ML072130003: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 27, 2007Mr. M. R. BlevinsSenior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043
{{#Wiki_filter:August 27, 2007 Mr. M. R. Blevins Senior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043


==SUBJECT:==
==SUBJECT:==
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OFACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO.
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO.
MD4143)
MD4143)


==Dear Mr. Blevins:==
==Dear Mr. Blevins:==


On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued ConfirmatoryAction Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays werecompleted for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.Based on your letters, the NRC has found that all the commitments listed in the CAL andsupporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.Thank you for informing us of the actions documented in your letter. These actions may beexamined during a future NRC inspection of your facility.Since the CAL addressed both CPSES units, it will remain open until all CAL commitmentspertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and theNRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or M. R. Blevins-2-Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will bemade available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html
On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.
.Sincerely,/RA/Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-445 cc:  See next page
In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays were completed for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.
Based on your letters, the NRC has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.
Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.
Since the CAL addressed both CPSES units, it will remain open until all CAL commitments pertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.
Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or


ML072130003*Conurrence via e-mailOFFICENRR/DCI/CPNBNRR/DCI/CPNB/BCNRR/DORL/LPL4/PMNRR/DORL/LPL4/LANAMETlupold, Tchan forTChanBSingalJBurkhardt DATE8/9/078/9/078/7/078/7/07 OFFICENRR/DORL/LPL4/BCNRR/DCI/DDRS/D, RIV *NRR/DORL/D NAMETHiltzMEvansDchamberlain, Wjones forCHaney DATE8/8/078/9/078/21/078/27/07 December 2004Comanche Peak Steam Electric Station cc:Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 2159 Glen Rose, TX 76403-2159Regional Administrator, Region IVU.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011Mr. Fred W. Madden, DirectorRegulatory Affairs TXU Generation Company LP P.O. Box 1002 Glen Rose, TX 76043George L. Edgar, Esq.Morgan Lewis 1111 Pennsylvania Avenue, NW Washington, DC 20004County JudgeP.O. Box 851 Glen Rose, TX  76043Environmental and Natural  Resources Policy Director Office of the Governor P.O. Box 12428 Austin, TX 78711-3189Mr. Richard A. Ratliff, ChiefBureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX  78756-3189Mr. Brian AlmonPublic Utility Commission William B. Travis Building P.O. Box 13326 1701 North Congress Avenue Austin, TX 78701-3326Ms. Susan M. JablonskiOffice of Permitting, Remediation and Registration Texas Commission on Environmental Quality MC-122 P.O. Box 13087 Austin, TX 78711-3087Terry Parks, Chief InspectorTexas Department of Licensing and Regulation Boiler Program P.O. Box 12157 Austin, TX 78711}}
M. R. Blevins                                  Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.
Sincerely,
                                              /RA/
Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-445 cc: See next page
 
ML072130003                       *Conurrence via e-mail OFFICE    NRR/DCI/CPNB        NRR/DCI/CPNB/BC          NRR/DORL/LPL4/PM          NRR/DORL/LPL4/LA NAME      Tlupold, Tchan for  TChan                    BSingal                    JBurkhardt DATE      8/9/07              8/9/07                  8/7/07                    8/7/07 OFFICE    NRR/DORL/LPL4/BC    NRR/DCI/D                DRS/D, RIV
* NRR/DORL/D NAME      THiltz              MEvans                  Dchamberlain, Wjones for  CHaney DATE      8/8/07              8/9/07                  8/21/07                    8/27/07
 
Comanche Peak Steam Electric Station cc:
Senior Resident Inspector           Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission   Bureau of Radiation Control P.O. Box 2159                       Texas Department of Health Glen Rose, TX 76403-2159            1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission   Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400     Public Utility Commission Arlington, TX 76011                  William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director        1701 North Congress Avenue Regulatory Affairs                   Austin, TX 78701-3326 TXU Generation Company LP P.O. Box 1002                       Ms. Susan M. Jablonski Glen Rose, TX 76043                  Office of Permitting, Remediation and Registration George L. Edgar, Esq.               Texas Commission on Environmental Morgan Lewis                         Quality 1111 Pennsylvania Avenue, NW         MC-122 Washington, DC 20004                P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851                        Terry Parks, Chief Inspector Glen Rose, TX 76043                  Texas Department of Licensing and Regulation Environmental and Natural            Boiler Program Resources Policy Director          P.O. Box 12157 Office of the Governor              Austin, TX 78711 P.O. Box 12428 Austin, TX 78711-3189 December 2004}}

Revision as of 05:03, 23 November 2019

Completion of Actions for Confirmatory Action Letter NRR-07-007
ML072130003
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 08/27/2007
From: Catherine Haney
Plant Licensing Branch III-2
To: Blevins M
TXU Power
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC MD4143, NRR-07-007
Download: ML072130003 (4)


Text

August 27, 2007 Mr. M. R. Blevins Senior Vice President and Chief Nuclear Officer TXU Power Comanche Peak Steam Electric Station ATTN: Regulatory Affairs Department P.O. Box 1002 Glen Rose, TX 76043

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 - COMPLETION OF ACTIONS FOR CONFIRMATORY ACTION LETTER NRR-07-007 (TAC NO.

MD4143)

Dear Mr. Blevins:

On March 20, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Confirmatory Action Letter (CAL) No. NRR-07-007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML070730620) regarding dissimilar metal welds in the pressurizer at Comanche Peak Steam Electric Station (CPSES), Units 1 and 2. This letter acknowledges receipt of your letters dated April 5, and June 19, 2007 (ADAMS Accession Nos. ML071020040 and ML071770137, respectively) informing the NRC of actions taken in response to this CAL.

In your letters, you stated pressurizer Alloy 82/182 butt weld structural weld overlays were completed for CPSES Unit 1 during refueling outage 1RF12 which ended April 20, 2007. The weld overlays included four safety/relief nozzles, a spray nozzle, and a surge nozzle, and that ultrasonic examination of the Unit 1 pressurizer weld overlays was completed on March 23, 2007.

Based on your letters, the NRC has found that all the commitments listed in the CAL and supporting commitment letter (ADAMS Accession No. ML070530211) have been met for CPSES Unit 1. With respect to CPSES Unit 1, no further response is required regarding the CAL, and it is no longer necessary to implement enhanced inspection and leakage monitoring requirements for the reactor coolant system at CPSES Unit 1. This closes TAC No. MD4143.

Thank you for informing us of the actions documented in your letter. These actions may be examined during a future NRC inspection of your facility.

Since the CAL addressed both CPSES units, it will remain open until all CAL commitments pertaining to CPSES Unit 2 are complete. Therefore, TAC No. MD4144 for Unit 2 will also remain open.

Current NRC guidance regarding CALs is contained in the NRC Enforcement Policy and the NRC Enforcement Manual, which are available at the NRC web site at http://www.nrc.gov/about-nrc/regulatory/enforcement.html (click on Enforcement Policy or

M. R. Blevins Enforcement Guidance) or by contacting the Government Printing Office (GPO) toll-free at 1-888-293-6498. The GPO is open from 7:00 a.m. to 9:00 p.m. EST, Monday through Friday (except Federal holidays).

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html.

Sincerely,

/RA/

Catherine Haney, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-445 cc: See next page

ML072130003 *Conurrence via e-mail OFFICE NRR/DCI/CPNB NRR/DCI/CPNB/BC NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NAME Tlupold, Tchan for TChan BSingal JBurkhardt DATE 8/9/07 8/9/07 8/7/07 8/7/07 OFFICE NRR/DORL/LPL4/BC NRR/DCI/D DRS/D, RIV

  • NRR/DORL/D NAME THiltz MEvans Dchamberlain, Wjones for CHaney DATE 8/8/07 8/9/07 8/21/07 8/27/07

Comanche Peak Steam Electric Station cc:

Senior Resident Inspector Mr. Richard A. Ratliff, Chief U.S. Nuclear Regulatory Commission Bureau of Radiation Control P.O. Box 2159 Texas Department of Health Glen Rose, TX 76403-2159 1100 West 49th Street Austin, TX 78756-3189 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission Mr. Brian Almon 611 Ryan Plaza Drive, Suite 400 Public Utility Commission Arlington, TX 76011 William B. Travis Building P.O. Box 13326 Mr. Fred W. Madden, Director 1701 North Congress Avenue Regulatory Affairs Austin, TX 78701-3326 TXU Generation Company LP P.O. Box 1002 Ms. Susan M. Jablonski Glen Rose, TX 76043 Office of Permitting, Remediation and Registration George L. Edgar, Esq. Texas Commission on Environmental Morgan Lewis Quality 1111 Pennsylvania Avenue, NW MC-122 Washington, DC 20004 P.O. Box 13087 Austin, TX 78711-3087 County Judge P.O. Box 851 Terry Parks, Chief Inspector Glen Rose, TX 76043 Texas Department of Licensing and Regulation Environmental and Natural Boiler Program Resources Policy Director P.O. Box 12157 Office of the Governor Austin, TX 78711 P.O. Box 12428 Austin, TX 78711-3189 December 2004