ML110480852: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML110480852
| number = ML110480852
| issue date = 11/01/2011
| issue date = 11/01/2011
| title = Cooper Nuclear Station - Request for Withholding Information from Public Disclosure, 2/18/11 Affidavit Executed by J. Harrison, GE Hitachi Nuclear Energy, NEDC-33543P, Revision 0
| title = Request for Withholding Information from Public Disclosure, 2/18/11 Affidavit Executed by J. Harrison, GE Hitachi Nuclear Energy, NEDC-33543P, Revision 0
| author name = Wilkins L E
| author name = Wilkins L
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name = O'Grady B J
| addressee name = O'Grady B
| addressee affiliation = Nebraska Public Power District (NPPD)
| addressee affiliation = Nebraska Public Power District (NPPD)
| docket = 05000298
| docket = 05000298
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:ME5287
| project = TAC:ME5287
| stage = Other
| stage = Withholding Request Acceptance
}}
}}


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 2011 Mr. Brian J. O'Grady Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR COOPER NUCLEAR STATION (TAC NO. ME5287)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 1, 2011 Mr. Brian J. O'Grady Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321
 
==SUBJECT:==
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR COOPER NUCLEAR STATION (TAC NO. ME5287)


==Dear Mr. O'Grady:==
==Dear Mr. O'Grady:==
By letter dated January 5, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 110100291), Nebraska Public Power District (the licensee) submitted an affidavit dated February 18, 2010, executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, dated February 2010. A nonproprietary copy of this document, designated as NEDO-33543, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room under ADAMS Accession No. ML 110100292.
 
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.  
By letter dated January 5, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110100291), Nebraska Public Power District (the licensee) submitted an affidavit dated February 18, 2010, executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
: b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, dated February 2010.
B. -2 Therefore, NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
A nonproprietary copy of this document, designated as NEDO-33543, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room under ADAMS Accession No. ML110100292.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
: a.     Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
: b.     Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea.wilkins@nrc.gov. Sincerely, Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, MIC Wilmington, NC Additional Distribution via Listserv B. -2 Therefore, NEDC-33543P, "Nebraska Public Power D'S!flCt, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
 
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
B. O'Grady                                      -2 Therefore, NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea,wilkins@nrc.gov. Sincerely, IRAI Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No, 50-298 James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, MIC Wilmington, NC Additional Distribution via Listserv DISTRIBUTION:
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
PUBLIC RidsNrrDorlLpl4 Resource LPLIV r/f RidsNrrLAJBurkhardt Resource RidsAcrsAcnw_MailCTR Resource RidsNrrPMCooper Resource RidsNrrDssSrxb Resource RidsOgcRp Resource RidsNrrDssSrxb Resource RidsRgn4MailCenter Resource ADAMS Accession No. ML 110480852 NRRlLPL4/PM NRR/LPL4/LA NRR/DSS/SRXB/BC NRR/DE/EICB/BC NRR/LPL4/BC NRR/LPL4/PM LWllkins JBurkhardt AUlses GWilson MMarkley LWllkins 3/3/11 2/24/11 3/4/11 3/23/11 1111/11 11/1/11 OFFICIAL RECORD COPY}}
If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea.wilkins@nrc.gov.
Sincerely, Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc:    James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, MIC A-55 Wilmington, NC 28401 Additional Distribution via Listserv
 
ML110480852 NRRlLPL4/PM NRR/LPL4/LA   NRR/DSS/SRXB/BC   NRR/DE/EICB/BC       NRR/LPL4/BC NRR/LPL4/PM LWllkins     JBurkhardt     AUlses           GWilson             MMarkley   LWllkins 3/3/11       2/24/11       3/4/11           3/23/11             1111/11     11/1/11}}

Latest revision as of 03:17, 13 November 2019

Request for Withholding Information from Public Disclosure, 2/18/11 Affidavit Executed by J. Harrison, GE Hitachi Nuclear Energy, NEDC-33543P, Revision 0
ML110480852
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/01/2011
From: Lynnea Wilkins
Plant Licensing Branch IV
To: O'Grady B
Nebraska Public Power District (NPPD)
Wilkins, L E, NRR/DORL/LPL4, 415-1377
References
TAC ME5287, NEDC-33543P, Rev 0
Download: ML110480852 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 1, 2011 Mr. Brian J. O'Grady Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR COOPER NUCLEAR STATION (TAC NO. ME5287)

Dear Mr. O'Grady:

By letter dated January 5, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110100291), Nebraska Public Power District (the licensee) submitted an affidavit dated February 18, 2010, executed by James F. Harrison, GE-Hitachi Nuclear Energy Americas LLC (GEH), requesting that the information contained in the following document be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:

NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, dated February 2010.

A nonproprietary copy of this document, designated as NEDO-33543, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room under ADAMS Accession No. ML110100292.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by GEH's competitors without license from GEH constitutes a competitive economic advantage over other companies.
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

B. O'Grady -2 Therefore, NEDC-33543P, "Nebraska Public Power District, Cooper Nuclear Station, Safety Relief Valve Capacity and Setpoint Evaluation," Revision 0, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions, please contact me at 301-415-1377 or via e-mail at Iynnea.wilkins@nrc.gov.

Sincerely, Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-298 cc: James F. Harrison Vice President, Fuel Licensing, Regulatory Affairs GE-Hitachi Nuclear Energy Americas LLC P.O. Box 780, MIC A-55 Wilmington, NC 28401 Additional Distribution via Listserv

ML110480852 NRRlLPL4/PM NRR/LPL4/LA NRR/DSS/SRXB/BC NRR/DE/EICB/BC NRR/LPL4/BC NRR/LPL4/PM LWllkins JBurkhardt AUlses GWilson MMarkley LWllkins 3/3/11 2/24/11 3/4/11 3/23/11 1111/11 11/1/11