| issue date = 09/19/2006
| issue date = 09/19/2006
| title = Response to NRC Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
| title = Response to NRC Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
| author name = Becker J R
| author name = Becker J
| author affiliation = Pacific Gas & Electric Co
| author affiliation = Pacific Gas & Electric Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-Pacific Gas and Electric Company'James Rl. Becker Diablo Canyon Power Plant Vice President P. 0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 September 19, 2006 Fax: 805.545.4234 PG&E Letter DCL-06-1 10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2006-15, Preparation and Schedulinq of Operator Licensing Examinations Dear Commissioners and Staff: Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2006-15, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.If you have further questions, please contact David L. Burns, Operations Training Supervisor, at (805) 545-3173.S incerel Jai /es R. Becker dngd/4347 Enclosure cc: David L. Burns Terry W. Jackson Bruce S. Mallett Alan B. Wang A member of the STARS (Strategic Teaming and Resource Sharing) Altiance ob: Callaway
{{#Wiki_filter:- Pacific ElectricGas and Company' James Rl.Becker             Diablo Canyon Power Plant Vice President               P.0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 September 19, 2006                                                                 Fax: 805.545.4234 PG&E Letter DCL-06-1 10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2006-15, Preparation and Schedulinq of Operator Licensing Examinations
 
==Dear Commissioners and Staff:==
 
Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2006-15, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.
Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.
Ifyou have further questions, please contact David L. Burns, Operations Training Supervisor, at (805) 545-3173.
Sincerel Jai/es R. Becker dngd/4347 Enclosure cc:     David L. Burns Terry W. Jackson Bruce S. Mallett Alan B. Wang A member of the STARS   (Strategic Teaming and Resource Sharing) Altiance                         ob:
Callaway
* Comanche Peak
* Comanche Peak
* Diablo Canyon
* Diablo Canyon
* Palo Verde
* Palo Verde
* South Texas Project
* South Texas Project
* Wolf Creek Enclosure PG&E Letter DCL-06-1 10 NRC Form 536,"Operator Licensing Examination Data" U~I~C FORM 536 U+/- NUCLEAR REGULATORYCOMUISSION MRC FORM 539 6.=1;zl U.S. NUCLEAR RErGULATORY COMMISSION OPERATOR LICENSING EXAMINATION DATA APPRaUEDIfy cIH: POO 3150-0131 EXPRES Ci~1.XZC*cdwi.ce, m~. I r".F Thj ." t4-on wf f is L44t v4an t4x",mr ard rwA.1Ca4 wC ocax examrawra.
* Wolf Creek
sre c zCr teucd,~4G~-~r "2a o -Racorcs amc FO'A.IWrvacv SorgEcý=,arcM 5 K~t U S.~ Ykc~. DC 20:03.I ~~A~~~a~i~~A r~c cocr~x- or spordor. a rc a pC4'~tn in rce mra.1,c ao r.~cc to. e-4 Irt~r-aJcc.
 
c~lcd.+/-(p DaourP Diablo Canycn Paier P~ai, A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY C7 CY 08 cY op cCY 1C, ESTNATM NLUMBt1ER OF Ir.ENSEE-PREPARED 11 0 EXi r4ATKINS ESTWMTED NLUMBER OF NRCPRPARE 0 0 0 EXA14~ATbCONS III B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER CY 07 CY ct CY CO CY 10 NUMBER OF REACTOR 7 10 0 OPERATORS NUMBER OF S D£4OR REACTOR 3 e 0. 6 OPERATORS  
Enclosure PG&E Letter DCL-06-1 10 NRC Form 536, "Operator Licensing Examination Data"
-f4STANT NUM BER OF REACTOR OPERATORS  
 
-UPGRADE 0 2 NUMBER OF SU41OR REACrOR 0 0 0 OPERATORS  
  ~I~C FORM MRC          536 FORM 539            U.S. NUCLEAR U+/-           REGULATORYCOMUISSION U NUCLEAR RErGULATORY COMMISSION APPRaUEDIfy cIH:           POO3150-0131             EXPRES Ci~1.XZC*
-LIM rTD PROPOSED DATES PRN4AY DATE 03013,217 05.01 ?DDS 03:31/2010 ALTERNATE DATE 0 u .rV1 "DDs C4-1,'01 O I C, C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE f#lCK:f4M!nd kli-WISI FCV el'lrW 04 owtM}}
6.=1;zl cdwi.ce, m~.       I r".F Thj ." t4-on wf     f is L44t v4an t4x",mr ard rwA.1Ca4 wCocax examrawra. sre c                       zCr teucd,~4G~-~r OPERATOR LICENSING                                "2a o - Racorcs amc FO'A.IWrvacv SorgEcý=,arcM         5 K~t U S.
EXAMINATION DATA
                                                                          ~ Ykc~.         DC 20:03.I     ~~A~~~a~i~~A r~ccocr~x- or spordor. a rc a pC4'~tn in rce mra.1,c ao r.~cc to. e-4 Irt~r-aJcc.c~lcd.+/-(
p DaourP Diablo Canycn Paier P~ai, A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER                     CY C7               CY 08                         cY op                       cCY 1C, ESTNATM NLUMBt1ER OF Ir.ENSEE-PREPARED               11                                                           0 EXi r4ATKINS ESTWMTED NLUMBER OF NRCPRPARE                                                 0               0                                         0 EXA14~ATbCONS       III B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER                     CY 07               CY ct                           CY CO                       CY     10 NUMBER OF REACTOR                     7                     10                               0 OPERATORS NUMBER OF S D£4OR REACTOR                     3                     e                               0.                         6 OPERATORS - f4STANT NUM BER OF SD*1OR REACTOR OPERATORS - UPGRADE                                                                           0                           2 NUMBER OF SU41OR REACrOR                                           0                             0                           0 OPERATORS - LIM rTD PROPOSED DATES PRN4AY DATE               03013,217           05.01 ?DDS                                                 03:31/2010 ALTERNATE DATE                                 0 .rV1 u      "DDs                                           C4-1,'01 OIC, C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE f#lCK:f4M!nd kli-WISI                                                                                                 04 MtCaOW*mowtM FCV el'lrW}}

Latest revision as of 14:40, 23 November 2019

Response to NRC Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
ML062720137
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/19/2006
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-06-110, RIS-06-015
Download: ML062720137 (3)


Text

- Pacific ElectricGas and Company' James Rl.Becker Diablo Canyon Power Plant Vice President P.0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 September 19, 2006 Fax: 805.545.4234 PG&E Letter DCL-06-1 10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2006-15, Preparation and Schedulinq of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2006-15, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.

Ifyou have further questions, please contact David L. Burns, Operations Training Supervisor, at (805) 545-3173.

Sincerel Jai/es R. Becker dngd/4347 Enclosure cc: David L. Burns Terry W. Jackson Bruce S. Mallett Alan B. Wang A member of the STARS (Strategic Teaming and Resource Sharing) Altiance ob:

Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-06-1 10 NRC Form 536, "Operator Licensing Examination Data"

~I~C FORM MRC 536 FORM 539 U.S. NUCLEAR U+/- REGULATORYCOMUISSION U NUCLEAR RErGULATORY COMMISSION APPRaUEDIfy cIH: POO3150-0131 EXPRES Ci~1.XZC*

6.=1;zl cdwi.ce, m~. I r".F Thj ." t4-on wf f is L44t v4an t4x",mr ard rwA.1Ca4 wCocax examrawra. sre c zCr teucd,~4G~-~r OPERATOR LICENSING "2a o - Racorcs amc FO'A.IWrvacv SorgEcý=,arcM 5 K~t U S.

EXAMINATION DATA

~ Ykc~. DC 20:03.I ~~A~~~a~i~~A r~ccocr~x- or spordor. a rc a pC4'~tn in rce mra.1,c ao r.~cc to. e-4 Irt~r-aJcc.c~lcd.+/-(

p DaourP Diablo Canycn Paier P~ai, A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY C7 CY 08 cY op cCY 1C, ESTNATM NLUMBt1ER OF Ir.ENSEE-PREPARED 11 0 EXi r4ATKINS ESTWMTED NLUMBER OF NRCPRPARE 0 0 0 EXA14~ATbCONS III B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER CY 07 CY ct CY CO CY 10 NUMBER OF REACTOR 7 10 0 OPERATORS NUMBER OF S D£4OR REACTOR 3 e 0. 6 OPERATORS - f4STANT NUM BER OF SD*1OR REACTOR OPERATORS - UPGRADE 0 2 NUMBER OF SU41OR REACrOR 0 0 0 OPERATORS - LIM rTD PROPOSED DATES PRN4AY DATE 03013,217 05.01 ?DDS 03:31/2010 ALTERNATE DATE 0 .rV1 u "DDs C4-1,'01 OIC, C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE f#lCK:f4M!nd kli-WISI 04 MtCaOW*mowtM FCV el'lrW