 FOL expires October 21, 2055. There are numerous RFOs between now and the end of the FOL.
Potentially, this amendment could be effective but remain not implemented for decades. Does TVA have a schedule to install TPBARs in WBN Unit 2? If so, which RFO is the TPBARs scheduled to be installed for WBN Unit 2? Are the WBN Unit 2 TPBARs scheduled to be installed during the Cycle 4 RFO in the fall of 2020? Is there a contingency plan if the TPBARs are not installed in WBN Unit 2 as planned that RFO? For example, if TVA plans to install TPBARs in WBN Unit 2 during the Cycle 4 RFO in the fall of 2020, but for some reason is not able to, what is TVAs contingency plan?
DORL RAI #3 What was the permeation rate for Cycle 13 of WBN Unit 1? What was the permeation rate of Cycle 14 of WBN Unit 1? What has TVA learned from the testing of the TPBARs from Cycles 13 and 14?
SNPB RAI #1 During the acceptance review of this LAR, NRC staff requested supplemental information and TVA responded on February 15, 2018 in a letter CNL-18-018. The supplemental information requested was to clarify the discrepancy between the fluence results from WCAP-18191-NP and WCAP-17035-NP for Watts Bar Unit 2 4
regarding the change reported inside surface neutron fluence for the RPV at 32 EFPY (1861 E+19 n/cm2 from WCAP-18191-NP versus 3.17 E+19 n/cm2 from WCAP-17035-NP). The TVA response provides a comparison of the power distribution of Cycle 7 in WCAP-18191 (low leakage pattern) and the radial power distribution used in WCAP-17035 (out-in pattern) in Tables 1 and 2. It was shown that the average of the relative power in the peripheral assemblies for low leakage pattern used in WCAP-18192 for Cycle 7 is 0.590 (Table 1) while the average of the relative power in the peripheral assemblies for out-in pattern used in WCAP-17035 is 0.97.
However, a vast majority of the relative powers of the interior assemblies in Table 1 show increased relative powers compared to those listed in Table 2. Please provide an explanation for why the relative powers of the interior assemblies in Table 1 is greater than those of the Table 2.
SNPB RAI #2 It is stated in TVA response (CNL-18-018) that the average peripheral power increases the number of TPBARs. Also the maximum RPV flux increases from 1.351E10 n/cm2-s to 1.687E10 n/cm2-s between Cycle 3 and Cycle 4. Furthermore, the maximum reactor pressure vessel (RPV) flux further increases in Cycle 5 to about 1.95E10 n/cm2-s through Cycle 7. While these increases in maximum RPV flux cannot be solely associated with the implementation of TPBARs, the anticipated loading patterns including TPBARs (Cycles 4 through7) will impart a greater maximum flux on the reactor vessel than Cycle 3 which does not include TPBARs.
(a) Please describe the factors that contribute to the increase in RPV flux as the number of TBBARs increase.
(b) Provide data on the flux values from both out-in pattern and low leakage patterns used in WCAP-18191 and WCAP-17035, respectively.
5
Hearing Identifier: NRR_DMPS Email Number: 537 Mail Envelope Properties (John.Lamb@nrc.gov20180827155700)
Subject:
RAI for Watts Bar Unit 2 TPBARs LAR and Watts Bar Units 1 and 2 LAR Related to Fuel Storage (EPID: L-2017-LLA-0427)
Sent Date: 8/27/2018 3:57:12 PM Received Date: 8/27/2018 3:57:00 PM From: Lamb, John Created By: John.Lamb@nrc.gov Recipients:
"rdwells0@tva.gov" <rdwells0@tva.gov>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 14761 8/27/2018 3:57:00 PM image001.png 19621 Options Priority: High Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: