ML14204A755: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14204A755
| number = ML14204A755
| issue date = 07/21/2014
| issue date = 07/21/2014
| title = Ltr 07/21/14 Dresden Units 2 and 3 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| title = Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000237/2014005]]
See also: [[see also::IR 05000237/2014005]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 July 21, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC  President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005; 05000249/2014005 Dear Mr. Pacilio: On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline inspection procedure (IP) 71111.07, "Heat Sink Performance." In order to minimize the impact that the inspection has on the site and to ensure a productive  
{{#Wiki_filter:UNITED STATES
inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This  
                            NUCLEAR REGULATORY COMMISSION
information should be available to the lead inspector no later than October 6, 2014. By October 17, 2014, the inspector will communicate the initial selected set of approximately  
                                                REGION III
2-3 risk significant heat exchangers. The second group is needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than November 17, 2014. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above as well as plant specific reference material. This information should be available onsite to the inspector on December 1, 2014. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated. 
                                      2443 WARRENVILLE RD. SUITE 210
M. Pacilio     -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.  If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection. The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our
                                            LISLE, IL 60532-4352
regulatory contact for this inspection is G. Graff of your organization.  If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.  Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.  A hard-copy or compact disc (CD) with the required information is also an acceptable option. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number." In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, 
                                              July 21, 2014
/RA Stuart Sheldon Acting For/ 
Mr. Michael J. Pacilio
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety  Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Enclosure: Triennial Heat Sink Performance  Inspection Document Request cc w/encl:  Distribution via LISTSERV 
Senior VP, Exelon Generation Co., LLC
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Enclosure Inspection Report:  05000237/2014005; 05000249/2014005 Inspection Dates:  December 1 - 5, 2014 Inspection Procedure: Inspection Procedure 71111.07, "Heat Sink Performance" Lead Inspector:  Néstor J. Féliz Adorno (630) 829-9739  nestor.feliz-adorno@nrc.gov I. Information Requested By October 6, 2014 1. List of the Generic Letter (GL) 89-13, "Service Water System Problems Affecting Safety-Related Equipment," heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of Corrective Action Program documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat exchanger testing, ultimate heat sink (UHS), and safety-related service and closed cooling water systems for the previous three years or since the last Corrective Action Program document list was sent to the NRC for the previous heat sink performance inspection.  The list should include all Corrective Action Program documents not on the last Corrective Action Program document list. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems since the last heat sink performance inspection. 5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. 7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. 8. List of risk significant non-safety-related functions (with a short description) of the service water system and UHS.
   President and CNO, Exelon Nuclear
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  2 II. Information Requested By November 17, 2014 1. Copies of the GL 89-13 responses and commitments.  2. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g., the GL 89-13 Heat Exchanger Program description).  3. Copies of the selected Corrective Action Program documents. 4. For the specific heat exchangers selected: a. Copy of system description and design basis document for the heat exchangers (as applicable). b. Provide a list of calculations (with a short description), which currently apply to each heat exchanger. c. Provide the calculations or evaluations that: i. establish the limiting design basis heat load required to be removed by each
4300 Winfield Road
of these heat exchangers; ii. demonstrate the heat exchangers capacity to remove the limiting heat load; iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria); iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and  v. evaluate excessive tube vibration in each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. e. Copy of the design specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the selected heat exchangers. f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers. 5. For the UHS and the safety-related service and closed cooling water systems (or equivalent): a. Copy of system description and design basis document (as applicable).   
Warrenville, IL 60555
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  3 a. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service and closed cooling water systems. b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.  c. Copy of the construction code and Design Specification. d. Copies of normal, abnormal, and emergency operating procedures associated
SUBJECT:       DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
with the UHS and safety-related service water systems including procedures for loss of these systems. e. Copies of the procedures associated with in-service test of the safety-related service and closed cooling water pumps. f. Copies of corrective action documents associated with waterhammer or hydraulic transients in the service water system since the last heat sink inspection. g. If available, provide an electronic copy of piping and instrumentation diagrams (P&IDs) for the service and closed cooling water systems, including the intake structure. h. Provide a list of calculations (with a short description), which currently apply to
                OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
UHS, service and closed cooling water systems. i. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability. j. Copy of calculation addressing safety-related service and closed cooling water systems flow balance. k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety-related service and closed cooling water systems and/or UHS. 6. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related heat exchanger to be performed during the on-site portion of the inspection. 7. Electronic copies of the current Final Safety Analysis Report, Technical Specifications, Technical Specifications Basis, and Technical Report Manual. III. Information Requested to be Available on First Day of Inspection, December 1, 2014 1. For the specific heat exchangers selected: a. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers, which are performance tested. b. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal 
                REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  4 performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments).  Include calibration records for the instruments used during these tests. c. Information regarding any alarms, which monitor on-line performance. d. Copy of the document describing the inspection results of each heat exchanger.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. e. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years. f. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded. g. Copy of the periodic flow testing at or near maximum design flow.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. h. Copy of the document which identifies the current number of tubes in service for
                05000249/2014005
each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger. i. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger. j. Copies of the documents that verify the structural integrity of the heat exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results). k. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers. 2. For the review of the safety-related service and closed cooling water systems and UHS: a. Copies of calculations and surveillances that determine the UHS reservoir
Dear Mr. Pacilio:
capacity and heat transfer capability. b. Copies of surveillance procedures and testing results performed on the instrumentation relied upon to determine UHS reservoir capability.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. c. Copies of the last two performance tests, such as the ASME in-service test, for the pumps, valves, and, if applicable, the towers fans in the safety-related service water system.  If the components are not performance tested, please provide
On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site
documentation verifying performance by the methods actually used. 
portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  5 d. Copies of the documents that demonstrate that flow balance testing of the safety-related service water system was performed during the last three years.  If the last flow test was performed longer than three years, then provide the last test. e. Copies of the documents that demonstrate that flow balance testing will continue to be periodically done in the future. f. Copies of procedures used to monitor interface valves between the safety-related sections of the service and closed cooling water systems, the non-safety-related sections, and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. g. Copies of the procedures that verify the performance of risk significant non-safety functions of the safety-related service water system and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. h. Copies of the testing, inspection, or monitoring program procedures for buried or inaccessible piping of the service and closed cooling water systems and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. i. Copies of the ultrasonic test results and/or visual inspections that verify the structural integrity of the service and closed cooling water systems piping. j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe leaks of the service and closed cooling water systems, including structural evaluations and/or planned corrective actions. k. History of any thru wall pipe leak on the service and closed cooling water systems.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. l. Copies of the documents associated with the periodic inspection program used to detect protective coating failure, corrosion, and erosion of the service and closed cooling water systems. m. Copies of the IST vibration monitoring results and operational history for deep draft vertical pumps, if applicable.  The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. If the information requested above will not be available, please contact Néstor J. Féliz Adorno as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.
Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline
  M. Pacilio     -2- All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.  If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to
inspection procedure (IP) 71111.07, Heat Sink Performance.
minimize the number of documents requested during the preparation week or during the on-site inspection. The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our regulatory contact for this inspection is G. Graff of your organization.  If there are questions about the material requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.  Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov.  A hard-copy or compact disc (CD) with the required information is also an acceptable option. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements
In order to minimize the impact that the inspection has on the site and to ensure a productive
were approved by the Office of Management and Budget Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an
inspection, we have enclosed a request for documents needed for the inspection. The
information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, 
documents have been divided into three groups.
/RA Stuart Sheldon Acting For/  Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety  Docket Nos. 50-237; 50-249 License Nos. DPR-19; DPR-25 Enclosure: TRIENNIAL HEAT SINK PERFORMANCE  INSPECTION DOCUMENT REQUEST cc w/encl:  Distribution via LISTSERV  DISTRIBUTION: See next Page    DOCUMENT NAME:  G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx  -Publicly Available  -Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII    NAME SSheldon for NAdorno:ls SSheldon for AMStone  DATE 07/11/14 07/21/14  OFFICIAL RECORD COPY
The first group lists information necessary for our initial inspection scoping activities. This
  Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014. SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005; 05000249/2014005  DISTRIBUTION: Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu 
    information should be available to the lead inspector no later than October 6, 2014. By
    October 17, 2014, the inspector will communicate the initial selected set of approximately
    2-3 risk significant heat exchangers.
The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the selected heat exchangers,
    should be available at the Regional Office no later than November 17, 2014. This
    information should be separated for each selected component, especially if provided
    electronically (e.g., folder with component name that includes calculations, condition
    reports, maintenance history, etc.). During the in-office preparation activities, the inspector
    may identify additional information needed to support the inspection.
The last group includes the additional information above as well as plant specific
    reference material. This information should be available onsite to the inspector on
    December 1, 2014. It is also requested that corrective action documents and/or questions
     developed during the inspection be provided to the inspector as the documents are
     generated.


M. Pacilio                                      -2-
All requested documents are to be for the time period from the onsite inspection period back to
the documents that were provided in response to the previous heat sink performance
inspection. If no activities were accomplished in that time period, then the request applies to
the last applicable document in the previous time period. It is important that these documents
be as complete as possible, in order to minimize the number of documents requested during
the preparation week or during the on-site inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our
regulatory contact for this inspection is G. Graff of your organization. If there are questions
about the material requested, or the inspection, please call Néstor J. Féliz Adorno at
(630) 829-9739. Please send the information to the following e-mail address
nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information
is also an acceptable option.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget Control Number 3150-
0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's
"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records System
(PARS) component of NRC's Agencywide Documents Access and Management System
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
                                                Sincerely,
                                                /RA Stuart Sheldon Acting For/
                                                Ann Marie Stone, Chief
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-237; 50-249
License Nos. DPR-19; DPR-25
Enclosure:
Triennial Heat Sink Performance
Inspection Document Request
cc w/encl: Distribution via LISTSERV
      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report:              05000237/2014005; 05000249/2014005
Inspection Dates:              December 1 - 5, 2014
Inspection Procedure:          Inspection Procedure 71111.07, Heat Sink Performance
Lead Inspector:                Néstor J. Féliz Adorno
                                (630) 829-9739
                                nestor.feliz-adorno@nrc.gov
I.    Information Requested By October 6, 2014
      1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
          Safety-Related Equipment, heat exchangers in order of risk significance.
      2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat
          exchanger.
      3. List of Corrective Action Program documents (with a short description) associated
          with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat
          exchanger testing, ultimate heat sink (UHS), and safety-related service and closed
          cooling water systems for the previous three years or since the last Corrective Action
          Program document list was sent to the NRC for the previous heat sink performance
          inspection. The list should include all Corrective Action Program documents not on
          the last Corrective Action Program document list.
      4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and
          safety-related service and closed cooling water systems since the last heat sink
          performance inspection.
      5. Last two System Health Report(s) and maintenance rule system notebooks for all the
          GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
          water systems.
      6. List of engineering-related operator workarounds (with a short description)
          associated with GL 89-13 heat exchangers, UHS, and safety-related service and
          closed cooling water systems. The requested documents are to be for the time
          period from the onsite inspection period back to the documents that were provided in
          response to the previous heat sink performance inspection.
      7. List of permanent and temporary modifications (with a short description) associated
          with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
          water systems. The requested documents are to be for the time period from the
          onsite inspection period back to the documents that were provided in response to the
          previous heat sink performance inspection.
      8. List of risk significant non-safety-related functions (with a short description) of the
          service water system and UHS.
                                                                                          Enclosure
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
II.  Information Requested By November 17, 2014
    1. Copies of the GL 89-13 responses and commitments.
    2. Copies of procedures developed to implement the recommendations of GL 89-13
        (e.g., the GL 89-13 Heat Exchanger Program description).
    3. Copies of the selected Corrective Action Program documents.
    4. For the specific heat exchangers selected:
        a. Copy of system description and design basis document for the heat exchangers
              (as applicable).
        b. Provide a list of calculations (with a short description), which currently apply to
              each heat exchanger.
        c. Provide the calculations or evaluations that:
              i. establish the limiting design basis heat load required to be removed by each
                  of these heat exchangers;
              ii. demonstrate the heat exchangers capacity to remove the limiting heat load;
            iii. correlate surveillance testing and/or inspection results from these heat
                  exchangers with design basis heat removal capability (e.g., basis for
                  surveillance test and/or inspection acceptance criteria);
            iv. evaluate the potential for water hammer in each heat exchanger or
                  associated piping; and
              v. evaluate excessive tube vibration in each heat exchanger.
        d. Copy of any operability determinations or other documentation of degradation
              associated with the heat exchangers or the systems that support the operation
              for the selected heat exchangers.
        e. Copy of the design specification, heat exchanger data sheets, and vendor
              documents including component drawings applicable for the selected heat
              exchangers.
        f.  Copies of normal, abnormal, and emergency operating procedures associated
              with the selected heat exchangers.
    5. For the UHS and the safety-related service and closed cooling water systems (or
        equivalent):
        a. Copy of system description and design basis document (as applicable).
                                                2
    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
          a. Copy of any operability determinations or other documentation of degradation
              associated with the UHS and the safety-related service and closed cooling water
              systems.
          b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
              states the maximum cooling water system inlet temperature limit that still allows
              full licensed power operation of the nuclear reactor.
          c. Copy of the construction code and Design Specification.
          d. Copies of normal, abnormal, and emergency operating procedures associated
              with the UHS and safety-related service water systems including procedures for
              loss of these systems.
          e. Copies of the procedures associated with in-service test of the safety-related
              service and closed cooling water pumps.
          f.  Copies of corrective action documents associated with waterhammer or hydraulic
              transients in the service water system since the last heat sink inspection.
          g. If available, provide an electronic copy of piping and instrumentation diagrams
              (P&IDs) for the service and closed cooling water systems, including the intake
              structure.
          h. Provide a list of calculations (with a short description), which currently apply to
              UHS, service and closed cooling water systems.
          i.  Copies of calculations and surveillances that determine the UHS reservoir
              capacity and heat transfer capability.
          j.  Copy of calculation addressing safety-related service and closed cooling water
              systems flow balance.
          k. Provide a list of instruments (with a short description) associated with automatic
              or alarm functions for the safety-related service and closed cooling water
              systems and/or UHS.
      6. A schedule of all inspections, cleanings, maintenance, or testing of any
          safety-related heat exchanger to be performed during the on-site portion of the
          inspection.
      7. Electronic copies of the current Final Safety Analysis Report, Technical
          Specifications, Technical Specifications Basis, and Technical Report Manual.
III.  Information Requested to be Available on First Day of Inspection, December 1, 2014
      1. For the specific heat exchangers selected:
          a. Copies of the two most recent completed tests and evaluation data confirming
              thermal performance for those heat exchangers, which are performance tested.
          b. Documentation and procedures that identify the types, accuracy, and location of
              any special instrumentation used for the two most recently completed thermal
                                                3
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
          performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow
          instruments or temperature instruments). Include calibration records for the
          instruments used during these tests.
      c. Information regarding any alarms, which monitor on-line performance.
      d. Copy of the document describing the inspection results of each heat exchanger.
          The requested documents are to be for the time period from the onsite inspection
          period back to the documents that were provided in response to the previous
          heat sink performance inspection.
      e. The cleaning and inspection maintenance schedule for each heat exchanger for
          the next 5 years.
      f. Copy of the operating procedure that ensures that the maximum cooling water
          system inlet temperature limit is not exceeded.
      g. Copy of the periodic flow testing at or near maximum design flow. The requested
          documents are to be for the time period from the onsite inspection period back to
          the documents that were provided in response to the previous heat sink
          performance inspection.
      h. Copy of the document which identifies the current number of tubes in service for
          each heat exchanger and the supporting calculation which establishes the
          maximum number of tubes which can be plugged in each heat exchanger.
      i. Copy of the document establishing the repair criteria (plugging limit) for degraded
          tubes which are identified in each heat exchanger.
      j. Copies of the documents that verify the structural integrity of the heat exchanger
          (e.g., eddy current summary sheets, ultrasonic testing results, and visual
          inspection results).
      k. Copies of those documents that describe the methods taken to control water
          chemistry in the heat exchangers.
2.    For the review of the safety-related service and closed cooling water systems and
      UHS:
      a. Copies of calculations and surveillances that determine the UHS reservoir
          capacity and heat transfer capability.
      b. Copies of surveillance procedures and testing results performed on the
          instrumentation relied upon to determine UHS reservoir capability. The
          requested documents are to be for the time period from the onsite inspection
          period back to the documents that were provided in response to the previous
          heat sink performance inspection.
      c. Copies of the last two performance tests, such as the ASME in-service test, for
          the pumps, valves, and, if applicable, the towers fans in the safety-related service
          water system. If the components are not performance tested, please provide
          documentation verifying performance by the methods actually used.
                                            4
        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
            d. Copies of the documents that demonstrate that flow balance testing of the
                safety-related service water system was performed during the last three years.
                If the last flow test was performed longer than three years, then provide the last
                test.
            e. Copies of the documents that demonstrate that flow balance testing will continue
                to be periodically done in the future.
            f. Copies of procedures used to monitor interface valves between the
                safety-related sections of the service and closed cooling water systems, the
                non-safety-related sections, and the associated results. The requested
                documents are to be for the time period from the onsite inspection period back to
                the documents that were provided in response to the previous heat sink
                performance inspection.
            g. Copies of the procedures that verify the performance of risk significant non-safety
                functions of the safety-related service water system and the associated results.
                The requested documents are to be for the time period from the onsite inspection
                period back to the documents that were provided in response to the previous
                heat sink performance inspection.
            h. Copies of the testing, inspection, or monitoring program procedures for buried or
                inaccessible piping of the service and closed cooling water systems and the
                associated results. The requested documents are to be for the time period from
                the onsite inspection period back to the documents that were provided in
                response to the previous heat sink performance inspection.
            i. Copies of the ultrasonic test results and/or visual inspections that verify the
                structural integrity of the service and closed cooling water systems piping.
            j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe
                leaks of the service and closed cooling water systems, including structural
                evaluations and/or planned corrective actions.
            k. History of any thru wall pipe leak on the service and closed cooling water
                systems. The requested documents are to be for the time period from the onsite
                inspection period back to the documents that were provided in response to the
                previous heat sink performance inspection.
            l. Copies of the documents associated with the periodic inspection program used to
                detect protective coating failure, corrosion, and erosion of the service and closed
                cooling water systems.
            m. Copies of the IST vibration monitoring results and operational history for deep
                draft vertical pumps, if applicable. The requested documents are to be for the
                time period from the onsite inspection period back to the documents that were
                provided in response to the previous heat sink performance inspection.
If the information requested above will not be available, please contact Néstor J. Féliz Adorno
as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.
                                                    5
M. Pacilio                                                                -2-
All requested documents are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink performance inspection. If no
activities were accomplished in that time period, then the request applies to the last applicable document
in the previous time period. It is important that these documents be as complete as possible, in order to
minimize the number of documents requested during the preparation week or during the on-site
inspection.
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory
contact for this inspection is G. Graff of your organization. If there are questions about the material
requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the
information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc
(CD) with the required information is also an acceptable option.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements
were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not
conduct or sponsor, and a person is not required to respond to, a request for information or an
information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget Control Number.
In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of
Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's
Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA Stuart Sheldon Acting For/
                                                                          Ann Marie Stone, Chief
                                                                          Engineering Branch 2
                                                                          Division of Reactor Safety
Docket Nos. 50-237; 50-249
License Nos. DPR-19; DPR-25
Enclosure:
TRIENNIAL HEAT SINK PERFORMANCE
INSPECTION DOCUMENT REQUEST
                                                         
cc w/encl: Distribution via LISTSERV
DISTRIBUTION:
See next Page
DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx
Publicly Available                        Non-Publicly Available                    Sensitive              Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE                  RIII                                            RIII
NAME                    SSheldon for NAdorno:ls                          SSheldon for AMStone
DATE                    07/11/14                                        07/21/14
                                                          OFFICIAL RECORD COPY
Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.
SUBJECT:      DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION
              OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND
              REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;
              05000249/2014005
DISTRIBUTION:
Anthony Bowers
RidsNrrDorlLpl3-2 Resource
RidsNrrPMDresden Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Steven Orth
Allan Barker
Carole Ariano
Linda Linn
DRPIII
DRSIII
Patricia Buckley
Carmen Olteanu
}}
}}

Latest revision as of 04:49, 17 November 2019

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000237/2014005; 05000249/2014005
ML14204A755
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/21/2014
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Nestor Felix Adorno
References
IR-14-005
Download: ML14204A755 (9)


See also: IR 05000237/2014005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 21, 2014

Mr. Michael J. Pacilio

Senior VP, Exelon Generation Co., LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

Dear Mr. Pacilio:

On December 1, 2014, the U.S. Nuclear Regulatory Commission (NRC) will begin the on-site

portion of the Triennial Heat Sink Performance Inspection at your Dresden Nuclear Power

Station, Units 2 and 3. This inspection will be performed in accordance with NRC baseline

inspection procedure (IP) 71111.07, Heat Sink Performance.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 6, 2014. By

October 17, 2014, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

  • The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than November 17, 2014. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the inspector

may identify additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific

reference material. This information should be available onsite to the inspector on

December 1, 2014. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink performance

inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period. It is important that these documents

be as complete as possible, in order to minimize the number of documents requested during

the preparation week or during the on-site inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our

regulatory contact for this inspection is G. Graff of your organization. If there are questions

about the material requested, or the inspection, please call Néstor J. Féliz Adorno at

(630) 829-9739. Please send the information to the following e-mail address

nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc (CD) with the required information

is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's

"Rules of Practice," a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records System

(PARS) component of NRC's Agencywide Documents Access and Management System

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

Triennial Heat Sink Performance

Inspection Document Request

cc w/encl: Distribution via LISTSERV

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000237/2014005; 05000249/2014005

Inspection Dates: December 1 - 5, 2014

Inspection Procedure: Inspection Procedure 71111.07, Heat Sink Performance

Lead Inspector: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

I. Information Requested By October 6, 2014

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of Corrective Action Program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, heat

exchanger testing, ultimate heat sink (UHS), and safety-related service and closed

cooling water systems for the previous three years or since the last Corrective Action

Program document list was sent to the NRC for the previous heat sink performance

inspection. The list should include all Corrective Action Program documents not on

the last Corrective Action Program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, UHS, and

safety-related service and closed cooling water systems since the last heat sink

performance inspection.

5. Last two System Health Report(s) and maintenance rule system notebooks for all the

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service and

closed cooling water systems. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description) associated

with GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

8. List of risk significant non-safety-related functions (with a short description) of the

service water system and UHS.

Enclosure

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

II. Information Requested By November 17, 2014

1. Copies of the GL 89-13 responses and commitments.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. Copies of the selected Corrective Action Program documents.

4. For the specific heat exchangers selected:

a. Copy of system description and design basis document for the heat exchangers

(as applicable).

b. Provide a list of calculations (with a short description), which currently apply to

each heat exchanger.

c. Provide the calculations or evaluations that:

i. establish the limiting design basis heat load required to be removed by each

of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

e. Copy of the design specification, heat exchanger data sheets, and vendor

documents including component drawings applicable for the selected heat

exchangers.

f. Copies of normal, abnormal, and emergency operating procedures associated

with the selected heat exchangers.

5. For the UHS and the safety-related service and closed cooling water systems (or

equivalent):

a. Copy of system description and design basis document (as applicable).

2

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

a. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service and closed cooling water

systems.

b. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still allows

full licensed power operation of the nuclear reactor.

c. Copy of the construction code and Design Specification.

d. Copies of normal, abnormal, and emergency operating procedures associated

with the UHS and safety-related service water systems including procedures for

loss of these systems.

e. Copies of the procedures associated with in-service test of the safety-related

service and closed cooling water pumps.

f. Copies of corrective action documents associated with waterhammer or hydraulic

transients in the service water system since the last heat sink inspection.

g. If available, provide an electronic copy of piping and instrumentation diagrams

(P&IDs) for the service and closed cooling water systems, including the intake

structure.

h. Provide a list of calculations (with a short description), which currently apply to

UHS, service and closed cooling water systems.

i. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

j. Copy of calculation addressing safety-related service and closed cooling water

systems flow balance.

k. Provide a list of instruments (with a short description) associated with automatic

or alarm functions for the safety-related service and closed cooling water

systems and/or UHS.

6. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related heat exchanger to be performed during the on-site portion of the

inspection.

7. Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

III. Information Requested to be Available on First Day of Inspection, December 1, 2014

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests and evaluation data confirming

thermal performance for those heat exchangers, which are performance tested.

b. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

3

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

c. Information regarding any alarms, which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat exchanger.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger for

the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling water

system inlet temperature limit is not exceeded.

g. Copy of the periodic flow testing at or near maximum design flow. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

h. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

i. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

j. Copies of the documents that verify the structural integrity of the heat exchanger

(e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results).

k. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

2. For the review of the safety-related service and closed cooling water systems and

UHS:

a. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

b. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

c. Copies of the last two performance tests, such as the ASME in-service test, for

the pumps, valves, and, if applicable, the towers fans in the safety-related service

water system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used.

4

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

d. Copies of the documents that demonstrate that flow balance testing of the

safety-related service water system was performed during the last three years.

If the last flow test was performed longer than three years, then provide the last

test.

e. Copies of the documents that demonstrate that flow balance testing will continue

to be periodically done in the future.

f. Copies of procedures used to monitor interface valves between the

safety-related sections of the service and closed cooling water systems, the

non-safety-related sections, and the associated results. The requested

documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous heat sink

performance inspection.

g. Copies of the procedures that verify the performance of risk significant non-safety

functions of the safety-related service water system and the associated results.

The requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

h. Copies of the testing, inspection, or monitoring program procedures for buried or

inaccessible piping of the service and closed cooling water systems and the

associated results. The requested documents are to be for the time period from

the onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

i. Copies of the ultrasonic test results and/or visual inspections that verify the

structural integrity of the service and closed cooling water systems piping.

j. Copies of the procedures to monitor, assess, and disposition active thru wall pipe

leaks of the service and closed cooling water systems, including structural

evaluations and/or planned corrective actions.

k. History of any thru wall pipe leak on the service and closed cooling water

systems. The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to the

previous heat sink performance inspection.

l. Copies of the documents associated with the periodic inspection program used to

detect protective coating failure, corrosion, and erosion of the service and closed

cooling water systems.

m. Copies of the IST vibration monitoring results and operational history for deep

draft vertical pumps, if applicable. The requested documents are to be for the

time period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

If the information requested above will not be available, please contact Néstor J. Féliz Adorno

as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.

5

M. Pacilio -2-

All requested documents are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink performance inspection. If no

activities were accomplished in that time period, then the request applies to the last applicable document

in the previous time period. It is important that these documents be as complete as possible, in order to

minimize the number of documents requested during the preparation week or during the on-site

inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our regulatory

contact for this inspection is G. Graff of your organization. If there are questions about the material

requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739. Please send the

information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy or compact disc

(CD) with the required information is also an acceptable option.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements

were approved by the Office of Management and Budget Control Number 3150-0011. The NRC may not

conduct or sponsor, and a person is not required to respond to, a request for information or an

information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget Control Number.

In accordance with Title 10, Code of Federal Regulations (CFR), Section 2.390 of the NRC's "Rules of

Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's

Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Stuart Sheldon Acting For/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-237; 50-249

License Nos. DPR-19; DPR-25

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION DOCUMENT REQUEST

cc w/encl: Distribution via LISTSERV

DISTRIBUTION:

See next Page

DOCUMENT NAME: G:\DRSIII\DRS\Work in Progress\Ltr 072114 Dresden 2014 UHS RFI NFA.docx

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII

NAME SSheldon for NAdorno:ls SSheldon for AMStone

DATE 07/11/14 07/21/14

OFFICIAL RECORD COPY

Letter to Michael J. Pacilio from Ann Marie Stone dated July 21, 2014.

SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 - NOTIFICATION

OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND

REQUEST FOR INFORMATION INSPECTION REPORT 05000237/2014005;

05000249/2014005

DISTRIBUTION:

Anthony Bowers

RidsNrrDorlLpl3-2 Resource

RidsNrrPMDresden Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Steven Orth

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Carmen Olteanu