| issue date = 12/20/2016 | | issue date = 12/20/2016 | ||
| title = | | title = 16 Confirmation of Initial Operator License Examinations - Point Beach Nuclear Plant, Units 1 and 2 | ||
| author name = Orlikowski R | | author name = Orlikowski R | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = Coffey R | | addressee name = Coffey R | ||
Line 13: | Line 13: | ||
| page count = 3 | | page count = 3 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 | |||
==SUBJECT:== | |||
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS - | |||
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 | |||
==Dear Mr. Coffey:== | |||
We have received your letter, NRC 2016-0031, dated July 13, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested initial operator licensing examination dates be scheduled for September 2019 and September 2021. In response, we have scheduled initial license examinations for the weeks of: | |||
* September 3 and 9, 2019, with an onsite validation scheduled for the week of August 5, 2019; and | |||
* September 7 and 13, 2021, with an onsite validation date of August 9, 2021. | |||
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date. | |||
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for these examinations, these examinations were each scheduled for 2 weeks. | |||
Please inform us if the number of applicants decline below 10 for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations. | |||
A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program. | |||
R. Coffey In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV | |||
R. Coffey In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV DISTRIBUTION: | |||
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML16356A408 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 11/23/16 12/20/16 OFFICIAL RECORD COPY}} |
Latest revision as of 14:10, 16 November 2019
ML16356A408 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 12/20/2016 |
From: | Robert Orlikowski Operations Branch III |
To: | Coffey R Point Beach |
References | |
Download: ML16356A408 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 December 20, 2016 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241
SUBJECT:
CONFIRMATION OF INITIAL OPERATOR LICENSE EXAMINATIONS -
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
Dear Mr. Coffey:
We have received your letter, NRC 2016-0031, dated July 13, 2016, in response to U.S. Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations. In the letter, you requested initial operator licensing examination dates be scheduled for September 2019 and September 2021. In response, we have scheduled initial license examinations for the weeks of:
- September 3 and 9, 2019, with an onsite validation scheduled for the week of August 5, 2019; and
- September 7 and 13, 2021, with an onsite validation date of August 9, 2021.
In the unlikely event that we are unable to support the examination during the scheduled weeks, we will inform you immediately, upon discovery, of such conditions and make arrangements to administer the examination at a mutually acceptable date.
We understand that your staff will develop the examinations unless we determine it is necessary for the NRC to develop an examination in which case, we will notify you immediately upon discovery of that need. Because your letter indicated that there were more than nine applicants being considered for these examinations, these examinations were each scheduled for 2 weeks.
Please inform us if the number of applicants decline below 10 for any examination as this will impact the examination schedule. Also, please inform us at your earliest opportunity if you discover you need to change the scheduled dates for the examinations.
A supplementary letter will be sent to the training department approximately 150 days prior to the examination informing the training manager of the chief examiners name. The letter will also outline examination security expectations, list the materials required by the NRC to conduct the examination, reconfirm the examination date, and reconfirm the number of candidates you have in the Training Program.
R. Coffey In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV
R. Coffey In accordance with Title 10 of the Code of Federal Regulations 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc: Distribution via LISTSERV DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML16356A408 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME RKWalton:jw ROrlikowski DATE 11/23/16 12/20/16 OFFICIAL RECORD COPY