ML11221A023: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML11221A023
| number = ML11221A023
| issue date = 08/02/2011
| issue date = 08/02/2011
| title = R.E. Ginna Nuclear Power Plant, Thirty (30) Day Special Report
| title = Thirty (30) Day Special Report
| author name = Mogren T
| author name = Mogren T
| author affiliation = Constellation Energy Group, R. E. Ginna Nuclear Power Plant, LLC
| author affiliation = Constellation Energy Group, R. E. Ginna Nuclear Power Plant, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Thomas Mogren Manager -Engineering Services R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road C E N G Ontario, New York 14519-9364 a joint venture of eoF I585.771.5208 cmsmJ14eDF 585.771.3392 Fax Thomas.Mogren@cengllc.com August 2, 2011 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION:
{{#Wiki_filter:Thomas Mogren Manager - Engineering Services R.E. Ginna Nuclear Power Plant, LLC C E NG a joint venture of       eoF I585.771.5208 1503 Lake Road Ontario, New York 14519-9364 cmsmJ14eDF                                                   585.771.3392 Fax Thomas.Mogren@cengllc.com August 2, 2011 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION:               Document Control Desk
Document Control Desk  


==SUBJECT:==
==SUBJECT:==
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Thirty (30) Day Special Report Radiation monitor RM-14A, Channel 3, Plant Vent Iodine Accident Range Radiation Monitor, was inoperable for greater than 30 days. This special report is submitted in accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 27, which requires that the radiation monitor be operable during all modes of operation.
R.E. Ginna Nuclear Power Plant Docket No. 50-244 Thirty (30) Day Special Report Radiation monitor RM-14A, Channel 3, Plant Vent Iodine Accident Range Radiation Monitor, was inoperable for greater than 30 days. This special report is submitted in accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 27, which requires that the radiation monitor be operable during all modes of operation. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable.
This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable.
Radiation monitor RM-14A, Channel 3 was taken out of service on 6/21/11 at 09:05 for the required quarterly calibration. However, due to not satisfying the procedural requirement for sensitivity, the radiation monitor could not be returned to service. Subsequent calibration attempts were performed with adjustments to the attenuator and gain being necessary. After the appropriate adjustments were implemented, the calibration yielded a satisfactory sensitivity in accordance with the calibration procedure. The radiation monitor was returned to operable status on 7/21/11 at 21:46.
Radiation monitor RM-14A, Channel 3 was taken out of service on 6/21/11 at 09:05 for the required quarterly calibration.
Return to service of the radiation monitor was delayed based on the required troubleshooting, impact of the radioactive source strength, inability to replace the detector due to the lack of a qualified spare detector and scheduling constraints. Corrective Action Program condition report CR-2011-005288 was opened to document the radiation monitor being inoperable for greater than 30 days.
However, due to not satisfying the procedural requirement for sensitivity, the radiation monitor could not be returned to service. Subsequent calibration attempts were performed with adjustments to the attenuator and gain being necessary.
 
After the appropriate adjustments were implemented, the calibration yielded a satisfactory sensitivity in accordance with the calibration procedure.
The radiation monitor was returned to operable status on 7/21/11 at 21:46.Return to service of the radiation monitor was delayed based on the required troubleshooting, impact of the radioactive source strength, inability to replace the detector due to the lack of a qualified spare detector and scheduling constraints.
Corrective Action Program condition report CR-2011-005288 was opened to document the radiation monitor being inoperable for greater than 30 days.
Document Control Desk August 2, 2011 Page 2 Should you have questions regarding this matter, please contact Thomas Harding at 585.771.5219 or Thomas.HardingJr@CENGLLC.com.
Document Control Desk August 2, 2011 Page 2 Should you have questions regarding this matter, please contact Thomas Harding at 585.771.5219 or Thomas.HardingJr@CENGLLC.com.
V~pu~ulyyours Thomas Mogre(cc: W.M. Dean, NRC D. V. Pickett, NRC Resident Inspector, NRC (Ginna)}}
V~pu~ulyyours Thomas Mogre(
cc:   W.M. Dean, NRC D. V. Pickett, NRC Resident Inspector, NRC (Ginna)}}

Latest revision as of 17:25, 12 November 2019

Thirty (30) Day Special Report
ML11221A023
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/02/2011
From: Mogren T
Constellation Energy Group, Ginna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML11221A023 (2)


Text

Thomas Mogren Manager - Engineering Services R.E. Ginna Nuclear Power Plant, LLC C E NG a joint venture of eoF I585.771.5208 1503 Lake Road Ontario, New York 14519-9364 cmsmJ14eDF 585.771.3392 Fax Thomas.Mogren@cengllc.com August 2, 2011 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 ATTENTION: Document Control Desk

SUBJECT:

R.E. Ginna Nuclear Power Plant Docket No. 50-244 Thirty (30) Day Special Report Radiation monitor RM-14A, Channel 3, Plant Vent Iodine Accident Range Radiation Monitor, was inoperable for greater than 30 days. This special report is submitted in accordance with Section 3.3 and Table 3.3-1, Action 1, of the R.E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (ODCM), Revision 27, which requires that the radiation monitor be operable during all modes of operation. This report outlines the action taken, the cause of the inoperability, and period of time the monitor was inoperable.

Radiation monitor RM-14A, Channel 3 was taken out of service on 6/21/11 at 09:05 for the required quarterly calibration. However, due to not satisfying the procedural requirement for sensitivity, the radiation monitor could not be returned to service. Subsequent calibration attempts were performed with adjustments to the attenuator and gain being necessary. After the appropriate adjustments were implemented, the calibration yielded a satisfactory sensitivity in accordance with the calibration procedure. The radiation monitor was returned to operable status on 7/21/11 at 21:46.

Return to service of the radiation monitor was delayed based on the required troubleshooting, impact of the radioactive source strength, inability to replace the detector due to the lack of a qualified spare detector and scheduling constraints. Corrective Action Program condition report CR-2011-005288 was opened to document the radiation monitor being inoperable for greater than 30 days.

Document Control Desk August 2, 2011 Page 2 Should you have questions regarding this matter, please contact Thomas Harding at 585.771.5219 or Thomas.HardingJr@CENGLLC.com.

V~pu~ulyyours Thomas Mogre(

cc: W.M. Dean, NRC D. V. Pickett, NRC Resident Inspector, NRC (Ginna)