ML082681136: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML082681136
| number = ML082681136
| issue date = 09/25/2008
| issue date = 09/25/2008
| title = Arkansas Nuclear One, Unit 1 - Correction to Facility Operating License Page 3 to Amendment No. 233 Containment Spray Nozzle Technical Specification Test Requirements (TAC MD8310)
| title = Correction to Facility Operating License Page 3 to Amendment No. 233 Containment Spray Nozzle Technical Specification Test Requirements
| author name = Wang A B
| author name = Wang A
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name =  
| addressee name =  
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:September 25, 2008  
{{#Wiki_filter:September 25, 2008 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
 
1448 S.R. 333 Russellville, AR 72802
Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802  


==SUBJECT:==
==SUBJECT:==
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)  
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008  
On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008 The amendment revised the Surveillance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.
Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.
If you have any questions, please call me at 301-415-1445.
Sincerely,
                                                        /RA by Michael T. Markley for/
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313


The amendment revised the Surveill ance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.
==Enclosure:==
As stated cc w/encl: See next page


Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page. 
Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
 
1448 S.R. 333 Russellville, AR 72802
If you have any questions, please call me at 301-415-1445.
 
Sincerely,
 
/RA by Michael T. Markley for/
 
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
 
Docket No. 50-313
 
==Enclosure:==
As stated cc w/encl:  See next page Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802  


==SUBJECT:==
==SUBJECT:==
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)  
CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)


==Dear Sir or Madam:==
==Dear Sir or Madam:==


On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008  
On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008 The amendment revised the Surveillance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.
 
Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.
The amendment revised the Surveill ance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.  
If you have any questions, please call me at 301-415-1445.
 
Sincerely,
Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.
                                                              /RA by Michael T. Markley for/
 
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313
If you have any questions, please call me at 301-415-1445.  
 
Sincerely,  
 
/RA by Michael T. Markley for/  
 
Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  
 
Docket No. 50-313  


==Enclosure:==
==Enclosure:==
As stated cc w/encl: See next page DISTRIBUTION PUBLIC LPLIV r/f RidsAcrsAcnw_MailCTR Resource RidsNrrDirsItsb Resource RidsNrrDorlDpr Resource RidsNrrDorlLpl4 Resource RidsNrrPMAWang Resource RidsNrrLAGLappert Resource RidsOgcRp Resource RidsRgn4MailCenter Resource GHill, OIS (2) ADAMS Accession No. ML082681136 *Concurred by Email OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang* GLappert MMarkley DATE 9/24/08 9/25/08 9/25/08 OFFICIAL AGENCY RECORD  
As stated cc w/encl: See next page DISTRIBUTION PUBLIC                               RidsNrrDorlDpr Resource              RidsRgn4MailCenter Resource LPLIV r/f                           RidsNrrDorlLpl4 Resource              GHill, OIS (2)
 
RidsAcrsAcnw_MailCTR Resource        RidsNrrPMAWang Resource RidsNrrDirsItsb Resource             RidsNrrLAGLappert Resource RidsOgcRp Resource ADAMS Accession No. ML082681136                               *Concurred by Email OFFICE         NRR/LPL4/PM           NRR/LPL4/LA               NRR/LPL4/BC NAME           AWang*                 GLappert                   MMarkley DATE           9/24/08               9/25/08                   9/25/08 OFFICIAL AGENCY RECORD
Arkansas Nuclear One        (June 2008)
 
cc:
Senior Vice President Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Vice President, Oversight Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Manager, Nuclear Safety
& Licensing Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Senior Vice President
  & Chief Operating Officer Entergy Operations, Inc.
P.O. Box 31995 Jackson, MS  39286-1995
 
Associate General Counsel Entergy Nuclear Operations P.O. Box 31995 Jackson, MS  39286-1995
 
Manager, Licensing Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR  72802 Section Chief, Division of Health Radiation Control Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867
 
Section Chief, Division of Health Emergency Management Section Arkansas Department of Health and Human Services 4815 West Markham Street, Slot 30 Little Rock, AR  72205-3867
 
Pope County Judge Pope County Courthouse 100 W. Main Street Russellville, AR  72801


Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 310 London, AR 72847  
Arkansas Nuclear One                                        (June 2008) cc:
Senior Vice President          Section Chief, Division of Health Entergy Nuclear Operations    Radiation Control Section P.O. Box 31995                Arkansas Department of Health and Jackson, MS 39286-1995          Human Services 4815 West Markham Street, Slot 30 Vice President, Oversight      Little Rock, AR 72205-3867 Entergy Nuclear Operations P.O. Box 31995                Section Chief, Division of Health Jackson, MS 39286-1995        Emergency Management Section Arkansas Department of Health and Senior Manager, Nuclear Safety  Human Services
& Licensing                  4815 West Markham Street, Slot 30 Entergy Nuclear Operations    Little Rock, AR 72205-3867 P.O. Box 31995 Jackson, MS 39286-1995        Pope County Judge Pope County Courthouse Senior Vice President          100 W. Main Street
& Chief Operating Officer    Russellville, AR 72801 Entergy Operations, Inc.
P.O. Box 31995                Senior Resident Inspector Jackson, MS 39286-1995        U.S. Nuclear Regulatory Commission P.O. Box 310 Associate General Counsel      London, AR 72847 Entergy Nuclear Operations P.O. Box 31995                Regional Administrator, Region IV Jackson, MS 39286-1995        U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Manager, Licensing            Arlington, TX 76011-4125 Entergy Operations, Inc.
Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802


Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Arlington, TX  76011-4125
ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1


ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1 Renewed License No. DPR-51 Amendment No. 233 (5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.  
(5)     EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6)     EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
: c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.  
: c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license.
(1)     Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.
EOI shall operate the facility in accordance with the Technical Specifications.  
(2)     Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license.
(3) Safety Analysis Report The licensee's SAR supplement submitted pursuant to 10 CFR 54.21(d),
EOI shall operate the facility in accordance with the Technical Specifications.
as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014.  
(3)     Safety Analysis Report The licensees SAR supplement submitted pursuant to 10 CFR 54.21(d),
(4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.}}
as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014.
(4)     Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.
Renewed License No. DPR-51 Amendment No. 233}}

Latest revision as of 13:39, 14 November 2019

Correction to Facility Operating License Page 3 to Amendment No. 233 Containment Spray Nozzle Technical Specification Test Requirements
ML082681136
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/25/2008
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC MD8310
Download: ML082681136 (5)


Text

September 25, 2008 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:

CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)

Dear Sir or Madam:

On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008 The amendment revised the Surveillance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.

Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.

If you have any questions, please call me at 301-415-1445.

Sincerely,

/RA by Michael T. Markley for/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313

Enclosure:

As stated cc w/encl: See next page

Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT NO. 1 - CORRECTION TO FACILITY OPERATING LICENSE PAGE 3 TO AMENDMENT NO. 233 RE:

CONTAINMENT SPRAY NOZZLE TECHNICAL SPECIFICATION TEST REQUIREMENTS (TAC NO. MD8310)

Dear Sir or Madam:

On July 9, 2008, the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 233 to Facility Operating License No. DPR-51 for the Arkansas Nuclear One, Unit No. 1 (ANO-1). The amendment consisted of changes to the facility operating licenses and the Technical Specifications (TSs) in response to your application dated March 13, 2008 The amendment revised the Surveillance Requirement (SR) 3.6.5.8 to require verification that containment spray nozzles are unobstructed following maintenance that could result in nozzle blockage, in lieu of the current SR of performing the test every 10 years.

Due to a formatting error, the issued revised page 3 of the facility operating license for ANO-1 inadvertently shifted text in the license. This administrative error only affected page 3 of the Unit 1 license and did not impact Amendment No. 233 for ANO-1. The omission does not change the NRC staff conclusions regarding Amendment No. 233 for ANO-1. Enclosed is a corrected version of page 3 to the Unit 1 facility operating license that restores page 3 of the license. Please discard the associated page from the previous amendment and replace it with the enclosed page.

If you have any questions, please call me at 301-415-1445.

Sincerely,

/RA by Michael T. Markley for/

Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313

Enclosure:

As stated cc w/encl: See next page DISTRIBUTION PUBLIC RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource LPLIV r/f RidsNrrDorlLpl4 Resource GHill, OIS (2)

RidsAcrsAcnw_MailCTR Resource RidsNrrPMAWang Resource RidsNrrDirsItsb Resource RidsNrrLAGLappert Resource RidsOgcRp Resource ADAMS Accession No. ML082681136 *Concurred by Email OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NAME AWang* GLappert MMarkley DATE 9/24/08 9/25/08 9/25/08 OFFICIAL AGENCY RECORD

Arkansas Nuclear One (June 2008) cc:

Senior Vice President Section Chief, Division of Health Entergy Nuclear Operations Radiation Control Section P.O. Box 31995 Arkansas Department of Health and Jackson, MS 39286-1995 Human Services 4815 West Markham Street, Slot 30 Vice President, Oversight Little Rock, AR 72205-3867 Entergy Nuclear Operations P.O. Box 31995 Section Chief, Division of Health Jackson, MS 39286-1995 Emergency Management Section Arkansas Department of Health and Senior Manager, Nuclear Safety Human Services

& Licensing 4815 West Markham Street, Slot 30 Entergy Nuclear Operations Little Rock, AR 72205-3867 P.O. Box 31995 Jackson, MS 39286-1995 Pope County Judge Pope County Courthouse Senior Vice President 100 W. Main Street

& Chief Operating Officer Russellville, AR 72801 Entergy Operations, Inc.

P.O. Box 31995 Senior Resident Inspector Jackson, MS 39286-1995 U.S. Nuclear Regulatory Commission P.O. Box 310 Associate General Counsel London, AR 72847 Entergy Nuclear Operations P.O. Box 31995 Regional Administrator, Region IV Jackson, MS 39286-1995 U.S. Nuclear Regulatory Commission 612 E. Lamar Blvd., Suite 400 Manager, Licensing Arlington, TX 76011-4125 Entergy Operations, Inc.

Arkansas Nuclear One 1448 SR 333 Russellville, AR 72802

ENCLOSURE CORRECTED LICENSE PAGE 3 FOR AMENDMENT NO. 233 FACILITY OPERATING LICENSE NO. DPR-51 ARKANSAS NUCLEAR ONE, UNIT NO. 1

(5) EOI, pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) EOI, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

c. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level EOI is authorized to operate the facility at steady state reactor core power levels not in excess of 2568 megawatts thermal.

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 233, are hereby incorporated in the renewed license.

EOI shall operate the facility in accordance with the Technical Specifications.

(3) Safety Analysis Report The licensees SAR supplement submitted pursuant to 10 CFR 54.21(d),

as revised on March 14, 2001, describes certain future inspection activities to be completed before the period of extended operation. The licensee shall complete these activities no later than May 20, 2014.

(4) Physical Protection EOI shall fully implement and maintain in effect all provisions of the Commission-approved physical security, training and qualification, and safeguards contingency plans, including amendments made pursuant to provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The combined set of plans, which contains Safeguards Information protected under 10 CFR 73.21, is entitled: "Arkansas Nuclear One Physical Security Plan, Training and Qualifications Plan, and Safeguards Contingency Plan," as submitted on May 4, 2006.

Renewed License No. DPR-51 Amendment No. 233