ML060300082

From kanterella
Jump to navigation Jump to search

2006/01/25-Submittal of Vermont Yankee Nuclear Power Station License No. DPR-28 License Renewal Application
ML060300082
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/25/2006
From: Maguire W F
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
%dam200611, BVY 06-009
Download: ML060300082 (6)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.Vernont Yankee P.O. BoOX 50 185 Old Ferry Road te- y Brattleboro, VT 05302.0500 t w Tel 802 257 5271 January 25, 2006 BVY 06-009 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50271)License Renewal ApDlication Pursuant to 10 CFR 54.17, Entergy Nuclear Operations, Inc. and Entergy Nuclear Vermont Yankee, LLC. (Entergy) hereby applies for the renewal of the operating license for the Vermont Yankee Nuclear Power Station (VYNPS) to extend the license for an additional 20 years beyond the current expiration date. With renewal, the VYNPS operating license would be extended from midnight on March 21, 2012 to midnight on March 21, 2032.The enclosed License Renewal Application and related Appendices contain the information required by 10 CFR 54 for the contents of an application including an environmental report, entitled "Applicant's Environmental Report -Operating License Renewal Stage," (Appendix E)satisfying the applicable requirements of 10 CFR 51 Subpart A.As required by 10 CFR 54.21(b), current licensing basis changes which have a material effect on the content of this application, including the Updated Final Safety Analysis Report (UFSAR)Supplement (Appendix A), will be identified at least annually while the application is under NRC review and at least three months prior to the scheduled completion of the NRC review.This application is submitted in accordance with 10 CFR 2 Subpart A, 10 CFR 50.4, and 10 CFR 50.30. Entergy hereby submits the original (plus 80 CDs) of the application pursuant to 10 CFR 50.4(b), 10 CFR 51.55(a), and 10 CFR 54.17(a).Should you have any questions concerning this submittal, please contact Mr. James DeVincentis at (802) 258-4236.Commitments contained in this application are summarized in Attachment 1..3 4crs' F m( t ,4eterstcn

<),s-fee BVY 06-009 Page 2 of 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on January 2vI, 2006.Sincerely, Williamn F. M~gi General ulhaglant Operations Vermont Yanee Nuclear Power Station

Attachment:

List of Regulatory Commitments

Enclosures:

License Renewal Application Appendix A Updated Final Safety Analysis Report Supplement Appendix B Aging Management Programs and Activities Appendix C Response to BWRVIP Applicant Action Items Appendix D Technical Specifications Changes Appendix E Applicant's Environmental Report cc: see next page BVY 06-009 Page 3 of 3 cc: Mr. James E. Dyer, Director (w/o attachment and enclosures)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. Samuel J. Collins (w/o attachment and enclosures)

Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mr. Jack Strosnider, Director (w/o attachment and enclosures)

Office of Nuclear Material and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-00001 Mr. Johnny H. Eads Project Manager U.S. Nuclear Regulatory Commission Office 0-i1 F1 Washington, DC 20555-00001 Mr. James Shea (w/o attachment and enclosures)

U.S. Nuclear Regulatory Commission Office 0-8B-1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 USNRC Resident Inspector (w/o attachment and enclosures)

Entergy Nuclear Vermont Yankee, LLC P.O. Box 157 Vemon, Vermont 05354 Mr. David O'Brien, Commissioner VT Department of Public Service 112 State Street -Drawer 20 Montpelier, Vermont 05620-2601 BVY 06-009 Docket No. 50-271 Attachment 1 Vermont Yankee Nuclear Power Station License No. DPR-28 License Renewal Application List of Regulatory Commitments Attachment 1 to BVY 06-009 Page 1 of 1 List of Regulatory Commitments The following table identifies those actions committed to by Entergy Nuclear Operations, Inc. in this document.

Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE SCHEDULED ONE-ck One) COMPLETION TIME CONTINUING DATE COMMITMENT ACTION COMPLIANCE (if Required)Programs listed in Appendix B Section X March 22, 2012 B.1 of the license renewal application BVY 06-009 Docket No. 50-271 Enclosure Vermont Yankee Nuclear Power Station License No. DPR-28 License Renewal Application