CCNPP Units 1 & 2 2008 RO Examination Outline
- 3. Generic Knowledge and Abilities 1
2 3
4 10 Categories
?
Total 0
0 Note:
- 1.
Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the 'Tier Totals" in each WA category shall not be less than two).
The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by *1 from that specified in the table based on NRC revisions.
The final RO exam must total 75 points and the SRO-only exam must total 25 points.
Systemdevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systemdevolutions that are not included on the outline should be added. Refer to Section D.l.b of ES-401 for guidance regarding the elimination of inappropriate WA statements.
Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected.
Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.
The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable WAS.
On the following pages, enter the WA numbers, a brief description of each topic, the topics' importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
For Tier 3, select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.
- 2.
- 3.
- 4.
- 5.
- 6.
7.*
- 8.
- 9.
CCNPP Units 1 & 2 2008 RO Examination Outline PWR Examination. Outline Form ES-401-2 d At innal Plant Evolutions - Tier 11Group 1 (RO / SRO)
=i I
l l
i IS-401 Emergency 1
YAPE # / Name / Safety Function K
1 450230 450231
)00008 Pressurizer Vapor Space iccident I 3
)00009 Small Break LOCA / 3
)00015117 RCP Malfunctions I 4
~sozson I AK1.03 -Relationship between charging I 3.0 100022 Loss of Rx Coolant Makeup I 2 X
420569 2 - LPI or Decay Heat Removal RHR
?.2 100025 Loss of RHR System / 4 100026 Loss of Component Cooling Nater / 8 100027 Pressurizer Pressure Control System Malfunction I 3 129 ATWS11 300038 Steam Gen. Tube Rupture / 3 45025 1 Q50712 2.4.31 Knowledge of annunciator alarms, 450252 Q50253 X
DO0054 (CE/EO6) Loss of Main Feedwater I 4
450254 000055 Station Blackout I 6 450255 000056 Loss of Off-site Power / 6 450256 000057 Loss of Vital AC Inst. Bus I 6
000062 Loss of Nuclear Svc Water / 4 000065 Loss of Instrument Air 18 450474 450258 Q50090 000077 Generator Voltage and Electric Grid Disturbances I 6 CUE02 Reactor Trip-Stabilization -
Recovery/l CE/EO5 Steam Line Rupture-Excess Heat Transfer I
WA Categoty Totals:
3 420628 450261 2.4.4 - Ability to recognize abnormal 4.5 indications for system operating parameters that are entry-level conditions for emergency I and abnormal operation procedures I
l l
18 -
3 I 3 I 3 I Group Point Total:
CCNPP Units 1 & 2 2008 RO Examination Outline ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions -Tier l/Group 2 (RO / SRO) required to obtain desired operating 450262 450264 4.50265 Q50266U US07 13
~~
450268 450475 450270 450273
CCNPP Units 1 & 2 2008 RO Examination Outline P
1 Examini lms - Tier 'Group 1 (RO / SRO)
I I
A l G l WA Topic(s) 5.02 - Safety system logic and not in use continuously monitored K6.01 - Sensors and detectors K1.02 - SEChemote monitoring and pressure in containment after a LOCA by condensing steam, to reduce radiological hazard, and K2.02 - MOVS determine the effects on reactivity of plant changes, such as reactor coolant system temperature, IR -
2.6 3.6 -
2.9 -
2.8 3.8 4.2 2.6 -
3.4 3.0 -
2.5 -
3.8 2.7 3.7 3.1 2.7 c
2.5 c -
1.1 450476 450275 450276 450290 Q50350 QS06 13 050836 450337 Q50338R 450339 450340 Q50341R 450342 450343 450345 450347 450348
CCNPP Units 1 & 2 2008 RO Examination Outline System # / Name 001 Control Rod Drive 11 01 1 Pressurizer Level Control 015 Nuclear Instrumentation ll 11 017 In-core Temperature Monitor 027 Containment Iodine Removal 035 Steam Generator 041 Steam Dumpnurbine Bypass Control 056 Condensate 071 Waste Gas DisDosal 086 Fire Protection II WA Category Point Totals:
3.5 1 450373 3.2 450374 li
CCNPP Units 1 & 2 2008 RO Examination Outline Generic Knowledge and Abilities Outline (Tier 3)
Facility: CCN Category
- 1.
Conduct of Operations
- 2.
Equipment Control
- 3.
Radiation Control Units 1 & 2 Date of Exam:
611 312008 I
I Topic RO IR 2.1.30 Ability to locate and operate components, including local 4.4 Q50381R controls.
2.2.22 Knowledge of limiting conditions for operations and safety 4.0 Q50385R limits 2.2.42 Ability to recognize system parameters that are entry-level 3.9 Q50384R conditions for Technical Specifications.
and operation of a system, and understand how oDerator actions 2.2.44 Ability to interpret control room indications to verify the status 4.2 450387 2.3.4 2.3.12 2.3.1 3 Knowledge of radiation exposure limits under normal or emergency conditions.
Knowledge of radiological safety principles pertaining to licensed operator duties, such as containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning filters, etc.
Knowledge of radiological safety procedures pertaining to licensed operator duties, such as response to radiation monitor alarms, containment entry requirements, fuel handling responsibilities, access to locked high-radiation areas, aligning 3.2 450388 3.2 450389 3.4 450390 450389 n-3.4 450390 ll.
2.4.46 Ability to venfy that the darnis are consistent with the plant 4.2 4507 14 conditions It 4.
I Subtotal I NA I NA
CCNPP Units 1 & 2 2008 RO Examination Outline ES-401 Record of Rejected WAS Form ES-401-4 Tier I Group 112 21 1 Randomly Reason for Rejection Selected WA 0067-AA2.10 025 -K4.04 Not applicable to CCNPP Not Applicable to CCNPP 111 006, A. 1.09 2.4.32 111 Unable to write an meaningful ECCS question for RO to address locked rotor amperage for the ECCS pumps since there are no unique RO actions for ECCS locked rotor. Sampled new WA topic CCNPP does not have a loss of annunciator procedure, Sampled new WA 112 112 21 1 3
EPE 00029 ATWS EPE 077-G2.4.28 EPE-001, G 2.17 EPE 036. G 2.1.21 No logical connection with the grouping of 029 ATWS and G 2.3.12, Sampled new KIA topic Unable to write a question that addressed security requirements associated with the EPE without referencing B.5.B issues or saferruards information. Samded new KIA toDic Original WA topic was unable to be tested in a written test. suited best for simulator, NRC directed replacing with G 2.4.14 Unable to write appropriate question for the written exam with this combination of EPEI WA Topic, best suited for walkthrough, saiiitded new KIA toiiic
CCNPP Units 1 & 2 2008 SRO Examination Outline Facility:
CCNPP Units 1 & 2 SRO EXAM Date of Exam:
6/13/2008 RO WA Category Points K
K K
K K
K A
A A
A G
1 2
3 4
5 6
1 2
3 4
Total Tier Group
- 1.
1 0
0 0
Emergency &
Plant Abnormal 2
0 0
0 N/A
. 0 0 NIA 0
0 Evolutions TierTotals 0 0 0 Categories Note:
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.*
- a.
- 9.
Ensure that at least two topics from every applicable WA category are sampled within each tier of the RO and SRO-only outlines (Le., except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each WA category shall not be less than two).
The point total for each group and tier in the proposed outline must match that specified in the table.
The final point total for each group and tier may deviate by ~ t l from that specified in the table based on NRC revisions.
The final RO exam must total 75 points and the SRO-only exam must total 25 points.
Systemdevolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systemdevolutions that are not included on the outline should be added. Refer to Section D.l.b of ES-401 for guidance regarding the elimination of inappropriate WA statements.
Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
Absent a plant-specific priority, only those WAS having an importance rating (IR) of 2.5 or higher shall be selected.
Use the RO and SRO ratings for the RO and SRO-only portions, respectively.
Select SRO topics for Tiers 1 and 2 from the shaded systems and WA categories.
The generic (G) WAS in Tiers 1 and 2 shall be selected from Section 2 of the WA Catalog, but the topics must be relevant to the applicable evolution or system. Refer to Section D.1.b of ES-401 for the applicable WAS.
On the following pages, enter the WA numbers, a brief description of each topic, the topics importance ratings (IRs) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
For Tier 3, select topics from Section 2 of the WA catalog, and enter the WA numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to WAS that are linked to 10 CFR 55.43.
CCNPP Units 1 & 2 2008 SRO Examination Outline ES-401 2
Form ES-401-2 the following as they apply to a reactor trip: Proper actions to be taken if the automatic safety functions have not taken Recovery I1 062 Loss of Nuclear Service Water Heat Transfer 000058 Loss of DC Power16
CCNPP Units 1 & 2 2008 SRO Examination Outline 11 ES-401 PWR Examination Outline Form ES-401-2 understand how operator actions IR -
4.2 3.4 4.4 4.0 Q205SS 450493 450496 4 -
CCNPP Units 1 & 2 2008 SRO Examination Outline 11 ES-401 F
3 Examini mms - Tier on Outline Form ES-401-2
'Group 1 {RO / SRO)
WA Topic($
A2.01 - Problems with RCP seals, especially rates of seal leak-Off.
A 2 0 1 Ability to (a) predict the impacts of the following malfunctions or operations on the RPS; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Faulty Bistable operation 2.2.21 Knowledge of pre-and post-maintenance operability requirements.
A2.03 - Failure of ESF IR -
3.9 -
3.6 4.1 4.4 2.2.43 Knowledge of the process used to track inoDerable alarms.
3.3 450432 450450 45045 1 450453 450455 5
CCNPP Units 1 & 2 2008 SRO Examination Outline ES-401 System # / Name 028 Hydrogen Recombiner and Purge Control 029 Containment Purge 072 Area Radiation Monitoring WA Category Point Totals:
P K
K K
K 1
2 3
4 PV 3 Examini
'ms - Tier on Outline Form ES-401-2
I I
I A2.01 - Ability to (a) predict the impacts of the following malfunctions or operations on the Containment Purge System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations:
Maintenance or other activity taking 3.1 450456 420602 450458
CCNPP Units 1 & 2 2008 SRO Examination Outline ES-401 Generic Knowledge and Abilities Outline (Tier 3)
Facility: CCNP Category
- 1.
Conduct of Operations
- 2.
Equipment Control
- 3.
Radiation Control
- 4.
Emergency Procedures Plan Units 1 & 2 Date of Exam:
6/13/2008 KIA #
Topic RO IR 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc.
Knowledge of procedures and limitations involved in core 2.1.36 2.2.14 2.2.18 Knowledge of the process for controlling equipment configuration or status.
Knowledge of the process for managing maintenance activities during shutdown loperations, such as risk assessments, work 2.3.15 I
Knowledge of radiation monitoring systems, such as fixed radiation monitors and alarms, portable survey instruments, 2.4.5 2.4.21 Knowledge of the organization of the operating procedures Knowledge of the parameters and logic used to assess the status of safety functions, such as reactivity control, core cooling and heat removal, reactor coolant system integrity, containment 450459 4.1 I 450462 4.3 I 050553 I
3.9 I Q45548R Q50655 3.4 I
CCNPP Units 1 & 2 2008 SRO Examination Outline ES-401 Record of Rejected WAS Form ES-401-4 Tier I Randomly Group Selected WA NONE Reason for Rejection NIA 111 EA2.05 111 Reactor trip first out indication.
111 01 1 Large Break LOCN2.2.20 003 Small Break When grouped with the EIAPE it was impossible to write a question to match because of the non logical grouping. Replacing with 062.
Spent excessive amount of time attempting to develop question, NRC I CCNPP does not have a first out annunciator system. Resampled WA I
I LOCN EA 2.09 I Directed replacing with 001 1 Large Break LOCA II I
I 111 112 112 21 1 111 212 0401 G2.4.9 028 Pressurizer Level G 2.14 061ARM Gen 2.2.18 RPS A2.03 0581 AA2.01 0291A2.03 When grouped with 0040, Steam Line break this was not a logical match and impossible to write a question that addresses the grouping. Sampled New WA Non Logical match of EPEIAPE with generic, Not possible to write a question that matches both. Resampled WA Unable to write question that was sufficiently different from other questions on RO and SRO exams without inordinate effort. Resampled WA Spent excessive amount of time attempting to develop question. NRC directed redacine with RPS 2.01 On a loss of dc power, CCNPP does not have an auto DC power source that comes on line. So WA not applicable. NRC directed replacing with AA 2.03 Spent excessive amount of time attempting to develop question. NRC directed replacing with A2.01
CCNPP Units 1 & 2 2008 SRO Examination Outline
CCNPP Units 1 & 2 2008 RQ Walkthrough Exam Outline ES-301 Administrative Topics Outline Form ES-301-1 Faci I i ty:
Examination Level: RO SRO 0 CCNPP Units 1 & 2 Date of Examination: 6/16/2008 Administrative Topic (see Note)
Conduct of Operations Conduct of Operations Equipment Control I Radiation Control Operating Test Number: 2008 Type Code*
M, C N, C M, S N, c Describe activity to be performed
~
2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc. (3.9,4.2)
Calculate Tq using the excore Nis (JPM-2008-NIS) 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, and reports. (3.6,3.8)
Determine Determine Time to Boil (TTB) for the Shift Turnover Sheet (JPM-2008-TTB)
~ _ _ _ _ _
~
2.2.44 Ability to interpret control room indications to verify the status and operation of a system, and understand how operator actions and directives affect plant and system conditions. (4.2,4.4)
Determine that RCP restart criteria are met following a station blackout (JPM-2008-RCP)-
2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (3.5, 3.6)
Determine radiological conditions for personnel exposure (JPM-2008-RAD)-
Emergency Procedures/Plan NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; I 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (1 1)
(P)revious 2 exams (I 1; randomly selected)
ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2
CCNPP Units 1 & 2 2008 RO Walkthrough Exam Outline Facility:
CCNPP Units 1 & 2 Date of Examination: 6/16/2008 Exam Level: RO 0 SRO-I SRO-U 0 Operating Test No.: 2008 M,
S Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title 1
~
~
~
~~
~~~
- a. CEDS-Respond to CEA(s) Misaligned by 8 " or more (JPM-2008-CEDM)
I A,NS
- c. PPCS - Respond to a Pressurizer spray valve failure (JPM-2008-PPCS)
NS
- d. M W - Respond to a feedwater rupture at power (JPM-2008-MFW) 8
- f. 41 6OVAC - Verify Vital Auxiliaries after a loss of Offsite power (JPM -2008-41 60V)
- g. NIS - Calculate Power Ratio recorder setpoints and adjust the potentiometers (JPM-2008-AOP7H)
- h. CCW-Respond to a CCW malfunction (JPM-2008-CCW)
~
~
~~~~~
11 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. 41 6OVAC - Prelube and locally start OC D/G and energize a 4KV Bus after a severe fire (JPM-2008-4KV-OC-DG)
~
~~
~~
~~
~
- k. MRSS - Locally Shut MSlV due to Control Room Evacuation (JPM-2008-MSIV)
Type Code*
Safety Function A,M,L,S 2
~~
4(sec) 6 M S I
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
CCNPP Units 1 & 2 2008 R
- Type Codes (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams
( W A (S)imulator 1 Walkthrough Exam Outline Criteria for RO / SRO-I / SRO-U 4-6 / 4-6 / 2-3 5 9 / r ; 8 / 5 4 2 1 / 2 1 / 2 1 2 1 121 / 2 1 2 2 / 2 2 / 2 1 5 3 / 5 3 15 2 (randomly selected) 2 1 12 1 / 2 1
- / - / 21 (control room system)
CCNPP Units 1 & 2 2008 SRO Walkthrough Exam Outline ES-301 Administrative Topics Outline Form ES-301-1 Facility:
CCNPP Units 1 & 2 Date of Examination: 6/16/2008 Examination Level: RO 0 SRO Operating Test Number: 2008 Administrative Topic (see Note)
Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Procedures/Plan Type Code*
N, C Describe activity to be performed 2.1.18 Ability to make accurate, clear, and concise logs, records, status boards, and reports. (3.6,3.8)
Determine 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> reportability requirements based on plant events (JPM-2008-RM SROl 2.1.25 Ability to interpret reference materials, such as graphs, curves, tables, etc. (3.9,4.2)
Evaluate draining the Refueling Pool to 45 with a Containment Closure Deviation (JPM-2008-NO-114-SRO) 2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power Isources, on the status of limiting conditions for operations. (3.1,4.2)
Evaluate the affects of degraded equipment support on T.S.
(JPM 2008-MNT) 2.3.7 Ability to comply with radiation work permit requirements during normal or abnormal conditions. (3.5,3.6)
Perform a Risk assessment of an activity in the RCA (JPM 2008-RAD-SRO) 2.4.38 Ability to take actions called for in the facility emergency plan, including supporting or acting as emergency coordinator if required.( 2.4, 4.4)
(JPM-2008-ERPIP)
Determine amronriate ERPIP resDonse actions NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (I 3 for ROs; I 4 for SROs & RO retakes)
(N)ew or (M)odified from bank (1 1)
(P)revious 2 exams (5 1; randomly selected)
ES-301 Control Room/ln-Plant Systems Outline Form ES-301-2
CCNPP Units 1 & 2 2008 SRO Walkthrough Exam Outline Faci I i ty:
ExamLevel: RO 0 SRO-I SRO-U 0 Operating Test No.: 2008 CCNPP Units 1 & 2 Date of Examination: 6/16/2008 System / JPM Title Type Code*
Safety Function
- a. CEDS-Respond to CEA(s) Misaligned by 8" or more (JPM-2008-CEDM) n A, M S M S 1
6 7
A,M,L,S 2
- c. PPCS - Respond to a Pressurizer spray valve failure (JPM-2008-PPCS)
A S S 3
- e. RHR - Respond to a loss of all LPSl pumps while on SDC-ESFAS (JPM-2008-SDC-2)
- f. 41 GOVAC - Verify Vital Auxiliaries after a loss of Offsite power (JPM-2008-416OV)
- g. NIS - Calculate Power Ratio recorder setpoints and adjust the potentiometers (JPM-2008-AOWH)
A, M,L, S
- h. CCW-Respond to a CCW malfunction (JPM-2008-CCW) 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
E,D 8
- j. 41 6OVAC - Prelube and locally start OC D/G and energize a 4KV Bus after a severe fire (JPM-2008-4KV-OC-DG)
- k. MRSS - Locally Shut MSlV due to Control Room Evacuation (JPM-2008-MSIV)
E, M 6
E, N,R 4(sec)
Q All RO and SRO-I control room (and implant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Type Codes Criteria for RO / SRO-I / SRO-U
CCNPP Units 1 & 2 2008 SRO Walkthrough Exam Outline (A)lternate path 4-6 14-6 / 2-3 (C)ontrol room (D)irect from bank 1 9 / 1 a / s 4 (E)mergency or abnormal in-plant (EN)gineered safety feature
- / - / 21 (control room system)
(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA 2 1 1 2 1 121 (S)imulator 2 1 / 2 1 1 2 1 2 1 / 2 1 1 2 1 2 2 / 2 2 / 2 1 I
3 / I 3 / I 2 (randomly selected)
- e. RHR - Respond to a loss of all LPSl pumps while on SDC-ESFAS (JPM-2008-SDC-2)
Facility:
CCNPP Units 1 & 2 Date of Examination: 6/16/2008 Exam Level: RO 0 SRO-l SRO-U Operating Test No.: _2008 A, M,L, S Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
- a. CEDS-Respond to CEA(s) Misaligned by 8" or more A, M, S (JPM-2008-CEDM)
- b.
C.
~~
~~
~~
- g. NIS - Calculate Power Ratio recorder setpoints and adjust the potentiometers (JPM-2008-AOWH) 1 MS In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
Safety Function
~
7
- 1.
- j. 41 6OVAC - Denergize a 4KV Bus during a Control Room Evacuation (JPM-2008-4KV(OC-DG)
E, M 6
- k. MRSS - Locally Shut MSlV due to Control Room Evacuation (JPM-2008-MSIV)
E, N 4( sec)
CCNPP Units 1 & 2 2008 SRO Walkthrough Exam Outline Q
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Type Codes Criteria for RO I SRO-I I SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power I Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (WCA (S)imulator 4-6 I 4-6 12-3
<9/.58/.54 2 112 1 1 2 1 2 1 1 2 1 1 2 1 2 2 1 2 2 1 2 1
.5 3 1.5 3 I S 2 (randomly selected) 2 1 I 2 1 I 2 1
- I - I 21 (control room system)
Page 1 of 21 Appendix D Scenario Outline Form ES-D-1 Op-Test No.: 2008r Scenario No.: 1 Facility:
Calvert Cliffs 1 & 2 Scenario No.:
1 Op-Test No.: 2008 Examiners:
Operators:
Turnover: Unit 1 was MOC at 100% for previous 6 months 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> ago power was reduced to 75% power to perform valve testing which was completed SAT. 11 & 12 charging pumps are running with boron equalization in progress. CVCS makeup is aligned for direct. No equipment out of service. Instructions for the shift are to return to 100% power at approximately 30% per hour.
Page 2 of:
Target Quantitative Attributes (Per Scenario; See Section D.5.d)
- 1.
Total malfunctions (5-8)
Actual Attributes I
1 7
~
- 2.
Malfunctions after EOP entry (1-2)
- 3.
Abnormal events (2-4)
- 4.
Maior transients (1-2)
~
I 1
3 I
1 5
I 1
2
- 7.
Critical tasks (2-3)
- 5.
- 6.
EOPs enteredlrequiring substantive actions (1-2)
EOP continaencies reauirina substantive actions 10-2)
~~
I 1
1 I
1 1
Page 1 of 25 Appendix D Scenario Outline Form ES-D-1 Target Quantitative Attributes (Per Scenario; See Section D.5.d)
- 1.
Total malfunctions (5-8)
Op-Test No.: 2008 Scenario No.:
3 Facility:
Calvert Cliffs 1 & 2 Scenario No.:
3 Op-Test No.:
2008
-- I Actual Attributes
/
I 8
Examiners:
Operators:
- 2.
- 3.
Abnormal events (2-4)
Malfunctions after EOP entry (1-2)
- 4.
Major transients (1-2)
- 5.
- 6.
EOPs enteredlrequiring substantive actions (1-2)
EOP contingencies requiring substantive actions (0-2)
Turnover: Unit 1 is at 100% power, MOL equilibrium conditions. 13 HPSI pump tagged out for repair of excessive vibration during last STP 0-7B (3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> into 36 hour4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> maintenance window) IAS LCO 3.5.2.A.
I
/
2 1
1 6
1 1
2 I
1 1
I 1
0
- 7.
Critical tasks (2-3)
/
I 2
Page 1 of 21 1
2 3
4 5
6 7
8 Appendix D Scenario Outline Form ES-D-1 m o o 1-02 RCS026-0 1 I/N (RO)
PZR Level X Transmitter Failure (high)
CEDS012-37 C (ALL)
CEDS Raise Relay sticks when CEA withdrawn 12 AFW Pump Failure C (ROISRO)
Downpower due to expiration of CEA alignment time N (CROBRO)
RCS002 M (ALL)
RCS Leak of 100 GPM CEDSOlO c (RO)
RCSOO2 M (ALL)
RCS Leak increases to 200 GPM Panel Override C (CRO)
SIAS B Block Failure SIAS B Block Mechanical Binding of 2 CEAs (51 & 62)
Op-Test No.: 2008 Scenario No.:
2 Facility:
Calvert Cliffs 1 & 2 Scenario No.:
2 Op-Test No.:
2008 Examiners:
Operators:
Turnover: Unit 1 is at 100% power at EOC. 12 AFW pump tagged out for repair of overspeed trip device linkage (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> into 18 hour2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> maintenance window).
Page 2 of 21 Target Quantitative Attributes (Per Scenario; See Section D.5.d)
- 1.
Total malfunctions (5-8)
- 2.
Malfunctions after EOP entry (1-2)
Actual Attributes I
1 I
t
- 3.
Abnormal events (2-4)
- 4.
Major transients (1-2)
I 1
I 1
~
~~
- 5.
- 6.
EOPs enteredlrequiring substantive actions (1-2)
EOP contingencies requiring substantive actions (0-2)
I 1
I 1
- 7.
Critical tasks (2-3)
I 1
Page 1 of 22 Appendix D Scenario Outline Form ES-D-1 Facility:
Calvert Cliffs 1 & 2 Scenario No.:
4 Op-Test No.:
2008 NIOOll-01 CVCSOO4-01 F W O 18-02 CDOOS SWYD002 4KV001-01 AFWOO1-01 Examiners:
Operators:
N (CRO/SRO) 1 (RO)
Channel A NI Power Summer Failure C (RO) 11 Charging Pump coupling failure I (CRO) 12 FRV Controller Failure C (CRO)
Condensate header rupture M (ALL)
C (CRO)
C(CR0) 11 AFW Pump Failure Loss of Offsite Power 11 4KV bus fault Turnover: Unit 1 is at 100°/o power, MOC, Equilibrium Conditions. 12 AFW pump tagged out for repair of overspeed trip device linkage (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> into 18 hour2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> maintenance window).
Target Quantitative Attributes (Per Scenario; See Section D.5.d)
- 1.
Total malfunctions (5-8)
Event
~
-- I Actual Attributes I
1 7
E
- 2.
Malfunctions after EOP entry (1-2)
- 3.
Abnormal events (2-4)
- 4.
Major transients (1-2)
Malf. No.
Event Type*
Event I
1 2
I 1
3 I
1 1
- 5.
- 6.
EOPs enteredhequiring substantive actions (1-2)
EOP continaencies reauirina substantive actions (0-2)
I TSO-SO directed downpower I
1 1
I 1
0 I
- 7.
Critical tasks (2-3)
I 1