Response to NRC Regulatory Issue Summary 2012-07. Preparation and Scheduling of Operator Licensing Examinations
ML12192A212
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/09/2012
From: Welsch J
Pacific Gas & Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
DCL-12-067, OL-DPR-80, OL-DPR-82, RIS 12-007
Download: ML12192A212 (3)


Text

Pacific Gas and Electric Company James M. Welsch Diablo Canyon Power Plant Station Director Mail Code 104/5/502 P. O. Box 56 Avila Bea ch, CA 93424 805.545.3242 July 9,2012 Internal: 691 .3242 Fax: 805.545.4234 Internet: JMW1@pge.com PG&E Letter DCL-12-067 u.s. Nuclear Regulatory Commission 10 CFR 50.55 ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2012-07. Preparation and Scheduling of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2012-07, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.

If you have further questions, please contact Mr. Dave Burns, Operations Training Manager, at (805) 545-3173.

Sincerely, F'1i; I? 7/~ -r:~ J. .... i,Jd:scL James M. Welsch wrl8/6980 Enclosure cc/enc: John M. Becerra, Training Supervisor Dave L. Burns, Operations Training Manager Elmo E. Collins, NRC Region IV Michael S. Peck, NRC Senior Resident Inspector Joseph M. Sebrosky, NRR Senior Project Manager A membe r of the STARS (Strategic Teaming and Resourc e Sharing) Alli a nce Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre
  • South Te x as Project
  • Wolf Creek

Enclosure PG&E Letter DCL-12-067 NRC Form 536, "Operator Licensing Examination Data"

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.' This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to Infocoliects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EXAMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY. NRC REGION Diablo Canyon Power Plant IV A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 NUMBER OF REACTOR OPERATORS 6 6 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 3 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 3 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 PROPOSED DATES PRIMARY DATE 08/14114 04/11116 ALTERNATE DATE 07/14114 05/23116 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 12 CANDIDATES NRC FORM 536 (9-2011)