ML092810435: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML092810435
| number = ML092810435
| issue date = 10/08/2009
| issue date = 10/08/2009
| title = Watts Bar Initial Exam 2009-301 Draft Sim/In-Plant JPMs
| title = Initial Exam 2009-301 Draft Sim/In-Plant JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II
| author affiliation = NRC/RGN-II
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REV. 0 PAGE 1 0F 128 WATTS BAR NUCLEAR PLANT B.1.a  
{{#Wiki_filter:REV. 0                           PAGE 1 0F 128 WATTS BAR NUCLEAR PLANT B.1.a B.1.a Withdraw Shutdown Banks


B.1.a Withdraw Shutdown Banks  
REV. 0                                                                      PAGE 2 0F 128 WATTS BAR NUCLEAR PLANT B.1.a Task:    Withdraw Shutdown Banks Alternate Path:  Following failure of the group step counters, the reactor trip breakers are opened in accordance with Technical Requirement 3.1.7.
Facility JPM #:  B.1.a 2009 May NRC Exam K/A Rating(s):    001 A3.05 3.5/3.5 Task Standard:    Withdrawal of shutdown banks is initiated starting with Shutdown Bank A.
Preferred Evaluation Location:                            Preferred Evaluation Method:
Simulator __X__    In-Plant _____                        Perform __X___        Simulate ___ _


REV. 0 PAGE  2  0F 128 WATTS BAR NUCLEAR PLANT B.1.a  Task: Withdraw Shutdown Banks
==References:==
 
SOI-85.0, Control Rod Drive and Position Indication System, Rev. 38.
Alternate Path:
TR 3.1.7, Reactivity Control Systems, Position Indicating System - Shutdown.
Following failure of the group step counters, the reactor trip breakers are opened in accordance with Technical Requirement 3.1.7.
AOI-2, Malfunction of Reactor Control System, Rev. 37.
Facility JPM #: B.1.a 2009 May NRC Exam K/A Rating(s):
Task Number:     RO-085-SOI-85-001                         APPLICABLE FOR: RO/SRO RO-085-SOI-85-010 10CFR55.45: CFR: 41.7/45.13 Validation Time: 10 min. Time Critical: No
001 A3.05 3.5/3.5    Task Standard: Withdrawal of shutdown banks is initiated starting with Shutdown Bank A.
===========================================================================
Preferred Evaluation Location:    Preferred Evaluation  Method:
Applicant:     ___________________________         _________________         Time Start: ________
Simulator __X__    In-Plant _____  Perform __X___    Simulate ___ _
NAME                             SSN            Time Finish: ________
References
Performance Rating: SAT ____ UNSAT ____                                       Performance Time ___
: SOI-85.0, Control Rod Drive and Position Indication System, Rev. 38. TR 3.1.7, Reactivity Control Systems, Position Indicating System - Shutdown. AOI-2, Malfunction of Reactor Control System, Rev. 37.  
Examiner: _____________________________             _____________________________/________
 
NAME                                     SIGNATURE                   DATE
Task Number:   RO-085-SOI-85-001   APPLICABLE FOR: RO/SRO RO-085-SOI-85-010 10CFR55.45
: CFR: 41.7/45.13 Validation Time: 10 min. Time Critical:
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:   ________
NAME SSNTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================
===========================================================================
COMMENTS REV. 0 PAGE  3  0F 128 WATTS BAR NUCLEAR PLANT B.1.a  SIMULATOR OPERATOR INSTRUCTIONS:
COMMENTS
: 1. Initialize to IC 311. a. Ensure the following items are displayed on the Director Summary Page:
rd19 Shutdown bank a demand counter fails 0
: b. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. Event 20 is set when Shutdown Bank A reaches 100 steps. Malfunction rd19 will enter at this event.
: c. Place the simulator in RUN momentarily, and acknowledge all alarms
: 3. ENSURE 1-NR-92-145 Recorder is selected to Source Range N31 and Intermediate Range N35. 
: 4. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.
: 5. After performer indicates understanding of task, place simulator in run.


REV. 0                                                            PAGE 3 0F 128 WATTS BAR NUCLEAR PLANT B.1.a SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 311.
: a. Ensure the following items are displayed on the Director Summary Page:
rd19          Shutdown bank a demand counter fails                    0
: b. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. Event 20 is set when Shutdown Bank A reaches 100 steps. Malfunction rd19 will enter at this event.
: c. Place the simulator in RUN momentarily, and acknowledge all alarms
: 3. ENSURE 1-NR-92-145 Recorder is selected to Source Range N31 and Intermediate Range N35.
: 4. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.
: 5. After performer indicates understanding of task, place simulator in run.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
Marked copy of SOI-85.01, indicating steps have been performed to Section 5.4, Step 6.
Marked copy of SOI-85.01, indicating steps have been performed to Section 5.4, Step 6.
REV. 0 PAGE  4  0F 128 WATTS BAR NUCLEAR PLANT B.1.a  READ TO OPERATOR
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


REV. 0                                                                  PAGE 4 0F 128 WATTS BAR NUCLEAR PLANT B.1.a READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.  
: 1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.
: 2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.  
: 2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.
: 3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.  
: 3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.
: 4. The US/SRO has approved shutdown bank withdrawal.  
: 4. The US/SRO has approved shutdown bank withdrawal.
: 5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.
: 5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.
INITIATING CUES:
INITIATING CUES:
: 1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.  
: 1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.
: 2. Notify the SRO when the shutdown banks are fully withdrawn.  
: 2. Notify the SRO when the shutdown banks are fully withdrawn.


REV. 0 PAGE 5 0F 128     WATTS BAR NUCLEAR PLANT B.1.a **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
REV. 0                                                         PAGE 5 0F 128 WATTS BAR NUCLEAR PLANT B.1.a START TIME: _______
. START TIME: _______
STEP/STANDARD                               SAT/UNSAT STEP 1.:         Obtain the appropriate procedure.                        ___ SAT
STEP/STANDARD SAT/UNSAT STEP 1.: Obtain the appropriate procedure.  
___ UNSAT STANDARD: Performer identifies SOI-85.01 and goes to Section 5.4 Shutdown Banks Withdrawal.
Evaluator Cue: Hand marked-up copy of SOI-85.01 to the performer after the performer successfully identifies the procedure and section.
STEP 2:      [6] ENSURE 1-RBSS, ROD BANK SELECTOR SWITCH                  ___ SAT
[1-M-4], in MANUAL.
___ UNSAT STANDARD: Performer ensures that the Rod Bank Selector Switch RBSS-1 is in MANUAL position.
COMMENTS:
STEP 3:      [7] OBTAIN SRO Approval to withdraw Shutdown Banks.          ___ SAT
___ UNSAT STANDARD: If requested, state that SRO approval has been granted.
COMMENTS:
      **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


STANDARD: Performer identifies SOI-85.01 and goes to Section 5.4    "Shutdown Banks Withdrawal". 
REV. 0                                                             PAGE 6 0F 128 WATTS BAR NUCLEAR PLANT B.1.a STEP/STANDARD                                 SAT/UNSAT STEP 4:    [8] OBSERVE the following for proper response during Bank       ___ SAT Withdrawal:
 
A. Source Range (SR)                 ________                 ___ UNSAT B. Intermediate Range (IR)           ________
Evaluator Cue:  Hand marked-up copy of SOI-85.01 to the performer after the performer successfully identifies the procedure and section.
C. Startup Meters                     ________
___ SAT
D. Nuclear Recorders                 ________
 
STANDARD: Performer monitors above parameters as the rods are being withdrawn COMMENTS:
___ UNSAT
STEP 5: [9] SELECT SD Bank A (SBA) on ROD BANK SELECTOR                   Critical Step SWITCH, 1-RBSS.
 
___ SAT
STEP 2:    [6] ENSURE 1-RBSS, ROD BANK SELECTOR SWITCH  [1-M-4], in MANUAL.
___ UNSAT STANDARD: Performer places Rod Bank Selector switch RBSS-1 in SBA position.
 
COMMENTS:
STANDARD: Performer ensures that the Rod Bank Selector Switch RBSS-1 is in MANUAL position.
STEP 6:    [10] PLACE 1-FLRM, IN-HOLD-OUT SWITCH, to OUT to begin         Critical Step withdrawing Shutdown Banks A1 and A2 to greater than or equal to 225 Steps.                                         ___ SAT STANDARD: Performer places 1-FLR to the OUT position and monitors           ___ UNSAT shutdown bank A group A1 and A2 are responding.
 
COMMENTS:
COMMENTS: 
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
 
___ SAT
 
___ UNSAT
 
STEP 3:    [7] OBTAIN SRO Approval to withdraw Shutdown Banks.
STANDARD: If requested, state that SRO approval has been granted.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 6 0F 128     WATTS BAR NUCLEAR PLANT B.1.a **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP/STANDARD SAT/UNSAT STEP 4:    [8] OBSERVE the following for proper response during Bank   Withdrawal:
A. Source Range (SR)   ________
B. Intermediate Range (IR)   ________
C. Startup Meters     ________
D. Nuclear Recorders   ________  
 
STANDARD: Performer monitors above parameters as the rods are being withdrawn  
 
COMMENTS:
 
___ SAT
 
___ UNSAT
 
STEP 5: [9] SELECT SD Bank A (SBA) on ROD BANK SELECTOR   SWITCH, 1-RBSS.  
 
STANDARD: Performer places Rod Bank Selector switch RBSS-1 in SBA position.
COMMENTS:
 
Critical Step
___ SAT
 
___ UNSAT
 
STEP 6:    [10] PLACE 1-FLRM, IN-HOLD-OUT SWITCH, to OUT to begin withdrawing Shutdown Banks A1 and A2 to greater than or equal to 225 Steps.  
 
STANDARD: Performer places 1-FLR to the OUT position and monitors shutdown bank A group A1 and A2 are responding.  
 
COMMENTS:
 
Critical Step
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 7 0F 128      WATTS BAR NUCLEAR PLANT B.1.a **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP/STANDARD SAT/UNSAT STEP 7:    [11] MONITOR the following as the Bank is being withdrawn:  A. Group Step Counters B. RPIs C. "In-Out" Status Lights D. Rod speed (64 Steps/Minute)
 
STANDARD: Performer monitors parameters as the rods are being withdrawn.  


REV. 0                                                              PAGE 7 0F 128 WATTS BAR NUCLEAR PLANT B.1.a STEP/STANDARD                                  SAT/UNSAT STEP 7:      [11] MONITOR the following as the Bank is being withdrawn:        ___ SAT A. Group Step Counters B. RPIs                                                        ___ UNSAT C. In-Out Status Lights D. Rod speed (64 Steps/Minute)
STANDARD: Performer monitors parameters as the rods are being withdrawn.
COMMENTS:
COMMENTS:
___ SAT
___ UNSAT
Note to evaluator:
Note to evaluator:
Malfunction to fail step counters is to be inserted when Shutdown Bank A the rods reach approximately 100 steps.
Malfunction to fail step counters is to be inserted when Shutdown Bank A the rods reach approximately 100 steps.
Performer may refer to TR-3.1.7. If so, the required action is to open the Reactor Trip breakers.
Performer may refer to TR-3.1.7. If so, the required action is to open the Reactor Trip breakers.
STEP 9:   Open the Reactor Trip Breakers.
STEP 9:     Open the Reactor Trip Breakers.                                 Critical Step
Cue:   After the reactor trip breakers have been opened state ' We will stop here
___ SAT Cue: After the reactor trip breakers have been opened state We will stop here                                                                 ___ UNSAT STANDARD: Performer determines the Group 1 step counter is not capable of determining the demand position for each of the Shutdown bank A rods within + 2 steps and opens the reactor trip breakers.
 
STANDARD: Performer determines the Group 1 step counter is not capable of determining the demand position for each of the Shutdown bank A rods within +
2 steps and opens the reactor trip breakers.  
 
COMMENTS:
COMMENTS:
Critical Step
___ SAT
___ UNSAT
STOP TIME ________
STOP TIME ________
REV. 0 PAGE  8  0F 10  WATTS BAR NUCLEAR PLANT B.1.b  APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
      **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


REV. 0                                                                      PAGE 8 0F 10 WATTS BAR NUCLEAR PLANT B.1.b APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.  
: 1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.
: 2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.  
: 2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.
: 3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.  
: 3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.
: 4. The US/SRO has approved shutdown bank withdrawal.  
: 4. The US/SRO has approved shutdown bank withdrawal.
: 5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.
: 5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.
INITIATING CUES:
INITIATING CUES:
: 1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.  
: 1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.
: 2. Notify the SRO when the shutdown banks are fully withdrawn.  
: 2. Notify the SRO when the shutdown banks are fully withdrawn.


REV. 0 PAGE 9 0F 10 WATTS BAR NUCLEAR PLANT B.1.b  
REV. 0                                       PAGE 9 0F 10 WATTS BAR NUCLEAR PLANT B.1.b B.1.b Place Excess Letdown in Service per AOI-6


B.1.b Place Excess Letdown in Service per AOI-6  
REV. 0                                                                    PAGE 10 0F 10 WATTS BAR NUCLEAR PLANT B.1.b EVALUATION SHEET Task: Place Excess Letdown in Service per AOI-6.
Alternate Path:  N/A Facility JPM #:  3-OT-JPMR022 Rev 3 K/A Rating(s):  004 A4.06 [3.6/3.1]    004A 1.11 [3.0/3.0]        004 A2.22 [3.2/3.1]
004 A2.22 [3.2/3.1]    2.1.30 [3.9/3.4]            2.1.23 [3.9/4.0]
Task Standard:    Excess Letdown has been placed in service per AOI-6, Step 15.
Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator __X__  In-Plant _____                      Perform __X___    Simulate ____


REV. 0 PAGE  10  0F 10  WATTS BAR NUCLEAR PLANT B.1.b    EVALUATION SHEET Task: Place Excess Letdown in Service per AOI-6.
==References:==
Alternate Path:
AOI-6, Small Reactor Coolant System Leak, Rev 32.
N/A  Facility JPM #: 3-OT-JPMR022 Rev 3 K/A Rating(s):
Task Number:   RO-062-SOI-62-007               APPLICABLE FOR: RO/SRO RO-068-AOI-6-001 10CFR55.45: 6, 12 Validation Time: 10 min. Time Critical: No
004 A4.06 [3.6/3.1] 004A 1.11 [3.0/3.0]  004 A2.22  [3.2/3.1]  004 A2.22 [3.2/3.1] 2.1.30 [3.9/3.4] 2.1.23 [3.9/4.0]
===========================================================================
Task Standard: Excess Letdown has been placed in service per AOI-6, Step 15.
Applicant:   ___________________________       _________________     Time Start: ________
Preferred Evaluation Location:    Preferred Evaluation  Method:
NAME                         SSN          Time Finish: ________
Simulator __X__    In-Plant _____  Perform __X___    Simulate ____
Performance Rating: SAT ____ UNSAT ____                                 Performance Time ___
References
Examiner: _____________________________         _____________________________/________
: AOI-6, "Small Reactor Coolant System Leak", Rev 32.
NAME                                 SIGNATURE                 DATE
Task Number: RO-062-SOI-62-007 APPLICABLE FOR: RO/SRO RO-068-AOI-6-001 10CFR55.45: 6, 12 Validation Time:   10 min.
===========================================================================
Time Critical:
COMMENTS
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:   ________
NAME SSNTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================  


COMMENTS REV. 0 PAGE 11 0F 10 WATTS BAR NUCLEAR PLANT B.1.b REV. 0 PAGE 12 0F 10 WATTS BAR NUCLEAR PLANT B.1.b SIMULATOR OPERATOR INSTRUCTIONS:
REV. 0                         PAGE 11 0F 10 WATTS BAR NUCLEAR PLANT B.1.b
: 1. Initialize to IC 312. a. Ensure following letdown and charging isolation valves are closed.  
 
: a. 1-FCV-62-72.
REV. 0                                                                 PAGE 12 0F 10 WATTS BAR NUCLEAR PLANT B.1.b SIMULATOR OPERATOR INSTRUCTIONS:
: b. 1-FCV-62-73.  
: 1. Initialize to IC 312.
: c. 1-FCV-62-74.  
: a. Ensure following letdown and charging isolation valves are closed.
: d. 1-FCV-62-76.  
: a. 1-FCV-62-72.
: e. 1-FCV-62-69.  
: b. 1-FCV-62-73.
: f. 1-FCV-62-70.  
: c. 1-FCV-62-74.
: g. 1-FCV-62-85.  
: d. 1-FCV-62-76.
: h. 1-FCV-62-86.  
: e. 1-FCV-62-69.
: i. 1-FCV-62-90.  
: f. 1-FCV-62-70.
: j. 1-FCV-62-91.  
: g. 1-FCV-62-85.
: b. Ensure 1-FCV-62-93 is in manual and seal flow is stable at approximately 8 gpm per RCP seal.
: h. 1-FCV-62-86.
: c. Ensure pressurizer level is approximately 66% and rising slowly.
: i. 1-FCV-62-90.
: 2. Acknowledge all alarms.  
: j. 1-FCV-62-91.
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task. 4. After performer indicates understanding of the task, place simulator to RUN.
: b. Ensure 1-FCV-62-93 is in manual and seal flow is stable at approximately 8 gpm per RCP seal.
: c. Ensure pressurizer level is approximately 66% and rising slowly.
: 2. Acknowledge all alarms.
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task.
: 4. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
A marked up copy of AOI-6, signed off through Step 14, with Step 15 CIRCLED.


A marked up copy of AOI-6, signed off through Step 14, with Step 15 CIRCLED.
REV. 0                                                                     PAGE 13 0F 10 WATTS BAR NUCLEAR PLANT B.1.b READ TO OPERATOR DIRECTION TO TRAINEE:
 
REV. 0 PAGE 13 0F 10 WATTS BAR NUCLEAR PLANT B.1.b   READ TO OPERATOR
 
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. The Unit is operating at 100 % power.  
: 1. The Unit is operating at 100 % power.
: 2. A small leak has been found on the normal letdown path.  
: 2. A small leak has been found on the normal letdown path.
: 3. Letdown and Charging have been isolated per AOI-6, "Small Reactor Coolant System Leak".  
: 3. Letdown and Charging have been isolated per AOI-6, Small Reactor Coolant System Leak.
: 4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown. 5. You are the Operator at the Controls.  
: 4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown.
 
: 5. You are the Operator at the Controls.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.  
: 1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.
: 2. You are to notify the Unit Supervisor when the excess letdown has been aligned.  
: 2. You are to notify the Unit Supervisor when the excess letdown has been aligned.


REV. 3 PAGE 14 0F 10 WATTS BAR NUCLEAR PLANT B.1.b   START TIME: _______
REV. 3                                                                 PAGE 14 0F 10 WATTS BAR NUCLEAR PLANT B.1.b START TIME: _______
STEP 1: Obtain a copy of the procedure.  
STEP 1:     Obtain a copy of the procedure.                                 ___ SAT STANDARD: A copy of AOI-6 has been obtained.
___ UNSAT COMMENTS:
STEP 2:    Check pressurizer level DROPPING or STABLE.
___ SAT STANDARD: Performer observes a RISING trend on pressurizer level and enters RESPONSE NOT OBTAINED column for actions.
NOTE:      Use of the RNO Column was directed by the INITIATING            ___ UNSAT CUES.
COMMENTS:
STEP 3:    If pzr level is rising, THEN PLACE excess letdown in service.
___ SAT STANDARD: Performer enters the RESPONSE NOT OBTAINED column and begins procedure actions.
NOTE:      Use of the RNO Column was directed by the INITIATING            ___ UNSAT CUES.
COMMENTS:


STANDARD: A copy of AOI-6 has been obtained.  
REV. 3                                                              PAGE 15 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 4 :  a. OPEN 1-FCV-70-143                                            CRITICAL STEP STANDARD: At panel 1-M-27B the performer places 1-HS-70-143A to OPEN. Performer verifies the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess      ___ SAT letdown flow.
NOTE:    When the performer opens 1-FCV-70-143, Annunciator 239-D will be received. This alarm occurs whenever 1-          ___ UNSAT FCV-70-143 is OPEN and flow on 1-FS-70-8 is less than 230 gpm.
COMMENTS:
STEP 5 :  b. OPEN 1-FCV-70-85                                            CRITICAL STEP STANDARD: At panel 1-M-27B the performer places 1-HS-70-85A to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to            ___ SAT establish excess letdown flow.
NOTE:    When the performer opens 1-FCV-70-85, Annunciator 239-D will clear as soon as flow is greater than 230 gpm      ___ UNSAT Performer may use 1-FI-70-84 (panel 1-M-27B) to monitor flow.
COMMENTS:
STEP 6 :  c. OPEN 1-FCV-62-54                                            CRITICAL STEP STANDARD: At panel 1-M-5 the performer places 1-HS-62-54 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish          ___ SAT excess letdown flow.
COMMENTS:
___ UNSAT


COMMENTS:        ___ SAT  
REV. 3                                                              PAGE 16 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 7 :  d. OPEN 1-FCV-62-55                                            CRITICAL STEP STANDARD: At panel 1-M-5 the performer places 1-HS-62-55 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish          ___ SAT excess letdown flow.
COMMENTS:
___ UNSAT STEP 8 :  e. ENSURE 1-FCV-62-59 is in NORMAL                            ___ SAT STANDARD: At panel 1-M-5 the performer determines that 1-HS-62-59A is in the NORM position, with the RED seal return light LIT.
___ UNSAT COMMENTS:
STEP 9:  f. ADJUST 1-HIC-62-56A to obtain maximum flow and              CRITICAL maintain excess letdown hx outlet temp less than 200°F.          STEP STANDARD: At panel 1-M-5 the performer opens 1-HIC-62-56A while monitoring 1-TI-62-58. Excess letdown temperature must         ___ SAT remain below 200°F as indicated on 1-TI-62-58. Step is critical to establish excess letdown flow.
COMMENTS:                                                                ___ UNSAT


___ UNSAT
REV. 3                                                               PAGE 17 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 10:   STABILIZE pzr level by adjusting seal injection and excess letdown flows.                                                 ___ SAT STANDARD: At panel 1-M-5 the performer observes pzr level trend on 1-LR-68-339. Performer may also set up a trend of pzr level on ICS computer using inputs from 1-LI-68-339A, 1-LI-68-335A      ___ UNSAT and 1-LI-68-320.
 
COMMENTS:
STEP 2: Check pressurizer level DROPPING or STABLE.
STEP 11:    Notify the Unit Supervisor that Excess Letdown has been placed in service.                                            ___ SAT STANDARD: The Unit Supervisor has been notified that Excess Letdown has been placed in service.
 
___ UNSAT
STANDARD: Performer observes a RISING trend on pressurizer level and enters RESPONSE NOT OBTAINED column for actions.
    **CUE:  When notified, acknowledge the report.
NOTE:  Use of the RNO Column was directed by the INITIATING CUES.
COMMENTS:   
 
___ SAT
 
___ UNSAT
 
STEP 3: If pzr level is rising, THEN PLACE excess letdown in service.
 
STANDARD: Performer enters the RESPONSE NOT OBTAINED column and begins procedure actions.
NOTE:  Use of the RNO Column was directed by the INITIATING CUES.
COMMENTS:   
 
___ SAT
 
___ UNSAT
 
REV. 3 PAGE 15  0F 10 WATTS BAR NUCLEAR PLANT B.1.b   STEP 4 : a. OPEN 1-FCV-70-143
 
STANDARD: At panel 1-M-27B the perform er places 1-HS-70-143A to OPEN. Performer verifies the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess letdown flow.
NOTE:  When the performer opens 1-FCV-70-143, Annunciator 239-D will be received. This alarm occurs whenever 1-FCV-70-143 is OPEN and flow on 1-FS-70-8 is less than
 
230 gpm.
COMMENTS:
COMMENTS:
CRITICAL STEP 
END OF TASK STOP TIME: ________
 
___ SAT
 
___ UNSAT STEP 5 : b. OPEN 1-FCV-70-85
 
STANDARD: At panel 1-M-27B the perform er places 1-HS-70-85A to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess letdown flow.
NOTE:  When the performer opens 1-FCV-70-85, Annunciator 239-D will clear as soon as flow is greater than 230 gpm Performer may use 1-FI-70-84 (panel 1-M-27B) to monitor flow.
COMMENTS:   
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 6 : c. OPEN 1-FCV-62-54
 
STANDARD: At panel 1-M-5 the performer places 1-HS-62-54 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess letdown flow.
 
COMMENTS:   
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT
 
REV. 3  PAGE  16  0F 10  WATTS BAR NUCLEAR PLANT B.1.b  STEP 7 : d. OPEN 1-FCV-62-55
 
STANDARD: At panel 1-M-5 the performer places 1-HS-62-55 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess letdown flow.
 
COMMENTS:   
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 8 : e. ENSURE 1-FCV-62-59 is in NORMAL
 
STANDARD: At panel 1-M-5 the performer determines that 1-HS-62-59A is in the NORM position, with the RED seal return light LIT. 
 
COMMENTS:   
 
___ SAT
 
___ UNSAT STEP 9: f. ADJUST 1-HIC-62-56A to obtain maximum flow and maintain excess letdown hx outlet temp less than 200
°F.
STANDARD: At panel 1-M-5 the performer opens 1-HIC-62-56A while monitoring 1-TI-62-58. Excess letdown temperature must remain below 200
°F as indicated on 1-TI-62-58. Step is critical to establish excess letdown flow.
 
COMMENTS:   
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT
 
REV. 3  PAGE  17  0F 10  WATTS BAR NUCLEAR PLANT B.1.b    STEP 10: STABILIZE pzr level by adjusting seal injection and excess letdown flows.
 
STANDARD: At panel 1-M-5 the performer observes pzr level trend on 1-LR-68-339. Performer may also set up a trend of pzr level on ICS computer using inputs from 1-LI-68-339A, 1-LI-68-335A and 1-LI-68-320.
 
COMMENTS:   
 
___ SAT
 
___ UNSAT
 
STEP 11: Notify the Unit Supervisor that Excess Letdown has been placed in service.
 
STANDARD: The Unit Supervisor has been notified that Excess Letdown has been placed in service.
 
**CUE: When notified, acknowledge the report.
 
COMMENTS:   
 
END OF TASK
 
___ SAT
 
___ UNSAT STOP TIME: ________  


REV. 0 PAGE 18 OF 128 WATTS BAR NUCLEAR PLANT B.1.c APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
REV. 0                                                                 PAGE 18 OF 128 WATTS BAR NUCLEAR PLANT B.1.c APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned  
INITIAL CONDITIONS:
 
: 1. The Unit is operating at 100 % power.
task. INITIAL CONDITIONS:
: 2. A small leak has been found on the normal letdown path.
: 1. The Unit is operating at 100 % power.  
: 3. Letdown and Charging have been isolated per AOI-6, Small Reactor Coolant System Leak.
: 2. A small leak has been found on the normal letdown path.  
: 4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown.
: 3. Letdown and Charging have been isolated per AOI-6, "Small Reactor Coolant System Leak".  
: 5. You are the Operator at the Controls.
: 4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown. 5. You are the Operator at the Controls.  
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.  
: 1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.
: 2. You are to notify the Unit Supervisor when the excess letdown has been aligned.  
: 2. You are to notify the Unit Supervisor when the excess letdown has been aligned.


REV. 0 PAGE 19 OF 128 WATTS BAR NUCLEAR PLANT B.1.c  
REV. 0                               PAGE 19 OF 128 WATTS BAR NUCLEAR PLANT B.1.c B.1.c Isolate Cold Leg Accumulators per E-1


B.1.c Isolate Cold Leg Accumulators per E-1  
REV. 0                                                                  PAGE 20 OF 128 WATTS BAR NUCLEAR PLANT B.1.c Task:    Isolate Cold Leg Accumulators per E-1 Alternate Path:    Cold Leg Accumulator cannot be isolated and must be vented to comply with E-1.
Facility JPM #:    N/A K/A Rating(s):      011 EA1.09 [4.3/4.3]
Task Standard:      Cold Leg Accumulators 1, 2, and 3 are isolated per E-1 Step 26 AER. Cold Leg Accumulator 4 is vented, per E-1, Step 26 RNO.
Preferred Evaluation Location:                              Preferred Evaluation Method:
Simulator __X__      In-Plant _____                        Perform __X___  Simulate ___ _


REV. 0 PAGE 20 OF 128 WATTS BAR NUCLEAR PLANT B.1.Task: Isolate Cold Leg Accumulators per E-1
==References:==
E-1,Loss of Reactor or Secondary Coolant, Rev. 15 Task Number:       RO-063-SOI-63-003              APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6 Validation Time: 15 min. Time Critical: No
===========================================================================
Applicant:      ___________________________          _________________    Time Start: ________
NAME                            SSN        Time Finish: ________
Performance Rating: SAT ____ UNSAT ____                                    Performance Time ___
Examiner: _____________________________              _____________________________/________
NAME                                  SIGNATURE                DATE
===========================================================================
COMMENTS


Alternate Path:
REV. 0                                                               PAGE 21 OF 128 WATTS BAR NUCLEAR PLANT B.1.c SIMULATOR OPERATOR INSTRUCTIONS:
Cold Leg Accumulator cannot be isolated and must be vented to comply with E-1. Facility JPM #: N/A  K/A Rating(s):
: 1. Initialize to IC 313
011 EA1.09 [4.3/4.3]    Task Standard: Cold Leg Accumulators 1, 2, and 3 are isolated per E-1 Step 26 AER. Cold Leg Accumulator 4 is vented, per E-1, Step 26 RNO.
: a. Ensure the following items are displayed on the Director Summary Page:
Preferred Evaluation Location:    Preferred Evaluation  Method:
th03a         loca-small leak loop 1                                   100% severity th01a         loca-hot leg loop 1                                       4.5% severity hs-63-67a     hs-63-67a sis accumulator tank 4 flow isolation valve     Open
Simulator __X__    In-Plant _____  Perform __X___    Simulate ___ _
: b. Ensure that the following remote is set as indicated on the Director Remote Page.
References
sir01         pwr to cold leg accumu isolation valves fcv-63-67, 80, 98, 119   on
: E-1,"Loss of Reactor or Secondary Coolant", Rev. 15 Task Number: RO-063-SOI-63-003 APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6  Validation Time:  15  min.
: c. Place the simulator in RUN momentarily, and acknowledge all alarms.
Time Critical:
: 4. Place simulator in FREEZE until the performer indicates an understanding of the task.
No ===========================================================================
: 3. After performer indicates understanding of the task, place simulator to RUN.
Applicant: ___________________________ _________________ Time Start:    ________
NAME SSNTime Finish:  ________
Performance Rating:  SAT ____  UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________  NAME  SIGNATURE DATE
===========================================================================
COMMENTS REV. 0 PAGE 21 OF 128 WATTS BAR NUCLEAR PLANT B.1.c   SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 313 a. Ensure the following items are displayed on the Director Summary Page:
th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity hs-63-67a hs-63-67a sis accumulator tank 4 flow isolation valve Open  
: b. Ensure that the following remote is set as indicated on the Director Remote Page. sir01 pwr to cold leg accumu isolation valves fcv-63-67, 80, 98, 119 on  
: c. Place the simulator in RUN momentarily, and acknowledge all alarms.  
: 4. Place simulator in FREEZE until the performer indicates an understanding of the task. 3. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
A marked-up copy of E-1, signed off through Step 25, with Step 26 circled.


A marked-up copy of E-1, signed off through Step 25, with Step 26 circled.
REV. 0                                                                 PAGE 22 OF 128 WATTS BAR NUCLEAR PLANT B.1.c READ TO OPERATOR DIRECTION TO TRAINEE:
 
REV. 0 PAGE 22 OF 128 WATTS BAR NUCLEAR PLANT B.1.c   READ TO OPERATOR
 
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. A large LOCA has occurred.  
: 1. A large LOCA has occurred.
: 2. E-1 performance has just been resumed after performance of ES-1.3.  
: 2. E-1 performance has just been resumed after performance of ES-1.3.
: 3. You are Control Room Operator.
: 3. You are Control Room Operator.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.  
: 1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.
: 2. You are to notify Unit Supervisor when you have completed Step 26.  
: 2. You are to notify Unit Supervisor when you have completed Step 26.


REV. 0 PAGE 23 OF 128 WATTS BAR NUCLEAR PLANT B.1.c START TIME: _______
REV. 0                                                   PAGE 23 OF 128 WATTS BAR NUCLEAR PLANT B.1.c START TIME: _______
STEP 1: Obtain a copy of the procedure.  
STEP 1:   Obtain a copy of the procedure.
___ SAT STANDARD: A copy of E-1 has been obtained EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the examiner will ___ UNSAT provide a marked-up copy of the instruction.
COMMENTS:
STEP 2:    a. ENSURE power to isolation valves restored USING Appendix A (E-1), CLA Breaker Operation.
STANDARD:                                                            ___ SAT EXAMINERS CUE: When asked, inform the performer that E-1 Appendix A CLA BREAKER OPERATION is complete.
___ UNSAT COMMENTS:


STANDARD: A copy of E-1 has been obtained EXAMINER'S CUE:
REV. 0                                                      PAGE 24 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 3:    CHECK RCS pressure less than 250 psig.
After the performer has de monstrated the method of obtaining the correct instruction, the examiner will
STANDARD: Performer reads RCS pressure from one of the following PAM instruments and determines that pressure is approximately 70  ___ SAT psig.
RVLIS-ICCM PLASMA DISPLAY on 1-M-4 or 1-M-6 Loop 4 HL PRESS 1-PI-68-70                                    ___ UNSAT Loop 3 HL PRESS 1-PI-68-64 Loop 2 HL Press 1-PI-68-63 COMMENTS:
STEP 4:    CLOSE cold leg accumulator isolation valves.                  CRITICAL STEP STANDARD: Performer places 1-HS-63-118, 1-HS-63-98, 1-HS-63-80 and 1-HS-63-67 to close. Performer observes that 1-HS-63-67      ___ SAT indicating lights do not change, indicating that 1-FCV-63-67, CLA 4 Isolation valve remains OPEN. Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.                                      ___ UNSAT COMMENTS:
STEP 5:    c. PERFORM the following                                      CRITICAL STEP STANDARD:  Performer determines that RNO actions are required since 1-FCV-63-67 did NOT CLOSE. Step is critical since this action  ___ SAT is taken to minimize the chance of nitrogen injection into the RCS.
COMMENTS:                                                                ___ UNSAT


provide a marked-up copy of the instruction.
REV. 0                                                       PAGE 25 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 6:  1) RESET Phase B                                              CRITICAL STEP STANDARD:
 
___ SAT Performer observes the Phase B lights on the Master Isolation Signal Status panels 1-XX-55-6C and 1-XX-55-6D on 1-M-6 are LIT, indicating that Phase B has been actuated.
COMMENTS:   
___ UNSAT Performer depresses 1-HS-30-64D B CNTMT ISOL RESET TR-A, and observes the B light goes DARK on 1-XX-55-6C Performer depresses 1-HS-30-64E B CNTMT ISOL RESET TR-B, and observes the B light goes DARK 1-XX-55-6D.
 
Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.
___ SAT
COMMENTS:
 
___ UNSAT STEP 2: a. ENSURE power to isolation valves restored USING Appendix A (E-1), CLA Breaker Operation.
 
STANDARD:
EXAMINER'S CUE: When asked, inform the performer that E-1 Appendix A CLA BREAKER OPERATION is complete.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 PAGE 24 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 3: CHECK RCS pressure less than 250 psig.
 
STANDARD: Performer reads RCS pressure from one of the following PAM instruments and determines that pressure is approximately 70 psig.
RVLIS-ICCM PLASMA DISPLAY on 1-M-4 or 1-M-6 Loop 4 HL PRESS 1-PI-68-70 Loop 3 HL PRESS 1-PI-68-64 Loop 2 HL Press 1-PI-68-63
 
COMMENTS:   
 
___ SAT
 
___ UNSAT STEP 4: CLOSE cold leg accumulator isolation valves.
 
STANDARD: Performer places 1-HS-63-118, 1-HS-63-98, 1-HS-63-80 and 1-HS-63-67 to close. Performer observes that 1-HS-63-67 indicating lights do not change, indicating that 1-FCV-63-67, CLA 4 Isolation valve remains OPEN. Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.
 
COMMENTS: 
 
CRITICAL STEP       ___ SAT
 
___ UNSAT STEP 5: c. PERFORM the following
 
STANDARD: Performer determines that RNO actions are required since 1-FCV-63-67 did NOT CLOSE. Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.
COMMENTS: 
 
CRITICAL STEP      ___ SAT  
 
___ UNSAT REV. 0 PAGE 25 OF 128 WATTS BAR NUCLEAR PLANT B.1.c  STEP 6: 1)  RESET Phase B STANDARD:
Performer observes the Phase B lights on the Master Isolation Signal Status panels 1-XX-55-6C and 1-XX-55-6D on 1-M-6 are LIT, indicating that Phase B has been actuated.
Performer depresses 1-HS-30-64D B CNTMT ISOL RESET TR-A, and observes the B light goes DARK on 1-XX-55-6C Performer depresses 1-HS-30-64E B CNTMT ISOL RESET TR-B, and observes the B light goes DARK 1-XX-55-6D.
Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.
 
COMMENTS:  
 
CRITICAL STEP      ___ SAT
 
___ UNSAT REV. 0 PAGE 26 OF 128 WATTS BAR NUCLEAR PLANT B.1.c  STEP 7: 2) ENSURE aux air pressure to cntmt is greater than 75 psig [M-15] AND OPEN cntmt air supply valves.
 
STANDARD:
Performer observes air pressure on 0-PI-32-104A, Aux Air A Press and 0-PI-32-105A, Aux Air Press indicate 95 psig and that 1-FCV-32-80, 1-FCV-32-102, and 1-FCV-32-110 are CLOSED.
Performer places 1-HS-30-80A in the OPEN position and holds until RED light is LIT, GREEN light is DARK. 
 
Performer places 1-HS-30-102A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.


REV. 0                                                      PAGE 26 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 7:  2) ENSURE aux air pressure to cntmt is greater than 75 psig  CRITICAL
[M-15] AND OPEN cntmt air supply valves.                      STEP STANDARD:                                                              ___ SAT Performer observes air pressure on 0-PI-32-104A, Aux Air A Press and 0-PI-32-105A, Aux Air Press indicate 95 psig and that 1-FCV-32-80, 1-FCV-32-102, and 1-FCV-32-110 are        ___ UNSAT CLOSED.
Performer places 1-HS-30-80A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.
Performer places 1-HS-30-102A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.
Performer places 1-HS-30-110A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.
Performer places 1-HS-30-110A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.
Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.
Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.
COMMENTS:  
COMMENTS:


CRITICAL STEP      ___ SAT
REV. 0                                                       PAGE 27 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 8:   3) OPEN any unisolated accumulators nitrogen makeup valve. CRITICAL STEP STANDARD:   Performer determines that 1-FCV-63-63 for CLA 4 must be OPENED.                                                       ___ SAT Performer places 1-HS-63-63A N2 TO CL ACCUM 4 to OPEN position, and verifies RED light is LIT GREEN light is DARK.
 
___ UNSAT Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.
___ UNSAT REV. 0 PAGE 27 OF 128 WATTS BAR NUCLEAR PLANT B.1.c   STEP 8: 3) OPEN any unisolated accumulator's nitrogen makeup valve.  
COMMENTS:
 
STEP 8:   4) OPEN 1-FCV-63-65 vent header.                               CRITICAL STEP STANDARD:   Performer rotates 1-HIC-63-65A in the counterclockwise direction to OPEN 1-FCV-63-65 FULLY.                           ___ SAT Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.
STANDARD: Performer determines that 1-FCV-63-63 for CLA 4 must be OPENED.
___ UNSAT COMMENTS:
Performer places 1-HS-63-63A N2 TO CL ACCUM 4 to OPEN position, and verifies RED light is LIT GREEN light is DARK.
STEP 9:   Notify the Unit Supervisor that E-1, Step 26 is complete.
Step is critical since this action is taken to minimize the   chance of nitrogen injection into the RCS.  
STANDARD: Performer notifies the Unit Supervisor that Step 26 is complete
 
___ SAT COMMENTS:
COMMENTS:  
___ UNSAT END OF TASK STOP TIME ________
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 8: 4) OPEN 1-FCV-63-65 vent header.  
 
STANDARD: Performer rotates 1-HIC-63-65A in the counterclockwise direction to OPEN 1-FCV-63-65 FULLY.
Step is critical since this action is taken to minimize the   chance of nitrogen injection into the RCS.  
 
COMMENTS:  
 
CRITICAL STEP      ___ SAT
 
___ UNSAT
 
STEP 9: Notify the Unit Supervisor that E-1, Step 26 is complete.  
 
STANDARD: Performer notifies the Unit Supervisor that Step 26 is complete  
 
COMMENTS:  
 
END OF TASK  
 
___ SAT
 
___ UNSAT STOP TIME ________
REV. 6  PAGE 28 OF 128 WATTS BAR NUCLEAR PLANT B.1.d  APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 6                                                                        PAGE 28 OF 128 WATTS BAR NUCLEAR PLANT B.1.d APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. A large LOCA has occurred.  
: 1. A large LOCA has occurred.
: 2. E-1 performance has just been resumed, after performance of ES-1.3.  
: 2. E-1 performance has just been resumed, after performance of ES-1.3.
: 3. You are Control Room Operator.
: 3. You are Control Room Operator.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.  
: 1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.
: 2. You are to notify Unit Supervisor when you have completed Step 26.  
: 2. You are to notify Unit Supervisor when you have completed Step 26.


REV. 6 PAGE 29 OF 128 WATTS BAR NUCLEAR PLANT B.1.d  
REV. 6                                     PAGE 29 OF 128 WATTS BAR NUCLEAR PLANT B.1.d B.1.d Place RHR Spray in Service per FR-Z.1


B.1.d Place RHR Spray in Service per FR-Z.1  
REV. 6                                                                          PAGE 30 OF 128 WATTS BAR NUCLEAR PLANT B.1.d EVALUATION SHEET Task: Place RHR Spray in Service per FR-Z.1 Alternate Path:  When the performer attempts to close 1-FCV-63-94, the valve will NOT close. This requires entry into the RNO in order to place Train A RHR Spray in service.
Facility JPM #:  3-OT-JPMR016A Rev 5 K/A Rating(s):  005 A4.01 [3.6/3.4]
Task Standard:    Train A of RHR Spray has been placed in-service per FR-Z.1.
Preferred Evaluation Location:                            Preferred Evaluation Method:
Simulator __X__    In-Plant __ ___                      Perform __X____      Simulate ____


REV. 6  PAGE 30 OF 128 WATTS BAR NUCLEAR PLANT B.1.d    EVALUATION SHEET Task: Place RHR Spray in Service per FR-Z.1 Alternate Path:
==References:==
When the performer attempts to close 1-FCV-63-94, the valve will NOT close. This requires entry into the RNO in order to place Train A RHR Spray in service.
FR-Z.1, High Containment Pressure, Rev.10 Task Number:   RO-113-FR-Z.1-001                 APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 4, 6, 7, 8 Validation Time: 10 min. Time Critical: No
Facility JPM #: 3-OT-JPMR016A Rev 5 K/A Rating(s):
===========================================================================
005 A4.01 [3.6/3.4]
Candidate:   ___________________________           _________________     Time Start: ________
Task Standard: Train "A" of RHR Spray has been placed in-service per FR-Z.1.
NAME                         SSN/EIN        Time Finish: ________
Preferred Evaluation Location:    Preferred Evaluation Method:
Performance Rating: SAT ____ UNSAT ____                                   Performance Time ___
Simulator __X__    In-Plant __ ___  Perform __X____    Simulate ____
Examiner: _____________________________             _____________________________/________
References
NAME                                 SIGNATURE                 DATE
: FR-Z.1, "High Containment Pressure", Rev.10 Task Number: RO-113-FR-Z.1-001 APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 4, 6, 7, 8 Validation Time:   10 min.
Time Critical:
No ===========================================================================
Candidate: ___________________________ _________________ Time Start:   ________
NAME SSN/EINTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================
===========================================================================
COMMENTS REV. 6  PAGE 31 OF 128 WATTS BAR NUCLEAR PLANT B.1.d REV. 6  PAGE 32 OF 128 WATTS BAR NUCLEAR PLANT B.1.d  SIMULATOR OPERATOR INSTRUCTIONS:
COMMENTS
: 1. Initialize to IC 314. a. Ensure the following items are displayed on the Director Summary Page:
th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity ch01a containment pressure transmitter failure pdt-3-42 14 ch01b containment pressure transmitter failure pdt-3-43 14 ch01c containment pressure transmitter failure pdt-3-44 14 ch01d containment pressure transmitter failure pdt-3-45 14 ei-72-12a 07020 cntmt spray pmp b amps 35 fi-72-13 07010 cntmt spray pmp b flow 3000 hs-72-10a-3 06010 cntmt spray pump b mtr sw(red) on hs-72-10a-1 06010 cntmt spray pump b mtr sw(green) off hs-72-27a-1 06020 cntmt spray pump a mtr sw(green) off pdi-30-42 03160 cntmt press diff indicator 12 pdi-30-43 03170 cntmt press diff indicator 12 pdi-30-44 03180 cntmt press diff indicator 12 pdi-30-45 03190 cntmt press diff indicator 12 pdr-30-133-1 03150 cntmt annulus dp indicator 0.5 hs-72-10a hs-72-10a containment spray pump b mtr sw ptlock hs-63-94a Hs-63-94a rhr to rcs cl1_4 flow control valve s open
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Place Hold Order on A CS Pump - handswitch is in PULL-TO-LOCK position
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task. 4. After performer indicates understanding of the task, place simulator to RUN.


REV. 6                        PAGE 31 OF 128 WATTS BAR NUCLEAR PLANT B.1.d
REV. 6                                                                    PAGE 32 OF 128 WATTS BAR NUCLEAR PLANT B.1.d SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 314.
: a. Ensure the following items are displayed on the Director Summary Page:
th03a              loca-small leak loop 1                            100% severity th01a              loca-hot leg loop 1                                4.5% severity ch01a              containment pressure transmitter failure pdt-3-42  14 ch01b              containment pressure transmitter failure pdt-3-43  14 ch01c              containment pressure transmitter failure pdt-3-44  14 ch01d              containment pressure transmitter failure pdt-3-45  14 ei-72-12a          07020 cntmt spray pmp b amps                      35 fi-72-13            07010 cntmt spray pmp b flow                      3000 hs-72-10a-3        06010 cntmt spray pump b mtr sw(red)              on hs-72-10a-1        06010 cntmt spray pump b mtr sw(green)            off hs-72-27a-1        06020 cntmt spray pump a mtr sw(green)            off pdi-30-42          03160 cntmt press diff indicator                  12 pdi-30-43          03170 cntmt press diff indicator                  12 pdi-30-44          03180 cntmt press diff indicator                  12 pdi-30-45          03190 cntmt press diff indicator                  12 pdr-30-133-1        03150 cntmt annulus dp indicator                  0.5 hs-72-10a          hs-72-10a containment spray pump b mtr sw          ptlock hs-63-94a          Hs-63-94a rhr to rcs cl1_4 flow control valve s    open
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Place Hold Order on A CS Pump - handswitch is in PULL-TO-LOCK position
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task.
: 4. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
Ensure marked copies of FR-Z.1 are available to the evaluators.


Ensure marked copies of FR-Z.1 are available to the evaluators.
REV. 6                                                                         PAGE 33 OF 128 WATTS BAR NUCLEAR PLANT B.1.d READ TO OPERATOR DIRECTION TO TRAINEE:
 
REV. 6 PAGE 33 OF 128 WATTS BAR NUCLEAR PLANT B.1.d   READ TO OPERATOR
 
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. 1A-A Containment Spray Pump has been tagged out of service.
: 1. 1A-A Containment Spray Pump has been tagged out of service.
: 2. The unit was at 100% when a Large Break LOCA occurred.  
: 2. The unit was at 100% when a Large Break LOCA occurred.
: 3. 1B-B Containment Spray Pump started and has been spraying Containment.  
: 3. 1B-B Containment Spray Pump started and has been spraying Containment.
: 4. The break occurred an hour and 10 minutes ago.  
: 4. The break occurred an hour and 10 minutes ago.
: 5. All ECCS equipment is performing it s design functions and is on Containment Sump Recirc.  
: 5. All ECCS equipment is performing its design functions and is on Containment Sump Recirc.
: 6. You are the Operator at the Controls (OAC).
: 6. You are the Operator at the Controls (OAC).
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you to perform FR-Z., "HIGH CONTAINMENT PRESSURE", Step 10, DETERMINE if RHR spray should be placed in service.  
: 1. The Unit Supervisor directs you to perform FR-Z., HIGH CONTAINMENT PRESSURE, Step 10, DETERMINE if RHR spray should be placed in service.
: 2. You are to notify the Unit Supervisor when you have completed Step 10.  
: 2. You are to notify the Unit Supervisor when you have completed Step 10.


REV. 6 PAGE 34 OF 128 WATTS BAR NUCLEAR PLANT B.1.d   START TIME: _______
REV. 6                                                                 PAGE 34 OF 128 WATTS BAR NUCLEAR PLANT B.1.d START TIME: _______
STEP 1: Obtain a copy of the procedure.  
STEP 1:   Obtain a copy of the procedure.
 
___ SAT STANDARD: A copy of FR-Z.1 has been obtained.
STANDARD: A copy of FR-Z.1 has been obtained.
EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator will       ___ UNSAT provide a marked-up copy of the instruction.
EXAMINER'S CUE:
COMMENTS:
After the performer has de monstrated the method of obtaining the correct instruction, the evaluator will  
STEP 2:   [Step 10] DETERMINE if RHR Spray should be placed in               ___ SAT service:
 
: a. CHECK the following conditions:
provide a marked-up copy of the instruction.
* At least one hour elapsed since beginning of the accident.                                                   ___ UNSAT
 
COMMENTS:  
 
___ SAT
 
___ UNSAT STEP 2: [Step 10] DETERMINE if RHR Spray should be placed in service: a. CHECK the following conditions:
* At least one hour elapsed since beginning of the accident.
* Cntmt Press greater than 9.5 psig.
* Cntmt Press greater than 9.5 psig.
* RHR suction aligned to the cntmt sump.
* RHR suction aligned to the cntmt sump.
* At least one charging pump and one SI pump running  
* At least one charging pump and one SI pump running STANDARD: 1. Performer has determined that an hour has lapsed since the beginning of the accident. [Given in initial conditions]
: 2. Cntmt press has been checked > 9.5 psig.
: 3. FCV-63-72 and FCV-63-73 verified to be open by red indicating lights.
: 4. 1 CCP & 1 SIP verified to be running by indicating lights or amps.
COMMENTS:


STANDARD: 1. Performer has determined that an hour has lapsed since  the beginning of the accident. [Given in initial conditions]  
REV. 6                                                            PAGE 35 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 3:        [STEP 10b] ALIGN Train B RHR spray:                            ___ SAT
: 2. Cntmt press has been checked > 9.5 psig.
: 1) ENSURE Train B RHR pump RUNNING.
: 3. FCV-63-72 and FCV-63-73 verified to be open by red indicating lights. 4. 1 CCP & 1 SIP verified to be running by indicating lights or amps.
STANDARD: Train B RHR pump verified to be running by indicating light or amps.                                                         ___ UNSAT COMMENTS:
COMMENTS:  
STEP 4:        [STEP 10b 2)] Close RHR crosstie 1-FCV-74-35.
___ SAT STANDARD: 1-HS-74-35-A has been checked in the CLOSED position and the green light illuminated on HS.
COMMENTS:                                                                    ___ UNSAT STEP 5:       [STEP 10b 3)] CLOSE RHR injection 1-FCV-63-94.                CRITICAL STEP STANDARD: 1-HS-63-94-A has been placed in the CLOSED position and the performer recognizes that the GREEN light DOES NOT      ___ SAT illuminate.
Performer enters the RNO Column to perform actions to align Train A RHR spray.
Step is critical since the RHR system is not designed to     ___ UNSAT support both RHR spray and suction requirements associated with sump recirculation.
COMMENTS:
EVALUATOR NOTE: Performer may either have US dispatch personnel or will dispatch personnel to investigate the cause of the failure of 1-FCV-63-94.


___ SAT  
REV. 6                                                                  PAGE 36 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 6:    [STEP 10b RNO] ALIGN Train A RHR spray:                            ___ SAT
: 1) ENSURE Train A RHR pump RUNNING.
STANDARD: Train A RHR pump verified to be running by indicating light or      ___ UNSAT amps.
COMMENTS:
STEP 7:    [STEP 10b RNO] 2) CLOSE RHR crosstie 1-FCV-74-33.
___ SAT STANDARD: 1-HS-74-33-A has been placed/checked in the CLOSED position and the green light illuminated on HS.
___ UNSAT COMMENTS:
STEP 8:    [STEP 10b RNO] 3) CLOSE RHR injection 1-FCV-63-93.                  CRITICAL STEP STANDARD: 1-HS-63-93-A has been placed in the CLOSED position and the green light illuminated on HS. Step is critical to establish A Train RHR Spray.                                                  ___ SAT COMMENTS:
___ UNSAT STEP 9:    [STEP 10b RNO] 4) OPEN RHR spray 1-FCV-72-40.                      CRITICAL STEP STANDARD: 1-HS-72-40A has been placed/checked in the OPEN position and the Red light illuminated on hand switch. Step is critical to establish A Train RHR Spray.
___ SAT COMMENTS:
___ UNSAT


___ UNSAT REV. 6  PAGE 35 OF 128 WATTS BAR NUCLEAR PLANT B.1.d  STEP 3: [STEP 10b]
REV. 6                                                             PAGE 37 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 10:   Notify the Unit Supervisor that RHR spray is in service.
ALIGN Train B RHR spray:
___ SAT STANDARD: Notify the Unit Supervisor that RHR spray has been placed in service.
: 1) ENSURE Train B RHR pump RUNNING.
    **CUE: When notified, acknowledge the report using repeat           ___ UNSAT back.
 
COMMENTS:
STANDARD: Train B RHR pump verified to be running by indicating light or amps. COMMENTS: 
END OF TASK TIME STOP: ________
 
___ SAT
 
___ UNSAT
 
STEP 4: [STEP 10b 2)] Close RHR crosstie 1-FCV-74-35.
 
STANDARD: 1-HS-74-35-A has been checked in the CLOSED position and the green light illuminated on HS.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 5: [STEP 10b 3)] CLOSE RHR injection 1-FCV-63-94.
 
STANDARD: 1-HS-63-94-A has been placed in the CLOSED position and the performer recognizes that the GREEN light DOES NOT illuminate.
Performer enters the RNO Colu mn to perform actions to align Train A RHR spray. Step is critical since the RHR system is not designed to support both RHR spray and suction requirements associated with sump recirculation.
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT EVALUATOR NOTE: Performer may either have US dispatch personnel or will dispatch personnel to investigate the cause of the failure of 1-FCV-63-94.
 
REV. 6  PAGE 36 OF 128 WATTS BAR NUCLEAR PLANT B.1.d  STEP 6: [STEP 10b RNO] ALIGN Train A RHR spray: 1) ENSURE Train A RHR pump RUNNING.
 
STANDARD: Train A RHR pump verified to be running by indicating light or amps.
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 7: [STEP 10b RNO]  2) CLOSE RHR crosstie 1-FCV-74-33.
 
STANDARD: 1-HS-74-33-A has been placed/checked in the CLOSED position and the green light illuminated on HS.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 8: [STEP 10b RNO]  3) CLOSE RHR injection 1-FCV-63-93.
 
STANDARD:  1-HS-63-93-A has been placed in the CLOSED position and the green light illuminated on HS. Step is critical to establish A Train RHR Spray.
 
COMMENTS: 
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 9: [STEP 10b RNO] 
: 4) OPEN RHR spray 1-FCV-72-40.
 
STANDARD:  1-HS-72-40A has been placed/checked in the OPEN position and the Red light illuminated on hand switch. Step is critical to establish A Train RHR Spray.
 
COMMENTS: 
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT REV. 6 PAGE 37 OF 128 WATTS BAR NUCLEAR PLANT B.1.d   STEP 10: Notify the Unit Supervisor that RHR spray is in service.  
 
STANDARD: Notify the Unit Supervisor that RHR spray has been placed in service. **CUE: When notified, acknowledge the report using repeat back.
 
COMMENTS:  
 
END OF TASK
___ SAT
 
___ UNSAT
 
TIME STOP: ________  
 
REV. 0 Page 38 of 128 WATTS BAR NUCLEAR PLANT B.1.e  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 0                                                                  Page 38 of 128 WATTS BAR NUCLEAR PLANT B.1.e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned  
INITIAL CONDITIONS:
 
: 1. 1A-A Containment Spray Pump has been tagged out of service.
task. INITIAL CONDITIONS:
: 2. The unit was at 100% when a Large Break LOCA occurred.
: 1. 1A-A Containment Spray Pump has been tagged out of service.
: 3. 1B-B Containment Spray Pump started and has been spraying Containment.
: 2. The unit was at 100% when a Large Break LOCA occurred.  
: 4. The break occurred an hour and 10 minutes ago.
: 3. 1B-B Containment Spray Pump started and has been spraying Containment.  
: 5. All ECCS equipment is performing its design functions and is on Containment Sump Recirc.
: 4. The break occurred an hour and 10 minutes ago.  
: 5. All ECCS equipment is performing it s design functions and is on Containment Sump Recirc.  
: 6. You are the Operator at the Controls (OAC).
: 6. You are the Operator at the Controls (OAC).
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you to perform FR-Z., "HIGH CONTAINMENT PRESSURE", Step 10, DETERMINE if RHR spray should be placed in service.  
: 1. The Unit Supervisor directs you to perform FR-Z., HIGH CONTAINMENT PRESSURE, Step 10, DETERMINE if RHR spray should be placed in service.
: 2. You are to notify the Unit Supervisor when you have completed Step 10.  
: 2. You are to notify the Unit Supervisor when you have completed Step 10.


REV. 0 Page 39 of 128 WATTS BAR NUCLEAR PLANT B.1.e  
REV. 0                                   Page 39 of 128 WATTS BAR NUCLEAR PLANT B.1.e B.1.e Place Containment Hydrogen Recombiner A in Service per SOI-83.01


B.1.e Place Containment Hydrogen Recombiner "A" in Service per SOI-83.01  
REV. 0                                                              Page 40 of 128 WATTS BAR NUCLEAR PLANT B.1.e Task:    Place Containment Hydrogen Recombiner A in Service per SOI-83.01.
Alternate Path:    N/A Facility JPM #:    3-OT-JPMR052 K/A Rating(s):    028A2.01 [3.4/3.6]
Task Standard:      Containment Hydrogen Recombiner A has been placed in service per SOI-83.01.
Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator __X__    In-Plant _____                    Perform __X___    Simulate ___ _


REV. 0 Page 40 of 128 WATTS BAR NUCLEAR PLANT B.1.Task: Place Containment Hydrogen Recombiner A in Service per SOI-83.01.  
==References:==
E-1, Loss of Reactor or Secondary Coolant, Rev. 15.
SOI-83.01, Containment Hydrogen Recombiners, Rev. 15.
TI-83.01,Hydrogen Recombiner Required Power-vs.-Containment Pressure Curves, Rev. 1.
Task Number:     RO-063-SOI-63-003            APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6 Validation Time: 15 min. Time Critical: No
===========================================================================
Applicant:    ___________________________      _________________    Time Start: ________
NAME                        SSN          Time Finish: ________
Performance Rating: SAT ____ UNSAT ____                                Performance Time ___
Examiner: _____________________________          _____________________________/________
NAME                                SIGNATURE                DATE
===========================================================================
COMMENTS


Alternate Path:
REV. 0                         Page 41 of 128 WATTS BAR NUCLEAR PLANT B.1.e
N/A  Facility JPM #: 3-OT-JPMR052 K/A Rating(s):
028A2.01 [3.4/3.6]    Task Standard: Containment Hydrogen Recombiner A has been placed in service per SOI-83.01.
Preferred Evaluation Location:    Preferred Evaluation Method:
Simulator __X__    In-Plant _____  Perform __X___    Simulate ___ _
References
: E-1, "Loss of Reactor or Secondary Coolant", Rev. 15. SOI-83.01, "Containment Hydrogen Recombiners", Rev. 15. TI-83.01,"Hydrogen Recombiner Required Power-vs.-Containment Pressure Curves", Rev. 1.
Task Number: RO-063-SOI-63-003 APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6  Validation Time:  15  min.
Time Critical:
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:    ________
NAME SSNTime Finish:  ________
Performance Rating:  SAT ____  UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________  NAME  SIGNATURE DATE
===========================================================================
COMMENTS REV. 0 Page 41 of 128 WATTS BAR NUCLEAR PLANT B.1.e REV. 0 Page 42 of 128 WATTS BAR NUCLEAR PLANT B.1.e  SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 315. a. Ensure the following items are displayed on the Director Summary Page:
th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity mux_03c123 125-a cntmt hi-hi press steamline isol on pi-30-310 03110 containment pressure 3.5 pi-30-311 03120 containment pressure 3.5 h2i-43-200 03060 loca h2 cntmt monitor 3.5 h2i-43-210 03070 loca h2 cntmt monitor 3.5 pdi-30-42 03160 cntmt press diff indicator 4 pdi-30-43 03170 cntmt press diff indicator 4 pdi-30-44 03180 cntmt press diff indicator 4 pdi-30-45 03190 cntmt press diff indicator 4
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Place simulator in FREEZE until the performer indicates an understanding of the task. 3. After performer indicates understanding of the task, place simulator to RUN.


REV. 0                                                              Page 42 of 128 WATTS BAR NUCLEAR PLANT B.1.e SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 315.
: a. Ensure the following items are displayed on the Director Summary Page:
th03a              loca-small leak loop 1                            100% severity th01a              loca-hot leg loop 1                                4.5% severity mux_03c123          125-a cntmt hi-hi press steamline isol            on pi-30-310          03110 containment pressure                        3.5 pi-30-311          03120 containment pressure                        3.5 h2i-43-200          03060 loca h2 cntmt monitor                        3.5 h2i-43-210          03070 loca h2 cntmt monitor                        3.5 pdi-30-42          03160 cntmt press diff indicator                  4 pdi-30-43          03170 cntmt press diff indicator                  4 pdi-30-44          03180 cntmt press diff indicator                  4 pdi-30-45          03190 cntmt press diff indicator                  4
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Place simulator in FREEZE until the performer indicates an understanding of the task.
: 3. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
Ensure copies of SOI-83.01 and TI-83.01 are available for the evaluator.


Ensure copies of SOI-83.01 and TI-83.01 are available for the evaluator.
REV. 0                                                                 Page 43 of 128 WATTS BAR NUCLEAR PLANT B.1.e READ TO OPERATOR DIRECTION TO TRAINEE:
 
REV. 0 Page 43 of 128 WATTS BAR NUCLEAR PLANT B.1.e   READ TO OPERATOR
 
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit has experienced a LOCA.  
: 1. Unit has experienced a LOCA.
: 2. MCR crew is following E-1, Loss of Reactor or Secondary Coolant.  
: 2. MCR crew is following E-1, Loss of Reactor or Secondary Coolant.
: 3. E-1, directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.  
: 3. E-1, directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.
: 4. You are Control Room Operator.
: 4. You are Control Room Operator.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to place Hydrogen Recombiner "A" in service, using SOI-83.01, Containment Hydrogen Recombiners.  
: 1. The Unit Supervisor has directed you to place Hydrogen Recombiner A in service, using SOI-83.01, Containment Hydrogen Recombiners.
: 2. Notify Unit Supervisor when the required power setting is reached  
: 2. Notify Unit Supervisor when the required power setting is reached


REV. 0 Page 44 of 128 WATTS BAR NUCLEAR PLANT B.1.e START TIME: _______
REV. 0                                                         Page 44 of 128 WATTS BAR NUCLEAR PLANT B.1.e START TIME: _______
STEP 1: Obtain a copy of the procedure.  
STEP 1:     Obtain a copy of the procedure.
___ SAT STANDARD: Obtains SOI-83.01 and goes to Section 8.1.
EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator can      ___ UNSAT provide a copy of the instruction.
COMMENTS:
CAUTION 1 Temperature of 1400°F is not to be exceeded on any operable thermocouple.
CAUTION 2 On DG power, DG load should remain 4400 kW or less.
CAUTION 3 If there is any indication Recombiner A is not operating properly (through recombiner instrumentation), the Recombiner should be shutdown, a WR written, and the other Recombiner placed in service.
NOTE:    TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE contains the curves that will be needed to adjust the power level for the recombiner.
STEP 2:    [1] ENSURE POWER ADJUST potentiometer [1-M-10] set at            ___ SAT 000.
STANDARD: Performer verifies that three zeros (000) are indicated on Panel 1-M-10.                                                    ___ UNSAT COMMENTS:


STANDARD: Obtains SOI-83.01 and goes to Section 8.1.
REV. 0                                                          Page 45 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 3:    [2] VERIFY the White POWER IN AVAILABLE light LIT.                ___ SAT STANDARD: Performer verifies that the White POWER IN AVAILABLE light LIT on 1-M-10.                                                   ___ UNSAT COMMENTS:
EXAMINER'S CUE:
STEP 4:    [3] ENSURE TEMPERATURE CHANNEL (thermocouple                      CRITICAL selector) is selected for channel 1, 2, or 3.                   STEP
After the performer has de monstrated the method of obtaining the correct instruction, the evaluator can
___ SAT STANDARD:       Performer verifies that the TEMPERATURE CHANNEL (thermocouple selector) is selected for channel 1, 2, or 3.
NOTE        Any one of the three settings is acceptable.                ___ UNSAT COMMENTS:
STEP 5:    [4] ENSURE TEMPERATURE OUT (indicator dial), set on              ___ SAT 1400°F.
STANDARD:  Performer verifies that the TEMPERATURE OUT (indicator          ___ UNSAT dial), set on 1400°F.
COMMENTS:
NOTE:    Red light on TEMPERATURE OUT (indicator dial) is lit when setpoint selected on indicator is reached.


provide a copy of the instruction.
REV. 0                                                Page 46 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 6:  [5] REQUEST Chemistry to sample containment atmosphere CRITICAL for H2 concentration.                                STEP
___ SAT STANDARD:  Performer contacts Chemistry to sample containment atmosphere.
EVALUATOR CUE: Containment atmosphere has been sampled and the  ___ UNSAT hydrogen concentration is 3.5%.
COMMENTS:
STEP 7:  [6] RECORD the Date and Time on Data Sheet 1.         ___ SAT STANDARD: Performer records Date and Time on Data Sheet 1
___ UNSAT COMMENTS:


COMMENTS:  
REV. 0                                                      Page 47 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 8:  [7] RECORD CNTMT H2 % on Data Sheet 1, THEN                  ___ SAT INDICATE from which source H2 percentage was obtained:
[7.1] ANAL A CNTMT H2,1-H21-43-200 [1-M-10]
___ UNSAT
[7.2] ANAL B CNTMT H2, 1-H21-43-210 [1-M-10]
[7.3] Chemistry sample analysis STANDARD: Performer has data available from each of the sources and may enter a value for any of them. The containment hydrogen concentration is 3.5%.
COMMENTS:
STEP 9:  [8] IF containment H2 is greater than 5%, THEN DO NOT        ___ SAT place H2 Recombiner in service, and NOTIFY the SM.
STANDARD:  Performer confirms that hydrogen concentration is less than ___ UNSAT 5% and enters N/A for this step.
COMMENTS:


___ SAT  
REV. 0                                                      Page 48 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 10:  [9] RECORD CNTMT PRESS (psig) on Data Sheet 1,                ___ SAT THEN INDICATE which indicator was used:
[9.1] 1-PI-30-310, CNTMT WR PRESS [1-M-9]
___ UNSAT
[9.2] 1-PI-30-311, CNTMT WR PRESS [1-M-9]
STANDARD:  Performer enters a value of 3 psig for either pressure indicator.
COMMENTS:
STEP 11:  [10] TURN POWER OUT (MS Starter) switch to ON, and            CRITICAL VERIFY switch plate Red light LIT.                        STEP STANDARD:  Performer places switch in the UP position, and verifies the ___ SAT RED light is LIT. Step is critical since this action provides power to the recombiner.
COMMENTS:                                                              ___ UNSAT STEP 12:  [11] ADJUST POWER ADJUST potentiometer clockwise to          CRITICAL obtain 5 kW on POWER OUT meter, and MAINTAIN for          STEP 10 minutes.
___ SAT STANDARD:  Performer adjusts the potentiometer and obtains 5 kW on the POWER OUT meter. Step is critical to warm up the recombiner.
___ UNSAT EVALUATOR CUE: Time Compression - 10 minutes have elapsed.
COMMENTS:


___ UNSAT CAUTION 1 Temperature of 1400°F is not to be exceeded on any operable thermocouple. CAUTION 2  On DG power, DG load should remain 4400 kW or less. CAUTION 3  If there is any indication Recombiner A is not operating properly (through recombiner instrumentation), the Recombiner should be shutdown, a WR  written, and the other Recombiner placed in service.
REV. 0                                                      Page 49 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 13:  [12] ADJUST POWER ADJUST potentiometer to obtain 10          CRITICAL kW on POWER OUT meter, and MAINTAIN for 10                STEP minutes.
NOTE:  TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT  PRESSURE contains the curves that will be needed to adjust the power level for the recombiner.  
___ SAT STANDARD:  Performer adjusts the potentiometer and obtains 10 kW on the POWER OUT meter. Step is critical to warm up the recombiner.                                                  ___ UNSAT EVALUATOR CUE: Time Compression - 10 minutes have elapsed.
COMMENTS:
STEP 14: [13] ADJUST POWER ADJUST potentiometer to obtain 20          ___ SAT kW on POWER OUT meter, and MAINTAIN for 5 minutes.
STANDARD:  Performer adjusts the potentiometer and obtains 20 kW on the ___ UNSAT POWER OUT meter. Step is critical to warm up the recombiner.
EVALUATOR CUE: Time Compression - 5 minutes have elapsed.
COMMENTS:
STEP 15[14] DETERMINE the REQUIRED POWER (kW) based on              ___ SAT current CNTMT PRESSURE (psig) using Attachment 3 of TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.
___ UNSAT STANDARD: Performer uses 3 psig containment pressure and reads 70 kW off the Attachment 3 curve in TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.
COMMENTS:


STEP 2: [1] ENSURE POWER ADJUST potentiometer [1-M-10] set at  000.
REV. 0                                                        Page 50 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 16:       [15] ADJUST POWER ADJUST potentiometer to obtain the          CRITICAL REQUIRED POWER (kW) using Attachment 3 of TI-              STEP 83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.                   ___ SAT STANDARD:       Performer adjusts the potentiometer and obtains 70 kW on the POWER OUT meter. Step is critical to warm up the recombiner.                                                  ___ UNSAT COMMENTS:
STANDARD: Performer verifies that three zeros ("000") are indicated on Panel 1-M-10.  
NOTES
: 1) Periodic potentiometer adjustment is necessary to maintain Required Power setting.
Temperature is obtained by selecting an average temperature of all operable thermocouples. Temperature should rise to 1150-1400°F in approximately 4 hours depending on initial containment temperature.
: 2) Recombiner temperature should be allowed to stabilize before making power changes due to the lag time between adjustment and actual temperature change.
: 3) 1 kW power change is approximately equal to 20°F recombiner temperature change.
STEP 17:      [16] AFTER recombiner temperature has stabilized for approximately 30 minutes, THEN ADJUST POWER ADJUST potentiometer to maintain 1225 - 1400°F recombiner average temperature.                          ___ SAT STANDARD:
EVALUATOR CUE: Time Compression - 30 minutes have elapsed, and              ___ UNSAT another operator will make adjustments to maintain temperature between 1225 - 1400°F.
COMMENTS:


COMMENTS: 
REV. 0                                                       Page 51 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 18:   [18] NOTIFY SRO that Recombiner A is in service and will be monitored at least once every 24 hours per Section 8.2.
 
___ SAT STANDARD:   Performer notifies the SRO that A Recombiner is in service.
___ SAT
COMMENTS:
 
___ UNSAT END OF TASK STOP TIME ________
___ UNSAT REV. 0 Page 45 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 3: [2] VERIFY the White POWER IN AVAILABLE light LIT.
 
STANDARD: Performer verifies that the White POWER IN AVAILABLE light LIT on 1-M-10.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 4: [3] ENSURE TEMPERATURE CHANNEL (thermocouple  selector) is selected for channel 1, 2, or 3.
 
STANDARD:  Performer verifies that the TEMPERATURE CHANNEL    (thermocouple selector) is selected for channel 1, 2, or 3.
NOTE  Any one of the three settings is acceptable.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 5: [4] ENSURE TEMPERATURE OUT (indicator dial), set on    1400°F.
 
STANDARD:  Performer verifies that the TEMPERATURE OUT (indicator dial), set on 1400°F.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT NOTE:  Red light on TEMPERATURE OUT (indicator dial) is lit when setpoint selected  on indicator is reached.
REV. 0 Page 46 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 6: [5] REQUEST Chemistry to sample containment atmosphere  for H2 concentration.
 
STANDARD:  Performer contacts Chemistry to sample containment atmosphere.
EVALUATOR CUE:  Containment atmosphere has been sampled and the hydrogen concentration is 3.5%.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 7: [6] RECORD the Date and Time on Data Sheet 1.
 
STANDARD: Performer records Date and Time on Data Sheet 1
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 Page 47 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 8: [7] RECORD CNTMT H2 % on Data Sheet 1, THEN    INDICATE from which source H2 percentage was obtained:
[7.1] ANAL A CNTMT H2,1-H21-43-200 [1-M-10]
 
[7.2] ANAL B CNTMT H2 , 1-H21 210 [1-M-10]
 
[7.3] Chemistry sample analysis STANDARD: Performer has data available from each of the sources and may enter a value for any of them. The containment hydrogen concentration is 3.5%.   
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 9: [8] IF containment H2 is greater than 5%, THEN DO NOT place H2 Recombiner in service, and NOTIFY the SM. 
 
STANDARD:  Performer confirms that hydrogen concentration is less than 5% and enters N/A for this step.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 Page 48 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 10: [9]  RECORD CNTMT PRESS (psig) on Data Sheet 1,  THEN INDICATE which indicator was used:
 
[9.1] 1-PI-30-310, CNTMT WR PRESS [1-M-9] 
 
[9.2] 1-PI-30-311, CNTMT WR PRESS [1-M-9]
 
STANDARD:  Performer enters a value of 3 psig for either pressure indicator.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 11: [10] TURN POWER OUT (MS Starter) switch to ON, and  VERIFY switch plate Red light LIT.
 
STANDARD:  Performer places switch in the UP position, and verifies the RED light is LIT. Step is critical since this action provides power to the recombiner.
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 12: [11] ADJUST POWER ADJUST potentiometer clockwise to  obtain 5 kW on POWER OUT meter, and MAINTAIN for  10 minutes.
 
STANDARD:  Performer adjusts the potentiometer and obtains 5 kW on the POWER OUT meter. Step is critical to warm up the recombiner.
EVALUATOR CUE:  Time Compression - 10 minutes have elapsed.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT REV. 0 Page 49 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 13: [12]  ADJUST POWER ADJUST potentiometer to obtain 10  kW on POWER OUT meter, and MAINTAIN for 10  minutes.
 
STANDARD:  Performer adjusts the potentiometer and obtains 10 kW on the POWER OUT meter. Step is critical to warm up the recombiner.
EVALUATOR CUE:  Time Compression - 10 minutes have elapsed.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 14: [13]  ADJUST POWER ADJUST potentiometer to obtain 20  kW on POWER OUT meter, and MAINTAIN for 5  minutes.
 
STANDARD:  Performer adjusts the potentiometer and obtains 20 kW on the POWER OUT meter. Step is critical to warm up the recombiner.
EVALUATOR CUE:  Time Compression - 5 minutes have elapsed.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 15: [14]  DETERMINE the REQUIRED POWER (kW) based on  current CNTMT PRESSURE (psig) using Attachment 3 of TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.
 
STANDARD:  Performer uses 3 psig containment pressure and reads 70 kW off the Attachment 3 curve in TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 Page 50 of 128 WATTS BAR NUCLEAR PLANT B.1.e  STEP 16: [15]  ADJUST POWER ADJUST potentiometer to obtain the    REQUIRED POWER (kW) using Attachment 3 of TI- 83.01, HYDROGEN RECOMBINER REQUIRED    POWER-VS-CONTAINMENT PRESSURE CURVES.
 
STANDARD:  Performer adjusts the potentiometer and obtains 70 kW on the POWER OUT meter. Step is critical to warm up the recombiner.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT NOTES 1)  Periodic potentiometer adjustment is necessary to maintain Required Power setting. Temperature is obtained by selecting an average temperature of all operable thermocouples. Temperature should rise to 1150-1400°F in approximately 4 hours  depending on initial containment temperature. 2)  Recombiner temperature should be allowed to stabilize before making power changes  due to the lag time between adjustment and actual temperature change.
: 3)  1 kW power change is approximately equal to 20°F recombiner temperature change.
STEP 17: [16]  AFTER recombiner temperature has stabilized for  approximately 30 minutes, THEN ADJUST POWER  ADJUST potentiometer to maintain 1225 - 1400°F recombiner average temperature.
 
STANDARD:    EVALUATOR CUE: Time Compression - 30 minutes have elapsed, and another operator will make adjustments to maintain temperature between 1225 - 1400°F.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 Page 51 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 18: [18] NOTIFY SRO that Recombiner A is in service and will be     monitored at least once every 24 hours per Section 8.2.  
 
STANDARD: Performer notifies the SRO that "A" Recombiner is in service.  
 
COMMENTS:  
 
END OF TASK  
 
___ SAT
 
___ UNSAT STOP TIME ________
REV. 6      PAGE 52 OF 128 WATTS BAR NUCLEAR PLANT B.1.f  APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 6                                                                          PAGE 52 OF 128 WATTS BAR NUCLEAR PLANT B.1.f APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit has experienced a LOCA.  
: 1. Unit has experienced a LOCA.
: 2. MCR Crew is following Emergency Instru ction E-1, Loss of Reactor or Secondary Coolant. 3. E-1, Step 30 RNO Step c. directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.  
: 2. MCR Crew is following Emergency Instruction E-1, Loss of Reactor or Secondary Coolant.
: 3. E-1, Step 30 RNO Step c. directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.
: 4. You are Control Room Operator.
: 4. You are Control Room Operator.
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to place Hydrogen Recombiner "A" in service, using SOI-83.01, Containment Hydrogen Recombiners.  
: 1. The Unit Supervisor has directed you to place Hydrogen Recombiner A in service, using SOI-83.01, Containment Hydrogen Recombiners.
: 2. Notify Unit Supervisor when the required power setting is reached  
: 2. Notify Unit Supervisor when the required power setting is reached


REV. 6     PAGE 53 OF 128 WATTS BAR NUCLEAR PLANT B.1.f    
REV. 6                                         PAGE 53 OF 128 WATTS BAR NUCLEAR PLANT B.1.f B.1.f Synchronizing DG 1B-B from the MCR per SOI-82.02


B.1.f Synchronizing DG 1B-B from the MCR per SOI-82.02  
REV. 6                                                                          PAGE 54 OF 128 WATTS BAR NUCLEAR PLANT B.1.f EVALUATION SHEET Task: Synchronizing DG 1B-B from the MCR per SOI-82.02 Alternate Path:  N/A Facility JPM #:  3-OT-JPMR060 K/A Rating(s):  064-A1.03 [3.2/3.3      064-A4.01 [4.0/4.3]
064-A2.03 [3.1/3.1]      064-A4.03 [3.2/3.3]  064-A4.06 [3.9/3.9]
Task Standard:    1B-B Diesel Generator is synchronized to the shutdown board from the MCR per SOI-82.02 Section 8.1.4, and then loaded to  3.3 MW and 0.74-1.25 MVARs.
Preferred Evaluation Location:                          Preferred Evaluation Method:
Simulator __X__ In-Plant __ ___                        Perform __X____ Simulate ____


REV. 6      PAGE 54 OF 128 WATTS BAR NUCLEAR PLANT B.1.f  EVALUATION SHEET Task: Synchronizing DG 1B-B from the MCR per SOI-82.02 Alternate Path:
==References:==
N/A Facility JPM #: 3-OT-JPMR060 K/A Rating(s):
SOI-82.02, Diesel Generator (D/G) 1B-B Rev. 65 Task Number:   RO-082-SOI-82-002                APPLICABLE FOR: RO/SRO RO-082-SOI-82-008 RO-082-SOI-82-010 10CFR55.45: 3, 4, 6, 8 Validation Time: 18 min. Time Critical: No
064-A1.03 [3.2/3.3 064-A4.01 [4.0/4.3]    064-A2.03 [3.1/3.1] 064-A4.03 [3.2/3.3] 064-A4.06 [3.9/3.9]
===========================================================================
Task Standard: 1B-B Diesel Generator is synchronized to the shutdown board from the MCR per SOI-82.02 Section 8.1.4, and then loaded to  3.3 MW and 0.74-1.25 MVARs.
Candidate:    ___________________________        _________________    Time Start: ________
Preferred Evaluation Location:    Preferred Evaluation Method:
NAME                            SSN/ID      Time Finish: ________
Simulator __X__    In-Plant __ ___ Perform __X____    Simulate ____
Performance Rating: SAT ____ UNSAT ____                                Performance Time ___
References
Examiner: _____________________________          _____________________________/________
: SOI-82.02, "Diesel Generator (D/G) 1B-B" Rev. 65
NAME                                  SIGNATURE                DATE
===========================================================================
COMMENTS


Task Number: RO-082-SOI-82-002  APPLICABLE FOR: RO/SRO RO-082-SOI-82-008 RO-082-SOI-82-010 10CFR55.45
REV. 6                                                                     PAGE 55 OF 128 WATTS BAR NUCLEAR PLANT B.1.f SIMULATOR OPERATOR INSTRUCTIONS:
:  3, 4, 6, 8
: 1. Initialize to IC # 316.
 
: 2. 1B-B Diesel Generator is running unloaded, after an idle start.
Validation Time:  18 min.
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.
Time Critical:  No ===========================================================================
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task.
Candidate: ___________________________ _________________ Time Start:    ________
: 4. After performer indicates understanding of the task, place simulator to RUN.
NAME SSN/IDTime Finish:  ________
Performance Rating:  SAT ____  UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________  NAME  SIGNATURE DATE
===========================================================================
COMMENTS REV. 6     PAGE 55 OF 128 WATTS BAR NUCLEAR PLANT B.1.f   SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC  
# 316. 2. 1B-B Diesel Generator is running unloaded, after an idle start.  
: b. Place the simulator in RUN momentarily, and acknowledge all alarms.  
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task. 4. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
Ensure a marked-up copy of SOI-82.02 is available to provide to each performer.
Ensure a marked-up copy of SOI-82.02 is available to provide to each performer.
Stop Watch, to time Synchroscope rotation.  
Stop Watch, to time Synchroscope rotation.
 
REV. 6      PAGE 56 OF 128 WATTS BAR NUCLEAR PLANT B.1.f    READ TO OPERATOR
 
DIRECTION TO TRAINEE:


REV. 6                                                                          PAGE 56 OF 128 WATTS BAR NUCLEAR PLANT B.1.f READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit is at 100% power.  
: 1. Unit is at 100% power.
: 2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.  
: 2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.
: 3. The 1B-B DG is running at rated speed , after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.  
: 3. The 1B-B DG is running at rated speed, after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.
: 4. You are an extra control room operator on shift.  
: 4. You are an extra control room operator on shift.
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs.
: 1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs.
: 2. SOI-82.01, Section 8.1.4 Steps 1 through 3 have been performed.  
: 2. SOI-82.01, Section 8.1.4 Steps 1 through 3 have been performed.
: 3. You are to inform the Unit Supervisor when the diesel generator is loaded to  3.3 MWs.
: 3. You are to inform the Unit Supervisor when the diesel generator is loaded to  3.3 MWs.
REV. 6      PAGE 57 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. START TIME: _______
STEP 1: Obtain a copy of the instruction.


STANDARD: A copy of SOI-82.02 Section 8.1.4 has been obtained.
REV. 6                                                                  PAGE 57 OF 128 WATTS BAR NUCLEAR PLANT B.1.f START TIME: _______
STEP 1:        Obtain a copy of the instruction.
___ SAT STANDARD: A copy of SOI-82.02 Section 8.1.4 has been obtained.
EXAMINERS CUE: After the performer has demonstrated the method            ___ UNSAT of obtaining the correct instruction, the evaluator can provide a copy of the instruction.
COMMENTS:
STEP 2:    [4] PLACE 1-HS-82-48, DG MODE SELECTOR, in                      CRITICAL PARALLEL. [0-M-26].                                            STEP
___ SAT STANDARD: 1-HS-82-48, DG MODE SELECTOR, is placed in PARALLEL. This step is critical for task performance to allow proper operation of voltage regulator & DG speed droop circuits.                                              ___ UNSAT COMMENTS:
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


EXAMINER'S CUE:
REV. 6                                                                    PAGE 58 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 3:     [5]    ENSURE the following sync switches for 1B-B D/G in OFF.
After the performer has demonstrated the method of obtaining the correct instruction, the evaluator can provide a copy of the instruction.
NOMENCLATURE            LOCATION        POSITION          UNID MAINTENANCE 6.9 UNIT            0-M-26          OFF          1-HS-57-69 BD 1C SYNC SWITCH ALTERNATE CSST C SYNC          0-M-26          OFF          1-HS-57-115 SWITCH DG SYNC SWITCH                  0-M-26          OFF          1-HS-57-74 NORMAL-CSST D SYNC              0-M-26          OFF          1-HS-57-72 SWITCH STANDARD: Performer checks listed sync switches in OFF position              ___ SAT COMMENTS:
___ UNSAT STEP 4:    [6]    PLACE 1-HS-57-74, DG SYNC SWITCH, to SYN.                  CRITICAL STEP STANDARD: 1-HS-57-74, DG SYNC SWITCH, is placed to SYN position.            ___ SAT This step is critical to allow synchronization of D/G to 1B-B Shutdown board.
COMMENTS:                                                                    ___ UNSAT CAUTION:        When adjusting speed and voltage care must be taken to prevent overshooting desired values. Voltage control response is approximately five times faster than speed control response.
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


COMMENTS:     
REV. 6                                                                    PAGE 59 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 5:    [7]    MATCH generator Incoming Frequency (1-XI-82-32) with        CRITICAL Running Frequency (1-XI-82-33) using 1-HS-82-43,              STEP SPEED CONTROL [0-M-26].
___ SAT STANDARD: 1-HS-82-43 is used to adjust generator frequency (incoming) on 1-XI-82-32 to match with board frequency (running) on 1-XI-82-33. This step is critical to allow synchronization of D/G to 1B-B Shutdown board.                ___ UNSAT COMMENTS:
STEP 6:    [8] MATCH generator Incoming Voltage, (1-EI-82-34) with            CRITICAL Running Voltage (1-EI-82-35) using 1-HS-82-42,                STEP VOLTAGE REGULATOR [0-M-26].
___ SAT STANDARD: 1-HS-82-42 is used to adjust generator voltage on 1-EI                34 to match with board voltage on 1-EI-82-35. This step is critical to allow synchronization of D/G to 1B-B Shutdown board.                                              ___ UNSAT COMMENTS:
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


___ SAT
REV. 6                                                                     PAGE 60 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 7:   [9]   ENSURE DG Frequency and Voltage are MATCHED CRITICAL with 6.9 kV SD Bd, AND ADJUST 1-HS-82-43, SPEED STEP CONTROL, [0-M-26] to obtain desired clockwise rotation (15 or more seconds) on 1-XI-82-31, TRAIN 1B-B
 
___ SAT SYNCHROSCOPE.
___ UNSAT STEP 2: [4] PLACE 1-HS-82-48, DG MODE SELECTOR, in PARALLEL.  [0-M-26].
STANDARD: Performer verifies running and incoming frequency and voltage are matched and that the synchroscope is moving       ___ UNSAT slowly in the clockwise direction at 15 seconds or more per rotation on the scope. This step is critical to ensure proper DG synchronization that is performed in the next step.
 
NOTE TO EVALUATOR: The performer may use a stopwatch to time the 15 second rotation. Provide stopwatch if asked.
STANDARD: 1-HS-82-48, DG MODE SELECTOR, is placed in PARALLEL. This step is critical for task performance to allow proper operation of voltage regulator & DG speed droop circuits. 
COMMENTS:
 
NOTES
COMMENTS: 
: 1) Steps 8.1.4[10] through 8.1.4[11.3] may be signed off after completion of Step 8.1.4[11.3]
 
: 2) Peer checking required on the next step
CRITICAL STEP 
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
 
___ SAT
 
___ UNSAT
 
REV. 6     PAGE 58 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 3: [5] ENSURE the following sync switches for 1B-B D/G in OFF. NOMENCLATURE LOCATION POSITION UNID MAINTENANCE 6.9 UNIT BD 1C SYNC SWITCH 0-M-26 OFF 1-HS-57-69  ALTERNATE CSST C SYNC SWITCH 0-M-26 OFF 1-HS-57-115  DG SYNC SWITCH 0-M-26 OFF 1-HS-57-74  NORMAL-CSST D SYNC SWITCH 0-M-26 OFF 1-HS-57-72 STANDARD: Performer checks listed sync switches in OFF position COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 4: [6] PLACE 1-HS-57-74, DG SYNC SWITCH, to SYN.
 
STANDARD:  1-HS-57-74, DG SYNC SWITCH, is placed to SYN position.
This step is critical to allow synchronization of D/G to 1B-B Shutdown board.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT CAUTION: When adjusting speed and voltage care must be taken to prevent overshooting desired values. Voltage control response is approximately five times faster than speed control response.
 
REV. 6      PAGE 59 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 5: [7] MATCH generator Incoming Frequency (1-XI-82-32) with Running Frequency (1-XI-82-33) using 1-HS-82-43, SPEED CONTROL [0-M-26].
 
STANDARD: 1-HS-82-43 is used to adjust generator frequency (incoming) on 1-XI-82-32 to match with board frequency (running) on 1-XI-82-33. This step is critical to allow synchronization of D/G to 1B-B Shutdown board.
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT STEP 6: [8]  MATCH generator Incoming Voltage, (1-EI-82-34) with Running Voltage (1-EI-82-35) using 1-HS-82-42, VOLTAGE REGULATOR [0-M-26]. 
 
STANDARD:  1-HS-82-42 is used to adjust generator voltage on 1-EI-82-34 to match with board voltage on 1-EI-82-35. This step is critical to allow synchronization of D/G to 1B-B Shutdown board.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT REV. 6      PAGE 60 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 7: [9] ENSURE DG Frequency and Voltage are MATCHED with 6.9 kV SD Bd, AND ADJUST 1-HS-82-43, SPEED CONTROL, [0-M-26] to obtain desired clockwise rotation (15 or more seconds) on 1-XI-82-31, TRAIN 1B-B SYNCHROSCOPE.
STANDARD: Performer verifies running and incoming frequency and voltage are matched and that the synchroscope is moving slowly in the clockwise direction at 15 seconds or more per rotation on the scope. This step is critical to ensure proper DG synchronization that is performed in the next step. NOTE TO EVALUATOR: The performer may use a stopwatch to time the 15 second rotation.
Provide stopwatch if asked.
COMMENTS:  
 
CRITICAL STEP
___ SAT
 
___ UNSAT NOTES 1) Steps 8.1.4[10] through 8.1.4[11.3] may be signed off after completion of Step 8.1.4[11.3] 2) Peer checking required on the next step
 
REV. 6      PAGE 61 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 8: [10] WHEN TRAIN 1B-B SYNCHROSCOPE (1-XI-82-31) reaches 12 o'clock, THEN TURN 1-HS-57-73A, 1914 - DG TO SD 1B-B, to CLOSE. 
 
STANDARD:  ACB 1914, DG TO SD 1B-B, is closed with 1-HS-57-73A, when the synchroscope reaches 12 o'clock. This step is critical to ensure proper DG synchronization onto 1B-B Shutdown Board.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT NOTE Maintain outgoing VARS by periodically adjusting voltage regulator with 1-HS-82-42 while loading DG. Controls should not be operated simultaneously.
STEP 9: [11] PERFORM the following: [11.1] LOAD DG promptly using 1-HS-82-43, SPEED CONTROL to at least 1.1 Megawatts as indicated on 1-EI-82-40A, DG MEGAWATTS (0-M-26).
STANDARD:  The generator output is increased to  1.1 MW on 0-EI 40A. This step is critical to ensure proper DG loading and avoid reverse power trip.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT REV. 6      PAGE 62 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. NOTE DG MEGAVARs may "swing" when the 6.9 KV automatic tap changers engage to stabilize the voltage in the system.
STEP 10: [11.2]  PERFORM the following:
[b] MAINTAIN DG MEGAVARS 0.75 to 1.25 OUTGOING on 1-EI-82-41A, with 1-HS-82-42, VOLTAGE REGULATOR.
STANDARD:  The generator megavars is adjusted to between 0.75 and 1.25 Megavars on 0-EI-82-41A.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT CAUTION Operation of the DG at load of 2.7 MW or less for extended period of time may lead to exhaust fire.
STEP 11: [11.3] PERFORM the following: [c] RAISE load to at least 3.3 Megawatts.
STANDARD:  The generator output is raised to  3.3 MW on 0-EI 40A. This step is to ensure DG is loaded per task assignment.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT REV. 6      PAGE 63 OF 128 WATTS BAR NUCLEAR PLANT B.1.f **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 12: [11.4] PLACE 1-HS-57-74, DG SYNC SWITCH, to OFF.
STANDARD:  1-HS-57-74, DG SYNC SWITCH, is placed to OFF


COMMENTS:  
REV. 6                                                                  PAGE 61 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 8:                                                                    CRITICAL
[10]    WHEN TRAIN 1B-B SYNCHROSCOPE (1-XI-82-31) reaches 12 oclock, THEN TURN 1-HS-57-73A, 1914 -        STEP DG TO SD 1B-B, to CLOSE.
___ SAT STANDARD: ACB 1914, DG TO SD 1B-B, is closed with 1-HS-57-73A, when the synchroscope reaches 12 oclock. This step is critical to ensure proper DG synchronization onto 1B-B Shutdown Board.                                            ___ UNSAT COMMENTS:
NOTE      Maintain outgoing VARS by periodically adjusting voltage regulator with 1-HS-82-42 while loading DG. Controls should not be operated simultaneously.
STEP 9:    [11]    PERFORM the following:                                  CRITICAL STEP
[11.1] LOAD DG promptly using 1-HS-82-43, SPEED CONTROL to at least 1.1 Megawatts as indicated on 1-EI-82-40A, DG MEGAWATTS (0-M-26).
___ SAT STANDARD: The generator output is increased to  1.1 MW on 0-EI                40A. This step is critical to ensure proper DG loading and avoid reverse power trip.
___ UNSAT COMMENTS:
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


___ SAT  
REV. 6                                                              PAGE 62 OF 128 WATTS BAR NUCLEAR PLANT B.1.f NOTE      DG MEGAVARs may swing when the 6.9 KV automatic tap changers engage to stabilize the voltage in the system.
STEP 10: [11.2] PERFORM the following:
[b] MAINTAIN DG MEGAVARS 0.75 to 1.25 OUTGOING on 1-EI-82-41A, with 1-HS-82-42,        ___ SAT VOLTAGE REGULATOR.
STANDARD: The generator megavars is adjusted to between 0.75 and 1.25 Megavars on 0-EI-82-41A.                            ___ UNSAT COMMENTS:
CAUTION Operation of the DG at load of 2.7 MW or less for extended period of time may lead to exhaust fire.
CRITICAL STEP 11: [11.3] PERFORM the following:
STEP
[c] RAISE load to at least 3.3 Megawatts.
STANDARD: The generator output is raised to  3.3 MW on 0-EI                40A. This step is to ensure DG is loaded per task        ___ SAT assignment.
___ UNSAT COMMENTS:
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


REV. 6                                                                    PAGE 63 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 12: [11.4] PLACE 1-HS-57-74, DG SYNC SWITCH, to OFF.
STANDARD: 1-HS-57-74, DG SYNC SWITCH, is placed to OFF                      ___ SAT COMMENTS:
___ UNSAT STEP 13: [11.5] MAINTAIN DG operation for a minimum of one hour, OR until engine temperatures stabilize.
___ UNSAT STEP 13: [11.5] MAINTAIN DG operation for a minimum of one hour, OR until engine temperatures stabilize.
STANDARD: Performer reecognizes that the DG must be run for a minimum of 1 hour, OR until engine temperatures stabilize.
___ SAT STANDARD: Performer reecognizes that the DG must be run for a minimum of 1 hour, OR until engine temperatures stabilize.
EVALUATOR CUE: If asked, state temperatures will be monitored locally until they stabilize.  
EVALUATOR CUE: If asked, state temperatures will be monitored               ___ UNSAT locally until they stabilize.
 
COMMENTS:
COMMENTS:  
STEP 14:         Notify the Unit Supervisor that DG 1B-B is synchronized to the shutdown board and loaded to  3.3 MW.
 
___ SAT STANDARD: The Unit Supervisor is notified that DG 1B-B is synchronized to the shutdown board and loaded to  3.3 MW.                                                           ___ UNSAT CUE:       As Unit Supervisor, when notified, acknowledge the report.
___ SAT
COMMENTS:
 
END OF TASK TIME STOP: ________
___ UNSAT STEP 14: Notify the Unit Supervisor that DG 1B-B is synchronized to the shutdown board and loaded to  3.3 MW.
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
STANDARD: The Unit Supervisor is notified that DG 1B-B is synchronized to the shutdown board and loaded to  3.3 MW.
CUE: As Unit Supervisor, wh en notified, acknowledge the report.
COMMENTS:  
 
END OF TASK
 
___ SAT
 
___ UNSAT TIME STOP: ________  
 
REV. 2 PAGE 64 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 2                                                                PAGE 64 OF 128 WATTS BAR NUCLEAR PLANT B.1.g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit is at 100% rated thermal power.  
: 1. Unit is at 100% rated thermal power.
: 2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.  
: 2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.
: 3. The 1B-B DG is running at rated speed , after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.  
: 3. The 1B-B DG is running at rated speed, after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.
: 4. You are an extra control room operator on shift.  
: 4. You are an extra control room operator on shift.
INITIATING CUES:
: 1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs.
: 2. You are to inform the Unit Supervisor when the diesel generator is loaded to  3.3 MWs.
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


INITIATING CUES:
REV. 2                                                     PAGE 65 OF 128 WATTS BAR NUCLEAR PLANT B.1.g B.1.g Return PRM N-42 to Service per AOI-4
: 1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs. 2. You are to inform the Unit Supervisor when the diesel generator is loaded to  3.3 MWs.
**Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
REV. 2 PAGE 65 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
.  


B.1.g Return PRM N-42 to Service per AOI-4  
REV. 2                                                                      PAGE 66 OF 128 WATTS BAR NUCLEAR PLANT B.1.g Task:          Return PRM N-42 to Service per AOI-4 Alternate Path:    When rod control is returned to auto a continuous rod insertion occurs requiring performer to return rod control to manual and then a trip of the reactor.
Facility JPM #:    3-OT-JPMR108A Rev 0 K/A Rating(s):    015A4.02      [3.9/3.9]    2.1.23        [3.9/4.0]    001AA1.05 [4.3/4.2]
Task Standard: The DETECTOR CURRENT COMPARATOR switch for UPPER SECTION, the DETECTOR CURRENT COMPARATOR switch for LOWER SECTION, the ROD STOP BYPASS, the POWER MISMATCH BYPASS, and the COMPARATOR CHANNEL DEFEAT have been placed in NORMAL or OPERATE as directed AOI-4, Attachment 1 and then reactor is manually tripped due to continuous rod insertion.
Preferred Evaluation Location:                              Preferred Evaluation Method:
Simulator __X__      In-Plant _____                        Perform __X___    Simulate ___ _


REV. 2 PAGE 66 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
==References:==
. Task: Return PRM N-42 to Service per AOI-4 Alternate Path:
AOI-4, NUCLEAR INSTRUMENTATION MALFUNCTIONS, Rev 28 Task Number:     RO-092-AOI-4-002                   APPLICABLE FOR: RO/SRO RO-085-AOI-2-005 10CFR55.45: 2, 3, 4, 5, 6, 12 Validation Time: 12 min. Time Critical: No
When rod control is returned to auto a continuous rod insertion occurs requiring performer to return rod control to manual and then a trip of the reactor. Facility JPM #: 3-OT-JPMR108A Rev 0 K/A Rating(s):
===========================================================================
015A4.02 [3.9/3.9] 2.1.23 [3.9/4.0] 001AA1.05 [4.3/4.2]
Applicant:     ___________________________         _________________       Time Start: ________
Task Standard: The DETECTOR CURRENT COMPARATOR switch for UPPER SECTION, the DETECTOR CURRENT COMPARATOR switch for LOWER SECTION, the ROD STOP BYPASS, the POWER MISMATCH BYPASS, and the COMPARATOR CHANNEL DEFEAT have been placed in NORMAL or OPERATE as directed AOI-4,  and then reactor is manually tripped due to continuous rod insertion.
NAME                             SSN/EIN      Time Finish: ________
Preferred Evaluation Location:    Preferred Evaluation Method:
Performance Rating: SAT ____ UNSAT ____                                     Performance Time ___
Simulator __X__    In-Plant _____  Perform __X___    Simulate ___ _
Examiner: _____________________________             _____________________________/________
References
NAME                                     SIGNATURE                 DATE
: AOI-4, "NUCLEAR INSTRUMENTATION MALFUNCTIONS", Rev 28 Task Number: RO-092-AOI-4-002 APPLICABLE FOR: RO/SRO RO-085-AOI-2-005 10CFR55.45: 2, 3, 4, 5, 6, 12 Validation Time:     12 min.
Time Critical:
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:   ________
NAME SSN/EINTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================
===========================================================================
COMMENTS REV. 2 PAGE 67 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
COMMENTS
.
      **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
REV. 2 PAGE 68 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
 
. SIMULATOR OPERATOR INSTRUCTIONS:
REV. 2                                                     PAGE 67 OF 128 WATTS BAR NUCLEAR PLANT B.1.g
: 1. Initialize to IC 317. a. Ensure the following items are displayed on the Director Summary Page:
**Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
rd02 Uncontrolled rod insertion, bank d, group 2 100% severity
: b. Ensure the switches on 1-M-13 to the "N42" position to defeat Power Range Channel N42 inputs per AOI-4, Attachment 1, and Step 1 a. through f.
: c. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. The malfunction will be entered when Rod Control Selector Switch is placed in AUTO (Event 23).
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task. 4. After performer indicates understanding of the task, place simulator to RUN.


REV. 2                                                                PAGE 68 OF 128 WATTS BAR NUCLEAR PLANT B.1.g SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 317.
: a. Ensure the following items are displayed on the Director Summary Page:
rd02                Uncontrolled rod insertion, bank d, group 2        100% severity
: b. Ensure the switches on 1-M-13 to the N42 position to defeat Power Range Channel N42 inputs per AOI-4, Attachment 1, and Step 1 a. through f.
: c. Place the simulator in RUN momentarily, and acknowledge all alarms.
: 2. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. The malfunction will be entered when Rod Control Selector Switch is placed in AUTO (Event 23).
: 3. Place simulator in FREEZE until the performer indicates an understanding of the task.
: 4. After performer indicates understanding of the task, place simulator to RUN.
Tools/Equipment/Procedures Needed:
Tools/Equipment/Procedures Needed:
Ensure a marked-up copy of AOI-4 is available to the Evaluator and clean copies of AOI-2 in all copies of Abnormal Operating Instructions on the Simulator Floor.
**Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


Ensure a marked-up copy of AOI-4 is available to the Evaluator and clean copies of AOI-2 in all copies of Abnormal Operating Instructions on the Simulator Floor.
REV. 2                                                                 PAGE 69 OF 128 WATTS BAR NUCLEAR PLANT B.1.g READ TO OPERATOR DIRECTION TO TRAINEE:
 
REV. 2 PAGE 69 OF 128 WATTS BAR NUCLEAR PLANT B.1.g **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
.
READ TO OPERATOR
 
DIRECTION TO TRAINEE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is at 100% power.  
: 1. Unit 1 is at 100% power.
: 2. PRM N42 failed during last shift.  
: 2. PRM N42 failed during last shift.
: 3. AOI-4 Section 3.4 has been completed through Step 16.a.  
: 3. AOI-4 Section 3.4 has been completed through Step 16.a.
: 4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.  
: 4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.
: 5. You are the Operator at the Controls.  
: 5. You are the Operator at the Controls.
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to return PRM N42 to service.  
: 1. The Unit Supervisor has directed you to return PRM N42 to service.
: 2. You are to notify the US when the control rods have been returned to AUTO.  
: 2. You are to notify the US when the control rods have been returned to AUTO.
    **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


REV. 2 PAGE 70 OF 128 WATTS BAR NUCLEAR PLANT B.1.g START TIME: _______
REV. 2                                                     PAGE 70 OF 128 WATTS BAR NUCLEAR PLANT B.1.g START TIME: _______
STEP 1: Obtain the correct procedure.  
STEP 1:     Obtain the correct procedure.
___ SAT STANDARD: A copy of AOI-4 has been obtained.
EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator will ___ UNSAT provide a marked-up copy of the instruction.
COMMENTS:
CAUTION  Allowing at least 5 minutes between any rod control input (i.e., T-avg, T-ref, or NIS) change and placing rods in AUTO, will help prevent undesired control rod movement.
STEP 2:      [Step 16b] REFER TO Attachment 1, PRM Function At NIS Rack, step 2.
___ SAT STANDARD: Performer refers to Attachment 1, PRM Function At NIS Rack, Step 2 for restoration of PRM N42.
___ UNSAT COMMENTS:


STANDARD: A copy of AOI-4 has been obtained.
REV. 2                                                    PAGE 71 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE TO EVALUATOR: The following steps are from Attachment 1 page 2 of 2 AOI-4 STEP 3:    [STEP 2] WHEN PRM is ready for return to service, THEN      CRITICAL PERFORM the following steps:                                  STEP
EXAMINER'S CUE:
: a. PLACE DETECTOR CURRENT COMPARATOR switch for UPPER SECTION in NORMAL
After the performer has de monstrated the method of obtaining the correct instruction, the evaluator will
___ SAT STANDARD: Detector Current Comparator Upper Section switch placed to NORMAL (Miscellaneous Control & Indication Panel,1-IDWR-92-N50-G IV)
___ UNSAT Step is critical for proper restoration of upper power detector to current comparator.
COMMENTS:
STEP 4:    [STEP 2 b] PLACE DETECTOR CURRENT COMPARATOR                CRITICAL switch for LOWER SECTION in NORMAL                            STEP STANDARD: Detector Current Comparator Lower Section switch placed to NORMAL (Miscellaneous Control & Indication Panel, 1-      ___ SAT IDWR-92-N50-G IV).
Step is critical for proper restoration of lower power detector to current comparator.                              ___ UNSAT COMMENTS:


provide a marked-up copy of the instruction.
REV. 2                                                       PAGE 72 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE: On the following step, annunciator window 66-C, 67-C, 68-C, OR 69-C, N-(#) OVERPOWER ROD STOP BYPASSED, will clear depending on which channel is bypassed.
 
STEP 5:       [STEP 2 c] PLACE ROD STOP BYPASS switch in OPERATE.           CRITICAL STEP STANDARD: Rod Stop Bypass switch is positioned from N42 to OPERATE (Miscellaneous Control & Indication Panel,1-       ___ SAT IDWR-92-N50-G IV)
COMMENTS:   
Step is critical for proper restoration of to enable rod stop interlock protection from this channel.                       ___ UNSAT COMMENTS:
 
STEP 6:       [STEP 2 d] PLACE POWER MISMATCH BYPASS switch in               CRITICAL OPERATE.                                                       STEP
___ SAT
___ SAT STANDARD: Power Mismatch Bypass switch is positioned from N42 to OPERATE (Miscellaneous Control & Indication Panel, 1-IDWR-92-N50-G IV)
 
___ UNSAT Step is critical to restore channel input to high auctioneering circuit and power mismatch circuits.
___ UNSAT CAUTION Allowing at least 5 minutes between any rod control input (i.e., T-avg, T-ref, or NIS) change and placing rods in AUTO, will help prevent undesired control rod movement.
COMMENTS:
STEP 2: [Step 16b]
REFER TO Attachment 1, PRM Function At NIS Rack, step 2.
 
STANDARD: Performer refers to Attachment 1, PRM Function At NIS Rack, Step 2 for restoration of PRM N42.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 2 PAGE 71 OF 128 WATTS BAR NUCLEAR PLANT B.1.g  NOTE TO EVALUATOR:  The following steps are from Attachment 1 page 2 of 2 AOI-4 STEP 3: [STEP 2]  WHEN PRM is ready for return to service , THEN PERFORM the following steps:
: a. PLACE DETECTOR CURRENT COMPARATOR switch for UPPER SECTION in NORMAL STANDARD: Detector Current Comparator Upper Section switch placed to "NORMAL" (Miscellaneous Control & Indication Panel,1-IDWR-92-N50-G IV)
Step is critical for proper restoration of upper power detector to current comparator.
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT
 
STEP 4: [STEP 2 b]
PLACE DETECTOR CURRENT COMPARATOR switch for LOWER SECTION in NORMAL
 
STANDARD:  Detector Current Comparator Lower Section switch placed to "NORMAL" (Miscellaneous Control & Indication Panel, 1-IDWR-92-N50-G IV).
Step is critical for proper restoration of lower power detector to current comparator.
 
COMMENTS: 
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT REV. 2 PAGE 72 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE: On the following step, annunciator window 66-C, 67-C, 68-C, OR 69-C, N-(#) OVERPOWER ROD STOP BYPASSED, will clear depending on which channel is bypassed.
STEP 5: [STEP 2 c]
PLACE ROD STOP BYPASS switch in OPERATE.
 
STANDARD: Rod Stop Bypass switch is positioned from "N42" to "OPERATE(Miscellaneous Control & Indication Panel,1-IDWR-92-N50-G IV)
Step is critical for proper restoration of to enable rod stop  
 
interlock protection from this channel.
COMMENTS:  
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 6: [STEP 2 d]
PLACE POWER MISMATCH BYPASS switch in OPERATE.
STANDARD: Power Mismatch Bypass switch is positioned from "N42" to "OPERATE" (Miscellaneous Control & Indication Panel, 1-IDWR-92-N50-G IV)
Step is critical to rest ore channel input to high auctioneering circuit and power mismatch circuits.
 
COMMENTS:  
 
CRITICAL STEP
___ SAT
 
___ UNSAT
 
REV. 2 PAGE 73 OF 128 WATTS BAR NUCLEAR PLANT B.1.g  NOTE: On the following step, annunciator window 82-E, NIS CHANNEL IN TEST, will clear.
STEP 7: [STEP 2 e]
PLACE COMPARATOR CHANNEL DEFEAT switch in NORMAL.
STANDARD:  Comparator Channel Defeat Switch is positioned to "NORMAL" (Comparator & Rate Panel, Comparator N37, 1-IDWR-92-N37 IV). Step is critical to restor e channel input to channel comparator alarm circuits.
 
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT


REV. 2                                                            PAGE 73 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE: On the following step, annunciator window 82-E, NIS CHANNEL IN TEST, will clear.
STEP 7:      [STEP 2 e] PLACE COMPARATOR CHANNEL DEFEAT switch in                CRITICAL NORMAL.                                                              STEP
___ SAT STANDARD: Comparator Channel Defeat Switch is positioned to NORMAL (Comparator & Rate Panel, Comparator N37, 1-IDWR-92-N37 IV).
___ UNSAT Step is critical to restore channel input to channel comparator alarm circuits.
COMMENTS:
NOTE: On the following step, annunciator window 115-E, POWER RANGE FLUX RATE HI, will clear if the positive rate trip light is LIT.
NOTE: On the following step, annunciator window 115-E, POWER RANGE FLUX RATE HI, will clear if the positive rate trip light is LIT.
STEP 8: [STEP 2 f]
STEP 8:       [STEP 2 f] IF POSITIVE RATE TRIP is LIT, THEN RESET RATE MODE switch.
IF POSITIVE RATE TRIP is LIT, THEN RESET RATE MODE switch.
STANDARD: Positive Rate Trip light on Power Range Upper N42A, 1-IDWR         ___ SAT 42A II, is checked and determines light is NOT LIT and continues to next step.
 
COMMENTS:                                                                         ___ UNSAT
STANDARD: Positive Rate Trip light on Power Range Upper N42A, 1-IDWR-92-42A II, is checked and determines light is NOT LIT and continues to next step.
COMMENTS:  
 
___ SAT
 
___ UNSAT
 
REV. 2 PAGE 74 OF 128 WATTS BAR NUCLEAR PLANT B.1.g  NOTE TO EVALUATOR:  Performer returns to AOI-4 at step 16 c.
STEP 9: [STEP 16 c]
ENSURE T-avg and T-ref within 1
°. STANDARD:  Performer verifies T-avg and T-ref within 1
° by recorder 1-TR-68-2B on 1-M-5 or other T-avg - T-ref indications.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT  
 
STEP 10: [STEP 16 d] ENSURE zero demand on control rod position indication [1-M-4].


STANDARD: Performer determines zero demand on control rod position indication CERPI display or ICS computer display for CERPI
REV. 2                                                      PAGE 74 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE TO EVALUATOR: Performer returns to AOI-4 at step 16 c.
STEP 9:    [STEP 16 c] ENSURE T-avg and T-ref within 1°.
___ SAT STANDARD: Performer verifies T-avg and T-ref within 1° by recorder 1-TR-68-2B on 1-M-5 or other T-avg - T-ref indications.
___ UNSAT COMMENTS:
STEP 10:  [STEP 16 d] ENSURE zero demand on control rod position indication [1-M-4].
STANDARD: Performer determines zero demand on control rod position       ___ SAT indication CERPI display or ICS computer display for CERPI
* CERPI Display
* CERPI Display
* Plant computer  
* Plant computer
___ UNSAT COMMENTS:


COMMENTS:  
REV. 2                                                        PAGE 75 OF 128 WATTS BAR NUCLEAR PLANT B.1.g STEP 11:    [STEP 16 e] IF auto rod control desired, PLACE control rods in AUTO.                                                          ___ SAT STANDARD: The rod control hand switch has been placed in AUTO position.                                                      ___ UNSAT
    **CUE:  If asked, respond as US that auto rod control is desired.
NOTE TO EVALUATOR: Continuous rod insertion malfunction is inserted when rod control is placed in AUTO. The operator may immediately return rod control to manual, check for rod motion stopped, and then trip the reactor before referring to AOI-2.
COMMENTS:
NOTE TO EVALUATOR: The Following Steps are from AOI-2 Section 3.2 due to continuous rod insertion.
STEP 12:    [STEP 1] PLACE control rods in MAN.
___ SAT STANDARD: Rod control hand switch has been placed in Manual position.
NOTE:    Rods will continue to step IN.                              ___ UNSAT COMMENTS:


___ SAT
REV. 2                                                       PAGE 76 OF 128 WATTS BAR NUCLEAR PLANT B.1.g STEP 13:   [STEP 2] CHECK control rod movement STOPPED.
 
___ SAT STANDARD: Rod control indications have been checked for movement and performer determines that rods are still inserting and goes to RNO for step.
___ UNSAT REV. 2 PAGE 75 OF 128 WATTS BAR NUCLEAR PLANT B.1.g  STEP 11: [STEP 16 e]
___ UNSAT
IF auto rod control desired, PLACE control rods in AUTO.
    **NOTE: Rods will continue to step IN.
 
COMMENTS:
STANDARD:  The rod control hand switch has been placed in AUTO position.
STEP 14:   [STEP 2 RNO] TRIP reactor. GO TO E-0, Reactor Trip or           CRITICAL Safety Injection.                                               STEP
 
___ SAT STANDARD: Reactor Trip hand switch on 1-M-4 or 1-M-6 has been placed to the TRIP position. Performer than goes to E-0.
**CUE: If asked, respond as US that auto rod control is desired.
Critical step, as uncontrolled rod movement in manual rod     ___ UNSAT control requires a reactor trip.
NOTE TO EVALUATOR:  Continuous rod insertion malfunction is inserted when rod control is placed in AUTO. The operator may immediately return rod control to manual, check for rod motion stopped, and then trip the reactor before referring to AOI-2. 
  **CUE:   Upon transition to E-O, inform performer WELL STOP HERE.
 
COMMENTS:
COMMENTS: 
END OF TASK TIME STOP: ________
 
___ SAT
 
___ UNSAT
 
NOTE TO EVALUATOR:  The Following Steps are from AOI-2 Section 3.2 due to continuous rod insertion.
STEP 12: [STEP 1] PLACE control rods in MAN.
 
STANDARD:  Rod control hand switch has been placed in Manual position.
NOTE: Rods will continue to step IN.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 2 PAGE 76 OF 128 WATTS BAR NUCLEAR PLANT B.1.g   STEP 13: [STEP 2] CHECK control rod movement STOPPED.  
 
STANDARD: Rod control indications have been checked for movement and performer determines that rods are still inserting and goes to RNO for step.  
**NOTE: Rods will continue to step IN.
 
COMMENTS:  
 
___ SAT
 
___ UNSAT
 
STEP 14: [STEP 2 RNO]
TRIP reactor.
GO TO E-0, Reactor Trip or Safety Injection.  
 
STANDARD: Reactor Trip hand switch on 1-M-4 or 1-M-6 has been placed to the TRIP position. Performer than goes to E-0.
Critical step, as uncontrolled rod movement in manual rod control requires a reactor trip.
  **CUE: Upon transition to E-O, inform performer "WE'LL STOP HERE".
COMMENTS:  
 
END OF TASK CRITICAL STEP
___ SAT
 
___ UNSAT
 
TIME STOP: ________
REV. 0 PAGE 77 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 0                                                                  PAGE 77 OF 128 WATTS BAR NUCLEAR PLANT B.1.h APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is at 100% power.  
: 1. Unit 1 is at 100% power.
: 2. PRM N42 failed during last shift.  
: 2. PRM N42 failed during last shift.
: 3. AOI-4 Section 3.4 has been completed through Step 16.a.  
: 3. AOI-4 Section 3.4 has been completed through Step 16.a.
: 4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.  
: 4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.
: 5. You are the Operator at the Controls.  
: 5. You are the Operator at the Controls.
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor has directed you to return PRM N42 to service.  
: 1. The Unit Supervisor has directed you to return PRM N42 to service.
: 2. You are to notify the US when the control rods have been returned to AUTO.  
: 2. You are to notify the US when the control rods have been returned to AUTO.


REV. 0 PAGE 78 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  
REV. 0                                   PAGE 78 OF 128 WATTS BAR NUCLEAR PLANT B.1.h B.1.h Shutdown A Train EGTS Following a 10 Hour Run per SOI-65.02.


B.1.h Shutdown "A" Train EGTS Following a 10 Hour Run per SOI-65.02.  
REV. 0                                                            PAGE 79 OF 128 WATTS BAR NUCLEAR PLANT B.1.h Task:    Shutdown A Train EGTS Following a 10 Hour Run per SOI-65.02.
Alternate Path:  N/A Facility JPM #:  3-OT-JPMR169 K/A Rating(s):  027A4.01      (3.3*/3.3*)
Task Standard:    EGTS A Train has been shutdown and returned to ES Standby alignment in accordance with SOI-65.02.
Preferred Evaluation Location:                        Preferred Evaluation Method:
Simulator __X__    In-Plant _____                    Perform __X___  Simulate ___ _


REV. 0 PAGE 79 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  Task: Shutdown "A" Train EGTS Following a 10 Hour Run per SOI-65.02.
==References:==
Alternate Path:
SOI-65.02 Emergency Gas Treatment System Rev. 24 Task Number:   RO-065-SOI-65-005               APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 6, 8 Validation Time: 15 min. Time Critical: No
N/A  Facility JPM #: 3-OT-JPMR169 K/A Rating(s):
027A4.01 (3.3*/3.3*)    Task Standard: EGTS "A" Train has been shutdown and returned to ES Standby alignment in accordance with SOI-65.02.
Preferred Evaluation Location:    Preferred Evaluation Method:
Simulator __X__    In-Plant _____  Perform __X___    Simulate ___ _
References
: SOI-65.02 "Emergency Gas Treatment System" Rev. 24 Task Number: RO-065-SOI-65-005 APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 6, 8 Validation Time:   15   min.
Time Critical:
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:    ________
NAME SSNTime Finish:  ________
Performance Rating:  SAT ____  UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________  NAME  SIGNATURE DATE
===========================================================================
===========================================================================
COMMENTS REV. 0 PAGE 80 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  SIMULATOR OPERATOR INSTRUCTIONS:
Applicant:    ___________________________      _________________    Time Start: ________
: 1. Initialize to IC 318  2. Ensure the alignment for "A" Train EGTS in service:  
NAME                      SSN          Time Finish: ________
Performance Rating: SAT ____ UNSAT ____                              Performance Time ___
Examiner: _____________________________        _____________________________/________
NAME                              SIGNATURE                DATE
===========================================================================
COMMENTS


REV. 0                                                                PAGE 80 OF 128 WATTS BAR NUCLEAR PLANT B.1.h SIMULATOR OPERATOR INSTRUCTIONS:
: 1. Initialize to IC 318
: 2. Ensure the alignment for A Train EGTS in service:
1-FCV-65 Open.
1-FCV-65 Open.
1-FCO-65 Open.
1-FCO-65 Open.
1-HS-65-81/86 - OPEN 1-HS-65-83/87 in A-AUTO STANDBY 0-HS-65-23A - RUNNING.  
1-HS-65-81/86 - OPEN 1-HS-65-83/87 in A-AUTO STANDBY 0-HS-65-23A - RUNNING.
: 3. Acknowledge all alarms.  
: 3. Acknowledge all alarms.
: 5. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.  
: 5. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.
: 5. After performer indicates understanding of task, place simulator in run.
: 5. After performer indicates understanding of task, place simulator in run.
SIMULATOR OPERATOR INSTRUCTIONS:
SIMULATOR OPERATOR INSTRUCTIONS:
NONE Tools/Equipment/Procedures Needed:
NONE Tools/Equipment/Procedures Needed:
 
Ensure clean copy of SOI-65.02 in all copies of Operating Instructions on the Simulator Floor.
Ensure clean copy of SOI-65.02 in all copies of Operating Instructions on the Simulator Floor.
REV. 0 PAGE 81 OF 128 WATTS BAR NUCLEAR PLANT B.1.h    READ TO OPERATOR
DIRECTION TO TRAINEE:


REV. 0                                                                  PAGE 81 OF 128 WATTS BAR NUCLEAR PLANT B.1.h READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is at 100% power.  
: 1. Unit 1 is at 100% power.
: 2. 0-SI-65-6-A "Emergency Gas Treatment System Train A 10-Hour Operation" performance in progress.  
: 2. 0-SI-65-6-A Emergency Gas Treatment System Train A 10-Hour Operation performance in progress.
: 3. "A" Train EGTS Fan has been in service for 10 hours.  
: 3. A Train EGTS Fan has been in service for 10 hours.
: 4. You are a support operator in the control room.  
: 4. You are a support operator in the control room.
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you shutdown the "A" Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.  
: 1. The Unit Supervisor directs you shutdown the A Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.
: 2. You are to notify Unit Supervisor when you have completed the task.
: 2. You are to notify Unit Supervisor when you have completed the task.
 
REV. 0 PAGE 82 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  START TIME: _______
STEP 1: Obtain a copy of the procedure.  


STANDARD: A copy of SOI-65.02 section 7.1 has been obtained.
REV. 0                                                          PAGE 82 OF 128 WATTS BAR NUCLEAR PLANT B.1.h START TIME: _______
EXAMINER'S CUE:
STEP 1:      Obtain a copy of the procedure.
After the performer has de monstrated the method of obtaining the correct instruction, the evaluator provides a copy of the instruction.
___ SAT STANDARD: A copy of SOI-65.02 section 7.1 has been obtained.
EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator           ___ UNSAT provides a copy of the instruction.
NOTE TO EVALUATOR: Performer may also identify Section 5.0 as needed to return EGTS to standby. You may provide a copy of this section when performer seeks to obtain a copy.
NOTE TO EVALUATOR: Performer may also identify Section 5.0 as needed to return EGTS to standby. You may provide a copy of this section when performer seeks to obtain a copy.
COMMENTS:
CAUTION:  If EGTS is in service due to an accident signal initiation, and the charcoal filter banks have decay heat, an engineering evaluation must be performed before shutting down the EGTS system.
NOTE      If EGTS was Auto actuated, both Trains shutdown sections must be performed prior to return to standby readiness.
STEP 2:      [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.
STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D      ___ SAT
            ØA light DARK.
COMMENTS:
___ UNSAT


COMMENTS:  
REV. 0                                                  PAGE 83 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 3:  [Step 2] Momentarily PLACE 0-HS-65-23A, EGTS FAN &        CRITICAL DISCH DMPR, in STOP (returns to A-AUTO).                    STEP STANDARD: Performer stops A Train EGTS Fan with 0-HS-65-23A and checks red light off and green light ON the associated handswitch.                                              ___ SAT Step is critical to shutdown the running EGTS Fan.
COMMENTS:                                                          ___ UNSAT STEP 4:  [Step 3] ENSURE 1-FCV-65-8, EGTS TR-A U1 SUCT DMPR,      ___ SAT CLOSED.
STANDARD: Performer checks 1-HS-65-8 and verifies red light off and green light ON for the associated hand switch            ___ UNSAT Step is critical to shutdown return ventilation lineup to normal following 10 hour run.
COMMENTS:
STEP 5:  [Step 4] PERFORM the following:                          CRITICAL
[a] CLOSE 1-FCO-65-10, EGTS TR-A U1 SUCT DMPR.              STEP
[b] CLOSE 1-FCO-65-26, EGTS TO U1 SHIELD BLDG.
___ SAT STANDARD: Performer closes 1-FCO-65-10 with 1-HS-65-10; performer closes 1-FC0-65-26 with 1-HS-65-26. Respective hand switches red lights are off and green lights are LIT. ___ UNSAT Step is critical to shutdown return ventilation lineup to normal following 10 hour run.
COMMENTS:


___ SAT  
REV. 0                                                  PAGE 84 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 6:      [STEP 5] IF Train A EGTS to be returned to STANDBY, THEN:  CRITICAL PERFORM the following:                                        STEP NOMENCLATURE              LOCATION      POSITION          UNID EGTS TR-A U1 SUCT DMPR        0-M-27B        A AUTO        1-HS-65-10 EGTS TR-A U1 SHIELD BLDG        0-M-27B        A AUTO        1-HS-65-26 STANDARD: Performer places 1-HS-65-10 and 1-HS-65-26 to the A AUTO      ___ SAT position.
Step is critical to return these hand switches to ES Standby alignment.                                        ___ UNSAT COMMENTS:
STEP 7:      [Step 6] IF Train B EGTS is to be shutdown, THEN GO TO Section 7.2.
STANDARD: Performer determines that this step does not apply and        ___ SAT proceeds to the next step.
COMMENTS:
___ UNSAT STEP 8:      [Step 7] IF EGTS is to be returned to STANDBY, THEN GO TO Section 5.0 to align EGTS for STANDBY.
STANDARD: Performer goes to Section 5.0.                                ___ SAT COMMENTS:
___ UNSAT


___ UNSAT CAUTION: If EGTS is in service due to an accident signal initiation, and the charcoal filter banks have decay heat, an engineering evaluation must be performed before shutting down the EGTS system.
REV. 0                                                      PAGE 85 OF 128 WATTS BAR NUCLEAR PLANT B.1.h NOTE TO EVALUATOR: The following performance steps are from section 5.1 of SOI-65.02.
NOTE  If EGTS was Auto actuated, both Trains' shutdown sections must be performed prior to return to standby readiness.
CAUTION     IF EGTS is being returned to standby after auto actuation, THEN both Sections 7.1 and 7.2 must be performed prior to Standby Readiness alignment.
STEP 2: [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.  
STEP 9:       [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.
STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D  ___ SAT
              ØA light DARK.
NOTE TO EVALUATOR: This was previously performed in step 2 of JPM.                                            ___ UNSAT COMMENTS:
STEP 10:      [Step 2] ENSURE the following valves are CLOSED and          CRITICAL PLACE 1-HS-65-81/86 in A AUTO.                                  STEP NOMENCLATURE              LOCATION      POSITION          UNID U1 EGTS-ANN P CNTLR A          0-M-27B        A AUTO      1-HS-65-81/86 ISOL STANDARD: Performer locates 1-HS-65-81/88 and places in A-AUTO. Step        ___ SAT is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.
COMMENTS:                                                                  ___ UNSAT


STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D
REV. 0                                                    PAGE 86 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 11:      [STEP 3] ENSURE breaker position for the following:
NOMENCLATURE              LOCATION    POSITION            UNID 120VAC VITAL INST POWER BD 1-I EGTS TRAIN A AUX RELAYS          Bkr 38        OFF        1-BKR-235-1/38 1-PCV-65-81/1-PCV-65-86 STANDARD: Performer contacts the Control Building AUO (or an AUO) and      ___ SAT requests performance of Step 3.
      **CUE:    When asked as the AUO, state 1-BKR-235-1/38 is in the OFF position.                                            ___ UNSAT COMMENTS:
STEP 12:      [Step 4] ENSURE the following valves are CLOSED and          CRITICAL PLACE 1-HS-65-83/87 in A AUTO.                                  STEP NOMENCLATURE              LOCATION    POSITION            UNID U1 EGTS-ANN P CNTLR B          0-M-27B      A AUTO        1-HS-65-83/87 ISOL STANDARD: Performer locates 1-HS-65-83/87 and places in A-AUTO. Step        ___ SAT is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.
COMMENTS:                                                                  ___ UNSAT


ØA light DARK.  
REV. 0                                                    PAGE 87 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 13:    [STEP 5] ENSURE breaker position for the following:
NOMENCLATURE              LOCATION      POSITION            UNID 120VAC VITAL INST POWER BD 1-II EGTS TRAIN B AUX RELAYS        Bkr 38        OFF        1-BKR-235-2/38 1-PCV-65-81/1-PCV-65-86 STANDARD: Performer contacts an AUO and requests performance of Step      ___ SAT 5.
      **CUE:    When asked as the AUO, state1-BKR-235-2/38 is in the OFF position.                                            ___ UNSAT COMMENTS:
STEP 14:    [STEP 6] PERFORM the following:
NOMENCLATURE              LOCATION      POSITION            UNID EGTS FAN A & DISCHG DMPR        0-M-27B      A AUTO        0-HS-65-23A EGTS FAN B & DISCHG DMPR        0-M-27B      A AUTO        0-HS-65-42A STANDARD: Performer locates 0-HS-65-23A and ensures in A-AUTO.            ___ SAT Performer locates 0-HS-65-42A and ensures in A-AUTO.
COMMENTS:
___ UNSAT


COMMENTS: 
REV. 0                                                               PAGE 88 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 15:       [STEP 7] OPEN the following valves, and PLACE the                     CRITICAL handswitches in A AUTO:                                                   STEP NOMENCLATURE                 LOCATION       POSITION           UNID U1 ANN VAC FANS SUCT             0-M-27B     OPEN, HS in     0-HS-65-52 A AUTO U1 ANN VAC FANS SUCT             0-M-27B     OPEN, HS in     0-HS-65-53 A AUTO STANDARD: Performer locates 0-HS-65-52 and ensures OPEN and in A-                       ___ SAT AUTO.
 
Performer locates 0-HS-65-53 and ensures OPEN and in A-AUTO.
___ SAT
Step is critical to establishing EGTS configuration for               ___ UNSAT automatic start after a ØA Cntmt Isolation signal.
 
COMMENTS:
___ UNSAT REV. 0 PAGE 83 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 3: [Step 2] Momentarily PLACE 0-HS-65-23A, EGTS FAN & DISCH DMPR, in STOP (returns to A-AUTO).
NOTES
 
: 1) The following step may be N/Ad if annulus vacuum fans are running.
STANDARD: Performer stops "A" Train EGTS Fan with 0-HS-65-23A and checks red light off and green light ON the associated handswitch.
: 2) If a phase A signal has been present, the next step may start one Ann Vac Fan due to low flow.
Step is critical to shutdown the running EGTS Fan.
Either fan may be selected first. Flow should be allowed to stabilize before the second fan is placed in auto to avoid two fans running. SOI-65.01 Section 5.0 should be referenced to ensure proper damper alignment and control after fan start.
 
COMMENTS: 
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 4: [Step 3] ENSURE 1-FCV-65-8, EGTS TR-A U1 SUCT DMPR, CLOSED.
STANDARD: Performer checks 1-HS-65-8 and verifies red light off and green light ON for the associated hand switch Step is critical to shutdown return ventilation lineup to normal following 10 hour run.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 5: [Step 4] PERFORM the following: [a] CLOSE 1-FCO-65-10, EGTS TR-A U1 SUCT DMPR.
[b] CLOSE 1-FCO-65-26, EGTS TO U1 SHIELD BLDG.
 
STANDARD: Performer closes 1-FCO-65-10 with 1-HS-65-10; performer closes 1-FC0-65-26 with 1-HS-65-26. Respective hand switches red lights are off and green lights are LIT.
Step is critical to shutdown return ventilation lineup to normal following 10 hour run.
 
COMMENTS: 
 
CRITICAL STEP      ___ SAT
 
___ UNSAT REV. 0 PAGE 84 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 6: [STEP 5] IF Train A EGTS to be returned to STANDBY, THEN: PERFORM the following:
CRITICAL STEP  NOMENCLATURE LOCATION POSITION UNID EGTS TR-A U1 SUCT DMPR 0-M-27B A AUTO 1-HS-65-10 EGTS TR-A U1 SHIELD BLDG 0-M-27B A AUTO 1-HS-65-26 STANDARD: Performer places 1-HS-65-10 and 1-HS-65-26 to the A AUTO position.
Step is critical to return these hand switches to ES Standby alignment.
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 7: [Step 6] IF Train B EGTS is to be shutdown, THEN GO TO Section 7.2.
STANDARD: Performer determines that this step does not apply and proceeds to the next step. 
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 8: [Step 7]
IF EGTS is to be returned to STANDBY, THEN GO TO Section 5.0 to align EGTS for STANDBY.
 
STANDARD: Performer goes to Section 5.0. 
 
COMMENTS: 
 
___ SAT
 
___ UNSAT REV. 0 PAGE 85 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  NOTE TO EVALUATOR: The following performance steps are from section 5.1 of SOI-65.02.
CAUTION IF EGTS is being returned to standby after auto actuation, THEN both Sections 7.1 and 7.2 must be performed prior to Standby Readiness alignment.
STEP 9: [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.
 
STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D
 
ØA light DARK.
NOTE TO EVALUATOR: This was previously performed in step 2 of JPM.
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 10: [Step 2] ENSURE the following valves are CLOSED and PLACE 1-HS-65-81/86 in A AUTO. CRITICAL STEP  NOMENCLATURE LOCATION POSITION UNID U1 EGTS-ANN P CNTLR A ISOL 0-M-27B A AUTO 1-HS-65-81/86 STANDARD: Performer locates 1-HS-65-81/88 and places in A-AUTO. Step is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 86 OF 128 WATTS BAR NUCLEAR PLANT B.1.h   STEP 11: [STEP 3] ENSURE breaker position for the following:
NOMENCLATURE LOCATION POSITION UNID 120VAC VITAL INST POWER BD 1-I EGTS TRAIN A AUX RELAYS 1-PCV-65-81/1-PCV-65-86 Bkr 38 OFF 1-BKR-235-1/38 STANDARD: Performer contacts the Control Building AUO (or an AUO) and requests performance of Step 3.
  **CUE: When asked as the AU O, state "1-BKR-235-1/38 is in the OFF position".
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 12: [Step 4] ENSURE the following valves are CLOSED and PLACE 1-HS-65-83/87 in A AUTO. CRITICAL STEP  NOMENCLATURE LOCATION POSITION UNID U1 EGTS-ANN P CNTLR B ISOL 0-M-27B A AUTO 1-HS-65-83/87 STANDARD: Performer locates 1-HS-65-83/87 and places in A-AUTO. Step is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 87 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 13: [STEP 5] ENSURE breaker position for the following:
NOMENCLATURE LOCATION POSITION UNID 120VAC VITAL INST POWER BD 1-II EGTS TRAIN B AUX RELAYS 1-PCV-65-81/1-PCV-65-86 Bkr 38 OFF 1-BKR-235-2/38 STANDARD: Performer contacts an AUO and requests performance of Step
: 5.  **CUE: When asked as the AUO, stat e"1-BKR-235-2/38 is in the OFF position".
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 14: [STEP 6] PERFORM the following:
NOMENCLATURE LOCATION POSITION UNID EGTS FAN A & DISCHG DMPR 0-M-27B A AUTO 0-HS-65-23A EGTS FAN B & DISCHG DMPR 0-M-27B A AUTO 0-HS-65-42A STANDARD: Performer locates 0-HS-65-23A and ensures in A-AUTO. Performer locates 0-HS-65-42A and ensures in A-AUTO.
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 88 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 15: [STEP 7] OPEN the following valves, and PLACE the handswitches in A AUTO:
CRITICAL STEP NOMENCLATURE LOCATION POSITION UNID U1 ANN VAC FANS SUCT 0-M-27B OPEN, HS in A AUTO 0-HS-65-52 U1 ANN VAC FANS SUCT 0-M-27B OPEN, HS in A AUTO 0-HS-65-53 STANDARD: Performer locates 0-HS-65-52 and ensures OPEN and in A-AUTO. Performer locates 0-HS-65-53 and ensures OPEN and in A-AUTO. Step is critical to est ablishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.  
 
COMMENTS:  
 
___ SAT
 
___ UNSAT
 
NOTES 1) The following step may be N/A'd if annulus vacuum fans are running. 2) If a phase A signal has been present, the next step may start one Ann Vac Fan due to low flow. Either fan may be selected first. Flow should be allowed to stabilize before the second fan is placed in auto to avoid two fans running. SOI-65.01 Section 5.0 should be referenced to ensure proper damper alignment and control after fan start
 
REV. 0 PAGE 89 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 16: [STEP 8] PLACE the following handswitches in STOP to break seal-in, AND RETURN to A-P AUTO:
NOMENCLATURE LOCATION POSITION UNID ANN VAC FAN 1A & SUCT FCO 0-M-27B A P AUTO 1-HS-65-77A ANN VAC FAN 1B & SUCT FCO 0-M-27B A P AUTO 1-HS-65-74A STANDARD: Performer verifies that annulus vacuum fans are running and N/As the step.
 
COMMENTS: 
 
___ SAT
 
___ UNSAT
 
STEP 17: [STEP 9] IF an accident signal (A) has occurred and WHEN Annulus P is greater than 4.0 in. H2O, THEN: (N/A if TACF 1-07-0002-065 is in effect.) PERFORM the following
:    NOMENCLATURE LOCATION POSITION UNID PCV-65-81 and PCV-65-86, EGTS CNTMT ANNULUS DP
 
RESET A5W/737, 1-JB -292-4013-A, N. of GFFD Rm. RESET 1-HS-65-80 and 1-HS-65-90 PCV-65-83 and PCV-65-87, EGTS CNTMT ANNULUS DP RESET  A4V/737, 1-JB-292-4015-B, S. of GFFD Rm. RESET 1-HS-65-82 and 1-HS-65-97 STANDARD: Performer determines that no accident signal was present and N/As the step COMMENTS: 
 
___ SAT
 
___ UNSAT
 
CAUTION PDIC-65-80 & 82 Setpoint Thumbwheels are adjusted by MIG only.
 
REV. 0 PAGE 90 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 18: [STEP 10] ENSURE the following controllers in AUTO:  CRITICAL STEP  NOMENCLATURE LOCATION POSITION UNID EGTS-ANN P CONTROL 0-M-27B AUTO 1-PDIC-65-82 EGTS-ANN P CONTROL 0-M-27B AUTO 1-PDIC 80 STANDARD: Performer locates 1-PDIC-65-82 and ensures controller is in AUTO    Performer locates 1-PDIC 80 and ensures controller is in AUTO    Step is critical to establish EGTS standby alignment.


COMMENTS:  
REV. 0                                                      PAGE 89 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 16:      [STEP 8] PLACE the following handswitches in STOP to break seal-in, AND RETURN to A-P AUTO:
NOMENCLATURE              LOCATION        POSITION          UNID ANN VAC FAN 1A & SUCT FCO      0-M-27B        A P AUTO      1-HS-65-77A ANN VAC FAN 1B & SUCT FCO      0-M-27B        A P AUTO      1-HS-65-74A STANDARD: Performer verifies that annulus vacuum fans are running and        ___ SAT N/As the step.
COMMENTS:                                                                    ___ UNSAT STEP 17:      [STEP 9] IF an accident signal (A) has occurred and WHEN Annulus P is greater than 4.0 in. H2O, THEN: (N/A if TACF 1-07-0002-065 is in effect.) PERFORM the following:
NOMENCLATURE              LOCATION          POSITION          UNID PCV-65-81 and PCV-65-86,    A5W/737, 1-JB -292-    RESET      1-HS-65-80 and EGTS CNTMT ANNULUS DP      4013-A, N. of GFFD                  1-HS-65-90 RESET                              Rm.
PCV-65-83 and PCV-65-87,    A4V/737, 1-JB-292-      RESET      1-HS-65-82 and EGTS CNTMT ANNULUS DP      4015-B, S. of GFFD                  1-HS-65-97 RESET                              Rm.
STANDARD: Performer determines that no accident signal was present and        ___ SAT N/As the step COMMENTS:
___ UNSAT CAUTION PDIC-65-80 & 82 Setpoint Thumbwheels are adjusted by MIG only.


___ SAT
REV. 0                                                     PAGE 90 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 18:   [STEP 10] ENSURE the following controllers in AUTO:         CRITICAL STEP NOMENCLATURE           LOCATION           POSITION           UNID EGTS-ANN P              0-M-27B           AUTO         1-PDIC-65-82 CONTROL EGTS-ANN P              0-M-27B           AUTO         1-PDIC 80 CONTROL STANDARD: Performer locates 1-PDIC-65-82 and ensures controller is in   ___ SAT AUTO Performer locates 1-PDIC 80 and ensures controller is in AUTO Step is critical to establish EGTS standby alignment.       ___ UNSAT COMMENTS:
 
___ UNSAT
 
REV. 0 PAGE 91 OF 128 WATTS BAR NUCLEAR PLANT B.1.h   STEP 19: [STEP 11] ENSURE the following:
NOMENCLATURE LOCATION POSITION UNID EGTS TR A DECAY COOLING 0-M-27B CLOSE 0-HS-65-28B EGTS TR A DECAY COOLING 0-M-27B CLOSE 0-HS-65-28A EGTS TR B DECAY COOLING 0-M-27B CLOSE 0-HS-65-47A EGTS TR B DECAY COOLING 0-M-27B CLOSE 0-HS-65-47B STANDARD:
Performer locates 0-HS-65-28B and ensures that it is CLOSED. Performer locates 0-HS-65-28A and ensures that it is CLOSED. Performer locates 0-HS-65-47A and ensures that it is CLOSED. Performer locates 0-HS-65-47B and ensures that it is CLOSED. COMMENTS: 
 
___ SAT
 
___ UNSAT
 
REV. 0 PAGE 92 OF 128 WATTS BAR NUCLEAR PLANT B.1.h  STEP 20: [STEP 12] PERFORM the following: CRITICAL STEP NOMENCLATURE LOCATION POSITION UNID EGTS TR-A U1 SUCT DMPR 0-M-27B A AUTO 1-HS-65-10 EGTS TR-A U1 SUCT DMPR 0-M-27B CLOSE 1-HS-65-8 EGTS FAN B U1 SUCT DMPR 0-M-27B CLOSE 1-HS-65-51 EGTS TR-B U1 SUCT DMPR 0-M-27B A AUTO 1-HS-65-30 EGTS TO U1 SHIELD BLDG 0-M-27B A AUTO 1-HS-65-26 EGTS TO U1 SHIELD BLDG 0-M-27B A AUTO 1-HS-65-27 STANDARD:
Performer locates 1-HS-65-10 and ensures that it is in A-AUTO. Performer locates 1-HS-65-8 and ensures that it is CLOSED.
Performer locates 1-HS-65-51 and ensures that it is CLOSED.
Performer locates 1-HS-65-30 and ensures that it is in A-AUTO. Performer locates 1-HS-65-26 and ensures that it is in A-AUTO. Performer locates 1-HS-65-27 and ensures that it is in A-AUTO. Step is critical to establish EGTS standby alignment.  


REV. 0                                                    PAGE 91 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 19:    [STEP 11] ENSURE the following:
NOMENCLATURE            LOCATION    POSITION              UNID EGTS TR A DECAY                0-M-27B      CLOSE          0-HS-65-28B COOLING EGTS TR A DECAY                0-M-27B      CLOSE          0-HS-65-28A COOLING EGTS TR B DECAY                0-M-27B      CLOSE          0-HS-65-47A COOLING EGTS TR B DECAY                0-M-27B      CLOSE          0-HS-65-47B COOLING STANDARD:                                                                ___ SAT Performer locates 0-HS-65-28B and ensures that it is CLOSED.
Performer locates 0-HS-65-28A and ensures that it is      ___ UNSAT CLOSED.
Performer locates 0-HS-65-47A and ensures that it is CLOSED.
Performer locates 0-HS-65-47B and ensures that it is CLOSED.
COMMENTS:
COMMENTS:
___ SAT
___ UNSAT
STEP 21: Notify the Unit Supervisor that "A" Train EGTS Fan is shutdown and realigned for standby readiness.
STANDARD: Performer notifies the Unit Supervisor that "A" Train EGTS Fan is shutdown and realigned for standby readiness.


REV. 0                                                      PAGE 92 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 20:      [STEP 12] PERFORM the following:                              CRITICAL STEP NOMENCLATURE                LOCATION      POSITION          UNID EGTS TR-A U1 SUCT                0-M-27B        A AUTO        1-HS-65-10 DMPR EGTS TR-A U1 SUCT                0-M-27B        CLOSE          1-HS-65-8 DMPR EGTS FAN B U1                    0-M-27B        CLOSE        1-HS-65-51 SUCT DMPR EGTS TR-B U1 SUCT                0-M-27B        A AUTO        1-HS-65-30 DMPR EGTS TO U1 SHIELD                0-M-27B        A AUTO        1-HS-65-26 BLDG EGTS TO U1 SHIELD                0-M-27B        A AUTO        1-HS-65-27 BLDG STANDARD:
___ SAT Performer locates 1-HS-65-10 and ensures that it is in A-AUTO.
Performer locates 1-HS-65-8 and ensures that it is CLOSED.
Performer locates 1-HS-65-51 and ensures that it is CLOSED. ___ UNSAT Performer locates 1-HS-65-30 and ensures that it is in A-AUTO.
Performer locates 1-HS-65-26 and ensures that it is in A-AUTO.
Performer locates 1-HS-65-27 and ensures that it is in A-AUTO.
Step is critical to establish EGTS standby alignment.
COMMENTS:
COMMENTS:
END OF TASK
STEP 21:      Notify the Unit Supervisor that A Train EGTS Fan is shutdown  ___ SAT and realigned for standby readiness.
___ SAT  
STANDARD: Performer notifies the Unit Supervisor that A Train EGTS Fan is shutdown and realigned for standby readiness.              ___ UNSAT COMMENTS:
 
END OF TASK TIME STOP: ________
___ UNSAT  
 
TIME STOP: ________
REV. 0      PAGE 93 0F 128 WATTS BAR NUCLEAR PLANT B.1.i  APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 0                                                                          PAGE 93 0F 128 WATTS BAR NUCLEAR PLANT B.1.i APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is at 100% power.  
: 1. Unit 1 is at 100% power.
: 2. 0-SI-65-6-A "Emergency Gas Treatment System Train A 10-Hour Operation" performance in progress.  
: 2. 0-SI-65-6-A Emergency Gas Treatment System Train A 10-Hour Operation performance in progress.
: 3. "A" Train EGTS Fan has been in service for 10 hours.  
: 3. A Train EGTS Fan has been in service for 10 hours.
: 4. You are a support operator in the control room.  
: 4. You are a support operator in the control room.
 
INITIATING CUES:
INITIATING CUES:
: 1. The Unit Supervisor directs you shutdown the "A" Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.  
: 1. The Unit Supervisor directs you shutdown the A Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.
: 2. You are to notify Unit Supervisor when you have completed the task.  
: 2. You are to notify Unit Supervisor when you have completed the task.


REV. 0     PAGE 94 0F 128 WATTS BAR NUCLEAR PLANT B.1.i    
REV. 0                                         PAGE 94 0F 128 WATTS BAR NUCLEAR PLANT B.1.i B.1.j Perform a boration of the RCS (LOCALLY) per AOI-34


B.1.j Perform a boration of the RCS (LOCALLY) per AOI-34  
REV. 0                                                                                PAGE 95 0F 128 WATTS BAR NUCLEAR PLANT B.1.i Task: Perform a Boration of the RCS (LOCALLY) per AOI-34 Alternate Path:  1-FCV-62-138 will not open locally, requiring manual valve 1-ISV-62-929 to be opened locally. This also requires use of control room flow indication, since the indication of flow via this path is not available locally.
Facility JPM #:  3-OT-JPMA020B Rev 4.
K/A Rating(s):  024AA1.04                    [3.6/3.7]      024AK3.01 [4.1/4.4]
024AA1.18                    [3.7/3.6]      024AA1.20 [3.2/3.3]
Task Standard:    Boration flow has been established on 1-FI-62-139 after opening 1-ISV-62-929 locally.
Preferred Evaluation Location:                              Preferred Evaluation Method:
Simulator __ __  In-Plant __ X__                          Perform ______      Simulate __X__


REV. 0      PAGE 95 0F 128 WATTS BAR NUCLEAR PLANT B.1.i    Task: Perform a Boration of the RCS (LOCALLY) per AOI-34 Alternate Path:
==References:==
1-FCV-62-138 will not open locally, requiring manual valve 1-ISV-62-929 to be opened locally. This also requires use of control room flow indication, since the indication of flow via this path is not available locally.
AOI-34, IMMEDIATE BORATION, Rev. 23.
Facility JPM #: 3-OT-JPMA020B Rev 4.
Task Number:   AUO-062-AOI-27-001                   APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 6, 8, 9, 10 Validation Time: 17 min. Time Critical: No
K/A Rating(s):
024AA1.04 [3.6/3.7] 024AK3.01 [4.1/4.4]    024AA1.18 [3.7/3.6] 024AA1.20 [3.2/3.3]
Task Standard: Boration flow has been established on 1-FI-62-139 after opening 1-ISV-62-929 locally. Preferred Evaluation Location:    Preferred Evaluation Method:
Simulator __ __    In-Plant __ X__  Perform ______    Simulate __X__
References
: AOI-34, "IMMEDIATE BORATION", Rev. 23.
Task Number: AUO-062-AOI-27-001 APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 6, 8, 9, 10 Validation Time:   17 min.
Time Critical:
No ===========================================================================
Candidate: ___________________________ _________________ Time Start:    ________
NAME SSN/EINTime Finish:  ________
Performance Rating:  SAT ____  UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________  NAME  SIGNATURE DATE
===========================================================================
===========================================================================
COMMENTS REV. 0     PAGE 96 0F 128 WATTS BAR NUCLEAR PLANT B.1.i REV. 0     PAGE 97 0F 128 WATTS BAR NUCLEAR PLANT B.1.i   Tools/Equipment/Procedures Needed:
Candidate:    ___________________________            _________________        Time Start: ________
NAME                              SSN/EIN        Time Finish: ________
Performance Rating: SAT ____ UNSAT ____                                        Performance Time ___
Examiner: _____________________________              _____________________________/________
NAME                                    SIGNATURE                  DATE
===========================================================================
COMMENTS
 
REV. 0                         PAGE 96 0F 128 WATTS BAR NUCLEAR PLANT B.1.i
 
REV. 0                                                                   PAGE 97 0F 128 WATTS BAR NUCLEAR PLANT B.1.i Tools/Equipment/Procedures Needed:
Hard Hat, Gloves, Safety Glasses, Hearing Protection, and Plant Approved Shoes.
Hard Hat, Gloves, Safety Glasses, Hearing Protection, and Plant Approved Shoes.
Procedure AOI-34, "Immediate Boration".
Procedure AOI-34, Immediate Boration.
ALARA considerations NOTE: Start this JPM at the RAD WASTE DESK.
ALARA considerations NOTE:       Start this JPM at the RAD WASTE DESK.
REV. 0      PAGE 98 0F 128 WATTS BAR NUCLEAR PLANT B.1.i    READ TO OPERATOR
 
DIRECTION TO TRAINEE:


REV. 0                                                                          PAGE 98 0F 128 WATTS BAR NUCLEAR PLANT B.1.i READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547
INITIAL CONDITIONS:
°F. 2. The normal makeup controls did not function correctly to establish boric acid flow. 3. Both Boric Acid pumps are operating in FAST speed.  
: 1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547°F.
: 2. The normal makeup controls did not function correctly to establish boric acid flow.
: 3. Both Boric Acid pumps are operating in FAST speed.
: 4. 1-FCV-62-138 did not open from the Main Control Room.
: 4. 1-FCV-62-138 did not open from the Main Control Room.
INITIATING CUES:
INITIATING CUES:
: 1. You have been assigned to perform AOI-34, Step 6 actions to locally establish boric acid flow.  
: 1. You have been assigned to perform AOI-34, Step 6 actions to locally establish boric acid flow.
: 2. You are to notify the MCR operator when you have established boric acid flow.  
: 2. You are to notify the MCR operator when you have established boric acid flow.


REV. 3     PAGE 99 0F 13 WATTS BAR NUCLEAR PLANT B.1.i   START TIME: _______
REV. 3                                                                 PAGE 99 0F 13 WATTS BAR NUCLEAR PLANT B.1.i START TIME: _______
STEP 1: Obtain a copy of the appropriate instruction.  
STEP 1:     Obtain a copy of the appropriate instruction.
 
___ SAT STANDARD:
STANDARD:   EXAMINER'S CUE: After the method of obtaining an instruction properly has been demonstrated, the evaluator provides a copy of the instruction.  
EXAMINERS CUE: After the method of obtaining an instruction properly has been demonstrated, the evaluator           ___ UNSAT provides a copy of the instruction.
 
COMMENTS:
COMMENTS:  
STEP 2:   [STEP 6.b. RNO] Locally ADJUST 1-FCV-62-138 to obtain               CRITICAL required flow.                                                       STEP STANDARD: 1-FCV-138-B, EMERGENCY BORATION FLOW CONTROL, is located. The manual lever is pushed to the manual position (in   ___ SAT direction of arrow) and the performer opens the valve by turning the hand wheel in the counter-clockwise direction.
 
___ SAT
 
___ UNSAT STEP 2: [STEP 6.b. RNO] Locally ADJUST 1-FCV-62-138 to obtain required flow.
 
STANDARD: 1-FCV-138-B, EMERGENCY BORATION FLOW CONTROL, is located. The manual lever is pushed to the manual position (in direction of arrow) and the performer opens the valve by turning the hand wheel in the counter-clockwise direction.
Step is critical to establish flow path.
Step is critical to establish flow path.
CUE: After performer indicates how to open the valve state "the motor operator hand wheel will NOT rotate."
___ UNSAT CUE:     After performer indicates how to open the valve state the motor operator hand wheel will NOT rotate.
COMMENTS:


COMMENTS:   
REV. 3                                                                  PAGE 100 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 3:      [STEP 6.c.] CHECK emergency borate flow on 1-FI-62-137A.        CRITICAL STEP STANDARD: 1-FI-62-137A.has been located and checked and                      ___ SAT determination made that no flow has been established. Entry into c. RNO is therefore required. Step is critical to evaluating whether a flow path has been established.
___ UNSAT CUE:      When performer checks FI-62-137A, state the indicator reads 0.
COMMENTS:
NoteThe following step is required since valve could not be operated electrically STEP 4:        [STEP 6c. RNO] Locally OPEN manual boration valve 1-ISV-      CRITICAL 62-929      [Blender Station/713].                              STEP STANDARD: 1-ISV-62-929 is opened by turning the hand wheel in the counter-clockwise direction. Step is critical because it      ___ SAT initiates boration flow.
CUE:      After performer indicates how to open the valve, state, the hand wheel was rotated many turns in the counter-      ___ UNSAT clockwise direction and has stopped.
COMMENTS:


CRITICAL STEP 
REV. 3                                                             PAGE 101 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 5:   [STEP 6.c. RNO continued] ENSURE BA flow control 1-FCV-         CRITICAL 62-140 OPEN.                                                     STEP STANDARD: Performer observes 1-FCV-62-140 and determines that the       ___ SAT valve is OPEN. Step is critical because 1-FCV-62-140 is in series with 1-ISV-62-929 and must be in the OPEN position in order to establish boration flow.
 
___ UNSAT COMMENTS:
___ SAT
STEP 6:   [STEP c. RNO continued] ENSURE BA to Blender, 1-FI          139, indicating flow.
 
___ SAT STANDARD: Performer contacts the MCR to determine if flow is indicated on 1-FI-62-139.
___ UNSAT REV. 3      PAGE  100  0F 13  WATTS BAR NUCLEAR PLANT B.1.i    STEP 3: [STEP 6.c.]
___ UNSAT CUE:  When MCR is contacted, state1-FI-62-139 is indicating 40 gpm.
CHECK emergency borate flow on 1-FI-62-137A.
COMMENTS:
STANDARD: 1-FI-62-137A.has been located and checked and determination made that no flow has been established. Entry into c. RNO is therefore required. Step is critical to evaluating whether a flow path has been established.
CUE: When performer checks FI-62-137A, state "the indicator reads "0".
COMMENTS: 
 
CRITICAL STEP
___ SAT
 
___ UNSAT
 
Note: The following step is required since valve could not be operated electrically STEP 4: [STEP 6c. RNO] Locally OPEN manual boration valve 1-ISV-62-929  [Blender Station/713].
 
STANDARD: 1-ISV-62-929 is opened by turning the hand wheel in the counter-clockwise direction. Step is critical because it initiates boration flow.
CUE: After performer indicates how to open the valve, state, "the hand wheel was rotated many turns in the counter-clockwise direction and has stopped."
 
COMMENTS: 
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT REV. 3     PAGE 101 0F 13 WATTS BAR NUCLEAR PLANT B.1.i   STEP 5: [STEP 6.c. RNO continued]
ENSURE BA flow control 1-FCV-62-140 OPEN.  
 
STANDARD: Performer observes 1-FCV-62-140 and determines that the valve is OPEN. Step is critical because 1-FCV-62-140 is in series with 1-ISV-62-929 and must be in the OPEN position in order to establish boration flow.
 
COMMENTS:
 
CRITICAL STEP 
 
___ SAT
 
___ UNSAT STEP 6: [STEP c. RNO continued] ENSURE BA to Blender, 1-FI-62-139, indicating flow.  


STANDARD: Performer contacts the MCR to determine if flow is indicated on 1-FI-62-139.
REV. 3                                                           PAGE 102 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 15:   [7] IF emergency boration flow established, THEN GO TO Step 9.
CUE: When MCR is contacted, state"1-FI-62-139 is indicating 40 gpm".
STANDARD: Performer contacts MCR and reports that emergency boration flow has been established.                                 ___ SAT CUE:   Acknowledge report as MCR operator using repeat back.
COMMENTS: 
COMMENTS:                                                             ___ UNSAT END OF TASK TIME STOP: ________
 
___ SAT
 
___ UNSAT REV. 3     PAGE 102 0F 13 WATTS BAR NUCLEAR PLANT B.1.i   STEP 15: [7] IF emergency boration flow established , THEN GO TO Step 9.
STANDARD: Performer contacts MCR and reports that emergency boration flow has been established.
CUE: Acknowledge report as MCR operator using repeat back.
COMMENTS:
 
END OF TASK
 
___ SAT
 
___ UNSAT TIME STOP: ________
REV. 0  PAGE  103  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 0                                                                        PAGE 103 0F 15 WATTS BAR NUCLEAR PLANT B.1.j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.
I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. INITIAL CONDITIONS:
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
: 1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547
INITIAL CONDITIONS:
°F. 2. The normal makeup controls did not function correctly to establish boric acid flow. 3. Both Boric Acid pumps are operating in FAST speed.  
: 1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547°F.
: 4. 1-FCV-62-138 did not open from the Main Control Room. INITIATING CUES:
: 2. The normal makeup controls did not function correctly to establish boric acid flow.
: 1. You have been assigned perform AOI-34, Step 6.b RNO actions to locally establish boric acid flow.  
: 3. Both Boric Acid pumps are operating in FAST speed.
: 2. You are to notify the MCR operator when you have established boric acid flow.  
: 4. 1-FCV-62-138 did not open from the Main Control Room.
INITIATING CUES:
: 1. You have been assigned perform AOI-34, Step 6.b RNO actions to locally establish boric acid flow.
: 2. You are to notify the MCR operator when you have established boric acid flow.


REV. 0 PAGE 104 0F 15 WATTS BAR NUCLEAR PLANT B.1.j  
REV. 0                                         PAGE 104 0F 15 WATTS BAR NUCLEAR PLANT B.1.j B.1.j Perform E-3, Attachment 3, Steamline Isolation (Local)


B.1.j Perform E-3, Attachment 3, Steamline Isolation (Local)  
REV. 0                                                                        PAGE 105 0F 15 WATTS BAR NUCLEAR PLANT B.1.j Task:        Perform E-3, Attachment 3, Steamline Isolation (Local)
Alternate Path:  N/A Facility JPM #:  3-OT-JPMA054 Rev 3 K/A Rating(s):  038 EA1.32 [4.6/4.7]              2.1.30 [3.9/3.4]
Task Standard:    All nine steam line traps have been located. One steam trap has been isolated (all others are isolated the same way). Main steam supplies to each MFP turbine have been located and isolated.
Preferred Evaluation Location:                            Preferred Evaluation Method:
Simulator __ __  In-Plant __ X__                        Perform ______  Simulate __X__


REV. 0  PAGE  105  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  Task:  Perform E-3, Attachment 3, Steamline Isolation (Local)
==References:==
Alternate Path:
E-3, Steam Generator Tube Rupture, Rev. 22 Task Number:   RO-113-EOP-3-001                   APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 5.6 Validation Time: 20 min. Time Critical: No
N/A  Facility JPM #: 3-OT-JPMA054 Rev 3 K/A Rating(s):
===========================================================================
038 EA1.32 [4.6/4.7]  2.1.30 [3.9/3.4]
Candidate:   ___________________________         _________________     Time Start: ________
Task Standard: All nine steam line traps have been located. One steam trap has been isolated (all others are isolated the same way). Main steam supplies to each MFP turbine have been located and isolated.
NAME                           SSN/EIN    Time Finish: ________
Preferred Evaluation Location:    Preferred Evaluation Method:
Performance Rating: SAT ____ UNSAT ____                                   Performance Time ___
Simulator __ __    In-Plant __ X__  Perform ______    Simulate __X__
Examiner: _____________________________           _____________________________/________
References
NAME                                   SIGNATURE               DATE
: E-3, Steam Generator Tube Rupture, Rev. 22 Task Number: RO-113-EOP-3-001 APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 5.6 Validation Time:   20 min.
Time Critical: No ===========================================================================
Candidate: ___________________________ _________________ Time Start:   ________
NAME SSN/EINTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================
===========================================================================
COMMENTS REV. 0  PAGE  106  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  Tools/Equipment/Procedures Needed:
COMMENTS
 
Hard Hat, Safety Glasses, Flashlight, Hearing Protection, Gloves, and Plant Approved Shoes.
 
E-3, Attachment 3.


REV. 0                                                                    PAGE 106 0F 15 WATTS BAR NUCLEAR PLANT B.1.j Tools/Equipment/Procedures Needed:
Hard Hat, Safety Glasses, Flashlight, Hearing Protection, Gloves, and Plant Approved Shoes.
E-3, Attachment 3.
SAFETY Considerations:
SAFETY Considerations:
High Temperature Pipes, Ladder Safety, ALARA considerations.  
High Temperature Pipes, Ladder Safety, ALARA considerations.
 
NOTE:       Start this JPM in the MCR.
NOTE: Start this JPM in the MCR.  
EVALUATOR NOTE: Provide copy of E-3, Attachment 3, Steamline Isolation (Local) to performer with candidates cue sheet.
 
EVALUATOR NOTE: Provide copy of E-3, Attachment 3, "Steamline Isolation (Local)" to performer with candidate's cue sheet.  
 
REV. 0  PAGE  107  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  READ TO OPERATOR
 
DIRECTION TO TRAINEE:


REV. 0                                                                        PAGE 107 0F 15 WATTS BAR NUCLEAR PLANT B.1.j READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is in Mode 3 after a Steam Generator tube rupture on S/G # 2.  
: 1. Unit 1 is in Mode 3 after a Steam Generator tube rupture on S/G # 2.
: 2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.  
: 2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.
: 3. Main Steam line warming is NOT in progress.  
: 3. Main Steam line warming is NOT in progress.
 
INITIATING CUES:
INITIATING CUES:
: 1. The MCR operator has directed you to locally isolate the steam traps and Main Feed Pump Turbine on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local).  
: 1. The MCR operator has directed you to locally isolate the steam traps and Main Feed Pump Turbine on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local).
: 2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.  
: 2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.


REV. 0 PAGE 108 0F 15 WATTS BAR NUCLEAR PLANT B.1.j   START TIME: _______  
REV. 0                                                               PAGE 108 0F 15 WATTS BAR NUCLEAR PLANT B.1.j START TIME: _______
STEP 1:      Obtain a copy of the procedure.
STANDARD: A copy of E-3, Attachment 3, Steamline Isolation (Local) is        ___SAT obtained.
EXAMINERS CUE: Provide E-3, Attachment 3,Steamline Isolation (Local) to the performer.                                ___UNSAT COMMENTS:
STEP 2:      [Step 1] COORDINATE steam trap isolation with RADPROT.
STANDARD: The performer contacts RADCON.
___SAT CUE: As RADCON when contacted, state that survey of steam lines has been made and is continuing periodically.
___UNSAT COMMENTS:
EXAMINER NOTE:
the performer must locate all nine steam traps and demonstrate how to isolate one of them.
The performer may use a flashlight to point out the hard to reach moisture traps.
The performer must locate an EOP ladder for use in operating valves, located in hard to reach locations


STEP 1: Obtain a copy of the procedure.  
REV. 0                                                                  PAGE 109 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 3: [STEP 2] CLOSE at least one valve listed for each steam moisture          CRITICAL trap manifold:                                                    STEP
[MAIN STEAM LINES]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 200            1-ISV-1-916        OR      1-ISV-1-922        [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-200 can be accomplished by either closing 1-ISV-1-916 or closing 1-ISV    ___SAT 922. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state        ___UNSAT the hand wheel turns a few rotations and gets snug.
COMMENTS:


___SAT  
REV. 0                                                                  PAGE 110 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 4:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
[MAIN STEAM LINES]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 201          1-ISV-1-926        OR      1-ISV-1-932        [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-201 can be        ___SAT accomplished by either closing 1-ISV-1-926 or closing 1-ISV              932. (Rotating hand wheel clockwise) Step is critical to isolate flow path.
___UNSAT CUE: After the performer has demonstrated how to close the valve, state the hand wheel turns a few rotations and gets snug.
COMMENTS:
STEP 5:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
[MAIN STEAM LINES]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 202          1-ISV-1-936        OR      1-ISV-1-942        [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-202 can be        ___SAT accomplished by either closing 1-ISV-1-936 or closing 1-ISV              942. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
___UNSAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug.
COMMENTS:


___UNSAT  STANDARD: A copy of E-3, Attachment 3, Steamline Isolation (Local) is obtained.
REV. 0                                                                    PAGE 111 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 6:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
EXAMINER'S CUE: Provide E-3, Attachment 3,"Steamline Isolation (Local)" to the performer.
[MAIN STEAM LINES]
COMMENTS:  
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 203          1-ISV-1-946        OR      1-ISV-1-952        [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-203 can be accomplished by either closing 1-ISV-1-946 or closing 1-ISV    ___SAT 952. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state          ___UNSAT that the hand wheel turns a few rotations and gets snug.
COMMENTS:
STEP 7:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
[COMMON STEAM HEADER]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 204          1-ISV-1-956        OR      1-ISV-1-962        [T4J/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-204 can be        ___SAT accomplished by either closing 1-ISV-1-956 or closing 1-ISV              962. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
___UNSAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug.
COMMENTS:


STEP 2: [Step 1]   COORDINATE steam trap isolation with RADPROT.  
REV. 0                                                                  PAGE 112 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 8:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                   STEP
[COMMON STEAM HEADER]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 206          1-ISV-1-966        OR      1-ISV-1-972        [T6J/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-206 can be accomplished by either closing 1-ISV-1-966 or closing 1-ISV              972. (Rotating hand wheel clockwise). Step is critical to        ___SAT isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug.                      ___UNSAT COMMENTS:
STEP 9:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
[STEAM DUMP HEADER]
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 207          1-ISV-1-976        OR      1-ISV-1-982        [T7H/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-207 can be accomplished by either closing 1-ISV-1-976 or closing 1-ISV    ___SAT 982. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state        ___UNSAT that the hand wheel turns a few rotations and gets snug.
COMMENTS:


___SAT
REV. 0                                                                   PAGE 113 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 10:     [STEP 2 continued]         CLOSE at least one valve listed for     CRITICAL each steam moisture trap manifold:                                   STEP
 
[STEAM DUMP HEADER]
___UNSAT STANDARD: The performer contacts RADCON.
MSTR TRAP LEVEL           MSTR TRAP ###           MSTR TRAP DRAIN        LOCATION SWITCH ###           STR ISOL                   ISOL 208          1-ISV-1-986        OR      1-ISV-1-992        [T7G/708]
CUE: As RADCON when contacted, state "that survey of steam lines has been made and is continuing periodically".
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-208 can be accomplished by either closing 1-ISV-1-986 or closing 1-ISV   ___SAT 992. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
COMMENTS: 
CUE: After the performer has demonstrated how to close the valve, state         ___UNSAT that the hand wheel turns a few rotations and gets snug.
 
COMMENTS:
EXAMINER NOTE:  the performer must locate all nine steam traps and demonstrate how to isolate one of them.
The performer may use a flashlight to point out the hard to reach moisture traps.
 
The performer must locate an "EOP ladder" for use in operating valves, located in hard to reach locations
 
REV. 0 PAGE 109  0F 15 WATTS BAR NUCLEAR PLANT B.1.j   STEP 3: [STEP 2] CLOSE at least one valve listed for each steam moisture trap manifold: [MAIN STEAM LINES]
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL MSTR TRAP DRAIN ISOL LOCATION  200 1-ISV-1-916 OR1-ISV-1-922 [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-200 can be accomplished by either closing 1-ISV-1-916 or closing 1-ISV-1-922. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state "the hand wheel turns a few rotations and gets snug".
 
___SAT
 
___UNSAT  COMMENTS:  
 
REV. 0  PAGE  110  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  STEP 4: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [MAIN STEAM LINES] CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  201 1-ISV-1-926 OR1-ISV-1-932 [T1M/708] 


___SAT
REV. 0                                                                    PAGE 114 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 11:      [STEP 2 continued]        CLOSE at least one valve listed for      CRITICAL each steam moisture trap manifold:                                    STEP
 
[STEAM DUMP HEADER]
___UNSAT STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-201 can be accomplished by either closing 1-ISV-1-926 or closing 1-ISV-1-932. (Rotating hand wheel clockwise) Step is critical to isolate flow path.
MSTR TRAP LEVEL          MSTR TRAP ###          MSTR TRAP DRAIN        LOCATION SWITCH ###            STR ISOL                  ISOL 209          1-ISV-1-996        OR      1-ISV-1-1002        [T7F/708]
CUE: After the performer has demonstrated how to close the valve, state " the hand wheel turns a few rotations and gets snug".
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-209 can be accomplished by either closing 1-ISV-1-996 or closing 1-ISV     ___SAT 1002. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state         ___UNSAT that the hand wheel turns a few rotations and gets snug.
COMMENTS:
COMMENTS:
STEP 5: [STEP 2 continued]
STEP 12:     [STEP 3] CLOSE steam supply isolation and bypass for                 CRITICAL each Main Feed Pump Turbine:                                           STEP MFPT     NOMENCLATURE             LOCATION       POSITION         UNID 1A     MFPT 1A HP STEAM           T2J/729       CLOSED       1-ISV-1-611 SUPPLY ISOL STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.
CLOSE at least one valve listed for each steam moisture trap manifold: [MAIN STEAM LINES]
___SAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations and gets snug.
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
___UNSAT COMMENTS:
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  202 1-ISV-1-936 OR1-ISV-1-942 [T1M/708] 
 
___SAT
 
___UNSAT STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-202 can be accomplished by either closing 1-ISV-1-936 or closing 1-ISV-1-942. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
COMMENTS: 
 
REV. 0  PAGE  111  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  STEP 6: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [MAIN STEAM LINES] CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  203 1-ISV-1-946 OR1-ISV-1-952 [T1M/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-203 can be accomplished by either closing 1-ISV-1-946 or closing 1-ISV-1-952. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
STEP 7: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [COMMON STEAM HEADER]
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  204 1-ISV-1-956 OR1-ISV-1-962 [T4J/708] 
 
___SAT
 
___UNSAT STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-204 can be accomplished by either closing 1-ISV-1-956 or closing 1-ISV-1-962. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
COMMENTS: 
 
REV. 0  PAGE  112  0F 15 WATTS BAR NUCLEAR PLANT B.1.j    STEP 8: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [COMMON STEAM HEADER]
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  206 1-ISV-1-966 OR1-ISV-1-972 [T6J/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-206 can be accomplished by either closing 1-ISV-1-966 or closing 1-ISV-1-972. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
STEP 9: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [STEAM DUMP HEADER]
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  207 1-ISV-1-976 OR1-ISV-1-982 [T7H/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-207 can be accomplished by either closing 1-ISV-1-976 or closing 1-ISV-1-982. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
REV. 0  PAGE  113  0F 15 WATTS BAR NUCLEAR PLANT B.1.j  STEP 10: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [STEAM DUMP HEADER] CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  208 1-ISV-1-986 OR1-ISV-1-992 [T7G/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-208 can be accomplished by either closing 1-ISV-1-986 or closing 1-ISV-1-992.  (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
REV. 0  PAGE  114  0F 15 WATTS BAR NUCLEAR PLANT B.1.j    STEP 11: [STEP 2 continued]
CLOSE at least one valve listed for each steam moisture trap manifold: [STEAM DUMP HEADER]
CRITICAL STEP  MSTR TRAP LEVEL SWITCH ###
MSTR TRAP ### STR ISOL  MSTR TRAP DRAIN ISOL  LOCATION  209 1-ISV-1-996 OR1-ISV-1-1002 [T7F/708]
STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-209 can be accomplished by either closing 1-ISV-1-996 or closing 1-ISV-1-1002. (Rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
STEP 12: [STEP 3] CLOSE steam supply isolation and bypass for each Main Feed Pump Turbine:
CRITICAL STEP MFPT NOMENCLATURE LOCATION POSITION UNID 1A MFPT 1A HP STEAM SUPPLY ISOL T2J/729 CLOSED 1-ISV-1-611 STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.
CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations a nd gets snug".
 
___SAT
 
___UNSAT  COMMENTS: 
 
REV. 0  PAGE  115  0F 15 WATTS BAR NUCLEAR PLANT B.1.j    STEP 13: [STEP 3 continued]
CLOSE steam supply isolation and bypass for each Main Feed Pump Turbine:
MFPT NOMENCLATURE LOCATION POSITION UNID 1A MFPT 1A HP STEAM SUPPLY ISOL BYPASS T2J/729 CLOSED 1-IBV-1-613 STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).
CUE: After the performer has demonstrated how to close the valve, state "the hand wheel does not move with clockwise force on hand wheel".
 
___SAT
 
___UNSAT  COMMENTS: 
 
STEP 14: [STEP 3 continued]
CLOSE steam supply isolation and bypass for each Main Feed Pump Turbine:
CRITICAL STEP  MFPT NOMENCLATURE LOCATION POSITION UNID 1B MFPT 1B HP STEAM SUPPLY ISOL T2H/729 CLOSED 1-ISV-1-612 STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.
 
___SAT  
 
___UNSAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations a nd gets snug".
COMMENTS:  
 
REV. 0  PAGE  116  0F 15 WATTS BAR NUCLEAR PLANT B.1.j    STEP 16: [STEP 3]  CLOSE steam supply isolation and bypass for each MFPT:
MFPT NOMENCLATURE LOCATION POSITION UNID 1B MFPT 1B HP STEAM SUPPLY ISOL BYPASS T2H/729 CLOSED 1-IBV-1-614 STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).
CUE: After the performer has demonstrated how to close the valve, state "the hand wheel does not move with clockwise force on hand wheel".
 
___SAT
 
___UNSAT 


COMMENTS:  
REV. 0                                                                  PAGE 115 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 13:      [STEP 3 continued]      CLOSE steam supply isolation and bypass for each Main Feed Pump Turbine:
MFPT      NOMENCLATURE          LOCATION          POSITION          UNID 1A      MFPT 1A HP STEAM        T2J/729          CLOSED        1-IBV-1-613 SUPPLY ISOL BYPASS STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).
CUE: After the performer has demonstrated how to close the valve, state        ___SAT the hand wheel does not move with clockwise force on hand wheel.
COMMENTS:                                                                      ___UNSAT STEP 14:      [STEP 3 continued]      CLOSE steam supply isolation and            CRITICAL bypass for each Main Feed Pump Turbine:                              STEP MFPT      NOMENCLATURE          LOCATION          POSITION          UNID 1B      MFPT 1B HP STEAM        T2H/729          CLOSED        1-ISV-1-612 SUPPLY ISOL STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.
___SAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations and gets snug.
___UNSAT COMMENTS:


STEP 17: Notify the MCR Operator that local main steam isolation has been completed per E-3, Attachment 3.  
REV. 0                                                                  PAGE 116 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 16:      [STEP 3] CLOSE steam supply isolation and bypass for each MFPT:
 
MFPT      NOMENCLATURE          LOCATION        POSITION          UNID 1B    MFPT 1B HP STEAM          T2H/729        CLOSED        1-IBV-1-614 SUPPLY ISOL BYPASS STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).
___SAT
___SAT CUE: After the performer has demonstrated how to close the valve, state the hand wheel does not move with clockwise force on hand wheel.
 
___UNSAT COMMENTS:
___UNSAT STANDARD: The MCR Operator has been notified that local main steam isolation has been performed per E-3, Attachment 3.
STEP 17:     Notify the MCR Operator that local main steam isolation has been completed per E-3, Attachment 3.
CUE: When notified, acknowledge the report.
STANDARD: The MCR Operator has been notified that local main steam isolation has been performed per E-3, Attachment 3.             ___SAT CUE: When notified, acknowledge the report.
COMMENTS:
COMMENTS:                                                                     ___UNSAT END OF TASK TIME STOP: ________
 
END OF TASK TIME STOP: ________
REV. 4 PAGE 117  0F 128 WATTS BAR NUCLEAR PLANT B.1.k  CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


REV. 4                                                                  PAGE 117 0F 128 WATTS BAR NUCLEAR PLANT B.1.k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. Unit 1 is in Mode 3 after suffering a Steam Generator tube rupture on S/G # 2.  
: 1. Unit 1 is in Mode 3 after suffering a Steam Generator tube rupture on S/G # 2.
: 2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.  
: 2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.
: 3. Main Steam line warming is NOT in progress.
: 3. Main Steam line warming is NOT in progress.
INITIATING CUES:
INITIATING CUES:
: 1. The MCR operator has directed you to locally isolate the steam traps and MFPT on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local). 2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.  
: 1. The MCR operator has directed you to locally isolate the steam traps and MFPT on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local).
: 2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.


REV. 4 PAGE 118 0F 128 WATTS BAR NUCLEAR PLANT B.1.k    
REV. 4                                   PAGE 118 0F 128 WATTS BAR NUCLEAR PLANT B.1.k B.1.k Place the CVCS Cation Demineralizer in Service per SOI-62.04


B.1.k Place the CVCS Cation Demineralizer in Service per SOI-62.04  
REV. 4                                                                PAGE 119 0F 128 WATTS BAR NUCLEAR PLANT B.1.k Task:    Place the CVCS Cation Demineralizer in Service per SOI-62.04 Alternate Path:    N/A Facility JPM #:    3-OT-JPMA041 K/A Rating(s):    004A1.07      [2.7/3.1]
Task Standard:      The appropriate valves have been located and opened to place the CVCS cation bed in service per SOI-62.04.
Preferred Evaluation Location:                            Preferred Evaluation Method:
Simulator ____    In-Plant __X___                      Perform __X___  Simulate ___ _


REV. 4 PAGE 119  0F 128 WATTS BAR NUCLEAR PLANT B.1.k  Task: Place the CVCS Cation Demineralizer in Service per SOI-62.04
==References:==
 
SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53 Task Number:     AUO-062-AOI-028-001             APPLICABLE FOR: RO/SRO 10CFR55.45: 8, 9 Validation Time: 20 min. Time Critical: No
Alternate Path:
===========================================================================
N/A  Facility JPM #: 3-OT-JPMA041 K/A Rating(s):
Applicant:     ___________________________         _________________     Time Start: ________
004A1.07 [2.7/3.1]    Task Standard: The appropriate valves have been located and opened to place the CVCS cation bed in service per SOI-62.04.
NAME                         SSN          Time Finish: ________
Preferred Evaluation Location:    Preferred Evaluation  Method:
Performance Rating: SAT ____ UNSAT ____                                 Performance Time ___
Simulator ____    In-Plant __X___  Perform __X___    Simulate ___ _
Examiner: _____________________________           _____________________________/________
References
NAME                                 SIGNATURE               DATE
: SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53 Task Number: AUO-062-AOI-028-001         APPLICABLE FOR: RO/SRO 10CFR55.45: 8, 9 Validation Time:   20   min.
Time Critical:
No ===========================================================================
Applicant: ___________________________ _________________ Time Start:   ________
NAME SSNTime Finish: ________
Performance Rating:   SAT ____ UNSAT ____
Performance Time ___
Examiner: _____________________________
_____________________________/________ NAME SIGNATURE DATE  
===========================================================================
===========================================================================
COMMENTS REV. 4 PAGE 120  0F 128 WATTS BAR NUCLEAR PLANT B.1.k  Tools/Equipment/Procedures Needed:
COMMENTS


REV. 4                                                          PAGE 120 0F 128 WATTS BAR NUCLEAR PLANT B.1.k Tools/Equipment/Procedures Needed:
Hard Hat, Safety Glasses, Hearing Protection, Gloves and Plant Approved Shoes Copy of SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53, Section 8.2 and Attachment 1 with data entered.
Hard Hat, Safety Glasses, Hearing Protection, Gloves and Plant Approved Shoes Copy of SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53, Section 8.2 and Attachment 1 with data entered.
SAFETY CONSIDERATIONS
SAFETY CONSIDERATIONS:
:
Hot pipes, high noise, and heat.
Hot pipes, high noise, and heat.
Radiation levels.
Radiation levels.
Ladder use to reach valve handwheels.  
Ladder use to reach valve handwheels.
 
REV. 4 PAGE 121  0F 128 WATTS BAR NUCLEAR PLANT B.1.k    READ TO OPERATOR
 
DIRECTION TO TRAINEE:


REV. 4                                                                  PAGE 121 0F 128 WATTS BAR NUCLEAR PLANT B.1.k READ TO OPERATOR DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. The Unit is at 100% power.  
: 1. The Unit is at 100% power.
: 2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.  
: 2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.
: 3. RCS boron concentration is 870 ppm.  
: 3. RCS boron concentration is 870 ppm.
: 4. Chemistry has requested that cation bed be placed in service for 53 minutes.  
: 4. Chemistry has requested that cation bed be placed in service for 53 minutes.
: 5. The Cation bed has been filled and vented.  
: 5. The Cation bed has been filled and vented.
: 6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.
: 6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.
INITIATING CUES:
INITIATING CUES:
: 1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.  
: 1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.
: 2. You are to notify the MCR when the CVCS Cation Bed is in service.
: 2. You are to notify the MCR when the CVCS Cation Bed is in service.


REV. 0 PAGE 122 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
REV. 0                                                         PAGE 122 0F 128 WATTS BAR NUCLEAR PLANT B.1.k START TIME: _______
. START TIME: _______
STEP 1:         Obtain a copy of the procedure.                                 ___ SAT STANDARD: Performer has obtained a copy of SOI-62.04, Section 8.2 EXAMINERS CUE: After the performer has demonstrated the method of             ___ UNSAT obtaining the correct instruction, the evaluator can provide a copy of the instruction.
STEP 1: Obtain a copy of the procedure.  
COMMENTS:
 
STEP 2:         [1] ENSURE CB FILLED and VENTED per Section 8.1.               ___ SAT STANDARD: Performer determines the Cation Bed is filled and vented per the INITIAL CONDITIONS provided.                               ___ UNSAT EXAMINERS CUE: If asked, inform the performer that Section 8.1 is complete.
STANDARD: Performer has obtained a copy of SOI-62.04, Section 8.2 EXAMINER'S CUE:
COMMENTS:
After the performer has de monstrated the method of obtaining the correct instruction, the evaluator can  
Due to the location of one of the valve handwheels that will be operated, the performer may require a ladder to reach the valve handwheel. If required, a general use ladder, NOT an EOP ladder, must be located by the operator.
 
        **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
provide a copy of the instruction.
 
COMMENTS:  
 
___ SAT
 
___ UNSAT STEP 2: [1] ENSURE CB FILLED and VENTED per Section 8.1.  
 
STANDARD: Performer determines the Cation Bed is filled and vented per the INITIAL CONDITIONS provided.  
 
EXAMINER'S CUE: If asked, inform the performer that Section 8.1 is complete.
COMMENTS:  
 
___ SAT
 
___ UNSAT Due to the location of one of the valve handwheels that will be operated, the performer may require a ladder to reach the valve handwheel. If required, a general use ladder, NOT an EOP ladder, must be located by the operator.
 
REV. 0 PAGE 123 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 3: [2] PERFORM the following:
NOMENCLATURE LOCATION POSITION UNID CVCS CATION DEMIN BED INLET A3T/713  CLOSED 1-ISV-62-915 CVCS CATION DEMIN BED OUTLET A3T/713  CLOSED 1-ISV-62-916 CVCS CATION DEMIN BED VENT A3T/713  CLOSED 1-VTV-62-917 CVCS CATION DEMIN BED RESIN FILL A5U/737  CLOSED 1-ISV-62-918 CVCS CATION DEMIN BED RESIN DISCH A7U/713  CLOSED 1-ISV-62-919 CVCS CATION DEMIN BED DRAIN A3T/713  CLOSED 1-DRV-62-920 CVCS CATION BED FLUSH A3T/713 CLOSED 1-FLV-62-921 STANDARD: The above listed valves have been located and checked closed (clockwise to close).
EVALUATOR CUE: If the performer attempts to move the handwheel clockwise then countercl ockwise, state" the handwheel will not rotate".
 
COMMENTS: 
 
___ SAT
 
___ UNSAT STEP 4: [3] ENSURE 1-ISV-62-922, CVCS MIXED BED DEMIN OUTLET [A3T/713], is OPEN.  


REV. 0                                                      PAGE 123 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 3:        [2] PERFORM the following:
NOMENCLATURE                LOCATION      POSITION            UNID CVCS CATION DEMIN BED                A3T/713      CLOSED        1-ISV-62-915 INLET CVCS CATION DEMIN BED                A3T/713      CLOSED        1-ISV-62-916 OUTLET CVCS CATION DEMIN BED                A3T/713      CLOSED        1-VTV-62-917 VENT CVCS CATION DEMIN BED                A5U/737      CLOSED        1-ISV-62-918 RESIN FILL CVCS CATION DEMIN BED                A7U/713      CLOSED        1-ISV-62-919 RESIN DISCH CVCS CATION DEMIN BED                A3T/713      CLOSED        1-DRV-62-920 DRAIN CVCS CATION BED FLUSH                A3T/713      CLOSED        1-FLV-62-921 STANDARD: The above listed valves have been located and checked closed        ___ SAT (clockwise to close).
EVALUATOR CUE:          If the performer attempts to move the handwheel clockwise then counterclockwise, state the          ___ UNSAT handwheel will not rotate.
COMMENTS:
STEP 4:          [3] ENSURE 1-ISV-62-922, CVCS MIXED BED DEMIN                ___ SAT OUTLET [A3T/713], is OPEN.
STANDARD: 1-ISV-62-922 is verified to be open.
STANDARD: 1-ISV-62-922 is verified to be open.
EVALUATOR CUE: If the performer attempts to move the handwheel clockwise then countercl ockwise, state" the handwheel will not rotate".
___ UNSAT EVALUATOR CUE:           If the performer attempts to move the handwheel clockwise then counterclockwise, state the handwheel will not rotate.
COMMENTS:
          **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


COMMENTS:  
REV. 0                                                        PAGE 124 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 5:        [4] REVIEW Attachment 1, Resin Status Sheet to ensure CB is    ___ SAT FILLED and BORATED.
STANDARD:        Performer determines that the CB is filled and borated (given in initial conditions) and proceeds to the next step.          ___ UNSAT EVALUATOR CUE:            If asked, state the Resin Status Sheet indicates the CB is filled and vented and borated to the 870 ppm, the same concentration as the RCS).
COMMENTS:
STEP 6:        [5] NOTIFY SRO of intent to place CB in service, and its        ___ SAT current boron concentration as recorded on Attachment 1, Resin Status Sheet.
STANDARD:        The performer contacts SRO and notifies them of intent to      ___ UNSAT place cation Bed in service, advises them of boron concentration recorded on Attachment 1.
NOTE TO EVALUATOR: Task assignment sheet provides the boron concentration derived from Attachment 1. The Rad Waste desk contains the current Attachment 1 for cation bed which will be different than task assignment sheet.
COMMENTS:
CAUTION Cation Bed may need to be flushed to minimize reactivity effects if cation bed boron concentration varies more than 20 ppm from that of the RCS boron concentration or if a new cation bed is being placed in service.
        **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


___ SAT
REV. 0                                                         PAGE 125 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 7:         [6] OPEN 1-ISV-62-915, CVCS CATION DEMIN BED INLET.             CRITICAL STEP STANDARD: 1-ISV-62-915 has been located and opened (turned in the counter-clockwise direction).                                   ___ SAT EVALUATOR CUE:           After valve hand wheel is moved in the counterclockwise direction, state the hand wheel rotates several turns and stops.                      ___ UNSAT If indicator checked, indicate it points to the open position.
 
Step is critical to establish flow through the cation demineralizer.
___ UNSAT REV. 0 PAGE 124 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
COMMENTS:
. STEP 5: [4] REVIEW Attachment 1, Resin Status Sheet to ensure CB is FILLED and BORATED.  
STEP 8:         [7] IF flush is desired for cation bed, THEN GO TO Section 8.7, ___ SAT Flushing Cation Bed to Adjust Boron Prior to Use.
 
STANDARD: Performer determines that flush is not required (per EVALUATOR CUE) and N/As step.                                   ___ UNSAT EVALUATOR CUE: State that flush is not necessary, nor desired at this time.
STANDARD: Performer determines that the CB is filled and borated (given in initial conditions) and proceeds to the next step.
COMMENTS:
EVALUATOR CUE: If asked, state "the Resin Status Sheet indicates the CB is filled and vented and borated to the 870 ppm, the same concentration as the RCS)".  
CAUTION Maximum Cation Bed flow is 75 gpm. May be read locally at 1-FI-62-113 (Panel 1-L-57 at A3T/713).
 
        **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
COMMENTS:  
 
___ SAT
 
___ UNSAT STEP 6: [5] NOTIFY SRO of intent to place CB in service, and its current boron concentration as recorded on Attachment 1, Resin Status Sheet.  
 
STANDARD: The performer contacts SRO and notifies them of intent to place cation Bed in service, advises them of boron concentration recorded on Attachment 1.  
 
NOTE TO EVALUATOR: Task assignment sheet provides the boron concentration derived from Attachment 1. The Rad Waste desk contains the current  for cation bed which will be different than task assignment sheet. 
 
COMMENTS:  
 
___ SAT
 
___ UNSAT CAUTION Cation Bed may need to be flushed to minimize reactivity effects if cation bed boron concentration varies more than 20 ppm from that of the RCS boron concentration or if a new cation bed is being placed in service.
 
REV. 0 PAGE 125 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 7: [6] OPEN 1-ISV-62-915, CVCS CATION DEMIN BED INLET.
 
STANDARD: 1-ISV-62-915 has been located and opened (turned in the counter-clockwise direction).
EVALUATOR CUE:  After valve hand wheel is moved in the counterclockwise direction, state "the hand wheel rotates several turns and stops.


REV. 0                                                        PAGE 126 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 9:          [8] SLOWLY OPEN 1-ISV-62-916, CVCS CATION DEMIN                CRITICAL BED OUTLET.                                                      STEP STANDARD: 1-ISV-62-916 has been located and opened slowly (turned in            ___ SAT the counter-clockwise direction).
EVALUATOR CUE:            After valve hand wheel is moved in the counter-clockwise direction, state that the hand wheel        ___ UNSAT rotates several turns and stops.
If indicator checked, indicate it points to the open position.
If indicator checked, indicate it points to the open position.
Step is critical to establish fl ow through the cation demineralizer.
Step is critical to establish flow through the cation demineralizer.
 
COMMENTS:
COMMENTS: 
STEP 10:         [9] SLOWLY THROTTLE CLOSE 1-ISV-62-922, CVCS MIXED             CRITICAL BED DEMIN OUTLET, until desired cation bed flow rate             STEP achieved.
 
___ SAT STANDARD: 1-ISV-62-922 has been located and closed slowly (turned in the clockwise direction).
CRITICAL STEP      ___ SAT
EVALUATOR CUE: After valve hand wheel is moved in the clockwise                 ___ UNSAT direction, state the hand wheel rotates several turns and stops. If indicator checked, indicate it points to the closed position.
 
___ UNSAT STEP 8: [7] IF flush is desired for cation bed, THEN GO TO Section 8.7, Flushing Cation Bed to Adjust Boron Prior to Use.
 
STANDARD: Performer determines that flush is not required (per EVALUATOR CUE) and N/As step.
EVALUATOR CUE: State that flush is not necessary, nor desired at this time.
COMMENTS: 
 
___ SAT
 
___ UNSAT CAUTION Maximum Cation Bed flow is 75 gpm. May be read locally at 1-FI-62-113 (Panel 1-L-57 at A3T/713).
 
REV. 0 PAGE 126 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
. STEP 9: [8] SLOWLY OPEN 1-ISV-62-916, CVCS CATION DEMIN BED OUTLET.
 
STANDARD:  1-ISV-62-916 has been located and opened slowly (turned in the counter-clockwise direction).
EVALUATOR CUE: After valve hand wh eel is moved in the counter-clockwise direction, state that the hand wheel rotates several turns and stops. 
 
If indicator checked, indicate it points to the open position.
 
Step is critical to establish fl ow through the cation demineralizer.  
 
COMMENTS:  
 
CRITICAL STEP      ___ SAT
 
___ UNSAT STEP 10: [9] SLOWLY THROTTLE CLOSE 1-ISV-62-922, CVCS MIXED BED DEMIN OUTLET, until desired cation bed flow rate achieved.
 
STANDARD: 1-ISV-62-922 has been located and closed slowly (turned in the clockwise direction).
EVALUATOR CUE: After valve hand wheel is moved in the clockwise direction, state "the hand wheel rotates several turns and stops." If indicator checked, indicate it points to the closed position.  
 
EVALUATOR CUE: When 1 FI-62-113 is checked by the local indicator OR the CRT Monitor located near the demineralizer control valves, state it indicates 75 gpm. IF the MCR is contacted, state the letdown flow is 75 gpm.
EVALUATOR CUE: When 1 FI-62-113 is checked by the local indicator OR the CRT Monitor located near the demineralizer control valves, state it indicates 75 gpm. IF the MCR is contacted, state the letdown flow is 75 gpm.
Step is critical to establish fl ow through the cation demineralizer.  
Step is critical to establish flow through the cation demineralizer.
COMMENTS:
        **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.


COMMENTS: 
REV. 0                                                       PAGE 127 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 11:       [10] RECORD Time, Date, and Flowrate when CB was placed in service on Attachment 1, Resin Status Sheet.
 
CUE: Another operator will enter the information on Attachment 1,       ___ SAT Resin Status Sheet.
CRITICAL STEP      ___ SAT
STANDARD: The performer addresses entry of the Date, Time and Flow rate that the Cation Bed was placed in service is recorded on ___ UNSAT Attachment 1.
 
COMMENTS:
___ UNSAT REV. 0 PAGE 127 0F 128 WATTS BAR NUCLEAR PLANT B.1.k **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated
STEP 12:       [11] NOTIFY Chemistry of Time, Date, and Flowrate when CB was placed in service.
. STEP 11: [10] RECORD Time, Date, and Flowrate when CB was placed in service on Attachment 1, Resin Status Sheet.
STANDARD: The Performer notifies Chemistry of Time, Date, and Flowrate       ___ SAT when CB was placed in service COMMENTS:
CUE: Another operator will enter the information on Attachment 1, Resin Status Sheet.  
___ UNSAT END OF TASK STOP TIME ________
 
      **Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.
STANDARD: The performer addresses entry of the Date, Time and Flow rate that the Cation Bed was placed in service is recorded on  
.  
 
COMMENTS:  
 
___ SAT
 
___ UNSAT STEP 12: [11] NOTIFY Chemistry of Time, Date, and Flowrate when CB was placed in service.  
 
STANDARD: The Performer notifies Chemistry of Time, Date, and Flowrate when CB was placed in service  
 
COMMENTS:  
 
END OF TASK  
 
___ SAT
 
___ UNSAT STOP TIME ________
APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)


APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
: 1. The Unit is at 100% power.  
: 1. The Unit is at 100% power.
: 2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.  
: 2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.
: 3. RCS boron concentration is 870 ppm.  
: 3. RCS boron concentration is 870 ppm.
: 4. Chemistry has requested that cation bed be placed in service for 53 minutes.  
: 4. Chemistry has requested that cation bed be placed in service for 53 minutes.
: 5. The Cation bed has been filled and vented.  
: 5. The Cation bed has been filled and vented.
: 6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.
: 6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.
INITIATING CUES:
INITIATING CUES:
: 1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.  
: 1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.
: 2. You are to notify the MCR when the CVCS Cation Bed is in service.}}
: 2. You are to notify the MCR when the CVCS Cation Bed is in service.}}

Latest revision as of 02:39, 14 November 2019

Initial Exam 2009-301 Draft Sim/In-Plant JPMs
ML092810435
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 10/08/2009
From:
NRC/RGN-II
To:
References
50-390/09-301, 50-391/09-301
Download: ML092810435 (128)


Text

REV. 0 PAGE 1 0F 128 WATTS BAR NUCLEAR PLANT B.1.a B.1.a Withdraw Shutdown Banks

REV. 0 PAGE 2 0F 128 WATTS BAR NUCLEAR PLANT B.1.a Task: Withdraw Shutdown Banks Alternate Path: Following failure of the group step counters, the reactor trip breakers are opened in accordance with Technical Requirement 3.1.7.

Facility JPM #: B.1.a 2009 May NRC Exam K/A Rating(s): 001 A3.05 3.5/3.5 Task Standard: Withdrawal of shutdown banks is initiated starting with Shutdown Bank A.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ___ _

References:

SOI-85.0, Control Rod Drive and Position Indication System, Rev. 38.

TR 3.1.7, Reactivity Control Systems, Position Indicating System - Shutdown.

AOI-2, Malfunction of Reactor Control System, Rev. 37.

Task Number: RO-085-SOI-85-001 APPLICABLE FOR: RO/SRO RO-085-SOI-85-010 10CFR55.45: CFR: 41.7/45.13 Validation Time: 10 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 3 0F 128 WATTS BAR NUCLEAR PLANT B.1.a SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 311.
a. Ensure the following items are displayed on the Director Summary Page:

rd19 Shutdown bank a demand counter fails 0

b. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. Event 20 is set when Shutdown Bank A reaches 100 steps. Malfunction rd19 will enter at this event.
c. Place the simulator in RUN momentarily, and acknowledge all alarms
3. ENSURE 1-NR-92-145 Recorder is selected to Source Range N31 and Intermediate Range N35.
4. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.
5. After performer indicates understanding of task, place simulator in run.

Tools/Equipment/Procedures Needed:

Marked copy of SOI-85.01, indicating steps have been performed to Section 5.4, Step 6.

REV. 0 PAGE 4 0F 128 WATTS BAR NUCLEAR PLANT B.1.a READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.
2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.
3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.
4. The US/SRO has approved shutdown bank withdrawal.
5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.

INITIATING CUES:

1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.
2. Notify the SRO when the shutdown banks are fully withdrawn.

REV. 0 PAGE 5 0F 128 WATTS BAR NUCLEAR PLANT B.1.a START TIME: _______

STEP/STANDARD SAT/UNSAT STEP 1.: Obtain the appropriate procedure. ___ SAT

___ UNSAT STANDARD: Performer identifies SOI-85.01 and goes to Section 5.4 Shutdown Banks Withdrawal.

Evaluator Cue: Hand marked-up copy of SOI-85.01 to the performer after the performer successfully identifies the procedure and section.

STEP 2: [6] ENSURE 1-RBSS, ROD BANK SELECTOR SWITCH ___ SAT

[1-M-4], in MANUAL.

___ UNSAT STANDARD: Performer ensures that the Rod Bank Selector Switch RBSS-1 is in MANUAL position.

COMMENTS:

STEP 3: [7] OBTAIN SRO Approval to withdraw Shutdown Banks. ___ SAT

___ UNSAT STANDARD: If requested, state that SRO approval has been granted.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 6 0F 128 WATTS BAR NUCLEAR PLANT B.1.a STEP/STANDARD SAT/UNSAT STEP 4: [8] OBSERVE the following for proper response during Bank ___ SAT Withdrawal:

A. Source Range (SR) ________ ___ UNSAT B. Intermediate Range (IR) ________

C. Startup Meters ________

D. Nuclear Recorders ________

STANDARD: Performer monitors above parameters as the rods are being withdrawn COMMENTS:

STEP 5: [9] SELECT SD Bank A (SBA) on ROD BANK SELECTOR Critical Step SWITCH, 1-RBSS.

___ SAT

___ UNSAT STANDARD: Performer places Rod Bank Selector switch RBSS-1 in SBA position.

COMMENTS:

STEP 6: [10] PLACE 1-FLRM, IN-HOLD-OUT SWITCH, to OUT to begin Critical Step withdrawing Shutdown Banks A1 and A2 to greater than or equal to 225 Steps. ___ SAT STANDARD: Performer places 1-FLR to the OUT position and monitors ___ UNSAT shutdown bank A group A1 and A2 are responding.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 7 0F 128 WATTS BAR NUCLEAR PLANT B.1.a STEP/STANDARD SAT/UNSAT STEP 7: [11] MONITOR the following as the Bank is being withdrawn: ___ SAT A. Group Step Counters B. RPIs ___ UNSAT C. In-Out Status Lights D. Rod speed (64 Steps/Minute)

STANDARD: Performer monitors parameters as the rods are being withdrawn.

COMMENTS:

Note to evaluator:

Malfunction to fail step counters is to be inserted when Shutdown Bank A the rods reach approximately 100 steps.

Performer may refer to TR-3.1.7. If so, the required action is to open the Reactor Trip breakers.

STEP 9: Open the Reactor Trip Breakers. Critical Step

___ SAT Cue: After the reactor trip breakers have been opened state We will stop here ___ UNSAT STANDARD: Performer determines the Group 1 step counter is not capable of determining the demand position for each of the Shutdown bank A rods within + 2 steps and opens the reactor trip breakers.

COMMENTS:

STOP TIME ________

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 8 0F 10 WATTS BAR NUCLEAR PLANT B.1.b APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A unit startup is in progress following a trip from 100% power due to a generator electrical relay malfunction that occurred 6 days ago.
2. Per the Nuclear Operating Book (NOB), Sheet 7 BANK OVERLAP AND ROD INSERTION LIMITS, the shutdown banks fully withdrawn position is 230 steps.
3. GO-2, Reactor Startup, Section 3.2 Actions Performed Before Startup, is complete to Step [13.10], WITHDRAW Shutdown Rods to fully withdrawn per SOI-85.01.
4. The US/SRO has approved shutdown bank withdrawal.
5. SOI-85.01, Control Rod Drive and Indication System, is being performed and is complete to through Section 5.4, Step 5.

INITIATING CUES:

1. You are to continue the performance of SOI-85.01 at Section 5.4 Step 6, and withdraw the shutdown banks.
2. Notify the SRO when the shutdown banks are fully withdrawn.

REV. 0 PAGE 9 0F 10 WATTS BAR NUCLEAR PLANT B.1.b B.1.b Place Excess Letdown in Service per AOI-6

REV. 0 PAGE 10 0F 10 WATTS BAR NUCLEAR PLANT B.1.b EVALUATION SHEET Task: Place Excess Letdown in Service per AOI-6.

Alternate Path: N/A Facility JPM #: 3-OT-JPMR022 Rev 3 K/A Rating(s): 004 A4.06 [3.6/3.1] 004A 1.11 [3.0/3.0] 004 A2.22 [3.2/3.1]

004 A2.22 [3.2/3.1] 2.1.30 [3.9/3.4] 2.1.23 [3.9/4.0]

Task Standard: Excess Letdown has been placed in service per AOI-6, Step 15.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ____

References:

AOI-6, Small Reactor Coolant System Leak, Rev 32.

Task Number: RO-062-SOI-62-007 APPLICABLE FOR: RO/SRO RO-068-AOI-6-001 10CFR55.45: 6, 12 Validation Time: 10 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 11 0F 10 WATTS BAR NUCLEAR PLANT B.1.b

REV. 0 PAGE 12 0F 10 WATTS BAR NUCLEAR PLANT B.1.b SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 312.
a. Ensure following letdown and charging isolation valves are closed.
a. 1-FCV-62-72.
b. 1-FCV-62-73.
c. 1-FCV-62-74.
d. 1-FCV-62-76.
e. 1-FCV-62-69.
f. 1-FCV-62-70.
g. 1-FCV-62-85.
h. 1-FCV-62-86.
i. 1-FCV-62-90.
j. 1-FCV-62-91.
b. Ensure 1-FCV-62-93 is in manual and seal flow is stable at approximately 8 gpm per RCP seal.
c. Ensure pressurizer level is approximately 66% and rising slowly.
2. Acknowledge all alarms.
3. Place simulator in FREEZE until the performer indicates an understanding of the task.
4. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

A marked up copy of AOI-6, signed off through Step 14, with Step 15 CIRCLED.

REV. 0 PAGE 13 0F 10 WATTS BAR NUCLEAR PLANT B.1.b READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Unit is operating at 100 % power.
2. A small leak has been found on the normal letdown path.
3. Letdown and Charging have been isolated per AOI-6, Small Reactor Coolant System Leak.
4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown.
5. You are the Operator at the Controls.

INITIATING CUES:

1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.
2. You are to notify the Unit Supervisor when the excess letdown has been aligned.

REV. 3 PAGE 14 0F 10 WATTS BAR NUCLEAR PLANT B.1.b START TIME: _______

STEP 1: Obtain a copy of the procedure. ___ SAT STANDARD: A copy of AOI-6 has been obtained.

___ UNSAT COMMENTS:

STEP 2: Check pressurizer level DROPPING or STABLE.

___ SAT STANDARD: Performer observes a RISING trend on pressurizer level and enters RESPONSE NOT OBTAINED column for actions.

NOTE: Use of the RNO Column was directed by the INITIATING ___ UNSAT CUES.

COMMENTS:

STEP 3: If pzr level is rising, THEN PLACE excess letdown in service.

___ SAT STANDARD: Performer enters the RESPONSE NOT OBTAINED column and begins procedure actions.

NOTE: Use of the RNO Column was directed by the INITIATING ___ UNSAT CUES.

COMMENTS:

REV. 3 PAGE 15 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 4 : a. OPEN 1-FCV-70-143 CRITICAL STEP STANDARD: At panel 1-M-27B the performer places 1-HS-70-143A to OPEN. Performer verifies the RED light is LIT and the GREEN light is OFF. Step is critical to establish excess ___ SAT letdown flow.

NOTE: When the performer opens 1-FCV-70-143, Annunciator 239-D will be received. This alarm occurs whenever 1- ___ UNSAT FCV-70-143 is OPEN and flow on 1-FS-70-8 is less than 230 gpm.

COMMENTS:

STEP 5 : b. OPEN 1-FCV-70-85 CRITICAL STEP STANDARD: At panel 1-M-27B the performer places 1-HS-70-85A to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to ___ SAT establish excess letdown flow.

NOTE: When the performer opens 1-FCV-70-85, Annunciator 239-D will clear as soon as flow is greater than 230 gpm ___ UNSAT Performer may use 1-FI-70-84 (panel 1-M-27B) to monitor flow.

COMMENTS:

STEP 6 : c. OPEN 1-FCV-62-54 CRITICAL STEP STANDARD: At panel 1-M-5 the performer places 1-HS-62-54 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish ___ SAT excess letdown flow.

COMMENTS:

___ UNSAT

REV. 3 PAGE 16 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 7 : d. OPEN 1-FCV-62-55 CRITICAL STEP STANDARD: At panel 1-M-5 the performer places 1-HS-62-55 to OPEN and holds the switch to OPEN until the RED light is LIT and the GREEN light is OFF. Step is critical to establish ___ SAT excess letdown flow.

COMMENTS:

___ UNSAT STEP 8 : e. ENSURE 1-FCV-62-59 is in NORMAL ___ SAT STANDARD: At panel 1-M-5 the performer determines that 1-HS-62-59A is in the NORM position, with the RED seal return light LIT.

___ UNSAT COMMENTS:

STEP 9: f. ADJUST 1-HIC-62-56A to obtain maximum flow and CRITICAL maintain excess letdown hx outlet temp less than 200°F. STEP STANDARD: At panel 1-M-5 the performer opens 1-HIC-62-56A while monitoring 1-TI-62-58. Excess letdown temperature must ___ SAT remain below 200°F as indicated on 1-TI-62-58. Step is critical to establish excess letdown flow.

COMMENTS: ___ UNSAT

REV. 3 PAGE 17 0F 10 WATTS BAR NUCLEAR PLANT B.1.b STEP 10: STABILIZE pzr level by adjusting seal injection and excess letdown flows. ___ SAT STANDARD: At panel 1-M-5 the performer observes pzr level trend on 1-LR-68-339. Performer may also set up a trend of pzr level on ICS computer using inputs from 1-LI-68-339A, 1-LI-68-335A ___ UNSAT and 1-LI-68-320.

COMMENTS:

STEP 11: Notify the Unit Supervisor that Excess Letdown has been placed in service. ___ SAT STANDARD: The Unit Supervisor has been notified that Excess Letdown has been placed in service.

___ UNSAT

    • CUE: When notified, acknowledge the report.

COMMENTS:

END OF TASK STOP TIME: ________

REV. 0 PAGE 18 OF 128 WATTS BAR NUCLEAR PLANT B.1.c APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task.

INITIAL CONDITIONS:

1. The Unit is operating at 100 % power.
2. A small leak has been found on the normal letdown path.
3. Letdown and Charging have been isolated per AOI-6, Small Reactor Coolant System Leak.
4. The RADPRO Supervisor has been informed of the intent to establish Excess Letdown.
5. You are the Operator at the Controls.

INITIATING CUES:

1. The Unit Supervisor has directed you to establish excess letdown to the VCT per AOI-6, Section 3.0, and Step 15, RESPONSE NOT OBTAINED.
2. You are to notify the Unit Supervisor when the excess letdown has been aligned.

REV. 0 PAGE 19 OF 128 WATTS BAR NUCLEAR PLANT B.1.c B.1.c Isolate Cold Leg Accumulators per E-1

REV. 0 PAGE 20 OF 128 WATTS BAR NUCLEAR PLANT B.1.c Task: Isolate Cold Leg Accumulators per E-1 Alternate Path: Cold Leg Accumulator cannot be isolated and must be vented to comply with E-1.

Facility JPM #: N/A K/A Rating(s): 011 EA1.09 [4.3/4.3]

Task Standard: Cold Leg Accumulators 1, 2, and 3 are isolated per E-1 Step 26 AER. Cold Leg Accumulator 4 is vented, per E-1, Step 26 RNO.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ___ _

References:

E-1,Loss of Reactor or Secondary Coolant, Rev. 15 Task Number: RO-063-SOI-63-003 APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6 Validation Time: 15 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 21 OF 128 WATTS BAR NUCLEAR PLANT B.1.c SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 313
a. Ensure the following items are displayed on the Director Summary Page:

th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity hs-63-67a hs-63-67a sis accumulator tank 4 flow isolation valve Open

b. Ensure that the following remote is set as indicated on the Director Remote Page.

sir01 pwr to cold leg accumu isolation valves fcv-63-67, 80, 98, 119 on

c. Place the simulator in RUN momentarily, and acknowledge all alarms.
4. Place simulator in FREEZE until the performer indicates an understanding of the task.
3. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

A marked-up copy of E-1, signed off through Step 25, with Step 26 circled.

REV. 0 PAGE 22 OF 128 WATTS BAR NUCLEAR PLANT B.1.c READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A large LOCA has occurred.
2. E-1 performance has just been resumed after performance of ES-1.3.
3. You are Control Room Operator.

INITIATING CUES:

1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.
2. You are to notify Unit Supervisor when you have completed Step 26.

REV. 0 PAGE 23 OF 128 WATTS BAR NUCLEAR PLANT B.1.c START TIME: _______

STEP 1: Obtain a copy of the procedure.

___ SAT STANDARD: A copy of E-1 has been obtained EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the examiner will ___ UNSAT provide a marked-up copy of the instruction.

COMMENTS:

STEP 2: a. ENSURE power to isolation valves restored USING Appendix A (E-1), CLA Breaker Operation.

STANDARD: ___ SAT EXAMINERS CUE: When asked, inform the performer that E-1 Appendix A CLA BREAKER OPERATION is complete.

___ UNSAT COMMENTS:

REV. 0 PAGE 24 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 3: CHECK RCS pressure less than 250 psig.

STANDARD: Performer reads RCS pressure from one of the following PAM instruments and determines that pressure is approximately 70 ___ SAT psig.

RVLIS-ICCM PLASMA DISPLAY on 1-M-4 or 1-M-6 Loop 4 HL PRESS 1-PI-68-70 ___ UNSAT Loop 3 HL PRESS 1-PI-68-64 Loop 2 HL Press 1-PI-68-63 COMMENTS:

STEP 4: CLOSE cold leg accumulator isolation valves. CRITICAL STEP STANDARD: Performer places 1-HS-63-118, 1-HS-63-98, 1-HS-63-80 and 1-HS-63-67 to close. Performer observes that 1-HS-63-67 ___ SAT indicating lights do not change, indicating that 1-FCV-63-67, CLA 4 Isolation valve remains OPEN. Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS. ___ UNSAT COMMENTS:

STEP 5: c. PERFORM the following CRITICAL STEP STANDARD: Performer determines that RNO actions are required since 1-FCV-63-67 did NOT CLOSE. Step is critical since this action ___ SAT is taken to minimize the chance of nitrogen injection into the RCS.

COMMENTS: ___ UNSAT

REV. 0 PAGE 25 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 6: 1) RESET Phase B CRITICAL STEP STANDARD:

___ SAT Performer observes the Phase B lights on the Master Isolation Signal Status panels 1-XX-55-6C and 1-XX-55-6D on 1-M-6 are LIT, indicating that Phase B has been actuated.

___ UNSAT Performer depresses 1-HS-30-64D B CNTMT ISOL RESET TR-A, and observes the B light goes DARK on 1-XX-55-6C Performer depresses 1-HS-30-64E B CNTMT ISOL RESET TR-B, and observes the B light goes DARK 1-XX-55-6D.

Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.

COMMENTS:

REV. 0 PAGE 26 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 7: 2) ENSURE aux air pressure to cntmt is greater than 75 psig CRITICAL

[M-15] AND OPEN cntmt air supply valves. STEP STANDARD: ___ SAT Performer observes air pressure on 0-PI-32-104A, Aux Air A Press and 0-PI-32-105A, Aux Air Press indicate 95 psig and that 1-FCV-32-80, 1-FCV-32-102, and 1-FCV-32-110 are ___ UNSAT CLOSED.

Performer places 1-HS-30-80A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.

Performer places 1-HS-30-102A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.

Performer places 1-HS-30-110A in the OPEN position and holds until RED light is LIT, GREEN light is DARK.

Step is critical since this action is taken to allow the air supply to the nitrogen makeup and vent valves to be restored.

COMMENTS:

REV. 0 PAGE 27 OF 128 WATTS BAR NUCLEAR PLANT B.1.c STEP 8: 3) OPEN any unisolated accumulators nitrogen makeup valve. CRITICAL STEP STANDARD: Performer determines that 1-FCV-63-63 for CLA 4 must be OPENED. ___ SAT Performer places 1-HS-63-63A N2 TO CL ACCUM 4 to OPEN position, and verifies RED light is LIT GREEN light is DARK.

___ UNSAT Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.

COMMENTS:

STEP 8: 4) OPEN 1-FCV-63-65 vent header. CRITICAL STEP STANDARD: Performer rotates 1-HIC-63-65A in the counterclockwise direction to OPEN 1-FCV-63-65 FULLY. ___ SAT Step is critical since this action is taken to minimize the chance of nitrogen injection into the RCS.

___ UNSAT COMMENTS:

STEP 9: Notify the Unit Supervisor that E-1, Step 26 is complete.

STANDARD: Performer notifies the Unit Supervisor that Step 26 is complete

___ SAT COMMENTS:

___ UNSAT END OF TASK STOP TIME ________

REV. 6 PAGE 28 OF 128 WATTS BAR NUCLEAR PLANT B.1.d APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. A large LOCA has occurred.
2. E-1 performance has just been resumed, after performance of ES-1.3.
3. You are Control Room Operator.

INITIATING CUES:

1. The Unit Supervisor directs you perform E-1, Step 26, DETERMINE if cold leg accumulators should be isolated.
2. You are to notify Unit Supervisor when you have completed Step 26.

REV. 6 PAGE 29 OF 128 WATTS BAR NUCLEAR PLANT B.1.d B.1.d Place RHR Spray in Service per FR-Z.1

REV. 6 PAGE 30 OF 128 WATTS BAR NUCLEAR PLANT B.1.d EVALUATION SHEET Task: Place RHR Spray in Service per FR-Z.1 Alternate Path: When the performer attempts to close 1-FCV-63-94, the valve will NOT close. This requires entry into the RNO in order to place Train A RHR Spray in service.

Facility JPM #: 3-OT-JPMR016A Rev 5 K/A Rating(s): 005 A4.01 [3.6/3.4]

Task Standard: Train A of RHR Spray has been placed in-service per FR-Z.1.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X____ Simulate ____

References:

FR-Z.1, High Containment Pressure, Rev.10 Task Number: RO-113-FR-Z.1-001 APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 4, 6, 7, 8 Validation Time: 10 min. Time Critical: No

===============================================================

Candidate: ___________________________ _________________ Time Start: ________

NAME SSN/EIN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 6 PAGE 31 OF 128 WATTS BAR NUCLEAR PLANT B.1.d

REV. 6 PAGE 32 OF 128 WATTS BAR NUCLEAR PLANT B.1.d SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 314.
a. Ensure the following items are displayed on the Director Summary Page:

th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity ch01a containment pressure transmitter failure pdt-3-42 14 ch01b containment pressure transmitter failure pdt-3-43 14 ch01c containment pressure transmitter failure pdt-3-44 14 ch01d containment pressure transmitter failure pdt-3-45 14 ei-72-12a 07020 cntmt spray pmp b amps 35 fi-72-13 07010 cntmt spray pmp b flow 3000 hs-72-10a-3 06010 cntmt spray pump b mtr sw(red) on hs-72-10a-1 06010 cntmt spray pump b mtr sw(green) off hs-72-27a-1 06020 cntmt spray pump a mtr sw(green) off pdi-30-42 03160 cntmt press diff indicator 12 pdi-30-43 03170 cntmt press diff indicator 12 pdi-30-44 03180 cntmt press diff indicator 12 pdi-30-45 03190 cntmt press diff indicator 12 pdr-30-133-1 03150 cntmt annulus dp indicator 0.5 hs-72-10a hs-72-10a containment spray pump b mtr sw ptlock hs-63-94a Hs-63-94a rhr to rcs cl1_4 flow control valve s open

b. Place the simulator in RUN momentarily, and acknowledge all alarms.
2. Place Hold Order on A CS Pump - handswitch is in PULL-TO-LOCK position
3. Place simulator in FREEZE until the performer indicates an understanding of the task.
4. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

Ensure marked copies of FR-Z.1 are available to the evaluators.

REV. 6 PAGE 33 OF 128 WATTS BAR NUCLEAR PLANT B.1.d READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. 1A-A Containment Spray Pump has been tagged out of service.
2. The unit was at 100% when a Large Break LOCA occurred.
3. 1B-B Containment Spray Pump started and has been spraying Containment.
4. The break occurred an hour and 10 minutes ago.
5. All ECCS equipment is performing its design functions and is on Containment Sump Recirc.
6. You are the Operator at the Controls (OAC).

INITIATING CUES:

1. The Unit Supervisor directs you to perform FR-Z., HIGH CONTAINMENT PRESSURE, Step 10, DETERMINE if RHR spray should be placed in service.
2. You are to notify the Unit Supervisor when you have completed Step 10.

REV. 6 PAGE 34 OF 128 WATTS BAR NUCLEAR PLANT B.1.d START TIME: _______

STEP 1: Obtain a copy of the procedure.

___ SAT STANDARD: A copy of FR-Z.1 has been obtained.

EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator will ___ UNSAT provide a marked-up copy of the instruction.

COMMENTS:

STEP 2: [Step 10] DETERMINE if RHR Spray should be placed in ___ SAT service:

a. CHECK the following conditions:
  • At least one hour elapsed since beginning of the accident. ___ UNSAT
  • Cntmt Press greater than 9.5 psig.
  • RHR suction aligned to the cntmt sump.
  • At least one charging pump and one SI pump running STANDARD: 1. Performer has determined that an hour has lapsed since the beginning of the accident. [Given in initial conditions]
2. Cntmt press has been checked > 9.5 psig.
3. FCV-63-72 and FCV-63-73 verified to be open by red indicating lights.
4. 1 CCP & 1 SIP verified to be running by indicating lights or amps.

COMMENTS:

REV. 6 PAGE 35 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 3: [STEP 10b] ALIGN Train B RHR spray: ___ SAT

1) ENSURE Train B RHR pump RUNNING.

STANDARD: Train B RHR pump verified to be running by indicating light or amps. ___ UNSAT COMMENTS:

STEP 4: [STEP 10b 2)] Close RHR crosstie 1-FCV-74-35.

___ SAT STANDARD: 1-HS-74-35-A has been checked in the CLOSED position and the green light illuminated on HS.

COMMENTS: ___ UNSAT STEP 5: [STEP 10b 3)] CLOSE RHR injection 1-FCV-63-94. CRITICAL STEP STANDARD: 1-HS-63-94-A has been placed in the CLOSED position and the performer recognizes that the GREEN light DOES NOT ___ SAT illuminate.

Performer enters the RNO Column to perform actions to align Train A RHR spray.

Step is critical since the RHR system is not designed to ___ UNSAT support both RHR spray and suction requirements associated with sump recirculation.

COMMENTS:

EVALUATOR NOTE: Performer may either have US dispatch personnel or will dispatch personnel to investigate the cause of the failure of 1-FCV-63-94.

REV. 6 PAGE 36 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 6: [STEP 10b RNO] ALIGN Train A RHR spray: ___ SAT

1) ENSURE Train A RHR pump RUNNING.

STANDARD: Train A RHR pump verified to be running by indicating light or ___ UNSAT amps.

COMMENTS:

STEP 7: [STEP 10b RNO] 2) CLOSE RHR crosstie 1-FCV-74-33.

___ SAT STANDARD: 1-HS-74-33-A has been placed/checked in the CLOSED position and the green light illuminated on HS.

___ UNSAT COMMENTS:

STEP 8: [STEP 10b RNO] 3) CLOSE RHR injection 1-FCV-63-93. CRITICAL STEP STANDARD: 1-HS-63-93-A has been placed in the CLOSED position and the green light illuminated on HS. Step is critical to establish A Train RHR Spray. ___ SAT COMMENTS:

___ UNSAT STEP 9: [STEP 10b RNO] 4) OPEN RHR spray 1-FCV-72-40. CRITICAL STEP STANDARD: 1-HS-72-40A has been placed/checked in the OPEN position and the Red light illuminated on hand switch. Step is critical to establish A Train RHR Spray.

___ SAT COMMENTS:

___ UNSAT

REV. 6 PAGE 37 OF 128 WATTS BAR NUCLEAR PLANT B.1.d STEP 10: Notify the Unit Supervisor that RHR spray is in service.

___ SAT STANDARD: Notify the Unit Supervisor that RHR spray has been placed in service.

    • CUE: When notified, acknowledge the report using repeat ___ UNSAT back.

COMMENTS:

END OF TASK TIME STOP: ________

REV. 0 Page 38 of 128 WATTS BAR NUCLEAR PLANT B.1.e CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task.

INITIAL CONDITIONS:

1. 1A-A Containment Spray Pump has been tagged out of service.
2. The unit was at 100% when a Large Break LOCA occurred.
3. 1B-B Containment Spray Pump started and has been spraying Containment.
4. The break occurred an hour and 10 minutes ago.
5. All ECCS equipment is performing its design functions and is on Containment Sump Recirc.
6. You are the Operator at the Controls (OAC).

INITIATING CUES:

1. The Unit Supervisor directs you to perform FR-Z., HIGH CONTAINMENT PRESSURE, Step 10, DETERMINE if RHR spray should be placed in service.
2. You are to notify the Unit Supervisor when you have completed Step 10.

REV. 0 Page 39 of 128 WATTS BAR NUCLEAR PLANT B.1.e B.1.e Place Containment Hydrogen Recombiner A in Service per SOI-83.01

REV. 0 Page 40 of 128 WATTS BAR NUCLEAR PLANT B.1.e Task: Place Containment Hydrogen Recombiner A in Service per SOI-83.01.

Alternate Path: N/A Facility JPM #: 3-OT-JPMR052 K/A Rating(s): 028A2.01 [3.4/3.6]

Task Standard: Containment Hydrogen Recombiner A has been placed in service per SOI-83.01.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ___ _

References:

E-1, Loss of Reactor or Secondary Coolant, Rev. 15.

SOI-83.01, Containment Hydrogen Recombiners, Rev. 15.

TI-83.01,Hydrogen Recombiner Required Power-vs.-Containment Pressure Curves, Rev. 1.

Task Number: RO-063-SOI-63-003 APPLICABLE FOR: RO/SRO 10CFR55.45: 5, 6 Validation Time: 15 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 Page 41 of 128 WATTS BAR NUCLEAR PLANT B.1.e

REV. 0 Page 42 of 128 WATTS BAR NUCLEAR PLANT B.1.e SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 315.
a. Ensure the following items are displayed on the Director Summary Page:

th03a loca-small leak loop 1 100% severity th01a loca-hot leg loop 1 4.5% severity mux_03c123 125-a cntmt hi-hi press steamline isol on pi-30-310 03110 containment pressure 3.5 pi-30-311 03120 containment pressure 3.5 h2i-43-200 03060 loca h2 cntmt monitor 3.5 h2i-43-210 03070 loca h2 cntmt monitor 3.5 pdi-30-42 03160 cntmt press diff indicator 4 pdi-30-43 03170 cntmt press diff indicator 4 pdi-30-44 03180 cntmt press diff indicator 4 pdi-30-45 03190 cntmt press diff indicator 4

b. Place the simulator in RUN momentarily, and acknowledge all alarms.
2. Place simulator in FREEZE until the performer indicates an understanding of the task.
3. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

Ensure copies of SOI-83.01 and TI-83.01 are available for the evaluator.

REV. 0 Page 43 of 128 WATTS BAR NUCLEAR PLANT B.1.e READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit has experienced a LOCA.
2. MCR crew is following E-1, Loss of Reactor or Secondary Coolant.
3. E-1, directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.
4. You are Control Room Operator.

INITIATING CUES:

1. The Unit Supervisor has directed you to place Hydrogen Recombiner A in service, using SOI-83.01, Containment Hydrogen Recombiners.
2. Notify Unit Supervisor when the required power setting is reached

REV. 0 Page 44 of 128 WATTS BAR NUCLEAR PLANT B.1.e START TIME: _______

STEP 1: Obtain a copy of the procedure.

___ SAT STANDARD: Obtains SOI-83.01 and goes to Section 8.1.

EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator can ___ UNSAT provide a copy of the instruction.

COMMENTS:

CAUTION 1 Temperature of 1400°F is not to be exceeded on any operable thermocouple.

CAUTION 2 On DG power, DG load should remain 4400 kW or less.

CAUTION 3 If there is any indication Recombiner A is not operating properly (through recombiner instrumentation), the Recombiner should be shutdown, a WR written, and the other Recombiner placed in service.

NOTE: TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE contains the curves that will be needed to adjust the power level for the recombiner.

STEP 2: [1] ENSURE POWER ADJUST potentiometer [1-M-10] set at ___ SAT 000.

STANDARD: Performer verifies that three zeros (000) are indicated on Panel 1-M-10. ___ UNSAT COMMENTS:

REV. 0 Page 45 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 3: [2] VERIFY the White POWER IN AVAILABLE light LIT. ___ SAT STANDARD: Performer verifies that the White POWER IN AVAILABLE light LIT on 1-M-10. ___ UNSAT COMMENTS:

STEP 4: [3] ENSURE TEMPERATURE CHANNEL (thermocouple CRITICAL selector) is selected for channel 1, 2, or 3. STEP

___ SAT STANDARD: Performer verifies that the TEMPERATURE CHANNEL (thermocouple selector) is selected for channel 1, 2, or 3.

NOTE Any one of the three settings is acceptable. ___ UNSAT COMMENTS:

STEP 5: [4] ENSURE TEMPERATURE OUT (indicator dial), set on ___ SAT 1400°F.

STANDARD: Performer verifies that the TEMPERATURE OUT (indicator ___ UNSAT dial), set on 1400°F.

COMMENTS:

NOTE: Red light on TEMPERATURE OUT (indicator dial) is lit when setpoint selected on indicator is reached.

REV. 0 Page 46 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 6: [5] REQUEST Chemistry to sample containment atmosphere CRITICAL for H2 concentration. STEP

___ SAT STANDARD: Performer contacts Chemistry to sample containment atmosphere.

EVALUATOR CUE: Containment atmosphere has been sampled and the ___ UNSAT hydrogen concentration is 3.5%.

COMMENTS:

STEP 7: [6] RECORD the Date and Time on Data Sheet 1. ___ SAT STANDARD: Performer records Date and Time on Data Sheet 1

___ UNSAT COMMENTS:

REV. 0 Page 47 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 8: [7] RECORD CNTMT H2 % on Data Sheet 1, THEN ___ SAT INDICATE from which source H2 percentage was obtained:

[7.1] ANAL A CNTMT H2,1-H21-43-200 [1-M-10]

___ UNSAT

[7.2] ANAL B CNTMT H2, 1-H21-43-210 [1-M-10]

[7.3] Chemistry sample analysis STANDARD: Performer has data available from each of the sources and may enter a value for any of them. The containment hydrogen concentration is 3.5%.

COMMENTS:

STEP 9: [8] IF containment H2 is greater than 5%, THEN DO NOT ___ SAT place H2 Recombiner in service, and NOTIFY the SM.

STANDARD: Performer confirms that hydrogen concentration is less than ___ UNSAT 5% and enters N/A for this step.

COMMENTS:

REV. 0 Page 48 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 10: [9] RECORD CNTMT PRESS (psig) on Data Sheet 1, ___ SAT THEN INDICATE which indicator was used:

[9.1] 1-PI-30-310, CNTMT WR PRESS [1-M-9]

___ UNSAT

[9.2] 1-PI-30-311, CNTMT WR PRESS [1-M-9]

STANDARD: Performer enters a value of 3 psig for either pressure indicator.

COMMENTS:

STEP 11: [10] TURN POWER OUT (MS Starter) switch to ON, and CRITICAL VERIFY switch plate Red light LIT. STEP STANDARD: Performer places switch in the UP position, and verifies the ___ SAT RED light is LIT. Step is critical since this action provides power to the recombiner.

COMMENTS: ___ UNSAT STEP 12: [11] ADJUST POWER ADJUST potentiometer clockwise to CRITICAL obtain 5 kW on POWER OUT meter, and MAINTAIN for STEP 10 minutes.

___ SAT STANDARD: Performer adjusts the potentiometer and obtains 5 kW on the POWER OUT meter. Step is critical to warm up the recombiner.

___ UNSAT EVALUATOR CUE: Time Compression - 10 minutes have elapsed.

COMMENTS:

REV. 0 Page 49 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 13: [12] ADJUST POWER ADJUST potentiometer to obtain 10 CRITICAL kW on POWER OUT meter, and MAINTAIN for 10 STEP minutes.

___ SAT STANDARD: Performer adjusts the potentiometer and obtains 10 kW on the POWER OUT meter. Step is critical to warm up the recombiner. ___ UNSAT EVALUATOR CUE: Time Compression - 10 minutes have elapsed.

COMMENTS:

STEP 14: [13] ADJUST POWER ADJUST potentiometer to obtain 20 ___ SAT kW on POWER OUT meter, and MAINTAIN for 5 minutes.

STANDARD: Performer adjusts the potentiometer and obtains 20 kW on the ___ UNSAT POWER OUT meter. Step is critical to warm up the recombiner.

EVALUATOR CUE: Time Compression - 5 minutes have elapsed.

COMMENTS:

STEP 15: [14] DETERMINE the REQUIRED POWER (kW) based on ___ SAT current CNTMT PRESSURE (psig) using Attachment 3 of TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.

___ UNSAT STANDARD: Performer uses 3 psig containment pressure and reads 70 kW off the Attachment 3 curve in TI-83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES.

COMMENTS:

REV. 0 Page 50 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 16: [15] ADJUST POWER ADJUST potentiometer to obtain the CRITICAL REQUIRED POWER (kW) using Attachment 3 of TI- STEP 83.01, HYDROGEN RECOMBINER REQUIRED POWER-VS-CONTAINMENT PRESSURE CURVES. ___ SAT STANDARD: Performer adjusts the potentiometer and obtains 70 kW on the POWER OUT meter. Step is critical to warm up the recombiner. ___ UNSAT COMMENTS:

NOTES

1) Periodic potentiometer adjustment is necessary to maintain Required Power setting.

Temperature is obtained by selecting an average temperature of all operable thermocouples. Temperature should rise to 1150-1400°F in approximately 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> depending on initial containment temperature.

2) Recombiner temperature should be allowed to stabilize before making power changes due to the lag time between adjustment and actual temperature change.
3) 1 kW power change is approximately equal to 20°F recombiner temperature change.

STEP 17: [16] AFTER recombiner temperature has stabilized for approximately 30 minutes, THEN ADJUST POWER ADJUST potentiometer to maintain 1225 - 1400°F recombiner average temperature. ___ SAT STANDARD:

EVALUATOR CUE: Time Compression - 30 minutes have elapsed, and ___ UNSAT another operator will make adjustments to maintain temperature between 1225 - 1400°F.

COMMENTS:

REV. 0 Page 51 of 128 WATTS BAR NUCLEAR PLANT B.1.e STEP 18: [18] NOTIFY SRO that Recombiner A is in service and will be monitored at least once every 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per Section 8.2.

___ SAT STANDARD: Performer notifies the SRO that A Recombiner is in service.

COMMENTS:

___ UNSAT END OF TASK STOP TIME ________

REV. 6 PAGE 52 OF 128 WATTS BAR NUCLEAR PLANT B.1.f APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit has experienced a LOCA.
2. MCR Crew is following Emergency Instruction E-1, Loss of Reactor or Secondary Coolant.
3. E-1, Step 30 RNO Step c. directs that the hydrogen recombiners be placed in service using SOI-83.01, Containment Hydrogen Recombiners.
4. You are Control Room Operator.

INITIATING CUES:

1. The Unit Supervisor has directed you to place Hydrogen Recombiner A in service, using SOI-83.01, Containment Hydrogen Recombiners.
2. Notify Unit Supervisor when the required power setting is reached

REV. 6 PAGE 53 OF 128 WATTS BAR NUCLEAR PLANT B.1.f B.1.f Synchronizing DG 1B-B from the MCR per SOI-82.02

REV. 6 PAGE 54 OF 128 WATTS BAR NUCLEAR PLANT B.1.f EVALUATION SHEET Task: Synchronizing DG 1B-B from the MCR per SOI-82.02 Alternate Path: N/A Facility JPM #: 3-OT-JPMR060 K/A Rating(s): 064-A1.03 [3.2/3.3 064-A4.01 [4.0/4.3]

064-A2.03 [3.1/3.1] 064-A4.03 [3.2/3.3] 064-A4.06 [3.9/3.9]

Task Standard: 1B-B Diesel Generator is synchronized to the shutdown board from the MCR per SOI-82.02 Section 8.1.4, and then loaded to 3.3 MW and 0.74-1.25 MVARs.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant __ ___ Perform __X____ Simulate ____

References:

SOI-82.02, Diesel Generator (D/G) 1B-B Rev. 65 Task Number: RO-082-SOI-82-002 APPLICABLE FOR: RO/SRO RO-082-SOI-82-008 RO-082-SOI-82-010 10CFR55.45: 3, 4, 6, 8 Validation Time: 18 min. Time Critical: No

===============================================================

Candidate: ___________________________ _________________ Time Start: ________

NAME SSN/ID Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 6 PAGE 55 OF 128 WATTS BAR NUCLEAR PLANT B.1.f SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC # 316.
2. 1B-B Diesel Generator is running unloaded, after an idle start.
b. Place the simulator in RUN momentarily, and acknowledge all alarms.
3. Place simulator in FREEZE until the performer indicates an understanding of the task.
4. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

Ensure a marked-up copy of SOI-82.02 is available to provide to each performer.

Stop Watch, to time Synchroscope rotation.

REV. 6 PAGE 56 OF 128 WATTS BAR NUCLEAR PLANT B.1.f READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit is at 100% power.
2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.
3. The 1B-B DG is running at rated speed, after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.
4. You are an extra control room operator on shift.

INITIATING CUES:

1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs.
2. SOI-82.01, Section 8.1.4 Steps 1 through 3 have been performed.
3. You are to inform the Unit Supervisor when the diesel generator is loaded to 3.3 MWs.

REV. 6 PAGE 57 OF 128 WATTS BAR NUCLEAR PLANT B.1.f START TIME: _______

STEP 1: Obtain a copy of the instruction.

___ SAT STANDARD: A copy of SOI-82.02 Section 8.1.4 has been obtained.

EXAMINERS CUE: After the performer has demonstrated the method ___ UNSAT of obtaining the correct instruction, the evaluator can provide a copy of the instruction.

COMMENTS:

STEP 2: [4] PLACE 1-HS-82-48, DG MODE SELECTOR, in CRITICAL PARALLEL. [0-M-26]. STEP

___ SAT STANDARD: 1-HS-82-48, DG MODE SELECTOR, is placed in PARALLEL. This step is critical for task performance to allow proper operation of voltage regulator & DG speed droop circuits. ___ UNSAT COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 58 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 3: [5] ENSURE the following sync switches for 1B-B D/G in OFF.

NOMENCLATURE LOCATION POSITION UNID MAINTENANCE 6.9 UNIT 0-M-26 OFF 1-HS-57-69 BD 1C SYNC SWITCH ALTERNATE CSST C SYNC 0-M-26 OFF 1-HS-57-115 SWITCH DG SYNC SWITCH 0-M-26 OFF 1-HS-57-74 NORMAL-CSST D SYNC 0-M-26 OFF 1-HS-57-72 SWITCH STANDARD: Performer checks listed sync switches in OFF position ___ SAT COMMENTS:

___ UNSAT STEP 4: [6] PLACE 1-HS-57-74, DG SYNC SWITCH, to SYN. CRITICAL STEP STANDARD: 1-HS-57-74, DG SYNC SWITCH, is placed to SYN position. ___ SAT This step is critical to allow synchronization of D/G to 1B-B Shutdown board.

COMMENTS: ___ UNSAT CAUTION: When adjusting speed and voltage care must be taken to prevent overshooting desired values. Voltage control response is approximately five times faster than speed control response.

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 59 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 5: [7] MATCH generator Incoming Frequency (1-XI-82-32) with CRITICAL Running Frequency (1-XI-82-33) using 1-HS-82-43, STEP SPEED CONTROL [0-M-26].

___ SAT STANDARD: 1-HS-82-43 is used to adjust generator frequency (incoming) on 1-XI-82-32 to match with board frequency (running) on 1-XI-82-33. This step is critical to allow synchronization of D/G to 1B-B Shutdown board. ___ UNSAT COMMENTS:

STEP 6: [8] MATCH generator Incoming Voltage, (1-EI-82-34) with CRITICAL Running Voltage (1-EI-82-35) using 1-HS-82-42, STEP VOLTAGE REGULATOR [0-M-26].

___ SAT STANDARD: 1-HS-82-42 is used to adjust generator voltage on 1-EI 34 to match with board voltage on 1-EI-82-35. This step is critical to allow synchronization of D/G to 1B-B Shutdown board. ___ UNSAT COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 60 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 7: [9] ENSURE DG Frequency and Voltage are MATCHED CRITICAL with 6.9 kV SD Bd, AND ADJUST 1-HS-82-43, SPEED STEP CONTROL, [0-M-26] to obtain desired clockwise rotation (15 or more seconds) on 1-XI-82-31, TRAIN 1B-B

___ SAT SYNCHROSCOPE.

STANDARD: Performer verifies running and incoming frequency and voltage are matched and that the synchroscope is moving ___ UNSAT slowly in the clockwise direction at 15 seconds or more per rotation on the scope. This step is critical to ensure proper DG synchronization that is performed in the next step.

NOTE TO EVALUATOR: The performer may use a stopwatch to time the 15 second rotation. Provide stopwatch if asked.

COMMENTS:

NOTES

1) Steps 8.1.4[10] through 8.1.4[11.3] may be signed off after completion of Step 8.1.4[11.3]
2) Peer checking required on the next step
    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 61 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 8: CRITICAL

[10] WHEN TRAIN 1B-B SYNCHROSCOPE (1-XI-82-31) reaches 12 oclock, THEN TURN 1-HS-57-73A, 1914 - STEP DG TO SD 1B-B, to CLOSE.

___ SAT STANDARD: ACB 1914, DG TO SD 1B-B, is closed with 1-HS-57-73A, when the synchroscope reaches 12 oclock. This step is critical to ensure proper DG synchronization onto 1B-B Shutdown Board. ___ UNSAT COMMENTS:

NOTE Maintain outgoing VARS by periodically adjusting voltage regulator with 1-HS-82-42 while loading DG. Controls should not be operated simultaneously.

STEP 9: [11] PERFORM the following: CRITICAL STEP

[11.1] LOAD DG promptly using 1-HS-82-43, SPEED CONTROL to at least 1.1 Megawatts as indicated on 1-EI-82-40A, DG MEGAWATTS (0-M-26).

___ SAT STANDARD: The generator output is increased to 1.1 MW on 0-EI 40A. This step is critical to ensure proper DG loading and avoid reverse power trip.

___ UNSAT COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 62 OF 128 WATTS BAR NUCLEAR PLANT B.1.f NOTE DG MEGAVARs may swing when the 6.9 KV automatic tap changers engage to stabilize the voltage in the system.

STEP 10: [11.2] PERFORM the following:

[b] MAINTAIN DG MEGAVARS 0.75 to 1.25 OUTGOING on 1-EI-82-41A, with 1-HS-82-42, ___ SAT VOLTAGE REGULATOR.

STANDARD: The generator megavars is adjusted to between 0.75 and 1.25 Megavars on 0-EI-82-41A. ___ UNSAT COMMENTS:

CAUTION Operation of the DG at load of 2.7 MW or less for extended period of time may lead to exhaust fire.

CRITICAL STEP 11: [11.3] PERFORM the following:

STEP

[c] RAISE load to at least 3.3 Megawatts.

STANDARD: The generator output is raised to 3.3 MW on 0-EI 40A. This step is to ensure DG is loaded per task ___ SAT assignment.

___ UNSAT COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 6 PAGE 63 OF 128 WATTS BAR NUCLEAR PLANT B.1.f STEP 12: [11.4] PLACE 1-HS-57-74, DG SYNC SWITCH, to OFF.

STANDARD: 1-HS-57-74, DG SYNC SWITCH, is placed to OFF ___ SAT COMMENTS:

___ UNSAT STEP 13: [11.5] MAINTAIN DG operation for a minimum of one hour, OR until engine temperatures stabilize.

___ SAT STANDARD: Performer reecognizes that the DG must be run for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, OR until engine temperatures stabilize.

EVALUATOR CUE: If asked, state temperatures will be monitored ___ UNSAT locally until they stabilize.

COMMENTS:

STEP 14: Notify the Unit Supervisor that DG 1B-B is synchronized to the shutdown board and loaded to 3.3 MW.

___ SAT STANDARD: The Unit Supervisor is notified that DG 1B-B is synchronized to the shutdown board and loaded to 3.3 MW. ___ UNSAT CUE: As Unit Supervisor, when notified, acknowledge the report.

COMMENTS:

END OF TASK TIME STOP: ________

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 64 OF 128 WATTS BAR NUCLEAR PLANT B.1.g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit is at 100% rated thermal power.
2. Testing is being conducted on 1B-B diesel generator. It is to be paralleled to the shutdown board for a Factory Rep. on site.
3. The 1B-B DG is running at rated speed, after performance of SOI-82.02, Section 8.1.3 Idle Speed to Rated Speed.
4. You are an extra control room operator on shift.

INITIATING CUES:

1. The Unit Supervisor directs you to parallel the 1B-B diesel generator to the 1B-B Shutdown Board per SOI-82.02 and load it to 3.3 MWs.
2. You are to inform the Unit Supervisor when the diesel generator is loaded to 3.3 MWs.
    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 65 OF 128 WATTS BAR NUCLEAR PLANT B.1.g B.1.g Return PRM N-42 to Service per AOI-4

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 66 OF 128 WATTS BAR NUCLEAR PLANT B.1.g Task: Return PRM N-42 to Service per AOI-4 Alternate Path: When rod control is returned to auto a continuous rod insertion occurs requiring performer to return rod control to manual and then a trip of the reactor.

Facility JPM #: 3-OT-JPMR108A Rev 0 K/A Rating(s): 015A4.02 [3.9/3.9] 2.1.23 [3.9/4.0] 001AA1.05 [4.3/4.2]

Task Standard: The DETECTOR CURRENT COMPARATOR switch for UPPER SECTION, the DETECTOR CURRENT COMPARATOR switch for LOWER SECTION, the ROD STOP BYPASS, the POWER MISMATCH BYPASS, and the COMPARATOR CHANNEL DEFEAT have been placed in NORMAL or OPERATE as directed AOI-4, Attachment 1 and then reactor is manually tripped due to continuous rod insertion.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ___ _

References:

AOI-4, NUCLEAR INSTRUMENTATION MALFUNCTIONS, Rev 28 Task Number: RO-092-AOI-4-002 APPLICABLE FOR: RO/SRO RO-085-AOI-2-005 10CFR55.45: 2, 3, 4, 5, 6, 12 Validation Time: 12 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN/EIN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 67 OF 128 WATTS BAR NUCLEAR PLANT B.1.g

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 68 OF 128 WATTS BAR NUCLEAR PLANT B.1.g SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 317.
a. Ensure the following items are displayed on the Director Summary Page:

rd02 Uncontrolled rod insertion, bank d, group 2 100% severity

b. Ensure the switches on 1-M-13 to the N42 position to defeat Power Range Channel N42 inputs per AOI-4, Attachment 1, and Step 1 a. through f.
c. Place the simulator in RUN momentarily, and acknowledge all alarms.
2. Load NRC_Exam_Event_Files.evt from the NRC Exam Flash Drive. The malfunction will be entered when Rod Control Selector Switch is placed in AUTO (Event 23).
3. Place simulator in FREEZE until the performer indicates an understanding of the task.
4. After performer indicates understanding of the task, place simulator to RUN.

Tools/Equipment/Procedures Needed:

Ensure a marked-up copy of AOI-4 is available to the Evaluator and clean copies of AOI-2 in all copies of Abnormal Operating Instructions on the Simulator Floor.

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 69 OF 128 WATTS BAR NUCLEAR PLANT B.1.g READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is at 100% power.
2. PRM N42 failed during last shift.
3. AOI-4 Section 3.4 has been completed through Step 16.a.
4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.
5. You are the Operator at the Controls.

INITIATING CUES:

1. The Unit Supervisor has directed you to return PRM N42 to service.
2. You are to notify the US when the control rods have been returned to AUTO.
    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 2 PAGE 70 OF 128 WATTS BAR NUCLEAR PLANT B.1.g START TIME: _______

STEP 1: Obtain the correct procedure.

___ SAT STANDARD: A copy of AOI-4 has been obtained.

EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator will ___ UNSAT provide a marked-up copy of the instruction.

COMMENTS:

CAUTION Allowing at least 5 minutes between any rod control input (i.e., T-avg, T-ref, or NIS) change and placing rods in AUTO, will help prevent undesired control rod movement.

STEP 2: [Step 16b] REFER TO Attachment 1, PRM Function At NIS Rack, step 2.

___ SAT STANDARD: Performer refers to Attachment 1, PRM Function At NIS Rack, Step 2 for restoration of PRM N42.

___ UNSAT COMMENTS:

REV. 2 PAGE 71 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE TO EVALUATOR: The following steps are from Attachment 1 page 2 of 2 AOI-4 STEP 3: [STEP 2] WHEN PRM is ready for return to service, THEN CRITICAL PERFORM the following steps: STEP

a. PLACE DETECTOR CURRENT COMPARATOR switch for UPPER SECTION in NORMAL

___ SAT STANDARD: Detector Current Comparator Upper Section switch placed to NORMAL (Miscellaneous Control & Indication Panel,1-IDWR-92-N50-G IV)

___ UNSAT Step is critical for proper restoration of upper power detector to current comparator.

COMMENTS:

STEP 4: [STEP 2 b] PLACE DETECTOR CURRENT COMPARATOR CRITICAL switch for LOWER SECTION in NORMAL STEP STANDARD: Detector Current Comparator Lower Section switch placed to NORMAL (Miscellaneous Control & Indication Panel, 1- ___ SAT IDWR-92-N50-G IV).

Step is critical for proper restoration of lower power detector to current comparator. ___ UNSAT COMMENTS:

REV. 2 PAGE 72 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE: On the following step, annunciator window 66-C, 67-C, 68-C, OR 69-C, N-(#) OVERPOWER ROD STOP BYPASSED, will clear depending on which channel is bypassed.

STEP 5: [STEP 2 c] PLACE ROD STOP BYPASS switch in OPERATE. CRITICAL STEP STANDARD: Rod Stop Bypass switch is positioned from N42 to OPERATE (Miscellaneous Control & Indication Panel,1- ___ SAT IDWR-92-N50-G IV)

Step is critical for proper restoration of to enable rod stop interlock protection from this channel. ___ UNSAT COMMENTS:

STEP 6: [STEP 2 d] PLACE POWER MISMATCH BYPASS switch in CRITICAL OPERATE. STEP

___ SAT STANDARD: Power Mismatch Bypass switch is positioned from N42 to OPERATE (Miscellaneous Control & Indication Panel, 1-IDWR-92-N50-G IV)

___ UNSAT Step is critical to restore channel input to high auctioneering circuit and power mismatch circuits.

COMMENTS:

REV. 2 PAGE 73 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE: On the following step, annunciator window 82-E, NIS CHANNEL IN TEST, will clear.

STEP 7: [STEP 2 e] PLACE COMPARATOR CHANNEL DEFEAT switch in CRITICAL NORMAL. STEP

___ SAT STANDARD: Comparator Channel Defeat Switch is positioned to NORMAL (Comparator & Rate Panel, Comparator N37, 1-IDWR-92-N37 IV).

___ UNSAT Step is critical to restore channel input to channel comparator alarm circuits.

COMMENTS:

NOTE: On the following step, annunciator window 115-E, POWER RANGE FLUX RATE HI, will clear if the positive rate trip light is LIT.

STEP 8: [STEP 2 f] IF POSITIVE RATE TRIP is LIT, THEN RESET RATE MODE switch.

STANDARD: Positive Rate Trip light on Power Range Upper N42A, 1-IDWR ___ SAT 42A II, is checked and determines light is NOT LIT and continues to next step.

COMMENTS: ___ UNSAT

REV. 2 PAGE 74 OF 128 WATTS BAR NUCLEAR PLANT B.1.g NOTE TO EVALUATOR: Performer returns to AOI-4 at step 16 c.

STEP 9: [STEP 16 c] ENSURE T-avg and T-ref within 1°.

___ SAT STANDARD: Performer verifies T-avg and T-ref within 1° by recorder 1-TR-68-2B on 1-M-5 or other T-avg - T-ref indications.

___ UNSAT COMMENTS:

STEP 10: [STEP 16 d] ENSURE zero demand on control rod position indication [1-M-4].

STANDARD: Performer determines zero demand on control rod position ___ SAT indication CERPI display or ICS computer display for CERPI

  • CERPI Display
  • Plant computer

___ UNSAT COMMENTS:

REV. 2 PAGE 75 OF 128 WATTS BAR NUCLEAR PLANT B.1.g STEP 11: [STEP 16 e] IF auto rod control desired, PLACE control rods in AUTO. ___ SAT STANDARD: The rod control hand switch has been placed in AUTO position. ___ UNSAT

    • CUE: If asked, respond as US that auto rod control is desired.

NOTE TO EVALUATOR: Continuous rod insertion malfunction is inserted when rod control is placed in AUTO. The operator may immediately return rod control to manual, check for rod motion stopped, and then trip the reactor before referring to AOI-2.

COMMENTS:

NOTE TO EVALUATOR: The Following Steps are from AOI-2 Section 3.2 due to continuous rod insertion.

STEP 12: [STEP 1] PLACE control rods in MAN.

___ SAT STANDARD: Rod control hand switch has been placed in Manual position.

NOTE: Rods will continue to step IN. ___ UNSAT COMMENTS:

REV. 2 PAGE 76 OF 128 WATTS BAR NUCLEAR PLANT B.1.g STEP 13: [STEP 2] CHECK control rod movement STOPPED.

___ SAT STANDARD: Rod control indications have been checked for movement and performer determines that rods are still inserting and goes to RNO for step.

___ UNSAT

    • NOTE: Rods will continue to step IN.

COMMENTS:

STEP 14: [STEP 2 RNO] TRIP reactor. GO TO E-0, Reactor Trip or CRITICAL Safety Injection. STEP

___ SAT STANDARD: Reactor Trip hand switch on 1-M-4 or 1-M-6 has been placed to the TRIP position. Performer than goes to E-0.

Critical step, as uncontrolled rod movement in manual rod ___ UNSAT control requires a reactor trip.

    • CUE: Upon transition to E-O, inform performer WELL STOP HERE.

COMMENTS:

END OF TASK TIME STOP: ________

REV. 0 PAGE 77 OF 128 WATTS BAR NUCLEAR PLANT B.1.h APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is at 100% power.
2. PRM N42 failed during last shift.
3. AOI-4 Section 3.4 has been completed through Step 16.a.
4. Work Control has notified the MCR that repairs to PRM N42 are complete and the instrument is ready to be returned to service.
5. You are the Operator at the Controls.

INITIATING CUES:

1. The Unit Supervisor has directed you to return PRM N42 to service.
2. You are to notify the US when the control rods have been returned to AUTO.

REV. 0 PAGE 78 OF 128 WATTS BAR NUCLEAR PLANT B.1.h B.1.h Shutdown A Train EGTS Following a 10 Hour Run per SOI-65.02.

REV. 0 PAGE 79 OF 128 WATTS BAR NUCLEAR PLANT B.1.h Task: Shutdown A Train EGTS Following a 10 Hour Run per SOI-65.02.

Alternate Path: N/A Facility JPM #: 3-OT-JPMR169 K/A Rating(s): 027A4.01 (3.3*/3.3*)

Task Standard: EGTS A Train has been shutdown and returned to ES Standby alignment in accordance with SOI-65.02.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __X__ In-Plant _____ Perform __X___ Simulate ___ _

References:

SOI-65.02 Emergency Gas Treatment System Rev. 24 Task Number: RO-065-SOI-65-005 APPLICABLE FOR: RO/SRO 10CFR55.45: 3, 6, 8 Validation Time: 15 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 80 OF 128 WATTS BAR NUCLEAR PLANT B.1.h SIMULATOR OPERATOR INSTRUCTIONS:

1. Initialize to IC 318
2. Ensure the alignment for A Train EGTS in service:

1-FCV-65 Open.

1-FCO-65 Open.

1-HS-65-81/86 - OPEN 1-HS-65-83/87 in A-AUTO STANDBY 0-HS-65-23A - RUNNING.

3. Acknowledge all alarms.
5. Freeze simulator until the performer indicates understanding of the task and time is allowed for control board familiarization.
5. After performer indicates understanding of task, place simulator in run.

SIMULATOR OPERATOR INSTRUCTIONS:

NONE Tools/Equipment/Procedures Needed:

Ensure clean copy of SOI-65.02 in all copies of Operating Instructions on the Simulator Floor.

REV. 0 PAGE 81 OF 128 WATTS BAR NUCLEAR PLANT B.1.h READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is at 100% power.
2. 0-SI-65-6-A Emergency Gas Treatment System Train A 10-Hour Operation performance in progress.
3. A Train EGTS Fan has been in service for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.
4. You are a support operator in the control room.

INITIATING CUES:

1. The Unit Supervisor directs you shutdown the A Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.
2. You are to notify Unit Supervisor when you have completed the task.

REV. 0 PAGE 82 OF 128 WATTS BAR NUCLEAR PLANT B.1.h START TIME: _______

STEP 1: Obtain a copy of the procedure.

___ SAT STANDARD: A copy of SOI-65.02 section 7.1 has been obtained.

EXAMINERS CUE: After the performer has demonstrated the method of obtaining the correct instruction, the evaluator ___ UNSAT provides a copy of the instruction.

NOTE TO EVALUATOR: Performer may also identify Section 5.0 as needed to return EGTS to standby. You may provide a copy of this section when performer seeks to obtain a copy.

COMMENTS:

CAUTION: If EGTS is in service due to an accident signal initiation, and the charcoal filter banks have decay heat, an engineering evaluation must be performed before shutting down the EGTS system.

NOTE If EGTS was Auto actuated, both Trains shutdown sections must be performed prior to return to standby readiness.

STEP 2: [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.

STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D ___ SAT

ØA light DARK.

COMMENTS:

___ UNSAT

REV. 0 PAGE 83 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 3: [Step 2] Momentarily PLACE 0-HS-65-23A, EGTS FAN & CRITICAL DISCH DMPR, in STOP (returns to A-AUTO). STEP STANDARD: Performer stops A Train EGTS Fan with 0-HS-65-23A and checks red light off and green light ON the associated handswitch. ___ SAT Step is critical to shutdown the running EGTS Fan.

COMMENTS: ___ UNSAT STEP 4: [Step 3] ENSURE 1-FCV-65-8, EGTS TR-A U1 SUCT DMPR, ___ SAT CLOSED.

STANDARD: Performer checks 1-HS-65-8 and verifies red light off and green light ON for the associated hand switch ___ UNSAT Step is critical to shutdown return ventilation lineup to normal following 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> run.

COMMENTS:

STEP 5: [Step 4] PERFORM the following: CRITICAL

[a] CLOSE 1-FCO-65-10, EGTS TR-A U1 SUCT DMPR. STEP

[b] CLOSE 1-FCO-65-26, EGTS TO U1 SHIELD BLDG.

___ SAT STANDARD: Performer closes 1-FCO-65-10 with 1-HS-65-10; performer closes 1-FC0-65-26 with 1-HS-65-26. Respective hand switches red lights are off and green lights are LIT. ___ UNSAT Step is critical to shutdown return ventilation lineup to normal following 10 hour1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> run.

COMMENTS:

REV. 0 PAGE 84 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 6: [STEP 5] IF Train A EGTS to be returned to STANDBY, THEN: CRITICAL PERFORM the following: STEP NOMENCLATURE LOCATION POSITION UNID EGTS TR-A U1 SUCT DMPR 0-M-27B A AUTO 1-HS-65-10 EGTS TR-A U1 SHIELD BLDG 0-M-27B A AUTO 1-HS-65-26 STANDARD: Performer places 1-HS-65-10 and 1-HS-65-26 to the A AUTO ___ SAT position.

Step is critical to return these hand switches to ES Standby alignment. ___ UNSAT COMMENTS:

STEP 7: [Step 6] IF Train B EGTS is to be shutdown, THEN GO TO Section 7.2.

STANDARD: Performer determines that this step does not apply and ___ SAT proceeds to the next step.

COMMENTS:

___ UNSAT STEP 8: [Step 7] IF EGTS is to be returned to STANDBY, THEN GO TO Section 5.0 to align EGTS for STANDBY.

STANDARD: Performer goes to Section 5.0. ___ SAT COMMENTS:

___ UNSAT

REV. 0 PAGE 85 OF 128 WATTS BAR NUCLEAR PLANT B.1.h NOTE TO EVALUATOR: The following performance steps are from section 5.1 of SOI-65.02.

CAUTION IF EGTS is being returned to standby after auto actuation, THEN both Sections 7.1 and 7.2 must be performed prior to Standby Readiness alignment.

STEP 9: [Step 1] ENSURE a ØA Cntmt Isolation signal is NOT present.

STANDARD: Performer determines that ØA Cntmt Isolation signal is NOT present by checking Master Isol Signal PNLs 1-XX-55-6C & 6D ___ SAT

ØA light DARK.

NOTE TO EVALUATOR: This was previously performed in step 2 of JPM. ___ UNSAT COMMENTS:

STEP 10: [Step 2] ENSURE the following valves are CLOSED and CRITICAL PLACE 1-HS-65-81/86 in A AUTO. STEP NOMENCLATURE LOCATION POSITION UNID U1 EGTS-ANN P CNTLR A 0-M-27B A AUTO 1-HS-65-81/86 ISOL STANDARD: Performer locates 1-HS-65-81/88 and places in A-AUTO. Step ___ SAT is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.

COMMENTS: ___ UNSAT

REV. 0 PAGE 86 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 11: [STEP 3] ENSURE breaker position for the following:

NOMENCLATURE LOCATION POSITION UNID 120VAC VITAL INST POWER BD 1-I EGTS TRAIN A AUX RELAYS Bkr 38 OFF 1-BKR-235-1/38 1-PCV-65-81/1-PCV-65-86 STANDARD: Performer contacts the Control Building AUO (or an AUO) and ___ SAT requests performance of Step 3.

    • CUE: When asked as the AUO, state 1-BKR-235-1/38 is in the OFF position. ___ UNSAT COMMENTS:

STEP 12: [Step 4] ENSURE the following valves are CLOSED and CRITICAL PLACE 1-HS-65-83/87 in A AUTO. STEP NOMENCLATURE LOCATION POSITION UNID U1 EGTS-ANN P CNTLR B 0-M-27B A AUTO 1-HS-65-83/87 ISOL STANDARD: Performer locates 1-HS-65-83/87 and places in A-AUTO. Step ___ SAT is critical to establishing EGTS configuration for automatic start after a ØA Cntmt Isolation signal.

COMMENTS: ___ UNSAT

REV. 0 PAGE 87 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 13: [STEP 5] ENSURE breaker position for the following:

NOMENCLATURE LOCATION POSITION UNID 120VAC VITAL INST POWER BD 1-II EGTS TRAIN B AUX RELAYS Bkr 38 OFF 1-BKR-235-2/38 1-PCV-65-81/1-PCV-65-86 STANDARD: Performer contacts an AUO and requests performance of Step ___ SAT 5.

    • CUE: When asked as the AUO, state1-BKR-235-2/38 is in the OFF position. ___ UNSAT COMMENTS:

STEP 14: [STEP 6] PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID EGTS FAN A & DISCHG DMPR 0-M-27B A AUTO 0-HS-65-23A EGTS FAN B & DISCHG DMPR 0-M-27B A AUTO 0-HS-65-42A STANDARD: Performer locates 0-HS-65-23A and ensures in A-AUTO. ___ SAT Performer locates 0-HS-65-42A and ensures in A-AUTO.

COMMENTS:

___ UNSAT

REV. 0 PAGE 88 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 15: [STEP 7] OPEN the following valves, and PLACE the CRITICAL handswitches in A AUTO: STEP NOMENCLATURE LOCATION POSITION UNID U1 ANN VAC FANS SUCT 0-M-27B OPEN, HS in 0-HS-65-52 A AUTO U1 ANN VAC FANS SUCT 0-M-27B OPEN, HS in 0-HS-65-53 A AUTO STANDARD: Performer locates 0-HS-65-52 and ensures OPEN and in A- ___ SAT AUTO.

Performer locates 0-HS-65-53 and ensures OPEN and in A-AUTO.

Step is critical to establishing EGTS configuration for ___ UNSAT automatic start after a ØA Cntmt Isolation signal.

COMMENTS:

NOTES

1) The following step may be N/Ad if annulus vacuum fans are running.
2) If a phase A signal has been present, the next step may start one Ann Vac Fan due to low flow.

Either fan may be selected first. Flow should be allowed to stabilize before the second fan is placed in auto to avoid two fans running. SOI-65.01 Section 5.0 should be referenced to ensure proper damper alignment and control after fan start.

REV. 0 PAGE 89 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 16: [STEP 8] PLACE the following handswitches in STOP to break seal-in, AND RETURN to A-P AUTO:

NOMENCLATURE LOCATION POSITION UNID ANN VAC FAN 1A & SUCT FCO 0-M-27B A P AUTO 1-HS-65-77A ANN VAC FAN 1B & SUCT FCO 0-M-27B A P AUTO 1-HS-65-74A STANDARD: Performer verifies that annulus vacuum fans are running and ___ SAT N/As the step.

COMMENTS: ___ UNSAT STEP 17: [STEP 9] IF an accident signal (A) has occurred and WHEN Annulus P is greater than 4.0 in. H2O, THEN: (N/A if TACF 1-07-0002-065 is in effect.) PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID PCV-65-81 and PCV-65-86, A5W/737, 1-JB -292- RESET 1-HS-65-80 and EGTS CNTMT ANNULUS DP 4013-A, N. of GFFD 1-HS-65-90 RESET Rm.

PCV-65-83 and PCV-65-87, A4V/737, 1-JB-292- RESET 1-HS-65-82 and EGTS CNTMT ANNULUS DP 4015-B, S. of GFFD 1-HS-65-97 RESET Rm.

STANDARD: Performer determines that no accident signal was present and ___ SAT N/As the step COMMENTS:

___ UNSAT CAUTION PDIC-65-80 & 82 Setpoint Thumbwheels are adjusted by MIG only.

REV. 0 PAGE 90 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 18: [STEP 10] ENSURE the following controllers in AUTO: CRITICAL STEP NOMENCLATURE LOCATION POSITION UNID EGTS-ANN P 0-M-27B AUTO 1-PDIC-65-82 CONTROL EGTS-ANN P 0-M-27B AUTO 1-PDIC 80 CONTROL STANDARD: Performer locates 1-PDIC-65-82 and ensures controller is in ___ SAT AUTO Performer locates 1-PDIC 80 and ensures controller is in AUTO Step is critical to establish EGTS standby alignment. ___ UNSAT COMMENTS:

REV. 0 PAGE 91 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 19: [STEP 11] ENSURE the following:

NOMENCLATURE LOCATION POSITION UNID EGTS TR A DECAY 0-M-27B CLOSE 0-HS-65-28B COOLING EGTS TR A DECAY 0-M-27B CLOSE 0-HS-65-28A COOLING EGTS TR B DECAY 0-M-27B CLOSE 0-HS-65-47A COOLING EGTS TR B DECAY 0-M-27B CLOSE 0-HS-65-47B COOLING STANDARD: ___ SAT Performer locates 0-HS-65-28B and ensures that it is CLOSED.

Performer locates 0-HS-65-28A and ensures that it is ___ UNSAT CLOSED.

Performer locates 0-HS-65-47A and ensures that it is CLOSED.

Performer locates 0-HS-65-47B and ensures that it is CLOSED.

COMMENTS:

REV. 0 PAGE 92 OF 128 WATTS BAR NUCLEAR PLANT B.1.h STEP 20: [STEP 12] PERFORM the following: CRITICAL STEP NOMENCLATURE LOCATION POSITION UNID EGTS TR-A U1 SUCT 0-M-27B A AUTO 1-HS-65-10 DMPR EGTS TR-A U1 SUCT 0-M-27B CLOSE 1-HS-65-8 DMPR EGTS FAN B U1 0-M-27B CLOSE 1-HS-65-51 SUCT DMPR EGTS TR-B U1 SUCT 0-M-27B A AUTO 1-HS-65-30 DMPR EGTS TO U1 SHIELD 0-M-27B A AUTO 1-HS-65-26 BLDG EGTS TO U1 SHIELD 0-M-27B A AUTO 1-HS-65-27 BLDG STANDARD:

___ SAT Performer locates 1-HS-65-10 and ensures that it is in A-AUTO.

Performer locates 1-HS-65-8 and ensures that it is CLOSED.

Performer locates 1-HS-65-51 and ensures that it is CLOSED. ___ UNSAT Performer locates 1-HS-65-30 and ensures that it is in A-AUTO.

Performer locates 1-HS-65-26 and ensures that it is in A-AUTO.

Performer locates 1-HS-65-27 and ensures that it is in A-AUTO.

Step is critical to establish EGTS standby alignment.

COMMENTS:

STEP 21: Notify the Unit Supervisor that A Train EGTS Fan is shutdown ___ SAT and realigned for standby readiness.

STANDARD: Performer notifies the Unit Supervisor that A Train EGTS Fan is shutdown and realigned for standby readiness. ___ UNSAT COMMENTS:

END OF TASK TIME STOP: ________

REV. 0 PAGE 93 0F 128 WATTS BAR NUCLEAR PLANT B.1.i APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is at 100% power.
2. 0-SI-65-6-A Emergency Gas Treatment System Train A 10-Hour Operation performance in progress.
3. A Train EGTS Fan has been in service for 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.
4. You are a support operator in the control room.

INITIATING CUES:

1. The Unit Supervisor directs you shutdown the A Train EGTS Fan per SOI-65.02 and return EGTS to Standby Alignment per the procedure.
2. You are to notify Unit Supervisor when you have completed the task.

REV. 0 PAGE 94 0F 128 WATTS BAR NUCLEAR PLANT B.1.i B.1.j Perform a boration of the RCS (LOCALLY) per AOI-34

REV. 0 PAGE 95 0F 128 WATTS BAR NUCLEAR PLANT B.1.i Task: Perform a Boration of the RCS (LOCALLY) per AOI-34 Alternate Path: 1-FCV-62-138 will not open locally, requiring manual valve 1-ISV-62-929 to be opened locally. This also requires use of control room flow indication, since the indication of flow via this path is not available locally.

Facility JPM #: 3-OT-JPMA020B Rev 4.

K/A Rating(s): 024AA1.04 [3.6/3.7] 024AK3.01 [4.1/4.4]

024AA1.18 [3.7/3.6] 024AA1.20 [3.2/3.3]

Task Standard: Boration flow has been established on 1-FI-62-139 after opening 1-ISV-62-929 locally.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X__ Perform ______ Simulate __X__

References:

AOI-34, IMMEDIATE BORATION, Rev. 23.

Task Number: AUO-062-AOI-27-001 APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 6, 8, 9, 10 Validation Time: 17 min. Time Critical: No

===============================================================

Candidate: ___________________________ _________________ Time Start: ________

NAME SSN/EIN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 96 0F 128 WATTS BAR NUCLEAR PLANT B.1.i

REV. 0 PAGE 97 0F 128 WATTS BAR NUCLEAR PLANT B.1.i Tools/Equipment/Procedures Needed:

Hard Hat, Gloves, Safety Glasses, Hearing Protection, and Plant Approved Shoes.

Procedure AOI-34, Immediate Boration.

ALARA considerations NOTE: Start this JPM at the RAD WASTE DESK.

REV. 0 PAGE 98 0F 128 WATTS BAR NUCLEAR PLANT B.1.i READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547°F.
2. The normal makeup controls did not function correctly to establish boric acid flow.
3. Both Boric Acid pumps are operating in FAST speed.
4. 1-FCV-62-138 did not open from the Main Control Room.

INITIATING CUES:

1. You have been assigned to perform AOI-34, Step 6 actions to locally establish boric acid flow.
2. You are to notify the MCR operator when you have established boric acid flow.

REV. 3 PAGE 99 0F 13 WATTS BAR NUCLEAR PLANT B.1.i START TIME: _______

STEP 1: Obtain a copy of the appropriate instruction.

___ SAT STANDARD:

EXAMINERS CUE: After the method of obtaining an instruction properly has been demonstrated, the evaluator ___ UNSAT provides a copy of the instruction.

COMMENTS:

STEP 2: [STEP 6.b. RNO] Locally ADJUST 1-FCV-62-138 to obtain CRITICAL required flow. STEP STANDARD: 1-FCV-138-B, EMERGENCY BORATION FLOW CONTROL, is located. The manual lever is pushed to the manual position (in ___ SAT direction of arrow) and the performer opens the valve by turning the hand wheel in the counter-clockwise direction.

Step is critical to establish flow path.

___ UNSAT CUE: After performer indicates how to open the valve state the motor operator hand wheel will NOT rotate.

COMMENTS:

REV. 3 PAGE 100 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 3: [STEP 6.c.] CHECK emergency borate flow on 1-FI-62-137A. CRITICAL STEP STANDARD: 1-FI-62-137A.has been located and checked and ___ SAT determination made that no flow has been established. Entry into c. RNO is therefore required. Step is critical to evaluating whether a flow path has been established.

___ UNSAT CUE: When performer checks FI-62-137A, state the indicator reads 0.

COMMENTS:

Note: The following step is required since valve could not be operated electrically STEP 4: [STEP 6c. RNO] Locally OPEN manual boration valve 1-ISV- CRITICAL 62-929 [Blender Station/713]. STEP STANDARD: 1-ISV-62-929 is opened by turning the hand wheel in the counter-clockwise direction. Step is critical because it ___ SAT initiates boration flow.

CUE: After performer indicates how to open the valve, state, the hand wheel was rotated many turns in the counter- ___ UNSAT clockwise direction and has stopped.

COMMENTS:

REV. 3 PAGE 101 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 5: [STEP 6.c. RNO continued] ENSURE BA flow control 1-FCV- CRITICAL 62-140 OPEN. STEP STANDARD: Performer observes 1-FCV-62-140 and determines that the ___ SAT valve is OPEN. Step is critical because 1-FCV-62-140 is in series with 1-ISV-62-929 and must be in the OPEN position in order to establish boration flow.

___ UNSAT COMMENTS:

STEP 6: [STEP c. RNO continued] ENSURE BA to Blender, 1-FI 139, indicating flow.

___ SAT STANDARD: Performer contacts the MCR to determine if flow is indicated on 1-FI-62-139.

___ UNSAT CUE: When MCR is contacted, state1-FI-62-139 is indicating 40 gpm.

COMMENTS:

REV. 3 PAGE 102 0F 13 WATTS BAR NUCLEAR PLANT B.1.i STEP 15: [7] IF emergency boration flow established, THEN GO TO Step 9.

STANDARD: Performer contacts MCR and reports that emergency boration flow has been established. ___ SAT CUE: Acknowledge report as MCR operator using repeat back.

COMMENTS: ___ UNSAT END OF TASK TIME STOP: ________

REV. 0 PAGE 103 0F 15 WATTS BAR NUCLEAR PLANT B.1.j CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Reactor has been tripped and AOI-34 is being performed due to an RCS cooldown resulting in temperature less than 547°F.
2. The normal makeup controls did not function correctly to establish boric acid flow.
3. Both Boric Acid pumps are operating in FAST speed.
4. 1-FCV-62-138 did not open from the Main Control Room.

INITIATING CUES:

1. You have been assigned perform AOI-34, Step 6.b RNO actions to locally establish boric acid flow.
2. You are to notify the MCR operator when you have established boric acid flow.

REV. 0 PAGE 104 0F 15 WATTS BAR NUCLEAR PLANT B.1.j B.1.j Perform E-3, Attachment 3, Steamline Isolation (Local)

REV. 0 PAGE 105 0F 15 WATTS BAR NUCLEAR PLANT B.1.j Task: Perform E-3, Attachment 3, Steamline Isolation (Local)

Alternate Path: N/A Facility JPM #: 3-OT-JPMA054 Rev 3 K/A Rating(s): 038 EA1.32 [4.6/4.7] 2.1.30 [3.9/3.4]

Task Standard: All nine steam line traps have been located. One steam trap has been isolated (all others are isolated the same way). Main steam supplies to each MFP turbine have been located and isolated.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator __ __ In-Plant __ X__ Perform ______ Simulate __X__

References:

E-3, Steam Generator Tube Rupture, Rev. 22 Task Number: RO-113-EOP-3-001 APPLICABLE FOR: AUO/RO/SRO 10CFR55.45: 5.6 Validation Time: 20 min. Time Critical: No

===============================================================

Candidate: ___________________________ _________________ Time Start: ________

NAME SSN/EIN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 0 PAGE 106 0F 15 WATTS BAR NUCLEAR PLANT B.1.j Tools/Equipment/Procedures Needed:

Hard Hat, Safety Glasses, Flashlight, Hearing Protection, Gloves, and Plant Approved Shoes.

E-3, Attachment 3.

SAFETY Considerations:

High Temperature Pipes, Ladder Safety, ALARA considerations.

NOTE: Start this JPM in the MCR.

EVALUATOR NOTE: Provide copy of E-3, Attachment 3, Steamline Isolation (Local) to performer with candidates cue sheet.

REV. 0 PAGE 107 0F 15 WATTS BAR NUCLEAR PLANT B.1.j READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 3 after a Steam Generator tube rupture on S/G # 2.
2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.
3. Main Steam line warming is NOT in progress.

INITIATING CUES:

1. The MCR operator has directed you to locally isolate the steam traps and Main Feed Pump Turbine on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local).
2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.

REV. 0 PAGE 108 0F 15 WATTS BAR NUCLEAR PLANT B.1.j START TIME: _______

STEP 1: Obtain a copy of the procedure.

STANDARD: A copy of E-3, Attachment 3, Steamline Isolation (Local) is ___SAT obtained.

EXAMINERS CUE: Provide E-3, Attachment 3,Steamline Isolation (Local) to the performer. ___UNSAT COMMENTS:

STEP 2: [Step 1] COORDINATE steam trap isolation with RADPROT.

STANDARD: The performer contacts RADCON.

___SAT CUE: As RADCON when contacted, state that survey of steam lines has been made and is continuing periodically.

___UNSAT COMMENTS:

EXAMINER NOTE:

the performer must locate all nine steam traps and demonstrate how to isolate one of them.

The performer may use a flashlight to point out the hard to reach moisture traps.

The performer must locate an EOP ladder for use in operating valves, located in hard to reach locations

REV. 0 PAGE 109 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 3: [STEP 2] CLOSE at least one valve listed for each steam moisture CRITICAL trap manifold: STEP

[MAIN STEAM LINES]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 200 1-ISV-1-916 OR 1-ISV-1-922 [T1M/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-200 can be accomplished by either closing 1-ISV-1-916 or closing 1-ISV ___SAT 922. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state ___UNSAT the hand wheel turns a few rotations and gets snug.

COMMENTS:

REV. 0 PAGE 110 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 4: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[MAIN STEAM LINES]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 201 1-ISV-1-926 OR 1-ISV-1-932 [T1M/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-201 can be ___SAT accomplished by either closing 1-ISV-1-926 or closing 1-ISV 932. (Rotating hand wheel clockwise) Step is critical to isolate flow path.

___UNSAT CUE: After the performer has demonstrated how to close the valve, state the hand wheel turns a few rotations and gets snug.

COMMENTS:

STEP 5: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[MAIN STEAM LINES]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 202 1-ISV-1-936 OR 1-ISV-1-942 [T1M/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-202 can be ___SAT accomplished by either closing 1-ISV-1-936 or closing 1-ISV 942. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

___UNSAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug.

COMMENTS:

REV. 0 PAGE 111 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 6: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[MAIN STEAM LINES]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 203 1-ISV-1-946 OR 1-ISV-1-952 [T1M/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-203 can be accomplished by either closing 1-ISV-1-946 or closing 1-ISV ___SAT 952. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state ___UNSAT that the hand wheel turns a few rotations and gets snug.

COMMENTS:

STEP 7: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[COMMON STEAM HEADER]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 204 1-ISV-1-956 OR 1-ISV-1-962 [T4J/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-204 can be ___SAT accomplished by either closing 1-ISV-1-956 or closing 1-ISV 962. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

___UNSAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug.

COMMENTS:

REV. 0 PAGE 112 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 8: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[COMMON STEAM HEADER]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 206 1-ISV-1-966 OR 1-ISV-1-972 [T6J/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-206 can be accomplished by either closing 1-ISV-1-966 or closing 1-ISV 972. (Rotating hand wheel clockwise). Step is critical to ___SAT isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns a few rotations and gets snug. ___UNSAT COMMENTS:

STEP 9: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[STEAM DUMP HEADER]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 207 1-ISV-1-976 OR 1-ISV-1-982 [T7H/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-207 can be accomplished by either closing 1-ISV-1-976 or closing 1-ISV ___SAT 982. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state ___UNSAT that the hand wheel turns a few rotations and gets snug.

COMMENTS:

REV. 0 PAGE 113 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 10: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[STEAM DUMP HEADER]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 208 1-ISV-1-986 OR 1-ISV-1-992 [T7G/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-208 can be accomplished by either closing 1-ISV-1-986 or closing 1-ISV ___SAT 992. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state ___UNSAT that the hand wheel turns a few rotations and gets snug.

COMMENTS:

REV. 0 PAGE 114 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 11: [STEP 2 continued] CLOSE at least one valve listed for CRITICAL each steam moisture trap manifold: STEP

[STEAM DUMP HEADER]

MSTR TRAP LEVEL MSTR TRAP ### MSTR TRAP DRAIN LOCATION SWITCH ### STR ISOL ISOL 209 1-ISV-1-996 OR 1-ISV-1-1002 [T7F/708]

STANDARD: The performer locates each moisture trap. Demonstration of the isolation of the trap associated with 1-LS-209 can be accomplished by either closing 1-ISV-1-996 or closing 1-ISV ___SAT 1002. (Rotating hand wheel clockwise). Step is critical to isolate flow path.

CUE: After the performer has demonstrated how to close the valve, state ___UNSAT that the hand wheel turns a few rotations and gets snug.

COMMENTS:

STEP 12: [STEP 3] CLOSE steam supply isolation and bypass for CRITICAL each Main Feed Pump Turbine: STEP MFPT NOMENCLATURE LOCATION POSITION UNID 1A MFPT 1A HP STEAM T2J/729 CLOSED 1-ISV-1-611 SUPPLY ISOL STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.

___SAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations and gets snug.

___UNSAT COMMENTS:

REV. 0 PAGE 115 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 13: [STEP 3 continued] CLOSE steam supply isolation and bypass for each Main Feed Pump Turbine:

MFPT NOMENCLATURE LOCATION POSITION UNID 1A MFPT 1A HP STEAM T2J/729 CLOSED 1-IBV-1-613 SUPPLY ISOL BYPASS STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).

CUE: After the performer has demonstrated how to close the valve, state ___SAT the hand wheel does not move with clockwise force on hand wheel.

COMMENTS: ___UNSAT STEP 14: [STEP 3 continued] CLOSE steam supply isolation and CRITICAL bypass for each Main Feed Pump Turbine: STEP MFPT NOMENCLATURE LOCATION POSITION UNID 1B MFPT 1B HP STEAM T2H/729 CLOSED 1-ISV-1-612 SUPPLY ISOL STANDARD: The performer locates valve and closes valve (rotating hand wheel clockwise). Step is critical to isolate flow path.

___SAT CUE: After the performer has demonstrated how to close the valve, state that the hand wheel turns many rotations and gets snug.

___UNSAT COMMENTS:

REV. 0 PAGE 116 0F 15 WATTS BAR NUCLEAR PLANT B.1.j STEP 16: [STEP 3] CLOSE steam supply isolation and bypass for each MFPT:

MFPT NOMENCLATURE LOCATION POSITION UNID 1B MFPT 1B HP STEAM T2H/729 CLOSED 1-IBV-1-614 SUPPLY ISOL BYPASS STANDARD: The performer locates valve and checks valve closed (rotating hand wheel clockwise).

___SAT CUE: After the performer has demonstrated how to close the valve, state the hand wheel does not move with clockwise force on hand wheel.

___UNSAT COMMENTS:

STEP 17: Notify the MCR Operator that local main steam isolation has been completed per E-3, Attachment 3.

STANDARD: The MCR Operator has been notified that local main steam isolation has been performed per E-3, Attachment 3. ___SAT CUE: When notified, acknowledge the report.

COMMENTS: ___UNSAT END OF TASK TIME STOP: ________

REV. 4 PAGE 117 0F 128 WATTS BAR NUCLEAR PLANT B.1.k CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit 1 is in Mode 3 after suffering a Steam Generator tube rupture on S/G # 2.
2. The Main Steam Isolation Valve (MSIV) on S/G # 2 has failed to close.
3. Main Steam line warming is NOT in progress.

INITIATING CUES:

1. The MCR operator has directed you to locally isolate the steam traps and MFPT on the main steam system by performing E-3, Attachment 3, Steamline Isolation (Local).
2. You are to notify the MCR operator when E-3, Attachment 3 has been completed.

REV. 4 PAGE 118 0F 128 WATTS BAR NUCLEAR PLANT B.1.k B.1.k Place the CVCS Cation Demineralizer in Service per SOI-62.04

REV. 4 PAGE 119 0F 128 WATTS BAR NUCLEAR PLANT B.1.k Task: Place the CVCS Cation Demineralizer in Service per SOI-62.04 Alternate Path: N/A Facility JPM #: 3-OT-JPMA041 K/A Rating(s): 004A1.07 [2.7/3.1]

Task Standard: The appropriate valves have been located and opened to place the CVCS cation bed in service per SOI-62.04.

Preferred Evaluation Location: Preferred Evaluation Method:

Simulator ____ In-Plant __X___ Perform __X___ Simulate ___ _

References:

SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53 Task Number: AUO-062-AOI-028-001 APPLICABLE FOR: RO/SRO 10CFR55.45: 8, 9 Validation Time: 20 min. Time Critical: No

===============================================================

Applicant: ___________________________ _________________ Time Start: ________

NAME SSN Time Finish: ________

Performance Rating: SAT ____ UNSAT ____ Performance Time ___

Examiner: _____________________________ _____________________________/________

NAME SIGNATURE DATE

===============================================================

COMMENTS

REV. 4 PAGE 120 0F 128 WATTS BAR NUCLEAR PLANT B.1.k Tools/Equipment/Procedures Needed:

Hard Hat, Safety Glasses, Hearing Protection, Gloves and Plant Approved Shoes Copy of SOI-62.04, CVCS PURIFICATION SYSTEM, Rev. 53, Section 8.2 and Attachment 1 with data entered.

SAFETY CONSIDERATIONS:

Hot pipes, high noise, and heat.

Radiation levels.

Ladder use to reach valve handwheels.

REV. 4 PAGE 121 0F 128 WATTS BAR NUCLEAR PLANT B.1.k READ TO OPERATOR DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Unit is at 100% power.
2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.
3. RCS boron concentration is 870 ppm.
4. Chemistry has requested that cation bed be placed in service for 53 minutes.
5. The Cation bed has been filled and vented.
6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.

INITIATING CUES:

1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.
2. You are to notify the MCR when the CVCS Cation Bed is in service.

REV. 0 PAGE 122 0F 128 WATTS BAR NUCLEAR PLANT B.1.k START TIME: _______

STEP 1: Obtain a copy of the procedure. ___ SAT STANDARD: Performer has obtained a copy of SOI-62.04, Section 8.2 EXAMINERS CUE: After the performer has demonstrated the method of ___ UNSAT obtaining the correct instruction, the evaluator can provide a copy of the instruction.

COMMENTS:

STEP 2: [1] ENSURE CB FILLED and VENTED per Section 8.1. ___ SAT STANDARD: Performer determines the Cation Bed is filled and vented per the INITIAL CONDITIONS provided. ___ UNSAT EXAMINERS CUE: If asked, inform the performer that Section 8.1 is complete.

COMMENTS:

Due to the location of one of the valve handwheels that will be operated, the performer may require a ladder to reach the valve handwheel. If required, a general use ladder, NOT an EOP ladder, must be located by the operator.

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 123 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 3: [2] PERFORM the following:

NOMENCLATURE LOCATION POSITION UNID CVCS CATION DEMIN BED A3T/713 CLOSED 1-ISV-62-915 INLET CVCS CATION DEMIN BED A3T/713 CLOSED 1-ISV-62-916 OUTLET CVCS CATION DEMIN BED A3T/713 CLOSED 1-VTV-62-917 VENT CVCS CATION DEMIN BED A5U/737 CLOSED 1-ISV-62-918 RESIN FILL CVCS CATION DEMIN BED A7U/713 CLOSED 1-ISV-62-919 RESIN DISCH CVCS CATION DEMIN BED A3T/713 CLOSED 1-DRV-62-920 DRAIN CVCS CATION BED FLUSH A3T/713 CLOSED 1-FLV-62-921 STANDARD: The above listed valves have been located and checked closed ___ SAT (clockwise to close).

EVALUATOR CUE: If the performer attempts to move the handwheel clockwise then counterclockwise, state the ___ UNSAT handwheel will not rotate.

COMMENTS:

STEP 4: [3] ENSURE 1-ISV-62-922, CVCS MIXED BED DEMIN ___ SAT OUTLET [A3T/713], is OPEN.

STANDARD: 1-ISV-62-922 is verified to be open.

___ UNSAT EVALUATOR CUE: If the performer attempts to move the handwheel clockwise then counterclockwise, state the handwheel will not rotate.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 124 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 5: [4] REVIEW Attachment 1, Resin Status Sheet to ensure CB is ___ SAT FILLED and BORATED.

STANDARD: Performer determines that the CB is filled and borated (given in initial conditions) and proceeds to the next step. ___ UNSAT EVALUATOR CUE: If asked, state the Resin Status Sheet indicates the CB is filled and vented and borated to the 870 ppm, the same concentration as the RCS).

COMMENTS:

STEP 6: [5] NOTIFY SRO of intent to place CB in service, and its ___ SAT current boron concentration as recorded on Attachment 1, Resin Status Sheet.

STANDARD: The performer contacts SRO and notifies them of intent to ___ UNSAT place cation Bed in service, advises them of boron concentration recorded on Attachment 1.

NOTE TO EVALUATOR: Task assignment sheet provides the boron concentration derived from Attachment 1. The Rad Waste desk contains the current Attachment 1 for cation bed which will be different than task assignment sheet.

COMMENTS:

CAUTION Cation Bed may need to be flushed to minimize reactivity effects if cation bed boron concentration varies more than 20 ppm from that of the RCS boron concentration or if a new cation bed is being placed in service.

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 125 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 7: [6] OPEN 1-ISV-62-915, CVCS CATION DEMIN BED INLET. CRITICAL STEP STANDARD: 1-ISV-62-915 has been located and opened (turned in the counter-clockwise direction). ___ SAT EVALUATOR CUE: After valve hand wheel is moved in the counterclockwise direction, state the hand wheel rotates several turns and stops. ___ UNSAT If indicator checked, indicate it points to the open position.

Step is critical to establish flow through the cation demineralizer.

COMMENTS:

STEP 8: [7] IF flush is desired for cation bed, THEN GO TO Section 8.7, ___ SAT Flushing Cation Bed to Adjust Boron Prior to Use.

STANDARD: Performer determines that flush is not required (per EVALUATOR CUE) and N/As step. ___ UNSAT EVALUATOR CUE: State that flush is not necessary, nor desired at this time.

COMMENTS:

CAUTION Maximum Cation Bed flow is 75 gpm. May be read locally at 1-FI-62-113 (Panel 1-L-57 at A3T/713).

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 126 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 9: [8] SLOWLY OPEN 1-ISV-62-916, CVCS CATION DEMIN CRITICAL BED OUTLET. STEP STANDARD: 1-ISV-62-916 has been located and opened slowly (turned in ___ SAT the counter-clockwise direction).

EVALUATOR CUE: After valve hand wheel is moved in the counter-clockwise direction, state that the hand wheel ___ UNSAT rotates several turns and stops.

If indicator checked, indicate it points to the open position.

Step is critical to establish flow through the cation demineralizer.

COMMENTS:

STEP 10: [9] SLOWLY THROTTLE CLOSE 1-ISV-62-922, CVCS MIXED CRITICAL BED DEMIN OUTLET, until desired cation bed flow rate STEP achieved.

___ SAT STANDARD: 1-ISV-62-922 has been located and closed slowly (turned in the clockwise direction).

EVALUATOR CUE: After valve hand wheel is moved in the clockwise ___ UNSAT direction, state the hand wheel rotates several turns and stops. If indicator checked, indicate it points to the closed position.

EVALUATOR CUE: When 1 FI-62-113 is checked by the local indicator OR the CRT Monitor located near the demineralizer control valves, state it indicates 75 gpm. IF the MCR is contacted, state the letdown flow is 75 gpm.

Step is critical to establish flow through the cation demineralizer.

COMMENTS:

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

REV. 0 PAGE 127 0F 128 WATTS BAR NUCLEAR PLANT B.1.k STEP 11: [10] RECORD Time, Date, and Flowrate when CB was placed in service on Attachment 1, Resin Status Sheet.

CUE: Another operator will enter the information on Attachment 1, ___ SAT Resin Status Sheet.

STANDARD: The performer addresses entry of the Date, Time and Flow rate that the Cation Bed was placed in service is recorded on ___ UNSAT Attachment 1.

COMMENTS:

STEP 12: [11] NOTIFY Chemistry of Time, Date, and Flowrate when CB was placed in service.

STANDARD: The Performer notifies Chemistry of Time, Date, and Flowrate ___ SAT when CB was placed in service COMMENTS:

___ UNSAT END OF TASK STOP TIME ________

    • Italicized Cues Are To Be Used Only If JPM Performance Is Being Simulated.

APPLICANT CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. The Unit is at 100% power.
2. Letdown orifice valve 1-FCV-62-74 is open and letdown flow (as indicated in MCR) is 75 gpm.
3. RCS boron concentration is 870 ppm.
4. Chemistry has requested that cation bed be placed in service for 53 minutes.
5. The Cation bed has been filled and vented.
6. SOI-62.04, Attachment 1, Resin Status Sheet indicates that the Cation Bed is at the same boron concentration of the RCS.

INITIATING CUES:

1. The MCR operator has directed you to place the CVCS Cation Bed in service per procedure.
2. You are to notify the MCR when the CVCS Cation Bed is in service.