ML082590478: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:September 3, 2008  
{{#Wiki_filter:September 3, 2008 Mr. William C. Holston Manager, Nuclear Training Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
 
Mr. William C. Holston Manager, Nuclear Training Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702  


==SUBJECT:==
==SUBJECT:==
NRC OPERATOR LICENSING EXAM RESULTS (Calvert Cliffs Nuclear Power Plant)
NRC OPERATOR LICENSING EXAM RESULTS (Calvert Cliffs Nuclear Power Plant)
(Cover letter publicly available, enclosures withheld from public)  
(Cover letter publicly available, enclosures withheld from public)


==Dear Mr. Holston:==
==Dear Mr. Holston:==


The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on June 25, 2008, and the walk-through (overall)  
The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on June 25, 2008, and the walk-through (overall) and/or simulator operating tests administered the week of June 16, 2008 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors.
 
As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, eleven individuals were administered the examination and five passed.
and/or simulator operat ing tests administered the week of June 16, 2008 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, "Operator Licensing Examination Standards for Power Reactors."
 
As indicated in Enclosure 1, the completed ES-501-2, "Power Plant Licensing Examination Results Summary," eleven individuals were administered the examination and five passed.
However, we will not be issuing licenses for three of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Additionally, we are unable to determine the license status for one of the applicants at this time until he has completed his examination.
However, we will not be issuing licenses for three of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Additionally, we are unable to determine the license status for one of the applicants at this time until he has completed his examination.
The NRC has agreed to delay its final licensing action regarding this applicant until the applicant can complete his licensing examination. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly.
The NRC has agreed to delay its final licensing action regarding this applicant until the applicant can complete his licensing examination. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.
contains the individual results ES-303-1 and 303-2, "Operator License Examination Report," for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appr opriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license app lications (i.e., NRC Form 398).  
 
is a copy of the licenses.  
 
Mr. Holston  Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
 
Sincerely,        /RA/
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety


Docket No. 050-317, 050-318 License No. DPR-53, DPR-69  
Mr. Holston                                    Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,
                                            /RA/
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 050-317, 050-318 License No. DPR-53, DPR-69


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
 
Vice President Plant Manager Manager, Nuclear Training
cc w/licenses:
Vice President Plant Manager Manager, Nuclear Training  


Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.
Sincerely,       /RA/
Sincerely,
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety  
                                                    /RA/
 
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 050-317, 050-318 License No. DPR-53, DPR-69
Docket No. 050-317, 050-318 License No. DPR-53, DPR-69  


==Enclosures:==
==Enclosures:==
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 1. ES-501-2, Power Plant Licensing Examination Results Summary
: 2. ES-303-1 and 303-2, Individual Examination Results
: 2. ES-303-1 and 303-2, Individual Examination Results
: 3. Licenses
: 3. Licenses cc w/licenses:
 
Vice President Plant Manager Manager, Nuclear Training Distribution: w/o enclosures:
cc w/licenses:
Master Exam File SUNSI Review Complete:         slh           (Reviewer=s Initials)
Vice President Plant Manager Manager, Nuclear Training  
ADAMS PKG NO.: ML073040307 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY08-CC Jun 08 (U01633)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public.
 
OFFICE             RI/DRS/OB             RI/DRS/OB                 RI/DRS/OB NAME               CJBixler/CJB           DSilk/DS                 SHansell/SLH DATE               09/02/08               09/03/08                 09/03/08 OFFICIAL RECORD COPY}}
Distribution: w/o enclosures:
Master Exam File SUNSI Review Complete:         slh                   (Reviewer
=s Initials) ADAMS PKG NO.: ML073040307 DOCUMENT NAME:   G:\DRS\Operations Branch\SILK\Exam FY08-CC Jun 08 (U01633)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public. OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB   NAME CJBixler/CJB DSilk/DS SHansell/SLH DATE 09/02/08   09/03/08 09/03/08 OFFICIAL RECORD COPY}}

Latest revision as of 13:56, 14 November 2019

NRC Operator Licensing Exam Results (Calvert Cliffs Nuclear Power Plant) (Cover Letter Publicly Available, Enclosures Withheld from Public)
ML082590478
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/03/2008
From: Hansell S
Operations Branch I
To: William Holston
Constellation Generation Group
Hansell S
Shared Package
ML073040307 List:
References
TAC U01633
Download: ML082590478 (3)


Text

September 3, 2008 Mr. William C. Holston Manager, Nuclear Training Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702

SUBJECT:

NRC OPERATOR LICENSING EXAM RESULTS (Calvert Cliffs Nuclear Power Plant)

(Cover letter publicly available, enclosures withheld from public)

Dear Mr. Holston:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on June 25, 2008, and the walk-through (overall) and/or simulator operating tests administered the week of June 16, 2008 at your facility. This meets the intent of Section E.1 of ES-501 of NUREG 1021, Operator Licensing Examination Standards for Power Reactors.

As indicated in Enclosure 1, the completed ES-501-2, Power Plant Licensing Examination Results Summary, eleven individuals were administered the examination and five passed.

However, we will not be issuing licenses for three of the applicants who passed - as explained in Section ES-501, paragraph D.3.c. - because any written examination with a passing grade of 82 percent or below is normally held for review until those applicants who failed the examination have had an opportunity to appeal their license denials. Additionally, we are unable to determine the license status for one of the applicants at this time until he has completed his examination.

The NRC has agreed to delay its final licensing action regarding this applicant until the applicant can complete his licensing examination. This information is considered "proprietary" in accordance with 10 CFR 2.390, and it supplements the information contained in the related examination report for your facility, which will be issued shortly. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for each of the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicants have authorized the release of this information to your facility by signing Block 19A of their license applications (i.e., NRC Form 398). is a copy of the licenses.

Mr. Holston Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 050-317, 050-318 License No. DPR-53, DPR-69

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Vice President Plant Manager Manager, Nuclear Training

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 050-317, 050-318 License No. DPR-53, DPR-69

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

Vice President Plant Manager Manager, Nuclear Training Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: slh (Reviewer=s Initials)

ADAMS PKG NO.: ML073040307 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY08-CC Jun 08 (U01633)\ExamNotificationLtr1.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB DSilk/DS SHansell/SLH DATE 09/02/08 09/03/08 09/03/08 OFFICIAL RECORD COPY