IR 05000335/2009302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 03/03/2010
| issue date = 03/03/2010
| title = Er 05000335-09-302, 05000389-09-302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations
| title = Er 05000335-09-302, 05000389-09-302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations
| author name = Widmann M T
| author name = Widmann M
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Nazar M
| addressee name = Nazar M
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION
[[Issue date::March 03, 2010]]


Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
==REGION II==
rch 03, 2010


SUBJECT: ST. LUCIE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000335/2009302 AND 05000389/2009302
==SUBJECT:==
ST. LUCIE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000335/2009302 AND 05000389/2009302


==Dear Mr. Nazar:==
==Dear Mr. Nazar:==
During the period of January 11 - 14, 2010, the Nuclear Regulatory Commission (NRC) administered operating tests to employees of your company who had applied for licenses to operate the St. Lucie Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 15, 2009.
During the period of January 11 - 14, 2010, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the St. Lucie Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 15, 2009.


Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the operating and the written examinations. One RO applicant failed only the Administrative Section of the Operating Test. There were three post-examination comments concerning the written examination. These comments, and the NRC resolution of these comments, are summarized in report, St. Lucie Nuclear Plant - NRC Operator License Examination Report 05000335/2009301 and 05000389/2009301 (ML100430839). A Simulator Fidelity Report is included in this report as Enclosure 2.
Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the operating and the written examinations. One RO applicant failed only the Administrative Section of the Operating Test. There were three post-examination comments concerning the written examination. These comments, and the NRC resolution of these comments, are summarized in report, St. Lucie Nuclear Plant - NRC Operator License Examination Report 05000335/2009301 and 05000389/2009301 (ML100430839). A Simulator Fidelity Report is included in this report as Enclosure 2.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).


FP&L 2 If you have any questions concerning this letter, please contact me at (404) 562-4550.
FP&L   2 If you have any questions concerning this letter, please contact me at (404) 562-4550.


Sincerely,/RA/ Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety  
Sincerely,
 
/RA/
Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16  
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16


===Enclosures:===
===Enclosures:===
1. Report Details 2. Simulator Fidelity Report  
1. Report Details 2. Simulator Fidelity Report


cc w/encl: (See page 2)
REGION II==
Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16 Report No.: 05000335/2009302, 05000389/2009302 Licensee: Florida Power and Light Company (FP&L)
Facility: St. Lucie Nuclear Plant, Units 1 & 2 Location: 6351 S. Ocean Drive Jensen Beach, FL 34957 Dates: Operating Test - January 11 - 14, 2010 Written Examination - December 15, 2009 Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer S. Rose, Senior Project Engineer P. Capehart, Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure 1


_________________________ X SUNSI REVIEW COMPLETE /RA/ OFFICE RII:DRS RII:DRS RII:DRS RII:DRP RII:DRP SIGNATURE RSB /RA/ PGC /RA/ MTW /RA/ SDR /RA/ MDS /RA/ NAME RBaldwin PCapehart MWidmann SRose MSykes DATE 03/02/2010 03/02/2010 03/03/2010 03/03/2010 03/02/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution Gene St. Pierre Vice President, Fleet Support Florida Power & Light Company Electronic Mail Distribution
SUMMARY OF FINDINGS ER 05000335/2009302, 05000389/2009302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations.


Ronnie Lingle Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Supp.1, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.


Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
The NRC administered the operating tests during the period of January 11 - 14, 2010.


Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Larry Nicholson Director Licensing Florida Power & Light Company Electronic Mail Distribution Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009. The written examination, operating test outlines and operating test details were developed by the St. Lucie Nuclear Plant training staff.


Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company P. O. Box 14000 Juno Beach, FL 33408
Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.


(Vacant) Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution
There were three post examination comments (ML100430839).


Seth B. Dunston Training Manager St. Lucie Nuclear Plant Electronic Mail Distribution Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution cc w/encl continued next page FP&L 3 cc w/encl continued:
No findings of significance were identified.
Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution


FP&L 4 Letter to Mano Nazar from Malcolm T. Widmann dated March 03, 2010
Enclosure 1


SUBJECT: ST. LUCIE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000335/2009302 AND 05000389/2009302 Distribution w/encl
REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The St. Lucie Nuclear Plant training staff developed the written examination and operating test. NRC regional examiners reviewed the proposed examination material to determine whether it was developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.
: C. Evans, RII L. Slack, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMStLucie Resource


Enclosure 1 NUCLEAR REGULATORY COMMISSION REGION II
Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.


Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16 Report No.: 05000335/2009302, 05000389/2009302 Licensee: Florida Power and Light Company (FP&L)
The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.


Facility: St. Lucie Nuclear Plant, Units 1 & 2 Location: 6351 S. Ocean Drive Jensen Beach, FL 34957 Dates: Operating Test - January 11 - 14, 2010 Written Examination - December 15, 2009  
The examiners evaluated four SRO and two RO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of January 11 - 14, 2010. Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009.


Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer S. Rose, Senior Project Engineer P. Capehart, Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure 1 SUMMARY OF FINDINGS ER 05000335/2009302, 05000389/2009302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations.
The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the St. Lucie Nuclear Plant, met requirements specified in 10 CFR Part 55, Operators Licenses.


The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Supp.1, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.
b. Findings The NRC determined that the details provided by the licensee for the written exam, walkthrough, and simulator tests were within the range of acceptability expected for a proposed examination.


The NRC administered the operating tests during the period of January 11 - 14, 2010. Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009. The written examination, operating test outlines and operating test details were developed by the St. Lucie Nuclear Plant training staff.
Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO)
applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.


Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.
A copy of the final as-given RO and SRO written examinations and answer keys, with all changes incorporated, and the licensees post-examination comments, may be accessed in the ADAMS system (ADAMS Accession Numbers, ML100410029, ML100410030 and ML100410028).


There were three post examination comments (ML100430839).
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.


No findings of significance were identified.
Enclosure 1


Enclosure 1 REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The St. Lucie Nuclear Plant training staff developed the written examination and operating test. NRC regional examiners reviewed the proposed examination material to determine whether it was developed in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
4OA6 Meetings Exit Meeting Summary On January 15, 2010, the examination team discussed generic issues associated with the operating test with R. Anderson, Site Vice President, and members of the St. Lucie Nuclear Plant staff. The examiners asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.


The examiners reviewed the licensee's examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, "Integrity of Examinations and Tests."
PARTIAL LIST OF PERSONS CONTACTED Licensee personnel R. Anderson - Site Vice President R. Lingle - Operations Manager J. Klauck - Asst. Operations Manager E. Katzman - Licensing Manager M. Bladek - Asst. Operations Manager - Training S. Duston - Training Manager T. Benton - Operations Training Supervisor M. Verbeck - ILT Training Supervisor NRC personnel T. Hoeg, SRI S. Sanchez, RI Enclosure 1


The examiners evaluated four SRO and two RO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of January 11 - 14, 2010. Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the St. Lucie Nuclear Plant, met requirements specified in 10 CFR Part 55, "Operators' Licenses."
SIMULATION FACILITY REPORT Facility Licensee: St. Lucie Nuclear Plant Facility Docket Nos.: 05000335/05000389 Operating Tests Administered on: January 11-14, 2009 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.


b. Findings The NRC determined that the details provided by the licensee for the written exam, walkthrough, and simulator tests were within the range of acceptability expected for a proposed examination.
Item  Description Safety Injection System The SIS Header experienced oscillations when it was cross tied (SIS)  with the Charging System. DR 201007 was written to address this issue.


Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.
Fuel Handling Building The FHB controls are not accessible from the Instructor (IF). DR (FHB) 201008 was written to address this issue.
 
A copy of the final "as-given" RO and SRO written examinations and answer keys, with all changes incorporated, and the licensee's post-examination comments, may be accessed in the ADAMS system (ADAMS Accession Numbers, ML100410029, ML100410030 and ML100410028).
 
Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.


4 Enclosure 1 4OA6 Meetings Exit Meeting Summary On January 15, 2010, the examination team discussed generic issues associated with the operating test with R. Anderson, Site Vice President, and members of the St. Lucie Nuclear Plant staff. The examiners asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
Simulation Computer PLIS2 stopped (froze) during the NRC examination. DR 201009 PLIS2  was written to address this issue.


PARTIAL LIST OF PERSONS CONTACTED Licensee personnel R. Anderson - Site Vice President R. Lingle - Operations Manager J. Klauck - Asst. Operations Manager E. Katzman - Licensing Manager M. Bladek - Asst. Operations Manager - Training S. Duston - Training Manager T. Benton - Operations Training Supervisor M. Verbeck - ILT Training Supervisor NRC personnel T. Hoeg, SRI S. Sanchez, RI Enclosure 2 SIMULATION FACILITY REPORT Facility Licensee: St. Lucie Nuclear Plant Facility Docket Nos.: 05000335/05000389 Operating Tests Administered on: January 11-14, 2009 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
Variable High Power Trip VHPT alarms lock in on the simulator, however, do not lock in on (VHPT)  the actual plant. DR 2010010 was written to address this issue.


Item Description Safety Injection System (SIS) The SIS Header experienced oscillations when it was cross tied with the Charging System. DR 201007 was written to address this  
Analog Display System ADS Display not showing randomness as seen in the plant during (ADS) manual rod motion. Dr 2010017 was written to address this issue.


issue. Fuel Handling Building (FHB) The FHB controls are not accessible from the Instructor (IF). DR 201008 was written to address this issue. Simulation Computer PLIS2 PLIS2 stopped (froze) during the NRC examination. DR 201009 was written to address this issue. Variable High Power Trip (VHPT) VHPT alarms lock in on the simulator, however, do not lock in on the actual plant. DR 2010010 was written to address this issue. Analog Display System (ADS) ADS Display not showing randomness as seen in the plant during manual rod motion. Dr 2010017 was written to address this issue.
Enclosure 2
}}
}}

Latest revision as of 22:20, 13 November 2019

Er 05000335-09-302, 05000389-09-302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations
ML100620701
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2010
From: Widmann M
Operations Branch I
To: Nazar M
Florida Power & Light Co
References
50-335/09-302, 50-389/09-302 50-335/09-302, 50-389/09-302
Download: ML100620701 (11)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 03, 2010

SUBJECT:

ST. LUCIE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000335/2009302 AND 05000389/2009302

Dear Mr. Nazar:

During the period of January 11 - 14, 2010, the Nuclear Regulatory Commission (NRC)

administered operating tests to employees of your company who had applied for licenses to operate the St. Lucie Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 15, 2009.

Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the operating and the written examinations. One RO applicant failed only the Administrative Section of the Operating Test. There were three post-examination comments concerning the written examination. These comments, and the NRC resolution of these comments, are summarized in report, St. Lucie Nuclear Plant - NRC Operator License Examination Report 05000335/2009301 and 05000389/2009301 (ML100430839). A Simulator Fidelity Report is included in this report as Enclosure 2.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).

FP&L 2 If you have any questions concerning this letter, please contact me at (404) 562-4550.

Sincerely,

/RA/

Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16

Enclosures:

1. Report Details 2. Simulator Fidelity Report

REGION II==

Docket No.: 50-335, 50-389 License No.: DPR-67, NPF-16 Report No.: 05000335/2009302, 05000389/2009302 Licensee: Florida Power and Light Company (FP&L)

Facility: St. Lucie Nuclear Plant, Units 1 & 2 Location: 6351 S. Ocean Drive Jensen Beach, FL 34957 Dates: Operating Test - January 11 - 14, 2010 Written Examination - December 15, 2009 Examiners: R. Baldwin, Chief Examiner, Senior Operations Engineer S. Rose, Senior Project Engineer P. Capehart, Operations Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure 1

SUMMARY OF FINDINGS ER 05000335/2009302, 05000389/2009302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations.

The NRC examiners conducted operator licensing initial examinations in accordance with the guidance in NUREG-1021, Revision 9, Supp.1, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.

The NRC administered the operating tests during the period of January 11 - 14, 2010.

Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009. The written examination, operating test outlines and operating test details were developed by the St. Lucie Nuclear Plant training staff.

Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO) applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.

There were three post examination comments (ML100430839).

No findings of significance were identified.

Enclosure 1

REPORT DETAILS 4. OTHER ACTIVITIES 4OA5 Operator Licensing Initial Examinations a. Inspection Scope The St. Lucie Nuclear Plant training staff developed the written examination and operating test. NRC regional examiners reviewed the proposed examination material to determine whether it was developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1.

Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.

The examiners reviewed the licensees examination security measures while preparing and administering the examinations to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.

The examiners evaluated four SRO and two RO applicants who were being assessed under the guidelines specified in NUREG-1021. The examiners administered the operating tests during the period of January 11 - 14, 2010. Members of the St. Lucie Power Plant training staff administered the written examination on December 15, 2009.

The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the St. Lucie Nuclear Plant, met requirements specified in 10 CFR Part 55, Operators Licenses.

b. Findings The NRC determined that the details provided by the licensee for the written exam, walkthrough, and simulator tests were within the range of acceptability expected for a proposed examination.

Four Senior Reactor Operator (SRO) applicants and one Reactor Operator (RO)

applicant passed both the written and operating examinations. One RO applicant failed only the Administrative Section of the Operating Test.

A copy of the final as-given RO and SRO written examinations and answer keys, with all changes incorporated, and the licensees post-examination comments, may be accessed in the ADAMS system (ADAMS Accession Numbers, ML100410029, ML100410030 and ML100410028).

Copies of all individual examination reports were sent to the facility Training Manager for evaluation and determination of appropriate remedial training.

Enclosure 1

4OA6 Meetings Exit Meeting Summary On January 15, 2010, the examination team discussed generic issues associated with the operating test with R. Anderson, Site Vice President, and members of the St. Lucie Nuclear Plant staff. The examiners asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.

PARTIAL LIST OF PERSONS CONTACTED Licensee personnel R. Anderson - Site Vice President R. Lingle - Operations Manager J. Klauck - Asst. Operations Manager E. Katzman - Licensing Manager M. Bladek - Asst. Operations Manager - Training S. Duston - Training Manager T. Benton - Operations Training Supervisor M. Verbeck - ILT Training Supervisor NRC personnel T. Hoeg, SRI S. Sanchez, RI Enclosure 1

SIMULATION FACILITY REPORT Facility Licensee: St. Lucie Nuclear Plant Facility Docket Nos.: 05000335/05000389 Operating Tests Administered on: January 11-14, 2009 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and, without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.

Item Description Safety Injection System The SIS Header experienced oscillations when it was cross tied (SIS) with the Charging System. DR 201007 was written to address this issue.

Fuel Handling Building The FHB controls are not accessible from the Instructor (IF). DR (FHB) 201008 was written to address this issue.

Simulation Computer PLIS2 stopped (froze) during the NRC examination. DR 201009 PLIS2 was written to address this issue.

Variable High Power Trip VHPT alarms lock in on the simulator, however, do not lock in on (VHPT) the actual plant. DR 2010010 was written to address this issue.

Analog Display System ADS Display not showing randomness as seen in the plant during (ADS) manual rod motion. Dr 2010017 was written to address this issue.

Enclosure 2