ML091730041: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091730041
| number = ML091730041
| issue date = 05/11/2009
| issue date = 05/11/2009
| title = Vermont Yankee Retake - Final Written Examination with Answer Key (401-5 Format)
| title = Retake - Final Written Examination with Answer Key (401-5 Format)
| author name =  
| author name =  
| author affiliation = Entergy Nuclear Vermont Yankee, LLC
| author affiliation = Entergy Nuclear Vermont Yankee, LLC
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   1 K/A # 295025 EA2.02   Importance Rating   4.2 (K&A Statement)   EA2.02 - Ability to determine and/or interpret the following as they apply to HIGH REACTOR PRESSURE: Reactor Power Proposed Question: SRO 1 With the plant operating at 80% RTP IAW OP 0105, "Reactor Operations", power is lost to the Electro-Hydraulic Pressure Regulator (EPR).
{{#Wiki_filter:ES-401                         Sample Written Examination                                       Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                 Level                             RO               SRO Tier #                                             1 Group #                                             1 K/A #                             295025 EA2.02 Importance Rating                                   4.2 (K&A Statement) EA2.02 - Ability to determine and/or interpret the following as they apply to HIGH REACTOR PRESSURE: Reactor Power Proposed Question:                 SRO 1 With the plant operating at 80% RTP IAW OP 0105, Reactor Operations, power is lost to the Electro-Hydraulic Pressure Regulator (EPR).
Which ONE of the following describes the reactor power response and course of action taken to stabilize the plant?  
Which ONE of the following describes the reactor power response and course of action taken to stabilize the plant?
Reactor Power will          (1)          . The correct course of action is to                      (2)      .
A. (1) decrease (2) enter ONLY OT 3115, Reactor Pressure Transients. Verify the MPR takes control THEN place the EPR in CUTOUT B. (1) increase (2) enter OT 3110, Positive Reactivity Insertion AND OT 3115, Reactor Pressure Transients. Verify the MPR takes control THEN place the EPR in CUTOUT C. (1) decrease (2) enter ONLY OT 3115, Reactor Pressure Transients. Place the EPR in CUTOUT and raise the MPR setpoint to the pre-transient pressure D. (1) increase (2) enter OT 3110, Positive Reactivity Insertion AND OT 3115, Reactor Pressure Transients. Place the EPR in CUTOUT and raise the MPR setpoint to the pre-transient pressure Proposed Answer:                  B NUREG-1021, Revision 9, Supplement 1


Reactor Power will      (1)        . The correct course of action is to             (2)              .           A. (1) decrease (2) enter ONLY OT 3115, "Reactor Pressure Transients". Verify the MPR takes control THEN place the EPR in CUTOUT B. (1) increase (2) enter OT 3110, "Positive Reactivity Insertion" AND OT 3115, "Reactor              Pressure Transients". Verify the MPR takes control THEN place the EPR in              CUTOUT 
ES-401                    Sample Written Examination                        Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): Power will increase requiring OT 3110 entry B. (CORRECT): With the plant at 80% RTP, the candidate must understand the EPR is in control at a particular demanded setpoint/stoke condition and the MPR stroke is approximately 10% lower and setpoint slightly higher. As the EPR stroke fails low, pressure will be controlled by the MPR once the strokes are approximately matched.
The MPR will then control plant pressure higher than its original value. As pressure increases, the void fraction in the core decreases, resulting in a higher moderator to fuel ratio. This will result in positive reactivity being added and a subsequent rise in reactor power. Additionally, in accordance with the UFSAR, a pressure increase collapses the voids in the moderator, causing an insertion of positive reactivity. IAW ARS 7-G-2 and OT 3115: If pressure is rising, THEN verify the MPR takes control and place the EPR CUTOUT SWITCH on CRP 9-7 to CUTOUT. OT 3110 is entered to the positive reactivity insertion. This procedure references you directly to OT 3115.
C. (INCORRECT): Power will increase requiring OT 3110 entry and MPR setpoint is lowered to its pre-transient pressure.
D. (INCORRECT): The MPR setpoint is lowered to its pre-transient pressure.
Technical Reference(s):      OT 3115, Revision 11              (Attach if not previously OT 3110, Revision 23              provided)
OP 2144 Appendix B, Revision 25 ARS 7-G-2 Revision 15 UFSAR Section 14.4.2, Revision 22 Proposed references to be provided to applicants during                  None examination:
NUREG-1021, Revision 9, Supplement 1


C. (1) decrease (2) enter ONLY OT 3115, "Reactor Pressure Transients". Place the EPR in CUTOUT and raise the MPR setpoint to the pre-transient pressure D. (1) increase (2) enter OT 3110, "Positive Reactivity Insertion" AND OT 3115, "Reactor Pressure Transients". Place the EPR in CUTOUT and raise the MPR setpoint to the pre- transient pressure Proposed Answer: B NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExplanation (Optional):
ES-401                 Sample Written Examination                 Form ES-401-5 Question Worksheet Learning Objective:     LOT-00-602 RO EO 5         (As available)
 
Question Source:         Bank #                               Lot more Modified Bank #                       (Note changes or attach parent)
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
New             X Question History:         Last NRC Exam     No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis             X 10 CFR Part 55 Content:   55.41 55.43   5, 6 Comments:
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
Developed on 3/24/09 NUREG-1021, Revision 9, Supplement 1
A. (INCORRECT): Power will increase requiring OT 3110 entry B. (CORRECT): With the plant at 80% RTP, the candidate must understand the EPR is in control at a particular demanded setpoint/stoke condition and the MPR stroke is approximately 10% lower and setpoint slightly higher. As the EPR stroke fails low, pressure will be controlled by the MPR once the strokes are approximately matched. The MPR will then control plant pressure higher than its original value. As pressure increases, the void fraction in the core decreases, resulting in a higher moderator to fuel ratio. This will result in positive reactivity being added and a subsequent rise in reactor power. Additionally, in accordance with the UFSAR, a pressure increase collapses the voids in the moderator, causing an insertion of positive reactivity. IAW ARS 7-G-2 and OT 3115: If pressure is rising, THEN verify the MPR takes control and place the EPR CUTOUT SWITCH on CRP 9-7 to CUTOUT. OT 3110 is entered to the positive reactivity insertion. This procedure references you directly to OT 3115. C. (INCORRECT): Power will increase requiring OT 3110 entry and MPR setpoint is lowered to its pre-transient pressure. D. (INCORRECT): The MPR setpoint is lowered to its pre-transient pressure. 
 
Technical Reference(s): OT 3115, Revision 11 OT 3110, Revision 23 OP 2144 Appendix B, Revision 25 ARS 7-G-2 Revision 15 UFSAR Section 14.4.2, Revision 22 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetLearning Objective: LOT-00-602 RO EO 5 (As available)
Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent) New X   Question History: Last NRC Exam No  
 
Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5, 6 Comments: Developed on 3/24/09  
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  1  Group #  1  K/A # 295001 AA2.03  Importance Rating  3.3 (K&A Statement)  AA2.03 - Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION : Actual core flow Proposed Question: SRO 2 A reactor startup is in progress IAW OP 0105, "Reactor Operations" with reactor power at 20% RTP. Both Recirculation Pumps are operating at minimum speed.
The "A" Recirculation Pump trips. The drive flow in Recirculation loop "B" is observed to be 4.6 Mlbm/hr. 


ES-401                          Sample Written Examination                                      Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                  Level                            RO                  SRO Tier #                                              1 Group #                                              1 K/A #                            295001 AA2.03 Importance Rating                                    3.3 (K&A Statement) AA2.03 - Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION : Actual core flow Proposed Question:                SRO 2 A reactor startup is in progress IAW OP 0105, Reactor Operations with reactor power at 20% RTP. Both Recirculation Pumps are operating at minimum speed.
The "A" Recirculation Pump trips. The drive flow in Recirculation loop "B" is observed to be 4.6 Mlbm/hr.
The crew is performing the follow-up actions per the appropriate OT Procedure.
The crew is performing the follow-up actions per the appropriate OT Procedure.
Based on the above-  
Based on the above The core flow as INDCIATED on the Total Jet Pump Flow Recorder and ERFIS power to flow map compared to ACTUAL core flow will be                                (1)            .
After a required 5 minute wait, if the crew desires to maintain temperatures in the idle loop, the Control Room Supervisor will direct the Reactor Operator to re-open the A Recirculation Pump                      (2)                .
A. (1) higher due to forward flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3118, Recirculation Pump Trip B. (1) higher due to reverse flow in the "A" loop jet pumps (2) Discharge Valve, RV-53A, IAW OT 3117, Reactor Instabilities C. (1) lower due to reverse flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3117, Reactor Instabilities D. (1) lower due to forward flow in the "A" loop jet pumps (2) Discharge Valve RV-53A, IAW OT 3118, Recirculation Pump Trip Proposed Answer:                  D NUREG-1021, Revision 9, Supplement 1


The core flow as INDCIATED on the Total Jet Pump Flow Recorder and ERFIS power to flow map compared to ACTUAL core flow will be        (1) . After a required 5 minute wait, if the crew desires to maintain temperatures in the idle loop, the Control Room Supervisor will direct the Reactor Operator to re-open the "A" Recirculation Pump              (2)  .
ES-401                  Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
A. (1) higher due to forward flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3118, "Recirculation Pump Trip" B. (1) higher due to reverse flow in the "A" loop jet pumps (2) Discharge Valve, RV-53A, IAW OT 3117, "Reactor Instabilities" C. (1) lower due to reverse flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3117, "Reactor Instabilities"
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): Actual flow is greater than indicated flow. Also, the Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3118. The Discharge Valve is re-opened.
B. (INCORRECT): Actual flow is greater than indicated flow. The Discharge Valve should have been closed and is directed to be opened to warm up the idle loop IAW OT 3118, NOT OT 3117.
C. (INCORRECT): The Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3117. The Discharge Valve is re-opened.
D. (CORRECT): Comprehension based on understanding plant initial conditions and the flow circuitry response as a result. Some single loop conditions (<5 mlb/hr or 14 kgpm drive flow in operating loop) result in positive flow through the idle jet pumps. If positive flow through the idle jet pumps occurs, actual core flow will be greater than the core flow indicated. IAW OT 3118 step 7a and 7b, IF desired to maintain temperatures of the isolated loop, THEN verify the pump discharge valve has been closed for at least five minutes and OPEN PUMP DISCHARGE RV-53A.
The valve was closed in follow-up action #1.
Technical Reference(s):    OT 3118, Revision 30            (Attach if not previously provided)
Proposed references to be provided to applicants during              None examination:
Learning Objective:        LOT-00-202 AA2.03                (As available)
Question Source:          Bank #                                      Lot more Modified Bank #      6822 (ILO)             (Note changes or NUREG-1021, Revision 9, Supplement 1


D. (1) lower due to forward flow in the "A" loop jet pumps (2) Discharge Valve RV-53A, IAW OT 3118, "Recirculation Pump Trip" Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
ES-401                Sample Written Examination                    Form ES-401-5 Question Worksheet attach parent)
New Question History:        Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                    X 10 CFR Part 55 Content:  55.41 55.43      5 Comments:
Developed on 3/25/09; Suction valve replaced with discharge bypass valve in A(2) and C(2) on 5/15/09 NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
ES-401                         Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                 Level                             RO               SRO Tier #                                             1 Group #                                             1 K/A #                             295031 EA2.04 Importance Rating                                   4.8 (K&A Statement) EA2.04 - Ability to determine and/or interpret the following as they apply to REACTOR LOW WATER LEVEL : Adequate core cooling Proposed Question:                 SRO 3 The reactor was operating at 100% power. A large break loss of coolant accident (LOCA) has occurred with the following conditions:
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): Actual flow is greater than indicated flow. Also, the Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3118. The Discharge Valve is re-opened. B. (INCORRECT): Actual flow is greater than indicated flow. The Discharge Valve should have been closed and is directed to be opened to warm up the idle loop IAW OT 3118, NOT OT 3117. C. (INCORRECT): The Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3117. The Discharge Valve is re-opened. D. (CORRECT): Comprehension based on understanding plant initial conditions and the flow circuitry response as a result. Some single loop conditions (<5 mlb/hr or 14 kgpm drive flow in operating loop) result in positive flow through the idle jet pumps. If positive flow through the idle jet pumps occurs, actual core flow will be greater than the core flow indicated. IAW OT 3118 step 7a and 7b, IF desired to maintain temperatures of the isolated loop, THEN verify the pump discharge valve has been closed for at least five minutes and OPEN PUMP DISCHARGE RV-53A. The valve was closed in follow-up action #1. 
 
Technical Reference(s): OT 3118, Revision 30 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None  Learning Objective: LOT-00-202 AA2.03 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  # 6822 (ILO) (Note changes or NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheetattach parent)  New    Question History: Last NRC Exam No
 
Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 3/25/09; Suction valve replaced with discharge bypass valve in A(2) and C(2) on 5/15/09
 
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   1 K/A # 295031 EA2.04 Importance Rating   4.8 (K&A Statement)   EA2.04 - Ability to determine and/or interpret the following as they apply to REACTOR LOW WATER LEVEL : Adequate core cooling Proposed Question: SRO 3 The reactor was operating at 100% power. A large break loss of coolant accident (LOCA) has occurred with the following conditions:
* Reactor pressure < 100 psig
* Reactor pressure < 100 psig
* Core Spray is the only available injection system Which ONE of the following sets of sustained Core Spray (CS) flow rates and RPV water level conditions require exiting EOP-1, "RPV Control", and entry into the Severe Accident Guidelines (SAGs)?  
* Core Spray is the only available injection system Which ONE of the following sets of sustained Core Spray (CS) flow rates and RPV water level conditions require exiting EOP-1, RPV Control, and entry into the Severe Accident Guidelines (SAGs)?
 
A. CS "A": 3500 gpm CS "B": 0 gpm RPV level: -45" steady B. CS "A": 2000 gpm CS B: 1500 gpm RPV level: -40 steady C. CS A: 1500 gpm CS B: 1500 gpm RPV level: -15 steady D. CS A: 0 gpm CS "B": 0 gpm RPV level -10 steady Proposed Answer:                   B NUREG-1021, Revision 9, Supplement 1
A. CS "A": 3500 gpm       CS "B": 0 gpm       RPV level: -45" steady  
 
B. CS "A": 2000 gpm       CS "B": 1500 gpm       RPV level: -40" steady C. CS "A": 1500 gpm CS "B': 1500 gpm       RPV level: -15" steady D. CS "A": 0 gpm       CS "B": 0 gpm       RPV level -10" steady Proposed Answer: B NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
A. Incorrect - SAG entry requires the loss of Adequate Core Cooling (ACC). Spray Cooling is satisfied IAW Table S, EOP-1 RPV water level >-48", and CS flow rate on "A" or "B" is >3250 gpm B. Correct - SAG entry requires the loss of Adequate Core Cooling. Core Submergence is NOT satisfied because RPV water level is <+6", Steam Cooling is NOT satisfied because RPV water level is <-19", and Spray Cooling is NOT satisfied because CS flow for a single CS system is <3250 gpm. Without ACC, EOP-1 step RCL-17 requires SAG entry.
C. Incorrect - RPV water level is >-19", Steam Cooling is satisfied.
D. Incorrect - RPV water level is >-19", Steam Cooling is satisfied


Technical Reference(s): EOP-1, Step RC/L RC/L-17 PP-7019 EOP Manual Volume 4 - Study Guide Revision 13 Section 6 Page 33   (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
None  Learning Objective: LOT-00-610 obj. 2.4.43 (As available)  
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
A. Incorrect - SAG entry requires the loss of Adequate Core Cooling (ACC). Spray Cooling is satisfied IAW Table S, EOP-1 RPV water level >-48, and CS flow rate on A or B is >3250 gpm B. Correct - SAG entry requires the loss of Adequate Core Cooling. Core Submergence is NOT satisfied because RPV water level is <+6, Steam Cooling is NOT satisfied because RPV water level is <-19, and Spray Cooling is NOT satisfied because CS flow for a single CS system is <3250 gpm. Without ACC, EOP-1 step RCL-17 requires SAG entry.
C. Incorrect - RPV water level is >-19, Steam Cooling is satisfied.
D. Incorrect - RPV water level is >-19, Steam Cooling is satisfied Technical Reference(s):   EOP-1, Step RC/L           (Attach if not previously RC/L-17                         provided)
PP-7019 EOP Manual Volume 4 - Study Guide Revision 13 Section 6 Page 33 Proposed references to be provided to applicants during             None examination:
Learning Objective:       LOT-00-610 obj. 2.4.43           (As available)
Question Source:          Bank #                                      Lot more Modified Bank #    3669 (ILO)              (Note changes or attach parent)
NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  # 3669 (ILO)
ES-401                 Sample Written Examination         Form ES-401-5 Question Worksheet New Question History:         Last NRC Exam     No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content:  55.41 55.43    5 Comments:
(Note changes or attach parent)
Written: 3/24/09.
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet New   Question History: Last NRC Exam No  
NUREG-1021, Revision 9, Supplement 1


Question Cognitive Level: Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Written: 3/24/09. 
ES-401                       Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:             Level                             RO                     SRO Tier #                                                   1 Group #                                                   1 K/A #                             600000 2.1.20 Importance Rating                                         4.6 (K&A Statement) 2.1.20 - Conduct of Operations: Ability to interpret and execute procedure steps (Plant Fire On-site)
 
Proposed Question:               SRO 4 With the plant at full power operation, the following sequence of events occurred for the West Switchgear Room:
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   1 K/A # 600000 2.1.20 Importance Rating   4.6 (K&A Statement)   2.1.20 - Conduct of Operations: Ability to interpret and execute procedure steps (Plant Fire On-site) Proposed Question: SRO 4 With the plant at full power operation, the following sequence of events occurred for the West Switchgear Room:
* At 1218, two ionization/smoke detectors alarmed.
* At 1218, two ionization/smoke detectors alarmed.
* At 1221, a thermal cable detector alarmed.
* At 1221, a thermal cable detector alarmed.
The electrical timer associated with the West Switchgear Room CO 2 Discharge System will BEGIN at       (1)       . In response to these events, the CRS will direct a cooldown rate of             (2)            .
The electrical timer associated with the West Switchgear Room CO2 Discharge System will BEGIN at         (1)       .
A. (1) 1218 (2) 80-100&deg;F/hour in accordance with OP 0109, "Plant Restoration" B. (1) 1221 (2) 20-40&deg;F/hour in accordance with OP 0109, "Plant Restoration" C. (1) 1218 (2) 20-40&deg;F/hour in accordance with OP 3020, "Fire Emergency Response Procedure" D. (1) 1221 (2) 80-100&deg;F/hour in accordance with OP 3020, "Fire Emergency Response                     Procedure" Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
In response to these events, the CRS will direct a cooldown rate of                                 (2)            .
 
A. (1) 1218 (2) 80-100&deg;F/hour in accordance with OP 0109, Plant Restoration B. (1) 1221 (2) 20-40&deg;F/hour in accordance with OP 0109, Plant Restoration C. (1) 1218 (2) 20-40&deg;F/hour in accordance with OP 3020, Fire Emergency Response Procedure D. (1) 1221 (2) 80-100&deg;F/hour in accordance with OP 3020, Fire Emergency Response Procedure Proposed Answer:                 D NUREG-1021, Revision 9, Supplement 1
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100&deg;F/hour. While OP 0109 references OP 0105 to cooldown at a rate not to exceed 90F/hour, OP 3020 directs a cooldown rate based on the location of the fire. B. (INCORRECT): OP 3020 directs a cooldown rate of 80-100&deg;F/hour. 


ES-401                    Sample Written Examination                        Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100&deg;F/hour. While OP 0109 references OP 0105 to cooldown at a rate not to exceed 90F/hour, OP 3020 directs a cooldown rate based on the location of the fire.
B. (INCORRECT): OP 3020 directs a cooldown rate of 80-100&deg;F/hour.
C. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100&deg;F/hour.
C. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100&deg;F/hour.
D. (CORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. In accordance with OP 3020 a cooldown rate of 80-100&deg;F/hour established.
D. (CORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. In accordance with OP 3020 a cooldown rate of 80-100&deg;F/hour established.
Technical Reference(s): OP 3020 Figure 1, Revision 54 OP 2186 Discussion page 6, Revision 57 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
Technical Reference(s):     OP 3020 Figure 1, Revision       (Attach if not previously 54                               provided)
None  Learning Objective: LOT-00-602 SRO EO10 (As available)  
OP 2186 Discussion page 6, Revision 57 Proposed references to be provided to applicants during               None examination:
Learning Objective:         LOT-00-602 SRO EO10             (As available)
Question Source:          Bank #                                      Lot more Modified Bank #                              (Note changes or attach parent)
New                  X NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Question History: Last NRC Exam No  
ES-401                 Sample Written Examination                 Form ES-401-5 Question Worksheet Question History:         Last NRC Exam       No Question Cognitive Level: Memory or Fundamental Knowledge        X Comprehension or Analysis 10 CFR Part 55 Content:  55.41 55.43    5 Comments:
Developed on 3/23/09; Revised on 4/22/09, B(2) and C(2) swapped on 5/15/09 NUREG-1021, Revision 9, Supplement 1


Question Cognitive Level: Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 3/23/09; Revised on 4/22/09, B(2) and C(2) swapped on 5/15/09
ES-401                        Sample Written Examination                                    Form ES-401-5 Question Worksheet Examination Outline Cross-reference:              Level                         RO                    SRO Tier #                                                1 Group #                                              1 K/A #                          295016 2.4.6 Importance Rating                                    4.7 (K&A Statement) 2.4.6 - Emergency Procedures / Plan: Knowledge of EOP mitigation strategies (Control Room Abandonment)
Proposed Question:             SRO 5 As a result of a fire in the Control Room, the Control Room has been abandoned.
NO control room actions were completed prior to exiting the control room.
Actions required to isolate the reactor and assure the Main Steam Isolation Valves (MSIVs) remain isolated are performed IAW _________(1)_________, which directs the operator to ________(2)__________.
A. (1) OP 3126, Shutdown Using Alternate Methods (2) close containment air supply valves and open containment air vent valves to close the INBOARD MSIVs B. (1) OP 2191, Containment Air System (2) close containment air supply valves and open containment air vent valves to close the INBOARD MSIVs C. (1) OP 3126, Shutdown Using Alternate Methods (2) close instrument air supply valves and open instrument air vent valves to close the OUTBOARD MSIVs D. (1) OP 2190, Service and Instrument Air (2) close instrument air supply valves and open instrument air vent valves to close the OUTBOARD MSIVs Proposed Answer:                C NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExamination Outline Cross-reference: Level RO  SRO  Tier #  1  Group #  1  K/A # 295016 2.4.6  Importance Rating  4.7 (K&A Statement)   2.4.6 - Emergency Procedures / Plan: Knowledge of EOP mitigation strategies (Control Room Abandonment) Proposed Question: SRO 5 As a result of a fire in the Control Room, the Control Room has been abandoned.
ES-401                   Sample Written Examination                       Form ES-401-5 Question Worksheet Explanation (Optional):
NO control room actions were completed prior to exiting the control room.
Note: the implementation of OP 3126, Appendix B actions are completed by the Control Room Supervisor (SRO)
 
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
Actions required to isolate the reactor and assure the Main Steam Isolation Valves (MSIVs) remain isolated are performed IAW _________(1)_________, which directs the operator to ________(2)
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
__________.
: 2. Question cannot be answered by knowing the immediate operator actions.
 
: 3. Question cannot be answered by knowing EOP entry conditions
A. (1) OP 3126, "Shutdown Using Alternate Methods"      (2) close containment air supply valves and open containment air vent valves to              close the INBOARD MSIVs B. (1) OP 2191, "Containment Air System" (2) close containment air supply valves and open containment air vent valves to  close the INBOARD MSIVs C. (1) OP 3126, "Shutdown Using Alternate Methods"        (2) close instrument air supply valves and open instrument air vent valves to    close the OUTBOARD MSIVs
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
 
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
D. (1)  OP 2190, "Service and Instrument Air"        (2)  close instrument air supply valves and open instrument air vent valves to  close the OUTBOARD MSIVs Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional): Note: the implementation of OP 3126, Appendix B actions are completed by the Control Room Supervisor (SRO)
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. Incorrect - the inboard MSIVs are NOT isolated.
A. Incorrect - the inboard MSIVs are NOT isolated.
B. Incorrect - the inboard MSIVs are NOT isolated.
B. Incorrect - the inboard MSIVs are NOT isolated.
C. Correct - the outboard MSIVs are isolated by isolating and venting instrument air using OP 3126, Appendix B steps 1a, b.
C. Correct - the outboard MSIVs are isolated by isolating and venting instrument air using OP 3126, Appendix B steps 1a, b.
D. Incorrect - OP 2191 provides no guidance on isolating the MSIVs following control room abandonment. Appendix B, of OP 3126 provides the correct direction. Instrument Air valves are operated, making this a plausible distractor  
D. Incorrect - OP 2191 provides no guidance on isolating the MSIVs following control room abandonment. Appendix B, of OP 3126 provides the correct direction. Instrument Air valves are operated, making this a plausible distractor Technical Reference(s):   OP 3126 Appendix B Rev 18       (Attach if not previously P&ID 191160 SH 3 (L-16)         provided)
 
Proposed references to be provided to applicants during             None examination:
Technical Reference(s): OP 3126 Appendix B Rev 18 P&ID 191160 SH 3 (L-16) (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Learning Objective:       LOT-00-612 obj. 8, B(2)         (As available)
None  Learning Objective: LOT-00-612 obj. 8, B(2) (As available)  
Question Source:         Bank #                                     Lot more Modified Bank #                             (Note changes or attach parent)
 
New                 X Question History:           Last NRC Exam         No Question Cognitive Level: Memory or Fundamental Knowledge               X NUREG-1021, Revision 9, Supplement 1
Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent) New X   Question History: Last NRC Exam No  
 
Question Cognitive Level: Memory or Fundamental Knowledge X NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 5  Comments:  Written 3/24/09 NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  1  Group #  1  K/A # 295006 2.4.20  Importance Rating  4.3 (K&A Statement)  2.4.20 - Emergency Procedures / Plan: Knowledge of operational implications of EOP warnings, cautions, and notes (SCRAM) Proposed Question: SRO 6 In accordance with the EOP Bases document, which ONE of the following correctly describes the concern and operational implication of operating the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) turbines at elevated Torus temperatures when needed to maintain adequate core cooling during post Scram Reactor Pressure Vessel (RPV) Control? 
 
HPCI and RCIC operation with this condition is          (1)    . HPCI and RCIC turbine operation while lined up to take suction on the Torus with elevated temperatures >140&deg;F will result in            (2) .
A. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY                    (2) vortexing at the pump suction leading to eventual damage to the pump impeller B. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and                        Severe Accident Guidelines (2) vortexing at the pump suction leading to eventual damage to the pump impeller C. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY                        (2) pump cavitation and erosion leading to degraded pump performance or complete            loss of function


D. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and                        Severe Accident Guidelines                (2) pump cavitation and erosion leading to degraded pump performance or complete            loss of function
ES-401                Sample Written Examination  Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content:  55.41 55.43    5 Comments:
Written 3/24/09 NUREG-1021, Revision 9, Supplement 1


Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExplanation (Optional):  
ES-401                         Sample Written Examination                                   Form ES-401-5 Question Worksheet Examination Outline Cross-reference:              Level                          RO                  SRO Tier #                                              1 Group #                                              1 K/A #                          295006 2.4.20 Importance Rating                                    4.3 (K&A Statement) 2.4.20 - Emergency Procedures / Plan: Knowledge of operational implications of EOP warnings, cautions, and notes (SCRAM)
Proposed Question:              SRO 6 In accordance with the EOP Bases document, which ONE of the following correctly describes the concern and operational implication of operating the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) turbines at elevated Torus temperatures when needed to maintain adequate core cooling during post Scram Reactor Pressure Vessel (RPV) Control?
HPCI and RCIC operation with this condition is                      (1)          .
HPCI and RCIC turbine operation while lined up to take suction on the Torus with elevated temperatures >140&deg;F will result in                    (2)              .
A. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY (2) vortexing at the pump suction leading to eventual damage to the pump impeller B. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and Severe Accident Guidelines (2) vortexing at the pump suction leading to eventual damage to the pump impeller C. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY (2) pump cavitation and erosion leading to degraded pump performance or complete loss of function D. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and Severe Accident Guidelines (2) pump cavitation and erosion leading to degraded pump performance or complete loss of function Proposed Answer:                 D NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
: 6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
Justification for K/A match: OT 3100 Reactor Scram directs level to be controlled using various systems. These systems include HPCI and RCIC. There is a statement to use these systems unless directed otherwise by the EOPs. This is the tie to using Caution 3 basis to a reactor scram (post scram level control).
Justification for K/A match: OT 3100 Reactor Scram directs level to be controlled using various systems. These systems include HPCI and RCIC. There is a statement to use these systems unless directed otherwise by the EOPs. This is the tie to using Caution 3 basis to a reactor scram (post scram level control).
A. (INCORRECT): Vortexing in the CST is a concern based on CST water level. The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller. Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.
A. (INCORRECT): Vortexing in the CST is a concern based on CST water level. The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller. Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.
 
B. (INCORRECT): The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller.
B. (INCORRECT): The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller.
C. (INCORRECT): Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.
C. (INCORRECT): Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.
D. (CORRECT): In accordance with the HPCI and RCIC Design Basis Documents, operation <140&deg;F ensures NPSH requirements are met in order to prevent HPCI/RCIC pump cavitation and erosion which can lead to degraded performance or complete loss of function. In accordance with OP 2120 and OP 2121 (HPCI/RCIC), operation >140&deg;F is not permitted unless required by the EOPs. In accordance with the EOP Study Guide (Volume 4), this caution does not imply that they can't be run and that it may be necessary to operate the turbines to address adequate core cooling concerns.
D. (CORRECT): In accordance with the HPCI and RCIC Design Basis Documents, operation <140&deg;F ensures NPSH requirements are met in order to prevent HPCI/RCIC pump cavitation and erosion which can lead to degraded performance or complete loss of function. In accordance with OP 2120 and OP 2121 (HPCI/RCIC),
 
operation >140&deg;F is not permitted unless required by the EOPs. In accordance with the EOP Study Guide (Volume 4), this caution does not imply that they cant be run and that it may be necessary to operate the turbines to address adequate core cooling concerns.
Technical Reference(s): EOP Volume 4 Study Guide, (Attach if not previously NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetSection 4 page 9, Revision 13 OP 2120 precaution 11, Revision 55 OP 2121 precaution 22, Revision 52 HPCI DBD Section 2.4.1, Revision 33 RCIC DBD Section 2.4.2, Revision 20 provided)    Proposed references to be provided to applicants during examination:
Technical Reference(s):     EOP Volume 4 Study Guide,       (Attach if not previously NUREG-1021, Revision 9, Supplement 1
None  Learning Objective: LOT-00-622 RO EO8 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41   55.43 5 Comments: Developed 3/24/09; Distractors A, B revised on 5/15/09  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet Section 4 page 9, Revision    provided) 13 OP 2120 precaution 11, Revision 55 OP 2121 precaution 22, Revision 52 HPCI DBD Section 2.4.1, Revision 33 RCIC DBD Section 2.4.2, Revision 20 Proposed references to be provided to applicants during        None examination:
Learning Objective:      LOT-00-622 RO EO8              (As available)
Question Source:        Bank #                                  Lot more Modified Bank #                          (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge           X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 55.43     5 Comments:
Developed 3/24/09; Distractors A, B revised on 5/15/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExamination Outline Cross-reference: Level RO SRO Tier #   1 Group #   1 K/A # 295004 2.4.3 Importance Rating   3.9 (K&A Statement)   2.4.3 - Emergency Procedures / Plan: Ability to identify post-accident instrumentation (Partial or Total Loss of DC Pwr) Proposed Question: SRO 7 Level Transmitters associated with Post Accident Reactor Water Level Shroud Instrumentation have the following power supplies:
ES-401                       Sample Written Examination                                       Form ES-401-5 Question Worksheet Examination Outline Cross-reference:             Level                               RO                     SRO Tier #                                                     1 Group #                                                   1 K/A #                               295004 2.4.3 Importance Rating                                         3.9 (K&A Statement) 2.4.3 - Emergency Procedures / Plan: Ability to identify post-accident instrumentation (Partial or Total Loss of DC Pwr)
Proposed Question:             SRO 7 Level Transmitters associated with Post Accident Reactor Water Level Shroud Instrumentation have the following power supplies:
* LT-2-3-73A powered from DC-2 through 24V ECCS Distribution Panel B
* LT-2-3-73A powered from DC-2 through 24V ECCS Distribution Panel B
* LT-2-3-73B powered from DC-1 through 24V ECCS Distribution Panel A With the plant operating at 100% power, an electrical transient occurs resulting in the following annunciators:
* LT-2-3-73B powered from DC-1 through 24V ECCS Distribution Panel A With the plant operating at 100% power, an electrical transient occurs resulting in the following annunciators:
* CRP 8-E-8 "DG-B TROUBLE"
* CRP 8-E-8 DG-B TROUBLE
* CRP 8-F-8 "DG-B CTRL PWR LOSS"
* CRP 8-F-8 DG-B CTRL PWR LOSS
* CRP 8-N-1 "DC
* CRP 8-N-1 DC-1/DC-2 BKR TRIP The Technical Specification Post Accident level Instrument that is available for use following the transient is             (1)           .
-1/DC-2 BKR TRIP" The Technical Specification Post Accident level Instrument that is available for use following the transient is           (1)           . In accordance with Technical Specifications, the Control Room Supervisor must verify that the inoperable instrument is restored to service within         (2)          . NOTE: ONLY Consider the Technical Specification implications on Post Accident Instrumentation.  
In accordance with Technical Specifications, the Control Room Supervisor must verify that the inoperable instrument is restored to service within                         (2)          .
NOTE: ONLY Consider the Technical Specification implications on Post Accident Instrumentation.
A. (1) LI-2-3-91A (2) 7 days or place the reactor in a hot shutdown condition B. (1) LI-2-3-91B (2) 7 days or place the reactor in a hot shutdown condition C. (1) LI-2-3-91A (2) 30 days or submit a report to the Commission D. (1) LI-2-3-91B (2) 30 days or submit a report to the Commission Proposed Answer:                C NUREG-1021, Revision 9, Supplement 1


A. (1)  LI-2-3-91A      (2)  7 days or place the reactor in a hot shutdown condition B. (1)  LI-2-3-91B (2)  7 days or place the reactor in a hot shutdown condition C. (1)  LI-2-3-91A      (2)  30 days or submit a report to the Commission D. (1)  LI-2-3-91B      (2)  30 days or submit a report to the Commission
ES-401                   Sample Written Examination                     Form ES-401-5 Question Worksheet Explanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Explanation (Optional):  
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
 
: 2. Question cannot be answered by knowing the immediate operator actions.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
 
SRO-ONLY Question Validity [10CFR55.43(b)(2)]:
SRO-ONLY Question Validity [10CFR55.43(b)(2)]: (1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line. (3) Question cannot be answered by knowing the TS Safety Limits or their bases.
(1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.
(3) Question cannot be answered by knowing the TS Safety Limits or their bases.
(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
A. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel "A". LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. Additionally, the loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1).
A. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. Additionally, the loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1).
B. Incorrect- The loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1). After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.
B. Incorrect- The loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1). After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.
C. Correct- The indications provided support a loss of DC-1/24V ECCS Distribution Panel "A". DC-1 provides normal control power to the "B" EDG. Therefore, LT 3-73A still remains (powered from DC-2). Referring to G-191267. Sheet 1, LT-2-3-73A feeds LI-2-3-91A. IAS T.S. Table 3.2.6, LI-2-3-91A is a post accident instrument. With one level instrument (LI-2-3-91A/B) unavailable for use, T.S. Table 3.2.6 (Note 1) states: Within 30 days following the loss of one indication, restore the inoperable channel to service or-D. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel "A". LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.
C. Correct- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. DC-1 provides normal control power to the B EDG. Therefore, LT       3-73A still remains (powered from DC-2). Referring to G-191267. Sheet 1, LT       3-73A feeds LI-2-3-91A. IAS T.S. Table 3.2.6, LI-2-3-91A is a post accident instrument. With one level instrument (LI-2-3-91A/B) unavailable for use, T.S.
Technical Reference(s): Technical Specifications Table 3.2.6, Amendment 207 (Attach if not previously provided)
Table 3.2.6 (Note 1) states: Within 30 days following the loss of one indication, restore the inoperable channel to service or D. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetON 3159, Rev 15 P&ID G-191267 Sheet 1 Revision 30 Proposed references to be provided to applicants during examination: P&ID G-191267 Sheet 1 Technical Specifications Table
Technical Reference(s):   Technical Specifications         (Attach if not previously Table 3.2.6, Amendment 207       provided)
 
NUREG-1021, Revision 9, Supplement 1
====3.2.6 Learning====
Objective: LOT-00-601 EO-10 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 2, 5 Comments: Written 3/23/09; Revised on 4/22/09; Re-written (NEW) on 4/27/09  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet ON 3159, Rev 15 P&ID G-191267 Sheet 1 Revision 30 Proposed references to be provided to applicants during        P&ID G-191267 Sheet examination:                                                  1 Technical Specifications Table 3.2.6 Learning Objective:      LOT-00-601 EO-10              (As available)
Question Source:        Bank #                                  Lot more Modified Bank #                          (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41 55.43   2, 5 Comments: Written 3/23/09; Revised on 4/22/09; Re-written (NEW) on 4/27/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   2 K/A # 295020 AA2.05 Importance Rating   3.6 (K&A Statement) AA2.05 - Ability to determine and/or interpret the following as they apply to INADVERTENT CONTAINMENT ISOLATION : Reactor water level Proposed Question: SRO 8 A small break LOCA coincident with a Loss of Normal Power has occurred with the following plant conditions:
ES-401                           Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                 Level                           RO                 SRO Tier #                                             1 Group #                                             2 K/A #                           295020 AA2.05 Importance Rating                                   3.6 (K&A Statement) AA2.05 - Ability to determine and/or interpret the following as they apply to INADVERTENT CONTAINMENT ISOLATION : Reactor water level Proposed Question:                 SRO 8 A small break LOCA coincident with a Loss of Normal Power has occurred with the following plant conditions:
* Drywell Pressure is 5.5 psig and rising slowly
* Drywell Pressure is 5.5 psig and rising slowly
* RPV Level is 137" and steady. The lowest observed level post scram was 95".
* RPV Level is 137 and steady. The lowest observed level post scram was 95.
* RPV Pressure is 870 psig and lowering slowly.
* RPV Pressure is 870 psig and lowering slowly.
* OT 3122, "Loss of Normal Power", Immediate Actions are complete with NO other actions performed.
* OT 3122, Loss of Normal Power, Immediate Actions are complete with NO other actions performed.
Five minutes after level control is established, annunciator 4-U-2 "RCIC STEAM LINE P HI" alarms. RCIC responds as designed. There are NO Steam Leak Detection alarms and temperatures in the steam tunnel and Reactor Building remain steady.
Five minutes after level control is established, annunciator 4-U-2 RCIC STEAM LINE P HI alarms. RCIC responds as designed. There are NO Steam Leak Detection alarms and temperatures in the steam tunnel and Reactor Building remain steady.
IAW EOP-1, "RPV Control", the CRS must direct an RPV water level band of             (1)           using           (2)           .     A. (1) 127-177(2) Table "C", "Preferred Injection Systems" B. (1) 127-177(2) Table "D", "Alternate Injection Subsystems" C. (1) +6 - 177(2) Table "C", "Preferred Injection Systems" D. (1) +6 - 177(2) Table "D", Alternate Injection Subsystems" Proposed Answer: A NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
IAW EOP-1, RPV Control, the CRS must direct an RPV water level band of (1)       using             (2)         .
 
A. (1) 127-177 (2) Table C, Preferred Injection Systems B. (1) 127-177 (2) Table D, Alternate Injection Subsystems C. (1) +6 - 177 (2) Table C, Preferred Injection Systems D. (1) +6 - 177 (2) Table D, Alternate Injection Subsystems Proposed Answer:                   A NUREG-1021, Revision 9, Supplement 1
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. Correct - A high DW pressure signal exists coincident with an LNP, as a result the only injection system operating is HPCI. A Group VI isolation of RCIC occurs; however, RCIC did not initiate because RPV level never reached 82.5". With RPV water level steady at 137" with HPCI injection, the correct level band is 127-177" using Table "C" Preferred Injection Systems. HPCI is a Preferred Injection System.
B. Incorrect - Table "D" Alternate Injection Subsystems are not directed unless RPV water level can not be restored and maintained above 127" (RC/L-1). With RPV water level above 127" and HPCI injecting, Table "D" is incorrect. This is a plausible distractor based on: if the student believes that either the HPCI system is a Table "D" alternate injection subsystem or that other systems from Table "D" should be used. 


C. Incorrect - The RPV water level band should remain 127-177" since HPCI is still available and the isolation of RCIC, which was not injecting, should have no affect on RPV water level. The water level band is expanded to +6-177" when water level can not be restored and maintained above 127". If the student believes RCIC was injecting and has now isolated, this is a plausible distractor.  
ES-401                    Sample Written Examination                        Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. Correct - A high DW pressure signal exists coincident with an LNP, as a result the only injection system operating is HPCI. A Group VI isolation of RCIC occurs; however, RCIC did not initiate because RPV level never reached 82.5. With RPV water level steady at 137 with HPCI injection, the correct level band is 127-177 using Table C Preferred Injection Systems. HPCI is a Preferred Injection System.
B. Incorrect - Table D Alternate Injection Subsystems are not directed unless RPV water level can not be restored and maintained above 127 (RC/L-1). With RPV water level above 127 and HPCI injecting, Table D is incorrect. This is a plausible distractor based on: if the student believes that either the HPCI system is a Table D alternate injection subsystem or that other systems from Table D should be used.
C. Incorrect - The RPV water level band should remain 127-177 since HPCI is still available and the isolation of RCIC, which was not injecting, should have no affect on RPV water level. The water level band is expanded to +6-177 when water level can not be restored and maintained above 127. If the student believes RCIC was injecting and has now isolated, this is a plausible distractor.
D. Incorrect - The water level band is expanded to +6-177 when water level can not be restored and maintained above 127. If the student believes RCIC was injecting and has now isolated, this is a plausible distractor. This is a plausible distractor based on:
if the student believes that either the HPCI system is a Table D alternate injection subsystem or that other systems from Table D should be used.
Technical Reference(s):    EOP Volume 4 - Study              (Attach if not previously Guide EOP-1 RPV Control          provided)
Section 6 Revision 14 pages 14 of 51 - 20 of 51.
ARP 4-U-2 Rev. 8 Proposed references to be provided to applicants during                None NUREG-1021, Revision 9, Supplement 1


D. Incorrect - The water level band is expanded to +6-177" when water level can not be restored and maintained above 127". If the student believes RCIC was injecting and has now isolated, this is a plausible distractor. This is a plausible distractor based on: if the student believes that either the HPCI system is a Table "D" alternate injection subsystem or that other systems from Table "D" should be used.
ES-401                Sample Written Examination                Form ES-401-5 Question Worksheet examination:
Technical Reference(s): EOP Volume 4 - Study Guide EOP-1 RPV Control Section 6 Revision 14 pages 14 of 51 - 20 of 51.
Learning Objective:      LOT-00-610 Rev 19 Obj      (As available) 2.4.43 Question Source:         Bank #                              Lot more Modified Bank #                      (Note changes or attach parent)
New              X Question History:          Last NRC Exam    No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis            X 10 CFR Part 55 Content:    55.41 55.43    5 Comments:
Written 4/3/09 NUREG-1021, Revision 9, Supplement 1


ARP 4-U-2 Rev. 8 (Attach if not previously provided)    Proposed references to be provided to applicants during None NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheetexamination:
ES-401                         Sample Written Examination                                   Form ES-401-5 Question Worksheet Examination Outline Cross-reference:               Level                         RO                     SRO Tier #                                                 1 Group #                                               2 K/A #                         295012 2.4.31 Importance Rating                                     4.1 (K&A Statement) 2.4.31 - Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures (High Drywell Temperature)
Learning Objective: LOT-00-610 Rev 19 Obj 2.4.43 (As available)
Proposed Question:               SRO 9 With the reactor at 95% RTP, environmental conditions in the drywell have degraded giving the Control Room the following indications:
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments:
* Annunciator 5-F-2, Drywell Trouble, is in alarm
Written 4/3/09
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   2 K/A # 295012 2.4.31 Importance Rating   4.1 (K&A Statement) 2.4.31 - Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures (High Drywell Temperature) Proposed Question: SRO 9 With the reactor at 95% RTP, environmental conditions in the drywell have degraded giving the Control Room the following indications:
* Annunciator 5-F-2, "Drywell Trouble", is in alarm
* Drywell temperature is 260&deg;F and rising
* Drywell temperature is 260&deg;F and rising
* Drywell pressure is 1.9 psig and slowly rising EOP-3, "Primary Containment Control", has been entered and all specified actions have been attempted. In the event that drywell temperature cannot be restored and maintained below its structural design limit, entry into what other Emergency Operating Procedure(s) is (are) required?  
* Drywell pressure is 1.9 psig and slowly rising EOP-3, Primary Containment Control, has been entered and all specified actions have been attempted. In the event that drywell temperature cannot be restored and maintained below its structural design limit, entry into what other Emergency Operating Procedure(s) is (are) required?
(1) EOP-1, "RPV Level Control" (2) EOP-5, "RPV-Emergency Depressurization" (3) SAG-2, "RPV, Containment and Radioactive Release Control"
(1) EOP-1, RPV Level Control (2) EOP-5, RPV-Emergency Depressurization (3) SAG-2, RPV, Containment and Radioactive Release Control A. 1 ONLY B. 3 ONLY C. 1 and 2 ONLY D. 2 and 3 ONLY Proposed Answer:                 C NUREG-1021, Revision 9, Supplement 1
 
A. 1 ONLY B. 3 ONLY C. 1 and 2 ONLY  
 
D. 2 and 3 ONLY Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
See comments section for why this is a justifiable SRO-ONLY question A. (INCORRECT): WHEN drywell temperature cannot be restored and maintained below 280&deg;F, verify EOP-1 has been entered. At this point an RPV-ED is required as well. B. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. Conditions do warrant an entry into EOP-1 and EOP-5. C. (CORRECT): Indications may be indicative of a fire in the drywell. In accordance with EOP-3, WHEN drywell temperature cannot be restored and maintained below 280&deg;F, verify EOP-1 has been entered. At this point an RPV-ED is required. The override in EOP-1 (Step RC/OR-4) states that if an RPV-ED is or has been required, exit the pressure flowpath and enter EOP-5 RPV-ED. D. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. EOP-1 is required to be entered to get you into EOP-5 which is required in EOP-3. 
 
Technical Reference(s): EOP-1, Revision 3 EOP-3, Revision 4 EOP Study Guide (Volume 4), Section 8, Revision 13 ARS 5-F-2, Revision 7 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None  Learning Objective: LOT-00-607 CRS 3 and 4 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis
ES-401                  Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
See comments section for why this is a justifiable SRO-ONLY question A. (INCORRECT): WHEN drywell temperature cannot be restored and maintained below 280&deg;F, verify EOP-1 has been entered. At this point an RPV-ED is required as well.
B. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. Conditions do warrant an entry into EOP-1 and EOP-5.
C. (CORRECT): Indications may be indicative of a fire in the drywell. In accordance with EOP-3, WHEN drywell temperature cannot be restored and maintained below 280&deg;F, verify EOP-1 has been entered. At this point an RPV-ED is required. The override in EOP-1 (Step RC/OR-4) states that if an RPV-ED is or has been required, exit the pressure flowpath and enter EOP-5 RPV-ED.
D. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. EOP-1 is required to be entered to get you into EOP-5 which is required in EOP-3.
Technical Reference(s):  EOP-1, Revision 3                (Attach if not previously EOP-3, Revision 4                provided)
EOP Study Guide (Volume 4), Section 8, Revision 13 ARS 5-F-2, Revision 7 Proposed references to be provided to applicants during            None examination:
Learning Objective:      LOT-00-607 CRS 3 and 4          (As available)
Question Source:        Bank #                                      Lot more Modified Bank #                            (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge               X Comprehension or Analysis NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet 10 CFR Part 55 Content: 55.41   55.43 5* (See comments) Comments: *This question has been developed with the intent of 10CFR55.43 (b) (5) in mind although the generic K/A for this question (2.4.31) does not reference the same 10CFR55.43 requirement. However, this concept is tied to a specific site SRO objective which is written as follows: LOT-00-607 (EOP-3), CRS objective #3 (Implement EOPs to mitigate adverse plant trends) and objective #4 (Direct and prioritize crew actions to mitigate plant transients/accidents). This objective is not redundant with any RO objective. A RO objective dealing with this concept is objective #2 (Given a step or combination of steps from the procedure, describe what is accomplished by the step(s), and the reason the step is important to Primary Containment Control). Developed on 3/25/09  
ES-401                   Sample Written Examination                     Form ES-401-5 Question Worksheet 10 CFR Part 55 Content:       55.41 55.43     5* (See comments)
Comments: *This question has been developed with the intent of 10CFR55.43 (b) (5) in mind although the generic K/A for this question (2.4.31) does not reference the same 10CFR55.43 requirement. However, this concept is tied to a specific site SRO objective which is written as follows: LOT-00-607 (EOP-3), CRS objective #3 (Implement EOPs to mitigate adverse plant trends) and objective #4 (Direct and prioritize crew actions to mitigate plant transients/accidents). This objective is not redundant with any RO objective. A RO objective dealing with this concept is objective #2 (Given a step or combination of steps from the procedure, describe what is accomplished by the step(s),
and the reason the step is important to Primary Containment Control).
Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   1 Group #   2 K/A # 500000 EA2.03 Importance Rating   3.8 (K&A Statement) EA2.03 - Ability to determine and / or interpret the following as they apply to HIGH PRIMARY CONTAINMENT HYDROGEN CONCENTRATIONS: Combustible limits for drywell Proposed Question: SRO 10 The Severe Accident Guidelines (SAGs) have been entered and the containment has the following conditions:
ES-401                           Sample Written Examination                                       Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                 Level                             RO                 SRO Tier #                                               1 Group #                                             2 K/A #                             500000 EA2.03 Importance Rating                                   3.8 (K&A Statement) EA2.03 - Ability to determine and / or interpret the following as they apply to HIGH PRIMARY CONTAINMENT HYDROGEN CONCENTRATIONS: Combustible limits for drywell Proposed Question:                 SRO 10 The Severe Accident Guidelines (SAGs) have been entered and the containment has the following conditions:
* Drywell H2 - 5%
* Drywell H2 - 5%
* Drywell O2 - 5%
* Drywell O2 - 5%
* Torus H2 - 7%
* Torus H2 - 7%
* Torus O2 - 4%
* Torus O2 - 4%
As the SRO designated as the Decision Maker, utilizing the attached steps from SAG-2, "RPV, Containment, and Radioactivity Release Control", determine the venting methodology and criteria for venting termination for the drywell.
As the SRO designated as the Decision Maker, utilizing the attached steps from SAG-2, RPV, Containment, and Radioactivity Release Control, determine the venting methodology and criteria for venting termination for the drywell.
IAW SAG-2 Action Level         (1)   , vent/purge the drywell using         (2)         vent the containment:           (3) .
IAW SAG-2 Action Level                   (1)       , vent/purge the drywell using                   (2)     vent the containment:               (3)             .
A. (1) 2       (2) nitrogen only       (3) until off site release rates reach the General Emergency criteria B. (1) 3 (2) nitrogen only       (3) until off site release rates reach the General Emergency criteria C. (1) 2       (2) air or nitrogen (3) irrespective of off site release rates D. (1) 3       (2) air or nitrogen       (3) irrespective of off site release rates Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
A. (1) 2 (2) nitrogen only (3) until off site release rates reach the General Emergency criteria B. (1) 3 (2) nitrogen only (3) until off site release rates reach the General Emergency criteria C. (1) 2 (2) air or nitrogen (3) irrespective of off site release rates D. (1) 3 (2) air or nitrogen (3) irrespective of off site release rates Proposed Answer:                   D NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. Incorrect - Drywell conditions should be evaluated as Action Level 3. Answer is correct for Action Level 2 B. Incorrect - Air or Nitrogen should be used and venting should not be terminated at the General Emergency release rate criteria C. Incorrect - Drywell conditions should be evaluated as Action Level 3.
A. Incorrect - Drywell conditions should be evaluated as Action Level 3. Answer is correct for Action Level 2 B. Incorrect - Air or Nitrogen should be used and venting should not be terminated at the General Emergency release rate criteria C. Incorrect - Drywell conditions should be evaluated as Action Level 3.
D. Correct - Drywell conditions should be evaluated as Action Level 3, air or nitrogen should be used, venting should be performed irrespective of off site release rates  
D. Correct - Drywell conditions should be evaluated as Action Level 3, air or nitrogen should be used, venting should be performed irrespective of off site release rates Technical Reference(s):   SAG-2, Rev 1                     (Attach if not previously PP 7019 Technical Support       provided)
 
Guidelines, Appendix E, Section 7.4 Combustible Gas Vent, Rev 2 Proposed references to be provided to applicants during             SAG-2 Steps H examination:                                                        H-5 Learning Objective:       LOT-01-624 SRO 2                 (As available)
Technical Reference(s): SAG-2, Rev 1 PP 7019 Technical Support Guidelines, Appendix E, Section 7.4 Combustible Gas Vent, Rev 2 (Attach if not previously provided)    Proposed references to be provided to applicants during examination: SAG-2 Steps H H-5 Learning Objective: LOT-01-624 SRO 2 (As available)  
Question Source:          Bank #                                      Lot more Modified Bank #    5615 (ILO)              (Note changes or attach parent)
New Question History:            Last NRC Exam        No NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  # 5615 (ILO) (Note changes or attach parent)  New    Question History: Last NRC Exam No NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5 Comments: Written 3/26/09 NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  2  Group #  1  K/A # 262001 A2.10  Importance Rating  3.4 (K&A Statement)  A2.10 - Ability to (a) predict the impacts of the following on the A.C. ELECTRICAL DISTRIBUTION ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Exceeding current limitations Proposed Question: SRO 11 The "B" Residual Heat Removal (RHR) Pump is tagged out for corrective maintenance.
ES-401                 Sample Written Examination         Form ES-401-5 Question Worksheet Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis       X 10 CFR Part 55 Content:   55.41 55.43   5 Comments:
Written 3/26/09 NUREG-1021, Revision 9, Supplement 1


ES-401                            Sample Written Examination                                    Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                    Level                            RO                  SRO Tier #                                                2 Group #                                              1 K/A #                            262001 A2.10 Importance Rating                                    3.4 (K&A Statement) A2.10 - Ability to (a) predict the impacts of the following on the A.C. ELECTRICAL DISTRIBUTION ;
and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Exceeding current limitations Proposed Question:                  SRO 11 The B Residual Heat Removal (RHR) Pump is tagged out for corrective maintenance.
With the plant operating at 70% RTP, a Loss of Normal Power (LNP) occurs coincident with a Loss of Coolant Accident (LOCA).
With the plant operating at 70% RTP, a Loss of Normal Power (LNP) occurs coincident with a Loss of Coolant Accident (LOCA).
Post scram plant conditions are as follows:
Post scram plant conditions are as follows:
* The Reactor Building is NOT accessible due to high radiation levels.
* The Reactor Building is NOT accessible due to high radiation levels.
* The "B" EDG failed to start due to a fault on the respective bus.
* The B EDG failed to start due to a fault on the respective bus.
* Buses 8 and 9 are NOT cross tied.
* Buses 8 and 9 are NOT cross tied.
* All other systems respond as designed.
* All other systems respond as designed.
Line 248: Line 300:
* Torus level is 11 feet and rising slowly.
* Torus level is 11 feet and rising slowly.
Additionally, the control room receives the following:
Additionally, the control room receives the following:
* Annunciator 3-J-1, "RHR PUMP A TRIP"
* Annunciator 3-J-1, RHR PUMP A TRIP
* Annunciator 3-J-3, "RHR PUMP A/B OVLD"
* Annunciator 3-J-3, RHR PUMP A/B OVLD
* Report from the TBAO that ONLY the 51A and 51B targets on the "A" RHR pump breaker cubicle are dropped.
* Report from the TBAO that ONLY the 51A and 51B targets on the A RHR pump breaker cubicle are dropped.
IAW OP 2142, "4KV Electrical System", under some circumstances the "A" RHR Pump can be restarted WITHOUT being cleared by the Maintenance Department if it tripped on         (1) .        
IAW OP 2142, 4KV Electrical System, under some circumstances the A RHR Pump can be restarted WITHOUT being cleared by the Maintenance Department if it tripped on (1)       .
 
Given these conditions, the Control Room Supervisor should direct spraying the Torus and Drywell in accordance with EOP-3, Primary Containment Control, using (2)          .
Given these conditions, the Control Room Supervisor should direct spraying the Torus and Drywell in accordance with EOP-3, "Primary Containment Control", using       (2)          .
A. (1) time delayed (TIME target) overcurrent (2) OP 2124, Residual Heat Removal System, Appendix C, Torus Cooling/Containment Spray NUREG-1021, Revision 9, Supplement 1
A. (1) time delayed (TIME target) overcurrent (2) OP 2124, "Residual Heat Removal System", Appendix "C", "Torus            Cooling/Containment Spray"
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetB. (1) time delayed (TIME target) overcurrent (2) OE 3107, "SAG/EOP Appendices", Appendix "S", "Primary Containment Spray      Using Alternate Methods" C. (1) instantaneous (INST target) overcurrent (2) OP 2124, "Residual Heat Removal System", Appendix "C", "Torus Cooling/Containment Spray" D. (1) instantaneous (INST target) overcurrent (2) OE 3107, "SAG/EOP Appendices", Appendix "S", "Primary Containment Spray      Using Alternate Methods"
 
Proposed Answer: A NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional): SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (CORRECT): The candidate must first understand the nature of the trip. In this case, it's a time delay overcurrent trip which is allowed to be re-started IAW OP 2142 Precaution # 15 if the pump is needed for an emergency condition. In this case, with Drywell and Torus pressures equal, there is a problem with containment. If this problem is not addressed, the PSP curve will be challenged. The options are to spray the torus using alternate systems or to restart the only available RHR pump (C and D are powered from Bus 3 which is not powered and B was tagged out for maintenance leaving A as the only available RHR pump). Because the RB is inaccessible, OE 3107 Appendix "S" cannot be performed (local operation of RHR-183, 184, 70A/B, 71A/B). Therefore the only other option is to restart the pump that tripped on time delay overcurrent in an effort to prevent exceeding the PSP curve limits.
B. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S


C. (INCORRECT): OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department. 
ES-401                  Sample Written Examination              Form ES-401-5 Question Worksheet B. (1) time delayed (TIME target) overcurrent (2) OE 3107, SAG/EOP Appendices, Appendix S, Primary Containment Spray Using Alternate Methods C. (1) instantaneous (INST target) overcurrent (2) OP 2124, Residual Heat Removal System, Appendix C, Torus Cooling/Containment Spray D. (1) instantaneous (INST target) overcurrent (2) OE 3107, SAG/EOP Appendices, Appendix S, Primary Containment Spray Using Alternate Methods Proposed Answer:          A NUREG-1021, Revision 9, Supplement 1


D. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S. Also, OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department.  
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (CORRECT): The candidate must first understand the nature of the trip. In this case, its a time delay overcurrent trip which is allowed to be re-started IAW OP 2142 Precaution # 15 if the pump is needed for an emergency condition. In this case, with Drywell and Torus pressures equal, there is a problem with containment. If this problem is not addressed, the PSP curve will be challenged. The options are to spray the torus using alternate systems or to restart the only available RHR pump (C and D are powered from Bus 3 which is not powered and B was tagged out for maintenance leaving A as the only available RHR pump). Because the RB is inaccessible, OE 3107 Appendix S cannot be performed (local operation of RHR-183, 184, 70A/B, 71A/B). Therefore the only other option is to restart the pump that tripped on time delay overcurrent in an effort to prevent exceeding the PSP curve limits.
B. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S C. (INCORRECT): OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department.
D. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S. Also, OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department.
Technical Reference(s):    OP 2142, Revision 50, LPC        (Attach if not previously 1                                provided)
EOP-3 Revision 4 OP 2124 Revision 113 LPC 3
ARS 3-J-3, Revision 14 LPC 2
NUREG-1021, Revision 9, Supplement 1


Technical Reference(s): OP 2142, Revision 50, LPC 1 EOP-3 Revision 4 OP 2124 Revision 113 LPC 3 ARS 3-J-3, Revision 14 LPC 2 (Attach if not previously provided)
ES-401                 Sample Written Examination                   Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during       Partial ARS 3-J-1 and examination:                                                  3-J-3 up to automatic actions statement.
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during examination: Partial ARS 3-J-1 and 3-J-3 up to automatic actions statement.
Learning Objective:     LOT-01-262 A2.10               (As available)
Learning Objective: LOT-01-262 A2.10 (As available)  
Question Source:        Bank #                                  Lot more Modified Bank #                        (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41 55.43    5 Comments:
Developed on 4/13/09 NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No
ES-401                            Sample Written Examination                                 Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                   Level                           RO             SRO Tier #                                         2 Group #                                       1 K/A #                           215005 A2.04 Importance Rating                             3.9 (K&A Statement) A2.04 - Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions: SCRAM trip signals Proposed Question:                 SRO 12 The reactor is being restarted following a refueling outage.
 
* The Mode Switch is in START AND HOT STBY.
Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 4/13/09 NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   2 Group #   1 K/A # 215005 A2.04 Importance Rating   3.9 (K&A Statement)   A2.04 - Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions: SCRAM trip signals Proposed Question: SRO 12 The reactor is being restarted following a refueling outage.
* The Mode Switch is in "START AND HOT STBY"
.
* All IRMs are operating reading between 25 and 35 on Range 10.
* All IRMs are operating reading between 25 and 35 on Range 10.
* All APRMs downscale lights are clear, with indicated power at approximately 3%.
* All APRMs downscale lights are clear, with indicated power at approximately 3%.
* APRMs "C" and "D" are bypassed IAW OP 2132, "Average Power Range Monitor Channels".
* APRMs C and D are bypassed IAW OP 2132, Average Power Range Monitor Channels.
A feedwater temperature transient occurs causing the following APRM & IRM readings:
A feedwater temperature transient occurs causing the following APRM & IRM readings:
APRM Power (%) IRM Power (%) APRM A 15 IRM A60/125 APRM B 11 IRM B55/125 APRM C 13 IRM C55/125 APRM D 11 IRM D122/125 APRM E 12 IRM E55/125 APRM F 11 IRM F50/125 All other plant parameters are within their normal range.  
APRM Power (%)                                                               IRM Power (%)
(1) Predict the Reactor Protection System response (2) Determine the required procedural direction.  
APRM A                   15                                                   IRM A        60/125 APRM B                   11                                                   IRM B        55/125 APRM C                   13                                                   IRM C        55/125 APRM D                   11                                                   IRM D        122/125 APRM E                   12                                                   IRM E        55/125 APRM F                   11                                                   IRM F        50/125 All other plant parameters are within their normal range.
 
(1) Predict the Reactor Protection System response (2) Determine the required procedural direction.
A. (1) Full Reactor Scram (2) Enter OT 3100, "Reactor Scram" and VERIFY the Individual Recirculation Pump       controllers are in manual at minimum speed.
A. (1) Full Reactor Scram (2) Enter OT 3100, Reactor Scram and VERIFY the Individual Recirculation Pump controllers are in manual at minimum speed.
 
NUREG-1021, Revision 9, Supplement 1
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet B. (1) Full Reactor Scram (2) Enter OT 3100, "Reactor Scram" and SHIFT the Individual Recirculation Pump      controllers to manual and reduce to minimum speed.
C. (1) Half Scram Channel "A" only,  (2) IAW OP 2134, "Reactor Protection System", bypass "A" APRM, and reset the half      scram D. (1) Half Scram Channel "B" only (2) IAW OP 2134, "Reactor Protection System", bypass "B" IRM, and reset the half scram Proposed Answer: A Explanation (Optional):


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet B. (1) Full Reactor Scram (2) Enter OT 3100, Reactor Scram and SHIFT the Individual Recirculation Pump controllers to manual and reduce to minimum speed.
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
C. (1) Half Scram Channel A only, (2) IAW OP 2134, Reactor Protection System, bypass A APRM, and reset the half scram D. (1) Half Scram Channel B only (2) IAW OP 2134, Reactor Protection System, bypass B IRM, and reset the half scram Proposed Answer:          A Explanation (Optional):
A. Correct - "A" RPS trips based on "A" APRM at 15% with the mode switch out of RUN. "B" RPS trips based on "D" IRM HI HI condition >120/125. OT 3100 will be entered. Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. Correct - A RPS trips based on A APRM at 15% with the mode switch out of RUN. B RPS trips based on D IRM HI HI condition >120/125. OT 3100 will be entered. Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions.
B. Incorrect - Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions. There is NO need to shift the controllers to manual.
B. Incorrect - Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions. There is NO need to shift the controllers to manual.
C. Incorrect - "B" RPS also trips due to the "D" IRM HI HI condition. Plausible distractor because candidate may believe with "D" APRM bypassed, the "D" IRM may not trip.
C. Incorrect - B RPS also trips due to the D IRM HI HI condition. Plausible distractor because candidate may believe with D APRM bypassed, the D IRM may not trip.
D. Incorrect - "A" RPS also trips due to the "A" APRM at 15% with the mode switch out of RUN. Plausible distractor if mode switch was in RUN.  
D. Incorrect - A RPS also trips due to the A APRM at 15% with the mode switch out of RUN. Plausible distractor if mode switch was in RUN.
 
NUREG-1021, Revision 9, Supplement 1
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetTechnical Reference(s): Tech Spec Table 3.1.1 Amendment 229 OP 2132, APRM Rev. 23/1 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None  Learning Objective: LOT-05-215 obj. 4.01, 4.02 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  # 6740 (ILO) (Note changes or attach parent)  New    Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5 Comments: Written 3/24/09  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet Technical Reference(s):  Tech Spec Table 3.1.1          (Attach if not previously Amendment 229                  provided)
OP 2132, APRM Rev. 23/1 Proposed references to be provided to applicants during          None examination:
Learning Objective:      LOT-05-215 obj. 4.01, 4.02    (As available)
Question Source:        Bank #                                    Lot more Modified Bank #    6740 (ILO)            (Note changes or attach parent)
New Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41 55.43   5 Comments:
Written 3/24/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   2 Group #   1 K/A # 223002 2.4.18 Importance Rating   4.0 (K&A Statement)   2.4.18 - Emergency Procedures / Plan: Knowledge of the specific bases for EOPs (PCIS/Nuclear Steam Supply Shutoff) Proposed Question: SRO 13 Following a scram, power remains at 25% RTP. The CRS enters and directs actions IAW EOP-2, "ATWS RPV Control". OE 3107, "EOP/SAG Appendices", Appendix P, "Bypassing Group 1 Low-Low Level Isolation Signals" has been ordered. Additionally:
ES-401                       Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:             Level                           RO                   SRO Tier #                                               2 Group #                                             1 K/A #                           223002 2.4.18 Importance Rating                                   4.0 (K&A Statement) 2.4.18 - Emergency Procedures / Plan: Knowledge of the specific bases for EOPs (PCIS/Nuclear Steam Supply Shutoff)
Proposed Question:             SRO 13 Following a scram, power remains at 25% RTP. The CRS enters and directs actions IAW EOP-2, ATWS RPV Control. OE 3107, EOP/SAG Appendices, Appendix P, Bypassing Group 1 Low-Low Level Isolation Signals has been ordered. Additionally:
* While installing jumpers required by the Appendix, a Loss of Normal Power (LNP) occurred.
* While installing jumpers required by the Appendix, a Loss of Normal Power (LNP) occurred.
* RPV water level reached 79 inches before rising again.
* RPV water level reached 79 inches before rising again.
The basis for bypassing the PCIS Group 1 isolation signal is to           (1)       .
The basis for bypassing the PCIS Group 1 isolation signal is to                           (1)       .
EOP-2 RPV Pressure leg control, step ARC/OR-5, directs the MSIVs to be re-opened if conditions permit. In this case, the MSIVs           (2)           . A. (1) preserve the condenser as a heat sink (2) shall be re-opened using Appendix P as long as there is no indication of a Main       Steam Line (MSL) Break B. (1) preserve the condenser as a heat sink (2) shall remain closed until OT 3122, "Loss of Normal Power", has been implemented and power to Circ Water equipment restored.
EOP-2 RPV Pressure leg control, step ARC/OR-5, directs the MSIVs to be re-opened if conditions permit. In this case, the MSIVs                   (2)         .
C. (1) prevent the possibility of reaching 110&deg;F in the Torus (2) shall be re-opened using Appendix CC, "RPV Venting or Depressurization using       MSIVs", as long as there is no indication of a Main Steam Line (MSL) Break D. (1) prevent the possibility of reaching 110&deg;F in the Torus (2) shall remain closed until OT 3122, "Loss of Normal Power", has been             implemented and power to Circ Water equipment restored.
A. (1) preserve the condenser as a heat sink (2) shall be re-opened using Appendix P as long as there is no indication of a Main Steam Line (MSL) Break B. (1) preserve the condenser as a heat sink (2) shall remain closed until OT 3122, Loss of Normal Power, has been implemented and power to Circ Water equipment restored.
Proposed Answer: B NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
C. (1) prevent the possibility of reaching 110&deg;F in the Torus (2) shall be re-opened using Appendix CC, RPV Venting or Depressurization using MSIVs, as long as there is no indication of a Main Steam Line (MSL) Break D. (1) prevent the possibility of reaching 110&deg;F in the Torus (2) shall remain closed until OT 3122, Loss of Normal Power, has been implemented and power to Circ Water equipment restored.
 
Proposed Answer:               B NUREG-1021, Revision 9, Supplement 1
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
A. (INCORRECT): Power is lost to Group 1 logic and the Main Condenser is not available. B. (CORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems. With a loss of Normal Power (LNP), power is lost to both RPS buses therefore the MSIVs go shut due to a loss of power to Group 1 logic. Additionally, the Main Condenser is not available as required by step ARC/OR-5. Once power is restored to Bus 1 and/or Bus 2, the CW System can be restored to make the Main Condenser available. The MSIVs should remain closed an cannot be re-opened. C.  (INCORRECT): If the MSIVs could be re-opened, step ARC/OR-5 directs the use of Appendix P, not CC. D. (INCORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems.
 
Technical Reference(s): EOP Study Guide, Volume 4, Section 7, Revision 13 EOP-2 Revision 5 OT 3122, Revision 21 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Learning Objective: LOT-00-610 2.4.18 and 2.4.41 (As available)
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No
 
Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 3/27/09
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  2  Group #  1  K/A # 212000 2.1.32  Importance Rating  4.0 (K&A Statement)  2.1.32 - Conduct of Operations: Ability to explain and apply system limits and precautions (RPS) Proposed Question: SRO 14 The plant is operating at 100% power IAW OP 0105, "Reactor Operations".  "A" and "F" APRMs are bypassed IAW OP 2132, "Average Power Range Monitor Channels". Two LPRMs are currently bypassed on each of the following APRMs:
* "B" APRM
* "D" APRM
* "F" APRM All APRMs are OPERABLE.
A trip of "A" Reactor Protection System Motor Generator occurs with the following annunciators:
* 5-K-1 "AUTO SCRAM CH A"
* 5-K-7 "MANUAL SCRAM CH A"
* 5-M-1 "APRM A, C, E HI-HI/INOP"
* 5-M-2 "APRM B, D, F HI-HI/INOP"
* 5-M-6 "APRM BUS A/B ALT PWR SOURCE" Based on these indications, ALL the ATWS actions of DP-0166, "Operations Department Standards", have been performed. Additionally, the STA reported that NO control rod motion occurred. 


What is the basis for the action directed by the Control Room Supervisor and what Emergency Action Level classification IAW AP 3125, "Emergency Plan Classification and Action Level Scheme" should be declared?
ES-401                    Sample Written Examination                    Form ES-401-5 Question Worksheet Explanation (Optional):
Based on the above, the Control Room Supervisor must ensure a manual Reactor Scram has been initiated. RPS "B" should have also tripped based on an APRM                            (1)           .
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
The correct EAL declaration IAW AP 3125, "Emergency Plan Classification and Action Level Scheme" is             (2)            . A. (1) downscale condition due to too few LPRM inputs to APRM "B" (2) an Alert (A-7-c) 
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
: 6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
A. (INCORRECT): Power is lost to Group 1 logic and the Main Condenser is not available.
B. (CORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems. With a loss of Normal Power (LNP), power is lost to both RPS buses therefore the MSIVs go shut due to a loss of power to Group 1 logic. Additionally, the Main Condenser is not available as required by step ARC/OR-5. Once power is restored to Bus 1 and/or Bus 2, the CW System can be restored to make the Main Condenser available. The MSIVs should remain closed an cannot be re-opened.
C. (INCORRECT): If the MSIVs could be re-opened, step ARC/OR-5 directs the use of Appendix P, not CC.
D. (INCORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems.
Technical Reference(s):    EOP Study Guide, Volume 4,      (Attach if not previously Section 7, Revision 13          provided)
EOP-2 Revision 5 OT 3122, Revision 21 Proposed references to be provided to applicants during              None examination:
NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetB. (1)  downscale condition due to too few LPRM inputs to APRM "D"      (2)  an Alert (A-7-c)
ES-401                 Sample Written Examination                 Form ES-401-5 Question Worksheet Learning Objective:      LOT-00-610 2.4.18 and      (As available) 2.4.41 Question Source:        Bank #                              Lot more Modified Bank #                      (Note changes or attach parent)
C. (1) INOP condition due to too few LPRM inputs to APRM "B" (2)  a Site Area Emergency (S-7-c)
New              X Question History:          Last NRC Exam      No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis            X 10 CFR Part 55 Content:    55.41 55.43    5 Comments:
D. (1)  INOP condition due to too few LPRM inputs to APRM "D"      (2)  a Site Area Emergency (S-7-c)
Developed on 3/27/09 NUREG-1021, Revision 9, Supplement 1
Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional): In accordance with OP 2134, Reactor Protection System, Precaution 1b "When shifting to any RPS alternate power supply: A full scram can occur under certain LPRM bypass conditions."


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions.
ES-401                        Sample Written Examination                                        Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                Level                            RO                    SRO Tier #                                                2 Group #                                                1 K/A #                            212000 2.1.32 Importance Rating                                      4.0 (K&A Statement) 2.1.32 - Conduct of Operations: Ability to explain and apply system limits and precautions (RPS)
: 3. Question cannot be answered by knowing EOP entry conditions 
Proposed Question:               SRO 14 The plant is operating at 100% power IAW OP 0105, Reactor Operations. A and F APRMs are bypassed IAW OP 2132, Average Power Range Monitor Channels. Two LPRMs are currently bypassed on each of the following APRMs:
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
* B APRM
* D APRM
* F APRM All APRMs are OPERABLE.
A trip of A Reactor Protection System Motor Generator occurs with the following annunciators:
* 5-K-1 AUTO SCRAM CH A
* 5-K-7 MANUAL SCRAM CH A
* 5-M-1 APRM A, C, E HI-HI/INOP
* 5-M-2 APRM B, D, F HI-HI/INOP
* 5-M-6 APRM BUS A/B ALT PWR SOURCE Based on these indications, ALL the ATWS actions of DP-0166, Operations Department Standards, have been performed. Additionally, the STA reported that NO control rod motion occurred.
What is the basis for the action directed by the Control Room Supervisor and what Emergency Action Level classification IAW AP 3125, Emergency Plan Classification and Action Level Scheme should be declared?
Based on the above, the Control Room Supervisor must ensure a manual Reactor Scram has been initiated. RPS B should have also tripped based on an APRM (1)        .
The correct EAL declaration IAW AP 3125, Emergency Plan Classification and Action Level Scheme is              (2)            .
A. (1) downscale condition due to too few LPRM inputs to APRM B (2) an Alert (A-7-c)
NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(7)]: 1. Emergency classifications Note- The OATC actions IAW DP-0166 include manual scram pushbuttons, ARI/RPT, and tripping the recirc drive motor breakers.
ES-401                  Sample Written Examination                Form ES-401-5 Question Worksheet B. (1) downscale condition due to too few LPRM inputs to APRM D (2) an Alert (A-7-c)
A. - Incorrect - APRM "B" does not share LPRMs. Each APRM has 20 LPRMs assigned. Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs B. - Incorrect -The failure of the AUTO scram signal to function meets the criteria for EAL A-7-c; however, the manual scram also failed as indicated by the OATC completing his immediate actions and no rod motion.
C. (1) INOP condition due to too few LPRM inputs to APRM B (2) a Site Area Emergency (S-7-c)
C. - Incorrect - Incorrect - APRM "B" does not share LPRMs. Each APRM has 20 LPRMs assigned. Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs D. - Correct - APRM "D" is associated with "B" RPS. Ten LPRMs are assigned to "D" APRM. With two LPRMs bypassed and all of the shared LPRMs from "A" RPS de-energized an INOP trip signal will be generated because there are <9 LPRMs available as indicated by annunciator 5-M-2. The INOP trip signal on "B" RPS and the shutdown of "A" RPS MG set should result in a full reactor scram. The failure of the AUTO "B" RPS scram signal to function resulted in a failure of the auto scram function which meets the criteria for EAL A-7-c. Since the OATC actions failed to move the control rods, the manual scram failure will meet the criteria for EAL S-7-c since power is >2%. 
D. (1) INOP condition due to too few LPRM inputs to APRM D (2) a Site Area Emergency (S-7-c)
Proposed Answer:        D NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Technical Reference(s): OP 2134, Rev. 17  OP 2132, Rev 23/1 AP 3125 App A, Rev. 21  T.S. Table 3.1.1 Note 5 Amendment 229 EAL Technical Bases Section 7, Rev. 6 DP-0166, Rev 19 (Attach if not previously provided)    Proposed references to be provided to applicants during examination: AP 3125 EAL A-7-c and S-7-c Learning Objective: LOT-00-900 SRO 2 (As available)
ES-401                     Sample Written Examination                   Form ES-401-5 Question Worksheet Explanation (Optional):
In accordance with OP 2134, Reactor Protection System, Precaution 1b When shifting to any RPS alternate power supply: A full scram can occur under certain LPRM bypass conditions.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
SRO-ONLY Question Validity [10CFR55.43(b)(7)]:
: 1. Emergency classifications Note- The OATC actions IAW DP-0166 include manual scram pushbuttons, ARI/RPT, and tripping the recirc drive motor breakers.
A. - Incorrect - APRM B does not share LPRMs. Each APRM has 20 LPRMs assigned.
Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs B. - Incorrect -The failure of the AUTO scram signal to function meets the criteria for EAL A-7-c; however, the manual scram also failed as indicated by the OATC completing his immediate actions and no rod motion.
C. - Incorrect - Incorrect - APRM B does not share LPRMs. Each APRM has 20 LPRMs assigned. Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs D. - Correct - APRM D is associated with B RPS. Ten LPRMs are assigned to D APRM. With two LPRMs bypassed and all of the shared LPRMs from A RPS de-energized an INOP trip signal will be generated because there are <9 LPRMs available as indicated by annunciator 5-M-2. The INOP trip signal on B RPS and the shutdown of A RPS MG set should result in a full reactor scram. The failure of the AUTO B RPS scram signal to function resulted in a failure of the auto scram function which meets the criteria for EAL A-7-c. Since the OATC actions failed to move the control rods, the manual scram failure will meet the criteria for EAL S-7-c since power is >2%.
NUREG-1021, Revision 9, Supplement 1


Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent) New X   Question History: Last NRC Exam No  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet Technical Reference(s):  OP 2134, Rev. 17              (Attach if not previously OP 2132, Rev 23/1              provided)
AP 3125 App A, Rev. 21 T.S. Table 3.1.1 Note 5 Amendment 229 EAL Technical Bases Section 7, Rev. 6 DP-0166, Rev 19 Proposed references to be provided to applicants during          AP 3125 EAL A-7-c examination:                                                    and S-7-c Learning Objective:      LOT-00-900 SRO 2              (As available)
Question Source:         Bank #                                   Lot more Modified Bank #                           (Note changes or attach parent)
New               X Question History:         Last NRC Exam       No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                  X 10 CFR Part 55 Content:    55.41 55.43    5, 7 Comments:
Written 3/21/09 NUREG-1021, Revision 9, Supplement 1


Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5, 7 Comments: Written 3/21/09
ES-401                       Sample Written Examination                                 Form ES-401-5 Question Worksheet Examination Outline Cross-reference:             Level                         RO                   SRO Tier #                                             2 Group #                                           1 K/A #                         211000 2.4.11 Importance Rating                                 4.2 (K&A Statement) 2.4.11 - Emergency Procedures / Plan: Knowledge of abnormal condition procedures (SLC)
 
Proposed Question:             SRO 15 An Anticipated Transient Without Scram (ATWS) has occurred. The reactor is at 45%
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   2 Group #   1 K/A # 211000 2.4.11 Importance Rating   4.2 (K&A Statement)   2.4.11 - Emergency Procedures / Plan: Knowledge of abnormal condition procedures (SLC) Proposed Question: SRO 15 An Anticipated Transient Without Scram (ATWS) has occurred. The reactor is at 45% RTP and EOP-2, "ATWS RPV Control", has been entered. Additionally:
RTP and EOP-2, ATWS RPV Control, has been entered. Additionally:
* Both SLC Pumps are unavailable.
* Both SLC Pumps are unavailable.
* The Field Support Supervisor is directed to implement alternate measures for Boron injection using OE 3107, "EOP/SAG Appendices".
* The Field Support Supervisor is directed to implement alternate measures for Boron injection using OE 3107, EOP/SAG Appendices.
After Boron has been injected using OE 3107           (1)           , a plant cooldown can commence as directed by EOP-2 "ATWS RPV Control", when           (2)         . A. (1) Appendix K, "Boron injection CRD System from SLC Tank" (2) 2.5 drums of Boric Acid and 2.5 drums of Borax have been injected  
After Boron has been injected using OE 3107                       (1)         , a plant cooldown can commence as directed by EOP-2 ATWS RPV Control, when                                 (2)       .
 
A. (1) Appendix K, Boron injection CRD System from SLC Tank (2) 2.5 drums of Boric Acid and 2.5 drums of Borax have been injected B. (1) Appendix I, Alternate SLC Initiation (2) SLC tank level has decreased by at least 15% volume C. (1) Appendix K, Boron injection CRD System from SLC Tank (2) SLC tank level has decreased by at least 30% volume D. (1) Appendix I, Alternate SLC Initiation (2) two consecutive chemistry samples reveal that at least 660 ppm naturally enriched boron has been added Proposed Answer:               C NUREG-1021, Revision 9, Supplement 1
B. (1) Appendix I, "Alternate SLC Initiation(2) SLC tank level has decreased by at least 15% volume C. (1) Appendix K, "Boron injection CRD System from SLC Tank" (2) SLC tank level has decreased by at least 30% volume D. (1) Appendix I, "Alternate SLC Initiation(2) two consecutive chemistry samples reveal that at least 660 ppm naturally       enriched boron has been added Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                  Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed. 6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
: 6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.
A. (INCORRECT): Appendix K uses the CRD System to pump the contents of the SLC Tank to the RPV. This Appendix does NOT use drums of Boric Acid or Borax. Those are used by Appendix J. Also, this amount is equivalent to HSBW.
A. (INCORRECT): Appendix K uses the CRD System to pump the contents of the SLC Tank to the RPV. This Appendix does NOT use drums of Boric Acid or Borax. Those are used by Appendix J. Also, this amount is equivalent to HSBW.
B. (INCORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists this would be the amount of Hot Shutdown Boron Weight- not CSBW. Additionally, the use of Appendix I requires at least one SLC pump be available.
B. (INCORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists this would be the amount of Hot Shutdown Boron Weight- not CSBW. Additionally, the use of Appendix I requires at least one SLC pump be available.
 
C. (CORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists (Appendix K with CRD) then this is the Cold Shutdown Boron Weight.
C. (CORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists (Appendix K with CRD) then this is the Cold Shutdown Boron Weight. Appendix K will result in the SLC Tank being injected to the RPV. IAW EOP-2, once the tank level decreases by 30% (CSBW), then a cooldown can commence.  
Appendix K will result in the SLC Tank being injected to the RPV. IAW EOP-2, once the tank level decreases by 30% (CSBW), then a cooldown can commence.
 
D. (INCORRECT): While 660 ppm represents the correct amount of boron injected into the RPV for CSBW conditions (OE 3107 Appendix J discussion), 2 samples are not required to prove the concentration for use of any boron injection procedure.
D. (INCORRECT): While 660 ppm represents the correct amount of boron injected into the RPV for CSBW conditions (OE 3107 Appendix J discussion), 2 samples are not required to prove the concentration for use of any boron injection procedure.
Additionally, the use of Appendix I requires at least one SLC pump be available.
Additionally, the use of Appendix I requires at least one SLC pump be available.
Technical Reference(s): OE 3107 Appendix K, Revision 25 EOP-2 Table "L", Revision 5 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
Technical Reference(s):   OE 3107 Appendix K,             (Attach if not previously Revision 25                     provided)
None  Learning Objective: LOT-00-610 2.4.11 and 2.4.41 (As available)
EOP-2 Table L, Revision 5 Proposed references to be provided to applicants during             None examination:
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No
Learning Objective:       LOT-00-610 2.4.11 and           (As available) 2.4.41 NUREG-1021, Revision 9, Supplement 1
 
Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments:
Developed on 3/24/09


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExamination Outline Cross-reference: Level RO  SRO  Tier #  2  Group #   2  K/A # 201002 A2.04  Importance Rating  3.1 (K&A Statement)   A2.04 - Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Control rod block Proposed Question: SRO 16 The plant is operating at 75% RTP with the "C" and "D" APRMs bypassed in accordance with OP 2132, "Average Power Range Monitor Channels".
ES-401                 Sample Written Examination             Form ES-401-5 Question Worksheet Question Source:         Bank #                           Lot more Modified Bank #                 (Note changes or attach parent)
 
New              X Question History:          Last NRC Exam    No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis        X 10 CFR Part 55 Content:   55.41 55.43    5 Comments:
Following a rod sequence exchange the order has gone out to return to full power operations. As control rods are withdrawn, the "E" APRM power supply fails giving the control room the following annunciator:
Developed on 3/24/09 NUREG-1021, Revision 9, Supplement 1
* 5-M-1, "APRM A, C, E HI-HI/INOP" All other APRMs are indicating 75-80%. 


ES-401                          Sample Written Examination                                      Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                  Level                          RO                  SRO Tier #                                              2 Group #                                              2 K/A #                          201002 A2.04 Importance Rating                                    3.1 (K&A Statement) A2.04 - Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Control rod block Proposed Question:                  SRO 16 The plant is operating at 75% RTP with the C and D APRMs bypassed in accordance with OP 2132, Average Power Range Monitor Channels.
Following a rod sequence exchange the order has gone out to return to full power operations. As control rods are withdrawn, the E APRM power supply fails giving the control room the following annunciator:
* 5-M-1, APRM A, C, E HI-HI/INOP All other APRMs are indicating 75-80%.
Which ONE of the following identifies the expected plant response and direction in order to continue with the power ascension?
Which ONE of the following identifies the expected plant response and direction in order to continue with the power ascension?
The plant response is a   (1)       . After UN-bypassing the "C" APRM, the CRS will direct the CRO to       (2) .
The plant response is a                   (1)           . After UN-bypassing the C APRM, the CRS will direct the CRO to           (2)               .
A. (1) Rod Block AND half scram (2) bypass the "E" APRM IAW OP 2133, "Rod Block Monitor" and reset the half scram IAW OP 2134, "Reactor Protection System" B. (1) Rod Block ONLY (2) bypass the "E" APRM IAW OP 2133, "Rod Block Monitor" C. (1) Rod Block AND half scram (2) bypass the "E" APRM IAW ARS 5-M-1 and reset the half scram IAW OP 2134, "Reactor Protection System".
A. (1) Rod Block AND half scram (2) bypass the E APRM IAW OP 2133, Rod Block Monitor and reset the half scram IAW OP 2134, Reactor Protection System B. (1) Rod Block ONLY (2) bypass the E APRM IAW OP 2133, Rod Block Monitor C. (1) Rod Block AND half scram (2) bypass the E APRM IAW ARS 5-M-1 and reset the half scram IAW OP 2134, Reactor Protection System.
D. (1) Rod Block ONLY (2) bypass the "E" APRM IAW ARS 5-M-1 Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
D. (1) Rod Block ONLY (2) bypass the E APRM IAW ARS 5-M-1 Proposed Answer:                   C NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                  Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
A. (INCORRECT): The "E" APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133. B. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1). Additionally, the "E" APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133. C.
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
D. (CORRECT): The failed APRM has resulted in an INOP condition. This INOP will cause a Rod Block Withdrawal (ARS 5-D-3) and half scram on RPS channel "A". To bypass the "E" APRM, the "C" APRM has to be taken out of bypass. After this, the half scram is reset to allow power ascension to continue. E. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1).  
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (INCORRECT): The E APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133.
B. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1). Additionally, the E APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133.
C.
D. (CORRECT): The failed APRM has resulted in an INOP condition. This INOP will cause a Rod Block Withdrawal (ARS 5-D-3) and half scram on RPS channel A. To bypass the E APRM, the C APRM has to be taken out of bypass. After this, the half scram is reset to allow power ascension to continue.
E. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1).
Technical Reference(s):    ARSs 5-D-3 and 5-M-1,          (Attach if not previously Revision 7, LPC #1              provided)
OP 2132 Section B, Revision 23, LPC #1 Proposed references to be provided to applicants during            None examination:
Learning Objective:        LOT-03-201 A2.04                (As available)
Question Source:          Bank #                                      Lot more Modified Bank #                            (Note changes or attach parent)
New                  X NUREG-1021, Revision 9, Supplement 1


Technical Reference(s): ARSs 5-D-3 and 5-M-1, Revision 7, LPC #1 OP 2132 Section B, Revision 23, LPC #1 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
ES-401                Sample Written Examination        Form ES-401-5 Question Worksheet Question History:         Last NRC Exam      No Question Cognitive Level: Memory or Fundamental Knowledge  X Comprehension or Analysis 10 CFR Part 55 Content:  55.41 55.43      5 Comments:
None  Learning Objective: LOT-03-201 A2.04 (As available)
Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetQuestion History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 3/25/09
ES-401                             Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                     Level                         RO                 SRO Tier #                                           2 Group #                                           2 K/A #                         234000 A2.02 Importance Rating                                 3.6 (K&A Statement) A2.02 - Ability to (a) predict the impacts of the following on FUEL HANDLING EQUIPMENT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of refueling platform air system Proposed Question:                   SRO 17 Refueling operations are in progress with the following plant conditions:
 
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   2 Group #   2 K/A # 234000 A2.02 Importance Rating   3.6 (K&A Statement) A2.02 - Ability to (a) predict the impacts of the following on FUEL HANDLING EQUIPMENT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of refueling platform air system Proposed Question: SRO 17 Refueling operations are in progress with the following plant conditions:
* All control rods are inserted.
* All control rods are inserted.
* The Refuel Platform is over the core.
* The Refuel Platform is over the core.
* The grapple is loaded with a fuel assembly that is being withdrawn for movement to the spent fuel pool.
* The grapple is loaded with a fuel assembly that is being withdrawn for movement to the spent fuel pool.
As the fuel assembly is being withdrawn, breaker LSW-CO, "Air Compressor Motor Starter", on the Refuel Platform trips open. Air compressor pressure as read on the dryer output pressure gage lowers to 0 psig.
As the fuel assembly is being withdrawn, breaker LSW-CO, Air Compressor Motor Starter, on the Refuel Platform trips open. Air compressor pressure as read on the dryer output pressure gage lowers to 0 psig.
Based on the above-  
Based on the above The            (1)            .
IAW OP 1101, Management of Refueling Activities and Fuel Assembly Movement, refueling operations are halted and may be re-initiated only by the                                (2)        .
A. (1) grapple fails closed (2) Refuel Floor Supervisor with concurrence from the Shift Manager B. (1) grapple fails closed (2) Shift Manager with concurrence from the Operations Manager C. (1) hoist fails in the as-is position (2) Refuel Floor Supervisor with concurrence from the Shift Manager D. (1) hoist fails in the as-is position (2) Shift Manager with concurrence from the Operations Manager NUREG-1021, Revision 9, Supplement 1


The            (1) .
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Proposed Answer:            B Explanation (Optional):
IAW OP 1101, "Management of Refueling Activities and Fuel Assembly Movement", refueling operations are halted and may be re-initiated only by the           (2) . A. (1) grapple fails closed (2) Refuel Floor Supervisor with concurrence from the Shift Manager
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
SRO-ONLY Question Validity [10CFR55.43(b)(7)]:
: 1. Refuel Floor SRO Responsibilities A. (INCORRECT): IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager B. (CORRECT): The grapple fails closed on a loss of air. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager C. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost.
D. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager Technical Reference(s):    Electrical Drawing 5920-        (Attach if not previously 12001 Sheet 1, Revision 0      provided)
OP 1101, Revision 46 LOT-00-234 Instructor Guide, Revision 28 Proposed references to be provided to applicants during              None examination:
Learning Objective:        LOT-00-234, AA2.02, K6.04      (As available)
NUREG-1021, Revision 9, Supplement 1


B. (1) grapple fails closed (2) Shift Manager with concurrence from the Operations Manager
ES-401                Sample Written Examination                Form ES-401-5 Question Worksheet Question Source:        Bank #                              Lot more Modified Bank #                      (Note changes or attach parent)
New              X Question History:          Last NRC Exam    No Question Cognitive Level: Memory or Fundamental Knowledge        X Comprehension or Analysis 10 CFR Part 55 Content:    55.41 55.43    5, 7 Comments: Developed on 4/3/09 (Redrawn K/A as directed by Lead Examiner)
NUREG-1021, Revision 9, Supplement 1


C. (1) hoist  fails in the "as-is" position (2) Refuel Floor Supervisor with concurrence from the Shift Manager 
ES-401                            Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                   Level                             RO                 SRO Tier #                                                 2 Group #                                               2 K/A #                             233000 A2.01 Importance Rating                                     2.9 (K&A Statement) A2.01 - Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: High pool level Proposed Question:                 SRO 18 During a refueling outage with the fuel pool gates OUT, Normal Fuel Pool Cooling is aligned to the Fuel Pool IAW OP 2184, Normal Fuel Pool Cooling. Additionally, the following indications are observed:
 
* Annunciator 4-H-8, FUEL POOL CLG SYS TROUBLE alarming.
D. (1) hoist fails in the "as-is" position (2) Shift Manager with concurrence from the Operations Manager 
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                           Form ES-401-5 Question WorksheetProposed Answer: B Explanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
 
SRO-ONLY Question Validity [10CFR55.43(b)(7)]: 1. Refuel Floor SRO Responsibilities
 
A. (INCORRECT): IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager B. (CORRECT): The grapple fails closed on a loss of air. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager C. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost. D. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager Technical Reference(s): Electrical Drawing 5920-12001 Sheet 1, Revision 0 OP 1101, Revision 46 LOT-00-234 Instructor Guide, Revision 28 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
None  Learning Objective: LOT-00-234, AA2.02, K6.04 (As available)
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetQuestion Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No
 
Question Cognitive Level: Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 5, 7 Comments: Developed on 4/3/09 (Redrawn K/A as directed by Lead Examiner)
 
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   2 Group #   2 K/A # 233000 A2.01 Importance Rating   2.9 (K&A Statement) A2.01 - Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: High pool level Proposed Question: SRO 18 During a refueling outage with the fuel pool gates OUT, Normal Fuel Pool Cooling is aligned to the Fuel Pool IAW OP 2184, "Normal Fuel Pool Cooling". Additionally, the following indications are observed:
* Annunciator 4-H-8, "FUEL POOL CLG SYS TROUBLE" alarming.
* Fuel Storage Pool Level reading on ERFIS is 37.52 feet.
* Fuel Storage Pool Level reading on ERFIS is 37.52 feet.
Which ONE of the following actions is required to control Fuel Pool Level?
Which ONE of the following actions is required to control Fuel Pool Level?
IAW Fuel Pool Annunciator Response Procedure               (1) check the RCU drain flow regulator (RMC-12-143) and drain flow line up on CRP 9-4 and                     (2)                   SETPOINT if necessary.
IAW Fuel Pool Annunciator Response Procedure                                       (1)               check the RCU drain flow regulator (RMC-12-143) and drain flow line up on CRP 9-4 and (2)                 SETPOINT if necessary.
A. (1) FP-D-4, "HIGH LEVEL FUEL STORAGE POOL"      (2) increase B. (1) FP-D-3, "LOW LEVEL FUEL STORAGE POOL"        (2) increase  
A. (1) FP-D-4, HIGH LEVEL FUEL STORAGE POOL (2) increase B. (1) FP-D-3, LOW LEVEL FUEL STORAGE POOL (2) increase C. (1) FP-D-3, LOW LEVEL FUEL STORAGE POOL (2) reduce D. (1) FP-D-4, HIGH LEVEL FUEL STORAGE POOL (2) reduce Proposed Answer:                    A NUREG-1021, Revision 9, Supplement 1


C. (1) FP-D-3, "LOW LEVEL FUEL STORAGE POOL"      (2) reduce D. (1) FP-D-4, "HIGH LEVEL FUEL STORAGE POOL" (2) reduce Proposed Answer: A NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExplanation (Optional):  
ES-401                   Sample Written Examination                       Form ES-401-5 Question Worksheet Explanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A - Correct - 37.47 feet is a high level condition. During a refueling, ARS FP-D-4 provides guidance to increase the RCU drain flow regulator setpoint for a high water level condition.
A - Correct - 37.47 feet is a high level condition. During a refueling, ARS FP-D-4 provides guidance to increase the RCU drain flow regulator setpoint for a high water level condition.
B - Incorrect - 37.47 feet is a high level condition
B - Incorrect - 37.47 feet is a high level condition C - Incorrect - 37.47 feet is a high level condition D - Incorrect - ARS FP-D-3, LOW LEVEL FUEL STORAGE POOL provides guidance to reduce the RCU drain flow regulator setpoint for a low water level condition Technical Reference(s):     ARS 4-H-8, Rev. 8               (Attach if not previously ARS FP-D-4, Rev. 1             provided)
 
ARS FP-D-3, Rev. 1 Proposed references to be provided to applicants during               None examination:
C - Incorrect - 37.47 feet is a high level condition  
Learning Objective:         LOT-00-601 EO7, 10               (As available)
 
Question Source:           Bank #                                     Lot more Modified Bank #                             (Note changes or attach parent)
D - Incorrect - ARS FP-D-3, LOW LEVEL FUEL STORAGE POOL provides guidance to reduce the RCU drain flow regulator setpoint for a low water level condition Technical Reference(s): ARS 4-H-8, Rev. 8 ARS FP-D-4, Rev. 1 ARS FP-D-3, Rev. 1 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
New                 X Question History:             Last NRC Exam         No Question Cognitive Level: Memory or Fundamental Knowledge                X NUREG-1021, Revision 9, Supplement 1
None  Learning Objective: LOT-00-601 EO7, 10 (As available)  
 
Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent) New X   Question History: Last NRC Exam No  


Question Cognitive Level: Memory or Fundamental Knowledge X NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content: 55.41   55.43 5 Comments: Written 3/21/09 NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  3  Group #    K/A # 2.1.4  Importance Rating  3.8 (K&A Statement) 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management. Proposed Question: SRO 19 A plant startup and heatup are in progress. Criticality has just been achieved with 18 control rods fully withdrawn. While obtaining criticality data, the Rod Worth Minimizer fails and becomes INOP. The Control Room Supervisor (CRS) directs the Operator at the Controls (OATC) to withdraw control rods to reach the Point of Adding Heat (POAH) and establish a heat up rate. 
ES-401                 Sample Written Examination Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43     5 Comments:
Written 3/21/09 NUREG-1021, Revision 9, Supplement 1


ES-401                        Sample Written Examination                                        Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                Level                            RO                    SRO Tier #                                                  3 Group #
K/A #                            2.1.4 Importance Rating                                        3.8 (K&A Statement) 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management.
Proposed Question:              SRO 19 A plant startup and heatup are in progress. Criticality has just been achieved with 18 control rods fully withdrawn. While obtaining criticality data, the Rod Worth Minimizer fails and becomes INOP. The Control Room Supervisor (CRS) directs the Operator at the Controls (OATC) to withdraw control rods to reach the Point of Adding Heat (POAH) and establish a heat up rate.
Which ONE of the following describes the guidance concerning Reactivity Management for this scenario?
Which ONE of the following describes the guidance concerning Reactivity Management for this scenario?
In accordance with EN-OP-115, "Conduct of Operations", ALL control rod withdrawals require a peer checker to verify the correct control rod is selected and observe various panel indications. This peer check can be made by               (1)       . In accordance with Technical Specifications, when the RWM is inoperable and a startup is to proceed, the control rod sequence must be verified by     (2)         . A. (1) the Reactivity SRO or Reactor Engineering (2) Reactor Engineering  
In accordance with EN-OP-115, Conduct of Operations, ALL control rod withdrawals require a peer checker to verify the correct control rod is selected and observe various panel indications. This peer check can be made by                               (1)             .
 
In accordance with Technical Specifications, when the RWM is inoperable and a startup is to proceed, the control rod sequence must be verified by                                 (2)           .
B. (1) the Shift Technical Advisor or a second licensed operator       (2) Reactor Engineering C. (1) the Reactivity SRO or Reactor Engineering (2) a second licensed operator D. (1) the Shift Technical Advisor or a second licensed operator (2) a second licensed operator Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
A. (1) the Reactivity SRO or Reactor Engineering (2) Reactor Engineering B. (1) the Shift Technical Advisor or a second licensed operator (2) Reactor Engineering C. (1) the Reactivity SRO or Reactor Engineering (2) a second licensed operator D. (1) the Shift Technical Advisor or a second licensed operator (2) a second licensed operator Proposed Answer:                 D NUREG-1021, Revision 9, Supplement 1


ES-401                    Sample Written Examination                    Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(6)]:
SRO-ONLY Question Validity [10CFR55.43(b)(6)]:
* Knowledge of Tech Spec Bases for reactivity controls A. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
* Knowledge of Tech Spec Bases for reactivity controls A. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
Line 460: Line 560:
C. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
C. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
D. Correct- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
D. Correct- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.
Technical Reference(s): EN-OP-115, Section 5.4(28) T.S. Section 3.3.B.3.a and Bases 3.3 (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
Technical Reference(s):   EN-OP-115, Section 5.4(28)     (Attach if not previously T.S. Section 3.3.B.3.a and     provided)
None  Learning Objective: LOT-00-701 Obj. 8 LOT-03-215 K8 (As available)
Bases 3.3 Proposed references to be provided to applicants during           None examination:
Question Source: Bank # Lot more Modified Bank # 3698 (ILO) (Note changes or attach parent)
Learning Objective:       LOT-00-701 Obj. 8             (As available)
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet New    Question History: Last NRC Exam No
LOT-03-215 K8 Question Source:           Bank #                                   Lot more Modified Bank #   3698 (ILO)             (Note changes or attach parent)
NUREG-1021, Revision 9, Supplement 1


Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41   55.43 6 Comments: Selected 3/23/09; Re-written following K/A redraw on 5-5-09  
ES-401                Sample Written Examination                  Form ES-401-5 Question Worksheet New Question History:        Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge         X Comprehension or Analysis 10 CFR Part 55 Content:   55.41 55.43   6 Comments: Selected 3/23/09; Re-written following K/A redraw on 5-5-09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   3 Group #     K/A # 2.2.40 Importance Rating   4.7 (K&A Statement) 2.2.40 Ability to apply technical specifications for a system. Proposed Question: SRO 20 With the plant at full power operations, a 14 day LCO is in progress for corrective maintenance on the HPCI Aux Oil Pump. Additionally:
ES-401                            Sample Written Examination                         Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                   Level                 RO           SRO Tier #                               3 Group #
* A surveillance inspection revealed that several snubbers for the "A" and "B" Loops of the Residual Heat Removal (RHR) System have failed.
K/A #                 2.2.40 Importance Rating                   4.7 (K&A Statement) 2.2.40 Ability to apply technical specifications for a system.
Proposed Question:                 SRO 20 With the plant at full power operations, a 14 day LCO is in progress for corrective maintenance on the HPCI Aux Oil Pump. Additionally:
* A surveillance inspection revealed that several snubbers for the A and B Loops of the Residual Heat Removal (RHR) System have failed.
* Engineering has performed an evaluation: risk is assessed and managed.
* Engineering has performed an evaluation: risk is assessed and managed.
* It is expected that the snubbers will not be operable for another 20 hours.
* It is expected that the snubbers will not be operable for another 20 hours.
For the conditions above, which ONE of the following describes the MOST limiting Technical Specification LCO required?
For the conditions above, which ONE of the following describes the MOST limiting Technical Specification LCO required?
 
A. The A AND B Loops of RHR are declared inoperable. An orderly shutdown shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours.
A. The "A" AND "B" Loops of RHR are declared inoperable. An orderly shutdown shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours.
B. ONLY one Loop of RHR is declared inoperable. An orderly shutdown shall be initiated and the reactor pressure shall be reduced to within 150 psig within 24 hours.
B. ONLY one Loop of RHR is declared inoperable. An orderly shutdown shall be initiated and the reactor pressure shall be reduced to within 150 psig within 24 hours.
C. A tracking LCO is entered for the "A" AND "B" Loops of RHR. Since the snubbers will be operable within 72 hours, the plant will remain in a 14 day LCO for HPCI being inoperable.
C. A tracking LCO is entered for the A AND B Loops of RHR. Since the snubbers will be operable within 72 hours, the plant will remain in a 14 day LCO for HPCI being inoperable.
D. No action is required. Snubber operability does not affect the operability of the RHR System. The plant remains in a 14 day LCO for HPCI being inoperable.
D. No action is required. Snubber operability does not affect the operability of the RHR System. The plant remains in a 14 day LCO for HPCI being inoperable.
Proposed Answer:                    A NUREG-1021, Revision 9, Supplement 1


Proposed Answer: A NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetExplanation (Optional):  
ES-401                   Sample Written Examination                     Form ES-401-5 Question Worksheet Explanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(2)]:
SRO-ONLY Question Validity [10CFR55.43(b)(2)]: (1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line. (3) Question cannot be answered by knowing the TS Safety Limits or their bases. (4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
(1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.
A. (CORRECT): Technical Specification 3.0.8.b. provides a time limit of 12 hours for inoperable snubbers associated with more than one train or subsystem. The stem of the question indicates snubbers have been identified in both the "A" and "B" trains of RHR and the time frame for repair is 20 hours. Therefore, both trains of RHR are declared inoperable, resulting in entry to 3.5.A.6, 24 hour cold shutdown LCO. This LCO is more restrictive than the 3.5.E.3 24 hour 150 psig LCO.
(3) Question cannot be answered by knowing the TS Safety Limits or their bases.
(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
A. (CORRECT): Technical Specification 3.0.8.b. provides a time limit of 12 hours for inoperable snubbers associated with more than one train or subsystem. The stem of the question indicates snubbers have been identified in both the A and B trains of RHR and the time frame for repair is 20 hours. Therefore, both trains of RHR are declared inoperable, resulting in entry to 3.5.A.6, 24 hour cold shutdown LCO. This LCO is more restrictive than the 3.5.E.3 24 hour 150 psig LCO.
B. (INCORRECT): If the candidate was to interpret T.S. 3.0.8.a incorrectly, he could conclude that ONLY one loop of RHR needs to be declared Inoperable. In this instance, the candidate would apply the 3.5.E.3 LCO. However two trains of RHR inoperable based on reported snubber conditions.
B. (INCORRECT): If the candidate was to interpret T.S. 3.0.8.a incorrectly, he could conclude that ONLY one loop of RHR needs to be declared Inoperable. In this instance, the candidate would apply the 3.5.E.3 LCO. However two trains of RHR inoperable based on reported snubber conditions.
C. (INCORRECT): The 72 hour tracking LCO is for a single system as specified in 3.0.8.a. Since both trains of RHR are affected, this is incorrect. The candidate's misapplication of this LCO makes this a plausible distractor.
C. (INCORRECT): The 72 hour tracking LCO is for a single system as specified in 3.0.8.a. Since both trains of RHR are affected, this is incorrect. The candidates misapplication of this LCO makes this a plausible distractor.
D. (INCORRECT): The stem of the question indicates the snubbers are being "assessed and managed"; however, there are more restrictions in 3.0.8.b which need to be applied. If the student reads only the first paragraph of 3.0.8, this becomes a plausible distractor.  
D. (INCORRECT): The stem of the question indicates the snubbers are being assessed and managed; however, there are more restrictions in 3.0.8.b which need to be applied. If the student reads only the first paragraph of 3.0.8, this becomes a plausible distractor.
 
Technical Reference(s):   Tech Specs Section 3.0.8.b       (Attach if not previously Amendment 230, and 3.5.A.6       provided)
Technical Reference(s): Tech Specs Section 3.0.8.b Amendment 230, and 3.5.A.6 Amendment 228 (Attach if not previously provided)    Proposed references to be provided to applicants during examination: Tech Specs 3/4.0 and 3/4.5 without bases.
Amendment 228 Proposed references to be provided to applicants during             Tech Specs 3/4.0 and examination:                                                        3/4.5 without bases.
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Learning Objective: LOT-00-308 SRO#1 (As available)
NUREG-1021, Revision 9, Supplement 1
 
Question Source: Bank #  Lot more  Modified Bank  # 6948 (ILO) (Note changes or attach parent)  New    Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 2 Comments: Developed on 4/3/09  
ES-401                Sample Written Examination                Form ES-401-5 Question Worksheet Learning Objective:      LOT-00-308 SRO#1            (As available)
 
Question Source:        Bank #                              Lot more Modified Bank #  6948 (ILO)          (Note changes or attach parent)
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO  SRO  Tier #  3  Group #    K/A # 2.3.4  Importance Rating  3.7 (K&A Statement) 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions. Proposed Question: SRO 21 The Control Room has declared a Site Area Emergency.
New Question History:          Last NRC Exam    No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis               X 10 CFR Part 55 Content:   55.41 55.43     2 Comments: Developed on 4/3/09 NUREG-1021, Revision 9, Supplement 1


ES-401                        Sample Written Examination                                    Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                Level                          RO                SRO Tier #                                            3 Group #
K/A #                          2.3.4 Importance Rating                                3.7 (K&A Statement) 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.
Proposed Question:              SRO 21 The Control Room has declared a Site Area Emergency.
The Emergency Plan has been activated but the supporting facilities have NOT been manned.
The Emergency Plan has been activated but the supporting facilities have NOT been manned.
It has been determined that four (4) valves on the Refuel Floor must be closed to mitigate the transient.
It has been determined that four (4) valves on the Refuel Floor must be closed to mitigate the transient.
Line 501: Line 607:
* Current exposure for the only available AO: 380 mR for current year
* Current exposure for the only available AO: 380 mR for current year
* Time estimate: 20 minutes
* Time estimate: 20 minutes
* Radiation Field:10.5 R/hr The exposure to complete the task must be authorized by the           (1)           as specified IAW           (2)           .
* Radiation Field:10.5 R/hr The exposure to complete the task must be authorized by the                             (1)       as specified IAW             (2)           .
A. (1) Shift Manager       (2) EN-RP-201, "Dosimetry Administration" B. (1) General Manager Plant Operations       (2) EN-RP-201, "Dosimetry Administration"
A. (1) Shift Manager (2) EN-RP-201, Dosimetry Administration B. (1) General Manager Plant Operations (2) EN-RP-201, Dosimetry Administration C. (1) Shift Manager (2) OP 3507, Emergency Radiation Exposure Control D. (1) General Manager Plant Operations (2) OP 3507, Emergency Radiation Exposure Control Proposed Answer:                 C NUREG-1021, Revision 9, Supplement 1
 
C. (1) Shift Manager       (2) OP 3507, "Emergency Radiation Exposure Control" D. (1) General Manager Plant Operations (2) OP 3507, "Emergency Radiation Exposure Control" Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(4)]: 1. Question requires analysis and interpretation of radiation readings as they pertain to selection of administrative, normal, abnormal, and emergency procedures. 


ES-401                    Sample Written Examination                    Form ES-401-5 Question Worksheet Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(4)]:
: 1. Question requires analysis and interpretation of radiation readings as they pertain to selection of administrative, normal, abnormal, and emergency procedures.
A 20 minute exposure in a 10.5 R/hr field is an exposure of 3.5 R plus the current exposure of 380 mR equals a total exposure of 3.88 R.
A 20 minute exposure in a 10.5 R/hr field is an exposure of 3.5 R plus the current exposure of 380 mR equals a total exposure of 3.88 R.
IAW OP 3507 the following provides guidance:
IAW OP 3507 the following provides guidance:
* Section 4.1 "The Shift Manager is responsible for authorizing emergency dose guidelines depending on the emergency until relieved by the Emergency Plant Manager or Emergency Director."
* Section 4.1 The Shift Manager is responsible for authorizing emergency dose guidelines depending on the emergency until relieved by the Emergency Plant Manager or Emergency Director.
* Section 5.2 "
* Section 5.2 IF tasks are being conducted within areas that show a significant increase in general area dose rates from normal plant radiological conditions, OR THEN the emergency dose control process will be used to control radiation exposure of personnel.
IF tasks are being conducted within areas that show a significant increase in general area dose rates from normal plant radiological conditions, OR -- THEN the emergency dose control process will be used to control radiation exposure of personnel."
* Attachment 9.5 Emergency Dose Limits. Line 1 - Dose Limit 5 Rem (TEDE) for All Work Activities A. Incorrect - EN-RP-201 is for normal planned exposures. The SM is not the approving authority for this exposure.
* Attachment 9.5 Emergency Dose Limits. Line 1 - Dose Limit 5 Rem (TEDE) for All Work Activities A. Incorrect - EN-RP-201 is for normal planned exposures. The SM is not the approving authority for this exposure.
B. Incorrect - This is the correct answer for normal planned exposures and the GMPO is the approving authority since the total exposure is between 3 - 4 R.
B. Incorrect - This is the correct answer for normal planned exposures and the GMPO is the approving authority since the total exposure is between 3 - 4 R.
C. Correct - OP 3507 Emergency Radiation Exposure Control provides guidance on exposure limits during an emergency. During an emergency condition, the Plant Emergency Director (PED) authorizes the exposure limits. Since the EOF, TSC, and OSC are not manned, the SM is the PED. An exposure limit of 5 R TEDE is authorized IAW Attachment 9.5 of OP 3507.
C. Correct - OP 3507 Emergency Radiation Exposure Control provides guidance on exposure limits during an emergency. During an emergency condition, the Plant Emergency Director (PED) authorizes the exposure limits. Since the EOF, TSC, and OSC are not manned, the SM is the PED. An exposure limit of 5 R TEDE is authorized IAW Attachment 9.5 of OP 3507.
D. Incorrect - the GMPO is not the approving authority. The GMPO approves extensions between 3-4R IAW EN-RP-201 Section 5.4 for normal planned exposures.  
D. Incorrect - the GMPO is not the approving authority. The GMPO approves extensions between 3-4R IAW EN-RP-201 Section 5.4 for normal planned exposures.
 
Technical Reference(s):   OP 3507 Sections 4.1, 5.2,     (Attach if not previously 5.3, Att 9.5, Rev 40           provided)
Technical Reference(s): OP 3507 Sections 4.1, 5.2, 5.3, Att 9.5, Rev 40 EN-RP-201 Sections 5.4 Rev 2 (Attach if not previously provided)
EN-RP-201 Sections 5.4 Rev 2
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during examination:
NUREG-1021, Revision 9, Supplement 1
None  Learning Objective: LOT-00-900 SRO 3 (As available)
 
Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No


Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 4 Comments: Written 3/29/09  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during        None examination:
Learning Objective:      LOT-00-900 SRO 3              (As available)
Question Source:        Bank #                                  Lot more Modified Bank #                          (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                 X 10 CFR Part 55 Content:   55.41 55.43   4 Comments:
Written 3/29/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   3 Group #     K/A # 2.4.11 Importance Rating   4.2 (K&A Statement) 2.4.11 Knowledge of abnormal condition procedures. Proposed Question: SRO 22 A plant startup is in progress IAW OP 0105, "Reactor Operation" with the turbine online. The reactor is at 20% RTP with annunciator 5-K-8, "STOP/CTRL VLV FAST CLOSURE BYP", illuminated.
ES-401                         Sample Written Examination                   Form ES-401-5 Question Worksheet Examination Outline Cross-reference:               Level             RO           SRO Tier #                         3 Group #
Additionally, Annunciator 7-F-2, "TURB Excessive Vibration" alarms in the control room.
K/A #             2.4.11 Importance Rating               4.2 (K&A Statement) 2.4.11 Knowledge of abnormal condition procedures.
Proposed Question:               SRO 22 A plant startup is in progress IAW OP 0105, Reactor Operation with the turbine online.
The reactor is at 20% RTP with annunciator 5-K-8, STOP/CTRL VLV FAST CLOSURE BYP, illuminated.
Additionally, Annunciator 7-F-2, TURB Excessive Vibration alarms in the control room.
The ERFIS screen for "Turbine Bearing Performance" indicates the following:
The ERFIS screen for "Turbine Bearing Performance" indicates the following:
* Bearings 1X, 1Y and 8X are alarming with a slowly rising trend in all three values.
* Bearings 1X, 1Y and 8X are alarming with a slowly rising trend in all three values.
* All other bearing temperatures and trends are stable.
* All other bearing temperatures and trends are stable.
Failure to take operator action in a timely manner will result in:  
Failure to take operator action in a timely manner will result in:
(1) Which ONE of the following plant responses? (2) What required actions to be taken?
(1) Which ONE of the following plant responses?
A. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.       (2) Enter ONLY ON 3154, "Load Reject". Verify 1T ACB, 81-1T ACB and T-1 MOD open. B. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip. (2) Enter ONLY ON 3154, "Load Reject". Verify 1T ACB, 81-1T ACB and T-1 MOD open. C. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip. (2) Enter OT 3100, "Reactor Scram" AND ON 3154, "Load Reject". Verify house loads have transferred to the Startup Transformers.  
(2) What required actions to be taken?
 
A. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.
D. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip. (2) Enter OT 3100, "Reactor Scram" AND ON 3154, "Load Reject". Verify house loads have transferred to the Startup Transformers.  
(2) Enter ONLY ON 3154, Load Reject. Verify 1T ACB, 81-1T ACB and T-1 MOD open.
 
B. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Proposed Answer: A Explanation (Optional):
(2) Enter ONLY ON 3154, Load Reject. Verify 1T ACB, 81-1T ACB and T-1 MOD open.
 
C. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 2. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 3. Question cannot be answered by knowing the immediate operator actions. 
(2) Enter OT 3100, Reactor Scram AND ON 3154, Load Reject. Verify house loads have transferred to the Startup Transformers.
: 4. Question cannot be answered by knowing EOP entry conditions 
D. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.
: 5. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 6. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
(2) Enter OT 3100, Reactor Scram AND ON 3154, Load Reject. Verify house loads have transferred to the Startup Transformers.
 
NUREG-1021, Revision 9, Supplement 1
A. (CORRECT): First the candidate needs to understand the logic. A turbine trip will occur if both axes on the same bearing reach the trip setpoint. Then the candidate must integrate the fact that power is <25% RTP, therefore annunciator 5-K-8 is lit (bypass of the auto scram on a turbine trip). Since a scram will not occur, OT 3100 is not entered. ON 3154 is entered based on ARS 7-F-2. B. (INCORRECT): The same axis for two different bearings will not result in a turbine trip. C. (INCORRECT): With power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable. D. (INCORRECT): The same axis for two different bearings will not result in a turbine trip. Also, with power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable.


Technical Reference(s): ON 3154, Revision 11 LPC 1 ARS 7-F-2, Revision 15  
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Proposed Answer:            A Explanation (Optional):
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 2. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 3. Question cannot be answered by knowing the immediate operator actions.
: 4. Question cannot be answered by knowing EOP entry conditions
: 5. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 6. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
A. (CORRECT): First the candidate needs to understand the logic. A turbine trip will occur if both axes on the same bearing reach the trip setpoint. Then the candidate must integrate the fact that power is <25% RTP, therefore annunciator 5-K-8 is lit (bypass of the auto scram on a turbine trip). Since a scram will not occur, OT 3100 is not entered. ON 3154 is entered based on ARS 7-F-2.
B. (INCORRECT): The same axis for two different bearings will not result in a turbine trip.
C. (INCORRECT): With power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable.
D. (INCORRECT): The same axis for two different bearings will not result in a turbine trip. Also, with power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable.
Technical Reference(s):     ON 3154, Revision 11 LPC 1     (Attach if not previously ARS 7-F-2, Revision 15         provided)
Proposed references to be provided to applicants during              None examination:
Learning Objective:        LOT-00-600 RO EO4 and            (As available)
SRO EO1 NUREG-1021, Revision 9, Supplement 1


  (Attach if not previously provided)    Proposed references to be provided to applicants during examination:
ES-401                Sample Written Examination            Form ES-401-5 Question Worksheet Question Source:        Bank #                          Lot more Modified Bank # 6163 (ILO)      (Note changes or attach parent)
None  Learning Objective: LOT-00-600 RO EO4 and SRO EO1 (As available)
New Question History:          Last NRC Exam     No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis        X 10 CFR Part 55 Content:    55.41 55.43    5 Comments:
Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1


NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                           Form ES-401-5 Question WorksheetQuestion Source: Bank #  Lot more  Modified Bank  # 6163 (ILO) (Note changes or attach parent)  New    Question History: Last NRC Exam No
ES-401                            Sample Written Examination                                         Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                   Level                               RO             SRO Tier #                                             3 Group #
 
K/A #                               2.2.37 Importance Rating                                   4.6 (K&A Statement) 2.2.37 Ability to determine operability and / or availability of safety related equipment.
Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 5  Comments: Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   3 Group #     K/A # 2.2.37 Importance Rating   4.6 (K&A Statement) 2.2.37 Ability to determine operability and / or availability of safety related equipment. Proposed Question: SRO 23 A plant shutdown and cooldown are being performed IAW OP 0105, "Reactor Operations" with the following conditions:
Proposed Question:                 SRO 23 A plant shutdown and cooldown are being performed IAW OP 0105, Reactor Operations with the following conditions:
* All rods inserted
* All rods inserted
* RPV pressure: 800 psig
* RPV pressure: 800 psig
* Cooldown rate: 60
* Cooldown rate: 60&deg;F/hr
&deg;F/hr
* Both House Heating Boilers tripped due to low fuel oil level.
* Both House Heating Boilers tripped due to low fuel oil level.
* Outside air temperature is 10
* Outside air temperature is 10&deg;F.
&deg;F. The Turbine Building AO reports the "A" Diesel Room temperature is 47
The Turbine Building AO reports the A Diesel Room temperature is 47&deg;F Determine the operability of the A Emergency Diesel Generator (EDG) and the correct guidance for assessing availability.
&deg;F Determine the operability of the "A" Emergency Diesel Generator (EDG) and the correct guidance for assessing availability.  
A EDG is               (1)             .
"A" EDG is             (1) .
Risk assessment availability will be assessed IAW                                   (2)       .
Risk assessment availability will be assessed IAW             (2)   . A. (1) OPERABLE       (2) AP 0172, "Work Schedule Risk Management - Online"
A. (1) OPERABLE (2) AP 0172, Work Schedule Risk Management - Online B. (1) OPERABLE (2) AP 0173, Work Schedule Risk Management - Outage C. (1) INOPERABLE (2) AP 0172, Work Schedule Risk Management - Online D. (1) INOPERABLE (2) AP 0173, Work Schedule Risk Management - Outage Proposed Answer:                   C NUREG-1021, Revision 9, Supplement 1
 
B. (1) OPERABLE       (2) AP 0173, "Work Schedule Risk Management - Outage" C. (1) INOPERABLE (2) AP 0172, "Work Schedule Risk Management - Online" D. (1) INOPERABLE       (2) AP 0173, "Work Schedule Risk Management - Outage" Proposed Answer: C NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional): Precautions in OP 2192 (#10) and OP 2126 (#17) specify the UFSAR minimum temperature is 50 0 F  SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 
: 3. Question cannot be answered by knowing EOP entry conditions 
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed. SRO-ONLY Question Validity [10CFR55.43(b)(2)]: 1. Question cannot be answered by knowing 1 hour TS/TRM action 2. Question cannot be answered by knowing the LCO/TRM information listed above the line. 3. Question cannot be answered by knowing the TS Safety Limits or their bases. 
: 4. Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements. 


ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
Precautions in OP 2192 (#10) and OP 2126 (#17) specify the UFSAR minimum temperature is 500F SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
SRO-ONLY Question Validity [10CFR55.43(b)(2)]:
: 1. Question cannot be answered by knowing 1 hour TS/TRM action
: 2. Question cannot be answered by knowing the LCO/TRM information listed above the line.
: 3. Question cannot be answered by knowing the TS Safety Limits or their bases.
: 4. Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
A. Incorrect - With EDG room temperature <50F, the associated EDG should be declared INOPERABLE. Risk Management - availability will be assessed using AP 0172. When RCS pressure is 100 psig, the transition from AP-0172 - Online to AP-0173 - Outage Risk is performed. At 800 psig, AP 0172 should still be used to assess availability.
A. Incorrect - With EDG room temperature <50F, the associated EDG should be declared INOPERABLE. Risk Management - availability will be assessed using AP 0172. When RCS pressure is 100 psig, the transition from AP-0172 - Online to AP-0173 - Outage Risk is performed. At 800 psig, AP 0172 should still be used to assess availability.
B. Incorrect - AP 0173 is a plausible distractor since the plant is shutdown, while the outage period has begun by output breaker status, risk management transitions to AP-0173 has not been met with RCS pressure greater than 100 psig.
B. Incorrect - AP 0173 is a plausible distractor since the plant is shutdown, while the outage period has begun by output breaker status, risk management transitions to AP-0173 has not been met with RCS pressure greater than 100 psig.
C. Correct - "A" EDG is INOPERABLE with room temperature <50F and AP 0172 will assess the availability of "A" EDG  
C. Correct - A EDG is INOPERABLE with room temperature <50F and AP 0172 will assess the availability of A EDG D. Incorrect - At 800 psig, AP 0172 should still be used to assess availability.
 
Technical Reference(s):    OP 2192, Rev. 65,                (Attach if not previously Precaution #10                  provided)
D. Incorrect - At 800 psig, AP 0172 should still be used to assess availability.  
OP 2126, Rev. 55, Precaution #17 AP 0173, Rev. 21 Section 1.2.1, 1.2.2 NUREG-1021, Revision 9, Supplement 1


Technical Reference(s): OP 2192, Rev. 65, Precaution #10 OP 2126, Rev. 55, Precaution #17 AP 0173, Rev. 21 Section 1.2.1, 1.2.2  (Attach if not previously provided)
ES-401                 Sample Written Examination                   Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during         None examination:
NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet   Proposed references to be provided to applicants during examination:
Learning Objective:     LOT-00-601 EO5                 (As available)
None  Learning Objective: LOT-00-601 EO5 (As available)  
Question Source:        Bank #                                  Lot more Modified Bank #                          (Note changes or attach parent)
New                X Question History:          Last NRC Exam        No Question Cognitive Level: Memory or Fundamental Knowledge            X Comprehension or Analysis 10 CFR Part 55 Content:    55.41 55.43    2,5 Comments:
Written 3/26/09 NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X  Question History: Last NRC Exam No
ES-401                         Sample Written Examination                               Form ES-401-5 Question Worksheet Examination Outline Cross-reference:               Level                         RO           SRO Tier #                                       3 Group #
 
K/A #                         2.1.34 Importance Rating                           3.5 (K&A Statement) 2.1.34 Knowledge of primary and secondary plant chemistry limits.
Question Cognitive Level: Memory or Fundamental Knowledge X  Comprehension or Analysis 10 CFR Part 55 Content: 55.41  55.43 2,5 Comments: Written 3/26/09 NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   3 Group #     K/A # 2.1.34 Importance Rating   3.5 (K&A Statement) 2.1.34 Knowledge of primary and secondary plant chemistry limits. Proposed Question: SRO 24 A plant startup is in progress IAW OP 0105, "Reactor Operations". Reactor Power is being held at ~22%. Chemistry has taken reactor coolant samples IAW OP 4612, "Reactor Water System Sampling and Treatment". The following results were given to the Control Room Supervisor for review:
Proposed Question:               SRO 24 A plant startup is in progress IAW OP 0105, Reactor Operations. Reactor Power is being held at ~22%. Chemistry has taken reactor coolant samples IAW OP 4612, Reactor Water System Sampling and Treatment. The following results were given to the Control Room Supervisor for review:
* Conductivity is 2.8 mho/cm
* Conductivity is 2.8 mho/cm
* Chloride ion concentration is 0.15 ppm
* Chloride ion concentration is 0.15 ppm
* I-131 dose equivalent is 1.8 Ci/gm. (This is the first I-131 sample)
* I-131 dose equivalent is 1.8 Ci/gm. (This is the first I-131 sample)
Which ONE of the following actions is required based on these coolant chemistry results?
Which ONE of the following actions is required based on these coolant chemistry results?
 
A. The startup shall continue IAW OP 0105 since all given chemistry samples are satisfactory.
A. The startup shall continue IAW OP 0105 since all given chemistry samples are satisfactory.
B. The coolant shall be sampled every 4 hours and analyzed for radioactive iodines until Iodine dose equivalent is within specification.
B. The coolant shall be sampled every 4 hours and analyzed for radioactive iodines until Iodine dose equivalent is within specification.
C. The reactor shall be in the cold shutdown condition within 24 hours based on chlorides being out of specification.  
C. The reactor shall be in the cold shutdown condition within 24 hours based on chlorides being out of specification.
 
D. The reactor shall be in the cold shutdown condition within 24 hours based on iodines being out of specification.
D. The reactor shall be in the cold shutdown condition within 24 hours based on iodines being out of specification.
Proposed Answer: B NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
Proposed Answer:                 B NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(2)]: (1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line. (3) Question cannot be answered by knowing the TS Safety Limits or their bases. (4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
 
SRO-ONLY Question Validity [10CFR55.43(b)(2)]:
A. (INCORRECT): The candidate may believe these results are sat based on thinking the Iodine limit is 4 Ci/gm (T.S. 3.6.B.1.c), Conductivity limit is 10 mho/cm (TRM 3.6.B.3), and chloride limit is 0.1 ppm (TRM 3.6.B.3). However, in this case, Radioiodine concentrations are UNSAT IAW OP 4612 Table 3 and TS limits. Samples are required every 4 hours to ensure 1.1 Ci/gm is not exceeded for greater than 24 hours. This action to continue a startup may not be conservative since a concentration >1.1 Ci/gm is indicative of failure of the cleanup demineralizer or gross activity in the gaseous effluents is near the limit which is indicative of a potential fuel failure. B. (CORRECT): T.S section 4.6.B.1.e C. (INCORRECT): Chlorides are not out of spec. Because steaming rate is greater than 100,000 lbm/hour, the chloride spec is now 0.5 ppm. If steaming rate was <100,000 lbm/hour, then chlorides would be out of spec. 22% power provides greater than 100,000 lbm/hour. D. (INCORRECT): This would be the case if either radiochemistry iodine concentration exceeded 1.1 Ci/gm for greater than 24 hours or if concentration exceeded 4.0 Ci/gm at any time. 4.0 Ci/gm is the iodine spike limit. Exceeding this limit will not guarantee we will be within the 10CFR50.67 dose guidelines in the event of a postulated LOCA.
(1) Question cannot be answered by knowing 1 hour TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.
 
(3) Question cannot be answered by knowing the TS Safety Limits or their bases.
Technical Reference(s): OP 0105, Revision 86 LPC 2 OP 4612, Revision 37 Technical Specifications section 4.6.B.1.e Amendment  
(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.
 
A. (INCORRECT): The candidate may believe these results are sat based on thinking the Iodine limit is 4 Ci/gm (T.S. 3.6.B.1.c), Conductivity limit is 10 mho/cm (TRM 3.6.B.3), and chloride limit is 0.1 ppm (TRM 3.6.B.3). However, in this case, Radioiodine concentrations are UNSAT IAW OP 4612 Table 3 and TS limits.
190 (Attach if not previously provided)
Samples are required every 4 hours to ensure 1.1 Ci/gm is not exceeded for greater than 24 hours. This action to continue a startup may not be conservative since a concentration >1.1 Ci/gm is indicative of failure of the cleanup demineralizer or gross activity in the gaseous effluents is near the limit which is indicative of a potential fuel failure.
NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during examination: T.S Section 3.6 without bases. TRM Section 3/4.6
B. (CORRECT): T.S section 4.6.B.1.e C. (INCORRECT): Chlorides are not out of spec. Because steaming rate is greater than 100,000 lbm/hour, the chloride spec is now 0.5 ppm. If steaming rate was <100,000 lbm/hour, then chlorides would be out of spec. 22% power provides greater than 100,000 lbm/hour.
 
D. (INCORRECT): This would be the case if either radiochemistry iodine concentration exceeded 1.1 Ci/gm for greater than 24 hours or if concentration exceeded 4.0 Ci/gm at any time. 4.0 Ci/gm is the iodine spike limit. Exceeding this limit will not guarantee we will be within the 10CFR50.67 dose guidelines in the event of a postulated LOCA.
Learning Objective: LOT-00-301 SRO #3 (As available)
Technical Reference(s):     OP 0105, Revision 86 LPC 2       (Attach if not previously OP 4612, Revision 37             provided)
Technical Specifications section 4.6.B.1.e Amendment 190 NUREG-1021, Revision 9, Supplement 1


Question Source: Bank # Lot more Modified Bank # 6296 (ILO) (Note changes or attach parent) New   Question History: Last NRC Exam No  
ES-401                  Sample Written Examination                    Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during        T.S Section 3.6 examination:                                                    without bases.
TRM Section 3/4.6 Learning Objective:      LOT-00-301 SRO #3              (As available)
Question Source:         Bank #                                   Lot more Modified Bank #   6296 (ILO)           (Note changes or attach parent)
New Question History:         Last NRC Exam       No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis                X 10 CFR Part 55 Content:    55.41 55.43    2 Comments:
Developed on 4/14/09 NUREG-1021, Revision 9, Supplement 1


Question Cognitive Level: Memory or Fundamental Knowledge  Comprehension or Analysis X 10 CFR Part 55 Content: 55.41  55.43 2  Comments: Developed on 4/14/09 NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier #   3 Group #     K/A # 2.4.35 Importance Rating   4.0 (K&A Statement) 2.4.35 Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects. Proposed Question: SRO 25 An Anticipated Transient Without Scram (ATWS) has occurred. Additionally:
ES-401                         Sample Written Examination                                     Form ES-401-5 Question Worksheet Examination Outline Cross-reference:                 Level                         RO                   SRO Tier #                                               3 Group #
K/A #                         2.4.35 Importance Rating                                   4.0 (K&A Statement) 2.4.35 Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects.
Proposed Question:               SRO 25 An Anticipated Transient Without Scram (ATWS) has occurred. Additionally:
* NO rod motion occurred
* NO rod motion occurred
* The Scram Air Header remains pressurized
* The Scram Air Header remains pressurized
* RPS remains energized
* RPS remains energized
* RPV Pressure is steady at 920 psig.
* RPV Pressure is steady at 920 psig.
The CRS directs the Reactor Building Auxiliary Operator (RBAO) to perform Appendix D, "Manual Isolation and Venting of the Scram Air Header". When the RBAO reported the scram air header has been isolated and vented, SOME control rod motion occurred.
The CRS directs the Reactor Building Auxiliary Operator (RBAO) to perform Appendix D, Manual Isolation and Venting of the Scram Air Header. When the RBAO reported the scram air header has been isolated and vented, SOME control rod motion occurred.
 
NO additional actions have been performed IAW Appendix D.
NO additional actions have been performed IAW Appendix D.
Which of the following (if any) can be directed by the CRS to successfully insert the remaining control rods?
 
(1) Appendix G, Manual Insertion of Individual Control Rods (2) Appendix H, Vent the Control Rod Drive Over Piston Volume A. BOTH (1) and (2)
Which of the following (if any) can be directed by the CRS to successfully insert the remaining control rods?  
B. Neither (1) nor (2)
 
(1) Appendix G, "Manual Insertion of Individual Control Rods" (2) Appendix H, "Vent the Control Rod Drive Over Piston Volume"
 
A. BOTH (1) and (2)
B. Neither (1) nor (2)  
 
C. ONLY (1)
C. ONLY (1)
D. ONLY (2)
D. ONLY (2)
Proposed Answer: D NUREG-1021, Revision 9, Supplement 1 ES-401                            Sample Written Examination                            Form ES-401-5 Question WorksheetExplanation (Optional):
Proposed Answer:                 D NUREG-1021, Revision 9, Supplement 1


SRO-ONLY Question Validity [10CFR55.43(b)(5)]: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation. 2. Question cannot be answered by knowing the immediate operator actions. 3. Question cannot be answered by knowing EOP entry conditions
ES-401                    Sample Written Examination                      Form ES-401-5 Question Worksheet Explanation (Optional):
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure. 5. Question requires detailed knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps.
SRO-ONLY Question Validity [10CFR55.43(b)(5)]:
A. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.
: 1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
: 2. Question cannot be answered by knowing the immediate operator actions.
: 3. Question cannot be answered by knowing EOP entry conditions
: 4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
: 5. Question requires detailed knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps.
A. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.
B. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion. There are notes in Appendix D, G, and BB providing this information. Nothing in the stem prevents Appendix H from being performed.
B. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion. There are notes in Appendix D, G, and BB providing this information. Nothing in the stem prevents Appendix H from being performed.
C. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.
C. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.
D. Correct - Appendix H CAN be implemented because there is no affect on the ability to vent the overpiston area. Also, there is adequate RPV Pressure to insert control rods (>500#).
D. Correct - Appendix H CAN be implemented because there is no affect on the ability to vent the overpiston area. Also, there is adequate RPV Pressure to insert control rods (>500#).
 
Technical Reference(s):     OE 3107 Rev. 25,                 (Attach if not previously Appendices D, G, H               provided)
Technical Reference(s): OE 3107 Rev. 25, Appendices D, G, H (Attach if not previously provided)     Proposed references to be provided to applicants during examination:
Proposed references to be provided to applicants during               None examination:
None  Learning Objective: LOT-00-626 EO3 (As available)  
Learning Objective:         LOT-00-626 EO3                   (As available)
Question Source:            Bank #                                      Lot more Modified Bank #                            (Note changes or attach parent)
New                X NUREG-1021, Revision 9, Supplement 1


Question Source: Bank #  Lot more  Modified Bank  #  (Note changes or attach parent)  New X NUREG-1021, Revision 9, Supplement 1 ES-401                           Sample Written Examination                           Form ES-401-5 Question WorksheetQuestion History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge   Comprehension or Analysis X 10 CFR Part 55 Content: 55.41   55.43 5 Comments: Written 3/24/09}}
ES-401                 Sample Written Examination         Form ES-401-5 Question Worksheet Question History:         Last NRC Exam     No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis       X 10 CFR Part 55 Content:   55.41 55.43   5 Comments:
Written 3/24/09 NUREG-1021, Revision 9, Supplement 1}}

Latest revision as of 05:44, 14 November 2019

Retake - Final Written Examination with Answer Key (401-5 Format)
ML091730041
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 05/11/2009
From:
Entergy Nuclear Vermont Yankee
To: Johnson G
Operations Branch I
Hansell S
Shared Package
ML090930023 List:
References
TAC U01794
Download: ML091730041 (77)


Text

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295025 EA2.02 Importance Rating 4.2 (K&A Statement) EA2.02 - Ability to determine and/or interpret the following as they apply to HIGH REACTOR PRESSURE: Reactor Power Proposed Question: SRO 1 With the plant operating at 80% RTP IAW OP 0105, Reactor Operations, power is lost to the Electro-Hydraulic Pressure Regulator (EPR).

Which ONE of the following describes the reactor power response and course of action taken to stabilize the plant?

Reactor Power will (1) . The correct course of action is to (2) .

A. (1) decrease (2) enter ONLY OT 3115, Reactor Pressure Transients. Verify the MPR takes control THEN place the EPR in CUTOUT B. (1) increase (2) enter OT 3110, Positive Reactivity Insertion AND OT 3115, Reactor Pressure Transients. Verify the MPR takes control THEN place the EPR in CUTOUT C. (1) decrease (2) enter ONLY OT 3115, Reactor Pressure Transients. Place the EPR in CUTOUT and raise the MPR setpoint to the pre-transient pressure D. (1) increase (2) enter OT 3110, Positive Reactivity Insertion AND OT 3115, Reactor Pressure Transients. Place the EPR in CUTOUT and raise the MPR setpoint to the pre-transient pressure Proposed Answer: B NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (INCORRECT): Power will increase requiring OT 3110 entry B. (CORRECT): With the plant at 80% RTP, the candidate must understand the EPR is in control at a particular demanded setpoint/stoke condition and the MPR stroke is approximately 10% lower and setpoint slightly higher. As the EPR stroke fails low, pressure will be controlled by the MPR once the strokes are approximately matched.

The MPR will then control plant pressure higher than its original value. As pressure increases, the void fraction in the core decreases, resulting in a higher moderator to fuel ratio. This will result in positive reactivity being added and a subsequent rise in reactor power. Additionally, in accordance with the UFSAR, a pressure increase collapses the voids in the moderator, causing an insertion of positive reactivity. IAW ARS 7-G-2 and OT 3115: If pressure is rising, THEN verify the MPR takes control and place the EPR CUTOUT SWITCH on CRP 9-7 to CUTOUT. OT 3110 is entered to the positive reactivity insertion. This procedure references you directly to OT 3115.

C. (INCORRECT): Power will increase requiring OT 3110 entry and MPR setpoint is lowered to its pre-transient pressure.

D. (INCORRECT): The MPR setpoint is lowered to its pre-transient pressure.

Technical Reference(s): OT 3115, Revision 11 (Attach if not previously OT 3110, Revision 23 provided)

OP 2144 Appendix B, Revision 25 ARS 7-G-2 Revision 15 UFSAR Section 14.4.2, Revision 22 Proposed references to be provided to applicants during None examination:

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Learning Objective: LOT-00-602 RO EO 5 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5, 6 Comments:

Developed on 3/24/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295001 AA2.03 Importance Rating 3.3 (K&A Statement) AA2.03 - Ability to determine and/or interpret the following as they apply to PARTIAL OR COMPLETE LOSS OF FORCED CORE FLOW CIRCULATION : Actual core flow Proposed Question: SRO 2 A reactor startup is in progress IAW OP 0105, Reactor Operations with reactor power at 20% RTP. Both Recirculation Pumps are operating at minimum speed.

The "A" Recirculation Pump trips. The drive flow in Recirculation loop "B" is observed to be 4.6 Mlbm/hr.

The crew is performing the follow-up actions per the appropriate OT Procedure.

Based on the above The core flow as INDCIATED on the Total Jet Pump Flow Recorder and ERFIS power to flow map compared to ACTUAL core flow will be (1) .

After a required 5 minute wait, if the crew desires to maintain temperatures in the idle loop, the Control Room Supervisor will direct the Reactor Operator to re-open the A Recirculation Pump (2) .

A. (1) higher due to forward flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3118, Recirculation Pump Trip B. (1) higher due to reverse flow in the "A" loop jet pumps (2) Discharge Valve, RV-53A, IAW OT 3117, Reactor Instabilities C. (1) lower due to reverse flow in the "A" loop jet pumps (2) Discharge Bypass Valve, RV-54A, IAW OT 3117, Reactor Instabilities D. (1) lower due to forward flow in the "A" loop jet pumps (2) Discharge Valve RV-53A, IAW OT 3118, Recirculation Pump Trip Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (INCORRECT): Actual flow is greater than indicated flow. Also, the Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3118. The Discharge Valve is re-opened.

B. (INCORRECT): Actual flow is greater than indicated flow. The Discharge Valve should have been closed and is directed to be opened to warm up the idle loop IAW OT 3118, NOT OT 3117.

C. (INCORRECT): The Discharge Bypass Valve should not have been closed and is NOT directed to be opened to warm up the idle loop IAW OT 3117. The Discharge Valve is re-opened.

D. (CORRECT): Comprehension based on understanding plant initial conditions and the flow circuitry response as a result. Some single loop conditions (<5 mlb/hr or 14 kgpm drive flow in operating loop) result in positive flow through the idle jet pumps. If positive flow through the idle jet pumps occurs, actual core flow will be greater than the core flow indicated. IAW OT 3118 step 7a and 7b, IF desired to maintain temperatures of the isolated loop, THEN verify the pump discharge valve has been closed for at least five minutes and OPEN PUMP DISCHARGE RV-53A.

The valve was closed in follow-up action #1.

Technical Reference(s): OT 3118, Revision 30 (Attach if not previously provided)

Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-202 AA2.03 (As available)

Question Source: Bank # Lot more Modified Bank # 6822 (ILO) (Note changes or NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet attach parent)

New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/25/09; Suction valve replaced with discharge bypass valve in A(2) and C(2) on 5/15/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295031 EA2.04 Importance Rating 4.8 (K&A Statement) EA2.04 - Ability to determine and/or interpret the following as they apply to REACTOR LOW WATER LEVEL : Adequate core cooling Proposed Question: SRO 3 The reactor was operating at 100% power. A large break loss of coolant accident (LOCA) has occurred with the following conditions:

  • Reactor pressure < 100 psig
  • Core Spray is the only available injection system Which ONE of the following sets of sustained Core Spray (CS) flow rates and RPV water level conditions require exiting EOP-1, RPV Control, and entry into the Severe Accident Guidelines (SAGs)?

A. CS "A": 3500 gpm CS "B": 0 gpm RPV level: -45" steady B. CS "A": 2000 gpm CS B: 1500 gpm RPV level: -40 steady C. CS A: 1500 gpm CS B: 1500 gpm RPV level: -15 steady D. CS A: 0 gpm CS "B": 0 gpm RPV level -10 steady Proposed Answer: B NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.

A. Incorrect - SAG entry requires the loss of Adequate Core Cooling (ACC). Spray Cooling is satisfied IAW Table S, EOP-1 RPV water level >-48, and CS flow rate on A or B is >3250 gpm B. Correct - SAG entry requires the loss of Adequate Core Cooling. Core Submergence is NOT satisfied because RPV water level is <+6, Steam Cooling is NOT satisfied because RPV water level is <-19, and Spray Cooling is NOT satisfied because CS flow for a single CS system is <3250 gpm. Without ACC, EOP-1 step RCL-17 requires SAG entry.

C. Incorrect - RPV water level is >-19, Steam Cooling is satisfied.

D. Incorrect - RPV water level is >-19, Steam Cooling is satisfied Technical Reference(s): EOP-1, Step RC/L (Attach if not previously RC/L-17 provided)

PP-7019 EOP Manual Volume 4 - Study Guide Revision 13 Section 6 Page 33 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-610 obj. 2.4.43 (As available)

Question Source: Bank # Lot more Modified Bank # 3669 (ILO) (Note changes or attach parent)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written: 3/24/09.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 600000 2.1.20 Importance Rating 4.6 (K&A Statement) 2.1.20 - Conduct of Operations: Ability to interpret and execute procedure steps (Plant Fire On-site)

Proposed Question: SRO 4 With the plant at full power operation, the following sequence of events occurred for the West Switchgear Room:

  • At 1218, two ionization/smoke detectors alarmed.
  • At 1221, a thermal cable detector alarmed.

The electrical timer associated with the West Switchgear Room CO2 Discharge System will BEGIN at (1) .

In response to these events, the CRS will direct a cooldown rate of (2) .

A. (1) 1218 (2) 80-100°F/hour in accordance with OP 0109, Plant Restoration B. (1) 1221 (2) 20-40°F/hour in accordance with OP 0109, Plant Restoration C. (1) 1218 (2) 20-40°F/hour in accordance with OP 3020, Fire Emergency Response Procedure D. (1) 1221 (2) 80-100°F/hour in accordance with OP 3020, Fire Emergency Response Procedure Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100°F/hour. While OP 0109 references OP 0105 to cooldown at a rate not to exceed 90F/hour, OP 3020 directs a cooldown rate based on the location of the fire.

B. (INCORRECT): OP 3020 directs a cooldown rate of 80-100°F/hour.

C. (INCORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. OP 3020 directs a cooldown rate of 80-100°F/hour.

D. (CORRECT): The electrical timer commences upon receipt of two ionization detector alarms and a thermal cable detector alarm. In accordance with OP 3020 a cooldown rate of 80-100°F/hour established.

Technical Reference(s): OP 3020 Figure 1, Revision (Attach if not previously 54 provided)

OP 2186 Discussion page 6, Revision 57 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-602 SRO EO10 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/23/09; Revised on 4/22/09, B(2) and C(2) swapped on 5/15/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295016 2.4.6 Importance Rating 4.7 (K&A Statement) 2.4.6 - Emergency Procedures / Plan: Knowledge of EOP mitigation strategies (Control Room Abandonment)

Proposed Question: SRO 5 As a result of a fire in the Control Room, the Control Room has been abandoned.

NO control room actions were completed prior to exiting the control room.

Actions required to isolate the reactor and assure the Main Steam Isolation Valves (MSIVs) remain isolated are performed IAW _________(1)_________, which directs the operator to ________(2)__________.

A. (1) OP 3126, Shutdown Using Alternate Methods (2) close containment air supply valves and open containment air vent valves to close the INBOARD MSIVs B. (1) OP 2191, Containment Air System (2) close containment air supply valves and open containment air vent valves to close the INBOARD MSIVs C. (1) OP 3126, Shutdown Using Alternate Methods (2) close instrument air supply valves and open instrument air vent valves to close the OUTBOARD MSIVs D. (1) OP 2190, Service and Instrument Air (2) close instrument air supply valves and open instrument air vent valves to close the OUTBOARD MSIVs Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

Note: the implementation of OP 3126, Appendix B actions are completed by the Control Room Supervisor (SRO)

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. Incorrect - the inboard MSIVs are NOT isolated.

B. Incorrect - the inboard MSIVs are NOT isolated.

C. Correct - the outboard MSIVs are isolated by isolating and venting instrument air using OP 3126, Appendix B steps 1a, b.

D. Incorrect - OP 2191 provides no guidance on isolating the MSIVs following control room abandonment. Appendix B, of OP 3126 provides the correct direction. Instrument Air valves are operated, making this a plausible distractor Technical Reference(s): OP 3126 Appendix B Rev 18 (Attach if not previously P&ID 191160 SH 3 (L-16) provided)

Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-612 obj. 8, B(2) (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 3/24/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295006 2.4.20 Importance Rating 4.3 (K&A Statement) 2.4.20 - Emergency Procedures / Plan: Knowledge of operational implications of EOP warnings, cautions, and notes (SCRAM)

Proposed Question: SRO 6 In accordance with the EOP Bases document, which ONE of the following correctly describes the concern and operational implication of operating the High Pressure Coolant Injection (HPCI) and Reactor Core Isolation Cooling (RCIC) turbines at elevated Torus temperatures when needed to maintain adequate core cooling during post Scram Reactor Pressure Vessel (RPV) Control?

HPCI and RCIC operation with this condition is (1) .

HPCI and RCIC turbine operation while lined up to take suction on the Torus with elevated temperatures >140°F will result in (2) .

A. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY (2) vortexing at the pump suction leading to eventual damage to the pump impeller B. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and Severe Accident Guidelines (2) vortexing at the pump suction leading to eventual damage to the pump impeller C. (1) permitted as directed by the Severe Accident Guidelines (SAGs) ONLY (2) pump cavitation and erosion leading to degraded pump performance or complete loss of function D. (1) permitted as directed by the Emergency Operating Procedures (EOPs) and Severe Accident Guidelines (2) pump cavitation and erosion leading to degraded pump performance or complete loss of function Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.

Justification for K/A match: OT 3100 Reactor Scram directs level to be controlled using various systems. These systems include HPCI and RCIC. There is a statement to use these systems unless directed otherwise by the EOPs. This is the tie to using Caution 3 basis to a reactor scram (post scram level control).

A. (INCORRECT): Vortexing in the CST is a concern based on CST water level. The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller. Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.

B. (INCORRECT): The basis for operating HPCI/RCIC with Torus suction <140F does not deal with vortexing concerns and damage to the pump impeller.

C. (INCORRECT): Operation of HPCI and RCIC at high suction temperatures is permitted under emergency conditions to address adequate core cooling concerns with the understanding that the equipment may fail under continued operations.

D. (CORRECT): In accordance with the HPCI and RCIC Design Basis Documents, operation <140°F ensures NPSH requirements are met in order to prevent HPCI/RCIC pump cavitation and erosion which can lead to degraded performance or complete loss of function. In accordance with OP 2120 and OP 2121 (HPCI/RCIC),

operation >140°F is not permitted unless required by the EOPs. In accordance with the EOP Study Guide (Volume 4), this caution does not imply that they cant be run and that it may be necessary to operate the turbines to address adequate core cooling concerns.

Technical Reference(s): EOP Volume 4 Study Guide, (Attach if not previously NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Section 4 page 9, Revision provided) 13 OP 2120 precaution 11, Revision 55 OP 2121 precaution 22, Revision 52 HPCI DBD Section 2.4.1, Revision 33 RCIC DBD Section 2.4.2, Revision 20 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-622 RO EO8 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed 3/24/09; Distractors A, B revised on 5/15/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 1 K/A # 295004 2.4.3 Importance Rating 3.9 (K&A Statement) 2.4.3 - Emergency Procedures / Plan: Ability to identify post-accident instrumentation (Partial or Total Loss of DC Pwr)

Proposed Question: SRO 7 Level Transmitters associated with Post Accident Reactor Water Level Shroud Instrumentation have the following power supplies:

  • LT-2-3-73A powered from DC-2 through 24V ECCS Distribution Panel B
  • LT-2-3-73B powered from DC-1 through 24V ECCS Distribution Panel A With the plant operating at 100% power, an electrical transient occurs resulting in the following annunciators:
  • CRP 8-E-8 DG-B TROUBLE
  • CRP 8-F-8 DG-B CTRL PWR LOSS
  • CRP 8-N-1 DC-1/DC-2 BKR TRIP The Technical Specification Post Accident level Instrument that is available for use following the transient is (1) .

In accordance with Technical Specifications, the Control Room Supervisor must verify that the inoperable instrument is restored to service within (2) .

NOTE: ONLY Consider the Technical Specification implications on Post Accident Instrumentation.

A. (1) LI-2-3-91A (2) 7 days or place the reactor in a hot shutdown condition B. (1) LI-2-3-91B (2) 7 days or place the reactor in a hot shutdown condition C. (1) LI-2-3-91A (2) 30 days or submit a report to the Commission D. (1) LI-2-3-91B (2) 30 days or submit a report to the Commission Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

SRO-ONLY Question Validity [10CFR55.43(b)(2)]:

(1) Question cannot be answered by knowing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.

(3) Question cannot be answered by knowing the TS Safety Limits or their bases.

(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.

A. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. Additionally, the loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1).

B. Incorrect- The loss of one indicator requires action to be taken within 30 days (T.S. Table 3.2.6 Note 1). After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.

C. Correct- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. DC-1 provides normal control power to the B EDG. Therefore, LT 3-73A still remains (powered from DC-2). Referring to G-191267. Sheet 1, LT 3-73A feeds LI-2-3-91A. IAS T.S. Table 3.2.6, LI-2-3-91A is a post accident instrument. With one level instrument (LI-2-3-91A/B) unavailable for use, T.S.

Table 3.2.6 (Note 1) states: Within 30 days following the loss of one indication, restore the inoperable channel to service or D. Incorrect- The indications provided support a loss of DC-1/24V ECCS Distribution Panel A. LI-2-3-91B is fed from LT-2-3-73B which was lost as a result of losing power to DC-1. After realizing DC-1 has been lost, LI-2-3-91B is plausible due to the cross arrangement of the 24V ECCS electrical distribution.

Technical Reference(s): Technical Specifications (Attach if not previously Table 3.2.6, Amendment 207 provided)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet ON 3159, Rev 15 P&ID G-191267 Sheet 1 Revision 30 Proposed references to be provided to applicants during P&ID G-191267 Sheet examination: 1 Technical Specifications Table 3.2.6 Learning Objective: LOT-00-601 EO-10 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2, 5 Comments: Written 3/23/09; Revised on 4/22/09; Re-written (NEW) on 4/27/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 295020 AA2.05 Importance Rating 3.6 (K&A Statement) AA2.05 - Ability to determine and/or interpret the following as they apply to INADVERTENT CONTAINMENT ISOLATION : Reactor water level Proposed Question: SRO 8 A small break LOCA coincident with a Loss of Normal Power has occurred with the following plant conditions:

  • Drywell Pressure is 5.5 psig and rising slowly
  • RPV Level is 137 and steady. The lowest observed level post scram was 95.
  • RPV Pressure is 870 psig and lowering slowly.
  • OT 3122, Loss of Normal Power, Immediate Actions are complete with NO other actions performed.

Five minutes after level control is established, annunciator 4-U-2 RCIC STEAM LINE P HI alarms. RCIC responds as designed. There are NO Steam Leak Detection alarms and temperatures in the steam tunnel and Reactor Building remain steady.

IAW EOP-1, RPV Control, the CRS must direct an RPV water level band of (1) using (2) .

A. (1) 127-177 (2) Table C, Preferred Injection Systems B. (1) 127-177 (2) Table D, Alternate Injection Subsystems C. (1) +6 - 177 (2) Table C, Preferred Injection Systems D. (1) +6 - 177 (2) Table D, Alternate Injection Subsystems Proposed Answer: A NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. Correct - A high DW pressure signal exists coincident with an LNP, as a result the only injection system operating is HPCI. A Group VI isolation of RCIC occurs; however, RCIC did not initiate because RPV level never reached 82.5. With RPV water level steady at 137 with HPCI injection, the correct level band is 127-177 using Table C Preferred Injection Systems. HPCI is a Preferred Injection System.

B. Incorrect - Table D Alternate Injection Subsystems are not directed unless RPV water level can not be restored and maintained above 127 (RC/L-1). With RPV water level above 127 and HPCI injecting, Table D is incorrect. This is a plausible distractor based on: if the student believes that either the HPCI system is a Table D alternate injection subsystem or that other systems from Table D should be used.

C. Incorrect - The RPV water level band should remain 127-177 since HPCI is still available and the isolation of RCIC, which was not injecting, should have no affect on RPV water level. The water level band is expanded to +6-177 when water level can not be restored and maintained above 127. If the student believes RCIC was injecting and has now isolated, this is a plausible distractor.

D. Incorrect - The water level band is expanded to +6-177 when water level can not be restored and maintained above 127. If the student believes RCIC was injecting and has now isolated, this is a plausible distractor. This is a plausible distractor based on:

if the student believes that either the HPCI system is a Table D alternate injection subsystem or that other systems from Table D should be used.

Technical Reference(s): EOP Volume 4 - Study (Attach if not previously Guide EOP-1 RPV Control provided)

Section 6 Revision 14 pages 14 of 51 - 20 of 51.

ARP 4-U-2 Rev. 8 Proposed references to be provided to applicants during None NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet examination:

Learning Objective: LOT-00-610 Rev 19 Obj (As available) 2.4.43 Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 4/3/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 295012 2.4.31 Importance Rating 4.1 (K&A Statement) 2.4.31 - Emergency Procedures / Plan: Knowledge of annunciator alarms, indications, or response procedures (High Drywell Temperature)

Proposed Question: SRO 9 With the reactor at 95% RTP, environmental conditions in the drywell have degraded giving the Control Room the following indications:

  • Drywell temperature is 260°F and rising
  • Drywell pressure is 1.9 psig and slowly rising EOP-3, Primary Containment Control, has been entered and all specified actions have been attempted. In the event that drywell temperature cannot be restored and maintained below its structural design limit, entry into what other Emergency Operating Procedure(s) is (are) required?

(1) EOP-1, RPV Level Control (2) EOP-5, RPV-Emergency Depressurization (3) SAG-2, RPV, Containment and Radioactive Release Control A. 1 ONLY B. 3 ONLY C. 1 and 2 ONLY D. 2 and 3 ONLY Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

See comments section for why this is a justifiable SRO-ONLY question A. (INCORRECT): WHEN drywell temperature cannot be restored and maintained below 280°F, verify EOP-1 has been entered. At this point an RPV-ED is required as well.

B. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. Conditions do warrant an entry into EOP-1 and EOP-5.

C. (CORRECT): Indications may be indicative of a fire in the drywell. In accordance with EOP-3, WHEN drywell temperature cannot be restored and maintained below 280°F, verify EOP-1 has been entered. At this point an RPV-ED is required. The override in EOP-1 (Step RC/OR-4) states that if an RPV-ED is or has been required, exit the pressure flowpath and enter EOP-5 RPV-ED.

D. (INCORRECT): There is no SAG entry requirement based on the indications in the stem. EOP-1 is required to be entered to get you into EOP-5 which is required in EOP-3.

Technical Reference(s): EOP-1, Revision 3 (Attach if not previously EOP-3, Revision 4 provided)

EOP Study Guide (Volume 4), Section 8, Revision 13 ARS 5-F-2, Revision 7 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-607 CRS 3 and 4 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet 10 CFR Part 55 Content: 55.41 55.43 5* (See comments)

Comments: *This question has been developed with the intent of 10CFR55.43 (b) (5) in mind although the generic K/A for this question (2.4.31) does not reference the same 10CFR55.43 requirement. However, this concept is tied to a specific site SRO objective which is written as follows: LOT-00-607 (EOP-3), CRS objective #3 (Implement EOPs to mitigate adverse plant trends) and objective #4 (Direct and prioritize crew actions to mitigate plant transients/accidents). This objective is not redundant with any RO objective. A RO objective dealing with this concept is objective #2 (Given a step or combination of steps from the procedure, describe what is accomplished by the step(s),

and the reason the step is important to Primary Containment Control).

Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 1 Group # 2 K/A # 500000 EA2.03 Importance Rating 3.8 (K&A Statement) EA2.03 - Ability to determine and / or interpret the following as they apply to HIGH PRIMARY CONTAINMENT HYDROGEN CONCENTRATIONS: Combustible limits for drywell Proposed Question: SRO 10 The Severe Accident Guidelines (SAGs) have been entered and the containment has the following conditions:

  • Drywell H2 - 5%
  • Drywell O2 - 5%
  • Torus H2 - 7%
  • Torus O2 - 4%

As the SRO designated as the Decision Maker, utilizing the attached steps from SAG-2, RPV, Containment, and Radioactivity Release Control, determine the venting methodology and criteria for venting termination for the drywell.

IAW SAG-2 Action Level (1) , vent/purge the drywell using (2) vent the containment: (3) .

A. (1) 2 (2) nitrogen only (3) until off site release rates reach the General Emergency criteria B. (1) 3 (2) nitrogen only (3) until off site release rates reach the General Emergency criteria C. (1) 2 (2) air or nitrogen (3) irrespective of off site release rates D. (1) 3 (2) air or nitrogen (3) irrespective of off site release rates Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. Incorrect - Drywell conditions should be evaluated as Action Level 3. Answer is correct for Action Level 2 B. Incorrect - Air or Nitrogen should be used and venting should not be terminated at the General Emergency release rate criteria C. Incorrect - Drywell conditions should be evaluated as Action Level 3.

D. Correct - Drywell conditions should be evaluated as Action Level 3, air or nitrogen should be used, venting should be performed irrespective of off site release rates Technical Reference(s): SAG-2, Rev 1 (Attach if not previously PP 7019 Technical Support provided)

Guidelines, Appendix E, Section 7.4 Combustible Gas Vent, Rev 2 Proposed references to be provided to applicants during SAG-2 Steps H examination: H-5 Learning Objective: LOT-01-624 SRO 2 (As available)

Question Source: Bank # Lot more Modified Bank # 5615 (ILO) (Note changes or attach parent)

New Question History: Last NRC Exam No NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 3/26/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 262001 A2.10 Importance Rating 3.4 (K&A Statement) A2.10 - Ability to (a) predict the impacts of the following on the A.C. ELECTRICAL DISTRIBUTION ;

and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Exceeding current limitations Proposed Question: SRO 11 The B Residual Heat Removal (RHR) Pump is tagged out for corrective maintenance.

With the plant operating at 70% RTP, a Loss of Normal Power (LNP) occurs coincident with a Loss of Coolant Accident (LOCA).

Post scram plant conditions are as follows:

  • The Reactor Building is NOT accessible due to high radiation levels.
  • The B EDG failed to start due to a fault on the respective bus.
  • Buses 8 and 9 are NOT cross tied.
  • All other systems respond as designed.
  • Drywell and Torus pressures are identical at 12.0 psig and rising quickly.
  • Torus level is 11 feet and rising slowly.

Additionally, the control room receives the following:

  • Report from the TBAO that ONLY the 51A and 51B targets on the A RHR pump breaker cubicle are dropped.

IAW OP 2142, 4KV Electrical System, under some circumstances the A RHR Pump can be restarted WITHOUT being cleared by the Maintenance Department if it tripped on (1) .

Given these conditions, the Control Room Supervisor should direct spraying the Torus and Drywell in accordance with EOP-3, Primary Containment Control, using (2) .

A. (1) time delayed (TIME target) overcurrent (2) OP 2124, Residual Heat Removal System, Appendix C, Torus Cooling/Containment Spray NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet B. (1) time delayed (TIME target) overcurrent (2) OE 3107, SAG/EOP Appendices, Appendix S, Primary Containment Spray Using Alternate Methods C. (1) instantaneous (INST target) overcurrent (2) OP 2124, Residual Heat Removal System, Appendix C, Torus Cooling/Containment Spray D. (1) instantaneous (INST target) overcurrent (2) OE 3107, SAG/EOP Appendices, Appendix S, Primary Containment Spray Using Alternate Methods Proposed Answer: A NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (CORRECT): The candidate must first understand the nature of the trip. In this case, its a time delay overcurrent trip which is allowed to be re-started IAW OP 2142 Precaution # 15 if the pump is needed for an emergency condition. In this case, with Drywell and Torus pressures equal, there is a problem with containment. If this problem is not addressed, the PSP curve will be challenged. The options are to spray the torus using alternate systems or to restart the only available RHR pump (C and D are powered from Bus 3 which is not powered and B was tagged out for maintenance leaving A as the only available RHR pump). Because the RB is inaccessible, OE 3107 Appendix S cannot be performed (local operation of RHR-183, 184, 70A/B, 71A/B). Therefore the only other option is to restart the pump that tripped on time delay overcurrent in an effort to prevent exceeding the PSP curve limits.

B. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S C. (INCORRECT): OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department.

D. (INCORRECT): The RB is inaccessible to perform OE 3107 Appendix S. Also, OP 2142 Precaution #14 does not allow restarting a pump on instantaneous overcurrent unless cleared by the maintenance department.

Technical Reference(s): OP 2142, Revision 50, LPC (Attach if not previously 1 provided)

EOP-3 Revision 4 OP 2124 Revision 113 LPC 3

ARS 3-J-3, Revision 14 LPC 2

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during Partial ARS 3-J-1 and examination: 3-J-3 up to automatic actions statement.

Learning Objective: LOT-01-262 A2.10 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 4/13/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 215005 A2.04 Importance Rating 3.9 (K&A Statement) A2.04 - Ability to (a) predict the impacts of the following on the AVERAGE POWER RANGE MONITOR/LOCAL POWER RANGE MONITOR SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions: SCRAM trip signals Proposed Question: SRO 12 The reactor is being restarted following a refueling outage.

  • The Mode Switch is in START AND HOT STBY.
  • All IRMs are operating reading between 25 and 35 on Range 10.
  • All APRMs downscale lights are clear, with indicated power at approximately 3%.
  • APRMs C and D are bypassed IAW OP 2132, Average Power Range Monitor Channels.

A feedwater temperature transient occurs causing the following APRM & IRM readings:

APRM Power (%) IRM Power (%)

APRM A 15 IRM A 60/125 APRM B 11 IRM B 55/125 APRM C 13 IRM C 55/125 APRM D 11 IRM D 122/125 APRM E 12 IRM E 55/125 APRM F 11 IRM F 50/125 All other plant parameters are within their normal range.

(1) Predict the Reactor Protection System response (2) Determine the required procedural direction.

A. (1) Full Reactor Scram (2) Enter OT 3100, Reactor Scram and VERIFY the Individual Recirculation Pump controllers are in manual at minimum speed.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet B. (1) Full Reactor Scram (2) Enter OT 3100, Reactor Scram and SHIFT the Individual Recirculation Pump controllers to manual and reduce to minimum speed.

C. (1) Half Scram Channel A only, (2) IAW OP 2134, Reactor Protection System, bypass A APRM, and reset the half scram D. (1) Half Scram Channel B only (2) IAW OP 2134, Reactor Protection System, bypass B IRM, and reset the half scram Proposed Answer: A Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. Correct - A RPS trips based on A APRM at 15% with the mode switch out of RUN. B RPS trips based on D IRM HI HI condition >120/125. OT 3100 will be entered. Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions.

B. Incorrect - Because initial power was 3%, the status of the Recirculation Pumps is manual and minimum. The operator would verify the controllers for the given plant conditions. There is NO need to shift the controllers to manual.

C. Incorrect - B RPS also trips due to the D IRM HI HI condition. Plausible distractor because candidate may believe with D APRM bypassed, the D IRM may not trip.

D. Incorrect - A RPS also trips due to the A APRM at 15% with the mode switch out of RUN. Plausible distractor if mode switch was in RUN.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Technical Reference(s): Tech Spec Table 3.1.1 (Attach if not previously Amendment 229 provided)

OP 2132, APRM Rev. 23/1 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-05-215 obj. 4.01, 4.02 (As available)

Question Source: Bank # Lot more Modified Bank # 6740 (ILO) (Note changes or attach parent)

New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 3/24/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 223002 2.4.18 Importance Rating 4.0 (K&A Statement) 2.4.18 - Emergency Procedures / Plan: Knowledge of the specific bases for EOPs (PCIS/Nuclear Steam Supply Shutoff)

Proposed Question: SRO 13 Following a scram, power remains at 25% RTP. The CRS enters and directs actions IAW EOP-2, ATWS RPV Control. OE 3107, EOP/SAG Appendices, Appendix P, Bypassing Group 1 Low-Low Level Isolation Signals has been ordered. Additionally:

  • While installing jumpers required by the Appendix, a Loss of Normal Power (LNP) occurred.
  • RPV water level reached 79 inches before rising again.

The basis for bypassing the PCIS Group 1 isolation signal is to (1) .

EOP-2 RPV Pressure leg control, step ARC/OR-5, directs the MSIVs to be re-opened if conditions permit. In this case, the MSIVs (2) .

A. (1) preserve the condenser as a heat sink (2) shall be re-opened using Appendix P as long as there is no indication of a Main Steam Line (MSL) Break B. (1) preserve the condenser as a heat sink (2) shall remain closed until OT 3122, Loss of Normal Power, has been implemented and power to Circ Water equipment restored.

C. (1) prevent the possibility of reaching 110°F in the Torus (2) shall be re-opened using Appendix CC, RPV Venting or Depressurization using MSIVs, as long as there is no indication of a Main Steam Line (MSL) Break D. (1) prevent the possibility of reaching 110°F in the Torus (2) shall remain closed until OT 3122, Loss of Normal Power, has been implemented and power to Circ Water equipment restored.

Proposed Answer: B NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.

A. (INCORRECT): Power is lost to Group 1 logic and the Main Condenser is not available.

B. (CORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems. With a loss of Normal Power (LNP), power is lost to both RPS buses therefore the MSIVs go shut due to a loss of power to Group 1 logic. Additionally, the Main Condenser is not available as required by step ARC/OR-5. Once power is restored to Bus 1 and/or Bus 2, the CW System can be restored to make the Main Condenser available. The MSIVs should remain closed an cannot be re-opened.

C. (INCORRECT): If the MSIVs could be re-opened, step ARC/OR-5 directs the use of Appendix P, not CC.

D. (INCORRECT): To prepare for the possibility of the MSIVs closing as water level is intentionally lowered, Appendix P is implemented to prevent an unintended loss of the main condenser. Preserving the Main Condenser as a heat sink significantly reduces the energy that must be absorbed by the Torus and prolongs the availability of the Condensate/Feedwater Systems.

Technical Reference(s): EOP Study Guide, Volume 4, (Attach if not previously Section 7, Revision 13 provided)

EOP-2 Revision 5 OT 3122, Revision 21 Proposed references to be provided to applicants during None examination:

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Learning Objective: LOT-00-610 2.4.18 and (As available) 2.4.41 Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/27/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 212000 2.1.32 Importance Rating 4.0 (K&A Statement) 2.1.32 - Conduct of Operations: Ability to explain and apply system limits and precautions (RPS)

Proposed Question: SRO 14 The plant is operating at 100% power IAW OP 0105, Reactor Operations. A and F APRMs are bypassed IAW OP 2132, Average Power Range Monitor Channels. Two LPRMs are currently bypassed on each of the following APRMs:

A trip of A Reactor Protection System Motor Generator occurs with the following annunciators:

  • 5-M-1 APRM A, C, E HI-HI/INOP
  • 5-M-2 APRM B, D, F HI-HI/INOP
  • 5-M-6 APRM BUS A/B ALT PWR SOURCE Based on these indications, ALL the ATWS actions of DP-0166, Operations Department Standards, have been performed. Additionally, the STA reported that NO control rod motion occurred.

What is the basis for the action directed by the Control Room Supervisor and what Emergency Action Level classification IAW AP 3125, Emergency Plan Classification and Action Level Scheme should be declared?

Based on the above, the Control Room Supervisor must ensure a manual Reactor Scram has been initiated. RPS B should have also tripped based on an APRM (1) .

The correct EAL declaration IAW AP 3125, Emergency Plan Classification and Action Level Scheme is (2) .

A. (1) downscale condition due to too few LPRM inputs to APRM B (2) an Alert (A-7-c)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet B. (1) downscale condition due to too few LPRM inputs to APRM D (2) an Alert (A-7-c)

C. (1) INOP condition due to too few LPRM inputs to APRM B (2) a Site Area Emergency (S-7-c)

D. (1) INOP condition due to too few LPRM inputs to APRM D (2) a Site Area Emergency (S-7-c)

Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

In accordance with OP 2134, Reactor Protection System, Precaution 1b When shifting to any RPS alternate power supply: A full scram can occur under certain LPRM bypass conditions.

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

SRO-ONLY Question Validity [10CFR55.43(b)(7)]:

1. Emergency classifications Note- The OATC actions IAW DP-0166 include manual scram pushbuttons, ARI/RPT, and tripping the recirc drive motor breakers.

A. - Incorrect - APRM B does not share LPRMs. Each APRM has 20 LPRMs assigned.

Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs B. - Incorrect -The failure of the AUTO scram signal to function meets the criteria for EAL A-7-c; however, the manual scram also failed as indicated by the OATC completing his immediate actions and no rod motion.

C. - Incorrect - Incorrect - APRM B does not share LPRMs. Each APRM has 20 LPRMs assigned. Two LPRMs bypassed would not result in an INOP trip because its value would be greater than 12 LPRMs D. - Correct - APRM D is associated with B RPS. Ten LPRMs are assigned to D APRM. With two LPRMs bypassed and all of the shared LPRMs from A RPS de-energized an INOP trip signal will be generated because there are <9 LPRMs available as indicated by annunciator 5-M-2. The INOP trip signal on B RPS and the shutdown of A RPS MG set should result in a full reactor scram. The failure of the AUTO B RPS scram signal to function resulted in a failure of the auto scram function which meets the criteria for EAL A-7-c. Since the OATC actions failed to move the control rods, the manual scram failure will meet the criteria for EAL S-7-csince power is >2%.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Technical Reference(s): OP 2134, Rev. 17 (Attach if not previously OP 2132, Rev 23/1 provided)

AP 3125 App A, Rev. 21 T.S. Table 3.1.1 Note 5 Amendment 229 EAL Technical Bases Section 7, Rev. 6 DP-0166, Rev 19 Proposed references to be provided to applicants during AP 3125 EAL A-7-c examination: and S-7-c Learning Objective: LOT-00-900 SRO 2 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5, 7 Comments:

Written 3/21/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 1 K/A # 211000 2.4.11 Importance Rating 4.2 (K&A Statement) 2.4.11 - Emergency Procedures / Plan: Knowledge of abnormal condition procedures (SLC)

Proposed Question: SRO 15 An Anticipated Transient Without Scram (ATWS) has occurred. The reactor is at 45%

RTP and EOP-2, ATWS RPV Control, has been entered. Additionally:

  • Both SLC Pumps are unavailable.
  • The Field Support Supervisor is directed to implement alternate measures for Boron injection using OE 3107, EOP/SAG Appendices.

After Boron has been injected using OE 3107 (1) , a plant cooldown can commence as directed by EOP-2 ATWS RPV Control, when (2) .

A. (1) Appendix K, Boron injection CRD System from SLC Tank (2) 2.5 drums of Boric Acid and 2.5 drums of Borax have been injected B. (1) Appendix I, Alternate SLC Initiation (2) SLC tank level has decreased by at least 15% volume C. (1) Appendix K, Boron injection CRD System from SLC Tank (2) SLC tank level has decreased by at least 30% volume D. (1) Appendix I, Alternate SLC Initiation (2) two consecutive chemistry samples reveal that at least 660 ppm naturally enriched boron has been added Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.
6. Question requires detailed knowledge of diagnostic steps and decision points in the EOPs that involve transitions to event specific sub-procedures or emergency contingency procedures.

A. (INCORRECT): Appendix K uses the CRD System to pump the contents of the SLC Tank to the RPV. This Appendix does NOT use drums of Boric Acid or Borax. Those are used by Appendix J. Also, this amount is equivalent to HSBW.

B. (INCORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists this would be the amount of Hot Shutdown Boron Weight- not CSBW. Additionally, the use of Appendix I requires at least one SLC pump be available.

C. (CORRECT): Under boron injection conditions where the SLC tank is available and a flowpath exists (Appendix K with CRD) then this is the Cold Shutdown Boron Weight.

Appendix K will result in the SLC Tank being injected to the RPV. IAW EOP-2, once the tank level decreases by 30% (CSBW), then a cooldown can commence.

D. (INCORRECT): While 660 ppm represents the correct amount of boron injected into the RPV for CSBW conditions (OE 3107 Appendix J discussion), 2 samples are not required to prove the concentration for use of any boron injection procedure.

Additionally, the use of Appendix I requires at least one SLC pump be available.

Technical Reference(s): OE 3107 Appendix K, (Attach if not previously Revision 25 provided)

EOP-2 Table L, Revision 5 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-610 2.4.11 and (As available) 2.4.41 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/24/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 201002 A2.04 Importance Rating 3.1 (K&A Statement) A2.04 - Ability to (a) predict the impacts of the following on the REACTOR MANUAL CONTROL SYSTEM ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Control rod block Proposed Question: SRO 16 The plant is operating at 75% RTP with the C and D APRMs bypassed in accordance with OP 2132, Average Power Range Monitor Channels.

Following a rod sequence exchange the order has gone out to return to full power operations. As control rods are withdrawn, the E APRM power supply fails giving the control room the following annunciator:

  • 5-M-1, APRM A, C, E HI-HI/INOP All other APRMs are indicating 75-80%.

Which ONE of the following identifies the expected plant response and direction in order to continue with the power ascension?

The plant response is a (1) . After UN-bypassing the C APRM, the CRS will direct the CRO to (2) .

A. (1) Rod Block AND half scram (2) bypass the E APRM IAW OP 2133, Rod Block Monitor and reset the half scram IAW OP 2134, Reactor Protection System B. (1) Rod Block ONLY (2) bypass the E APRM IAW OP 2133, Rod Block Monitor C. (1) Rod Block AND half scram (2) bypass the E APRM IAW ARS 5-M-1 and reset the half scram IAW OP 2134, Reactor Protection System.

D. (1) Rod Block ONLY (2) bypass the E APRM IAW ARS 5-M-1 Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (INCORRECT): The E APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133.

B. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1). Additionally, the E APRM needs to be bypassed IAW ARS 5-M-1 and NOT OP 2133.

C.

D. (CORRECT): The failed APRM has resulted in an INOP condition. This INOP will cause a Rod Block Withdrawal (ARS 5-D-3) and half scram on RPS channel A. To bypass the E APRM, the C APRM has to be taken out of bypass. After this, the half scram is reset to allow power ascension to continue.

E. (INCORRECT): A half scram will also result from an APRM INOP condition (ARS 5-M-1).

Technical Reference(s): ARSs 5-D-3 and 5-M-1, (Attach if not previously Revision 7, LPC #1 provided)

OP 2132 Section B, Revision 23, LPC #1 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-03-201 A2.04 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 234000 A2.02 Importance Rating 3.6 (K&A Statement) A2.02 - Ability to (a) predict the impacts of the following on FUEL HANDLING EQUIPMENT; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: Loss of refueling platform air system Proposed Question: SRO 17 Refueling operations are in progress with the following plant conditions:

  • The Refuel Platform is over the core.
  • The grapple is loaded with a fuel assembly that is being withdrawn for movement to the spent fuel pool.

As the fuel assembly is being withdrawn, breaker LSW-CO, Air Compressor Motor Starter, on the Refuel Platform trips open. Air compressor pressure as read on the dryer output pressure gage lowers to 0 psig.

Based on the above The (1) .

IAW OP 1101, Management of Refueling Activities and Fuel Assembly Movement, refueling operations are halted and may be re-initiated only by the (2) .

A. (1) grapple fails closed (2) Refuel Floor Supervisor with concurrence from the Shift Manager B. (1) grapple fails closed (2) Shift Manager with concurrence from the Operations Manager C. (1) hoist fails in the as-is position (2) Refuel Floor Supervisor with concurrence from the Shift Manager D. (1) hoist fails in the as-is position (2) Shift Manager with concurrence from the Operations Manager NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed Answer: B Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

SRO-ONLY Question Validity [10CFR55.43(b)(7)]:

1. Refuel Floor SRO Responsibilities A. (INCORRECT): IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager B. (CORRECT): The grapple fails closed on a loss of air. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager C. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost.

D. (INCORRECT): There is no affect on the hoist when the Refuel Platform Air Compressors are lost. Also, IAW OP 1101 Precaution #18, If refueling has been halted, in the event of any unusual or abnormal occurrence, refueling operations may only be re-initiated by the Shift Manager after receiving concurrence from the Operations Manager Technical Reference(s): Electrical Drawing 5920- (Attach if not previously 12001 Sheet 1, Revision 0 provided)

OP 1101, Revision 46 LOT-00-234 Instructor Guide, Revision 28 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-234, AA2.02, K6.04 (As available)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5, 7 Comments: Developed on 4/3/09 (Redrawn K/A as directed by Lead Examiner)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 2 Group # 2 K/A # 233000 A2.01 Importance Rating 2.9 (K&A Statement) A2.01 - Ability to (a) predict the impacts of the following on the FUEL POOL COOLING AND CLEAN-UP ; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: High pool level Proposed Question: SRO 18 During a refueling outage with the fuel pool gates OUT, Normal Fuel Pool Cooling is aligned to the Fuel Pool IAW OP 2184, Normal Fuel Pool Cooling. Additionally, the following indications are observed:

  • Fuel Storage Pool Level reading on ERFIS is 37.52 feet.

Which ONE of the following actions is required to control Fuel Pool Level?

IAW Fuel Pool Annunciator Response Procedure (1) check the RCU drain flow regulator (RMC-12-143) and drain flow line up on CRP 9-4 and (2) SETPOINT if necessary.

A. (1) FP-D-4, HIGH LEVEL FUEL STORAGE POOL (2) increase B. (1) FP-D-3, LOW LEVEL FUEL STORAGE POOL (2) increase C. (1) FP-D-3, LOW LEVEL FUEL STORAGE POOL (2) reduce D. (1) FP-D-4, HIGH LEVEL FUEL STORAGE POOL (2) reduce Proposed Answer: A NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A - Correct - 37.47 feet is a high level condition. During a refueling, ARS FP-D-4 provides guidance to increase the RCU drain flow regulator setpoint for a high water level condition.

B - Incorrect - 37.47 feet is a high level condition C - Incorrect - 37.47 feet is a high level condition D - Incorrect - ARS FP-D-3, LOW LEVEL FUEL STORAGE POOL provides guidance to reduce the RCU drain flow regulator setpoint for a low water level condition Technical Reference(s): ARS 4-H-8, Rev. 8 (Attach if not previously ARS FP-D-4, Rev. 1 provided)

ARS FP-D-3, Rev. 1 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-601 EO7, 10 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 3/21/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.1.4 Importance Rating 3.8 (K&A Statement) 2.1.37 Knowledge of procedures, guidelines, or limitations associated with reactivity management.

Proposed Question: SRO 19 A plant startup and heatup are in progress. Criticality has just been achieved with 18 control rods fully withdrawn. While obtaining criticality data, the Rod Worth Minimizer fails and becomes INOP. The Control Room Supervisor (CRS) directs the Operator at the Controls (OATC) to withdraw control rods to reach the Point of Adding Heat (POAH) and establish a heat up rate.

Which ONE of the following describes the guidance concerning Reactivity Management for this scenario?

In accordance with EN-OP-115, Conduct of Operations, ALL control rod withdrawals require a peer checker to verify the correct control rod is selected and observe various panel indications. This peer check can be made by (1) .

In accordance with Technical Specifications, when the RWM is inoperable and a startup is to proceed, the control rod sequence must be verified by (2) .

A. (1) the Reactivity SRO or Reactor Engineering (2) Reactor Engineering B. (1) the Shift Technical Advisor or a second licensed operator (2) Reactor Engineering C. (1) the Reactivity SRO or Reactor Engineering (2) a second licensed operator D. (1) the Shift Technical Advisor or a second licensed operator (2) a second licensed operator Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(6)]:

  • Knowledge of Tech Spec Bases for reactivity controls A. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.

B. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.

C. Incorrect- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.

D. Correct- A second individual (licensed operator or Shift Technical Advisor) with no concurrent activities should be present during manual rod insertion or withdrawal. In accordance with Technical Specifications, Continuing a reactor startup if the RWM subsequently fails is acceptable if a second licensed operator verifies the withdrawal sequence.

Technical Reference(s): EN-OP-115, Section 5.4(28) (Attach if not previously T.S. Section 3.3.B.3.a and provided)

Bases 3.3 Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-701 Obj. 8 (As available)

LOT-03-215 K8 Question Source: Bank # Lot more Modified Bank # 3698 (ILO) (Note changes or attach parent)

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 6 Comments: Selected 3/23/09; Re-written following K/A redraw on 5-5-09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.2.40 Importance Rating 4.7 (K&A Statement) 2.2.40 Ability to apply technical specifications for a system.

Proposed Question: SRO 20 With the plant at full power operations, a 14 day LCO is in progress for corrective maintenance on the HPCI Aux Oil Pump. Additionally:

  • Engineering has performed an evaluation: risk is assessed and managed.
  • It is expected that the snubbers will not be operable for another 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.

For the conditions above, which ONE of the following describes the MOST limiting Technical Specification LCO required?

A. The A AND B Loops of RHR are declared inoperable. An orderly shutdown shall be initiated and the reactor shall be in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

B. ONLY one Loop of RHR is declared inoperable. An orderly shutdown shall be initiated and the reactor pressure shall be reduced to within 150 psig within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

C. A tracking LCO is entered for the A AND B Loops of RHR. Since the snubbers will be operable within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, the plant will remain in a 14 day LCO for HPCI being inoperable.

D. No action is required. Snubber operability does not affect the operability of the RHR System. The plant remains in a 14 day LCO for HPCI being inoperable.

Proposed Answer: A NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(2)]:

(1) Question cannot be answered by knowing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.

(3) Question cannot be answered by knowing the TS Safety Limits or their bases.

(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.

A. (CORRECT): Technical Specification 3.0.8.b. provides a time limit of 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> for inoperable snubbers associated with more than one train or subsystem. The stem of the question indicates snubbers have been identified in both the A and B trains of RHR and the time frame for repair is 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />. Therefore, both trains of RHR are declared inoperable, resulting in entry to 3.5.A.6, 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> cold shutdown LCO. This LCO is more restrictive than the 3.5.E.3 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 150 psig LCO.

B. (INCORRECT): If the candidate was to interpret T.S. 3.0.8.a incorrectly, he could conclude that ONLY one loop of RHR needs to be declared Inoperable. In this instance, the candidate would apply the 3.5.E.3 LCO. However two trains of RHR inoperable based on reported snubber conditions.

C. (INCORRECT): The 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> tracking LCO is for a single system as specified in 3.0.8.a. Since both trains of RHR are affected, this is incorrect. The candidates misapplication of this LCO makes this a plausible distractor.

D. (INCORRECT): The stem of the question indicates the snubbers are being assessed and managed; however, there are more restrictions in 3.0.8.b which need to be applied. If the student reads only the first paragraph of 3.0.8, this becomes a plausible distractor.

Technical Reference(s): Tech Specs Section 3.0.8.b (Attach if not previously Amendment 230, and 3.5.A.6 provided)

Amendment 228 Proposed references to be provided to applicants during Tech Specs 3/4.0 and examination: 3/4.5 without bases.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Learning Objective: LOT-00-308 SRO#1 (As available)

Question Source: Bank # Lot more Modified Bank # 6948 (ILO) (Note changes or attach parent)

New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Comments: Developed on 4/3/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.3.4 Importance Rating 3.7 (K&A Statement) 2.3.4 Knowledge of radiation exposure limits under normal or emergency conditions.

Proposed Question: SRO 21 The Control Room has declared a Site Area Emergency.

The Emergency Plan has been activated but the supporting facilities have NOT been manned.

It has been determined that four (4) valves on the Refuel Floor must be closed to mitigate the transient.

The following information is applicable to the task to be performed:

  • Personnel required: one Auxiliary Operator (AO)
  • Current exposure for the only available AO: 380 mR for current year
  • Time estimate: 20 minutes
  • Radiation Field:10.5 R/hr The exposure to complete the task must be authorized by the (1) as specified IAW (2) .

A. (1) Shift Manager (2) EN-RP-201, Dosimetry Administration B. (1) General Manager Plant Operations (2) EN-RP-201, Dosimetry Administration C. (1) Shift Manager (2) OP 3507, Emergency Radiation Exposure Control D. (1) General Manager Plant Operations (2) OP 3507, Emergency Radiation Exposure Control Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(4)]:

1. Question requires analysis and interpretation of radiation readings as they pertain to selection of administrative, normal, abnormal, and emergency procedures.

A 20 minute exposure in a 10.5 R/hr field is an exposure of 3.5 R plus the current exposure of 380 mR equals a total exposure of 3.88 R.

IAW OP 3507 the following provides guidance:

  • Section 4.1 The Shift Manager is responsible for authorizing emergency dose guidelines depending on the emergency until relieved by the Emergency Plant Manager or Emergency Director.
  • Section 5.2 IF tasks are being conducted within areas that show a significant increase in general area dose rates from normal plant radiological conditions, OR THEN the emergency dose control process will be used to control radiation exposure of personnel.
  • Attachment 9.5 Emergency Dose Limits. Line 1 - Dose Limit 5 Rem (TEDE) for All Work Activities A. Incorrect - EN-RP-201 is for normal planned exposures. The SM is not the approving authority for this exposure.

B. Incorrect - This is the correct answer for normal planned exposures and the GMPO is the approving authority since the total exposure is between 3 - 4 R.

C. Correct - OP 3507 Emergency Radiation Exposure Control provides guidance on exposure limits during an emergency. During an emergency condition, the Plant Emergency Director (PED) authorizes the exposure limits. Since the EOF, TSC, and OSC are not manned, the SM is the PED. An exposure limit of 5 R TEDE is authorized IAW Attachment 9.5 of OP 3507.

D. Incorrect - the GMPO is not the approving authority. The GMPO approves extensions between 3-4R IAW EN-RP-201 Section 5.4 for normal planned exposures.

Technical Reference(s): OP 3507 Sections 4.1, 5.2, (Attach if not previously 5.3, Att 9.5, Rev 40 provided)

EN-RP-201 Sections 5.4 Rev 2

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-900 SRO 3 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 4 Comments:

Written 3/29/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.4.11 Importance Rating 4.2 (K&A Statement) 2.4.11 Knowledge of abnormal condition procedures.

Proposed Question: SRO 22 A plant startup is in progress IAW OP 0105, Reactor Operation with the turbine online.

The reactor is at 20% RTP with annunciator 5-K-8, STOP/CTRL VLV FAST CLOSURE BYP, illuminated.

Additionally, Annunciator 7-F-2, TURB Excessive Vibration alarms in the control room.

The ERFIS screen for "Turbine Bearing Performance" indicates the following:

  • Bearings 1X, 1Y and 8X are alarming with a slowly rising trend in all three values.
  • All other bearing temperatures and trends are stable.

Failure to take operator action in a timely manner will result in:

(1) Which ONE of the following plant responses?

(2) What required actions to be taken?

A. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.

(2) Enter ONLY ON 3154, Load Reject. Verify 1T ACB, 81-1T ACB and T-1 MOD open.

B. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.

(2) Enter ONLY ON 3154, Load Reject. Verify 1T ACB, 81-1T ACB and T-1 MOD open.

C. (1) Bearings 1X and 1Y reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.

(2) Enter OT 3100, Reactor Scram AND ON 3154, Load Reject. Verify house loads have transferred to the Startup Transformers.

D. (1) Bearings 1X and 8X reach the trip setpoint causing MTS-1 to trip resulting in a turbine trip.

(2) Enter OT 3100, Reactor Scram AND ON 3154, Load Reject. Verify house loads have transferred to the Startup Transformers.

NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed Answer: A Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

2. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
3. Question cannot be answered by knowing the immediate operator actions.
4. Question cannot be answered by knowing EOP entry conditions
5. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
6. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

A. (CORRECT): First the candidate needs to understand the logic. A turbine trip will occur if both axes on the same bearing reach the trip setpoint. Then the candidate must integrate the fact that power is <25% RTP, therefore annunciator 5-K-8 is lit (bypass of the auto scram on a turbine trip). Since a scram will not occur, OT 3100 is not entered. ON 3154 is entered based on ARS 7-F-2.

B. (INCORRECT): The same axis for two different bearings will not result in a turbine trip.

C. (INCORRECT): With power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable.

D. (INCORRECT): The same axis for two different bearings will not result in a turbine trip. Also, with power <25% RTP, an automatic scram will not occur. Also, there is nothing in the stem that suggests a manual scram is required. Therefore entry into OT 3100 and verification of house load transfer is not applicable.

Technical Reference(s): ON 3154, Revision 11 LPC 1 (Attach if not previously ARS 7-F-2, Revision 15 provided)

Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-600 RO EO4 and (As available)

SRO EO1 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question Source: Bank # Lot more Modified Bank # 6163 (ILO) (Note changes or attach parent)

New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Developed on 3/25/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.2.37 Importance Rating 4.6 (K&A Statement) 2.2.37 Ability to determine operability and / or availability of safety related equipment.

Proposed Question: SRO 23 A plant shutdown and cooldown are being performed IAW OP 0105, Reactor Operations with the following conditions:

  • All rods inserted
  • RPV pressure: 800 psig
  • Cooldown rate: 60°F/hr
  • Both House Heating Boilers tripped due to low fuel oil level.
  • Outside air temperature is 10°F.

The Turbine Building AO reports the A Diesel Room temperature is 47°F Determine the operability of the A Emergency Diesel Generator (EDG) and the correct guidance for assessing availability.

A EDG is (1) .

Risk assessment availability will be assessed IAW (2) .

A. (1) OPERABLE (2) AP 0172, Work Schedule Risk Management - Online B. (1) OPERABLE (2) AP 0173, Work Schedule Risk Management - Outage C. (1) INOPERABLE (2) AP 0172, Work Schedule Risk Management - Online D. (1) INOPERABLE (2) AP 0173, Work Schedule Risk Management - Outage Proposed Answer: C NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

Precautions in OP 2192 (#10) and OP 2126 (#17) specify the UFSAR minimum temperature is 500F SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires assessing plant conditions and then prescribing a plant procedure or section of a procedure to mitigate recover, or with which to proceed.

SRO-ONLY Question Validity [10CFR55.43(b)(2)]:

1. Question cannot be answered by knowing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TS/TRM action
2. Question cannot be answered by knowing the LCO/TRM information listed above the line.
3. Question cannot be answered by knowing the TS Safety Limits or their bases.
4. Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.

A. Incorrect - With EDG room temperature <50F, the associated EDG should be declared INOPERABLE. Risk Management - availability will be assessed using AP 0172. When RCS pressure is 100 psig, the transition from AP-0172 - Online to AP-0173 - Outage Risk is performed. At 800 psig, AP 0172 should still be used to assess availability.

B. Incorrect - AP 0173 is a plausible distractor since the plant is shutdown, while the outage period has begun by output breaker status, risk management transitions to AP-0173 has not been met with RCS pressure greater than 100 psig.

C. Correct - A EDG is INOPERABLE with room temperature <50F and AP 0172 will assess the availability of A EDG D. Incorrect - At 800 psig, AP 0172 should still be used to assess availability.

Technical Reference(s): OP 2192, Rev. 65, (Attach if not previously Precaution #10 provided)

OP 2126, Rev. 55, Precaution #17 AP 0173, Rev. 21 Section 1.2.1, 1.2.2 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-601 EO5 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge X Comprehension or Analysis 10 CFR Part 55 Content: 55.41 55.43 2,5 Comments:

Written 3/26/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.1.34 Importance Rating 3.5 (K&A Statement) 2.1.34 Knowledge of primary and secondary plant chemistry limits.

Proposed Question: SRO 24 A plant startup is in progress IAW OP 0105, Reactor Operations. Reactor Power is being held at ~22%. Chemistry has taken reactor coolant samples IAW OP 4612, Reactor Water System Sampling and Treatment. The following results were given to the Control Room Supervisor for review:

  • Conductivity is 2.8 mho/cm
  • I-131 dose equivalent is 1.8 Ci/gm. (This is the first I-131 sample)

Which ONE of the following actions is required based on these coolant chemistry results?

A. The startup shall continue IAW OP 0105 since all given chemistry samples are satisfactory.

B. The coolant shall be sampled every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and analyzed for radioactive iodines until Iodine dose equivalent is within specification.

C. The reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> based on chlorides being out of specification.

D. The reactor shall be in the cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> based on iodines being out of specification.

Proposed Answer: B NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(2)]:

(1) Question cannot be answered by knowing 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> TS/TRM action (2) Question cannot be answered by knowing the LCO/TRM information listed above the line.

(3) Question cannot be answered by knowing the TS Safety Limits or their bases.

(4) Question can be answered by applying sections 3 and/or 4 in accordance with rules of application requirements.

A. (INCORRECT): The candidate may believe these results are sat based on thinking the Iodine limit is 4 Ci/gm (T.S. 3.6.B.1.c), Conductivity limit is 10 mho/cm (TRM 3.6.B.3), and chloride limit is 0.1 ppm (TRM 3.6.B.3). However, in this case, Radioiodine concentrations are UNSAT IAW OP 4612 Table 3 and TS limits.

Samples are required every 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to ensure 1.1 Ci/gm is not exceeded for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. This action to continue a startup may not be conservative since a concentration >1.1 Ci/gm is indicative of failure of the cleanup demineralizer or gross activity in the gaseous effluents is near the limit which is indicative of a potential fuel failure.

B. (CORRECT): T.S section 4.6.B.1.e C. (INCORRECT): Chlorides are not out of spec. Because steaming rate is greater than 100,000 lbm/hour, the chloride spec is now 0.5 ppm. If steaming rate was <100,000 lbm/hour, then chlorides would be out of spec. 22% power provides greater than 100,000 lbm/hour.

D. (INCORRECT): This would be the case if either radiochemistry iodine concentration exceeded 1.1 Ci/gm for greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or if concentration exceeded 4.0 Ci/gm at any time. 4.0 Ci/gm is the iodine spike limit. Exceeding this limit will not guarantee we will be within the 10CFR50.67 dose guidelines in the event of a postulated LOCA.

Technical Reference(s): OP 0105, Revision 86 LPC 2 (Attach if not previously OP 4612, Revision 37 provided)

Technical Specifications section 4.6.B.1.e Amendment 190 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Proposed references to be provided to applicants during T.S Section 3.6 examination: without bases.

TRM Section 3/4.6 Learning Objective: LOT-00-301 SRO #3 (As available)

Question Source: Bank # Lot more Modified Bank # 6296 (ILO) (Note changes or attach parent)

New Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 2 Comments:

Developed on 4/14/09 NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Examination Outline Cross-reference: Level RO SRO Tier # 3 Group #

K/A # 2.4.35 Importance Rating 4.0 (K&A Statement) 2.4.35 Knowledge of local auxiliary operator tasks during emergency and the resultant operational effects.

Proposed Question: SRO 25 An Anticipated Transient Without Scram (ATWS) has occurred. Additionally:

  • NO rod motion occurred
  • RPS remains energized
  • RPV Pressure is steady at 920 psig.

The CRS directs the Reactor Building Auxiliary Operator (RBAO) to perform Appendix D, Manual Isolation and Venting of the Scram Air Header. When the RBAO reported the scram air header has been isolated and vented, SOME control rod motion occurred.

NO additional actions have been performed IAW Appendix D.

Which of the following (if any) can be directed by the CRS to successfully insert the remaining control rods?

(1) Appendix G, Manual Insertion of Individual Control Rods (2) Appendix H, Vent the Control Rod Drive Over Piston Volume A. BOTH (1) and (2)

B. Neither (1) nor (2)

C. ONLY (1)

D. ONLY (2)

Proposed Answer: D NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Explanation (Optional):

SRO-ONLY Question Validity [10CFR55.43(b)(5)]:

1. Question cannot be answered by knowing system operation, flowpath, logic, initiation.
2. Question cannot be answered by knowing the immediate operator actions.
3. Question cannot be answered by knowing EOP entry conditions
4. Question cannot be answered by knowing the purpose, overall sequence of events, or overall mitigation strategy of a procedure.
5. Question requires detailed knowledge of when to implement attachments and appendices, including how to coordinate these items with procedure steps.

A. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.

B. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion. There are notes in Appendix D, G, and BB providing this information. Nothing in the stem prevents Appendix H from being performed.

C. Incorrect - Appendix G CAN NOT be implemented because the CRD flow control valve fails closed rendering drive and cooling water pressures unavailable for control rod insertion.

D. Correct - Appendix H CAN be implemented because there is no affect on the ability to vent the overpiston area. Also, there is adequate RPV Pressure to insert control rods (>500#).

Technical Reference(s): OE 3107 Rev. 25, (Attach if not previously Appendices D, G, H provided)

Proposed references to be provided to applicants during None examination:

Learning Objective: LOT-00-626 EO3 (As available)

Question Source: Bank # Lot more Modified Bank # (Note changes or attach parent)

New X NUREG-1021, Revision 9, Supplement 1

ES-401 Sample Written Examination Form ES-401-5 Question Worksheet Question History: Last NRC Exam No Question Cognitive Level: Memory or Fundamental Knowledge Comprehension or Analysis X 10 CFR Part 55 Content: 55.41 55.43 5 Comments:

Written 3/24/09 NUREG-1021, Revision 9, Supplement 1