MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report 2024-09-09
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 IR 05000335/20213012021-06-21021 June 2021 NRC Examination Report 05000335/2021301 and 05000389/2021301 IR 05000335/20203012021-02-16016 February 2021 NRC Operator License Examination Report 05000335/2020301 and 05000389/2020301 IR 05000335/20193022019-10-18018 October 2019 NRC Examination Report 05000335/2019302 and 05000389/2019302 IR 05000335/20193012019-06-0404 June 2019 St. Lucie Nuclear Plant, Units 1 & 2, NRC Operator License Examination Report 05000335/2019301 and 05000389/2019301 ML18361A6642018-07-24024 July 2018 301 ADAMS2D Page 1 Exam Admin Items Normal Release IR 05000335/20153012015-04-28028 April 2015 Er 05000335/2015301, 05000389/2015301; Operating Test 03/02-11/ 2015 & Written Exam March 18, 2015; St. Lucie Nuclear Plant; Operator License Examinations IR 05000335/20113022011-12-0707 December 2011 NRC Operator License Examination Report 05000335/2011302 and 05000389/2011302 IR 05000335/20113012011-05-16016 May 2011 NRC Operator License Er 05000335-11-301 and 05000389-11-301, Errata ML1111901122011-04-29029 April 2011 Er 05000335-11-301, 05000389-11-301, on 02/21-03/03/2011, and 03/17/2011, St. Lucie Nuclear Plant, Licensed Operator Examinations IR 05000335/20093022010-03-0303 March 2010 Er 05000335-09-302, 05000389-09-302, 01/11-14/2010 and 12/15/2009; St. Lucie Nuclear Plant, Licensed Operator Examinations IR 05000335/20093012010-02-12012 February 2010 NRC Operator License Examination Report 05000335-09-301 and 05000389-09-301 IR 05000335/20083012008-10-0303 October 2008 Er 05000335-08-301, 05000389-08-301, 07/23-25 and 07/28-30/2008 and 08/01/2008; St. Lucie Nuclear Plant, Licensed Operator Examinations ML0810206642008-04-10010 April 2008 IR 05000335-08-301 and 05000389-08-301, on 04/08/2008, 07/21/2008 and 07/28/2008, St. Lucie Nuclear Plant, Reactor and Senior Reactor Operator Initial Examination 2023-09-20
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION une 4, 2019
SUBJECT:
ST. LUCIE NUCLEAR PLANT - NRC OPERATOR LICENSE EXAMINATION REPORT 05000335/2019301 AND 05000389/2019301
Dear Mr. Nazar:
During the period March 18 - 22, 2019, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the St. Lucie Nuclear Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests and the written examination submittal with those members of your staff identified in the enclosed report. The written examination was administered by your staff on March 28, 2019.
Two Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. One SRO applicant failed the operating test and one SRO applicant failed the written examination. There were no post-administration comments concerning the operating or written examinations.
The initial RO and SRO examinations submitted by your staff did meet the guidelines for quality contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11, as described in the enclosed report.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room). If you have any questions concerning this letter, please contact me at (404) 997-4551.
Sincerely,
/RA/
Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Docket Nos: 50-335, 50-389 License Nos: DPR-67, NPF-16
Enclosures:
1. Report Details 2. Facility Comments and NRC Resolution 3. Simulator Fidelity Report
REGION II==
Examination Report Docket No.: 05000335, 05000389 License No.: DPR-67, NPF-16 Report No.: 05000335/2019301, 05000389/2019301 EPID No.: I- 2019-OLL-0020 Licensee: Florida Power and Light Company (FP&L)
Facility: St. Lucie Nuclear Plant, Units 1 & 2 Location: 6351 S. Ocean Drive Jensen Beach, FL 34957 Dates: Operating Test - March 18-22, 2019 Written Examination - March 28, 2019 Examiners: M. Kennard, Chief Examiner, Senior Operations Engineer B. Caballero, Senior Operations Engineer M. Donithan, Operations Engineer N. Lacy, Operations Engineer T. Morrissey, Senior Resident Inspector (Trainee)
Approved by: Gerald J. McCoy, Chief Operations Branch 1 Division of Reactor Safety Enclosure 1
SUMMARY
ER 05000335/2019301, 05000389/2019301; operating test March 18-22, 2019 & written exam
March 28, 2019; St. Lucie Nuclear Plant; Operator License Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 11, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the St. Lucie Nuclear Plant staff developed both the operating tests and the written examination. The initial written RO and SRO examination submittals did meet the quality guidelines contained in NUREG-1021.
The NRC administered the operating tests during the period March 18-22, 2019. Members of the St. Lucie Nuclear Plant training staff administered the written examination on March 28, 2019. Two Reactor Operator (RO) and seven Senior Reactor Operator (SRO) applicants passed both the operating test and written examination. One SRO applicant failed the operating test and one SRO applicant failed the written examination. Eight applicants were issued licenses commensurate with the level of examination administered. One applicant was issued a letter stating that he passed the examination, but a license would not be issued until a medical evaluation had been completed.
There were no post-examination comments.
No findings were identified.
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Operator Licensing Examinations
a. Inspection Scope
The NRC evaluated the submitted operating test by combining the scenario events and JPMs in order to determine the percentage of submitted test items that required replacement or significant modification. The NRC also evaluated the submitted written examination questions (RO and SRO questions considered separately) in order to determine the percentage of submitted questions that required replacement or significant modification, or that clearly did not conform with the intent of the approved knowledge and ability (K/A) statement. Any questions that were deleted during the grading process, or for which the answer key had to be changed, were also included in the count of unacceptable questions. The percentage of submitted test items that were unacceptable was compared to the acceptance criteria of NUREG-1021, Operator Licensing Standards for Power Reactors.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC administered the operating tests during the period of March 18-22, 2019. The NRC examiners evaluated two Reactor Operator (RO) and nine Senior Reactor Operator (SRO) applicants using the guidelines contained in NUREG-1021. Members of the St. Lucie Nuclear Plant training staff administered the written examination on March 28, 2019. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the St. Lucie Nuclear Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
The NRC evaluated the performance or fidelity of the simulation facility during the preparation and conduct of the operating tests.
b. Findings
No findings were identified.
The NRC developed the written examination sample plan outline. Members of the St.
Lucie Nuclear Plant training staff developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 11, of NUREG-1021. The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021 and incorporated into the final version of the examination materials.
The NRC determined that the licensees written and operating test submittal was within the range of acceptable quality specified by NUREG-1021 specified by NUREG-1021.
Two RO applicants and seven SRO applicants passed both the operating test and written examination. One SRO applicant passed the written examination but did not pass the operating test. One SRO applicant passed the operating exam but did not pass the written exam. Two RO applicants and six SRO applicants were issued licenses.
One SRO applicant was issued a preliminary results letter and license issuance is delayed, pending review of updated medical information.
The examiners discussed several issues with station management. With respect to the operation of the simulator, approximately forty-five minutes of delay were experienced to revalidate a simulator because of applicant high failure rate. The revalidation confirmed that the JPM was validated and the simulator was operating properly. The delay did not impact the integrity of the administered test items, but the planned examination schedule was impacted.
Additionally, the examiners discussed several generic issues associated with applicant performance on the operating test. These issues included:
- Difficulty in paralleling off-site sources
- Difficulty in locating hydrogen purge system components Copies of all individual examination reports were sent to the facility Training Manager for evaluation of weaknesses and determination of appropriate remedial training.
The licensee submitted a letter stating that no post-examination comments would be submitted. A copy of the licensees letter may be accessed in the ADAMS system (ADAMS Accession Number ML19135A304). A copy of the final written examinations and answer keys, with all changes incorporated, may be accessed not earlier than March 29, 2021, in the ADAMS system (ADAMS Accession Numbers ML19135A319 and ML19136A009).
4OA6 Meetings, Including Exit
Exit Meeting Summary
On March 22, 2019, the NRC examination team discussed generic issues associated with the operating test with Mr. Don DeBoer, Operations Director, and members of the St. Lucie Nuclear Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
On May 15, 2019, the Chief Examiner discussed final examination results with Training Staff.
KEY POINTS OF CONTACT Licensee personnel D. DeBoer, Site Director B. Boltz, Operations Director T. Spillman, Operations Manager W. Goader, Training Manager E. Feightner, Initial License Training Supervisor Travis Ouret, Training Supervisor M. Snyder, Licensing Manager K. Paez, Licensing Analyst K. Keith, Operations Class Mentor NRC personnel T. Morrissey, Senior Resident Inspector
FACILITY POST-EXAMINATION COMMENTS AND NRC RESOLUTIONS
The facility submitted no post-examination comments as indicated in a letter which can be found
in ADAMS under Accession Number ML19135A304.
SIMULATOR FIDELITY REPORT
Facility Licensee: St. Lucie Nuclear Plant
Facility Docket No.: 05000335, 05000389
Operating Test Administered: March 18-22, 2019
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and, without further verification and review in accordance with Inspection
Procedure 71111.11 are not indicative of noncompliance with 10 CFR 55.46. No licensee
action is required in response to these observations.
The following:
- MV-08-03, 2C Pump response is inconsistent when operated from the control boards. AR
2306933
- Evaluate simulator response of the 2B EDG when paralleling with offsite power per 2 EOP
Appendix D. AR 2306778