ML083400431: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:December 5, 2008  
{{#Wiki_filter:December 5, 2008 Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077
 
Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077  


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL BEAVER VALLEY UNIT 2  
INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL BEAVER VALLEY UNIT 2


==Dear Mr. Sena:==
==Dear Mr. Sena:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.  
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J.
Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008.
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.
Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant.
Sincerely,
                                                /RA/
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73


The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J. Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077
 
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concl uded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate fo r licensing oper ators at your facility, do not administer the exam ination and cont act me at (610) 337-5046.
 
Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant. 
 
Sincerely,        /RA/  Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety
 
Docket No. 50-412 License No. NPF-73 Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077  


==SUBJECT:==
==SUBJECT:==
INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL (BEAVER VALLEY UNIT 2)  
INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL (BEAVER VALLEY UNIT 2)


==Dear Mr. Sena:==
==Dear Mr. Sena:==


The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2. The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J. Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence. The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concl uded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate fo r licensing oper ators at your facility, do not administer the exam ination and cont act me at (610) 337-5046. Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant. Sincerely,       /RA/ Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 SUNSI Review Complete:       DMS                 (Reviewer
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.
=s Initials) ADAMS PKG: ML081060562     ADAMS ACCESSION NO. ML083400431 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc After declaring this document AAn Official Agency Record
The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J.
@ it will be released to the Public. To receive a copy of this document, indicate in the box:
Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence.
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure  
The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008.
" N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB DSilk/DMS SLHansell/SLH  
This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.
 
Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant.
DATE 12/05/08 12/05/08 12/05/08       OFFICIAL RECORD COPY P. Sena 2 cc:
Sincerely,
J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering
                                                                    /RA/
 
Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 SUNSI Review Complete:           DMS           (Reviewer=s Initials)
K. Fili, Vice President, Fleet Oversight  P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. O'Claire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio
ADAMS PKG: ML081060562                                                       ADAMS ACCESSION NO. ML083400431 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.
 
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE             RI/DRS/OB               RI/DRS/OB                 RI/DRS/OB NAME               CJBixler/CJB           DSilk/DMS                 SLHansell/SLH DATE               12/05/08               12/05/08                 12/05/08 OFFICIAL RECORD COPY
Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency W. J. Rudolph, II, Superint endent, Operations Training P. Sena 3
 
Distribution: (Via E-Mail) S. Collins, RA M. Dapas, DRA D. Roberts, DRS S. Hansell, DRS D. Silk, DRS, Chief Examiner D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP S. Williams, RI OEDO R. Nelson, NRR N. Morgan, NRR, PM R. Guzman, NRR Backup D. Werkheiser, Senior Resident Inspector D. Spindler, RI


P. Garrett, Resident OA
P. Sena                                        2 cc:
J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering K. Fili, Vice President, Fleet Oversight P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency W. J. Rudolph, II, Superintendent, Operations Training


Distribution
P. Sena                                  3 Distribution: (Via E-Mail)
: C. Bixler, DRS Master Exam File}}
S. Collins, RA M. Dapas, DRA D. Roberts, DRS S. Hansell, DRS D. Silk, DRS, Chief Examiner D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP S. Williams, RI OEDO R. Nelson, NRR N. Morgan, NRR, PM R. Guzman, NRR Backup D. Werkheiser, Senior Resident Inspector D. Spindler, RI P. Garrett, Resident OA Distribution:
C. Bixler, DRS Master Exam File}}

Latest revision as of 10:37, 14 November 2019

Initial Operator Licensing Examination Written Test Approval (Beaver Valley Unit 2)
ML083400431
Person / Time
Site: Beaver Valley
Issue date: 12/05/2008
From: Hansell S
Operations Branch I
To: Sena P
FirstEnergy Nuclear Operating Co
Shared Package
ML081060562 List:
References
Download: ML083400431 (4)


Text

December 5, 2008 Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL BEAVER VALLEY UNIT 2

Dear Mr. Sena:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J.

Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73

Mr. Peter P. Sena, III Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P. O. Box 4, Route 168 Shippingport, PA 15077

SUBJECT:

INITIAL OPERATOR LICENSING EXAMINATION WRITTEN TEST APPROVAL (BEAVER VALLEY UNIT 2)

Dear Mr. Sena:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at Beaver Valley Unit 2.

The NRC has completed its review of the operator license applications submitted in connection with this examination and separately provided a list of approved applicants to Mr. William J.

Rudolph, Superintendent, Operations Training. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC has approved the subject examinations and hereby authorizes you to administer the written examinations in accordance with Revision 9, Supplement 1, of NUREG-1021, AOperator Licensing Examinations Standards for Power Reactors,@ during the week of December 15, 2008.

This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering this examination, you also agree that it meets NUREG-1021 guidelines, and is appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that this examination is not appropriate for licensing operators at your facility, do not administer the examination and contact me at (610) 337-5046.

Please contact your Chief Examiner, Mr. D. Silk, at 610-337-5372, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written test) specified for each applicant.

Sincerely,

/RA/

Samuel L. Hansell, Chief Operations Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73 SUNSI Review Complete: DMS (Reviewer=s Initials)

ADAMS PKG: ML081060562 ADAMS ACCESSION NO. ML083400431 DOCUMENT NAME: G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc G:\DRS\Operations Branch\SILK\Exam FY09-BV2 Dec 08 (U01628)\WrittenExamApprovalLtr.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB DSilk/DMS SLHansell/SLH DATE 12/05/08 12/05/08 12/05/08 OFFICIAL RECORD COPY

P. Sena 2 cc:

J. Hagan, President and Chief Nuclear Officer J. Lash, Senior Vice President of Operations and Chief Operating Officer D. Pace, Senior Vice President, Fleet Engineering K. Fili, Vice President, Fleet Oversight P. Harden, Vice President, Nuclear Support G. Halnon, Director, Fleet Regulatory Affairs Manager, Fleet Licensing Company K. Ostrowski, Director, Site Operations E. Hubley, Director, Maintenance M. Manoleras, Director, Engineering R. Brosi, Director, Site Performance Improvement C. Keller, Manager, Site Regulatory Compliance D. Jenkins, Attorney, FirstEnergy Corporation M. Clancy, Mayor, Shippingport, PA D. Allard, Director, PADEP C. OClaire, State Liaison to the NRC, State of Ohio Z. Clayton, EPA-DERR, State of Ohio Director, Utilities Department, Public Utilities Commission, State of Ohio D. Hill, Chief, Radiological Health Program, State of West Virginia J. Lewis, Commissioner, Division of Labor, State of West Virginia W. Hill, Beaver County Emergency Management Agency J. Johnsrud, National Energy Committee, Sierra Club J. Powers, Director, PA Office of Homeland Security R. French, Director, PA Emergency Management Agency W. J. Rudolph, II, Superintendent, Operations Training

P. Sena 3 Distribution: (Via E-Mail)

S. Collins, RA M. Dapas, DRA D. Roberts, DRS S. Hansell, DRS D. Silk, DRS, Chief Examiner D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP S. Barber, DRP C. Newport, DRP S. Williams, RI OEDO R. Nelson, NRR N. Morgan, NRR, PM R. Guzman, NRR Backup D. Werkheiser, Senior Resident Inspector D. Spindler, RI P. Garrett, Resident OA Distribution:

C. Bixler, DRS Master Exam File