| number = ML060620036
| number = ML060620036
| issue date = 03/16/2006
| issue date = 03/16/2006
| title = Susquehanna Steam Electric Station, Unit 2, License Amendment, Revision to Technical Specifications 3.3.8.1 and 3.8.7 (TAC No. MC6521)
| title = License Amendment, Revision to Technical Specifications 3.3.8.1 and 3.8.7
| author name = Guzman R V
| author name = Guzman R
| author affiliation = NRC/NRR/ADRO/DORL
| author affiliation = NRC/NRR/ADRO/DORL
| addressee name = McKinney B T
| addressee name = Mckinney B
| addressee affiliation = PPL Susquehanna, LLC
| addressee affiliation = PPL Susquehanna, LLC
| docket = 05000388
| docket = 05000388
| license number = NPF-022
| license number = NPF-022
| contact person = Guzman R V, NRR/DLPM 415-1030
| contact person = Guzman R, NRR/DLPM 415-1030
| case reference number = TAC MC6521
| case reference number = TAC MC6521
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50, Safety Evaluation
| document type = Letter, License-Operating (New/Renewal/Amendments) DKT 50, Safety Evaluation
| page count = 15
| page count = 15
| project = TAC:MC6521
| project = TAC:MC6521
| stage = Approval
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:March 16, 2006Mr. Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3Berwick, PA 18603-0467
{{#Wiki_filter:March 16, 2006 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467


==SUBJECT:==
==SUBJECT:==
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OFAMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND3.8.7 (TAC NO. MC6521)
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND 3.8.7 (TAC NO. MC6521)


==Dear Mr. McKinney:==
==Dear Mr. McKinney:==


The Commission has issued the enclosed Amendment No. 208 to Facility Operating LicenseNo. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006. The amendment revises the SSES 2 TS 3.3.8.1, "Loss of Power (LOP) Instrumentation," to     (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. Inaddition, the amendment revises the SSES 2 TS 3.8.7, "Distribution Systems - Operating," to(1) eliminate "or more" and the plural to "subsystems" such that the condition will read "one Unit1 AC [alternating current] electrical power distribution s ubsystem inoperable," and (2) add anew Condition D for two Unit 1 AC electrical power distributi on subsystems inoperable.A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in theCommission's Biweekly Federal Register Notice.Sincerely,/RA/Richard V. Guzman, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-388
The Commission has issued the enclosed Amendment No. 208 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006.
The amendment revises the SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, to (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1 and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. In addition, the amendment revises the SSES 2 TS 3.8.7, Distribution Systems - Operating, to (1) eliminate or more and the plural to subsystems such that the condition will read one Unit 1 AC [alternating current] electrical power distribution subsystem inoperable, and (2) add a new Condition D for two Unit 1 AC electrical power distribution subsystems inoperable.
A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.
Sincerely,
                                              /RA/
Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-388


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 208 to     License No. NPF-22         2. Safety Evaluationcc w/encls: See next page Mr. Britt T. McKinneyMarch 16, 2006Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3Berwick, PA 18603-0467
: 1. Amendment No. 208 to License No. NPF-22
: 2. Safety Evaluation cc w/encls: See next page
 
Mr. Britt T. McKinney                                March 16, 2006 Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467


==SUBJECT:==
==SUBJECT:==
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OFAMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND3.8.7 (TAC NO. MC6521)
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND 3.8.7 (TAC NO. MC6521)


==Dear Mr. McKinney:==
==Dear Mr. McKinney:==


The Commission has issued the enclosed Amendment No. 208 to Facility Operating LicenseNo. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006. The amendment revises the SSES 2 TS 3.3.8.1, "Loss of Power (LOP) Instrumentation," to   (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. Inaddition, the amendment revises the SSES 2 TS 3.8.7, "Distribution Systems - Operating," to(1) eliminate "or more" and the plural to "subsystems" such that the condition will read "one Unit1 AC [alternating current] electrical power distribution s ubsystem inoperable," and (2) add anew Condition D for two Unit 1 AC electrical power distributi on subsystems inoperable.A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in theCommission's Biweekly Federal Register Notice.Sincerely,/RA/Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-388
The Commission has issued the enclosed Amendment No. 208 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006.
The amendment revises the SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, to (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1 and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. In addition, the amendment revises the SSES 2 TS 3.8.7, Distribution Systems - Operating, to (1) eliminate or more and the plural to subsystems such that the condition will read one Unit 1 AC [alternating current] electrical power distribution subsystem inoperable, and (2) add a new Condition D for two Unit 1 AC electrical power distribution subsystems inoperable.
A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.
Sincerely,
                                                      /RA/
Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-388


==Enclosures:==
==Enclosures:==
: 1. Amendment No. 208 to     License No. NPF-22         2. Safety Evaluationcc w/encls: See next page DISTRIBUTIONPUBLICRidsNrrDorlLplaRidsNrrPmRGuzmanRidsNrrLASLittle LPLI-1 RFRidsOGCMailCenterRidsAcrsAcnwMailCenterRidsRgn1MailCenterGHill(4)RidsNrrDirsItsbRidsNrrDprRidsNrrDeEeib DNguyen* Input provided by memo. No substantial changes made.ADAMS Accession Number:   ML060620036OFFICELPLI-1/PMLPLI-1/LADE/EEIB/BC(A)OGCLPLI-1/CNAMERGuzmanSLittleEBrownSHamrickRLauferDATE3/2/063/2/062/28/06 (SE DTD)3/14/063/16/06OFFICIAL RECORD COPY Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
: 1. Amendment No. 208 to License No. NPF-22
Robert A. SacconeVice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3Berwick, PA 18603-0467Aloysius J. Wrape, IIIGeneral Manager - Performance Improvement and Oversight PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Terry L. HarpsterGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Walter E. MorrisseySupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Steven M. CookManager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA  18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.
: 2. Safety Evaluation cc w/encls: See next page DISTRIBUTION PUBLIC              RidsNrrDorlLpla        RidsNrrPmRGuzman                RidsNrrLASLittle LPLI-1 RF          RidsOGCMailCenter RidsAcrsAcnwMailCenter                RidsRgn1MailCenter GHill(4)           RidsNrrDirsItsb        RidsNrrDpr                      RidsNrrDeEeib DNguyen
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266Director, Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035Regional Administrator, Region 1U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township
* Input provided by memo. No substantial changes made.
ADAMS Accession Number: ML060620036 OFFICE      LPLI-1/PM      LPLI-1/LA      DE/EEIB/BC(A)     OGC          LPLI-1/C NAME        RGuzman        SLittle        EBrown            SHamrick    RLaufer DATE        3/2/06        3/2/06        2/28/06 (SE DTD)   3/14/06      3/16/06 OFFICIAL RECORD COPY
 
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Robert A. Saccone                                Luis A. Ramos Vice President - Nuclear Operations             Community Relations Manager, PPL Susquehanna, LLC                             Susquehanna 769 Salem Blvd., NUCSB3                          PPL Susquehanna, LLC Berwick, PA 18603-0467                          634 Salem Blvd., SSO Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Performance                   Bryan A. Snapp, Esq Improvement and Oversight                     Assoc. General Counsel PPL Susquehanna, LLC                             PPL Services Corporation Two North Ninth Street, GENPL4                   Two North Ninth Street, GENTW3 Allentown, PA 18101-1179                        Allentown, PA 18101-1179 Terry L. Harpster                                Supervisor - Document Control Services General Manager - Plant Support                 PPL Susquehanna, LLC PPL Susquehanna, LLC                             Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSA4                          Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro                                  Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs            212 Locust Street PPL Susquehanna, LLC                            P.O. Box 1266 Two North Ninth Street, GENPL4                  Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Walter E. Morrissey                              Pennsylvania Department of Supervising Engineer                              Environmental Protection Nuclear Regulatory Affairs                      Rachel Carson State Office Building PPL Susquehanna, LLC                            P.O. Box 8469 769 Salem Blvd., NUCSA4                          Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Crowthers                            U.S. Nuclear Regulatory Commission Supervising Engineer                            P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs                      Berwick, PA 18603-0035 PPL Susquehanna, LLC Two North Ninth Street, GENPL4                  Regional Administrator, Region 1 Allentown, PA 18101-1179                        U.S. Nuclear Regulatory Commission 475 Allendale Road Steven M. Cook                                  King of Prussia, PA 19406 Manager - Quality Assurance PPL Susquehanna, LLC                            Board of Supervisors 769 Salem Blvd., NUCSB2                          Salem Township Berwick, PA 18603-0467                          P.O. Box 405 Berwick, PA 18603-0035
 
Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:
Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803


P.O. Box 405 Berwick, PA 18603-0035 Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803 PPL SUSQUEHANNA, LLCALLEGHENY ELECTRIC COOPERATIVE, INC.DOCKET NO. 50-388SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2AMENDMENT TO FACILITY OPERATING LICENSEAmendment No. 208 License No. NPF-221.The Nuclear Regulatory Commission (the Commission or the NRC) having f ound that:A.The application for the amendment filed by PPL Susquehanna, LLC, dated   March 18, 2005, as supplemented on February 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I;B.The facility will operate in conformity with the application, the provisions of theAct, and the regulations of the Commission;C.There is reasonable assurance: (i) that the activities authorized by thisamendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with theCommission's regulations set forth in 10 CFR Chapter I;D.The issuance of this amendment will not be inimical to the common defense andsecurity or to the health and safety of the public; andE.The issuance of this amendment is in accordance with 10 CFR Part 51 of theCommission's regulations and all applicable requirements have been satisfied. 2.Accordingly, the license is amended by changes to the Technical Specifications asindicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:(2)Technical Specifications and Environmental Protection PlanThe Technical Specifications contained in Appendix A, as revised throughAmendment No. 208 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and theEnvironmental Protection Plan.3.This license amendment is effective as of its date of issuance and shall be implementedwithin 60 days. FOR THE NUCLEAR REGULATORY COMMISSION/RA/Richard J. Laufer, ChiefPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.
DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 208 License No. NPF-22
: 1. The Nuclear Regulatory Commission (the Commission or the NRC) having found that:
A. The application for the amendment filed by PPL Susquehanna, LLC, dated March 18, 2005, as supplemented on February 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
: 2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:
(2)     Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 208 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION
                                                /RA/
Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation


==Attachment:==
==Attachment:==
Changes to the Technical SpecificationsDate of Issuance: March 16, 2006 ATTACHMENT TO LICENSE AMENDMENT NO. 208FACILITY OPERATING LICENSE NO. NPF-22DOCKET NO. 50-388Replace the following pages of the Appendix A Technical Specifications with the attachedrevised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change. REMOVEINSERT3.3-72TS / 3.3-723.3-73TS / 3.3-73 3.3-74TS / 3.3-74 3.8-44TS / 3.8-44 3.8-45TS / 3.8-45 3.8-46TS / 3.8-46 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIONRELATED TO AMENDMENT NO. 208 TO FACILITY OPERATING LICENSE NO. NPF-22PPL SUSQUEHANNA, LLCALLEGHENY ELECTRIC COOPERATIVE, INC.SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2DOCKET NO. 50-38
Changes to the Technical Specifications Date of Issuance: March 16, 2006
 
ATTACHMENT TO LICENSE AMENDMENT NO. 208 FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.
REMOVE                                  INSERT 3.3-72                                  TS / 3.3-72 3.3-73                                  TS / 3.3-73 3.3-74                                  TS / 3.3-74 3.8-44                                  TS / 3.8-44 3.8-45                                  TS / 3.8-45 3.8-46                                  TS / 3.8-46
 
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 208 TO FACILITY OPERATING LICENSE NO. NPF-22 PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.
SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 DOCKET NO. 50-388
 
==1.0    INTRODUCTION==
 
By application dated March 18, 2005 (Agencywide Documents Access and Management System Accession No. ML050890379), as supplemented by letter dated February 28, 2006, PPL Susquehanna, LLC (PPL, the licensee), requested changes to the Technical Specifications (TSs) for Susquehanna Steam Electric Station, Unit 2 (SSES 2). The supplement dated February 28, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination.
The proposed changes to SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, and TS 3.8.7, Distribution Systems - Operating, are as follows:
(a)    TS Section 3.3.8.1, Condition A is revised to clarify that this condition applies to inoperable instrumentation except during the performance of Surveillance Requirement (SR) 3.8.1.19 (loss-of-coolant accident (LOCA)/loss of offsite power (LOOP) testing) on Unit 1. TS Bases Section B 3.3.8.1 is also revised to clarify that this condition is applicable to both Unit 1 and Unit 2 LOP instrumentation.
(b)    New Condition B to TS 3.3.8.1 is added to allow the LOP instrumentation for two Unit 1 4.16 Kilovolt (kV) engineered safeguards system (ESS) buses in the same division to be inoperable for up to 8 hours for the performance of SR 3.8.1.19 on Unit 1. Existing TS 3.3.8.1, Conditions B through D, are renumbered to accommodate new Condition B. TS Bases Section B 3.3.8.1 is also revised.
(c)    TS 3.8.7 Condition C is revised to eliminate or more and to make a subsystem singular such that the condition will read, one Unit 1 alternating current (AC) electrical power distribution subsystem inoperable.
(d)    A new Condition D to TS 3.8.7 is added for two inoperable Unit 1 AC electrical power distribution subsystems. The new condition will apply to a single Unit 1 division (which comprises two subsystems) only during testing required by Unit 1 TS SR 3.8.1.19. This
 
new condition will impose an 8-hour completion time for restoration of at least one of the two Unit 1 AC distribution subsystems. Existing Conditions D through I are renumbered to accommodate new Condition D. Renumbered TS 3.8.7 Condition E is revised to include new Condition D. TS Bases Section B 3.8.7 is also revised.
 
==2.0    REGULATORY EVALUATION==
 
The regulatory requirements and guidance which the Nuclear Regulatory Commission (NRC) staff considered in its review of the application are as follows:
: 1.      Title 10 of the Code of Federal Regulations (10 CFR) establishes the fundamental regulatory requirements with respect to the reactivity control systems. Specifically, General Design Criterion 17 (GDC-17), Electric power systems, in Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50 states, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system must have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system must be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
: 2.      GDC-18, Inspection and testing of electric power systems, requires that electric power systems that are important to safety be designed to permit appropriate periodic inspection and testing.
: 3.      Section 50.36, Technical specifications, provides the regulatory requirements for the content required in a licensees TSs. Section 50.36 states, in part, that the TSs will include SRs to assure that the quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation (LCOs) will be met.
 
==3.0    TECHNICAL EVALUATION==
 
3.1    Background The safety-related AC distribution system at SSES 1 and 2 consists of four 4.16 kV ESS buses, each of which has a primary and alternate offsite source of power and an onsite emergency diesel generator (EDG) that supports one 4.16 kV ESS bus in each unit. The onsite power system consists of four independent load groups, Channels A, B, C, and D. Each Load group consists of a Class 1E 4kV bus, a Class 1E 480V load center, Class 1E 480 volt (V) motor control centers, and a Class 1E 208/120V distribution panel. All safety-related loads are divided among these four load groups. Loss of any one load group will not prevent the minimum safety functions from being performed (i.e., three of the four load groups will meet the design basis requirement). Two divisionalized load groups are established from the four load groups
 
(Division I is comprised of Channels A and C; Division II, is comprised of Channels B and D) for those engineered safety feature loads which require one out of two load groups to meet the design basis requirements. The divisionalized loads are energized from the four load groups, rather than from just two load groups, for load diversity considerations. At all voltage levels (4kV, 480V, and 208/120V), divisionalized loads are fed from the channelized load groups. In addition, both units share parts of the Unit 1 AC distribution system, since the emergency service water (ESW), standby gas treatment system (SGTS), and control structure heating, ventilation, and air conditioner (HVAC) are energized only from the Unit 1 AC distribution system. Thus, some components required by Unit 2 receive power through Unit 1 electrical power distribution subsystems. The Unit 1 electrical power distribution subsystems needed to support the required Unit 2 equipment are addressed in the SSES 2 TS LCO 3.8.7, Table 3.8.7-1.
3.2      Proposed Change to TS Section 3.3.8.1, Condition A The proposed revision to TS Section 3.3.8.1, Condition A will clarify that this condition applies to inoperable instrumentation except during the performance of SR 3.8.1.19 on Unit 1. Bases Section B 3.3.8.1, Condition A will be revised to state that the condition applies to the LOP instrumentation on the 4.16 kV ESS buses for both SSES 1 and 2 since both the Unit 1 and the Unit 2 4.16 kV ESS buses are required to support operation of Unit 2.
The NRC staff finds the revision to TS Section 3.3.8.1, Condition A, acceptable because it clarifies that the condition applies to inoperable LOP instrumentation, except during the performance of Unit 1 SR 3.8.1.19.
3.3      Proposed Change To Add New Condition B to TS 3.3.8.1 The new Condition B in TS 3.3.8.1 will allow the LOP instrumentation on two 4.16kV ESS buses in the same division to be inoperable for up to 8 hours for the performance of Unit 1 SR 3.8.1.19 during Unit 1 refueling outages. Unit 1 TS SR 3.8.1.19 (i.e., testing system response to a LOOP signal in conjunction with an ECCS initiation signal) must be performed during Unit 1 refueling outages. This surveillance is performed for each division individually so that the LOP instrumentation becomes inoperable on only one division of buses (the instrumentation is inhibited from performing its function to facilitate ECCS response timing). During these tests, Unit 2 is normally operating at full power. SSES 2 TS 3.3.8.1, Loss of Power (LOP)
Instrumentation, requires Unit 1 to have the LOP instrumentation operable to support certain common loads. This Unit 1 testing makes the LOP instrumentation for the Unit 1 4.16 kV ESS buses inoperable. Since the common 4.16 kV loads are not by the Unit 2 AC distribution system, the corresponding Unit 2 surveillance test does not similarly affect Unit 1 operations or compliance with Unit 1 TS 3.3.8.1.
In its March 18, 2005, submittal, PPL provided the following technical justification for the proposed change to TS 3.3.8.1:
[...]Normally during the performance of SR 3.8.1.19, the LOP instrumentation can be returned to operable status within one hour provided there are no issues with the test equipment etc. Having additional time to perform the surveillance test allows for correction of minor issues and does not adversely affect human performance while still being able to support the mitigation of accident conditions.
 
During the Unit 1 performance of SR 3.8.1.19, sufficient equipment is available to support mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 4.16 kV ESS buses (both Divisions) and the Unit 2 required portions of the two remaining Unit 1 4.16kV ESS buses is sufficient to support accident mitigation and subsequent safe shutdown of Unit 2.
Additionally, performance of the Unit 1 test does not result in the inability of any emergency diesel generator to support its associated Unit 2 AC distribution subsystem.
The diesels are fully loaded to support the Unit 1 testing for approximately one hour.
This meets the requirement to run fully loaded for a five-minute period to fulfill the TS SR 3.8.1.19. Although considered highly unlikely, if a design basis loss of coolant accident (LOCA) and loss of offsite power occurs on Unit 2 during this test, the operator would be directed to take manual compensatory actions. These operator actions have been addressed in the test procedure. The operator would take immediate action to shed non-essential loads from the Unit 1 loaded diesels to prepare the diesels for the accident loads via the load sequence timers in Unit 2.
If a loss of offsite power event alone were to occur to one or both units during the Unit 1 tests, the AC distribution subsystems not associated with the tested subsystems are capable of supporting the minimum safety functions necessary to shutdown the reactor(s) and maintain them in a safe shutdown condition. Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour Completion Time (Required Action A.1) balances the benefit of performing the required test with the low probability of a loss of offsite power or LOCA with loss of offsite power while one division is inoperable for the duration of the test.
The NRC staff reviewed why two load groups have to be de-energized in order to perform SR 3.8.1.19 and why one load group cannot be deenergized to perform this SR. PPL indicated during the February 1, 2006, teleconference with NRC (ML060730525) and in its February 28, 2006, supplemental response, that it is possible to perform the LOCA/LOOP surveillance one load group at a time; however, testing in this manner does not adequately test the design of the plant as adverse interactions between the load groups would not be detectable. The design of the plant for a LOCA/LOOP relies upon the EDGs to all start and load onto their respective 4 kV ESS bus in each unit. Design features exist that preclude adverse interaction between any of the load groups. Testing 2 load groups (a division) at the same time, verifies that there is no adverse interaction between the 2 load groups.
The NRC staff also reviewed why the combined LOCA/LOOP test has to be performed on one division at a time. In its supplemental response dated February 28, 2006, PPL stated that the LOCA/LOOP test has always been performed on a divisional bases since some divisional safety-related equipment is also energized from the Channel C and D ESS buses. Examples such as Residual Heat Removal Service Water and Control Structure Chillers, which are divisional systems, are fed from the Unit 1C and the Unit 1D ESS Buses. The current procedure assures that the LOCA/LOOP test satisfies the requirements to demonstrate operability of the channelized and divisionalized loads under LOCA/LOOP conditions, and reduces the time that the plant would be in an LCO condition. This surveillance allows the entire division to be tested and assures that the divisional support equipment is energized to support the ECCS functions.
 
The NRC staff also requested PPL to address the compensatory measures that will be taken when the LOCA/LOOP test is being performed. PPL indicated that during the LOCA/LOOP test, plant procedures and outage work management restrict maintenance activities on the Unit 1 division that is affected by the test, which ensures the redundant Unit 1 division is operable. If it were necessary to perform emergent maintenance/repair work on Unit 2 equipment, the risk of performing this work would be evaluated under the Maintenance Rule Program, and the necessary compensatory measures identified by the risk evaluation would be put into place. PPL also indicated that work on the transmission system directly affecting the offsite source to SSES 1 and 2 will be controlled and reviewed, and that communications will be established with the Pennsylvania New Jersey Maryland (PJM) Energy Management System in accordance with the applicable PJM procedures to ensure grid stability.
The NRC staff confirmed that there is assurance that sufficient equipment is available to support mitigation of accident conditions on Unit 2 during the performance of TS SR 3.8.1.19 for Unit 1. The AC electrical equipment of all four Unit 2 4.16 kV ESS buses (both divisions) and for the Unit 2 required portions of the two remaining Unit 1 4.16 kV ESS buses are sufficient to support accident mitigation and the subsequent safe shutdown of Unit 2. The performance of SR 3.8.1.19 will momentarily deenergize one Unit 1 division (two subsystems) of AC electrical power distribution subsystems. The remaining AC electrical power distribution subsystems required by SSES 2 TS 3.8.7 are sufficient to support the assumed accident mitigation and subsequent safe shutdown of Unit 2. On this basis, the NRC staff concludes that the proposed change to TS 3.3.8.1 is acceptable.
3.4    Proposed Change to TS 3.8.7, Condition C During the conversion to Improved TSs, the phrase, or more, was added to SSES 2 TS 3.8.7, Condition C. PPL stated that it could not find a discussion or purpose for the words or more in any internal documents or any documents sent to the NRC staff. The NRC staff finds that the removal of this phrase is administrative; therefore, the subject change is acceptable.
3.5    Proposed Change to TS 3.8.7 PPL proposed to add a new Condition D to TS 3.8.7, which will apply to a single Unit 1 division (which comprises two subsystems). This TS will be in effect only during testing required by Unit 1 TS SR 3.8.1.19. This new condition will impose an 8-hour completion time for restoration of at least one of the two Unit 1 AC distribution subsystems.
PPL indicated that SR 3.8.1.19 for Unit 1 is performed when Unit 1 is shutdown and Unit 2 is at power. Since certain common loads (ESW, SGTS, and HVAC) required for Unit 2 operation are supplied by Unit 1 4.16 kV ESS buses only, the Unit 1 surveillance test affects the availability of one division of required loads for Unit 2 while it is at power. SSES 2 TS 3.8.7 requires that various Unit 1 AC electrical power distribution subsystems remain energized to support required Unit 2 equipment; and Action C allows only one subsystem to be deenergized.
Since the test required by Unit 1 SR 3.8.1.19 effectively deenergizes two Unit 1 AC distribution subsystems (i.e. one division), SSES 2 TS LCO 3.8.7 is not met. Since Action C of SSES 2 TS 3.8.7 allows one Unit 1 AC distribution subsystem to be deenergized, Unit 2 entry into LCO 3.0.3 is required.
 
PPL also indicated that performance of Unit 1 SR 3.8.1.19 deenergizes both AC electrical power distribution subsystems of one division because the surveillance is also a partial functional test of other systems. When performing Unit 1 SR 3.8.1.19, it is necessary to block the automatic transfer from the normal to the alternate offsite power supply for the two Unit 1 4kV buses in the same division being tested before deenergizing them for the surveillance.
Blocking the automatic transfer disables two Unit 1 AC subsystems at a time when they are required to be operable to support Unit 2 operation. Sufficient equipment is available during the Unit 1 performance of SR 3.8.1.19 to support mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 AC distribution subsystems (both divisions) and the Unit 2 parts of the two remaining Unit 1 distribution subsystems is sufficient to support accident mitigation and the subsequent safe shutdown of Unit 2. Additionally, performance of the Unit 1 test does not preclude any EDG from being able to support the associated Unit 2 AC distribution subsystem.
In its March 18, 2005, submittal, PPL states that the diesels are fully loaded to support the Unit 1 testing for approximately 1 hour, meeting the 5 minute fully loaded period requirement for performing TS SR 3.8.1.19. If a design basis LOCA and LOOP occur on Unit 2 during this test, the operator is directed to take manual compensatory actions. PPL also states in its submittal that these operator actions have been addressed in the corresponding test procedure. The operator will take immediate action to shed nonessential loads from the Unit 1 loaded diesels to prepare the diesels for the accident loads via the load sequence timers in Unit 2. If only a LOOP event occurs to one or both units during the Unit 1 tests, the AC distribution subsystems not associated with the tested subsystems will be capable of supporting the minimum safety functions necessary to shutdown the reactors and maintain them in a safe shutdown condition.
Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour completion time (Required Action A.1) balances the benefit of performing the required test with the low probability of a LOOP or a LOCA with a LOOP while one division in Unit 1 is inoperable for the duration of the test.
The NRC staff reviewed the completion time difference between having one or more Unit 2 load groups (8 hours) out of service and having one Unit 1 (72 hours) load group out of service.
PPL stated that the 8-hour completion time to restore Unit 2 load group(s) (provided there is no loss of safety function) is consistent with the completion times stated in NUREG-1433, Standard Technical Specifications General Electric Plants, BWR/4. NUREG-1433 justified the completion time on the basis that the remaining AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shutdown the reactor and maintain it in a safe shutdown condition, assuming no single failure. The overall reliability is reduced, however, because a single failure in the remaining power distribution subsystems could result in the minimum required engineered safety feature functions not being supported.
Therefore, the required AC buses, load centers, motor control centers, and distribution panels must be restored to OPERABLE status within 8 hours. As stated in the SSES 2 TS Bases, the completion time of 72 hours for the loss of one Unit 1 AC load group is consistent with the completion times associated with LCOs for the Unit 2 and common equipment affected by loss of a Unit 1 AC load group. The equipment affected by the loss of a Unit 1 AC load group is ESW, SGTS, or Control Structure HVAC (Control Room Emergency Outside Air Supply). The loss of one Unit 1 ac load group does not cause a loss of safety function. The LCO completion times for the affected common equipment are equal to or greater than 7 days: therefore, the 72-hour completion time is conservative with respect to the individual LCO times.


==81.0INTRODUCTION==
Based on its review of the information provided by PPL, the NRC staff concludes that (1) sufficient equipment is available to support mitigation of an accident on Unit 2 during the performance of SR 3.8.1.19 for Unit 1 during shutdown, (2) the 8-hour required completion time balances the benefit of performing the required test with the low probability of a LOOP or a LOCA with a LOOP while one division in Unit 1 is inoperable for the duration of the test.
By application dated March 18, 2005 (Agencywide Documents Access and ManagementSystem Accession No. ML050890379), as supplemented by letter dated February 28, 2006, PPL Susquehanna, LLC (PPL, the licensee), requested changes to the Technical Specifications (TSs) for Susquehanna Steam Electric Station, Unit 2 (SSES 2). The supplement dated February 28, 2006, provided additional information that clarified the application, did not expandthe scope of the application as originally noticed, and did not change the staff's originalproposed no significant hazards consideration determination. The proposed changes to SSES 2 TS 3.3.8.1, "Loss of Power (LOP) Instrumentation," and  TS 3.8.7, "Distribution Systems - Operating," are as follows:(a) TS Section 3.3.8.1, Condition A is revised to clarify that this condition applies toinoperable instrumentation except during the performance of Surveillance Requirement(SR) 3.8.1.19 (loss-of-coolant accident (LOCA)/loss of offsite power (LOOP) testing) on Unit 1. TS Bases Section B 3.3.8.1 is also revised to clarify that this condition is applicable to both Unit 1 and Unit 2 LOP instrumentation.(b)New Condition B to TS 3.3.8.1 is added to allow the LOP instrumentation for two Unit 14.16 Kilovolt (kV) engineered safeguards system (ESS) buses in the same division to beinoperable for up to 8 hours for the performance of SR 3.8.1.19 on Unit 1. Existing TS 3.3.8.1, Conditions B through D, are renumbered to accommodate new Condition B. TS Bases Section B 3.3.8.1 is also revised.(c)TS 3.8.7 Condition C is revised to eliminate "or more" and to ma ke a subsystem singularsuch that the condition will read, "one Unit 1 alternating current (AC) electrical powerdistribution subsystem inoperable." (d)A new Condition D to TS 3.8.7 is added for two inoperable Unit 1 AC electrical powerdistribution subsystems. The new condition will apply to a single Unit 1 division (whichcomprises two subsystems) only during testing required by Unit 1 TS SR 3.8.1.19. This  new condition will impose an 8-hour completion time for restoration of at least one of thetwo Unit 1 AC distribution subsystems. Existing Conditions D through I are renumberedto accommodate new Condition D. Renumbered TS 3.8.7 Condition E is revised to include new Condition D. TS Bases Section B 3.8.7 is also revised.
Therefore, the NRC staff finds the proposed TS changes to TS 3.8.7 in Unit 2 acceptable.
3.6      Conclusion Based upon the above evaluation, the NRC staff finds that: (1) there is reasonable assurance that sufficient equipment is available to support mitigation of accident condition in Unit 2 during the performance of Unit 1 SR 3.8.1.19, (2) the 8 hour required completion time balances the benefit of performing the required test with the low probability of a LOOP or a LOOP/LOCA while one division in Unit 1 is inoperable for the duration of the test, (3) compensatory measures would ensure the availability of the remaining sources of AC power and electrical power distribution system during performance of Unit 1 SR 3.8.1.19. Therefore, the proposed TS changes are acceptable. The NRC staff also concludes that the proposed changes will not affect PPLs compliance with requirements of GDC 17 and 18.


==2.0 REGULATORY EVALUATION==
==4.0       STATE CONSULTATION==
The regulatory requirements and guidance which the Nuclear Regulatory Commission (NRC)staff considered in its review of the application are as follows: 1. Title 10 of the Code of Federal Regulations (10 CFR) establishes the fundamentalregulatory requirements with respect to the reactivity control systems. Specifically,General Design Criterion 17 (GDC-17), "Electric power systems," in Appendix A,"General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50 states, in part, that nuclear power plants have onsite and offsite electric power systems to permit thefunctioning of structures, systems, and components that are important to safety. Theonsite system must have sufficient independence, r edundancy, and testability to performits safety function, assuming a single failure. The offsite power system must be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from theremaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies. 2.GDC-18, "Inspection and testing of electric power systems," requires that electric powersystems that are important to safety be designed to permit appropriate periodicinspection and testing.3.Section 50.36, "Technical specifications," provides the regulatory requirements for thecontent required in a licensee's TSs. Section 50.36 states, in part, that the TSs willinclude SRs to assure that the quality of systems and components is maintained, thatfacility operation will be within safety limits, and that the limiting conditions for operation(LCOs) will be met.


==3.0TECHNICAL EVALUATION==
In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments. The State official had no comments.
3.1BackgroundThe safety-related AC distribution system at SSES 1 and 2 consists of four 4.16 kV ESS buses,each of which has a primary and alternate offsite source of power and an onsite emergency diesel generator (EDG) that supports one 4.16 kV ESS bus in each unit. The onsite power system consists of four independent load groups, Channels A, B, C, and D. Each Load groupconsists of a Class 1E 4kV bus, a Class 1E 480V load center, Class 1E 480 volt (V) motor control centers, and a Class 1E 208/120V distribution panel. All safety-related loads are dividedamong these four load groups. Loss of any one load group will not prevent the minimum safetyfunctions from being performed (i.e., three of the four load groups will meet the design basisrequirement). Two divisionalized load groups are established from the four load groups  (Division I is comprised of Channels A and C; Division II, is comprised of Channels B and D) forthose engineered safety feature loads which require one out of two load groups to meet the design basis requirements. The divisionalized loads are energized from the four load groups, rather than from just two load groups, for load diversity considerations. At all voltage levels (4kV, 480V, and 208/120V), divisionalized loads are fed from the channelized load groups. In addition, both units share parts of the Unit 1 AC distribution system, since the emergencyservice water (ESW), standby gas treatment system (SGTS), and control structure heating,ventilation, and air conditioner (HVAC) are energized only from the Unit 1 AC distribution system. Thus, some components required by Unit 2 receive power through Unit 1 electricalpower distribution subsystems. The Unit 1 electrical power distribution s ubsystems needed tosupport the required Unit 2 equipment are addressed in the SSES 2 TS LCO 3.8.7, Table 3.8.7-1.3.2Proposed Change to TS Section 3.3.8.1, Condition A The proposed revision to TS Section 3.3.8.1, Condition A will clarify that this condition applies toinoperable instrumentation except during the performance of SR 3.8.1.19 on Unit 1. BasesSection B 3.3.8.1, Condition A will be revised to state that the condition applies to the LOPinstrumentation on the 4.16 kV ESS buses for both SSES 1 and 2 since both the Unit 1 and theUnit 2 4.16 kV ESS buses are required to support operation of Unit 2. The NRC staff finds the revision to TS Section 3.3.8.1, Condition A, acceptable because itclarifies that the condition applies to inoperable LOP instrumentation, except during theperformance of Unit 1 SR 3.8.1.19. 3.3Proposed Change To Add New Condition B to TS 3.3.8.1 The new Condition B in TS 3.3.8.1 will allow the LOP instrumentation on two 4.16kV ESS busesin the same division to be inoperable for up to 8 hours for the performance of Unit 1 SR 3.8.1.19 during Unit 1 refueling outages. Unit 1 TS SR 3.8.1.19 (i.e., testing system responseto a LOOP signal in conjunction with an ECCS initiation signal) must be performed during Unit 1 refueling outages. This surveillance is performed for each division individually so that the LOPinstrumentation becomes inoperable on only one division of buses (the instrumentation is inhibited from performing its function to facilitate ECCS response timing). During these tests,Unit 2 is normally operating at full power. SSES 2 TS 3.3.8.1, "Loss of Power (LOP)
Instrumentation," requires Unit 1 to have the LOP instrumentation operable to support certaincommon loads. This Unit 1 testing makes the LOP instrumentation for the Unit 1 4.16 kV ESS buses inoperable. Since the common 4.16 kV loads are not by the Unit 2 AC distribution system, the corresponding Unit 2 surveillance test does not similarly affect Unit 1operations or compliance with Unit 1 TS 3.3.8.1. In its March 18, 2005, submittal, PPL provided the following technical justification for theproposed change to TS 3.3.8.1:[...]Normally during the performance of SR 3.8.1.19, the LOP instrumentation can bereturned to operable status within one hour provided there are no issues with the test equipment etc. Having additional time to perform the surveillance test allows forcorrection of minor issues and does not adversely affect human performance while still being able to support the mitigation of accident conditions. During the Unit 1 performance of SR 3.8.1.19, sufficient equipment is available tosupport mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 4.16 kV ESS buses (both Divisions) and the Unit 2 required portions of the two remaining Unit 1 4.16kV ESS buses is sufficient to support accident mitigation and subsequent safe shutdown of Unit 2.Additionally, performance of the Unit 1 test does not result in the inability of anyemergency diesel generator to support its associated Unit 2 AC distribution subsystem. The diesels are fully loaded to support the Unit 1 testing for approximately one hour.
This meets the requirement to run fully loaded for a five-minute period to fulfill the TSSR 3.8.1.19. Although considered highly unlikely, if a design basis loss of coolant accident (LOCA) and loss of offsite power occurs on Unit 2 during this test, the operator would be directed to take manual compensatory actions. These operator actions have been addressed in the test procedure. The operator would take immediate action to shed non-essential loads from the Unit 1 loaded diesels to prepare the diesels for the accident loads via the load sequence timers in Unit 2. If a loss of offsite power event alone were to occur to one or both units during the Unit 1tests, the AC distribution subsystems not associated with the tested subsystems arecapable of supporting the minimum safety functions necessary to shutdown the reactor(s) and maintain them in a safe shutdown condition. Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour Completion Time (Required Action A.1) balances the benefit of performing the required test with the low probability of a loss of offsite power or LOCA with loss ofoffsite power while one division is inoperable for the duration of the test. The NRC staff reviewed why two load groups have to be de-energized in order to perform SR3.8.1.19 and why one load group cannot be deenergized to perform this SR. PPL indicated during the February 1, 2006, teleconference with NRC (ML060730525) and in its February 28, 2006, supplemental response, that it is possible to perform the LOCA/LOOPsurveillance one load group at a time; however, testing in this manner does not adequately test the design of the plant as adverse interactions between the load groups would not bedetectable. The design of the plant for a LOCA/LOOP relies upon the EDGs to all start andload onto their respective 4 kV ESS bus in each unit. Design features exist that preclude adverse interaction between any of the load groups. Testing 2 load groups (a division) at the same time, verifies that there is no adverse interaction between the 2 load groups. The NRC staff also reviewed why the combined LOCA/LOOP test has to be performed on onedivision at a time. In its supplemental response dated February 28, 2006, PPL stated that theLOCA/LOOP test has always been performed on a divisional bases since some divisional safety-related equipment is also energized from the Channel C and D ESS buses. Examples such as Residual Heat Removal Service Water and Control Structure Chillers, which aredivisional systems, are fed from the Unit 1C and the Unit 1D ESS Buses. The currentprocedure assures that the LOCA/LOOP test satisfies the requirements to demonstrateoperability of the channelized and divisionalized loads under LOCA/LOOP conditions, andreduces the time that the plant would be in an LCO condition. This surveillance allows theentire division to be tested and assures that the divisional support equipment is energized to support the ECCS functions. The NRC staff also requested PPL to address the compensatory measures that will be taken when the LOCA/LOOP test is being performed. PPL indicated that during the LOCA/LOOPtest, plant procedures and outage work management restrict maintenance activities on the Unit 1 division that is affected by the test, which ensures the redundant Unit 1 division is operable. If it were necessary to perform emergent maintenance/repair work on Unit 2 equipment, the risk of performing this work would be evaluated under the Maintenance Rule Program, and the necessary compensatory measures identified by the risk evaluation would be put into place. PPL also indicated that work on the transmission system directly affecting theoffsite source to SSES 1 and 2 will be controlled and reviewed, and that communications will beestablished with the Pennsylvania New Jersey Maryland (PJM) Energy Management System in accordance with the applicable PJM procedures to ensure grid stability.The NRC staff confirmed that there is assurance that sufficient equipment is available tosupport mitigation of accident conditions on Unit 2 during the performance of TS SR 3.8.1.19 for Unit 1. The AC electrical equipment of all four Unit 2 4.16 kV ESS buses (both divisions) and for the Unit 2 required portions of the two remaining Unit 1 4.16 kV ESS buses are sufficient to support accident mitigation and the subsequent safe shutdown of Unit 2. Theperformance of SR 3.8.1.19 will momentarily deenergize one Unit 1 division (two subsystems)of AC electrical power distribution subsystems. The remaining AC electrical power distribution subsystems required by SSES 2 TS 3.8.7 are sufficient to support the assumed accidentmitigation and subsequent safe shutdown of Unit 2. On this basis, the NRC staff concludes thatthe proposed change to TS 3.3.8.1 is acceptable.3.4Proposed Change to TS 3.8.7, Condition C During the conversion to Improved TSs, the phrase, "or more," was added to SSES 2 TS 3.8.7,Condition C. PPL stated that it could not find a discussion or purpose for the words "or more" in any internal documents or any documents sent to the NRC staff. The NRC staff finds that the removal of this phrase is administrative; therefore, the subject change is acceptable.3.5Proposed Change to TS 3.8.7 PPL proposed to add a new Condition D to TS 3.8.7, which will apply to a single Unit 1 division(which comprises two subsystems). This TS will be in effect only during testing required by Unit 1 TS SR 3.8.1.19. This new condition will impose an 8-hour completion time for restorationof at least one of the two Unit 1 AC distribution subsystems.PPL indicated that SR 3.8.1.19 for Unit 1 is performed when Unit 1 is shutdown and Unit 2 is atpower. Since certain common loads (ESW, SGTS, and HVAC) required for Unit 2 operation are supplied by Unit 1 4.16 kV ESS buses only, the Unit 1 surveillance test affects theavailability of one division of required loads for Unit 2 while it is at power. SSES 2 TS 3.8.7requires that various Unit 1 AC electrical power distribution subsystems remain energized tosupport required Unit 2 equipment; and Action C allows only one subsystem to be deenergized. Since the test required by Unit 1 SR 3.8.1.19 effectively deenergizes two Unit 1 AC distribution subsystems (i.e. one division), SSES 2 TS LCO 3.8.7 is not met. Since Action C of SSES 2 TS3.8.7 allows one Unit 1 AC distribution subsystem to be deenergized,  Unit 2 entry into LCO3.0.3 is required. PPL also indicated that performance of Unit 1 SR 3.8.1.19 deenergizes both AC electricalpower distribution subsystems of one division because the surveillance is also a partialfunctional test of other systems. When performing Unit 1 SR 3.8.1.19, it is necessary to blockthe automatic transfer from the normal to the alternate offsite power supply for the two Unit 14kV buses in the same division being tested before deenergizing them for the surveillance. Blocking the automatic transfer disables two Unit 1 AC subsystems at a time when they arerequired to be operable to support Unit 2 operation. Sufficient equipment is available during the Unit 1 performance of SR 3.8.1.19 to support mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 AC distribution subsystems (both divisions) and the  Unit 2 parts of the two remaining Unit 1 distribution subsystems is sufficient to support accidentmitigation and the subsequent safe shutdown of Unit 2. Additionally, performance of the Unit 1 test does not preclude any EDG from being able to support the associated Unit 2 AC distribution subsystem.In its March 18, 2005, submittal, PPL states that the diesels are fully loaded to support the  Unit 1 testing for approximately 1 hour, meeting the 5 minute fully loaded period requirement for performing TS SR 3.8.1.19. If a design basis LOCA and LOOP occur on Unit 2 during this test, the operator is directed to take manual compensatory actions. PPL also states in its submittal that these operator actions have been addressed in the corresponding test procedure. Theoperator will take immediate action to shed nonessential loads from the Unit 1 loaded diesels toprepare the diesels for the accident loads via the load sequence timers in Unit 2. If only a LOOP event occurs to one or both units during the Unit 1 tests, the AC distribution s ubsystemsnot associated with the tested subsystems will be capable of supporting the minimum safetyfunctions necessary to shutdown the reactors and maintain them in a safe shutdown condition.
Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour completion time (Required Action A.1) balances the benefit of performing the required test with the low probability of a LOOP or a LOCA with a LOOP whileone division in Unit 1 is inoperable for the duration of the test.The NRC staff reviewed the completion time difference between having one or more Unit 2 loadgroups (8 hours) out of service and having one Unit 1 (72 hours) load group out of service.
PPL stated that the 8-hour completion time to restore Unit 2 load group(s) (provided there is no loss of safety function) is consistent with the completion times stated in NUREG-1433,"Standard Technical Specifications General Electric Plants, BWR/4."  NUREG-1433 justified thecompletion time on the basis that the remaining AC electrical power distribution subsystems arecapable of supporting the minimum safety functions necessary to shutdown the reactor and maintain it in a safe shutdown condition, assuming no single failure. The overall reliability isreduced, however, because a single failure in the remaining power distribution s ubsystemscould result in the minimum required engineered safety feature functions not being supported.
Therefore, the required AC buses, load centers, motor control centers, and distribution panelsmust be restored to OPERABLE status within 8 hours. As stated in the SSES 2 TS Bases, the completion time of 72 hours for the loss of one Unit 1 AC load group is consistent with the completion times associated with LCOs for the Unit 2 and common equipment affected by loss of a Unit 1 AC load group. The equipment affected by the loss of a Unit 1 AC load group is ESW, SGTS, or Control Structure HVAC (Control Room Emergency Outside Air Supply). The loss of one Unit 1 ac load group does not cause a loss of safety function. The LCO completion times for the affected common equipment are equal to or greater than 7 days:  therefore, the 72-hour completion time is conservative with respect to the individual LCO times. Based on its review of the information provided by PPL, the NRC staff concludes that            (1) sufficient equipment is available to support mitigation of an accident on Unit 2 during the performance of SR 3.8.1.19 for Unit 1 during shutdown, (2) the 8-hour required completion time balances the benefit of performing the required test with the low probability of a LOOP or aLOCA with a LOOP while one division in Unit 1 is inoperable for the duration of the test.
Therefore, the NRC staff finds the proposed TS changes to TS 3.8.7 in Unit 2 acceptable.3.6 Conclusion Based upon the above evaluation, the NRC staff finds that:  (1) there is reasonable assurancethat sufficient equipment is available to support mitigation of accident condition in Unit 2 during the performance of Unit 1 SR 3.8.1.19, (2) the 8 hour required completion time balances the benefit of performing the required test with the low probability of a LOOP or a LOOP/LOCAwhile one division in Unit 1 is inoperable for the duration of the test, (3) compensatory measures would ensure the availability of the remaining sources of AC power and electricalpower distribution system during performance of Unit 1 SR 3.8.1.19. Therefore, the proposedTS changes are acceptable. The NRC staff also concludes that the proposed changes will notaffect PPL's compliance with requirements of GDC 17 and 18.


==4.0STATE CONSULTATION==
==5.0      ENVIRONMENTAL CONSIDERATION==
In accordance with the Commission's regulations, the Pennsylvania State official was notified ofthe proposed issuance of the amendments. The State official had no comments. 


==5.0ENVIRONMENTAL CONSIDERATION==
The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (70 FR 29800). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
The amendments change a requirement with respect to installation or use of a facilitycomponent located within the restricted area as defined in 10 CFR Part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve nosignificant increase in the amounts, and no significant change in the types, of any effluents thatmay be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been nopublic comment on such finding (70 FR 29800). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR51.22(b) no environmental impact statement or environmental assessment need be prepared inconnection with the issuance of the amendments.


==6.0CONCLUSION==
==6.0      CONCLUSION==
The Commission has concluded, based on the considerations discussed above, that:  (1) thereis reasonable assurance that the health and safety of the public will not be endangered byoperation in the proposed manner, (2) such activities will be conducted in compliance with theCommission's regulations, and (3) the issuance of the amendments will not be inimical to thecommon defense and security or to the health and safety of the public. Principal Contributor:  D. Nguyen


Date: March 16, 2006}}
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor: D. Nguyen Date: March 16, 2006}}

Latest revision as of 22:35, 23 November 2019

License Amendment, Revision to Technical Specifications 3.3.8.1 and 3.8.7
ML060620036
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 03/16/2006
From: Richard Guzman
Plant Licensing Branch III-2
To: Mckinney B
Susquehanna
Guzman R, NRR/DLPM 415-1030
References
TAC MC6521
Download: ML060620036 (15)


Text

March 16, 2006 Mr. Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND 3.8.7 (TAC NO. MC6521)

Dear Mr. McKinney:

The Commission has issued the enclosed Amendment No. 208 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006.

The amendment revises the SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, to (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1 and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. In addition, the amendment revises the SSES 2 TS 3.8.7, Distribution Systems - Operating, to (1) eliminate or more and the plural to subsystems such that the condition will read one Unit 1 AC [alternating current] electrical power distribution subsystem inoperable, and (2) add a new Condition D for two Unit 1 AC electrical power distribution subsystems inoperable.

A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.

Sincerely,

/RA/

Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-388

Enclosures:

1. Amendment No. 208 to License No. NPF-22
2. Safety Evaluation cc w/encls: See next page

Mr. Britt T. McKinney March 16, 2006 Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 - ISSUANCE OF AMENDMENT RE: REVISION TO TECHNICAL SPECIFICATIONS 3.3.8.1 AND 3.8.7 (TAC NO. MC6521)

Dear Mr. McKinney:

The Commission has issued the enclosed Amendment No. 208 to Facility Operating License No. NPF-22 for the Susquehanna Steam Electric Station, Unit 2 (SSES 2). The amendment consists of changes to the Technical Specifications (TSs) in response to your application dated March 18, 2005, as supplemented by letter dated February 28, 2006.

The amendment revises the SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, to (1) clarify that Condition A applies to the LOP instrumentation associated with both the Unit 1 and Unit 2 4.16 Kilovolt (kV) Engineered Safeguards System (ESS) buses since both the Unit 1 and Unit 2 buses are required to support Unit 2 operation, (2) add a new Condition B to allow the LOP instrumentation for two Unit 1 4.16kV ESS buses in the same division to be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the performance of Surveillance Requirement 3.8.1.19 on Unit 1. In addition, the amendment revises the SSES 2 TS 3.8.7, Distribution Systems - Operating, to (1) eliminate or more and the plural to subsystems such that the condition will read one Unit 1 AC [alternating current] electrical power distribution subsystem inoperable, and (2) add a new Condition D for two Unit 1 AC electrical power distribution subsystems inoperable.

A copy of our safety evaluation is also enclosed. The Notice of Issuance will be included in the Commission's Biweekly Federal Register Notice.

Sincerely,

/RA/

Richard V. Guzman, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-388

Enclosures:

1. Amendment No. 208 to License No. NPF-22
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION PUBLIC RidsNrrDorlLpla RidsNrrPmRGuzman RidsNrrLASLittle LPLI-1 RF RidsOGCMailCenter RidsAcrsAcnwMailCenter RidsRgn1MailCenter GHill(4) RidsNrrDirsItsb RidsNrrDpr RidsNrrDeEeib DNguyen
  • Input provided by memo. No substantial changes made.

ADAMS Accession Number: ML060620036 OFFICE LPLI-1/PM LPLI-1/LA DE/EEIB/BC(A) OGC LPLI-1/C NAME RGuzman SLittle EBrown SHamrick RLaufer DATE 3/2/06 3/2/06 2/28/06 (SE DTD) 3/14/06 3/16/06 OFFICIAL RECORD COPY

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Robert A. Saccone Luis A. Ramos Vice President - Nuclear Operations Community Relations Manager, PPL Susquehanna, LLC Susquehanna 769 Salem Blvd., NUCSB3 PPL Susquehanna, LLC Berwick, PA 18603-0467 634 Salem Blvd., SSO Berwick, PA 18603-0467 Aloysius J. Wrape, III General Manager - Performance Bryan A. Snapp, Esq Improvement and Oversight Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation Two North Ninth Street, GENPL4 Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Allentown, PA 18101-1179 Terry L. Harpster Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSA4 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Walter E. Morrissey Pennsylvania Department of Supervising Engineer Environmental Protection Nuclear Regulatory Affairs Rachel Carson State Office Building PPL Susquehanna, LLC P.O. Box 8469 769 Salem Blvd., NUCSA4 Harrisburg, PA 17105-8469 Berwick, PA 18603-0467 Senior Resident Inspector Michael H. Crowthers U.S. Nuclear Regulatory Commission Supervising Engineer P.O. Box 35, NUCSA4 Nuclear Regulatory Affairs Berwick, PA 18603-0035 PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Regional Administrator, Region 1 Allentown, PA 18101-1179 U.S. Nuclear Regulatory Commission 475 Allendale Road Steven M. Cook King of Prussia, PA 19406 Manager - Quality Assurance PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSB2 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035

Susquehanna Steam Electric Station, Unit Nos. 1 and 2 cc:

Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803

PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.

DOCKET NO. 50-388 SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 208 License No. NPF-22

1. The Nuclear Regulatory Commission (the Commission or the NRC) having found that:

A. The application for the amendment filed by PPL Susquehanna, LLC, dated March 18, 2005, as supplemented on February 28, 2006, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of the Facility Operating License No. NPF-22 is hereby amended to read as follows:

(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 208 and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. PPL Susquehanna, LLC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3. This license amendment is effective as of its date of issuance and shall be implemented within 60 days.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Richard J. Laufer, Chief Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: March 16, 2006

ATTACHMENT TO LICENSE AMENDMENT NO. 208 FACILITY OPERATING LICENSE NO. NPF-22 DOCKET NO. 50-388 Replace the following pages of the Appendix A Technical Specifications with the attached revised pages. The revised pages are identified by amendment number and contain marginal lines indicating the areas of change.

REMOVE INSERT 3.3-72 TS / 3.3-72 3.3-73 TS / 3.3-73 3.3-74 TS / 3.3-74 3.8-44 TS / 3.8-44 3.8-45 TS / 3.8-45 3.8-46 TS / 3.8-46

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 208 TO FACILITY OPERATING LICENSE NO. NPF-22 PPL SUSQUEHANNA, LLC ALLEGHENY ELECTRIC COOPERATIVE, INC.

SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 2 DOCKET NO. 50-388

1.0 INTRODUCTION

By application dated March 18, 2005 (Agencywide Documents Access and Management System Accession No. ML050890379), as supplemented by letter dated February 28, 2006, PPL Susquehanna, LLC (PPL, the licensee), requested changes to the Technical Specifications (TSs) for Susquehanna Steam Electric Station, Unit 2 (SSES 2). The supplement dated February 28, 2006, provided additional information that clarified the application, did not expand the scope of the application as originally noticed, and did not change the staffs original proposed no significant hazards consideration determination.

The proposed changes to SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation, and TS 3.8.7, Distribution Systems - Operating, are as follows:

(a) TS Section 3.3.8.1, Condition A is revised to clarify that this condition applies to inoperable instrumentation except during the performance of Surveillance Requirement (SR) 3.8.1.19 (loss-of-coolant accident (LOCA)/loss of offsite power (LOOP) testing) on Unit 1. TS Bases Section B 3.3.8.1 is also revised to clarify that this condition is applicable to both Unit 1 and Unit 2 LOP instrumentation.

(b) New Condition B to TS 3.3.8.1 is added to allow the LOP instrumentation for two Unit 1 4.16 Kilovolt (kV) engineered safeguards system (ESS) buses in the same division to be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the performance of SR 3.8.1.19 on Unit 1. Existing TS 3.3.8.1, Conditions B through D, are renumbered to accommodate new Condition B. TS Bases Section B 3.3.8.1 is also revised.

(c) TS 3.8.7 Condition C is revised to eliminate or more and to make a subsystem singular such that the condition will read, one Unit 1 alternating current (AC) electrical power distribution subsystem inoperable.

(d) A new Condition D to TS 3.8.7 is added for two inoperable Unit 1 AC electrical power distribution subsystems. The new condition will apply to a single Unit 1 division (which comprises two subsystems) only during testing required by Unit 1 TS SR 3.8.1.19. This

new condition will impose an 8-hour completion time for restoration of at least one of the two Unit 1 AC distribution subsystems. Existing Conditions D through I are renumbered to accommodate new Condition D. Renumbered TS 3.8.7 Condition E is revised to include new Condition D. TS Bases Section B 3.8.7 is also revised.

2.0 REGULATORY EVALUATION

The regulatory requirements and guidance which the Nuclear Regulatory Commission (NRC) staff considered in its review of the application are as follows:

1. Title 10 of the Code of Federal Regulations (10 CFR) establishes the fundamental regulatory requirements with respect to the reactivity control systems. Specifically, General Design Criterion 17 (GDC-17), Electric power systems, in Appendix A, "General Design Criteria for Nuclear Power Plants," to 10 CFR Part 50 states, in part, that nuclear power plants have onsite and offsite electric power systems to permit the functioning of structures, systems, and components that are important to safety. The onsite system must have sufficient independence, redundancy, and testability to perform its safety function, assuming a single failure. The offsite power system must be supplied by two physically independent circuits that are designed and located so as to minimize, to the extent practical, the likelihood of their simultaneous failure under operating and postulated accident and environmental conditions. In addition, this criterion requires provisions to minimize the probability of losing electric power from the remaining electric power supplies as a result of loss of power from the unit, the offsite transmission network, or the onsite power supplies.
2. GDC-18, Inspection and testing of electric power systems, requires that electric power systems that are important to safety be designed to permit appropriate periodic inspection and testing.
3. Section 50.36, Technical specifications, provides the regulatory requirements for the content required in a licensees TSs. Section 50.36 states, in part, that the TSs will include SRs to assure that the quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation (LCOs) will be met.

3.0 TECHNICAL EVALUATION

3.1 Background The safety-related AC distribution system at SSES 1 and 2 consists of four 4.16 kV ESS buses, each of which has a primary and alternate offsite source of power and an onsite emergency diesel generator (EDG) that supports one 4.16 kV ESS bus in each unit. The onsite power system consists of four independent load groups, Channels A, B, C, and D. Each Load group consists of a Class 1E 4kV bus, a Class 1E 480V load center, Class 1E 480 volt (V) motor control centers, and a Class 1E 208/120V distribution panel. All safety-related loads are divided among these four load groups. Loss of any one load group will not prevent the minimum safety functions from being performed (i.e., three of the four load groups will meet the design basis requirement). Two divisionalized load groups are established from the four load groups

(Division I is comprised of Channels A and C; Division II, is comprised of Channels B and D) for those engineered safety feature loads which require one out of two load groups to meet the design basis requirements. The divisionalized loads are energized from the four load groups, rather than from just two load groups, for load diversity considerations. At all voltage levels (4kV, 480V, and 208/120V), divisionalized loads are fed from the channelized load groups. In addition, both units share parts of the Unit 1 AC distribution system, since the emergency service water (ESW), standby gas treatment system (SGTS), and control structure heating, ventilation, and air conditioner (HVAC) are energized only from the Unit 1 AC distribution system. Thus, some components required by Unit 2 receive power through Unit 1 electrical power distribution subsystems. The Unit 1 electrical power distribution subsystems needed to support the required Unit 2 equipment are addressed in the SSES 2 TS LCO 3.8.7, Table 3.8.7-1.

3.2 Proposed Change to TS Section 3.3.8.1, Condition A The proposed revision to TS Section 3.3.8.1, Condition A will clarify that this condition applies to inoperable instrumentation except during the performance of SR 3.8.1.19 on Unit 1. Bases Section B 3.3.8.1, Condition A will be revised to state that the condition applies to the LOP instrumentation on the 4.16 kV ESS buses for both SSES 1 and 2 since both the Unit 1 and the Unit 2 4.16 kV ESS buses are required to support operation of Unit 2.

The NRC staff finds the revision to TS Section 3.3.8.1, Condition A, acceptable because it clarifies that the condition applies to inoperable LOP instrumentation, except during the performance of Unit 1 SR 3.8.1.19.

3.3 Proposed Change To Add New Condition B to TS 3.3.8.1 The new Condition B in TS 3.3.8.1 will allow the LOP instrumentation on two 4.16kV ESS buses in the same division to be inoperable for up to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for the performance of Unit 1 SR 3.8.1.19 during Unit 1 refueling outages. Unit 1 TS SR 3.8.1.19 (i.e., testing system response to a LOOP signal in conjunction with an ECCS initiation signal) must be performed during Unit 1 refueling outages. This surveillance is performed for each division individually so that the LOP instrumentation becomes inoperable on only one division of buses (the instrumentation is inhibited from performing its function to facilitate ECCS response timing). During these tests, Unit 2 is normally operating at full power. SSES 2 TS 3.3.8.1, Loss of Power (LOP)

Instrumentation, requires Unit 1 to have the LOP instrumentation operable to support certain common loads. This Unit 1 testing makes the LOP instrumentation for the Unit 1 4.16 kV ESS buses inoperable. Since the common 4.16 kV loads are not by the Unit 2 AC distribution system, the corresponding Unit 2 surveillance test does not similarly affect Unit 1 operations or compliance with Unit 1 TS 3.3.8.1.

In its March 18, 2005, submittal, PPL provided the following technical justification for the proposed change to TS 3.3.8.1:

[...]Normally during the performance of SR 3.8.1.19, the LOP instrumentation can be returned to operable status within one hour provided there are no issues with the test equipment etc. Having additional time to perform the surveillance test allows for correction of minor issues and does not adversely affect human performance while still being able to support the mitigation of accident conditions.

During the Unit 1 performance of SR 3.8.1.19, sufficient equipment is available to support mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 4.16 kV ESS buses (both Divisions) and the Unit 2 required portions of the two remaining Unit 1 4.16kV ESS buses is sufficient to support accident mitigation and subsequent safe shutdown of Unit 2.

Additionally, performance of the Unit 1 test does not result in the inability of any emergency diesel generator to support its associated Unit 2 AC distribution subsystem.

The diesels are fully loaded to support the Unit 1 testing for approximately one hour.

This meets the requirement to run fully loaded for a five-minute period to fulfill the TS SR 3.8.1.19. Although considered highly unlikely, if a design basis loss of coolant accident (LOCA) and loss of offsite power occurs on Unit 2 during this test, the operator would be directed to take manual compensatory actions. These operator actions have been addressed in the test procedure. The operator would take immediate action to shed non-essential loads from the Unit 1 loaded diesels to prepare the diesels for the accident loads via the load sequence timers in Unit 2.

If a loss of offsite power event alone were to occur to one or both units during the Unit 1 tests, the AC distribution subsystems not associated with the tested subsystems are capable of supporting the minimum safety functions necessary to shutdown the reactor(s) and maintain them in a safe shutdown condition. Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour Completion Time (Required Action A.1) balances the benefit of performing the required test with the low probability of a loss of offsite power or LOCA with loss of offsite power while one division is inoperable for the duration of the test.

The NRC staff reviewed why two load groups have to be de-energized in order to perform SR 3.8.1.19 and why one load group cannot be deenergized to perform this SR. PPL indicated during the February 1, 2006, teleconference with NRC (ML060730525) and in its February 28, 2006, supplemental response, that it is possible to perform the LOCA/LOOP surveillance one load group at a time; however, testing in this manner does not adequately test the design of the plant as adverse interactions between the load groups would not be detectable. The design of the plant for a LOCA/LOOP relies upon the EDGs to all start and load onto their respective 4 kV ESS bus in each unit. Design features exist that preclude adverse interaction between any of the load groups. Testing 2 load groups (a division) at the same time, verifies that there is no adverse interaction between the 2 load groups.

The NRC staff also reviewed why the combined LOCA/LOOP test has to be performed on one division at a time. In its supplemental response dated February 28, 2006, PPL stated that the LOCA/LOOP test has always been performed on a divisional bases since some divisional safety-related equipment is also energized from the Channel C and D ESS buses. Examples such as Residual Heat Removal Service Water and Control Structure Chillers, which are divisional systems, are fed from the Unit 1C and the Unit 1D ESS Buses. The current procedure assures that the LOCA/LOOP test satisfies the requirements to demonstrate operability of the channelized and divisionalized loads under LOCA/LOOP conditions, and reduces the time that the plant would be in an LCO condition. This surveillance allows the entire division to be tested and assures that the divisional support equipment is energized to support the ECCS functions.

The NRC staff also requested PPL to address the compensatory measures that will be taken when the LOCA/LOOP test is being performed. PPL indicated that during the LOCA/LOOP test, plant procedures and outage work management restrict maintenance activities on the Unit 1 division that is affected by the test, which ensures the redundant Unit 1 division is operable. If it were necessary to perform emergent maintenance/repair work on Unit 2 equipment, the risk of performing this work would be evaluated under the Maintenance Rule Program, and the necessary compensatory measures identified by the risk evaluation would be put into place. PPL also indicated that work on the transmission system directly affecting the offsite source to SSES 1 and 2 will be controlled and reviewed, and that communications will be established with the Pennsylvania New Jersey Maryland (PJM) Energy Management System in accordance with the applicable PJM procedures to ensure grid stability.

The NRC staff confirmed that there is assurance that sufficient equipment is available to support mitigation of accident conditions on Unit 2 during the performance of TS SR 3.8.1.19 for Unit 1. The AC electrical equipment of all four Unit 2 4.16 kV ESS buses (both divisions) and for the Unit 2 required portions of the two remaining Unit 1 4.16 kV ESS buses are sufficient to support accident mitigation and the subsequent safe shutdown of Unit 2. The performance of SR 3.8.1.19 will momentarily deenergize one Unit 1 division (two subsystems) of AC electrical power distribution subsystems. The remaining AC electrical power distribution subsystems required by SSES 2 TS 3.8.7 are sufficient to support the assumed accident mitigation and subsequent safe shutdown of Unit 2. On this basis, the NRC staff concludes that the proposed change to TS 3.3.8.1 is acceptable.

3.4 Proposed Change to TS 3.8.7, Condition C During the conversion to Improved TSs, the phrase, or more, was added to SSES 2 TS 3.8.7, Condition C. PPL stated that it could not find a discussion or purpose for the words or more in any internal documents or any documents sent to the NRC staff. The NRC staff finds that the removal of this phrase is administrative; therefore, the subject change is acceptable.

3.5 Proposed Change to TS 3.8.7 PPL proposed to add a new Condition D to TS 3.8.7, which will apply to a single Unit 1 division (which comprises two subsystems). This TS will be in effect only during testing required by Unit 1 TS SR 3.8.1.19. This new condition will impose an 8-hour completion time for restoration of at least one of the two Unit 1 AC distribution subsystems.

PPL indicated that SR 3.8.1.19 for Unit 1 is performed when Unit 1 is shutdown and Unit 2 is at power. Since certain common loads (ESW, SGTS, and HVAC) required for Unit 2 operation are supplied by Unit 1 4.16 kV ESS buses only, the Unit 1 surveillance test affects the availability of one division of required loads for Unit 2 while it is at power. SSES 2 TS 3.8.7 requires that various Unit 1 AC electrical power distribution subsystems remain energized to support required Unit 2 equipment; and Action C allows only one subsystem to be deenergized.

Since the test required by Unit 1 SR 3.8.1.19 effectively deenergizes two Unit 1 AC distribution subsystems (i.e. one division), SSES 2 TS LCO 3.8.7 is not met. Since Action C of SSES 2 TS 3.8.7 allows one Unit 1 AC distribution subsystem to be deenergized, Unit 2 entry into LCO 3.0.3 is required.

PPL also indicated that performance of Unit 1 SR 3.8.1.19 deenergizes both AC electrical power distribution subsystems of one division because the surveillance is also a partial functional test of other systems. When performing Unit 1 SR 3.8.1.19, it is necessary to block the automatic transfer from the normal to the alternate offsite power supply for the two Unit 1 4kV buses in the same division being tested before deenergizing them for the surveillance.

Blocking the automatic transfer disables two Unit 1 AC subsystems at a time when they are required to be operable to support Unit 2 operation. Sufficient equipment is available during the Unit 1 performance of SR 3.8.1.19 to support mitigation of accident conditions in Unit 2. The resulting combination of all four Unit 2 AC distribution subsystems (both divisions) and the Unit 2 parts of the two remaining Unit 1 distribution subsystems is sufficient to support accident mitigation and the subsequent safe shutdown of Unit 2. Additionally, performance of the Unit 1 test does not preclude any EDG from being able to support the associated Unit 2 AC distribution subsystem.

In its March 18, 2005, submittal, PPL states that the diesels are fully loaded to support the Unit 1 testing for approximately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, meeting the 5 minute fully loaded period requirement for performing TS SR 3.8.1.19. If a design basis LOCA and LOOP occur on Unit 2 during this test, the operator is directed to take manual compensatory actions. PPL also states in its submittal that these operator actions have been addressed in the corresponding test procedure. The operator will take immediate action to shed nonessential loads from the Unit 1 loaded diesels to prepare the diesels for the accident loads via the load sequence timers in Unit 2. If only a LOOP event occurs to one or both units during the Unit 1 tests, the AC distribution subsystems not associated with the tested subsystems will be capable of supporting the minimum safety functions necessary to shutdown the reactors and maintain them in a safe shutdown condition.

Therefore, the required AC buses must be restored to operable status within a relatively short period of time. The 8-hour completion time (Required Action A.1) balances the benefit of performing the required test with the low probability of a LOOP or a LOCA with a LOOP while one division in Unit 1 is inoperable for the duration of the test.

The NRC staff reviewed the completion time difference between having one or more Unit 2 load groups (8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />) out of service and having one Unit 1 (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) load group out of service.

PPL stated that the 8-hour completion time to restore Unit 2 load group(s) (provided there is no loss of safety function) is consistent with the completion times stated in NUREG-1433, Standard Technical Specifications General Electric Plants, BWR/4. NUREG-1433 justified the completion time on the basis that the remaining AC electrical power distribution subsystems are capable of supporting the minimum safety functions necessary to shutdown the reactor and maintain it in a safe shutdown condition, assuming no single failure. The overall reliability is reduced, however, because a single failure in the remaining power distribution subsystems could result in the minimum required engineered safety feature functions not being supported.

Therefore, the required AC buses, load centers, motor control centers, and distribution panels must be restored to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. As stated in the SSES 2 TS Bases, the completion time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> for the loss of one Unit 1 AC load group is consistent with the completion times associated with LCOs for the Unit 2 and common equipment affected by loss of a Unit 1 AC load group. The equipment affected by the loss of a Unit 1 AC load group is ESW, SGTS, or Control Structure HVAC (Control Room Emergency Outside Air Supply). The loss of one Unit 1 ac load group does not cause a loss of safety function. The LCO completion times for the affected common equipment are equal to or greater than 7 days: therefore, the 72-hour completion time is conservative with respect to the individual LCO times.

Based on its review of the information provided by PPL, the NRC staff concludes that (1) sufficient equipment is available to support mitigation of an accident on Unit 2 during the performance of SR 3.8.1.19 for Unit 1 during shutdown, (2) the 8-hour required completion time balances the benefit of performing the required test with the low probability of a LOOP or a LOCA with a LOOP while one division in Unit 1 is inoperable for the duration of the test.

Therefore, the NRC staff finds the proposed TS changes to TS 3.8.7 in Unit 2 acceptable.

3.6 Conclusion Based upon the above evaluation, the NRC staff finds that: (1) there is reasonable assurance that sufficient equipment is available to support mitigation of accident condition in Unit 2 during the performance of Unit 1 SR 3.8.1.19, (2) the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> required completion time balances the benefit of performing the required test with the low probability of a LOOP or a LOOP/LOCA while one division in Unit 1 is inoperable for the duration of the test, (3) compensatory measures would ensure the availability of the remaining sources of AC power and electrical power distribution system during performance of Unit 1 SR 3.8.1.19. Therefore, the proposed TS changes are acceptable. The NRC staff also concludes that the proposed changes will not affect PPLs compliance with requirements of GDC 17 and 18.

4.0 STATE CONSULTATION

In accordance with the Commission's regulations, the Pennsylvania State official was notified of the proposed issuance of the amendments. The State official had no comments.

5.0 ENVIRONMENTAL CONSIDERATION

The amendments change a requirement with respect to installation or use of a facility component located within the restricted area as defined in 10 CFR Part 20 and change surveillance requirements. The NRC staff has determined that the amendments involve no significant increase in the amounts, and no significant change in the types, of any effluents that may be released offsite, and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (70 FR 29800). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.

6.0 CONCLUSION

The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.

Principal Contributor: D. Nguyen Date: March 16, 2006