| number = ML100610261
| number = ML100610261
| issue date = 03/02/2010
| issue date = 03/02/2010
| title = Waterford Steam Electric Station, Unit 3 - Acceptance Review Email, Relief Request W3-CISI-001, Request for Alternative to ASME IWE-5521, Post Repair Testing of the Steel Containment Vessel Opening (TAC No. ME3345)
| title = Acceptance Review Email, Relief Request W3-CISI-001, Request for Alternative to ASME IWE-5521, Post Repair Testing of the Steel Containment Vessel Opening
| author name = Kalyanam N K
| author name = Kalyanam N
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = Mason M E, Murillo R J
| addressee name = Mason M, Murillo R
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Kalyanam, Kaly Sent: Tuesday, March 02, 2010 9:54 AM To: MURILLO, ROBERT J; MASON, MICHAEL E (WF3) Cc: Feintuch, Karl; Lingam, Siva; Lent, Susan; Burkhardt, Janet  
{{#Wiki_filter:From:                     Kalyanam, Kaly Sent:                     Tuesday, March 02, 2010 9:54 AM To:                       MURILLO, ROBERT J; MASON, MICHAEL E (WF3)
Cc:                       Feintuch, Karl; Lingam, Siva; Lent, Susan; Burkhardt, Janet


==Subject:==
==Subject:==
Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re. Post Repair Testing of the SCV Opening (ME3345)
Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re.
Post Repair Testing of the SCV Opening (ME3345)
Bob/Mike:
Bob/Mike:
By letter dated February 9, 2010, Entergy Operations, Inc. (Entergy) submitted a Request Alternative to ASME IWE-5521 Regarding Post Repair Testing of Waterford Steam Electric Station, Unit 3 (Waterford 3) Steel Containment Vessel (SCV) Opening.  
By letter dated February 9, 2010, Entergy Operations, Inc. (Entergy) submitted a Request Alternative to ASME IWE-5521 Regarding Post Repair Testing of Waterford Steam Electric Station, Unit 3 (Waterford 3) Steel Containment Vessel (SCV) Opening.
 
Entergy plans to replace the Waterford 3 steam generators (SGs) during the 17th refueling outage. The removal of a welded construction hatch in the SCV will be required for providing access for the original and replacement SGs in and out of containment. Entergy would be required to perform a containment integrated leak rate test (ILRT) in accordance with IWE-5221, "Leakage Test," of ASME Section XI and 1 OCFR50, Appendix J prior to reentry into Mode 4.
Entergy plans to replace the Waterford 3 steam generators (SGs) during the 17th refueling outage. The removal of a welded construction hatch in the SCV will be required for providing access for the original and replacement SGs in and out of containment. Entergy would be required to perform a containment integrated leak rate test (ILRT) in accordance with IWE-5221, "Leakage Test," of ASME Section XI and 1 OCFR50, Appendix J prior to reentry into Mode 4. However, the performance of a localized leakage test provides a more appropriate leak test than an ILRT for the limited repair area. Therefore, Entergy is " requesting relief from the ASME Section Xl, IWE-5221 requirements to perform a localized pressure test for the associated repair of the Waterford 3 SCV.  
However, the performance of a localized leakage test provides a more appropriate leak test than an ILRT for the limited repair area. Therefore, Entergy is " requesting relief from the ASME Section Xl, IWE-5221 requirements to perform a localized pressure test for the associated repair of the Waterford 3 SCV.
 
The purpose of this email is to provide the results of the NRC staff's acceptance review of this request for alternative. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Sections 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.
The purpose of this email is to provide the results of the NRC staff's acceptance review of this request for alternative. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Sections 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.  
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1480.
N. Kalyanam Project Manager ANO-1and 2 & Waterford 3 NRC/NRR/DORL/LPL4 Email: kaly.kalyanam@nrc.gov E-mail Properties


The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41608634C8A24)
 
If you have any questions, please contact me at (301) 415-1480.
N. Kalyanam Project Manager ANO-1and 2 & Waterford 3 NRC/NRR/DORL/LPL4 Email:  kaly.kalyanam@nrc.gov E-mail Properties Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41608634C8A24)  


==Subject:==
==Subject:==
Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re. Post Repair Testing of the SCV Opening (ME3345)  
Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re.
 
Post Repair Testing of the SCV Opening (ME3345)
Sent Date:       3/2/2010 9:53:42 AM Received Date:       3/2/2010 9:53:42 AM From:               Kalyanam, Kaly  
Sent Date:     3/2/2010 9:53:42 AM Received Date:       3/2/2010 9:53:42 AM From:           Kalyanam, Kaly Created By:       Kaly.Kalyanam@nrc.gov Recipients:
 
Created By:         Kaly.Kalyanam@nrc.gov  
 
Recipients:
RMURILL@entergy.com (MURILLO, ROBERT J)
RMURILL@entergy.com (MURILLO, ROBERT J)
Tracking Status: None MMASON@entergy.com (MASON, MICHAEL E (WF3))
Tracking Status: None MMASON@entergy.com (MASON, MICHAEL E (WF3))
Tracking Status: None  
Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)
 
Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Karl.Feintuch@nrc.gov (Feintuch, Karl)                 Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)
Tracking Status: None  
Tracking Status: None Post Office:
 
HQCLSTR01.nrc.gov Files         Size     Date & Time MESSAGE         11832       3/2/2010 Options Expiration Date:
Post Office:
Priority:               olImportanceNormal ReplyRequested:        False Return Notification:     False Sensitivity:     olNormal Recipients received:}}
HQCLSTR01.nrc.gov  
 
Files               Size       Date & Time  
 
MESSAGE       11832       3/2/2010  
 
Options Expiration Date:
Priority:                       olImportanceNormal ReplyRequested:        False Return Notification:       False  
 
Sensitivity:         olNormal Recipients received:}}

Latest revision as of 22:25, 13 November 2019

Acceptance Review Email, Relief Request W3-CISI-001, Request for Alternative to ASME IWE-5521, Post Repair Testing of the Steel Containment Vessel Opening
ML100610261
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/02/2010
From: Kalyanam N
Plant Licensing Branch IV
To: Mason M, Murillo R
Entergy Operations
Kalyanam N, NRR/DORL/LPL4, 415-1480
References
TAC ME3345
Download: ML100610261 (1)


Text

From: Kalyanam, Kaly Sent: Tuesday, March 02, 2010 9:54 AM To: MURILLO, ROBERT J; MASON, MICHAEL E (WF3)

Cc: Feintuch, Karl; Lingam, Siva; Lent, Susan; Burkhardt, Janet

Subject:

Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re.

Post Repair Testing of the SCV Opening (ME3345)

Bob/Mike:

By letter dated February 9, 2010, Entergy Operations, Inc. (Entergy) submitted a Request Alternative to ASME IWE-5521 Regarding Post Repair Testing of Waterford Steam Electric Station, Unit 3 (Waterford 3) Steel Containment Vessel (SCV) Opening.

Entergy plans to replace the Waterford 3 steam generators (SGs) during the 17th refueling outage. The removal of a welded construction hatch in the SCV will be required for providing access for the original and replacement SGs in and out of containment. Entergy would be required to perform a containment integrated leak rate test (ILRT) in accordance with IWE-5221, "Leakage Test," of ASME Section XI and 1 OCFR50, Appendix J prior to reentry into Mode 4.

However, the performance of a localized leakage test provides a more appropriate leak test than an ILRT for the limited repair area. Therefore, Entergy is " requesting relief from the ASME Section Xl, IWE-5221 requirements to perform a localized pressure test for the associated repair of the Waterford 3 SCV.

The purpose of this email is to provide the results of the NRC staff's acceptance review of this request for alternative. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Pursuant to Sections 50.55a(a)(3)(i) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1480.

N. Kalyanam Project Manager ANO-1and 2 & Waterford 3 NRC/NRR/DORL/LPL4 Email: kaly.kalyanam@nrc.gov E-mail Properties

Mail Envelope Properties (94A2A4408AC65F42AC084527534CF41608634C8A24)

Subject:

Acceptance Review Result - Request for Alternative to ASME IWE-5521 Re.

Post Repair Testing of the SCV Opening (ME3345)

Sent Date: 3/2/2010 9:53:42 AM Received Date: 3/2/2010 9:53:42 AM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:

RMURILL@entergy.com (MURILLO, ROBERT J)

Tracking Status: None MMASON@entergy.com (MASON, MICHAEL E (WF3))

Tracking Status: None Karl.Feintuch@nrc.gov (Feintuch, Karl)

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 11832 3/2/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: