ML082461008: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML082461008
| number = ML082461008
| issue date = 09/02/2008
| issue date = 09/02/2008
| title = Sequoyah Inspection/Activity Plan, 09/02/2008 - 12/31/2009, Report 22
| title = Inspection/Activity Plan, 09/02/2008 - 12/31/2009, Report 22
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DRP/RPB6
| author affiliation = NRC/RGN-II/DRP/RPB6
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:SequoyahInspection / Activity Plan09/02/2008
{{#Wiki_filter:Page 1 of 2                                                                                        Sequoyah 09/02/2008      08:17:26                                                                Inspection / Activity Plan Report 22 09/02/2008 - 12/31/2009 Unit                                                                                                                          No. of Staff    Planned Dates          Inspection Number        Inspection Activity                                                    Title                                        on Site      Start      End            Type EB3TI172        - U2 TI-172                                                                                                3 1, 2            IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                  09/08/2008 09/12/2008 Generic Safety Inspection TI-171         - B.5.B PHASE 2&3                                                                                          3 1, 2            IP 2515/171            Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies              10/06/2008 10/10/2008 Generic Safety Inspection PSB1-EP         - EMERGENCY PREPAREDNESS EXERCISE                                                                          4 1, 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review                10/13/2008 10/17/2008 Baseline Inspections 1, 2           IP 7111401              Exercise Evaluation                                                                                  10/13/2008 10/17/2008 EP Baseline Inspection 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                                    10/13/2008 10/17/2008 EP Baseline Inspection 1, 2           IP 71151-EP01          Drill/Exercise Performance                                                                            10/13/2008 10/17/2008 Baseline Inspections 1, 2           IP 71151-EP02          ERO Drill Participation                                                                              10/13/2008 10/17/2008 Baseline Inspections 1, 2           IP 71151-EP03          Alert & Notification System                                                                          10/13/2008 10/17/2008 Baseline Inspections TI-176         - EDG TECH SPEC SURV ENDURANCE MARGIN TEST                                                                  2 1, 2            IP 2515/176            Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing        10/28/2008 10/29/2008 Generic Safety Inspection OL RQ           - REQUAL INSPECTION                                                                                        2 1, 2            IP 7111111B            Licensed Operator Requalification Program                                                            12/01/2008 12/05/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59                                                                                        6 1, 2            IP 7111117              Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications                      12/01/2008 12/05/2008 Baseline Inspections 1, 2           IP 7111117              Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications                      12/08/2008 12/12/2008 Baseline Inspections OL EXAM         - INITIAL EXAM PREP                                                                                        4 1                  V23307              SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES                                                        01/05/2009 01/09/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 1                                                                                    4 1                  V23307              SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES                                                        01/26/2009 01/31/2009 Not Applicable OL EXAM         - INITIAL EXAM - WEEK 2                                                                                    3 1                  V23307              SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES                                                        02/02/2009 02/06/2009 Not Applicable PSB1-RP         - RP OCCUPATIONAL PREINSPECTION VISIT                                                                      1 1, 2            IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants                      02/17/2009 02/19/2009 Other Routine 1, 2           IP 7112101              Access Control to Radiologically Significant Areas                                                    02/17/2009 02/19/2009 Baseline Inspections PSB1-RP         - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)                                                                   2 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                    03/30/2009 04/03/2009 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                                          03/30/2009 04/03/2009 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                                    03/30/2009 04/03/2009 Baseline Inspections 1, 2           IP 71151-OR01          Occupational Exposure Control Effectiveness                                                          03/30/2009 04/03/2009 Baseline Inspections 1, 2           IP 71151-PR01          RETS/ODCM Radiological Effluent                                                                      03/30/2009 04/03/2009 Baseline Inspections EB3ISI         - UNIT 1 INSERVICE PROTECTION                                                                              2 1              IP 7111108P            Inservice Inspection Activities - PWR                                                                04/06/2009 04/10/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.
-12/31/2009InspectionTypeInspection ActivityPlanned DatesStart          EndNo. of Staffon SiteTitleUnitNumberPage 1 of 209/02/200808:17:26Report 22 3EB3TI172-U2 TI-172Generic Safety InspectionReactor Coolant System Dissimiliar Metal Butt Welds09/08/200809/12/20081, 2 2515/172IP 3TI-171-B.5.B PHASE 2&3Generic Safety InspectionVerification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies10/06/200810/10/20081, 2 2515/171IP 4PSB1-EP-EMERGENCY PREPAREDNESS EXERCISEBaseline InspectionsEmergency Response Organization, Drill/Exercise Performance Indicator, Program Review10/13/200810/17/20081, 2 2515/175IPEP Baseline InspectionExercise Evaluation10/13/200810/17/20081, 2 7111401IPEP Baseline InspectionEmergency Action Level and Emergency Plan Changes10/13/200810/17/20081, 2 7111404IPBaseline InspectionsDrill/Exercise Performance10/13/200810/17/20081, 2 71151-EP01IPBaseline InspectionsERO Drill Participation10/13/200810/17/20081, 2 71151-EP02IPBaseline InspectionsAlert & Notification System10/13/200810/17/20081, 2 71151-EP03IP 2TI-176-EDG TECH SPEC SURV ENDURANCE MARGIN TESTGeneric Safety InspectionEmergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing10/28/200810/29/20081, 2 2515/176IP 2OL RQ-REQUAL INSPECTIONBaseline InspectionsLicensed Operator Requalification Program12/01/200812/05/20081, 2 7111111BIP 6EB1-MODS-MODIFICATIONS-10CFR50.59Baseline InspectionsEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications12/01/200812/05/20081, 2 7111117IPBaseline InspectionsEvaluations of Changes, Tests, or Experiments and Permanent Plant Modifications12/08/200812/12/20081, 2 7111117IP 4OL EXAM-INITIAL EXAM PREPNot ApplicableSEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES01/05/200901/09/20091 V23307 4OL EXAM-INITIAL EXAM - WEEK 1Not ApplicableSEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES01/26/200901/31/20091 V23307 3OL EXAM-INITIAL EXAM - WEEK 2Not ApplicableSEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES02/02/200902/06/20091 V23307 1PSB1-RP-RP OCCUPATIONAL PREINSPECTION VISITOther RoutineOperation of an Independent Spent Fuel Storage Installation at Operating Plants02/17/200902/19/20091, 2 60855.1IPBaseline InspectionsAccess Control to Radiologically Significant Areas02/17/200902/19/20091, 2 7112101IP 2PSB1-RP-RP OCCUPATIONAL INSPECTION WK1 (OUTAGE)Baseline InspectionsAccess Control to Radiologically Significant Areas03/30/200904/03/20091, 2 7112101IPBaseline InspectionsALARA Planning and Controls03/30/200904/03/20091, 2 7112102IPBaseline InspectionsRadioactive Material Processing and Transportation03/30/200904/03/20091, 2 7112202IPBaseline InspectionsOccupational Exposure Control Effectiveness03/30/200904/03/20091, 2 71151-OR01IPBaseline InspectionsRETS/ODCM Radiological Effluent03/30/200904/03/20091, 2 71151-PR01IP 2 EB3ISI-UNIT 1 INSERVICE PROTECTIONBaseline InspectionsInservice Inspection Activities - PWR04/06/200904/10/20091 7111108PIPThis report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
SequoyahInspection / Activity Plan09/02/2008
 
-12/31/2009InspectionTypeInspection ActivityPlanned DatesStart          EndNo. of Staffon SiteTitleUnitNumberPage 2 of 209/02/200808:17:26Report 22 1EB3TI172-TI-172 RCS DM BUTT WELDSGeneric Safety InspectionReactor Coolant System Dissimiliar Metal Butt Welds04/06/200904/10/20091 2515/172IP 2PSB1-RP-RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)Baseline InspectionsAccess Control to Radiologically Significant Areas04/13/200904/19/20091, 2 7112101IPBaseline InspectionsALARA Planning and Controls04/13/200904/19/20091, 2 7112102IPBaseline InspectionsRadioactive Material Processing and Transportation04/13/200904/19/20091, 2 7112202IP 5PI&R-PROBLEM IDENTIFICATION AND RESOLUTIONBaseline InspectionsIdentification and Resolution of Problems08/10/200908/14/20091 71152BIPBaseline InspectionsIdentification and Resolution of Problems08/24/200908/28/20091 71152BIP 1EB3-HS-HEAT SINKBaseline InspectionsHeat Sink Performance08/24/200908/28/20091, 2 7111107BIP 1PSB1EP-EMERGENCY PREPAREDNESS INSPECTIONBaseline InspectionsEmergency Response Organization, Drill/Exercise Performance Indicator, Program Review10/26/200910/30/20091, 2 2515/175IPEP Baseline InspectionAlert and Notification System Testing10/26/200910/30/20091, 2 7111402IPEP Baseline InspectionEmergency Response Organization Augmentation Testing10/26/200910/30/20091, 2 7111403IPEP Baseline InspectionEmergency Action Level and Emergency Plan Changes10/26/200910/30/20091, 2 7111404IPEP Baseline InspectionCorrection of Emergency Preparedness Weaknesses and Deficiencies10/26/200910/30/20091, 2 7111405IPBaseline InspectionsDrill/Exercise Performance10/26/200910/30/20091, 2 71151-EP01IPBaseline InspectionsERO Drill Participation10/26/200910/30/20091, 2 71151-EP02IPBaseline InspectionsAlert & Notification System10/26/200910/30/20091, 2 71151-EP03IP 1EB3ISI-UNIT 2 INSERVICE INSPECTIONBaseline InspectionsInservice Inspection Activities - PWR11/02/200911/06/20092 7111108PIP 1EB3TI172-TI-172 RCS DM BUTT WELDSGeneric Safety InspectionReactor Coolant System Dissimiliar Metal Butt Welds11/02/200911/06/20092 2515/172IP 3OL EXAM-INITIAL EXAM PREPNot ApplicableSEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES12/14/200912/18/20091 V23325This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}
Page 2 of 2                                                                                      Sequoyah 09/02/2008      08:17:26                                                                Inspection / Activity Plan Report 22 09/02/2008 - 12/31/2009 Unit                                                                                                                      No. of Staff    Planned Dates          Inspection Number        Inspection Activity                                                    Title                                    on Site      Start      End            Type EB3TI172        - TI-172 RCS DM BUTT WELDS                                                                              1 1              IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                04/06/2009 04/10/2009 Generic Safety Inspection PSB1-RP         - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE)                                                               2 1, 2            IP 7112101              Access Control to Radiologically Significant Areas                                                04/13/2009 04/19/2009 Baseline Inspections 1, 2           IP 7112102              ALARA Planning and Controls                                                                        04/13/2009 04/19/2009 Baseline Inspections 1, 2           IP 7112202              Radioactive Material Processing and Transportation                                                04/13/2009 04/19/2009 Baseline Inspections PI&R           - PROBLEM IDENTIFICATION AND RESOLUTION                                                                5 1              IP 71152B              Identification and Resolution of Problems                                                          08/10/2009 08/14/2009 Baseline Inspections 1              IP 71152B              Identification and Resolution of Problems                                                          08/24/2009 08/28/2009 Baseline Inspections EB3-HS         - HEAT SINK                                                                                            1 1, 2            IP 7111107B            Heat Sink Performance                                                                              08/24/2009 08/28/2009 Baseline Inspections PSB1EP          - EMERGENCY PREPAREDNESS INSPECTION                                                                    1 1, 2            IP 2515/175            Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review              10/26/2009 10/30/2009 Baseline Inspections 1, 2           IP 7111402              Alert and Notification System Testing                                                              10/26/2009 10/30/2009 EP Baseline Inspection 1, 2           IP 7111403              Emergency Response Organization Augmentation Testing                                              10/26/2009 10/30/2009 EP Baseline Inspection 1, 2           IP 7111404              Emergency Action Level and Emergency Plan Changes                                                  10/26/2009 10/30/2009 EP Baseline Inspection 1, 2           IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies                                  10/26/2009 10/30/2009 EP Baseline Inspection 1, 2           IP 71151-EP01          Drill/Exercise Performance                                                                        10/26/2009 10/30/2009 Baseline Inspections 1, 2           IP 71151-EP02          ERO Drill Participation                                                                            10/26/2009 10/30/2009 Baseline Inspections 1, 2           IP 71151-EP03          Alert & Notification System                                                                        10/26/2009 10/30/2009 Baseline Inspections EB3ISI          - UNIT 2 INSERVICE INSPECTION                                                                          1 2            IP 7111108P            Inservice Inspection Activities - PWR                                                              11/02/2009 11/06/2009 Baseline Inspections EB3TI172        - TI-172 RCS DM BUTT WELDS                                                                              1 2            IP 2515/172            Reactor Coolant System Dissimiliar Metal Butt Welds                                                11/02/2009 11/06/2009 Generic Safety Inspection OL EXAM         - INITIAL EXAM PREP                                                                                    3 1                  V23325              SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES                                                    12/14/2009 12/18/2009 Not Applicable This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.}}

Latest revision as of 13:26, 14 November 2019

Inspection/Activity Plan, 09/02/2008 - 12/31/2009, Report 22
ML082461008
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 09/02/2008
From:
Reactor Projects Region 2 Branch 6
To:
References
Download: ML082461008 (2)


Text

Page 1 of 2 Sequoyah 09/02/2008 08:17:26 Inspection / Activity Plan Report 22 09/02/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3TI172 - U2 TI-172 3 1, 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 09/08/2008 09/12/2008 Generic Safety Inspection TI-171 - B.5.B PHASE 2&3 3 1, 2 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 10/06/2008 10/10/2008 Generic Safety Inspection PSB1-EP - EMERGENCY PREPAREDNESS EXERCISE 4 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 10/13/2008 10/17/2008 Baseline Inspections 1, 2 IP 7111401 Exercise Evaluation 10/13/2008 10/17/2008 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/13/2008 10/17/2008 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 10/13/2008 10/17/2008 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 10/13/2008 10/17/2008 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 10/13/2008 10/17/2008 Baseline Inspections TI-176 - EDG TECH SPEC SURV ENDURANCE MARGIN TEST 2 1, 2 IP 2515/176 Emergency Diesel Generator Tech Spec Surveillance Requirements Re: Endurance & Margin Testing 10/28/2008 10/29/2008 Generic Safety Inspection OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections EB1-MODS - MODIFICATIONS-10CFR50.59 6 1, 2 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 12/01/2008 12/05/2008 Baseline Inspections 1, 2 IP 7111117 Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 12/08/2008 12/12/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 4 1 V23307 SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/05/2009 01/09/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 1 4 1 V23307 SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 01/26/2009 01/31/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23307 SEQUOYAH/JANUARY 2009 EXAM AT POWER FACILITIES 02/02/2009 02/06/2009 Not Applicable PSB1-RP - RP OCCUPATIONAL PREINSPECTION VISIT 1 1, 2 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants 02/17/2009 02/19/2009 Other Routine 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 02/17/2009 02/19/2009 Baseline Inspections PSB1-RP - RP OCCUPATIONAL INSPECTION WK1 (OUTAGE) 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 03/30/2009 04/03/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 03/30/2009 04/03/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 03/30/2009 04/03/2009 Baseline Inspections 1, 2 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/30/2009 04/03/2009 Baseline Inspections 1, 2 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/30/2009 04/03/2009 Baseline Inspections EB3ISI - UNIT 1 INSERVICE PROTECTION 2 1 IP 7111108P Inservice Inspection Activities - PWR 04/06/2009 04/10/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Sequoyah 09/02/2008 08:17:26 Inspection / Activity Plan Report 22 09/02/2008 - 12/31/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB3TI172 - TI-172 RCS DM BUTT WELDS 1 1 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 04/06/2009 04/10/2009 Generic Safety Inspection PSB1-RP - RP OCCUPATIONAL INSPECTION WK2 (OUTAGE) 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/13/2009 04/19/2009 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/13/2009 04/19/2009 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/13/2009 04/19/2009 Baseline Inspections PI&R - PROBLEM IDENTIFICATION AND RESOLUTION 5 1 IP 71152B Identification and Resolution of Problems 08/10/2009 08/14/2009 Baseline Inspections 1 IP 71152B Identification and Resolution of Problems 08/24/2009 08/28/2009 Baseline Inspections EB3-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 08/24/2009 08/28/2009 Baseline Inspections PSB1EP - EMERGENCY PREPAREDNESS INSPECTION 1 1, 2 IP 2515/175 Emergency Response Organization, Drill/Exercise Performance Indicator, Program Review 10/26/2009 10/30/2009 Baseline Inspections 1, 2 IP 7111402 Alert and Notification System Testing 10/26/2009 10/30/2009 EP Baseline Inspection 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 10/26/2009 10/30/2009 EP Baseline Inspection 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/26/2009 10/30/2009 EP Baseline Inspection 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 10/26/2009 10/30/2009 EP Baseline Inspection 1, 2 IP 71151-EP01 Drill/Exercise Performance 10/26/2009 10/30/2009 Baseline Inspections 1, 2 IP 71151-EP02 ERO Drill Participation 10/26/2009 10/30/2009 Baseline Inspections 1, 2 IP 71151-EP03 Alert & Notification System 10/26/2009 10/30/2009 Baseline Inspections EB3ISI - UNIT 2 INSERVICE INSPECTION 1 2 IP 7111108P Inservice Inspection Activities - PWR 11/02/2009 11/06/2009 Baseline Inspections EB3TI172 - TI-172 RCS DM BUTT WELDS 1 2 IP 2515/172 Reactor Coolant System Dissimiliar Metal Butt Welds 11/02/2009 11/06/2009 Generic Safety Inspection OL EXAM - INITIAL EXAM PREP 3 1 V23325 SEQUOYAH/JANUARY 2010 EXAM AT POWER FACILITIES 12/14/2009 12/18/2009 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.