ML14204A755: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14204A755
| number = ML14204A755
| issue date = 07/21/2014
| issue date = 07/21/2014
| title = Ltr 07/21/14 Dresden Units 2 and 3 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| title = Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000237/2014005]]
See also: [[see also::IR 05000237/2014005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                            NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352 July 21, 2014
                                            LISLE, IL 60532-4352
  Mr. Michael J. Pacilio
                                              July 21, 2014
Senior VP, Exelon Generation Co., LLC
Mr. Michael J. Pacilio
  President and CNO, Exelon Nuclear  
Senior VP, Exelon Generation Co., LLC
4300 Winfield Road
  President and CNO, Exelon Nuclear
Warrenville, IL 60555
4300 Winfield Road
SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC  
Warrenville, IL 60555
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
SUBJECT:       DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
AND REQUEST FOR INFORMATION
                OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
INSPECTION
                REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
REPORT 05000237/2014005; 05000249/2014005 Dear Mr. Pacilio
                05000249/2014005
: On December 1, 2014, the U.S. Nuclear Regulatory Commission (
Dear Mr. Pacilio:
NRC) will begin the on
On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site
-site portion of the  
portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power
Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline inspection procedure (IP) 71111.
Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline
07, "Heat Sink Performance."
inspection procedure (IP) 71111.07, Heat Sink Performance.
In order to minimize the impact that the inspection has on the site and to ensure a productive  
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups.
inspection, we have enclosed a request for documents needed for the inspection. The
   The first group lists information necessary for our initial inspection scoping activities. This  
documents have been divided into three groups.
information should be available to the lead
*   The first group lists information necessary for our initial inspection scoping activities. This
inspector no later than October 6, 2014. By October 17, 2014, the inspector will communicate the initial selected set of approximately  
    information should be available to the lead inspector no later than October 6, 2014. By
    October 17, 2014, the inspector will communicate the initial selected set of approximately
    2-3 risk significant heat exchangers.
*  The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the selected heat exchangers,
    should be available at the Regional Office no later than November 17, 2014. This
    information should be separated for each selected component, especially if provided
    electronically (e.g., folder with component name that includes calculations, condition
    reports, maintenance history, etc.). During the in-office preparation activities, the inspector
    may identify additional information needed to support the inspection.
*  The last group includes the additional information above as well as plant specific
    reference material. This information should be available onsite to the inspector on
    December 1, 2014. It is also requested that corrective action documents and/or questions
    developed during the inspection be provided to the inspector as the documents are
    generated.


2-3 risk significant heat exchangers.
M. Pacilio                                      -2-
  The second group
All requested documents are to be for the time period from the onsite inspection period back to
is needed to support our in
the documents that were provided in response to the previous heat sink performance
-office preparation activities.  This
inspection. If no activities were accomplished in that time period, then the request applies to
set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than November 17, 2014. This information should be separated for each selected component, especially if provide
the last applicable document in the previous time period. It is important that these documents
d electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
be as complete as possible, in order to minimize the number of documents requested during
.).  During the in
the preparation week or during the on-site inspection.
-office preparation activities, the inspector may identify additional information needed to support the inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our
  The last group includes the additional information above as well as plant specific reference
regulatory contact for this inspection is G. Graff of your organization. If there are questions
material.  This information should be available onsite to the inspector
about the material requested, or the inspection, please call Néstor J. Féliz Adorno at
on December 1, 2014.  It is also requested that corrective action documents and/or question
(630) 829-9739. Please send the information to the following e-mail address
s developed during the inspection be provided to the inspector as the documents are generated.
nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information
 
is also an acceptable option.
M. Pacilio
This letter does not contain new or amended information collection requirements subject to the
    -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
heat sink performance
requirements were approved by the Office of Management and Budget Control Number 3150-
inspection. If no activities were accomplished
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
in that time period, then the request applies to the last applicable document in the previous time period.
request for information or an information collection requirement unless the requesting
It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on
document displays a currently valid Office of Management and Budget Control Number.
-site inspection.
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's
The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public
regulatory contact for this inspection is
inspection in the NRC Public Document Room or from the Publicly Available Records System
G. Graff of your organization.  
(PARS) component of NRC's Agencywide Documents Access and Management System
If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.  Please send the information to the following e
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
-mail address nestor.feliz
Public Electronic Reading Room).
-adorno@nrc.gov.  A hard
                                                Sincerely,
-copy or compact disc (CD) with the required information is also an acceptable option.
                                                /RA Stuart Sheldon Acting For/
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of
                                                Ann Marie Stone, Chief
1995 (44 U.S.C. 3501 et seq.).  
                                                Engineering Branch 2
Existing information collection requirements were approved by the Office of Management and Budget Control Number
                                                Division of Reactor Safety
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
Docket Nos. 50-237; 50-249
" In accordance with Title 10, Code of Federal Regulations
License Nos. DPR-19; DPR-25
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Enclosure:
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
Triennial Heat Sink Performance
-rm/adams.html
Inspection Document Request
(the Public Electronic Reading Room).
cc w/encl: Distribution via LISTSERV
Sincerely,
 
 
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
/RA Stuart Sheldon Acting For/
Inspection Report:             05000237/2014005; 05000249/2014005
 
Inspection Dates:              December 1 - 5, 2014
Ann Marie Stone, Chief Engineering Branch 2
Inspection Procedure:          Inspection Procedure 71111.07, Heat Sink Performance
Division of
Lead Inspector:                Néstor J. Féliz Adorno
Reactor Safety
                                (630) 829-9739
Docket Nos. 50
                                nestor.feliz-adorno@nrc.gov
-237; 50-249 License Nos. DPR
I.    Information Requested By October 6, 2014
-19; DPR-25 Enclosure:
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Triennial Heat Sink Performance
          Safety-Related Equipment, heat exchangers in order of risk significance.
Inspection Document Request
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
cc w/encl:  Distribution via LISTSERV
          exchanger.
 
      3. List of Corrective Action Program documents (with a short description) associated
TRIENNIAL HEAT
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
SINK PERFORMANCE INSPECTION
          exchanger testing, ultimate heat sink (UHS), and safety-related service and closed
DOCUMENT REQUEST
          cooling water systems for the previous three years or since the last Corrective Action
Enclosure
          Program document list was sent to the NRC for the previous heat sink performance
Inspection Report:
          inspection. The list should include all Corrective Action Program documents not on
  05000237/2014005; 05000249/2014005
          the last Corrective Action Program document list.
Inspection Dates:
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and
  December 1
          safety-related service and closed cooling water systems since the last heat sink
- 5, 2014 Inspection
          performance inspection.
Procedure:
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
Inspection Procedure 71111.07, "Heat Sink Performance"
          GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
Lead Inspector:
          water systems.
  Néstor J. Féliz Adorno
      6. List of engineering-related operator workarounds (with a short description)
(630) 829
          associated with GL 89-13 heat exchangers, UHS, and safety-related service and
-9739  nestor.feliz
          closed cooling water systems. The requested documents are to be for the time
-adorno@nrc.gov
          period from the onsite inspection period back to the documents that were provided in
I. Information Requested By October 6, 2014
          response to the previous heat sink performance inspection.
1. List of the Generic Letter (GL) 89
      7. List of permanent and temporary modifications (with a short description) associated
-13, "Service Water System Problems Affecting Safety-Related Equipment,"
          with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
heat exchangers in order of risk significance.
          water systems. The requested documents are to be for the time period from the
2. Copy of heat exchanger performance trending data tracked for each GL 89
          onsite inspection period back to the documents that were provided in response to the
-13 heat exchanger.
          previous heat sink performance inspection.
3. List of Corrective Action Program
      8. List of risk significant non-safety-related functions (with a short description) of the
documents (with a short description) associated with GL 89
          service water system and UHS.
-13 heat exchangers, heat sinks,
                                                                                          Enclosure
silting, corrosion, fouling,
 
heat exchanger testing,
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
ultimate heat sink (UHS), and safety
II.  Information Requested By November 17, 2014
-related service and closed cooling water systems
    1. Copies of the GL 89-13 responses and commitments.
for the previous three
    2. Copies of procedures developed to implement the recommendations of GL 89-13
years or since the last Corrective Action Program document list was sent to the NRC for the previous heat sink performance inspection. The list should include all Corrective Action Program
        (e.g., the GL 89-13 Heat Exchanger Program description).
documents not on the last Corrective Action Program
    3. Copies of the selected Corrective Action Program documents.
document list.
    4. For the specific heat exchangers selected:
4. Copy of any self
        a. Copy of system description and design basis document for the heat exchangers
-assessment done on any of GL 89
              (as applicable).
-13 heat exchangers,
        b. Provide a list of calculations (with a short description), which currently apply to
UHS, and safety-related service and closed cooling water systems
              each heat exchanger.
since the last heat sink performance inspection.
        c. Provide the calculations or evaluations that:
5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers,
              i. establish the limiting design basis heat load required to be removed by each
UHS, and safety-related service and closed cooling water systems.
                  of these heat exchangers;
6. List of engineering
              ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
-related operator workarounds
            iii. correlate surveillance testing and/or inspection results from these heat
(with a short description)
                  exchangers with design basis heat removal capability (e.g., basis for
associated with GL 89-13 heat exchangers
                  surveillance test and/or inspection acceptance criteria);
, UHS, and safety-related service and closed cooling water systems.
            iv. evaluate the potential for water hammer in each heat exchanger or
  The requested documents are to be for the time period from the onsite inspection period back to the
                  associated piping; and
documents that were provided in response to the previous
              v. evaluate excessive tube vibration in each heat exchanger.
heat sink performance
        d. Copy of any operability determinations or other documentation of degradation
inspection. 7. List of permanent and temporary modifications
              associated with the heat exchangers or the systems that support the operation
(with a short description)
              for the selected heat exchangers.
associated with GL 89
        e. Copy of the design specification, heat exchanger data sheets, and vendor
-13 heat exchangers
              documents including component drawings applicable for the selected heat
, UHS, and safety-related service and closed cooling water systems.
              exchangers.
  The requested documents are to be for the time period from the onsite inspection period back to the
        f.   Copies of normal, abnormal, and emergency operating procedures associated
documents that were provided in response to the previous heat sink performance
              with the selected heat exchangers.
inspection. 8. List of risk significant non
    5. For the UHS and the safety-related service and closed cooling water systems (or
-safety-related functions (with a short description) of the service water system and UHS.
        equivalent):
TRIENNIAL HEAT
        a. Copy of system description and design basis document (as applicable).
SINK PERFORMANCE INSPECTION
                                                2
DOCUMENT REQUEST
 
  2 II. Information Requested By November 17, 2014
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
1. Copies of the GL 89
          a. Copy of any operability determinations or other documentation of degradation
-13 responses
              associated with the UHS and the safety-related service and closed cooling water
and commitments
              systems.
. 2. Copies of procedures developed to implement the recommendations of GL 89
          b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
-13 (e.g., the GL 89
              states the maximum cooling water system inlet temperature limit that still allows
-13 Heat Exchanger Program description).
              full licensed power operation of the nuclear reactor.
  3. Copies of the selected Corrective Action Program
          c. Copy of the construction code and Design Specification.
documents.
          d. Copies of normal, abnormal, and emergency operating procedures associated
4. For the specific heat exchangers selected:
              with the UHS and safety-related service water systems including procedures for
a. Copy of system description and design basis document for the heat exchangers (as applicable).
              loss of these systems.
b. Provide a list of calculations
          e. Copies of the procedures associated with in-service test of the safety-related
(with a short description
              service and closed cooling water pumps.
), which currently apply to each heat exchanger
          fCopies of corrective action documents associated with waterhammer or hydraulic
. c. Provide the calculations or evaluations that:
              transients in the service water system since the last heat sink inspection.
i. establish the limiting design basis heat load required to be removed by each
          g. If available, provide an electronic copy of piping and instrumentation diagrams
of these heat exchangers;
              (P&IDs) for the service and closed cooling water systems, including the intake
ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
              structure.
iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria);
          h. Provide a list of calculations (with a short description), which currently apply to
iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and
              UHS, service and closed cooling water systems.
v. evaluate excessive tube vibration in each heat exchanger.
          i. Copies of calculations and surveillances that determine the UHS reservoir
  d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers.
              capacity and heat transfer capability.
e. Copy of the design specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the selected heat exchangers.
          j.  Copy of calculation addressing safety-related service and closed cooling water
f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers.
              systems flow balance.
  5. For the UHS and the safety
          k. Provide a list of instruments (with a short description) associated with automatic
-related service
              or alarm functions for the safety-related service and closed cooling water
and closed cooling
              systems and/or UHS.
water system
      6. A schedule of all inspections, cleanings, maintenance, or testing of any
s (or equivalent):
          safety-related heat exchanger to be performed during the on-site portion of the
a. Copy of system description and design basis document (as applicable).
          inspection.
   
      7. Electronic copies of the current Final Safety Analysis Report, Technical
TRIENNIAL HEAT
          Specifications, Technical Specifications Basis, and Technical Report Manual.
SINK PERFORMANCE INSPECTION
III. Information Requested to be Available on First Day of Inspection, December 1, 2014
DOCUMENT REQUEST
      1. For the specific heat exchangers selected:
  3 a. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety
          a. Copies of the two most recent completed tests and evaluation data confirming
-related service
              thermal performance for those heat exchangers, which are performance tested.
and closed cooling
          b. Documentation and procedures that identify the types, accuracy, and location of
water systems. b. Copy of the document (e.g.
              any special instrumentation used for the two most recently completed thermal
, UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.
                                                3
  c. Copy of the construction code and Design Specification. d. Copies of normal, abnormal, and emergency operating procedures associated
 
with the UHS and safety
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
-related service water systems including procedures for loss of these systems.
          performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
e. Copies of the procedures associated with in
          instruments or temperature instruments). Include calibration records for the
-service test of the safety
          instruments used during these tests.
-related service and closed cooling water pumps.
      c. Information regarding any alarms, which monitor on-line performance.
f. Copies of corrective
      d. Copy of the document describing the inspection results of each heat exchanger.
action documents associated with waterhammer or hydraulic transients in the service water system since the last heat sink inspection
          The requested documents are to be for the time period from the onsite inspection
. g. If available, provide an electronic copy of piping and instrumentation diagrams (P&IDs) for the service
          period back to the documents that were provided in response to the previous
and closed cooling
          heat sink performance inspection.
water system
      e. The cleaning and inspection maintenance schedule for each heat exchanger for
s, including the intake structure.
          the next 5 years.
h. Provide a list of calculations (with a short description), which currently apply to
      f. Copy of the operating procedure that ensures that the maximum cooling water
UHS, service and closed cooling
          system inlet temperature limit is not exceeded.
water system
      g. Copy of the periodic flow testing at or near maximum design flow. The requested
s. i. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability.
          documents are to be for the time period from the onsite inspection period back to
j. Copy of calculation addressing safety
          the documents that were provided in response to the previous heat sink
-related service and closed cooling water systems flow balance.
          performance inspection.
k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety
      h. Copy of the document which identifies the current number of tubes in service for
-related service
          each heat exchanger and the supporting calculation which establishes the
and closed cooling
          maximum number of tubes which can be plugged in each heat exchanger.
water systems and/or UHS.
      i. Copy of the document establishing the repair criteria (plugging limit) for degraded
6. A schedule of all inspections, cleanings, maintenance, or testing of
          tubes which are identified in each heat exchanger.
any safety-related heat exchanger to be performed
      j. Copies of the documents that verify the structural integrity of the heat exchanger
during the  
          (e.g., eddy current summary sheets, ultrasonic testing results, and visual
on-site portion of
          inspection results).
the inspection
      k. Copies of those documents that describe the methods taken to control water
. 7. Electronic
          chemistry in the heat exchangers.
copies of the current Final Safety Analysis Report, Technical Specifications, Technical Specifications Basis, and Technical Report Manual.
2.     For the review of the safety-related service and closed cooling water systems and
III. Information Requested to be Available on First Day of Inspection, December 1, 2014
      UHS:
1. For the specific heat exchangers selected
      a. Copies of calculations and surveillances that determine the UHS reservoir
: a. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers
          capacity and heat transfer capability.
, which are performance tested.
      b. Copies of surveillance procedures and testing results performed on the
b. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal 
          instrumentation relied upon to determine UHS reservoir capability. The
TRIENNIAL HEAT
          requested documents are to be for the time period from the onsite inspection
SINK PERFORMANCE INSPECTION
          period back to the documents that were provided in response to the previous
DOCUMENT REQUEST
          heat sink performance inspection.
  4 performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests.
      c. Copies of the last two performance tests, such as the ASME in-service test, for
c. Information regarding any alarms
          the pumps, valves, and, if applicable, the towers fans in the safety-related service
, which monitor on
          water system. If the components are not performance tested, please provide
-line performance.
          documentation verifying performance by the methods actually used.
d. Copy of the document describing the inspection results
                                            4
of each heat exchanger
 
.  The requested documents are to be for the time period from the onsite inspection period back to the
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
documents that were provided in response to the previous
            d. Copies of the documents that demonstrate that flow balance testing of the
heat sink performance  
                safety-related service water system was performed during the last three years.
inspection. e. The cleaning and inspection maintenance schedule for each heat exchanger for the next
                If the last flow test was performed longer than three years, then provide the last
5 years. f. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded
                test.
. g. Copy of the periodic flow testing at or near maximum design flow.  The requested documents are to be for the time period from the onsite inspection period back t
            e. Copies of the documents that demonstrate that flow balance testing will continue
o the documents that were provided in response to the previous
                to be periodically done in the future.
heat sink performance
            f. Copies of procedures used to monitor interface valves between the
inspection. h. Copy of the document which identifies the current number of tubes in service for
                safety-related sections of the service and closed cooling water systems, the
each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger
                non-safety-related sections, and the associated results. The requested
. i. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
                documents are to be for the time period from the onsite inspection period back to
. j. Copies of the documents that verify the structural integrity of the heat exchanger
                the documents that were provided in response to the previous heat sink
(e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results
                performance inspection.
). k. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
            g. Copies of the procedures that verify the performance of risk significant non-safety
. 2. For the review of t
                functions of the safety-related service water system and the associated results.
he safety-related service and closed cooling water systems and
                The requested documents are to be for the time period from the onsite inspection
UHS: a. Copies of calculations and surveillances that determine the UHS reservoir
                period back to the documents that were provided in response to the previous
capacity and heat transfer capability.
                heat sink performance inspection.
b. Copies of surveillance procedures and testing results performed
            h. Copies of the testing, inspection, or monitoring program procedures for buried or
on the instrumentation relied upon to determine UHS reservoir capability.  The requested documents are to be for the time period from the onsite inspection period back to the
                inaccessible piping of the service and closed cooling water systems and the
documents that were provided in response to the previous
                associated results. The requested documents are to be for the time period from
heat sink performance  
                the onsite inspection period back to the documents that were provided in
inspection. c. Copies of the last two performance tests, such as the ASME in
                response to the previous heat sink performance inspection.
-service test
            i. Copies of the ultrasonic test results and/or visual inspections that verify the
, for the pumps, valves, and, if applicable, the towers
                structural integrity of the service and closed cooling water systems piping.
fans in the safety
            j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe
-related service water system. If the components are not performance tested, please provide
                leaks of the service and closed cooling water systems, including structural
documentation verifying performance by the methods actually used.
                evaluations and/or planned corrective actions.
 
            k. History of any thru wall pipe leak on the service and closed cooling water
TRIENNIAL HEAT
                systems. The requested documents are to be for the time period from the onsite
SINK PERFORMANCE INSPECTION
                inspection period back to the documents that were provided in response to the
DOCUMENT REQUEST
                previous heat sink performance inspection.
  5 d. Copies of the documents that demonstrate that flow balance testing of the safety-related service water system
            l. Copies of the documents associated with the periodic inspection program used to
was performed
                detect protective coating failure, corrosion, and erosion of the service and closed
during the last three years.  If the last flow test was performed longer than three years, then provide the last test. e. Copies of the documents that demonstrate that flow balance testing will continue to be periodically done in the future.
                cooling water systems.
f. Copies of
            m. Copies of the IST vibration monitoring results and operational history for deep
procedures used to monitor interface valves between the safety-related sections of the service
                draft vertical pumps, if applicable. The requested documents are to be for the
and closed cooling
                time period from the onsite inspection period back to the documents that were
water systems, the non-safety-related sections,
                provided in response to the previous heat sink performance inspection.
and the associated results
If the information requested above will not be available, please contact Néstor J. Féliz Adorno
.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.
heat sink performance  
                                                    5
inspection. g. Copies of the procedures that verify the performance of risk significant non-safety functions
 
of the safety
M. Pacilio                                                                -2-
-related service water system
All requested documents are to be for the time period from the onsite inspection period back to the
and the associated results
documents that were provided in response to the previous heat sink performance inspection. If no
. The requested documents are to be for the time period from the onsite inspection period back to the
activities were accomplished in that time period, then the request applies to the last applicable document
documents that were provided in response to the previous
in the previous time period. It is important that these documents be as complete as possible, in order to
heat sink performance  
minimize the number of documents requested during the preparation week or during the on-site
inspection. h. Copies of the testing
inspection.
, inspection, or monitoring
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory
program procedures
contact for this inspection is G. Graff of your organization. If there are questions about the material
for buried or inaccessible piping
requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the
of the service
information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc
and closed cooling
(CD) with the required information is also an acceptable option.
water system
This letter does not contain new or amended information collection requirements subject to the
s and the associated results
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
.  The requested documents are to be for the time period from the onsite inspection period back to the
were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not
documents that were provided in response to the previous
conduct or sponsor, and a person is not required to respond to, a request for information or an
heat sink performance  
information collection requirement unless the requesting document displays a currently valid Office of
inspection. i. Copies of the ultrasonic test results and/or visual inspections that verify
Management and Budget Control Number.
the structural integrity of the service and closed cooling
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of
water system
Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the
s piping. j. Copies of the procedures to monitor
NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's
, assess, and disposition active thru wall pipe leaks of the service
Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
and closed cooling
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
water system
                                                                          Sincerely,
s, including structural evaluations and/or planned corrective actions.
                                                                          /RA Stuart Sheldon Acting For/
k. History of any thru wall pipe leak on
                                                                          Ann Marie Stone, Chief
the service
                                                                          Engineering Branch 2
and closed cooling
                                                                          Division of Reactor Safety
water systems. The requested documents are to be for the time period from the onsite inspection period back to the
Docket Nos. 50-237; 50-249
documents that were provided in response to the previous heat sink performance inspection. l. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion
License Nos. DPR-19; DPR-25
of the service
Enclosure:
and closed cooling water system
TRIENNIAL HEAT SINK PERFORMANCE
s. m. Copies of the IST vibration monitoring results and
INSPECTION DOCUMENT REQUEST
operational history for deep draft vertical pumps, if applicable.  The requested documents are to be for the time period from the onsite inspection period back to the
                                                         
documents that were provided in response to the previous
cc w/encl: Distribution via LISTSERV
heat sink performance
DISTRIBUTION:
inspection. If the information requested above will not be available, please contact Néstor J. Féliz Adorno as soon as possible at (630) 829
See next Page
-9739 or email nestor.feliz
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx
-adorno@nrc.gov
  Publicly Available                        Non-Publicly Available                    Sensitive              Non-Sensitive
.  
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  M. Pacilio
  OFFICE                  RIII                                            RIII
    -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.
  NAME                    SSheldon for NAdorno:ls                          SSheldon for AMStone
  If no activities were accomplished in that time period, then the
  DATE                    07/11/14                                        07/21/14
request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to
                                                          OFFICIAL RECORD COPY
minimize the number of documents requested during the preparation week or during the on
 
-site inspection. The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our regulatory contact for this inspection is G. Graff of your organization.
Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.
  If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630)
SUBJECT:      DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
  829-9739. Please send the information to the following e
              OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
-mail address nestor.feliz
              REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
-adorno@nrc.gov. A hard
              05000249/2014005
-copy or compact disc (CD) with the required information is also an acceptable option.
DISTRIBUTION:
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements
Anthony Bowers
were approved by the Office of Management
RidsNrrDorlLpl3-2 Resource
and Budget Control Number
RidsNrrPMDresden Resource
3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an
RidsNrrDirsIrib Resource
information collection requirement unless the requesting document displays a currently valid Office of
Cynthia Pederson
Management and Budget
Darrell Roberts
Control Number
Steven Orth
. In accordance with Title 10, Code of Federal Regulations
Allan Barker
(CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
Carole Ariano
enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
Linda Linn
-rm/adams.html
DRPIII
(the Public Electronic Reading Room).
DRSIII
Sincerely,
Patricia Buckley
 
Carmen Olteanu
/RA Stuart Sheldon Acting For/
  Ann Marie Stone, Chief
Engineering Branch 2
Division of
Reactor Safety
Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 Enclosure:
TRIENNIAL HEAT SINK PERFORMANCE
INSPECTION DOCUMENT REQUEST
cc w/encl:  Distribution via LISTSERV
  DISTRIBUTION
: See next Page
    DOCUMENT NAME:  G:\DRSIII\DRS\Work in Progress
\Ltr 072114 Dresden 2014 UHS RFI NFA.docx
  -Publicly Available
  -Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII    NAME SSheldon for NAdorno:ls
SSheldon for AMStone
  DATE 07/11/14 07/21/14  OFFICIAL RECORD COPY
  Letter to Michael J. Pacilio from Ann Marie Stone dated July
21, 2014. SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
AND REQUEST FOR INFORMATION
INSPECTION
REPORT 05000237/2014005; 05000249/2014005
DISTRIBUTION
: Anthony Bowers
RidsNrrDorlLpl3
-2 Resource
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Steven Orth
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Patricia Buckley
Carmen Olteanu
}}
}}

Latest revision as of 04:49, 17 November 2019

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
ML14204A755
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/21/2014
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Nestor Felix Adorno
References
IR-14-005
Download: ML14204A755 (9)


See also: IR 05000237/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 21, 2014

Mr. Michael J. Pacilio

Senior VP, Exelon Generation Co., LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

Dear Mr. Pacilio:

On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power

Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline

inspection procedure (IP) 71111.07, Heat Sink Performance.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 6, 2014. By

October 17, 2014, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than November 17, 2014. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the inspector

may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available onsite to the inspector on

December 1, 2014. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the on-site inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our

regulatory contact for this inspection is G. Graff of your organization. If there are questions

about the material requested, or the inspection, please call Néstor J. Féliz Adorno at

(630) 829-9739. Please send the information to the following e-mail address

nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information

is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records System

(PARS) component of NRC's Agencywide Documents Access and Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

Triennial Heat Sink Performance

Inspection Document Request

cc w/encl: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000237/2014005; 05000249/2014005

Inspection Dates: December 1 - 5, 2014

Inspection Procedure: Inspection Procedure 71111.07, Heat Sink Performance

Lead Inspector: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

I. Information Requested By October 6, 2014

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger testing, ultimate heat sink (UHS), and safety-related service and closed

cooling water systems for the previous three years or since the last Corrective Action

Program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all Corrective Action Program documents not on

the last Corrective Action Program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and

safety-related service and closed cooling water systems since the last heat sink

performance inspection.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service and

closed cooling water systems. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

8. List of risk significant non-safety-related functions (with a short description) of the

service water system and UHS.

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

II. Information Requested By November 17, 2014

1. Copies of the GL 89-13 responses and commitments.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. Copies of the selected Corrective Action Program documents.

4. For the specific heat exchangers selected:

a. Copy of system description and design basis document for the heat exchangers

(as applicable).

b. Provide a list of calculations (with a short description), which currently apply to

each heat exchanger.

c. Provide the calculations or evaluations that:

i. establish the limiting design basis heat load required to be removed by each

of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the design specification, heat exchanger data sheets, and vendor

documents including component drawings applicable for the selected heat

exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

5. For the UHS and the safety-related service and closed cooling water systems (or

equivalent):

a. Copy of system description and design basis document (as applicable).

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

a. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service and closed cooling water

systems.

b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

c. Copy of the construction code and Design Specification.

d. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

e. Copies of the procedures associated with in-service test of the safety-related

service and closed cooling water pumps.

f. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last heat sink inspection.

g. If available, provide an electronic copy of piping and instrumentation diagrams

(P&IDs) for the service and closed cooling water systems, including the intake

structure.

h. Provide a list of calculations (with a short description), which currently apply to

UHS, service and closed cooling water systems.

i. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

j. Copy of calculation addressing safety-related service and closed cooling water

systems flow balance.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service and closed cooling water

systems and/or UHS.

6. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related heat exchanger to be performed during the on-site portion of the

inspection.

7. Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, December 1, 2014

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers, which are performance tested.

b. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

c. Information regarding any alarms, which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

g. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

h. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

i. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

j. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

k. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the safety-related service and closed cooling water systems and

UHS:

a. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

b. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

c. Copies of the last two performance tests, such as the ASME in-service test, for

the pumps, valves, and, if applicable, the towers fans in the safety-related service

water system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

d. Copies of the documents that demonstrate that flow balance testing of the

safety-related service water system was performed during the last three years.

If the last flow test was performed longer than three years, then provide the last

test.

e. Copies of the documents that demonstrate that flow balance testing will continue

to be periodically done in the future.

f. Copies of procedures used to monitor interface valves between the

safety-related sections of the service and closed cooling water systems, the

non-safety-related sections, and the associated results. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

g. Copies of the procedures that verify the performance of risk significant non-safety

functions of the safety-related service water system and the associated results.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

h. Copies of the testing, inspection, or monitoring program procedures for buried or

inaccessible piping of the service and closed cooling water systems and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

i. Copies of the ultrasonic test results and/or visual inspections that verify the

structural integrity of the service and closed cooling water systems piping.

j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe

leaks of the service and closed cooling water systems, including structural

evaluations and/or planned corrective actions.

k. History of any thru wall pipe leak on the service and closed cooling water

systems. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

l. Copies of the documents associated with the periodic inspection program used to

detect protective coating failure, corrosion, and erosion of the service and closed

cooling water systems.

m. Copies of the IST vibration monitoring results and operational history for deep

draft vertical pumps, if applicable. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

If the information requested above will not be available, please contact Néstor J. Féliz Adorno

as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.

5

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable document

in the previous time period. It is important that these documents be as complete as possible, in order to

minimize the number of documents requested during the preparation week or during the on-site

inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory

contact for this inspection is G. Graff of your organization. If there are questions about the material

requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the

information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc

(CD) with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of

Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via LISTSERV

DISTRIBUTION:

See next Page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME SSheldon for NAdorno:ls SSheldon for AMStone

DATE 07/11/14 07/21/14

OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

DISTRIBUTION:

Anthony Bowers

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Steven Orth

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Carmen Olteanu