ML100950243: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/05/2010
| issue date = 04/05/2010
| title = Meeting Summary of 3-31-10 Public Meeting with FENOC
| title = Meeting Summary of 3-31-10 Public Meeting with FENOC
| author name = Bellamy R R
| author name = Bellamy R
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 5, 2010 FirstEnergy Nuclear Operating Company Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants  
{{#Wiki_filter:April 5, 2010 LICENSEE:      FirstEnergy Nuclear Operating Company FACILITIES:    Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants
 
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC)
OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC) Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100600637, ML100910266 and ML100910315, respectively. A list of principal NRC and licensee meeting participants is enclosed.
Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance.
The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML 100600637, ML 100910266 and ML 100910315, respectively.
A list of principal NRC and licensee meeting participants is enclosed.
The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.
The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions I and III, the Office of Nuclear Reactor Regulation and the Office of Nuclear Security and Incident Response.
The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions I and III, the Office of Nuclear Reactor Regulation and the Office of Nuclear Security and Incident Response. The meeting concluded with a discussion of plans to continue annual meetings involving the NRC regions and program offices and all plants in the FENOC fleet.
The meeting concluded with a discussion of plans to continue annual meetings involving the NRC regions and program offices and all plants in the FENOC fleet. I RAJ Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58 As Stated 2 Principal Meeting Participants S. Collins, Regional Administrator, RI M. Satorius, Regional Administrator, Rill E. Leeds, Director, Office of Nuclear Reactor Regulation (NRR) w. Dean, Deputy Director, Office of Nuclear Security and Incident Response (NSIR) A. Howe, Acting Director, Division of Operating Reactor Licensing, NRR R. Bellamy, Chief, Projects Branch, RI J. Cameron, Chief, Projects Branch, Rill FirstEnergy Nuclear Operating Company J. Hagan, President and Chief Nuclear OFFicer J. Lash, Senior Vice President FENOC Operations D. Pace, Senior Vice President, Engineering P. Sena, Vice President, FENOC Operations K. Fili, Vice President, Fleet Oversight B. Allen, Vice President, Davis-Besse P. Harden, Vice President, Beaver Valley M. Bezilla, Vice President, Perry Distribution Executive Director for Operations, OEDO (RIDSEDOMA1LCENTER)
I RAJ Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
 
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
==Enclosure:==
Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
As Stated
Director, Division of Inspection  
 
& Regional Support, NRRlDIRS (RIDSNRRDIRS)
2 Principal Meeting Participants S. Collins, Regional Administrator, RI M. Satorius, Regional Administrator, Rill E. Leeds, Director, Office of Nuclear Reactor Regulation (NRR)
Director, Division of Operating Reactor Licensing, NRRIDORL (RIDSNRRDORL)
: w. Dean, Deputy Director, Office of Nuclear Security and Incident Response (NSIR)
Asst. General Counsel Materials Litigation  
A. Howe, Acting Director, Division of Operating Reactor Licensing, NRR R. Bellamy, Chief, Projects Branch, RI J. Cameron, Chief, Projects Branch, Rill FirstEnergy Nuclear Operating Company J. Hagan, President and Chief Nuclear OFFicer J. Lash, Senior Vice President FENOC Operations D. Pace, Senior Vice President, Engineering P. Sena, Vice President, FENOC Operations K. Fili, Vice President, Fleet Oversight B. Allen, Vice President, Davis-Besse P. Harden, Vice President, Beaver Valley M. Bezilla, Vice President, Perry
& Enforcement, OGC (RI DSOGCMA1LCENTER)
 
S. Collins, ORA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP D. Roberts, DRS P. Wilson, DRS R. Bellamy, DRP S. Barber, DRP C. Newport, DRP J. Greives, DRP D. Werkheiser, DRP, SRI E. Bonney, DRP, RI P. Garrett, DRP, Res OA L. Trocine, RI OEDO D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, SLO J. Thompson, NRR G. Matakas, ORA C. O'Daniell, ORA D. Bearde, DRS K. Heater, DRP T. Haverkamp, DNMS M. Satorius, Rill W. Dean, NSIR J. Cameron, Rill V. Lewis, Rl Receptionist RidsNRRPMBeaver Valley Resource RidsNrrDirslpab@nrc.gov ROPreportsResource@nrc.gov SUNSI Review Complete:
3 Distribution Executive Director for Operations, OEDO                                                                 (RIDSEDOMA1LCENTER)
RRB (Reviewer's Initials DOC NAME: G:\DRP\BRANCH6\Briefings, Site Visits, and Presentation\Site FENOC MTGs\FENOC Meeting Summary After declaring this document "An Official Agency Record" it will be released to the To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with attachment/enclosure  
Deputy Executive Director for Reactor Programs, OEDO                                                   (RIDSEDOMAILCENTER)
'N" =No OFFICE RI/DRP I RIIDRP I RI/DRP I NAME CNewportl cn SBarberl SB RBellamyl DATE 04/02/10 04/02/10 OFFICIAL RECORD COPY}}
Director, Office of Nuclear Reactor Regulation, NRR                                                                 (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR                                                         (RIDSNRROD)
Director, Division of Inspection & Regional Support, NRRlDIRS                                                       (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRRIDORL                                                         (RIDSNRRDORL)
Asst. General Counsel Materials Litigation & Enforcement, OGC                                           (RI DSOGCMA1LCENTER)
S. Collins, ORA                                                                  R. Barkley, ORA M. Dapas, ORA                                                                     N. McNamara, SLO D. Lew, DRP                                                                       D. Tifft, SLO J. Clifford, DRP                                                                 J. Thompson, NRR D. Roberts, DRS                                                                   G. Matakas, ORA P. Wilson, DRS                                                                   C. O'Daniell, ORA R. Bellamy, DRP                                                                   D. Bearde, DRS S. Barber, DRP                                                                    K. Heater, DRP C. Newport, DRP                                                                   T. Haverkamp, DNMS J. Greives, DRP                                                                   M. Satorius, Rill D. Werkheiser, DRP, SRI                                                           W. Dean, NSIR E. Bonney, DRP, RI                                                               J. Cameron, Rill P. Garrett, DRP, Res OA                                                           V. Lewis, Rl Receptionist L. Trocine, RI OEDO                                                               RidsNRRPMBeaver Valley Resource D. Screnci, PAO                                                                   RidsNrrDirslpab@nrc.gov N. Sheehan, PAO                                                                   ROPreportsResource@nrc.gov SUNSI Review Complete:                       RRB           (Reviewer's Initials DOC NAME: G:\DRP\BRANCH6\Briefings, Site Visits, and Presentation\Site Visits\BV\AII FENOC MTGs\FENOC Meeting Summary 3-31-10.doc After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with attachment/enclosure 'N" =No copy OFFICE           RI/DRP                       I     RIIDRP                     I     RI/DRP                 I                        I NAME             CNewportl cn                       SBarberl SB                       RBellamyl RRB DATE             04/02/10                            04/02/10                           04/02/10 OFFICIAL RECORD COPY}}

Latest revision as of 21:08, 13 November 2019

Meeting Summary of 3-31-10 Public Meeting with FENOC
ML100950243
Person / Time
Site: Beaver Valley, Davis Besse, Perry
Issue date: 04/05/2010
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
bellamy rr
References
Download: ML100950243 (3)


Text

April 5, 2010 LICENSEE: FirstEnergy Nuclear Operating Company FACILITIES: Beaver Valley, Davis-Besse, and Perry Nuclear Power Plants

SUBJECT:

SUMMARY

OF THE MARCH 31, 2010, PUBLIC MEETING TO DISCUSS FENOC FLEET PERFORMANCE On March 31, 2010, the Nuclear Regulatory Commission (NRC) Headquarters, Region I and Region III met with the FirstEnergy Nuclear Operating Company (FENOC) management to discuss fleet performance. The public meeting was held at the Embassy Suites, Pittsburgh International Airport. The meeting notice, licensee presentation and list of attendees can be found in the Agencywide Documents Access and Management System (ADAMS) as ML100600637, ML100910266 and ML100910315, respectively. A list of principal NRC and licensee meeting participants is enclosed.

The NRC began the meeting with a brief introduction, followed by FENOC management discussions of 2009 fleet performance, individual site overviews for Beaver Valley, Perry and Davis-Besse, fleet oversight and assessment updates and fleet project updates. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials.

The meeting provided a useful forum to discuss common themes at the FENOC plants with the NRC Regions I and III, the Office of Nuclear Reactor Regulation and the Office of Nuclear Security and Incident Response. The meeting concluded with a discussion of plans to continue annual meetings involving the NRC regions and program offices and all plants in the FENOC fleet.

I RAJ Ronald R. Bellamy, Ph.D., Chief Branch 6 Division of Reactor Projects Docket Nos. 50-334, 50-412, 50-346, and 50-440 License Nos. DPR-66, NPF-73, NPF-3, NPF-58

Enclosure:

As Stated

2 Principal Meeting Participants S. Collins, Regional Administrator, RI M. Satorius, Regional Administrator, Rill E. Leeds, Director, Office of Nuclear Reactor Regulation (NRR)

w. Dean, Deputy Director, Office of Nuclear Security and Incident Response (NSIR)

A. Howe, Acting Director, Division of Operating Reactor Licensing, NRR R. Bellamy, Chief, Projects Branch, RI J. Cameron, Chief, Projects Branch, Rill FirstEnergy Nuclear Operating Company J. Hagan, President and Chief Nuclear OFFicer J. Lash, Senior Vice President FENOC Operations D. Pace, Senior Vice President, Engineering P. Sena, Vice President, FENOC Operations K. Fili, Vice President, Fleet Oversight B. Allen, Vice President, Davis-Besse P. Harden, Vice President, Beaver Valley M. Bezilla, Vice President, Perry

3 Distribution Executive Director for Operations, OEDO (RIDSEDOMA1LCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Director, Division of Inspection & Regional Support, NRRlDIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRRIDORL (RIDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement, OGC (RI DSOGCMA1LCENTER)

S. Collins, ORA R. Barkley, ORA M. Dapas, ORA N. McNamara, SLO D. Lew, DRP D. Tifft, SLO J. Clifford, DRP J. Thompson, NRR D. Roberts, DRS G. Matakas, ORA P. Wilson, DRS C. O'Daniell, ORA R. Bellamy, DRP D. Bearde, DRS S. Barber, DRP K. Heater, DRP C. Newport, DRP T. Haverkamp, DNMS J. Greives, DRP M. Satorius, Rill D. Werkheiser, DRP, SRI W. Dean, NSIR E. Bonney, DRP, RI J. Cameron, Rill P. Garrett, DRP, Res OA V. Lewis, Rl Receptionist L. Trocine, RI OEDO RidsNRRPMBeaver Valley Resource D. Screnci, PAO RidsNrrDirslpab@nrc.gov N. Sheehan, PAO ROPreportsResource@nrc.gov SUNSI Review Complete: RRB (Reviewer's Initials DOC NAME: G:\DRP\BRANCH6\Briefings, Site Visits, and Presentation\Site Visits\BV\AII FENOC MTGs\FENOC Meeting Summary 3-31-10.doc After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" =Copy without attachment/enclosure "E" =Copy with attachment/enclosure 'N" =No copy OFFICE RI/DRP I RIIDRP I RI/DRP I I NAME CNewportl cn SBarberl SB RBellamyl RRB DATE 04/02/10 04/02/10 04/02/10 OFFICIAL RECORD COPY