COVER LETTER | |||
Mr. Charles G. Pardee | |||
Chief Nuclear Officer (CNO) and Senior Vice President | |||
Exelon Generation Company, LLC | |||
200 Exelon Way | |||
Kennett Square, PA 19348 | |||
SUBJECT: OYSTER CREEK GENERATING STATION - NRC LICENSE RENEWAL | |||
FOLLOW-UP INSPECTION REPORT 05000219/2008007 | |||
Dear Mr. Pardee | |||
On December 23, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an | |||
inspection at your Oyster Creek Generating Station. The enclosed report documents the | |||
inspection results, which were discussed on December 23, 2008, with Mr. T. Rausch, Site Vice | |||
President, Mr. M. Gallagher, Vice President License Renewal, and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to safety and | |||
compliance with the Commission's rules and regulations and with the conditions of your license. | |||
In addition, an appeal of a licensing board decision regarding the Oyster Creek application for a | |||
renewed license is pending before the Commission. The NRC staff concluded Oyster Creek | |||
should not enter the extended period of operation without directly observing continuing license | |||
renewal activities at Oyster Creek. Therefore, the NRC staff performed an inspection using | |||
Inspection Procedure (IP) 71003 "Post-Approval Site Inspection for License Renewal" and | |||
observed Oyster Creek license renewal activities during the last refuel outage prior to entering | |||
the period of extended operation. | |||
IP 71003 verifies license conditions added as part of a renewed license, license renewal | |||
commitments, selected aging management programs, and license renewal commitments | |||
revised after the renewed license was granted, are implemented in accordance with Title 10 of | |||
the Code of Federal Regulations (CFP Part 54, "Requirements for the Renewal of Operating | |||
I icn.,P.s fnr Nuclear Power Plants."[_ (b)(5) | |||
(b)(5) ] -T, ___ | |||
(b)(5) )"heinspectors reviewed selected procedures ana recoras, ooserveo | |||
activities, and intervie ed personnel. The enclosed report records the inspector's observations, | |||
absent any conclusions of adequacy, pending the final decision of the Commissioners on the | |||
appeal of the renewed license. | |||
aicobiatc* | |||
ac0rac withit thOfre domd | |||
w of | |||
the,1*edom of IM w | |||
Infoffnadoo ACL | |||
M --,O 00 1/-r 0 "7Q AlIA7 | |||
BC Input to OC 2008-07 | |||
SUMMARY OF FINDINGS | |||
IR 05000219/2008007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek | |||
Generating Station; License Renewal Follow-up | |||
The report covers a multi-week inspection of license renewal follow-up items. It was conducted | |||
by five region based engineering inspectors and the Oyster Creek resident inspector. The | |||
inspection was conducted in accordance with Insoection Procedure 71003 "Post-Approval Site | |||
In.-ni.r.tinn fnr I ir.pnse Renewal.'E (b)(5) | |||
(b)((5) | |||
(b)(5) "]In accordance with the NRC's agreement with the State of New Jersey, state | |||
engineers-bbserved portions of the NRC's staff review. The report documents inspection | |||
observations, absent any conclusions of adequacy, pending the final decision of the | |||
Commissioners on the appeal of the renewed license. | |||
BC Input to OC 2008-07 | |||
BODY OF REPORT -- SAMPLE SELECTION PROCESS | |||
1. Inspection Sample Selection Process | |||
This inspection was conducted in order to observe AmerGen's continuing license | |||
renewal activities during the last refueling outage prior to Oyster Creek (OC) entering the | |||
extended period of operation. The inspection team selected a number of inspection | |||
samples for review, using the NRC accepted guidance based on their importance in the | |||
license renewal a~j~lication process, as an opportunity to make observations on license | |||
renewal activitie s( (b)(5) | |||
- | |||
(b)(5) | |||
Accordingly, the inspectors recorded observations, without any assessment of | |||
implementation adequacy or safety significance. Inspection observations were | |||
considered, in light of pending 10 CFR 54 license renewal commitments and license | |||
conditions, as documented in NUREG-1875, "Safety Evaluation Report (SER) Related to | |||
the License Renewal of Oyster Creek Generating Station," as well as programmatic | |||
performance under on-going implementation of 10 CFR 50 current licensing basis (CLB) | |||
requirements. | |||
The reviewed SER proposed commitments and license conditions were selected based | |||
on several attributes including: the risk significance using insights gained from sources | |||
such as the NRC's "Significance Determination Process Risk Informed Inspection | |||
Notebooks," revision 2; the extent and results of previous license renewal audits and | |||
inspections of aging management programs; the extent or complexity of a commitment; | |||
and the extent that baseline inspection programs will inspect a system, structure, or | |||
component (SSC), or commodity group. | |||
For each commitment and on a sampling basis, the inspectors reviewed supporting | |||
documents including completed surveillances, conducted interviews, performed visual | |||
inspection of structures and components including those not accessible during power | |||
operation, and observed selected activities described below. The inspectors also | |||
reviewed selected corrective actions taken as a consequence of previous license | |||
renewal inspections. | |||
At the time of the inspection, AmerGen Energy Company, LLC was the licensee for | |||
Oyster Creek Generating Station. As of January 8, 2009, the OC license was | |||
transferred to Exelon Generating Company, LLC by license amendment No. 271 | |||
(ML082750072). | |||
}} | }} |
Latest revision as of 05:07, 14 November 2019
ML091980297 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 06/17/2009 |
From: | Division of Reactor Safety I |
To: | Pardee C Exelon Generation Co |
References | |
FOIA/PA-2009-0070 | |
Download: ML091980297 (3) | |
See also: IR 05000219/2008007
Text
BC Input to OC 2008-07 TdýE F]~~~IN 410 ~
COVER LETTER
Mr. Charles G. Pardee
Chief Nuclear Officer (CNO) and Senior Vice President
Exelon Generation Company, LLC
200 Exelon Way
Kennett Square, PA 19348
SUBJECT: OYSTER CREEK GENERATING STATION - NRC LICENSE RENEWAL
FOLLOW-UP INSPECTION REPORT 05000219/2008007
Dear Mr. Pardee
On December 23, 2008, the U. S. Nuclear Regulatory Commission (NRC) completed an
inspection at your Oyster Creek Generating Station. The enclosed report documents the
inspection results, which were discussed on December 23, 2008, with Mr. T. Rausch, Site Vice
President, Mr. M. Gallagher, Vice President License Renewal, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and
compliance with the Commission's rules and regulations and with the conditions of your license.
In addition, an appeal of a licensing board decision regarding the Oyster Creek application for a
renewed license is pending before the Commission. The NRC staff concluded Oyster Creek
should not enter the extended period of operation without directly observing continuing license
renewal activities at Oyster Creek. Therefore, the NRC staff performed an inspection using
Inspection Procedure (IP) 71003 "Post-Approval Site Inspection for License Renewal" and
observed Oyster Creek license renewal activities during the last refuel outage prior to entering
the period of extended operation.
IP 71003 verifies license conditions added as part of a renewed license, license renewal
commitments, selected aging management programs, and license renewal commitments
revised after the renewed license was granted, are implemented in accordance with Title 10 of
the Code of Federal Regulations (CFP Part 54, "Requirements for the Renewal of Operating
I icn.,P.s fnr Nuclear Power Plants."[_ (b)(5)
(b)(5) ] -T, ___
(b)(5) )"heinspectors reviewed selected procedures ana recoras, ooserveo
activities, and intervie ed personnel. The enclosed report records the inspector's observations,
absent any conclusions of adequacy, pending the final decision of the Commissioners on the
appeal of the renewed license.
aicobiatc*
ac0rac withit thOfre domd
w of
the,1*edom of IM w
Infoffnadoo ACL
M --,O 00 1/-r 0 "7Q AlIA7
BC Input to OC 2008-07
SUMMARY OF FINDINGS
IR 05000219/2008007; 10/27/2008 - 12/23/2008; Exelon, LLC, Oyster Creek
Generating Station; License Renewal Follow-up
The report covers a multi-week inspection of license renewal follow-up items. It was conducted
by five region based engineering inspectors and the Oyster Creek resident inspector. The
inspection was conducted in accordance with Insoection Procedure 71003 "Post-Approval Site
In.-ni.r.tinn fnr I ir.pnse Renewal.'E (b)(5)
(b)((5)
(b)(5) "]In accordance with the NRC's agreement with the State of New Jersey, state
engineers-bbserved portions of the NRC's staff review. The report documents inspection
observations, absent any conclusions of adequacy, pending the final decision of the
Commissioners on the appeal of the renewed license.
BC Input to OC 2008-07
BODY OF REPORT -- SAMPLE SELECTION PROCESS
1. Inspection Sample Selection Process
This inspection was conducted in order to observe AmerGen's continuing license
renewal activities during the last refueling outage prior to Oyster Creek (OC) entering the
extended period of operation. The inspection team selected a number of inspection
samples for review, using the NRC accepted guidance based on their importance in the
license renewal a~j~lication process, as an opportunity to make observations on license
renewal activitie s( (b)(5)
-
(b)(5)
Accordingly, the inspectors recorded observations, without any assessment of
implementation adequacy or safety significance. Inspection observations were
considered, in light of pending 10 CFR 54 license renewal commitments and license
conditions, as documented in NUREG-1875, "Safety Evaluation Report (SER) Related to
the License Renewal of Oyster Creek Generating Station," as well as programmatic
performance under on-going implementation of 10 CFR 50 current licensing basis (CLB)
requirements.
The reviewed SER proposed commitments and license conditions were selected based
on several attributes including: the risk significance using insights gained from sources
such as the NRC's "Significance Determination Process Risk Informed Inspection
Notebooks," revision 2; the extent and results of previous license renewal audits and
inspections of aging management programs; the extent or complexity of a commitment;
and the extent that baseline inspection programs will inspect a system, structure, or
component (SSC), or commodity group.
For each commitment and on a sampling basis, the inspectors reviewed supporting
documents including completed surveillances, conducted interviews, performed visual
inspection of structures and components including those not accessible during power
operation, and observed selected activities described below. The inspectors also
reviewed selected corrective actions taken as a consequence of previous license
renewal inspections.
At the time of the inspection, AmerGen Energy Company, LLC was the licensee for
Oyster Creek Generating Station. As of January 8, 2009, the OC license was
transferred to Exelon Generating Company, LLC by license amendment No. 271