ML17018A204: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17018A204
| number = ML17018A204
| issue date = 01/17/2017
| issue date = 01/17/2017
| title = Ltr 01/17/17 Clinton Operator Licensing Examination Approval
| title = Operator Licensing Examination Approval
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000461
| docket = 05000461
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 17, 2017   Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 17, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL
OPERATOR LICENSING EXAMINATION APPROVAL


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station. The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Joe Ruth, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," one day during the week of February 6, 2017. The NRC staff will administer the operating tests during the week(s) of January 30, 2017, and February 6, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Joe Ruth, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, one day during the week of February 6, 2017.
The NRC staff will administer the operating tests during the week(s) of January 30, 2017, and February 6, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.
Please contact your Chief Examiner, Mr. Chuck Zoia, at 630-829-9863, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
Please contact your Chief Examiner, Mr. Chuck Zoia, at 630-829-9863, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
B. Hanson     This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding.Sincerely, /RA/
 
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV       Mr. Joe Ruth, Training Director B. Hanson     Letter to Bryan C. Hanson from Robert J. Orlikowski dated January 17, 2017
B. Hanson                                       This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
                                                /RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV Mr. Joe Ruth, Training Director
 
B. Hanson                                 Letter to Bryan C. Hanson from Robert J. Orlikowski dated January 17, 2017


==SUBJECT:==
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado, NRR Colleen Schmidt, DRS
OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:
 
Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17018A204 OFFICE     RIII               RIII               RIII               RIII NAME       CSchmidt:jw         CZoia             ROrlikowski DATE       01/10/17           01/17/17           01/17/17 OFFICIAL RECORD COPY}}
ADAMS Accession Number: ML17018A204 OFFICE RIII RIII RIII RIII NAME CSchmidt:jw CZoia ROrlikowski DATE 01/10/17 01/17/17 01/17/17 OFFICIAL RECORD COPY}}

Latest revision as of 14:52, 16 November 2019

Operator Licensing Examination Approval
ML17018A204
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/17/2017
From: Robert Orlikowski
Operations Branch III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Shared Package
ML16308A460 List:
References
Download: ML17018A204 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 January 17, 2017 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Hanson:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Clinton Power Station.

The U. S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Joe Ruth, Training Director. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and you may administer the written examinations in accordance with Revision 10, of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, one day during the week of February 6, 2017.

The NRC staff will administer the operating tests during the week(s) of January 30, 2017, and February 6, 2017. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at 630-829-9834.

Please contact your Chief Examiner, Mr. Chuck Zoia, at 630-829-9863, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

B. Hanson This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc: Distribution via LISTSERV Mr. Joe Ruth, Training Director

B. Hanson Letter to Bryan C. Hanson from Robert J. Orlikowski dated January 17, 2017

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRSIII DRPIII Nancy Salgado, NRR Colleen Schmidt, DRS ADAMS Accession Number: ML17018A204 OFFICE RIII RIII RIII RIII NAME CSchmidt:jw CZoia ROrlikowski DATE 01/10/17 01/17/17 01/17/17 OFFICIAL RECORD COPY