NRC 2016-0031, Response to Regulatory Information Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
(Redirected from NRC 2016-0031)
Jump to navigation Jump to search
Response to Regulatory Information Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.
ML16195A440
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/13/2016
From: Woyak B
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2016-0031, RIS-16-09
Download: ML16195A440 (2)


Text

July 13, 2016 NRC 2016-0031 RIS 2016-09 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Regulatory Information Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations" On June 16, 2016, the NRC issued Regulatory Issue Summary (RIS) 2016-09. RIS 2016-09 requested that each licensee provide an update of operator licensing examination information for calendar years 2018 through 2021.

The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units 1 and 2.

If there are questions associated with the content of the enclosures, please contact Mr. Jamie Pierce, Point Beach Nuclear Plant Training Manager, at 920/755-7791.

Sincerely, NextEra Energy Point Beach, LLC Bryan Woy.ak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.:,e.V:..._fl. REo<rc.,.;.

infonnation collection Is used to plan budgets and resources for operator examinations. Send

~  %. OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC2fl555-0001. or by e-mail to EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Olflce of Information and Regulatory Affairs,

,.,J1 ~0-!? " NEOB-10202, (3150-0131), Office of Management and Budge!, Washington, DC 20503. If a means

""***'~ used to Impose an infonnalion collection does not display a currenliy valid OMB control number, the NRC may not conductor sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY NRC REGION Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-201 Region Ill Renewed License Nos. DPR-24 and DPR-27 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 PROPOSED NUMBER

- - CY2020

-- CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NA 09/03/2019 NA 09/07/2021 ALTERNATE DATE NA 09/23/2019 NA 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 12 0 CANDIDATES NRC FORM 536 (05-2016)

July 13, 2016 NRC 2016-0031 RIS 2016-09 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Response to Regulatory Information Summary 2016-09, "Preparation and Scheduling of Operator Licensing Examinations" On June 16, 2016, the NRC issued Regulatory Issue Summary (RIS) 2016-09. RIS 2016-09 requested that each licensee provide an update of operator licensing examination information for calendar years 2018 through 2021.

The enclosure to this letter provides the NextEra Energy Point Beach, LLC, response for the Point Beach Nuclear Plant, Units 1 and 2.

If there are questions associated with the content of the enclosures, please contact Mr. Jamie Pierce, Point Beach Nuclear Plant Training Manager, at 920/755-7791.

Sincerely, NextEra Energy Point Beach, LLC Bryan Woy.ak Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

NRC FORM536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150..0131 EXPIRES: 10/31/2017 (05-2016) Estimated burden per response to comply with this voluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

.:,e.V:..._fl. REo<rc.,.;.

infonnation collection Is used to plan budgets and resources for operator examinations. Send

~  %. OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC2fl555-0001. or by e-mail to EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Olflce of Information and Regulatory Affairs,

,.,J1 ~0-!? " NEOB-10202, (3150-0131), Office of Management and Budge!, Washington, DC 20503. If a means

""***'~ used to Impose an infonnalion collection does not display a currenliy valid OMB control number, the NRC may not conductor sponsor, and a person is not required to respond to, the infonnation collection.

FACILITY NRC REGION Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-201 Region Ill Renewed License Nos. DPR-24 and DPR-27 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 PROPOSED NUMBER

- - CY2020

-- CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 0 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NA 09/03/2019 NA 09/07/2021 ALTERNATE DATE NA 09/23/2019 NA 09/27/2021

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2017 CY 2018 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 0 0 12 0 CANDIDATES NRC FORM 536 (05-2016)