ML062960320: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE COMMISSIONIn the Matter of)
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                       )
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
                                        )
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
ENTERGY NUCLEAR VERMONT YANKEE,         )       Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR             )
)(Vermont Yankee Nuclear Power Station))NRC STAFF ANSWER TO ENTERGY'SPETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20David E. RothCounsel for NRC StaffMitzi A. YoungCounsel for NRC StaffOctober 20, 2006  
OPERATIONS, INC.                     )       ASLBP No. 06-849-03-LR
-i-TABLE OF CONTENTSPageTABLE OF AUTHORITIES....................................................iiINTRODUCTION...........................................................1BACKGROUND............................................................1
                                        )
(Vermont Yankee Nuclear Power Station) )
NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 David E. Roth Counsel for NRC Staff Mitzi A. Young Counsel for NRC Staff October 20, 2006
 
                                                            -i-TABLE OF CONTENTS Page TABLE OF AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1


==SUMMARY==
==SUMMARY==
OF RULINGS.....................................................5 DISCUSSION..............................................................6 I.Applicable Legal Standards for Interlocutory Review...........................6 II.The Standards of 10 C.F.R. § 2.341(f) Are Not Met...........................10A.Entergy Has Not Been Threatened with Immediate and Serious Irreparable Impact...........................10B.Entergy Has Not Shown That Admission of NEC Contention 1 Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner....................11III.Entergy Request for the Commission to Exercise Its Inherent Supervisory Authority ...........................................................12A.Scope of License Renewal Review.................................13B.Exercise of the Commission's Supervisory Authority Is Warrantedfor Administrative Efficiency.......................................14
OF RULINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 DISCUSSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 I. Applicable Legal Standards for Interlocutory Review . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 II. The Standards of 10 C.F.R. § 2.341(f) Are Not Met . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 A. Entergy Has Not Been Threatened with Immediate and Serious Irreparable Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 B. Entergy Has Not Shown That Admission of NEC Contention 1 Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner . . . . . . . . . . . . . . . . . . . . 11 III. Entergy Request for the Commission to Exercise Its Inherent Supervisory Authority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 A. Scope of License Renewal Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 B. Exercise of the Commissions Supervisory Authority Is Warranted for Administrative Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
 
                                                      -ii-TABLE OF AUTHORITIES Page ADMINISTRATIVE DECISIONS Commission:
AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station),
CLI-06-24, 63 NRC ___ slip op. (Sept. 6, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Connecticut Yankee Atomic Power Co. (Haddam Neck Plant),
CLI-01-25, 54 NRC 368 (2001). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7, 8, 10, 11, 12 Consolidated Edison Co. of New York (Indian Point, Unit 2),
Power Authority of the State of New York (Indian Point Unit 3),
CLI-82-15, 16 NRC 27 (1982) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site),
CLI-04-31, 60 NRC 461 (2004) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8, 9 Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site),
System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site),
CLI-06-20, 63 NRC ___ slip op. (July 26, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9, 12 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4),
CLI-01-17, 54 NRC 3 (2001) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Georgia Power Co., et al. (Vogtle Electric Generating Plant, Units 1 and 2),
CLI-95-15, 42 NRC 181 (1995) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Louisiana Energy Services LP (National Enrichment Facility),
CLI-06-22, 63 NRC __ (Aug. 17, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13, 17 Private Fuel Storage, LLC (Independent Spent Fuel Storage Facility),
CLI-98-7, 47 NRC 307 (1998) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site),
CLI-94-11, 40 NRC 55 (1994) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7, 8, 9,11 Atomic Licensing Appeal Board:
Duke Power Co., et al. (Catawba Nuclear Station, Units 1 and 2),
ALAB-768, 19 NRC 988 (1984) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),
ALAB-861, 25 NRC 129 (1987) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
 
                                                            -iii-Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),
ALAB-515, 8 NRC 702 (1978) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Atomic Safety and Licensing Board:
Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations Inc.
(Vermont Yankee Nuclear Power Station),
LBP-06-20, 63 NRC __ , slip op. (Sept. 22, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . passim Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4),
LBP-01-6, 53 NRC 138 (2001) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Louisiana Energy Services LP (National Enrichment Facility),
LBP-04-14, 60 NRC 40 (2004) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 FEDERAL AND STATE STATUTES Federal Water Pollution and Control Act, 33 U.S.C. § 1251 et seq . . . . . . . . . . . . . . . . . . . 6, 13 Federal Water Pollution and Control Act § 316(a), 33 U.S.C. § 1326(a) . . . . . . . . . . . . . . . . . 15 Federal Water Pollution and Control Act § 316(b), 33 U.S.C. § 1326(b) . . . . . . . . . . . . . . . . . 15 Federal Water Pollution and Control Act § 402, 33 U.S.C. § 1342 . . . . . . . . . . . . . . . . . . . . . . 3 Federal Water Pollution and Control Act § 511(c), 33 U.S.C. § 1371(c) . . . . . . . . . . . . . . . . . . 3 Vermont Administrative Procedure Act, 3 V.S.A. § 814(b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 REGULATIONS 10 C.F.R. § 2.311(b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 10 C.F.R. § 2.311(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 10 C.F.R. § 2.335(a) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 10 C.F.R. § 2.341(f) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10, 11, 12 10 C.F.R. § 2.341(f)(2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6, 7, 10, 11 10 C.F.R. § 2.341(b)(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 10 C.F.R. § 51.45(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 10 C.F.R. § 51.45(d) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16, 17 10 C.F.R. § 51.53(c)(3)(I) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15, 17 10 C.F.R. § 51.53(c)(3)(ii) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
 
                                                            -iv-REGULATIONS (continued) 10 C.F.R. § 51.53(c)(3)(ii)(B)
                        . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . passim 10 C.F.R. § 51.71(d) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. § 51.95(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. Part 51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. Part 51, Subpart A, Appendix B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13, 15 10 C.F.R. Part 54 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 40 C.F.R. Part 125 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15


CONCLUSION............................................................17
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                  )
-ii-TABLE OF AUTHORITIESPageADMINISTRATIVE DECISIONSCommission
                                                  )
:AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 63 NRC ___ slip op. (Sept. 6, 2006)....................................9Connecticut Yankee Atomic Power Co. (Haddam Neck Plant),                               CLI-01-25, 54 NRC 368 (2001)......................................7, 8, 10, 11, 12Consolidated Edison Co. of New York (Indian Point, Unit 2), Power Authority of the State of New York (Indian Point Unit 3),CLI-82-15, 16 NRC 27 (1982)..................................................9Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site)
ENTERGY NUCLEAR VERMONT YANKEE,                    )          Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR                        )
,CLI-04-31, 60 NRC 461 (2004)...............................................8, 9Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site),  CLI-06-20, 63 NRC ___ slip op. (July 26, 2006).................................9, 12Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4),CLI-01-17, 54 NRC 3 (2001)..................................................13Georgia Power Co., et al. (Vogtle Electric Generating Plant, Units 1 and 2)
OPERATIONS, INC.                                 )          ASLBP No. 06-849-03-LR
,CLI-95-15, 42 NRC 181 (1995)
                                                  )
.................................................
(Vermont Yankee Nuclear Power Station)            )
7Louisiana Energy Services LP (National Enrichment Facility), CLI-06-22, 63 NRC __ (Aug. 17, 2006).......................................13, 17Private Fuel Storage, LLC (Independent Spent Fuel Storage Facility)
NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 INTRODUCTION Pursuant to 10 C.F.R. § 2.341(f)(2) and 10 C.F.R. § 2.341(b)(3), the staff of the Nuclear Regulatory Commission (Staff) hereby responds to the Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively Entergy) petition for interlocutory review of LBP-06-20.1 Entergys Petition for Interlocutory Review of LBP-06-20 Admitting New England Coalitions Contention 1 (October 10, 2006) (Petition). The Petition also includes an alternative request for the Commission to exercise its inherent supervisory authority. See Petition at 2. For the reasons set forth herein, the Staff submits the Petition should be denied on the grounds that the criteria for interlocutory review have not been met. The Staff, however, believes that the exercise of the Commissions inherent supervisory authority may be warranted.
,CLI-98-7, 47 NRC 307 (1998)..................................................8Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site)
BACKGROUND On March 27, 2006,2 the NRC published a notice of docketing and opportunity for hearing concerning Entergys application, under 10 C.F.R. Part 54, for renewal of Operating 1
,CLI-94-11, 40 NRC 55 (1994)...........................................7, 8, 9,11Atomic Licensing Appeal Board
Memorandum and Order (Ruling on Standing, Contentions, Hearing Procedures, State Statutory Claim, and Contention Adoption), LBP-06-20, 63 NRC ___, slip op. (Sept. 22, 2006) (Order).
:Duke Power Co., et al. (Catawba Nuclear Station, Units 1 and 2), ALAB-768, 19 NRC 988 (1984).................................................7Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),ALAB-861, 25 NRC 129 (1987).................................................8
2 71 Fed. Reg. 15,220.
-iii-Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),ALAB-515, 8 NRC 702 (1978).................................................13Atomic Safety and Licensing Board
 
:Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations Inc.(Vermont Yankee Nuclear Power Station),
License No. DPR-28, for an additional 20 years beyond the current March 21, 2012 expiration date.3 As relevant to the instant petition, the Application included an Environmental Report (ER), which appended the current National Pollutant Discharge Elimination System (NPDES) permit from the State of Vermont, but indicated that a proposed permit amendment from the Waste Water Management Division of the Vermont Agency of Natural Resources (VANR) would allow a one degree increase in thermal discharges. See ER at 4-17.4 That amendment was partially granted by the VANR on March 30, 2006,5 the day before the permit that was in timely renewal6 was to expire.
LBP-06-20, 63 NRC __ , slip op. (Sept. 22, 2006)
The New England Coalition (NEC) filed a timely intervention petition challenging the application.7 NEC Contention 1, at issue here, alleged that Entergy's ER did not sufficiently assess the impacts of increased thermal discharges over the requested twenty-year license 3
..............................
See Letter from William F. Maguire, Entergy, to NRC, dated January 25, 2006 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML060300082, [Application]
passimFlorida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4),LBP-01-6, 53 NRC 138 (2001)................................................13Louisiana Energy Services LP (National Enrichment Facility), LBP-04-14, 60 NRC 40 (2004)................................................13FEDERAL AND STATE STATUTESFederal Water Pollution and Control Act, 33 U.S.C. § 1251 et seq...................6, 13Federal Water Pollution and Control Act § 316(a), 33 U.S.C. § 1326(a).................15Federal Water Pollution and Control Act § 316(b), 33 U.S.C. § 1326(b).................15Federal Water Pollution and Control Act § 402, 33 U.S.C. § 1342 ......................3Federal Water Pollution and Control Act § 511(c), 33 U.S.C. § 1371(c) ..................3Vermont Administrative Procedure Act, 3 V.S.A. § 814(b)............................2REGULATIONS10 C.F.R. § 2.311(b).........................................................610 C.F.R. § 2.311(c).........................................................610 C.F.R. § 2.335(a)........................................................1210 C.F.R. § 2.341(f)..................................................10, 11, 1210 C.F.R. § 2.341(f)(2)...............................................6, 7, 10, 1110 C.F.R. § 2.341(b)(3).......................................................110 C.F.R. § 51.45(c)........................................................17 10 C.F.R. § 51.45(d).....................................................16, 17 10 C.F.R. § 51.53(c)(3)(I).................................................15, 17 10 C.F.R. § 51.53(c)(3)(ii)....................................................15
ML060300085, Appendix E [Environmental Report] ML060300086).
-iv-REGULATIONS (continued)10 C.F.R. § 51.53(c)(3)(ii)(B)
4 The NPDES permit was submitted in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(B).
...................................................
5 The VANR granted the proposed one degree increase in thermal effluent limitations for the time period of June 16 through October 14, but postponed a decision on whether to grant the proposed increase for May 16 through June 15. See Amended Permit at 4; Fact Sheet at 4.
passim10 C.F.R. § 51.71(d)........................................................13 10 C.F.R. § 51.95(c)........................................................13 10 C.F.R. Part 51..........................................................13 10 C.F.R. Part 51, Subpart A, Appendix B ....................................13, 1510 C.F.R. Part 54...........................................................1 40 C.F.R. Part 125.........................................................15 1  Memorandum and Order (Ruling on Standing, Contentions, Hearing Procedures, State StatutoryClaim, and Contention Adoption), LBP-06-20, 63 NRC ___, slip op.  (Sept. 22, 2006) ("Order").
6 The permit attached to Entergys ER was due to expire on March 31, 2006. See ER at Attachment D. Since Entergy had previously applied for renewal, the permit is considered to be in timely renewal. See ER at 9-1. When a licensee has made timely and sufficient application for the renewal of a license or a new license with reference to any activity of a continuing nature, the existing license does not expire until the application has been finally determined by the agency, and, in case the application is denied or the terms of the new license limited, until the last day for seeking review of the agency order or a later date fixed by order of the reviewing court. 3 V.S.A. § 814(b); see also Letter from Carole Fowler, Administration and Compliance Section, VANR WWMD, to Lynn DeWald, Entergy, dated September 30, 2005 (Attachment 1 to Entergys Answer to [NECs] Petition for Leave to Intervene (June 22, 2006)
2  71 Fed. Reg. 15,220.
(Entergy Answer)).
UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE COMMISSIONIn the Matter of)
7
)ENTERGY NUCLEAR VERMONT YANKEE,)Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR)
[NECs] Petition for Leave to Intervene, Request for Hearing, and Contentions (May 26, 2006)
OPERATIONS, INC.)ASLBP No. 06-849-03-LR
(NEC Petition).
)
 
(Vermont Yankee Nuclear Power Station)) 
extension. See NEC Petition at 13. Entergy and the NRC filed answers to the petition.8 Entergy opposed admission of the contention, arguing that it impermissibly challenged 10 C.F.R.
)NRC STAFF ANSWER TO ENTERGY'S PETITION  FOR INTERLOCUTORY REVIEW OF LBP-06-20INTRODUCTIONPursuant to 10 C.F.R. § 2.341(f)(2) and 10 C.F.R. § 2.341(b)(3), the staff of the NuclearRegulatory Commission ("Staff") hereby responds to the Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively "Entergy") petition for interlocutory review of LBP-06-20.
§ 51.53(c)(3)(ii)(B) and section 511(c) of the Clean Water Act, 33 U.S.C. § 1371(c). Entergy Answer at 11. Entergy claimed that submission of its NPDES permit would provide Vermonts 316(a) determination, that no further analysis was required, that section 511(c) of the Federal Water Pollution Control Act (FWPCA or Clean Water Act)9 precluded NRC from reviewing or imposing an effluent limitation different from the States effluent limitation, and, thus, no material dispute with the application was raised. Id. at 12-14. The Staff noted that Entergys Application did not include the then-current discharge permit, which authorized and assessed the one degree increase in thermal discharges, and thus did not object to the admission of the contention to the extent that it alleged Entergys ER did not contain an assessment of the impact of that increased thermal discharge on American shad during the renewal period. See Staff Answer at 8. The Staff argued, however, that the submission of the amended permit issued March 30, 2006 would render the contention moot. See id. at 9.
1 Entergy's Petition for Interlocutory Review of LBP-06-20 Admitting New EnglandCoalition's Contention 1 (October 10, 2006) ("Petition"). The Petition also includes an alternativerequest for the Commission to exercise its inherent supervisory authority.
On June 29, 2006, NEC filed a reply, disputing that a 5-year NPDES permit (whether or not in timely renewal) was dispositive of whether Entergy adequately assessed the impacts of the renewal period and raising matters beyond the scope of the original Contention.10 On September 22, 2006, the Atomic Safety and Licensing Board (Board) issued a Memorandum and Order, which, inter alia, found Contention 1 admissible. See Order at 51-57.
See Petition at 2. Forthe reasons set forth herein, the Staff submits  the  Petition should be denied on the grounds that the criteria for interlocutory review have not been met. The Staff, however, believes that the exercise of the Commission's inherent supervisory authority may be warranted.BACKGROUND On March 27, 2006, 2 the NRC published a notice of docketing and opportunity forhearing concerning Entergy's application, under 10 C.F.R. Part 54, for renewal of Operating  3  See  Letter from William F. Maguire, Entergy, to NRC, dated January 25, 2006 (AgencywideDocument Access and Management System ("ADAMS") Accession Nos. ML060300082, [Application]ML060300085, Appendix E [Environmental Report] ML060300086).
8 Entergys Answer to [NECs] Petition for Leave to Intervene (June 22, 2006) (Entergy Answer); NRC Staff Answer to Request for Hearing of [NEC] (June 22, 2006) (Staff Answer).
4  The NPDES permit was submitted in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(B).
9 Under section 402 of the FWPCA of 1972, 33 U.S.C. § 1342, NPDES permits are issued by the U.S. Environmental Protection Agency or by authorized States.
5  The VANR granted the proposed one degree increase in thermal effluent limitations for the timeperiod of June 16 through October 14, but postponed a decision on whether to grant the proposed increase for May 16 through June 15.
10
See Amended Permit at 4; Fact Sheet at 4.
[NECs] Reply to Entergy and NRC Staff Answers to Petition for Leave to Intervene, Request for Hearing and Contentions (June 29, 2006) (Reply) at 3-6. NEC argued that the previous permit expired and that the amended permit was subject to a stay request. Id.
6  The permit attached to Entergy's ER was due to expire on March 31, 2006.
 
See ER atAttachment D. Since Entergy had previously applied for renewal, the permit is considered to be in timelyrenewal.
The Board majority ruled that NEC Contention 1 raised a material issue concerning whether Entergys ER contains a sufficient assessment of increased thermal discharges over the proposed renewal period and was supported by the basis statement that the ER contains an insufficient analysis of the thermal impacts in the Connecticut River and merely refers to an NPDES permit, which is under appeal, of allegedly uncertain status, and does not cover the twenty years covered by the proposed license renewal." Order at 52 (citing NEC Petition at 11).
See ER at 9-1.  "When a licensee has made timely and sufficient application for the renewal ofa license or a new license with reference to any activity of a continuing nature, the existing license doesnot expire until the application has been finally determined by the agency, and, in case the application is denied or the terms of the new license limited, until the last day for seeking review of the agency order or a later date fixed by order of the reviewing court."  3 V.S.A. § 814(b); see also Letter from Carole Fowler,Administration and Compliance Section, VANR WWMD, to Lynn DeWald, Entergy, dated September 30,2005 (Attachment 1 to Entergy's Answer to [NEC's] Petition for Leave to Intervene (June 22, 2006)
The dissenting opinion by Judge Wardwell concluded that NEC Contention 1 was inadmissible because Entergy has addressed its previous omission of an assessment by providing, on July 27, 2006,11 its amended permit that authorized the increased discharges and that, even if the permit was overturned on appeal, the permit originally included in the application would satisfy NRC requirements. See LBP-06-20, Dissenting Opinion of Judge Wardwell on Admissibility of New England Coalition's Contention 1 (Environmental) ("Dissenting Opinion").
("Entergy Answer")).
On October 10, 2006, Entergy filed the instant motion, requesting that the Commission take interlocutory review of LBP-06-20 insofar as it admitted NEC Contention 1. Petition at 1.
7  [NEC's] Petition for Leave to Intervene, Request for Hearing, and Contentions (May 26, 2006)("NEC Petition"). License No. DPR-28, for an additional 20 years beyond the current March 21, 2012 expirationdate.3  As relevant to the instant petition, the Application included an Environmental Report("ER"), which appended the current National Pollutant Discharge Elimination System ("NPDES")
Entergy argues that the decision was inconsistent with NRC rules and established precedent, and is thus clearly erroneous. Id. Entergy also argues that advancement of Contention 1 would cause Entergy immediate and serious irreparable harm, the impact of which could not be alleviated through a petition for review of the Boards final decision at the end of the proceeding, and would affect the basic structure of the proceeding in a pervasive and unusual manner. See id. Accordingly, Entergy asks the Commission to review the Board majoritys ruling on NEC Contention 1 and reverse that ruling in its entirety. Id. at 23.
permit from the State of Vermont, but indicated that a proposed permit amendment from the Waste Water Management Division of the Vermont Agency of Natural Resources ("VANR")
Before addressing these arguments, it is helpful to recount the Boards rulings.
would allow a one degree increase in thermal discharges. See ER at 4-17.
11 See Letter from Ted A. Sullivan, VYNPS to NRC, dated July 27, 2006 (forwarding License Renewal Application, Amendment 6) (ML062130080). As noted previously, the NPDES amended permit, issued on March 30, 2006, had a March 31, 2006 expiration date, but remained in timely renewal under Vermont law. See note 5, supra.
4  That amendmentwas partially granted by the VANR on March 30, 2006, 5 the day before the permit that was intimely renewal 6 was to expire. The New England Coalition ("NEC") filed a timely intervention petition challenging theapplication.
7  NEC Contention 1, at issue here, alleged that Entergy's ER did not sufficientlyassess the impacts of increased thermal discharges over the requested twenty-year license  8  Entergy's Answer to [NEC's] Petition for Leave to Intervene (June 22, 2006) ("EntergyAnswer"); NRC Staff Answer to Request for Hearing of [NEC] (June 22, 2006) ("Staff Answer").
9  Under section 402 of the FWPCA of 1972, 33 U.S.C. § 1342, NPDES permits are issued by theU.S. Environmental Protection Agency or by authorized States.
10  [NEC's] Reply to Entergy and NRC Staff Answers to Petition for Leave to Intervene, Requestfor Hearing and Contentions (June 29, 2006) ("Reply") at 3-6. NEC argued that the previous permitexpired and that the amended permit was subject to a stay request.
Id.extension.
See NEC Petition at 13. Entergy and the NRC filed answers to the petition.
8  Entergyopposed admission of the contention, arguing that it impermissibly challenged 10 C.F.R.
§ 51.53(c)(3)(ii)(B) and section 511(c) of the Clean Water Act, 33 U.S.C. § 1371(c). Entergy Answer at 11. Entergy claimed that submission of its NPDES permit would provide Vermont's 316(a) determination, that no further analysis was required, that section 511(c) of the Federal Water Pollution Control Act (FWPCA or Clean Water Act) 9 precluded NRC from reviewing orimposing an effluent limitation different from the State's effluent limitation, and, thus, no material dispute with the application was raised. Id. at 12-14. The Staff noted that Entergy's Applicationdid not  include the then-current discharge permit, which authorized and assessed the one degree increase in thermal discharges, and thus did not object to the admission of the contention to the extent that it alleged Entergy's ER did not contain an assessment of the impact of that increased thermal discharge on American shad during the renewal period.
See StaffAnswer at 8. The Staff argued, however, that the submission of the amended permit issued March 30, 2006 would render the contention moot.
See id. at 9. On June 29, 2006, NEC filed a reply, disputing that a  5-year NPDES permit  (whether ornot in timely renewal) was dispositive of whether Entergy adequately assessed the impacts of the renewal period and raising matters beyond the scope of the original Contention.
10    On September 22, 2006, the Atomic Safety and Licensing Board ("Board") issued aMemorandum and Order, which, inter alia, found Contention 1 admissible.
See Order at 51-57. 11  See Letter from Ted A. Sullivan, VYNPS to NRC, dated July 27, 2006 (forwarding LicenseRenewal Application, Amendment 6) (ML062130080). As noted previously, the NPDES amended permit, issued on March 30, 2006, had a March 31, 2006 expiration date, but remained in timely renewal under Vermont law.
See note 5, supra.      The Board majority ruled that NEC Contention 1 raised a material issue concerning whetherEntergy's ER contains a sufficient assessment of increased thermal discharges over the proposed renewal period and was supported by the basis statement that "'the ER contains an insufficient analysis of the thermal impacts in the Connecticut River and merely refers to an NPDES permit, which is under appeal, of allegedly uncertain status, and does not cover the twenty years covered by the proposed license renewal.'"  Order at 52 (citing NEC Petition at 11).
The dissenting opinion by Judge Wardwell concluded that NEC Contention 1 was inadmissiblebecause Entergy has addressed its previous omission of an assessment by providing, on July 27, 2006, 11 its amended permit that authorized the increased discharges and that, even ifthe permit was overturned on appeal, the permit originally included in the application would satisfy NRC requirements.
See LBP-06-20, Dissenting Opinion of Judge Wardwell onAdmissibility of New England Coalition's Contention 1 (Environmental) ("Dissenting Opinion"). On October 10, 2006, Entergy filed the instant motion, requesting that the Commissiontake interlocutory review of LBP-06-20 insofar as it admitted NEC Contention 1. Petition at 1.
Entergy argues that the decision was "inconsistent with NRC rules and established precedent, and is thus clearly erroneous." Id. Entergy also argues that advancement of Contention 1 wouldcause Entergy immediate and serious irreparable harm, the impact of which could not be alleviated through a petition for review of the Board's final decision at the end of the proceeding, and would affect the basic structure of the proceeding in a pervasive and unusual manner. See id. Accordingly, Entergy asks the Commission to review the Board majority's ruling on NECContention 1 and reverse that ruling in its entirety. Id. at 23. Before addressing these arguments, it is helpful to recount the Board's rulings.


==SUMMARY==
==SUMMARY==
OF RULINGSThe majority admitted NEC Contention 1, concluding that it satisfied the criteria of10 C.F.R § 2.309(f)(i-vi). Order at 52. The Board rejected as unreasonable the Staff's argument that the contention merely challenged the adequacy of Entergy's assessment of the one-degree increase. Order at 52 n.55. The Board also rejected the claim that the contention was barred by the FWPCA, but acknowledged that it "bars NRC from reviewing or imposing effluent limitations, water quality certification requirements, or other FWPCA requirements." Order at 54-55. The Board further questioned the status of VYNPS's NPDES permit relative to the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirement to provide a current copy of the permit, in particularbecause the permit was only good for five years, an "expired" permit was under appeal in the Vermont Environmental Court and the effectiveness of the permit had been stayed. Order at 55-57. The Board concluded that litigation was necessary to resolve how or if 10 C.F.R.
OF RULINGS The majority admitted NEC Contention 1, concluding that it satisfied the criteria of 10 C.F.R § 2.309(f)(i-vi). Order at 52. The Board rejected as unreasonable the Staff's argument that the contention merely challenged the adequacy of Entergys assessment of the one-degree increase. Order at 52 n.55. The Board also rejected the claim that the contention was barred by the FWPCA, but acknowledged that it "bars NRC from reviewing or imposing effluent limitations, water quality certification requirements, or other FWPCA requirements." Order at 54-55. The Board further questioned the status of VYNPS's NPDES permit relative to the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirement to provide a current copy of the permit, in particular because the permit was only good for five years, an expired permit was under appeal in the Vermont Environmental Court and the effectiveness of the permit had been stayed. Order at 55-57. The Board concluded that litigation was necessary to resolve how or if 10 C.F.R.
§ 51.53(c)(3)(ii)(B) could be satisfied by the NPDES permit. Order at 55-56. The Board further questioned the interplay between Part 51 regulations and the permit in terms of how or if National Environmental Policy Act ("NEPA") requirements are met through 10 C.F.R.
§ 51.53(c)(3)(ii)(B) could be satisfied by the NPDES permit. Order at 55-56. The Board further questioned the interplay between Part 51 regulations and the permit in terms of how or if National Environmental Policy Act (NEPA) requirements are met through 10 C.F.R.
§ 51.53(c)(3)(ii)(B), and concluded that regulatory interpretation was needed. Order at 56. The Board similarly questioned whether reliance on a five-year permit would satisfy the NRC's NEPA obligations. Order at 56-57. By contrast, the Dissent agreed with the NRC Staff that the contention was admissible tothe extent it alleged the Application was missing information, but opined that the omission had been corrected when Entergy docketed its amended permit.
§ 51.53(c)(3)(ii)(B), and concluded that regulatory interpretation was needed. Order at 56. The Board similarly questioned whether reliance on a five-year permit would satisfy the NRCs NEPA obligations. Order at 56-57.
See Dissenting Opinion at 1. TheDissent concluded that Entergy had already met the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirements, even while the permit was under an ongoing appeal. Id. at 4-5. Judge Wardwell reasoned that 10 C.F.R. § 51.53(c)(3)(ii)(B) includes all requirements for an impact assessment in an ER and that there was no dispute raised. Id. at 4. Specifically, he concluded that the required analyses 12  An appeal lies where an intervention petition has been wholly denied or where another partyclaims an intervention petition should have been wholly denied.
By contrast, the Dissent agreed with the NRC Staff that the contention was admissible to the extent it alleged the Application was missing information, but opined that the omission had been corrected when Entergy docketed its amended permit. See Dissenting Opinion at 1. The Dissent concluded that Entergy had already met the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirements, even while the permit was under an ongoing appeal. Id. at 4-5. Judge Wardwell reasoned that 10 C.F.R. § 51.53(c)(3)(ii)(B) includes all requirements for an impact assessment in an ER and that there was no dispute raised. Id. at 4. Specifically, he concluded that the required analyses
See 10 C.F.R. § 2.311(b) and (c).were covered either by Category 1 (contained in the GEIS) or Category 2 (site-specific impactsaddressed by the NPDES permit). Id. He opined that to require the Applicant to do more wasan impermissible challenge to the regulations, and would raise issues outside the scope of a license renewal proceeding. Id. Judge Wardwell also opined that if Contention 1 was an attempt to raise issues otherthan a Category 2 issue related to thermal discharges (i.e., heat shock), NEC's contention couldalso be rejected as an impermissible challenge to the regulations. Id. at 5. The Dissent further concluded that the status of the NPDES permit was not an issue because if the permit were overturned on appeal, the contention would be moot. Id. at 6. With respect to the  five-yearterm of an NPDES permit, the Dissent viewed that permit as providing on-going re-assessment of the increase in temperature, as being consistent with NRC regulations, the FWPCA and NEPA, such that if submitted, no additional analysis of thermal impacts was needed.
Id. at 9-10. The Dissent noted that the case law states that NRC must take the evaluation at face value and not undertake an independent analysis. Id. at  9. The Dissent concluded that Entergy hasprovided all the information required by regulations, that the stayed status of the permit is not relevant, and that the Board cannot require any further evaluations because to do so would be a challenge to NRC regulations.
Id. at 10-11.DISCUSSIONI.Applicable Legal Standards In cases where an appeal does not lie, 12 the Commission has the discretion to grantinterlocutory review in limited circumstances. The Commission's regulations on interlocutory review provide that petitions for interlocutory review will be entertained by the Commission at the request of a party despite the absence of a referral or certification by the presiding officer only if  the party demonstrates that the issue for which the party seeks interlocutory review:(I) Threatens the party adversely affected by it with immediate and seriousirreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officer's final decision; or(ii) Affects the basic structure of the proceeding in a pervasive or unusualmanner.10 C.F.R. § 2.341(f)(2). The Commission has rejected the argument that a mere increase in the burden oflitigation constitutes "serious and irreparable" harm. Connecticut Yankee Atomic Power Co
.(Haddam Neck Plant), CLI-01-25, 54 NRC 368, 374 (2001). The Commission has stated that:  It is well established in Commission jurisprudence that the mere commitment ofresources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order. See, e.g., Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit1), ALAB-861, 25 NRC 129, 138-39 (1987) ( "Shoreham"); Public Service Co. ofNew Hampshire (Seabrook Station, Units 1 and 2), ALAB-858, 25 NRC 17, 21-22(1987); Commonwealth Edison Co. (Zion Station, Units 1 and 2), ALAB-116, 6AEC 258, 259 (1973). Nor may a party obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Licensing Board.
See , e.g., Virginia Electric & Power Co
.(North Anna Power Station, Units 1 & 2), ALAB-741, 18 NRC 371, 378 n. 11 (1983), and authority cited therein.


Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site), CLI-94-11, 40 NRC 55, 61(1994).Absent a potential for truly exceptional delay or expense, an interlocutory review petitionwill be denied.
were covered either by Category 1 (contained in the GEIS) or Category 2 (site-specific impacts addressed by the NPDES permit). Id. He opined that to require the Applicant to do more was an impermissible challenge to the regulations, and would raise issues outside the scope of a license renewal proceeding. Id.
See Duke Power Co. et al. (Catawba Nuclear Station, Units 1 and 2),  ALAB-768,19 NRC 988, 992 (1984). By contrast, immediate review would be appropriate where there is "the potential difficulty of unscrambling and remedying the impact of an improper disclosure in a lengthy, complex, and contentious proceeding, which spanned years of litigation, and has generated a massive record." Georgia Power Co. et al. (Vogtle Electric Generating Plant, Units 1and 2), CLI-95-15, 42 NRC 181, 184 (1995). The Commission has also considered and rejected the argument that the increased  litigation burden caused by the allowance of a contention has a "pervasive effect" on thestructure of the litigation. See Haddam Neck, CLI-01-25, 54 NRC at 374. "The basic structureof an ongoing adjudication is not changed simply because the admission of a contention results from a licensing board ruling that is important or novel, or may conflict with case law, policy, or Commission regulations. Similarly, the mere fact that additional issues must be litigated does not alter the basic structure of the proceedings in a pervasive or unusual way so as to justify interlocutory review of a licensing board decision.Id. at 374 n.13 (quoting Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-861, 25 NRC 129, 135 (1987)).The Staff notes that the Commission's "'basic structure' standard comprehends disputesover the very nature of the hearing in a particular proceeding -- for example, whether a licensing hearing should proceed in one step or in two -- not to routine arguments over admitting particular contentions."  Exelon Generation Company, LLC (Early Site Permit for the Clinton ESP Site), CLI-04-31, 60 NRC 461, 467 (2004) (footnotes omitted). The Commission has viewed the creation of a second Board as worthy of an interlocutory review: The decision to create a second board is not unheard of in our practice, but it iscertainly an unusual event, particularly where, as here, the Chief Judge reassigns to a second board threshold admissibility questions that already are ripe for decision by the initial Board. We agree with PFS and the NRC Staff that a ruling of this sort "affects the basic structure of the proceeding," by arguably mandating duplicative or unnecessary litigating steps, and therefore is reviewable now.Private Fuel Storage, LLC. (Independent Spent Fuel Storage Facility), CLI-98-7, 47 NRC 307, 310 (1998). Additionally, the Commission has generally refrained from considering jurisdictionalissues until a final ruling. In Sequoyah  Fuels, the Licensing Board ruled that the jurisdictionalissue cannot be resolved without further factual inquiry, and the Commission considered it premature to interject itself via an interlocutory appeal: Although a definitive ruling by the Licensing Board that the Commission actuallyhas jurisdiction over GA in this proceeding might rise to the level of a pervasive or  unusual effect upon the nature of the proceeding, the preliminary ruling on appealhere does not. The fact that an appealed ruling touches on a jurisdictional issue does not, in and of itself, mandate interlocutory review.CLI-94-11, 40 NRC at 63. The Commission recently noted its "longstanding general policy disfavors interlocutoryreview" and stated that it grants review under its "pervasive and unusual" effect standard "only in extraordinary circumstances."  AmerGen Energy Co., LLC (Oyster Creek Nuclear GeneratingStation), CLI-06-24, 63 NRC __ , slip op. at 7-8 (Sept. 6, 2006) (citing Duke Energy Corp.
Judge Wardwell also opined that if Contention 1 was an attempt to raise issues other than a Category 2 issue related to thermal discharges (i.e., heat shock), NECs contention could also be rejected as an impermissible challenge to the regulations. Id. at 5. The Dissent further concluded that the status of the NPDES permit was not an issue because if the permit were overturned on appeal, the contention would be moot. Id. at 6. With respect to the five-year term of an NPDES permit, the Dissent viewed that permit as providing on-going re-assessment of the increase in temperature, as being consistent with NRC regulations, the FWPCA and NEPA, such that if submitted, no additional analysis of thermal impacts was needed. Id. at 9-10.
(Catawba Nuclear Station, Units 1 and 2), CLI-04-6, 59 NRC 62, 70 (2004) and Private FuelStorage, L.L.C (Independent Spent Fuel Storage Installation), CLI-10-1, 53 NRC 1, 5 (2001)). In addition to its ability to take interlocutory review of a Board decision, the Commissionhas "an inherent supervisory power over the conduct of adjudicatory proceedings, including the authority to provide guidance on the admissibility of contentions before licensing boards."
The Dissent noted that the case law states that NRC must take the evaluation at face value and not undertake an independent analysis. Id. at 9. The Dissent concluded that Entergy has provided all the information required by regulations, that the stayed status of the permit is not relevant, and that the Board cannot require any further evaluations because to do so would be a challenge to NRC regulations. Id. at 10-11.
Consolidated Edison Co. of New York (Indian Point, Unit 2), Power Authority of the State of NewYork (Indian Point, Unit 3), CLI-82-15, 16 NRC 27, at 34  (1982) (citing Public Service Co. ofNew Hampshire (Seabrook Station, Units 1 and 2), CLI-77-8, 5 NRC 503, 516-17 (1977); UnitedStates Energy Research & Development Administration (Clinch River Breeder Reactor Plant),CLI-76-13, 4 NRC 67, 75-76 (1976)).In Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-06-20, 63 NRC ___, slip op.at 7 (July 26, 2006) (footnote omitted), the Commission said:As we interpret the Boards' intention here, they plan to give a harder look at thoseissues that the Staff itself found problematic. That the Boards are looking for clues as to which areas these might be does not, standing alone, suggest to us that they intend to expand their role in a manner that would have a "pervasive and unusual effect on the litigation," necessitating interlocutory review.That being said, however, the Commission does have inherent supervisory powerover its adjudications and may direct our licensing boards' conduct of proceedings. Because our licensing boards are conducting the first "mandatory"  13  There is some question as to whether Entergy would, in fact, have to perform an assessmentof thermal impacts in order to respond to the admitted contention, or whether Entergy could make arguments which would be essentially legal in nature to answer the questions the Board posed in its order admitting the contention.
DISCUSSION I.     Applicable Legal Standards In cases where an appeal does not lie,12 the Commission has the discretion to grant interlocutory review in limited circumstances. The Commissions regulations on interlocutory review provide that petitions for interlocutory review will be entertained by the Commission at the request of a party despite the absence of a referral or certification by the presiding officer only if 12 An appeal lies where an intervention petition has been wholly denied or where another party claims an intervention petition should have been wholly denied. See 10 C.F.R. § 2.311(b) and (c).
See Order at 56-57. hearings this agency has held in more than two decades, we believe additionalCommission guidance is necessary to ensure that the proper balance is struck between the boards' need to obtain information for their review and the burden that production of such information could impose on the NRC staff. We therefore accept review under our inherent supervisory power over adjudications.As the previous discussion demonstrates, the threshold for the Commission either to take interlocutory review of a decision or to the exercise its supervisory authority over adjudications is a high one.
 
II.The Standards of 10 C.F.R. § 2.341(f) Are Not MetA.Entergy Has Not Been Threatened with Immediate andSerious Irreparable Impact Entergy has failed to meet the requirements of 10 C.F.R. § 2.341(f) in that it failed toshow  how admission of NEC Contention 1 threatened Entergy with immediate and serious irreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officer's final decision. Entergy stated that the majority's decision would require Entergy to provide anassessment of thermal impacts that is not required by the NRC rules, but did not demonstrate how this would constitute an immediate and serious irreparable impact under § 2.341(f).
the party demonstrates that the issue for which the party seeks interlocutory review:
Petition at 19. Entergy provided no legal authority to support the notion that performing the assessment constituted the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). Id. at 19. No expense or dollar value was pled in the Petition to showthat it was a truly exceptional cost, see Petition at 19-22, and does not appear that anassessment would fall into the serious and irreparable categories discussed in the Haddam Neck, CLI-01-25, supra.13  Entergy states that admitting Contention 1 would require Entergy to litigate the thermaleffects in two proceedings (the NRC hearing and the judicial review before the Vermont Environmental Court) simultaneously, and that such duplicate litigation would be extremely burdensome. Petition at 20. It is well established that the mere commitment of resources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order.
(I)      Threatens the party adversely affected by it with immediate and serious irreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officers final decision; or (ii)    Affects the basic structure of the proceeding in a pervasive or unusual manner.
See Sequoyah Fuels, CLI-94-11, 40 NRCat 61. As an example of a burden, Entergy states that it might have to produce documents inthe NRC proceeding, while at the same time responding to discovery requests in the State action. Petition at 20. Document production is not within the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). See Haddam Neck, CLI-01-25,54 NRC at 374. Entergy also states that duplicate litigation creates the risk of inconsistent decisions,which could delay and undermine the outcome (presumptively meaning that a loss in one litigation will negate the outcome in the other).
10 C.F.R. § 2.341(f)(2).
See Petition at 20. Entergy does not state whyeach "outcome" could not be appealed. A party may not obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Board.
The Commission has rejected the argument that a mere increase in the burden of litigation constitutes "serious and irreparable" harm. Connecticut Yankee Atomic Power Co.
See Sequoyah Fuels, CLI-94-11, 40 NRC at 61. B.Entergy Has Not Shown That Admission of NEC Contention 1Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner Entergy has not demonstrated that admission of NEC Contention 1 affects the basicstructure of the proceeding in a pervasive or unusual manner as required in 10 C.F.R. § 2.341(f). Entergy lists two reasons why it believes the Board's majority decision affects the basicstructure of the  proceeding in a pervasive and unusual manner:  1) It will require litigation of an issue that the NRC is barred from reviewing under the NRC rules and CWA; and 2) It requires  parties to litigate whether an NRC rule is valid. Petition at 19-20. Entergy's petition is silent withrespect to a "basic structure" standard, and offers no legal authority illuminates the intent of the regulation. Under Haddam Neck, the Commission rejected the argument that litigation of an areabarred by NRC regulation results in affecting the basic structure of a proceeding in a pervasive or unusual manner. CLI-01-25, 54 NRC at 374. Similarly, requiring parties to litigate whether a rule is valid, which would be an impermissible challenge to NRC rules under 10 C.F.R.
(Haddam Neck Plant), CLI-01-25, 54 NRC 368, 374 (2001). The Commission has stated that:
§ 2.335(a), is also insufficient under Haddam Neck. Id. Entergy simply states that, "requiring the parties to litigate whether an NRC rule is validwould not only be unprecedented, but would undoubtedly have a pervasive and unusual affect on the license renewal proceeding," without legal authority to support its statement. Petition at 22.
It is well established in Commission jurisprudence that the mere commitment of resources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order. See, e.g., Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-861, 25 NRC 129, 138-39 (1987) ( "Shoreham"); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-858, 25 NRC 17, 21-22 (1987); Commonwealth Edison Co. (Zion Station, Units 1 and 2), ALAB-116, 6 AEC 258, 259 (1973). Nor may a party obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Licensing Board. See, e.g., Virginia Electric & Power Co.
Entergy asserts that admission of NEC Contention 1 "would (for NRC purposes) essentially nullify the [State of Vermont Agency of Natural Resources] VANR's assessment, developed over a multi-year permitting process, on which both Entergy and the NRC are entitled to rely, and would usurp the decision making authority of the VANR and Vermont Environmental Court."  Petition at 19-20. Again, this does not satisfy the threshold in Haddam Neck, andcannot support review.
(North Anna Power Station, Units 1 & 2), ALAB-741, 18 NRC 371, 378 n. 11 (1983), and authority cited therein.
See Haddam Neck, CLI-01-25, 54 NRC at 374 n.14. III.Entergy Request for the Commission to Exercise Its Inherent SupervisoryEntergy requests that, if the Commission rejects Energy arguments for interlocutoryreview under 10 C.F.R. § 2.341(f), the Commission exercise its inherent supervisory authority over adjudication and review admission of NEC Contention 1.
Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site), CLI-94-11, 40 NRC 55, 61 (1994).
See Petition at 23 (citing Clinton ,CLI-06-20, supra, slip op. at 7). While the Staff does not believe that the situation presented bythis case is similar to that presented in Clinton, the Staff nonetheless believes that exercise ofsupervisory authority by the Commission is warranted, because the Board's decision appears to  challenge the license renewal regulatory framework. A.Scope of License Renewal Environmental ReviewThe scope of the environmental review for license renewal is limited in accordance with10 C.F.R. §§ 51.71(d) and 51.95(c). Florida Power & Light Co. (Turkey Point NuclearGenerating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3, 11-13 (2001). Consideration of environmental issues in the context of license renewal proceedings is specifically limited by10 C.F.R. Part 51 and by the NRC's "Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants" (NUREG-1437) ("GEIS"). Id. A number of environmentalissues potentially relevant to license renewal are classified in 10 C.F.R. Part 51, Subpart A, Appendix B as "Category 1" issues, which means that "the Commission resolved the[se] issues generically for all plants and those issues are not subject to further evaluation in any license renewal proceeding." Turkey Point, LBP-01-06, 53 NRC 138, 152-53, aff'd, CLI-01-17, 54 NRCat 11. The remaining issues, designated as "Category 2" in Appendix B, must be addressed by an applicant in its environmental report, and in the NRC's supplemental environmental impact statement for the facility at issue pursuant to 10 C.F.R. §§ 51.71(d) and 51.95(c).
Absent a potential for truly exceptional delay or expense, an interlocutory review petition will be denied. See Duke Power Co. et al. (Catawba Nuclear Station, Units 1 and 2), ALAB-768, 19 NRC 988, 992 (1984). By contrast, immediate review would be appropriate where there is the potential difficulty of unscrambling and remedying the impact of an improper disclosure in a lengthy, complex, and contentious proceeding, which spanned years of litigation, and has generated a massive record. Georgia Power Co. et al. (Vogtle Electric Generating Plant, Units 1 and 2), CLI-95-15, 42 NRC 181, 184 (1995).
Id.A contention that attempts to have the NRC impose discharge limits or monitoringrequirements is not admissible because the NRC does not have the authority to impose such requirements. See Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),ALAB-515, 8 NRC 702, 704 & n.6, 706-15 (1978) (FWCPA  Amendments of 1972, 33 U.S.C.
The Commission has also considered and rejected the argument that the increased
§ 1251, et seq., assigns the responsibility for water pollution control criteria and regulatingpolluters to the Environmental Protection Agency and the States). Similarly, a basis for a contention is inadmissible if it constitutes an impermissible challenge to Commission regulations.
 
See e.g. Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-06-22, 63 NRC __,  14  A discussion of case law regarding challenges to regulations was in LES, LBP-04-14, 60 NRCat 54-55: With limited exception, no rule or regulation of the Commission can be challenged in an adjudicatory proceeding. See 10 C.F.R. § 2.335; see also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 2), CLI-03-14, 58 NRC 207, 218 (2003). Bythe same token, any contention that amounts to an attack on applicable statutoryrequirements or represents a challenge to the basic structure of the Commission's regulatory process must be rejected.
litigation burden caused by the allowance of a contention has a "pervasive effect" on the structure of the litigation. See Haddam Neck, CLI-01-25, 54 NRC at 374. "The basic structure of an ongoing adjudication is not changed simply because the admission of a contention results from a licensing board ruling that is important or novel, or may conflict with case law, policy, or Commission regulations. Similarly, the mere fact that additional issues must be litigated does not alter the basic structure of the proceedings in a pervasive or unusual way so as to justify interlocutory review of a licensing board decision." Id. at 374 n.13 (quoting Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-861, 25 NRC 129, 135 (1987)).
See Public Service Co. of New Hampshire(Seabrook Station, Units 1 and 2), L BP-82-76, 16 NRC 1029, 1035 (1982) (citingPhiladelphia Electric Co. (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216,8 AEC 13, 20- 21 (1974)). Similarly, any contention that seeks to impose stricterrequirements than those set forth by the regulations is inadmissible. See Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-87-12, 26 NRC 383, 395(1987); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), LBP-82-106, 16 NRC 1649, 1656 (1982); Florida Power and Light Co. (Turkey PointNuclear Generating Plant, Units 3 and 4), LBP-01-6, 53 NRC 138, 159 (2001). Additionally, the adjudicatory process is not the proper venue for a petitioner to set forth a contention that merely addresses his or her own view regarding the direction regulatorypolicy should take. See Peach Bottom, ALAB-216, 8 AEC at 21 n.33.slip op. at 11 (Aug. 17, 2006) ("LES");
The Staff notes that the Commission's "'basic structure' standard comprehends disputes over the very nature of the hearing in a particular proceeding -- for example, whether a licensing hearing should proceed in one step or in two -- not to routine arguments over admitting particular contentions." Exelon Generation Company, LLC (Early Site Permit for the Clinton ESP Site),
LES, LBP-04-14, 60 NRC 40, 54-55 (2004).
CLI-04-31, 60 NRC 461, 467 (2004) (footnotes omitted). The Commission has viewed the creation of a second Board as worthy of an interlocutory review:
14 B.Exercise of the Commission's Supervisory Authority Is Warrantedfor Administrative Efficiency Entergy argues that the exercise of the Commission's inherent supervisory authority isneeded to prevent the majority from "imposing unnecessarily burdensome or duplicative efforts on Entergy. Petition at 23. The Dissent also questioned whether admission of NEC Contention 1 was proper given that (1) the contention was either moot or failed to raise a material dispute, (2) the contention impermissibly sought to require Entergy to address thermal impacts beyond the limited Category 2 issue of heat shock and by a means other than an NPDES permit, or (3) the contention inappropriately raised a Category 1 issue. Dissenting Opinion at 10-11. The Board's discussions on NEC Contention 1 appear to contemplate an impermissiblechallenge to 10 C.F.R. § 51.53(c)(3)(i) by requiring additional analyses of Category 1 issues which were generically determined.
The decision to create a second board is not unheard of in our practice, but it is certainly an unusual event, particularly where, as here, the Chief Judge reassigns to a second board threshold admissibility questions that already are ripe for decision by the initial Board. We agree with PFS and the NRC Staff that a ruling of this sort "affects the basic structure of the proceeding," by arguably mandating duplicative or unnecessary litigating steps, and therefore is reviewable now.
See LES, LBP-04-14, 60 NRC at 55 (noting that challengeto the Commission's regulations or rulemaking-associated generic determinations are  15  The plant uses a once-through cooling heat dissipation system.
Private Fuel Storage, LLC. (Independent Spent Fuel Storage Facility), CLI-98-7, 47 NRC 307, 310 (1998).
See Order at 48.
Additionally, the Commission has generally refrained from considering jurisdictional issues until a final ruling. In Sequoyah Fuels, the Licensing Board ruled that the jurisdictional issue cannot be resolved without further factual inquiry, and the Commission considered it premature to interject itself via an interlocutory appeal:
16  Table B-1 in Part 51, Subpart A, Appendix B lists other thermal effects as Category 1 including,cold shock, and the thermal plume as a barrier to migrating fish. Due to the lack of specificity of the contention, and NEC's filing, the Staff did not appreciate until reading the Board's dissent, that NECcontention 1 may well raise a Category 1 issue. The phrase "barriers to migration" was not used by NEC. impermissible). The Board's discussions also appear to contemplate an impermissible challengeto 10 C.F.R. § 51.53(c)(3)(ii)(B) by requiring more than submission of a copy of current CWA
Although a definitive ruling by the Licensing Board that the Commission actually has jurisdiction over GA in this proceeding might rise to the level of a pervasive or
 
unusual effect upon the nature of the proceeding, the preliminary ruling on appeal here does not. The fact that an appealed ruling touches on a jurisdictional issue does not, in and of itself, mandate interlocutory review.
CLI-94-11, 40 NRC at 63.
The Commission recently noted its longstanding general policy disfavors interlocutory review and stated that it grants review under its "pervasive and unusual" effect standard "only in extraordinary circumstances." AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 63 NRC __ , slip op. at 7-8 (Sept. 6, 2006) (citing Duke Energy Corp.
(Catawba Nuclear Station, Units 1 and 2), CLI-04-6, 59 NRC 62, 70 (2004) and Private Fuel Storage, L.L.C (Independent Spent Fuel Storage Installation), CLI-10-1, 53 NRC 1, 5 (2001)).
In addition to its ability to take interlocutory review of a Board decision, the Commission has "an inherent supervisory power over the conduct of adjudicatory proceedings, including the authority to provide guidance on the admissibility of contentions before licensing boards."
Consolidated Edison Co. of New York (Indian Point, Unit 2), Power Authority of the State of New York (Indian Point, Unit 3), CLI-82-15, 16 NRC 27, at 34 (1982) (citing Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-77-8, 5 NRC 503, 516-17 (1977); United States Energy Research & Development Administration (Clinch River Breeder Reactor Plant),
CLI-76-13, 4 NRC 67, 75-76 (1976)).
In Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-06-20, 63 NRC ___, slip op.
at 7 (July 26, 2006) (footnote omitted), the Commission said:
As we interpret the Boards' intention here, they plan to give a harder look at those issues that the Staff itself found problematic. That the Boards are looking for clues as to which areas these might be does not, standing alone, suggest to us that they intend to expand their role in a manner that would have a "pervasive and unusual effect on the litigation," necessitating interlocutory review.
That being said, however, the Commission does have inherent supervisory power over its adjudications and may direct our licensing boards' conduct of proceedings. Because our licensing boards are conducting the first "mandatory"
 
hearings this agency has held in more than two decades, we believe additional Commission guidance is necessary to ensure that the proper balance is struck between the boards' need to obtain information for their review and the burden that production of such information could impose on the NRC staff. We therefore accept review under our inherent supervisory power over adjudications.
As the previous discussion demonstrates, the threshold for the Commission either to take interlocutory review of a decision or to the exercise its supervisory authority over adjudications is a high one.
II.      The Standards of 10 C.F.R. § 2.341(f) Are Not Met A.     Entergy Has Not Been Threatened with Immediate and Serious Irreparable Impact Entergy has failed to meet the requirements of 10 C.F.R. § 2.341(f) in that it failed to show how admission of NEC Contention 1 threatened Entergy with immediate and serious irreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officers final decision.
Entergy stated that the majoritys decision would require Entergy to provide an assessment of thermal impacts that is not required by the NRC rules, but did not demonstrate how this would constitute an immediate and serious irreparable impact under § 2.341(f).
Petition at 19. Entergy provided no legal authority to support the notion that performing the assessment constituted the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). Id. at 19. No expense or dollar value was pled in the Petition to show that it was a truly exceptional cost, see Petition at 19-22, and does not appear that an assessment would fall into the serious and irreparable categories discussed in the Haddam Neck, CLI-01-25, supra.13 13 There is some question as to whether Entergy would, in fact, have to perform an assessment of thermal impacts in order to respond to the admitted contention, or whether Entergy could make arguments which would be essentially legal in nature to answer the questions the Board posed in its order admitting the contention. See Order at 56-57.
 
Entergy states that admitting Contention 1 would require Entergy to litigate the thermal effects in two proceedings (the NRC hearing and the judicial review before the Vermont Environmental Court) simultaneously, and that such duplicate litigation would be extremely burdensome. Petition at 20. It is well established that the mere commitment of resources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order. See Sequoyah Fuels, CLI-94-11, 40 NRC at 61.
As an example of a burden, Entergy states that it might have to produce documents in the NRC proceeding, while at the same time responding to discovery requests in the State action. Petition at 20. Document production is not within the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). See Haddam Neck, CLI-01-25, 54 NRC at 374.
Entergy also states that duplicate litigation creates the risk of inconsistent decisions, which could delay and undermine the outcome (presumptively meaning that a loss in one litigation will negate the outcome in the other). See Petition at 20. Entergy does not state why each "outcome" could not be appealed. A party may not obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Board. See Sequoyah Fuels, CLI-94-11, 40 NRC at 61.
B.      Entergy Has Not Shown That Admission of NEC Contention 1 Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner Entergy has not demonstrated that admission of NEC Contention 1 affects the basic structure of the proceeding in a pervasive or unusual manner as required in 10 C.F.R. § 2.341(f).
Entergy lists two reasons why it believes the Board's majority decision affects the basic structure of the proceeding in a pervasive and unusual manner: 1) It will require litigation of an issue that the NRC is barred from reviewing under the NRC rules and CWA; and 2) It requires
 
parties to litigate whether an NRC rule is valid. Petition at 19-20. Entergy's petition is silent with respect to a "basic structure" standard, and offers no legal authority illuminates the intent of the regulation.
Under Haddam Neck, the Commission rejected the argument that litigation of an area barred by NRC regulation results in affecting the basic structure of a proceeding in a pervasive or unusual manner. CLI-01-25, 54 NRC at 374. Similarly, requiring parties to litigate whether a rule is valid, which would be an impermissible challenge to NRC rules under 10 C.F.R.
§ 2.335(a), is also insufficient under Haddam Neck. Id.
Entergy simply states that, "requiring the parties to litigate whether an NRC rule is valid would not only be unprecedented, but would undoubtedly have a pervasive and unusual affect on the license renewal proceeding," without legal authority to support its statement. Petition at 22.
Entergy asserts that admission of NEC Contention 1 would (for NRC purposes) essentially nullify the [State of Vermont Agency of Natural Resources] VANR's assessment, developed over a multi-year permitting process, on which both Entergy and the NRC are entitled to rely, and would usurp the decision making authority of the VANR and Vermont Environmental Court. Petition at 19-20. Again, this does not satisfy the threshold in Haddam Neck, and cannot support review. See Haddam Neck, CLI-01-25, 54 NRC at 374 n.14.
III. Entergy Request for the Commission to Exercise Its Inherent Supervisory Entergy requests that, if the Commission rejects Energy arguments for interlocutory review under 10 C.F.R. § 2.341(f), the Commission exercise its inherent supervisory authority over adjudication and review admission of NEC Contention 1. See Petition at 23 (citing Clinton, CLI-06-20, supra, slip op. at 7). While the Staff does not believe that the situation presented by this case is similar to that presented in Clinton, the Staff nonetheless believes that exercise of supervisory authority by the Commission is warranted, because the Boards decision appears to
 
challenge the license renewal regulatory framework.
A.     Scope of License Renewal Environmental Review The scope of the environmental review for license renewal is limited in accordance with 10 C.F.R. §§ 51.71(d) and 51.95(c). Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3, 11-13 (2001). Consideration of environmental issues in the context of license renewal proceedings is specifically limited by 10 C.F.R. Part 51 and by the NRCs Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants (NUREG-1437) (GEIS). Id. A number of environmental issues potentially relevant to license renewal are classified in 10 C.F.R. Part 51, Subpart A, Appendix B as Category 1" issues, which means that the Commission resolved the[se] issues generically for all plants and those issues are not subject to further evaluation in any license renewal proceeding. Turkey Point, LBP-01-06, 53 NRC 138, 152-53, affd, CLI-01-17, 54 NRC at 11. The remaining issues, designated as Category 2 in Appendix B, must be addressed by an applicant in its environmental report, and in the NRCs supplemental environmental impact statement for the facility at issue pursuant to 10 C.F.R. §§ 51.71(d) and 51.95(c). Id.
A contention that attempts to have the NRC impose discharge limits or monitoring requirements is not admissible because the NRC does not have the authority to impose such requirements. See Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),
ALAB-515, 8 NRC 702, 704 & n.6, 706-15 (1978) (FWCPA Amendments of 1972, 33 U.S.C.
§ 1251, et seq., assigns the responsibility for water pollution control criteria and regulating polluters to the Environmental Protection Agency and the States). Similarly, a basis for a contention is inadmissible if it constitutes an impermissible challenge to Commission regulations.
See e.g. Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-06-22, 63 NRC __,
 
slip op. at 11 (Aug. 17, 2006) (LES); LES, LBP-04-14, 60 NRC 40, 54-55 (2004).14 B.        Exercise of the Commissions Supervisory Authority Is Warranted for Administrative Efficiency Entergy argues that the exercise of the Commissions inherent supervisory authority is needed to prevent the majority from imposing unnecessarily burdensome or duplicative efforts on Entergy. Petition at 23. The Dissent also questioned whether admission of NEC Contention 1 was proper given that (1) the contention was either moot or failed to raise a material dispute, (2) the contention impermissibly sought to require Entergy to address thermal impacts beyond the limited Category 2 issue of heat shock and by a means other than an NPDES permit, or (3) the contention inappropriately raised a Category 1 issue. Dissenting Opinion at 10-11.
The Board's discussions on NEC Contention 1 appear to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(i) by requiring additional analyses of Category 1 issues which were generically determined. See LES, LBP-04-14, 60 NRC at 55 (noting that challenge to the Commission's regulations or rulemaking-associated generic determinations are 14 A discussion of case law regarding challenges to regulations was in LES, LBP-04-14, 60 NRC at 54-55:
With limited exception, no rule or regulation of the Commission can be challenged in an adjudicatory proceeding. See 10 C.F.R. § 2.335; see also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 2), CLI-03-14, 58 NRC 207, 218 (2003). By the same token, any contention that amounts to an attack on applicable statutory requirements or represents a challenge to the basic structure of the Commission's regulatory process must be rejected. See Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), LBP-82-76, 16 NRC 1029, 1035 (1982) (citing Philadelphia Electric Co. (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 20- 21 (1974)). Similarly, any contention that seeks to impose stricter requirements than those set forth by the regulations is inadmissible. See Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-87-12, 26 NRC 383, 395 (1987); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2),
LBP-82-106, 16 NRC 1649, 1656 (1982); Florida Power and Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), LBP-01-6, 53 NRC 138, 159 (2001).
Additionally, the adjudicatory process is not the proper venue for a petitioner to set forth a contention that merely addresses his or her own view regarding the direction regulatory policy should take. See Peach Bottom, ALAB-216, 8 AEC at 21 n.33.
 
impermissible). The Board's discussions also appear to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(ii)(B) by requiring more than submission of a copy of current CWA
§ 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R.
§ 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R.
Part 125, or equivalent State permits and supporting documentation to satisfy Category 2 analyses requirements.
Part 125, or equivalent State permits and supporting documentation to satisfy Category 2 analyses requirements. See Order at 47-57.
See Order at 47-57.Environmental issues relating to license renewal are divided into two categories. Category 1 issues are those issues for which the generic analysis of the issue may be adopted in each plant-specific review; Category 2 issues are those issues for which the analysis reported in the GEIS has shown that one or more of the criteria of Category 1 cannot be met, and therefore additional plant-specific review is required. 10 C.F.R. Part 51, Subpart A, Appendix B, Table B-1 n.2. Each license renewal applicant must submit an environmental report. An environmental report is not required to contain analyses of the environmental impacts of the license renewal issues identified as Category 1. 10 C.F.R. § 51.53(c)(3)(i). An environmental report must contain analyses of the environmental impacts associated with license renewal and the impacts of operation during the renewal term for those issues identified as Category 2.
Environmental issues relating to license renewal are divided into two categories.
10 C.F.R. § 51.53(c)(3)(ii).The only Category 2 issue related to thermal discharges and relevant to VYNPS design 15is heat shock.
Category 1 issues are those issues for which the generic analysis of the issue may be adopted in each plant-specific review; Category 2 issues are those issues for which the analysis reported in the GEIS has shown that one or more of the criteria of Category 1 cannot be met, and therefore additional plant-specific review is required. 10 C.F.R. Part 51, Subpart A, Appendix B, Table B-1 n.2. Each license renewal applicant must submit an environmental report. An environmental report is not required to contain analyses of the environmental impacts of the license renewal issues identified as Category 1. 10 C.F.R. § 51.53(c)(3)(i). An environmental report must contain analyses of the environmental impacts associated with license renewal and the impacts of operation during the renewal term for those issues identified as Category 2.
16   The regulatory framework for environmental issues sets forth the requiredanalysis heat shock analysis by stating that the applicant must either submit a copy of its current CWA § 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R. Part 125, or equivalent State permits and supporting documentation, or if the applicant 17  In raising this issue, the Board may have viewed NEC's not merely as a challenge to theadequacy of Entergy's ER, but also as a challenge the Staff's yet to be published Supplemental Environmental Impact Statement..does not possess such a permit, the applicant must assess the impact of the proposed action onfish and shellfish resources resulting from heat shock and impingement and entrainment.
10 C.F.R. § 51.53(c)(3)(ii).
10 C.F.R. § 51.53(c)(3)(ii)(B). There are no other requirements explicitly related to the environmental report and the Category 2 heat shock issue. The Board construed NEC Contention 1 as alleging that the ER failed to sufficientlyassess the impacts of increased thermal discharges into the Connecticut River. Order at 47. In admitting this contention, the Board questioned the validity and effectiveness of Entergy's permit, and further asked:   [W]hether 10 C.F.R. § 51.53(c)(3)(ii)(B) is the only requirement the applicant mustmeet. The regulation focuses only on "heat shock." Does NEPA require an assessment of all environmental impacts of thermal discharges into a river or only the "heat shock" impacts? Are the general ER requirements found at 10 C.F.R.
The only Category 2 issue related to thermal discharges and relevant to VYNPS design15 is heat shock.16 The regulatory framework for environmental issues sets forth the required analysis heat shock analysis by stating that the applicant must either submit a copy of its current CWA § 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R. Part 125, or equivalent State permits and supporting documentation, or if the applicant 15 The plant uses a once-through cooling heat dissipation system. See Order at 48.
§§ 51.45(c) and 51.53(c) displaced, or instead merely supplemented, by the more narrow 10 C.F.R. § 51.53(c)(3)(ii)(B)? Order at 56. The Board asserted that these questions are "a matter of regulatory interpretation we need not reach today.Id. The Board further questioned whether the 10 C.F.R. § 51.45(d) requirement that anapplicant discuss the status of compliance with applicable environmental quality standards and requirements including, but not limited to, "thermal and other water pollution limitations or requirements" is satisfied by information Entergy has already submitted. Order at 56 n.58. In essence, the Board questions whether Entergy must prepare an assessment of thermal discharge impacts in addition to those performed for or by Federal or State permitting authorities and whether that assessment must address the entire license renewal period.
16 Table B-1 in Part 51, Subpart A, Appendix B lists other thermal effects as Category 1 including, cold shock, and the thermal plume as a barrier to migrating fish. Due to the lack of specificity of the contention, and NECs filing, the Staff did not appreciate until reading the Boards dissent, that NEC contention 1 may well raise a Category 1 issue. The phrase barriers to migration was not used by NEC.
17   For reasons setout by the dissent, in the Staff's view, the regulatory requirements for the contents of an ER are clear. If the Board is raising these issues in contemplation of imposing stricter requirements 18  For example, the Board's inquiry into whether a 5-year permit satisfies Entergy's obligationsmay constitute an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(ii)(B). The Board observed that the NPDES permit and/or § 316(b) determination expires in five years, and concluded that whether 10 C.F.R.
 
§ 51.53(c)(3)(ii)(B) and Part 51 in general could be satisfied by the NPDES permit was "a legal and factualissue squarely raised by NEC Contention 1."  Order at 56-57. As Entergy argued, the Board erred when it concluded that an assessment of the impact of heat shock on fish and shellfish would be required in that, even if the permit were vacated, the contention would be moot as the permit would revert to the pre-amendment discharge values.
does not possess such a permit, the applicant must assess the impact of the proposed action on fish and shellfish resources resulting from heat shock and impingement and entrainment.
Id. at 15 (citing Dissenting Opinion at 6). Entergy also argues that theCommission must accept an NPDES permitting agency assessment, even if the permit is under review.
10 C.F.R. § 51.53(c)(3)(ii)(B). There are no other requirements explicitly related to the environmental report and the Category 2 heat shock issue.
Id. than those set forth in the regulations, that action would be impermissible.
The Board construed NEC Contention 1 as alleging that the ER failed to sufficiently assess the impacts of increased thermal discharges into the Connecticut River. Order at 47. In admitting this contention, the Board questioned the validity and effectiveness of Entergys permit, and further asked:
18  See LES ,CLI-06-22, slip op. at 11, and cases cited therein. The Commission should exercise its inherent supervisory authority because, asdiscussed above, the Board's discussion of NEC Contention 1 appears to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(i) and 51.45(c) and (d) by requiring additional analyses of Category 1 issues which were generically determined, or by requiring more than a copy of current State or Federal FWPCA permits and determinations for an applicant to satisfy Category 2 analyses requirements.Although the Board did not explicitly rule in these areas, the Staff believes that, as amatter of administrative efficiency, the agency would benefit from a clear Commission determination regarding the requisite showing to satisfy these requirements. CONCLUSIONFor the foregoing reasons, the Commission should decline interlocutory review of theBoard's decision to accept for litigation NEC Contention 1. In the interest of administrative  efficiency, the Commission should exercise its inherent supervisory authority and provideguidance regarding requirements for analysis of thermal impacts and the required documentation and assessments for license renewal.
[W]hether 10 C.F.R. § 51.53(c)(3)(ii)(B) is the only requirement the applicant must meet. The regulation focuses only on heat shock. Does NEPA require an assessment of all environmental impacts of thermal discharges into a river or only the heat shock impacts? Are the general ER requirements found at 10 C.F.R.
Respectfully submitted, /RA/David E. RothCounsel for NRC Staff/RA/Mitzi A. YoungCounsel for the NRC StaffDated at Rockville, Marylandthis 20 th day of October, 2006 UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONBEFORE THE COMMISSIONIn the Matter of)
        §§ 51.45(c) and 51.53(c) displaced, or instead merely supplemented, by the more narrow 10 C.F.R. § 51.53(c)(3)(ii)(B)?
)ENTERGY NUCLEAR VERMONT YANKEE,   )LLC and ENTERGY NUCLEAR )Docket No. 50-271-LR OPERATIONS, INC.))ASLBP No. 06-849-03-LR(Vermont Yankee Nuclear Power Station))CERTIFICATE OF SERVICEI hereby certify that copies of the "NRC STAFF ANSWER TO ENTERGY'S PETITION FORINTERLOCUTORY REVIEW OF LBP-06-20" in the above-captioned proceeding have been served on the following through electronic mail and with copies by deposit in the NRC's internal mail system, or through electronic mail with copies by deposit in the U.S. mail as indicated by an asterisk, this 20 th day of October, 2006:Administrative JudgeAlex S. Karlin, Chair Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: ask2@nrc.govAdministrative JudgeThomas S. Elleman*
Order at 56. The Board asserted that these questions are a matter of regulatory interpretation we need not reach today. Id.
Atomic Safety and Licensing Board Panel 5207 Creedmoor Road, #101 Raleigh, NC 27612 E-mail: elleman@eos.ncsu.eduOffice of Commission AppellateAdjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAmail@nrc.govAdministrative JudgeRichard E. Wardwell Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rew@nrc.govOffice of the SecretaryAttn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.govSarah Hofmann, Esq.* Director of Public Advocacy Department of Public Service 112 State Street - Drawer 20 Montpelier, VT 05620-2601 E-mail: sarah.hofmann@state.vt.us  Diane Curran, Esq.*Harmon, Curran, Spielberg
The Board further questioned whether the 10 C.F.R. § 51.45(d) requirement that an applicant discuss the status of compliance with applicable environmental quality standards and requirements including, but not limited to, thermal and other water pollution limitations or requirements is satisfied by information Entergy has already submitted. Order at 56 n.58. In essence, the Board questions whether Entergy must prepare an assessment of thermal discharge impacts in addition to those performed for or by Federal or State permitting authorities and whether that assessment must address the entire license renewal period.17 For reasons set out by the dissent, in the Staffs view, the regulatory requirements for the contents of an ER are clear. If the Board is raising these issues in contemplation of imposing stricter requirements 17 In raising this issue, the Board may have viewed NECs not merely as a challenge to the adequacy of Entergys ER, but also as a challenge the Staffs yet to be published Supplemental Environmental Impact Statement..
& Eisenberg, L.L.P.
 
1726 M Street, NW., Suite 600 Washington, DC 20036 E-mail: dcurran@harmoncurran.comRonald A. Shems, Esq.*Karen Tyler, Esq.
than those set forth in the regulations, that action would be impermissible.18 See LES, CLI-06-22, slip op. at 11, and cases cited therein.
Shems Dunkiel Kassel & Saunders, PLLC 91 College Street Burlington, VT 05401 E-mail: rshems@sdkslaw.com Ktyler@sdkslaw.comCallie B. Newton, Chair*Gail MacArthur Lucy Gratwick Marcia Hamilton Town of Marlboro Selectboard P.O. Box 518 Marlboro, VT 05344 E-mail: cbnewton@sover.net marcialynn@ev1.netMarcia Carpentier, Esq.Jonathan M. Rund, Esq.
The Commission should exercise its inherent supervisory authority because, as discussed above, the Board's discussion of NEC Contention 1 appears to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(i) and 51.45(c) and (d) by requiring additional analyses of Category 1 issues which were generically determined, or by requiring more than a copy of current State or Federal FWPCA permits and determinations for an applicant to satisfy Category 2 analyses requirements.
Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.govJmr3@nrc.govAnthony Z. Roisman, Esq.* National Legal Scholars Law Firm 84 East Thetford Rd.
Although the Board did not explicitly rule in these areas, the Staff believes that, as a matter of administrative efficiency, the agency would benefit from a clear Commission determination regarding the requisite showing to satisfy these requirements.
Lyme, NH 03768 E-mail: aroisman@nationallegalscholars.comMatthew Brock, Esq.*Assistant Attorney General Office of the Massachusetts Attorney General Environmental Protection Division One Ashburton Place, Room 1813 Boston, MA 02108-1598 E-mail: matthew.brock@ago.state.ma.usDan MacArthur, DirectorTown of Marlboro Emergency Management P.O. Box 30 Marlboro, VT 05344 E-mail: dmacarthur@igc.orgDavid R. Lewis, Esq.*Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP 2300 N Street, NW Washington, DC 20037-1128 E-mail: david.lewis@pillsburylaw.com matias.travieso-diaz@pillsburylaw.com
CONCLUSION For the foregoing reasons, the Commission should decline interlocutory review of the Boards decision to accept for litigation NEC Contention 1. In the interest of administrative 18 For example, the Boards inquiry into whether a 5-year permit satisfies Entergys obligations may constitute an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(ii)(B). The Board observed that the NPDES permit and/or § 316(b) determination expires in five years, and concluded that whether 10 C.F.R.
    /RA/                                                                      David E. Roth Counsel for NRC Staff}}
§ 51.53(c)(3)(ii)(B) and Part 51 in general could be satisfied by the NPDES permit was "a legal and factual issue squarely raised by NEC Contention 1." Order at 56-57. As Entergy argued, the Board erred when it concluded that an assessment of the impact of heat shock on fish and shellfish would be required in that, even if the permit were vacated, the contention would be moot as the permit would revert to the pre-amendment discharge values. Id. at 15 (citing Dissenting Opinion at 6). Entergy also argues that the Commission must accept an NPDES permitting agency assessment, even if the permit is under review.
Id.
 
efficiency, the Commission should exercise its inherent supervisory authority and provide guidance regarding requirements for analysis of thermal impacts and the required documentation and assessments for license renewal.
Respectfully submitted,
                                                    /RA/
David E. Roth Counsel for NRC Staff
                                                    /RA/
Mitzi A. Young Counsel for the NRC Staff Dated at Rockville, Maryland this 20th day of October, 2006
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of                                 )
                                                )
ENTERGY NUCLEAR VERMONT YANKEE,                 )
LLC and ENTERGY NUCLEAR                     )         Docket No. 50-271-LR OPERATIONS, INC.                             )
                                                )         ASLBP No. 06-849-03-LR (Vermont Yankee Nuclear Power Station)           )
CERTIFICATE OF SERVICE I hereby certify that copies of the NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 in the above-captioned proceeding have been served on the following through electronic mail and with copies by deposit in the NRCs internal mail system, or through electronic mail with copies by deposit in the U.S. mail as indicated by an asterisk, this 20th day of October, 2006:
Administrative Judge                              Administrative Judge Alex S. Karlin, Chair                             Richard E. Wardwell Atomic Safety and Licensing Board Panel            Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission                 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                          Washington, DC 20555-0001 E-mail: ask2@nrc.gov                              E-mail: rew@nrc.gov Administrative Judge                              Office of the Secretary Thomas S. Elleman*                                 Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel           Mail Stop: O-16C1 5207 Creedmoor Road, #101                         U.S. Nuclear Regulatory Commission Raleigh, NC 27612                                 Washington, DC 20555-0001 E-mail: elleman@eos.ncsu.edu                      E-mail: hearingdocket@nrc.gov Office of Commission Appellate                    Sarah Hofmann, Esq.*
Adjudication                                      Director of Public Advocacy Mail Stop: O-16C1                                 Department of Public Service U.S. Nuclear Regulatory Commission                 112 State Street - Drawer 20 Washington, DC 20555-0001                         Montpelier, VT 05620-2601 E-mail: OCAAmail@nrc.gov                          E-mail: sarah.hofmann@state.vt.us
 
Diane Curran, Esq.*                        Anthony Z. Roisman, Esq.*
Harmon, Curran, Spielberg                  National Legal Scholars Law Firm
& Eisenberg, L.L.P.                        84 East Thetford Rd.
1726 M Street, NW., Suite 600              Lyme, NH 03768 Washington, DC 20036                        E-mail: aroisman@nationallegalscholars.com E-mail: dcurran@harmoncurran.com Matthew Brock, Esq.*
Ronald A. Shems, Esq.*                      Assistant Attorney General Karen Tyler, Esq.                           Office of the Massachusetts Attorney Shems Dunkiel Kassel & Saunders, PLLC        General 91 College Street                           Environmental Protection Division Burlington, VT 05401                        One Ashburton Place, Room 1813 E-mail: rshems@sdkslaw.com                  Boston, MA 02108-1598 Ktyler@sdkslaw.com                  E-mail: matthew.brock@ago.state.ma.us Callie B. Newton, Chair*                   Dan MacArthur, Director Gail MacArthur                             Town of Marlboro Lucy Gratwick                               Emergency Management Marcia Hamilton                             P.O. Box 30 Town of Marlboro                            Marlboro, VT 05344 Selectboard                                E-mail: dmacarthur@igc.org P.O. Box 518 Marlboro, VT 05344 E-mail: cbnewton@sover.net                  David R. Lewis, Esq.*
marcialynn@ev1.net                  Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP Marcia Carpentier, Esq.                     2300 N Street, NW Jonathan M. Rund, Esq.                     Washington, DC 20037-1128 Atomic Safety and Licensing Board Panel    E-mail: david.lewis@pillsburylaw.com Mail Stop: T-3F23                                  matias.travieso-diaz@pillsburylaw.com U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.gov Jmr3@nrc.gov
                                                    /RA/
David E. Roth Counsel for NRC Staff}}

Revision as of 13:52, 23 November 2019

2006/10/20-Vermont Yankee - NRC Staff Answer to Entergy'S Petition for Interlocutory Review of LBP-06-20
ML062960320
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/20/2006
From: Roth D, Matt Young
NRC/OGC
To:
NRC/OCM
Byrdsong A T
References
50-271-LR, ASLBP 06-849-03-LR, LBP-06-20, RAS 12408
Download: ML062960320 (25)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, ) Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 David E. Roth Counsel for NRC Staff Mitzi A. Young Counsel for NRC Staff October 20, 2006

-i-TABLE OF CONTENTS Page TABLE OF AUTHORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 BACKGROUND . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

SUMMARY

OF RULINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 DISCUSSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 I. Applicable Legal Standards for Interlocutory Review . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 II. The Standards of 10 C.F.R. § 2.341(f) Are Not Met . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 A. Entergy Has Not Been Threatened with Immediate and Serious Irreparable Impact . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 B. Entergy Has Not Shown That Admission of NEC Contention 1 Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner . . . . . . . . . . . . . . . . . . . . 11 III. Entergy Request for the Commission to Exercise Its Inherent Supervisory Authority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 A. Scope of License Renewal Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 B. Exercise of the Commissions Supervisory Authority Is Warranted for Administrative Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 CONCLUSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

-ii-TABLE OF AUTHORITIES Page ADMINISTRATIVE DECISIONS Commission:

AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station),

CLI-06-24, 63 NRC ___ slip op. (Sept. 6, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Connecticut Yankee Atomic Power Co. (Haddam Neck Plant),

CLI-01-25, 54 NRC 368 (2001). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7, 8, 10, 11, 12 Consolidated Edison Co. of New York (Indian Point, Unit 2),

Power Authority of the State of New York (Indian Point Unit 3),

CLI-82-15, 16 NRC 27 (1982) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 Exelon Generation Co., LLC (Early Site Permit for the Clinton ESP Site),

CLI-04-31, 60 NRC 461 (2004) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8, 9 Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site),

System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site),

CLI-06-20, 63 NRC ___ slip op. (July 26, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9, 12 Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4),

CLI-01-17, 54 NRC 3 (2001) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Georgia Power Co., et al. (Vogtle Electric Generating Plant, Units 1 and 2),

CLI-95-15, 42 NRC 181 (1995) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Louisiana Energy Services LP (National Enrichment Facility),

CLI-06-22, 63 NRC __ (Aug. 17, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13, 17 Private Fuel Storage, LLC (Independent Spent Fuel Storage Facility),

CLI-98-7, 47 NRC 307 (1998) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site),

CLI-94-11, 40 NRC 55 (1994) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7, 8, 9,11 Atomic Licensing Appeal Board:

Duke Power Co., et al. (Catawba Nuclear Station, Units 1 and 2),

ALAB-768, 19 NRC 988 (1984) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1),

ALAB-861, 25 NRC 129 (1987) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

-iii-Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),

ALAB-515, 8 NRC 702 (1978) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Atomic Safety and Licensing Board:

Entergy Nuclear Vermont Yankee, LLC, and Entergy Nuclear Operations Inc.

(Vermont Yankee Nuclear Power Station),

LBP-06-20, 63 NRC __ , slip op. (Sept. 22, 2006) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . passim Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4),

LBP-01-6, 53 NRC 138 (2001) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Louisiana Energy Services LP (National Enrichment Facility),

LBP-04-14, 60 NRC 40 (2004) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 FEDERAL AND STATE STATUTES Federal Water Pollution and Control Act, 33 U.S.C. § 1251 et seq . . . . . . . . . . . . . . . . . . . 6, 13 Federal Water Pollution and Control Act § 316(a), 33 U.S.C. § 1326(a) . . . . . . . . . . . . . . . . . 15 Federal Water Pollution and Control Act § 316(b), 33 U.S.C. § 1326(b) . . . . . . . . . . . . . . . . . 15 Federal Water Pollution and Control Act § 402, 33 U.S.C. § 1342 . . . . . . . . . . . . . . . . . . . . . . 3 Federal Water Pollution and Control Act § 511(c), 33 U.S.C. § 1371(c) . . . . . . . . . . . . . . . . . . 3 Vermont Administrative Procedure Act, 3 V.S.A. § 814(b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 REGULATIONS 10 C.F.R. § 2.311(b) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 10 C.F.R. § 2.311(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 10 C.F.R. § 2.335(a) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 10 C.F.R. § 2.341(f) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10, 11, 12 10 C.F.R. § 2.341(f)(2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6, 7, 10, 11 10 C.F.R. § 2.341(b)(3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 10 C.F.R. § 51.45(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 10 C.F.R. § 51.45(d) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16, 17 10 C.F.R. § 51.53(c)(3)(I) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15, 17 10 C.F.R. § 51.53(c)(3)(ii) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

-iv-REGULATIONS (continued) 10 C.F.R. § 51.53(c)(3)(ii)(B)

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . passim 10 C.F.R. § 51.71(d) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. § 51.95(c) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. Part 51 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 10 C.F.R. Part 51, Subpart A, Appendix B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13, 15 10 C.F.R. Part 54 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 40 C.F.R. Part 125 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, ) Docket No. 50-271-LR LLC, and ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-849-03-LR

)

(Vermont Yankee Nuclear Power Station) )

NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 INTRODUCTION Pursuant to 10 C.F.R. § 2.341(f)(2) and 10 C.F.R. § 2.341(b)(3), the staff of the Nuclear Regulatory Commission (Staff) hereby responds to the Entergy Nuclear Vermont Yankee, LLC and Entergy Nuclear Operations, Inc. (collectively Entergy) petition for interlocutory review of LBP-06-20.1 Entergys Petition for Interlocutory Review of LBP-06-20 Admitting New England Coalitions Contention 1 (October 10, 2006) (Petition). The Petition also includes an alternative request for the Commission to exercise its inherent supervisory authority. See Petition at 2. For the reasons set forth herein, the Staff submits the Petition should be denied on the grounds that the criteria for interlocutory review have not been met. The Staff, however, believes that the exercise of the Commissions inherent supervisory authority may be warranted.

BACKGROUND On March 27, 2006,2 the NRC published a notice of docketing and opportunity for hearing concerning Entergys application, under 10 C.F.R. Part 54, for renewal of Operating 1

Memorandum and Order (Ruling on Standing, Contentions, Hearing Procedures, State Statutory Claim, and Contention Adoption), LBP-06-20, 63 NRC ___, slip op. (Sept. 22, 2006) (Order).

2 71 Fed. Reg. 15,220.

License No. DPR-28, for an additional 20 years beyond the current March 21, 2012 expiration date.3 As relevant to the instant petition, the Application included an Environmental Report (ER), which appended the current National Pollutant Discharge Elimination System (NPDES) permit from the State of Vermont, but indicated that a proposed permit amendment from the Waste Water Management Division of the Vermont Agency of Natural Resources (VANR) would allow a one degree increase in thermal discharges. See ER at 4-17.4 That amendment was partially granted by the VANR on March 30, 2006,5 the day before the permit that was in timely renewal6 was to expire.

The New England Coalition (NEC) filed a timely intervention petition challenging the application.7 NEC Contention 1, at issue here, alleged that Entergy's ER did not sufficiently assess the impacts of increased thermal discharges over the requested twenty-year license 3

See Letter from William F. Maguire, Entergy, to NRC, dated January 25, 2006 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML060300082, [Application]

ML060300085, Appendix E [Environmental Report] ML060300086).

4 The NPDES permit was submitted in accordance with 10 C.F.R. § 51.53(c)(3)(ii)(B).

5 The VANR granted the proposed one degree increase in thermal effluent limitations for the time period of June 16 through October 14, but postponed a decision on whether to grant the proposed increase for May 16 through June 15. See Amended Permit at 4; Fact Sheet at 4.

6 The permit attached to Entergys ER was due to expire on March 31, 2006. See ER at Attachment D. Since Entergy had previously applied for renewal, the permit is considered to be in timely renewal. See ER at 9-1. When a licensee has made timely and sufficient application for the renewal of a license or a new license with reference to any activity of a continuing nature, the existing license does not expire until the application has been finally determined by the agency, and, in case the application is denied or the terms of the new license limited, until the last day for seeking review of the agency order or a later date fixed by order of the reviewing court. 3 V.S.A. § 814(b); see also Letter from Carole Fowler, Administration and Compliance Section, VANR WWMD, to Lynn DeWald, Entergy, dated September 30, 2005 (Attachment 1 to Entergys Answer to [NECs] Petition for Leave to Intervene (June 22, 2006)

(Entergy Answer)).

7

[NECs] Petition for Leave to Intervene, Request for Hearing, and Contentions (May 26, 2006)

(NEC Petition).

extension. See NEC Petition at 13. Entergy and the NRC filed answers to the petition.8 Entergy opposed admission of the contention, arguing that it impermissibly challenged 10 C.F.R.

§ 51.53(c)(3)(ii)(B) and section 511(c) of the Clean Water Act, 33 U.S.C. § 1371(c). Entergy Answer at 11. Entergy claimed that submission of its NPDES permit would provide Vermonts 316(a) determination, that no further analysis was required, that section 511(c) of the Federal Water Pollution Control Act (FWPCA or Clean Water Act)9 precluded NRC from reviewing or imposing an effluent limitation different from the States effluent limitation, and, thus, no material dispute with the application was raised. Id. at 12-14. The Staff noted that Entergys Application did not include the then-current discharge permit, which authorized and assessed the one degree increase in thermal discharges, and thus did not object to the admission of the contention to the extent that it alleged Entergys ER did not contain an assessment of the impact of that increased thermal discharge on American shad during the renewal period. See Staff Answer at 8. The Staff argued, however, that the submission of the amended permit issued March 30, 2006 would render the contention moot. See id. at 9.

On June 29, 2006, NEC filed a reply, disputing that a 5-year NPDES permit (whether or not in timely renewal) was dispositive of whether Entergy adequately assessed the impacts of the renewal period and raising matters beyond the scope of the original Contention.10 On September 22, 2006, the Atomic Safety and Licensing Board (Board) issued a Memorandum and Order, which, inter alia, found Contention 1 admissible. See Order at 51-57.

8 Entergys Answer to [NECs] Petition for Leave to Intervene (June 22, 2006) (Entergy Answer); NRC Staff Answer to Request for Hearing of [NEC] (June 22, 2006) (Staff Answer).

9 Under section 402 of the FWPCA of 1972, 33 U.S.C. § 1342, NPDES permits are issued by the U.S. Environmental Protection Agency or by authorized States.

10

[NECs] Reply to Entergy and NRC Staff Answers to Petition for Leave to Intervene, Request for Hearing and Contentions (June 29, 2006) (Reply) at 3-6. NEC argued that the previous permit expired and that the amended permit was subject to a stay request. Id.

The Board majority ruled that NEC Contention 1 raised a material issue concerning whether Entergys ER contains a sufficient assessment of increased thermal discharges over the proposed renewal period and was supported by the basis statement that the ER contains an insufficient analysis of the thermal impacts in the Connecticut River and merely refers to an NPDES permit, which is under appeal, of allegedly uncertain status, and does not cover the twenty years covered by the proposed license renewal." Order at 52 (citing NEC Petition at 11).

The dissenting opinion by Judge Wardwell concluded that NEC Contention 1 was inadmissible because Entergy has addressed its previous omission of an assessment by providing, on July 27, 2006,11 its amended permit that authorized the increased discharges and that, even if the permit was overturned on appeal, the permit originally included in the application would satisfy NRC requirements. See LBP-06-20, Dissenting Opinion of Judge Wardwell on Admissibility of New England Coalition's Contention 1 (Environmental) ("Dissenting Opinion").

On October 10, 2006, Entergy filed the instant motion, requesting that the Commission take interlocutory review of LBP-06-20 insofar as it admitted NEC Contention 1. Petition at 1.

Entergy argues that the decision was inconsistent with NRC rules and established precedent, and is thus clearly erroneous. Id. Entergy also argues that advancement of Contention 1 would cause Entergy immediate and serious irreparable harm, the impact of which could not be alleviated through a petition for review of the Boards final decision at the end of the proceeding, and would affect the basic structure of the proceeding in a pervasive and unusual manner. See id. Accordingly, Entergy asks the Commission to review the Board majoritys ruling on NEC Contention 1 and reverse that ruling in its entirety. Id. at 23.

Before addressing these arguments, it is helpful to recount the Boards rulings.

11 See Letter from Ted A. Sullivan, VYNPS to NRC, dated July 27, 2006 (forwarding License Renewal Application, Amendment 6) (ML062130080). As noted previously, the NPDES amended permit, issued on March 30, 2006, had a March 31, 2006 expiration date, but remained in timely renewal under Vermont law. See note 5, supra.

SUMMARY

OF RULINGS The majority admitted NEC Contention 1, concluding that it satisfied the criteria of 10 C.F.R § 2.309(f)(i-vi). Order at 52. The Board rejected as unreasonable the Staff's argument that the contention merely challenged the adequacy of Entergys assessment of the one-degree increase. Order at 52 n.55. The Board also rejected the claim that the contention was barred by the FWPCA, but acknowledged that it "bars NRC from reviewing or imposing effluent limitations, water quality certification requirements, or other FWPCA requirements." Order at 54-55. The Board further questioned the status of VYNPS's NPDES permit relative to the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirement to provide a current copy of the permit, in particular because the permit was only good for five years, an expired permit was under appeal in the Vermont Environmental Court and the effectiveness of the permit had been stayed. Order at 55-57. The Board concluded that litigation was necessary to resolve how or if 10 C.F.R.

§ 51.53(c)(3)(ii)(B) could be satisfied by the NPDES permit. Order at 55-56. The Board further questioned the interplay between Part 51 regulations and the permit in terms of how or if National Environmental Policy Act (NEPA) requirements are met through 10 C.F.R.

§ 51.53(c)(3)(ii)(B), and concluded that regulatory interpretation was needed. Order at 56. The Board similarly questioned whether reliance on a five-year permit would satisfy the NRCs NEPA obligations. Order at 56-57.

By contrast, the Dissent agreed with the NRC Staff that the contention was admissible to the extent it alleged the Application was missing information, but opined that the omission had been corrected when Entergy docketed its amended permit. See Dissenting Opinion at 1. The Dissent concluded that Entergy had already met the 10 C.F.R. § 51.53(c)(3)(ii)(B) requirements, even while the permit was under an ongoing appeal. Id. at 4-5. Judge Wardwell reasoned that 10 C.F.R. § 51.53(c)(3)(ii)(B) includes all requirements for an impact assessment in an ER and that there was no dispute raised. Id. at 4. Specifically, he concluded that the required analyses

were covered either by Category 1 (contained in the GEIS) or Category 2 (site-specific impacts addressed by the NPDES permit). Id. He opined that to require the Applicant to do more was an impermissible challenge to the regulations, and would raise issues outside the scope of a license renewal proceeding. Id.

Judge Wardwell also opined that if Contention 1 was an attempt to raise issues other than a Category 2 issue related to thermal discharges (i.e., heat shock), NECs contention could also be rejected as an impermissible challenge to the regulations. Id. at 5. The Dissent further concluded that the status of the NPDES permit was not an issue because if the permit were overturned on appeal, the contention would be moot. Id. at 6. With respect to the five-year term of an NPDES permit, the Dissent viewed that permit as providing on-going re-assessment of the increase in temperature, as being consistent with NRC regulations, the FWPCA and NEPA, such that if submitted, no additional analysis of thermal impacts was needed. Id. at 9-10.

The Dissent noted that the case law states that NRC must take the evaluation at face value and not undertake an independent analysis. Id. at 9. The Dissent concluded that Entergy has provided all the information required by regulations, that the stayed status of the permit is not relevant, and that the Board cannot require any further evaluations because to do so would be a challenge to NRC regulations. Id. at 10-11.

DISCUSSION I. Applicable Legal Standards In cases where an appeal does not lie,12 the Commission has the discretion to grant interlocutory review in limited circumstances. The Commissions regulations on interlocutory review provide that petitions for interlocutory review will be entertained by the Commission at the request of a party despite the absence of a referral or certification by the presiding officer only if 12 An appeal lies where an intervention petition has been wholly denied or where another party claims an intervention petition should have been wholly denied. See 10 C.F.R. § 2.311(b) and (c).

the party demonstrates that the issue for which the party seeks interlocutory review:

(I) Threatens the party adversely affected by it with immediate and serious irreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officers final decision; or (ii) Affects the basic structure of the proceeding in a pervasive or unusual manner.

10 C.F.R. § 2.341(f)(2).

The Commission has rejected the argument that a mere increase in the burden of litigation constitutes "serious and irreparable" harm. Connecticut Yankee Atomic Power Co.

(Haddam Neck Plant), CLI-01-25, 54 NRC 368, 374 (2001). The Commission has stated that:

It is well established in Commission jurisprudence that the mere commitment of resources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order. See, e.g., Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-861, 25 NRC 129, 138-39 (1987) ( "Shoreham"); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), ALAB-858, 25 NRC 17, 21-22 (1987); Commonwealth Edison Co. (Zion Station, Units 1 and 2), ALAB-116, 6 AEC 258, 259 (1973). Nor may a party obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Licensing Board. See, e.g., Virginia Electric & Power Co.

(North Anna Power Station, Units 1 & 2), ALAB-741, 18 NRC 371, 378 n. 11 (1983), and authority cited therein.

Sequoyah Fuels Corp. & General Atomics (Gore, Oklahoma Site), CLI-94-11, 40 NRC 55, 61 (1994).

Absent a potential for truly exceptional delay or expense, an interlocutory review petition will be denied. See Duke Power Co. et al. (Catawba Nuclear Station, Units 1 and 2), ALAB-768, 19 NRC 988, 992 (1984). By contrast, immediate review would be appropriate where there is the potential difficulty of unscrambling and remedying the impact of an improper disclosure in a lengthy, complex, and contentious proceeding, which spanned years of litigation, and has generated a massive record. Georgia Power Co. et al. (Vogtle Electric Generating Plant, Units 1 and 2), CLI-95-15, 42 NRC 181, 184 (1995).

The Commission has also considered and rejected the argument that the increased

litigation burden caused by the allowance of a contention has a "pervasive effect" on the structure of the litigation. See Haddam Neck, CLI-01-25, 54 NRC at 374. "The basic structure of an ongoing adjudication is not changed simply because the admission of a contention results from a licensing board ruling that is important or novel, or may conflict with case law, policy, or Commission regulations. Similarly, the mere fact that additional issues must be litigated does not alter the basic structure of the proceedings in a pervasive or unusual way so as to justify interlocutory review of a licensing board decision." Id. at 374 n.13 (quoting Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), ALAB-861, 25 NRC 129, 135 (1987)).

The Staff notes that the Commission's "'basic structure' standard comprehends disputes over the very nature of the hearing in a particular proceeding -- for example, whether a licensing hearing should proceed in one step or in two -- not to routine arguments over admitting particular contentions." Exelon Generation Company, LLC (Early Site Permit for the Clinton ESP Site),

CLI-04-31, 60 NRC 461, 467 (2004) (footnotes omitted). The Commission has viewed the creation of a second Board as worthy of an interlocutory review:

The decision to create a second board is not unheard of in our practice, but it is certainly an unusual event, particularly where, as here, the Chief Judge reassigns to a second board threshold admissibility questions that already are ripe for decision by the initial Board. We agree with PFS and the NRC Staff that a ruling of this sort "affects the basic structure of the proceeding," by arguably mandating duplicative or unnecessary litigating steps, and therefore is reviewable now.

Private Fuel Storage, LLC. (Independent Spent Fuel Storage Facility), CLI-98-7, 47 NRC 307, 310 (1998).

Additionally, the Commission has generally refrained from considering jurisdictional issues until a final ruling. In Sequoyah Fuels, the Licensing Board ruled that the jurisdictional issue cannot be resolved without further factual inquiry, and the Commission considered it premature to interject itself via an interlocutory appeal:

Although a definitive ruling by the Licensing Board that the Commission actually has jurisdiction over GA in this proceeding might rise to the level of a pervasive or

unusual effect upon the nature of the proceeding, the preliminary ruling on appeal here does not. The fact that an appealed ruling touches on a jurisdictional issue does not, in and of itself, mandate interlocutory review.

CLI-94-11, 40 NRC at 63.

The Commission recently noted its longstanding general policy disfavors interlocutory review and stated that it grants review under its "pervasive and unusual" effect standard "only in extraordinary circumstances." AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-06-24, 63 NRC __ , slip op. at 7-8 (Sept. 6, 2006) (citing Duke Energy Corp.

(Catawba Nuclear Station, Units 1 and 2), CLI-04-6, 59 NRC 62, 70 (2004) and Private Fuel Storage, L.L.C (Independent Spent Fuel Storage Installation), CLI-10-1, 53 NRC 1, 5 (2001)).

In addition to its ability to take interlocutory review of a Board decision, the Commission has "an inherent supervisory power over the conduct of adjudicatory proceedings, including the authority to provide guidance on the admissibility of contentions before licensing boards."

Consolidated Edison Co. of New York (Indian Point, Unit 2), Power Authority of the State of New York (Indian Point, Unit 3), CLI-82-15, 16 NRC 27, at 34 (1982) (citing Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), CLI-77-8, 5 NRC 503, 516-17 (1977); United States Energy Research & Development Administration (Clinch River Breeder Reactor Plant),

CLI-76-13, 4 NRC 67, 75-76 (1976)).

In Exelon Generation Co., LLC (Early Site Permit for Clinton ESP Site), System Energy Resources, Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-06-20, 63 NRC ___, slip op.

at 7 (July 26, 2006) (footnote omitted), the Commission said:

As we interpret the Boards' intention here, they plan to give a harder look at those issues that the Staff itself found problematic. That the Boards are looking for clues as to which areas these might be does not, standing alone, suggest to us that they intend to expand their role in a manner that would have a "pervasive and unusual effect on the litigation," necessitating interlocutory review.

That being said, however, the Commission does have inherent supervisory power over its adjudications and may direct our licensing boards' conduct of proceedings. Because our licensing boards are conducting the first "mandatory"

hearings this agency has held in more than two decades, we believe additional Commission guidance is necessary to ensure that the proper balance is struck between the boards' need to obtain information for their review and the burden that production of such information could impose on the NRC staff. We therefore accept review under our inherent supervisory power over adjudications.

As the previous discussion demonstrates, the threshold for the Commission either to take interlocutory review of a decision or to the exercise its supervisory authority over adjudications is a high one.

II. The Standards of 10 C.F.R. § 2.341(f) Are Not Met A. Entergy Has Not Been Threatened with Immediate and Serious Irreparable Impact Entergy has failed to meet the requirements of 10 C.F.R. § 2.341(f) in that it failed to show how admission of NEC Contention 1 threatened Entergy with immediate and serious irreparable impact which, as a practical matter, could not be alleviated through a petition for review of the presiding officers final decision.

Entergy stated that the majoritys decision would require Entergy to provide an assessment of thermal impacts that is not required by the NRC rules, but did not demonstrate how this would constitute an immediate and serious irreparable impact under § 2.341(f).

Petition at 19. Entergy provided no legal authority to support the notion that performing the assessment constituted the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). Id. at 19. No expense or dollar value was pled in the Petition to show that it was a truly exceptional cost, see Petition at 19-22, and does not appear that an assessment would fall into the serious and irreparable categories discussed in the Haddam Neck, CLI-01-25, supra.13 13 There is some question as to whether Entergy would, in fact, have to perform an assessment of thermal impacts in order to respond to the admitted contention, or whether Entergy could make arguments which would be essentially legal in nature to answer the questions the Board posed in its order admitting the contention. See Order at 56-57.

Entergy states that admitting Contention 1 would require Entergy to litigate the thermal effects in two proceedings (the NRC hearing and the judicial review before the Vermont Environmental Court) simultaneously, and that such duplicate litigation would be extremely burdensome. Petition at 20. It is well established that the mere commitment of resources to a hearing that may later prove to have been unnecessary does not constitute sufficient grounds for an interlocutory review of a Licensing Board order. See Sequoyah Fuels, CLI-94-11, 40 NRC at 61.

As an example of a burden, Entergy states that it might have to produce documents in the NRC proceeding, while at the same time responding to discovery requests in the State action. Petition at 20. Document production is not within the kind of "immediate and serious irreparable impact" contemplated in 10 C.F.R. § 2.341(f)(2). See Haddam Neck, CLI-01-25, 54 NRC at 374.

Entergy also states that duplicate litigation creates the risk of inconsistent decisions, which could delay and undermine the outcome (presumptively meaning that a loss in one litigation will negate the outcome in the other). See Petition at 20. Entergy does not state why each "outcome" could not be appealed. A party may not obtain interlocutory review merely by asserting potential delay and increased expense attributable to an allegedly erroneous ruling by the Board. See Sequoyah Fuels, CLI-94-11, 40 NRC at 61.

B. Entergy Has Not Shown That Admission of NEC Contention 1 Affects the Basic Structure of the Proceeding in a Pervasive or Unusual Manner Entergy has not demonstrated that admission of NEC Contention 1 affects the basic structure of the proceeding in a pervasive or unusual manner as required in 10 C.F.R. § 2.341(f).

Entergy lists two reasons why it believes the Board's majority decision affects the basic structure of the proceeding in a pervasive and unusual manner: 1) It will require litigation of an issue that the NRC is barred from reviewing under the NRC rules and CWA; and 2) It requires

parties to litigate whether an NRC rule is valid. Petition at 19-20. Entergy's petition is silent with respect to a "basic structure" standard, and offers no legal authority illuminates the intent of the regulation.

Under Haddam Neck, the Commission rejected the argument that litigation of an area barred by NRC regulation results in affecting the basic structure of a proceeding in a pervasive or unusual manner. CLI-01-25, 54 NRC at 374. Similarly, requiring parties to litigate whether a rule is valid, which would be an impermissible challenge to NRC rules under 10 C.F.R.

§ 2.335(a), is also insufficient under Haddam Neck. Id.

Entergy simply states that, "requiring the parties to litigate whether an NRC rule is valid would not only be unprecedented, but would undoubtedly have a pervasive and unusual affect on the license renewal proceeding," without legal authority to support its statement. Petition at 22.

Entergy asserts that admission of NEC Contention 1 would (for NRC purposes) essentially nullify the [State of Vermont Agency of Natural Resources] VANR's assessment, developed over a multi-year permitting process, on which both Entergy and the NRC are entitled to rely, and would usurp the decision making authority of the VANR and Vermont Environmental Court. Petition at 19-20. Again, this does not satisfy the threshold in Haddam Neck, and cannot support review. See Haddam Neck, CLI-01-25, 54 NRC at 374 n.14.

III. Entergy Request for the Commission to Exercise Its Inherent Supervisory Entergy requests that, if the Commission rejects Energy arguments for interlocutory review under 10 C.F.R. § 2.341(f), the Commission exercise its inherent supervisory authority over adjudication and review admission of NEC Contention 1. See Petition at 23 (citing Clinton, CLI-06-20, supra, slip op. at 7). While the Staff does not believe that the situation presented by this case is similar to that presented in Clinton, the Staff nonetheless believes that exercise of supervisory authority by the Commission is warranted, because the Boards decision appears to

challenge the license renewal regulatory framework.

A. Scope of License Renewal Environmental Review The scope of the environmental review for license renewal is limited in accordance with 10 C.F.R. §§ 51.71(d) and 51.95(c). Florida Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 & 4), CLI-01-17, 54 NRC 3, 11-13 (2001). Consideration of environmental issues in the context of license renewal proceedings is specifically limited by 10 C.F.R. Part 51 and by the NRCs Generic Environmental Impact Statement (GEIS) for License Renewal of Nuclear Plants (NUREG-1437) (GEIS). Id. A number of environmental issues potentially relevant to license renewal are classified in 10 C.F.R. Part 51, Subpart A, Appendix B as Category 1" issues, which means that the Commission resolved the[se] issues generically for all plants and those issues are not subject to further evaluation in any license renewal proceeding. Turkey Point, LBP-01-06, 53 NRC 138, 152-53, affd, CLI-01-17, 54 NRC at 11. The remaining issues, designated as Category 2 in Appendix B, must be addressed by an applicant in its environmental report, and in the NRCs supplemental environmental impact statement for the facility at issue pursuant to 10 C.F.R. §§ 51.71(d) and 51.95(c). Id.

A contention that attempts to have the NRC impose discharge limits or monitoring requirements is not admissible because the NRC does not have the authority to impose such requirements. See Tennessee Valley Authority (Yellow Creek Nuclear Plant, Units 1 and 2),

ALAB-515, 8 NRC 702, 704 & n.6, 706-15 (1978) (FWCPA Amendments of 1972, 33 U.S.C.

§ 1251, et seq., assigns the responsibility for water pollution control criteria and regulating polluters to the Environmental Protection Agency and the States). Similarly, a basis for a contention is inadmissible if it constitutes an impermissible challenge to Commission regulations.

See e.g. Louisiana Energy Services, L.P. (National Enrichment Facility), CLI-06-22, 63 NRC __,

slip op. at 11 (Aug. 17, 2006) (LES); LES, LBP-04-14, 60 NRC 40, 54-55 (2004).14 B. Exercise of the Commissions Supervisory Authority Is Warranted for Administrative Efficiency Entergy argues that the exercise of the Commissions inherent supervisory authority is needed to prevent the majority from imposing unnecessarily burdensome or duplicative efforts on Entergy. Petition at 23. The Dissent also questioned whether admission of NEC Contention 1 was proper given that (1) the contention was either moot or failed to raise a material dispute, (2) the contention impermissibly sought to require Entergy to address thermal impacts beyond the limited Category 2 issue of heat shock and by a means other than an NPDES permit, or (3) the contention inappropriately raised a Category 1 issue. Dissenting Opinion at 10-11.

The Board's discussions on NEC Contention 1 appear to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(i) by requiring additional analyses of Category 1 issues which were generically determined. See LES, LBP-04-14, 60 NRC at 55 (noting that challenge to the Commission's regulations or rulemaking-associated generic determinations are 14 A discussion of case law regarding challenges to regulations was in LES, LBP-04-14, 60 NRC at 54-55:

With limited exception, no rule or regulation of the Commission can be challenged in an adjudicatory proceeding. See 10 C.F.R. § 2.335; see also Dominion Nuclear Connecticut, Inc. (Millstone Nuclear Power Station, Unit 2), CLI-03-14, 58 NRC 207, 218 (2003). By the same token, any contention that amounts to an attack on applicable statutory requirements or represents a challenge to the basic structure of the Commission's regulatory process must be rejected. See Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2), LBP-82-76, 16 NRC 1029, 1035 (1982) (citing Philadelphia Electric Co. (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 20- 21 (1974)). Similarly, any contention that seeks to impose stricter requirements than those set forth by the regulations is inadmissible. See Long Island Lighting Co. (Shoreham Nuclear Power Station, Unit 1), CLI-87-12, 26 NRC 383, 395 (1987); Public Service Co. of New Hampshire (Seabrook Station, Units 1 and 2),

LBP-82-106, 16 NRC 1649, 1656 (1982); Florida Power and Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), LBP-01-6, 53 NRC 138, 159 (2001).

Additionally, the adjudicatory process is not the proper venue for a petitioner to set forth a contention that merely addresses his or her own view regarding the direction regulatory policy should take. See Peach Bottom, ALAB-216, 8 AEC at 21 n.33.

impermissible). The Board's discussions also appear to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(ii)(B) by requiring more than submission of a copy of current CWA

§ 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R.

Part 125, or equivalent State permits and supporting documentation to satisfy Category 2 analyses requirements. See Order at 47-57.

Environmental issues relating to license renewal are divided into two categories.

Category 1 issues are those issues for which the generic analysis of the issue may be adopted in each plant-specific review; Category 2 issues are those issues for which the analysis reported in the GEIS has shown that one or more of the criteria of Category 1 cannot be met, and therefore additional plant-specific review is required. 10 C.F.R. Part 51, Subpart A, Appendix B, Table B-1 n.2. Each license renewal applicant must submit an environmental report. An environmental report is not required to contain analyses of the environmental impacts of the license renewal issues identified as Category 1. 10 C.F.R. § 51.53(c)(3)(i). An environmental report must contain analyses of the environmental impacts associated with license renewal and the impacts of operation during the renewal term for those issues identified as Category 2.

10 C.F.R. § 51.53(c)(3)(ii).

The only Category 2 issue related to thermal discharges and relevant to VYNPS design15 is heat shock.16 The regulatory framework for environmental issues sets forth the required analysis heat shock analysis by stating that the applicant must either submit a copy of its current CWA § 316(b) determinations and, if necessary, a § 316(a) variance in accordance with 40 C.F.R. Part 125, or equivalent State permits and supporting documentation, or if the applicant 15 The plant uses a once-through cooling heat dissipation system. See Order at 48.

16 Table B-1 in Part 51, Subpart A, Appendix B lists other thermal effects as Category 1 including, cold shock, and the thermal plume as a barrier to migrating fish. Due to the lack of specificity of the contention, and NECs filing, the Staff did not appreciate until reading the Boards dissent, that NEC contention 1 may well raise a Category 1 issue. The phrase barriers to migration was not used by NEC.

does not possess such a permit, the applicant must assess the impact of the proposed action on fish and shellfish resources resulting from heat shock and impingement and entrainment.

10 C.F.R. § 51.53(c)(3)(ii)(B). There are no other requirements explicitly related to the environmental report and the Category 2 heat shock issue.

The Board construed NEC Contention 1 as alleging that the ER failed to sufficiently assess the impacts of increased thermal discharges into the Connecticut River. Order at 47. In admitting this contention, the Board questioned the validity and effectiveness of Entergys permit, and further asked:

[W]hether 10 C.F.R. § 51.53(c)(3)(ii)(B) is the only requirement the applicant must meet. The regulation focuses only on heat shock. Does NEPA require an assessment of all environmental impacts of thermal discharges into a river or only the heat shock impacts? Are the general ER requirements found at 10 C.F.R.

§§ 51.45(c) and 51.53(c) displaced, or instead merely supplemented, by the more narrow 10 C.F.R. § 51.53(c)(3)(ii)(B)?

Order at 56. The Board asserted that these questions are a matter of regulatory interpretation we need not reach today. Id.

The Board further questioned whether the 10 C.F.R. § 51.45(d) requirement that an applicant discuss the status of compliance with applicable environmental quality standards and requirements including, but not limited to, thermal and other water pollution limitations or requirements is satisfied by information Entergy has already submitted. Order at 56 n.58. In essence, the Board questions whether Entergy must prepare an assessment of thermal discharge impacts in addition to those performed for or by Federal or State permitting authorities and whether that assessment must address the entire license renewal period.17 For reasons set out by the dissent, in the Staffs view, the regulatory requirements for the contents of an ER are clear. If the Board is raising these issues in contemplation of imposing stricter requirements 17 In raising this issue, the Board may have viewed NECs not merely as a challenge to the adequacy of Entergys ER, but also as a challenge the Staffs yet to be published Supplemental Environmental Impact Statement..

than those set forth in the regulations, that action would be impermissible.18 See LES, CLI-06-22, slip op. at 11, and cases cited therein.

The Commission should exercise its inherent supervisory authority because, as discussed above, the Board's discussion of NEC Contention 1 appears to contemplate an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(i) and 51.45(c) and (d) by requiring additional analyses of Category 1 issues which were generically determined, or by requiring more than a copy of current State or Federal FWPCA permits and determinations for an applicant to satisfy Category 2 analyses requirements.

Although the Board did not explicitly rule in these areas, the Staff believes that, as a matter of administrative efficiency, the agency would benefit from a clear Commission determination regarding the requisite showing to satisfy these requirements.

CONCLUSION For the foregoing reasons, the Commission should decline interlocutory review of the Boards decision to accept for litigation NEC Contention 1. In the interest of administrative 18 For example, the Boards inquiry into whether a 5-year permit satisfies Entergys obligations may constitute an impermissible challenge to 10 C.F.R. § 51.53(c)(3)(ii)(B). The Board observed that the NPDES permit and/or § 316(b) determination expires in five years, and concluded that whether 10 C.F.R.

§ 51.53(c)(3)(ii)(B) and Part 51 in general could be satisfied by the NPDES permit was "a legal and factual issue squarely raised by NEC Contention 1." Order at 56-57. As Entergy argued, the Board erred when it concluded that an assessment of the impact of heat shock on fish and shellfish would be required in that, even if the permit were vacated, the contention would be moot as the permit would revert to the pre-amendment discharge values. Id. at 15 (citing Dissenting Opinion at 6). Entergy also argues that the Commission must accept an NPDES permitting agency assessment, even if the permit is under review.

Id.

efficiency, the Commission should exercise its inherent supervisory authority and provide guidance regarding requirements for analysis of thermal impacts and the required documentation and assessments for license renewal.

Respectfully submitted,

/RA/

David E. Roth Counsel for NRC Staff

/RA/

Mitzi A. Young Counsel for the NRC Staff Dated at Rockville, Maryland this 20th day of October, 2006

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE COMMISSION In the Matter of )

)

ENTERGY NUCLEAR VERMONT YANKEE, )

LLC and ENTERGY NUCLEAR ) Docket No. 50-271-LR OPERATIONS, INC. )

) ASLBP No. 06-849-03-LR (Vermont Yankee Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of the NRC STAFF ANSWER TO ENTERGYS PETITION FOR INTERLOCUTORY REVIEW OF LBP-06-20 in the above-captioned proceeding have been served on the following through electronic mail and with copies by deposit in the NRCs internal mail system, or through electronic mail with copies by deposit in the U.S. mail as indicated by an asterisk, this 20th day of October, 2006:

Administrative Judge Administrative Judge Alex S. Karlin, Chair Richard E. Wardwell Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ask2@nrc.gov E-mail: rew@nrc.gov Administrative Judge Office of the Secretary Thomas S. Elleman* Attn: Rulemaking and Adjudications Staff Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 5207 Creedmoor Road, #101 U.S. Nuclear Regulatory Commission Raleigh, NC 27612 Washington, DC 20555-0001 E-mail: elleman@eos.ncsu.edu E-mail: hearingdocket@nrc.gov Office of Commission Appellate Sarah Hofmann, Esq.*

Adjudication Director of Public Advocacy Mail Stop: O-16C1 Department of Public Service U.S. Nuclear Regulatory Commission 112 State Street - Drawer 20 Washington, DC 20555-0001 Montpelier, VT 05620-2601 E-mail: OCAAmail@nrc.gov E-mail: sarah.hofmann@state.vt.us

Diane Curran, Esq.* Anthony Z. Roisman, Esq.*

Harmon, Curran, Spielberg National Legal Scholars Law Firm

& Eisenberg, L.L.P. 84 East Thetford Rd.

1726 M Street, NW., Suite 600 Lyme, NH 03768 Washington, DC 20036 E-mail: aroisman@nationallegalscholars.com E-mail: dcurran@harmoncurran.com Matthew Brock, Esq.*

Ronald A. Shems, Esq.* Assistant Attorney General Karen Tyler, Esq. Office of the Massachusetts Attorney Shems Dunkiel Kassel & Saunders, PLLC General 91 College Street Environmental Protection Division Burlington, VT 05401 One Ashburton Place, Room 1813 E-mail: rshems@sdkslaw.com Boston, MA 02108-1598 Ktyler@sdkslaw.com E-mail: matthew.brock@ago.state.ma.us Callie B. Newton, Chair* Dan MacArthur, Director Gail MacArthur Town of Marlboro Lucy Gratwick Emergency Management Marcia Hamilton P.O. Box 30 Town of Marlboro Marlboro, VT 05344 Selectboard E-mail: dmacarthur@igc.org P.O. Box 518 Marlboro, VT 05344 E-mail: cbnewton@sover.net David R. Lewis, Esq.*

marcialynn@ev1.net Matias F. Travieso-Diaz Pillsbury Winthrop Shaw Pittman LLP Marcia Carpentier, Esq. 2300 N Street, NW Jonathan M. Rund, Esq. Washington, DC 20037-1128 Atomic Safety and Licensing Board Panel E-mail: david.lewis@pillsburylaw.com Mail Stop: T-3F23 matias.travieso-diaz@pillsburylaw.com U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: mxc7@nrc.gov Jmr3@nrc.gov

/RA/

David E. Roth Counsel for NRC Staff