Response to NRC Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
ML062720137
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/19/2006
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-06-110, RIS-06-015
Download: ML062720137 (3)


Text

- Pacific ElectricGas and Company' James Rl.Becker Diablo Canyon Power Plant Vice President P.0. Box 56 Diablo Canyon Operations and Avila Beach, CA 93424 Station Director 805.545.3462 September 19, 2006 Fax: 805.545.4234 PG&E Letter DCL-06-1 10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Response to NRC Regulatory Issue Summary 2006-15, Preparation and Schedulinq of Operator Licensing Examinations

Dear Commissioners and Staff:

Pursuant to the request for voluntary information identified in NRC Regulatory Issue Summary 2006-15, a completed NRC Form 536, "Operator Licensing Examination Data," is enclosed.

Pacific Gas and Electric Company makes no regulatory commitments (as defined by NEI 99-04) in this letter.

Ifyou have further questions, please contact David L. Burns, Operations Training Supervisor, at (805) 545-3173.

Sincerel Jai/es R. Becker dngd/4347 Enclosure cc: David L. Burns Terry W. Jackson Bruce S. Mallett Alan B. Wang A member of the STARS (Strategic Teaming and Resource Sharing) Altiance ob:

Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Enclosure PG&E Letter DCL-06-1 10 NRC Form 536, "Operator Licensing Examination Data"

~I~C FORM MRC 536 FORM 539 U.S. NUCLEAR U+/- REGULATORYCOMUISSION U NUCLEAR RErGULATORY COMMISSION APPRaUEDIfy cIH: POO3150-0131 EXPRES Ci~1.XZC*

6.=1;zl cdwi.ce, m~. I r".F Thj ." t4-on wf f is L44t v4an t4x",mr ard rwA.1Ca4 wCocax examrawra. sre c zCr teucd,~4G~-~r OPERATOR LICENSING "2a o - Racorcs amc FO'A.IWrvacv SorgEcý=,arcM 5 K~t U S.

EXAMINATION DATA

~ Ykc~. DC 20:03.I ~~A~~~a~i~~A r~ccocr~x- or spordor. a rc a pC4'~tn in rce mra.1,c ao r.~cc to. e-4 Irt~r-aJcc.c~lcd.+/-(

p DaourP Diablo Canycn Paier P~ai, A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY C7 CY 08 cY op cCY 1C, ESTNATM NLUMBt1ER OF Ir.ENSEE-PREPARED 11 0 EXi r4ATKINS ESTWMTED NLUMBER OF NRCPRPARE 0 0 0 EXA14~ATbCONS III B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER CY 07 CY ct CY CO CY 10 NUMBER OF REACTOR 7 10 0 OPERATORS NUMBER OF S D£4OR REACTOR 3 e 0. 6 OPERATORS - f4STANT NUM BER OF SD*1OR REACTOR OPERATORS - UPGRADE 0 2 NUMBER OF SU41OR REACrOR 0 0 0 OPERATORS - LIM rTD PROPOSED DATES PRN4AY DATE 03013,217 05.01 ?DDS 03:31/2010 ALTERNATE DATE 0 .rV1 u "DDs C4-1,'01 OIC, C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE f#lCK:f4M!nd kli-WISI 04 MtCaOW*mowtM FCV el'lrW